Bills

AB 740: Virtual power plants: load shifting: integrated energy policy report.

  • Session Year: 2025-2026
  • House: Assembly

Current Status:

Failed

(2025-10-03: Consideration of Governor's veto pending.)

Introduced

First Committee Review

First Chamber

Second Committee Review

Second Chamber

Enacted

Version:

Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information, including an overview of major energy trends and issues facing the state.

This bill would require the Energy Commission, in the next update to the biennial integrated energy policy report after January 1, 2027, and subject to available funding, to adopt a virtual power plant deployment plan. The bill would require the Energy Commission, in developing the plan, to take certain actions, and would require that the plan meet specified requirements.

Existing law requires the Energy Commission, in consultation with the Public Utilities Commission and the Independent System Operator, to adopt a goal for load shifting to reduce net peak electrical demand and adjust this target in each biennial integrated energy policy report thereafter.

This bill would require each electrical corporation to annually report to the Energy Commission its contribution towards meeting that load-shift goal.

Discussed in Hearing

Assembly Floor1MIN
Sep 11, 2025

Assembly Floor

Senate Floor2MIN
Sep 10, 2025

Senate Floor

Senate Standing Committee on Energy, Utilities and Communications10MIN
Jul 15, 2025

Senate Standing Committee on Energy, Utilities and Communications

Assembly Floor57SEC
Jun 2, 2025

Assembly Floor

View Older Hearings

News Coverage:

AB 740: Virtual power plants: load shifting: integrated energy policy report. | Digital Democracy