Existing law places various duties upon the Public Utilities Commission with respect to distributed generation and requires each electrical corporation to submit to the commission for its approval a distribution resources plan proposal to identify optimal locations for the deployment of distributed resources, as defined. Pursuant to existing law, the commission has established operational and metering requirements for a generation facility to be interconnected to an electrical corporations distribution grid.

This bill would authorize the commission to establish an expedited distribution grid interconnection dispute resolution process, as specified, with the goal of resolving disputes over interconnection applications within the jurisdiction of the commission in no more than 60 days from the time the dispute is formally brought to the commission. The bill would require the commission to appoint a qualified electrical systems engineer with substantial interconnection expertise to advise the director of the energy division and to provide adequate commission staff to assist in resolving interconnection disputes.

Discussed in Hearing

Assembly Floor38SEC
Aug 30, 2016

Assembly Floor

Senate Floor1MIN
Aug 24, 2016

Senate Floor

Assembly Floor58SEC
May 31, 2016

Assembly Floor

Assembly Standing Committee on Utilities and Commerce4MIN
Apr 20, 2016

Assembly Standing Committee on Utilities and Commerce

View Older Hearings

Bill Author

News Coverage: