Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan to ensure that load-serving entities meet specified requirements. Existing law requires each load-serving entity to prepare and file an integrated resource plan consistent with certain requirements on a time schedule directed by the commission and subject to commission review.

This bill would provide that, for a load-serving entity that is electrical cooperative, the above requirements only apply if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a 3-year average commencing January 1, 2013.

Discussed in Hearing

Assembly Floor47SEC
Jul 17, 2017

Assembly Floor

Senate Floor2MIN
Jul 10, 2017

Senate Floor

Senate Standing Committee on Energy, Utilities and Communications6MIN
Jun 6, 2017

Senate Standing Committee on Energy, Utilities and Communications

Assembly Standing Committee on Utilities and Energy19MIN
Mar 29, 2017

Assembly Standing Committee on Utilities and Energy

View Older Hearings

Bill Author

News Coverage: