SB 373: Public contracts: design-build: Stanislaus Regional Water Authority.
- Session Year: 2017-2018
- House: Senate
- Latest Version Date: 2017-09-30
Existing law, until January 1, 2025, authorizes the Department of General Services, the Department of Corrections and Rehabilitation, and certain local agencies to use the design-build procurement process for specified public works. Existing law defines a local agency and a project for purposes of these provisions.
This bill would modify those definitions to authorize the Stanislaus Regional Water Authority to use the design-build procurement process for its Regional Surface Water Supply Project.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Stanislaus Regional Water Authority.
Existing law, until January 1, 2025, authorizes the Department of General Services, the Department of Corrections and Rehabilitation, and certain local agencies to use the design-build procurement process for specified public works. Existing law defines a local agency and a project for purposes of these provisions.
This bill would modify those definitions to authorize the Stanislaus Regional Water Authority to use the design-build procurement process for its Regional Surface Water Supply Project.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Stanislaus Regional Water Authority.
Existing law, until January 1, 2025, authorizes the Department of General Services, the Department of Corrections and Rehabilitation, and certain local agencies to use the design-build procurement process for specified public works. Existing law defines a local agency and a project for purposes of these provisions.
This bill would modify those definitions to authorize the Stanislaus Regional Water Authority to use the design-build procurement process for its Regional Surface Water Supply Project.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Stanislaus Regional Water Authority.
Existing law, until January 1, 2025, authorizes the Department of General Services, the Department of Corrections and Rehabilitation, and certain local agencies to use the design-build procurement process for specified public works. Existing law defines a local agency and a project for purposes of these provisions.
This bill would modify those definitions to authorize the Stanislaus Regional Water Authority to use the design-build procurement process for its Regional Surface Water Supply Project.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Stanislaus Regional Water Authority.
Existing law, until January 1, 2025, authorizes the Department of General Services, the Department of Corrections and Rehabilitation, and certain local agencies to use the design-build procurement process for specified public works. Existing law defines a local agency and a project for purposes of these provisions.
This bill would modify those definitions to authorize the Stanislaus Regional Water Authority to use the design-build procurement process for its Regional Surface Water Supply Project.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Stanislaus Regional Water Authority.
Existing law authorizes a governmental agency to solicit proposals and enter into agreements with private entities for the design, construction, or reconstruction of, and to lease to private entities, specified types of fee-producing infrastructure projects. Existing law prohibits a state agency or specified governmental agencies from using this authorization to design, construct, finance, or operate a state project, as specified. This bill, until January 1, 2026, would specify that a state project, for these purposes, does not include the Stanislaus Regional Water Authoritys Surface Water Supply Project financed through any state grant or low interest loan funding including, but not limited to, the Safe Drinking Water State Revolving Fund.This bill would make legislative findings and declarations as to the necessity of a special statute for the Stanislaus Regional Water Authority.Existing law authorizes a governmental agency to solicit proposals and enter into agreements with private entities for the design, construction, or reconstruction of, and to lease to private entities, specified types of fee-producing infrastructure projects. Existing law prohibits a state agency or specified governmental agencies from using this authorization to design, construct, finance, or operate a state project, as specified.
This bill, until January 1, 2026, would specify that a state project, for these purposes, does not include the Stanislaus Regional Water Authoritys Surface Water Supply Project financed through any state grant or low interest loan funding including, but not limited to, the Safe Drinking Water State Revolving Fund.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Stanislaus Regional Water Authority.
For purposes of this chapter, the following definitions apply:
(a)Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build means a project delivery process in which both the design and construction of a project are procured from a single entity.
(d)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Local agency means the following:
(1)A city, county, or city and county.
(2)A special district that operates wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.
(3)Any transit district, included transit district, municipal operator, included municipal operator, any consolidated agency, as described in Section 132353.1 of the Public Utilities Code, any joint powers authority formed to provide transit service, any county transportation commission created pursuant to Section 130050 of the Public Utilities Code, or any other local or regional agency, responsible for the construction of transit projects.
(4)The San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act (Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code).
(5)The Stanislaus Regional Water Authority.
(g)(1)Except as specified in subdivision (h), for a local agency defined in paragraph (1) of subdivision (f), project means the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, but does not include the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure. For a local agency defined in paragraph (1) of subdivision (f) that operates wastewater facilities, solid waste management facilities, or water recycling facilities, project also means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, or regional and local water recycling facilities.
(2)For a local agency defined in paragraph (2) of subdivision (f), project means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities.
(3)Except as specified in subdivision (h), for a local agency defined in paragraph (3) of subdivision (f), project means a transit capital project that begins a project solicitation on or after January 1, 2015. A project, as defined by this paragraph, that begins the solicitation process before January 1, 2015, is subject to Article 6.8 (commencing with Section 20209.5) of Chapter 1. Project, as defined by this paragraph, does not include state highway construction or local street and road projects.
(4)For a local agency defined in paragraph (4) of subdivision (f), project has the same meaning as in paragraph (3), and shall also include development projects adjacent, or physically or functionally related, to transit facilities developed or jointly developed by the local agency.
(5)For a local agency defined in paragraph (5) of subdivision (f), project means the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
(h)In recognition of the additional transportation funds made available by the Road Repair and Accountability Act of 2017 (Chapter 5 of the Statutes of 2017), and to accelerate the delivery of transportation projects to the public, in addition to the authority provided in other subdivisions of this section, for a local agency defined in paragraph (1) or (3) of subdivision (f), for up to six projects to be selected by the Department of Transportation, a project also means construction or rehabilitation of local streets and roads, including, but not limited to, bridge replacement and railroad grade separations. Consistent with Provision 2 of Item 2660-110-0042 of Section 2.00 of the Budget Act of 2016, as amended by Chapter 7 of the Statutes of 2017, three projects shall be reserved for and selected by the Riverside County Transportation Commission, with the first priority for the projects listed in that budget item.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for the increased flexibility provided by the design-build alternative procurement process in contracting for the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
For purposes of this chapter, the following definitions apply:
(a)Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build means a project delivery process in which both the design and construction of a project are procured from a single entity.
(d)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Local agency means the following:
(1)A city, county, or city and county.
(2)A special district that operates wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.
(3)Any transit district, included transit district, municipal operator, included municipal operator, any consolidated agency, as described in Section 132353.1 of the Public Utilities Code, any joint powers authority formed to provide transit service, any county transportation commission created pursuant to Section 130050 of the Public Utilities Code, or any other local or regional agency, responsible for the construction of transit projects.
(4)The San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act (Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code).
(5)The Stanislaus Regional Water Authority.
(g)(1)Except as specified in subdivision (h), for a local agency defined in paragraph (1) of subdivision (f), project means the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, but does not include the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure. For a local agency defined in paragraph (1) of subdivision (f) that operates wastewater facilities, solid waste management facilities, or water recycling facilities, project also means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, or regional and local water recycling facilities.
(2)For a local agency defined in paragraph (2) of subdivision (f), project means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities.
(3)Except as specified in subdivision (h), for a local agency defined in paragraph (3) of subdivision (f), project means a transit capital project that begins a project solicitation on or after January 1, 2015. A project, as defined by this paragraph, that begins the solicitation process before January 1, 2015, is subject to Article 6.8 (commencing with Section 20209.5) of Chapter 1. Project, as defined by this paragraph, does not include state highway construction or local street and road projects.
(4)For a local agency defined in paragraph (4) of subdivision (f), project has the same meaning as in paragraph (3), and shall also include development projects adjacent, or physically or functionally related, to transit facilities developed or jointly developed by the local agency.
(5)For a local agency defined in paragraph (5) of subdivision (f), project means the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
(h)In recognition of the additional transportation funds made available by the Road Repair and Accountability Act of 2017 (Chapter 5 of the Statutes of 2017), and to accelerate the delivery of transportation projects to the public, in addition to the authority provided in other subdivisions of this section, for a local agency defined in paragraph (1) or (3) of subdivision (f), for up to six projects to be selected by the Department of Transportation, a project also means construction or rehabilitation of local streets and roads, including, but not limited to, bridge replacement and railroad grade separations. Consistent with Provision 2 of Item 2660-110-0042 of Section 2.00 of the Budget Act of 2016, as amended by Chapter 7 of the Statutes of 2017, three projects shall be reserved for and selected by the Riverside County Transportation Commission, with the first priority for the projects listed in that budget item.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for the increased flexibility provided by the design-build alternative procurement process in contracting for the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
For purposes of this chapter, the following definitions apply:
(a)Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build means a project delivery process in which both the design and construction of a project are procured from a single entity.
(d)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Local agency means the following:
(1)A city, county, or city and county.
(2)A special district that operates wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.
(3)Any transit district, included transit district, municipal operator, included municipal operator, any consolidated agency, as described in Section 132353.1 of the Public Utilities Code, any joint powers authority formed to provide transit service, any county transportation commission created pursuant to Section 130050 of the Public Utilities Code, or any other local or regional agency, responsible for the construction of transit projects.
(4)The San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act (Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code).
(5)The Stanislaus Regional Water Authority.
(g)(1)Except as specified in subdivision (h), for a local agency defined in paragraph (1) of subdivision (f), project means the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, but does not include the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure. For a local agency defined in paragraph (1) of subdivision (f) that operates wastewater facilities, solid waste management facilities, or water recycling facilities, project also means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, or regional and local water recycling facilities.
(2)For a local agency defined in paragraph (2) of subdivision (f), project means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities.
(3)Except as specified in subdivision (h), for a local agency defined in paragraph (3) of subdivision (f), project means a transit capital project that begins a project solicitation on or after January 1, 2015. A project, as defined by this paragraph, that begins the solicitation process before January 1, 2015, is subject to Article 6.8 (commencing with Section 20209.5) of Chapter 1. Project, as defined by this paragraph, does not include state highway construction or local street and road projects.
(4)For a local agency defined in paragraph (4) of subdivision (f), project has the same meaning as in paragraph (3), and in addition shall also include development projects adjacent, or physically or functionally related, to transit facilities developed or jointly developed by the local agency.
(5)For a local agency defined in paragraph (5) of subdivision (f), project means the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
(h)In recognition of the additional transportation funds made available by the Road Repair and Accountability Act of 2017 (Chapter 5 of the Statutes of 2017), and to accelerate the delivery of transportation projects to the public, in addition to the authority provided in other subdivisions of this section, for a local agency defined in paragraph (1) or (3) of subdivision (f), for up to six projects to be selected by the Department of Transportation, a project also means construction or rehabilitation of local streets and roads, including, but not limited to, bridge replacement and railroad grade separations. Consistent with Provision 2 of Item 2660-110-0042 of Section 2.00 of the Budget Act of 2016, as amended by Chapter 7 of the Statutes of 2017, three projects shall be reserved for and selected by the Riverside County Transportation Commission, with the first priority for the projects listed in that budget item.
SECTION 1.Section 22161 of the Public Contract Code is amended to read:22161.For purposes of this chapter, the following definitions apply:(a)Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.(c)Design-build means a project delivery process in which both the design and construction of a project are procured from a single entity.(d)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.(f)Local agency means the following:(1)A city, county, or city and county.(2)A special district that operates wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.(3)Any transit district, included transit district, municipal operator, included municipal operator, any consolidated agency, as described in Section 132353.1 of the Public Utilities Code, any joint powers authority formed to provide transit service, any county transportation commission created pursuant to Section 130050 of the Public Utilities Code, or any other local or regional agency, responsible for the construction of transit projects.(4)The San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act (Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code).(5)The Stanislaus Regional Water Authority.(g)(1)For a local agency defined in paragraph (1) of subdivision (f), project means the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, but does not include the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure. For a local agency defined in paragraph (1) of subdivision (f) that operates wastewater facilities, solid waste management facilities, or water recycling facilities, project also means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, or regional and local water recycling facilities.(2)For a local agency defined in paragraph (2) of subdivision (f), project means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities.(3)For a local agency defined in paragraph (3) of subdivision (f), project means a transit capital project that begins a project solicitation on or after January 1, 2015. A project, as defined by this paragraph, that begins the solicitation process before January 1, 2015, is subject to Article 6.8 (commencing with Section 20209.5) of Chapter 1. Project, as defined by this paragraph, does not include state highway construction or local street and road projects.(4)For a local agency defined in paragraph (4) of subdivision (f), project has the same meaning as in paragraph (3), and shall also include development projects adjacent, or physically or functionally related, to transit facilities developed or jointly developed by the local agency.(5)For a local agency defined in paragraph (5) of subdivision (f), project means the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for the increased flexibility provided by the design-build alternative procurement process in contracting for the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
For purposes of this chapter, the following definitions apply:
(a)Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build means a project delivery process in which both the design and construction of a project are procured from a single entity.
(d)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Local agency means the following:
(1)A city, county, or city and county.
(2)A special district that operates wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.
(3)Any transit district, included transit district, municipal operator, included municipal operator, any consolidated agency, as described in Section 132353.1 of the Public Utilities Code, any joint powers authority formed to provide transit service, any county transportation commission created pursuant to Section 130050 of the Public Utilities Code, or any other local or regional agency, responsible for the construction of transit projects.
(4)The San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act (Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code).
(5)The Stanislaus Regional Water Authority.
(g)(1)For a local agency defined in paragraph (1) of subdivision (f), project means the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, but does not include the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure. For a local agency defined in paragraph (1) of subdivision (f) that operates wastewater facilities, solid waste management facilities, or water recycling facilities, project also means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, or regional and local water recycling facilities.
(2)For a local agency defined in paragraph (2) of subdivision (f), project means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities.
(3)For a local agency defined in paragraph (3) of subdivision (f), project means a transit capital project that begins a project solicitation on or after January 1, 2015. A project, as defined by this paragraph, that begins the solicitation process before January 1, 2015, is subject to Article 6.8 (commencing with Section 20209.5) of Chapter 1. Project, as defined by this paragraph, does not include state highway construction or local street and road projects.
(4)For a local agency defined in paragraph (4) of subdivision (f), project has the same meaning as in paragraph (3), and in addition shall also include development projects adjacent, or physically or functionally related, to transit facilities developed or jointly developed by the local agency.
(5)For a local agency defined in paragraph (5) of subdivision (f), project means the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for the increased flexibility provided by the design-build alternative procurement process in contracting for the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
For purposes of this chapter, the following definitions apply:
(a)Best value means a value determined by evaluation of objective criteria that relate to price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the local agency and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the procuring agency, or a tradeoff between price and other specified factors.
(b)Construction subcontract means each subcontract awarded by the design-build entity to a subcontractor that will perform work or labor or render service to the design-build entity in or about the construction of the work or improvement, or a subcontractor licensed by the State of California that, under subcontract to the design-build entity, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications produced by the design-build team.
(c)Design-build means a project delivery process in which both the design and construction of a project are procured from a single entity.
(d)Design-build entity means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract.
(e)Design-build team means the design-build entity itself and the individuals and other entities identified by the design-build entity as members of its team. Members shall include the general contractor and, if utilized in the design of the project, all electrical, mechanical, and plumbing contractors.
(f)Local agency means the following:
(1)A city, county, or city and county.
(2)A special district that operates wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.
(3)Any transit district, included transit district, municipal operator, included municipal operator, any consolidated agency, as described in Section 132353.1 of the Public Utilities Code, any joint powers authority formed to provide transit service, any county transportation commission created pursuant to Section 130050 of the Public Utilities Code, or any other local or regional agency, responsible for the construction of transit projects.
(4)The San Diego Association of Governments, as referenced in the San Diego Regional Transportation Consolidation Act (Chapter 3 (commencing with Section 132350) of Division 12.7 of the Public Utilities Code).
(5)The Stanislaus Regional Water Authority.
(g)(1)For a local agency defined in paragraph (1) of subdivision (f), project means the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, but does not include the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure. For a local agency defined in paragraph (1) of subdivision (f) that operates wastewater facilities, solid waste management facilities, or water recycling facilities, project also means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, or regional and local water recycling facilities.
(2)For a local agency defined in paragraph (2) of subdivision (f), project means the construction of regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities.
(3)For a local agency defined in paragraph (3) of subdivision (f), project means a transit capital project that begins a project solicitation on or after January 1, 2015. A project, as defined by this paragraph, that begins the solicitation process before January 1, 2015, is subject to Article 6.8 (commencing with Section 20209.5) of Chapter 1. Project, as defined by this paragraph, does not include state highway construction or local street and road projects.
(4)For a local agency defined in paragraph (4) of subdivision (f), project has the same meaning as in paragraph (3), and in addition shall include development projects adjacent, or physically or functionally related, to transit facilities developed or jointly developed by the local agency.
(5)For a local agency defined in paragraph (5) of subdivision (f), project means the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for the increased flexibility provided by the design-build alternative procurement process in contracting for the Stanislaus Regional Water Authoritys Regional Surface Water Supply Project.
SECTION 1.Section 5956.10 of the Government Code, as amended by Section 1 of Chapter 664 of the Statutes of 2014, is amended to read:5956.10.(a) Notwithstanding any other provision of this chapter, neither the state or any state agency shall directly or indirectly use the authority in this chapter nor shall any governmental agency, as defined in Section 5956.3, use the authority in this chapter to design, construct, finance, or operate a state project. For purposes of this section, a state project includes any of the following:(1)Tollroads on state highways.(2)State water projects.(3)State park and recreation projects.(4)State financed projects.(b) These limitations shall not prohibit the state, any state agency, or any governmental agency, as defined in Section 5956.3, from utilizing authorizations contained in other provisions of law.(c)For purposes of this section, a state project does not include a governmental agency project financed through the State Water Pollution Control Revolving Fund, established pursuant to Section 13477 of the Water Code, or the Safe Drinking Water State Revolving Fund, established pursuant to Section 116760.30 of the Health and Safety Code.(d)For purposes of this section, a state water project does not include the Stanislaus Regional Water Authoritys Surface Water Supply Project financed through any state grant or low interest loan funding including, but not limited to, the Safe Drinking Water State Revolving Fund, established pursuant to Section 116760.30 of the Health and Safety Code.(e)This section shall remain in effect only until January 1, 2020, and as of that date is repealed.SEC. 2.Section 5956.10 of the Government Code, as added by Section 2 of Chapter 664 of the Statutes of 2014, is amended to read:5956.10.(a)Notwithstanding any other provision of this chapter, neither the state or any state agency shall directly or indirectly use the authority in this chapter nor shall any governmental agency, as defined in Section 5956.3, use the authority in this chapter to design, construct, finance, or operate a state project. For purposes of this section, a state project includes any of the following:(1)Tollroads on state highways.(2)State water projects.(3)State park and recreation projects.(4)State financed projects.(b)These limitations shall not prohibit the state, any state agency, or any governmental agency, as defined in Section 5956.3, from utilizing authorizations contained in other provisions of law.(c)For purposes of this section, a state water project does not include the Stanislaus Regional Water Authoritys Surface Water Supply Project financed through state grant or low interest loan funding including, but not limited to, the Safe Drinking Water State Revolving Fund, established pursuant to Section 116760.30 of the Health and Safety Code.(d)(1)This section shall become operative on January 1, 2020.(2)This section shall remain in effect only until January 1, 2026, and as of that date is repealed.SEC. 3.Section 5956.10 is added to the Government Code, to read:5956.10.(a)Notwithstanding any other provision of this chapter, neither the state or any state agency shall directly or indirectly use the authority in this chapter nor shall any governmental agency, as defined in Section 5956.3, use the authority in this chapter to design, construct, finance, or operate a state project. For purposes of this section, a state project includes any of the following:(1)Tollroads on state highways.(2)State water projects.(3)State park and recreation projects.(4)State financed projects.(b)These limitations shall not prohibit the state, any state agency, or any governmental agency, as defined in Section 5956.3, from utilizing authorizations contained in other provisions of law.(c)This section shall become operative on January 1, 2026.SEC. 4.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for enhanced financing options for the Stanislaus Regional Water Authoritys Surface Water Supply Project.(a) Notwithstanding any other provision of this chapter, neither the state or any state agency shall directly or indirectly use the authority in this chapter nor shall any governmental agency, as defined in Section 5956.3, use the authority in this chapter to design, construct, finance, or operate a state project. For purposes of this section, a state project includes any of the following:
(1)Tollroads on state highways.
(2)State water projects.
(3)State park and recreation projects.
(4)State financed projects.
(b) These limitations shall not prohibit the state, any state agency, or any governmental agency, as defined in Section 5956.3, from utilizing authorizations contained in other provisions of law.
(c)For purposes of this section, a state project does not include a governmental agency project financed through the State Water Pollution Control Revolving Fund, established pursuant to Section 13477 of the Water Code, or the Safe Drinking Water State Revolving Fund, established pursuant to Section 116760.30 of the Health and Safety Code.
(d)For purposes of this section, a state water project does not include the Stanislaus Regional Water Authoritys Surface Water Supply Project financed through any state grant or low interest loan funding including, but not limited to, the Safe Drinking Water State Revolving Fund, established pursuant to Section 116760.30 of the Health and Safety Code.
(d)This section shall become inoperative on December 31, 2019, and, as of January 1, 2020, is repealed, unless a later enacted statute, that becomes operative on or before January 1, 2020, deletes or extends the dates on which it becomes inoperative and is repealed.(e)This section shall remain in effect only until January 1, 2020, and as of that date is repealed.
SEC. 2.Section 5956.10 of the Government Code, as added by Section 2 of Chapter 664 of the Statutes of 2014, is amended to read:5956.10.(a)Notwithstanding any other provision of this chapter, neither the state or any state agency shall directly or indirectly use the authority in this chapter nor shall any governmental agency, as defined in Section 5956.3, use the authority in this chapter to design, construct, finance, or operate a state project. For purposes of this section, a state project includes any of the following:
(1)Tollroads on state highways.
(2)State water projects.
(3)State park and recreation projects.
(4)State financed projects.
(b)These limitations shall not prohibit the state, any state agency, or any governmental agency, as defined in Section 5956.3, from utilizing authorizations contained in other provisions of law.
(c)For purposes of this section, a state water project does not include the Stanislaus Regional Water Authoritys Surface Water Supply Project financed through state grant or low interest loan funding including, but not limited to, the Safe Drinking Water State Revolving Fund, established pursuant to Section 116760.30 of the Health and Safety Code.
(c)(d)(1)This section shall become operative on January 1, 2020.
(2)This section shall remain in effect only until January 1, 2026, and as of that date is repealed.
SEC. 3.Section 5956.10 is added to the Government Code, to read:5956.10.(a)Notwithstanding any other provision of this chapter, neither the state or any state agency shall directly or indirectly use the authority in this chapter nor shall any governmental agency, as defined in Section 5956.3, use the authority in this chapter to design, construct, finance, or operate a state project. For purposes of this section, a state project includes any of the following:
(1)Tollroads on state highways.
(2)State water projects.
(3)State park and recreation projects.
(4)State financed projects.
(b)These limitations shall not prohibit the state, any state agency, or any governmental agency, as defined in Section 5956.3, from utilizing authorizations contained in other provisions of law.
(c)This section shall become operative on January 1, 2026.
SEC. 4.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for enhanced financing options for the Stanislaus Regional Water Authoritys Surface Water Supply Project.
|
Date
|
Status
|
|---|---|
| Sep 30, 2017 | Chaptered by Secretary of State. Chapter 391, Statutes of 2017. |
| Sep 30, 2017 | Approved by the Governor. |
| Sep 6, 2017 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 31, 2017 | Assembly amendments concurred in. (Ayes 37. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 29, 2017 | Ordered to special consent calendar. |
| Aug 24, 2017 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 24, 2017 | Read third time. Passed. Ordered to the Senate. |
| Jul 17, 2017 | Read second time. Ordered to third reading. |
| Jul 13, 2017 | From committee: Do pass. (Ayes 9. Noes 0.) (July 12). |
| Jul 3, 2017 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on L. GOV. |
| Jun 5, 2017 | Referred to Com. on L. GOV. |
| May 23, 2017 | In Assembly. Read first time. Held at Desk. |
| May 22, 2017 | Read third time. Passed. (Ayes 37. Noes 0. Page 1146.) Ordered to the Assembly. |
| May 15, 2017 | Read second time. Ordered to third reading. |
| May 11, 2017 | Read third time and amended. |
| May 10, 2017 | Read second time. Ordered to third reading. |
| May 9, 2017 | Withdrawn from committee. |
| May 4, 2017 | Set for hearing May 15. |
| May 3, 2017 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 6. Noes 0. Page 944.) (May 3). Re-referred to Com. on APPR. |
| Apr 27, 2017 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on GOV. & F. |
| Apr 19, 2017 | Set for hearing May 3. |
| Mar 28, 2017 | April 5 set for first hearing canceled at the request of author. |
| Mar 8, 2017 | Set for hearing April 5. |
| Feb 23, 2017 | Referred to Coms. on GOV. & F. and APPR. |
| Feb 15, 2017 | From printer. May be acted upon on or after March 17. |
| Feb 14, 2017 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 31, 2017 | Special Consent Calendar # SB373 | Senate Floor |
Passed |
|
| Aug 24, 2017 | SB 373 Cannella Senate Third Reading By GRAY | Assembly Floor |
Passed |
|
| Jul 12, 2017 | Do pass. | Assembly Standing Committee on Local Government |
Passed |
|
| May 22, 2017 | Senate 3rd Reading SB373 Cannella et al. | Senate Floor |
Passed |
|
| May 3, 2017 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Governance and Finance |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Association Of California Water Agencies | * Support | Jul 12, 2017 |
| City of Ceres | * Support | Jul 12, 2017 |
| Stanislaus Regional Water Authority | ** Support | Aug 25, 2017 |
| stanislaus regional water authority [sponsor] | ** Support | Jul 11, 2017 |
| Turlock Irrigation District | ** Support | Aug 25, 2017 |
| Unknown. | ** Against | Apr 30, 2017 |
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
UNFINISHED BUSINESS
Bill No: SB 373
:
SENATE GOVERNANCE & FIN. COMMITTEE: 6-0, 5/3/17
AYES: McGuire, Nguyen, Beall, Hernandez, Lara, Moorlach
NO VOTE RECORDED: Hertzberg
SENATE FLOOR: 37-0, 5/22/17
AYES: Allen, Atkins, Bates, Beall, Berryhill, Bradford, Cannella, De León, Dodd, Gaines, Galgiani, Glazer, Hernandez, Hertzberg, Hill, Hueso, Jackson, Lara, Leyva, McGuire, Mendoza, Mitchell, Monning, Moorlach, Morrell, Newman, Nguyen, Nielsen, Portantino, Roth, Skinner, Stern, Stone, Vidak, Wieckowski, Wiener, Wilk
NO VOTE RECORDED: Anderson, Fuller, Pan
ASSEMBLY FLOOR: 74-0, 8/24/17 - See last page for vote
SOURCE: Stanislaus Regional Water Authority
DIGEST:
This bill allows the Stanislaus Regional Water Authority to utilize design-build to construct a surface water supply project.
Assembly Amendments
account for the changes to Public Contract Code Section 22161 made by the adoption of AB 115 (Committee on Budget, Chapter 20, Statutes of 2017).
Existing law:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system.
- Authorizes, until January 1, 2025, cities, counties, and specified special districts and transit agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process.
- Provides the following parameters for cities and counties that use design-build pursuant to 2), above:
- Allows design-build for the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities;
- Allow cities and counties that operate wastewater facilities, solid waste management facilities, or water recycling facilities to use design-build for the construction of such facilities, both local and regional; and,
- Prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure.
This bill:
- Adds the SRWA to the list of local agencies that are allowed under existing law to use design-build.
- Specifies that the SRWA may only use design-build for its Water Supply Project.
Background
Design-build. The LAPC Act requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional, and most widely-used, approach to public works construction. This approach splits construction projects into two distinct phases: design and construction. During the design phase, the local agency prepares detailed project plans and specifications using its own employees or by hiring outside architects and engineers. Once project designs are complete, local officials invite bids from the construction industry and award the contract to the lowest responsible bidder.
By contrast, state law allows state and local officials, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services from a single company before the development of complete plans and specifications. Under design-build, the agency contracts with a single entity—which can be a single firm, a consortium, or a joint venture—to design and construct a project. Before inviting bids, the agency prepares documents that describe the basic concept of the project, as opposed to a complete set of drawings and specifications of the final product. In the bidding phase, the agency typically evaluates bids on a low-bid or best-value basis, incorporating technical factors, such as qualifications and design quality, in addition to price. The Department of General Services, the California Department of Corrections and Rehabilitation, cities, counties, transit districts, special districts operating wastewater, water recycling, or solid waste management facilities, and certain health care districts may use design-build.
Originally the authorizations for state agencies and local governments to use design-build were dispersed throughout state law in separate code sections. In 2014, the Legislature consolidated these provisions into consistent, generally-applicable statutes (SB 785, Wolk, Chapter 931, Statutes of 2014). SB 785 outlined a standardized design-build procurement process in which the awarding authority may prepare a list of qualified or short-listed entities, based on specified criteria. Once a list of qualified or short-listed entities is complete, the awarding authority may prepare a request for proposals (RFP) that invite prequalified or short-listed entities to submit competitive sealed proposals in the manner prescribed by the awarding authority.
For projects utilizing low bid as the selection method, the competitive bidding process must involve lump-sum bids by the prequalified or short-listed design-build entities. Awards must be made to the design-build entity that is the lowest responsible bidder.
For those projects utilizing best value as a selection method, proposals must be evaluated using only the criteria and selection procedures specifically identified in the RFP. The awarding authority may reserve the right to request revisions and conduct negotiations with responsive proposers, if the authority specifies in the RFP how it will ensure that negotiations are conducted in good faith. The authority may hold discussions or negotiations with responsive proposers using the process specified in the RFP. Responsive proposers are ranked based on value provided. The contract must be awarded to the responsible design-build entity whose proposal is determined by the authority to have offered the best value to the public. Upon issuance of a contract award, the awarding authority must publicly announce its award, identifying the design-build entity to which the award is made, along with a written decision supporting its contract award and stating the basis of the award.
The state’s design-build statutes also impose requirements for the use of skilled labor, the issuance of performance bonds, insurance coverage, and identification of subcontractors that will complete at least one-half of 1% of the value of a contract.
Joint powers authorities (JPAs). The Joint Exercise of Powers Act provides the statutory authority for public entities to create and use a joint powers agreement, which is a legal framework for state and local governments to exercise common powers and create new public entities. JPAs can be attractive tool for local governments because they allow for agencies to pool resources and collaborate to remedy local difficulties.
SRWA. Established in 2011, the SRWA is a JPA, which includes the Cities of Ceres and Turlock. Each of the cities is authorized to develop, obtain, and serve a municipal and industrial water supply. The SRWA is considering constructing a surface water supply project within the region that will provide for the long-term drinking water needs of each participating city. Specifically, the project’s purpose is to correct existing and projected water supply deficiencies, avoid over-drafting of groundwater, improve water quality, increase system reliability, and meet requirements for an assured water supply. SRWA wants the flexibility to utilize the design-build process in order to reduce costs related to the construction of the surface water supply project.
Comments
Purpose of the bill. The surface water supply project proposed by the SRWA would provide existing municipal water purveyors with a long-term, reliable water source that would correct existing system deficiencies. SB 373 would help meet projected future drinking water demand for the cities of Ceres and Turlock in the portion of Stanislaus County south of the Tuolumne River. According to the SRWA, the existing design-bid-build process can be cumbersome and costly, placing unnecessary strain on the viability of the project. Design-build authority is vitally needed so that the agency can move expeditiously and cost-effectively to improve and stabilize the water supply for the citizens of Ceres and Turlock.
Design-build. SB 785 was enacted to harmonize the state’s design-build authorizations that had been scattered across sections of code. The particulars of SB 785 were carefully negotiated to balance the interests of project proponents, labor unions, contractors, and subcontractors. SB 785 specifically prohibited cities and counties from using the design-build project delivery method for the construction of water resources facilities. However, AB 2551 (Gallagher, Chapter 760, Statutes of 2016) created an exception to this rule as it allowed local agencies to use design-build, design-bid-build, or construction manager at-risk for specific surface storage projects that receive funding from the water storage funding allocation in Proposition 1, the water bond measure approved by the voters in November of 2014. SB 373 creates an additional exception for the SRWA’s surface water supply project. Although proponents may argue that these projects are distinctive and therefore warrant unique authority, SB 373 is just the most recent departure from the standard set by SB 785.
Special legislation. The California Constitution prohibits special legislation when a general law can apply (Article IV, §16). SB 373 contains findings and declarations explaining the need for legislation that provides increased flexibility in contracting for the SRWA’s Surface Water Supply Project.
Related/Prior Legislation
SB 373 is one of a number of bills in recent years to authorize specific local agencies to utilize design-build. For example, the Mayers Memorial Hospital District (AB 1290, Dahle, Chapter 34, Statutes of 2015) and the San Diego Association of Governments (SB 974, Committee on Governance and Finance, Chapter 366, Statutes of 2016) were given design-build authority since the adoption of SB 785. Additionally, SB 793 (Hill, 2017) allows the Beach Cities Health District, Peninsula Health Care District, and the Midpeninsula Regional Open Space District to use design-build and passed out of the Senate Governance and Finance Committee with a vote of 7-0 on April 19th.
AB 851 (Caballero) allows the Santa Clara Valley Water District to use design-build for the construction of buildings, and for the following types of projects: flood protection improvements; habitat restorations or enhancements; groundwater recharge or storage facilities; water treatment facilities; and, the retrofit, repair, or expansion of existing surface water storage facilities, among other provisions.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
Stanislaus Regional Water Authority (source)
Turlock Irrigation District
OPPOSITION: (Verified 8/25/17)
None received
ASSEMBLY FLOOR: 74-0, 8/24/17
AYES: Acosta, Arambula, Baker, Berman, Bigelow, Bloom, Bocanegra, Bonta, Brough, Burke, Caballero, Calderon, Cervantes, Chau, Chávez, Chen, Chiu, Choi, Cooley, Cooper, Cunningham, Dababneh, Dahle, Daly, Eggman, Flora, Fong, Frazier, Friedman, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez Fletcher, Gray, Grayson, Harper, Holden, Irwin, Jones-Sawyer, Kalra, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, Medina, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Quirk, Quirk-Silva, Reyes, Ridley-Thomas, Rodriguez, Rubio, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Voepel, Waldron, Weber, Wood, Rendon
NO VOTE RECORDED: Aguiar-Curry, Travis Allen, Chu, McCarty, Melendez
8/25/17 11:36:29
**** END ****
SENATE THIRD READING
STR Bill Id:SB 373
Author:()
As Amended Ver:July 3, 2017
Majority vote
SENATE VOTE: 37-0
Committee | Votes | Ayes | Noes |
Local Government | 9-0 | Aguiar-Curry, Waldron, Bloom, Caballero, Gonzalez Fletcher, Grayson, Lackey, Ridley-Thomas, Voepel |
SUMMARY: Allows the Stanislaus Regional Water Authority (SRWA) to use the design-build procurement method that is authorized for local agencies for its Regional Surface Water Supply Project (Water Supply Project). Specifically, this bill:
- Adds the SRWA to the list of local agencies that are allowed under existing law to use design-build.
- Specifies that the SRWA may only use design-build for its Water Supply Project.
- Finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of the California Constitution Section 16 of Article IV because of the need for the increased flexibility provided by the design-build alternative procurement process in contracting for the SRWA's Water Supply Project.
EXISTING LAW:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system.
- Authorizes, until January 1, 2025, cities, counties, and specified special districts and transit agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process.
- Provides the following parameters for cities and counties that use design-build pursuant to 2), above:
- Allows design-build for the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities;
- Allows cities and counties that operate wastewater facilities, solid waste management facilities, or water recycling facilities to use design-build for the construction of such facilities, both local and regional; and,
- Prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure [with the exception of b), above].
- Generally limits the types of special districts that may use design-build pursuant to 2), above, to transit districts, and special districts that operate wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.
- Limits the types of projects that special districts can construct using design-build pursuant to 2), above, to the following:
- Transit capital projects that begin project solicitation on or after January 1, 2015, excluding state highway construction or local street and road projects (for transit districts); and,
- Regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities (for special districts that operate those types of facilities).
- Authorizes, pursuant to the Joint Exercise of Powers Act (Act), two or more public agencies, by agreement, to form a joint powers authority (JPA) to exercise any power common to the contracting parties, as specified.
FISCAL EFFECT: None
COMMENTS:
- Bill Summary. This bill allows SRWA to use the design-build procurement process that is authorized for local agencies for its Water Supply Project. This bill is sponsored by SRWA.
- Author's Statement. According to the author, "Design build is a public works project delivery process in which both the design and construction of a project are procured from a single entity. Design build can offer significant cost savings for local entities over the design-bid-build process. SB 373 is needed so that the SRWA's Water Supply Project can be brought to fruition expeditiously and in the most cost-effective manner. This project will create a long-term, reliable water source for the cities of Ceres and Turlock, and will reduce groundwater dependence, avoid future over-drafting, improve drinking water quality, and improve water supply reliability and resiliency through future droughts, among other benefits."
- SRWA. Established in 2011, SRWA is a JPA that includes the cities of Ceres and Turlock. Each of the cities is authorized to develop, obtain, and serve a municipal and industrial water supply. The SRWA was formed for the purpose of making responsible decisions related to the development and operation of the Water Supply Project, which is intended to provide for the long-term drinking water needs of each participating city. Specifically, the project's purpose is to correct existing and projected water supply deficiencies, avoid over-drafting of groundwater, improve water quality, increase system reliability, and meet requirements for an assured water supply.
According to a white paper on the project, additional water is needed in most of the cities throughout the south Stanislaus County area because the current local groundwater supply is neither sufficient nor reliable to meet existing and/or future demands. The only existing municipal water supply source for areas in the south County is the limited groundwater from the Turlock Subbasin, where a significant amount of the previously existing groundwater supply has been lost due to water quality issues. It is expected that this decrease in reliable groundwater production capacity will, at a minimum, remain the same or continue to decrease as other wells are taken out-of-service due to increasingly stringent water quality regulations. Additionally, the disposal cost for wellhead treatment waste has increased significantly and this cost is anticipated to continue increasing due to regulatory requirements. The source water for this new water treatment plant is the Tuolumne River and the proposed intake is an existing infiltration gallery located four to five feet below the river bottom.
- Background. The Local Agency Public Construction Act generally requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional approach to public works construction. The design-bid-build process was developed to protect taxpayers from extravagance, corruption, and other improper practices by public officials, as well as to secure a fair and reasonable price for public works construction by injecting competition amongst bidders into the process. Although design-bid-build generally results in the lowest cost construction contract, it is not without its drawbacks, including:
- Projects generally take longer to complete because designs must be entirely completed, permits obtained, and right-of-way acquired before the construction contract can be bid and awarded;
- Designs prepared for a competitive low-bid procurement are developed to allow for a broad range of construction approaches. As a result, low-bid designs do not always equate to the most efficient design possible, depending on a particular contractor's particular strengths or capabilities;
- Because the project designer does not have the benefit of consulting with the entity that will ultimately be responsible for construction of the project, there may be significant issues that the designer does not anticipate, particularly constructability issues. This can result in change orders that ultimately drive up the price of the contract; and,
- Low-bid is not always the least expensive option, once change orders and contractor claims are factored into the overall project costs.
In the early 1990s, public works agencies grew frustrated with design-bid-build and began experimenting with other project delivery methods, including design-build. Under the design-build method, a single contract covers the design and construction of a project with a single company or consortium that acts as both the project designer and builder. The design-build entity arranges all architectural, engineering, and construction services, and is responsible for delivering the project at a guaranteed price and schedule based upon performance criteria set by the public agency.
Design-build differs from design-bid-build in some key areas, including:
- Shorter overall elapsed project delivery time because construction can begin before final design is complete;
- Project costs and schedule risks are more heavily borne by the design-build contractor;
- Construction claims and change orders are minimized;
- Designs can be developed to take advantage of particular contractor's strengths and abilities, thereby reducing the need to "over-design" for generic use as in design-bid-build;
- Project specifications are typically based on definitive performance criteria (which may or may not be well established by the project owner) rather than established specifications; and,
- Contracts are awarded based on best-value analyses rather than low-bid.
Design-build contracts are not without their drawbacks as well. For example, with a design-build project, the project owner must give up a good deal of control over the details of the project design. Additionally, design-build contractors are typically selected using qualifications-based selection criteria or best value analysis. These approaches are more subjective than a low-bid approach, potentially subjecting the public works owner to greater contract challenges and higher costs.
- Design-Build in California Law. As noted above, the Legislature began granting design-build authority in the early 1990's, and has typically done so with specified parameters, such as the duration of the authority, the types of agencies allowed to use it, the types of projects for which it can be used, cost thresholds, and specified procedures that must be followed in preparing and awarding contracts. Over the years, this resulted in a plethora of statutes in a variety of code sections, which created confusion for public agencies and contractors alike.
In an effort to consolidate these statutes, SB 785 (Wolk), Chapter 931, Statutes of 2014, repealed existing law authorizing the Department of General Services (DGS), the Department of Corrections and Rehabilitation (CDCR), and local agencies to use the design-build procurement process, and enacted uniform provisions authorizing DGS, CDCR, and specified local agencies to utilize the design-build procurement process for specified public works projects (with some exceptions, notably design-build authority for CalTrans). SB 785 created one set of codes for DGS and CDCR, and a separate set for specified local agencies, but with similar parameters.
- Related Legislation. AB 851 (Caballero), pending in the Senate Appropriations Committee, allows the Santa Clara Valley Water District to use design-build for the construction of buildings, and for the following types of projects: flood protection improvements; habitat restorations or enhancements; groundwater recharge or storage facilities; water treatment facilities; and, the retrofit, repair, or expansion of existing surface water storage facilities.
AB 1523 (Obernolte) of the current legislative session, pending in engrossing and enrolling, authorizes the San Bernardino County Transportation Authority to use design-build for the construction of the Mt. Vernon Avenue Viaduct project in the City of San Bernardino.
- Arguments in Support. The SRWA, sponsor of this measure, writes, "The Water Supply Project would provide the cities of Ceres and Turlock with a long-term, reliable water source that would correct existing system deficiencies and help meet projected future drinking water demand in the portion of Stanislaus County south of the Tuolumne River. In general, the proposed Water Supply Project would provide the following benefits:
- Correct existing and projected water supply deficiencies by providing the water needed to keep pace with existing and future demands;
- Avoid further over-drafting of the groundwater supply and assist in compliance with the Sustainable Groundwater Management Act;
- Improve declining water quality;
- Increase system reliability and create operational flexibility;
- Eliminate water system pressure problems currently experienced during peak water demand; and,
- Provide an assured water supply for a minimum of 20 years.
- Arguments in Opposition. None on file.
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0001191
Date of Hearing: July 12, 2017
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Cecilia Aguiar-Curry, Chair
SBPCA Bill Id:SB 373
Author:(Cannella) – As Amended Ver:July 3, 2017
SENATE VOTE: 37-0
SUBJECT: Public contracts: design-build: Stanislaus Regional Water Authority.
SUMMARY: Allows the Stanislaus Regional Water Authority (SRWA) to use the design-build procurement method that is authorized for local agencies for its Regional Surface Water Supply Project (Water Supply Project). Specifically, this bill:
- Adds the SRWA to the list of local agencies that are allowed under existing law to use design-build.
- Specifies that the SRWA may only use design-build for its Water Supply Project.
- Finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the need for the increased flexibility provided by the design-build alternative procurement process in contracting for the SRWA's Water Supply Project.
EXISTING LAW:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system.
- Authorizes, until January 1, 2025, cities, counties, and specified special districts and transit agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process.
- Provides the following parameters for cities and counties that use design-build pursuant to 2), above:
- Allows design-build for the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities;
- Allows cities and counties that operate wastewater facilities, solid waste management facilities, or water recycling facilities to use design-build for the construction of such facilities, both local and regional; and,
- Prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure [with the exception of b), above].
- Generally limits the types of special districts that may use design-build pursuant to 2), above, to transit districts, and special districts that operate wastewater facilities, solid waste management facilities, water recycling facilities, or fire protection facilities.
- Limits the types of projects that special districts can construct using design-build pursuant to 2), above, to the following:
- Transit capital projects that begin project solicitation on or after January 1, 2015, excluding state highway construction or local street and road projects (for transit districts); and,
- Regional and local wastewater treatment facilities, regional and local solid waste facilities, regional and local water recycling facilities, or fire protection facilities (for special districts that operate those types of facilities).
- Authorizes, pursuant to the Joint Exercise of Powers Act (Act), two or more public agencies, by agreement, to form a joint powers authority (JPA) to exercise any power common to the contracting parties, as specified.
FISCAL EFFECT: None
COMMENTS:
- Bill Summary. This bill allows SRWA to use the design-build procurement process that is authorized for local agencies for its Water Supply Project. This bill is sponsored by SRWA.
- Author's Statement. According to the author, "Design build is a public works project delivery process in which both the design and construction of a project are procured from a single entity. Design build can offer significant cost savings for local entities over the design-bid-build process. SB 373 is needed so that the SRWA's Water Supply Project can be brought to fruition expeditiously and in the most cost-effective manner. This project will create a long-term, reliable water source for the cities of Ceres and Turlock, and will reduce groundwater dependence, avoid future over-drafting, improve drinking water quality, and improve water supply reliability and resiliency through future droughts, among other benefits."
- SRWA. Established in 2011, SRWA is a JPA that includes the cities of Ceres and Turlock. Each of the cities is authorized to develop, obtain, and serve a municipal and industrial water supply. The SRWA was formed for the purpose of making responsible decisions related to the development and operation of the Water Supply Project, which is intended to provide for the long-term drinking water needs of each participating city. Specifically, the project’s purpose is to correct existing and projected water supply deficiencies, avoid over-drafting of groundwater, improve water quality, increase system reliability, and meet requirements for an assured water supply.
According to a white paper on the project, additional water is needed in most of the cities throughout the south Stanislaus County area because the current local groundwater supply is neither sufficient nor reliable to meet existing and/or future demands. The only existing municipal water supply source for areas in the south County is the limited groundwater from the Turlock Subbasin, where a significant amount of the previously existing groundwater supply has been lost due to water quality issues. It is expected that this decrease in reliable groundwater production capacity will, at a minimum, remain the same or continue to decrease as other wells are taken out-of-service due to increasingly stringent water quality regulations. Additionally, the disposal cost for wellhead treatment waste has increased significantly and this cost is anticipated to continue increasing due to regulatory requirements. The source water for this new water treatment plant is the Tuolumne River and the proposed intake is an existing infiltration gallery located four to five feet below the river bottom.
- Background. The Local Agency Public Construction Act generally requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional approach to public works construction. The design-bid-build process was developed to protect taxpayers from extravagance, corruption, and other improper practices by public officials, as well as to secure a fair and reasonable price for public works construction by injecting competition amongst bidders into the process. Although design-bid-build generally results in the lowest cost construction contract, it is not without its drawbacks, including:
- Projects generally take longer to complete because designs must be entirely completed, permits obtained, and right-of-way acquired before the construction contract can be bid and awarded;
- Designs prepared for a competitive low-bid procurement are developed to allow for a broad range of construction approaches. As a result, low-bid designs do not always equate to the most efficient design possible, depending on a particular contractor's particular strengths or capabilities;
- Because the project designer does not have the benefit of consulting with the entity that will ultimately be responsible for construction of the project, there may be significant issues that the designer does not anticipate, particularly constructability issues. This can result in change orders that ultimately drive up the price of the contract; and,
- Low-bid is not always the least expensive option, once change orders and contractor claims are factored into the overall project costs.
In the early 1990s, public works agencies grew frustrated with design-bid-build and began experimenting with other project delivery methods, including design-build. Under the design-build method, a single contract covers the design and construction of a project with a single company or consortium that acts as both the project designer and builder. The design-build entity arranges all architectural, engineering, and construction services, and is responsible for delivering the project at a guaranteed price and schedule based upon performance criteria set by the public agency.
Design-build differs from design-bid-build in some key areas, including:
- Shorter overall elapsed project delivery time because construction can begin before final design is complete;
- Project costs and schedule risks are more heavily borne by the design-build contractor;
- Construction claims and change orders are minimized;
- Designs can be developed to take advantage of particular contractor's strengths and abilities, thereby reducing the need to "over-design" for generic use as in design-bid-build;
- Project specifications are typically based on definitive performance criteria (which may or may not be well established by the project owner) rather than established specifications; and,
- Contracts are awarded based on best-value analyses rather than low-bid.
Design-build contracts are not without their drawbacks as well. For example, with a design-build project, the project owner must give up a good deal of control over the details of the project design. Additionally, design-build contractors are typically selected using qualifications-based selection criteria or best value analysis. These approaches are more subjective than a low-bid approach, potentially subjecting the public works owner to greater contract challenges and higher costs.
- Design-Build in California Law. As noted above, the Legislature began granting design-build authority in the early 1990's, and has typically done so with specified parameters, such as the duration of the authority, the types of agencies allowed to use it, the types of projects for which it can be used, cost thresholds, and specified procedures that must be followed in preparing and awarding contracts. Over the years, this resulted in a plethora of statutes in a variety of code sections, which created confusion for public agencies and contractors alike.
In an effort to consolidate these statutes, SB 785 (Wolk), Chapter 931, Statutes of 2014, repealed existing law authorizing the Department of General Services (DGS), the Department of Corrections and Rehabilitation (CDCR), and local agencies to use the design-build procurement process, and enacted uniform provisions authorizing DGS, CDCR, and specified local agencies to utilize the design-build procurement process for specified public works projects (with some exceptions, notably design-build authority for CalTrans). SB 785 created one set of codes for DGS and CDCR, and a separate set for specified local agencies, but with similar parameters.
- Related Legislation. AB 851 (Caballero) allows the Santa Clara Valley Water District to use design-build for the construction of buildings, and for the following types of projects: flood protection improvements; habitat restorations or enhancements; groundwater recharge or storage facilities; water treatment facilities; and, the retrofit, repair, or expansion of existing surface water storage facilities. AB 851 is pending in the Senate Appropriations Committee.
AB 1523 (Obernolte) authorizes the San Bernardino County Transportation Authority to use design-build for the construction of the Mt. Vernon Avenue Viaduct project in the City of San Bernardino. AB 1523 is pending in the Senate Appropriations Committee.
- Arguments in Support. The SRWA, sponsor of this measure, writes, "The Water Supply Project would provide the cities of Ceres and Turlock with a long-term, reliable water source that would correct existing system deficiencies and help meet projected future drinking water demand in the portion of Stanislaus County south of the Tuolumne River. In general, the proposed Water Supply Project would provide the following benefits:
- Correct existing and projected water supply deficiencies by providing the water needed to keep pace with existing and future demands;
- Avoid further over-drafting of the groundwater supply and assist in compliance with the Sustainable Groundwater Management Act;
- Improve declining water quality;
- Increase system reliability and create operational flexibility;
- Eliminate water system pressure problems currently experienced during peak water demand; and,
- Provide an assured water supply for a minimum of 20 years.
- Arguments in Opposition. None on file.
REGISTERED SUPPORT / OPPOSITION:
Support
Stanislaus Regional Water Authority [SPONSOR]
Turlock Irrigation District
Opposition
None on file
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
THIRD READING
Bill No: SB 373
:
SENATE GOVERNANCE & FIN. COMMITTEE: 6-0, 5/3/17
AYES: McGuire, Nguyen, Beall, Hernandez, Lara, Moorlach
NO VOTE RECORDED: Hertzberg
SUBJECT: Public contracts: design-build: Stanislaus Regional Water Authority
SOURCE: Stanislaus Regional Water Authority
DIGEST:
This bill allows the Stanislaus Regional Water Authority (SRWA) to utilize design-build to construct a surface water supply project.
Senate Floor Amendments of 5/11/17 add a coauthor and make a technical amendment.
Existing law:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system.
- Authorizes, until January 1, 2025, cities, counties, and specified special districts and transit agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process.
- Provides the following parameters for cities and counties that use design-build pursuant to 2), above:
- Allows design-build for the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities;
- Allow cities and counties that operate wastewater facilities, solid waste management facilities, or water recycling facilities to use design-build for the construction of such facilities, both local and regional; and,
- Prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure.
This bill allows the SRWA to utilize the design-build project delivery method in existing law to construct a surface water supply project.
Background
Design-build. The LAPC Act requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional, and most widely-used, approach to public works construction. This approach splits construction projects into two distinct phases: design and construction. During the design phase, the local agency prepares detailed project plans and specifications using its own employees or by hiring outside architects and engineers. Once project designs are complete, local officials invite bids from the construction industry and award the contract to the lowest responsible bidder.
By contrast, state law allows state and local officials, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services from a single company before the development of complete plans and specifications. Under design-build, the agency contracts with a single entity—which can be a single firm, a consortium, or a joint venture—to design and construct a project. Before inviting bids, the agency prepares documents that describe the basic concept of the project, as opposed to a complete set of drawings and specifications of the final product. In the bidding phase, the agency typically evaluates bids on a low-bid or best-value basis, incorporating technical factors, such as qualifications and design quality, in addition to price. The Department of General Services, the California Department of Corrections and Rehabilitation, cities, counties, transit districts, special districts operating wastewater, water recycling, or solid waste management facilities, and certain health care districts may use design-build.
Originally the authorizations for state agencies and local governments to use design-build were dispersed throughout state law in separate code sections. In 2014, the Legislature consolidated these provisions into consistent, generally-applicable statutes (SB 785, Wolk, Chapter 931, Statutes of 2014). SB 785 outlined a standardized design-build procurement process in which the awarding authority may prepare a list of qualified or short-listed entities, based on specified criteria. Once a list of qualified or short-listed entities is complete, the awarding authority may prepare a request for proposals (RFP) that invite prequalified or short-listed entities to submit competitive sealed proposals in the manner prescribed by the awarding authority.
For projects utilizing low bid as the selection method, the competitive bidding process must involve lump-sum bids by the prequalified or short-listed design-build entities. Awards must be made to the design-build entity that is the lowest responsible bidder.
For those projects utilizing best value as a selection method, proposals must be evaluated using only the criteria and selection procedures specifically identified in the RFP. The awarding authority may reserve the right to request revisions and conduct negotiations with responsive proposers, if the authority specifies in the RFP how it will ensure that negotiations are conducted in good faith. The authority may hold discussions or negotiations with responsive proposers using the process specified in the RFP. Responsive proposers are ranked based on value provided. The contract must be awarded to the responsible design-build entity whose proposal is determined by the authority to have offered the best value to the public. Upon issuance of a contract award, the awarding authority must publicly announce its award, identifying the design-build entity to which the award is made, along with a written decision supporting its contract award and stating the basis of the award.
The state’s design-build statutes also impose requirements for the use of skilled labor, the issuance of performance bonds, insurance coverage, and identification of subcontractors that will complete at least one-half of 1% of the value of a contract.
Joint powers authorities (JPAs). The Joint Exercise of Powers Act provides the statutory authority for public entities to create and use a joint powers agreement, which is a legal framework for state and local governments to exercise common powers and create new public entities. JPAs can be attractive tool for local governments because they allow for agencies to pool resources and collaborate to remedy local difficulties.
SRWA. Established in 2011, the SRWA is a JPA, which includes the Cities of Ceres and Turlock. Each of the cities is authorized to develop, obtain, and serve a municipal and industrial water supply. The SRWA is considering constructing a surface water supply project within the region that will provide for the long-term drinking water needs of each participating city. Specifically, the project’s purpose is to correct existing and projected water supply deficiencies, avoid over-drafting of groundwater, improve water quality, increase system reliability, and meet requirements for an assured water supply. SRWA wants the flexibility to utilize the design-build process in order to reduce costs related to the construction of the surface water supply project.
Comments
Purpose of the bill. The surface water supply project proposed by the SRWA would provide existing municipal water purveyors with a long-term, reliable water source that would correct existing system deficiencies. SB 373 would help meet projected future drinking water demand for the cities of Ceres and Turlock in the portion of Stanislaus County south of the Tuolumne River. According to the SRWA, the existing design-bid-build process can be cumbersome and costly, placing unnecessary strain on the viability of the project. Design-build authority is vitally needed so that the agency can move expeditiously and cost-effectively to improve and stabilize the water supply for the citizens of Ceres and Turlock.
Design-build. SB 785 was enacted to harmonize the state’s design-build authorizations that had been scattered across sections of code. The particulars of SB 785 were carefully negotiated to balance the interests of project proponents, labor unions, contractors, and subcontractors. SB 785 specifically prohibited cities and counties from using the design-build project delivery method for the construction of water resources facilities. However, AB 2551 (Gallagher, Chapter 760, Statutes of 2016) created an exception to this rule as it allowed local agencies to use design-build, design-bid-build, or construction manager at-risk for specific surface storage projects that receive funding from the water storage funding allocation in Proposition 1, the water bond measure approved by the voters in November of 2014. SB 373 creates an additional exception for the SRWA’s surface water supply project. Although proponents may argue that these projects are distinctive and therefore warrant unique authority, SB 373 is just the most recent departure from the standard set by SB 785.
Special legislation. The California Constitution prohibits special legislation when a general law can apply (Article IV, §16). SB 373 contains findings and declarations explaining the need for legislation that provides increased flexibility in contracting for the SRWA’s Surface Water Supply Project.
Related/Prior Legislation
SB 373 is one of a number of bills in recent years to authorize specific local agencies to utilize design-build. For example, the Mayers Memorial Hospital District (AB 1290, Dahle, Chapter 34, Statutes of 2015) and the San Diego Association of Governments (SB 974, Committee on Governance and Finance, Chapter 366, Statutes of 2016) were given design-build authority since the adoption of SB 785. Additionally, SB 793 (Hill, 2017) allows the Beach Cities Health District, Peninsula Health Care District, and the Midpeninsula Regional Open Space District to use design-build and passed out of the Senate Governance and Finance Committee with a vote of 7-0 on April 19th.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
Stanislaus Regional Water Authority (source)
OPPOSITION: (Verified 5/15/17)
None received
5/16/17 16:45:19
**** END ****
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
THIRD READING
Bill No: SB 373
:
SENATE GOVERNANCE & FIN. COMMITTEE: 6-0, 5/3/17
AYES: McGuire, Nguyen, Beall, Hernandez, Lara, Moorlach
NO VOTE RECORDED: Hertzberg
SOURCE: Stanislaus Regional Water Authority
DIGEST:
This bill allows the Stanislaus Regional Water Authority (SRWA) to utilize design-build to construct a surface water supply project.
Existing law:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system.
- Authorizes, until January 1, 2025, cities, counties, and specified special districts and transit agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process.
- Provides the following parameters for cities and counties that use design-build pursuant to 2), above:
- Allows design-build for the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities;
- Allow cities and counties that operate wastewater facilities, solid waste management facilities, or water recycling facilities to use design-build for the construction of such facilities, both local and regional; and,
- Prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure.
This bill allows the SRWA to utilize the design-build project delivery method in existing law to construct a surface water supply project.
Background
Design-build. The LAPC Act requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional, and most widely-used, approach to public works construction. This approach splits construction projects into two distinct phases: design and construction. During the design phase, the local agency prepares detailed project plans and specifications using its own employees or by hiring outside architects and engineers. Once project designs are complete, local officials invite bids from the construction industry and award the contract to the lowest responsible bidder.
By contrast, state law allows state and local officials, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services from a single company before the development of complete plans and specifications. Under design-build, the agency contracts with a single entity—which can be a single firm, a consortium, or a joint venture—to design and construct a project. Before inviting bids, the agency prepares documents that describe the basic concept of the project, as opposed to a complete set of drawings and specifications of the final product. In the bidding phase, the agency typically evaluates bids on a low-bid or best-value basis, incorporating technical factors, such as qualifications and design quality, in addition to price. The Department of General Services, the California Department of Corrections and Rehabilitation, cities, counties, transit districts, special districts operating wastewater, water recycling, or solid waste management facilities, and certain health care districts may use design-build.
Originally the authorizations for state agencies and local governments to use design-build were dispersed throughout state law in separate code sections. In 2014, the Legislature consolidated these provisions into consistent, generally-applicable statutes (SB 785, Wolk, Chapter 931, Statutes of 2014). SB 785 outlined a standardized design-build procurement process in which the awarding authority may prepare a list of qualified or short-listed entities, based on specified criteria. Once a list of qualified or short-listed entities is complete, the awarding authority may prepare a request for proposals (RFP) that invite prequalified or short-listed entities to submit competitive sealed proposals in the manner prescribed by the awarding authority.
For projects utilizing low bid as the selection method, the competitive bidding process must involve lump-sum bids by the prequalified or short-listed design-build entities. Awards must be made to the design-build entity that is the lowest responsible bidder.
For those projects utilizing best value as a selection method, proposals must be evaluated using only the criteria and selection procedures specifically identified in the RFP. The awarding authority may reserve the right to request revisions and conduct negotiations with responsive proposers, if the authority specifies in the RFP how it will ensure that negotiations are conducted in good faith. The authority may hold discussions or negotiations with responsive proposers using the process specified in the RFP. Responsive proposers are ranked based on value provided. The contract must be awarded to the responsible design-build entity whose proposal is determined by the authority to have offered the best value to the public. Upon issuance of a contract award, the awarding authority must publicly announce its award, identifying the design-build entity to which the award is made, along with a written decision supporting its contract award and stating the basis of the award.
The state’s design-build statutes also impose requirements for the use of skilled labor, the issuance of performance bonds, insurance coverage, and identification of subcontractors that will complete at least one-half of 1% of the value of a contract.
Joint powers authorities. The Joint Exercise of Powers Act provides the statutory authority for public entities to create and use a joint powers agreement, which is a legal framework for state and local governments to exercise common powers and create new public entities. Joint powers authorities (JPAs) can be attractive tool for local governments because they allow for agencies to pool resources and collaborate to remedy local difficulties.
SRWA. Established in 2011, the SRWA is a JPA, which includes the Cities of Ceres and Turlock. Each of the cities is authorized to develop, obtain, and serve a municipal and industrial water supply. The SRWA is considering constructing a surface water supply project within the region that will provide for the long-term drinking water needs of each participating city. Specifically, the project’s purpose is to correct existing and projected water supply deficiencies, avoid over-drafting of groundwater, improve water quality, increase system reliability, and meet requirements for an assured water supply. SRWA wants the flexibility to utilize the design-build process in order to reduce costs related to the construction of the surface water supply project.
Comments
Purpose of the bill. The surface water supply project proposed by the SRWA would provide existing municipal water purveyors with a long-term, reliable water source that would correct existing system deficiencies. SB 373 would help meet projected future drinking water demand for the cities of Ceres and Turlock in the portion of Stanislaus County south of the Tuolumne River. According to the SRWA, the existing design-bid-build process can be cumbersome and costly, placing unnecessary strain on the viability of the project. Design-build authority is vitally needed so that the agency can move expeditiously and cost-effectively to improve and stabilize the water supply for the citizens of Ceres and Turlock.
Design-build. SB 785 was enacted to harmonize the state’s design-build authorizations that had been scattered across sections of code. The particulars of SB 785 were carefully negotiated to balance the interests of project proponents, labor unions, contractors, and subcontractors. SB 785 specifically prohibited cities and counties from using the design-build project delivery method for the construction of water resources facilities. However, AB 2551 (Gallagher, Chapter 760, Statutes of 2016) created an exception to this rule as it allowed local agencies to use design-build, design-bid-build, or construction manager at-risk for specific surface storage projects that receive funding from the water storage funding allocation in Proposition 1, the water bond measure approved by the voters in November of 2014. SB 373 creates an additional exception for the SRWA’s surface water supply project. Although proponents may argue that these projects are distinctive and therefore warrant unique authority, SB 373 is just the most recent departure from the standard set by SB 785.
Special legislation. The California Constitution prohibits special legislation when a general law can apply (Article IV, §16). SB 373 contains findings and declarations explaining the need for legislation that provides increased flexibility in contracting for the SRWA’s Surface Water Supply Project.
Related/Prior Legislation
SB 373 is one of a number of bills in recent years to authorize specific local agencies to utilize design-build. For example, the Mayers Memorial Hospital District (AB 1290, Dahle, Chapter 34, Statutes of 2015) and the San Diego Association of Governments (SB 974, Committee on Governance and Finance, Chapter 366, Statutes of 2016) were given design-build authority since the adoption of SB 785. Additionally, SB 793 (Hill, 2017) allows the Beach Cities Health District, Peninsula Health Care District, and the Midpeninsula Regional Open Space District to use design-build and passed out of this Committee with a vote of 7-0 on April 19th.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
Stanislaus Regional Water Authority (source)
None received
5/10/17 14:29:26
**** END ****
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Mike McGuire, Chair
2017 - 2018 Regular
Bill No: | SB 373 | Hearing Date: | 5/3/17 |
Author: | Cannella | Tax Levy: | No |
Version: | 4/27/17 | Fiscal: | No |
Consultant: | MacDonald | ||
public contracts: design-build: Stanislaus regional water authority
Allows the Stanislaus Regional Water Authority to utilize design-build to construct a surface water supply project.
Background
Design-build. The Local Agency Public Construction Act requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional, and most widely-used, approach to public works construction. This approach splits construction projects into two distinct phases: design and construction. During the design phase, the local agency prepares detailed project plans and specifications using its own employees or by hiring outside architects and engineers. Once project designs are complete, local officials invite bids from the construction industry and award the contract to the lowest responsible bidder.
By contrast, state law allows state and local officials, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services from a single company before the development of complete plans and specifications. Under design-build, the agency contracts with a single entity—which can be a single firm, a consortium, or a joint venture—to design and construct a project. Before inviting bids, the agency prepares documents that describe the basic concept of the project, as opposed to a complete set of drawings and specifications of the final product. In the bidding phase, the agency typically evaluates bids on a low-bid or best-value basis, incorporating technical factors, such as qualifications and design quality, in addition to price. The Department of General Services, the California Department of Corrections and Rehabilitation, cities, counties, transit districts, special districts operating wastewater, water recycling, or solid waste management facilities, and certain health care districts may use design-build.
Originally the authorizations for state agencies and local governments to use design-build were dispersed throughout state law in separate code sections. In 2014, the Legislature consolidated these provisions into consistent, generally-applicable statutes (SB 785, Wolk, 2014). SB 785 outlined a standardized design-build procurement process in which the awarding authority may prepare a list of qualified or short-listed entities, based on specified criteria. Once a list of qualified or short-listed entities is complete, the awarding authority may prepare a request for proposals (RFP) that invite prequalified or short-listed entities to submit competitive sealed proposals in the manner prescribed by the awarding authority.
For projects utilizing low bid as the selection method, the competitive bidding process must involve lump-sum bids by the prequalified or short-listed design-build entities. Awards must be made to the design-build entity that is the lowest responsible bidder.
For those projects utilizing best value as a selection method, proposals must be evaluated using only the criteria and selection procedures specifically identified in the RFP. The awarding authority may reserve the right to request revisions and conduct negotiations with responsive proposers, if the authority specifies in the RFP how it will ensure that negotiations are conducted in good faith. The authority may hold discussions or negotiations with responsive proposers using the process specified in the RFP. Responsive proposers are ranked based on value provided. The contract must be awarded to the responsible design-build entity whose proposal is determined by the authority to have offered the best value to the public. Upon issuance of a contract award, the awarding authority must publicly announce its award, identifying the design-build entity to which the award is made, along with a written decision supporting its contract award and stating the basis of the award.
The state’s design-build statutes also impose requirements for the use of skilled labor, the issuance of performance bonds, insurance coverage, and identification of subcontractors that will complete at least one-half of 1% of the value of a contract.
JPAs. The Joint Exercise of Powers Act provides the statutory authority for public entities to create and use a joint powers agreement, which is a legal framework for state and local governments to exercise common powers and create new public entities. Joint powers authorities (JPAs) can be attractive tool for local governments because they allow for agencies to pool resources and collaborate to remedy local difficulties.
SRWA. Established in 2011, the Stanislaus Regional Water Authority (SRWA) is a JPA, which includes the Cities of Ceres and Turlock. Each of the cities is authorized to develop, obtain, and serve a municipal and industrial water supply. The SRWA is considering constructing a surface water supply project within the region that will provide for the long-term drinking water needs of each participating city. Specifically, the project’s purpose is to correct existing and projected water supply deficiencies, avoid over-drafting of groundwater, improve water quality, increase system reliability, and meet requirements for an assured water supply. SRWA wants the flexibility to utilize the design-build process in order to reduce costs related to the construction of the surface water supply project.
Proposed Law
Senate Bill 373 allows the SRWA to utilize the design-build project delivery method in existing law to construct a surface water supply project.
State Revenue Impact
No estimate.
Comments
- Purpose of the bill. The surface water supply project proposed by the SRWA would provide existing municipal water purveyors with a long-term, reliable water source that would correct existing system deficiencies. SB 373 would help meet projected future drinking water demand for the cities of Ceres and Turlock in the portion of Stanislaus County south of the Tuolumne River. According to the SRWA, the existing design-bid-build process can be cumbersome and costly, placing unnecessary strain on the viability of the project. Design-build authority is vitally needed so that the agency can move expeditiously and cost-effectively to improve and stabilize the water supply for the citizens of Ceres and Turlock.
- Design-build. SB 785 was enacted to harmonize the state’s design-build authorizations that had been scattered across sections of code. The particulars of SB 785 were carefully negotiated to balance the interests of project proponents, labor unions, contractors, and subcontractors. SB 785 specifically prohibited cities and counties from using the design-build project delivery method for the construction of water resources facilities. However, AB 2551 (Gallagher, 2016) created an exception to this rule as it allowed local agencies to use design-build, design-bid-build, or construction manager at-risk for specific surface storage projects that receive funding from the water storage funding allocation in Proposition 1, the water bond measure approved by the voters in November of 2014. SB 373 creates an additional exception for the SRWA’s surface water supply project. Although proponents may argue that these projects are distinctive and therefore warrant unique authority, SB 373 is just the most recent departure from the standard set by SB 785. The Committee may wish to consider a discussion on broadening design-build authority for large projects to all local agencies.
- Related legislation. SB 373 is one of a number of bills in recent years to authorize specific local agencies to utilize design-build. For example, the Mayers Memorial Hospital District (AB 1290, Dahle, 2015) and the San Diego Association of Governments (SB 974, Committee on Governance and Finance, 2016) were given design-build authority since the adoption of SB 785. Additionally, SB 793 (Hill) allows the Beach Cities Health District, Peninsula Health Care District, and the Midpeninsula Regional Open Space District to use design-build and passed out of this Committee with a vote of 7-0 on April 19th.
- Special legislation. The California Constitution prohibits special legislation when a general law can apply (Article IV, §16). Senate Bill 373 contains findings and declarations explaining the need for legislation that provides increased flexibility in contracting for the Stanislaus Regional Water Authority’s Surface Water Supply Project.
Support and Opposition
(4/27/17)
Support: Stanislaus Regional Water Authority (sponsor).
Opposition: Unknown.
-- END --
Discussed in Hearing
Assembly Floor
Assembly Standing Committee on Local Government
Senate Floor
Senate Standing Committee on Governance and Finance
Bill Author