AB 2109: Electricity: surcharge exemption: industrial process heat recovery.

  • Session Year: 2023-2024
  • House: Assembly
  • Latest Version Date: 2024-09-27

Current Status:

Passed

(2024-09-27: Chaptered by Secretary of State - Chapter 700, Statutes of 2024.)

Introduced

In Committee

First Chamber

In Committee

Second Chamber

Enacted

What does this bill do?

This bill lets industrial customers who install qualifying industrial process heat recovery systems avoid certain nonbypassable or departing load surcharges (charges that normally still apply when a customer cuts their grid use) on the kilowatt‑hours they stop taking from the grid, up to a cap set by the Public Utilities Commission. To qualify, the recovery must be integral to the process, produce electricity without extra fuel or added emissions, be self‑consumed onsite and not exported, be at least 500 kW and no more than 25% of the site’s peak load, and be installed on or after January 1, 2024; the commission must minimize costs passed to other customers.

The summary is provided by generative AI which can make mistakes. For original language, please view the details in the table below.

Version:

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law, except as provided, requires certain uneconomic costs to be applied to each customer based on the amount of electricity purchased by that customer from an electrical corporation or alternate supplier of electricity, subject to changes in usage occurring in the normal course of business. Under existing law, changes in usage occurring in the normal course of business are those resulting from, among other things, the enhancement or increased efficiency of equipment.

This bill would specify that the enhancement or increased efficiency of equipment occurring in the normal course of business includes industrial process heat recovery technology that meets prescribed requirements. The bill would prohibit nonbypassable or departing load surcharges from applying to a reduction in kilowatthours of electricity that an electrical corporation customer consumes from the electrical grid in a metered interval due to industrial process heat recovery technology, up to a cap established by the commission, that meets those prescribed requirements. The bill would also require the commission, in implementing that exemption from the surcharges, to minimize the cost impacts to all nonparticipating customers that are directly attributable to the nonbypassable or departing load charges of customers using industrial process heat recovery technology, as provided.

Under existing law, a violation of the Public Utilities Act, or of an order, decision, rule, direction, demand, or requirement of the commission is a crime.

Because the provisions of this bill would be part of the act, and a violation of a commission action implementing its requirements would be a crime, the bill would impose a state-mandated local program.

The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

This bill would provide that no reimbursement is required by this act for a specified reason.

Discussed in Hearing

Assembly Floor 56SEC
Aug 28, 2024

Assembly Floor

Senate Standing Committee on Energy, Utilities and Communications 11MIN
Jun 18, 2024

Senate Standing Committee on Energy, Utilities and Communications

Assembly Floor 1MIN
May 21, 2024

Assembly Floor

Assembly Standing Committee on Utilities and Energy 6MIN
Apr 17, 2024

Assembly Standing Committee on Utilities and Energy

View Older Hearings
Authors shown for version:
Chaptered (9/27/2024)

Bill Author