AB 2962: Wholesale Regional Water System Security and Reliability Act.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2024-08-26
Current Status:
Passed
(2024-08-26: Chaptered by Secretary of State - Chapter 203, Statutes of 2024.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law, the Wholesale Regional Water System Security and Reliability Act, requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system, as defined. Existing law makes the act inoperative and repeals these provisions on January 1, 2026.
This bill would extend the repeal date of the act to January 1, 2036, and make technical nonsubstantive changes. By extending the period of time during which certain requirements would apply to regional wholesale water suppliers and the City and County of San Francisco, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City and County of San Francisco and the regional water system, and that the bill addresses a matter of statewide concern rather than a municipal affair and applies to charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Wholesale Regional Water System Security and Reliability Act, requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system, as defined. Existing law makes the act inoperative and repeals these provisions on January 1, 2026.
This bill would extend the repeal date of the act to January 1, 2036, and make technical nonsubstantive changes. By extending the period of time during which certain requirements would apply to regional wholesale water suppliers and the City and County of San Francisco, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City and County of San Francisco and the regional water system, and that the bill addresses a matter of statewide concern rather than a municipal affair and applies to charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Wholesale Regional Water System Security and Reliability Act, requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system, as defined. Existing law makes the act inoperative and repeals these provisions on January 1, 2026.
This bill would extend the repeal date of the act to January 1, 2036. 2036, and make technical nonsubstantive changes. By extending the period of time during which certain requirements would apply to regional wholesale water suppliers and the City and County of San Francisco, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City and County of San Francisco and the regional water system, and that the bill addresses a matter of statewide concern rather than a municipal affair and applies to charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Wholesale Regional Water System Security and Reliability Act, requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system, as defined. Existing law makes the act inoperative and repeals these provisions on January 1, 2026.
This bill would extend the repeal date of the act to January 1, 2036. By extending the period of time during which certain requirements would apply to regional wholesale water suppliers and the City and County of San Francisco, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City and County of San Francisco and the regional water system, and that the bill addresses a matter of statewide concern rather than a municipal affair and applies to charter cities.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law authorizes the State Water Resources Control Board to administer a water rights program pursuant to which the board grants permits and licenses to appropriate water. Existing law requires the board to consider and act upon all applications for permits to appropriate water.This bill would make a nonsubstantive change to the latter provision.Existing law authorizes the State Water Resources Control Board to administer a water rights program pursuant to which the board grants permits and licenses to appropriate water. Existing law requires the board to consider and act upon all applications for permits to appropriate water.
This bill would make a nonsubstantive change to the latter provision.
The Legislature finds and declares all of the following:
(a)The City and County of San Francisco operates the Hetch Hetchy Project as a regional water delivery system, supplying water to persons and entities in the City and County of San Francisco and the Counties of Alameda, San Mateo, and Santa Clara.
(b)The Wholesale Regional Water System Security and Reliability Act requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system and to submit a report, on or before September 1 of each year, to various entities describing the progress made on the implementation of the capital improvement program during the previous fiscal year.
(c)The Wholesale Regional Water System Security and Reliability Act authorizes the City and County of San Francisco to determine that the completion dates for projects contained in the program should be delayed or that different projects should be constructed. The act requires each city to identify in its progress report any project that is behind schedule and for each project so identified to describe its plan and timeline for making up the delay or adopting a revised implementation schedule.
(d)The Wholesale Regional Water System Security and Reliability Act imposes various other requirements on regional wholesale water suppliers, including a requirement that these suppliers submit an annual report describing the progress made on securing supplemental sources of water to augment existing supplies during dry years.
(e)The Wholesale Regional Water System Security and Reliability Act shall become inoperative on January 1, 2026.
(f)On February 26, 2003, pursuant to the requirements of the Wholesale Regional Water System Security and Reliability Act, the San Francisco Public Utilities Commission submitted to the State Department of Health Care Services a report outlining the projects, schedule, and implementation plan for the capital improvement program that included 85 projects which expanded on the subset detailed in the act.
(g)The City and County of San Francisco has not yet concluded its capital improvement projects and, particularly, the regional groundwater storage and recovery project and the Alameda Creek recapture project will not be completed by the end of 2025.
(h)Both the regional groundwater storage and recovery project and the Alameda Creek recapture project are critical to the regional water systems ability to provide reliable water supply during a drought, specifically in response to the Wholesale Regional Water System Security and Reliability Acts requirement for the San Francisco Public Utilities Commission to submit a report annually on progress made during the previous calendar year on securing supplemental sources of water to augment existing supplies during dry years.
(i)In order to provide continued oversight of the capital improvement projects through completion and to account for any further adjustments to the projects schedule during the next 12 years, this bill would extend the oversight provisions of the Wholesale Regional Water System Security and Reliability Act to January 1, 2036.
(j)The continued reliability of the regional water system is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. This act shall apply to all cities, including charter cities and a charter city and county, as applicable pursuant to Division 20.5 (commencing with Section 73500) of the Water Code.
SEC. 2.Section 73504 of the Water Code is amended to read:73504.(a)Commencing in 2003, a regional wholesale water supplier shall submit a report to the Legislature and the State Water Resources Control Board on or before February 1 of each year, describing the progress made during the previous calendar year on securing supplemental sources of water to augment existing supplies during dry years.
(b)In order to supply adequately, dependably, and safely the requirements of all users of water, the city shall continue its practice of operating the reservoirs in the Counties of Tuolumne and Stanislaus in a manner that ensures that the generation of hydroelectric power will not cause any reasonably anticipated adverse impact on water service. The city shall assign higher priority to delivery of water to the bay area than to the generation of electric power, unless the Secretary of the Interior, in writing, notifies the city that doing so would violate the Raker Act (63 P.L. 41). The city shall make available to the public, on request, its plans of operations (rule curves) for these reservoirs.
(c)The city shall be deemed to be a local public agency for the purposes of Article 4 (commencing with Section 1810) of Chapter 11 of Part 2 of Division 2.
SEC. 3.Section 73510 of the Water Code is amended to read:73510.Notwithstanding Section 116500 of the Health and Safety Code, the State Water Resources Control Board shall ensure that the bay area regional water system is operated in compliance with the California Safe Drinking Water Act (Chapter 4 (commencing with Section 116275) of Part 12 of Division 104 of the Health and Safety Code) and the guidelines established by the United States Environmental Protection Agency for the purposes of administering the comparable provisions of the federal Safe Drinking Water Act (42 U.S.C. Sec. 300f et seq.).
SEC. 4.Section 73514 of the Water Code is amended to read:73514.This division shall remain in effect only until January 1, 2036, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2036, deletes or extends that date.
SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances regarding the operation of the bay area regional water system, as described in Section 1 of this act.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The City and County of San Francisco operates the Hetch Hetchy Project as a regional water delivery system, supplying water to persons and entities in the City and County of San Francisco and the Counties of Alameda, San Mateo, and Santa Clara.
(b)The Wholesale Regional Water System Security and Reliability Act requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system and to submit a report, on or before September 1 of each year, to various entities describing the progress made on the implementation of the capital improvement program during the previous fiscal year.
(c)The Wholesale Regional Water System Security and Reliability Act authorizes the City and County of San Francisco to determine that the completion dates for projects contained in the program should be delayed or that different projects should be constructed. The act requires each city to identify in its progress report any project that is behind schedule and for each project so identified to describe its plan and timeline for making up the delay or adopting a revised implementation schedule.
(d)The Wholesale Regional Water System Security and Reliability Act imposes various other requirements on regional wholesale water suppliers, including a requirement that these suppliers submit an annual report describing the progress made on securing supplemental sources of water to augment existing supplies during dry years.
(e)The Wholesale Regional Water System Security and Reliability Act shall become inoperative on January 1, 2026.
(f)On February 26, 2003, pursuant to the requirements of the Wholesale Regional Water System Security and Reliability Act, the San Francisco Public Utilities Commission submitted to the State Department of Health Care Services a report outlining the projects, schedule, and implementation plan for the capital improvement program that included 85 projects which expanded on the subset detailed in the act.
(g)The City and County of San Francisco has not yet concluded its capital improvement projects and, particularly, the regional groundwater storage and recovery project and the Alameda Creek recapture project will not be completed by the end of 2025.
(h)Both the regional groundwater storage and recovery project and the Alameda Creek recapture project are critical to the regional water systems ability to provide reliable water supply during a drought, specifically in response to the Wholesale Regional Water System Security and Reliability Acts requirement for the San Francisco Public Utilities Commission to submit a report annually on progress made during the previous calendar year on securing supplemental sources of water to augment existing supplies during dry years.
(i)In order to provide continued oversight of the capital improvement projects through completion and to account for any further adjustments to the projects schedule during the next 12 years, this bill would extend the oversight provisions of the Wholesale Regional Water System Security and Reliability Act to January 1, 2036.
(j)The continued reliability of the regional water system is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. This act shall apply to all cities, including charter cities and a charter city and county, as applicable pursuant to Division 20.5 (commencing with Section 73500) of the Water Code.
SEC. 2.Section 73504 of the Water Code is amended to read:73504.(a)Commencing in 2003, a regional wholesale water supplier shall submit a report to the Legislature and the State Water Resources Control Board on or before February 1 of each year, describing the progress made during the previous calendar year on securing supplemental sources of water to augment existing supplies during dry years.
(b)In order to supply adequately, dependably, and safely the requirements of all users of water, the city shall continue its practice of operating the reservoirs in the Counties of Tuolumne and Stanislaus in a manner that ensures that the generation of hydroelectric power will not cause any reasonably anticipated adverse impact on water service. The city shall assign higher priority to delivery of water to the bay area than to the generation of electric power, unless the Secretary of the Interior, in writing, notifies the city that doing so would violate the Raker Act (63 P.L. 41). The city shall make available to the public, on request, its plans of operations (rule curves) for these reservoirs.
(c)The city shall be deemed to be a local public agency for the purposes of Article 4 (commencing with Section 1810) of Chapter 11 of Part 2 of Division 2.
SEC. 3.Section 73510 of the Water Code is amended to read:73510.Notwithstanding Section 116500 of the Health and Safety Code, the State Water Resources Control Board shall ensure that the bay area regional water system is operated in compliance with the California Safe Drinking Water Act (Chapter 4 (commencing with Section 116275) of Part 12 of Division 104 of the Health and Safety Code) and the guidelines established by the United States Environmental Protection Agency for the purposes of administering the comparable provisions of the federal Safe Drinking Water Act (42 U.S.C. Sec. 300f et seq.).
SEC. 4.Section 73514 of the Water Code is amended to read:73514.This division shall remain in effect only until January 1, 2036, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2036, deletes or extends that date.
SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances regarding the operation of the bay area regional water system, as described in Section 1 of this act.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The City and County of San Francisco operates the Hetch Hetchy Project as a regional water delivery system, supplying water to persons and entities in the City and County of San Francisco and the Counties of Alameda, San Mateo, and Santa Clara.
(b)The Wholesale Regional Water System Security and Reliability Act requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system and to submit a report, on or before September 1 of each year, to various entities describing the progress made on the implementation of the capital improvement program during the previous fiscal year.
(c)The Wholesale Regional Water System Security and Reliability Act authorizes the City and County of San Francisco to determine that the completion dates for projects contained in the program should be delayed or that different projects should be constructed. The act requires each city to identify in its progress report any project that is behind schedule and for each project so identified to describe its plan and timeline for making up the delay or adopting a revised implementation schedule.
(d)The Wholesale Regional Water System Security and Reliability Act imposes various other requirements on regional wholesale water suppliers, including a requirement that these suppliers submit an annual report describing the progress made on securing supplemental sources of water to augment existing supplies during dry years.
(e)The Wholesale Regional Water System Security and Reliability Act shall become inoperative on January 1, 2026.
(f)On February 26, 2003, pursuant to the requirements of the Wholesale Regional Water System Security and Reliability Act, the San Francisco Public Utilities Commission submitted to the State Department of Health Care Services a report outlining the projects, schedule, and implementation plan for the capital improvement program that included 85 projects which expanded on the subset detailed in the act.
(g)The City and County of San Francisco has not yet concluded its capital improvement projects and, particularly, the regional groundwater storage and recovery project and the Alameda Creek recapture project will not be completed by the end of 2025.
(h)Both the regional groundwater storage and recovery project and the Alameda Creek recapture project are critical to the regional water systems ability to provide reliable water supply during a drought, specifically in response to the Wholesale Regional Water System Security and Reliability Acts requirement for the San Francisco Public Utilities Commission to submit a report annually on progress made during the previous calendar year on securing supplemental sources of water to augment existing supplies during dry years.
(i)In order to provide continued oversight of the capital improvement projects through completion and to account for any further adjustments to the projects schedule during the next 12 years, this bill would extend the oversight provisions of the Wholesale Regional Water System Security and Reliability Act to January 1, 2036.
(j)The continued reliability of the regional water system is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. This act shall apply to all cities, including charter cities and a charter city and county, as applicable pursuant to Division 20.5 (commencing with Section 73500) of the Water Code.
SEC. 2.Section 73504 of the Water Code is amended to read:73504.(a)Commencing in 2003, a regional wholesale water supplier shall submit a report to the Legislature and the State Department of Public Health, State Water Resources Control Board on or before February 1 of each year, describing the progress made during the previous calendar year on securing supplemental sources of water to augment existing supplies during dry years.
(b)In order to supply adequately, dependably, and safely the requirements of all users of water, the city shall continue its practice of operating the reservoirs in the Counties of Tuolumne and Stanislaus in a manner that ensures that the generation of hydroelectric power will not cause any reasonably anticipated adverse impact on water service. The city shall assign higher priority to delivery of water to the bay area than to the generation of electric power, unless the Secretary of the Interior, in writing, notifies the city that doing so would violate the Raker Act (63 P.L. 41). The city shall make available to the public, on request, its plans of operations (rule curves) for these reservoirs.
(c)The city shall be deemed to be a local public agency for the purposes of Article 4 (commencing with Section 1810) of Chapter 11 of Part 2 of Division 2.
SEC. 3.Section 73510 of the Water Code is amended to read:73510.Notwithstanding Section 116500 of the Health and Safety Code, the State Department of Public Health State Water Resources Control Board shall ensure that the bay area regional water system is operated in compliance with the California Safe Drinking Water Act (Chapter 4 (commencing with Section 116275) of Part 12 of Division 104 of the Health and Safety Code) and the guidelines established by the United States Environmental Protection Agency for the purposes of administering the comparable provisions of the federal Safe Drinking Water Act (42 U.S.C. Sec. 300f et seq.).
SEC. 2.SEC. 4.Section 73514 of the Water Code is amended to read:73514.This division shall remain in effect only until January 1, 2036, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2036, deletes or extends that date.
SEC. 3.SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances regarding the operation of the bay area regional water system, as described in Section 1 of this act.
SEC. 4.SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The City and County of San Francisco operates the Hetch Hetchy Project as a regional water delivery system, supplying water to persons and entities in the City and County of San Francisco and the Counties of Alameda, San Mateo, and Santa Clara.
(b)The Wholesale Regional Water System Security and Reliability Act requires the City and County of San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the bay area regional water system and to submit a report, on or before September 1 of each year, to various entities describing the progress made on the implementation of the capital improvement program during the previous fiscal year.
(c)The Wholesale Regional Water System Security and Reliability Act authorizes the City and County of San Francisco to determine that the completion dates for projects contained in the program should be delayed or that different projects should be constructed. The act requires each city to identify in its progress report any project that is behind schedule and for each project so identified to describe its plan and timeline for making up the delay or adopting a revised implementation schedule.
(d)The Wholesale Regional Water System Security and Reliability Act imposes various other requirements on regional wholesale water suppliers, including a requirement that these suppliers submit an annual report describing the progress made on securing supplemental sources of water to augment existing supplies during dry years.
(e)The Wholesale Regional Water System Security and Reliability Act shall become inoperative on January 1, 2026.
(f)On February 26, 2003, pursuant to the requirements of the Wholesale Regional Water System Security and Reliability Act, the San Francisco Public Utilities Commission submitted to the State Department of Health Care Services a report outlining the projects, schedule, and implementation plan for the capital improvement program that included 85 projects which expanded on the subset detailed in the act.
(g)The City and County of San Francisco has not yet concluded its capital improvement projects and, particularly, the regional groundwater storage and recovery project and the Alameda Creek recapture project will not be completed by the end of 2025.
(h)Both the regional groundwater storage and recovery project and the Alameda Creek recapture project are critical to the regional water systems ability to provide reliable water supply during a drought, specifically in response to the Wholesale Regional Water System Security and Reliability Acts requirement for the San Francisco Public Utilities Commission to submit a report annually on progress made during the previous calendar year on securing supplemental sources of water to augment existing supplies during dry years.
(i)In order to provide continued oversight of the capital improvement projects through completion and to account for any further adjustments to the projects schedule during the next 12 years, this bill would extend the oversight provisions of the Wholesale Regional Water System Security and Reliability Act to January 1, 2036.
(j)The continued reliability of the regional water system is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. This act shall apply to all cities, including charter cities and a charter city and county, as applicable pursuant to Division 20.5 (commencing with Section 73500) of the Water Code.
SEC. 2.Section 73514 of the Water Code is amended to read:73514.This division shall remain in effect only until January 1, 2026, 2036, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2026, 2036, deletes or extends that date.
SEC. 3.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances regarding the operation of the bay area regional water system, as described in Section 1 of this act.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
SECTION 1.Section 1250 of the Water Code is amended to read:1250.The board shall consider and act upon all applications for permits to appropriate water and shall do all things required or proper relating to these applications.The board shall consider and act upon all applications for permits to appropriate water and shall do all things required or proper relating to such these applications.
|
Date
|
Status
|
|---|---|
| Aug 26, 2024 | Chaptered by Secretary of State - Chapter 203, Statutes of 2024. |
| Aug 26, 2024 | Approved by the Governor. |
| Aug 19, 2024 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 12, 2024 | In Assembly. Ordered to Engrossing and Enrolling. |
| Aug 12, 2024 | Read third time. Passed. Ordered to the Assembly. (Ayes 38. Noes 0. Page 5045.). |
| Aug 6, 2024 | Read second time. Ordered to Consent Calendar. |
| Aug 5, 2024 | From committee: Be ordered to second reading file pursuant to Senate Rule 28.8 and ordered to Consent Calendar. |
| Jun 26, 2024 | From committee: Do pass and re-refer to Com. on APPR with recommendation: To Consent Calendar. (Ayes 7. Noes 0.) (June 26). Re-referred to Com. on APPR. |
| Jun 11, 2024 | From committee: Do pass and re-refer to Com. on L. GOV. with recommendation: To Consent Calendar. (Ayes 11. Noes 0.) (June 11). Re-referred to Com. on L. GOV. |
| May 29, 2024 | Referred to Coms. on N.R. & W. and L. GOV. |
| May 16, 2024 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 16, 2024 | Read third time. Passed. Ordered to the Senate. (Ayes 71. Noes 0.) |
| May 9, 2024 | Read second time. Ordered to Consent Calendar. |
| May 8, 2024 | From committee: Do pass. To Consent Calendar. (Ayes 15. Noes 0.) (May 8). |
| Apr 25, 2024 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 8. Noes 0.) (April 24). Re-referred to Com. on APPR. |
| Apr 11, 2024 | Re-referred to Com. on L. GOV. |
| Apr 10, 2024 | Read second time and amended. |
| Apr 9, 2024 | From committee: Amend, and do pass as amended and re-refer to Com. on L. GOV. with recommendation: To Consent Calendar. (Ayes 14. Noes 0.) (April 9). |
| Apr 1, 2024 | Re-referred to Com. on W., P., & W. |
| Mar 21, 2024 | Referred to Coms. on W., P., & W. and L. GOV. |
| Mar 21, 2024 | From committee chair, with author's amendments: Amend, and re-refer to Com. on W., P., & W. Read second time and amended. |
| Feb 17, 2024 | From printer. May be heard in committee March 18. |
| Feb 16, 2024 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 12, 2024 | Consent Calendar 2nd AB2962 Papan | Senate Floor |
Passed |
|
| Jun 26, 2024 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Local Government |
Passed |
|
| Jun 11, 2024 | Do pass, but first be re-referred to the Committee on [Local Government] with the recommendation: To Consent Calendar | Senate Standing Committee on Natural Resources and Water |
Passed |
|
| May 16, 2024 | AB 2962 Papan Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| May 8, 2024 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 24, 2024 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Local Government |
Passed |
|
| Apr 9, 2024 | Do pass as amended, and be re-referred to the Committee on [Local Government] with recommendation: To Consent Calendar | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Bay Area Water Supply And Conservation Agency | ** Support | |
| California Water Association | ** Support | |
| Junior Philanthropist Foundation | ** Support | |
| San Francisco Public Utilities Commission | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 2962 |
CONSENT
Bill No: AB 2962
Author: Papan (D)
Amended: 4/10/24 in Assembly
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 11-0, 6/11/24
AYES: Min, Seyarto, Allen, Dahle, Eggman, Grove, Hurtado, Laird, Limón, Padilla, Stern
SENATE LOCAL GOVERNMENT COMMITTEE: 7-0, 6/26/24
AYES: Durazo, Seyarto, Dahle, Glazer, Skinner, Wahab, Wiener
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 71-0, 5/16/24 (Consent) - See last page for vote
SUBJECT: Wholesale Regional Water System Security and Reliability Act
SOURCE: Bay Area Water Supply and Conservation Agency
DIGEST:
This bill extends the sunset date of the Wholesale Regional Water System Security and Reliability Act (WRWSSR Act) from January 1, 2026 to January 1, 2036.
ANALYSIS:
Existing law:
- Requires, under the WRWSSR Act, the City and County of San Francisco (City) to adopt a program of capital improvement projects to restore and improve the bay area regional water system (RWS) by February 1, 2003. The program of capital improvement shall contain specified projects and the program shall be 50% complete by 2010 and 100% complete by 2015. A copy of the capital improvement program shall be submitted to the State Water Resources Control Board (State Water Board) and the City shall report annually by September 1st to the Joint Legislative Audit Committee, the Seismic Safety Commission, and the State Water Board on progress made implementing the program of capital improvement. (Water Code (WC) §73501.)
- Requires, under the WRWSSR Act, the City to submit an annual report to the Legislature and Department of Public Health by February 1st that describes progress made in securing supplemental sources of water for its water service customers during dry years. Provides that the City shall assign a higher priority to the delivery of water to its urban customers than to the generation of hydroelectricity so long as doing so does not violate federal law. (WC §73504.)
- Requires, under the WRWSSR Act, the Department of Health Services to conduct an audit of the City’s program of maintenance for RWS by July 1, 2004. Prescribes the scope of that audit. (WC §73505.)
- Sunsets the WRWSSR Act on January 1, 2026. (WC §73514.)
- Provides for the formation, membership, powers and authorities, and financing of the Bay Area Water Supply and Conservation Agency (BAWSCA). (WC §81300 et seq.)
- Establishes the San Francisco Bay Area Regional Water System Financing Authority (Financing Authority), prescribes its membership, and authorizes it to issue bonds to finance a capital improvement program for RWS. W(C §81600 et seq.)
This bill:
- Extends the sunset of the WRWSSR Act from January 1, 2026 to January 1, 2036.
- Makes additional technical changes.
- Makes findings and declarations regarding the need for this bill.
- States that no reimbursement is required by this bill because the local agencies affected by this bill have the authority to levy service charges, fees, or assessments to cover the cost of its implementation.
Background
WRWSSR Act. AB 1823 (Papan, Chapter 841, Statutes of 2002), the WRWSSR Act, required the City and County of San Francisco to adopt capital improvement projects to ensure the reliability and quality of the RWS in the face of age-related or seismic stress. The San Francisco Public Utilities Commission (SFPUC) provides drinking water to approximately 2.7 million customers in the greater San Francisco Bay Area either directly or through wholesalers. SFPUC’s $4.8 billion Water System Improvement Program (WSIP) to provide a clean and reliable source of drinking water to its customers is subject to the WRWSSR Act. WSIP is funded by a bond measure approved by San Francisco voters in November 2002, which will be paid back by its customers in San Francisco, Alameda, San Mateo, and Santa Clara counties. The WRWSSR Act identified nine priority projects that were intended to keep water service relatively intact in the event of a major earthquake. WSIP projects include the construction of seismically-engineered conduits installed where the Hetch Hetchy Regional Water System crosses three of the nation’s most active earthquake faults (Calaveras, San Andreas, and Hayward) and the replacement of the Calaveras Dam.
Under the WRWSSR Act, the state maintains oversight over WSIP projects through annual reports submitted to the Joint Legislative Audit Committee, the Alfred E. Alquist Seismic Safety Commission, and the State Water Board. Initially, the WRWSSR Act was to sunset on 2010. However, SFPUC has not been able to complete all the projects on time for various reasons and has been given several extensions previously.
Comments
Need for another WRWSSR Act Extension. SFPUC reports that the WSIP is now scheduled to be completed in June 2032. Two water supply projects (the Alameda Creek Recapture Project and Regional Groundwater Storage and Recovery Project) remain and have been subject to continuing delays due to environmental and other issues. The author states that continued State oversight has proven critical to the successful implementation of San Francisco’s required capital program and it is important to have no gap in that oversight.
Related/Prior legislation
SB 699 (Hill, Chapter 214, Statutes of 2020) extended the sunset of the WRWSSR Act from January 1, 2022 to January 1, 2026, among other provisions.
SB 1345 (Committee on Natural Resources and Water, Chapter 489, Statutes of 2014) extended the sunset of the WRWSSR Act from January 1, 2015 to January 1, 2022, among other provisions.
AB 2437 (Ruskin, Chapter 99, Statutes of 2008) extended the sunset of the WRWSSR Act from December 31, 2010 to January 1, 2015.
SB 1870 (Speier, Chapter 849, Statutes of 2002) enacted the Financing Authority that prescribes the membership of the Financing Authority and authorizes it to issue bonds to finance a capital improvement program for the RWS.
AB 1823 (Lou Papan, Chapter 841, Statutes of 2002) enacted the WRWSSR Act.
AB 2058 (Lou Papan, Chapter 844, Statutes of 2002) provided for the formation of BAWSCA by at least 15 of the 26 public entities in Alameda, San Mateo, and Santa Clara Counties that purchase water from the City and County of San Francisco.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/6/24)
Bay Area Water Supply and Conservation Agency (source)
California Water Association
Junior Philanthropists Foundation
San Francisco Public Utilities Commission
OPPOSITION: (Verified 8/6/24)
None received
ARGUMENTS IN SUPPORT: According to the author, “AB 2962 is a simple sunset extension bill that extends state oversight of San Francisco Public Utility Commission’s capital investment program. In 2002, the San Francisco Regional Water System was outdated compared to seismic safety standards. Since the system crosses three active earthquake fault lines, the threat of entire counties being left without water was both evident and real. Recognizing the urgency of the situation, Assemblymember Lou Papan introduced AB 1823 to ensure ongoing state oversight of crucial capital improvements. The continuation of state oversight has been instrumental in the successful execution of SFPUC's necessary capital program. Maintaining this oversight without interruption is paramount to safeguarding the resilience and reliability of the area’s water infrastructure.”
ASSEMBLY FLOOR: 71-0, 5/16/24
AYES: Aguiar-Curry, Alanis, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Chen, Connolly, Davies, Dixon, Essayli, Mike Fong, Friedman, Gabriel, Gallagher, Garcia, Grayson, Haney, Hart, Holden, Hoover, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Robert Rivas
NO VOTE RECORDED: Addis, Alvarez, Cervantes, Megan Dahle, Flora, Vince Fong, Gipson, Irwin, Mathis
Prepared by: Paul Jacobs / N.R. & W. / (916) 651-4116
8/7/24 13:38:44
**** END ****
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2023 - 2024 Regular
Bill No: | AB 2962 | Hearing Date: | 6/26/24 |
Author: | Papan | Fiscal: | Yes |
Version: | 4/10/24 | Consultant: | Favorini-Csorba |
Wholesale Regional Water System Security and Reliability Act
Extends state oversight over Bay Area regional water system projects until 2036.
Background
San Francisco operates the Hetch Hetchy Water System, which transports water from the Sierra Nevada to San Francisco and provides domestic and industrial water to residents of Alameda, San Francisco, San Mateo, and Santa Clara counties. While San Francisco operates the water system, customers across the Bay Area depend on it for their water. Rather than rely on San Francisco to adequately plan for the entire region’s water needs, the Legislature enacted laws to guarantee that customers across the Bay Area had a water system they could depend on.
Wholesale Regional Water System Security and Reliability Act. SB 1823 (L. Papan, 2002) enacted the Wholesale Regional Water System Security and Reliability (WRWSSR) Act, which requires San Francisco to adopt a specified program of capital improvement projects designed to restore and improve the Bay Area regional water system. The San Francisco Public Utilities Commission (SFPUC) executes these projects through its Water System Improvement Program (WSIP). The goals of the program include (1) maintaining high-quality water and a gravity-driven system, (2) reducing vulnerability to earthquakes, (3) increasing delivery reliability, (4) meeting customer water supply needs, (5) enhancing sustainability, and (6) achieving a cost-effective and fully-operational system. Under the Act, the State maintains oversight over WSIP projects through annual reports submitted to the Joint Legislative Audit Committee, the Alfred E. Alquist Seismic Safety Commission, the State Water Resources Control Board, and the State Department of Public Health. The water transmission system constructed under WSIP now serves 27 retail distribution systems (including San Francisco) that provide water to over 2.7 million users and 30,000 businesses.
The initial WRWSSR Act sunset in 2010, but SFPUC was not able to complete all projects before the scheduled sunset date, so AB 2437 (Ruskin, 2008) extended the sunset date to 2010. SB 1345 (Committee on Natural Resources, 2014) extended the sunset until 2022, and SB 699 (Hill, 2019) further extended the sunset until 2026. These extensions allowed state oversight to continue ensuring that SFPUC continues to move forward with projects included in the plan. WSIP now includes 87 projects, including replacing the Calaveras Dam, and is 97 percent complete. While projects have progressed, additional delays have occurred, and SFPUC expects to complete a couple of projects after 2026. These include the Alameda Creek Recapture Project, which captures water released from the Calaveras Dam and bypassed around the Alameda Creek Diversion Dam, and the Regional Groundwater Storage and Recovery Project, which stores water in wet years and recovers that water for use during dry years.
The Bay Area Water Supply & Conservation Agency wants the Legislature to continue state oversight over the capital improvement projects performed under the WRWSSR Act.
Proposed Law
Assembly Bill 2962 extends the sunset of the WRWSSR Act from January 1, 2026 to January 1, 2036, and makes additional technical changes.
Comments
1. Purpose of the bill. According to the author, “AB 2962 is a simple sunset extension bill that extends state oversight of San Francisco Public Utility Commission’s capital investment program. In 2002, the San Francisco Regional Water System was outdated compared to seismic safety standards. Since the system crosses three active earthquake fault lines, the threat of entire counties being left without water was both evident and real. Recognizing the urgency of the situation, Assemblymember Lou Papan introduced AB 1823 to ensure ongoing state oversight of crucial capital improvements. The continuation of state oversight has been instrumental in the successful execution of SFPUC's necessary capital program. Maintaining this oversight without interruption is paramount to safeguarding the resilience and reliability of the area’s water infrastructure.”
2. Round four. The Legislature previously extended the sunset for WRWSSR Act to ensure state oversight over SFPUC WSIP projects continues until all projects are completed. This ensures state departments can weigh in and make recommendations if SFPUC changes projects. Unfortunately, two projects continue to experience challenges. SFPUC has faced challenges locating appropriate well sites for the Regional Groundwater Storage and Recovery project, and continues to work on resolving customer concerns over the Alameda Creek Recapture Project. SFPUC does not expect to complete either project until after the WRWSSR Act sunsets in 2026. While the current consensus is this oversight has helped ensure projects are completed in a timely fashion in line with WSIP goals, the Committee may wish to consider whether another extension of WRWSSR is sufficient to resolve the challenges SFPUC has had completing the remaining projects.
3. Mandate. The California Constitution requires the state to reimburse local governments for the costs of new or expanded state mandated local programs. Because AB 2962 extends the period of time during which certain requirements apply to regional wholesale water suppliers and the City and County of San Francisco, Legislative Counsel says it imposes a new state mandate. AB 2962 disclaims the state's responsibility for providing reimbursement by citing local governments’ authority to charge for the costs of implementing the bill’s provisions.
4. Special legislation. Section 16 of Article 4 of the California Constitution prohibits special legislation when a general law can apply. AB 2962 contains findings and declarations explaining the need for legislation that applies only to the San Francisco regional water system.
5. Incoming! The Senate Natural Resources and Water Committee approved AB 2962 at its June 11th hearing on a vote of 11-0. The Senate Local Government Committee is hearing the bill as the Committee of second reference.
Assembly Actions
Assembly Water, Parks, and Wildlife Committee: 14-0
Assembly Local Government Committee: 8-0
Assembly Appropriations Committee: 15-0
Assembly Floor: 71-0
Support and Opposition
(6/21/24)
Support: Bay Area Water Supply and Conservation Agency (sponsor)
California Water Association
Junior Philanthropists Foundation
San Francisco Public Utilities Commission
Opposition: None submitted.
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Dave Min, Chair
2023 - 2024 Regular
Bill No: AB Hearing Date: June 11, 2024
Author: | Papan | ||
Version: | April 10, 2024 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Paul Jacobs | ||
Subject: Wholesale Regional Water System Security and Reliability Act
SUMMARY
This bill would extend the sunset date of the Wholesale Regional Water System Security and Reliability Act (WRWSSR Act) from January 1, 2026 to January 1, 2036.
BACKGROUND AND EXISTING LAW
Background:
WRWSSR Act. AB 1823 (Papan, Chapter 841, Statutes of 2002), the WRWSSR Act, requires the City and County of San Francisco to adopt capital improvement projects to ensure the reliability and quality of the bay area regional water system (RWS) in the face of age-related or seismic stress. The San Francisco Public Utilities Commission (SFPUC) provides drinking water to approximately 2.7 million customers in the greater San Francisco Bay Area either directly or through wholesalers. SFPUC’s $4.8 billion Water System Improvement Program (WSIP) to provide a clean and reliable source of drinking water to its customers is subject to the WRWSSR Act. WSIP is funded by a bond measure approved by San Francisco voters in November 2002, which will be paid back by its customers in San Francisco, Alameda, San Mateo, and Santa Clara counties. The WRWSSR Act identified nine priority projects that were intended to keep water service relatively intact in the event of a major earthquake. WSIP projects include the construction of seismically-engineered conduits installed where the Hetch Hetchy Regional Water System crosses three of the nation’s most active earthquake faults (Calaveras, San Andreas, and Hayward) and the replacement of the Calaveras Dam.
Under the WRWSSR Act, the state maintains oversight over WSIP projects through annual reports submitted to the Joint Legislative Audit Committee, the Alfred E. Alquist Seismic Safety Commission, and the State Water Resources Control Board (State Water Board). Initially, the WRWSSR Act was to sunset on 2010. However, SFPUC has not been able to complete all the projects on time for various reasons and has been given several extensions previously.
Existing law:
- Requires, under the WRWSSR Act, the City and County of San Francisco (City) to adopt a program of capital improvement projects to restore and improve the RWS by February 1, 2003. The program of capital improvement shall contain specified projects and the program shall be 50% complete by 2010 and 100% complete by 2015. A copy of the capital improvement program shall be submitted to the State Water Board and the City shall report annually by September 1st to the Joint Legislative Audit Committee, the Seismic Safety Commission, and the State Water Board on progress made implementing the program of capital improvement. Water Code (WC) §73501.
- Requires, under the WRWSSR Act, the City to submit an annual report to the Legislature and Department of Public Health by February 1st that describes progress made in securing supplemental sources of water for its water service customers during dry years. Provides that the City shall assign a higher priority to the delivery of water to its urban customers than to the generation of hydroelectricity so long as doing so does not violate federal law. WC §73504.
- Requires, under the WRWSSR Act, the Department of Health Services to conduct an audit of the City’s program of maintenance for RWS by July 1, 2004. Prescribes the scope of that audit. WC §73505.
- Sunsets the WRWSSR Act on January 1, 2026. WC §73514.
- Provides for the formation, membership, powers and authorities, and financing of the Bay Area Water Supply and Conservation Agency (BAWSCA). WC §81300 et seq.
- Establishes the San Francisco Bay Area Regional Water System Financing Authority (Financing Authority), prescribes its membership, and authorizes it to issue bonds to finance a capital improvement program for RWS. WC §81600 et seq.
PROPOSED LAW
This bill:
- Extends the sunset of the WRWSSR Act from January 1, 2026 to January 1, 2036.
- Makes additional technical changes.
- Makes findings and declarations regarding the need for this bill.
- States that no reimbursement is required by this bill because the local agencies affected by this bill have the authority to levy service charges, fees, or assessments to cover the cost of its implementation.
ARGUMENTS IN SUPPORT
According to the author, “AB 2962 is a simple sunset extension bill that extends state oversight of San Francisco Public Utility Commission’s capital investment program. In 2002, the San Francisco Regional Water System was outdated compared to seismic safety standards. Since the system crosses three active earthquake fault lines, the threat of entire counties being left without water was both evident and real. Recognizing the urgency of the situation, Assemblymember Lou Papan introduced AB 1823 to ensure ongoing state oversight of crucial capital improvements. The continuation of state oversight has been instrumental in the successful execution of SFPUC's necessary capital program. Maintaining this oversight without interruption is paramount to safeguarding the resilience and reliability of the area’s water infrastructure.”
ARGUMENTS IN OPPOSITION
None Received
COMMENTS
Dual referral. This bill is referred to this Committee and the Senate Local Government Committee. Elements of the bill under the latter Committee’s jurisdiction will be discussed before that Committee and are included here for completeness and context only.
Need for another WRWSSR Act Extension. SFPUC reports that the WSIP is now scheduled to be completed in June 2032. Two water supply projects (the Alameda Creek Recapture Project and Regional Groundwater Storage and Recovery Project) remain and have been subject to continuing delays due to environmental and other issues. The author states that continued State oversight has proven critical to the successful implementation of San Francisco’s required capital program and it is important to have no gap in that oversight.
Prior legislation.
SB 699 (Hill, Chapter 214, Statutes of 2020), extends the sunset of the WRWSSR Act from January 1, 2022 to January 1, 2026, among other provisions.
SB 1345 (Committee on Natural Resources and Water, Chapter 489, Statutes of 2014), extends the sunset of the WRWSSR Act from January 1, 2015 to January 1, 2022, among other provisions.
AB 2437 (Ruskin, Chapter 99, Statutes of 2008), extends the sunset of the WRWSSR Act from December 31, 2010 to January 1, 2015.
AB 1823 (Lou Papan, Chapter 841, Statutes of 2002), enacts the WRWSSR Act.
AB 2058 (Lou Papan, Chapter 844, Statutes of 2002), provides for the formation of BAWSCA by at least 15 of the 26 public entities in Alameda, San Mateo, and Santa Clara Counties that purchase water from the City and County of San Francisco.
SB 1870 (Speier, Chapter 849, Statutes of 2002), enacts the Financing Authority that prescribes the membership of the Financing Authority and authorizes it to issue bonds to finance a capital improvement program for the RWS.
SUPPORT
Bay Area Water Supply and Conservation Agency (sponsor)
California Water Association
Junior Philanthropists Foundation
San Francisco Public Utilities Commission
OPPOSITION
None Received
-- END --
Date of Hearing: May 8, 2024
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 2962
Author:(Papan) – As Amended Ver:April 10, 2024
Policy Committee: | Water, Parks and Wildlife | Vote: | 14 - 0 |
Local Government | 8 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill extends the sunset of the “Wholesale Regional Water System Security and Reliability Act” (Act) from January 1, 2026, to January 1, 2036.
FISCAL EFFECT:
Ongoing minor costs, potentially in the low tens of thousands of dollars over the extended sunset period, to the State Water Resources Control Board (State Water Board) and the Seismic Safety Commission for continued oversight. These costs are reimbursed by the San Francisco Public Utilities Commission (SFPUC).
COMMENTS:
1) Purpose. According to the author:
AB 2962 is a simple sunset extension bill that extends state oversight of San Francisco Public Utility Commission’s capital investment program. In 2002, the San Francisco Regional Water System was outdated compared to seismic safety standards. Since the system crosses three active earthquake fault lines, the threat of entire counties being left without water was both evident and real. Recognizing the urgency of the situation, Assemblymember Lou Papan introduced AB 1823 to ensure ongoing state oversight of crucial capital improvements. The continuation of state oversight has been instrumental in the successful execution of SFPUC's necessary capital program. Maintaining this oversight without interruption is paramount to safeguarding the resilience and reliability of the area’s water infrastructure.
2) Background. SFPUC is part of the City and County of San Francisco and provides retail and wholesale water service to approximately 2.7 million residential, commercial, and industrial customers in San Francisco and the counties of Alameda, San Mateo, Santa Clara, San Joaquin, and Tuolumne. SFPUC owns and operates the San Francisco regional water system (RWS), which consists of water storage and treatment facilities, water transmission infrastructure, buildings and structures for facilities and employees, communications systems, and watersheds and rights-of-way lands in San Mateo, Santa Clara, and Alameda counties as well as western San Joaquin County. The major feature and water source in the RWS is the Hetch Hetchy Reservoir on the Tuolumne River that was built in the 1920s and 1930s. On average, water captured in Hetch Hetchy provides 85% of the water for the RWS with the remaining 15% coming from runoff in the Alameda and San Francisco Peninsula watersheds.
SFPUC State Auditor report. In 2000, the State Auditor found that SFPUC had been slow to assess and upgrade its water delivery system to enable it to survive catastrophic events such as earthquakes, fires, or floods. The auditor found that SFPUC had also been slow to estimate the amount of water it will need to meet demand in the future and to seek additional sources of water. As a result, the nearly 2.4 million customers in the City and County of San Francisco and in Alameda, San Mateo, and Santa Clara counties who rely on SFPUC for their drinking water were at greater risk of disruptions and water shortages in the event of a catastrophe or a drought. In response to the audit report, AB 1823 (Lou Papan), Chapter 841, Statutes of 2002 enacted the Act to provide oversight of and accountability for SFPUC’s efforts to develop and complete a capital improvement plan.
SFPUC Water System Improvement Program (WSIP). In May 2002, SFPUC adopted the WSIP, a $4.8 billion capital improvement program intended to rebuild and retrofit the RWS to improve system reliability, with a particular focus on seismic safety. The Act identified nine priority projects that were intended to keep water service relatively intact in the event of a major earthquake. Writing in support of this bill, the Bay Area Water Supply and Conservation Authority – which represents the interests of the 26 water suppliers that rely on water from the RWS – contends that the WSIP is “99% complete, but it is not yet done.” This bill extends state oversight of SFPUC’s capital program by ten years.
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Date of Hearing: April 24, 2024
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Juan Carrillo, Chair
ABPCA Bill Id:AB 2962 (
Author:Papan) – As Amended Ver:April 10, 2024
SUBJECT: Wholesale Regional Water System Security and Reliability Act.
SUMMARY: Extends the sunset date of the Wholesale Regional Water System Security and Reliability Act (WRWSSR Act) from January 1, 2026 to January 1, 2036. Specifically, this bill:
- Extends the sunset date of the WRWSSR Act from January 1, 2026 to January 1, 2036.
- Makes additional technical changes.
- Finds and declares that a special statute is necessary and that a general statute cannot be made applicable because of the unique circumstances regarding the operation of the bay area regional water system.
- Contains additional findings and declarations to support its purposes.
- Provides that no reimbursement is required by this bill because a local agency or school district has the authority to levy service charges, fees, or, assessment sufficient to pay for the program or level of service mandated by this bill.
EXISTING LAW:
- Requires, under the WRWSSR Act, the City and County of San Francisco (City) to adopt a program of capital improvement projects to restore and improve the Bay Area regional water system (RWS) by February 1, 2003. The program of capital improvement shall contain specified projects and the program shall be 50% complete by 2010 and 100% complete by 2015. A copy of the capital improvement program shall be submitted to the State Water Resources Control Board (State Water Board) and the City shall report annually by September 1st to the Joint Legislative Audit Committee, the Seismic Safety Commission, and the State Water Board on progress made implementing the program of capital improvement (Water Code § 73501).
- Requires, under the WRWSSR Act, the City to submit an annual report to the Legislature and Department of Public Health by February 1st that describes progress made in securing supplemental sources of water for its water service customers during dry years. Provides that the City shall assign a higher priority to the delivery of water to its urban customers than to the generation of hydroelectricity so long as doing so does not violate federal law (Water Code § 73504).
- Requires, under the WRWSSR Act, the Department of Health Services to conduct an audit of the City’s program of maintenance for RWS by July 1, 2004. Prescribes the scope of said audit (Water Code § 73505).
- Sunsets the WRWSSR Act on January 1, 2026 (Water Code § 73514).
- Provides for the formation, membership, powers and authorities, and financing of Bay Area Water Supply and Conservation Agency (BAWSCA) (Water Code § 81300 et seq.).
- Establishes the San Francisco Bay Area Regional Water System Financing Authority (Financing Authority), prescribes its membership, and authorizes it to issue bonds to finance a capital improvement program for RWS (Water Code § 81600 et seq.).
FISCAL EFFECT: This bill is keyed fiscal and contains a state mandated local program.
COMMENTS:
- Bill Summary and Author’s Statement. This bill extends the sunset date of the WRWSSR Act from January 1, 2026 to January 1, 2036. BAWSCA is the sponsor of this bill.
According to the author, “AB 2962 is a simple sunset extension bill that extends state oversight of San Francisco Public Utility Commission’s capital investment program. In 2002, the San Francisco Regional Water System was outdated compared to seismic safety standards. Since the system crosses three active earthquake fault lines, the threat of entire counties being left without water was both evident and real. Recognizing the urgency of the situation, Assemblymember Lou Papan introduced AB 1823 to ensure ongoing state oversight of crucial capital improvements. The continuation of state oversight has been instrumental in the successful execution of SFPUC's necessary capital program. Maintaining this oversight without interruption is paramount to safeguarding the resilience and reliability of the area’s water infrastructure.”
- Background. The San Francisco Public Utilities Commission (SFPUC) is part of the City and County of San Francisco and provides retail and wholesale water service to approximately 2.7 million residential, commercial, and industrial customers in San Francisco and the counties of Alameda, San Mateo, Santa Clara, San Joaquin, and Tuolumne. SFPUC owns and operates RWS which consists of water storage and treatment facilities, water transmission infrastructure, buildings and structures for facilities and employees, communications systems, and watersheds and rights-of-way lands in San Mateo, Santa Clara, and Alameda Counties as well as western San Joaquin County. The major feature and water source in the RWS is the Hetch Hetchy Reservoir on the Tuolumne River that was built in the 1920’s and -30’s following congressional authorization via the Raker Act in 1913.
- SFPUC State Auditor Report. Completed in February 2000 as requested by the Legislature, the State Auditor found “that [SFPUC] has been slow to assess and upgrade its water delivery system to enable it to survive catastrophic events such as earthquakes, fires, or floods. [SFPUC] has also been slow to estimate the amount of water it will need to meet demand in the future and to seek additional sources of water. As a result, the nearly 2.4 million customers in the City and County of San Francisco, and in Alameda, San Mateo, and Santa Clara counties who rely on [SFPUC] for their drinking water are at greater risk of disruptions and water shortages in the event of a catastrophe or a drought.” In response to the audit report, Assemblymember Lou Papan introduced AB 1823 in 2002 to provide oversight of and accountability for SFPUC’s efforts to develop and complete a capital improvement plan. AB 1823 enacted the “WRWSSR Act”.
At the time of the audit, most features of SFPUC’s regional water system were more than 75 years old and SFPUC had only begun the process to develop a capital improvement program in 1994. This alarmed many of SFPUC’s wholesale customers in Alameda, San Mateo, and Santa Clara counties, some of whom depend upon SFPUC for up to 80% of their drinking water supplies.
- SFPUC Water System Improvement Program (WSIP). SFPUC adopted the WSIP in May 2002. It is a $4.8 billion capital improvement program intended to rebuild and retrofit RWS to improve system reliability, especially focused on ensuring seismic safety. The WRWSSR Act identified nine priority projects (Water Code § 73502) that were intended to keep water service relatively intact in the event of a major earthquake. SFPUC reports, as of September 1, 2023, that the WSIP is on track to be completed by February 2027 and that 98.9% of the regional program component of the WSIP is already complete. According to BAWSCA, the completion date was recently revised and is now expected to be June 2032.
- BAWSCA. BAWSCA was established by AB 2058 (Lou Papan), Chapter 844, Statutes of 2002 and has the sole authority to represent the needs of the 24 public and two private water agencies that rely on RWS. BAWSCA represents these agencies and works with SFPUC to ensure that RWS is fixed.
- Previous legislation. SB 699 (Hill), Chapter 214, Statutes of 2020, extends the sunset of the WRWSSR Act from January 1, 2022 to January 1, 2026, among other provisions.
SB 1345 (Committee on Natural Resources and Water), Chapter 489, Statutes of 2014, extends the sunset of the WRWSSR Act from January 1, 2015 to January 1, 2022, among other provisions.
AB 2437 (Ruskin), Chapter 99, Statutes of 2008, extends the sunset of the WRWSSR Act from December 31, 2010 to January 1, 2015.
AB 1823 (Lou Papan), Chapter 841, Statutes of 2002, enacts the WRWSSR Act.
AB 2058 (Lou Papan), Chapter 844, Statutes of 2002, provides for the formation of BAWSCA by at least 15 of the 26 public entities in Alameda, San Mateo, and Santa Clara Counties that purchase water from the City and County of San Francisco.
SB 1870 (Speier), Chapter 849, Statutes of 2002, enacts the Financing Authority that prescribes the membership of the Financing Authority and authorizes it to issue bonds to finance a capital improvement program for the RWS. - Arguments in Support. According to the California Water Association, “Assembly Bill (AB) 2962 extends the authority of the BAWSCA for ten years, to January 1, 2036. The extension will allow BAWSCA to completed much need drought water supply projects.”
- Arguments in Opposition. None on file.
- Double-Referral. This bill was double-referred to the Assembly Water, Parks, and Wildlife Committee, where it passed on a 14-0 vote on April 9, 2024.
REGISTERED SUPPORT / OPPOSITION:
Support
California Water Association
Opposition
None on file
Analysis Prepared by: Jimmy MacDonald / L. GOV. / (916) 319-3958
Date of Hearing: April 9, 2024
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Diane Papan, Chair
ABPCA Bill Id:AB 2962 (
Author:Papan) – As Amended Ver:March 21, 2024
SUBJECT: Wholesale Regional Water System Security and Reliability Act
SUMMARY: Extends the sunset of the “Wholesale Regional Water System Security and Reliability Act” from January 1, 2026 to January 1, 2036. Specifically, this bill:
- Extends the sunset of the “Wholesale Regional Water System Security and Reliability Act” from January 1, 2026 to January 1, 2036.
- Makes findings and declarations regarding the need for this bill.
- States that no reimbursement is required by this bill because the local agencies affected by this bill have the authority to levy service charges, fees, or assessments to cover the cost of its implementation.
EXISTING LAW:
- Requires, under the Wholesale Regional Water System Security and Reliability Act, the City and County of San Francisco (City) to adopt a program of capital improvement projects to restore and improve the Bay Area regional water system (RWS) by February 1, 2003. The program of capital improvement shall contain specified projects and the program shall be 50% complete by 2010 and 100% complete by 2015. A copy of the capital improvement program shall be submitted to the State Water Resources Control Board (State Water Board) and the City shall report annually by September 1st to the Joint Legislative Audit Committee, the Seismic Safety Commission, and the State Water Board on progress made implementing the program of capital improvement (Water Code § 73501).
- Requires, under the Wholesale Regional Water System Security and Reliability Act, the City to prepare an emergency response plan in consultation with the San Francisco Bay Area Water Users Association (BAWSCA), Alameda County, Santa Clara County, and San Mateo County that describes how water service will be restored to its water service area following an earthquake or other natural or manmade disaster (Water Code § 73503).
- Requires, under the Wholesale Regional Water System Security and Reliability Act, the City to submit an annual report to the Legislature and Department of Public Health by February 1st that describes progress made in securing supplemental sources of water for its water service customers during dry years. Provides that the City shall assign a higher priority to the delivery of water to its urban customers than to the generation of hydroelectricity so long as doing so does not violate federal law (Water Code § 73504).
- Requires, under the Wholesale Regional Water System Security and Reliability Act, the Department of Health Services to conduct an audit of the City’s program of maintenance for RWS by July 1, 2004. Prescribes the scope of said audit (Water Code § 73505).
- Sunsets the Wholesale Regional Water System Security and Reliability Act on January 1, 2026 (Water Code § 73514).
- Provides for the formation, membership, powers and authorities, and financing of the Bay Area Water Supply and Conservation Agency (BAWSCA) (Water Code § 81300 et seq.).
- Establishes the San Francisco Bay Area Regional Water System Financing Authority (Financing Authority), prescribes its membership, and authorizes it to issue bonds to finance a capital improvement program for RWS (Water Code § 81600 et seq.).
FISCAL EFFECT: Unknown. This bill is keyed fiscal.
COMMENTS:
- Purpose of this bill. The author asserts that the original goal of the Wholesale Regional Water System Security and Reliability Act has been successful, but that a sunset extension is necessary because the capital improvement program for RWS is yet to be complete and, therefore, continued state oversight is necessary. The author argues that this bill is necessary because “continuation of state oversight has been instrumental in the successful execution of SFPUC's necessary capital program. Maintaining this oversight without interruption is paramount to safeguarding the resilience and reliability of the area’s water infrastructure.”
- Background. The San Francisco Public Utilities Commission (SFPUC) is part of the City and County of San Francisco and provides retail and wholesale water service to approximately 2.7 million residential, commercial, and industrial customers in San Francisco and the counties of Alameda, San Mateo, Santa Clara, San Joaquin, and Tuolumne. SFPUC owns and operates RWS which consists of water storage and treatment facilities, water transmission infrastructure, buildings and structures for facilities and employees, communications systems, and watersheds and rights-of-way lands in San Mateo, Santa Clara, and Alameda Counties as well as western San Joaquin County. The major feature and water source in the RWS is the Hetch Hetchy Reservoir on the Tuolumne River that was built in the 1920’s and -30’s following congressional authorization via the Raker Act in 1913. On average, water captured in Hetch Hetchy provides 85% of the water for RWS with the remaining 15% coming from runoff in the Alameda and San Francisco Peninsula watersheds.
SFPUC State Auditor report (99124). Completed in February 2000 as requested by the Legislature, the State Auditor found “that [SFPUC] has been slow to assess and upgrade its water delivery system to enable it to survive catastrophic events such as earthquakes, fires, or floods. [SFPUC] has also been slow to estimate the amount of water it will need to meet demand in the future and to seek additional sources of water. As a result, the nearly 2.4 million customers in the City and County of San Francisco, and in Alameda, San Mateo, and Santa Clara counties who rely on [SFPUC] for their drinking water are at greater risk of disruptions and water shortages in the event of a catastrophe or a drought.” In response to the audit report, Assemblymember Lou Papan introduced AB 1823 in 2002 to provide oversight of and accountability for SFPUC’s efforts to develop and complete a capital improvement plan. AB 1823 enacted the “Wholesale Regional Water System Security and Reliability Act” (see “Existing Law,” above for outline of its major features).
At the time of the audit, most features of SFPUC’s regional water system were more than 75 years old and SFPUC had only begun the process to develop a capital improvement program in 1994. This alarmed many of SFPUC’s wholesale customers in Alameda, San Mateo, and Santa Clara counties, some of whom depend upon SFPUC for up to 80% of their drinking water supplies.
SFPUC Water System Improvement Program (WSIP). SFPUC adopted the WSIP in May 2002. It is a $4.8 billion capital improvement program intended to rebuild and retrofit RWS to improve system reliability, especially focused on ensuring seismic safety. The Wholesale Regional Water System Security and Reliability Act identified nine priority projects (Water Code § 73502) that were intended to keep water service relatively intact in the event of a major earthquake. SFPUC reports, as of September 1, 2023, that the WSIP is on track to be completed by February 2027 and that 98.9% of the regional program component of the WSIP is already complete. According to BAWSCA, the completion date was recently revised and is now expected to be June 2032.
BAWSCA. BAWSCA was established by AB 2058 (Lou Papan) and has the sole authority to represent the needs of the 24 public and two private water agencies that rely on RWS. BAWSCA represents these agencies and works with SFPUC to ensure that RWS is fixed. - Arguments in support. The California Water Association supports this bill arguing that it is necessary to allow for the completion of projects to upgrade RWS and improve drought resiliency.
- Proposed technical amendments. This bill contains two obsolete references to the Department of Public Health (DPH). These references are from AB 1823 that enacted the Wholesale Regional Water System Security and Reliability Act and are there because, at that time, the state’s drinking water program was housed at DPH. The drinking water program, however, was transferred to the State Water Board in 2014. To reflect this change, the Committee may wish to ask the author to change the two references to DPH to the State Water Board.
- Dual-referral. This bill has also been referred to the Committee on Local Government.
- Related legislation. SB 699 (Hill), Chapter 214, Statutes of 2020, extends the sunset of the Wholesale Regional Water System Security and Reliability Act from January 1, 2022 to January 1, 2026, among other provisions.
SB 1345 (Committee on Natural Resources and Water), Chapter 489, Statutes of 2014, extends the sunset of the Wholesale Regional Water System Security and Reliability Act from January 1, 2015 to January 1, 2022, among other provisions.
AB 2437 (Ruskin), Chapter 99, Statutes of 2008, extends the sunset of the Wholesale Regional Water System Security and Reliability Act from December 31, 2010 to January 1, 2015.
AB 1823 (Lou Papan), Chapter 841, Statutes of 2002, enacts the Wholesale Regional Water System Security and Reliability Act.
AB 2058 (Lou Papan), Chapter 844, Statutes of 2002, provides for the formation of BAWSCA by at least 15 of the 26 public entities in Alameda, San Mateo, and Santa Clara Counties that purchase water from the City and County of San Francisco.
SB 1870 (Speier), Chapter 849, Statutes of 2002, enacts the Financing Authority that prescribes the membership of the Financing Authority and authorizes it to issue bonds to finance a capital improvement program for the RWS.
REGISTERED SUPPORT / OPPOSITION:
Support
California Water Association
Opposition
None on file
Analysis Prepared by: Pablo Garza / W., P., & W. / (916) 319-2096
Bill Author
Bill Co-Author(s):