SB 284: Electricity: energization transparency and efficiency: wholesale distribution service.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2024-06-20
Current Status:
Failed
(2024-07-01: July 1 set for first hearing canceled at the request of author.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
What does this bill do?
The bill requires electric companies to share their detailed distribution planning data, publish uniform technical rules for connecting and energizing new load, and make interconnection‑queue information available so developers, parties seeking to connect to the grid, and public agencies can connect more quickly and predictably. It also requires any electric company with a wholesale distribution tariff on file with the federal regulator (FERC) to offer service under that tariff to the state and other public entities so they can transmit electricity they use or sell directly to end customers, and not exclude or refuse needed distribution facilities.
The summary is provided by generative AI which can make mistakes. For original language, please view the details in the table below.
Existing law vests the Public Utilities Commission (PUC) with regulatory jurisdiction over public utilities, including electrical corporations.
This bill would require each electrical corporation to provide distribution planning data, as defined, to development project applicants, energizing entities, as defined, and public entities in a timely and efficient manner. The bill would require the PUC to require each electrical corporation to develop and make publicly available uniform technical standards and requirements for the energization of electrical load on the distribution system and information about its distribution system interconnection queue necessary for the energization of electrical load. The bill would require each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission to offer service under that tariff to the state, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate consumer, as provided.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because a violation of a PUC action implementing the bill would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission (PUC) with regulatory jurisdiction over public utilities, including electrical and gas corporations.
This bill would require the commission to require each electrical corporation to make distribution data and provide distribution planning standards available data, as defined, to development project applicants, interconnecting energizing entities, as defined, and public entities in a timely and efficient manner. The bill would require the commission PUC to require each electrical corporation to develop and make publicly available uniform technical standards and requirements for the energization of electrical load on the distribution system and information about its distribution system interconnection queue necessary for the interconnection of generation and energization of electrical load. The bill would require each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission to offer service under that tariff to the state, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate customer, at the voltage requested by those public entities. consumer, as provided.
The Subletting and Subcontracting Fair Practices Act imposes various requirements on the state and any county, city, body politic, or public agency, and prime contractors and subcontractors, as defined, relating to the solicitation and acceptance of bids for construction on a public work or improvement. The act requires a bid to include specified information relating to the contractors to perform work under that bid, imposes limitations on the substitution, assignment, or sublet of subcontractors once a bid has been accepted, creates a process for addressing clerical errors in a submitted bid that requires, among other things, that the affected contractors submit affidavits under penalty of perjury, and imposes requirements on prime contractors and subcontractors relating to payment bonds. The act imposes various penalties for the violation of these provisions.This bill would impose the above-described requirements on electrical corporations or gas corporations, defined as investor-owned utilities, prime contractors, and subcontractors relating to the solicitation and acceptance of bids for a project of an investor-owned utility when the expenditure for a project exceeds $10,000, the project is undertaken in California, and the investor-owned utility intends to contract out the project. The bill would require an investor-owned utility to solicit bids in writing and award the work to the lowest responsible bidder or reject all bids. The bill would also require an investor-owned utility to specify various requirements relating to the payment of a prevailing wage, apprenticeship training, payment bonds, and a grievance process. By expanding the crime of perjury, the bill would impose a state-mandated local program. This bill would require an investor-owned utility to require its contractors and subcontractors to use a skilled and trained workforce to perform work on projects for the production, generation, transmission, distribution, or storage of energy. The bill would require the commission to require investor-owned utilities to obtain certain reports from their contractors, bidders, or other entities and to transmit those reports to the commission.This bill would prohibit an investor-owned utility from requiring a contractor to enter into, or not enter into, a collective bargaining agreement with any labor organization as a condition for bidding on any contracting work, entering into a contract with, or performing any contracting work for, the investor-owned utility, unless the agreement is a multicraft project labor agreement and certain requirements are met.Existing law defines the term public works for the purposes of various requirements relating to wages, working hours, and workers compensation for work performed on a public works project. Existing law specifies that the construction, alteration, demolition, installation, or repair work on the electric transmission system located in California is a public works project. Existing law defines the term awarding body for this purpose to mean a department, board, authority, officer, or agent awarding a contract for public work. Existing law requires that, except as specified, not less than the general prevailing rate of per diem wages, determined by the Director of Industrial Relations, be paid to workers employed on public works projects. Existing law makes a willful violation of laws relating to the payment of prevailing wages on public works a misdemeanor.This bill would expand the definition of awarding body to include an investor-owned utility. The bill would expand the definition of public works by including the construction, alteration, demolition, installation, or repair work done in California under contract and paid for in whole or in part by an investor-owned utility. By expanding the scope of a crime, the bill would impose a state-mandated local program. Existing law requires a direct contractor that is awarded a public works contract involving an expenditure in excess of $25,000 to, before commencement of work, give a payment bond to and approved by the officer or public entity by whom the contract was awarded.This bill would specify that a public entity includes an investor-owned utility and that a project contracted by an investor-owned utility is a public works contract for purposes of this requirement.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission PUC is a crime.
Because certain provisions of this bill would be part of the Public Utilities Act and a violation of a commission PUC action implementing certain provisions of the bill would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical and gas corporations.
This bill would require the commission to require each electrical corporation to make distribution data and distribution planning standards available to development project applicants, interconnecting entities, and public entities in a timely and efficient manner. The bill would require the commission to require each electrical corporation to develop and make publicly available information about its distribution system interconnection queue necessary for the interconnection of generation and electrical load. The bill would require each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission to offer service under that tariff to the state, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate customer, at the voltage requested by those public entities.
The Subletting and Subcontracting Fair Practices Act imposes various requirements on the state and any county, city, body politic, or public agency, and prime contractors and subcontractors, as defined, relating to the solicitation and acceptance of bids for construction on a public work or improvement. The act requires a bid to include specified information relating to the contractors to perform work under that bid, imposes limitations on the substitution, assignment, or sublet of subcontractors once a bid has been accepted, creates a process for addressing clerical errors in a submitted bid that requires, among other things, that the affected contractors submit affidavits under penalty of perjury, and imposes requirements on prime contractors and subcontractors relating to payment bonds. The Act act imposes various penalties for the violation of these provisions.
This bill would impose the above-described requirements on electrical corporations or gas corporations, defined as investor-owned utilities, prime contractors, and subcontractors relating to the solicitation and acceptance of bids for a project of an investor-owned utility when the expenditure for a project exceeds $10,000. $10,000, the project is undertaken in California, and the investor-owned utility intends to contract out the project. The bill would require an investor-owned utility to solicit bids in writing and award the work to the lowest responsible bidder or reject all bids. The bill would also require an investor-owned utility to specify various requirements relating to the payment of a prevailing wage, apprenticeship training, payment bonds, and a grievance process. By expanding the crime of perjury, the bill would impose a state-mandated local program.
This bill would require an investor-owned utility to require its contractors and subcontractors to use a skilled and trained workforce to perform work on projects for the production, generation, transmission, distribution, or storage of energy. The bill would require the commission to require investor-owned utilities to obtain certain reports from their contractors, bidders, or other entities and to transmit those reports to the commission.
This bill would prohibit an investor-owned utility from requiring a contractor to enter into, or not enter into, a collective bargaining agreement with any labor organization as a condition for bidding on any contracting work, entering into a contract with, or performing any contracting work for, the investor-owned utility, unless the agreement is a multicraft project labor agreement and certain requirements are met.
Existing law defines the term public works for the purposes of various requirements relating to wages, working hours, and workers compensation for work performed on a public works project. Existing law specifies that the construction, alteration, demolition, installation, or repair work on the electric transmission system located in California is a public works project. Existing law defines the term awarding body for this purpose to mean a department, board, authority, officer, or agent award awarding a contract for public work. Existing law requires that, except as specified, not less than the general prevailing rate of per diem wages, determined by the Director of Industrial Relations, be paid to workers employed on public works projects. Existing law makes a willful violation of laws relating to the payment of prevailing wages on public works a misdemeanor.
This bill would expand the definition of awarding body to include an investor-owned utility. The bill would expand the definition of public works by including the construction, alteration, demolition, installation, or repair work done in California under contract and paid for in whole or in part by an investor-owned utility. By expanding the scope of a crime, the bill would impose a state-mandated local program.
Existing law requires a direct contractor that is awarded a public works contract involving an expenditure in excess of $25,000 to, before commencement of work, give a payment bond to and approved by the officer or public entity by whom the contract was awarded.
This bill would specify that a public entity includes an investor-owned utility and that a project contracted by an investor-owned utility is a public works contract for purposes of this requirement.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because certain provisions of this bill would be part of the Public Utilities Act and a violation of a commission action implementing certain provisions of the bill would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical and gas corporations.
This bill would require the commission to require each electrical corporation to make distribution data and distribution planning standards available to development project applicants, interconnecting entities, and public entities in a timely and efficient manner. The bill would require the commission to require each electrical corporation to develop and make publicly available information about its distribution system interconnection queue necessary for the interconnection of generation and electrical load. The bill would require each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission to offer service under that tariff to the state, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate customer, at the voltage requested by those public entities.
The Subletting and Subcontracting Fair Practices Act imposes various requirements on the state and any county, city, body politic, or public agency, and prime contractors and subcontractors, as defined, relating to the solicitation and acceptance of bids for construction on a public work or improvement. The act requires a bid to include specified information relating to the contractors to perform work under that bid, imposes limitations on the substitution, assignment, or sublet of subcontractors once a bid has been accepted, creates a process for addressing clerical errors in a submitted bid that requires, among other things, that the affected contractors submit affidavits under penalty of perjury, and imposes requirements on prime contractors and subcontractors relating to payment bonds. The Act imposes various penalties for the violation of these provisions.
This bill would impose the above-described requirements on electrical corporations or gas corporations, defined as investor-owned utilities, prime contractors, and subcontractors relating to the solicitation and acceptance of bids for a project of an investor-owned utility when the expenditure for a project exceeds $10,000. The bill would require an investor-owned utility to solicit bids in writing and award the work to the lowest responsible bidder or reject all bids. The bill would also require an investor-owned utility to specify various requirements relating to the payment of a prevailing wage, apprenticeship training, payment bonds, and a grievance process. By expanding the crime of perjury, the bill would impose a state-mandated local program.
This bill would require an investor-owned utility to require its contractors and subcontractors to use a skilled and trained workforce to perform work on projects for the production, generation, transmission, distribution, or storage of energy. The bill would require the commission to require investor-owned utilities to obtain certain reports from their contractors, bidders, or other entities and to transmit those reports to the commission.
This bill would prohibit an investor-owned utility from requiring a contractor to enter into, or not enter into, a collective bargaining agreement with any labor organization as a condition for bidding on any contracting work, entering into a contract with, or performing any contracting work for, the investor-owned utility, unless the agreement is a multicraft project labor agreement and certain requirements are met.
Existing law defines the term public works for the purposes of various requirements relating to wages, working hours, and workers compensation for work performed on a public works project. Existing law defines the term awarding body for this purpose to mean a department, board, authority, officer, or agent award a contract for public work. Existing law requires that, except as specified, not less than the general prevailing rate of per diem wages, determined by the Director of Industrial Relations, be paid to workers employed on public works projects. Existing law makes a willful violation of laws relating to the payment of prevailing wages on public works a misdemeanor.
This bill would expand the definition of awarding body to include an investor-owned utility. The bill would expand the definition of public works by including the construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part by an investor-owned utility. By expanding the scope of a crime, the bill would impose a state-mandated local program.
Existing law requires a direct contractor that is awarded a public works contract involving an expenditure in excess of $25,000 to, before commencement of work, give a payment bond to and approved by the officer or public entity by whom the contract was awarded.
This bill would specify that a public entity includes an investor-owned utility and that a project contracted by an investor-owned utility is a public works contract for purposes of this requirement.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because certain provisions of this bill would be part of the Public Utilities Act and a violation of a commission action implementing certain provisions of the bill would be a crime, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires a person who owns a vending machine to affix to the machine their name and address, as specified. If the person owns more than one vending machine located at the same place, existing law instead authorizes the person to post a clearly readable sign containing their name and address in a conspicuous location near the machines. Existing law makes a violation of those provisions a crime.This bill would require a person to post their telephone number, email address, or both, on the machine or in a conspicuous location, as may be appropriate. The bill would provide that a violation of these provisions is not a crime.Existing law requires a person who owns a vending machine to affix to the machine their name and address, as specified. If the person owns more than one vending machine located at the same place, existing law instead authorizes the person to post a clearly readable sign containing their name and address in a conspicuous location near the machines. Existing law makes a violation of those provisions a crime.
This bill would require a person to post their telephone number, email address, or both, on the machine or in a conspicuous location, as may be appropriate. The bill would provide that a violation of these provisions is not a crime.
The Legislative Legislature finds and declares both of the following:
(a)Distribution system information, including distribution planning data, should be made available to increase transparency and efficiency in the energization process, promote least cost interconnections of electrical load, increase transparency, and promote effective participation in the distribution planning process. Comparable information for transmission system planning and transmission load interconnections is available publicly or pursuant to nondisclosure agreements.
(b)To promote competition in the electrical distribution system and meet the states electrification goals, the states three largest electrical corporations that have filed a wholesale distribution tariff with the Federal Energy Regulatory Commission should remove barriers to accessing their distribution system for the state and its political subdivisions, including local publicly owned electric utilities and municipal electric utilities, to serve their own load and the load of their ultimate consumers and residents.
2849.1.For purposes of this chapter, the following definitions apply:
(a)Distribution planning data means the same or equivalent distribution data that an electrical corporation uses to plan the system, including distribution system planning models, all underlying load, including retail load and wholesale load, storage, distribution infrastructure facility data, detailed physical maps, historical, in-progress, and planned distribution capacity projects and facility upgrades, and distribution system planning standards.
(b)Energization means the connection of electrical load to the electrical transmission or distribution grid of an electrical corporation.
(c)Energizing entity means an entity seeking to connect electrical load to the electrical transmission or distribution grid of an electrical corporation.
2.Energization Transparency and Efficiency2849.5.Electrical corporations shall provide distribution planning data to development project applicants, energizing entities, and public entities in a timely and efficient manner.
2849.6.The commission shall require electrical corporations to develop and make publicly available uniform technical standards and requirements for the energization of electrical load on the distribution system.
2849.7.The commission shall require each electrical corporation to develop and make publicly available information about its distribution system interconnection queue necessary for the energization of electrical load.
3.Wholesale Distribution Service2849.10.Each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission shall offer service under that tariff to the State of California, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate consumer. This service shall be offered over all the distribution facilities of the electrical corporation. An electrical corporation subject to this requirement shall not exclude any distribution facilities from this obligation, or refuse to install any distribution facilities necessary to transmit electricity directly to the ultimate consumer, whether based on location, voltage level, or other characteristics of the applicable facilities. This obligation shall be in addition to any other requirement to offer service under that tariff that may exist under federal law.
SEC. 2.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislative finds and declares both of the following:
(a)Distribution system information, including distribution planning data, should be made available to increase transparency and efficiency in the energization process, promote least cost interconnections of electrical load, increase transparency, and promote effective participation in the distribution planning process. Comparable information for transmission system planning and transmission load interconnections is available publicly or pursuant to nondisclosure agreements.
(b)To promote competition in the electrical distribution system and meet the states electrification goals, electrical corporations that have filed a wholesale distribution tariff should remove barriers to accessing their distribution system for the state and its political subdivisions, including local publicly owned electric utilities and municipal electric utilities, to serve their own load and the load of their ultimate consumers and residents.
2849.2849.1.For purposes of this article, chapter, the following definitions apply:
(a)Interconnecting entity means an entity seeking to connect electrical generation or load to the electrical transmission or distribution grid of an electrical corporation.(a)Distribution planning data means the same or equivalent distribution data that an electrical corporation uses to plan the system, including distribution system planning models, all underlying load, including retail load and wholesale load, storage, distribution infrastructure facility data, detailed physical maps, historical, in-progress, and planned distribution capacity projects and facility upgrades, and distribution system planning standards.
(b)Interconnection Energization means the connection of electrical generation or load to the electrical transmission or distribution grid of an electrical corporation.
(c)Energizing entity means an entity seeking to connect electrical load to the electrical transmission or distribution grid of an electrical corporation.
2849.1.The commission shall require each electrical corporation to make distribution data and distribution planning standards available to development project applicants, interconnecting entities, and public entities in a timely and efficient manner.2849.2.The commission shall determine whether additional distribution system information beyond distribution data and distribution planning standards should be made available to increase transparency and efficiency in the interconnection process, promote least cost interconnections of generation and electrical load, and increase transparency and promote effective participation in the distribution planning process.2.Energization Transparency and Efficiency2849.5.Electrical corporations shall provide distribution planning data to development project applicants, energizing entities, and public entities in a timely and efficient manner.
2849.3.2849.6.The commission shall require electrical corporations to develop and make publicly available uniform technical standards and requirements for interconnection the energization of electrical load to on the distribution system.
2849.4.2849.7.The commission shall require each electrical corporation to develop and make publicly available information about its distribution system interconnection queue necessary for the interconnection of generation and energization of electrical load.
2. 3.Wholesale Distribution Service2849.10.(a)Each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission shall offer service under that tariff to the State of California, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate consumer, at the voltage level requested by those public entities. consumer. This service shall be offered over all the distribution facilities of the electrical corporation. An electrical corporation subject to this requirement shall not exclude any distribution facilities from this obligation, or refuse to install any distribution facilities necessary to transmit electricity directly to the ultimate consumer, whether based on location, voltage level, or other characteristics of the applicable facilities. This obligation shall be in addition to any other requirement to offer service under that tariff that may exist under federal law.
(b)The commission shall adopt rules to implement subdivision (a).SEC. 7.Part 7 (commencing with Section 3298) is added to Division 1 of the Public Utilities Code, to read:7.Contracting Practices of Electrical and Gas Corporations3298.For purposes of this part, the following definitions apply:(a)Bid invitation means any documents issued to prime contractors that contain descriptions of the work to be bid or the content, form, or manner of submission of bids by bidders.(b)Investor-owned utility means either of the following entities that are not subject to the Subletting and Subcontracting Fair Practices Act (Chapter 4 (commencing with Section 4100) of Part 1 of Division 2 of the Public Contract Code):(1)An electrical corporation, as defined in Section 218.(2)A gas corporation, as defined in Section 222.(c)Material change means a change with a substantial cost impact on the total bid as determined by the investor-owned utility.(d)Prime contractor means the contractor who contracts directly with the investor-owned utility.(e)(1)Project of an investor-owned utility or project means any construction, reconstruction, alteration, enlargement, renewal, demolition, installation, repair, or replacement of any structure, building, road, or other improvement of any kind, undertaken in California by an investor-owned utility.(2)For purposes of paragraph (1), construction includes alteration, demolition, repair, installation, and work performed during the design, preconstruction, and postconstruction phases of construction, including, but not limited to, inspection, land surveying work, and all cleanup work at the jobsite.(3) For purposes of paragraph (1), installation includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems.(f)Subcontractor means a contractor, within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, that contracts directly with any prime contractor or subcontractor.3298.1.This part applies if the expenditure required by a project of an investor-owned utility exceeds ten thousand dollars ($10,000) and the investor-owned utility intends to contract out the project.3298.2.An investor-owned utility taking bids for a project of an investor-owned utility shall provide in the specifications prepared for the project or in the general conditions under which bids will be received for the doing of the work incident to the project of an investor-owned utility that any person making a bid or offer to perform the work shall, in that persons bid or offer, set forth all of the following:(a)(1)The name, location of the place of business, and contractors license number of each subcontractor that will perform work or labor or render service to the prime contractor in or about the construction of the project, or a subcontractor licensed by the Contractors State License Board that, under subcontract to the prime contractor, specially fabricates, whether onsite or offsite, and installs a portion of the project according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractors total bid or ten thousand dollars ($10,000), whichever is greater.(2)(A)Subject to subparagraph (B), information requested by the investor-owned utility concerning any subcontractor that the prime contractor is required to list under this subdivision, other than the subcontractors name, location of business, and contractors license number may be submitted by the prime contractor up to 24 hours after the deadline established by the investor-owned utility for receipt of bids by prime contractors.(B)An investor-owned utility may implement subparagraph (A) at its option.(b)The portion of the work that will be done by each subcontractor under its contract. The prime contractor shall list only one subcontractor for each portion as is defined by the prime contractor in the prime contractors bid.3298.3.(a)An investor-owned utility taking bids for a project shall specify in the bid invitation and public notice the place the bids of the prime contractors are to be received and the time by which they shall be received, and that wages for work performed under the contract shall be paid at the prevailing rate pursuant to Section 3298.13. The date and time shall be extended by no less than 72 hours if the investor-owned utility issues any material changes, additions, or deletions to the invitation later than 72 hours before the bid closing. Any bids received after the time specified in the notice or any extension due to material changes shall be returned unopened.(b)The investor-owned utility shall file the bid invitation and public notice with the commission.3298.4.Circumvention by a general contractor that bids as a prime contractor of the requirement under Section 3298.3 for the general contractor to list its subcontractors, by the device of listing another contractor that will in turn sublet portions constituting the majority of the work covered by the prime contract, shall be considered a violation of this part and shall subject that general contractor to the penalties set forth in Section 3298.10, and disciplinary action authorized in Section 3298.11.3298.5.If a prime contractor fails to specify a subcontractor or if a prime contractor specifies more than one subcontractor for the same portion of work to be performed under the contract in excess of one-half of 1 percent of the prime contractors total bid, the prime contractor agrees that it is fully qualified to perform that portion itself, and that the prime contractor shall perform that portion itself. Except as provided for in Section 3298.6 or 3298.9, if after the award of contract, the prime contractor subcontracts any portion of that work, the prime contractor shall be subject to the disciplinary action authorized in Section 3298.11.3298.6.A prime contractor whose bid is accepted shall not do any of the following:(a)(1)Substitute a person as subcontractor in place of the subcontractor listed in the original bid, except that the investor-owned utility, or its duly authorized officer, may, except as otherwise provided in Section 3298.7, consent to the substitution of another person as a subcontractor in any of the following situations:(A)When the subcontractor listed in the bid, after having had a reasonable opportunity to do so, fails or refuses to execute a written contract for the scope of work specified in the subcontractors bid and at the price specified in the subcontractors bid, when that written contract, based upon the general terms, conditions, plans, and specifications for the project involved or the terms of that subcontractors written bid, is presented to the subcontractor by the prime contractor.(B)When the listed subcontractor becomes insolvent or the subject of an order for relief in bankruptcy.(C)When the listed subcontractor fails or refuses to perform its subcontract.(D)When the listed subcontractor fails or refuses to meet the bond requirements of the prime contractor as set forth in Section 3298.8.(E)When the prime contractor demonstrates to the investor-owned utility, or its duly authorized officer, subject to Section 3298.7, that the name of the subcontractor was listed as the result of an inadvertent clerical error.(F)When the listed subcontractor is not licensed by the Contractors State License Board.(G)When the investor-owned utility, or its duly authorized officer, determines that the work performed by the listed subcontractor is substantially unsatisfactory and not in substantial accordance with the plans and specifications, or that the subcontractor is substantially delaying or disrupting the progress of the work.(H)When the listed subcontractor is ineligible to work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code, or Section 2603 of the Public Contract Code.(I)When the investor-owned utility determines that a listed subcontractor is not a responsible contractor.(2)Before approving the prime contractors request for the substitution, the investor-owned utility, or its duly authorized officer, shall give notice in writing to the listed subcontractor of the prime contractors request to substitute and the reasons for the request. The notice shall be served by certified or registered mail to the last known address of the subcontractor. The listed subcontractor that has been so notified has five working days within which to submit written objections to the substitution to the investor-owned utility. Failure to file these written objections constitutes the listed subcontractors consent to the substitution.(3)If written objections are filed, the investor-owned utility shall give notice in writing of at least five working days to the listed subcontractor of a public hearing by the investor-owned utility on the prime contractors request for substitution.(b)Permit a subcontract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the original bid, without the consent of the investor-owned utility, or its duly authorized officer.(c)Other than in the performance of change orders causing changes or deviations from the original contract, sublet or subcontract any portion of the work in excess of one-half of 1 percent of the prime contractors total bid as to which its original bid did not designate a subcontractor.3298.7.(a)The prime contractor, as a condition to asserting a claim of inadvertent clerical error in the listing of a subcontractor, shall, within two working days after the time of the prime bid opening by the investor-owned utility, give written notice to the investor-owned utility and copies of that notice to the subcontractor that is claimed to have been listed in error and the intended subcontractor that had bid to the prime contractor before the bid opening. The notice shall be served by email, facsimile, or other method so as to ensure delivery by the next business day.(b)A listed subcontractor that has been notified by the prime contractor in accordance with this section as to an inadvertent clerical error shall be allowed six working days from the time of the prime bid opening within which to submit to the investor-owned utility and to the prime contractor written objection to the prime contractors claim of inadvertent clerical error. Failure of the listed subcontractor to file the written notice within the six working days shall be primary evidence of the subcontractors agreement that an inadvertent clerical error was made.(c)The investor-owned utility shall, after a public hearing, as applicable, and in the absence of compelling reasons to the contrary, consent to the substitution of the intended subcontractor under the following conditions:(1)If the prime contractor, the subcontractor listed in error, and the intended subcontractor each submit an affidavit to the investor-owned utility along with additional evidence as the parties may wish to submit that an inadvertent clerical error was in fact made, provided that the affidavits from each of the three parties are filed within eight working days from the time of the prime bid opening.(2)If the affidavits are filed by both the prime contractor and the intended subcontractor within the specified time but the subcontractor that the prime contractor claims to have listed in error does not submit, within six working days, to the investor-owned utility and to the prime contractor, written objection to the prime contractors claim of inadvertent clerical error as provided in this section.(3)If the affidavits are filed by both the prime contractor and the intended subcontractor, but the listed subcontractor has, within six working days from the time of the prime bid opening, submitted to the investor-owned utility and to the prime contractor written objection to the prime contractors claim of inadvertent clerical error, the investor-owned utility shall investigate the claims of the parties and shall hold a public hearing within 14 days of receipt of the affidavits as provided in this paragraph to determine the validity of those claims. The determination made shall be based on the facts contained in the declarations submitted under penalty of perjury by all three parties and supported by testimony under oath and subject to cross-examination. The investor-owned utility may, on its own motion or that of any other party, admit testimony of other contractors, any bid registries or depositories, or any other party in possession of facts that may have a bearing on the decision of the investor-owned utility.3298.8.(a)Each subcontractor submitting bids to a prime contractor to be prepared shall submit a faithful performance and payment bond or bonds if so requested by the prime contractor.(b)If a subcontractor submitting a bid to a prime contractor does not, upon the request of the prime contractor and at the expense of the prime contractor at the established charge or premium therefor, furnish to the prime contractor a bond or bonds issued by an admitted surety in which the prime contractor is named the obligee, guaranteeing prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract, the prime contractor may reject the bid within seven days of the failure to furnish the required bonds and make a substitution of another subcontractor subject to Section 3298.7.(c)(1)The bond or bonds may be required under this section only if the prime contractor in its written or published request for subbids clearly specifies the amount and requirements of the bond or bonds.(2)If the expense of the bond or bonds required under this section is to be borne by the subcontractor, that requirement shall also be specified in the prime contractors written or published request for subbids.(3)The prime contractors failure to specify bond requirements, in accordance with this subdivision, in the written or published request for subbids shall preclude the prime contractor from imposing bond requirements on the subcontractor under this section.(4)Whether or not the prime contractor requires a bond, the prime contractor and the subcontractor shall be jointly and severally liable for all wages claims and judgments asserted against the subcontractor or any labor contracting company or staffing agency.3298.9.Subletting or subcontracting of any portion of the work in excess of one-half of 1 percent of the prime contractors total bid as to which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and only after a finding reduced to writing as a public record of the investor-owned utility setting forth the facts constituting the emergency or necessity.3298.10.(a)A prime contractor violating this part violates its contract and the investor-owned utility may exercise the option, in its own discretion, of doing either of the following:(1)Canceling the contract.(2)Assessing the prime contractor a penalty in an amount of not more than 10 percent of the amount of the subcontract involved, and the penalty shall be deposited in the fund out of which the prime contract is awarded.(b)In any proceedings under this section the prime contractor shall be entitled to a public hearing and to five days notice of the time and place of the public hearing.3298.11.A violation of this part by a licensee under Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code constitutes grounds for disciplinary action by the Contractors State License Board, in addition to the penalties prescribed in Section 3298.10.3298.12.The failure on the part of a contractor to comply with this part does not constitute a defense to the contractor in any action brought against the contractor by a subcontractor.3298.13.(a)For a project subject to this part, the investor-owned utility shall solicit bids in writing and shall award the work to the lowest responsible bidder or reject all bids.(b)The investor-owned utility shall specify in the call for bids for the contract, in the bid specifications, and in the contract all of the following:(1)That prevailing wages are required of all contractors and their subcontractors of every tier.(2)That apprentices shall be employed and trained pursuant to Section 1777.5 of the Labor Code.(3)That certified payroll records pursuant to Section 1776 of the Labor Code shall be submitted to the investor-owned utility.(4)That the other provisions of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code shall apply to work on the project of the investor-owned utility.(5)That a payment bond, with the terms described in Section 9554 of the Civil Code, shall be required of the prime contractor for any project.(6)That the investor-owned utility has adopted a bid protest procedure that shall be available to any unsuccessful bidder.(7)That the contractor, bidder, or other entity, and its contractors and subcontractors at every tier, shall comply with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.(c)The payment bond described in paragraph (5) of subdivision (b) shall comply with the terms described in Section 9554 of the Civil Code. Chapter 5 (commencing with Section 9550) of Title 3 of Part 6 of Division 4 of the Civil Code applies to the payment bond required by this section.(d)The bid protest procedure described in paragraph (6) of subdivision (b) shall, at a minimum, be available to any bidder, and any person, firm, association, trust, partnership, labor organization, corporation, or other legal entity that has, before the letting of the bids on the project in question, entered into a contract with the bidders that have submitted bids, to protest on the basis that the low bidder is not responsible or the bid is not responsive.3298.14.(a)For purposes of this section, the definitions contained in Section 2601 of the Public Contract Code apply.(b)Commencing on or after January 1, 2024, the investor-owned utility shall require that its contractors and any subcontractors use a skilled and trained workforce to perform work on a project subject to this part for the production, generation, transmission, distribution, or storage of energy within an apprenticeable occupation in the building and construction trades, as specified in Section 2602 of the Public Contract Code, except as otherwise provided in this section.(c)The commission shall require all investor-owned utilities to obtain from their contractors, bidders, or other entities the report described in paragraph (2) of subdivision (a) of Section 2602 of the Public Contract Code. Those reports shall be transmitted by the investor-owned utilities to the commission, shall be considered a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), and shall be open to public inspection.(d)If the contractor, bidder, or other entity fails to provide the monthly report required by this section, or provides a report that is incomplete, the investor-owned utility shall withhold payments as the awarding body in accordance with subdivision (b) of Section 2602 of the Public Contract Code. If a monthly report does not demonstrate compliance with this section, the investor-owned utility shall withhold payments as the awarding body in accordance with subdivision (c) of Section 2602 of the Public Contract Code. The investor-owned utility shall resume payment as provided in subdivision (b) or (c) of Section 2602 of the Public Contract Code, as applicable. All actions withholding or resuming payment under this subdivision, including a plan to achieve substantial compliance as described in subparagraph (C) of paragraph (1) of subdivision (c) of Section 2602 of the Public Contract Code, shall be reported to the commission.(e)(1)The commission may enter into an agreement with the Labor Commissioner to delegate to the Labor Commissioner the authority to receive the reports required pursuant to subdivision (c) or (d).(2)The Labor Commissioner may conduct the investigations and take the actions described in Section 2603 of the Public Contract Code, under the procedures described in Section 1777.1 of the Labor Code as to any project. A contractor or subcontractor debarred from bidding on or being awarded a contract for a public work under Section 2603 of the Public Contract Code and Section 1777.1 of the Labor Code shall be similarly debarred, for the same period of time and under the same conditions, from bidding on or being awarded a contract for a project. The Labor Commissioner shall provide the commission with a list of the debarred contractors and subcontractors, in the same form as specified in subdivision (k) of Section 2603 of the Public Contract Code, and the commission shall post the list on its internet website and make the list available to investor-owned utilities.(3)If an investor-owned utility receives a monthly report that does not demonstrate compliance with the skilled and trained workforce requirements of this section, it shall forward a copy of the monthly report to the commission. The commission shall forward a copy of the monthly report to the Labor Commissioner for issuance of a civil wage and penalty assessment in accordance with this section. The commission may enter into an agreement with the Labor Commissioner for direct reporting and referral of the monthly reports to the Labor Commissioner.(f)No exceptions or delays in compliance with this section shall be allowed by the commission, except upon a showing of both of the following:(1)Diligent and good-faith efforts to comply.(2)The exception or delay is necessary to prevent immediate harm to public health or safety or to the environment. Any exception or delay granted shall cease as soon as the emergency requiring it is over.3298.15.All notices, bids, subcontractor lists, or other written documents required to be submitted to an investor-owned utility under this part shall be promptly transmitted to the commission, and shall be considered a writing and subject to public disclosure under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).3298.16.An investor-owned utility shall not enter into any agreement in contravention of this part.3298.17.This part does not limit or diminish any rights or remedies, either legal or equitable, of either of the following:(a)That an original or substituted subcontractor may have against the prime contractor, or the prime contractors successors or assigns.(b)That the investor-owned utility may have against the prime contractor, or the prime contractors successors or assigns, including the right to take over and complete the contract.SEC. 8.SEC. 2.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 9.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)The practices of bid shopping and bid peddling in connection with projects described in Part 7 (commencing with Section 3298) of Division 1 of the Public Utilities Code often result in poor quality of material and workmanship to the detriment of the ratepaying public, deprives the public of the full benefits of fair competition among prime contractors and subcontractors, and leads to insolvencies, loss of wages to employees, and other evils. Therefore, the same requirements for dealing with these problems on public works under the Subletting and Subcontracting Fair Practices Act (Chapter 4 (commencing with Section 4100) of Part 1 of Division 2 of the Public Contract Code) should be imposed on electrical and gas corporations.
(b)To ensure a fair and open bidding process, to eliminate favoritism, fraud, and corruption in the award of contracts, and to protect ratepayers from unnecessary costs costs, electrical and gas corporations should be required to award construction projects to the lowest responsible bidder.
(c)The requirements of competitive bidding imposed by this act will make it necessary to also impose the same protections for employees and the public as currently afforded on public works, specifically, to protect employees on projects from substandard wages that might be paid if contractors could recruit labor from distant cheap-labor areas, to permit union contractors to compete with nonunion contractors, to benefit the public through the superior efficiency of well-paid employees, to require electrical and gas corporations to participate in state-certified apprenticeship programs to secure a trained construction workforce to meet Californias infrastructure needs, and to compensate nonpublic employees with higher wages for the absence of job security and employment benefits enjoyed by public employees. The prevailing wage is a minimum wage that the Legislature finds should be extended to workers employed on certain projects of electrical and gas corporations that have been excluded from that protection.
(d)The deadly and costly fires that have ravaged the state in the last two years have highlighted the need for a skilled and trained workforce in the construction of utilities to minimize the risk of future disasters.
SEC. 2.Section 9551 is added to the Civil Code, to read:9551.For purposes of this chapter, an investor-owned utility, as defined in Section 3298 of the Public Utilities Code, shall be considered a public entity and any construction project or work contracted by an investor-owned utility, covered by the provisions of Section 3298 of the Public Utilities Code, shall be considered a public works contract.
SEC. 3.Section 1720 of the Labor Code is amended to read:1720.(a)As used in this chapter, public works means all of the following:
(1)Construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part out of public funds, except work done directly by a public utility company pursuant to order of the Public Utilities Commission or other public authority. For purposes of this paragraph, construction includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including, but not limited to, inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. For purposes of this paragraph, installation includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems. For purposes of this paragraph, public utility company does not include an investor-owned utility, as defined in Section 3298 of Public Utilities Code.
(2)Work done for irrigation, utility, reclamation, and improvement districts, and other districts of this type. Public works does not include the operation of the irrigation or drainage system of an irrigation or reclamation district, except as used in Section 1778 relating to retaining wages.
(3)Street, sewer, or other improvement work done under the direction and supervision or by the authority of an officer or public body of the state, or of a political subdivision or district thereof, whether the political subdivision or district operates under a freeholders charter or not.
(4)The laying of carpet done under a building lease-maintenance contract and paid for out of public funds.
(5)The laying of carpet in a public building done under contract and paid for in whole or in part out of public funds.
(6)Public transportation demonstration projects authorized pursuant to Section 143 of the Streets and Highways Code.
(7)(A)Infrastructure project grants from the California Advanced Services Fund pursuant to Section 281 of the Public Utilities Code.
(B)For purposes of this paragraph, the Public Utilities Commission is not the awarding body or the body awarding the contract, as defined in Section 1722.
(8)Tree removal work done in the execution of a project under paragraph (1).
(9)Construction, alteration, demolition, installation, or repair work done in California under contract and paid for in whole or in part by an investor-owned utility, as defined in Section 3298 of the Public Utilities Code.
(b)For purposes of this section, paid for in whole or in part out of public funds means all of the following:
(1)The payment of money or the equivalent of money by the state or political subdivision directly to or on behalf of the public works contractor, subcontractor, or developer.
(2)Performance of construction work by the state or political subdivision in execution of the project.
(3)Transfer by the state or political subdivision of an asset of value for less than fair market price.
(4)Fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations that would normally be required in the execution of the contract, that are paid, reduced, charged at less than fair market value, waived, or forgiven by the state or political subdivision.
(5)Money loaned by the state or political subdivision that is to be repaid on a contingent basis.
(6)Credits that are applied by the state or political subdivision against repayment obligations to the state or political subdivision.
(c)Notwithstanding subdivision (b), all of the following apply:
(1)Private residential projects built on private property are not subject to this chapter unless the projects are built pursuant to an agreement with a state agency, a redevelopment agency, a successor agency to a redevelopment agency when acting in that capacity, or a local public housing authority.
(2)If the state or a political subdivision requires a private developer to perform construction, alteration, demolition, installation, or repair work on a public work of improvement as a condition of regulatory approval of an otherwise private development project, and the state or political subdivision contributes no more money, or the equivalent of money, to the overall project than is required to perform this public improvement work, and the state or political subdivision maintains no proprietary interest in the overall project, then only the public improvement work shall thereby become subject to this chapter.
(3)(A)If the state or a political subdivision reimburses a private developer for costs that would normally be borne by the public, or provides directly or indirectly a public subsidy to a private development project that is de minimis in the context of the project, an otherwise private development project shall not thereby become subject to this chapter.
(B)(i)For purposes of subparagraph (A), a public subsidy is de minimis if it is both less than six hundred thousand dollars ($600,000) and less than 2 percent of the total project cost.
(ii)Notwithstanding clause (i), for purposes of subparagraph (A), a public subsidy for a project that consists entirely of single-family dwellings is de minimis if it is less than 2 percent of the total project cost.
(iii)This subparagraph shall not apply to a project that was advertised for bid, or a contract that was awarded, before July 1, 2021.
(4)The construction or rehabilitation of affordable housing units for low- or moderate-income persons pursuant to paragraph (5) or (7) of subdivision (e) of Section 33334.2 of the Health and Safety Code that are paid for solely with moneys from the Low and Moderate Income Housing Fund established pursuant to Section 33334.3 of the Health and Safety Code or that are paid for by a combination of private funds and funds available pursuant to Section 33334.2 or 33334.3 of the Health and Safety Code do not constitute a project that is paid for in whole or in part out of public funds.
(5)Unless otherwise required by a public funding program, the construction or rehabilitation of privately owned residential projects is not subject to this chapter if one or more of the following conditions are met:
(A)The project is a self-help housing project in which no fewer than 500 hours of construction work associated with the homes are to be performed by the home buyers.
(B)The project consists of rehabilitation or expansion work associated with a facility operated on a not-for-profit basis as temporary or transitional housing for homeless persons with a total project cost of less than twenty-five thousand dollars ($25,000).
(C)Assistance is provided to a household as either mortgage assistance, downpayment assistance, or for the rehabilitation of a single-family home.
(D)The project consists of new construction, expansion, or rehabilitation work associated with a facility developed by a nonprofit organization to be operated on a not-for-profit basis to provide emergency or transitional shelter and ancillary services and assistance to homeless adults and children. The nonprofit organization operating the project shall provide, at no profit, not less than 50 percent of the total project cost from nonpublic sources, excluding real property that is transferred or leased. Total project cost includes the value of donated labor, materials, and architectural and engineering services.
(E)The public participation in the project that would otherwise meet the criteria of subdivision (b) is public funding in the form of below-market interest rate loans for a project in which occupancy of at least 40 percent of the units is restricted for at least 20 years, by deed or regulatory agreement, to individuals or families earning no more than 80 percent of the area median income.
(d)Notwithstanding any provision of this section to the contrary, the following projects are not, solely by reason of this section, subject to this chapter:
(1)Qualified residential rental projects, as defined by Section 142(d) of the Internal Revenue Code, financed in whole or in part through the issuance of bonds that receive allocation of a portion of the state ceiling pursuant to Chapter 11.8 (commencing with Section 8869.80) of Division 1 of Title 2 of the Government Code on or before December 31, 2003.
(2)Single-family residential projects financed in whole or in part through the issuance of qualified mortgage revenue bonds or qualified veterans mortgage bonds, as defined by Section 143 of the Internal Revenue Code, or with mortgage credit certificates under a Qualified Mortgage Credit Certificate Program, as defined by Section 25 of the Internal Revenue Code, that receive allocation of a portion of the state ceiling pursuant to Chapter 11.8 (commencing with Section 8869.80) of Division 1 of Title 2 of the Government Code on or before December 31, 2003.
(3)Low-income housing projects that are allocated federal or state low-income housing tax credits pursuant to Section 42 of the Internal Revenue Code, Chapter 3.6 (commencing with Section 50199.4) of Part 1 of Division 31 of the Health and Safety Code, or Section 12206, 17058, or 23610.5 of the Revenue and Taxation Code, on or before December 31, 2003.
(e)Notwithstanding paragraph (1) of subdivision (a), construction, alteration, demolition, installation, or repair work on the electric transmission system located in California or the construction, alteration, demolition, installation, or repair work that is subject to Part 7 (commencing with Section 3298) of Division 1 of the Public Utilities Code constitutes a public works project for the purposes of this chapter.(f)(e)If a statute, other than this section, or a regulation, other than a regulation adopted pursuant to this section, or an ordinance or a contract applies this chapter to a project, the exclusions set forth in subdivision (d) do not apply to that project.
(g)(f)For purposes of this section, references to the Internal Revenue Code mean the Internal Revenue Code of 1986, as amended, and include the corresponding predecessor sections of the Internal Revenue Code of 1954, as amended.
(h)(g)The amendments made to this section by either Chapter 938 of the Statutes of 2001 or the act adding this subdivision shall not be construed to preempt local ordinances requiring the payment of prevailing wages on housing projects.
SEC. 4.Section 1722 of the Labor Code is amended to read:1722.Awarding body or body awarding the contract means department, board, authority, officer officer, or agent awarding a contract for public work, or an investor-owned utility, as defined in Section 3298 of the Public Utilities Code.
SEC. 5.Section 768.7 is added to the Public Utilities Code, to read:768.7.(a)For purposes of this section, the following definitions apply:
(1)Contractor means a contractor as defined in Section 7026 of the Business and Professions Code, but does not include an investor-owned utility, or any other entity with 10 percent or more common ownership with the investor-owned utility.
(2)Investor-owned utility means either of the following entities:
(A)An electrical corporation.
(B)A gas corporation.
(3)Project labor agreement means a prehire collective bargaining agreement, as described in Section 158(f) of Title 29 of the United States Code, that establishes terms and conditions of employment for a specific construction project or projects.
(b)An investor-owned utility shall not require a contractor to enter into, or not enter into, a collective bargaining agreement with any labor organization as a condition for bidding on any contracting work, entering into a contract with, or performing any contracting work for, the investor-owned utility, unless the agreement is a multicraft project labor agreement that includes all construction crafts with applicable coverage determinations for the specified scopes of work on the project pursuant to Section 1773 of the Labor Code and meets the requirements of Section 2500 of the Public Contract Code, including includes all of the following ratepayer protection provisions:
(1)The agreement prohibits discrimination based on race, national origin, religion, sex, sexual orientation, political affiliation, or membership in a labor organization in hiring and dispatching workers for the project.
(2)The agreement permits all qualified contractors and subcontractors to bid for and be awarded work on the project without regard to whether they are otherwise parties to collective bargaining agreements.
(3)The agreement contains an agreed-upon protocol concerning drug testing for workers who will be employed on the project.
(4)The agreement contains guarantees against work stoppages, strikes, lockouts, and similar disruptions of the project.
(5)The agreement provides that disputes arising from the agreement shall be resolved by a neutral arbitrator.
(c)This section does not alter or affect the relationship between an investor-owned utility and its own employees.
SEC. 6.Chapter 8.6 (commencing with Section 2849) is added to Part 2 of Division 1 of the Public Utilities Code, to read:8.6.Interconnection and Distribution1.Interconnection Transparency and Efficiency2849.For purposes of this article, the following definitions apply:
(a)Interconnecting entity means an entity seeking to connect electrical generation or load to the electrical transmission or distribution grid of an electrical corporation.
(b)Interconnection means the connection of electrical generation or load to the electrical transmission or distribution grid of an electrical corporation.
2849.2849.1.The commission shall require each electrical corporation to make distribution data and distribution planning standards available to development project applicants, interconnecting entities, and public entities in a timely and efficient manner.
2849.1.2849.2.The commission shall determine whether additional distribution system information beyond distribution data and distribution planning standards should be made available to increase transparency and efficiency in the interconnection process, promote least cost interconnections of generation and electrical load, and increase transparency and promote effective participation in the distribution planning process.
2849.2.2849.3.The commission shall require electrical corporations to develop and make publicly available uniform technical standards and requirements for interconnection of electrical load to the distribution system.
2849.3.2849.4.The commission shall require each electrical corporation to develop and make publicly available information about its distribution system interconnection queue necessary for the interconnection of generation and electrical load.
2.Wholesale Distribution Service2849.5.2849.10.(a)Each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission shall offer service under that tariff to the State of California, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate consumer, at the voltage level requested by those public entities. This obligation shall be in addition to any other requirement to offer service under that tariff that may exist under federal law.
(b)The commission shall adopt rules to implement subdivision (a).
SEC. 7.Part 7 (commencing with Section 3298) is added to Division 1 of the Public Utilities Code, to read:7.Contracting Practices of Electrical and Gas Corporations3298.For purposes of this part, the following definitions apply:
(a)Bid invitation means any documents issued to prime contractors that contain descriptions of the work to be bid or the content, form, or manner of submission of bids by bidders.
(b)Investor-owned utility means either of the following entities that are not subject to the Subletting and Subcontracting Fair Practices Act (Chapter 4 (commencing with Section 4100) of Part 1 of Division 2 of the Public Contract Code):
(1)An electrical corporation, as defined in Section 218.
(2)A gas corporation, as defined in Section 222.
(c)Material change means a change with a substantial cost impact on the total bid as determined by the investor-owned utility.
(d)Prime contractor means the contractor who contracts directly with the investor-owned utility.
(e)(1)Project of an investor-owned utility or project means any construction, reconstruction, alteration, enlargement, renewal, demolition, installation, repair, or replacement of any structure, building, road, or other improvement of any kind, undertaken in California by an investor-owned utility.
(2)For purposes of paragraph (1), construction includes alteration, demolition, repair, installation, and work performed during the design, preconstruction, and postconstruction phases of construction, including, but not limited to, inspection, land surveying work work, and all cleanup work at the jobsite.
(3) For purposes of paragraph (1), installation includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems.
(f)Subcontractor mean means a contractor, within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, that contracts directly with any prime contractor or subcontractor.
3298.1.This part applies if the expenditure required by a project of an investor-owned utility exceeds ten thousand dollars ($10,000). ($10,000) and the investor-owned utility intends to contract out the project.
3298.2.An investor-owned utility taking bids for a project of an investor-owned utility shall provide in the specifications prepared for the project or in the general conditions under which bids will be received for the doing of the work incident to the project of an investor-owned utility that any person making a bid or offer to perform the work shall, in that persons bid or offer, set forth all of the following:
(a)(1)The name, location of the place of business, and contractors license number of each subcontractor that will perform work or labor or render service to the prime contractor in or about the construction of the project, or a subcontractor licensed by the Contractors State License Board that, under subcontract to the prime contractor, specially fabricates, whether onsite or offsite, and installs a portion of the project according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractors total bid or ten thousand dollars ($10,000), whichever is greater.
(2)(A)Subject to subparagraph (B), information requested by the investor-owned utility concerning any subcontractor that the prime contractor is required to list under this subdivision, other than the subcontractors name, location of business, and contractors license number may be submitted by the prime contractor up to 24 hours after the deadline established by the investor-owned utility for receipt of bids by prime contractors.
(B)An investor-owned utility may implement subparagraph (A) at its option.
(b)The portion of the work that will be done by each subcontractor under its contract. The prime contractor shall list only one subcontractor for each portion as is defined by the prime contractor in the prime contractors bid.
3298.3.(a)An investor-owned utility taking bids for a project shall specify in the bid invitation and public notice the place the bids of the prime contractors are to be received and the time by which they shall be received, and that wages for work performed under the contract shall be paid at the prevailing rate pursuant to Section 3298.14. 3298.13. The date and time shall be extended by no less than 72 hours if the investor-owned utility issues any material changes, additions, or deletions to the invitation later than 72 hours before the bid closing. Any bids received after the time specified in the notice or any extension due to material changes shall be returned unopened.
(b)The investor-owned utility shall file the bid invitation and public notice with the commission.
3298.4.Circumvention by a general contractor that bids as a prime contractor of the requirement under Section 3298.3 for the general contractor to list its subcontractors, by the device of listing another contractor that will in turn sublet portions constituting the majority of the work covered by the prime contract, shall be considered a violation of this part and shall subject that general contractor to the penalties set forth in Section 3298.11, 3298.10, and disciplinary action authorized in Section 3298.12. 3298.11.
3298.5.If a prime contractor fails to specify a subcontractor or if a prime contractor specifies more than one subcontractor for the same portion of work to be performed under the contract in excess of one-half of 1 percent of the prime contractors total bid, the prime contractor agrees that it is fully qualified to perform that portion itself, and that the prime contractor shall perform that portion itself. Except as provided for in Section 3298.6 or 3298.10, 3298.9, if after the award of contract, the prime contractor subcontracts any portion of that work, the prime contractor shall be subject to the disciplinary action authorized in Section 3298.12. 3298.11.
3298.6.A prime contractor whose bid is accepted shall not do any of the following:
(a)(1)Substitute a person as subcontractor in place of the subcontractor listed in the original bid, except that the investor-owned utility, or its duly authorized officer, may, except as otherwise provided in Section 3298.8, 3298.7, consent to the substitution of another person as a subcontractor in any of the following situations:
(A)When the subcontractor listed in the bid, after having had a reasonable opportunity to do so, fails or refuses to execute a written contract for the scope of work specified in the subcontractors bid and at the price specified in the subcontractors bid, when that written contract, based upon the general terms, conditions, plans, and specifications for the project involved or the terms of that subcontractors written bid, is presented to the subcontractor by the prime contractor.
(B)When the listed subcontractor becomes insolvent or the subject of an order for relief in bankruptcy.
(C)When the listed subcontractor fails or refuses to perform its subcontract.
(D)When the listed subcontractor fails or refuses to meet the bond requirements of the prime contractor as set forth in Section 3298.9. 3298.8.
(E)When the prime contractor demonstrates to the investor-owned utility, or its duly authorized officer, subject to Section 3298.8. 3298.7, that the name of the subcontractor was listed as the result of an inadvertent clerical error.
(F)When the listed subcontractor is not licensed by the Contractors State License Board.
(G)When the investor-owned utility, or its duly authorized officer, determines that the work performed by the listed subcontractor is substantially unsatisfactory and not in substantial accordance with the plans and specifications, or that the subcontractor is substantially delaying or disrupting the progress of the work.
(H)When the listed subcontractor is ineligible to work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code, or Section 2603 of the Public Contract Code.
(I)When the investor-owned utility determines that a listed subcontractor is not a responsible contractor.
(2)Before approving the prime contractors request for the substitution, the investor-owned utility, or its duly authorized officer, shall give notice in writing to the listed subcontractor of the prime contractors request to substitute and the reasons for the request. The notice shall be served by certified or registered mail to the last known address of the subcontractor. The listed subcontractor that has been so notified has five working days within which to submit written objections to the substitution to the investor-owned utility. Failure to file these written objections constitutes the listed subcontractors consent to the substitution.
(3)If written objections are filed, the investor-owned utility shall give notice in writing of at least five working days to the listed subcontractor of a public hearing by the investor-owned utility on the prime contractors request for substitution.
(b)Permit a subcontract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the original bid, without the consent of the investor-owned utility, or its duly authorized officer.
(c)Other than in the performance of change orders causing changes or deviations from the original contract, sublet or subcontract any portion of the work in excess of one-half of 1 percent of the prime contractors total bid as to which its original bid did not designate a subcontractor.
3298.7.A subcontractor listed by a prime contractor under Section 3298.3 in the prime contractors bid as furnishing and installing carpeting shall not voluntarily sublet its subcontract with respect to any portion of the labor to be performed unless the subcontractor specified the subordinate subcontractor in the subcontractors bid for that subcontract to the prime contractor.3298.8.3298.7.(a)The prime contractor, as a condition to asserting a claim of inadvertent clerical error in the listing of a subcontractor, shall, within two working days after the time of the prime bid opening by the investor-owned utility, give written notice to the investor-owned utility and copies of that notice to the subcontractor that is claimed to have been listed in error and the intended subcontractor that had bid to the prime contractor before the bid opening. The notice shall be served by email, facsimile, or other method so as to ensure delivery by the next business day.
(b)A listed subcontractor that has been notified by the prime contractor in accordance with this section as to an inadvertent clerical error shall be allowed six working days from the time of the prime bid opening within which to submit to the investor-owned utility and to the prime contractor written objection to the prime contractors claim of inadvertent clerical error. Failure of the listed subcontractor to file the written notice within the six working days shall be primary evidence of the subcontractors agreement that an inadvertent clerical error was made.
(c)The investor-owned utility shall, after a public hearing, as applicable, and in the absence of compelling reasons to the contrary, consent to the substitution of the intended subcontractor under the following conditions:
(1)If the prime contractor, the subcontractor listed in error, and the intended subcontractor each submit an affidavit to the investor-owned utility along with additional evidence as the parties may wish to submit that an inadvertent clerical error was in fact made, provided that the affidavits from each of the three parties are filed within eight working days from the time of the prime bid opening.
(2)If the affidavits are filed by both the prime contractor and the intended subcontractor within the specified time but the subcontractor that the prime contractor claims to have listed in error does not submit, within six working days, to the investor-owned utility and to the prime contractor, written objection to the prime contractors claim of inadvertent clerical error as provided in this section.
(3)If the affidavits are filed by both the prime contractor and the intended subcontractor, but the listed subcontractor has, within six working days from the time of the prime bid opening, submitted to the investor-owned utility and to the prime contractor written objection to the prime contractors claim of inadvertent clerical error, the investor-owned utility shall investigate the claims of the parties and shall hold a public hearing within 14 days of receipt of the affidavits as provided in this paragraph to determine the validity of those claims. The determination made shall be based on the facts contained in the declarations submitted under penalty of perjury by all three parties and supported by testimony under oath and subject to cross-examination. The investor-owned utility may, on its own motion or that of any other party, admit testimony of other contractors, any bid registries or depositories, or any other party in possession of facts that may have a bearing on the decision of the investor-owned utility.
3298.9.3298.8.(a)Each subcontractor submitting bids to a prime contractor to be prepared shall submit a faithful performance and payment bond or bonds if so requested by the prime contractor.
(b)If a subcontractor submitting a bid to a prime contractor does not, upon the request of the prime contractor and at the expense of the prime contractor at the established charge or premium therefor, furnish to the prime contractor a bond or bonds issued by an admitted surety in which the prime contractor is named the obligee, guaranteeing prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract, the prime contractor may reject the bid within seven days of the failure to furnish the required bonds and make a substitution of another subcontractor subject to Section 3298.8. 3298.7.
(c)(1)The bond or bonds may be required under this section only if the prime contractor in its written or published request for subbids clearly specifies the amount and requirements of the bond or bonds.
(2)If the expense of the bond or bonds required under this section is to be borne by the subcontractor, that requirement shall also be specified in the prime contractors written or published request for subbids.
(3)The prime contractors failure to specify bond requirements, in accordance with this subdivision, in the written or published request for subbids shall preclude the prime contractor from imposing bond requirements on the subcontractor under this section.
(4)Whether or not the prime contractor requires a bond, the prime contractor and the subcontractor shall be jointly and severally liable for all wages claims and judgments asserted against the subcontractor or any labor contracting company or staffing agency.
3298.10.3298.9.Subletting or subcontracting of any portion of the work in excess of one-half of 1 percent of the prime contractors total bid as to which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and only after a finding reduced to writing as a public record of the investor-owned utility setting forth the facts constituting the emergency or necessity.
3298.11.3298.10.(a)A prime contractor violating this part violates its contract and the investor-owned utility may exercise the option, in its own discretion, of doing either of the following:
(1)Canceling the contract.
(2)Assessing the prime contractor a penalty in an amount of not more than 10 percent of the amount of the subcontract involved, and the penalty shall be deposited in the fund out of which the prime contract is awarded.
(b)In any proceedings under this section the prime contractor shall be entitled to a public hearing and to five days notice of the time and place of the public hearing.
3298.12.3298.11.A violation of this part by a licensee under Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code constitutes grounds for disciplinary action by the Contractors State License Board, in addition to the penalties prescribed in Section 3298.11. 3298.10.
3298.13.3298.12.The failure on the part of a contractor to comply with this part does not constitute a defense to the contractor in any action brought against the contractor by a subcontractor.
3298.14.3298.13.(a)For a project subject to this part, the investor-owned utility shall solicit bids in writing and shall award the work to the lowest responsible bidder or reject all bids.
(b)The investor-owned utility shall specify in the call for bids for the contract, in the bid specifications, and in the contract all of the following:
(1)That prevailing wages are required of all contractors and their subcontractors of every tier.
(2)That apprentices shall be employed and trained pursuant to Section 1777.5 of the Labor Code.
(3)That certified payroll records pursuant to Section 1776 of the Labor Code shall be submitted to the investor-owned utility.
(4)That the other provisions of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code shall apply to work on the project of the investor-owned utility.
(5)That a payment bond, with the terms described in Section 9554 of the Civil Code, shall be required of the prime contractor for any project.
(6)That the investor-owned utility has adopted a bid protest procedure that shall be available to any unsuccessful bidder.
(7)That the contractor, bidder, or other entity, and its contractors and subcontractors at every tier, shall comply with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(c)The payment bond described in paragraph (5) of subdivision (b) shall comply with the terms described in Section 9554 of the Civil Code. Chapter 5 (commencing with Section 9550) of Title 3 of Part 6 of Division 4 of the Civil Code applies to the payment bond required by this section.
(d)The bid protest procedure described in paragraph (6) of subdivision (b) shall, at a minimum, be available to any bidder, and any person, firm, association, trust, partnership, labor organization, corporation, or other legal entity that has, before the letting of the bids on the project in question, entered into a contract with the bidders that have submitted bids, to protest on the basis that the low bidder is not responsible or the bid is not responsive.
3298.15.3298.14.(a)For purposes of this section, the definitions contained in Section 2601 of the Public Contract Code apply.
(b)Commencing on or after January 1, 2024, the investor-owned utility shall require that its contractors and any subcontractors use a skilled and trained workforce to perform work on a project subject to this part for the production, generation, transmission, distribution, or storage of energy within an apprenticeable occupation in the building and construction trades, as specified in Section 2602 of the Public Contract Code, except as otherwise provided in this section.
(c)The commission shall require all investor-owned utilities to obtain from their contractors, bidders, or other entities the report described in paragraph (2) of subdivision (a) of Section 2602 of the Public Contract Code. Those reports shall be transmitted by the investor-owned utilities to the commission, shall be considered a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), and shall be open to public inspection.
(d)If the contractor, bidder, or other entity fails to provide the monthly report required by this section, or provides a report that is incomplete, the investor-owned utility shall withhold payments as the awarding body in accordance with subdivision (b) of Section 2602 of the Public Contract Code. If a monthly report does not demonstrate compliance with this section, the investor-owned utility shall withhold payments as the awarding body in accordance with subdivision (c) of Section 2602 of the Public Contract Code. The investor-owned utility shall resume payment as provided in subdivision (b) or (c) of Section 2602 of the Public Contract Code, as applicable. All actions withholding or resuming payment under this subdivision, including a plan to achieve substantial compliance as described in subparagraph (C) of paragraph (1) of subdivision (c) of Section 2602 of the Public Contract Code, shall be reported to the commission.
(e)(1)The commission may enter into an agreement with the Labor Commissioner to delegate to the Labor Commissioner the authority to receive the reports required pursuant to subdivision (c) or (d) (d).
(2)The Labor Commissioner may conduct the investigations and take the actions described in Section 2603 of the Public Contract Code, under the procedures described in Section 1777.1 of the Labor Code as to any project. A contractor or subcontractor debarred from bidding on or being awarded a contract for a public work under Section 2603 of the Public Contract Code and Section 1777.1 of the Labor Code shall be similarly debarred, for the same period of time and under the same conditions, from bidding on or being awarded a contract for a project. The Labor Commissioner shall provide the commission with a list of the debarred contractors and subcontractors, in the same form as specified in subdivision (k) of Section 2603 of the Public Contract Code, and the commission shall post the list on its internet website and make the list available to investor-owned utilities.
(3)If an investor-owned utility receives a monthly report that does not demonstrate compliance with the skilled and trained workforce requirements of this section, it shall forward a copy of the monthly report to the commission. The commission shall forward a copy of the monthly report to the Labor Commissioner for issuance of a civil wage and penalty assessment in accordance with this section. The commission may enter into an agreement with the Labor Commissioner for direct reporting and referral of the monthly reports to the Labor Commissioner.
(f)No exceptions or delays in compliance with this section shall be allowed by the commission, except upon a showing of both of the following:
(1)Diligent and good-faith efforts to comply.
(2)The exception or delay is necessary to prevent immediate harm to public health or safety or to the environment. Any exception or delay granted shall cease as soon as the emergency requiring it is over.
3298.16.3298.15.All notices, bids, subcontractor lists, or other written documents required to be submitted to an investor-owned utility under this part shall be promptly transmitted to the commission, and shall be considered a writing and subject to public disclosure under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
3298.17.3298.16.An investor-owned utility shall not enter into any agreement in contravention of this part.
3298.18.3298.17.This part does not limit or diminish any rights or remedies, either legal or equitable, of either of the following:
(a)That an original or substituted subcontractor may have against the prime contractor, or the prime contractors successors or assigns.
(b)That the investor-owned utility may have against the prime contractor, or the prime contractors successors or assigns, including the right to take over and complete the contract.
SEC. 8.The provisions of this act are severable. If any provision of this act or its application is held invalid, that invalidity shall not affect other provisions or applications that can be given effect without the invalid provision or application.
SEC. 8.SEC. 9.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)The practices of bid shopping and bid peddling in connection with projects described in Part 7 (commencing with Section 3298) of Division 1 of the Public Utilities Code often result in poor quality of material and workmanship to the detriment of the ratepaying public, deprives the public of the full benefits of fair competition among prime contractors and subcontractors, and leads to insolvencies, loss of wages to employees, and other evils. Therefore, the same requirements for dealing with these problems on public works under the Subletting and Subcontracting Fair Practices Act (Chapter 4 (commencing with Section 4100) of Part 1 of Division 2 of the Public Contract Code) should be imposed on electrical and gas corporations.
(b)To ensure a fair and open bidding process, to eliminate favoritism, fraud, and corruption in the award of contracts, and to protect ratepayers from unnecessary costs electrical and gas corporations should be required to award construction projects to the lowest responsible bidder.
(c)The requirements of competitive bidding imposed by this act will make it necessary to also impose the same protections for employees and the public as currently afforded on public works, specifically, to protect employees on projects from substandard wages that might be paid if contractors could recruit labor from distant cheap-labor areas, to permit union contractors to compete with nonunion contractors, to benefit the public through the superior efficiency of well-paid employees, to require electrical and gas corporations to participate in state-certified apprenticeship programs to secure a trained construction workforce to meet Californias infrastructure needs, and to compensate nonpublic employees with higher wages for the absence of job security and employment benefits enjoyed by public employees. The prevailing wage is a minimum wage that the Legislature finds should be extended to workers employed on certain projects of electrical and gas corporations that have been excluded from that protection.
(d)The deadly and costly fires that have ravaged the state in the last two years have highlighted the need for a skilled and trained workforce in the construction of utilities to minimize the risk of future disasters.
SEC. 2.Section 9551 is added to the Civil Code, to read:9551.For purposes of this chapter, an investor-owned utility, as defined in Section 3298 of the Public Utilities Code, shall be considered a public entity and any construction project or work contracted by an investor-owned utility, covered by the provisions of Section 3298 of the Public Utilities Code, shall be considered a public works contract.
SEC. 3.Section 1720 of the Labor Code is amended to read:1720.(a)As used in this chapter, public works means all of the following:
(1)Construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part out of public funds, except work done directly by a public utility company pursuant to order of the Public Utilities Commission or other public authority. For purposes of this paragraph, construction includes work performed during the design, site assessment, feasibility study, and other preconstruction phases of construction, including, but not limited to, inspection and land surveying work, regardless of whether any further construction work is conducted, and work performed during the postconstruction phases of construction, including, but not limited to, all cleanup work at the jobsite. For purposes of this paragraph, installation includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems.
(2)Work done for irrigation, utility, reclamation, and improvement districts, and other districts of this type. Public works does not include the operation of the irrigation or drainage system of an irrigation or reclamation district, except as used in Section 1778 relating to retaining wages.
(3)Street, sewer, or other improvement work done under the direction and supervision or by the authority of an officer or public body of the state, or of a political subdivision or district thereof, whether the political subdivision or district operates under a freeholders charter or not.
(4)The laying of carpet done under a building lease-maintenance contract and paid for out of public funds.
(5)The laying of carpet in a public building done under contract and paid for in whole or in part out of public funds.
(6)Public transportation demonstration projects authorized pursuant to Section 143 of the Streets and Highways Code.
(7)(A)Infrastructure project grants from the California Advanced Services Fund pursuant to Section 281 of the Public Utilities Code.
(B)For purposes of this paragraph, the Public Utilities Commission is not the awarding body or the body awarding the contract, as defined in Section 1722.
(8)Tree removal work done in the execution of a project under paragraph (1).
(9)Construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part by an investor-owned utility, as defined in Section 3298 of the Public Utilities Code.
(b)For purposes of this section, paid for in whole or in part out of public funds means all of the following:
(1)The payment of money or the equivalent of money by the state or political subdivision directly to or on behalf of the public works contractor, subcontractor, or developer.
(2)Performance of construction work by the state or political subdivision in execution of the project.
(3)Transfer by the state or political subdivision of an asset of value for less than fair market price.
(4)Fees, costs, rents, insurance or bond premiums, loans, interest rates, or other obligations that would normally be required in the execution of the contract, that are paid, reduced, charged at less than fair market value, waived, or forgiven by the state or political subdivision.
(5)Money loaned by the state or political subdivision that is to be repaid on a contingent basis.
(6)Credits that are applied by the state or political subdivision against repayment obligations to the state or political subdivision.
(c)Notwithstanding subdivision (b), all of the following apply:
(1)Private residential projects built on private property are not subject to this chapter unless the projects are built pursuant to an agreement with a state agency, a redevelopment agency, a successor agency to a redevelopment agency when acting in that capacity, or a local public housing authority.
(2)If the state or a political subdivision requires a private developer to perform construction, alteration, demolition, installation, or repair work on a public work of improvement as a condition of regulatory approval of an otherwise private development project, and the state or political subdivision contributes no more money, or the equivalent of money, to the overall project than is required to perform this public improvement work, and the state or political subdivision maintains no proprietary interest in the overall project, then only the public improvement work shall thereby become subject to this chapter.
(3)(A)If the state or a political subdivision reimburses a private developer for costs that would normally be borne by the public, or provides directly or indirectly a public subsidy to a private development project that is de minimis in the context of the project, an otherwise private development project shall not thereby become subject to this chapter.
(B)(i)For purposes of subparagraph (A), a public subsidy is de minimis if it is both less than six hundred thousand dollars ($600,000) and less than 2 percent of the total project cost.
(ii)Notwithstanding clause (i), for purposes of subparagraph (A), a public subsidy for a project that consists entirely of single-family dwellings is de minimis if it is less than 2 percent of the total project cost.
(iii)This subparagraph shall not apply to a project that was advertised for bid, or a contract that was awarded, before July 1, 2021.
(4)The construction or rehabilitation of affordable housing units for low- or moderate-income persons pursuant to paragraph (5) or (7) of subdivision (e) of Section 33334.2 of the Health and Safety Code that are paid for solely with moneys from the Low and Moderate Income Housing Fund established pursuant to Section 33334.3 of the Health and Safety Code or that are paid for by a combination of private funds and funds available pursuant to Section 33334.2 or 33334.3 of the Health and Safety Code do not constitute a project that is paid for in whole or in part out of public funds.
(5)Unless otherwise required by a public funding program, the construction or rehabilitation of privately owned residential projects is not subject to this chapter if one or more of the following conditions are met:
(A)The project is a self-help housing project in which no fewer than 500 hours of construction work associated with the homes are to be performed by the home buyers.
(B)The project consists of rehabilitation or expansion work associated with a facility operated on a not-for-profit basis as temporary or transitional housing for homeless persons with a total project cost of less than twenty-five thousand dollars ($25,000).
(C)Assistance is provided to a household as either mortgage assistance, downpayment assistance, or for the rehabilitation of a single-family home.
(D)The project consists of new construction, expansion, or rehabilitation work associated with a facility developed by a nonprofit organization to be operated on a not-for-profit basis to provide emergency or transitional shelter and ancillary services and assistance to homeless adults and children. The nonprofit organization operating the project shall provide, at no profit, not less than 50 percent of the total project cost from nonpublic sources, excluding real property that is transferred or leased. Total project cost includes the value of donated labor, materials, and architectural and engineering services.
(E)The public participation in the project that would otherwise meet the criteria of subdivision (b) is public funding in the form of below-market interest rate loans for a project in which occupancy of at least 40 percent of the units is restricted for at least 20 years, by deed or regulatory agreement, to individuals or families earning no more than 80 percent of the area median income.
(d)Notwithstanding any provision of this section to the contrary, the following projects are not, solely by reason of this section, subject to this chapter:
(1)Qualified residential rental projects, as defined by Section 142(d) of the Internal Revenue Code, financed in whole or in part through the issuance of bonds that receive allocation of a portion of the state ceiling pursuant to Chapter 11.8 (commencing with Section 8869.80) of Division 1 of Title 2 of the Government Code on or before December 31, 2003.
(2)Single-family residential projects financed in whole or in part through the issuance of qualified mortgage revenue bonds or qualified veterans mortgage bonds, as defined by Section 143 of the Internal Revenue Code, or with mortgage credit certificates under a Qualified Mortgage Credit Certificate Program, as defined by Section 25 of the Internal Revenue Code, that receive allocation of a portion of the state ceiling pursuant to Chapter 11.8 (commencing with Section 8869.80) of Division 1 of Title 2 of the Government Code on or before December 31, 2003.
(3)Low-income housing projects that are allocated federal or state low-income housing tax credits pursuant to Section 42 of the Internal Revenue Code, Chapter 3.6 (commencing with Section 50199.4) of Part 1 of Division 31 of the Health and Safety Code, or Section 12206, 17058, or 23610.5 of the Revenue and Taxation Code, on or before December 31, 2003.
(e)Notwithstanding paragraph (1) of subdivision (a), construction, alteration, demolition, installation, or repair work on the electric transmission system located in California or the construction, alteration, demolition, installation, or repair work that is subject to Part 7 (commencing with Section 3298) of Division 1 of the Public Utilities Code constitutes a public works project for the purposes of this chapter.
(f)If a statute, other than this section, or a regulation, other than a regulation adopted pursuant to this section, or an ordinance or a contract applies this chapter to a project, the exclusions set forth in subdivision (d) do not apply to that project.
(g)For purposes of this section, references to the Internal Revenue Code mean the Internal Revenue Code of 1986, as amended, and include the corresponding predecessor sections of the Internal Revenue Code of 1954, as amended.
(h)The amendments made to this section by either Chapter 938 of the Statutes of 2001 or the act adding this subdivision shall not be construed to preempt local ordinances requiring the payment of prevailing wages on housing projects.
SEC. 4.Section 1722 of the Labor Code is amended to read:1722.Awarding body or body awarding the contract means department, board, authority, officer or agent awarding a contract for public work. work, or an investor-owned utility, as defined in Section 3298 of the Public Utilities Code.
SEC. 5.Section 768.7 is added to the Public Utilities Code, to read:768.7.(a)For purposes of this section, the following definitions apply:
(1)Contractor means a contractor as defined in Section 7026 of the Business and Professions Code, but does not include an investor-owned utility, or any other entity with 10 percent or more common ownership with the investor-owned utility.
(2)Investor-owned utility means either of the following entities:
(A)An electrical corporation.
(B)A gas corporation.
(3)Project labor agreement means a prehire collective bargaining agreement, as described in Section 158(f) of Title 29 of the United States Code, that establishes terms and conditions of employment for a specific construction project or projects.
(b)An investor-owned utility shall not require a contractor to enter into, or not enter into, a collective bargaining agreement with any labor organization as a condition for bidding on any contracting work, entering into a contract with, or performing any contracting work for, the investor-owned utility, unless the agreement is a multicraft project labor agreement that includes all construction crafts with applicable coverage determinations for the specified scopes of work on the project pursuant to Section 1773 of the Labor Code and meets the requirements of Section 2500 of the Public Contract Code, including all of the following ratepayer protection provisions:
(1)The agreement prohibits discrimination based on race, national origin, religion, sex, sexual orientation, political affiliation, or membership in a labor organization in hiring and dispatching workers for the project.
(2)The agreement permits all qualified contractors and subcontractors to bid for and be awarded work on the project without regard to whether they are otherwise parties to collective bargaining agreements.
(3)The agreement contains an agreed-upon protocol concerning drug testing for workers who will be employed on the project.
(4)The agreement contains guarantees against work stoppages, strikes, lockouts, and similar disruptions of the project.
(5)The agreement provides that disputes arising from the agreement shall be resolved by a neutral arbitrator.
(c)This section does not alter or affect the relationship between an investor-owned utility and its own employees.
SEC. 6.Chapter 8.6 (commencing with Section 2849) is added to Part 2 of Division 1 of the Public Utilities Code, to read:8.6.Interconnection and Distribution1.Interconnection Transparency and Efficiency2849.The commission shall require each electrical corporation to make distribution data and distribution planning standards available to development project applicants, interconnecting entities, and public entities in a timely and efficient manner.
2849.1.The commission shall determine whether additional distribution system information beyond distribution data and distribution planning standards should be made available to increase transparency and efficiency in the interconnection process, promote least cost interconnections of generation and electrical load, and increase transparency and promote effective participation in the distribution planning process.
2849.2.The commission shall require electrical corporations to develop and make publicly available uniform technical standards and requirements for interconnection of electrical load to the distribution system.
2849.3.The commission shall require each electrical corporation to develop and make publicly available information about its distribution system interconnection queue necessary for the interconnection of generation and electrical load.
2.Wholesale Distribution Service2849.5.(a)Each electrical corporation that has filed a wholesale distribution tariff with the Federal Energy Regulatory Commission shall offer service under that tariff to the State of California, an agency, authority, or instrumentality of the state, or a political subdivision to transmit electricity that those public entities consume or sell directly to an ultimate consumer, at the voltage level requested by those public entities. This obligation shall be in addition to any other requirement to offer service under that tariff that may exist under federal law.
(b)The commission shall adopt rules to implement subdivision (a).
SEC. 7.Part 7 (commencing with Section 3298) is added to Division 1 of the Public Utilities Code, to read:7.Contracting Practices of Electrical and Gas Corporations3298.For purposes of this part, the following definitions apply:
(a)Bid invitation means any documents issued to prime contractors that contain descriptions of the work to be bid or the content, form, or manner of submission of bids by bidders.
(b)Investor-owned utility means either of the following entities that are not subject to the Subletting and Subcontracting Fair Practices Act (Chapter 4 (commencing with Section 4100) of Part 1 of Division 2 of the Public Contract Code):
(1)An electrical corporation, as defined in Section 218.
(2)A gas corporation, as defined in Section 222.
(c)Material change means a change with a substantial cost impact on the total bid as determined by the investor-owned utility.
(d)Prime contractor means the contractor who contracts directly with the investor-owned utility.
(e)(1)Project of an investor-owned utility or project means any construction, reconstruction, alteration, enlargement, renewal, demolition, installation, repair, or replacement of any structure, building, road, or other improvement of any kind, undertaken by an investor-owned utility.
(2)For purposes of paragraph (1), construction includes alteration, demolition, repair, installation, and work performed during the design, preconstruction, and postconstruction phases of construction, including, but not limited to, inspection, land surveying work and all cleanup work at the jobsite.
(3) For purposes of paragraph (1), installation includes, but is not limited to, the assembly and disassembly of freestanding and affixed modular office systems.
(f)Subcontractor mean a contractor, within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, that contracts directly with any prime contractor or subcontractor.
3298.1.This part applies if the expenditure required by a project of an investor-owned utility exceeds ten thousand dollars ($10,000).
3298.2.An investor-owned utility taking bids for a project of an investor-owned utility shall provide in the specifications prepared for the project or in the general conditions under which bids will be received for the doing of the work incident to the project of an investor-owned utility that any person making a bid or offer to perform the work shall, in that persons bid or offer, set forth all of the following:
(a)(1)The name, location of the place of business, and contractors license number of each subcontractor that will perform work or labor or render service to the prime contractor in or about the construction of the project, or a subcontractor licensed by the Contractors State License Board that, under subcontract to the prime contractor, specially fabricates, whether onsite or offsite, and installs a portion of the project according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractors total bid or ten thousand dollars ($10,000), whichever is greater.
(2)(A)Subject to subparagraph (B), information requested by the investor-owned utility concerning any subcontractor that the prime contractor is required to list under this subdivision, other than the subcontractors name, location of business, and contractors license number may be submitted by the prime contractor up to 24 hours after the deadline established by the investor-owned utility for receipt of bids by prime contractors.
(B)An investor-owned utility may implement subparagraph (A) at its option.
(b)The portion of the work that will be done by each subcontractor under its contract. The prime contractor shall list only one subcontractor for each portion as is defined by the prime contractor in the prime contractors bid.
3298.3.(a)An investor-owned utility taking bids for a project shall specify in the bid invitation and public notice the place the bids of the prime contractors are to be received and the time by which they shall be received, and that wages for work performed under the contract shall be paid at the prevailing rate pursuant to Section 3298.14. The date and time shall be extended by no less than 72 hours if the investor-owned utility issues any material changes, additions, or deletions to the invitation later than 72 hours before the bid closing. Any bids received after the time specified in the notice or any extension due to material changes shall be returned unopened.
(b)The investor-owned utility shall file the bid invitation and public notice with the commission.
3298.4.Circumvention by a general contractor that bids as a prime contractor of the requirement under Section 3298.3 for the general contractor to list its subcontractors, by the device of listing another contractor that will in turn sublet portions constituting the majority of the work covered by the prime contract, shall be considered a violation of this part and shall subject that general contractor to the penalties set forth in Section 3298.11, and disciplinary action authorized in Section 3298.12.
3298.5.If a prime contractor fails to specify a subcontractor or if a prime contractor specifies more than one subcontractor for the same portion of work to be performed under the contract in excess of one-half of 1 percent of the prime contractors total bid, the prime contractor agrees that it is fully qualified to perform that portion itself, and that the prime contractor shall perform that portion itself. Except as provided for in Section 3298.6 or 3298.10, if after the award of contract, the prime contractor subcontracts any portion of that work, the prime contractor shall be subject to the disciplinary action authorized in Section 3298.12.
3298.6.A prime contractor whose bid is accepted shall not do any of the following:
(a)(1)Substitute a person as subcontractor in place of the subcontractor listed in the original bid, except that the investor-owned utility, or its duly authorized officer, may, except as otherwise provided in Section 3298.8, consent to the substitution of another person as a subcontractor in any of the following situations:
(A)When the subcontractor listed in the bid, after having had a reasonable opportunity to do so, fails or refuses to execute a written contract for the scope of work specified in the subcontractors bid and at the price specified in the subcontractors bid, when that written contract, based upon the general terms, conditions, plans, and specifications for the project involved or the terms of that subcontractors written bid, is presented to the subcontractor by the prime contractor.
(B)When the listed subcontractor becomes insolvent or the subject of an order for relief in bankruptcy.
(C)When the listed subcontractor fails or refuses to perform its subcontract.
(D)When the listed subcontractor fails or refuses to meet the bond requirements of the prime contractor as set forth in Section 3298.9.
(E)When the prime contractor demonstrates to the investor-owned utility, or its duly authorized officer, subject to Section 3298.8. that the name of the subcontractor was listed as the result of an inadvertent clerical error.
(F)When the listed subcontractor is not licensed by the Contractors State License Board.
(G)When the investor-owned utility, or its duly authorized officer, determines that the work performed by the listed subcontractor is substantially unsatisfactory and not in substantial accordance with the plans and specifications, or that the subcontractor is substantially delaying or disrupting the progress of the work.
(H)When the listed subcontractor is ineligible to work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code, or Section 2603 of the Public Contract Code.
(I)When the investor-owned utility determines that a listed subcontractor is not a responsible contractor.
(2)Before approving the prime contractors request for the substitution, the investor-owned utility, or its duly authorized officer, shall give notice in writing to the listed subcontractor of the prime contractors request to substitute and the reasons for the request. The notice shall be served by certified or registered mail to the last known address of the subcontractor. The listed subcontractor that has been so notified has five working days within which to submit written objections to the substitution to the investor-owned utility. Failure to file these written objections constitutes the listed subcontractors consent to the substitution.
(3)If written objections are filed, the investor-owned utility shall give notice in writing of at least five working days to the listed subcontractor of a public hearing by the investor-owned utility on the prime contractors request for substitution.
(b)Permit a subcontract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the original bid, without the consent of the investor-owned utility, or its duly authorized officer.
(c)Other than in the performance of change orders causing changes or deviations from the original contract, sublet or subcontract any portion of the work in excess of one-half of 1 percent of the prime contractors total bid as to which its original bid did not designate a subcontractor.
3298.7.A subcontractor listed by a prime contractor under Section 3298.3 in the prime contractors bid as furnishing and installing carpeting shall not voluntarily sublet its subcontract with respect to any portion of the labor to be performed unless the subcontractor specified the subordinate subcontractor in the subcontractors bid for that subcontract to the prime contractor.
3298.8.(a)The prime contractor, as a condition to asserting a claim of inadvertent clerical error in the listing of a subcontractor, shall, within two working days after the time of the prime bid opening by the investor-owned utility, give written notice to the investor-owned utility and copies of that notice to the subcontractor that is claimed to have been listed in error and the intended subcontractor that had bid to the prime contractor before the bid opening. The notice shall be served by email, facsimile, or other method so as to ensure delivery by the next business day.
(b)A listed subcontractor that has been notified by the prime contractor in accordance with this section as to an inadvertent clerical error shall be allowed six working days from the time of the prime bid opening within which to submit to the investor-owned utility and to the prime contractor written objection to the prime contractors claim of inadvertent clerical error. Failure of the listed subcontractor to file the written notice within the six working days shall be primary evidence of the subcontractors agreement that an inadvertent clerical error was made.
(c)The investor-owned utility shall, after a public hearing, as applicable, and in the absence of compelling reasons to the contrary, consent to the substitution of the intended subcontractor under the following conditions:
(1)If the prime contractor, the subcontractor listed in error, and the intended subcontractor each submit an affidavit to the investor-owned utility along with additional evidence as the parties may wish to submit that an inadvertent clerical error was in fact made, provided that the affidavits from each of the three parties are filed within eight working days from the time of the prime bid opening.
(2)If the affidavits are filed by both the prime contractor and the intended subcontractor within the specified time but the subcontractor that the prime contractor claims to have listed in error does not submit, within six working days, to the investor-owned utility and to the prime contractor, written objection to the prime contractors claim of inadvertent clerical error as provided in this section.
(3)If the affidavits are filed by both the prime contractor and the intended subcontractor, but the listed subcontractor has, within six working days from the time of the prime bid opening, submitted to the investor-owned utility and to the prime contractor written objection to the prime contractors claim of inadvertent clerical error, the investor-owned utility shall investigate the claims of the parties and shall hold a public hearing within 14 days of receipt of the affidavits as provided in this paragraph to determine the validity of those claims. The determination made shall be based on the facts contained in the declarations submitted under penalty of perjury by all three parties and supported by testimony under oath and subject to cross-examination. The investor-owned utility may, on its own motion or that of any other party, admit testimony of other contractors, any bid registries or depositories, or any other party in possession of facts that may have a bearing on the decision of the investor-owned utility.
3298.9.(a)Each subcontractor submitting bids to a prime contractor to be prepared shall submit a faithful performance and payment bond or bonds if so requested by the prime contractor.
(b)If a subcontractor submitting a bid to a prime contractor does not, upon the request of the prime contractor and at the expense of the prime contractor at the established charge or premium therefor, furnish to the prime contractor a bond or bonds issued by an admitted surety in which the prime contractor is named the obligee, guaranteeing prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract, the prime contractor may reject the bid within seven days of the failure to furnish the required bonds and make a substitution of another subcontractor subject to Section 3298.8.
(c)(1)The bond or bonds may be required under this section only if the prime contractor in its written or published request for subbids clearly specifies the amount and requirements of the bond or bonds.
(2)If the expense of the bond or bonds required under this section is to be borne by the subcontractor, that requirement shall also be specified in the prime contractors written or published request for subbids.
(3)The prime contractors failure to specify bond requirements, in accordance with this subdivision, in the written or published request for subbids shall preclude the prime contractor from imposing bond requirements on the subcontractor under this section.
(4)Whether or not the prime contractor requires a bond, the prime contractor and the subcontractor shall be jointly and severally liable for all wages claims and judgments asserted against the subcontractor or any labor contracting company or staffing agency.
3298.10.Subletting or subcontracting of any portion of the work in excess of one-half of 1 percent of the prime contractors total bid as to which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and only after a finding reduced to writing as a public record of the investor-owned utility setting forth the facts constituting the emergency or necessity.
3298.11.(a)A prime contractor violating this part violates its contract and the investor-owned utility may exercise the option, in its own discretion, of doing either of the following:
(1)Canceling the contract.
(2)Assessing the prime contractor a penalty in an amount of not more than 10 percent of the amount of the subcontract involved, and the penalty shall be deposited in the fund out of which the prime contract is awarded.
(b)In any proceedings under this section the prime contractor shall be entitled to a public hearing and to five days notice of the time and place of the public hearing.
3298.12.A violation of this part by a licensee under Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code constitutes grounds for disciplinary action by the Contractors State License Board, in addition to the penalties prescribed in Section 3298.11.
3298.13.The failure on the part of a contractor to comply with this part does not constitute a defense to the contractor in any action brought against the contractor by a subcontractor.
3298.14.(a)For a project subject to this part, the investor-owned utility shall solicit bids in writing and shall award the work to the lowest responsible bidder or reject all bids.
(b)The investor-owned utility shall specify in the call for bids for the contract, in the bid specifications, and in the contract all of the following:
(1)That prevailing wages are required of all contractors and their subcontractors of every tier.
(2)That apprentices shall be employed and trained pursuant to Section 1777.5 of the Labor Code.
(3)That certified payroll records pursuant to Section 1776 of the Labor Code shall be submitted to the investor-owned utility.
(4)That the other provisions of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code shall apply to work on the project of the investor-owned utility.
(5)That a payment bond, with the terms described in Section 9554 of the Civil Code, shall be required of the prime contractor for any project.
(6)That the investor-owned utility has adopted a bid protest procedure that shall be available to any unsuccessful bidder.
(7)That the contractor, bidder, or other entity, and its contractors and subcontractors at every tier, shall comply with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(c)The payment bond described in paragraph (5) of subdivision (b) shall comply with the terms described in Section 9554 of the Civil Code. Chapter 5 (commencing with Section 9550) of Title 3 of Part 6 of Division 4 of the Civil Code applies to the payment bond required by this section.
(d)The bid protest procedure described in paragraph (6) of subdivision (b) shall, at a minimum, be available to any bidder, and any person, firm, association, trust, partnership, labor organization, corporation, or other legal entity that has, before the letting of the bids on the project in question, entered into a contract with the bidders that have submitted bids, to protest on the basis that the low bidder is not responsible or the bid is not responsive.
3298.15.(a)For purposes of this section, the definitions contained in Section 2601 of the Public Contract Code apply.
(b)Commencing on or after January 1, 2024, the investor-owned utility shall require that its contractors and any subcontractors use a skilled and trained workforce to perform work on a project subject to this part for the production, generation, transmission, distribution, or storage of energy within an apprenticeable occupation in the building and construction trades, as specified in Section 2602 of the Public Contract Code, except as otherwise provided in this section.
(c)The commission shall require all investor-owned utilities to obtain from their contractors, bidders, or other entities the report described in paragraph (2) of subdivision (a) of Section 2602 of the Public Contract Code. Those reports shall be transmitted by the investor-owned utilities to the commission, shall be considered a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code), and shall be open to public inspection.
(d)If the contractor, bidder, or other entity fails to provide the monthly report required by this section, or provides a report that is incomplete, the investor-owned utility shall withhold payments as the awarding body in accordance with subdivision (b) of Section 2602 of the Public Contract Code. If a monthly report does not demonstrate compliance with this section, the investor-owned utility shall withhold payments as the awarding body in accordance with subdivision (c) of Section 2602 of the Public Contract Code. The investor-owned utility shall resume payment as provided in subdivision (b) or (c) of Section 2602 of the Public Contract Code, as applicable. All actions withholding or resuming payment under this subdivision, including a plan to achieve substantial compliance as described in subparagraph (C) of paragraph (1) of subdivision (c) of Section 2602 of the Public Contract Code, shall be reported to the commission.
(e)(1)The commission may enter into an agreement with the Labor Commissioner to delegate to the Labor Commissioner the authority to receive the reports required pursuant to subdivision (c) or (d)
(2)The Labor Commissioner may conduct the investigations and take the actions described in Section 2603 of the Public Contract Code, under the procedures described in Section 1777.1 of the Labor Code as to any project. A contractor or subcontractor debarred from bidding on or being awarded a contract for a public work under Section 2603 of the Public Contract Code and Section 1777.1 of the Labor Code shall be similarly debarred, for the same period of time and under the same conditions, from bidding on or being awarded a contract for a project. The Labor Commissioner shall provide the commission with a list of the debarred contractors and subcontractors, in the same form as specified in subdivision (k) of Section 2603 of the Public Contract Code, and the commission shall post the list on its internet website and make the list available to investor-owned utilities.
(3)If an investor-owned utility receives a monthly report that does not demonstrate compliance with the skilled and trained workforce requirements of this section, it shall forward a copy of the monthly report to the commission. The commission shall forward a copy of the monthly report to the Labor Commissioner for issuance of a civil wage and penalty assessment in accordance with this section. The commission may enter into an agreement with the Labor Commissioner for direct reporting and referral of the monthly reports to the Labor Commissioner.
(f)No exceptions or delays in compliance with this section shall be allowed by the commission, except upon a showing of both of the following:
(1)Diligent and good-faith efforts to comply.
(2)The exception or delay is necessary to prevent immediate harm to public health or safety or to the environment. Any exception or delay granted shall cease as soon as the emergency requiring it is over.
3298.16.All notices, bids, subcontractor lists, or other written documents required to be submitted to an investor-owned utility under this part shall be promptly transmitted to the commission, and shall be considered a writing and subject to public disclosure under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
3298.17.An investor-owned utility shall not enter into any agreement in contravention of this part.
3298.18.This part does not limit or diminish any rights or remedies, either legal or equitable, of either of the following:
(a)That an original or substituted subcontractor may have against the prime contractor, or the prime contractors successors or assigns.
(b)That the investor-owned utility may have against the prime contractor, or the prime contractors successors or assigns, including the right to take over and complete the contract.
SEC. 8.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 17570 of the Business and Professions Code is amended to read:17570.(a)A person who owns a vending machine shall have their name and address affixed to the machine in a place where it may be seen by anyone using the machine.(b)Notwithstanding subdivision (a), a person who owns more than one vending machine located at the same place may, as an alternative to the above, post a clearly readable sign containing their name and address in a conspicuous location near the machines.(c)(1)In addition to posting their name and address, as specified in subdivisions (a) and (b), a person shall also post their telephone number, email address, or both, on the machine or in a conspicuous location, as may be appropriate.(2)Sections 17534 and 17572 shall not apply to paragraph (1).On and after July 1, 1969, every (a)A person who owns a vending machine shall have his their name and address affixed thereto to the machine in a place where it may be seen by anyone using the machine.
Notwithstanding the foregoing, in the event that(b)Notwithstanding subdivision (a), a person who owns more than one vending machine located at the same place, such a person place may, as an alternative to the above, post a clearly readable sign containing his their name and address in a conspicuous location near the machines.
(c)(1)In addition to posting their name and address, as specified in subdivisions (a) and (b), a person shall also post their telephone number, email address, or both, on the machine or in a conspicuous location, as may be appropriate.
(2)Sections 17534 and 17572 shall not apply to paragraph (1).
|
Date
|
Status
|
|---|---|
| Jul 1, 2024 | July 1 set for first hearing canceled at the request of author. |
| Jun 20, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 13, 2024 | Re-referred to Com. on U. & E. pursuant to Assembly Rule 96. |
| Jun 10, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on L. & E. |
| Jun 20, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on L. & E. |
| Jun 12, 2023 | Re-referred to Coms. on L. & E. and U. & E. pursuant to Assembly Rule 96. |
| Jun 8, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 8, 2023 | Referred to Coms. on U. & E. and L. & E. |
| Apr 10, 2023 | In Assembly. Read first time. Held at Desk. |
| Apr 10, 2023 | Read third time. Passed. (Ayes 25. Noes 1. Page 632.) Ordered to the Assembly. |
| Mar 28, 2023 | Read second time. Ordered to third reading. |
| Mar 27, 2023 | From committee: Do pass. (Ayes 7. Noes 0. Page 535.) (March 27). |
| Mar 6, 2023 | Set for hearing March 27. |
| Feb 9, 2023 | Referred to Com. on B., P. & E. D. |
| Feb 2, 2023 | From printer. May be acted upon on or after March 4. |
| Feb 1, 2023 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 10, 2023 | Senate 3rd Reading SB284 Wiener | Senate Floor |
Passed |
|
| Mar 27, 2023 | Do pass | Senate Standing Committee on Business, Professions and Economic Development |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| California State Association Of Electrical Workers | ** Against | |
| Coalition of California Utility Employees | ** Against | |
| Engineers and Scientists of California, IFPTE Local 20 | ** Against | |
| Housing Action Coalition | ** Support | |
| IBEW | ** Against | |
| IBEW Local Union 569 | ** Against | |
| Nor Cal Carpenters Union | ** Support | |
| Pacific Gas And Electric Company | ** Against | |
| San Diego Gas & Electric | ** Against | |
| San Francisco Public Utilities Commission – sponsor | ** Support | |
| Southern California Edison | ** Against | |
| Southern California Gas Company | ** Against | |
| Western Electrical Contractors Association | ** Against | |
| Western Line Constructors Chapter, Inc. | ** Against |
Date of Hearing: July 1, 2024
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 284
Author:(Wiener) – As Amended Ver:June 20, 2024
SENATE VOTE: 25-1
SUBJECT: Electricity: energization transparency and efficiency: wholesale distribution service
SUMMARY: Requires electrical corporations (investor-owned utilities, IOUs) to both make any and all distribution planning data publicly available, and to offer service under the federal Wholesale Distribution Tariff (WDT) at secondary voltage to serve customers of the state or any political subdivision at retail. Specifically, this bill:
- Requires IOUs to provide distribution planning data – inclusive of all models, underlying load, retail and wholesale load, storage, facility data, detailed physical maps, and capacity projects, among other items – to development project applicants, energizing entities, and public entities in a timely and efficient manner.
- Directs the California Public Utilities Commission (CPUC) to require IOUs to develop and make publicly available uniform technical standards and requirements (unspecified) for energization of electrical load on the distribution system, and to make publicly available information about distribution interconnection queues.
- Requires each IOU that has filed a WDT at the Federal Energy Regulatory Commission (FERC) to offer service under that tariff to the State of California, or any political subdivision or instrumentality of the state, in order to transmit electricity that those public entities sell directly to an ultimate consumer or consume themselves. Requires that the service be offered over all distribution facilities of the IOU, and that an IOU cannot refuse to install any distribution facilities necessary to transmit electricity directly to the ultimate consumer.
- Provides various findings relating to data sharing and promoting competition, defines relevant terms, and makes the provisions of the bill severable.
EXISTING LAW:
- Establishes and vests the CPUC with jurisdiction over all public utilities in the state. (Article XII of the California Constitution)
- Establishes that FERC has exclusive jurisdiction over the transmission of electric energy in interstate commerce. Also establishes the process and procedures for establishing transmission of electric energy in interstate commerce by public utilities, i.e., the rates, terms, and conditions of interstate electric transmission by public utilities. (Federal Power Act §§§ 201, 205, 206 (16 USC 824, 824d, 824e))
- Establishes that FERC has exclusive jurisdiction over sales of electric energy at wholesale in interstate commerce by public utilities, i.e., the rates, terms, and conditions of wholesale electric sales by public utilities (Federal Power Act §§§ 201, 205, 206 (16 USC 824, 824d, 824e))
- Prohibits mandatory retail wheeling and sham wholesale transactions, where an entity financially trades electricity and obtains wheeling services without actually owning any facilities that distribute the electricity, from FERC rules. (Federal Power Act § 212 (h))
- Provides two exceptions to the FERC prohibition on retail wheeling. The first is that the entity is a specified political subdivision of the state or federal government; the second is that the entity was either providing electric service at retail prior to October 24, 1992 or would utilize transmission or distribution facilities that it owns or controls. (16 USC § 824k(h))
- Establishes and vests the California Public Utilities Commission (CPUC), with jurisdiction over all public utilities in the state. (Article XII of the California Constitution)
- Defines “energization” and “energize” to mean connecting customers to the electrical distribution grid and establishing adequate electrical distribution capacity or upgrading electrical distribution or transmission capacity to provide electrical service for a new customer, or to provide upgraded electrical service to an existing customer. Explicitly excludes activities related to connecting electrical supply resources. (Public Utilities Code § 931)
- Requires the CPUC to establish reasonable average and maximum target energization time periods for connecting customers, to determine criteria for timely service, and establish various reporting requirements of the IOUs. (Public Utilities Code §§ 930-939.5)
FISCAL EFFECT: Unknown. This bill has been significantly amended since passage in the Senate; this version of the measure is keyed fiscal, and will be referred to the Assembly Committee on Appropriations for its review.
COMMENTS:
- Author’s Statement. According to the author, “Senate Bill 284 helps resolve systemic delays to the energization of customers served by the San Francisco Public Utilities Commission (SFPUC) by requiring investor-owned utilities (IOUs) with a wholesale distribution tariff to offer service to eligible publicly-owned utilities per the terms of such tariff without engaging in anticompetitive practices. Since 2018, these delays have affected 166 projects including over 2,000 units of affordable housing. The bill also requires IOUs to improve transparency for distribution planning, data, technical standards, and interconnection and energization queues.”
- State Intervention in a Federal Dispute. The second article of this bill, though broadly written to include all IOU territories and all government entities therein, has its origins and motivations from a longstanding dispute between Pacific Gas & Electric Company (PG&E) and the City and County of San Francisco (SF). This dispute has persisted for decades, with FERC adjudicating various cases, the cases being appealed in federal courts, the courts remanding actions back to FERC, and so on. The core issue is SF’s utilization of PG&E grid services through a WDT subject to FERC jurisdiction. The latest iteration of this long-simmering dispute is a trial in the United States Court of Appeals for the District of Columbia, currently on remand since January 2024 following FERC’s review of previous orders.[1] This bill asks the Legislature to adjudicate the dispute in favor of SF. The appropriateness of such a legislative intervention – regardless of the merits – in a federal dispute is unclear. Moreover, it is uncertain whether such an action of the Legislature would be preempted federally, once FERC issues an order or the Courts of Appeal offer their ruling.
- Prohibition of FERC orders of Retail Wheeling and Sham Transactions. The Federal Power Act (FPA) § 212(h)(1) precludes FERC from issuing any order under the FPA that requires the transmission of energy directly to an ultimate consumer (direct retail wheeling). Section 212(h)(2) prohibits sham transactions that are intended to evade the ban on direct retail wheeling. The FPA § 212(h)(2) "sham" prohibition precludes FERC from issuing any order under the FPA that is conditioned upon or requires the transmission of electric energy to, or for the benefit of, an entity if such electric energy would be sold by that entity directly to an ultimate consumer, unless certain conditions are met.
First, the entity must fall into one of the following categories. It must be a Federal power marketing agency, the Tennessee Valley Authority, a State or any political subdivision of a State, a corporation or association that has ever received a loan from the Rural Electrification Administration for purposes of providing electric service, a person having an obligation arising under State or local law to provide electric service to the public, or any corporation or association wholly owned by one of the foregoing. In addition, the entity seeking transmission must also meet one of two criteria: 1) It was providing electric service to the ultimate consumer on October 24, 1992, or 2) it would utilize transmission or distribution facilities that it owns or controls to deliver all such electric energy to the electric consumer.
As noted in a 1997 legal analysis of FERC Open Access Rules, “It is clear in the legislative history of the FPA that the fundamental goal of the "sham" prohibition is to preclude a wholesale sale that is actually a subterfuge intended to circumvent the ban on the Commission's ability to order retail wheeling directly to an end user. In particular, Congress was concerned that retail customers would create paper intermediaries that could obtain wholesale wheeling and thereby pirate retail customers whom the wheeling utility has a legal obligation to serve. The FPA and its legislative history make clear that state law determines retail marketing areas of electric utilities and that neither the newly amended §§ 211 and 212, nor any other provision of the FPA is to interfere with this state decision. This is also enforced in § 212(g) of the FPA, which precludes the Commission from issuing any order that is inconsistent with State laws governing retail marketing areas.”[2]
- SF vs. PG&E. The SF-PG&E dispute centers around the level of service SF is entitled to receive under PG&E’s Tariff and SF’s grandfathering under FPA §212, noted above. SF and PG&E have disagreed about the extent to which PG&E’s FERC-jurisdictional WDT permits SF to continue to receive service without having to own or control intervening distribution facilities between PG&E’s facilities and SF’s end-use customers. (What is known as primary [transmission] versus secondary [distribution] voltage.) As noted in FERC’s recent brief in the Federal Court of Appeal (acronyms used for brevity where appropriate) case on the matter:
“SF ‘does not have its own comprehensive…system to serve’ its customers; therefore, since 1945 it has ‘purchased wholesale…services under a series of interconnection agreements with PG&E.’ The 1987 Interconnection Agreement, the most recent of these agreements, governed interconnection of PG&E and SF’s systems to serve SF’s customers. Under the 1987 Interconnection Agreement, PG&E provided service to SF’s customers without SF having to own or control distribution facilities at each point of delivery. The 1987 Interconnection Agreement expired in July 2015.
While the 1987 Interconnection Agreement between PG&E and SF was in effect, FERC approved a settlement that amended the Tariff, including a Tariff provision at issue here [at the Court of Appeal]. As explained by this Court, PG&E Tariff requires customers to demonstrate ownership or control of distribution facilities except where a customer meets the §824k FPA criteria for grandfathering.
In October 2014, SF filed a complaint against PG&E alleging that, upon expiration of the 1987 Interconnection Agreement, PG&E would unreasonably deny service to SF under the Tariff. In December 2014, PG&E filed the Replacement Agreements to continue to provide service to SF. In the 2019 and 2020 Orders, FERC denied SF’s complaint and approved PG&E’s Replacement Agreements. FERC concluded that SF had not shown, based on the record, that PG&E would unreasonably deny service upon expiration of the 1987 Interconnection Agreement and concluded that PG&E’s Replacement Agreements were appropriate. … [Specifically] FERC concluded that PG&E’s ‘point of delivery approach to determining which SF customers qualify for service under the [Tariff]’ was appropriate.
SF appealed the 2019 and 2020 Orders. This Court rejected FERC’s reasoning…the Court found the [FERC] orders arbitrary and capricious. In October 2022, FERC issued the Remand Order [finding in favor of SF]. PG&E sought rehearing. In March 2023, FERC denied rehearing… and declined to overturn its [decision]. In the Remand Order, FERC found that PG&E must extend Tariff service to: (1) all end-use customers served by SF as of October 24, 1992, and (2) all customers that belong to that same class of customers, even at points of service that were initiated after October 24, 1992.”
FERC concluded the brief requesting the Court deny PG&E’s petitions for review.
- Far Reaching Implications. This bill not only asks the Legislature to settle this longstanding dispute between SF and PG&E, but it expands the eligibility under the FERC WDT to the State of California or any instrumentality of the state or political subdivision. It is unclear to committee how such an expansion is permissible under the Federal Powers Act, except perhaps under a liberal interpretation that these provisions amend state law governing retail markets, even if they do so through a wholesale federal tariff. If the expansion permitted under this bill is not federally preempted, the opposition raises concerns that this bill could permit similar SF-PG&E relationships statewide. They note that the bill would “encourage sham wholesale electric transactions, where municipal utilities ‘offer’ electric services to customers but rely exclusively upon the IOUs to build and operate the facilities necessary to serve retail municipal customers.” This option might be available to municipal utilities, joint powers authorities, or community choice aggregators. The concern with allowing such relationships to emerge is that receiving power at wholesale (on paper) may allow transactions where these entities avoid appropriate grid costs.
SF, as sponsor of this bill, notes these statutory changes are necessary due to the historic delays they have experienced from PG&E. They emphasize the bill would “facilitate the timely energization of new development projects [especially affordable housing] while promoting least cost energization.” Despite recent legislative and regulatory work in this space – through the passage of AB 50 (Wood, Chapter 317, Statutes of 2023) and SB 410 (Becker, Chapter 394, Statutes of 2023) – to ensure timely energization, SF notes those efforts are too narrow, focused on retail, not wholesale issues. The first article in this bill, however, which seeks more information on distribution planning, is likely too broad in its scope. It requires the IOUs to provide all manner of grid data to whomever seeks it. Given security concerns present around such critical infrastructure, like the Metcalf substation attack in 2013, caution should be exercised. The author acknowledges the broad nature of many of the provisions of the bill, and has indicated an openness to keeping the topic specific to SF-PG&E. However, as noted above, the committee may wish consider the appropriateness of such action.
- Previous Legislation.
AB 50 (Wood) requires the CPUC, to determine the criteria for customers to receive timely electricity service when requesting new service connections or upgraded service, known as "energization." Proposes several policies to address delays in connecting customers to the electrical grid, including improved information sharing with local governments, reporting by electric investor-owned utilities (IOUs), and other measures. Status: Chapter 317, Statutes of 2023.
SB 410 (Becker) requires the CPUC to establish by September 30, 2024, reasonable average and maximum target energization time periods in order to connect new customers and upgrade the service of existing customers to the electrical grid. This bill also requires reporting by electrical corporations and authorizes specified annual cost-recovery, subject to a cap. Status: Chapter 394, Statutes of 2023.
AB 2700 (McCarty) requires the CEC, in collaboration with CARB and the CPUC, to annually gather from state agencies specified entities’ fleet data on medium- and heavy-duty vehicles and share that data with electrical corporations and POUs to help inform electrical grid planning efforts to support the state’s anticipated demand for electric vehicle charging. Status: Chapter 354, Statutes of 2022.
REGISTERED SUPPORT / OPPOSITION:
Support
Housing Action Coalition
Nor Cal Carpenters Union
San Francisco Public Utilities Commission – sponsor
Opposition
California State Association of Electrical Workers
Coalition of California Utility Employees
Engineers and Scientists of California, Ifpte Local 20
IBEW
IBEW Local Union 569
Pacific Gas and Electric Company
San Diego Gas & Electric
Southern California Edison
Southern California Gas Company
Western Electrical Contractors Association
Western Line Constructors Chapter, INC.
Analysis Prepared by: Laura Shybut / U. & E. / (916) 319-2083
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 284 |
THIRD READING
Bill No: SB 284
Author: Wiener (D)
Introduced: 2/1/23
Vote: 21
SENATE BUS., PROF. & ECON. DEV. COMMITTEE: 7-0, 3/27/23
AYES: Roth, Archuleta, Becker, Dodd, Eggman, Smallwood-Cuevas, Wahab
NO VOTE RECORDED: Nguyen, Alvarado-Gil, Ashby, Glazer, Niello, Wilk
SUBJECT: Vending machines
SOURCE: Author
DIGEST:
This bill requires a person who owns a vending machine to post their telephone number, email address, or both, on a vending machine, as specified, in addition to the requirements under current law to post their name and address.
ANALYSIS: Existing federal law specifies that vending machine operators subject to §§ 403(q)(5)(H)(viii) of the Federal Food, Drug, and Cosmetic Act, or a vending machine operator that voluntarily registers to be subject to the requirements, must provide the following contact information on vending machines selling covered vending machine food: the vending machine operator's name, telephone number, and mailing address or email address. (21 CFR 101.8(e))
Existing state law:
- Requires every person who owns a vending machine to have their name and address affixed in a place where it may be seen by anyone using the machine. (Business and Professions Code (BPC)§ 17570)
- Makes a violation of 1) above a misdemeanor punishable by imprisonment in the county jail for up to six months, by a fine of up to $1,000, or by both, for each violation. (BPC § 17572)
- Requires each vending machine to have a sign indicating the owner’s name, address, and telephone number posted in a prominent place. (Health and Safety Code § 114145)
This bill:
- Requires that, in addition to posting their name and address, a person who owns a vending machine must also post their telephone number, email address, or both on the machine in a conspicuous location.
- States that violation of these provisions is not a misdemeanor and that the potential punishments for violation the posting of a name and address does not apply to the provisions of this bill.
Background
A vending machine is classified as a mechanical device, which is operated by the insertion of a coin or item representative of a value of five cents or more in order to dispense a product, service, or exchange of value. In the state of California, all vending machines are required to be constructed and maintained in accordance with the standards for health, safety, and performance set by NSF International (NSF) and the American National Standards Institute (ANSI). NSF is an independent, international organization, which develops public health standards and provides auditing and certification services. ANSI is a private, non-profit organization, which administers and organizes the United States voluntary standards and conformity assessment system. These two organizations collaborate to produce an annual American National Standard for vending machines (most recent publication: NSF/ANSI 25-2021: Vending Machines for Food and Beverages).
Presently, the only contact information required to be displayed on a vending machine in California is the machine owner’s name and address according to the BPC. However, the Health and Safety Code requires that vending machines display the owner’s name, address, and telephone number. This bill proposes updates to the BPC to require the addition of either the vending machine’s telephone number or an email address (or both) on the vending machine or in a conspicuous location. This bill does not specify whether the owner of the machine must post their professional, personal, or office contact information. Therefore, it is left to the discretion of the machine owner regarding which form of contact information should be displayed on the machine.
The proposed changes regarding the listing of owner contact information on vending machines may be useful for vending machine consumers, facility owners, construction or maintenance workers, and others who may wish to contact a vending machine’s owner. However, it is important to note that this bill specifies that failure to list an owner’s email or telephone number on a machine is exempt from classification as a misdemeanor. Therefore, the penalties associated with failure to list a vending machine owner’s name and address do not apply if a machine owner does not list their telephone number or email address.
Comments
This bill does not specify the type of email address or telephone number that must be displayed on a vending machine. Therefore, this language leaves this decision to the discretion of the vending machine owner regarding whether to display an office, professional, or personal telephone number or email address. It may be useful to specify the nature of the machine owner’s telephone number or email address displayed on their respective vending machines, especially regarding a requirement that the telephone number or email address must be active and routinely checked for new messages by the vending machine owner.
The penalty for a violation of current state law regarding the placement of owner contact information on vending machines is classified as a misdemeanor punishable by imprisonment in the county jail for up to six months, by a fine of up to $1,000 or by both. This bill specifies that failure to list the owner’s telephone number or email address is not a criminal offense; therefore, these punishments do not apply if a vending machine owner fails to comply with these new provisions. While this exemption ensures that current vending machine owners are not punished if they cannot immediately update the contact information listed on all of their existing machines, it also provides no impetus for vending machine owners to incorporate updated contact information on existing or new vending machines. The Author may wish to consider a grace period for these new provisions before including them in existing enforcement mechanisms. This allows time for vending machine owners to update contact information on existing machines, while ensuring that both new and existing vending machines all comply with these new provisions.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
SUPPORT: (Verified 3/28/23)
None received
OPPOSITION: (Verified 3/28/23)
None received
Prepared by: Dana Shaker / B., P. & E.D. /
3/29/23 15:16:40
**** END ****
SENATE COMMITTEE ON
BUSINESS, PROFESSIONS AND ECONOMIC DEVELOPMENT
Senator Richard Roth, Chair
2023 - 2024 Regular
Bill No: Hearing Date: March 27, 2023
Author: | |||
Version: | February 1, 2023 | ||
Urgency: | No | Fiscal: | No |
Consultant: | Dana Shaker | ||
Subject:
SUMMARY:
Requires a person who owns a vending machine to post their telephone number, email address, or both, on a vending machine, as specified, in addition to the requirements under current law to post their name and address.
Existing Federal Law:
- Specifies that vending machine operators subject to §§ 403(q)(5)(H)(viii) of the Federal Food, Drug, and Cosmetic Act, or a vending machine operator that voluntarily registers to be subject to the requirements, must provide the following contact information on vending machines selling covered vending machine food: the vending machine operator's name, telephone number, and mailing address or email address. (21 CFR 101.8(e))
Existing State Law:
- Requires every person who owns a vending machine to have their name and address affixed in a place where it may be seen by anyone using the machine. (Business and Professions Code (BPC)§ 17570)
- Makes a violation of 1) above a misdemeanor punishable by imprisonment in the county jail for up to six months, by a fine of up to $1,000, or by both, for each violation. (BPC § 17572)
- Requires each vending machine to have a sign indicating the owner’s name, address, and telephone number posted in a prominent place. (Health and Safety Code § 114145)
This bill:
- Requires that, in addition to posting their name and address, a person who owns a vending machine must also post their telephone number, email address, or both on the machine in a conspicuous location.
- States that violation of these provisions is not a misdemeanor and that the potential punishments for violation the posting of a name and address does not apply to the provisions of this bill.
FISCAL EFFECT:
Unknown. This bill is not keyed fiscal by Legislative Counsel.
COMMENTS:
- Purpose. The Author is the Sponsor of this bill. According to the author, “Existing law does not ensure that individuals who may be utilizing a vending machine (i.e. damage to machine, electronic issues) can report issues adequately to the owner of said vending machine – this bill addresses that by requiring that a telephone or email address (or both) is also posted.”
- Vending Machine Definitions and Regulatory Standards. A vending machine is classified as a mechanical device, which is operated by the insertion of a coin or item representative of a value of five cents or more in order to dispense a product, service, or exchange of value. In the state of California, all vending machines are required to be constructed and maintained in accordance with the standards for health, safety, and performance set by NSF International (NSF) and the American National Standards Institute (ANSI). NSF is an independent, international organization, which develops public health standards and provides auditing and certification services. ANSI is a private, non-profit organization, which administers and organizes the United States voluntary standards and conformity assessment system. These two organizations collaborate to produce an annual American National Standard for vending machines (most recent publication: NSF/ANSI 25-2021: Vending Machines for Food and Beverages).
- Vending Machine Owner Contact Information. Presently, the only contact information required to be displayed on a vending machine in California is the machine owner’s name and address according to the BPC. However, the Health and Safety Code requires that vending machines display the owner’s name, address, and telephone number. This bill proposes updates to the BPC to require the addition of either the vending machine’s telephone number or an email address (or both) on the vending machine or in a conspicuous location. This bill does not specify whether the owner of the machine must post their professional, personal, or office contact information. Therefore, it is left to the discretion of the machine owner regarding which form of contact information should be displayed on the machine.
The proposed changes regarding the listing of owner contact information on vending machines may be useful for vending machine consumers, facility owners, construction or maintenance workers, and others who may wish to contact a vending machine’s owner. However, it is important to note that this bill specifies that failure to list an owner’s email or telephone number on a machine is exempt from classification as a misdemeanor. Therefore, the penalties associated with failure to list a vending machine owner’s name and address do not apply if a machine owner does not list their telephone number or email address.
- Comments.
- Clarification of required email address or telephone number type. This bill does not specify the type of email address or telephone number that must be displayed on a vending machine. Therefore, this language leaves this decision to the discretion of the vending machine owner regarding whether to display an office, professional, or personal telephone number or email address. It may be useful to specify the nature of the machine owner’s telephone number or email address displayed on their respective vending machines, especially regarding a requirement that the telephone number or email address must be active and routinely checked for new messages by the vending machine owner.
- Penalty for failure to meet contact information requirements. The penalty for a violation of current state law regarding the placement of owner contact information on vending machines is classified as a misdemeanor punishable by imprisonment in the county jail for up to six months, by a fine of up to $1,000 or by both. This bill specifies that failure to list the owner’s telephone number or email address is not a criminal offense; therefore, these punishments do not apply if a vending machine owner fails to comply with these new provisions. While this exemption ensures that current vending machine owners are not punished if they cannot immediately update the contact information listed on all of their existing machines, it also provides no impetus for vending machine owners to incorporate updated contact information on existing or new vending machines. The Author may wish to consider a grace period for these new provisions before including them in existing enforcement mechanisms. This allows time for vending machine owners to update contact information on existing machines, while ensuring that both new and existing vending machines all comply with these new provisions.
SUPPORT AND OPPOSITION:
Support: None received
Opposition: None received
-- END --