Bills

AB 40: California Environmental Quality Act: environmental impact reports: coal handling, storage, and export.

  • Session Year: 2025-2026
  • House: Assembly
  • Latest Version Date: 2026-09-02

Current Status:

In Progress

(2026-09-08: Enrolled and presented to the Governor at 3:30 p.m.)

Introduced

In Committee

Awaiting First Chamber Vote

Passed First Chamber

In Committee

Awaiting Second Chamber Vote

Passed Second Chamber

Enacted

Version:

The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA provides that when an EIR has been prepared for a project, no subsequent or supplemental EIR shall be required by a lead agency or responsible agency, unless specified events occur.

This bill would require a lead agency, before issuing the initial discretionary approval for a large-volume bulk coal facility, defined as a facility with a design capacity exceeding 5,000,000 short tons per year of coal handling, storage, or export to prepare or cause to be prepared an EIR. The bill would prohibit a lead agency, air pollution control district, or air quality management district from relying on an existing EIR to issue a discretionary approval for, or to, a large-volume bulk coal facility, and would require a subsequent or new EIR to be prepared, if any of a list of specified conditions are met, including that there is an increase in design capacity of a project that did not previously meet the definition of a large-volume bulk coal facility, as provided; there is a change in the type of coal handled, stored, or exported, or the EIR did not explicitly address the type of coal handled, stored, or exported; or there is a significant increase in the quantity of coal handled, stored, or exported, or the EIR did not explicitly disclose the quantity of coal to be handled, stored, or exported. The bill would require an EIR or subsequent EIR prepared pursuant to these provisions to, among other things, evaluate the large-volume bulk coal facilitys potential to generate PM2.5 and PM10 fugitive dust emissions during construction and operations, and to require mitigation measures, as provided. The bill would apply these provisions to a discretionary approval that is pending or made after June 4, 2026, as specified.

Because the bill would create new duties for a lead agency, the bill would impose a state-mandated local program.

The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

This bill would provide that no reimbursement is required by this act for a specified reason.

Discussed in Hearing

Assembly Floor2MIN
Aug 28, 2026

Assembly Floor

Assembly Standing Committee on Natural Resources28MIN
Aug 27, 2026

Assembly Standing Committee on Natural Resources

Senate Floor4MIN
Aug 25, 2026

Senate Floor

Senate Standing Committee on Environmental Quality18MIN
Jul 1, 2026

Senate Standing Committee on Environmental Quality

Senate Floor2MIN
Aug 21, 2025

Senate Floor

Senate Standing Committee on Health17MIN
Jun 11, 2025

Senate Standing Committee on Health

Assembly Floor3MIN
Apr 21, 2025

Assembly Floor

Assembly Standing Committee on Appropriations1MIN
Apr 9, 2025

Assembly Standing Committee on Appropriations

View Older Hearings

News Coverage:

AB 40: California Environmental Quality Act: environmental impact reports: coal handling, storage, and export. | Digital Democracy