AB 626: Underground storage tanks: design and construction requirements: exemption.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-04-10
Current Status:
Failed
(2026-02-02: From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law provides for the regulation of underground storage tanks by the State Water Resources Control Board. Existing law requires underground storage tanks that are used to store hazardous substances and that are installed after January 1, 1984, to meet certain requirements, including that the primary containment be product tight and that the tanks secondary containment meet specified standards. Existing law provides that single-walled containers do not fulfill the requirement of an underground storage tank (UST) providing both a primary and a secondary containment, except under a specified circumstance. Existing law imposes various monitoring, inspection, replacement, and upgrading requirements on USTs installed on or before January 1, 1984, and used for the storage of hazardous substances. Existing law requires, by December 31, 2025, the owner or operator of a UST to permanently close that UST if the UST meets specified conditions.
This bill would exempt an operator from the tank closure requirement, described above, if the operator of a single-walled UST is acting in good faith to comply with the requirement to upgrade to a double-walled UST by September 30, 2025, and the operator meets specified conditions. The bill would require an operator seeking this exemption to submit a written request to the local enforcement agency, before September 30, 2025, and would require the local enforcement agency to review the request and issue a determination within 60 days of receipt. The bill would require the local agency to provide the determination to both the tank operator and the state board. By imposing additional duties on local officers, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law provides for the regulation of underground storage tanks by the State Water Resources Control Board. Existing law requires underground storage tanks that are used to store hazardous substances and that are installed after January 1, 1984, to meet certain requirements, including that the primary containment be product tight and that the tanks secondary containment meet specified standards. Existing law provides that single-walled containers do not fulfill the requirement of an underground storage tank (UST) providing both a primary and a secondary containment, except under a specified circumstance. Existing law imposes various monitoring, inspection, replacement, and upgrading requirements on USTs installed on or before January 1, 1984, and used for the storage of hazardous substances. Existing law requires, by December 31, 2025, the owner or operator of a UST to permanently close that UST if the UST meets specified conditions.This bill would exempt an operator from the tank closure requirement, described above, if the operator of a single-walled UST is acting in good faith to comply with the requirement to upgrade to a double-walled UST by December 31, 2025, and the operator meets specified conditions. The bill would require an operator seeking this exemption to submit a written request to the local enforcement agency, and would require the local enforcement agency to review the request and issue a determination within 60 days of receipt. By imposing additional duties on local officers, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.Existing law provides for the regulation of underground storage tanks by the State Water Resources Control Board. Existing law requires underground storage tanks that are used to store hazardous substances and that are installed after January 1, 1984, to meet certain requirements, including that the primary containment be product tight and that the tanks secondary containment meet specified standards. Existing law provides that single-walled containers do not fulfill the requirement of an underground storage tank (UST) providing both a primary and a secondary containment, except under a specified circumstance. Existing law imposes various monitoring, inspection, replacement, and upgrading requirements on USTs installed on or before January 1, 1984, and used for the storage of hazardous substances. Existing law requires, by December 31, 2025, the owner or operator of a UST to permanently close that UST if the UST meets specified conditions.
This bill would exempt an operator from the tank closure requirement, described above, if the operator of a single-walled UST is acting in good faith to comply with the requirement to upgrade to a double-walled UST by December 31, 2025, and the operator meets specified conditions. The bill would require an operator seeking this exemption to submit a written request to the local enforcement agency, and would require the local enforcement agency to review the request and issue a determination within 60 days of receipt. By imposing additional duties on local officers, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
(a)Notwithstanding any other provision of this chapter, an operator of a single-walled underground storage tank (UST) who is acting in good faith to comply with the requirements of Section 25292.05 to upgrade to a double-walled UST by December 31, 2025, shall not be subject to the penalties outlined in subdivision (b) of Section 25299, if all of the following conditions are met:
(1)The operator has submitted a complete application for all necessary permits to upgrade or replace the single-walled UST no later than September 30, 2025.
(2)The operator has demonstrated to the satisfaction of the local enforcement agency that delays in obtaining the required permits are beyond the operators control and are due to circumstances, including, but not limited to, administrative backlogs, incomplete reviews, or other permitting-related delays.
(3)The operator continues to operate the single-walled UST in compliance with all other applicable requirements of this chapter, including leak detection and secondary containment measures, to minimize environmental risks during the grace period.
(b)An operator seeking relief pursuant to this section shall submit a written request to the local enforcement agency, before September 30, 2025, including documentation of good faith efforts to comply and evidence of delays. The local enforcement agency shall review the request and issue a determination within 60 days of receipt. The local agency shall provide the determination to both the tank operator and the state board.
(c)This section does not waive the requirement for eventual compliance with Section 25292.05 or preclude the imposition of penalties for noncompliance with other provisions of this chapter.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to avert economic harm to operators of a single-wall underground storage tank who have made a good faith effort to comply with existing law, it is necessary that this bill take effect immediately.
SECTION 1.Section 25292.06 is added to the Health and Safety Code, to read:25292.06.(a)Notwithstanding any other provision of this chapter, an operator of a single-walled underground storage tank (UST) who is acting in good faith to comply with the requirements of Section 25292.05 to upgrade to a double-walled UST by December 31, 2025, shall not be subject to the penalties outlined in subdivision (b) of Section 25299, if all of the following conditions are met:(1)The operator has submitted a complete application for all necessary permits to upgrade or replace the single-walled UST no later than December 31, 2025.(2)The operator has demonstrated to the satisfaction of the local enforcement agency that delays in obtaining the required permits are beyond the operators control and are due to circumstances, including, but not limited to, administrative backlogs, incomplete reviews, or other permitting-related delays.(3)The operator continues to operate the single-walled UST in compliance with all other applicable requirements of this chapter, including leak detection and secondary containment measures, to minimize environmental risks during the grace period.(b)An operator seeking relief pursuant to this section shall submit a written request to the local enforcement agency, including documentation of good-faith efforts to comply and evidence of delays. The local enforcement agency shall review the request and issue a determination within 60 days of receipt.(c)This section does not waive the requirement for eventual compliance with Section 25292.05 or preclude the imposition of penalties for noncompliance with other provisions of this chapter.SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code. CORRECTIONS: HeadingLine 2.(a)Notwithstanding any other provision of this chapter, an operator of a single-walled underground storage tank (UST) who is acting in good faith to comply with the requirements of Section 25292.05 to upgrade to a double-walled UST by December 31, 2025, shall not be subject to the penalties outlined in subdivision (b) of Section 25299, if all of the following conditions are met:
(1)The operator has submitted a complete application for all necessary permits to upgrade or replace the single-walled UST no later than December 31, 2025.
(2)The operator has demonstrated to the satisfaction of the local enforcement agency that delays in obtaining the required permits are beyond the operators control and are due to circumstances, including, but not limited to, administrative backlogs, incomplete reviews, or other permitting-related delays.
(3)The operator continues to operate the single-walled UST in compliance with all other applicable requirements of this chapter, including leak detection and secondary containment measures, to minimize environmental risks during the grace period.
(b)An operator seeking relief pursuant to this section shall submit a written request to the local enforcement agency, including documentation of good-faith efforts to comply and evidence of delays. The local enforcement agency shall review the request and issue a determination within 60 days of receipt.
(c)This section does not waive the requirement for eventual compliance with Section 25292.05 or preclude the imposition of penalties for noncompliance with other provisions of this chapter.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
|
Date
|
Status
|
|---|---|
| Feb 2, 2026 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2026 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| May 23, 2025 | In committee: Held under submission. |
| Apr 23, 2025 | In committee: Set, first hearing. Referred to suspense file. |
| Apr 21, 2025 | Re-referred to Com. on APPR. |
| Apr 11, 2025 | Measure version as amended on April 10 corrected. |
| Apr 10, 2025 | Read second time and amended. |
| Apr 9, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (April 8). |
| Mar 3, 2025 | Referred to Com. on E.S & T.M. |
| Feb 14, 2025 | From printer. May be heard in committee March 16. |
| Feb 13, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 8, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Environmental Safety and Toxic Materials |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: April 23, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 626
Author:(Papan) – As Amended Ver:April 10, 2025
Policy Committee: | Environmental Safety and Toxic Materials | Vote: | 7 - 0 |
|
| ||
|
|
Urgency: Yes State Mandated Local Program: Yes Reimbursable: Yes
SUMMARY:
This bill exempts from penalties an operator of a single-walled underground storage tank (UST) who is acting in good faith to comply with specified requirements to upgrade their tank to a double-walled UST.
Specifically, this bill, among other things:
1) Provides that an operator of a single-walled UST who is acting in good faith to comply with specified requirements to upgrade to a double-walled UST by December 31, 2025, shall not be subject to penalties outlined in statute if all of the following conditions are met:
a) The operator has submitted a complete application for all necessary permits to upgrade or replace the single-walled UST no later than September 30, 2025.
b) The operator has demonstrated to the satisfaction of the local enforcement agency that delays in obtaining the required permits are beyond the operator’s control and are due to circumstances, including, but not limited to, administrative backlogs, incomplete reviews, or other permitting-related delays.
c) The operator continues to operate the single-walled UST in compliance with all other applicable requirements, including leak detection and secondary containment measures, to minimize environmental risks during the grace period.
2) Requires an operator seeking relief pursuant to this bill to submit a written request to the local enforcement agency, before September 30, 2025, including documentation of good faith efforts to comply and evidence of delays.
3) Requires the local enforcement agency to review the request and issue a determination within 60 days of receipt. Requires the local agency to provide the determination to both the tank operator and the State Water Resources Control Board (State Water Board).
4) Provides that this bill does not waive the requirement for eventual compliance with permanent closure requirements for single-walled USTs or preclude the imposition of penalties for noncompliance with other provisions of the chapter.
FISCAL EFFECT:
1) Significant one-time costs to the State Water Board to develop and update regulations. The State Water Board anticipates costs of approximately $1 million over the first two years to develop and update its UST regulations (Underground Storage Tank Cleanup Fund (USTCF)) and to revise its Replacing, Removing, or Upgrading Underground Storage Tank (RUST) loan and grant agreements (Petroleum UST Financing Account (Account) and USTCF).
2) Significant ongoing costs to the State Water Board to review new applications to determine eligibility for RUST funding. The State Water Board assumes these costs will begin two years following initial implementation and estimates ongoing annual costs of approximately $500,000 (Account and USTCF).
3) Ongoing cost pressure to remediate contamination caused by USTs that are allowed to remain in the ground longer than December 31, 2025. The State Water Board anticipates remediation of contamination caused by USTs that are allowed to remain in the ground longer than December 31, 2025, will cost in the hundreds of millions of dollars. The State Water Board notes that the longer these USTs are in the ground, the more complex and expensive the cleanup becomes at these sites (Account and USTCF).
4) By imposing requirements on a local enforcement agency – which, for purposes of this bill, is primarily a certified unified program agency (CUPA) – this bill creates a state-mandated local program. A CUPA is a local agency certified by the California Environmental Protection Agency to implement and enforce state hazardous waste and hazardous materials regulatory management programs. While CUPAs do collect fees to cover their administrative costs, it is not clear if the costs incurred by a CUPA to implement the requirements of this bill are recoverable through those fees. Therefore, these costs are potentially reimbursable by the state, subject to a determination by the Commission on State Mandates (General Fund).
COMMENTS:
1) Purpose. According to the author:
Despite their best efforts to meet the December 31, 2025 deadline for upgrading to double-walled underground storage tanks (USTs), many tank owners are facing significant delays in the permitting process, which are preventing them from meeting compliance requirements. AB 626 provides a much-needed grace period for operators who can demonstrate they have submitted the necessary documents for approval so they may continue serving their communities.
2) Background. Leaking USTs are a significant source of petroleum contamination in groundwater and pose threats to health, safety, and the environment. Current law requires every owner of a petroleum UST that is subject to state regulation to pay a per -gallon fee to the USTCF. This fee generates approximately $300 million annually at a fee of $0.02 per gallon stored.
The USTCF provides a means for petroleum UST owners and operators to meet the federal and state requirements of maintaining financial responsibility to pay for any damages arising from their tank operations. The fund assists a large number of small businesses and individuals by providing reimbursement for expenses associated with the cleanup of leaking USTs. The fund also provides money to the regional water boards and local regulatory agencies to abate emergency situations or to clean up abandoned sites that pose a threat to human health, safety, and the environment, as a result of a UST petroleum release. From 2014 through 2025, the USTCF has reimbursed claims across its various programs and subaccounts totaling approximately $2 billion.
A single-walled UST is either the tank or the connected piping (or both) that does not have secondary containment and a continuous leak detection system. SB 445 (Hill), Chapter 547, Statutes of 2014, requires all single-walled USTs to be converted to double-walled USTs or permanently closed by December 31, 2025. Failure to comply by this date can subject the operator to enforcement actions, including civil penalties of up to $5,000 per day. Loans and grants are available through the RUST program (funded by USTCF) to assist eligible small businesses with removing single-walled USTs and replacing them with double-walled USTs.
The Rural County Representatives of California writes in support of the bill:
There are approximately 600 single-walled UST systems still in operation throughout the state, some of which are owned and operated by governmental agencies. Other operators are located in rural areas where there may be fewer fueling opportunities and/or other complications associated with meeting the statutory deadline. AB 626 protects against the jarring business and local economic impacts that would be associated with the immediate closure of those facilities (or imposition of significant penalties) at the end of this year.
While not all operators may be able to show they are working in good faith to replace their USTs with double-walled systems, AB 626 will ensure that good actors (and their communities) are not penalized for issues beyond their control.
It is worth noting that the bill does not grant the State Water Board the ability to review or override a local agency’s decision to grant a UST owner relief from penalties. There likely will be variation across local agencies in what constitutes “acting in good faith,” circumstances outside of the operator’s control, and the specific evidence that must be submitted to support a determination.
Analysis Prepared by: Nikita Koraddi / APPR. / (916) 319-2081
Discussed in Hearing
Assembly Standing Committee on Environmental Safety and Toxic Materials
Bill Author
Bill Co-Author(s):