Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resources plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities to consider, as a part of the integrated resource plan process, the role of distributed energy resources and other specified energy- and efficiency-related tools, in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utilities, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate additional changes to Section 454.52 of the Public Utilities Code proposed by AB 759 to be operative only if this bill and AB 759 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resources plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities to consider, as a part of the integrated resource plan process, the role of distributed energy resources and other specified energy- and efficiency-related tools, in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utilities, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate additional changes to Section 454.52 of the Public Utilities Code proposed by AB 759 to be operative only if this bill and AB 759 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resources plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities to consider, as a part of the integrated resource plan process, the role of distributed energy resources and other specified energy- and efficiency-related tools, in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utility, utilities, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate additional changes to Section 454.52 of the Public Utilities Code proposed by Assembly Bill 759 to be operative only if this bill and Assembly Bill 759 are enacted and this bill is enacted last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resources plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities to consider, as a part of the integrated resource plan process, the role of clean energy technology, demand response, and energy efficiency distributed energy resources in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utility, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resources plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities to consider, as a part of the integrated resource plan process, establishing policies and procedures the role of clean energy technology, demand response, and energy efficiency in helping to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utility, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission to adopt a process for each load-serving entity to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that the load-serving entity meets, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030. Existing law requires a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, on or before January 1, 2019, to adopt an integrated resources plan and a process for updating the plan at least once every 5 years to ensure that the utility satisfies, among other things, the states greenhouse gas emissions reduction targets and the requirement to procure at least 50% of its electricity from eligible renewable resources by December 31, 2030.
This bill would require the commission and the governing boards of local publicly owned electric utilities to consider, as a part of the integrated resource plan process, establishing policies and procedures to ensure that each load-serving entity or local publicly owned electric utility, as applicable, meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers. Because this bill would impose additional duties on local publicly owned electric utility, this bill would impose a state-mandated local program.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because a violation of an order or decision of the commission implementing the bills requirements would be a crime, this bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for specified reasons.
Existing law requires the Public Utilities Commission (PUC) and the State Energy Resources Conservation and Development Commission (Energy Commission) to take specified actions in furtherance of meeting the states clean energy and pollution reduction objectives, including, among others, taking into account in proceedings associated with meeting the objectives the opportunities to decrease costs and increase benefits using renewable and nonrenewable technologies with zero or lowest feasible emissions of greenhouse gases, criteria pollutants, and toxic air contaminants onsite.This bill, on or before January 1, 2020, would require the PUC and the Energy Commission, in consultation with the Independent System Operator, to establish policies or procedures to ensure that electrical service providers meet net-load peak, as defined, energy and reliability needs while minimizing the use of fossil fuels and utilizing low-carbon technologies and electrical grid management strategies, as specified. The bill would require the PUC, no later than January 1, 2022, and every 4 years thereafter, to make a specified report to the Legislature.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Existing law requires the Public Utilities Commission (PUC) and the State Energy Resources Conservation and Development Commission (Energy Commission) to take specified actions in furtherance of meeting the states clean energy and pollution reduction objectives, including, among others, taking into account in proceedings associated with meeting the objectives the opportunities to decrease costs and increase benefits using renewable and nonrenewable technologies with zero or lowest feasible emissions of greenhouse gases, criteria pollutants, and toxic air contaminants onsite.
This bill, on or before January 1, 2020, would require the PUC and the Energy Commission, in consultation with the Independent System Operator, to establish policies or procedures to ensure that electrical service providers meet net-load peak, as defined, energy and reliability needs while minimizing the use of fossil fuels and utilizing low-carbon technologies and electrical grid management strategies, as specified. The bill would require the PUC, no later than January 1, 2022, and every 4 years thereafter, to make a specified report to the Legislature.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the PUC implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. This bill would state the intent of the Legislature to enact legislation that would establish a Clean Peak Reliability Requirement to ensure the states adoption of renewable energy generation results in an overall reduction of emissions of greenhouse gases from the electrical grid.The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030.
This bill would state the intent of the Legislature to enact legislation that would establish a Clean Peak Reliability Requirement to ensure the states adoption of renewable energy generation results in an overall reduction of emissions of greenhouse gases from the electrical grid.
(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 1.5.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing with January 1, 2013.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)In furtherance of the requirements of subdivision (b), the governing board of a local publicly owned electric utility shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each utility meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(d)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.Section 1.5 of this bill incorporates amendments to Section 454.52 of the Public Utilities Code proposed by both this bill and Assembly Bill 759. That section shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2018, (2) each bill amends Section 454.52 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 759, in which case Section 1 of this bill shall not become operative.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 1.5.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing with January 1, 2013.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)In furtherance of the requirements of subdivision (b), the governing board of a local publicly owned electric utility shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each utility meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(d)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.Section 1.5 of this bill incorporates amendments to Section 454.52 of the Public Utilities Code proposed by both this bill and Assembly Bill 759. That section shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2018, (2) each bill amends Section 454.52 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 759, in which case Section 1 of this bill shall not become operative.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)(A)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies, in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(B)For purposes of this paragraph, net-load peak means the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12.(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 1.5.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing with January 1, 2013.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)(1)In furtherance of the requirements of subdivision (b), the governing board of a local publicly owned electric utility shall consider the role of distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each utility meets net-load peak energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(2)For purposes of this paragraph, net-load peak means the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12.(d)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.Section 1.5 of this bill incorporates amendments to Section 454.52 of the Public Utilities Code proposed by both this bill and Assembly Bill 759. That section shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2018, (2) each bill amends Section 454.52 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 759, in which case Section 1 of this bill shall not become operative.
SEC. 3.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)(A)In furtherance of the requirements of paragraph (1), the commission shall consider the role of clean energy technology, demand response, and energy efficiency, distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies, in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(B)For purposes of this paragraph, net-load peak means the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)(1)In furtherance of the requirements of subdivision (b), the governing board of a local publicly owned electric utility shall consider the role of clean energy technology, demand response, and energy efficiency distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies, in helping to ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(2)For purposes of this paragraph, net-load peak means the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12.
(d)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)(A)In furtherance of the requirements of paragraph (1), the commission shall consider establishing policies and procedures, including new targets or requirements for the role of clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(B)For purposes of this paragraph, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California-based California balancing authority. authority, as defined in Section 399.12.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)(1)In furtherance of the requirements of subdivision (b), the governing board of a local publicly owned electric utility shall consider establishing policies and procedures, including new targets or requirements for the role of clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures efficiency in helping to ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(2)For purposes of this paragraph, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California-based California balancing authority. authority, as defined in Section 399.12.
(d)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)(A)In furtherance of the requirements of paragraph (1), the commission shall consider establishing policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers.
(B)For purposes of this paragraph, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California-based balancing authority.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 2.Section 9621 of the Public Utilities Code is amended to read:9621.(a)This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(b)On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1)Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly-owned electric utility that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2)Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1.
(3)Meets the goals specified in subparagraphs (D) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52, and the goal specified in subparagraph (C) of paragraph (1) of subdivision (a) of Section 454.52, as that goal is applicable to each local publicly owned electric utility. A local publicly owned electric utility shall not, solely by reason of this paragraph, be subject to requirements otherwise imposed on electrical corporations.
(c)(1)In furtherance of the requirements of subdivision (b), the governing board of a local publicly owned electric utility shall consider establishing policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the states energy goals at the least cost to ratepayers.
(2)For purposes of this paragraph, net-load peak means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California-based balancing authority.
(c)(d)(1)The integrated resource plan shall address procurement for the following:
(A)Energy efficiency and demand response resources pursuant to Section 9615.
(B)Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C)Transportation electrification.
(D)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E)The resource adequacy requirements established pursuant to Section 9620.
(2)(A)The governing board of the local publicly owned electric utility may authorize all source procurement that includes various resource types, including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, to ensure that the local publicly owned electric utility procures the optimum resource mix that meets the objectives of subdivision (b).
(B)The governing board may authorize procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in subdivision (b), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(d)(e)A local publicly owned electric utility shall satisfy the notice and public disclosure requirements of subdivision (f) of Section 399.30 with respect to any integrated resource plan or plan update it considers.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act or because costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.The Legislature finds and declares that the intent of establishing a low-cost, low-carbon reliability requirement is to ensure that the state meets its energy goals while reducing the need for new electricity generation and unnecessary new transmission, thus achieving the states goals at the least cost to ratepayers.SEC. 2.Section 400.1 is added to the Public Utilities Code, to read:400.1.(a)Net-load peak is the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by generation on the customer side of the meter.(b)On or before January 1, 2020, the commission and the Energy Commission, in consultation with the Independent System Operator, shall establish policies or procedures to ensure that electrical service providers meet net-load peak energy and reliability needs while minimizing the use of fossil fuels and utilizing low-carbon technologies and electrical grid management strategies.(c)In furtherance of subdivision (a), the commission and the Energy Commission may consider establishing new targets or requirements for energy technology that minimizes the percent of load met by fossil fuels during net-load peak energy demand and maximizes the use of low-carbon technologies to meet energy and capacity needs, including, but not limited to, any of the following:(1)Energy storage.(2)Demand response or demand management technology.(3)Energy efficiency.SEC. 3.Section 913.13 is added to the Public Utilities Code, to read:913.13.No later than January 1, 2022, and every four years thereafter, the commission shall report to the Legislature on all of the following:(a)The percent of overall energy needs met through the use of fossil-fueled electrical generation during net-load peak demand, as defined in Section 400.1.(b)The commissions efforts to reduce the percentage of energy needs met through the use of fossil-fueled electrical generation.SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.The Legislature finds and declares that the intent of establishing a low-cost, low-carbon reliability requirement is to ensure that the state meets its energy goals while reducing the need for new electricity generation and unnecessary new transmission, thus achieving the states goals at the least cost to ratepayers.
SEC. 2.Section 400.1 is added to the Public Utilities Code, to read:400.1.(a)Net-load peak is the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by generation on the customer side of the meter.
(b)On or before January 1, 2020, the commission and the Energy Commission, in consultation with the Independent System Operator, shall establish policies or procedures to ensure that electrical service providers meet net-load peak energy and reliability needs while minimizing the use of fossil fuels and utilizing low-carbon technologies and electrical grid management strategies.
(c)In furtherance of subdivision (a), the commission and the Energy Commission may consider establishing new targets or requirements for energy technology that minimizes the percent of load met by fossil fuels during net-load peak energy demand and maximizes the use of low-carbon technologies to meet energy and capacity needs, including, but not limited to, any of the following:
(1)Energy storage.
(2)Demand response or demand management technology.
(3)Energy efficiency.
SEC. 3.Section 913.13 is added to the Public Utilities Code, to read:913.13.No later than January 1, 2022, and every four years thereafter, the commission shall report to the Legislature on all of the following:
(a)The percent of overall energy needs met through the use of fossil-fueled electrical generation during net-load peak demand, as defined in Section 400.1.
(b)The commissions efforts to reduce the percentage of energy needs met through the use of fossil-fueled electrical generation.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.It is the intent of the Legislature to enact legislation that would establish a Clean Peak Reliability Requirement to ensure the states adoption of renewable energy generation results in an overall reduction of emissions of greenhouse gases from the electrical grid.It is the intent of the Legislature to enact legislation that would establish a Clean Peak Reliability Requirement to ensure the states adoption of renewable energy generation results in an overall reduction of emissions of greenhouse gases from the electrical grid.
|
Date
|
Status
|
|---|---|
| Sep 30, 2017 | Chaptered by Secretary of State. Chapter 389, Statutes of 2017. |
| Sep 30, 2017 | Approved by the Governor. |
| Sep 11, 2017 | Enrolled and presented to the Governor at 4 p.m. |
| Sep 6, 2017 | Assembly amendments concurred in. (Ayes 27. Noes 13.) Ordered to engrossing and enrolling. |
| Sep 5, 2017 | In Senate. Concurrence in Assembly amendments pending. |
| Sep 5, 2017 | Read third time. Passed. Ordered to the Senate. |
| Aug 28, 2017 | Read third time and amended. |
| Jul 20, 2017 | Read second time. Ordered to third reading. |
| Jul 19, 2017 | From committee: Do pass. (Ayes 12. Noes 4.) (July 19). |
| Jul 10, 2017 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 6, 2017 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 2.) (July 5). |
| Jun 29, 2017 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 21, 2017 | June 21 hearing postponed by committee. |
| Jun 8, 2017 | Referred to Com. on U. & E. |
| May 31, 2017 | In Assembly. Read first time. Held at Desk. |
| May 30, 2017 | Read third time. Passed. (Ayes 25. Noes 13. Page 1268.) Ordered to the Assembly. |
| May 26, 2017 | Read second time. Ordered to third reading. |
| May 25, 2017 | From committee: Do pass. (Ayes 5. Noes 2. Page 1182.) (May 25). |
| May 19, 2017 | Set for hearing May 25. |
| May 15, 2017 | May 15 hearing: Placed on APPR. suspense file. |
| May 4, 2017 | Set for hearing May 15. |
| May 3, 2017 | May 8 hearing postponed by committee. |
| May 1, 2017 | Set for hearing May 8. |
| Apr 25, 2017 | Withdrawn from committee. |
| Apr 24, 2017 | Read second time and amended. Re-referred to Com. on EQ. |
| Apr 20, 2017 | From committee: Do pass as amended and re-refer to Com. on EQ. (Ayes 8. Noes 3. Page 727.) (April 18). |
| Apr 18, 2017 | April 19 hearing postponed by committee. |
| Apr 6, 2017 | Set for hearing April 19 in EQ. pending receipt. |
| Apr 4, 2017 | Set for hearing April 18. |
| Mar 29, 2017 | Re-referred to Coms. on E., U. & C. and EQ. |
| Mar 21, 2017 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Feb 23, 2017 | Referred to Com. on RLS. |
| Feb 15, 2017 | From printer. May be acted upon on or after March 17. |
| Feb 14, 2017 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 6, 2017 | Unfinished Business SB338 Skinner et al. Concurrence | Senate Floor |
Passed |
|
| Sep 5, 2017 | SB 338 Skinner Senate Third Reading By MULLIN | Assembly Floor |
Passed |
|
| Jul 19, 2017 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 5, 2017 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| May 30, 2017 | Senate 3rd Reading SB338 Skinner et al. | Senate Floor |
Passed |
|
| May 25, 2017 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| May 15, 2017 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 18, 2017 | Do pass as amended, but first amend, and re-refer to the Committee on [Environmental Quality] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
UNFINISHED BUSINESS
Bill No: SB 338
:
SENATE ENERGY, U. & C. COMMITTEE: 8-3, 4/18/17
AYES: Hueso, Bradford, Hertzberg, Hill, McGuire, Skinner, Stern, Wiener
NOES: Morrell, Cannella, Vidak
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/25/17
AYES: Lara, Beall, Bradford, Hill, Wiener
NOES: Bates, Nielsen
SENATE FLOOR: 25-13, 5/30/17
AYES: Allen, Atkins, Beall, Bradford, De León, Dodd, Galgiani, Glazer, Hernandez, Hertzberg, Hill, Hueso, Jackson, Lara, Leyva, McGuire, Mendoza, Mitchell, Monning, Pan, Portantino, Skinner, Stern, Wieckowski, Wiener
NOES: Anderson, Bates, Berryhill, Cannella, Fuller, Gaines, Moorlach, Morrell, Nguyen, Nielsen, Stone, Vidak, Wilk
NO VOTE RECORDED: Newman, Roth
ASSEMBLY FLOOR: 46-26, 9/5/17 - See last page for vote
DIGEST:
This bill requires the CPUC and the governing board of each local POU to each consider the role of a variety of energy technologies and resources in meeting energy and reliability needs during and around the hour of peak demand while reducing the need for new generation and transmission resources.
Assembly Amendments remove the definition of “net-load peak”, and expand the types of energy resources to be considered to include energy storage and distributed energy resources. The amendments also include language to avoid conflict with AB 759 (Dahle, Chapter 140, Statutes of 2017), which affects some of the same sections of code as this bill and conditionally exempts an electrical cooperative from the need to prepare an integrated resource plan (IRP).
Existing law:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires the California Air Resources Board (ARB) to ensure that statewide greenhouse gas (GHG) emissions are reduced to at least 40 percent below the 1990 statewide GHG emissions level no later than December 31, 2030. (Health and Safety Code §38566)
- Requires the California Public Utilities Commission (CPUC) to determine appropriate targets, if any, for load servicing entities (LSEs) to procure energy storage systems. Requires LSEs to meet any targets adopted by the CPUC by 2015 and 2020. Requires publicly owned utilities (POUs) to set their own targets for the procurement of energy storage and then meet those targets by 2016 and 2021. (Public Utilities Code §2835 et seq.)
- Directs the California Energy Commission (CEC) and the CPUC, where feasible, to authorize procurement of resources to provide grid reliability services that minimize reliance on system power and fossil fuel resources and, where feasible, cost effective, and consistent with other state policy objectives, increase the use of large- and small-scale energy storage. (Public Utilities Code §400)
- Requires the CPUC to adopt a process for each load-serving entity (meaning each electrical corporation (often referred to as an “investor-owned utility” or “IOU”), each electric service provider (ESP) and each community choice aggregator (CCA)) to file an integrated resource plan (IRP) to ensure each meets (a) GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations. Requires each LSE to submit an IRP to the CPUC for review. (Public Resources Code §454.52)
- Requires the governing board of a local POU to adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility meets (a) the GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations, to be submitted to the CEC for review. Requires the CEC to provide recommendations to correct the deficiencies in the IRP. (Public Resources Code §§9621 and 9622)
This bill:
- Requires the CPUC to consider the role of distributed energy resources, including energy efficiency, existing renewable generation, energy storage, and grid operational efficiencies, in helping to ensure each LSE meets peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state's energy goals at the least cost to ratepayers.
- Requires the governing board of a POU, with an average annual electric demand exceeding 700 gigawatt hours, to consider the role of distributed energy resources, including energy efficiency, existing renewable generation, energy storage, and grid operational efficiencies, in helping to ensure each utility meets peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state's energy goals at the least cost to ratepayers.
Background
Bill seeks to address the peak. California is at the forefront of efforts to increase the use of renewable energy and reduce the use of fossil fuels. The author notes the intermittent nature of the output of our most-relied upon renewable energy sources—wind and solar. The author also notes the lack of coincidence of the output of these energy sources and of demand for electricity. The result, at least on some days of the year, is a sudden, steep ramp in demand for energy that cannot be met by renewable energy sources.
Existing law provides ample direction to the CPUC and, to a somewhat lesser extent the governing boards of POUs, to achieve the state’s renewable energy and GHG reduction goals, and other related objectives, at least cost. For example, Public Utilities Code §454.51 (a) requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Further, statute requires the CPUC to adopt a process by which each “load-serving entity” (meaning investor-owned utility (IOU), electric service provider (ESP) and community choice aggregator (CCA)) file a regularly updated IRP. The IRP, subject to CPUC oversight, details how the entity will meet GHG emissions reduction targets and achieve a variety of environmental and performance objectives. Statute establishes a similar IRP process to be developed by CEC, applicable to the POUs.
The CPUC and CEC are developing the IRP processes now. By some point early next year, presumably, the LSEs and POUs will file IRPs with the CPUC and CEC, respectively. Statutory direction and CPUC and CEC oversight should ensure that the IRP process results in an energy portfolio that achieves the state’s renewable energy and GHG reduction goals overall, among other objectives, at the least feasible cost. Such an outcome would address the author’s concerns.
What the IRP process will not address, however, is the energy resources used to meet peak energy demand specifically or the costs of doing so. To remedy this perceived deficiency, this bill directs the CPUC and the governing board of each POU, in developing their respective IRPs, to consider the role of certain energy resources in helping to ensure each electric utility meets energy needs and reliability needs in “hours to encompass the hour of peak demand of electricity,” while reducing the need for new electricity generation and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Assembly Appropriations Committee, this bill requires no additional state resources for implementation.
California Efficiency + Demand Management Council
None received
ARGUMENTS IN SUPPORT: According to the author:
California’s energy system is the cleanest in the nation, but it could also become the most expensive for ratepayers unless we use new technologies to reduce the need to build more power plants and energy transmission. To stop this need for double-building, California needs to encourage renewable energy companies and utilities to utilize new technology – like demand response, demand management, energy storage, and even energy efficiency – to move energy use to different times of the day when clean energy is abundant, and to store clean energy during the day for use at night. This will reduce the need to build more natural gas-fired plants and more transmission to provide energy at night, saving money for the ratepayer.
ASSEMBLY FLOOR: 46-26, 9/5/17
AYES: Aguiar-Curry, Arambula, Berman, Bloom, Bocanegra, Bonta, Burke, Calderon, Cervantes, Chau, Chiu, Chu, Dababneh, Daly, Eggman, Friedman, Cristina Garcia, Gipson, Gloria, Gonzalez Fletcher, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Levine, Limón, Low, Maienschein, McCarty, Medina, Mullin, Muratsuchi, Nazarian, O'Donnell, Quirk, Reyes, Rodriguez, Salas, Santiago, Mark Stone, Thurmond, Ting, Weber, Wood, Rendon
NOES: Acosta, Travis Allen, Baker, Bigelow, Brough, Caballero, Chávez, Chen, Choi, Cooley, Cunningham, Flora, Fong, Gallagher, Gray, Harper, Kiley, Lackey, Mathis, Mayes, Melendez, Obernolte, Patterson, Quirk-Silva, Voepel, Waldron
NO VOTE RECORDED: Cooper, Dahle, Frazier, Eduardo Garcia, Ridley-Thomas, Rubio, Steinorth
9/6/17 12:14:25
**** END ****
SENATE THIRD READING
STR Bill Id:SB 338
Author:(Skinner)
As Amended Ver:August 28, 2017
Majority vote
SENATE VOTE: 25-13
Committee | Votes | Ayes | Noes |
Utilities | 11-2 | Holden, Burke, Chávez, Eggman, Cristina Garcia, Eduardo Garcia, Muratsuchi, Quirk, Reyes, Santiago, Ting | Patterson, Fong |
Appropriations | 12-4 | Gonzalez Fletcher, Bloom, Bocanegra, Bonta, Quirk, Chau, Eggman, Friedman, Eduardo Garcia, McCarty, Muratsuchi, Reyes | Bigelow, Brough, Fong, Obernolte |
SUMMARY: This bill requires the consideration of distributed energy resources (DERs), including energy efficiency, existing renewable generation, energy storage, and grid operational efficiencies as part of the integrated resource planning (IRP) process for load-serving entities (LSEs) and publicly owned utilities (POUs). Specifically, this bill:
- Requires the California Public Utilities Commission (CPUC) to consider the role of DERs, including energy efficiency, existing renewable generation, energy storage, and grid operational efficiencies, in helping to ensure each LSE meets peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state's energy goals at the least cost to ratepayers.
- Requires the governing board of a POU, with an average annual electric demand exceeding 700 gigawatt hours, to consider the role of DERs, including energy efficiency, existing renewable generation, energy storage, and grid operational efficiencies, in helping to ensure each utility meets peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state's energy goals at the least cost to ratepayers.
FISCAL EFFECT: According to the Assembly Appropriations Committee, this bill requires no additional state resources for implementation.
COMMENTS:
Integrated Resource Planning Process – Among the new policies of SB 350 (De León) Chapter 547, Statutes of 2015 was the requirement that all LSEs – electric service providers, community choice aggregation, IOUs, and the 16 largest POUs – file IRPs. The plans are intended to show how the LSEs will achieve greenhouse gas (GHG) reduction targets and Renewables Portfolio Standard (RPS) mandates. The plans must also at the same time: fulfill the obligation of just and reasonable rates, minimize ratepayer impact, ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
Meeting the Challenges of Peak Demand – The Independent System Operator, which operates 80% of the state's electric grid, performed an analysis to determine when surplus and limited supplies might occur. It showed that throughout the year, on both weekdays and weekends, supply is expected to be constrained during the peak hours from 4 p.m. to 9 p.m. when the sun is setting and solar output is declining. During the months of July and August, the supplies are even more limited during peak hours, and higher demand begins as early as noon. More interesting, however, is the amount of time that supply is expected to be plentiful or in surplus. With the exception of July and August, on the weekends, supply surplus is expected to occur during "super off-peak" hours from 10 a.m. to 4 p.m. when solar generation is at its highest. Similarly, surplus conditions are expected during this same time period on March and April weekdays, when weather is mild and air conditioning use is at a minimum. Additionally, supply is projected to be generally plentiful starting at 9 p.m. through the next morning or afternoon, depending on the month.
There are several strategies available to address what is now commonly referred to as the "Duck Curve" and specifically the neck of the duck when intermittent renewable resources fall in production and demand increases. These include time-of-use rates (in development by the investor owned utilities [IOUs]) using lower prices and incentives to drive consumers to shift electric consumption to off-peak periods, energy storage, demand response, energy efficiency (particularly targeted for time and location), and large hydroelectric generation which, although not RPS eligible, is a GHG-free resource and can at times be plentiful such as this year.
Purpose – The bill requires the agencies, utilities, and other LSEs to consider the role of DERs, including energy efficiency, existing renewable generation, energy storage, and grid operational efficiencies to address peak as part of the IRP process to avoid the need for new electricity generation and new transmission. The IRP process is still under development. The degree to which procurement planning to meet peak will be separately considered as part of the IRP process is not clear at this time.
Analysis Prepared by: Kellie Smith / U. & E. / (916) 319-2083 FN: 0001454
SENATE THIRD READING
STR Bill Id:SB 338
Author:(Skinner)
As Amended Ver:July 10, 2017
Majority vote
SENATE VOTE: 25-13
Committee | Votes | Ayes | Noes |
Utilities | 11-2 | Holden, Burke, Chávez, Eggman, Cristina Garcia, Eduardo Garcia, Muratsuchi, Quirk, Reyes, Santiago, Ting | Patterson, Fong |
Appropriations | 12-4 | Gonzalez Fletcher, Bloom, Bocanegra, Bonta, Quirk, Chau, Eggman, Friedman, Eduardo Garcia, McCarty, Muratsuchi, Reyes | Bigelow, Brough, Fong, Obernolte |
SUMMARY: This bill requires the consideration of distributed energy resources (DERs), including energy efficiency, existing renewable generation, and grid operational efficiencies as part of the integrated resource planning (IRP) process for load-serving entities (LSEs) and publicly owned utilities (POUs). Specifically, this bill:
- Requires the California Public Utilities Commission (CPUC) to consider the role of DERs, including energy efficiency, existing renewable generation, and grid operational efficiencies, in helping to ensure each LSE meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state's energy goals at the least cost to ratepayers.
- Requires the governing board of a POU, with an average annual electric demand exceeding 700 gigawatt hours, to consider the role of DERs, including energy efficiency, existing renewable generation, and grid operational efficiencies, in helping to ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state's energy goals at the least cost to ratepayers.
- Defines "net-load peak" as the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority
FISCAL EFFECT: According to the Assembly Appropriations Committee, this bill requires no additional state resources for implementation.
COMMENTS:
Integrated Resource Planning Process – Among the new policies of SB 350 (De León) Chapter 547, Statutes of 2015 was the requirement that all LSEs – electric service providers, community choice aggregation, IOUs, and the 16 largest POUs – file IRPs. The plans are intended to show how the LSEs will achieve greenhouse gas(GHG) reduction targets and Renewables Portfolio Standard (RPS) mandates. The plans must also at the same time: fulfill the obligation of just and reasonable rates, minimize ratepayer impact, ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
Meeting the Challenges of Peak Demand – The Independent System Operator, which operates 80 percent of the state's electric grid, performed an analysis to determine when surplus and limited supplies might occur. It showed that throughout the year, on both weekdays and weekends, supply is expected to be constrained during the peak hours from 4 p.m. to 9 p.m. when the sun is setting and solar output is declining. During the months of July and August, the supplies are even more limited during peak hours, and higher demand begins as early as noon. More interesting, however, is the amount of time that supply is expected to be plentiful or in surplus. With the exception of July and August, on the weekends, supply surplus is expected to occur during "super off-peak" hours from 10 a.m. to 4 p.m. when solar generation is at its highest. Similarly, surplus conditions are expected during this same time period on March and April weekdays, when weather is mild and air conditioning use is at a minimum. Additionally, supply is projected to be generally plentiful starting at 9 p.m. through the next morning or afternoon, depending on the month.
There are several strategies available to address what is now commonly referred to as the "Duck Curve" and specifically the neck of the duck when intermittent renewable resources fall in production and demand increases. These include time-of-use rates (in development by the investor owned utilities [IOUs]) using lower prices and incentives to drive consumers to shift electric consumption to off-peak periods, energy storage, demand response, energy efficiency (particularly targeted for time and location), and large hydroelectric generation which, although not RPS eligible, is a GHG-free resource and can at times be plentiful such as this year.
Purpose – The bill requires the agencies, utilities, and other LSEs to consider the role of DERs, including energy efficiency, existing renewable generation, and grid operational efficiencies to address net-load peak as part of the IRP process to avoid the need for new electricity generation and new transmission. The IRP process is still under development. The degree to which procurement planning to meet net-load peak will be separately considered as part of the IRP process is not clear at this time.
Analysis Prepared by: Kellie Smith / U. & E. / (916) 319-2083 FN: 0001296
Date of Hearing: July 19, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
SBPCA Bill Id:SB 338
Author:(Skinner) – As Amended Ver:July 10, 2017
Policy Committee: | Utilities and Energy | Vote: | 11 - 2 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires the consideration of distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies as part of the integrated resource planning process for load-serving entities (LSEs) and publicly owned utilities (POUs). Specifically, this bill:
- Requires the California Public Utilities Commission to consider the role of distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies, in helping to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
- Requires the governing board of a local publicly owned electric utility, with an average annual electric demand exceeding 700 gigawatt hours, to consider the role of distributed energy resources, including energy efficiency, existing renewable generation, and grid operational efficiencies, in helping to ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
- Defines “net-load peak” as the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority.
FISCAL EFFECT:
No additional state resources.
COMMENTS:
- Purpose. According to the author, “SB 338 is aimed at reducing costly new electricity generation and transmission lines by requiring the PUC/CEC [California Energy Commission] to develop plans to meet our peek energy needs through strategies such as efficiency, demand management, energy storage and more.”
- Background. The California Renewable Portfolio Standard (RPS) program requires LSEs, and POUs to increase purchases of renewable energy to at least 33% of retail sales by December 31, 2020. The original RPS bill, SB 1078 (Sher), Chapter 516, Statutes of 2002, set a goal of 20% by 2017. SB 107 (Simitian), Chapter 464, Statutes of 2006 accelerated the deadline for 20% to 2010.
As renewable sources of energy have increased in California, particularly solar energy due to the RPS and household solar, there are times of the year when the state generates more energy than it needs. Energy must be generated to meet the current demand; because energy cannot yet be effectively stored at the scale needed, every electron generated must be needed or the system will crash, leading to blackouts.
To maintain reliability the Independent Systems Operator (ISO) must continuously match the demand for electricity with supply on a second-by-second basis. Historically, the ISO directed conventional, controllable power plant units to move up or down with the instantaneous or variable demand. With the growing penetration of renewables on the grid, there are higher levels of non-controllable, variable generation resources. Because of that, the ISO must direct controllable resources to match both variable demand and variable supply. - Integrated Resource Plans (IRPs). Among the new policies of SB 350 (De León), Chapter 547, Statutes of 2015, was the requirement that all electric service providers, community choice aggregation, IOUs, and the 16 largest POUs file IRPs. The plans are intended to show how the electrical providers will achieve GHG reduction targets and RPS mandates. The plans must also: a) fulfill the obligation of just and reasonable rates; b) minimize ratepayer impact; c) ensure system and local reliability; d) strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems and local communities; e) enhance distribution systems and demand-side energy management; and f) minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: July 5, 2017
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Chris Holden, Chair
SBPCA Bill Id:SB 338
Author:(Skinner) – As Amended Ver:June 29, 2017
SENATE VOTE: 25-13
SUBJECT: Net-load peak energy
SUMMARY: Requires the consideration of meeting net-load peak energy and reliability needs with specified resources as part of the integrated resource planning process (IRP). Specifically, this bill:
- Requires the California Public Utilities Commission (CPUC) to consider the role of clean energy technology, demand response, and energy efficiency, as part of the IRP process, to ensure that each load-serving entity (LSE) meets net-load peak energy and reliability needs while reducing the need for new electricity generation and transmission resources to achieve the state’s energy goals at the least cost to ratepayers.
- Requires local publicly owned electric utilities (POUs), with an average annual electric demand exceeding 700 gigawatt hours, as part of the utility’s IRP processes, to consider the role of clean energy technology, demand response, and energy efficiency to ensure each POU meets net-load peak energy and reliability needs while reducing the need for new electricity generation and transmission resources to achieve the state’s energy goals at the least cost to ratepayers.
- Defines “net-load peak” as the hour of peak demand of electricity excluding demand met by variable renewable generation connected to a California balancing authority.
EXISTING LAW:
- Requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide greenhouse gas (GHG) emissions limit established pursuant to the California Global Warming Solutions Act of 2006 or any successor legislation. (Public Utilities Code § 454.51[a])
- Directs the California Energy Commission (CEC) and the CPUC, where feasible, to authorize procurement of resources to provide grid reliability services that minimize reliance on system power and fossil fuel resources and, where feasible, cost effective, and consistent with other state policy objectives, increase the use of large- and small-scale energy storage. (Public Utilities Code § 400)
- Requires the CPUC to adopt a process for each LSE to file an IRP to ensure each meets (a) GHG emissions reduction targets for the electricity sector, (b) the Renewables Portfolio Standard (RPS), and (c) other goals and obligations. Requires each LSE to submit an IRP to the CPUC. (Public Resources Code § 454.52)
- Requires the governing board of a local POU to adopt an IRP and a process for updating the plan at least once every five years to ensure the utility meets (a) the GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations, to be submitted to the CEC for review. Requires the CEC to provide recommendations to correct the deficiencies in the IRP. (Public Resources Code §§ 9621, 9622)
- Requires the Air Resources Board (ARB) to ensure that statewide GHG emissions are reduced to at least 40 percent below the 1990 statewide GHG emissions level no later than December 31, 2030. (Health and Safety Code § 38566)
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewables Portfolio Standard (RPS). (Public Utilities Code § 399.11 et seq.)
- Requires the CPUC to determine appropriate targets, if any, for LSEs to procure energy storage systems. Requires LSEs to meet any targets adopted by the CPUC by 2015 and 2020. Requires POUs to set their own targets for the procurement of energy storage and then meet those targets by 2016 and 2021. (Public Utilities Code § 2835 et seq.)
FISCAL EFFECT: According to the Senate Appropriations Committee:
- Approximately $150,000 annually (ERPA or General Fund) to the CEC for one staff position to revise integrated resource plan guidelines, update energy forecast scenarios, and provide ongoing analysis and reporting on whether publicly owned utilities reduce their clean peak.
- Approximately $383,671 to the CPUC for staff to conduct proceedings to establish targets for LSE net-peak load and adopt a monitoring plan/framework, to monitor LSE progress, and potentially adjust program targets or conduct enforcement proceedings.
BACKGROUND:
Meeting the Challenges of Peak Demand – The Independent System Operator, which operates 80 percent of the state’s electric grid, performed an analysis to determine when surplus and limited supplies might occur. It showed that throughout the year, on both weekdays and weekends, supply is expected to be constrained during the peak hours from 4 p.m. to 9 p.m. when the sun is setting and solar output is declining. During the months of July and August, the supplies are even more limited during peak hours, and higher demand begins as early as noon. More interesting, however, is the amount of time that supply is expected to be plentiful or in surplus. With the exception of July and August, on the weekends, supply surplus is expected to occur during “super off-peak” hours from 10 a.m. to 4 p.m. when solar generation is at its highest. Similarly, surplus conditions are expected during this same time period on March and April weekdays, when weather is mild and air conditioning use is at a minimum. Additionally, supply is projected to be generally plentiful starting at 9 p.m. through the next morning or afternoon, depending on the month.
There are several strategies available to address what is now commonly referred to as the “Duck Curve” and specifically the neck of the duck when intermittent renewable resources fall in production and demand increases. These include time-of-use rates (in development by the investor owned utilities [IOUs]) using lower prices and incentives to drive consumers to shift electric consumption to off-peak periods, energy storage, demand response, energy efficiency (particularly targeted for time and location), and large hydroelectric generation which, although not RPS eligible, is a GHG-free resource and can at times be plentiful such as this year.
Integrated Resource Planning Process – Among the new policies of SB 350 was the requirement that all LSEs – electric service providers, community choice aggregation, IOUs, and the 16 largest POUs – to file IRPs. The plans are intended to show how the LSEs will achieve GHG reduction targets and RPS mandates. The plans must also at the same time: fulfill the obligation of just and reasonable rates, minimize ratepayer impact, ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emission, with early priority on disadvantaged communities.
COMMENTS:
- Author’s Statement. According to the author, California is dedicated to increasing renewably-sourced electricity, but our biggest renewable energy sources – solar and wind – don’t produce electricity 24/7. As a result, plans to meet “peak energy demand” project a need to build new fossil fuel power plants. SB 338 is aimed at reducing costly new electricity generation and transmission lines by requiring the PUC/CEC to develop plans to meet our peak energy needs through strategies such as efficiency, demand management, energy storage and more.
- Peak Demand. The author is raising a critical issue facing the state. California’s RPS goals are based on kilowatt hours – the utilities and other load-serving entities are required to procure a percentage of kilowatt hours delivered which is stated as retail sales. As utility procurement progressed the resource choices tended to be weighted first to wind and then to solar which took turns at, for the most part, being the lower priced resource on a kilowatt hour basis. Very little renewable baseload resources such as biomass and geothermal were procured.
Although the program has always required procurement to be based on “least-cost/best-fit” the “fit” seems to have been dropped on the cutting room floor long ago. This lack of planning for best fit has significantly contributed to the “Duck Curve” which reflects high solar resources in the middle of the day (the belly of the duck) coupled with a decline of solar in the afternoon as the sun goes down, and high demand for electricity in the evening (the neck of the duck). This bill is intended to address the demand – or peak – in the evening. This evening peak on the grid typically results in high demand for electricity for a short duration of time when fewer renewable resources are available to meet that peak. This can cause a higher use of natural gas plants or system power to meet the heavy demand and therefore higher GHG emissions and other criteria pollutants.
The author’s intent is to reduce costly electricity generation and transmission to address peak demand and require the planning agencies “to develop policies to meet peak energy needs while minimizing the use of fossil fuel resources. This will ensure that utilities are using clean resources or demand shifting to meet net energy needs instead of procuring new fossil fuel resources and increasing cost.”
- Meeting Peak. The bill requires the agencies and utilities to consider the role of “clean energy technology, demand response and energy efficiency” to meet the net peak to avoid the need for new electricity generation and new transmission. Low and no carbon resources and other program and service options to meet peak are certainly greater than just these three resources. The list is not exhaustive and excludes many other strategies such as time-of-use rates (which arguably could be considered a form of demand response), the Independent System Operator’s Energy Imbalance Market (and potentially regionalization if called for by the Legislature), storage, and large hydro. Finally, the committee is not aware of any statutory definition for “clean energy technology.”
To address these issues and ensure that the directive in this bill is consistent with current law and recognizes the full panoply of resources and services available to address peak, the committee may wish to consider amending the bill as follows to ensure a resource neutral, non-fossil-fueled based planning approach is considered:- At page 3, lines 30-31, strike “clean energy technology, demand response and energy efficiency” and insert “distributed energy, existing renewable generation, and grid operational efficiencies”.
- And, to ask the same consideration of the POUs, at page 5, lines 27-28, strike “clean energy technology, demand response and energy efficiency” and insert “distributed energy resources, existing renewable generation, and grid operational efficiencies”.
- At page 3, lines 30-31, strike “clean energy technology, demand response and energy efficiency” and insert “distributed energy, existing renewable generation, and grid operational efficiencies”.
- Exclusion of New Renewables. The author reports that her concern is not only how the utilities will meet peak demand but also that meeting peak could result in additional newly sited electric generation or transmission. To address this issue the bill expressly calls for the IRPs to avoid new generation and transmission resources in planning to meet peak demand. This would not only exclude gas plants but it would exclude from planning consideration the use of new renewable generation. This consideration would undermine the purpose of the IRP process which is to meet customer load with an optimal and cost-effective group of resources while meeting the state’s GHG reduction goals.
- Disruption of IRP Planning Cycle. The CPUC has begun the modeling for the IRPs as required in SB 350 and all LSEs are required to file the first IRPs in 2017. This bill would be operative on January 1, 2018 which will roughly coincide with the first IRP filing requirements meaning that the planning process for those plans would not be in compliance with this bill. The development of the plans is a substantive and involved process as is the review and approval of the plans once filed with the CPUC. To ensure that this bill would not disrupt the IRP process already underway, the committee should consider triggering the planning requirement of this measure with the next IRP planning cycle or no later than 2019.
This is not an issue for the POUs since the first IRPs are not required to be filed with the CEC until 2019. - Carbon Offsets. The intent of this bill could limit the ability of the electricity sector to use other strategies available to other GHG emitting sectors of the economy such as carbon offsets. The ARB currently permits voluntary, additional GHG emissions reductions from sources that are outside the cap, called offsets, to be used to meet up to eight percent of a facility's compliance obligation under the cap and trade program. The IRP was intended to provide the electricity sector with the latitude to meet GHG reduction goals and utilize different strategies. This bill could eliminate that tool from consideration.
- Related Legislation. AB 1405 (Mullin) Requires, on or before January 1, 2020, for the CPUC and CEC, in consultation with the ISO, to establish policies or procedures to minimize the use of fossil fuels used to meet net-load peak demand. Status: Set for hearing in the Senate Energy, Utilities & Communications Committee, July 10th.
REGISTERED SUPPORT / OPPOSITION:
Support
California Efficiency + Demand Management Council
Clean Power Campaign
East Penn
Ecoult
Enel Green Power North America
NexTracker Incorporated
Outback Power Technologies
Tesla, Inc.
Oppose
California Chamber Of Commerce
California Municipal Utilities Association
Independent Energy Producers Association
Pacific Gas and Electric Company
Sacramento Municipal Utility District
San Diego Gas & Electric
Analysis Prepared by: Kellie Smith / U. & E. /
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
THIRD READING
Bill No: SB 338
:
SENATE ENERGY, U. & C. COMMITTEE: 8-3, 4/18/17
AYES: Hueso, Bradford, Hertzberg, Hill, McGuire, Skinner, Stern, Wiener
NOES: Morrell, Cannella, Vidak
SENATE APPROPRIATIONS COMMITTEE: 5-2, 5/25/17
AYES: Lara, Beall, Bradford, Hill, Wiener
NOES: Bates, Nielsen
DIGEST:
This bill requires utility regulators to consider establishing policies and procedures to ensure each utility meets “net-load peak” energy needs and reliability needs while reducing the need for new generation and transmission.
Existing law:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires the California Air Resources Board (ARB) to ensure that statewide greenhouse gas (GHG) emissions are reduced to at least 40 percent below the 1990 statewide GHG emissions level no later than December 31, 2030. (Health and Safety Code §38566)
- Requires the California Public Utilities Commission (CPUC) to determine appropriate targets, if any, for load servicing entities (LSEs) to procure energy storage systems. Requires LSEs to meet any targets adopted by the CPUC by 2015 and 2020. Requires publicly owned utilities (POUs) to set their own targets for the procurement of energy storage and then meet those targets by 2016 and 2021. (Public Utilities Code §2835 et seq.)
- Directs the California Energy Commission (CEC) and the CPUC, where feasible, to authorize procurement of resources to provide grid reliability services that minimize reliance on system power and fossil fuel resources and, where feasible, cost effective, and consistent with other state policy objectives, increase the use of large- and small-scale energy storage. (Public Utilities Code §400)
- Requires the CPUC to adopt a process for each load-serving entity (meaning each electrical corporation (often referred to as an “investor-owned utility” or “IOU”), each electric service provider (ESP) and each community choice aggregator (CCA)) to file an integrated resource plan (IRP) to ensure each meets (a) GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations. Requires each LSE to submit an IRP to the CPUC for review. (Public Resources Code §454.52)
- Requires the governing board of a local POU to adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility meets (a) the GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations, to be submitted to the CEC for review. Requires the CEC to provide recommendations to correct the deficiencies in the IRP. (Public Resources Code §§9621 and 9622)
This bill:
- Defines “net-load peak” as the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California-based balancing authority.
- Authorizes CPUC, as part of the IRP development process applicable to IOUs, and the governing board of a POU, as part of the governing board’s development of its IRP, to consider establishing policies and procedures—including new targets or requirements for clean energy technology, demand response, and energy efficiency—to the extent they ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the state’s energy goals at the least cost to ratepayers.
Background
SB 338 Seeks to Address the Peak. California is at the forefront of efforts to increase the use of renewable energy and reduce the use of fossil fuels. The author notes the intermittent nature of the output of our most-relied upon renewable energy sources—wind and solar. The author also notes the lack of coincidence of the output of these energy sources and of demand for electricity. The result, at least on some days of the year, is a sudden, steep ramp in demand for energy that cannot be met by renewable energy sources.
The author expresses concern that the state will meet the demands of this ramp through reliance on new, distant, natural gas-fired electricity generation, and the transmission infrastructure needed to move the electricity to areas of demand for it. The author further fears the costs of such generation and transmission will be passed on to ratepayers, thereby undermining support for the state’s energy and environmental goals. The author contends the development of this infrastructure represents a double-building, in a sense. This is because, the author asserts, the use of alternative energy technologies—such as energy storage, demand response and demand technology, and energy efficiency—has the potential to make investments in new ramp-supporting natural gas infrastructure unnecessary.
Existing statute requires the CPUC to adopt a process by which each “load-serving entity” (meaning IOU, ESP and CCA) file a regularly updated IRP. The IRP, subject to CPUC oversight, details how the entity will achieve the following:
- Meet GHG emissions reduction targets.
- Procure at least 50 percent eligible renewable energy resources by December 31, 2030.
- Fulfill the obligation to serve IOU customers at just and reasonable rates.
- Minimize impacts on ratepayers’ bills.
- Ensure system and local reliability.
- Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
- Enhance distribution systems and demand-side energy management.
- Minimize localized air pollutants and other GHG emissions, with early priority on disadvantaged communities.
Statute establishes a similar IRP process to be developed by CEC, applicable to the POUs. The CPUC and CEC are now developing the IRP processes.
To ensure unnecessary investment does not occur, this bill requires utility regulators (the CPUC, in the case of IOUs, and the local governing board, the case of a POU), as part of development of IRPs, to consider establishing policies or procedures to ensure each utility meets “net-load peak” energy and reliability needs while minimizing the use of fossil fuels and utilizing low-carbon technologies and electrical grid management strategies.
As defined by this bill, “net-load peak” means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California-based balancing authority. This definition contains an internal inconsistency. To resolve this inconsistency, the author may wish to amend the bill at some point in the legislative process, as follows:
For purposes of this paragraph, “net-load peak” means the daily period of three or more consecutive hours in which the latest of the three period of hours is the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California-based balancing authority.
Related/Prior Legislation
AB 1405 (Mullin, 2017) requires each LSE to procure a minimum percentage of kilowatt hours delivered during the peak load time period from clean peak resources. The bill is pending action on the Assembly floor.
SB 350 (De León, Chapter 547, Statutes of 2015) created the requirement that each LSE and POU file an IRP with the CPUC and CEC, respectively.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Senate Committee on Appropriations:
- Approximately $150,000 annually (ERPA or General Fund) to the CEC for one staff position to revise integrated resource plan guidelines, update energy forecast scenarios, and provide ongoing analysis and reporting on whether publicly owned utilities reduce their clean peak.
- Approximately $383,671 to the CPUC for staff to conduct proceedings to establish targets for LSE net-peak load and adopt a monitoring plan/framework, to monitor LSE progress, and potentially adjust program targets or conduct enforcement proceedings.
California Energy Efficiency Industry Council
California Energy Storage Alliance
Tesla
OPPOSITION: (Verified 5/25/17)
California Chamber of Commerce
Independent Energy Producers Association
Northern California Power Agency
Pacific Gas and Electric Company
San Diego Gas & Electric
Southern California Edison
ARGUMENTS IN SUPPORT: According to the author:
California’s energy system is the cleanest in the nation, but it could also become the most expensive for ratepayers unless we use new technologies to reduce the need to build more power plants and energy transmission. To stop this need for double-building, California needs to encourage renewable energy companies and utilities to utilize new technology – like demand response, demand management, energy storage, and even energy efficiency – to move energy use to different times of the day when clean energy is abundant, and to store clean energy during the day for use at night. This will reduce the need to build more natural gas-fired plants and more transmission to provide energy at night, saving money for the ratepayer.
ARGUMENTS IN OPPOSITION: Opponents contend that, to the extent that energy storage, demand response and other non-conventional resources can be reliably available and serve the peak demand, these resources can already do so. Existing statute and programs ensure achievement of the state’s energy and environmental goals at the least possible cost. Additional prescriptions are likely to interfere with current programs and add costs.
5/27/17 15:38:06
SENATE COMMITTEE ON APPROPRIATIONS
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
SB 338 (Skinner) - Net-load peak energy
Version: April 24, 2017 | Policy Vote: E., U., & C. 8 - 3 |
Urgency: No | Mandate: Yes |
Hearing Date: May 15, 2017 | Consultant: Narisha Bonakdar |
This bill meets the criteria for referral to the Suspense File.
Bill Summary:
- SB 338 requires the California Public Utilities Commission (CPUC) and publicly owned utilities to consider establishing policies and procedures to ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the state’s energy goals at the least cost to ratepayers.
Fiscal Impact:
- Approximately $150,000 annually (ERPA or General Fund) to the California Energy Commission for one staff position to revise integrated resource plan guidelines, update energy forecast scenarios, and provide ongoing analysis and reporting on whether publicly owned utilities reduce their clean peak.
- Approximately $383,671 to the CPUC for staff to conduct proceedings to establish targets for load serving entities (LSE) net-peak load and adopt a monitoring plan/framework, to monitor LSE progress, and potentially adjust program targets or conduct enforcement proceedings.
Background:
Renewable Portfolio Standard (RPS). The California RPS program requires IOUs, POUs, and energy service providers to increase purchases of renewable energy to at least 33% of retail sales by December 31, 2020. The original RPS bill, SB 1078 (Sher, Chapter 516, Statutes of 2002) set a goal of 20% by 2017. SB 107 (Simitian, Chapter 464, Statutes of 2006) accelerated the deadline for 20% to 2010.
Fossil Fuel Power Plants, Peak Demand, and Renewable Overgeneration. As renewable sources of energy have increased in California, particularly solar energy due to the RPS and household solar, there are times of the year when the state generates more energy than it needs. Energy must be generated to meet the current demand; because energy cannot yet be effectively stored at the scale needed, every electron generated must be needed or the system will crash, leading to blackouts.
To maintain reliability the ISO must continuously match the demand for electricity with supply on a second-by-second basis. Historically, the ISO directed conventional, controllable power plant units to move up or down with the instantaneous or variable demand. With the growing penetration of renewables on the grid, there are higher levels of non-controllable, variable generation resources. Because of that, the ISO must direct controllable resources to match both variable demand and variable supply.
To ensure reliability under changing grid conditions, the ISO needs resources with ramping flexibility and the ability to start and stop multiple times per day. To ensure supply and demand match at all times, controllable resources will need the flexibility to change output levels and start and stop as dictated by real-time grid conditions.
The power plants we rely on to balance the demand for electricity with what our renewable sources are generating can only be turned down so far and continue to operate. If they are turned off entirely, they cannot be turned on fast enough to meet the state’s energy needs when solar power is no longer available. In order to ensure reliable electric service solar power must be curtailed, leading to fossil fuel based power being used to meet our peak demand.
Should the technology be developed that would allow for the storage of overgenerated renewable energy, this problem would be eliminated, allowing for the state to use clean energy to meet the demand at peak times.
Proposed Law:
- Makes findings and declarations.
- Defines “net-load peak” as the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by generation on the customer side of the meter.
- Requires the CPUC to consider establishing policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures ensure each load-serving entity meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the state’s energy goals at the least cost to ratepayers.
- Requires the governing board of a local publicly owned electric utility to consider establishing policies and procedures, including new targets or requirements for clean energy technology, demand response, and energy efficiency, to the extent those policies and procedures ensure each utility meets net-load peak energy needs and reliability needs while reducing the need for new electricity generation and new transmission in achieving the state’s energy goals at the least cost to ratepayers.
Related Legislation:
SB2X1 (Simitian, Chapter 1, Statutes of 2011) codified the 33% by 2020 RPS target.
SB 350 (De León, Chapter 547, Statutes of 2015) increased the RPS target to 50% by December 31, 2030.
Staff Comments:
- Purpose of Bill.
According to the author, “California is dedicated to increasing renewably-sourced electricity, but our biggest renewable energy sources – solar and wind – don’t produce electricity 24/7. As a result plans to meet “peak energy demand” project a need to build new fossil fuel power plants and transmission. SB 338 is aimed at reducing costly electricity generation and transmission by requiring the PUC to develop policies to meet our peak energy needs using existing clean resources or through efficiency, demand management, storage and more.”
The Energy Resources Program Account. The Energy Resources Program Account (ERPA), which funds most of the CEC’s activities, is in a structural deficit. The CEC has some discretion to raise the tax which funds the ERPA. However, increased revenue may not be sufficient to cover costs associated with this bill or future unfunded mandates. As such, this bill may result in a General Fund expense.
State mandate. This bill constitutes a state mandate. However, no reimbursement is required because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Wieckowski, Chair
2017 - 2018 Regular
Bill No: SB 338
Author: | Skinner | ||
Version: | 3/21/2017 | Hearing Date: | 4/19/2017 |
Urgency: | No | Fiscal: | Yes |
Consultant: | David Ernest García | ||
SUBJECT: Net-load peak energy
ANALYSIS:
Existing law:
- Requires, under the Renewable Portfolio Standard (RPS), investor-owned utilities (IOUs), publicly owned utilities (POUs) and certain other retail sellers of electricity to achieve 33% of their energy sales from an eligible renewable electrical generation facility by December 31, 2020, and establishes portfolio requirements and a timeline for procurement quantities of three product categories. (Public Utilities Code (PUC) §399.11 et seq.)
- Requires the Independent System Operator (ISO) to, among other things, forecast electrical demand and dispatch the lowest cost energy generator to meet demand while ensuring enough transmission capacity for delivery of power. (PUC §345 et seq.)
- Establishes the California Public Utilities Commission (CPUC) to, among other things, regulate electric utilities in California. (California Constitution, Article 12, §1 et seq.)
- Establishes the California Energy Resources Conservation and Development Commission (CEC) as the state’s primary energy policy and planning agency. (Public Resources Code §25000 et seq.)
This bill:
- Makes findings and declarations.
- Defines “net-load peak” as the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by generation on the customer side of the meter.
- Requires, on or before January 1, 2020, for the CPUC and CEC, in consultation with the ISO, to establish policies or procedures to minimize the use of fossil fuels used to meet net-load peak demand.
- Requires the CPUC, by January 1, 2022, and every four years thereafter, to report to the Legislature on the percent of energy needs met with fossil fuels during net-load peak and any efforts by the CPUC to reduce fossil fuel energy used to meet net-load peak demand.
Background
- Renewable Portfolio Standard (RPS).
The California RPS program requires IOUs, POUs, and energy service providers to increase purchases of renewable energy to at least 33% of retail sales by December 31, 2020. The original RPS bill, SB 1078 (Sher, Chapter 516, Statutes of 2002) set a goal of 20% by 2017. SB 107 (Simitian, Chapter 464, Statutes of 2006) accelerated the deadline for 20% to 2010.
SB2X1 (Simitian, Chapter 1, Statutes of 2011) codified the 33% by 2020 RPS target. SB 350 (De León, Chapter 547, Statutes of 2015) increased the RPS target to 50% by December 31, 2030. - Fossil Fuel Power Plants, Peak Demand, and Renewable Overgeneration.
As renewable sources of energy have increased in California, particularly solar energy due to the RPS and household solar, there are times of the year when the state generates more energy than it needs. Energy must be generated to meet the current demand; because energy cannot yet be effectively stored at the scale needed, every electron generated must be needed or the system will crash, leading to blackouts.
To maintain reliability the ISO must continuously match the demand for electricity with supply on a second-by-second basis. Historically, the ISO directed conventional, controllable power plant units to move up or down with the instantaneous or variable demand. With the growing penetration of renewables on the grid, there are higher levels of non-controllable, variable generation resources. Because of that, the ISO must direct controllable resources to match both variable demand and variable supply.
To ensure reliability under changing grid conditions, the ISO needs resources with ramping flexibility and the ability to start and stop multiple times per day. To ensure supply and demand match at all times, controllable resources will need the flexibility to change output levels and start and stop as dictated by real-time grid conditions.
The power plants we rely on to balance the demand for electricity with what our renewable sources are generating can only be turned down so far and continue to operate. If they are turned off entirely, they cannot be turned on fast enough to meet the state’s energy needs when solar power is no longer available. In order to ensure reliable electric service solar power must be curtailed, leading to fossil fuel based power being used to meet our peak demand.
Should the technology be developed that would allow for the storage of overgenerated renewable energy, this problem would be eliminated, allowing for the state to use clean energy to meet the demand at peak times.
Comments
- Purpose of Bill.
According to the author, “California is dedicated to increasing renewably-sourced electricity, but our biggest renewable energy sources – solar and wind – don’t produce electricity 24/7. As a result plans to meet “peak energy demand” project a need to build new fossil fuel power plants and transmission. SB 338 is aimed at reducing costly electricity generation and transmission by requiring the PUC to develop policies to meet our peak energy needs using existing clean resources or through efficiency, demand management, storage and more.” - Findings and Declarations.
It is very unclear what this bill is trying to accomplish. SB 338 defines net-load peak directs the CPUC and CEC to establish policies or procedures to minimize the use of fossil fuels used to meet net-load peak demand.
The findings and declarations, however, state that the intent of the bill is to meet California’s “energy goals while reducing the need for new electricity generation and unnecessary new transmission, thus achieving the state’s goals at the least cost to ratepayers.” Nothing in SB 338 addresses building new electricity generation or the costs to ratepayers associated with the bill.
Furthermore, it is unclear what “unnecessary transmission” means. As old power plants are decommissioned and new power plants are built, very little transmission infrastructure gets built.
An amendment is needed to harmonize the findings and declarations in the bill with what the bill accomplishes.
Related/Prior Legislation
AB 1405 (Mullin, 2017) requires the CPUC to determine the amount of peak energy provided by renewable resources and energy storage. AB 1405 is scheduled to be heard in the Assembly Utilities and Energy Committee on April 19, 2017.
SB 350 (de León, Chapter 547, Statutes of 2015), among other things, increased the Renewable Portfolio Standard from 33% by December 31, 2020 to 50% by December 31, 2030.
SB 180 (Jackson, 2015) would have required the CPUC and CEC to place an emissions performance standard on power plants providing peak power. SB 180 died in the Senate Appropriations Committee.
DOUBLE REFERRAL:
This measure is set to be heard in Senate Energy, Utilities and Communications Committee on April 18, 2017.
SOURCE:
Author
SUPPORT:
California Energy Storage Alliance
OPPOSITION:
None received
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2017 - 2018 Regular
Bill No: Hearing Date: 4/18/2017
Author: | |||
Version: | As Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC) to establish policies or procedures to ensure “electrical service providers” meet “net-load peak” energy and reliability needs through the use of low-carbon technologies and strategies.
ANALYSIS:
Existing law:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires the Air Resources Board (ARB) to ensure that statewide greenhouse gas (GHG) emissions are reduced to at least 40 percent below the 1990 statewide GHG emissions level no later than December 31, 2030. (Health and Safety Code §38566)
- Requires the CPUC to determine appropriate targets, if any, for load servicing entities (LSEs) to procure energy storage systems. Requires LSEs to meet any targets adopted by the CPUC by 2015 and 2020. Requires publicly owned utilities (POUs) to set their own targets for the procurement of energy storage and then meet those targets by 2016 and 2021. (Public Utilities Code §2835 et seq.)
- Directs the CEC and the CPUC, where feasible, to authorize procurement of resources to provide grid reliability services that minimize reliance on system power and fossil fuel resources and, where feasible, cost effective, and consistent with other state policy objectives, increase the use of large- and small-scale energy storage. (Public Utilities Code §400)
- Requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. The portfolio shall rely upon zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve any statewide GHG emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with §38500) of the Health and Safety Code) or any successor legislation. (Public Utilities Code §454.51(a))
- Requires the CPUC to adopt a process for each load-serving entity (meaning each electrical corporation (often referred to as an “investor-owned utility” or “IOU”), each electric service provider (ESP) and each community choice aggregator (CCA)) to file an integrated resource plan (IRP) to ensure each meets (a) GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations. Requires each LSE to submit an IRP to the CPUC for review. (Public Resources Code §454.52)
- Requires the governing board of a local POU to adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility meets (a) the GHG emissions reduction targets for the electricity sector, (b) the RPS, and (c) other goals and obligations, to be submitted to the CEC for review. Requires the CEC to provide recommendations to correct the deficiencies in the IRP. (Public Resources Code §§9621 and 9622)
This bill:
- Defines “net-load peak” as the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the California Independent System Operator (CAISO) grid.
- Requires, by January 1, 2020, CPUC and CEC, in consultation with CAISO, to establish mechanisms to ensure “electrical service providers” meet net-load peak energy and reliability needs while minimizing use of fossil fuels and using low-carbon technologies and electrical grid management strategies.
- Authorizes CPUC and CEC to consider establishing new requirements for energy technology that minimizes the percent of load met by fossil fuels during net-load peak energy demand and maximize the use of low-carbon technologies, including, but not limited to (a) energy storage, (b) demand response or demand management, and (c) energy efficiency.
- Requires, by January 1, 2022 and every four years thereafter, CPUC to report to the Legislature on the percent of overall energy needs met through the use of fossil-fueled electrical generation during net-load peak demand and on the CPUC’s efforts to reduce this percentage.
Background
SB 338 Seeks to Address the Peak. California is at the forefront of efforts to increase the use of renewable energy and reduce the use of fossil fuels. Indeed, the author of SB 338 has helped lead these efforts. The author notes the intermittent nature of the output of our most-relied upon renewable energy sources—wind and solar. The author also notes the lack of coincidence of the output of these energy sources and of demand for electricity. The result, at least on some days of the year, is a sudden, steep ramp in demand for energy that cannot be met by renewable energy sources.
The author expresses concern that the state will meet the demands of this ramp through reliance on new, distant, natural gas-fired electricity generation, and the transmission infrastructure needed to move the electricity to areas of demand for it. The author further fears the costs of such generation and transmission will be passed on to ratepayers, thereby undermining support for the state’s energy and environmental goals. The author contends the development of this infrastructure represents a double-building, in a sense. This is because, the author asserts, the use of alternative energy technologies—such as energy storage, demand response and demand technology, and energy efficiency—has the potential to make investments in new ramp-supporting natural gas infrastructure unnecessary.
To ensure such unnecessary investment does not occur, the author provides new direction to the CPUC and CEC, working in consultation with the CAISO. More specifically, SB 338 requires the CPUC and CEC to establish policies or procedures to ensure that “electrical service providers” meet “net-load peak” energy and reliability needs while minimizing the use of fossil fuels and utilizing low-carbon technologies and electrical grid management strategies. This bill further empowers each agency to consider establishing new targets or requirements for energy technology that minimizes the percent of load met by fossil fuels during net-load peak energy demand and maximizes the use of low-carbon technologies to meet energy and capacity needs. In these ways, this bill seeks to ensure that peak energy needs are met while minimizing the use of fossil fuel, thereby, the author concludes, reducing costs to ratepayers.
Statute Already Provides State Agencies Direction to Meet Goals at Least Cost. Despite the concerns animating SB 338, statute provides ample direction to the CPUC and CEC to achieve the state’s renewable energy and GHG reduction goals, and other related objectives, at least cost. For example, Public Utilities Code §454.51 (a) requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Further, statute requires the CPUC to adopt a process by which each “load-serving entity” (meaning IOU, ESP and CCA) file a regularly updated IRP. The IRP, subject to CPUC oversight, details how the entity will achieve the following:
- Meet GHG emissions reduction targets.
- Procure at least 50 percent eligible renewable energy resources by December 31, 2030.
- Fulfill the obligation to serve IOU customers at just and reasonable rates.
- Minimize impacts on ratepayers’ bills.
- Ensure system and local reliability.
- Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
- Enhance distribution systems and demand-side energy management.
- Minimize localized air pollutants and other GHG emissions, with early priority on disadvantaged communities.
Statute establishes a similar IRP process to be developed by CEC, applicable to the POUs.
The CPUC and CEC are developing the IRP processes now. By some point early next year, presumably, the LSEs and POUs will file IRPs with the CPUC and CEC, respectively. Statutory direction and CPUC and CEC oversight should ensure that the IRP process results in an energy portfolio that achieves the state’s renewable energy and GHG reduction goals, among other objectives, at the least feasible cost. Such an outcome would address the author’s concerns.
What the IRP process will not address, however, is the generation sources used to meet peak energy demand specifically or the costs of doing so. To the extent the committee shares the author’s concerns about the characteristics of the energy resources used to meet daily peak energy demand, the committee may wish to move the requirements of this bill to the code sections that govern the IRP process. In addition, to ensure the requirements of this bill do not unreasonably interfere with the ongoing IRP development process, the committee may wish to amend this bill to provide discretion to the CPUC and CEC in implementing the bill. Moving this bill to that code section would also clarify that this bill applies to all LSEs.
In addition, the author and committee may wish to amend this bill to modify the definition of “net-load peak” to make it consistent with how that term is used by CAISO.
Text of Proposed Amendments.
Section 1. Section 454.52 of the Public Utilities Code is amended to read:
(a) As used in this section, “net-load peak” means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the Independent System Operator grid.
(b)(1) Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A) Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sector’s percentage in achieving the economy wide GHG emissions reductions of 40 percent from 1990 levels by 2030.
(B) Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C) Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D) Minimize impacts on ratepayers’ bills.
(E) Ensure system and local reliability.
(F) Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G) Enhance distribution systems and demand-side energy management.
(H) Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2) In furtherance of (1), the commission shall consider establishing policies or procedures, including new targets or requirements for clean energy technology, demand response and energy efficiency, to the extent doing so ensures each load-serving entities meets net-load peak energy and reliability needs while reducing the need for new electricity generation and new transmission, thus achieving the state’s goals at the least cost to ratepayers.
…
Section 2. Section 9621 of the Public Utilities Code is amended to read:
(a) As used in this section, “net-load peak” means the daily period of three or more consecutive hours in which the latest of the three hours is the hour of peak demand for electricity, excluding demand met by variable renewable generation directly connected to the Independent System Operator grid.
(b)(a) This section shall apply to a local publicly owned electric utility with an annual electrical demand exceeding 700 gigawatthours, as determined on a three-year average commencing January 1, 2013.
(c)(b) On or before January 1, 2019, the governing board of a local publicly owned electric utility shall adopt an integrated resource plan and a process for updating the plan at least once every five years to ensure the utility achieves all of the following:
(1) Meets the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each local publicly-owned electric utility that reflect the electricity sector’s percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(2) Ensures procurement of at least 50 percent eligible renewable energy resources by 2030 consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(3) Meets the goals specified in subparagraphs (C) to (H), inclusive, of paragraph (1) of subdivision (a) of Section 454.52.
(c) (1) The integrated resource plan shall address procurement for the following:
(A) Energy efficiency and demand response resources pursuant to Section 9615.
(B) Energy storage requirements pursuant to Chapter 7.7 (commencing with Section 2835) of Part 2 of Division 1.
(C) Transportation electrification.
(D) A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(E) The resource adequacy requirements established pursuant to Section 9620.
(d) In furtherance of (b), the governing board of a local publicly owned electric utility shall consider establishing policies or procedures, including new targets or requirements for clean energy technology, demand response and energy efficiency, to the extent doing so ensures each load-serving entities meets net-load peak energy and reliability needs while reducing the need for new electricity generation and new transmission, thus achieving the state’s goals at the least cost to ratepayers.
Double Referral. Should this bill be approved by this committee, it will be re-referred to the Senate Committee on Environmental Quality for its consideration.
Prior/Related Legislation
AB 1405 (Mullin, 2017) requires each LSE to procure a minimum percentage of kilowatt hours delivered during the peak load time period from clean peak resources. The bill is pending action in the Assembly Committee on Utilities and Energy.
SB 350 (De León, Chapter 547, Statutes of 2015) created the requirement that each LSE and POU file an IRP with the CPUC and CEC, respectively.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
California Energy Storage Alliance
Tesla
OPPOSITION:
Independent Energy Producers Association
Northern California Power Agency
Pacific Gas and Electric Company
ARGUMENTS IN SUPPORT: According to the author:
California’s energy system is the cleanest in the nation, but it could also become the most expensive for ratepayers unless we use new technologies to reduce the need to build more power plants and energy transmission. To stop this need for double-building, California needs to encourage renewable energy companies and utilities to utilize new technology – like demand response, demand management, energy storage, and even energy efficiency – to move energy use to different times of the day when clean energy is abundant, and to store clean energy during the day for use at night. This will reduce the need to build more natural gas-fired plants and more transmission to provide energy at night, saving money for the ratepayer.
ARGUMENTS IN OPPOSITION: Opponents contend that, to the extent that energy storage, demand response and other non-conventional resources can be reliably available and serve the peak demand, these resources can already do so. Existing statute and programs ensure achievement of the state’s energy and environmental goals at the least possible cost. Additional prescriptions are likely to interfere with current programs and add costs.
-- END --
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Utilities and Energy
Senate Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Appropriations
Bill Author
Bill Co-Author(s):