SB 414: Transportation bonds: highway, street, and road projects.
- Session Year: 2017-2018
- House: Senate
- Latest Version Date: 2018-01-03
Existing law, the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century, approved by the voters as Proposition 1A at the November 4, 2008, general election, provides for the issuance of general obligation bonds in the amount of $9 billion for high-speed rail purposes and $950 million for other related rail purposes. Article XVI of the California Constitution requires measures authorizing general obligation bonds to specify the single object or work to be funded by the bonds and further requires a bond act to be approved by a 2/3 vote of each house of the Legislature and a majority of the voters.
This bill would provide that no further bonds shall be sold for high-speed rail purposes pursuant to the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century, except as specifically provided with respect to an existing appropriation for high-speed rail purposes for early improvement projects in the Phase 1 blended system. The bill, subject to the above exception, would require redirection of the unspent proceeds from outstanding bonds issued and sold for other high-speed rail purposes prior to the effective date of these provisions, upon appropriation, for use in retiring the debt incurred from the issuance and sale of those outstanding bonds. The bill, subject to the above exception, would also require the net proceeds of bonds subsequently issued and sold under the high-speed rail portion of the bond act, upon appropriation, to be made available to the California Transportation Commission for allocation for repair and new construction projects on state highways and freeways, and to the Controller for apportionment to cities and counties for transportation projects or other infrastructure projects, and local transit projects, as specified. The bill would make no changes to the authorization under the bond act for the issuance of $950 million in bonds for rail purposes other than high-speed rail. These provisions would become effective only upon approval by the voters at the June 5, 2018, statewide primary election.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law, the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century, approved by the voters as Proposition 1A at the November 4, 2008, general election, provides for the issuance of general obligation bonds in the amount of $9 billion for high-speed rail purposes and $950 million for other related rail purposes. Article XVI of the California Constitution requires measures authorizing general obligation bonds to specify the single object or work to be funded by the bonds and further requires a bond act to be approved by a 2/3 vote of each house of the Legislature and a majority of the voters.
This bill would provide that no further bonds shall be sold for high-speed rail purposes pursuant to the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century, except as specifically provided with respect to an existing appropriation for high-speed rail purposes for early improvement projects in the Phase 1 blended system. The bill, subject to the above exception, would require redirection of the unspent proceeds from outstanding bonds issued and sold for other high-speed rail purposes prior to the effective date of these provisions, upon appropriation, for use in retiring the debt incurred from the issuance and sale of those outstanding bonds. The bill, subject to the above exception, would also require the net proceeds of bonds subsequently issued and sold under the high-speed rail portion of the bond act, upon appropriation, to be made available to the California Transportation Commission for allocation for repair and new construction projects on state highways and freeways, and to the Controller for apportionment to transportation projects or other infrastructure projects, as specified. The bill would make no changes to the authorization under the bond act for the issuance of $950 million in bonds for rail purposes other than high-speed rail. These provisions would become effective only upon approval by the voters at the June 5, 2018, statewide primary election.
(a)(1)Notwithstanding any other provision of this chapter, and except as provided in paragraph (2), no further bonds shall be issued and sold for purposes of Section 2704.06 on and after the effective date of this section.
(2)This section shall not apply to bonds issued and sold for purposes of Section 2704.06 with respect to the appropriation in Item 2665-104-6043 of Section 2.00 of the Budget Act of 2012, as added by Section 3 of Chapter 152 of the Statutes of 2012.
(b)Notwithstanding any other provision of this chapter, and except as otherwise provided in paragraph (2) of subdivision (a), the unspent proceeds from the outstanding bonds issued and sold pursuant to Section 2704.06 prior to the effective date of this section shall, upon appropriation by the Legislature, be redirected from high-speed rail purposes for use in retiring the debt incurred from the issuance and sale of those outstanding bonds.
(c)Notwithstanding any other provision of this chapter, the remaining unissued bonds, as of the effective date of this section, that were previously authorized pursuant to Section 2704.06, except as otherwise provided in paragraph (2) of subdivision (a), are hereby authorized to be issued and sold, and 50 percent one-third of the net proceeds, upon appropriation by the Legislature, shall be made available to the California Transportation Commission for allocation to repair and new construction projects on state highways and freeways, and the remaining 50 percent one-third of the net proceeds, upon appropriation by the Legislature, shall be made available to Controller for apportionment to cities and counties for transportation projects or other infrastructure improvements. projects, and one-third of the net proceeds, upon appropriation by the Legislature, shall be made available to the Controller for apportionment to cities and counties for local transit projects.
SEC. 2.Section 1 of this act would modify the single object or work of a general obligation bond act previously submitted to the voters by the Legislature pursuant to Section 1 of Article XVI of the California Constitution, and subsequently approved by the voters as Proposition 1A at the November 4, 2008, statewide general election. Accordingly, Section 1 of this act shall become effective only upon approval by the voters. The Notwithstanding Section 9040 of the Elections Code, the Secretary of State shall submit Section 1 of this act to the voters on the ballot of the June 5, 2018, statewide primary election.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to require the proceeds of specified bonds authorized by Proposition 1A (2008) to be used for certain transportation purposes instead of for high-speed rail purposes at the earliest possible time, it is necessary that this act take effect immediately.
(a)(1)Notwithstanding any other provision of this chapter, and except as provided in paragraph (2), no further bonds shall be issued and sold for purposes of Section 2704.06 on and after the effective date of this section.
(2)This section shall not apply to bonds issued and sold for purposes of Section 2704.06 with respect to the appropriation in Item 2665-104-6043 of Section 2.00 of the Budget Act of 2012, as added by Section 3 of Chapter 152 of the Statutes of 2012.
(b)Notwithstanding any other provision of this chapter, and except as otherwise provided in paragraph (2) of subdivision (a), the unspent proceeds from the outstanding bonds issued and sold pursuant to Section 2704.06 prior to the effective date of this section shall, upon appropriation by the Legislature, be redirected from high-speed rail purposes for use in retiring the debt incurred from the issuance and sale of those outstanding bonds.
(c)Notwithstanding any other provision of this chapter, the remaining unissued bonds, as of the effective date of this section, that were previously authorized pursuant to Section 2704.06, except as otherwise provided in paragraph (2) of subdivision (a), are hereby authorized to be issued and sold, and 50 percent of the net proceeds, upon appropriation by the Legislature, shall be made available to the California Transportation Commission for allocation to repair and new construction projects on state highways and freeways, and the remaining 50 percent of the net proceeds, upon appropriation by the Legislature, shall be made available to Controller for apportionment to cities and counties for transportation projects or other infrastructure improvements.
SEC. 2.Section 1 of this act would modify the single object or work of a general obligation bond act previously submitted to the voters by the Legislature pursuant to Section 1 of Article XVI of the California Constitution, and subsequently approved by the voters as Proposition 1A at the November 4, 2008, statewide general election. Accordingly, Section 1 of this act shall become effective only upon approval by the voters. The Secretary of State shall submit Section 1 of this act to the voters on the ballot of the June 5, 2018, statewide primary election.
|
Date
|
Status
|
|---|---|
| Feb 1, 2018 | Returned to Secretary of Senate pursuant to Joint Rule 62(a). |
| Jan 9, 2018 | January 9 set for first hearing. Failed passage in committee. (Ayes 4. Noes 6.) |
| Jan 5, 2018 | Set for hearing January 10 in GOV. & F. pending receipt. |
| Jan 3, 2018 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on T. & H. |
| Dec 21, 2017 | Set for hearing January 9. |
| Apr 5, 2017 | April 4 set for first hearing. Failed passage in committee. (Ayes 3. Noes 6. Page 627.) Reconsideration granted. |
| Mar 22, 2017 | Set for hearing April 4. |
| Feb 23, 2017 | Referred to Coms. on T. & H. and GOV. & F. |
| Feb 16, 2017 | From printer. May be acted upon on or after March 18. |
| Feb 15, 2017 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jan 9, 2018 | Do pass, but first be re-referred to the Committee on [Governance and Finance] | Senate Standing Committee on Transportation and Housing |
Failed |
|
| Apr 4, 2017 | [First] hearing set for [04-05-2017]: Failed passage in Committee. Reconsideration granted | Senate Standing Committee on Transportation and Housing |
Passed |
|
| Apr 4, 2017 | Do pass, but first be re-referred to the Committee on [Governance and Finance] | Senate Standing Committee on Transportation and Housing |
Failed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: SB 414 Hearing Date: 1/9/2018
Author: | Vidak | ||
Version: | 1/3/2018 | ||
Urgency: | Yes | Fiscal: | Yes |
Consultant: | Manny Leon | ||
SUBJECT: Transportation bonds: highway, street, and road projects
DIGEST: This bill prohibits the issuing or selling of high-speed rail (HSR) bonds upon enactment and redirects remaining high-speed rail bond proceeds to state freeways and highways, local streets and roads, and local transit projects upon voter approval.
ANALYSIS:
The California High-Speed Rail Authority (HSRA) was established by legislation in 1996 (SB 1420, Kopp, Chapter 796) to direct the development and implementation of intercity high-speed rail service that is fully coordinated with other public transportation services. In 2008, California voters approved Proposition 1A, the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century (Prop. 1A), which authorized $9 billion in general obligation bonds for the high-speed rail project. Prop. 1A included a number of requirements the state must meet to access the bond funding for capital construction, including the identification of matching funds, the completion of a funding plan, and approval of required environmental clearance documents.
In 2009, the federal government augmented Prop. 1A bond funding with roughly $3.3 billion in funding from the American Recovery and Reinvestment Act and other federal funding programs. HSRA committed to match these federal funds with approximately $2.3 billion in state funding.
Of the $9 billion appropriated thus far for high-speed rail, HSRA spent $950 million through 2013-14, $388 million in 2014-15, $968 million in 2015-16, and $1.281 billion in 2016-17. HSRA plans to spend $1.462 billion in 2017-18: $1.269 million in Prop. 1A bond funds, $.6 million in federal funds, and $192 million in Cap-and-Trade funds. In addition, for the local assistance bookend projects, approximately $226.1 million in Prop 1A bond funds will be spent in 2017-18 (specifically Caltrain electrification in Northern California and Rosecrans/Marquardt grade separation in Southern California).
Existing Law:
- Establishes the HSRA and vests with it the responsibility to develop and implement a high-speed rail system in California.
- Authorizes the sale of $9 billion in general obligation bonds to partially fund the development and construction of California's high-speed rail system.
- Authorizes the expenditure of an additional $950 million in general obligation bonds for capital projects on other passenger rail lines to provide connectivity to the high-speed rail system as well as for capacity enhancements and safety improvements to those lines.
- Requires the HSRA to complete and submit to the Legislature funding plans and financial analyses prior to requesting an appropriation of bond funds for eligible capital costs and prior to committing bond proceeds for expenditure for construction and real property and equipment acquisition.
- Enacts SB 1 (Chapter 5, Statutes of 2017) which includes a 12 cent per gallon tax increase on gasoline, a transportation improvement fee, and an increase in the diesel sales tax. Revenues generated under SB 1 are required to be used for road improvements and rehabilitation, highway impacts, and enhanced transit services. Provisions in SB 1 do not allocate funds to high-speed rail.
This bill:
- Prohibits the issuing or selling of any HSR bonds upon enactment of this bill.
- Provides that HSR bonds that have been previously issued, sold, and appropriated may be continued to be used for HSR purposes.
- Redirects unspent proceeds from high-speed rail bonds issued and sold prior to the effective date of this legislation to retire the debt incurred from issuance and sale of these bonds.
- Upon approval by the voters, redirects the proceeds of remaining unissued bonds to repair and new construction projects on state highways and freeways (33%) and local streets and roads (33%), and local transit projects (33%).
- Requires the Secretary of State to place a measure authorizing these provisions on the June 2018 primary election ballot.
COMMENTS:
- Author’s Statement. According to the author, “Today’s High-Speed Rail project is not what voters approved in 2008. This proposed, massive transportation project could end up costing hundreds of billions of dollars and never be completed. It is extremely concerning that Quentin Kopp (the co-author of the original High-Speed Rail legislation, former Senate Transportation Committee chairman and former chairman of the High-Speed Rail Authority) is now opposed to the project. Kopp stated, ‘They have just mangled this project… It is the great train robbery… if they can get away with it.’ Another former chairman of the Senate Transportation Committee, now Democrat Congressman Mark DeSaulnier, said High-Speed Rail, which is the largest public works project in Californian history, could ultimately cost taxpayers as much as $350 billion to complete. Having two former chairmen of the Senate Transportation Committee question the performance and truthfulness of those running the High-Speed Rail Authority is a serious wake-up call. Californians deserve the right to vote on whether to spend billions of dollars on High-Speed Rail, or spend that money on roads, highways, and local transit projects.”
- Fulfilling the promise. Proponents of high-speed rail suggest that the project still technically meets the promises made to voters in 2008. In addition, some advocates argue that the project is transformative and should be pursued regardless of a potentially divergent electorate. These advocates suggest that, while voters today may not approve the project as currently envisioned, when the system is finally running and all of the benefits are realized, Californians will be thankful the state continued to pursue it in the face of its many detractors. They point to the significant opposition to construction of the Bay Area Rapid Transit (BART) system in the 1960s, which today is an integral part of the Bay Area transportation network.
Other supporters of high-speed rail argue that, despite the fact that today’s plan may not fully live up to the vision presented to voters in 2008, the large influx of construction dollars and potential jobs created in the Central Valley are too important to risk losing should the voters defeat the project at the ballot. To that end, HSRA reported in their 2017 Project Update Report that the Authority has contracted with 114 certified small and micro businesses throughout the state and has generated $1.11 billion in economic output in the Central Valley where high-speed rail construction is ongoing. The most updated figures by HSRA note that construction of the high-speed rail project in the Central Valley has created approximately 1,582 construction jobs and now has entered contracts with 230 certified small and micro businesses. With this region suffering one of the worst unemployment rates in the country, the funds from this project are stimulating much-needed relief to the Central Valley’s economy.
- Federal matching requirements. Complicating the implementation of this bill is the fact that the federal government requires the state to match any federal funding expended on the project. The HSRA 2017 Project Update Report further reported that HSRA had secured $3.48 billion in federal funds for high-speed rail. As of September 2017, HSRA has expended all federally allocated high-speed rail designated funds. It is unclear whether the state, if it suddenly ceased to pursue the high-speed rail project, would be in a position to pay back the federal government for some, if not all, of the federal funds expended. If that became the case, it is not clear how the state would achieve repayment without access to the Prop. 1A bond funds.
- HSR moving forward. Since the project’s construction commenced in 2015 in the Central Valley, HSRA now has over 119 miles of construction activity underway. This translates into bridges and structures being built, land being cleared, roads being upgraded, and Central Valley residents receiving well-paying employment opportunities.
Over the past two years, HSRA has released two major reports that have provided an update on the progress of the project’s construction and a roadmap on how HSRA envisions the project will move forward. First, the release of the 2016 Business Plan signaled a more concrete funding plan for the development of the initial operating segment (IOS). Second, the 2017 Project Update Report provided a thorough description of the construction that has occurred, the economic growth that has resulted from project construction, and further provides an overview of how HSRA intends to manage future risks. It’s important to note – HSRA does in fact continue to face funding and legal challenges and their outcomes are unclear. Furthermore, the project’s unsteady beginning is not without precedent among mega-projects with many of these challenges being widely reported. However, the project is now under construction and progressing. Thus, stopping the project now by redirecting the bonds will cause hundreds of millions of dollars of work and study to be wasted.
- SB 1. In April 2017, the Legislature passed and the Governor signed SB 1, a transportation funding package that is estimated to annually generate $5.2 billion that will primarily be allocated to road repair and rehabilitation, transit improvements, and congestion relief. Specifically, throughout the state, SB 1 funds will be directly allocated to cities and counties for road repairs, local transit agencies for transit improvements, and regional transportation agencies may apply for funds that provide congestion relief. Under SB 1, for example, in fiscal year (FY) 2017-18 the City of Fresno will receive approximately $3.54 million and Fresno County will receive $7.16 million in new revenues to be used for road rehabilitation and maintenance and Fresno transit agencies will receive $5.1 million for transit operational improvements starting FY 2018-19.
This bill, in its current form, proposes to place approximately $5.8 billion in unissued HSR bond dollars back onto the ballot to be reallocated for road construction, repairs, and transit projects. However, this bill is silent on how the funds would be allocated to public entities. In turn, it’s unclear how and in what proportion cities, counties, and transit agencies will receive their share of bond revenues if approved. Additionally, the new and ongoing infusion of SB 1 revenues to local entities will allow for effective long-term planning and programming of funds for transportation projects; it is unclear based on the provisions specified in this bill of the need for a one-time allocation to local entities of borrowed funds that will create additional costs to the state to pay back over a 30-year period. Lastly, with 481 cities, 58 counties and over 100 transit agencies in California and no clear direction on how the bond dollars will be allocated, this bill raises the question as to whether the state is effectively using public dollars to meet the state’s unfunded transportation needs or allocating funds to local entities that will provide minimal impact that will ultimately be costly for the state.
- Second Attempt. A nearly identical version of this bill was heard by this committee on April 4, 2017 and failed passage on a 3-6 vote. Reconsideration was granted at that time.
- Urgency. This bill was amended to include an urgency clause to the measure.
- Double Referral. This bill has been double referred to the Senate Governance and Finance Committee.
Related Legislation:
Many prior legislative attempts to reduce the amount of authorized indebtedness for the high-speed rail project have failed in each house:
SBX1 3 (Vidak, 2015) — similar to this bill, would have redirected high-speed rail bond proceeds to state freeways and highways, and local streets and roads, upon voter approval. SBX1 3 failed passage in the Senate Transportation and Infrastructure Committee in the 1st Extraordinary Session.
SB 901 (Vidak, 2014) — would have required the Secretary of State to place on the November 2014 general election ballot a referendum to prohibit the sale of additional high-speed rail bonds. It would also have authorized the net proceeds from outstanding bonds to be redirected, upon appropriation, to retirement of high-speed rail bond debt and would have prohibited expenditure of bond funds, or issuance of additional bonds, for high-speed rail until November 2014. SB 901 failed passage in the Senate Transportation and Housing Committee.
AB 1501 (Patterson, 2014) — would have prohibited HSRA from spending federal funds for which a state match is required unless state funding for the match is immediately available. AB 1501 failed passage in the Assembly Transportation Committee.
AB 2650 (Conway, 2014) — would have directed the Secretary of State to place on the November 2014 general election ballot a measure to prohibit further issuance and sale of any authorized bonds for high-speed rail, except for specified projects for which appropriations have already been made. It would also have redirected the proceeds of any outstanding bonds issued and sold to debt retirement, and reauthorized the issuance and sale of any unissued bonds for other transportation uses, upon legislative appropriation. AB 2650 failed passage in the Assembly Transportation Committee.
AB 842 (Donnelly, 2013) — would have prohibited the expenditure of state and federal funds for high-speed rail except as necessary to meet contractual commitments entered into before January 1, 2014. AB 842 failed passage in the Assembly Transportation Committee.
AB 1455 (Harkey, 2012) — would have reduced the amount of authorized indebtedness for HSRA to the amount contracted as of January 1, 2013 and excluded from these provisions indebtedness authorized for other rail purposes. AB 1455 failed passage in the Assembly Transportation Committee.
SB 22 (La Malfa, 2011) — would have reduced the amount of indebtedness authorized by Prop. 1A to the amount contracted as of January 1, 2012. SB 22 failed passage in the Senate Transportation and Housing Committee.
AB 76 (Harkey, 2011) — would have reduced the amount of authorized indebtedness for HSRA to the amount contracted as of January 1, 2012. AB 76 failed passage in the Assembly Transportation Committee.
AB 2121 (Harkey, 2010) — would have reduced the amount of general obligation debt authorized pursuant to Prop. 1A to the amount contracted by HSRA. It was amended in the Assembly Transportation Committee to instead require HSRA to annually submit a six-year funding program and a project progress report to the appropriate policy and budget committees of the Legislature. AB 2121 was passed by the Assembly, but died in the Senate Rules Committee.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
POSITIONS: (Communicated to the committee before noon on Wednesday,
January 3, 2018.)
SUPPORT:
Citizens for California High-Speed Rail Accountability
Community Coalition on High-Speed Rail
DERAIL
Howard Jarvis Taxpayers Association
Tos Farms Inc.
One individual
OPPOSITION:
California Labor Federation
State Building and Construction Trades Council
-- END --
SENATE COMMITTEE ON TRANSPORTATION AND HOUSING
Senator Jim Beall, Chair
2017 - 2018 Regular
Bill No: Hearing Date: 4/4/2017
Author: | Vidak | ||
Version: | 2/15/2017 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Manny Leon | ||
SUBJECT:
DIGEST: This bill prohibits the issuing or selling of high-speed rail (HSR) bonds upon enactment and redirects remaining high-speed rail bond proceeds to state freeways and highways and local streets and roads, upon voter approval.
ANALYSIS:
The California High-Speed Rail Authority (HSR) was established by legislation in 1996 (SB 1420, Kopp, Chapter 796) to direct the development and implementation of intercity high-speed rail service that is fully coordinated with other public transportation services. In 2008, California voters approved Proposition 1A, the Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century (Prop. 1A), which authorized $9 billion in general obligation bonds for the high-speed rail project. Prop. 1A included a number of requirements the state must meet to access the bond funding for capital construction, including the identification of matching funds, the completion of a funding plan, and approval of required environmental clearance documents.
In 2009, the federal government augmented Prop. 1A bond funding with roughly $3.3 billion in funding from the American Recovery and Reinvestment Act and other federal funding programs. HSR committed to match these federal funds with approximately $2.3 billion in state funding.
Of the $9.5 billion appropriated thus far for high-speed rail, HSR spent $950 million through 2013-14, $388 million in 2014-15 and $968M in 2015-16. For 2016-17, HSRA plans to spend $1.744 billion: $158 million in Prop. 1A bond funds, $902 million in federal funds, and $685 million in Cap-and-Trade revenues.
Existing Law:
- Establishes the California High-Speed Rail Authority (HSR) and vests with it the responsibility to develop and implement a high-speed rail system in California.
- Authorizes the sale of $9 billion in general obligation bonds to partially fund the development and construction of California's high-speed rail system.
- Authorizes the expenditure of an additional $950 million in general obligation bonds for capital projects on other passenger rail lines to provide connectivity to the high-speed rail system as well as for capacity enhancements and safety improvements to those lines.
- Requires the HSR to complete and submit to the Legislature funding plans and financial analyses prior to requesting an appropriation of bond funds for eligible capital costs and prior to committing bond proceeds for expenditure for construction and real property and equipment acquisition.
This bill:
- Prohibits the issuing or selling of any HSR bonds upon enactment of this bill.
- Provides that HSR bonds that have been previously issued, sold, and appropriated may be continued to be used for HSR purposes.
- Redirects unspent proceeds from high-speed rail bonds issued and sold prior to the effective date of this legislation to retire the debt incurred from issuance and sale of these bonds.
- Directs the proceeds of remaining unissued bonds to repair and new construction projects on state highways and freeways (50%) and local streets and roads (50%).
- Requires the Secretary of State to place a measure authorizing these provisions on the June 2018 primary election ballot.
COMMENTS:
- Author’s Statement. According to the author, “Today’s High-Speed Rail project is not what voters approved in 2008. This proposed, massive transportation project could end up costing hundreds of billions of dollars and never be completed. It is extremely concerning that Quentin Kopp (the co-author of the original High-Speed Rail legislation, former Senate Transportation Committee chairman and former chairman of the High-Speed Rail Authority) is now opposed to the project. Kopp stated, ‘They have just mangled this project… It is the great train robbery… if they can get away with it.’ Another former chairman of the Senate Transportation Committee, now Democrat Congressman Mark DeSaulnier, said High-Speed Rail, which is the largest public works project in Californian history, could ultimately cost taxpayers as much as $350 billion to complete. Having two former chairmen of the Senate Transportation Committee question the performance and truthfulness of those running the High-Speed Rail Authority is a serious wake-up call. Californians deserve the right to vote on whether to spend billions of dollars on High-Speed Rail, or spend that money on much-needed repairs of local roads and highways.”
- Fulfilling the promise. Proponents of high-speed rail suggest that the project still technically meets the promises made to voters in 2008. In addition, some advocates argue that the project is transformative and should be pursued regardless of a potentially divergent electorate. These advocates suggest that, while voters today may not approve the project as currently envisioned, when the system is finally running and all of the benefits are realized, Californians will be thankful the state continued to pursue it in the face of its many detractors. They point to the significant opposition to construction of the Bay Area Rapid Transit (BART) system in the 1960s, which today is an integral part of the Bay Area transportation network.
Other supporters of high-speed rail argue that, despite the fact that today’s plan may not fully live up to the vision presented to voters in 2008, the large influx of construction dollars and potential jobs created in the Central Valley are too important to risk losing should the voters defeat the project at the ballot. To that end, HSR reports in their 2017 Project Update Report that the Authority has contracted with 114 certified small and micro businesses throughout the state and has generated $1.11 billion in economic output in the Central Valley where HSR construction is ongoing. With this region suffering one of the worst unemployment rates in the country, the funds from this project are stimulating much-needed relief to the Central Valley’s economy.
- Federal matching requirements. Complicating the implementation of this bill is the fact that the federal government requires the state to match any federal funding expended on the project. According to the HSR 2017 Project Update Report, the HSR has secured $3.48 billion in federal funds. It is unclear whether the state, if it suddenly ceased to pursue the high-speed rail project, would be in a position to pay back the federal government for some, if not all, of the federal funds thus far expended. If that became the case, it is not clear how the state would achieve repayment without access to the Prop. 1A bond funds.
- HSR moving forward. Since the project’s construction commenced in 2015 in the Central Valley, HSR now has over 119 miles of construction activity underway. This translates into bridges and structures being built, land being cleared, roads being upgraded, and Central Valley residents receiving well-paying employment opportunities.
Over the past two years, HSR has released two major reports that have provided an update on the progress of the project’s construction and a roadmap on how HSR envisions the project will move forward. First, the release of the 2016 Business Plan signaled a more concrete funding plan for the development of the initial operating segment (IOS). Second, the 2017 Project Update Report provided a thorough description of the construction that has occurred, the economic growth that has resulted from project construction, and further provides an overview of how HSR intends to manage future risks. It’s important to note — HSR does in fact continue to face funding and legal challenges and their outcomes are unclear. However, the project is under construction and proceeding. Furthermore, the project’s unsteady beginning is not without precedent among mega-projects; and while the project is not progressing as smoothly as hoped, it is progressing and is better off today than it was when the Legislature committed to the project. Thus, stopping the project now by redirecting the bonds will cause hundreds of millions of dollars of work and study to be wasted.
- Double Referral. This bill has been double referred to the Senate Governance and Finance Committee.
Related Legislation:
Many prior legislative attempts to reduce the amount of authorized indebtedness for the high-speed rail project have failed in each house:
SBX1 3 (Vidak, 2015) — similar to this bill, would have redirected high-speed rail bond proceeds to state freeways and highways, and local streets and roads, upon voter approval. SBX1 3 failed passage in the Senate Transportation and Infrastructure Committee in the 1st Extraordinary Session.
SB 901 (Vidak, 2014) — would have required the Secretary of State to place on the November 2014 general election ballot a referendum to prohibit the sale of additional high-speed rail bonds. It would also have authorized the net proceeds from outstanding bonds to be redirected, upon appropriation, to retirement of high-speed rail bond debt and would have prohibited expenditure of bond funds, or issuance of additional bonds, for high-speed rail until November 2014. SB 901 failed passage in the Senate Transportation and Housing Committee.
AB 1501 (Patterson, 2014) — would have prohibited HSRA from spending federal funds for which a state match is required unless state funding for the match is immediately available. AB 1501 failed passage in the Assembly Transportation Committee.
AB 2650 (Conway, 2014) — would have directed the Secretary of State to place on the November 2014 general election ballot a measure to prohibit further issuance and sale of any authorized bonds for high-speed rail, except for specified projects for which appropriations have already been made. It would also have redirected the proceeds of any outstanding bonds issued and sold to debt retirement, and reauthorized the issuance and sale of any unissued bonds for other transportation uses, upon legislative appropriation. AB 2650 failed passage in the Assembly Transportation Committee.
AB 842 (Donnelly, 2013) — would have prohibited the expenditure of state and federal funds for high-speed rail except as necessary to meet contractual commitments entered into before January 1, 2014. AB 842 failed passage in the Assembly Transportation Committee.
AB 1455 (Harkey, 2012) — would have reduced the amount of authorized indebtedness for HSRA to the amount contracted as of January 1, 2013 and excluded from these provisions indebtedness authorized for other rail purposes. AB 1455 failed passage in the Assembly Transportation Committee.
SB 22 (La Malfa, 2011) — would have reduced the amount of indebtedness authorized by Prop. 1A to the amount contracted as of January 1, 2012. SB 22 failed passage in the Senate Transportation and Housing Committee.
AB 76 (Harkey, 2011) — would have reduced the amount of authorized indebtedness for HSRA to the amount contracted as of January 1, 2012. AB 76 failed passage in the Assembly Transportation Committee.
AB 2121 (Harkey, 2010) — would have reduced the amount of general obligation debt authorized pursuant to Prop. 1A to the amount contracted by HSRA. It was amended in the Assembly Transportation Committee to instead require HSRA to annually submit a six-year funding program and a project progress report to the appropriate policy and budget committees of the Legislature. AB 2121 was passed by the Assembly, but died in the Senate Rules Committee.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
POSITIONS: (Communicated to the committee before noon on Wednesday,
March 29, 2017.)
SUPPORT:
Citizens for California High-Speed Rail Accountability
Community Coalition on High-Speed Rail
DERAIL
Howard Jarvis Taxpayers Association
Tos Farms Inc.
One individual
OPPOSITION:
California Labor Federation.
-- END --
Discussed in Hearing
Senate Standing Committee on Transportation and Housing
Senate Standing Committee on Transportation and Housing
Bill Author
Bill Co-Author(s):