SB 771: California Environmental Quality Act: continuing education: public employees.
- Session Year: 2017-2018
- House: Senate
- Latest Version Date: 2017-07-18
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
This bill would establish a continuing education requirement for employees of public agencies who have primary responsibility to administer the act, as specified. Because this bill would require a public agency to ensure that this continuing education requirement is met, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
This bill would establish a continuing education requirement for employees of public agencies who have primary responsibility for overseeing compliance with the act. to administer the act, as specified. Because this bill would require a public agency to ensure that this continuing education requirement is met, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
This bill would establish a continuing education requirement for employees of public agencies who have responsibility for overseeing compliance with the act. Because this bill would require a public agency to ensure that this continuing education requirement is met, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Public agencies A public agency shall ensure that at least one or more of its employees who have been assigned the primary responsibility to administer this division pursuant to subdivision (a) of Section 15025 of Title 14 of the California Code of Regulations participate, complete at least two hours every two years, in appropriate years of continuing education programs offered by related to administration of this division. Continuing education may include any of the following:
(a)The Courses offered, accredited, or approved by the American Institute of Certified Planners.
(b)Continuing Courses offered by continuing legal education providers accredited or approved by the State Bar.
(c)Courses offered by the University of California, including extension programs.
(c)A(d)Training courses or sets of self-study materials with tests offered in person or online by a local agency or association of local agencies that offer one or more training courses, or sets of self-study materials with tests. These courses may be taken at home, in-person, or online. agencies.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
Public agencies shall ensure that their one or more employees who have been assigned the primary responsibility for overseeing compliance with this division to administer this division pursuant to subdivision (a) of Section 15025 of Title 14 of the California Code of Regulations participate, at least two hours annually, every two years, in appropriate continuing education programs offered by providers accredited or approved by the State Bar or the American Institute of Certified Planners. any of the following:
(a)The American Institute of Certified Planners.
(b)Continuing legal education providers accredited or approved by the State Bar.
(c)A local agency or association of local agencies that offer one or more training courses, or sets of self-study materials with tests. These courses may be taken at home, in-person, or online.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
Public agencies shall ensure that their employees who have responsibility for overseeing compliance with this division participate, at least two hours annually, in appropriate continuing education programs offered by providers accredited or approved by the State Bar or the American Institute of Certified Planners.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
|
Date
|
Status
|
|---|---|
| Sep 13, 2017 | Ordered to inactive file on request of Assembly Member Calderon. |
| Sep 5, 2017 | Read second time. Ordered to third reading. |
| Sep 1, 2017 | From committee: Do pass. (Ayes 12. Noes 3.) (September 1). |
| Aug 23, 2017 | August 23 set for first hearing. Placed on suspense file. |
| Jul 18, 2017 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 17, 2017 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 0.) (July 10). |
| Jun 26, 2017 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on NAT. RES. |
| Jun 21, 2017 | June 26 hearing postponed by committee. |
| Jun 12, 2017 | Referred to Com. on NAT. RES. |
| May 31, 2017 | In Assembly. Read first time. Held at Desk. |
| May 30, 2017 | Read third time. Passed. (Ayes 40. Noes 0. Page 1245.) Ordered to the Assembly. |
| Apr 18, 2017 | Read second time. Ordered to third reading. |
| Apr 17, 2017 | From committee: Do pass. (Ayes 7. Noes 0. Page 708.) (April 17). |
| Apr 5, 2017 | Set for hearing April 17. |
| Mar 29, 2017 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 7. Noes 0. Page 537.) (March 29). Re-referred to Com. on APPR. |
| Mar 10, 2017 | Set for hearing March 29. |
| Mar 9, 2017 | Referred to Com. on EQ. |
| Feb 21, 2017 | From printer. May be acted upon on or after March 23. |
| Feb 17, 2017 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 1, 2017 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 10, 2017 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| May 30, 2017 | Senate 3rd Reading SB771 De León | Senate Floor |
Passed |
|
| Apr 17, 2017 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| Mar 29, 2017 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Environmental Quality |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE THIRD READING
STR Bill Id:SB 771
Author:(De León)
As Amended Ver:July 18, 2017
Majority vote
SENATE VOTE: 40-0
Committee | Votes | Ayes | Noes |
Natural Resources | 8-0 | Cristina Garcia, Chau, Eggman, Flora, Limón, McCarty, Muratsuchi, Mark Stone | |
Appropriations | 12-3 | Gonzalez Fletcher, Bloom, Bocanegra, Bonta, Calderon, Chau, Eggman, Friedman, Gallagher, Eduardo Garcia, Jones-Sawyer, Reyes | Bigelow, Brough, Obernolte |
SUMMARY: Requires a public agency to ensure that at least one of its employees assigned the primary responsibility to administer the California Environmental Quality Act (CEQA) complete at least two hours of continuing education every two years, including courses offered by the American Institute of Certified Planners, continuing legal education providers accredited or approved by the State Bar, the University of California (UC), or a local agency or association of local agencies.
EXISTING LAW, CEQA:
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines.)
- Requires the Office of Planning and Research (OPR) to prepare and develop proposed guidelines for the implementation of CEQA by public agencies. Under the CEQA Guidelines, Section 15025, a public agency is authorized to assign specific functions to its staff to assist in administering CEQA.
FISCAL EFFECT: According to the Assembly Appropriations Committee, unknown, potentially significant state costs, or cost pressures. For example, the UC Davis extension course costs $360. One agency, the Department of Water Resources, indicates that although this bill requires only one of its employees to receive continuing education, it would likely send as many as 12 employees to training resulting in costs of $4,320 every two years, not including travel or other expenses. CEQA reviews are conducted by dozens of state agencies, as such, it is not unreasonable to assume state costs may exceed $150,000 per year across all state government.
COMMENTS:
CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that the project would not have a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA reviews are conducted by dozens of state agencies and hundreds of local and regional agencies. Under the CEQA Guidelines, each public agency is authorized to assign specific functions to its staff to assist. Although there are no specific training requirements for these staff, administering CEQA requires knowledge of the complex array of statutes, regulations, case law, and practice, as well as technical aspects of the multiple categories of environmental impacts that may be analyzed. Given these responsibilities, it seems appropriate to require continuing education for at least one staff from each public agency administering CEQA.
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0001682
Date of Hearing: August 23, 2017
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez Fletcher, Chair
SBPCA Bill Id:SB 771
Author:(De León) – As Amended Ver:July 18, 2017
Policy Committee: | Natural Resources | Vote: | 8 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires public agencies to ensure that at least one of its employees assigned the primary responsibility to administer the California Environmental Quality Act (CEQA) complete at least two hours every two years of continuing education related to the administration of the Act.
Continuing education may include any of the following: 1) courses offered, accredited or approved by the American Institute of Certified Planners; 2) Courses offered by continuing legal education providers accredited or approved by the State Bar; 3) courses offered by the University of California, including extension programs; and 4) training courses or sets of self-study materials with tests offered in person or online by local agencies.
FISCAL EFFECT:
Unknown, potentially significant state costs, or cost pressures. For example, the UC Davis extension course costs $360 dollars. One agency, the Department of Water Resources, indicates that although this bill requires only one of its employees to receive continuing education, it would likely send as many as 12 employees to training resulting in costs of $4,320 every two years, not including travel or other expenses.
CEQA reviews are conducted by dozens of state agencies, as such, it is not unreasonable to assume state costs may exceed $150,000 per year across all state government.
COMMENTS:
Background and Purpose.
CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that the project would not have a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect, the lead agency must prepare an environemental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA reviews are conducted by dozens of state agencies and hundreds of local and regional agencies. Under the CEQA Guidelines, each public agency is authorized to assign specific functions to its staff to assist. Although there are no specific training requirements for these staff, administering CEQA requires knowledge of the complex array of statutes, regulations, case law, and practice, as well as technical aspects of the multiple categories of environmental impacts that may be analyzed. Given these responsibilities, it seems appropriate to require continuing education for at least one staff from each public agency administering CEQA.
This bill ensures at least one employee of each agency will receive continuing education every two years.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: July 10, 2017
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Cristina Garcia, Chair
SBPCA Bill Id:SB 771
Author:(De León) – As Amended Ver:June 26, 2017
SENATE VOTE: 40-0
SUBJECT: California Environmental Quality Act: continuing education: public employees
SUMMARY: Requires public agencies to ensure that one or more employees assigned the primary responsibility to administer the California Environmental Quality Act (CEQA) participate in appropriate continuing education at least two hours every two years.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines.)
- Requires the Office of Planning and Research (OPR) to prepare and develop proposed guidelines for the implementation of CEQA by public agencies. Under the CEQA Guidelines, Section 15025, a public agency is authorized to assign specific functions to its staff to assist in administering CEQA.
THIS BILL requires public agencies to ensure that one or more employees assigned the primary responsibility to administer CEQA participate at least two hours every two years in appropriate continuing education programs offered by the American Institute of Certified Planners, continuing legal education providers accredited or approved by the State Bar, or a local agency or association of local agencies that offer one or more training courses, or sets of self-study materials with tests. These courses may be taken at home, in-person, or online.
FISCAL EFFECT: According to the Senate Appropriations Committee, unknown, likely minor costs (various special funds and General Fund), some of which may be recovered through CEQA fees.
COMMENTS:
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that the project would not have a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA reviews are conducted by dozens of state agencies and hundreds of local and regional agencies. Under the CEQA Guidelines, each public agency is authorized to assign specific functions to its staff to assist. Although there are no specific training requirements for these staff, administering CEQA requires knowledge of the complex array of statutes, regulations, case law, and practice, as well as technical aspects of the multiple categories of environmental impacts that may be analyzed. Given these responsibilities, it seems appropriate to require continuing education for at least one staff from each public agency administering CEQA.
- Suggested clarifying amendments. The author and the committee may wish to consider the following amendments to clarify the bill:
21098.5. Public agencies a public agency shall ensure that at least one or more of its employees who have been assigned the primary responsibility to administer this division pursuant to subdivision (a) of Section 15025 of Title 14 of the California Code of Regulations participate, complete at least two hours every two years, in appropriate of continuing education programs offered by related to administration of this division. Continuing education may include any of the following:
(a) The Courses offered, accredited, or approved by the American Institute of Certified Planners.
(b) Continuing Courses offered by continuing legal education providers accredited or approved by the State Bar.
(c) Courses offered by the University of California, including extension programs.
(d) Training courses, or sets of self-study materials with tests, offered in-person or online, by a A local agency or association of local agencies that offer one or more training courses, or sets of self-study materials with tests. These courses may be taken at home, in-person, or online.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file
Opposition
None on file
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB |
THIRD READING
Bill No: SB 771
:
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 3/29/17
AYES: Wieckowski, Stone, Bates, Hill, Lara, Skinner, Stern
SENATE APPROPRIATIONS COMMITTEE: 7-0, 4/17/17
AYES: Lara, Bates, Beall, Bradford, Hill, Nielsen, Wiener
DIGEST: This bill creates a continuing education requirement for employees of public agencies who have responsibility for overseeing compliance with the California Environmental Quality Act (CEQA).
ANALYSIS: Existing law, under CEQA, requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.).
This bill:
- Creates a continuing education requirement for employees of public agencies who have responsibility for overseeing compliance with CEQA.
- Requires these employees to participate in appropriate continuing education classes at least two hours annually.
- Requires the continuing education programs be offered by providers accredited or approved by the State Bar or the American Institute of Certified Planners.
Background
- Overview of CEQA process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND/MND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
If a mitigation measure would cause one or more significant effects in addition to those that would be caused by the proposed project, the effects of the mitigation measure must be discussed but in less detail than the significant effects of the proposed project. - What is analyzed in an environmental review? Pursuant to CEQA, an environmental review analyzing the significant direct and indirect environmental impacts of a proposed project may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary. Also, CEQA stipulates that the environmental impacts must be measured against existing physical conditions within the project area, not future, allowable conditions.
- CEQA provides hub for multi-disciplinary regulatory process. CEQA assists in moving a project through the multi-disciplinary, regulatory process because responsible agencies may rely on the lead agency’s environmental documentation in acting on the aspect of the project that requires its approval and must prepare its own findings regarding the project. A variety of issues, many of which involve permitting and/or regulatory program requirements, should be coordinated and analyzed together as a whole. CEQA provides a comprehensive analysis of a project’s impacts in those subject areas.
Comments
- Purpose of Bill. CEQA is a complex, procedural statute, which compels public agencies, in a public setting, with public participation, to consider and decide on projects with full knowledge about the environmental conditions and consequences of their actions. Over 17 subjects may be analyzed in a CEQA environmental review document; and the process for compiling all of the necessary facts in one place is the result of a meticulous and methodical process. It seems prudent that employees of public agencies implementing the law have the acumen and ability to perform their responsibilities with up-to-date knowledge. This bill requires these governmental employees to participate in continuing education classes at least two hours annually.
- CEQA: Legislation, case law, and guidelines. Implementing CEQA requires the public agency to know what the law is based on the statute itself, case law, and the CEQA Guidelines.
Legislation. Over the years, the statute has been amended many times, sometimes with fundamental changes occurring along the way. For example, the incorporation of climate change into CEQA – SB 97 (Dutton, Chapter 185, Statutes of 2007), required the Office of Planning and Research to amend the CEQA Guidelines to assist public agencies in the mitigation of greenhouse gas (GHG) emissions or the effects of GHG emissions. This new mandate essentially confirmed that GHG emissions are a significant impact to be analyzed under CEQA. The statute itself has been in existence for approximately 47 years and has morphed over the decades, as partially shown in the chart below.
As provided in the data above, legislation enacted between 1985 and 2013 shows a total of 408 sections have been added, amended, or repealed. Of the 408 modifications: 223 amend, 158 add, and 27 repeal various sections of CEQA. 109 of those changes, making up more than a quarter of the statutory provisions between 1985 and 2013, occurred in the most recent five years. Also, almost 50 changes occurred in one year, mostly due to the CEQA Revision Act of 1993.
In addition, several provisions of CEQA provide streamlined approaches, including:
- Master and focused EIRs;
- Transit priority and residential project streamlining (SB 375, Steinberg, Ducheny, Chapter 728, Statutes of 2008);
- Expedited review for environmental mandated projects;
- Special procedures for various types of housing projects (SB 1925, Sher, Polanco, Chapter 1039, Statutes of 2002);
- Various litigation, mediation, tiering, and other revisions (SB 1456, Simitian, Chapter 496, Statutes of 2010);
- Amendments to procedures relating to findings of overriding consideration (AB 231, Huber, Chapter 432, Statutes of 2010);
- Infill project and other streamlining provisions (SB 226, Simitian, Vargas, Chapter 469, Statutes of 2011); and,
- Several categorical exemptions contained in the CEQA Guidelines.
The statute has not stayed stagnant since its enactment, but rather has evolved over close to half a century and continues to do so every year.
Case law. According to the report, CEQA in the 21st Century: Environmental Quality, Economic Prosperity, and Sustainable Development in California, prepared by BAE Urban Economics (August 2016), the number of lawsuits filed under CEQA has averaged 195 per year since 2002. Fewer than 1 out of every 100 projects reviewed under CEQA (that were not considered exempt) were subject to litigation. The estimated rate of litigation for all CEQA projects undergoing environmental review (excluding exemptions) was 0.7% for the past few years.
Regardless of the small number of cases filed, like with other fields of law, appellate and state Supreme Court decisions set precedent where the statute or regulations (in this case the CEQA Guidelines) may be unclear or silent. Each year, there are a handful of decisions that help shape CEQA.
CEQA Guidelines. The CEQA Guidelines (California Code of Regulations Title 14, §15000 et seq.), which have the force of law, explain and interpret the statute for both the public agencies required to administer CEQA and for the public generally. The fundamental purpose of the Guidelines is to make the CEQA process comprehensible to those who administer it, to those who are subject to it, and to those for whose benefit it exists. The Guidelines provide objectives, criteria and procedures for the orderly evaluation of projects and the preparation of EIRs, NDs, and MNDs by public agencies. Also, interpretation of statutory changes and principles advanced by judicial decisions become incorporated into the Guidelines. The Governor’s Office of Planning and Research prepares and develops proposed amendments to the Guidelines at least every two years and transmits them to the Secretary of the Natural Resources Agency. The Secretary is responsible for certification and adoption of, and amendments to, the Guidelines.
- Conclusion. With the regular updating of the Guidelines, holdings in case law, as well as changes in the statute, it seems prudent for employees of public agencies implementing CEQA to ensure that they are well-versed on the environmental review process. This bill helps to achieve this purpose by requiring public agency employees, who have the responsibility of overseeing CEQA compliance, to participate in appropriate continual education classes at least two hours each year.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
According to the Senate Committee on Appropriations, SB 771 will have unknown, likely minor costs (various special funds and General Fund), some of which may be recovered through CEQA fees.
None received
OPPOSITION: (Verified 4/18/17)
None received
4/19/17 14:48:02
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Ricardo Lara, Chair
2017 - 2018 Regular Session
SB 771 (De León) - California Environmental Quality Act: continuing education: public employees
Version: February 17, 2017 | Policy Vote: E.Q. 7 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: April 17, 2017 | Consultant: Narisha Bonakdar |
This bill does not meet the criteria for referral to the Suspense File.
Bill Summary:
SB 771 requires employees of public agencies who oversee compliance with the California Environmental Quality Act (CEQA) to participate in at least two hours of continuing education annually, and specifies that these classes must be approved by the State Bar or the American Institute of Certified Planners.
Fiscal Impact:
Unknown, likely minor costs (various special funds and General Fund), some of which may be recovered through CEQA fees.
Background:
The California Environmental Quality Act (CEQA) is a statewide environmental protection policy enacted in 1970. CEQA requires state and local agencies to analyze and publicly disclosure the environmental impacts of proposed projects, and requires that all feasible measures to mitigate those impacts are undertaken. CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines.
Under CEQA, lead agencies (those responsible for carrying out or approving a proposed discretionary project) must prepare one of the following: (1) a negative declaration (ND) if the Initial Study determines that the project will not have a significant effect on the environment; (2) a mitigated negative declaration (MND) if the Initial Study identified potentially significant environmental impacts and the project is revised to eliminate or mitigate impacts to less than significant levels; or (3) an environmental impact report (EIR), that identifies and analyzes each significant environmental impact and identifies mitigation measures, if the Initial Study finds that the project will have a significant impact on the environment.
Proposed Law:
This bill:
- Creates a continuing education requirement for employees of public agencies who oversee CEQA compliance.
- Requires these employees to participate in appropriate continuing education classes at least two hours annually.
- Requires the continuing education programs be offered by providers accredited or approved by the State Bar or the American Institute of Certified Planners.
Staff Comments:
Costs. Staff notes that this bill may result in significant costs to the State as a whole. However, given that staff subject to the requirements of this bill will be employed by various departments and supported by different funds, it is unlikely that the cost to any given fund will meet the Suspense threshold. Furthermore, ongoing education may increase efficiency and result in fewer costly errors and complaints.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Wieckowski, Chair
2017 - 2018 Regular
Bill No: SB 771
Author: | de León | ||
Version: | 2/17/2017 | Hearing Date: | 3/29/2017 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Joanne Roy | ||
SUBJECT: California Environmental Quality Act: continuing education: public employees.
ANALYSIS:
Existing law, under the California Environmental Quality Act (CEQA), requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines). (Public Resources Code (PRC) §21000 et seq.).
This bill:
- Creates a continuing education requirement for employees of public agencies who have responsibility for overseeing compliance with CEQA.
- Requires these employees to participate in appropriate continuing education classes at least two hours annually.
- Requires the continuing education programs be offered by providers accredited or approved by the State Bar or the American Institute of Certified Planners.
Background
- Overview of CEQA process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND/MND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
If a mitigation measure would cause one or more significant effects in addition to those that would be caused by the proposed project, the effects of the mitigation measure must be discussed but in less detail than the significant effects of the proposed project. - What is analyzed in an environmental review? Pursuant to CEQA, an environmental review analyzing the significant direct and indirect environmental impacts of a proposed project may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary. Also, CEQA stipulates that the environmental impacts must be measured against existing physical conditions within the project area, not future, allowable conditions.
- CEQA provides hub for multi-disciplinary regulatory process. CEQA assists in moving a project through the multi-disciplinary, regulatory process because responsible agencies may rely on the lead agency’s environmental documentation in acting on the aspect of the project that requires its approval and must prepare its own findings regarding the project. A variety of issues, many of which involve permitting and/or regulatory program requirements, should be coordinated and analyzed together as a whole. CEQA provides a comprehensive analysis of a project’s impacts in those subject areas.
Comments
- Purpose of Bill. CEQA is a complex, procedural statute, which compels public agencies, in a public setting, with public participation, to consider and decide on projects with full knowledge about the environmental conditions and consequences of their actions. Over 17 subjects may be analyzed in a CEQA environmental review document; and the process for compiling all of the necessary facts in one place is the result of a meticulous and methodical process. It seems prudent that employees of public agencies implementing the law have the acumen and ability to perform their responsibilities with up-to-date knowledge. This bill requires these governmental employees to participate in continuing education classes at least two hours annually.
- CEQA: Legislation, case law, and guidelines. Implementing CEQA requires the public agency to know what the law is based on the statute itself, case law, and the CEQA Guidelines.
Legislation. Over the years, the statute has been amended many times, sometimes with fundamental changes occurring along the way. For example, the incorporation of climate change into CEQA – SB 97 (Dutton), Chapter 185, Statutes of 2007, required the Office of Planning and Research to amend the CEQA Guidelines to assist public agencies in the mitigation of greenhouse gas emissions or the effects of GHG emissions. This new mandate essentially confirmed that GHG emissions are a significant impact to be analyzed under CEQA. The statute itself has been in existence for approximately 47 years and has morphed over the decades, as partially shown in the chart below.
As provided in the data above, legislation enacted between 1985 and 2013 shows a total of 408 sections have been added, amended, or repealed. Of the 408 modifications: 223 amend, 158 add, and 27 repeal various sections of CEQA. 109 of those changes, making up more than a quarter of the statutory provisions between 1985 and 2013, occurred in the most recent five years. Also, almost 50 changes occurred in one year, mostly due to the CEQA Revision Act of 1993.
In addition, several provisions of CEQA provide streamlined approaches, including:
- Master and focused EIRs;
- Transit priority and residential project streamlining (SB 375, Steinberg, Ducheny, Chapter 728, Statutes of 2008);
- Expedited review for environmental mandated projects;
- Special procedures for various types of housing projects (SB 1925, Sher, Polanco, Chapter 1039, Statutes of 2002);
- Various litigation, mediation, tiering, and other revisions (SB 1456, Simitian, Chapter 496, Statutes of 2010);
- Amendments to procedures relating to findings of overriding consideration (AB 231, Huber, Chapter 432, Statutes of 2010);
- Infill project and other streamlining provisions (SB 226, Simitian, Vargas, Chapter 469, Statutes of 2011); and,
- Several categorical exemptions contained in the CEQA Guidelines.
The statute has not stayed stagnant since its enactment, but rather has evolved over close to half a century and continues to do so every year.
Case law. According to the report, CEQA in the 21st Century: Environmental Quality, Economic Prosperity, and Sustainable Development in California, prepared by BAE Urban Economics (August 2016), the number of lawsuits filed under CEQA has averaged 195 per year since 2002. Fewer than 1 out of every 100 projects reviewed under CEQA (that were not considered exempt) were subject to litigation. The estimated rate of litigation for all CEQA projects undergoing environmental review (excluding exemptions) was 0.7% for the past few years.
Regardless of the small number of cases filed, like with other fields of law, appellate and state Supreme Court decisions set precedent where the statute or regulations (in this case the CEQA Guidelines) may be unclear or silent. Each year, there are a handful of decisions that help shape CEQA.
CEQA Guidelines. The CEQA Guidelines (California Code of Regulations Title 14, §15000 et seq.), which have the force of law, explain and interpret the statute for both the public agencies required to administer CEQA and for the public generally. The fundamental purpose of the Guidelines is to make the CEQA process comprehensible to those who administer it, to those who are subject to it, and to those for whose benefit it exists. The Guidelines provide objectives, criteria and procedures for the orderly evaluation of projects and the preparation of EIRs, Negative Declarations, and Mitigated Negative Declarations by public agencies. Also, interpretation of statutory changes and principles advanced by judicial decisions become incorporated into the Guidelines. The Governor’s Office of Planning and Research prepares and develops proposed amendments to the Guidelines at least every two years and transmits them to the Secretary of the Natural Resources Agency. The Secretary is responsible for certification and adoption of, and amendments to, the Guidelines.
- Conclusion. With the regular updating of the Guidelines, holdings in case law, as well as changes in the statute, it seems prudent for employees of public agencies implementing CEQA to ensure that they are well-versed on the environmental review process. This bill helps to achieve this purpose by requiring public agency employees, who have the responsibility of overseeing CEQA compliance, to participate in appropriate continual education classes at least two hours each year.
SOURCE:
Author
SUPPORT:
None received
OPPOSITION:
None received
-- END --
Discussed in Hearing
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Natural Resources
Senate Floor
Senate Standing Committee on Appropriations
Bill Author
Bill Co-Author(s):