AB 1160: Forestry: timber operations: sustained yield plans.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2019-07-12
|
Date
|
Status
|
|---|---|
| Jul 12, 2019 | Chaptered by Secretary of State - Chapter 108, Statutes of 2019. |
| Jul 12, 2019 | Approved by the Governor. |
| Jul 8, 2019 | Enrolled and presented to the Governor at 3:30 p.m. |
| Jul 1, 2019 | In Assembly. Ordered to Engrossing and Enrolling. |
| Jul 1, 2019 | Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0.). |
| Jun 25, 2019 | Read second time. Ordered to Consent Calendar. |
| Jun 24, 2019 | From committee: Be ordered to second reading file pursuant to Senate Rule 28.8 and ordered to Consent Calendar. |
| Jun 11, 2019 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 8. Noes 0.) (June 11). Re-referred to Com. on APPR. |
| May 29, 2019 | Referred to Com. on N.R. & W. |
| May 23, 2019 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 22, 2019 | Read third time. Passed. Ordered to the Senate. |
| May 16, 2019 | Read second time. Ordered to Consent Calendar. |
| May 15, 2019 | From committee: Do pass. To Consent Calendar. (Ayes 16. Noes 0.) (May 15). |
| May 13, 2019 | Joint Rule 62(a), file notice suspended. (Page 1609.) |
| Apr 23, 2019 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (April 22). Re-referred to Com. on APPR. |
| Apr 22, 2019 | Re-referred to Com. on NAT. RES. |
| Apr 11, 2019 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Mar 27, 2019 | Re-referred to Com. on NAT. RES. |
| Mar 26, 2019 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Mar 25, 2019 | Referred to Com. on NAT. RES. |
| Feb 22, 2019 | From printer. May be heard in committee March 24. |
| Feb 21, 2019 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jul 1, 2019 | Consent Calendar AB1160 | Senate Floor |
Passed |
|
| Jun 11, 2019 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Natural Resources and Water |
Passed |
|
| May 22, 2019 | AB 1160 Dahle Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| May 15, 2019 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 22, 2019 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1160 |
CONSENT
Bill No: AB 1160
Amended: 4/11/19 in Assembly
SENATE NATURAL RES. & WATER COMMITTEE: 8-0, 6/11/19
AYES: Stern, Jones, Allen, Borgeas, Caballero, Hertzberg, Jackson, Monning
NO VOTE RECORDED: Hueso
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 77-0, 5/22/19 (Consent) - See last page for vote
SUBJECT: Forestry: timber operations: sustained yield plans
DIGEST:
This bill extends the effective date of a sustained yield plan (SYP) from no more than 10 years to no more than 20 years.
Existing law:
- Declares, in the Z’Berg-Nejedly Forest Practice Act that it is the policy of California to encourage prudent and responsible forest resource management calculated to serve the public’s need for timber and other forest products, while giving consideration to the public’s need for watershed protection, fisheries, and wildlife, sequestration of carbon dioxide, and recreational opportunities alike in this and future generations.
- Prohibits timber operations unless a Timber Harvest Plan (THP) has been prepared by a registered professional forester and approved by the Department of Forestry and Fire Protection (CAL FIRE).
- Considers a THP the functional equivalent of an environmental impact report (EIR) under the California Environmental Quality Act.
- Requires a THP to contain a description of the location of the planned harvest, the harvest method, measures to avoid excessive erosion, timeframe of operations, and other information required by forest practice rules (FPR) adopted by the Board of Forestry and Fire Protection (Board).
- Provides, in regulations of the Board, for SYPs. An SYP that is prepared and approved is effective for a period of no more than 10 years. An SYP may be renewed for a subsequent 10-year period following agency review and a public hearing.
- Requires industrial timber land owners with holdings larger than 50,000 acres are to demonstrate “maximum sustained production” through a large-scale management plan. Two primary options are available: SYPs and a less comprehensive plan called an “Option A.” (See comments.)
- Requires SYPs to include a current inventory of timber resources by stand type and class along with projections of growth and harvest levels, over a 100-year planning horizon. This data is considered proprietary and is thus not allowed public review without the consent of the landowner. However, CAL FIRE may field-check these inventories and evaluate the growth and yield models that are proposed.
- Requires SYPs to also contain a long-term assessment of impacts of timber operations on fish and wildlife, as well as in inventory of all watercourses, roads, and potentially unstable and erosive soils. The SYP must also address mitigation strategies for any of the above adverse impacts.
- Establishes the Timber Regulation and Forest Restoration Fund (TRFRF) [AB 1492 (Committee on Budget, Chapter 289, Statutes of 2012)] which receives funding from an authorized 1% assessment on lumber and engineered wood products sold at the retail level. Specifies that TRFRF shall be used with first priority to support the activities and costs of CAL FIRE, the Department of Conservation (DOC), the Department of Fish and Wildlife (DFW), the State Water Resources Control Board (SWRCB), and regional water quality control boards (RWQCBs) associated with the review of projects or permits necessary to conduct timber operations.
- Prohibits fees from being charged by CAL FIRE, DOC, DFW, SWRCB, and RWQCBs for review of a project, inspection and oversight of projects and permits necessary to conduct timber operations.
This bill extends the effective date of an SYP from no more than 10 years to no more than 20 years.
Comments
An SYP is an optional document for the landowner and is meant to supplement the THP process by providing a means for addressing long-term issues of sustained timber production, and cumulative effects analysis. The SYP is not meant to replace a THP, but to the extent the SYP addresses issues required in the THP it may be relied on (“tiered from”) for determining whether the THP is complete. A THP has an effective date between five and seven years. An SYP can be effective for 10 years. However, an SYP may be renewed for another 10 years following an agency and public review and the approval of the Director of CAL FIRE. According to CAL FIRE, there are three SYPs being used currently for timber harvesting operations: Red River, Shasta Forest and Collins Pine. All three have been renewed. The SYP sets a higher standard, but also lasts longer, which simplifies the development of future THPs for a landowner.
Both SYPs and Option A plans require THPs in order to proceed with harvest, but either plan may be used as a basis for a THP. As explained earlier, a SYP has more environmental information in it than does an “Option A.” For example, SYPs contain watershed and fish and wildlife impacts. As a consequence, SYPs provide a broader base from which future THPs may tier. Option A does not require that type of information. Option A plans are used more frequently by large landowners than SYPs.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
Associated California Loggers
California Farm Bureau Federation
California Forestry Association
Pacific Gas and Electric Company
Personal Insurance Federation of California
Collin Pine Company
Rural County Representatives of California
W.M. Beaty and Associates
OPPOSITION: (Verified 6/24/19)
None received
ARGUMENTS IN SUPPORT: According to the author, SYPs are one of the mechanisms that timberland owners can use to meet the requirement for maintaining maximum sustained production which ensures that any timber harvesting continues to be sustainable. SYPs must include projections of timber growth and harvesting over a 100-year or longer planning horizon, assessment of watershed and wildlife resources, and constraints of other resource values on timber production. Issues and mitigation measures that are adequately covered in an approved SYP may be addressed in individual timber harvesting plans by referencing the SYP. Following approval, an SYP is in force for a period of 10 years.
The author adds that in lieu of obtaining an SYP, a maximum sustained production plan may be achieved in an alternative fashion, but it does not have some of the same benefits of a long-term planning document. Since the work up-front to obtain the approval of an SYP is so significant, it should be valid for a longer period of time to encourage the use of such documents because they provide stability and certainty for state agencies, the public, and the landowner.
ASSEMBLY FLOOR: 77-0, 5/22/19
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO VOTE RECORDED: Cooley, Eduardo Garcia, Mullin
Prepared by: William Craven / N.R. & W. / (916) 651-4116
6/26/19 15:44:12
**** END ****
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Henry Stern, Chair
2019 - 2020 Regular
Bill No: AB Hearing Date: June 11, 2019
Author: | Dahle | ||
Version: | April 11, 2019 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | William Craven | ||
Subject: Forestry: timber operations: sustained yield plans
BACKGROUND AND EXISTING LAW
Pursuant to the Z’Berg-Nejedly Forest Practice Act (FPA):
- Declares that it is the policy of California to encourage prudent and responsible forest resource management calculated to serve the public’s need for timber and other forest products, while giving consideration to the public’s need for watershed protection, fisheries, and wildlife, sequestration of carbon dioxide, and recreational opportunities alike in this and future generations.
- Prohibits timber operations unless a Timber Harvest Plan (THP) has been prepared by a registered professional forester (RPF) and approved by the Department of Forestry and Fire Protection (CAL FIRE).
- Considers a THP the functional equivalent of an environmental impact report (EIR) under the California Environmental Quality Act (CEQA).
- Requires a THP to contain a description of the location of the planned harvest, the harvest method, measures to avoid excessive erosion, timeframe of operations, and other information required by forest practice rules (FPR) adopted by the Board of Forestry and Fire Protection (Board).
- Provides, in regulations of the Board, for Sustained Yield Plans (SYP). A SYP that is prepared and approved is effective for a period of no more than 10 years. An SYP may be renewed for a subsequent 10 year period following agency review and a public hearing.
- Requires industrial timber land owners with holdings larger than 50,000 acres are to demonstrate “maximum sustained production” through a large-scale management plan. Two primary options are available: SYPs and a less comprehensive plan called an “Option A.” (See comments.)
- Requires SYPs to include a current inventory of timber resources by stand type and class along with projections of growth and harvest levels, over a 100-year planning horizon. This data is considered proprietary and is thus not allowed public review without the consent of the landowner. However, CAL FIRE may field-check these inventories and evaluate the growth and yield models that are proposed.
- SYPs also contain a long-term assessment of impacts of timber operations on fish and wildlife, as well as in inventory of all watercourses, roads, and potentially unstable and erosive soils. The SYP must also address mitigation strategies for any of the above adverse impacts.
- Establishes the Timber Regulation and Forest Restoration Fund (TRFRF) [AB 1492 (Committee on Budget) Chapter 289, Statutes of 2012] which receives funding from an authorized 1% assessment on lumber and engineered wood products sold at the retail level. Specifies that TRFRF shall be used with first priority to support the activities and costs of CAL FIRE, the Department of Conservation (DOC), the Department of Fish and Wildlife (DFW), the State Water Resources Control Board (SWRCB), and regional water quality control boards (RWQCB) associated with the review of projects or permits necessary to conduct timber operations.
- Prohibits fees from being charged by CAL FIRE, DOC, DFW, SWRCB, and RWQCB for review of a project, inspection and oversight of projects and permits necessary to conduct timber operations.
PROPOSED LAW
Extends the effective date of a sustained yield plan (SYP) from no more than 10 years to no more than 20 years.
ARGUMENTS IN SUPPORT
According to the author, SYPs are one of the mechanisms that timberland owners can use to meet the requirement for maintaining maximum sustained production which ensures that any timber harvesting continues to be sustainable. SYPs must include projections of timber growth and harvesting over a 100-year or longer planning horizon, assessment of watershed and wildlife resources, and constraints of other resource values on timber production. Issues and mitigation measures that are adequately covered in an approved SYP may be addressed in individual timber harvesting plans by referencing the SYP. Following approval, an SYP is in force for a period of 10 years.
The author adds that in lieu of obtaining an SYP, a maximum sustained production plan may be achieved in an alternative fashion, but it does not have some of the same benefits of a long-term planning document. Since the work up-front to obtain the approval of an SYP is so significant, it should be valid for a longer period of time to encourage the use of such documents because they provide stability and certainty for state agencies, the public, and the landowner.
ARGUMENTS IN OPPOSITION: None Received.
COMMENTS
As noted in the existing law provisions, an SYP is an optional document for the landowner and is meant to supplement the THP process by providing a means for addressing long-term issues of sustained timber production, and cumulative effects analysis. The SYP is not meant to replace a THP, but to the extent the SYP addresses issues required in the THP it may be relied on for determining whether the THP is complete. A THP has an effective date between 5 and 7 years. An SYP can be effective for 10 years. However, an SYP may be renewed for another 10 years following an agency and public review and the approval of the Director of CAL FIRE. According to CAL FIRE, there are three SYPs being used currently for timber harvesting operations: Red River, Shasta Forest and Collins Pine. All three have been renewed. The SYP sets a higher standard, but also lasts longer, which simplifies the development of future THPs for a landowner.
Both SYPs and Option A plans require THPs in order to proceed with harvest, but either plan may be used as a basis for a THP. As explained earlier, a SYP has more environmental information in it than does an “Option A.” For example, SYPs contain watershed and fish and wildlife impacts. As a consequence, SYPs provide a broader base from which future THPs may tier. Option A does not require that type of information. Option A plans are used more frequently by large landowners than SYPs.
SUPPORT
Associated California Loggers
California Farm Bureau Federation
California Forestry Association
Pacific Gas and Electric Company
Personal Insurance Federation of California
Collin Pine Company
Rural County Representatives of California
W.M. Beaty and Associates
OPPOSITION
None Received
-- END --
Date of Hearing: May 15, 2019
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 1160
Author:(Dahle) – As Amended Ver:April 11, 2019
Policy Committee: | Natural Resources | Vote: | 10 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill extends the effective date of a sustained yield plan (SYP) from no more than 10 years to no more than 20 years.
FISCAL EFFECT:
The Board of Forestry and Fire Protection may have minor costs if regulations need to be amended or adopted.
COMMENTS:
The Forest Practices Act requires Timber Harvest Plans (THPs), which are complex discretionary permits that act as Environmental Impact Reports under the California Environmental Quality Act. AB 1492 (Committee on Budget), Chapter 289, Statutes of 2012, extended the life of THPs from three years to five years with an option for a two-year extension. AB 1492 also shifted state fees for a THP to an assessment on all lumber products to fund agency review. However, a THP can still cost landowners tens of thousands of dollars to prepare. In 2017, 1.58 billion board feet were harvested in California with an estimated value of approximately $307 million.
The SYP is an optional document for the landowner and is meant to supplement the THP process by providing a means for addressing long-term issues of sustained timber production and cumulative effects analysis. The SYP is not meant to replace a THP, but to the extent the SYP addresses issues required in the THP, it may be relied on for determining whether the THP is complete. A THP has an effective date between 5 and 7 years. An SYP can be effective for 10 years. However, an SYP may be renewed for another 10 years following an agency and public review and approval by the Director of CalFire. According to CalFire, there are three SYPs currently used for timber harvesting operations: Red River, Shasta Forest and Collins Pine. All three have been renewed. The SYP sets a higher standard, but also lasts longer, which simplifies the development of future THPs for a landowner.
This bill extends the effective date of an SYP by 10 years.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 22, 2019
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
ABPCA Bill Id:AB 1160 (
Author:Dahle) – As Amended Ver:April 11, 2019
SUBJECT: Forestry: timber operations: sustained yield plans
SUMMARY: Extends the effective date of a sustained yield plan (SYP) from no more than 10 years to no more than 20 years.
EXISTING LAW, pursuant to the Z’Berg-Nejedly Forest Practice Act (FPA):
- Declares that it is the policy of California to encourage prudent and responsible forest resource management calculated to serve the public’s need for timber and other forest products, while giving consideration to the public’s need for watershed protection, fisheries, and wildlife, sequestration of carbon dioxide, and recreational opportunities alike in this and future generations.
- Prohibits timber operations unless a Timber Harvest Plan (THP) has been prepared by a registered professional forester (RPF) and approved by the Department of Forestry and Fire Protection (CAL FIRE).
- Considers a THP the functional equivalent of an environmental impact report (EIR) under the California Environmental Quality Act (CEQA).
- Requires a THP to contain a description of the location of the planned harvest, the harvest method, measures to avoid excessive erosion, timeframe of operations, and other information required by forest practice rules (FPR) adopted by the Board of Forestry and Fire Protection (Board).
- Requires the Board to adopt district FPRs to ensure the continuous growing and harvesting of commercial forest tree species and to protect the soil, air, fish, wildfire, and water resources.
- Requires a SYP that is prepared and approved pursuant to district FPRs be effective for a period of no more than 10 years.
- Exempts various tree removal activities from THPs, including Christmas tree farms; rights-of-way for utility lines; conversions of less than three acres; fire prevention; defensible space; and dead, dying, and diseased trees. Requires ministerial permits for certain exemptions, called a notice of exemption, and subjects projects to inspection by CAL FIRE.
- Establishes the Timber Regulation and Forest Restoration Fund (TRFRF) [AB 1492 (Committee on Budget) Chapter 289, Statutes of 2012] which receives funding from an authorized 1% assessment on lumber and engineered wood products sold at the retail level. Specifies that TRFRF shall be used with first priority to support the activities and costs of CAL FIRE, the Department of Conservation (DOC), the Department of Fish and Wildlife (DFW), the State Water Resources Control Board (SWRCB), and regional water quality control boards (RWQCB) associated with the review of projects or permits necessary to conduct timber operations.
- Prohibits fees from being charged by CAL FIRE, DOC, DFW, SWRCB, and RWQCB for review of a project, inspection and oversight of projects and permits necessary to conduct timber operations.
FISCAL EFFECT: Unknown
COMMENTS:
- Author’s statement:
AB 1160 would extend the life of the SYP. SYPs are one of the mechanisms that timberland owners can use to meet the State's requirement for maintaining maximum sustained production which ensures that any timber harvesting continues to be sustainable. SYPs must include projections of timber growth and harvesting over a 100-year or longer planning horizon, assessment of watershed and wildlife resources, and constraints of other resource values on timber production. Issues and mitigation measures that are adequately covered in an approved SYP may be addressed in individual timber harvesting plans by referencing the SYP. Following approval, an SYP is in force for a period of 10 years.
In lieu of obtaining an SYP, a maximum sustained production plan may be achieved in an alternative fashion, but it does not have some of the same benefits of a long-term planning document. Since the work up-front to obtain the approval of an SYP is so significant, it should be valid for a longer period of time to encourage the use of such documents because they provide stability and certainty for state agencies, the public, and the landowner.
- Background. California has regulated forest practices on private lands since at least 1945. The Legislature assessed the effectiveness of forest practices and concluded that the industry could not be relied on to ensure proper water quality, forest health, and adequate timber supply. In 1957, the state Senate Interim Committee on Soil and Beach Erosion found that timber harvesting and logging road construction contributed to stream erosion and resultant impacts to fish populations. In 1962, the Assembly Interim Committee on Natural Resources, Planning, and Public Works concluded that timber regulations were inadequately enforced, leading to deleterious effects on water quality, fishing, and recreation. In 1967, after three years of study, the Assembly Subcommittee on Forest Practices and Watershed Management recommended that the basic state policy governing forest practices should be broadened and strengthened. These collective findings, coupled with a 1971 report that identified logging as a primary factor in an 80% decline of salmon and steelhead populations, motivated the Legislature to pass the FPA in 1973. The FPA requires THPs, which are complex discretionary permits that act as an EIR under CEQA.
In 2002, the Senate Office of Research found that timber harvesting in California was failing to adequately protect water quality and endangered species. Concerns were being raised that the Board’s rules were not protective of watersheds and were contributing to the decline of species such as salmon. SB 810 (Burton), Chapter 900, Statutes of 2003, prohibits a THP from being approved if the appropriate RWQCB finds that the proposed timber operations will result in a discharge into a watercourse that has been classified as impaired due to sediment, which causes or contributes to a violation of the regional water quality control plan.
AB 1492 (Committee on Budget), Chapter 289, Statutes of 2012, extended the life of THPs from three years to five years with an option for a two-year extension. AB 1492 also shifted state fees for a THP to an assessment on all lumber products to fund agency review. However, a THP can still cost landowners tens of thousands of dollars to prepare. In 2017 1.58 billion board feet were harvested in California with an estimated value of approximately $307 million.
- SYP. The SYP is an optional document for the landowner and is meant to supplement the THP process by providing a means for addressing long-term issues of sustained timber production, and cumulative effects analysis. The SYP is not meant to replace a THP, but to the extent the SYP addresses issues required in the THP it may be relied on for determining whether the THP is complete. A THP has an effective date between 5 and 7 years. An SYP can be effective for 10 years. However, an SYP may be renewed for another 10 years following an agency and public review and the approval of the Director of CAL FIRE. According to CAL FIRE, there are three SYPs being used currently for timber harvesting operations: Red River, Shasta Forest and Collins Pine. All three have been renewed. The SYP sets a higher standard, but also lasts longer, which simplifies the development of future THPs for a landowner.
REGISTERED SUPPORT / OPPOSITION:
Support
California Forestry Association
Pacific Gas and Electric Company
Personal Insurance Federation of California
Opposition
Center for Biological Diversity
Sierra Club California
Analysis Prepared by: Michael Jarred / NAT. RES. /
Bill Author
Bill Co-Author(s):