AB 1515: Planning and zoning: community plans: review under the California Environmental Quality Act.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2019-09-06
The Planning and Zoning Law requires each county and city to adopt a comprehensive, long-term general plan for its physical development and the development of any land outside its boundaries that, in the planning agencys judgment, bears relation to its planning, as provided. After the legislative body has adopted a general plan, that law also authorizes, or if so directed by the legislative body, requires, the planning agency to prepare specific plans for the systematic implementation of the general plan for all or part of the area covered by the general plan, as provided.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA limits the review of a project under its provisions if the parcel is zoned or designated in a community plan to accommodate a particular density of development, an environmental impact report was certified for that zoning or planning action, and the project is consistent with the zoning or community plan, as specified. CEQA requires a court, if it finds that any determination, finding, or decision of a public agency has been made without compliance with CEQA, to enter an order that includes one or more specified mandates, including a mandate to void the determination, finding, or decision of the public agency.
This bill, notwithstanding the above-described requirement for a court to enter an order under CEQA, would prohibit a court in an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of the local agency, including a charter city, in adopting an update to a community plan on the grounds of noncompliance with CEQA from, on the basis of that noncompliance, invalidating, reviewing, voiding, or setting aside the approval of a development project that meets certain requirements. The bill would define various terms for these purposes. The bill would specify that these provisions do not affect or alter the obligation for the approval of a development project that is consistent with an approved community plan update to comply with CEQA or, except as expressly provided, preclude or limit an action to attack, review, set aside, void, or annul the approval of a development project that is consistent with an approved community plan pursuant to specified law. The bill would repeal these provisions as of January 1, 2025, but would provide that the repeal of these provisions does not affect any right or immunity granted by the bill to a development project that meets specified requirements before that date.
The bill would include findings that changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all cities, including charter cities.
The Legislature finds and declares the following:
(a)The California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) requires that the environmental impacts, if any, of updated community plans be identified and mitigated. The act also guarantees the public an opportunity to review and comment on the environmental impacts of a project and to participate meaningfully in the development of mitigation measures for potentially significant environmental impacts.
(b)In many parts of the state, the city or county general plans cover so much geographic territory that local jurisdictions also adopt community plans that cover parts of that geographic territory. These community plans allow for tailored and responsive land use planning at the neighborhood level.
(c)While most jurisdictions update the land use element of their general plan as part of their general plan update, those with multiple community plan areas update these documents individually, requiring community plans to be reviewed through separate reviews pursuant to the act. In some jurisdictions with multiple community plans, these plans have not been updated in recent years to reflect changing local priorities as well as efforts to improve air quality, reduce climate pollution, increase transit ridership, reduce vehicle miles traveled, and provide more affordable housing.
(d)One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update.
SEC. 2.Article 8.2 (commencing with Section 65458) is added to Chapter 3 of Division 1 of Title 7 of the Government Code, to read:8.2.Community Plans65458.For purposes of this article:
(a)Community plan means a plan that meets all of the following requirements:
(1)The plan was adopted by a city, including a charter city, or county for a defined geographic area within its jurisdictional boundaries.
(2)The plan serves as the land use element, pursuant to subdivision (a) of Section 65302, for the area covered by the plan.
(3)The plan has not been updated for more than 10 years before the operative date of this article.
(4)The plan includes two or more transit priority areas, as defined in Section 21099 of the Public Resources Code.
(5)The city or county that adopts the plan has adopted, on or after January 1, 2015, a circulation or mobility element as a part of the general plan.
(6)The city or county that adopts the plan has a housing element that includes housing capacity to sufficiently accommodate regional housing needs projects as set forth in Section 65584.01.
(7)The city or county that adopts the plan has adopted a vehicle miles traveled threshold of significance for the area covered by the plan in compliance with Section 15064.3 of Title 14 of the California Code of Regulations.
(8)The area covered by the plan update is located within an urbanized area, as defined by Section 21071 of the Public Resources Code.
(9)The city or county that adopts the plan has also adopted any required ordinances or regulations related to either of the following:
(A)The designation of very high fire hazard severity zones pursuant to Section 51179.
(B)Flood plain management in accordance with the National Flood Insurance Program, pursuant to Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(b)Development project has the same meaning as defined in Section 65928.
(c)Update means a comprehensive amendment to a community plan that is intended to bring the community plan up to date with the most current land use policies and that includes amendments to both the plain text and plan land use map, as well as the adoption or amendment of any zoning ordinances necessary to bring zoning into consistency with the community plan.
65458.1.Notwithstanding Section 21168.9 of the Public Resources Code, in any order that results from an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of the local agency, including a charter city, in adopting an update to a community plan on the grounds of noncompliance with Division 13 (commencing with Section 21000) of the Public Resources Code, the court shall not, on the basis of that noncompliance, invalidate, review, void, or set aside the approval of any development project for which either of the following applies:
(a)The development project is approved before the court issues a stay in connection with the action or proceeding or an order or writ requiring the challenged environmental impact report or community plan update to be rescinded or set aside.
(b)The application for the development project is deemed complete, pursuant to Section 65943, before the court issues a stay, order, or writ described in subdivision (a).
65458.2.This article does not do either of the following:
(a)Affect or alter the obligation for the approval of a development project that is consistent with an approved community plan to comply with Division 13 (commencing with Section 21000) of the Public Resources Code.
(b)Except as expressly provided in Section 65458.1, preclude or limit an action to attack, review, set aside, void, or annul the approval of a development project that is consistent with an approved community plan pursuant to Section 21167 of the Public Resources Code.
65458.3.(a)This article shall remain in effect only until January 1, 2025, and as of that date is repealed.
(b)Notwithstanding subdivision (a), the repeal of this article pursuant to this section shall not affect any right or immunity granted pursuant to this article to a development project that meets the requirements specified in Section 65458.1 before January 1, 2025.
SEC. 3.The Legislature finds and declares that the timely approval of development projects is a matter of statewide concern and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 2 of this act adding Article 8.2 (commencing with Section 65458) to Chapter 3 of Division 1 of Title 7 of the Government Code applies to all cities, including charter cities.
|
Date
|
Status
|
|---|---|
| Sep 6, 2019 | Chaptered by Secretary of State - Chapter 269, Statutes of 2019. |
| Sep 6, 2019 | Approved by the Governor. |
| Sep 3, 2019 | Enrolled and presented to the Governor at 3:30 p.m. |
| Aug 26, 2019 | Senate amendments concurred in. To Engrossing and Enrolling. |
| Aug 22, 2019 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 24 pursuant to Assembly Rule 77. |
| Aug 22, 2019 | Read third time. Passed. Ordered to the Assembly. |
| Jun 27, 2019 | Read second time. Ordered to third reading. |
| Jun 26, 2019 | From committee: Do pass. (Ayes 9. Noes 0.) (June 25). |
| Jun 17, 2019 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on JUD. |
| Jun 11, 2019 | Read second time and amended. Re-referred to Com. on JUD. |
| Jun 10, 2019 | From committee: Amend, and do pass as amended and re-refer to Com. on JUD. (Ayes 7. Noes 0.) (June 5). |
| May 16, 2019 | Referred to Coms. on GOV. & F. and JUD. |
| May 6, 2019 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 6, 2019 | Read third time. Passed. Ordered to the Senate. |
| May 2, 2019 | Read second time. Ordered to third reading. |
| May 1, 2019 | Read second time and amended. Ordered returned to second reading. |
| Apr 30, 2019 | From committee: Amend, and do pass as amended. (Ayes 9. Noes 1.) (April 29). |
| Apr 25, 2019 | From committee: Do pass and re-refer to Com. on NAT. RES. (Ayes 8. Noes 0.) (April 24). Re-referred to Com. on NAT. RES. |
| Apr 1, 2019 | Re-referred to Com. on L. GOV. |
| Mar 28, 2019 | Referred to Coms. on L. GOV. and NAT. RES. |
| Feb 25, 2019 | Read first time. |
| Feb 23, 2019 | From printer. May be heard in committee March 25. |
| Feb 22, 2019 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 26, 2019 | AB 1515 Friedman Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 22, 2019 | Assembly 3rd Reading AB1515 Friedman By Allen | Senate Floor |
Passed |
|
| Jun 25, 2019 | Do pass | Senate Standing Committee on Judiciary |
Passed |
|
| Jun 5, 2019 | Do pass as amended, but first amend, and re-refer to the Committee on [Judiciary] | Senate Standing Committee on Governance and Finance |
Passed |
|
| May 6, 2019 | AB 1515 Friedman Assembly Third Reading | Assembly Floor |
Passed |
|
| Apr 29, 2019 | Do pass as amended. | Assembly Standing Committee on Natural Resources |
Passed |
|
| Apr 24, 2019 | Do pass and be re-referred to the Committee on [Natural Resources] | Assembly Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 1515
Author:(Friedman)
As Amended Ver:June 17, 2019
Majority vote
SUMMARY:
Prohibits a court from invalidating the approval of specified development projects in an order issued to remedy an updated community plan's noncompliance with the California Environmental Quality Act (CEQA).
The Senate Amendments:
Add findings and declarations justifying the bill's application to charter cities.
Clarify that the bill does not preclude or limit an action to attack, review, set aside, void, or annul the approval of a development project that is consistent with an approved community plan, as specified.
Require the area covered by a community plan update to be located in an urbanized area.
Require a city or county that adopts a community plan to also adopt required ordinances or regulations related to the designation of very high fire hazard severity zones and flood plain management in accordance with the National Flood Insurance Program.
Clarify that a community plan update must be a comprehensive, rather than a substantial, amendment to a community plan.
Make additional technical and clarifying changes.
COMMENTS:
This bill prohibits a court from invalidating, reviewing, voiding, or setting aside the approval of a development project in any order that results from an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a local agency in adopting an update to a community plan on the grounds of noncompliance with CEQA. A development project would have to meet one of the following requirements in order to enjoy the protections of this bill: the project would have to be approved before the court issues a stay in connection with the action or proceeding or an order or writ requiring the challenged Environmental Impact Report or community plan update to be rescinded or set aside; or, the application for the development project must be deemed complete before the court issues the stay, order, or writ.
The provisions of this bill are limited to a community plan that must meet a number of requirements, as specified. The bill further defines its parameters to specify that a community plan update must be a comprehensive amendment to a community plan that is intended to bring the community plan up to date with the most current land use policies. The update must also include amendments to both the plain text and plan land use map, as well as the adoption or amendment or any zoning ordinances necessary to bring zoning into consistency with the community plan. This bill also clarifies that it does not affect or alter the obligation for the approval of a development project that is consistent with an approved community plan to comply with CEQA, nor does it preclude or limit an action to attack, review, set aside, void, or annul the approval of a development project that is consistent with an approved community plan.
According to the Author:
"In 2017, the Los Angeles Department of City Planning, in collaboration with all city agencies, was directed to update Los Angeles' Land Use Element by 2024. Los Angeles' Land Use Element is comprised of 35 Community Plans that contain the guiding goals and principles for how each plan area should grow. Some of these plans are over 20 years (old) and cannot adequately address state and local priorities around housing, job creation, climate change, and transportation. To date, six Community Plans have been recently updated, 16 updates are currently underway, and 13 more updates will be launched by 2020.
"One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update."
Arguments in Support:
Mayor Eric Garcetti, City of Los Angeles, sponsor of this measure, writes, "AB 1515 is critical for cities like Los Angeles that are seeking to update their community plans to meet statewide housing production and environmental goals…AB 1515 will help to advance our Community Plan updates and provide clarity to the city, residents, and developers on how to implement an updated Community Plan in the event that its environmental documents are challenged in court. Providing certainty to development projects during the period of an environmental challenge is critical to meeting the goals of the updated plan."
Arguments in Opposition:
None on file.
FISCAL COMMENTS:
None
VOTES:
ASM LOCAL GOVERNMENT: 8-0-0
YES: Aguiar-Curry, Lackey, Bloom, Boerner Horvath, Ramos, Luz Rivas, Robert Rivas, Voepel
ASM NATURAL RESOURCES: 9-1-1
YES: Friedman, Flora, Chau, Eggman, Limón, Mathis, McCarty, Melendez, Muratsuchi
NO: Mark Stone
ABS, ABST OR NV: Cristina Garcia
ASSEMBLY FLOOR: 73-1-6
YES: Aguiar-Curry, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Eduardo Garcia, Gipson, Gloria, Gonzalez, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, O'Donnell, Obernolte, Patterson, Petrie-Norris, Quirk, Quirk- Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Santiago, Smith, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO: Mark Stone
ABS, ABST OR NV: Arambula, Chen, Cristina Garcia, Gray, Salas, Ting
SENATE FLOOR: 39-0-1
YES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dahle, Dodd, Durazo, Galgiani, Glazer, Lena Gonzalez, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
ABS, ABST OR NV: Jones
UPDATED:
VERSION: June 17, 2019
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0001479
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1515 |
THIRD READING
Bill No: AB 1515
Amended: 6/17/19 in Senate
SENATE GOVERNANCE & FIN. COMMITTEE: 7-0, 6/5/19
AYES: McGuire, Moorlach, Beall, Hertzberg, Hurtado, Nielsen, Wiener
SENATE JUDICIARY COMMITTEE: 9-0, 6/25/19
AYES: Jackson, Borgeas, Durazo, Lena Gonzalez, Jones, Monning, Stern, Umberg, Wieckowski
ASSEMBLY FLOOR: 73-1, 5/6/19 - See last page for vote
SUBJECT: Planning and zoning: community plans: review under the California Environmental Quality Act
SOURCE: Los Angeles Mayor Eric Garcetti
DIGEST:
This bill prohibits a court from invalidating a development approval that was granted based on a community plan that meets specified criteria, if the development was approved or had a complete application prior to the community plan being invalidated.
Existing law:
- Requires every county and city to adopt a general plan that sets out planned uses for all of the area covered by the plan. A general plan must include certain mandatory elements, such as a land use element that designates the proposed general distribution, general location, and extent of the uses of land; a housing element that establishes the locations and densities of housing for very low, low, moderate, and above moderate income households; and a circulation element that describes the general location of public infrastructure and facilities for the movement of goods and people.
- Allows cities and counties to adopt specific plans—also known as community plans—that provide for the systematic implementation of a general plan in a particular area.
- Requires, under the California Environmental Quality Act (CEQA), the state and local governments to study and mitigate, to the extent feasible, the environmental impacts of proposed projects. An agency that proposes to undertake a project that may have a significant impact on the environment must prepare an Environmental Impact Report (EIR) to study the impacts and identify measures to mitigate those impacts. An EIR may be required at many levels of planning, including the adoption of a general plan, a specific plan, or zoning ordinance, or for an individual development project.
- Provides for judicial review of CEQA actions taken by public agencies, following the agency's decision to carry out or approve the project. If a court finds that a project didn’t comply with CEQA, it must order the approving agency to do one of the following:
- Void the CEQA decision, determination, or finding;
- Suspend any or all specific project activities that could result in an adverse environmental change, until the public agency has taken any actions needed to bring the determination, finding, or decision into compliance with CEQA; or
- Take specific action to bring the determination, finding, or decision into compliance with CEQA.
This bill:
- Prohibits a court from invalidating, reviewing, voiding, or setting aside a development approval that was granted based on a community plan that is invalidated by a court for noncompliance with CEQA on the basis of that noncompliance, if either of the following occurs:
- The development is approved before the court issues a stay, order, or writ that requires the challenged EIR or community plan update to be rescinded or set aside; or
- The application for the development project is deemed complete under the Permit Streamlining Act before the court issues a stay, order, or writ that requires the challenged EIR or community plan update to be rescinded or set aside.
- Applies notwithstanding the duties CEQA imposes on a court to issue a stay, order, or writ if a project does not comply with CEQA.
- Requires, for a development to qualify for the bill’s prohibition, the community plan underlying the development approval to meet all of the following conditions:
- The plan was adopted by a city, including a charter city, or county for a defined geographic area within its jurisdictional boundaries;
- The plan serves as the land use element for the area covered by the plan;
- The plan has not been updated for more than 10 years before the operative date of the bill;
- The plan includes two or more transit priority areas;
- The city or county that adopts the plan has adopted, on or after January 1, 2015, a circulation or mobility element as a part of the general plan;
- The city or county that adopts the plan has a housing element that includes housing capacity to sufficiently accommodate its regional housing needs allocation; and
- The city or county that adopts the plan has adopted a vehicle miles traveled threshold of significance for the area that presumes that projects in the area have a less than significant transportation impact, consistent with state regulations.
- The area covered by the plan update is located within an urbanized area.
- The city or county that adopts the plan has also adopted any required ordinances or regulations related to either of the following:
- The designation of very high fire hazard severity zones pursuant to Section 51179.
- Flood plain management in accordance with the National Flood Insurance Program, pursuant to Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
- Defines a community plan update to include both the community plan itself and any zoning ordinances necessary to bring the zoning into consistency with the community plan.
- Provides that it does not:
- Affect or alter the obligation for the approval of a project that is consistent with an approved community plan update to comply with CEQA.
- Preclude or limit an action to attack, review, set aside, void, or annul the approval of a development project that is consistent with an approved community plan, except as otherwise provided in the bill.
- Sunsets the bill’s provisions on January 1, 2025, but provides that the sunset does not affect any right or immunity that the bill granted before January 1, 2025.
Background
Major land use changes can be controversial and are often litigated under CEQA. Mayor Eric Garcetti wants the Legislature to grant some protection to developments that are already approved or are nearly so if a community plan is voided on CEQA grounds.
Comments
- Purpose of the bill. According to the author, “While most jurisdictions update the land use element of their general plan as part of their general plan update, those with multiple community plan areas update these documents individually, requiring community plans to be reviewed through separate reviews pursuant to the act. In some jurisdictions with multiple community plans, these plans have not been updated in recent years to reflect changing local priorities as well as efforts to improve air quality, reduce climate pollution, increase transit ridership, reduce vehicle miles traveled, and provide more affordable housing.
“In 2017, the Los Angeles Department of City Planning, in collaboration with all city agencies, was directed to update Los Angeles’ Land Use Element by 2024. Los Angeles’s Land Use Element is comprised of 35 Community Plans that contain the guiding goals and principles for how each plan area should grow. Some of these plans are over 20 years and cannot adequately address state and local priorities around housing, job creation, climate change, and transportation. To date, six Community Plans have been recently updated, 16 updates are currently underway, and 13 more updates will be launched by 2020.
“One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update.
“AB 1515 assists the Community Plan update process and provides clarity to the local governments, residents, and developers on how to implement an updated Community Plan should its environmental document be challenged in court. By removing uncertainty during this period, development projects approved and deemed complete under an updated Community Plan would have confidence in moving forward, bringing the city closer to meeting the goals in the updated plan.”
- Wait a minute… CEQA can be a double-edged sword: it provides opportunities for both legitimate challenges to developments that will harm the environment and for less scrupulous actors to delay projects they don’t like for completely unrelated reasons. AB 1515 provides protection for some development approvals from being invalidated. By doing so, the bill poses a risk that some of these approvals will be issued without undergoing proper CEQA review. Specifically, if the project was approved ministerially, or qualified for a statutory exemption under CEQA, no project-level CEQA analysis would have been required, and the development would be approved without ever going through proper CEQA review. On the other hand, any other project approvals that require discretionary review—which applies to most projects—would still have to go through a separate project-level CEQA analysis. Furthermore, AB 1515 does not prevent a court from issuing an injunction that prevents the community plan from being used if the court thinks there is a real risk that the plan will result in environmental harm. On balance, the cost of delaying development may outweigh the relatively small potential unmitigated environmental impacts.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
Los Angeles Mayor Eric Garcetti (source)
California Apartment Association
California Association of Counties
California Association of Realtors
California Professional Association of Specialty Contractors
City of Glendale
City of San Diego
OPPOSITION: (Verified 6/28/19)
None received
ASSEMBLY FLOOR: 73-1, 5/6/19
AYES: Aguiar-Curry, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Eduardo Garcia, Gipson, Gloria, Gonzalez, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Santiago, Smith, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NOES: Mark Stone
NO VOTE RECORDED: Arambula, Chen, Cristina Garcia, Gray, Salas, Ting
Prepared by: Anton Favorini-Csorba / GOV. & F. / (916) 651-4119
6/28/19 12:04:43
**** END ****
Senator Hannah-Beth Jackson, Chair
2019-2020 Regular Session
Bill No: AB 1515 (Author:Friedman)
Version: June 17, 2019
Hearing Date: June 25, 2019
Fiscal: No
Urgency: No
Consultant: JT
SUBJECT
Planning and zoning: community plans: review under the California Environmental Quality Act
DIGEST
This bill prohibits a court that issues an order to remedy an updated community plan’s noncompliance with the California Environmental Quality Act (CEQA) from including in that order a remedy, based on that noncompliance, against certain development project approvals or applications that were completed before the issuance of the order.
EXECUTIVE SUMMARY
Existing law requires cities and counties to adopt comprehensive land-use plans known as general plans. To comply with this requirement, some jurisdictions have adopted community plans that collectively comprise the general plan. These plans establish the basic requirements and conditions under which specific projects may be approved. In some jurisdictions, community plans have not been updated for decades and are no longer suitable to current priorities. However, as a change to a master land-use planning document may have a significant effect on the environment, an updated community plan is subject to CEQA and thus may be challenged in court, creating uncertainty and delay for developers who have yet to acquire a vested right to build.
This bill, which is sponsored by Los Angeles Mayor Eric Garcetti, seeks to provide certainty to developers in jurisdictions that are in the process of modernizing their community plans. Specifically, the bill would, until 2025, provide that in any judicial order that results from a challenge to an updated community plan on the grounds of noncompliance with CEQA, the court in that same order may not, on the basis of that noncompliance, invalidate, review, void, or set aside the approval of any development project that, before the issuance of the order, was either approved or had its application deemed complete. The bill passed the Senate Governance and Finance Committee by a vote of 7-0. The bill has no known opposition.
PROPOSED CHANGES TO THE LAW
Existing law:
- Establishes CEQA, which requires a public agency to prepare, or cause to be prepared, and to certify the completion of, an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment, or to adopt a negative declaration if it finds that the project will not have that effect. (Pub. Res. Code § 21100 et seq.)
- Provides for enforcement of CEQA through judicial review of CEQA actions taken by public agencies, following an agency’s decision to approve or carry out a project. Requires that challenges alleging that a determination that a project will not have a significant effect on the environment was improper, or alleging that an EIR does not comply with CEQA, be filed in the Superior Court within 30 days of filing of the notice of approval. (Pub. Res. Code § 21167.) Requires courts to give CEQA actions “preference over all other civil actions.” (Pub. Res. Code § 21167.1(a).)
- Provides that during a challenge to an EIR or a negative declaration for noncompliance with CEQA, responsible agencies are required to act as though the EIR or negative declaration complies with CEQA and continue to process the application for the project under applicable timeframes. (14 Cal. Code Regs. § 15233; see also Pub. Res. Code § 21167.3.)
- Provides that a court may require the agency to set aside its CEQA determinations, findings, or decisions; to set aside its determination to approve the project; to suspend specific project activities; to order specific actions needed to comply with CEQA; or to combine these remedies as appropriate. (Pub. Res. Code § 21168.9(a).) Provides that the court’s order must be limited to mandates necessary to achieve compliance with CEQA and may include only those specified project activities in noncompliance with CEQA. (Id. at (b).) States that these provisions do not require the court to exercise its discretion in any particular manner and do not limit the court’s equitable powers. (Id. at (c).)
- Establishes the Planning and Zoning Law (Gov. Code § 65000 et seq.), which requires cities and counties to prepare, adopt, and amend general plans and elements—including the land use element—of those general plans in accordance with specified requirements. (Gov. Code § 65350.) Additionally requires that a general plan consist of a statement of development policies and include a diagram or diagrams and text setting forth objectives, principles, standards, and plan proposals. (Gov. Code § 65302.) Recognizes community plans as valid master land-use planning documents, but does not specifically set forth requirements governing the content and formation of these documents.
This bill:
- Finds and declares the following:
- CEQA requires environmental impacts of updated community plans to be identified and mitigated;
- some localities with expansive jurisdictions opt to use community plans as a means of implementing their general plans, allowing for tailored and responsible land use planning at the neighborhood level;
- such communities update their general plan by updating their community plans, which have not been updated in recent years to reflect changing local priorities and environmental values; and
- CEQA is a significant obstacle to this process because if there is a CEQA challenge against the community plan update, it is not clear if the update or the former community plan remains in effect during the pendency of the challenge, causing uncertainty and delay.
- Includes the following definitions:
- “Community plan” means a plan that was adopted for a defined geographic area in a city, including a charter city, or county; serves as the land use element of the plan; has not been updated for more than 10 years; includes two or more transit priority areas; the city or county has adopted plan updates regarding circulation or mobility, housing needs, and vehicle miles traveled; and the city or county has adopted any required ordinances or regulations related to very high fire hazard severity zones or flood plain management, as specified.
- “Development project” has the same meaning as in Government Code section 65928, which defines that term as any project undertaken for the purpose of development, including a project involving the issuance of a permit for construction or reconstruction but not a permit to operate. “Development project” does not include any ministerial projects proposed to be carried out or approved by public agencies.
- “Update” means a comprehensive amendment to a community plan that is intended to bring the community plan up to date with the most current land use policies and that includes amendments to both the plain text and plan land use map, as well as the adoption or amendment or of any zoning ordinances necessary to bring zoning into consistency with the community plan.
- Prohibits a court that issues an order to remedy an updated community plan’s noncompliance with the CEQA from including in that order a remedy, based on that noncompliance, against the approval of any development project that, before the issuance of the order, was either approved or had its application deemed complete pursuant to existing procedures.
- Specifies that its provisions do not do either of the following:
- affect or alter the obligation for the approval of a development project that is consistent with an approved community plan to comply with CEQA; and
- preclude or limit separate CEQA litigation against the approval of a development project that is consistent with an approved community plan.
- Sunsets January 1, 2025. Provides that the repeal of its provisions does not affect any right or immunity granted to a project pursuant to 3), above.
COMMENTS
- Author’s statement
The author writes:
While most jurisdictions update the land use element of their general plan as part of their general plan update, those with multiple community plan areas update these documents individually, requiring community plans to be reviewed through separate reviews pursuant to the act. In some jurisdictions with multiple community plans, these plans have not been updated in recent years to reflect changing local priorities as well as efforts to improve air quality, reduce climate pollution, increase transit ridership, reduce vehicle miles traveled, and provide more affordable housing.
In 2017, the Los Angeles Department of City Planning, in collaboration with all city agencies, was directed to update Los Angeles’ Land Use Element by 2024. Los Angeles’s Land Use Element is comprised of 35 Community Plans that contain the guiding goals and principles for how each plan area should grow. Some of these plans are over 20 years [old] and cannot adequately address state and local priorities around housing, job creation, climate change, and transportation. To date, six Community Plans have been recently updated, 16 updates are currently underway, and 13 more updates will be launched by 2020.
One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update.
AB 1515 assists the Community Plan update process and provides clarity to the local governments, residents, and developers on how to implement an updated Community Plan should its environmental document be challenged in court. By removing uncertainty during this period, development projects approved and deemed complete under an updated Community Plan would have confidence in moving forward, bringing the city closer to meeting the goals in the updated plan.
2. CEQA challenges to community plans
- CEQA generally
Enacted in 1970, CEQA requires state and local agencies to follow a set protocol to disclose and evaluate the significant environmental impacts of proposed projects and to adopt feasible measures to mitigate those impacts. CEQA itself applies to projects undertaken or requiring approval by public agencies, and, if more than one agency is involved, CEQA requires one of the agencies to be designated as the “lead agency.” The environmental review process required by CEQA consists of: (1) determining if the activity is a project; (2) determining if the project is exempt from CEQA; and (3) performing an initial study to identify the environmental impacts and, depending on the findings, preparing either a Negative Declaration (for projects with no significant impacts), a Mitigated Negative Declaration (for projects with significant impacts but that are revised in some form to avoid or mitigate those impacts), or an EIR (for projects with significant impacts).
An EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Before approving any project that has received environmental review, an agency must make certain findings pertaining to the project’s environmental impact and any associated mitigation measures. If mitigation measures are required or incorporated into a project, the public agency must adopt a reporting or monitoring program to ensure compliance with those measures. To enforce the requirements of CEQA, a civil action may be brought under several code sections to attack, review, set aside, void, or annul the acts or decisions of a public agency for noncompliance with the act.
“CEQA operates, not by dictating proenvironmental outcomes, but rather by mandating that ‘decision makers and the public’ study the likely environmental effects of contemplated government actions and thus make fully informed decisions regarding those actions. … In other words, CEQA does not care what decision is made as long as it is an informed one.” (Citizens Coalition Los Angeles v. City of Los Angeles (2018) 26 Cal. App. 5th 561, 577.)
- CEQA litigation
Unlike other environmental laws specific to air resources, water resources, or the control of toxic substances, there is no statewide bureaucracy charged with enforcement of CEQA. Rather, it is enforced through citizen participation and litigation if necessary. Arguably, this makes the implementation of CEQA more efficient and expeditious than if a state agency were created to administer the law. Thus, CEQA litigation—which occurs at very low rates[1]—could more appropriately be characterized as mere enforcement.
In general, the time period for filing a CEQA action is very short compared to other statutes of limitation. “CEQA provides unusually short statutes of limitations on filing court challenges to the approval of projects under the act.” (14 Cal. Code Regs. § 15112(a).) Although the applicable limitations period depends on the type of agency decision, these periods are generally 30 or 35 days. (See id. at (c); Pub. Res. Code § 21167(b)-(e).) If a challenge to an EIR is not commenced within the applicable time period, the project is conclusively presumed to comply with CEQA, unless there is substantial change in circumstances or new information becomes available. (Pub. Res. Code §§ 21166 & 21167.2.)
During a challenge to an EIR or a negative declaration for noncompliance with CEQA, responsible agencies are required to act as though the EIR or negative declaration complies with CEQA and continue to process the application for the project under applicable timeframes. (14 Cal. Code Regs. § 15233; see also Pub. Res. Code § 21167.3.) If an injunction or stay is granted pending the final determination of the issue of compliance, the responsible agency may only disapprove the project or grant a conditional approval, which constitutes permission to proceed only if the court action results in a final determination that the EIR or negative declaration complies with CEQA. (Pub. Res. Code § 21167.3 (a).) If no injunction or stay is granted pending the final determination of the issue of compliance, the responsible agency must assume that the EIR or negative declaration fully meets the requirements of CEQA; however, an approval granted constitutes permission to proceed with the projects at the applicant’s risk pending the final determination of the action or proceeding. (Id. at (b).) “The evident intent of section 21167.3 is to expedite CEQA review where a lawsuit contesting CEQA documentation is pending by designating one forum for resolution of claims of unlawful documentation and by requiring project review to proceed while the claims are resolved.” (City of Redding v. Shasta County Local Agency Formation Com. (1989) 209 Cal.App.3d 1169, 1181.)
Public Resources Code section 21168.9(a) provides courts with a range of remedies to fashion appropriate solutions to cure CEQA violations: a court may require the agency to set aside its CEQA determinations, findings, or decisions; to set aside its determination to approve the project; to suspend specific project activities; to order specific actions needed to comply with CEQA; or to combine these remedies as appropriate. The court’s order must be limited to mandates necessary to achieve compliance with CEQA and may include only those specified project activities in noncompliance with CEQA. (Id. at (b).) However, these provisions do not require the court to exercise its discretion in any particular manner and do not limit the court’s equitable powers. (Id. at (c).)
Importantly, under these provisions, a court has discretion to allow project activities to proceed pending CEQA compliance. For example, in POET, LLC v. State Air Resources Bd. (2013) 218 Cal.App.4th 681, the court ruled that the Air Resources Board violated CEQA in adopting low carbon fuel standards (LCFS) and set aside the regulations embodying those standards. Nevertheless, the court, interpreting section 21168.9, held that “our decision to void the premature approval of the LCFS regulations does not require us to suspend the operation of the regulations.” (Id. at 760.) “Thus, under section 21168.9, subdivision (c), courts retain the inherent equitable power to maintain the status quo pending statutory compliance, which permits them to allow a regulation, ordinance or program to remain in effect.” (Id. at 761.) The court stated that “CEQA should be interpreted in a manner that affords the fullest possible protection to the environment within the reasonable scope of the statutory language. [Citation.]” (Id. at 762.) The court concluded that suspending the regulations would cause more environmental harm than allowing them to remain in effect, and thus ordered that they remain operative pending corrective action. (Id. at 761-762.)
- Community plans
The Planning and Zoning Law provides for the comprehensive regulation of zoning and land use. (Gov. Code § 65000 et seq.) The keystone of this framework is the general plan, which has been described as a local government’s “constitution” for development. (Lesher Communications, Inc. v. City of Walnut Creek (1990) 52 Cal.3d 531, 540.) A general plan must consist of a statement of development policies and must include a diagram or diagrams and text setting forth objectives, principles, standards, and plan proposals. (Gov. Code § 65302.) Cities and counties are required to prepare, adopt, and amend general plans and elements of those general plans in accordance with specified requirements. (Gov. Code § 65350.) A city or county’s land use decisions, including development permitting, must be consistent with the general plan. (See DeVita v. County of Napa (1995) 9 Cal.4th 763, 772.) An update to a land use planning document such as a general plan constitutes a “project” that is subject to CEQA. (See Citizens Coalition Los Angeles v. City of Los Angeles (2018) 26 Cal. App. 5th 561, 578; City of Redlands v. County of San Bernardino (2002) 96 Cal.App.4th 398, 409.)
After the adoption of a general plan, localities may prepare “specific plans” for the systematic implementation of the general plan for all or part of the area covered by the general plan. (Gov. Code § 65450.) A specific plan must be related to the general plan (Gov. Code § 65451), and must be prepared, adopted, and amended in the same manner as a general plan, except as specified. (Gov. Code § 65453.) Furthermore, a specific plan may not be adopted or amended unless the proposed plan is consistent with the general plan. (Gov. Code § 65454.) CEQA does not apply to residential development projects consistent with a specific plan for which an EIR has been certified after January 1, 1980. (Gov. Code § 65457(a).)
Community plans, although mentioned in various statutes (see e.g., Gov. Code § 57426), do not appear to be creatures of statute. They have been characterized as components of, or means of amending, general plans. (See Citizens Coalition Los Angeles v. City of Los Angeles (2018) 26 Cal. App. 5th 561, 571 [describing General Plan of the City of Los Angeles and the Hollywood Community Plan as two general plans, in contradistinction to the Vermont/Western Transit Oriented District Specific Plan]; Christward Ministry v. Superior Court (1986) 184 Cal.App.3d 180, 197.)
This bill’s findings and declarations state that “[i]n many parts of the state, the city or county general plans cover so much geographic territory that local jurisdictions also adopt community plans that cover parts of that geographic territory. These community plans allow for tailored and responsive land use planning at the neighborhood level.” The bill states that jurisdictions that have multiple community plan areas update their general plan by updating these community plans. The bill defines a “community plan” as a plan that was adopted for a defined geographic area in a city, including a charter city, or county; serves as the land use element of the plan; has not been updated for more than 10 years; includes two or more transit priority areas; the city or county has adopted plan updates regarding circulation or mobility, housing needs, and vehicle miles traveled; and the city or county has adopted any required ordinances or regulations related to very high fire hazard severity zones or flood plain management, as specified.
- A CEQA challenge to an updated community plan could create uncertainty and delay development
If an EIR for a community plan update is challenged under CEQA, under Public Resources Code section 21167.3, the responsible agency is required to presume that the EIR is valid and continue to process applications and grant approvals under the updated community plan during the pendency of the challenge. If the court issues a preliminary injunction pending its final decision, the responsible agency may only grant a conditional use permit. However, if the court does not issue a preliminary injunction, the responsible agency may grant ordinary building permits.
If a developer chooses to proceed with an approved building permit, the developer likely does so at their own risk. Under principles of equity and due process, a developer may be protected from the possibility that a building permit is revoked if the developer has obtained a “vested right” to proceed with the project. Case law establishes that the right to complete a project vests if (1) a valid building permit, or its functional equivalent, has been issued and (2) the developer has “performed substantial work and incurred substantial liabilities in good faith reliance upon a permit issued by the government.” (Avco Community Developers, Inc. v. South Coast Regional Com. (1976) 17 Cal.3d 785, 791 [Avco].) This doctrine has been held to be applicable in the context of a community plan update that was accompanied by an ordinance that made corresponding zoning changes. (Consaul v. City of San Diego (1992) 6 Cal.App.4th 1781, 1801 [“…the vested rights doctrine enunciated by Avco has stood the test of time, and may properly be applied even to modern land use planning devices…”].) But section 21167.3 expressly provides that approvals granted in these conditions are subject to the final determination of a court. Consequently, the right to build likely does not vest under these circumstances.
As noted above, courts have broad discretion to fashion appropriate remedies in the enforcement of CEQA, which may include allowing a noncompliant community plan to remain in effect while corrected action is undertaken. In this regard, CEQA provides that courts retain their equitable powers in determining appropriate remedies and requires the fullest environmental protection possible. Given that modern community plans are likely to exceed their outdated predecessors in terms of environmental protection, the most likely outcome would seem to be that the court would order a successfully challenged community plan to remain in effect while it is brought into compliance.
By no means is this guaranteed. In recent high-profile litigation involving an update to the Hollywood community plan, which was originally adopted in 1988, a court held that the updated plan was “fatally flawed” because, in order to justify upzoning to high-density development, the plan relied on an estimation that the population would increase by 25 percent by 2040, even though it had declined 7 percent between 1990 and 2010.[2] The court’s order did not enable the city to continue to rely on the zoning changes that were part of the plan while it corrected the plan, which was re-issued in 2017.
3. Shields certain development projects not from CEQA itself, but from CEQA challenges against updated community plans
This bill, which would sunset in 2025, would prohibit a court that issues an order to remedy an updated community plan’s noncompliance with the CEQA from including in that order a remedy, based on that noncompliance, against the approval of any development project that, before the issuance of the order, was either approved or had its application deemed complete pursuant to the Permit Streamlining Act. (Gov. Code § 65920 et seq.) The bill clarifies that its provisions do not affect or alter the obligation for the approval of a development project that is consistent with an approved community plan to comply with CEQA, and do not preclude or limit separate CEQA litigation against the approval of a development project that is consistent with an approved community plan.
Thus, this bill immunizes certain development projects that are in the approval process from being jeopardized in litigation against a community plan update. The bill does not otherwise provide a safe harbor for such projects: they must still comply with CEQA and will continue to be subject to potential CEQA challenges separate from the litigation against the updated community plan. This bill thus offers reasonable assurances to developers that they will not be forced to absorb the risk of a community plan being stayed or invalidated by a court, but does not shield them from CEQA compliance generally. This strikes a balance by preventing developers from internalizing the costs of decisions beyond their control, while also preventing them from externalizing the costs of decisions that are within their control—namely, the environmental impacts of their particular projects. Additionally, the bill may embolden local governments to update outmoded community plans and modernize their land use planning schemes; even if these updates turn out to be flawed enough for a court to order that they be corrected, it is arguable that the updates will nevertheless likely be environmentally superior to their outdated predecessors.
Importantly, this bill applies only to comprehensive updates of community plans and thus would not cover instances of “spot zoning”—the selective rezoning of a particular parcel of land to give it fewer or greater rights than the parcels surrounding it. (Citizens Coalition Los Angeles v. City of Los Angeles (2018) 26 Cal. App. 5th 561, 592 [upholding an ordinance that created new zoning rules applicable to a specific parcel of land to facilitate the construction of a Target superstore].) The bill is intended to enable the comprehensive updating of community plans without posing undue risk to developers or to the environment; its benefits do not extend to targeted updates intended solely to affect specific projects or parcels.
4. Support
The sponsor writes:
AB-1515 is critical for cities like Los Angeles that are seeking to update their community plans to meet statewide housing production and environmental goals.
[…]
Importantly, AB-1515 is narrowly tailored to clarify what happens to development projects proposed under an updated plan if the plan is challenged in court. AB-1515 maintains and supports the requirements under CEQA to disclose all environmental impacts associated with an updated community plan and does not prohibit a plan’s environmental review from being challenged. Additionally, AB-1515 would only apply to community plans that have already met a high set of specific criteria aimed at advancing local and state priorities, including housing and environmental goals.
California Association of Counties adds:
At least eight counties use community plans, and this bill would remove any uncertainty that may arise should an updated community plan’s environmental review document be challenged in court. This bill would benefit jurisdictions and developers by giving them confidence that any projects approved and deemed complete under an updated community plan undergoing litigation will not be invalidated. This would prevent any unnecessary delays in the development process due to challenges to a jurisdiction’s community plan.
AB 1515 does not affect or alter the obligation of a development project consistent with an approved community plan update to comply with CEQA.
SUPPORT
Los Angeles Mayor Eric Garcetti (sponsor)
California Apartment Association
California Association of Counties
California Association of Realtors
California Professional Association of Specialty Contractors
City of Glendale
City of San Diego
OPPOSITION
None known
RELATED LEGISLATION
Pending Legislation: None known
Prior Legislation:
SB 948 (Allen, 2018) would have authorized the Governor to certify updates to a community plan and accompanying ordinances meeting specified requirements as eligible for the CEQA streamlining benefits provided by AB 900 (Buchanan, Ch. 354, Stats. 2011). The bill was held in the Senate Judiciary Committee.
PRIOR VOTES:
Senate Governance and Finance Committee (Ayes 7, Noes 0)
Assembly Floor (Ayes 73, Noes 1)
Assembly Natural Resources Committee (Ayes 9, Noes 1)
Assembly Local Government Committee (Ayes 8, Noes 0)
**************
Although the data is incomplete, three recent studies have found CEQA litigation rates of between one and three percent. BAE Urban Economics, CEQA in the 21st Century (Aug. 2016) https://rosefdn.org/wp-content/uploads/2016/08/CEQA-in-the-21st-Century.pdf (as of Apr. 27, 2019); Available at https://senv.senate.ca.gov/sites/senv.senate.ca.gov/files/ceqa_survey_
full_report_-_final_12-5-17.pdf (as of Mar. 1, 2019); Getting it Right: Examining the Local Land Use Entitlement Process to Inform Policy and Process (2018), available at https://www.law.berkeley.edu/wp-content/uploads/2018/02/Getting_It_Right.pdf (as of Mar. 1, 2019); Examining the Local Land Use Entitlement Process to Inform Policy and Process (2019) https://www.law.berkeley.edu/wp-content/uploads/2019/02/Examining-the-Local-Land-Use-Entitlement-Process-in-California.pdf (as of Mar. 1, 2019). ↑
City Planner Release Revised Hollywood Community Plan (Jun. 13, 2017) Los Angeles Business Journal, available at http://labusinessjournal.com/news/2017/jun/13/city-planners-release-revised-hollywood-community-/ (as of Jun. 2, 2019); Judge deals major blow to Hollywood growth plan (Dec. 11, 2013) Los Angeles Times, available at https://www.latimes.com/local/lanow/la-me-ln-judge-hollywood-growth-plan-20131211-story.html (as of Jun. 2, 2019). ↑
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Mike McGuire, Chair
2019 - 2020 Regular
Bill No: | AB 1515 | Hearing Date: | 6/5/19 |
Author: | Friedman | Tax Levy: | No |
Version: | 5/1/19 | Fiscal: | No |
Consultant: | Favorini-Csorba | ||
Planning and zoning: community plans: review under the California Environmental Quality Act
Prohibits a court from invalidating a development approval that was granted based on a community plan that meets specified criteria, if the development was approved or had a complete application prior to the community plan being invalidated.
Background
Land use planning and permitting. The Planning and Zoning Law requires every county and city to adopt a general plan that sets out planned uses for all of the area covered by the plan. A general plan must include seven mandatory elements, such as a land use element that designates the proposed general distribution, general location, and extent of the uses of land; a housing element that establishes the locations and densities of housing for very low, low, moderate, and above moderate income households; and a circulation element that describes the general location of public infrastructure and facilities for the movement of goods and people.
Cities’ and counties’ major land use decisions—including development permitting—must be consistent with their general plans. In this way, the general plan is a blueprint for future development. The Planning and Zoning Law also establishes a planning agency in each city and county, which may be a separate planning commission, administrative body, or the legislative body of the city or county itself.
Local agencies may also adopt specific plans—also known as community plans—that provide for the systematic implementation of a general plan in a particular area. Specific plans are an optional way to provide for the implementation of the general plan for all or a portion of a community. Specific plans are often appropriate for larger infill development opportunities. They allow a community to determine the mix of uses, densities and development standards that are suitable to the site or sites but that may not be applicable to the jurisdiction as a whole.
Environmental review. The California Environmental Quality Act (CEQA) requires the state and local governments to study and mitigate, to the extent feasible, the environmental impacts of proposed projects. An agency that proposes to undertake a project that may have a significant impact on the environment must prepare an Environmental Impact Report (EIR) to study the impacts and identify measures to mitigate those impacts. An EIR may be required at many levels of planning, including the adoption of a general plan, a specific plan, or zoning ordinance, or for an individual development project. CEQA also allows agencies to adopt a programmatic EIR, which is a more comprehensive EIR developed up front that can be used as the basis for more streamlined “tiered” EIRs for individual projects.
Some projects are exempt from CEQA review, through either a statutory exemption created by the Legislature or a categorical exemption created by the Secretary of Natural Resources because a given type of project does not usually have a significant effect on the environment. Other projects are subject to CEQA but will not have a significant effect on the environment; in these cases, the agency responsible for environmental review issues a negative declaration.
SB 375 (Steinberg, 2008) established a streamlined CEQA review process for residential and mixed-use projects that are consistent with an applicable “sustainable communities strategy” (SCS). SB 375 required each of the state’s the metropolitan planning organizations to develop an SCS containing land use, housing, and transportation strategies that would allow the region to meet GHG emission reduction targets established by the California Air Resources Board. Projects consistent with the applicable SCS and that meet other criteria may be exempt or subject to more limited analyses of environmental impacts.
SB 743 (Steinberg, 2013) created a new CEQA exemption for certain projects consistent with a specific plan that has a certified EIR, if the project is:
- A residential, employment center, or mixed use project;
- Located within a “transit priority area,” which is an area within half a mile of a major transit stop; and
- Consistent with an adopted sustainable communities strategy or alternative planning strategy.
A project is not exempt if it would cause new or worse significant impacts compared to what was analyzed in the environmental impact report for the specific plan. SB 743 also directed the Governor’s Office of Planning and Research to develop new criteria for determining the significance of transportation impacts of projects under CEQA. In 2018, OPR issued CEQA guidelines that emphasized Vehicle Miles Traveled (VMT) over measures of traffic flow as the best way to determine the transportation impacts of a project and established certain thresholds of significant impacts. These guidelines are codified in the California Code of Regulations.
Judicial review under CEQA. CEQA provides for judicial review of CEQA actions taken by public agencies, following the agency's decision to carry out or approve the project. Challenges alleging improper determination that a project may have a significant effect on the environment, or alleging an EIR doesn't comply with CEQA, must be filed in the Superior Court within 30 days of filing of the notice of approval. If a court finds that a project didn’t comply with CEQA, it must order the approving agency to do one of the following:
- Void the CEQA decision, determination, or finding;
- Suspend any or all specific project activities that could result in an adverse environmental change, until the public agency has taken any actions needed to bring the determination, finding, or decision into compliance with CEQA; or
- Take specific action to bring the determination, finding, or decision into compliance with CEQA.
Major land use changes can be controversial and are often litigated under CEQA. Mayor Eric Garcetti wants the Legislature to grant some protection to developments that are already approved or are nearly so if a community plan is voided on CEQA grounds.
Proposed Law
Assembly Bill 1515 prohibits a court from invalidating, reviewing, voiding, or setting aside a development approval that was granted based on a community plan that meets specified criteria, if either of the following occurs:
- The development is approved before the court issues a stay, order, or writ that requires the challenged EIR or community plan update to be rescinded or set aside; or
- The application for the development project is deemed complete under the Permit Streamlining Act before the court issues a stay, order, or writ that requires the challenged EIR or community plan update to be rescinded or set aside.
The bill applies notwithstanding the duties CEQA imposes on a court to issue a stay, order, or writ if a project does not comply with CEQA.
For a development to qualify for the bill’s prohibition, the community plan underlying the development approval must meet all of the following conditions:
- The plan was adopted by a city, including a charter city, or county for a defined geographic area within its jurisdictional boundaries;
- The plan serves as the land use element for the area covered by the plan;
- The plan has not been updated for more than 10 years before the operative date of the bill;
- The plan includes two or more transit priority areas;
- The city or county that adopts the plan has adopted, on or after January 1, 2015, a circulation or mobility element as a part of the general plan;
- The city or county that adopts the plan has a housing element that includes housing capacity to sufficiently accommodate its regional housing needs allocation; and
- The city or county that adopts the plan has adopted a VMT threshold of significance for the area that presumes that projects in the area have a less than significant transportation impact, consistent with state regulations.
AB 1515 defines a community plan update to include both the community plan itself and any zoning ordinances necessary to bring the zoning into consistency with the community plan.
The bill provides that it does not affect or alter the obligation of a project that is consistent with an approved community plan update to comply with CEQA. It also sunsets its provisions on January 1, 2025, but provides that the sunset does not affect any right or immunity that the bill granted before January 1, 2025.
State Revenue Impact
No estimate.
Comments
1. Purpose of the bill. According to the author, “While most jurisdictions update the land use element of their general plan as part of their general plan update, those with multiple community plan areas update these documents individually, requiring community plans to be reviewed through separate reviews pursuant to the act. In some jurisdictions with multiple community plans, these plans have not been updated in recent years to reflect changing local priorities as well as efforts to improve air quality, reduce climate pollution, increase transit ridership, reduce vehicle miles traveled, and provide more affordable housing.
“In 2017, the Los Angeles Department of City Planning, in collaboration with all city agencies, was directed to update Los Angeles’ Land Use Element by 2024. Los Angeles’s Land Use Element is comprised of 35 Community Plans that contain the guiding goals and principles for how each plan area should grow. Some of these plans are over 20 years and cannot adequately address state and local priorities around housing, job creation, climate change, and transportation. To date, six Community Plans have been recently updated, 16 updates are currently underway, and 13 more updates will be launched by 2020.
“One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update.
“AB 1515 assists the Community Plan update process and provides clarity to the local governments, residents, and developers on how to implement an updated Community Plan should its environmental document be challenged in court. By removing uncertainty during this period, development projects approved and deemed complete under an updated Community Plan would have confidence in moving forward, bringing the city closer to meeting the goals in the updated plan.”
2. Wait a minute… CEQA can be a double-edged sword: it provides opportunities for both legitimate challenges to developments that will harm the environment and for less scrupulous actors to delay projects they don’t like for completely unrelated reasons. Delays in project approval can be costly, and operating based off of out-of-date land use plans can have environmental consequences as well. For example, the CEQA regulations in place at the time many community plans in Los Angeles were adopted encouraged suburban development because city streets already have slower moving traffic than suburban arterials, but the regulations in force today encourage infill opportunities because development in urban areas results in fewer VMT.
To mitigate these issues and to allow development to proceed as the City of Los Angeles updates its community plans, AB 1515 provides protection for some development approvals from being invalidated. By doing so, the bill poses a risk that some of these approvals will be issued without undergoing proper CEQA review. Specifically, if the project was approved ministerially, or
qualified for a statutory exemption under CEQA, no project-level CEQA analysis would have been required, and the development would be approved without ever going through proper CEQA review. On the other hand, any other project approvals that require discretionary review—which applies to most projects—would still have to go through a separate project-level CEQA analysis. Furthermore, AB 1515 does not prevent a court from issuing an injunction that prevents the community plan from being used if the court thinks there is a real risk that the plan will result in environmental harm. On balance, the cost of delaying development may outweigh the relatively small potential unmitigated environmental impacts.
3. Charter city. The California Constitution allows cities that adopt charters to control their own “municipal affairs.” In all other matters, charter cities must follow the general, statewide laws. Because the Constitution doesn't define "municipal affairs," the courts determine whether a topic is a municipal affair or whether it's an issue of statewide concern. AB 1515 says that its statutory provisions apply to charter cities. However, it does not include findings and declarations supporting this statement. The Committee may wish to consider amending AB 1515 to include a justification for the application of the bill to charter cities.
4. Double referral. The Senate Rules Committee has ordered a double referral of AB 1515: first to the Senate Governance and Finance Committee to address issues of local land use permitting, and then to the Senate Judiciary Committee, which has jurisdiction over court procedures.
5. Prior legislation. SB 948 (Allen, 2018) would have authorized the Governor to certify some updates to a community plan and the accompanying ordinances as environmental leadership projects in order to receive streamlined judicial review of their compliance with CEQA. SB 948 died in the Senate Judiciary Committee.
Assembly Actions
Assembly Local Government Committee: 8-0
Assembly Natural Resources Committee: 9-1
Assembly Floor: 73-1
Support and Opposition
(5/31/19)
Support: California Association of Realtors; California Professional Association of Specialty Contractors (Calpasc); City of San Diego; Eric Garcetti, Mayor of Los Angeles; City of San Diego.
Opposition: Sierra Club.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 1515
Author:(Friedman)
As Amended Ver:May 1, 2019
Majority vote
SUMMARY:
Prohibits a court from invalidating a development project when specified legal actions are taken pursuant to the California Environmental Quality Act (CEQA) against an updated community plan in which the project is located.
Major Provisions
This bill prohibits a court from invalidating, reviewing, voiding, or setting aside the approval of a development project in any order that results from an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a local agency in adopting an update to a community plan on the grounds of noncompliance with CEQA. A development project would have to meet one of the following requirements in order to enjoy the protections of this bill: the project would have to be approved before the court issues a stay in connection with the action or proceeding, or an order or writ requiring the challenged environment impact report or community plan update to be rescinded or set aside; or, the application for the development project must be deemed complete before the court issues the stay, order, or writ.
The provisions of this bill are limited to a community plan that must meet a number of requirements, as specified. The bill further defines its parameters to specify that a community plan update must be a substantial amendment to a community plan that is intended to bring the community plan up to date with the most current land use policies. The update must also include amendments to both the plain text and plan land use map, as well as the adoption or amendment or any zoning ordinances necessary to bring zoning into consistency with the community plan. This bill also clarifies that it does not affect or alter the obligation of a development project that is consistent with an approved community plan update to comply with CEQA.
COMMENTS:
The Planning and Zoning Law requires each county and city to adopt a comprehensive, long-term general plan for its physical development and the development of any land outside its boundaries that bears relation to its planning. After the legislative body has adopted a general plan, the planning agency prepares specific plans for the systematic implementation of the general plan. These specific plans include community plans, which guide land use planning at the neighborhood level. These plans are considered "projects" under CEQA. Therefore, community plans are subject to CEQA's review, public process, and mitigation requirements.
According to the Author:
"In 2017, the Los Angeles Department of City Planning, in collaboration with all city agencies, was directed to update Los Angeles' Land Use Element by 2024. Los Angeles' Land Use Element is comprised of 35 Community Plans that contain the guiding goals and principles for how each plan area should grow. Some of these plans are over 20 years (old) and cannot adequately address state and local priorities around housing, job creation, climate change, and transportation. To date, six Community Plans have been recently updated, 16 updates are currently underway, and 13 more updates will be launched by 2020.
"One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update."
Arguments in Support:
Mayor Eric Garcetti, City of Los Angeles, sponsor of this measure, writes, "AB 1515 is critical for cities like Los Angeles that are seeking to update their community plans to meet statewide housing production and environmental goals…AB 1515 will help to advance our Community Plan updates and provide clarity to the city, residents, and developers on how to implement an updated Community Plan in the event that its environmental documents are challenged in court. Providing certainty to development projects during the period of an environmental challenge is critical to meeting the goals of the updated plan."
Arguments in Opposition:
None on file.
FISCAL COMMENTS:
None
VOTES:
ASM LOCAL GOVERNMENT: 8-0-0
YES: Aguiar-Curry, Lackey, Bloom, Boerner Horvath, Ramos, Luz Rivas, Robert Rivas, Voepel
ASM NATURAL RESOURCES: 9-1-1
YES: Friedman, Flora, Chau, Eggman, Limón, Mathis, McCarty, Melendez, Muratsuchi
NO: Mark Stone
ABS, ABST OR NV: Cristina Garcia
UPDATED:
VERSION: May 1, 2019
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0000353
Date of Hearing: April 29, 2019
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
ABPCA Bill Id:AB 1515 (
Author:Friedman) – As Amended Ver:March 28, 2019
SUBJECT: Planning and zoning: community plans: review under the California Environmental Quality Act
SUMMARY: Prohibits a court from invalidating the approval of a development project when specified legal actions are taken pursuant to the California Environmental Quality Act (CEQA) against an updated community plan for the area in which the project is located.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA.
- Authorizes judicial review of CEQA actions taken by public agencies, following the agency's decision to carry out or approve the project. Challenges alleging improper determination that a project may have a significant effect on the environment, or alleging an EIR doesn't comply with CEQA, must be filed in the Superior Court within 30 days of filing of the notice of approval. The courts are required to give CEQA actions preference over all other civil actions.
- Upon finding a public agency's actions are not in compliance with CEQA, requires a court to order one or more of the following:
- A mandate that the determination, finding, or decision be voided by the public agency, in whole or in part;
- If the court finds that a specific project activity or activities will prejudice the consideration or implementation of particular mitigation measures or alternatives to the project, a mandate that the public agency and any real parties in interest suspend any or all specific project activity or activities, pursuant to the determination, finding, or decision, that could result in an adverse change or alteration to the physical environment, until the public agency has taken any actions that may be necessary to bring the determination, finding, or decision into compliance with CEQA; and
- A mandate that the public agency take specific action as may be necessary to bring the determination, finding, or decision into compliance with CEQA.
Any order shall include only those mandates which are necessary to achieve compliance with CEQA and only those specific project activities in noncompliance with CEQA.
THIS BILL:
- Prohibits a court, in any order that results from an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a local agency in adopting an update to a community plan on the grounds of noncompliance with CEQA, from invalidating, reviewing, voiding, or setting aside the approval of any development project for which either of the following applies:
- The development project is approved before the court issues a stay in connection with the action or proceeding or an order or writ requiring the challenged EIR or community plan update to be rescinded or set aside; or,
- The application for the development project is deemed complete, pursuant to the Planning and Zoning Law, before the court issues a stay, order, or writ described in a), above.
- Provides that this bill does not affect or alter the obligation of a project that is consistent with an approved community plan update to comply with CEQA.
- Repeals the provisions of this bill on January 1, 2025, but provides that this repeal shall not affect any right or immunity granted pursuant to this bill to a development project that meets the requirements of 1), above, before January 1, 2025.
- Provides the following definitions:
- “Community plan” means a plan that meets all of the following requirements:
- The plan was adopted by a city or county for a defined geographic area within its jurisdictional boundaries;
- The plan serves as the land use element, pursuant to the Planning and Zoning Law, for the area covered by the plan;
- The plan has not been updated for more than 10 years before the operative date of this bill;
- The plan includes two or more transit priority areas, as defined in CEQA;
- The city or county that adopts the plan has adopted, on or after January 1, 2015, a circulation or mobility element as a part of the general plan;
- The city or county that adopts the plan has a housing element that includes housing capacity to sufficiently accommodate regional housing needs projects as set forth in the Planning and Zoning Law; and,
- The city or county that adopts the plan has adopted a vehicle miles traveled threshold of significance for the area covered by the plan in compliance with specified provisions of the CEQA Guidelines for determining the significance of transportation impacts.
- “Development project” means any project undertaken for the purpose of development, including a project involving the issuance of a permit for construction or reconstruction but not a permit to operate. “Development project” does not include any ministerial projects proposed to be carried out or approved by public agencies; and,
- “Update” means a substantial amendment to a community plan that is intended to bring the community plan up to date with the most current land use policies and that includes amendments to both the plain text and plan land use map, as well as the adoption or amendment or any zoning ordinances necessary to bring zoning into consistency with the community plan.
- “Community plan” means a plan that meets all of the following requirements:
- Makes a number of findings and declarations pertaining to the purposes of this bill.
FISCAL EFFECT: Non-fiscal
COMMENTS:
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA actions taken by public agencies can be challenged in Superior Court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Under current law, court challenges of CEQA decisions generally must be filed within 30 to 35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing. There is no deadline specified for the court to render a decision.
The Planning and Zoning Law requires each county and city to adopt a comprehensive, long-term general plan for its physical development and the development of any land outside its boundaries that bears relation to its planning. After the legislative body has adopted a general plan, the planning agency prepares specific plans for the systematic implementation of the general plan. These specific plans include community plans, which guide land use planning at the neighborhood level. These plans are considered “projects” under CEQA. Therefore, community plans are subject to CEQA’s review, public process, and mitigation requirements.
Existing law is silent as to what happens to the implementation of an updated community plan when its associated environmental document is challenged in court. In most cases, the updated plan remains in effect during the legal challenge, unless the court takes action to void the environmental clearance and rescind the plan. This potential rescission creates a state of uncertainty and prevents projects from utilizing the updated community plan while the environmental legal challenge is pending – possibly delaying all development in the plan area, including housing developments that would meet the plan’s goals and objectives.
- Author’s statement:
While most jurisdictions update the land use element of their general plan as part of their general plan update, those with multiple community plan areas update these documents individually, requiring community plans to be reviewed through separate reviews pursuant to CEQA. In some jurisdictions with multiple community plans, these plans have not been updated in recent years to reflect changing local priorities as well as efforts to improve air quality, reduce climate pollution, increase transit ridership, reduce vehicle miles traveled, and provide more affordable housing.
In 2017, the Los Angeles Department of City Planning, in collaboration with all city agencies, was directed to update Los Angeles’ Land Use Element by 2024. Los Angeles’s Land Use Element is comprised of 35 Community Plans that contain the guiding goals and principles for how each plan area should grow. Some of these plans are over 20 years old and cannot adequately address state and local priorities around housing, job creation, climate change, and transportation. To date, six Community Plans have been recently updated, 16 updates are currently underway, and 13 more updates will be launched by 2020.
One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update.
AB 1515 assists the Community Plan update process and provides clarity to the local governments, residents, and developers on how to implement an updated Community Plan should its environmental document be challenged in court. By removing uncertainty during this period, development projects approved and deemed complete under an updated Community Plan would have confidence in moving forward, bringing the city closer to meeting the goals in the updated plan.
- Arguments in Support. Mayor Eric Garcetti, City of Los Angeles, sponsor of this measure, writes:
AB 1515 is critical for cities like Los Angeles that are seeking to update their community plans to meet statewide housing production and environmental goals…AB 1515 will help to advance our Community Plan updates and provide clarity to the city, residents, and developers on how to implement an updated Community Plan in the event that its environmental documents are challenged in court. Providing certainty to development projects during the period of an environmental challenge is critical to meeting the goals of the updated plan.
Importantly, AB 1515 is narrowly tailored to clarify what happens to development projects proposed under an updated plan if the plan is challenged in court. AB 1515 maintains and supports the requirements under CEQA to disclose all environmental impacts associated with an updated community plan and does not prohibit a plan’s environmental review from being challenged. Additionally, AB 1515 would only apply to community plans that have already met a high set of specific criteria aimed at advancing local and state priorities, including housing and environmental goals.
- Double referral. This bill was approved by the Local Government Committee on April 24, 2019 by a vote of 8-0. In Local Government Committee, the author agreed to adopt amendments in this committee to specify that the bill applies to charter cities.
REGISTERED SUPPORT / OPPOSITION:
Support
Mayor Eric Garcetti, City of Los Angeles (sponsor)
California Association of Realtors
California Professional Association of Specialty Contractors
City of San Diego
Opposition
None on file
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Date of Hearing: April 24, 2019
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Cecilia Aguiar-Curry, Chair
ABPCA Bill Id:AB 1515 (
Author:Friedman) – As Amended Ver:March 28, 2019
SUBJECT: Planning and zoning: community plans: review under the California Environmental Quality Act.
SUMMARY: Prohibits a court from invalidating a development project when specified legal actions are taken pursuant to the California Environmental Quality Act (CEQA) against an updated community plan in which the project is located. Specifically, this bill:
- Prohibits a court, in any order that results from an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a local agency in adopting an update to a community plan on the grounds of noncompliance with CEQA, from invalidating, reviewing, voiding, or setting aside the approval of any development project for which either of the following applies:
- The development project is approved before the court issues a stay in connection with the action or proceeding or an order or writ requiring the challenged environmental impact report (EIR) or community plan update to be rescinded or set aside; or,
- The application for the development project is deemed complete, pursuant to the Planning and Zoning Law, before the court issues a stay, order, or writ described in a), above.
- Provides that this bill does not affect or alter the obligation of a project that is consistent with an approved community plan update to comply with CEQA.
- Repeals the provisions of this bill on January 1, 2025, but provides that this repeal shall not affect any right or immunity granted pursuant to this bill to a development project that meets the requirements of 1), above, before January 1, 2025.
- Provides the following definitions:
- “Community plan” means a plan that meets all of the following requirements:
- The plan was adopted by a city or county for a defined geographic area within its jurisdictional boundaries;
- The plan serves as the land use element, pursuant to the Planning and Zoning Law, for the area covered by the plan;
- The plan has not been updated for more than 10 years before the operative date of this bill;
- The plan includes two or more transit priority areas, as defined in CEQA;
- The city or county that adopts the plan has adopted, on or after January 1, 2015, a circulation or mobility element as a part of the general plan;
- The city or county that adopts the plan has a housing element that includes housing capacity to sufficiently accommodate regional housing needs projects as set forth in the Planning and Zoning Law; and,
- The city or county that adopts the plan has adopted a vehicle miles traveled threshold of significance for the area covered by the plan in compliance with specified provisions of the California Code of Regulations, which provide guidelines for implementing CEQA and determining the significance of transportation impacts;
- “Development project” means any project undertaken for the purpose of development, including a project involving the issuance of a permit for construction or reconstruction but not a permit to operate. “Development project” does not include any ministerial projects proposed to be carried out or approved by public agencies; and,
- “Update” means a substantial amendment to a community plan that is intended to bring the community plan up to date with the most current land use policies and that includes amendments to both the plain text and plan land use map, as well as the adoption or amendment or any zoning ordinances necessary to bring zoning into consistency with the community plan.
- “Community plan” means a plan that meets all of the following requirements:
- Makes a number of findings and declarations pertaining to the purposes of this bill.
FISCAL EFFECT: None
COMMENTS:
- Background. CEQA requires a lead agency to prepare and certify an EIR on a project that it proposes to carry out or approve that may have a significant effect on the environment. Alternatively, the lead agency may adopt a negative declaration if it finds that the project will not have a significant effect on the environment.
CEQA limits the review of a project if the parcel meets the following requirements: if it is zoned or designated in a community plan to accommodate a particular density of development; an EIR was certified for that zoning or planning action; and, the project is consistent with the zoning or community plan. However, CEQA also requires a court, if it finds that any determination, finding, or decision of a public agency has been made without compliance with CEQA, to enter an order that includes one or more specified mandates, including a mandate to void the determination, finding, or decision of the public agency.
The Planning and Zoning Law requires each county and city to adopt a comprehensive, long-term general plan for its physical development and the development of any land outside its boundaries that bears relation to its planning. After the legislative body has adopted a general plan, the planning agency prepares specific plans for the systematic implementation of the general plan. These specific plans include community plans, which guide land use planning at the neighborhood level. These plans are considered “projects” under CEQA. Therefore, community plans are subject to CEQA’s review, public process, and mitigation requirements.
Existing law is silent as to what happens to the implementation of an updated community plan when its associated environmental document is challenged in court. In most cases, the updated plan remains in effect during the legal challenge, unless the court takes action to void the environmental clearance and rescind the plan. This potential rescission creates a state of uncertainty and prevents projects from utilizing the updated community plan while the environment legal challenge is pending – possibly delaying all development in the plan area, including housing developments that would meet the plan’s goals and objectives.
- Author’s Statement. According to the author, “While most jurisdictions update the land use element of their general plan as part of their general plan update, those with multiple community plan areas update these documents individually, requiring community plans to be reviewed through separate reviews pursuant to the act. In some jurisdictions with multiple community plans, these plans have not been updated in recent years to reflect changing local priorities as well as efforts to improve air quality, reduce climate pollution, increase transit ridership, reduce vehicle miles traveled, and provide more affordable housing.
“In 2017, the Los Angeles Department of City Planning, in collaboration with all city agencies, was directed to update Los Angeles’ Land Use Element by 2024. Los Angeles’ Land Use Element is comprised of 35 Community Plans that contain the guiding goals and principles for how each plan area should grow. Some of these plans are over 20 years (old) and cannot adequately address state and local priorities around housing, job creation, climate change, and transportation. To date, six Community Plans have been recently updated, 16 updates are currently underway, and 13 more updates will be launched by 2020.
“One significant obstacle to updating these plans is the uncertainty that results if the environmental review document prepared pursuant to the act for the community plan update is challenged in a court. During the litigation process, it is unclear whether the community plan or the update will be in effect, causing developers and planners great uncertainty and potentially delaying all development in that community plan area and affecting the ability to obtain the needed housing intended by the community plan update.
“AB 1515 assists the Community Plan update process and provides clarity to the local governments, residents, and developers on how to implement an updated Community Plan should its environmental document be challenged in court. By removing uncertainty during this period, development projects approved and deemed complete under an updated Community Plan would have confidence in moving forward, bringing the city closer to meeting the goals in the updated plan.”
- Bill Summary. This bill prohibits a court from invalidating, reviewing, voiding, or setting aside the approval of a development project in any order that results from an action or proceeding to attack, review, set aside, void, or annul the acts or decisions of a local agency in adopting an update to a community plan on the grounds of noncompliance with CEQA.
A development project would have to meet one of the following requirements in order to enjoy the protections of this bill:
- The project would have to be approved before the court issues a stay in connection with the action or proceeding, or an order or writ requiring the challenged EIR or community plan update to be rescinded or set aside; or,
- The application for the development project must be deemed complete before the court issues the stay, order, or writ.
The provisions of this bill would also be limited to a community plan that meets all of the following requirements:
- The plan must be adopted by a city or county for a defined geographic area within its jurisdictional boundaries;
- The plan must serve as the land use element for the area covered by the plan;
- The plan must not have been updated for at least 10 years;
- The plan must include two or more transit priority areas;
- The city or county that adopts the plan must have adopted, on or after January 1, 2015, a circulation or mobility element as a part of its general plan;
- The city or county that adopts the plan has a housing element that includes housing capacity to sufficiently accommodate regional housing needs projects; and,
- The city or county that adopts the plan must have adopted a vehicle miles traveled threshold of significance for the area covered by the plan in compliance with provisions of the California Code of Regulations that provide guidelines for implementing CEQA and determining the significance of transportation impacts.
The bill further defines its parameters to specify that a community plan update must be a substantial amendment to a community plan that is intended to bring the community plan up to date with the most current land use policies. The update must also include amendments to both the plain text and plan land use map, as well as the adoption or amendment or any zoning ordinances necessary to bring zoning into consistency with the community plan.
This bill also clarifies that it does not affect or alter the obligation of a development project that is consistent with an approved community plan update to comply with CEQA.
This bill is sponsored by Mayor Eric Garcetti, City of Los Angeles.
- Committee Amendment. This bill does not specify that it applies to charter cities, which would leave out a number of cities, including the City of Los Angeles. The Committee may wish to amend this bill to apply its provisions to charter cities.
- Arguments in Support. Mayor Eric Garcetti, City of Los Angeles, sponsor of this measure, writes, “AB 1515 is critical for cities like Los Angeles that are seeking to update their community plans to meet statewide housing production and environmental goals…AB 1515 will help to advance our Community Plan updates and provide clarity to the city, residents, and developers on how to implement an updated Community Plan in the event that its environmental documents are challenged in court. Providing certainty to development projects during the period of an environmental challenge is critical to meeting the goals of the updated plan.
“Importantly, AB 1515 is narrowly tailored to clarify what happens to development projects proposed under an updated plan if the plan is challenged in court. AB 1515 maintains and supports the requirements under CEQA to disclose all environmental impacts associated with an updated community plan and does not prohibit a plan’s environmental review from being challenged. Additionally, AB 1515 would only apply to community plans that have already met a high set of specific criteria aimed at advancing local and state priorities, including housing and environmental goals.”
- Arguments in Opposition. None on file.
- Double-Referral. This bill is double-referred to the Natural Resources Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
Mayor Eric Garcetti, City of Los Angeles [SPONSOR]
California Association of REALTORS®
California Professional Association of Specialty Contractors
City of San Diego
Opposition
None on file
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958
Bill Author
Bill Co-Author(s):