AB 1560: California Environmental Quality Act: transportation: major transit stop.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2019-10-08
|
Date
|
Status
|
|---|---|
| Oct 8, 2019 | Chaptered by Secretary of State - Chapter 631, Statutes of 2019. |
| Oct 8, 2019 | Approved by the Governor. |
| Sep 17, 2019 | Enrolled and presented to the Governor at 3:30 p.m. |
| Sep 9, 2019 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 79. Noes 0.). |
| Sep 5, 2019 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after September 7 pursuant to Assembly Rule 77. |
| Sep 4, 2019 | Read third time. Passed. Ordered to the Assembly. |
| Aug 27, 2019 | Read second time. Ordered to third reading. |
| Aug 26, 2019 | Read third time and amended. Ordered to second reading. |
| Aug 20, 2019 | Read second time. Ordered to third reading. |
| Aug 19, 2019 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Aug 12, 2019 | In committee: Hearing postponed by committee. |
| Jul 8, 2019 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on APPR. |
| Jul 3, 2019 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 11. Noes 0.) (July 2). Re-referred to Com. on APPR. |
| Jun 25, 2019 | Read second time and amended. Re-referred to Com. on HOUSING. |
| Jun 24, 2019 | From committee: Amend, and do pass as amended and re-refer to Com. on HOUSING. (Ayes 6. Noes 0.) (June 19). |
| Jun 5, 2019 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on EQ. |
| May 29, 2019 | Referred to Coms. on EQ. and HOUSING. |
| May 23, 2019 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 22, 2019 | Read third time. Passed. Ordered to the Senate. |
| May 16, 2019 | Read second time. Ordered to Consent Calendar. |
| May 15, 2019 | From committee: Do pass. To Consent Calendar. (Ayes 16. Noes 0.) (May 15). |
| May 13, 2019 | Joint Rule 62(a), file notice suspended. (Page 1609.) |
| Apr 23, 2019 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 11. Noes 0.) (April 22). Re-referred to Com. on APPR. |
| Apr 22, 2019 | Re-referred to Com. on NAT. RES. |
| Apr 11, 2019 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Apr 3, 2019 | In committee: Hearing postponed by committee. |
| Mar 14, 2019 | Referred to Com. on NAT. RES. |
| Feb 25, 2019 | Read first time. |
| Feb 23, 2019 | From printer. May be heard in committee March 25. |
| Feb 22, 2019 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 9, 2019 | AB 1560 Friedman Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 4, 2019 | Assembly 3rd Reading AB1560 Friedman et al. By McGuire | Senate Floor |
Passed |
|
| Jul 2, 2019 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Housing |
Passed |
|
| Jun 19, 2019 | Do pass as amended, but first amend, and re-refer to the Committee on [Housing] | Senate Standing Committee on Environmental Quality |
Passed |
|
| May 22, 2019 | AB 1560 Friedman Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| May 15, 2019 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 22, 2019 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 1560
Author:(Friedman)
As Amended Ver:August 26, 2019
Majority vote
SUMMARY:
Revises the definition of a "major transit stop" for purposes of qualifying for exemption or abbreviated review under the California Environmental Quality Act (CEQA) to include a "bus rapid transit station," as defined, with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
The Senate Amendments:
Refine and clarify the definition of bus rapid transit.
COMMENTS:
CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines. Since 1985, any residential development project can be exempt from CEQA if the project is consistent with a specific plan for which an EIR has been certified. In 2002, SB 1925 established CEQA exemptions for certain residential projects providing affordable urban or agricultural housing, or located on an infill site within an urbanized area and meeting specified unit and acreage criteria. For purposes of qualifying for the CEQA exemption for urban infill housing, projects must be within one-half mile of a major transit stop.
More recently, the Legislature has enacted CEQA exemptions and streamlining for residential and certain other projects in infill areas. SB 375 (Steinberg), Chapter 728, Statutes of 2008 provided a CEQA exemption for a narrow set of eligible residential projects in infill areas adjacent to transit, as well as alternatives of abbreviated EIR and mitigated negative declaration review. SB 226 (Simitian), Chapter 469, Statutes of 2011 provided abbreviated CEQA review procedures for a broader set of urban infill projects, including retail, commercial, and public buildings, with no requirement regarding proximity to transit. SB 743 (Steinberg), Chapter 386, Statutes of 2013 established a new exemption for residential, mixed-use, and "employment center" projects located within one-half mile of a major transit stop, if the project is consistent with an adopted specific plan and specified elements of an SB 375 strategy.
According to the Author:
A transit priority area, defined in Public Resources Code Section 21099 is, generally, an area within .5 miles of an existing or planned major transit stop. Currently, major transit stop is defined in Public Resources Code Section 21064.3 as "a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute period." This definition does not include bus rapid transit.
In the city of Los Angeles, the definition of major transit stop is applied to the Transit Oriented Guidelines, per Measure JJJ. As such, the definition of major transit stop defines, and consequently limits the eligibility of projects for development incentives for projects that include affordable housing.
As presently defined, there are a significantly limited number of transit priority areas as the definition of major transit stop excludes many major bus lines. Areas of California well served by bus rapid transit, but not served by rail transit, have been unable to take advantage of incentive programs and been excluded from these definitions.
In areas like Southern California's San Fernando Valley region, the Orange Line is one of the busiest bus rapid transit lines operated by LA Metro and serves riders traveling in the San Fernando Valley and throughout Los Angeles County. It is essential that areas throughout California such as areas surrounding the Orange Line be eligible for incentives and CEQA streamlining to ensure housing development is maximized near transit.
Arguments in Support:
According to the Valley Industry and Commerce Association, the current definitions of transit priority area and major transit stop fail to address the use of on-demand and first mile last mile services that are essential to a vibrant transit community that is responsive to today's technology and demands.
Arguments in Opposition:
None received
FISCAL COMMENTS:
According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
VOTES:
ASM NATURAL RESOURCES: 11-0-0
YES: Friedman, Flora, Chau, Eggman, Cristina Garcia, Limón, Mathis, McCarty, Melendez, Muratsuchi, Mark Stone
ASM APPROPRIATIONS: 16-0-2
YES: Gonzalez, Bigelow, Bloom, Bonta, Calderon, Carrillo, Chau, Diep, Eggman, Fong, Gabriel, Maienschein, Obernolte, Petrie-Norris, Quirk, Robert Rivas
ABS, ABST OR NV: Brough, Eduardo Garcia
ASSEMBLY FLOOR: 77-0-3
YES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Muratsuchi, Nazarian, O'Donnell, Obernolte, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
ABS, ABST OR NV: Cooley, Eduardo Garcia, Mullin
SENATE FLOOR: 40-0-0
YES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dahle, Dodd, Durazo, Galgiani, Glazer, Lena Gonzalez, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
UPDATED:
VERSION: August 26, 2019
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0001913
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1560 |
THIRD READING
Bill No: AB 1560
Amended: 8/26/19 in Senate
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-0, 6/19/19
AYES: Allen, Bates, Dahle, Hill, Skinner, Stern
NO VOTE RECORDED: Wieckowski
SENATE HOUSING COMMITTEE: 11-0, 7/2/19
AYES: Wiener, Morrell, Bates, Caballero, Durazo, McGuire, Moorlach, Roth, Skinner, Umberg, Wieckowski
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 77-0, 5/22/19 (Consent) - See last page for vote
SUBJECT: California Environmental Quality Act: transportation: major transit stop
SOURCE: Valley Industry and Commerce Association
DIGEST:
This bill revises the definition of “major transit stop” to include “bus rapid transit,” as defined.
Senate Floor Amendments of 8/26/19 amend the definition of “bus rapid transit” to mean public mass transit service that has full-time dedicated bus lanes or operation in a separate right-of-way dedicated for public transportation, as specified.
Existing law, the California Environmental Quality Act (CEQA):
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration (ND), mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
- Creates specified incentives for the implementation of sustainable community strategies, including a CEQA exemption or abbreviated review for residential or mixed-use residential “transit priority projects,” as specified (PRC §21155 et seq.).
- Requires “transit priority project” to do all of the following:
- Contain at least 50% residential use, based on the total building square footage and, if the project contains between 26% and 50% nonresidential uses, a floor area ratio of not less than 0.75.
- Provide a minimum net density of at least 20 dwelling units per acre.
- Be within 1/2 mile of a major transit stop or high-quality transit corridor included in a regional transportation plan.
- Defines “major transit stop” as a site that contains any of the following:
- An existing rail transit station.
- A ferry terminal served by either a bus or rail transit service.
- The intersection of at least two major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Defines “high-quality transit corridor” as a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours (PRC §21155).
- Requires “transit priority project” to do all of the following:
This bill revises the definition of “major transit stop” to include a bus rapid transit station. Defines “bus rapid transit” as a public mass transit service provided by a public agency or public-private partnership that includes all of the following features:
- Full-time dedicated bus lanes or operation in a separate right-of-way dedicated for public transportation with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Transit signal priority.
- All-door boarding.
- Fare collection system that promotes efficiency.
- Defined stations.
Background
- CEQA
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project.
- What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas (GHG) emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary.
- Infill development. “Infill development” occurs in already built-up areas with existing transportation and utility infrastructure, often repurposes or replaces existing buildings, parking lots, or other impervious areas, and adds homes and/or businesses near the center of cities and towns. Infill development is considered a vital strategy for efficient growth.
Infill builds within an existing footprint of development, which can reduce development pressure on outlying areas, helping to safeguard lands that serve important ecological functions and preserve open space and prevent conversion of agricultural land; can reduce the amount that people drive, improving air quality and reducing GHG emissions; and can lead to the cleanup and reuse of formerly economically viable but now abandoned sites, including those contaminated with hazardous substances. Also, by locating new developments near population centers and amenities, communities can take advantage of existing water, sewer, and transportation systems, avoiding the cost of installing expensive new infrastructure.
According to the United States Environmental Protection Agency (US EPA), several trends point to a sustained increase in demand for infill development and a market opportunity for developers. Consumer preferences for the amenities that infill locations offer are likely to grow as changing demographics affect the housing market. In the next couple of decades, the needs and preferences of aging baby boomers, new households, and one-person households will drive real estate market trends – and infill locations are likely to attract many of these people. As more people choose to live in infill neighborhoods, employers are following, and vice versa. Many corporations are moving to infill locations, in part because they recognize the competitive advantages of being closer to the central city. (US EPA, “Smart Growth and Economic Success: Investing in Infill Development,” February 2014.)
The Strategic Growth Council, as a part of its broader legislative mandate, has identified “infill” development as an important strategy for achieving AB 32 GHG emissions reduction targets. While contributing to reductions of GHG emissions, achieving infill development can confer a broad range of benefits, such as increased economic vitality of the state’s urban centers; decreased consumption of energy, water, and other natural resources; reduced conversion of farmland and natural habitat areas; and the opportunity for more efficient infrastructure investment and delivery of municipal services.
- Measure JJJ and the Transit Oriented Communities Affordable Housing Incentive Program. Measure JJJ, also known as the “Build Better LA” Initiative, was approved by Los Angeles voters in November 2016, with the intent of, among other things, creating incentives for developers building near transit stops. Pursuant to Measure JJJ, the Los Angeles Municipal Code was added to create the Transit Oriented Communities (TOC) Affordable Housing Incentive Program. Measure JJJ required the Los Angeles Department of City Planning to create TOC Affordable Housing Incentive Guidelines (TOC Guidelines) for all housing developments located within a one-half mile radius of a major transit stop, which the TOC Guidelines define as a site containing a rail station or the intersection of two or more bus routes of a service interval of 15 minutes or less during the morning and afternoon peak commute periods.
Comments
- Purpose of Bill. According to the author, “The current definitions of ‘transit priority area’ and ‘major transit stop’ fail to address use of on demand and first-mile, last-mile services that are essential to a vibrant transit community that is responsive to today’s technology and demands. As presently defined, there are a significantly limited number of transit priority areas as the definition of ‘major transit stop’ excludes many of the San Fernando Valley’s major bus lines. Consequently, large swaths of the San Fernando Valley are excluded from eligibility under the TOC Guidelines and under the CEQA exemption discussed above. AB 1560 revises the definition of ‘major transit stop’ to include a bus rapid transit station, as defined, to ensure housing incentives apply to as much high quality transit as possible.”
- Expanding existing CEQA exemptions. The definition of “major transit stop” as it exists today was initially added by SB 1925 (Sher, Chapter 1039, Statutes of 2002). When enacted, the purpose of “major transit stop” was to provide incentives to developers for urban infill development near high-quality transit stops by way of a CEQA exemption. Some would argue that as the state’s urban planning and transportation policies evolve over time, so should what is considered a “major transit stop.”
Expanding the definition of “major transit stop” to include “bus rapid transit stations” will expand the application of the sustainable communities’ strategies and transit-oriented project exemptions described above; easing the requirements a projects has to meet to be eligible for the exemptions. While this would certainly promote for more development around transit, those developments would not be subject to any environmental review.
- What do we lose with a CEQA exemption? Often groups will seek a CEQA exemption in order to expedite construction of a particular type of project and reduce costs. Providing an exemption, however, can overlook the benefits of environmental review: to inform decisionmakers and the public about project impacts, identify ways to avoid or significantly reduce environmental damage, prevent environmental damage by requiring feasible alternatives or mitigation measures, disclose to the public reasons why an agency approved a project if significant environmental effects are involved, involve public agencies in the process, and increase public participation in the environmental review and the planning processes.
If a project is exempt from CEQA, certain issues may not get addressed. For example, environmental impacts including matters such as air quality, water quality, noise, cumulative impacts, and growth inducing impacts will not be considered, and neither will their potential mitigation measures or available alternatives.
Although the author’s intent is to encourage more development around transit stops through the increased applicability of CEQA exemptions, incentives, and bonuses that are predicated on being near a major transit stop – some of which contain affordable housing components - CEQA ensures that projects are approved in accordance with informed and responsible decisionmaking. Building an increased amount of affordable housing is certainly a priority in addressing the state’s housing crisis, but so is ensuring the that the development does not present a real risk of additional environmental and public health harm to both the community and the future residents of the development. It ensures that decisionmakers, project proponents, and the public know of the potential short-term, long-term, and maybe permanent consequences of a particular project before the project is approved. CEQA gives local governments and project proponents the opportunity to mitigate, or avoid if possible, those impacts.
Under CEQA, development projects around transit may consider any of the following, and more -
- Whether the project would expose sensitive populations to substantial air pollutant concentrations.
- Whether the project would impair or interfere with an adopted emergency response plan or emergency evacuation plan.
- Whether the project would require or result in the relocation or construction of new or expanded water or wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities.
- Whether the project would be located on a site that is included on a certain list of hazardous materials sites and would create a significant hazard to the public or the environment.
- Whether there are any seismic-related issues or landslide concerns.
Expanding the definition of “major transit stop” would remove additional projects from the environmental review process. And while there are other specified requirements that a development must meet to be eligible for an exemption, that “checklist” may not be as exhaustive and everything that is typically looked at during an environmental review may not be considered. CEQA provides a holistic look at the project, an opportunity to examine different aspects of the project in context of one another and not in a siloed fashion.
- What else would be affected? Expanding the definition will also affect the following existing programs; the applicability of which is based on its proximity to what is considered a “major transit stop:”
- CEQA exemption for certain urban residential projects (PRC §21159.24).
- Infrastructure finance district reimbursements and transit priority projects. Infrastructure finance districts may reimburse developers meeting certain requirements for permit expenses and expenses related to the construction of affordable housing units pursuant to the Transit Priority Project Program (TPPP). To be an eligible project under TPPP, the project must be located within one-half mile of a major transit stop or high-quality transit corridor.
- Second Neighborhood Infill Finance and Transit Improvements Act – NIFTI-2 (Gov. C. §53398.75.7) which allows certain enhanced infrastructure financing districts to issue debt for affordable housing near transit without voter approval.
- Low and Moderate Income Housing Asset Fund (LMIHF) and development of transit priority projects (Health & Safety Code §34176.1). Certain housing successors are allowed to transfer funds from their LMIHF to develop transit priority projects, permanent supportive housing, housing for agricultural employees, and special needs housing; with a limitation that the development cannot not located in certain census tracts unless the development is within 1/2 mile of a major transit stop or high-quality transit corridor.
- Congestion management programs and infill opportunity zones. Congestion management programs are required for every county that includes an urbanized area and are required to contain certain elements, including traffic level of service standards, which can be affected by designated infill opportunity zones. The designation of infill opportunity zones depend on various factors, including whether it is within one-half mile of a major transit stop or high-quality transit corridor.
- Developer incentives and bonuses. Various incentives and bonuses are given to developers whose projects meet a combination of criteria, including that the project be within one-half mile of a major transit stop. These bonuses and incentives include, but are not limited to, increased density, increased height, parking ratios, and floor area ratio bonuses (Gov. C. §65915, 65915.7, 65917.2).
- Designated historical resources. A project is not required to provide parking spaces greater than the number of parking spaces that existed on the project site prior if the project is converting or adapting a designated historical resource to a residential use that is located within one-half mile of a major transit stop (Health & Safety Code §18962).
- CEQA plays an important role in ensuring smart growth. Some may view the restrictiveness of the current “major transit stop” definition as hindering development of affordable housing projects near transit. This is not an entirely accurate statement. The presence of a “major transit stop” does not prevent a developer from building his or her project. A developer can build wherever they choose, within the limitations of other statutes and local ordinances of course, they just might not be eligible for the incentives. In fact, the opposite is true –a “major transit stop” is meant to encourage development near those spots; encouraging smart and sustainable growth around centralized areas by providing CEQA exemptions. It is not meant to apply to every project.
For these reasons, expanding the definition of “major transit stop” must be done in a very thoughtful and purposeful manner.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
Valley Industry and Commerce Association (source)
Association of Environmental Professionals
BizFed
California Apartment Association
California Association of Realtors
California Building Industry Association
Civil Justice Association of California
Hollywood Chamber of Commerce
Los Angeles Area Chamber of Commerce
Southern California Association of NonProfit Housing
OPPOSITION: (Verified 8/27/19)
None received
ASSEMBLY FLOOR: 77-0, 5/22/19
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO VOTE RECORDED: Cooley, Eduardo Garcia, Mullin
Prepared by: Genevieve M. Wong / E.Q. / (916) 651-4108
8/29/19 11:35:52
**** END ****
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1560 |
THIRD READING
Bill No: AB 1560
Amended: 7/8/19 in Senate
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 6-0, 6/19/19
AYES: Allen, Bates, Dahle, Hill, Skinner, Stern
NO VOTE RECORDED: Wieckowski
SENATE HOUSING COMMITTEE: 11-0, 7/2/19
AYES: Wiener, Morrell, Bates, Caballero, Durazo, McGuire, Moorlach, Roth, Skinner, Umberg, Wieckowski
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 77-0, 5/22/19 (Consent) - See last page for vote
SUBJECT: California Environmental Quality Act: transportation: major transit stop
SOURCE: Valley Industry and Commerce Association
DIGEST:
This bill revises the definition of “major transit stop” to include “bus rapid transit,” as defined.
Existing law, the California Environmental Quality Act (CEQA):
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration (ND), mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
- Creates specified incentives for the implementation of sustainable community strategies, including a CEQA exemption or abbreviated review for residential or mixed-use residential “transit priority projects,” as specified (PRC §21155 et seq.).
- Requires “transit priority project” to do all of the following:
- Contain at least 50% residential use, based on the total building square footage and, if the project contains between 26% and 50% nonresidential uses, a floor area ratio of not less than 0.75.
- Provide a minimum net density of at least 20 dwelling units per acre.
- Be within 1/2 mile of a major transit stop or high-quality transit corridor included in a regional transportation plan.
- Defines “major transit stop” as a site that contains any of the following:
- An existing rail transit station.
- A ferry terminal served by either a bus or rail transit service.
- The intersection of at least two major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Defines “high-quality transit corridor” as a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours (PRC §21155).
- Requires “transit priority project” to do all of the following:
This bill revises the definition of “major transit stop” to include a bus rapid transit station. Defines “bus rapid transit” as a public mass transit service provided by a public agency or public-private partnership that includes all of the following features:
- Peak period or full-time dedicated bus lanes or operation in a separate right-of-way dedicated for public transportation with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Transit signal priority.
- All-door boarding.
- Fare collection system that promotes efficiency.
- Defined stations.
Background
- CEQA
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project.
- What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas (GHG) emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary.
- Infill development. “Infill development” occurs in already built-up areas with existing transportation and utility infrastructure, often repurposes or replaces existing buildings, parking lots, or other impervious areas, and adds homes and/or businesses near the center of cities and towns. Infill development is considered a vital strategy for efficient growth.
Infill builds within an existing footprint of development, which can reduce development pressure on outlying areas, helping to safeguard lands that serve important ecological functions and preserve open space and prevent conversion of agricultural land; can reduce the amount that people drive, improving air quality and reducing GHG emissions; and can lead to the cleanup and reuse of formerly economically viable but now abandoned sites, including those contaminated with hazardous substances. Also, by locating new developments near population centers and amenities, communities can take advantage of existing water, sewer, and transportation systems, avoiding the cost of installing expensive new infrastructure.
According to the United States Environmental Protection Agency (US EPA), several trends point to a sustained increase in demand for infill development and a market opportunity for developers. Consumer preferences for the amenities that infill locations offer are likely to grow as changing demographics affect the housing market. In the next couple of decades, the needs and preferences of aging baby boomers, new households, and one-person households will drive real estate market trends – and infill locations are likely to attract many of these people. As more people choose to live in infill neighborhoods, employers are following, and vice versa. Many corporations are moving to infill locations, in part because they recognize the competitive advantages of being closer to the central city. (US EPA, “Smart Growth and Economic Success: Investing in Infill Development,” February 2014.)
The Strategic Growth Council, as a part of its broader legislative mandate, has identified “infill” development as an important strategy for achieving AB 32 GHG emissions reduction targets. While contributing to reductions of GHG emissions, achieving infill development can confer a broad range of benefits, such as increased economic vitality of the state’s urban centers; decreased consumption of energy, water, and other natural resources; reduced conversion of farmland and natural habitat areas; and the opportunity for more efficient infrastructure investment and delivery of municipal services.
- Measure JJJ and the Transit Oriented Communities Affordable Housing Incentive Program. Measure JJJ, also known as the “Build Better LA” Initiative, was approved by Los Angeles voters in November 2016, with the intent of, among other things, creating incentives for developers building near transit stops. Pursuant to Measure JJJ, the Los Angeles Municipal Code was added to create the Transit Oriented Communities (TOC) Affordable Housing Incentive Program. Measure JJJ required the Los Angeles Department of City Planning to create TOC Affordable Housing Incentive Guidelines (TOC Guidelines) for all housing developments located within a one-half mile radius of a major transit stop, which the TOC Guidelines define as a site containing a rail station or the intersection of two or more bus routes of a service interval of 15 minutes or less during the morning and afternoon peak commute periods.
Comments
- Purpose of Bill. According to the author, “The current definitions of ‘transit priority area’ and ‘major transit stop’ fail to address use of on demand and first-mile, last-mile services that are essential to a vibrant transit community that is responsive to today’s technology and demands. As presently defined, there are a significantly limited number of transit priority areas as the definition of ‘major transit stop’ excludes many of the San Fernando Valley’s major bus lines. Consequently, large swaths of the San Fernando Valley are excluded from eligibility under the TOC Guidelines and under the CEQA exemption discussed above. AB 1560 revises the definition of ‘major transit stop’ to include a bus rapid transit station, as defined, to ensure housing incentives apply to as much high quality transit as possible.”
- Expanding existing CEQA exemptions. The definition of “major transit stop” as it exists today was initially added by SB 1925 (Sher, Chapter 1039, Statutes of 2002). When enacted, the purpose of “major transit stop” was to provide incentives to developers for urban infill development near high-quality transit stops by way of a CEQA exemption. Some would argue that as the state’s urban planning and transportation policies evolve over time, so should what is considered a “major transit stop.”
Expanding the definition of “major transit stop” to include “bus rapid transit stations” will expand the application of the sustainable communities’ strategies and transit-oriented project exemptions described above; easing the requirements a projects has to meet to be eligible for the exemptions. While this would certainly promote for more development around transit, those developments would not be subject to any environmental review.
- What do we lose with a CEQA exemption? Often groups will seek a CEQA exemption in order to expedite construction of a particular type of project and reduce costs. Providing an exemption, however, can overlook the benefits of environmental review: to inform decisionmakers and the public about project impacts, identify ways to avoid or significantly reduce environmental damage, prevent environmental damage by requiring feasible alternatives or mitigation measures, disclose to the public reasons why an agency approved a project if significant environmental effects are involved, involve public agencies in the process, and increase public participation in the environmental review and the planning processes.
If a project is exempt from CEQA, certain issues may not get addressed. For example, environmental impacts including matters such as air quality, water quality, noise, cumulative impacts, and growth inducing impacts will not be considered, and neither will their potential mitigation measures or available alternatives.
Although the author’s intent is to encourage more development around transit stops through the increased applicability of CEQA exemptions, incentives, and bonuses that are predicated on being near a major transit stop – some of which contain affordable housing components - CEQA ensures that projects are approved in accordance with informed and responsible decisionmaking. Building an increased amount of affordable housing is certainly a priority in addressing the state’s housing crisis, but so is ensuring the that the development does not present a real risk of additional environmental and public health harm to both the community and the future residents of the development. It ensures that decisionmakers, project proponents, and the public know of the potential short-term, long-term, and maybe permanent consequences of a particular project before the project is approved. CEQA gives local governments and project proponents the opportunity to mitigate, or avoid if possible, those impacts.
Under CEQA, development projects around transit may consider any of the following, and more -
- Whether the project would expose sensitive populations to substantial air pollutant concentrations.
- Whether the project would impair or interfere with an adopted emergency response plan or emergency evacuation plan.
- Whether the project would require or result in the relocation or construction of new or expanded water or wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities.
- Whether the project would be located on a site that is included on a certain list of hazardous materials sites and would create a significant hazard to the public or the environment.
- Whether there are any seismic-related issues or landslide concerns.
Expanding the definition of “major transit stop” would remove additional projects from the environmental review process. And while there are other specified requirements that a development must meet to be eligible for an exemption, that “checklist” may not be as exhaustive and everything that is typically looked at during an environmental review may not be considered. CEQA provides a holistic look at the project, an opportunity to examine different aspects of the project in context of one another and not in a siloed fashion.
- What else would be affected? Expanding the definition will also affect the following existing programs; the applicability of which is based on its proximity to what is considered a “major transit stop:”
- CEQA exemption for certain urban residential projects (PRC §21159.24).
- Infrastructure finance district reimbursements and transit priority projects. Infrastructure finance districts may reimburse developers meeting certain requirements for permit expenses and expenses related to the construction of affordable housing units pursuant to the Transit Priority Project Program (TPPP). To be an eligible project under TPPP, the project must be located within one-half mile of a major transit stop or high-quality transit corridor.
- Second Neighborhood Infill Finance and Transit Improvements Act – NIFTI-2 (Gov. C. §53398.75.7) which allows certain enhanced infrastructure financing districts to issue debt for affordable housing near transit without voter approval.
- Low and Moderate Income Housing Asset Fund (LMIHF) and development of transit priority projects (Health & Safety Code §34176.1). Certain housing successors are allowed to transfer funds from their LMIHF to develop transit priority projects, permanent supportive housing, housing for agricultural employees, and special needs housing; with a limitation that the development cannot not located in certain census tracts unless the development is within 1/2 mile of a major transit stop or high-quality transit corridor.
- Congestion management programs and infill opportunity zones. Congestion management programs are required for every county that includes an urbanized area and are required to contain certain elements, including traffic level of service standards, which can be affected by designated infill opportunity zones. The designation of infill opportunity zones depend on various factors, including whether it is within one-half mile of a major transit stop or high-quality transit corridor.
- Developer incentives and bonuses. Various incentives and bonuses are given to developers whose projects meet a combination of criteria, including that the project be within one-half mile of a major transit stop. These bonuses and incentives include, but are not limited to, increased density, increased height, parking ratios, and floor area ratio bonuses (Gov. C. §65915, 65915.7, 65917.2).
- Designated historical resources. A project is not required to provide parking spaces greater than the number of parking spaces that existed on the project site prior if the project is converting or adapting a designated historical resource to a residential use that is located within one-half mile of a major transit stop (Health & Safety Code §18962).
- CEQA plays an important role in ensuring smart growth. Some may view the restrictiveness of the current “major transit stop” definition as hindering development of affordable housing projects near transit. This is not an entirely accurate statement. The presence of a “major transit stop” does not prevent a developer from building his or her project. A developer can build wherever they choose, within the limitations of other statutes and local ordinances of course, they just might not be eligible for the incentives. In fact, the opposite is true –a “major transit stop” is meant to encourage development near those spots; encouraging smart and sustainable growth around centralized areas by providing CEQA exemptions. It is not meant to apply to every project.
For these reasons, expanding the definition of “major transit stop” must be done in a very thoughtful and purposeful manner.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
Valley Industry and Commerce Association (source)
Association of Environmental Professionals
BizFed
California Apartment Association
California Association of Realtors
California Building Industry Association
Civil Justice Association of California
Hollywood Chamber of Commerce
Los Angeles Area Chamber of Commerce
Southern California Association of NonProfit Housing
OPPOSITION: (Verified 8/19/19)
None received
ASSEMBLY FLOOR: 77-0, 5/22/19
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO VOTE RECORDED: Cooley, Eduardo Garcia, Mullin
Prepared by: Genevieve M. Wong / E.Q. / (916) 651-4108
8/21/19 9:50:59
**** END ****
SENATE COMMITTEE ON HOUSING
Senator Scott Wiener, Chair
2019 - 2020 Regular
Bill No: AB 1560 Hearing Date: 7/2/2019
Author: | Friedman | ||
Version: | 6/25/2019 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Alison Hughes | ||
SUBJECT: California Environmental Quality Act: transportation: major transit stop
DIGEST: This bill redefines “major transit stop” to include “bus rapid transit,” as defined.
ANALYSIS:
Existing law, pursuant to the California Environmental Quality Act (CEQA):
- Creates specified incentives for the implementation of the strategies, including CEQA exemption or abbreviated review for residential or mixed-use residential “transit priority projects,” if the project is consistent with the use designation, density, building intensity, and applicable policies specified for the project area in either an approved sustainable communities strategy or alternative planning strategy.
- Requires a “transit priority project” to do all of the following:
- Contain at least 50% residential use, based on the total building square footage and, if the project contains between 26% and 50% nonresidential uses, a floor area ratio of not less than 0.75.
- Provide a minimum net density of at least 20 dwelling units per acre.
- Be located within ½ mile of a major transit stop or high-quality transit corridor included in a regional transportation plan.
- Defines “major transit stop” as a site that contains any of the following:
- An existing rail transit station.
- A ferry terminal served by either a bus or rail transit service.
- The intersection of at least two major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Defines “high-quality transit corridor” as a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.
- Establishes state funding programs to fund affordable housing development near transit.
This bill:
- Redefines “major transit stop” as a site containing an existing rail or bus rapid transit station or a ferry terminal served by either a bus or rail transit service.
- Defines “bus rapid transit” as a public mass transit service provided by a public agency or a public-private partnership that includes all of the following features:
- Peak period or full-time dedicated bus lanes or operation in a separate right-of-way dedicated for public transportation with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Transit signal priority.
- All-door boarding.
- Off-board fare collection systems at the stations.
- Defined stations.
- Defines “bus rapid transit station” means a clearly defined bus station served by a bus rapid transit.
COMMENTS
- Purpose of the bill. According to the author, “The current definitions of ‘transit priority area’ and ‘major transit stop’ fail to address use of on demand and first-mile, last-mile services that are essential to a vibrant transit community that is responsive to today’s technology and demands. As presently defined, there are a significantly limited number of transit priority areas as the definition of ‘major transit stop’ excludes many of the San Fernando Valley’s major bus lines. Consequently, large swaths of the San Fernando Valley are excluded from eligibility under the TOC Guidelines and under the CEQA exemption discussed above. AB 1560 revises the definition of ‘major transit stop’ to include a bus rapid transit station, as defined, to ensure housing incentives apply to as much high quality transit as possible.”
- Housing near transit. Research has shown that encouraging more dense housing near transit serves not only as a means of increasing ridership of public transportation to reduce greenhouse gases (GHGs), but also a solution to our state’s housing crisis. As part of California’s overall strategy to combat climate change, the Legislature began the process of encouraging more transit oriented development with the passage of SB 375 (Steinberg, Chapter 728, Statutes of 2008). SB 375 is aimed at reducing the amount that people drive and associated GHGs by requiring the coordination of transportation, housing, and land use planning. The Legislature subsequently allocated 20% of the ongoing Cap and Trade Program funds to the Affordable Housing and Sustainable Communities Program, which funds land use, housing, transportation, and land preservation projects to support infill and compact development that reduce GHGs. At least half of the funds must support affordable housing projects.
A 2016 McKinsey Report, A Toolkit to Close California’s Housing Gap: 3.5 Million Homes by 2025, found that increasing housing density around high-frequency public transit stations could build 1.2 – 3 million units within a half-mile radius of transit. The report notes that this new development would have to be sensitive to the character of a place, and recommends that local communities proactively rezone station areas for higher residential density to pave the way for private investments, accelerate land-use approvals, and use bonds to finance station area infrastructure.
Research has also demonstrated a positive relationship between income and vehicle miles traveled (VMT). A study by the Center for Neighborhood Technology, entitled Income, Location Efficiency, and VMT: Affordable housing as a Climate Strategy, created a model to isolate the relationship of income on VMT. This model found that lower-income families living near transit were likely to drive less than their wealthier neighbors. More specifically, in metro regions, home to two-thirds of California’s population, identically composed and located low-income households were predicted to drive 10% less than the median, very low-income households 25% less, and extremely low-income households 33% less. By contrast, middle income households were predicted to drive 5% more and above moderate-income households 14% more. The patterns are similar for the other two regional contexts, although the differences are slightly reduced in rural areas. This research demonstrates the value of encouraging lower-income people to live near transit who are more likely to increase transit ridership.
- Major transit stops under CEQA. The definition of “major transit stop” as it exists today was initially added by SB 1925 (Sher, Chapter 1039, Statutes of 2002). When enacted, the purpose of “major transit stop” was to provide incentives to developers for urban infill development near high-quality transit stops by way of a CEQA exemption. Since that time, the Legislature has passed several programs that provide exemptions under CEQA for projects that develop near major transit stops.
- Existing transit-oriented development programs. The Affordable Housing and Sustainable Communities (AHSC) Program, administered by the Strategic Growth Council, furthers the purposes of AB 32 (Chapter 488, Statues 2006) and SB 375 (Chapter 728, Statutes, 2008) by investing in projects that reduce GHG emissions by supporting more compact, infill development patterns, encouraging active transportation and transit usage, and protecting agricultural land from sprawl development. Funding for AHSC is provided from the Greenhouse Gas Reduction Fund (GGRF), an account established to receive Cap-and-Trade auction proceeds. AHSC provides grants and/or loans to projects that achieve GHG reductions and benefit disadvantaged communities, low-income communities, and low-income households through increasing accessibility of affordable housing connected to high quality transit. High quality transit includes bus rapid transit with a headway frequency of every 15 minutes or less and service seven days a week.
Additionally, the California Housing and Community Development Department (HCD) administers the Transit Oriented Development (TOD) Program. Its primary objectives are to increase the overall supply of housing, increase the supply of affordable housing, increase public transit ridership, and minimize automobile trips. The program seeks to accomplish these objectives by providing financial assistance for the development of housing and related infrastructure near public transit stations, including bus rapid transit.
- Existing land use program that tie housing to major transit stops. While the definition of “major transit stop” is housed under CEQA, several land use housing incentives in recent years have tied housing developments to transit using the CEQA definition of “major transit stop” without providing the CEQA exemptions. Here are some examples:
- SB 961 (Allen, Chapter 559, Statutes of 2018) tied affordable housing within an enhanced infrastructure financing district to major transit stops.
- AB 2372 (Gloria, Chapter 915, Statues of 2018) authorized a city or county to establish a procedure by ordinance to grant a developer a floor area ratio bonus in lieu of a density bonus.
- AB 744 (Chau, Chapter 699, Statues of 2015) reduced parking on density bonus projects that contain 100% affordable units and are near a major transit stop.
As evidenced in the “Related Legislation,” more and more the Legislature is incentivizing housing construction near transit using the “major transit stop” definition under CEAQ. This bill expands the definition of “major transit stop” to include “bus rapid transit,” as defined, to reflect the policy contained within existing state-funded transit-oriented development programs. In effect, this bill expands the locations where existing and future transit oriented developments could be located.
6) Double-referral. This bill was heard in the Environmental Quality Committee and passed out on June 19th on a vote of 6-0.
Related Legislation:
SB 4 (McGuire, 2019) — would have established a ministerial approval process for transit-oriented development and small multifamily developments that meet specified conditions. This bill was pulled at the request of the author in the Senate Governance and Finance Committee.
SB 50 (Wiener, 2019) — requires local governments to grant equitable communities incentives to jobs-rich housing projects and transit-rich housing projects that meet certain requirements, including proximity to a major transit stop, as specified. This bill is pending in the Senate Appropriations Committee.
SB 621 (Glazer, 2019) — applies expedited judicial review of CEQA cases that involve certain affordable housing projects that are in close proximity to a major transit stop. This bill is pending in the Assembly Natural Resources Committee.
AB 1717 (Friedman, 2019) — would have created the Transit-Oriented Affordable Housing Funding Program Act to use tax increment financing to fund multifamily housing either one-half mile of a major transit stop or one-quarter mile of a high-quality bus corridor. This bill was held in the Assembly Appropriations Committee.
AB 1763 (Chiu, 2019) — among other things, prohibits a city or county from imposing any maximum controls on density, and allows height and floor area ratio increases for housing developments if 100% of the units are restricted to lower-income households and if it is located within one-half mile of a major transit stop. This bill is pending in the Senate Governance and Finance Committee.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
POSITIONS: (Communicated to the committee before noon on Wednesday,
June 26, 2019.)
SUPPORT:
Valley Industry And Commerce Association (Sponsor)
BizFed
California Association of Realtors
California Building Industry Association
Civil Justice Association of California
Los Angeles Area Chamber of Commerce
Southern California Association of Nonprofit Housing
OPPOSITION:
None received.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Allen, Chair
2019 - 2020 Regular
Bill No: AB 1560
Author: | Friedman | ||
Version: | 6/05/2019 | Hearing Date: | 6/19/2019 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Genevieve M. Wong | ||
SUBJECT: California Environmental Quality Act: transportation: major transit stop
DIGEST: Revises the definition of “major transit stop” to include a “bus rapid transit station,” as defined.
ANALYSIS:
Existing law, the California Environmental Quality Act (CEQA):
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
- Requires metropolitan planning organizations (MPOs) to include a sustainable communities strategy (SCS), in their regional transportation plans, or an alternative planning strategy (APS), for the purpose of reducing greenhouse gas (GHG) emissions; aligns planning for transportation and housing; and creates specified incentives for the implementation of the strategies, including CEQA exemption or abbreviated review for residential or mixed-use residential “transit priority projects,” if the project is consistent with the use designation, density, building intensity, and applicable policies specified for the project area in either an approved SCS or APS (PRC §21155 et seq.).
- Requires “transit priority project” to do all of the following:
- Contain at least 50% residential use, based on the total building square footage and, if the project contains between 26% and 50% nonresidential uses, a floor area ratio of not less than 0.75.
- Provide a minimum net density of at least 20 dwelling units per acre.
- Be within ½ mile of a major transit stop or high-quality transit corridor included in a regional transportation plan.
- Defines “major transit stop” as a site that contains any of the following:
- An existing rail transit station.
- A ferry terminal served by either a bus or rail transit service.
- The intersection of at least two major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Defines “high-quality transit corridor” as a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours (PRC §21155).
- Requires “transit priority project” to do all of the following:
This bill:
- Revises the definition of “major transit stop” to also include a bus rapid transit station. Defines “bus rapid transit station” as either:
- A clearly defined bus station served by a bus rapid transit.
- A bus station served by a bus line that has a full-time dedicated bus lane or a separate right-of-way, or operates on a fixed guideway.
- Defines “bus rapid transit” as a public mass transit service provided by a public agency or by a public-private partnership that includes all of the following:
- Peak period or full-time dedicated bus lanes or operation in a separate right-of-way dedicated for public transportation.
- Transit signal priority,
- All-door boarding.
- Off-board fare collection systems at the stations.
- Defined stations with shelters.
Background
- Background on CEQA.
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings.
- What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary.
- CEQA provides a hub for multi-disciplinary regulatory process. An environmental review provides a forum for all the described issue areas to be considered together rather than siloed from one another. It provides a comprehensive review of the project, considering all applicable environmental laws and how those laws interact with one another. For example, it would be prudent for a lead agency to know that a proposal to mitigate a significant impact (i.e. alleviate temporary traffic congestion, due to construction of a development project, by detouring traffic to an alternative route) may trigger a new significant impact (i.e. the detour may redirect the impact onto a sensitive resource, such as a habitat of an endangered species). The environmental impact caused by the proposed mitigation measure should be evaluated as well. CEQA provides the opportunity to analyze a broad spectrum of a project’s potential environmental impacts and how each impact may intertwine with one another.
- What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary.
- Infill development. “Infill development” occurs in already built-up areas with existing transportation and utility infrastructure, often repurposes or replaces existing buildings, parking lots, or other impervious areas, and adds homes and/or businesses near the center of cities and towns. Infill development is considered a vital strategy for efficient growth.
Infill builds within an existing footprint of development, which can reduce development pressure on outlying areas, helping to safeguard lands that serve important ecological functions and preserve open space and prevent conversion of agricultural land; can reduce the amount that people drive, improving air quality and reducing GHG emissions; and can lead to the cleanup and reuse of formerly economically viable but now abandoned sites, including those contaminated with hazardous substances. Also, by locating new developments near population centers and amenities, communities can take advantage of existing water, sewer, and transportation systems, avoiding the cost of installing expensive new infrastructure.
According to the US Environmental Protection Agency (US EPA), several trends point to a sustained increase in demand for infill development and a market opportunity for developers. Consumer preferences for the amenities that infill locations offer are likely to grow as changing demographics affect the housing market. In the next couple of decades, the needs and preferences of aging baby boomers, new households, and one-person households will drive real estate market trends – and infill locations are likely to attract many of these people. As more people choose to live in infill neighborhoods, employers are following, and vice versa. Many corporations are moving to infill locations, in part because they recognize the competitive advantages of being closer to the central city. (US EPA, “Smart Growth and Economic Success: Investing in Infill Development,” February 2014.)
The Strategic Growth Council (SGC), as a part of its broader legislative mandate, has identified “infill” development as an important strategy for achieving AB 32 greenhouse gas (GHG) emissions reduction targets. While contributing to reductions of GHG emissions, achieving infill development can confer a broad range of benefits, such as increased economic vitality of the state’s urban centers; decreased consumption of energy, water, and other natural resources; reduced conversion of farmland and natural habitat areas; and the opportunity for more efficient infrastructure investment and delivery of municipal services.
Over the past several years, MPOs have been preparing SCS plans mandated by SB 375 (Steinberg, Chapter 728, Statutes of 2008) through regional planning efforts. As part of these planning efforts, MPOs have developed new regional and local population and employment forecasts that envision increasingly clustered future regional land use patterns that likely will provide GHG emissions reductions benefits.
- CEQA and transit.
Transit priority projects and SB 375. SB 375 (Steinberg, Chapter 728, Statutes of 2008) established the Sustainable Communities and Climate Protection Act of 2008. SB 375 directed the California Air Resources Board (ARB) to set regional targets for reducing GHG emissions, setting up a “bottom up” approach to ensure that cities and counties are involved in the development of regional plans to achieve those targets. SB 375 tied together the regional allocation of housing needs and regional transportation planning in an effort to reduce GHG emissions from motor vehicle trips. According to ARB, transportation accounts for approximately 40% of GHG emissions, with cars and light trucks making up a significant majority of those emissions (30% overall).
SB 375 established a collaborative process between regional and state agencies to set regional GHG reduction targets, and provided CEQA incentives for development projects that are consistent with a regional plan that meets those targets. SB 375 has three major components: (i) Using the regional transportation planning process to achieve reductions in GHG emissions consistent with AB 32 goals; (ii) Offering CEQA incentives to encourage projects that are consistent with a regional plan that achieves GHG emission reductions; and, (iii) Coordinating the regional housing needs allocation process with the regional transportation process while maintaining local authority over land use decisions.
In 2011, the Legislature enacted the Transit Priority Project Program (TPPP) (Hancock, Chapter 446, Statutes of 2011) to provide a process for cities and counties to create development patterns in the form of transit priority projects to create jobs, reduce vehicle miles traveled, expand the availability of open-space, build the density needed for transit viability, and meet regional housing targets.
A transit priority project is exempt from CEQA as a sustainable community project if, after a public hearing, the project meets certain requirements, including a requirement that the project be located within one-half mile of a major transit station or within one-quarter mile of high-quality transit corridor, and various conditions to ensure that the project has no significant environmental impacts.
Sustainable communities’ environmental assessment. A transit priority project that is not eligible for the above-described exemption, may be reviewed through a sustainable communities environmental assessment, which is similar to a MND except that the lead agency’s actions are subject to a more deferential standard of review (substantial evidence instead of fair argument).
Abbreviated EIR. A transit priority project may also use an abbreviated EIR, which would limit the consideration of cumulative impacts and does not require analysis of off-site alternatives to the project.
Transit-oriented projects and SB 743. SB 743 (Steinberg, Chapter 386, Statutes of 2013) made several changes to CEQA for projects located in areas served by transit (i.e. transit- oriented development (TOD)). SB 743 also created a new exemption for projects that are consistent with a Specific Plan if the project is a residential, mixed-use residential, or employment center project located within a transit priority area (an area within one-half mile of an existing or planned major transit stop) (PRC §21155.4).
- Measure JJJ and the Transit Oriented Communities Affordable Housing Incentive Program. Measure JJJ, also known as the “Build Better LA” Initiative, was approved by Los Angeles voters in November 2016, with the intent of, among other things, creating incentives for developers building near transit stops. Pursuant to Measure JJJ, the Los Angeles Municipal Code was added to create the Transit Oriented Communities (TOC) Affordable Housing Incentive Program (TOC Program). Measure JJJ required the Los Angeles Department of City Planning to create TOC Affordable Housing Incentive Guidelines (TOC Guidelines) for all housing developments located within a one-half mile radius of a major transit stop, which the TOC Guidelines define as a site containing a rail station or the intersection of two or more bus routes of a service interval of 15 minutes or less during the morning and afternoon peak commute periods.
Comments
- Purpose of Bill. According to the author,
“A Transit Priority Area, defined in California Public Resources Code Section 21099 is, generally, an area within ½ mile of an existing or planned Major Transit Stop. Currently, Major Transit Stop is defined in California Public Resources Code Section 21064.3 as “a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute period.” This definition excludes areas throughout the state which are well served by transit where major bus lines either do not intersect, or do intersect, but fall short of the 15-minute headways required by the definition.
“In the city of Los Angeles, the definition of “Major Transit Stop” is applied to the Transit Oriented Guidelines, per Measure JJJ. As such, the definition of Major Transit Stop defines, and consequently limits the eligibility of projects for development incentives for projects that include affordable housing.
“As presently defined, there are a significantly limited number of Transit Priority Areas as the definition of Major Transit Stop excludes many major bus lines. Areas of California well served by Bus Rapid Transit (BRT), but not served by rail transit, have been unable to take advantage of incentive programs and been excluded from these definitions.
“In areas like Southern California’s San Fernando Valley region, the Orange Line is one of the busiest BRT lines operated by LA Metro and serves riders traveling in the San Fernando Valley and throughout Los Angeles County. It is essential that areas throughout California such as areas surrounding the Orange Line be eligible for incentives and CEQA exemptions to ensure housing development is maximized near transit.”
- Changing a widely applicable definition to address a local issue. Proponents of AB 1560 would like to see the definition of major transit stop expanded to increase the number of projects eligible for Measure JJJ funds. The definition, however, has applications across various CEQA exemptions and state programs and those implications, on a statewide level, should be considered.
- Expanding existing CEQA exemptions. The definition of “major transit stop” as it exists today was initially added by SB 1925 (Sher, Chapter 1039, Statutes of 2002). When enacted, the purpose of “major transit stop” was to provide incentives to developers for urban infill development near high-quality transit stops by way of a CEQA exemption. Some would argue that as the state’s urban planning and transportation policies evolve over time, so should what is considered a “major transit stop.”
Expanding the definition of “major transit stop” to include “bus rapid transit stations” will expand the application of the sustainable communities’ strategies and transit-oriented project exemptions described above; easing the requirements a projects has to meet to be eligible for the exemptions. While this would certainly promote for more development around transit, those developments would not be subject to any environmental review.
Is this definition out-of-date? Is there a demonstrated need to lax these requirements on a statewide level? Are developers throughout the state asserting that the definition of major transit stop is too restrictive?
- What do we lose with a CEQA exemption? Often groups will seek a CEQA exemption in order to expedite construction of a particular type of project and reduce costs. Providing an exemption, however, can overlook the benefits of environmental review: to inform decisionmakers and the public about project impacts, identify ways to avoid or significantly reduce environmental damage, prevent environmental damage by requiring feasible alternatives or mitigation measures, disclose to the public reasons why an agency approved a project if significant environmental effects are involved, involve public agencies in the process, and increase public participation in the environmental review and the planning processes.
If a project is exempt from CEQA, certain issues may not get addressed. For example, environmental impacts including matters such as air quality, water quality, noise, cumulative impacts, and growth inducing impacts will not be considered, and neither will their potential mitigation measures or available alternatives.
Although the author’s intent is to encourage more development around transit stops through the increased applicability of CEQA exemptions, incentives, and bonuses that are predicated on being near a major transit stop – some of which contain affordable housing components - CEQA ensures that projects are approved in accordance with informed and responsible decisionmaking. Building an increased amount of affordable housing is certainly a priority in addressing the state’s housing crisis, but so is ensuring the that the development does not present a real risk of additional environmental and public health harm to both the community and the future residents of the development. It ensures that decisionmakers, project proponents, and the public know of the potential short-term, long-term, and maybe permanent consequences of a particular project before the project is approved. CEQA gives local governments and project proponents the opportunity to mitigate, or avoid if possible, those impacts.
Under CEQA, development projects around transit may consider any of the following, and more -
- Whether the project would expose sensitive populations to substantial air pollutant concentrations.
- Whether the project would impair or interfere with an adopted emergency response plan or emergency evacuation plan.
- Whether the project would require or result in the relocation or construction of new or expanded water or wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities.
- Whether sufficient water supplies are available to serve the project.
- Whether the project would generate solid waste in excess of the capacity of local infrastructure.
- Whether the project conflicts with provisions of a local, state, or regional conservation plan.
- Whether the project would be located on a site that is included on a certain list of hazardous materials sites and would create a significant hazard to the public or the environment.
- Whether there are any seismic-related issues or landslide concerns.
By expanding the definition of “major transit stop,” AB 1560 would remove an increased number of projects from the environmental review process. And while there are other specified requirements that a development must meet to be eligible for an exemption, that “checklist” may not be as exhaustive and everything that is typically looked at during an environmental review may not be considered. CEQA provides a holistic look at the project, an opportunity to examine different aspects of the project in context of one another and not in a siloed fashion.
- What else would be affected? Expanding the definition will also affect the following existing programs; the applicability of which is based on its proximity to what is considered a “major transit stop:”
- CEQA exemption for certain urban residential projects (PRC 21159.24).
- Infrastructure finance district reimbursements and transit priority projects. Infrastructure finance districts may reimburse developers meeting certain requirements for permit expenses and expenses related to the construction of affordable housing units pursuant to the TPPP. To be an eligible project under TPPP, the project must be located within one-half mile of a major transit stop or high-quality transit corridor.
- Second Neighborhood Infill Finance and Transit Improvements Act – NIFTI-2 (Gov. C. §53398.75.7) which allows certain enhanced infrastructure financing districts (EIFDs) to issue debt for affordable housing near transit without voter approval.
- Low and Moderate Income Housing Asset Fund (LMIHF) and development of transit priority projects (Health & Safety Code §34176.1). Certain housing successors are allowed to transfer funds from their LMIHF to develop transit priority projects, permanent supportive housing, housing for agricultural employees, and special needs housing; with a limitation that the development cannot not located in certain census tracts unless the development is within ½ mile of a major transit stop or high-quality transit corridor.
- Congestion management programs and infill opportunity zones. Congestion management programs are required for every county that includes an urbanized area and are required to contain certain elements, including traffic level of service standards, which can be affected by designated infill opportunity zones. The designation of infill opportunity zones depend on various factors, including whether it is within one-half mile of a major transit stop or high-quality transit corridor.
- Developer incentives and bonuses. Various incentives and bonuses are given to developers whose projects meet a combination of criteria, including that the project be within one-half mile of a major transit stop. These bonuses and incentives include, but are not limited to, increased density, increased height, parking ratios,and floor area ratio bonuses (Gov. C. §65915, 65915.7, 65917.2).
- Designated historical resources. A project is not required to provide parking spaces greater than the number of parking spaces that existed on the project site prior if the project is converting or adapting a designated historical resource to a residential use that is located within one-half mile of a major transit stop (Health & Safety Code §18962).
It is logical that an expansion of the “major transit stop” definition would also expand the applicability of these programs; applying to more areas of the state. This consideration, and more, will likely be addressed by the Senate Housing Committee, which this bill has been referred to next. From an environmental perspective, however, what type of environmental impacts could result from an expansion of these programs, particularly those that provide density bonuses, floor area ratio bonuses, and height increases?
- Other pending legislation. Changing the definition of AB 1560 would also affect the following bills that are currently before the Legislature:
- SB 50 (Weiner) would require local governments to grant certain equitable communities incentives to jobs-rich housing projects and transit-rich housing projects that meet certain requirements, including proximity to a major transit stop, as specified.
- SB 235 (Dodd) authorizes the County of Napa and the City of Napa to reach an agreement to allow one of the two jurisdictions to report in its annual progress report housing units developed in the jurisdiction if certain conditions are met, including that the housing developments reported do not include any housing development within certain areas unless it is within one-half mile of a major transit stop or high-quality transit corridor.
- SB 621 (Glazer) applies expedited judicial review of CEQA cases that involve certain affordable housing projects that are in close proximity to a major transit stop.
- AB 738 (Mullin), where a jurisdiction within San Mateo County contributes affordable housing funds to a deed-restricted affordable housing development in another jurisdiction in that county, authorizes both jurisdictions to agree to allow the contributing jurisdiction to report certain information on a specified report if the development is not located in certain areas unless it is within one-half mile of a major transit stop or high-quality transit corridor.
- AB 1763 (Chiu), among other things, requires a city or county to not impose any maximum controls on density, allow height increase, and allow a floor area ratio increase for housing developments if 100% of the units are restricted to lower-income households and if it is located within one-half mile of a major transit stop.
If both AB 1560 and any of the above-described bills are enacted, how will those bills be affected by the expanded definition of “major transit stop”? Would those changes be consistent with the intent behind that particular legislation? Would the changes affect the policy considerations of the applicable committees that have already analyzed the bill this session?
- CEQA plays an important role in ensuring smart growth. Some may view the restrictiveness of the current “major transit stop” definition as hindering development of affordable housing projects near transit. This is not an entirely accurate statement. The presence of a “major transit stop” does not prevent a developer from building his or her project. A developer can build wherever they choose, within the limitations of other statutes and local ordinances of course, they just might not be eligible for the incentives. In fact, the opposite is true –a “major transit stop” is meant to encourage development near those spots; encouraging smart and sustainable growth around centralized areas by providing CEQA exemptions. It is not meant to apply to every project.
For these reasons, expanding the definition of “major transit stop” must be done in a very thoughtful and purposeful manner. - Incentives are not meant to be automatic. Studies by the California Department of Transportation, the US EPA, and the Metropolitan Transportation Commission have found that focusing development in areas served by transit can result in local, regional, and statewide benefits, including;
- Increased transportation choices
- Increased public safety
- Increased transit ridership
- Reduced vehicle miles traveled
- Increased household disposable income
- Reduced air pollution and energy consumption
- Conservation of natural resources and open space
- Increased economic development
- Increased affordable housing
- Reduced local infrastructure costs.
The purpose of using major transit stops as a focal point of development is to encourage development in areas served by transit and achieve the benefits noted above.
Under AB 1560, a bus rapid transit station could be either (Option #1) a clearly defined bus station served by a bus rapid transit line, or (Option #2) a bus station served by a bus line that has a dedicated bus lane or a separate right-of-way, or operates on a fixed guideway. In comparison to Option 1, Option 2 falls short of what is typically thought of as high-quality transit. While it would be a step above your typical bus station and route by being in a dedicated lane or separate right-of-way, it lacks other attributes that would contribute to transit passenger convenience and attract increased ridership; such as the case for Option 1. If no one is using it, how does it contribute to reduced vehicle miles traveled and, in turn, reduced air pollution and energy consumption? Is a project that is tied to an Option 2 bus station as a “major transit stop” deserving of the benefits of incentives and CEQA exemptions? Further, would there be incentive to be near an Option 1 station if a project would get the same benefits for being near the lessor standard of Option 2?
Increasing infill development, particularly projects served by transit, is a laudable goal. If the Legislature is going to expand the definition of “major transit stop,” thereby also expanding the application of not only various CEQA exemptions and streamlining, but also various development incentives; shouldn’t the Legislature ensure that the expanded definition does not just maintain the status quo, but makes for better development planning and achieves the benefits listed above? While some may argue that broadening the scope of a major transit stop to cover additional areas would increase affordable housing, is this enough for it to be considered “high quality transit”? Isn’t the point of an incentive to encourage a party to act in a certain way to obtain a benefit? Where is the incentive to perform better if they are given the benefit without changing behavior?
Additionally, neither Option 1 nor 2 provides for minimum frequency of service requirement, which would help achieve the benefits of increased transportation choices, increased transit ridership and, in turn, reduced vehicle miles traveled. Standard frequency of service for high-quality transit is 15 minutes or less during peak commute periods.
The committee may wish to amend the bill to narrow the definition of a bus rapid transit station to mean an Option 1 station with a frequency of service interval of 15 minute or less during the morning and afternoon peak commute periods.
Related/Prior Legislation
SB 827 (Wiener, 2018) would have required local governments to grant a developer of a transit-rich housing project “transit-rich housing bonuses,” as specified, based on the project’s proximity to a major transit stop and if certain criteria are met. SB 827 did not get out of Senate Transportation and Housing Committee.
AB 1886 (McCarty, 2016) would have revised the definition of “transit priority project” such that 50%, instead of 25%, of the project area may be farther than one-half mile from a major transit stop or high-quality transit corridor.
For additional related legislation, see Comment #5, above.
DOUBLE REFERRAL
If this measure is approved by the Senate Environmental Quality Committee, the do pass motion must include the action to re-refer the bill to the Senate Housing Committee.
SOURCE:
Valley Industry and Commerce Association
SUPPORT:
Valley Industry and Commerce Association (VICA) (sponsor)
BizFed
California Association of Realtors
California Building Industry Association
Civil Justice Association of California
Los Angeles Area Chamber of Commerce
Southern California Association of NonProfit Housing
OPPOSITION:
None received
-- END --
Date of Hearing: May 16, 2019
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 1560
Author:(Friedman) – As Amended Ver:April 11, 2019
Policy Committee: | Natural Resources | Vote: | 11 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill revises the definition of a "major transit stop" for purposes of qualifying for exemption or abbreviated review under the California Environmental Quality Act (CEQA) to include a bus rapid transit station, as defined, with a frequency of service interval of 20 minutes or less during the morning and afternoon peak commute periods. Specifically, this bill:
- Revises the definition of “major transit stop” to include a bus rapid transit station with a frequency of service interval of 20 minutes or less during the morning and afternoon peak commute periods.
- Increases the minimum frequency of service interval for major bus routes from 15 minutes to 20 minutes.
- Defines “bus rapid transit line” as a public mass transit service provided by a public agency or by a public-private partnership that includes at least two of the following features:
- Peak period or full-time dedicated bus lanes.
- Transit signal priority.
- All-door boarding.
- Defines “bus rapid transit station” to mean either of the following:
- A bus stop served by a bus rapid transit line.
- A bus stop served by a bus line that meets both of the following:
- The bus line has a full-time dedicated bus lane extending one-half mile in each direction of the bus stop or, in the case of a terminus stop, one-half mile of the terminus stop in the direction of the bus line.
- The bus line has all-door boarding at the bus or terminus stop.
FISCAL EFFECT:
Neglible, if any, state costs.
COMMENTS:
Background and Purpose. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows the project would not have a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project with an environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA includes various statutory exemptions, as well as categorical exemptions in CEQA Guidelines. SB 375, Chapter 728, Statutes of 2008, provided a CEQA exemption for a narrow set of eligible residential projects in infill areas adjacent to transit, as well as an abbreviated EIR and mitigated negative declaration review.
SB 226, Chapter 469, Statutes of 2011, provided abbreviated CEQA review procedures for a broader set of urban infill projects, including retail, commercial and public buildings, with no requirement regarding proximity to transit. SB 743, Chapter 386, Statutes of 2013 established a new exemption for residential, mixed-use and "employment center" projects located within one-half mile of a major transit stop, if the project is consistent with an adopted specific plan and specified elements of an SB 375 strategy.
This bill will allow more projects adjacent to public transportation to qualify for CEQA exemptions and expedited CEQA review.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 22, 2019
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
ABPCA Bill Id:AB 1560 (
Author:Friedman) – As Amended Ver:April 11, 2019
SUBJECT: California Environmental Quality Act: transportation: major transit stop
SUMMARY: Revises the definition of a "major transit stop" for purposes of qualifying for exemption or abbreviated review under the California Environmental Quality Act (CEQA) to include a bus rapid transit station, as defined, with a frequency of service interval of 20 minutes or less during the morning and afternoon peak commute periods.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines.)
- Requires metropolitan planning organizations (MPOs) to include a sustainable communities strategy (SCS), as defined, in their regional transportation plans, or an alternative planning strategy (APS), for the purpose of reducing greenhouse gas (GHG) emissions; aligns planning for transportation and housing; and creates specified incentives for the implementation of the strategies, including CEQA exemption or abbreviated review for residential or mixed-use residential "transit priority projects," if the project is consistent with the use designation, density, building intensity, and applicable policies specified for the project area in either an approved SCS or APS. [SB 375 (Steinberg), Chapter 728, Statutes of 2008]
- Requires a "transit priority project" to meet the following conditions:
- Contain at least 50% residential use;
- Provide at least 20 dwellings per acre; and
- Be within 1/2 mile of a major transit stop or high-quality transit corridor.
- Defines "major transit stop" as a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods.
- Defines "high-quality transit corridor" as a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.
- Requires a "transit priority project" to meet the following conditions:
THIS BILL:
- Revises the definition of “major transit stop” to include a bus rapid transit station with a frequency of service interval of 20 minutes or less during the morning and afternoon peak commute periods.
- Increases the minimum frequency of service interval for major bus routes from 15 to 20 minutes.
- Defines “bus rapid transit line” as a public mass transit service provided by a public agency or by a public-private partnership that includes at least two of the following features:
- Peak period or full-time dedicated bus lanes.
- Transit signal priority.
- All-door boarding.
- Defines “bus rapid transit station” to mean either of the following:
- A bus stop served by a bus rapid transit line.
- A bus stop served by a bus line that meets both of the following:
- The bus line has a full-time dedicated bus lane extending one-half mile in each direction of the bus stop or in the case of a terminus stop one-half mile of the terminus stop in the direction of the bus line.
- The bus line has all-door boarding at the bus or terminus stop.
FISCAL EFFECT: Unknown
COMMENTS:
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that the project would not have a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines. Since 1985, any residential development project can be exempt from CEQA if the project is consistent with a specific plan for which an EIR has been certified. In 2002, SB 1925 established CEQA exemptions for certain residential projects providing affordable urban or agricultural housing, or located on an infill site within an urbanized area and meeting specified unit and acreage criteria. For purposes of qualifying for the CEQA exemption for urban infill housing, projects must be within one-half mile of a major transit stop.
More recently, the Legislature has enacted CEQA exemptions and streamlining for residential and certain other projects in infill areas. SB 375 (2008) provided a CEQA exemption for a narrow set of eligible residential projects in infill areas adjacent to transit, as well as alternatives of abbreviated EIR and mitigated negative declaration review. SB 226 (2011) provided abbreviated CEQA review procedures for a broader set of urban infill projects, including retail, commercial, and public buildings, with no requirement regarding proximity to transit. SB 743 (2013) established a new exemption for residential, mixed-use, and "employment center" projects located within one-half mile of a major transit stop, if the project is consistent with an adopted specific plan and specified elements of an SB 375 strategy.
- Author’s statement:
A Transit Priority Area, defined in California Public Resources Code Section 21099 is, generally, an area within ½ mile of an existing or planned Major Transit Stop. Currently, Major Transit Stop is defined in California Public Resources Code Section 21064.3 as “a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute period.” This definition excludes areas throughout the state which are well served by transit where major bus lines either do not intersect, or do intersect, but fall short of the 15-minute headways required by the definition.
In the city of Los Angeles, the definition of “Major Transit Stop” is applied to the Transit Oriented Guidelines, per Measure JJJ. As such, the definition of Major Transit Stop defines, and consequently limits the eligibility of projects for development incentives for projects that include affordable housing.
As presently defined, there are a significantly limited number of Transit Priority Areas as the definition of Major Transit Stop excludes many major bus lines. Areas of California well served by Bus Rapid Transit (BRT), but not served by rail transit, have been unable to take advantage of incentive programs and been excluded from these definitions.
In areas like Southern California’s San Fernando Valley region, the Orange Line is one of the busiest BRT lines operated by LA Metro and serves riders traveling in the San Fernando Valley and throughout Los Angeles County. It is essential that areas throughout California such as areas surrounding the Orange Line be eligible for incentives and CEQA exemptions to ensure housing development is maximized near transit.
- Three forms of relief. SB 375 provides three alternative forms of relief for CEQA review of transit priority projects:
- Exemption (Section 21155.1). This requires a hearing and findings by the public agency that the project meets specified criteria, including a variety of conditions to ensure the project has no significant environmental impacts. The project must also be located within one-half mile of a rail transit station or ferry terminal, or within one-quarter mile of a high-quality transit corridor.
- Sustainable communities environmental assessment [Section 21155.2(b)]. This is equivalent to a mitigated negative declaration, except that the lead agency's actions are subject to a more deferential standard of review (substantial evidence rather than fair argument).
- Abbreviated EIR [Section 21155.2(c)]. This limits the consideration of cumulative impacts and does not require analysis of off-site alternatives to the project.
REGISTERED SUPPORT / OPPOSITION:
Support
California Association of Realtors
Civil Justice Association of California
Los Angeles Area Chamber of Commerce
Southern California Association of Nonprofit Housing
Valley Industry and Commerce Association
Opposition
None on file
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Bill Author
Bill Co-Author(s):