AB 2421: Land use: permitting: wireless communications: emergency standby generators.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2020-09-29
|
Date
|
Status
|
|---|---|
| Sep 29, 2020 | Chaptered by Secretary of State - Chapter 255, Statutes of 2020. |
| Sep 29, 2020 | Approved by the Governor. |
| Sep 11, 2020 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 30, 2020 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 72. Noes 0. Page 5367.). |
| Aug 29, 2020 | In Assembly. Concurrence in Senate amendments pending. |
| Aug 29, 2020 | Read third time. Passed. Ordered to the Assembly. (Ayes 34. Noes 1. Page 4430.). |
| Aug 14, 2020 | Read second time. Ordered to third reading. |
| Aug 13, 2020 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jul 31, 2020 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on APPR. |
| Jul 30, 2020 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (July 29). Re-referred to Com. on APPR. |
| Jul 22, 2020 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on GOV. & F. |
| Jul 1, 2020 | Referred to Com. on GOV. & F. |
| Jun 11, 2020 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 10, 2020 | Read third time. Passed. Ordered to the Senate. (Ayes 76. Noes 0. Page 4789.) |
| Jun 8, 2020 | Read second time. Ordered to third reading. |
| Jun 4, 2020 | Read second time and amended. Ordered returned to second reading. |
| Jun 3, 2020 | From committee: Amend, and do pass as amended. (Ayes 18. Noes 0.) (June 3). |
| Jun 2, 2020 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 12, 2020 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 0.) (May 12). Re-referred to Com. on APPR. |
| Mar 16, 2020 | Re-referred to Com. on L. GOV. |
| Mar 12, 2020 | From committee chair, with author's amendments: Amend, and re-refer to Com. on L. GOV. Read second time and amended. |
| Mar 2, 2020 | Referred to Coms. on L. GOV. and C. & C. |
| Feb 20, 2020 | From printer. May be heard in committee March 21. |
| Feb 19, 2020 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 30, 2020 | AB 2421 Quirk Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 29, 2020 | Assembly 3rd Reading AB2421 Quirk et al. By Hertzberg | Senate Floor |
Passed |
|
| Jul 29, 2020 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Governance and Finance |
Passed |
|
| Jun 10, 2020 | AB 2421 Quirk Assembly Third Reading By RIVAS, L. | Assembly Floor |
Passed |
|
| Jun 3, 2020 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| May 12, 2020 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 2421
Author:(Quirk)
As Amended Ver:July 31, 2020
Majority vote
SUMMARY:
Requires expedited permitting of emergency standby generators for macro cell towers.
The Senate Amendments:
- Clarify that the applicable local agency is required to review an application to install a generator.
- Change the allowable capacity of generators from 190 gallons to up to 300 gallons.
- Remove the requirement that the generator must be certified to California emission standards and, instead, require the generator to be compliant with applicable air quality regulations.
- Limit the cumulative physical dimensions of the generator and storage tank to no more than 250 cubic feet in volume.
- Require the generator to be located not more than 100 feet from the physical structure of the macro cell tower or base station.
- Clarify the process for incomplete applications.
- Make additional technical, clarifying and conforming changes.
COMMENTS:
This bill limits permit reviews for emergency standby generators for macro cell towers to administrative, non-discretionary review only, and creates a shot-clock by which permit reviews must be completed. The proposed generator must be rated below 50 horsepower, compliant with applicable air quality regulations, have a double-wall storage tank that does not exceed 300 gallons, and be mounted on a concrete pad. The macro cell tower site at which the emergency standby generator is proposed to be installed must be an existing site that was previously permitted by the applicable local agency. The emergency standby generator must comply with all applicable state and local laws and regulations, including building and fire safety codes. The cumulative physical dimensions of the generator and storage tank must be no more than 250 cubic feet in volume and the generator must be located not more than 100 feet from the physical structure of the macro cell tower or base station.
A county or city must approve or deny a permit application for such a generator within 60 days. If an application is incomplete, the county or city has 10 days to notify the applicant, in which case the 60-day period is suspended. If the application is determined not to be complete, the local agency's determination shall specify those parts of the application that are incomplete and shall indicate the manner in which they can be made complete, including a list and thorough description of the specific information needed to complete the application. In any subsequent review of the application determined to be incomplete, the local agency shall not request the applicant to provide any new information that was not stated in the initial list of items that were not complete. Upon receipt of any resubmittal of the application, a new 60-day period shall begin, during which the local agency shall determine the completeness of the application.
A county or city cannot require any new or different information for a permit application than it routinely requires for applications for other emergency standby generators. If a county or city fails to approve or deny a completed application within 60 days, the application will be deemed approved.
This bill does not prohibit a local agency from revoking, through the appropriate process, the permit or approval status for an emergency standby generator that is determined to violate an applicable state or local law or regulation, including building and fire safety codes, or from otherwise enforcing state and local law with respect to the emergency standby generator.
If a county or city requires more than one permit application for the installation of a generator, all applications submitted concurrently must be issued within the same 60-day period set forth above. A county or city may not require an applicant to submit proof of consent or other authorization from an underlying property owner as part of the initial application for a generator permit. However, the applicant must not install the generator until the applicant provides documentation to the local agency, if the local agency requires it.
A county of city may impose a permit fee to cover its costs associated with administering this bill. The fee shall not exceed the reasonable costs of providing the service for which the fee is charged and shall not be levied for general revenue purposes. This bill applies to all counties and cities, including charter cities, and contains a repeal date of January 1, 2024.
Public Safety Power Shutoffs (PSPS) have been part of California's strategy to prevent wildfires for several years. However, 2019 was a landmark year for PSPS events, which occurred from October 9 to November 1 in about 30 counties in Northern California and several in Southern California and affected all three of the state's largest power utilities – Pacific Gas and Electric Company (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E). Over the course of the PSPS events, more than 3 million people lost power.
Given the critical importance of uninterrupted communications during power outages, this bill seeks to protect this communications infrastructure so it will continue to operate in the event the primary source of power goes down during a PSPS event or other power interruption. AT&T reports some delays (from five to 30 months) in local jurisdictions that have required – as part of the permitting process for back-up generators – variances, substantial aesthetic structures, spec sheets and transmission details on existing equipment not affected by a generator application, and documents that the agency already has on file.
In addition to speeding up the permitting process with a shot-clock and deemed approved approach, this bill also prohibits local agencies from requiring a permit applicant to prove up-front that an underlying property owner has provided consent for the installation of a generator. This allows the applicant to pursue the permitting process concurrently with the process of obtaining permission from property owners. The applicant would still be required to provide this evidence to the local agency before installing the generator if the agency requires it as part of the permitting process.
According to the Author:
"In order to facilitate wireless network upgrades needed to mitigate the impacts of Public Safety Power Shutoffs, this legislation will help enable the rapid deployment of emergency standby generators at macro cell sites. These resources are vital for public safety and welfare to help ensure consumers maintain access to 911 services, wireless emergency alerts, and other public safety communications.
"AB 2421 is a critical component to supporting the efforts of wireless service providers to install emergency standby generators before catastrophic events threaten Californians' ability to stay connected to emergency services when needed most. Without the short term, narrowly crafted process prescribed in this legislation, widely differing and lengthy permitting requirements across the state could delay these public safety efforts by many months. AB 2421 is focused on improving public safety through power-resilient wireless communications networks."
Arguments in Support:
The Peace Officers Research Association of California, in support, writes, "This bill would enable California to take timely steps to improve public safety communications in preparation for the coming wildfire seasons and possible power shutoffs by electric utilities. AB 2421 streamlines the local permitting process for back-up power equipment at cell sites, while safeguarding final permitting authority with the local jurisdiction. This legislation would only apply to the installation of generators that are certified to California low emission standards.
"Expediting the deployment of back-up power solutions at wireless sites is essential to public safety. During extended power outages, wildfires, and other emergencies, mobile communications are critical for our members to stay connected, as well as to share potentially life-saving information with the public. Even when commercial power is lost, Californians must be able to maintain access to 911 and receive emergency notifications, including Wireless Emergencies Alerts (WEA) broadcast by our public safety officials. California's Legislature should use every tool available to rapidly prepare for the growing threat of wildfires, power outages, and other disasters. For these reasons, we strongly urge you to support AB 2421."
Arguments in Opposition:
The Communications Workers of America, District 9 (CWA), writes, "CWA believes strongly that the communications grid should be reliable, promote public safety, and be subject to robust oversight. CWA workers are on the front lines, working to ensure the reliability of these cell towers, and the communications grid as a whole. Local review can be a critical step to ensuring reliability and establishing the necessity of a requested approval. There may be circumstances demanding an expedited review process with automatic approval after 60 days. However, the default provision contained in AB 2421 applies to every application, in every city and county in California. This bill is not narrowly tailored to only those areas of high wildfire risk or other exigent circumstances. Nor is there an avenue for the local government to extend the mandated timeline for justifiable reasons. "Additionally, AB 2421's focus on short-term generator power could have the unintended consequence of allowing corporations to ignore or delay long-term infrastructure investment and repair. Ultimately, it is in the best interest of California to ensure that it has a communications grid that has been hardened and is available to all. CWA believes that a greater focus should be made on the long-term health of the communications grid as opposed to an overreliance on temporary solutions. Furthermore, discussion on this bill would benefit from insight into how telecommunications companies responded to outages during recent wildfires and what strategies they employed for long-term sustainability. Unfortunately, these corporations have failed to provide this information and have argued that they are not required to inform the public about their activities. Temporary and short-term responses may be necessary, but are best evaluated in the context of understanding the overall strategies to maintain and strengthen the communications grid long-term."
FISCAL COMMENTS:
According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
VOTES:
ASM LOCAL GOVERNMENT: 8-0-0
YES: Aguiar-Curry, Lackey, Bloom, Boerner Horvath, Ramos, Luz Rivas, Robert Rivas, Voepel
ASM APPROPRIATIONS: 18-0-0
YES: Gonzalez, Bigelow, Bauer-Kahan, Bloom, Bonta, Calderon, Carrillo, Chau, Megan Dahle, Diep, Eggman, Fong, Gabriel, Eduardo Garcia, Petrie-Norris, McCarty, Robert Rivas, Voepel
ASSEMBLY FLOOR: 76-0-3
YES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, McCarty, Medina, Mullin, Muratsuchi, Nazarian, O'Donnell, Obernolte, Patterson, Petrie-Norris, Quirk-Silva, Ramos, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
ABS, ABST OR NV: Mayes, Quirk, Reyes
SENATE FLOOR: 34-1-5
YES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dahle, Dodd, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Leyva, Melendez, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Umberg, Wieckowski, Wilk
NO: Wiener
ABS, ABST OR NV: Durazo, Lena Gonzalez, Jones, McGuire, Stern
UPDATED:
VERSION: July 31, 2020
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0003472
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 2421 |
THIRD READING
Bill No: AB 2421
Author: Quirk (D), et al.
Amended: 7/31/20 in Senate
Vote: 21
SENATE GOVERNANCE & FIN. COMMITTEE: 7-0, 7/29/20
AYES: McGuire, Moorlach, Beall, Hertzberg, Hurtado, Nielsen, Wiener
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 76-0, 6/10/20 - See last page for vote
SUBJECT: Land use: permitting: wireless communications: emergency standby generators
SOURCE: Author
DIGEST:
This bill requires, until January 1, 2024, a local agency to administratively review an application to install an emergency standby generator at an existing macro cell tower site.
ANALYSIS:
Existing law:
- Establishes that every county or city may make and enforce within its limits all local, police, sanitary, and other ordinances and regulations not in conflict with general laws.
- Requires public agencies to act fairly and promptly on applications for development permits, including wireless facilities.
- Requires public agencies to compile lists of information that applicants must provide and explain the criteria they will use to review permit applications.
- Provides that public agencies have 30 days to determine whether applications for development projects are complete; failure to act results in an application being "deemed complete."
- Provides that a state or local government may not deny, and shall approve, any request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such a tower or base station. Under the Federal Communications Commission (FCC) rules governing such requests, the approval must be issued within 60 days or the request shall be deemed granted.
- Requires, once a complete application for a wireless facility has been submitted, local officials to act within a specific time period after completing any environmental review documents required under the California Environmental Quality Act (CEQA). Specifically, local governments must act within (a) 60 days after completing a negative declaration or determining that a project is exempt from review, or (b) 180 days after certifying an environmental impact report. If the local government fails to approve or disapprove the application in the applicable time period, the application is deemed granted, and the applicant may file suit in state court to order the local government to issue the permit.
- Requires a completed permit application for a collocation or siting permit for a wireless telecommunications facility to be deemed approved if a county or city fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC decisions.
- Provides that the placement or installation of certain wireless facilities, including antennas and related equipment, on or immediately adjacent to a wireless telecommunications facility, is a permitted use not subject to a county or city discretionary permit.
- Requires the state to reimburse local agencies for their costs when the state imposes new programs or additional duties on them, unless they meet specified exceptions.
This bill:
- Establishes an emergency standby generator that serves a macro cell site as a permitted use and requires a local agency to review a permit request to install an emergency standby generator on an administrative, nondiscretionary basis if it meets all of the following requirements:
- The generator is proposed to be installed to serve an existing macro cell tower site that was permitted by the applicable local agency.
- The generator is rated below 50 horsepower, compliant with applicable air quality regulations, has a double-wall storage tank of no more than 300 gallon capacity, and is mounted on a concrete pad.
- The generator complies with all applicable state and local laws and regulations, including building and fire safety codes.
- The physical dimensions of the generator and storage tank are cumulatively no more than 250 cubic feet.
- The generator is located within 100 feet of the physical structure of the macro cell tower or base station.
- Requires a local agency that receives a permit application to install a generator to approve or deny the application within 60 days of application submittal if the application meets the above requirements.
- Requires the local agency, if it determines the application is incomplete, to notify the applicant in writing within 10 days of receipt and indicate (a) what parts of the application are incomplete and (b) the specific information required to complete the application. AB 2421 suspends the 60-day review period during the time the applicant is responding to the local agency. Once the application is resubmitted, a new 60-day review period begins. If a local agency receives multiple applications concurrently, all applications must be reviewed within the same 60-day period.
- Prevents local agencies from requiring new information that was not identified as missing in the initial comments to the applicant, nor can it require any new or different information for the permit applications than it routinely requires for applications for other emergency standby generators.
- Prohibits a local agency from requiring the applicant to demonstrate that the property owner has consented to the installation of the generator as part of the application, but an applicant cannot install the generator until the property owner’s consent has been documented.
- Allows a local agency to revoke a permit or approval status for a generator that is found to violate an applicable state or local law and can enforce state and local laws regarding the generator.
- Allows a local agency to charge a reasonable permit fee to cover costs associated with this bill, but prohibits charging fees for general revenue purposes.
- Includes findings and declarations, including that it does not apply to the deployment of 5G technologies.
- Provides that its statutory provisions apply to charter cities. To support this assertion, this bill includes a legislative finding that installation of emergency standby generators has a significant public safety impact in California and is a matter of statewide concern.
- Disclaims this bill is a reimbursable state mandate by saying that no reimbursement is required by this act because local agencies can levy fees to pay for the program.
- Repeals the provisions of this bill on January 1, 2024.
Background
Land use regulation. Local governments use their police power to enact zoning ordinances that shape development, such as setting maximum heights and densities for housing units, minimum numbers of required parking spaces, setbacks to preserve privacy, lot coverage ratios to increase open space, and others. These ordinances can also include conditions on development to address aesthetics, community impacts, or other particular site-specific considerations. Zoning ordinances also identify the types of land uses that are permitted as of right and without special conditions—sometimes known as a “permitted use,” as well as others that may be permitted only if certain conditions are satisfied or some uses that may be prohibited in an area altogether.
Providers of wireless telecommunications services (“carriers”) must apply to cities and counties for permits to build structures or other wireless facilities that support wireless telecommunications equipment, like antennae and related devices. Similarly, wireless carriers must seek local approval to place additional telecommunications equipment on structures where that equipment already exists, known as “collocations.” Current wireless communication technology is largely dependent on wireless facilities that have required a network of large, “macro” cell towers that are often over 200 feet tall.
Federal requirements for local decisions on wireless facilities. Local governments generally have discretion when establishing a process for permitting wireless facilities and other land uses. However, two federal laws, the Telecommunications Act of 1996 and the Spectrum Act of 2012, require local governments to act within a “reasonable period of time” on permits for siting wireless facilities. The FCC is responsible for administering these laws and implementing this requirement. These regulations provide that a state or local government may not deny, and must approve, any request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such a tower or base station. Under the FCC regulations governing such requests, the approval must be issued within 60 days or the request is deemed granted.
Public Safety Power Shutoffs. Public Safety Power Shutoffs (PSPS) events disrupt power that is provided to cell tower sites. In order to sustain power to this communications infrastructure, wireless carriers must install emergency backup generators to provide a temporary power source. These generators are typically diesel-powered and have run-times that vary based on the size of the tank, but carriers estimate that generators of approximately to 300 gallons can provide power for three days (72 hours). Some wireless carriers report some delays (from five to 30 months) in local jurisdictions that have required—as part of the permitting process for back-up generators.
Comments
- Purpose of the bill. According to the author, “In order to facilitate wireless network upgrades, needed to mitigate the impacts of Public Safety Power Shutoffs, AB 2421 will help enable the rapid deployment of emergency standby generators at macro cell sites. These generators are vital for public safety and welfare, thus helping to ensure consumers maintain access to 911 services, wireless emergency alerts, and other public safety communications. AB 2421 is a critical component in supporting the efforts of wireless service providers to install emergency standby generators before catastrophic events threaten Californians’ ability to stay connected to emergency services when needed most. Without the short term, narrowly crafted process prescribed in this legislation, widely differing and lengthy permitting requirements across the state could delay these public safety efforts by many months. AB 2421 is focused on improving public safety through power-resilient wireless communications networks.”
- Where’s the beef? While local agencies can adopt, and some already have adopted, permitting processes similar to AB 2421, some agencies still require a more elaborate review process to provide opportunities to address community concerns. In those communities, AB 2421 imposes a simplified process that may remove opportunities for the public to raise concerns and have local officials address them. Additionally, this bill applies across the entire state regardless of wildfire risk or other circumstances. On the other hand, AB 2421 includes various provisions to ensure that the impacts of these generators remain reasonable, allows local governments to rescind permits that were deemed approved if the generator violates state and local laws, and includes a sunset to ensure that this bill’s terms only apply during the relatively intensive generator construction effort to respond to current PSPS challenges.
- Environmental quality concerns. While many local agencies have opted to apply an administrative approval to emergency standby generators at cell towers, this bill mandates it statewide; which also removes CEQA’s application. While air districts will continue to require and enforce permits, and generators will be individually certified to California standards, local governments will not be able to consider the cumulative impacts of those generators. Public participation and transparency in a local government’s approval of a project is a cornerstone of CEQA. While these generators will have lesser air quality impact than their counterparts that are rated with more than 50 horsepower, statewide administrative review for generators at cell towers could lead to a desire to apply administrative review in other locations.
Related/Prior Legislation
SB 649 (Hueso, 2018) would have streamlined permitting and capped local fees for small cell wireless facilities by requiring administrative, non-discretionary review of those facilities. SB 649 was vetoed by the Governor
AB 57 (Quirk, Chapter 685, Statutes of 2015), which the Governor signed into law, provided that a collocation or siting application for a wireless telecommunications facility is deemed approved if the city or county fails to approve or disapprove the application within the reasonable time periods specified in applicable decisions of the FCC, all required public notices have been provided regarding application, and the applicant has provided a notice to the city or county that the reasonable time period has lapsed.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/14/20)
100 Black Men of Long Beach, Inc.
African American Male Education Network and Development
American Indian Chamber of Commerce of California
Anaheim Fire & Rescue
APAPA Solano County
Apple Valley Chamber of Commerce
Apple Valley Fire Protection District
Arc
Arc of San Francisco
Asian Business Association
Asian Business Association of San Diego
Asian Pacific Islander American Public Affairs Association
Asian Pacific Islander American Public Affairs Association Community Education Foundation
Association of California Water Agencies
AT&T Central Valley Veterans
AT&T Inc. and its Affiliates
Beaumont Chamber of Commerce
Beverly Oncology & Imaging
Big Bear Fire Authority
Black Business Association
Black Chamber of Orange County
Bodega Bay Fire Protection District
Boys & Girls Club North Valley
Boys and Girls Club of El Dorado County
Brotherhood Crusade
Burbank Chamber of Commerce
Cal Asian Pacific Islander Chamber of Commerce
Calaveras County Sheriff's Office
California Asian Pacific Chamber of Commerce
California Association of Highway Patrolmen
California Black Chamber of Commerce
California Chapter National Emergency Number Association
California Fire Chiefs Association
California Hispanic Chamber of Commerce
California Hospital Association/California Association of Hospitals and Health Systems
California Police Chiefs Association
California State Conference of the National Association for the Advancement of Colored People
California State Firefighters' Association
Carlsbad Chamber of Commerce
Carmel Valley Chamber of Commerce
Center for Fathers and Families
Chambers of Commerce along the Highway 78 Corridor
Chicano Federation of San Diego County
Chino Valley Chamber of Commerce
City of Hayward
City of Hayward Fire Department
City of Montecito Fire Department
City of Palm Springs Fire Department
City of Santa Rosa Fire Department
City of Seaside
Coalition for Responsible Community Development
Community Women Vital Voices
Concerned Citizens Community Involvement
Congress of California Seniors
Contra Costa County Fire Protection District
Corona Chamber Of Commerce
Corona Fire Department
Cosumnes Fire Department
County of Riverside
County of San Bernardino
CTIA
Disability Action Center
Dr. Rhuenette Alums
East Bay Leadership Council
East Bay Municipal Utility District
El Dorado County Chamber of Commerce
El Dorado County Sheriff's Office
Escondido Chamber of Commerce
Filipina Women's Network
Fire Districts Association of California
Fire Safe Council of San Diego County
Fontana Chamber of Commerce
Fresno Police Officers Association
Frontier Senior Center – AAASCO
Glendale Chamber of Commerce
Greater Coachella Valley Chamber of Commerce
Greater Los Angeles African American Chamber of Commerce
Greater Riverside Chamber of Commerce
Greater Sacramento Urban League
Hemet San Jacinto Valley Chamber of Commerce
Hesperia Chamber of Commerce
Highland Chamber of Commerce
Hispanic 100
Inland Empire Chamber Legislative Alliance
Inland Empire Economic Partnership
Inland Empire Regional Broadband Consortium
Janet Goeske Foundation
Kern County Fire Department and Office of Emergency Services
Kheir Clinic
Kings/Tulare Homeless Alliance
Korean American Seniors Association of Orange County
La Cañada Flintridge Chamber of Commerce and Community Association
LAAAWPPI
Lakeside Chamber of Commerce
Latino Education and Advocacy Days
Lead Cal State San Bernardino
Lighthouse Counseling & Family Resource Center
Long Beach Area Chamber of Commerce
Los Angeles African American Women's Public Policy Institute
Los Angeles County Fire Department
Madera County Sheriff's Office
Mariposa County Sheriff's Office
Meeks Bay Fire Protection District
Mission of the 100 Black Men of Long Beach, Inc.
Montecito Fire Department
Monterey County Business Council
Monterey County Hospitality Association
Monterey County Sheriff's Department
Moreno Valley Chamber of Commerce
Mother Lode Rehabilitation Enterprises Inc.
Murrieta Wildomar Chamber of Commerce
NAACP
NAACP LA
NAACP Ventura County
Napa Valley Support Services
Newcastle Fire Protection District
North County Fire Protection District
North Sonoma Coast Fire Protection District
North Tahoe Fire Protection District
Novato Fire Protection District
Oasis San Diego
Oceanside Chamber of Commerce
Office of the Sheriff, Calaveras County
Orange County Business Council
Orange County Hispanic Chamber Of Commerce
Organization of Chinese Americans
Organization of Chinese Americans, Greater Sacramento Chapter
Oroville Rescue Mission
Pacific Grove Chamber of Commerce
Parent Institute for Quality Education
Pasadena Chamber of Commerce and Civic Association
Pasadena/Altadena Ivy Foundation
Peace Officers Research Association of California
Perris Valley Chamber of Commerce
Pomona Chamber of Commerce
Rancho Cucamonga Chamber of Commerce
Recknagel Enterprises
Redlands Chamber of Commerce
Resource Conservation District of Greater San Diego County
Rincon Fire Department
Riverside Sheriffs' Association
Rural County Representatives of California
Sacramento Asian Pacific Chamber of Commerce
Sacramento Black Chamber of Commerce
Sacramento Hispanic Chamber of Commerce
Sacramento Metropolitan Fire District
San Bernardino County Fire Chiefs Association
San Diego County Sheriff's Department
San Diego Fire-Rescue
San Diego North County Chambers
San Diego Oasis
San Francisco Chamber of Commerce
San Gabriel Valley Economic Partnership
San Marcos Chamber Of Commerce
Santa Barbara County Fire Department
Santa Clara County Fire Chiefs Association
Seaside Fire Department
Self-Help for the Elderly
sf.citi
Sierra College
Sierra College Foundation
Slavic-American Chamber of Commerce
Society for the Blind
South Placer Fire Protection District
Southeast Community Development Corporation
Southern Border Broadband Consortium
Southern Marin Emergency Medical Paramedic System
Southern Marin Fire Protection District
Sutter Creek Fire Protection District
Tahoe Prosperity Center
TechNet-Technology Network
The Arc and United Cerebral Palsy California Collaboration
The Arc of Butte County
The Arc of California
The Arc San Francisco
The Village Project
Thinkwatts Foundation
Tiburon Fire Protection District
UFCW Local 648
Upland Chamber of Commerce
Urban Corps of San Diego County
Urban League - Greater Sacramento
Veterans Association
Veterans Association of North County
Victor Valley Chamber of Commerce
Vista Chamber Of Commerce
Western Fire Chiefs Association
World Institute on Disability
Young Visionaries Youth Leadership Academy
Zephyr Real Estate
OPPOSITION: (Verified 8/14/20)
Communications Workers of America, District 9
ASSEMBLY FLOOR: 76-0, 6/10/20
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, McCarty, Medina, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk-Silva, Ramos, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
NO VOTE RECORDED: Mayes, Quirk, Reyes
Prepared by: Jonathan Peterson / GOV. & F. / (916) 651-4119
8/15/20 12:26:28
**** END ****
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Mike McGuire, Chair
2019 - 2020 Regular
Bill No: | AB 2421 | Hearing Date: | 7/29/20 |
Author: | Quirk | Tax Levy: | No |
Version: | 7/22/20 | Fiscal: | Yes |
Consultant: | Favorini-Csorba | ||
Land use: permitting: wireless communications: emergency standby generators
Requires, until January 1, 2024, a local agency to administratively review an application to install an emergency standby generator at an existing macro cell tower site.
Background
Due to the COVID-19 Pandemic and the unprecedented nature of the 2020 Legislative Session, all Senate Policy Committees are working under a compressed timeline. This timeline does not allow this bill to be referred and heard by more than one committee as a typical timeline would allow. In order to fully vet the contents of this measure for the benefit of Senators and the public, this analysis includes information from the Senate Environmental Quality Committee.
Land use regulation. The California Constitution allows a city to "make and enforce within its limits, all local, police, sanitary, and other ordinances and regulations not in conflict with general laws, known as the police power of cities." It is from this fundamental power that local governments derive their authority to regulate land through planning, zoning, and building ordinances, thereby protecting public health, safety and welfare.
Local governments use their police power to enact zoning ordinances that shape development, such as setting maximum heights and densities for housing units, minimum numbers of required parking spaces, setbacks to preserve privacy, lot coverage ratios to increase open space, and others. These ordinances can also include conditions on development to address aesthetics, community impacts, or other particular site-specific considerations. Zoning ordinances also identify the types of land uses that are permitted as of right and without special conditions—sometimes known as a “permitted use,” as well as others that may be permitted only if certain conditions are satisfied or some uses that may be prohibited in an area altogether.
Providers of wireless telecommunications services (“carriers”) must apply to cities and counties for permits to build structures or other wireless facilities that support wireless telecommunications equipment, like antennae and related devices. Similarly, wireless carriers must seek local approval to place additional telecommunications equipment on structures where that equipment already exists, known as “collocations.” Current wireless communication technology is largely dependent on wireless facilities that have required a network of large, “macro” cell towers that are often over 200 feet tall.
State and federal requirements for local decisions on wireless facilities. Local governments generally have discretion when establishing a process for permitting wireless facilities and other land uses—they can make the approval process relatively simple and administrative or more complicated, requiring public hearings and extensive information. However, they remain subject to state and federal laws on wireless facility permitting. Two federal laws, the Telecommunications Act of 1996 and the Spectrum Act of 2012, require local governments to act within a “reasonable period of time” on permits for siting wireless facilities. The Federal Communications Commission (FCC) is responsible for administering these laws and implementing this requirement. These regulations provide that a state or local government may not deny, and must approve, any request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such a tower or base station. Under the FCC regulations governing such requests, the approval must be issued within 60 days or the request is deemed granted.
State law also specifies timelines for approvals of wireless facilities. Specifically, the 1977 Permit Streamlining Act requires public agencies to act fairly and promptly on applications for development permits, including wireless facilities. Public agencies must compile lists of information that applicants must provide and explain the criteria they will use to review permit applications. Public agencies have 30 days to determine whether applications for development projects are complete; failure to act results in an application being "deemed complete." However, local governments may continue to request additional information, potentially extending the time before the shot clock begins running.
Once a complete application for a wireless facility has been submitted, the Act requires local officials to act within a specific time period after completing any environmental review documents required under the California Environmental Quality Act (CEQA). Specifically, local governments must act within (1) 60 days after completing a negative declaration or determining that a project is exempt from review, or (2) 180 days after certifying an environmental impact report (EIR). If the local government fails to approve or disapprove the application in the applicable time period, the application is deemed granted, and the applicant may file suit in state court to order the local government to issue the permit.
Public Safety Power Shutoffs. Public Safety Power Shutoffs (PSPS) have been part of California’s strategy to prevent wildfires for several years. However, 2019 was a landmark year for PSPS events, which occurred from October 9 to November 1 in about 30 counties in Northern California and several in Southern California and affected all three of the state’s largest power utilities –Pacific Gas and Electric Company (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E). Over the course of the PSPS events, more than 3 million people lost power.
These PSPS events disrupt power that is provided to cell tower sites. In order to sustain power to this communications infrastructure, wireless carriers must install emergency backup generators to provide a temporary power source. These generators are typically diesel-powered and have run-times that vary based on the size of the tank, but carriers estimate that generators of approximately to 300 gallons can provide power for three days (72 hours).
Some wireless carriers report some delays (from five to 30 months) in local jurisdictions that have required—as part of the permitting process for back-up generators—variances, substantial aesthetic structures, spec sheets and transmission details on existing equipment not affected by a generator application, and documents that the agency already has on file. The author wants the Legislature to streamline the local permitting process for installing emergency back-up generators.
Proposed Law
Assembly Bill 2421, notwithstanding any law affecting local permitting and until January 1, 2024, establishes an emergency standby generator that serves a macro cell site as a permitted use and requires a local agency to review a permit request to install an emergency standby generator on an administrative, nondiscretionary basis if it meets all of the following requirements:
- The generator is proposed to be installed to serve an existing macro cell tower site that was permitted by the applicable local agency.
- The generator is rated below 50 horsepower, certified to California emission standards, has a double-wall storage tank of no more than 300 gallon capacity, and is mounted on a concrete pad.
- The generator complies with all applicable state and local laws and regulations, including building and fire safety codes.
- The physical dimensions of the generator and storage tank are cumulatively no more than 250 cubic feet.
- The generator is located within 100 feet of the physical structure of the macro cell tower or base station.
A local agency that receives a permit application to install a generator must approve or deny the application within 60 days of submittal of the application if the application meets the above requirements.
If the local agency determines the application is incomplete, it must notify the applicant in writing within 10 days of receiving the application and indicate (1) what parts of the application are incomplete and (2) the specific information required to complete the application. AB 2421 suspends the 60-day review period during the time the applicant is responding to the local agency. Once the application is resubmitted, a new 60-day review period begins. If a local agency receives multiple applications concurrently, all applications must be reviewed within the same 60-day period.
A local agency cannot require new information that was not identified as missing in the initial comments to the applicant, nor can it require any new or different information for the permit applications than it routinely requires for applications for other emergency standby generators. AB 2421 also prohibits a local agency from requiring the applicant to demonstrate that the property owner has consented to the installation of the generator as part of the application, but an applicant cannot install the generator until the property owner’s consent has been documented.
Any permit application that is not approved or denied within the time periods established in the bill is deemed approved. However, a local agency can revoke a permit or approval status for a generator that is found to violate an applicable state or local law and can enforce state and local laws regarding the generator.
AB 2421 allows a local agency to charge a reasonable permit fee to cover costs associated with the bill, but prohibits charging fees for general revenue purposes.
AB 2421 includes findings and declarations, including that it does not apply to the deployment of 5G technologies, and sunsets its provisions on January 1, 2024.
State Revenue Impact
No estimate.
Comments
1. Purpose of the bill. According to the author, “In order to facilitate wireless network upgrades, needed to mitigate the impacts of Public Safety Power Shutoffs, AB 2421 will help enable the rapid deployment of emergency standby generators at macro cell sites. These generators are vital for public safety and welfare, thus helping to ensure consumers maintain access to 911 services, wireless emergency alerts, and other public safety communications. AB 2421 is a critical component in supporting the efforts of wireless service providers to install emergency standby generators before catastrophic events threaten Californians’ ability to stay connected to emergency services when needed most. Without the short term, narrowly crafted process prescribed in this legislation, widely differing and lengthy permitting requirements across the state could delay these public safety efforts by many months. AB 2421 is focused on improving public safety through power-resilient wireless communications networks.”
2. Where’s the beef? Cities and counties are empowered by the California Constitution to safeguard the health and welfare of its citizens through their police power. As a corollary to that, local agencies currently have discretion in how to permit modification, subject to state and federal limits that require action within certain timeframes and prohibit denial of complete applications. Accordingly, local agencies currently have the authority to adopt permitting processes for emergency generators similar to the administrative, nondiscretionary process mandated by AB 2421—and many have. But those agencies that still require a more elaborate review process, such as through the planning commission or other bodies may have good reasons for doing so: to provide opportunities to address the concerns of community members to whom local elected officials are responsible or to require mitigation of impacts associated with the generators. In those communities, AB 2421 imposes a simplified process that may remove opportunities for the public to raise concerns and have local officials address them. On the other hand, AB 2421 includes various provisions to ensure that the impacts of these generators remain reasonable, such as to require compliance with California emissions standards, local building and safety codes, and a limitation on the size of the generators. The bill also allows local governments to rescind permits that were deemed approved if the generator violates state and local laws and includes a sunset to ensure that the bill’s terms only apply during the relatively intensive generator construction effort that is needed to respond to the current PSPS challenges.
3. Also brought to you by… According to the Senate Environmental Quality Committee, “While many local agencies have opted to apply an administrative approval to emergency standby generators at cell towers, this bill mandates it statewide; which also removes CEQA’s application. Public participation and transparency in a local government’s approval of a project is a cornerstone of CEQA; the act does not care what decision is made as long as it is an informed one. Air pollution such as nitrogen oxides, particulate matter, and diesel particulate matter, emitted by standby generators can cause cancer, premature death, and other health problems. While air districts, which span one or more counties, will continue to require and enforce permits, and generators will be individually certified to California emission standards, local governments will not be able to consider the cumulative impacts of those generators. Maintaining access to communication is important, as is protecting the air quality of those communities. Proponents of the bill point out that these generators will operate for a maximum of 72 hours in areas during a power shutoff or emergency, are rated below 50 horsepower, and only installed at an already existing cell tower site. These generators will have lesser air quality impact than their counterparts that are rated with more than 50 horsepower. As a final consideration, will statewide administrative review for generators at cell towers lead to a desire to apply administrative review in other locations?”
4. Charter cities. The California Constitution allows cities that adopt charters to control their own “municipal affairs.” In all other matters, charter cities must follow the general, statewide laws. Because the Constitution doesn’t define “municipal affairs,” the courts determine whether a topic is a municipal affair or whether it’s an issue of statewide concern. AB 2421 says that its statutory provisions apply to charter cities. To support this assertion, the bill includes a legislative finding that installation of emergency standby generators has a significant public safety impact in California and is a matter of statewide concern.
5. Mandate. The California Constitution generally requires the state to reimburse local agencies for their costs when the state imposes new programs or additional duties on them. According to the Legislative Counsel’s Office, AB 2421 creates a new state-mandated local program. AB 2421 disclaims this mandate by saying that no reimbursement is required by this act because local agencies can levy fees to pay for the program.
6. Related legislation. AB 57 (Quirk, 2015) provided that a collocation or siting application for a wireless telecommunications facility is deemed approved if the city or county fails to approve or disapprove the application within the reasonable time periods specified in applicable decisions of the FCC, all required public notices have been provided regarding application, and the applicant has provided a notice to the city or county that the reasonable time period has lapsed. The Senate Governance and Finance Committee approved AB 57 on a vote of six to one. SB 649 (Hueso, 2018) would have streamlined permitting and capped local fees for small cell wireless facilities by requiring administrative, non-discretionary review of those facilities. The Senate Governance and Finance Committee approved SB 649 on a vote of seven to one. SB 649 was vetoed by the Governor with the following message:
“To the Members of the California State Senate: I am returning Senate Bill 649 without my signature. This bill establishes a uniform permitting process for small cell wireless equipment and fixes the rates local governments may charge for placement of that equipment on city or county owned property, such as streetlights and traffic signal poles. There is something of real value in having a process that results in extending this innovative technology rapidly and efficiently. Nevertheless, I believe that the interest which localities have in managing rights of way requires a more balanced solution than the one achieved in this bill.”
Assembly Actions
Assembly Local Government Committee: 8-0
Assembly Appropriations Committee: 18-0
Assembly Floor: 76-0
Support and Opposition
(7/24/20)
Support: 100 Black Men of Long Beach, Inc; African American Male Education Network and Development (A2mend); American Indian Chamber Of Commerce of California; Anaheim Fire & Rescue; Apple Valley Chamber Of Commerce; Apple Valley Fire Protection District; Arc; Arc of San Francisco; Asian Business Association; Asian Business Association of San Diego; Asian Pacific Islander American Public Affairs Association (APAPA); APAPA Solano County; Asian Pacific Islander American Public Affairs Association Community Education Foundation (APAPA-CEF); Association of California Water Agencies (ACWA); AT&T Central Valley Veterans; AT&T Inc. and its Affiliates; Beaumont Chamber Of Commerce; Beverly Oncology & Imaging; Big Bear Fire Authority; Black Business Association; Black Chamber of Orange County; Bodega Bay Fire Protection District; Boys & Girls Club North Valley; Boys and Girls Club of El Dorado County; Brotherhood Crusade; Burbank Chamber of Commerce; Cal Asian Pacific Islander Chamber of Commerce; Calaveras County Sheriff's Office; California Asian Pacific Chamber of Commerce; California Association of Highway Patrolmen; California Black Chamber of Commerce; California Chapter National Emergency Number Association (CALNENA); California Fire Chiefs Association; California Hispanic Chamber of Commerce; California Hospital Association/California Association of Hospitals and Health Systems; California Police Chiefs Association; California State Conference of the National Association for the Advancement of Colored People; California State Firefighters' Association; Carlsbad Chamber of Commerce; Carmel Valley Chamber of Commerce; Center for Fathers and Families; Chambers of Commerce along the Highway 78; Corridor; Chicano Federation of San Diego County; Chino Valley Chamber Of Commerce; City of Hayward; City of Hayward Fire Department; City of Montecito Fire Department; City of Palm Springs Fire Department; City of Santa Rosa Fire Department; City of Seaside; Coalition for Responsible Community Development; Community Women Vital Voices; Concerned Citizens Community Involvement; Congress of California Seniors; Contra Costa County Fire Protection District; Corona Chamber Of Commerce; Corona Fire Department; Cosumnes Fire Department; County Of Riverside; County Of San Bernardino; CTIA; Disability Action Center; Dr. Rhuenette Alums; East Bay Leadership Council; East Bay Municipal Utility District; El Dorado County Chamber of Commerce; El Dorado County Sheriff's Office; Escondido Chamber Of Commerce; Filipina Women's Network; Fire Districts Association of California; Fire Safe Council of San Diego County; Fontana Chamber of Commerce; Fresno Police Officers Association (FPOA); Frontier Senior Center – AAASCO; Glendale Chamber of Commerce; Greater Coachella Valley Chamber of Commerce; Greater Los Angeles African American Chamber of Commerce; Greater Riverside Chamber of Commerce; Greater Sacramento Urban League; Hemet San Jacinto Valley Chamber of Commerce; Hesperia Chamber of Commerce; Highland Chamber of Commerce; Hispanic 100; Inland Empire Chamber Legislative Alliance; Inland Empire Economic Partnership (IEEP); Inland Empire Regional Broadband Consortium; Janet Goeske Foundation; Kern County Fire Department and Office of Emergency Services; Kheir Clinic; Kings/Tulare Homeless Alliance; Korean American Seniors Association of Orange County; La Cañada Flintridge Chamber of Commerce and Community Association; LAAAWPPI; Lakeside Chamber of Commerce; Latino Education and Advocacy Days; Lead Cal State San Bernardino; Lighthouse Counseling & Family Resource Center; Long Beach Area Chamber of Commerce; Los Angeles African American Women's Public Policy Institute; Los Angeles County Fire Department; Madera County Sheriff's Office; Mariposa County Sheriff's Office; Meeks Bay Fire Protection District; Mission of the 100 Black Men of Long Beach, Inc.; Montecito Fire Department; Monterey County Business Council; Monterey County Hospitality Association; Monterey County Sheriff's Department; Moreno Valley Chamber of Commerce; Mother Lode Rehabilitation Enterprises Inc.; Murrieta Wildomar Chamber of Commerce; NAACP; NAACP LA; NAACP Ventura County; Napa Valley Support Services; Newcastle Fire Protection District; North County Fire Protection District; North Sonoma Coast Fire Protection District; North Tahoe Fire Protection District; Novato Fire Protection District; Oasis San Diego; Oceanside Chamber of Commerce; Office of the Sheriff, Calaveras County; Orange County Business Council; Orange County Hispanic Chamber Of Commerce; Organization of Chinese Americans; Organization of Chinese Americans, Greater Sacramento Chapter; Oroville Rescue Mission; Pacific Grove Chamber of Commerce; Parent Institute for Quality Education; Pasadena Chamber of Commerce and Civic Association; Pasadena/Altadena Ivy Foundation; Peace Officers Research Association of California (PORAC); Perris Valley Chamber of Commerce; Pomona Chamber of Commerce; Rancho Cucamonga Chamber of Commerce; Recknagel Enterprises; Redlands Chamber of Commerce; Resource Conservation District of Greater San Diego County; Rincon Fire Department; Riverside Sheriffs' Association; Rural County Representatives of California; Sacramento Asian Pacific Chamber of Commerce; Sacramento Black Chamber of Commerce; Sacramento Hispanic Chamber of Commerce; Sacramento Metropolitan Fire District; San Bernardino County Fire Chiefs Association; San Diego County Sheriff's Department; San Diego Fire-Rescue; San Diego North County Chambers; San Diego Oasis; San Francisco Chamber of Commerce; San Gabriel Valley Economic Partnership; San Marcos Chamber Of Commerce; Santa Barbara County Fire Department; Santa Clara County Fire Chiefs Association; Seaside Fire Department; Self-Help for the Elderly; sf.citi; Sierra College; Sierra College Foundation; Slavic-American Chamber of Commerce; Society for the Blind; South Placer Fire Protection District; Southeast Community Development Corporation; Southern Border Broadband Consortium; Southern Marin Emergency Medical Paramedic System; Southern Marin Fire Protection District; Sutter Creek Fire Protection District; Tahoe Prosperity Center; TechNet-Technology Network; The Arc and United Cerebral Palsy California Collaboration; The Arc of Butte County; The Arc of California; The Arc San Francisco; The Village Project; Thinkwatts Foundation; Tiburon Fire Protection District; UFCW Local 648; Upland Chamber of Commerce; Urban Corps of San Diego County; Urban League - Greater Sacramento; Veterans Association; Veterans Association of North County; Victor Valley Chamber of Commerce; Vista Chamber Of Commerce; Western Fire Chiefs Association; World Institute on Disability; Young Visionaries Youth Leadership Academy; Zephyr Real Estate.
Opposition: Unknown.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 2421
Author:(Quirk)
As Amended Ver:June 4, 2020
Majority vote
SUMMARY:
Requires expedited permitting of emergency standby generators for macro cell towers.
Major Provisions
This bill limits permit reviews for emergency standby generators for macro cell towers to administrative review only, and creates a shot-clock by which permit reviews must be completed. The proposed generator must be rated below 50 horsepower and certified to California emission standards, have a 190-gallon double-wall storage tank, and be mounted on a concrete pad. The macro cell tower site at which the emergency standby generator is proposed to be installed must be an existing site that was previously permitted by the local agency. The emergency standby generator must comply with all applicable state and local laws and regulations, including building and fire safety codes.
A county or city must approve or deny a permit application for such a generator within 60 days. If an application is incomplete, the county or city has 10 days to notify the applicant, in which case the shot-clock stops until the applicant provides the requested information. A county or city cannot require any new or different information for a permit application than it routinely requires for applications for other emergency standby generators. If a county or city fails to approve or deny a completed application within 60 days, the application will be deemed approved.
This bill does not prohibit a local agency from revoking, through the appropriate process, the permit or approval status for an emergency standby generator that is determined to violate an applicable state or local law or regulation, including building and fire safety codes, or from otherwise enforcing state and local law with respect to the emergency standby generator.
If a county or city requires more than one permit application for the installation of a generator, all applications submitted concurrently must be issued within the same 60-day period set forth above. A county or city may not require an applicant to submit proof of consent or other authorization from an underlying property owner as part of the initial application for a generator permit. However, the applicant must not install the generator until the applicant provides documentation to the local agency, if the local agency requires it.
A county of city may impose a permit fee to cover its costs associated with administering this bill. The fee shall not exceed the reasonable costs of providing the service for which the fee is charged and shall not be levied for general revenue purposes. This bill applies to all counties and cities, including charter cities, and contains a repeal date of January 1, 2024.
COMMENTS:
Public Safety Power Shutoffs have been part of California's strategy to prevent wildfires for several years. However, 2019 was a landmark year for PSPS events, which occurred from October 9 to November 1 in about 30 counties in Northern California and several in Southern California and affected all three of the state's largest power utilities – Pacific Gas and Electric Company (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E). Over the course of the PSPS events, more than 3 million people lost power.
Given the critical importance of uninterrupted communications during power outages, this bill seeks to protect this communications infrastructure so it will continue to operate in the event the primary source of power goes down during a PSPS event or other power interruption. AT&T reports some delays (from five to 30 months) in local jurisdictions that have required – as part of the permitting process for back-up generators – variances, substantial aesthetic structures, spec sheets and transmission details on existing equipment not affected by a generator application, and documents that the agency already has on file.
In addition to speeding up the permitting process with a shot-clock and deemed approved approach, this bill also prohibits local agencies from requiring a permit applicant to prove up-front that an underlying property owner has provided consent for the installation of a generator. This allows the applicant to pursue the permitting process concurrently with the process of obtaining permission from property owners. The applicant would still be required to provide this evidence to the local agency before installing the generator if the agency requires it as part of the permitting process.
According to the Author:
"In order to facilitate wireless network upgrades needed to mitigate the impacts of Public Safety Power Shutoffs, this legislation will help enable the rapid deployment of emergency standby generators at macro cell sites. These resources are vital for public safety and welfare to help ensure consumers maintain access to 911 services, wireless emergency alerts, and other public safety communications.
"AB 2421 is a critical component to supporting the efforts of wireless service providers to install emergency standby generators before catastrophic events threaten Californians' ability to stay connected to emergency services when needed most. Without the short term, narrowly crafted process prescribed in this legislation, widely differing and lengthy permitting requirements across the state could delay these public safety efforts by many months. AB 2421 is focused on improving public safety through power-resilient wireless communications networks."
Arguments in Support:
The Peace Officers Research Association of California, in support, writes, "This bill would enable California to take timely steps to improve public safety communications in preparation for the coming wildfire seasons and possible power shutoffs by electric utilities. AB 2421 streamlines the local permitting process for back-up power equipment at cell sites, while safeguarding final permitting authority with the local jurisdiction. This legislation would only apply to the installation of generators that are certified to California low emission standards.
"Expediting the deployment of back-up power solutions at wireless sites is essential to public safety. During extended power outages, wildfires, and other emergencies, mobile communications are critical for our members to stay connected, as well as to share potentially life-saving information with the public. Even when commercial power is lost, Californians must be able to maintain access to 911 and receive emergency notifications, including Wireless Emergencies Alerts (WEA) broadcast by our public safety officials. California's Legislature should use every tool available to rapidly prepare for the growing threat of wildfires, power outages, and other disasters. For these reasons, we strongly urge you to support AB 2421."
Arguments in Opposition: The Communications Workers of America, District 9 (CWA), writes, "CWA believes strongly that the communications grid should be reliable, promote public safety, and be subject to robust oversight. CWA workers are on the front lines, working to ensure the reliability of these cell towers, and the communications grid as a whole. Local review can be a critical step to ensuring reliability and establishing the necessity of a requested approval. There may be circumstances demanding an expedited review process with automatic approval after 60 days. However, the default provision contained in AB 2421 applies to every application, in every city and county in California. This bill is not narrowly tailored to only those areas of high wildfire risk or other exigent circumstances. Nor is there an avenue for the local government to extend the mandated timeline for justifiable reasons. "Additionally, AB 2421's focus on short-term generator power could have the unintended consequence of allowing corporations to ignore or delay long-term infrastructure investment and repair. Ultimately, it is in the best interest of California to ensure that it has a communications grid that has been hardened and is available to all. CWA believes that a greater focus should be made on the long-term health of the communications grid as opposed to an overreliance on temporary solutions. Furthermore, discussion on this bill would benefit from insight into how telecommunications companies responded to outages during recent wildfires and what strategies they employed for long-term sustainability. Unfortunately, these corporations have failed to provide this information and have argued that they are not required to inform the public about their activities. Temporary and short-term responses may be necessary, but are best evaluated in the context of understanding the overall strategies to maintain and strengthen the communications grid long-term."
FISCAL COMMENTS:
According to the Assembly Appropriations Committee, no state costs. State-mandated local costs are not reimbursable by the state because the bill authorizes a local agency to impose a fee to cover costs associated with administering the bill's provisions.
VOTES:
ASM LOCAL GOVERNMENT: 8-0-0
YES: Aguiar-Curry, Lackey, Bloom, Boerner Horvath, Ramos, Luz Rivas, Robert Rivas, Voepel
ASM APPROPRIATIONS: 18-0-0
YES: Gonzalez, Bigelow, Bauer-Kahan, Bloom, Bonta, Calderon, Carrillo, Chau, Megan Dahle, Diep, Eggman, Fong, Gabriel, Eduardo Garcia, Petrie-Norris, McCarty, Robert Rivas, Voepel
UPDATED:
VERSION: June 4, 2020
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0003026
Date of Hearing: June 2, 2020
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 2421
Author:(Quirk) – As Amended Ver:March 12, 2020
Policy Committee: | Local Government | Vote: | 8 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: Yes
SUMMARY:
This bill requires, until January 1, 2024, cities and counties, including charter cities and counties, to adopt expedited permitting procedures to install emergency standby generators for macro cell towers. Among its provisions, this bill:
- Requires an emergency standby generator proposed to be installed within the physical footprint of a macro cell tower site to be a permitted use subject only to local agency administrative review if it meets both of the following requirements:
- The emergency standby generator is rated below 50 horsepower, certified to California emission standards, has a 190-gallon double-wall storage tank and is mounted on a concrete pad.
- The macro cell tower site at which the emergency standby generator is proposed to be installed is an existing site that was previously permitted by the local agency.
- Requires a local agency that receives a completed permit application that meets the requirements specified above to approve or deny the application within 60 days of submittal of the application, as specified.
- Deems approved a completed application the local agency has not approved or denied within
60 days of receipt or upon expiration of any tolling period. - Provides, if the local agency requires more than one permit application for the installation of an emergency standby generator, all applications submitted concurrently be issued within the same 60-day period set forth above.
- Prohibits the local agency from requiring the applicant to submit proof of consent or other authorization from an underlying property owner as part of the initial application for a permit; however, the applicant cannot install the emergency standby generator until the applicant provides documentation, if required, to the local agency.
FISCAL EFFECT:
State-mandated local costs to cities and counties, likely to exceed $150,000 (GF) statewide, to provide an expedited permitting process for emergency standby generators for three years. Current law is not clear regarding whether local agencies have the authority to levy a fee to cover the costs of the new expedited permitting process required in the bill. Accordingly, Legislative Counsel has not included local fee disclaimer language in the bill. Whether these costs are reimbursable by the state will be subject to a determination by the Commission on State Mandates, should a local agency file a claim.
COMMENTS:
- Purpose. This bill seeks to expedite the installation of back-up power generators for macro cell towers to mitigate loss of wireless communication services during a Public Safety Power Shutoffs (PSPS) or natural disaster. According to the author:
This legislation will help enable the rapid deployment of emergency standby generators at macro cell sites. These resources are vital for public safety and welfare to help ensure consumers maintain access to 911 services, wireless emergency alerts, and other public safety communications.
- Background. In 2019, PSPS events occurred from October 9 to November 1 in about 30 counties in Northern California and several in Southern California and affected all three of the state’s largest electric utilities –Pacific Gas and Electric Company (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E). Over the course of the PSPS events, more than 3 million people lost power.
AT&T indicates there are hundreds of cell towers in California without backup power. They also report experiencing some delays (from five to 30 months) in local agencies’ permitting processes because they have required – as part of the permitting process for back-up generators – variances, substantial aesthetic structures, spec sheets and transmission details on existing equipment not affected by a generator application, and documents that the agency already has on file. This bill seeks to address these delays with a state-wide, expedited permitting process for communications infrastructure so it will continue to operate in the event the primary power source goes down during a PSPS event or other power interruption.
- Concerns. The Rural County Representatives of California, expressing concerns, write:
While RCRC supports the intent of this bill, we remain concerned with the ‘deemed approved’ provision of the bill. Specifically, AB 2421 requires approval of a permit application for installing an emergency standby generator at a cell tower site if the local government fails to process (approve or deny) the application within 60 days, even if the proposed project fails to meet the health and safety requirements in current law. RCRC requests amendments to ensure that a project must comply with all applicable laws.
- Prior Legislation. AB 57 (Quirk), Chapter 685 of the Statutes of 2015, requires a collocation or siting application for a wireless telecommunications facility to be deemed approved, if specified conditions are met, and applies these provisions to all counties and cities.
Analysis Prepared by: Jennifer Swenson / APPR. / (916) 319-2081
Date of Hearing: May 12, 2020
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Cecilia Aguiar-Curry, Chair
ABPCA Bill Id:AB 2421 (
Author:Quirk) – As Amended Ver:March 12, 2020
SUBJECT: Land use: permitting: wireless communications.
SUMMARY: Requires expedited permitting of emergency standby generators for macro cell towers. Specifically, this bill:
- Requires an emergency standby generator proposed to be installed within the physical footprint of a macro cell tower site to be a permitted use subject only to local agency administrative review if it meets both of the following requirements:
- The emergency standby generator is rated below 50 horsepower, certified to California emission standards, has a 190-gallon double-wall storage tank, and is mounted on a concrete pad; and,
- The macro cell tower site at which the emergency standby generator is proposed to be installed is an existing site that was previously permitted by the local agency.
- Requires a local agency that receives a completed permit application to install an emergency standby generator that meets the requirements specified above to approve or deny the application within 60 days of submittal of the application, subject to both of the following:
- If, within 10 days of submission, the local agency notifies the applicant in writing that the application is deficient, then the 60-day period shall be tolled until the applicant provides the information requested; and,
- The local agency shall not require any new or different information for the permit applications than it routinely requires for applications for other emergency standby generators.
- Requires a completed application that the local agency has not approved or denied within
60 days of receiving the application or upon expiration of any tolling period to be deemed approved. - Provides that, if the local agency requires more than one permit application for the installation of an emergency standby generator, all applications submitted concurrently shall be issued within the same 60-day period set forth above.
- Prohibits the local agency from requiring the applicant to submit proof of consent or other authorization from an underlying property owner as part of the initial application for an emergency standby generator permit; however, the applicant shall not install the emergency standby generator until the applicant provides documentation, if required, to the local agency.
- Repeals the provisions of this bill on January 1, 2024.
- Provides the following definitions for the purposes of this bill:
- “Emergency standby generator” means a stationary generator used for the generation of electricity that meets the criteria set forth in a specified section of the California Code of Regulations that governs airborne toxic control measures for stationary compression ignition engines;
- “Local agency” means a city, county, or city and county; and,
- “Macro cell tower site” means the place where wireless telecommunications equipment and network components, including towers, transmitters, base stations, and emergency powers necessary for providing wide area outdoor service, are located. A macro cell tower site does not include rooftop, small cell, or outdoor and indoor distributed antenna system sites.
- Finds and declares that the installation of emergency standby generators at wireless telecommunications facility sites as set forth in this bill has a significant public safety impact in California and is a matter of statewide concern and is not a municipal affair as that term is used in the California Constitution. Therefore, this bill applies to all cities, including charter cities.
- Provides that, if the Commission on State Mandates determines that this bill contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to current law governing state mandated local costs.
- Makes a number of findings and declarations regarding wildfires in California, Public Safety Power Shutoffs (PSPS) as one strategy for preserving public safety and welfare, and the need to enable the rapid deployment of emergency standby generators for wireless infrastructure to ensure public safety communications during PSPS events.
EXISTING LAW:
- Establishes that every county or city may make and enforce within its limits all local, police, sanitary, and other ordinances and regulations not in conflict with general laws.
- Provides that a state or local government may not deny, and shall approve, any request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such a tower or base station. Under the FCC rules governing such requests, the approval must be issued within 60 days or the request shall be deemed granted.
- Requires a completed permit application for a collocation or siting permit for a wireless telecommunications facility to be deemed approved if a county or city fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC decisions.
- Provides that the placement or installation of certain wireless facilities, including antennas and related equipment, on or immediately adjacent to a wireless telecommunications facility, is a permitted use not subject to a county or city discretionary permit.
FISCAL EFFECT: This bill is keyed fiscal and contains a state-mandated local program.
COMMENTS:
- Bill Summary. This bill limits permit reviews for specified emergency standby generators for macro cell towers to administrative action only, and creates a shot-clock by which permit reviews must be completed. The proposed generator must be rated below 50 horsepower and certified to California emission standards, have a 190-gallon double-wall storage tank, and be mounted on a concrete pad. The macro cell tower site at which the emergency standby generator is proposed to be installed must be an existing site that was previously permitted by the local agency.
A county or city must approve or deny an application for such a generator within 60 days. If an application is deficient, the county or city has 10 days to notify the applicant, in which case the shot-clock stops until the applicant provides the requested information. A county or city cannot require any new or different information for a permit application than it routinely requires for applications for other emergency standby generators.
If a county or city fails to approve or deny a completed application within 60 days, the application will be deemed approved. If a county or city requires more than one permit application for the installation of a generator, all applications submitted concurrently must be issued within the same 60-day period set forth above.
A county or city may not require an applicant to submit proof of consent or other authorization from an underlying property owner as part of the initial application for a generator permit. However, the applicant must not install the generator until the applicant provides documentation to the local agency, if the local agency requires it.
This bill applies to all counties and cities, including charter cities, and contains a repeal date of January 1, 2024. This bill is sponsored by the author.
- Author's Statement. According to the author, “In order to facilitate wireless network upgrades needed to mitigate the impacts of Public Safety Power Shutoffs, this legislation will help enable the rapid deployment of emergency standby generators at macro cell sites. These resources are vital for public safety and welfare to help ensure consumers maintain access to 911 services, wireless emergency alerts, and other public safety communications.
“AB 2421 is a critical component to supporting the efforts of wireless service providers to install emergency standby generators before catastrophic events threaten Californians’ ability to stay connected to emergency services when needed most. Without the short term, narrowly crafted process prescribed in this legislation, widely differing and lengthy permitting requirements across the state could delay these public safety efforts by many months. AB 2421 is focused on improving public safety through power-resilient wireless communications networks.”
- Background. Public Safety Power Shutoffs have been part of California’s strategy to prevent wildfires for several years. However, 2019 was a landmark year for PSPS events, which occurred from October 9 to November 1 in about 30 counties in Northern California and several in Southern California and affected all three of the state’s largest power utilities –Pacific Gas and Electric Company (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E). Over the course of the PSPS events, more than 3 million people lost power.
In the wake of tremendous public outcry over the shut-offs and their impacts, the California Public Utilities Commission (PUC) took a number of actions to “address the mistakes and operational gaps identified in the utility’s October 2019 PSPS events and to provide lessons learned to ensure they are not repeated.” These included a series of emergency meetings, investigations, re-evaluations of how utilities use PSPS, ensuring additional consumer protections, and proposing additional PSPS guidelines for utilities to follow.
Most recently, on April 29, 2020, the PUC issued for public comment a proposal that would require large electric investor-owned utilities to accelerate deployment of microgrids and resiliency projects to minimize the impacts of wildfire-caused power outages and PSPS events. The Proposed Decision orders utilities to prioritize, streamline, and expedite microgrids and resiliency projects that could be put in place by September 1, 2020, and requires collaboration with local and tribal governments. The proposal is intended to rapidly develop and deploy projects that could keep electricity on for critical facilities and other customers during power outages. Among other things, the Proposed Decision conditionally approves several resiliency proposals from two utilities. Among the proposals from PG&E is a program to procure temporary, portable generators for use at substations and other key locations of public benefit for the 2020 wildfire season.
While procuring back-up generators for use with utility infrastructure is certainly helpful and part of the solution, this bill also seeks to expedite the installation of back-up power generators for macro cell towers. Given the critical importance of uninterrupted communications during power outages, this bill seeks to protect this communications infrastructure so it will continue to operate in the event the primary source of power goes down during a PSPS event or other power interruption. AT&T reports some delays (from five to 30 months) in local jurisdictions that have required – as part of the permitting process for back-up generators – variances, substantial aesthetic structures, spec sheets and transmission details on existing equipment not affected by a generator application, and documents that the agency already has on file.
In addition to speeding up the permitting process with a shot-clock and deemed approved approach, this bill also prohibits local agencies from requiring a permit applicant to prove up-front that an underlying property owner has provided consent for the installation of a generator. This allows the applicant to pursue the permitting process concurrently with the process of obtaining permission from property owners. The applicant would still be required to provide this evidence to the local agency before installing the generator if the agency requires it as part of the permitting process.
- Arguments in Support. The Peace Officers Research Association of California, in support, writes, “This bill would enable California to take timely steps to improve public safety communications in preparation for the coming wildfire seasons and possible power shutoffs by electric utilities. AB 2421 streamlines the local permitting process for back-up power equipment at cell sites, while safeguarding final permitting authority with the local jurisdiction. This legislation would only apply to the installation of generators that are certified to California low emission standards.
“Expediting the deployment of back-up power solutions at wireless sites is essential to public safety. During extended power outages, wildfires, and other emergencies, mobile communications are critical for our members to stay connected, as well as to share potentially life-saving information with the public. Even when commercial power is lost, Californians must be able to maintain access to 911 and receive emergency notifications, including Wireless Emergencies Alerts (WEA) broadcast by our public safety officials.
“California’s Legislature should use every tool available to rapidly prepare for the growing threat of wildfires, power outages, and other disasters. For these reasons, we strongly urge you to support AB 2421.”
- Concerns. The Rural County Representatives of California, expressing concerns, write, “AB 2421 sets forth a streamlined local permitting process for siting backup power generators on macro cellular tower sites through January 1, 2024. While RCRC supports the intent of this bill (to expeditiously deploy backup power generation to cell towers to mitigate loss of wireless communication services during an outage), we remain concerned with the ‘deemed approved’ provision of the bill. Specifically, AB 2421 requires approval of a permit application for installing an emergency standby generator at a cell tower site if the local government fails to process (approve or deny) the application within 60 days, even if the proposed project fails to meet the health and safety requirements in current law. Therefore, RCRC requests the following amendments to AB 2421 to ensure that a project must comply with all applicable laws:
Government Code Section 65850.75 (d) A completed application that the local agency has not approved or denied within 60 days of receiving the application or upon expiration of any tolling period shall be deemed approved insofar as it complies with all applicable requirements of this section and state fire, structural, electrical, and other building codes as adopted or amended by the local agency.
“RCRC staff appreciates the ongoing efforts of your staff and the bill’s sponsors in addressing our concerns. We believe that through continued discussions in the next couple weeks, we will be able to come to an agreement that will both allow for swift deployment of backup power in preparation for the approaching fire/PSPS season, while maintaining the ability of local government to protect its residents through approving only projects that meet applicable health and safety standards.”
- Arguments in Opposition. None on file.
REGISTERED SUPPORT / OPPOSITION:
Support
100 Black Men of Long Beach, Inc.
African American Male Education Network and Development (A2MEND)
American Indian Chamber of Commerce of California
Asian Business Association of San Diego
Asian Pacific Islander American Public Affairs Association (APAPA)
AT&T
AT&T Central Valley Veterans
Beverly Oncology & Imaging
Black Business Association
Black Chamber of Orange County
Boys & Girls Club of El Dorado County Western Slope
Brotherhood Crusade
Burbank Chamber of Commerce
Calaveras County Sheriff's Office
California Asian Pacific Chamber of Commerce
California Association of Highway Patrolmen
California Black Chamber of Commerce
California Hispanic Chambers of Commerce
California State Conference of The National Association for The Advancement of Colored People
Carlsbad Chamber of Commerce
Center for Fathers and Families
Coalition for Responsible Community Development
Community Women Vital Voices
Concerned Citizens Community Involvement
Congress of California Seniors
CTIA
El Dorado County Chamber of Commerce
El Dorado County Sheriff's Office
Escondido Chamber of Commerce
Filipina Women's Network
Fire Safe Council of San Diego County
Fresno Police Officers Association (FPOA)
Frontier Senior Center - AAASCO
Glendale Chamber of Commerce
Greater Coachella Valley Chamber of Commerce
Greater Los Angeles African American Chamber of Commerce
Greater Riverside Chambers of Commerce
Greater Sacramento Urban League
Hispanic 100
Inland Empire Economic Partnership (IEEP)
Janet Goeske Foundation
Kheir Clinic
Kings/Tulare Homeless Alliance
Korean American Seniors Association of Orange County
La Cañada Flintridge Chamber of Commerce and Community Association
Lakeside Chamber of Commerce
Lighthouse Counseling and Family Resource Center
Long Beach Area Chamber of Commerce
Los Angeles NAACP
Madera County Sheriff's Office
Mariposa County Sheriff's Office
Meeks Bay Fire Protection District
Monterey County Sheriff's Department
Mother Lode Rehabilitation Enterprises Inc. (MORE)
NAACP
North Tahoe Fire Protection District
Oceanside Chamber of Commerce
Orange County Business Council
Orange County Hispanic Chamber of Commerce
Organization of Chinese Americans
Organization of Chinese Americans, Greater Sacramento Chapter
Oroville Rescue Mission
Pasadena Chamber of Commerce and Civic Association
Pasadena/altadena Ivy Foundation
Peace Officers Research Association of California (PORAC)
Resource Conservation District of Greater San Diego County
Sacramento Asian Pacific Chamber of Commerce
Sacramento Black Chamber of Commerce
Sacramento Hispanic Chamber of Commerce
San Diego Oasis
San Francisco Chamber of Commerce
San Gabriel Valley Economic Partnership
San Marcos Chamber of Commerce
Self-Help for the Elderly
Sf.citi
Sierra College Foundation
Slavic-American Chamber of Commerce
Society for the Blind
Southeast Community Development Corporation
Southern Border Broadband Consortium
Tahoe Prosperity Center
Technet-technology Network
The Arc and United Cerebral Palsy California Collaboration
The Arc of Butte County
The Arc San Francisco
The Village Project
Thinkwatts Foundation
UFCW Local 648
Urban Corps of San Diego County
Veterans Association of North County
Vista Chamber of Commerce
World Institute on Disability
Concerns
American Planning Association, California Chapter
League of California Cities
Rural County Representatives of California
Opposition
None on file
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958
Bill Author
Bill Co-Author(s):