AB 2932: City of Long Beach: design-build process.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2020-09-09
|
Date
|
Status
|
|---|---|
| Sep 9, 2020 | Chaptered by Secretary of State - Chapter 54, Statutes of 2020. |
| Sep 9, 2020 | Approved by the Governor. |
| Sep 4, 2020 | Enrolled and presented to the Governor at 2 p.m. |
| Aug 28, 2020 | In Assembly. Ordered to Engrossing and Enrolling. |
| Aug 28, 2020 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. (Ayes 39. Noes 0. Page 4372.). |
| Jul 31, 2020 | Read second time. Ordered to Consent Calendar. |
| Jul 30, 2020 | From committee: Do pass. To Consent Calendar. (Ayes 7. Noes 0.) (July 29). |
| Jul 1, 2020 | Referred to Com. on GOV. & F. |
| Jun 16, 2020 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 15, 2020 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 79. Noes 0. Page 4850.). |
| Jun 10, 2020 | Read third time and amended. Ordered to third reading. (Page 4746.) |
| May 13, 2020 | Read second time. Ordered to third reading. |
| May 12, 2020 | From committee: Do pass. (Ayes 8. Noes 0.) (May 12). |
| Mar 5, 2020 | Referred to Com. on L. GOV. |
| Feb 24, 2020 | Read first time. |
| Feb 22, 2020 | From printer. May be heard in committee March 23. |
| Feb 21, 2020 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 28, 2020 | Consent Calendar AB2932 O'Donnell Urgency Clause | Senate Floor |
Passed |
|
| Jul 29, 2020 | Do pass and be ordered to the Consent Calendar | Senate Standing Committee on Governance and Finance |
Passed |
|
| Jun 15, 2020 | AB 2932 O'Donnell Third Reading Urgency | Assembly Floor |
Passed |
|
| May 12, 2020 | Do pass. | Assembly Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 2932 |
CONSENT
Bill No: AB 2932
Author: O'Donnell (D)
Amended: 6/10/20 in Assembly
Vote: 27 - Urgency
SENATE GOVERNANCE & FIN. COMMITTEE: 7-0, 7/29/20
AYES: McGuire, Moorlach, Beall, Hertzberg, Hurtado, Nielsen, Wiener
ASSEMBLY FLOOR: 79-0, 6/15/20 - See last page for vote
SUBJECT: City of Long Beach: design-build process
SOURCE: City of Long Beach
DIGEST:
This bill allows the City of Long Beach to use the design-build contracting process to award contracts for curb ramps that are compliant with the Americans with Disabilities Act.
ANALYSIS:
Existing law:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system.
- Authorizes, until January 1, 2025, cities, counties, and specified special districts, transit and transportation agencies, and specified additional local agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process.
- Provides the following parameters for cities and counties that use design-build:
- Allows design-build for the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities;
- Allows cities and counties that operate wastewater facilities, solid waste management facilities, or water recycling facilities to use design-build for the construction of such facilities; and,
- Prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure.
This bill:
- Allows the City of Long Beach, upon approval of its city council, to use the design-build contracting process authorized for local agencies to award a contract for curb ramp construction.
- Defines “design build” as the procurement process in which both the design and construction of a project are procured from a single entity.
- Allows, for these curb ramp projects, the City of Long Beach to perform project development services, including performance specifications, preliminary engineering, procurement services and the preparation of project reports, construction inspection services (excluding specialty bridge inspectors), and the preparation of specified documents.
- Requires, for these curb ramp projects, the City of Long Beach to be limited to no more than 3,000 ramps, with the total cost not to exceed $20 million dollars per year, and subject to completion prior to January 1, 2025.
- Finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique conditions in the City of Long Beach that make it necessary to grant the City of Long Beach and the City of Long Beach Public Works Department the authority to use the specific design-build procurement process described in this bill.
Background
The Americans with Disabilities Act (ADA) established civil rights protections at the federal level for individuals with physical and mental disabilities and guarantees them with equal opportunities and access in areas such as public accommodations, transportation, and state and local government services. In 2014, five Long Beach residents filed a class action lawsuit against the City of Long Beach arguing that the city is in violation of the ADA. Specifically, their lawsuit claimed the City did not provide curb cuts at corners or repair sidewalks to accommodate individuals in wheelchairs or with other mobility disabilities.
In 2017, the City of Long Beach settled the class action lawsuit. As a result of the settlement, the City of Long Beach must:
- Build up to 4,500 missing curb ramps by December 31, 2022;
- Spend up to $50 million to repair approximately 16,000 curb ramps that are damaged or otherwise inaccessible to disabled individuals;
- Spend up to $125 million to remedy broken sidewalks and crosswalks within 30 years of the settlement; and,
- Reserve more than $5 million during the first 10 years of the settlement period to make specific infrastructure fixes that residents with disabilities will be able to request.
Comments
- Purpose of the bill. According to the author, “AB 2932 authorizes the City of Long Beach to utilize design-build contracting in order to expedite the construction of curb ramps and upgrade sidewalks to ensure compliance with the American with Disabilities Act. As part of a settlement agreement, the City must complete 3,000 curb ramps by December 31, 2022. This bill will enable the City to expedite the bidding and construction processes. The streamlined process for bidding and awarding these contracts will expedite the upgrade of sidewalks and curbs that will expand access to and ensure that residents can safely travel along city streets.”
- Project expansion. Current law already authorizes local agencies to utilize design build contracting for public work projects in excess of one million dollars ($1,000,000) until January 1, 2025. However, because existing law does not allow design build for projects that are not construction or improvement of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, the city would not be able to use design build without legislative approval. While this would expand the City of Long Beach’s design build authority beyond what the Legislature has previously authorized, using traditional contracting methods could put the City as risk of missing the settlement deadlines.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
SUPPORT: (Verified 7/31/20)
City of Long Beach (source)
OPPOSITION: (Verified 7/31/20)
None received
ASSEMBLY FLOOR: 79-0, 6/15/20
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
Prepared by: Gustavo Medrano / GOV. & F. / (916) 651-4119
7/31/20 17:51:56
**** END ****
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Mike McGuire, Chair
2019 - 2020 Regular
Bill No: | AB 2932 | Hearing Date: | 7/29/20 |
Author: | O'Donnell | Tax Levy: | No |
Version: | 6/10/20 | Fiscal: | No |
Consultant: | Medrano | ||
City of Long Beach: design-build process
Allows the City of Long Beach to use design-build contracting for curb ramps to comply with the Americans with Disabilities Act (ADA).
Background
Design build. The Local Agency Public Construction Act (the Act) generally requires local agencies to invite bids for construction projects and award contracts to the lowest responsible bidder. Local agencies typically use the traditional design-bid-build method for constructing public works. This approach splits construction projects into two distinct phases: design and construction. During the design phase, the local agency prepares detailed project plans and specifications using its own employees or by hiring outside architects and engineers. Once project designs are complete, local agencies invite bids from the construction community and award the contract to the lowest responsible bidder.
By contrast, state law allows state and local officials, until January 1, 2025, to use the design-build method for contracts in excess of $1 million to procure both design and construction services from a single company before the development of complete plans and specifications. Under design-build, the agency contracts with a single entity—which can be a single firm, a consortium, or a joint venture—to design and construct a project. The Department of General Services, the California Department of Corrections and Rehabilitation, cities, counties, transit districts, special districts operating wastewater, water recycling, or solid waste management facilities, and certain health care districts may use design-build for projects that are for construction or improvement of a building or buildings, county sanitation wastewater treatment facilities, or park and recreational facilities.
Originally, the authorization for state agencies and local governments to use design-build were dispersed throughout state law in separate code sections. In 2014, the Legislature consolidated these provisions into consistent, generally-applicable statutes (SB 785, Wolk, 2014). SB 785 outlined a standardized design-build procurement process in which the awarding authority may prepare a list of qualified or short-listed entities, based on specified criteria. Once a list of qualified or short-listed entities is complete, the awarding authority may prepare a request for proposals (RFP) that invite prequalified or short-listed entities to submit competitive sealed proposals in the manner the awarding authority prescribes.
Before inviting bids, the agency prepares documents that describe the basic concept of the project, as opposed to a complete set of drawings and specifications of the final product. In the bidding phase, the agency typically evaluates bids on a low-bid or best-value basis, incorporating technical factors, such as qualifications and design quality, in addition to price. For projects utilizing low bid as the selection method, the awarding authority must award the contract to the lowest responsible bidder.
For projects utilizing best value as a selection method, proposals must be evaluated using only the criteria and selection procedures specifically identified in the RFP. For example, projects that utilize best value do not only take cost into consideration; owners use a variety of factors (e.g. past performance, safety, financial capacity) to ensure the bid is awarded to the proposal that offers the best value to the public. The awarding authority may reserve the right to request revisions and conduct negotiations with responsive proposers, if the authority specifies in the RFP how it will ensure that negotiations are conducted in good faith. The authority may hold discussions or negotiations with responsive proposers using the process specified in the RFP. The awarding authority ranks responsive bidders based on the specified best-value criteria, and must award the contract to the bid that offers the best value to the public. Upon issuance of a contract award, the awarding authority must publicly announce its award, identifying the design-build entity to which it made the award, along with a written decision supporting its contract award and stating the basis of the award.
The state’s design-build statutes also requires the use of a skilled-and-trained workforce, the issuance of performance bonds, insurance coverage, and identification of subcontractors that will complete at least one-half of 1% of the value of a contract.
The City of Long Beach. The American Disabilities Act (ADA) established civil rights protections for individuals with physical and mental disabilities and guarantees them with equal opportunities and access in areas such as public accommodations, transportation, and state and local government services. In 2014, five Long Beach residents filed a class action lawsuit against the City of Long Beach arguing that the city is in violation of the ADA. Specifically, their lawsuit claimed the city did not provide curb cuts at corners or repair sidewalks to accommodate individuals in wheelchairs or with other mobility disabilities.
In 2017, the City of Long Beach settled the class action lawsuit. As a result of the settlement, the City of Long Beach must:
- Build up to 4,500 missing curb ramps by December 31, 2022;
- Spend up to $50 million to repair approximately 16,000 curb ramps that are damaged or otherwise inaccessible to disabled individuals;
- Spend up to $125 million to remedy broken sidewalks and crosswalks within 30 years of the settlement; and,
- Reserve more than $5 million during the first 10 years of the settlement period to make specific infrastructure fixes that residents with disabilities will be able to request.
The settlement also gave the city of Long Beach two years to complete a self-evaluation of its sidewalks, curb ramps and other pedestrian paths of travel to determine the extent to which individuals with disabilities have restricted access. Upon its completion, Long Beach officials had to hold at least two public hearings and meet again with the plaintiffs and their attorneys to plan how the work would be completed. The city published the report in 2019, and according to the report, the city analyzed 1,215 miles of sidewalk and 12,091 curb ramps. While the city found that most of the city’s sidewalks were in compliance with ADA, the report indicated that there were tens of thousands of sidewalk obstructions, improper slopes, damaged and missing curb ramps, and other instances of noncompliance with the ADA.
The report found that sidewalk obstructions, such as uneven gaps between sidewalk slabs, overgrown vegetation, and light poles, were the most common form of barriers impeding accessibility for individuals with mobility disabilities to travel across. Of the curb ramps analyzed, the report indicated that 92 percent of the 12,091 studied were in violation of the ADA. In some instances, curb ramps were uneven or damaged while in other occasions curb ramps were non-existent in intersections that individuals with disabilities would have difficulty accessing. After the publication of the report, the city ranked its curb ramps and sidewalks by the number of barriers to access. The ranking was determined by the level of severity of these barriers to access for each of the sidewalks and curb ramps combined with its level of activity or use. The city used both factors, alongside specific public input from individuals’ disabilities, to develop a plan to ensure all curb ramps and sidewalks are ADA-compliant.
According to the City of Long Beach, as of July 2020, the city has constructed approximately 1,600 curb ramps. The City of Long Beach, the sponsors of the bill, is requesting the ability to use design build to expedite the construction of the remaining curb ramps to meet the December 2022 deadline set by the settlement.
Proposed Law
Assembly Bill 2932 allows the City of Long Beach, upon approval of its city council, to use design-build contracting to award contracts for ADA-compliant curb ramps. The bill also allows, for these curb ramp projects, the City of Long Beach and the Long Beach Public Works Department to perform project development services, including performance specifications, preliminary engineering, procurement services, preparation of project reports, and construction inspection services, excluding specialty bridge inspections. The bill limits the city’s use of this authority to no more than 3,000 ramps, with the total cost not to exceed $20 million dollars per year, and requires the city to complete these ramps by January 1, 2025.
State Revenue Impact
No estimate.
Comments
- Purpose of the bill. According to the author, “AB 2932 authorizes the City of Long Beach to utilize design-build contracting in order to expedite the construction of curb ramps and upgrade sidewalks to ensure compliance with the American with Disabilities Act. As part of a settlement agreement, the City must complete 3,000 curb ramps by December 31, 2022. This bill will enable the City to expedite the bidding and construction processes. The streamlined process for bidding and awarding these contracts will expedite the upgrade of sidewalks and curbs that will expand access to and ensure that residents can safely travel along city streets.”
- Project expansion. Current law already authorizes local agencies to utilize design build contracting for public work projects in excess of one million dollars ($1,000,000) until January 1, 2025. However, because existing law does not allow design build for projects that are not construction or improvement of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities, the city would not be able to use design build without legislative approval. While this would expand the City of Long Beach’s design build authority beyond what the Legislature has previously authorized, using traditional contracting methods could put the City as risk of missing the settlement deadlines. The Committee may wish to consider whether to expand the city’s design-build authority if it decreases the risk that the city misses the settlement’s deadlines.
- Similar legislation. AB 2932 follows several other measures previously enacted by the Legislature. Two years ago, the Legislature approved, and the Governor signed, AB 2654 (Quirk-Silva, 2018) which authorized the County of Orange, with approval from the county board of supervisors, to use the design-build for flood protection, beach, and bikeway improvements. Three years ago, the Legislature approved, and the Governor signed, AB 851 (Caballero, 2017) which authorized the Santa Clara Valley Water District, with approval from its governing board, to use design-build for projects such as habitat restoration, floor protection improvements, and groundwater recharge or storage facilities.
- Special legislation. The California Constitution prohibits special legislation when a general law can apply (Article IV, §16). AB 2932 contains findings and declarations explaining the need for legislation that applies only to the city of Long Beach.
- Urgency. As an urgency statute, AB 2932 must be approved by 2/3 vote of each house of the Legislature. Regular legislation takes effect on the January 1, following its passage, but urgency bills take effect as soon as they are passed, signed, and chaptered.
Assembly Actions
Assembly Local Government Committee: 8-0
Assembly Floor: 79-0
Support and Opposition
Support: City of Long Beach (Sponsor)
Opposition: Unknown
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 2932
Author:(O'Donnell)
As Amended Ver:June 10, 2020
2/3 vote. Urgency
SUMMARY:
Allows the City of Long Beach to use the design-build contracting process to award contracts for curb ramps that are compliant with the Americans with Disabilities Act.
Major Provisions
This bill allows the City of Long Beach to use design-build for projects to install curb-ramps. This authority is limited to no more than 3,000 ramps, with the total cost not to exceed $20 million dollars per year. Projects must be complete by January 1, 2025. The City and its employees may perform project development services and preparation of documents in relation to these projects. This bill contains an urgency clause.
COMMENTS:
According to the City of Long Beach, "In April 2017, Judge Dale Fischer preliminarily approved a class-action settlement agreement to make sidewalks, crosswalks, and other pedestrian pathways safer and more accessible. Under the agreement, the City is working to address a number of accessibility issues, including the construction of up to 4,500 missing curb ramps; retrofit up to $50 million or 16,000 existing curb ramps not in compliance with relevant accessibility standards; and, remediate up to $125 million in repairs for inaccessible sidewalks, crosswalks, and other pedestrian facilities over the next 30 years. To date, and in accordance with Americans with Disabilities Act (ADA) regulations, the City has assessed the existing conditions of 1,160 miles of sidewalks, conducted a third-party assessment identifying barriers to safe and equal access, and held public hearings to inform Long Beach residents of the outcomes and receive public input."
According to the Author:
"AB 2932 authorizes the City of Long Beach to utilize design-build contracting in order to expedite the construction of curb ramps and upgrade sidewalks to ensure compliance with the American with Disabilities Act. As part of a settlement agreement, the City must complete 3,000 curb ramps by December 31, 2022. This bill will enable the City to expedite the bidding and construction processes. The streamlined process for bidding and awarding these contracts will expedite the upgrade of sidewalks and curbs that will expand access to and ensure that residents can safely travel along city streets."
Arguments in Support:
The City of Long Beach, sponsor of this bill, states "Work related to accessibility infrastructure improvements continue to progress amid industry-wide construction challenges posed by the COVID-19 pandemic. Construction in the public right-of-way is an essential service, and, as such, the City is obligated to build 4,500 curb ramps by fiscal year end 2022…AB 2932 is vital to the City's fulfillment of completed self-assessment and transition plan obligations within the set timeframe."
Arguments in Opposition:
None on file.
FISCAL COMMENTS:
None
VOTES:
ASM LOCAL GOVERNMENT: 8-0-0
YES: Aguiar-Curry, Lackey, Bloom, Boerner Horvath, Ramos, Luz Rivas, Robert Rivas, Voepel
UPDATED:
VERSION: June 10, 2020
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0003044
ASSEMBLY THIRD READING
ATR Bill Id:AB 2932
Author:(O'Donnell)
As Introduced Ver:February 21, 2020
Majority vote
SUMMARY:
Allows the City of Long Beach to use the design-build contracting process to award contracts for curb ramps that are compliant with the Americans with Disabilities Act.
Major Provisions
This bill allows the City of Long Beach to use design-build for projects to install curb-ramps. This authority is limited to no more than 3,000 ramps, with the total cost not to exceed $20 million dollars per year. Projects must be complete by January 1, 2025. The City and its employees may perform project development services and preparation of documents in relation to these projects.
COMMENTS:
According to the City of Long Beach, "In April 2017, Judge Dale Fischer preliminarily approved a class-action settlement agreement to make sidewalks, crosswalks, and other pedestrian pathways safer and more accessible. Under the agreement, the City is working to address a number of accessibility issues, including the construction of up to 4,500 missing curb ramps; retrofit up to $50 million or 16,000 existing curb ramps not in compliance with relevant accessibility standards; and, remediate up to $125 million in repairs for inaccessible sidewalks, crosswalks, and other pedestrian facilities over the next 30 years. To date, and in accordance with Americans with Disabilities Act (ADA) regulations, the City has assessed the existing conditions of 1,160 miles of sidewalks, conducted a third-party assessment identifying barriers to safe and equal access, and held public hearings to inform Long Beach residents of the outcomes and receive public input."
According to the Author:
"AB 2932 authorizes the City of Long Beach to utilize design-build contracting in order to expedite the construction of curb ramps and upgrade sidewalks to ensure compliance with the American with Disabilities Act. As part of a settlement agreement, the City must complete 3,000 curb ramps by December 31, 2022. This bill will enable the City to expedite the bidding and construction processes. The streamlined process for bidding and awarding these contracts will expedite the upgrade of sidewalks and curbs that will expand access to and ensure that residents can safely travel along city streets."
Arguments in Support:
The City of Long Beach, sponsor of this bill, states "Work related to accessibility infrastructure improvements continue to progress amid industry-wide construction challenges posed by the COVID-19 pandemic. Construction in the public right-of-way is an essential service, and, as such, the City is obligated to build 4,500 curb ramps by fiscal year end 2022…AB 2932 is vital to the City's fulfillment of completed self-assessment and transition plan obligations within the set timeframe."
Arguments in Opposition:
None on file
FISCAL COMMENTS:
None
VOTES:
ASM LOCAL GOVERNMENT: 8-0-0
YES: Aguiar-Curry, Lackey, Bloom, Boerner Horvath, Ramos, Luz Rivas, Robert Rivas, Voepel
UPDATED:
VERSION: February 21, 2020
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0002766
Date of Hearing: May 12, 2020
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Cecilia Aguiar-Curry, Chair
ABPCA Bill Id:AB 2932 (
Author:O'Donnell) – As Introduced Ver:February 21, 2020
SUBJECT: City of Long Beach: design-build process.
SUMMARY: Allows the City of Long Beach to use the design-build contracting process to award contracts for curb ramps that are compliant with the Americans with Disabilities Act (ADA). Specifically, this bill:
- Allows the City of Long Beach, upon approval of its city council, to use the design-build contracting process authorized under specified existing law for local agencies to award contracts for curb ramps that are compliant with the ADA.
- Allows, for these curb ramp projects, the City of Long Beach and city employees in the City of Long Beach Public Works Department to perform project development services, including performance specifications, preliminary engineering, procurement services and the preparation of project reports, and construction inspection services, excluding specialty bridge inspectors. The city shall also be the responsible agency for, and city employees in the Public Works Department may perform, the preparation of documents that may include, but need not be limited to, the size, type, and desired design character of the project, performance specifications covering quality of materials, equipment, and workmanship, preliminary plans, and any other information deemed necessary to describe adequately the needs of the city.
- Requires, for these curb ramp projects, the City of Long Beach to be limited to no more than 3,000 ramps, with the total cost not to exceed $20 million dollars per year, and subject to completion prior to January 1, 2025.
- Finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique conditions in City of Long Beach that make it necessary to grant the City of Long Beach and the City of Long Beach Public Works Department the authority to use the specific design-build procurement process described in this bill.
EXISTING LAW:
- Requires, pursuant to the Local Agency Public Construction Act (LAPC Act), local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder under the traditional design-bid-build project delivery system.
- Authorizes, until January 1, 2025, cities, counties, and specified special districts and transit agencies to use design-build for specified public works contracts in excess of $1 million using either a low bid or best value process.
- Provides the following parameters for cities and counties that use design-build pursuant to 2), above:
- Allows design-build for the construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities;
- Allow cities and counties that operate wastewater facilities, solid waste management facilities, or water recycling facilities to use design-build for the construction of such facilities, both local and regional; and,
- Prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure [with the exception of b), above].
FISCAL EFFECT: None
COMMENTS:
- Bill Summary. This bill allows the City of Long Beach to use design-build for projects to install curb-ramps. This authority is limited to no more than 3,000 ramps, with the total cost not to exceed $20 million dollars per year. Projects must be complete by January 1, 2025. The City and its employees may perform project development services and preparation of documents in relation to these projects. This bill is sponsored by the City of Long Beach.
- Author’s Statement. According to the author, “AB 2932 authorizes the City of Long Beach to utilize design-build contracting in order to expedite the construction of curb ramps and upgrade sidewalks to ensure compliance with the American with Disabilities Act. As part of a settlement agreement, the City must complete 3,000 curb ramps by December 31, 2022. This bill will enable the City to expedite the bidding and construction processes. The streamlined process for bidding and awarding these contracts will expedite the upgrade of sidewalks and curbs that will expand access to and ensure that residents can safely travel along city streets.”
- Background. According to the City of Long Beach, “In April 2017, Judge Dale Fischer preliminarily approved a class-action settlement agreement to make sidewalks, crosswalks, and other pedestrian pathways safer and more accessible. Under the agreement, the City is working to address a number of accessibility issues, including the construction of up to 4,500 missing curb ramps; retrofit up to $50 million or 16,000 existing curb ramps not in compliance with relevant accessibility standards; and, remediate up to $125 million in repairs for inaccessible sidewalks, crosswalks, and other pedestrian facilities over the next 30 years. To date, and in accordance with Americans with Disabilities Act (ADA) regulations, the City has assessed the existing conditions of 1,160 miles of sidewalks, conducted a third-party assessment identifying barriers to safe and equal access, and held public hearings to inform Long Beach residents of the outcomes and receive public input.”
- Design-Build for Local Agencies. The LAPC Act generally requires local officials to invite bids for construction projects and then award contracts to the lowest responsible bidder. This design-bid-build method is the traditional approach to public works construction. However, California law also allows local agencies to use the design-build method, in which a single contract covers the design and construction of a project with a single company or consortium that acts as both the project designer and builder.
Existing law limits the use of design-build by counties and cities to the following types of projects:
- The construction of a building or buildings and improvements directly related to the construction of a building or buildings, county sanitation wastewater treatment facilities, and park and recreational facilities; and,
- Local and regional wastewater facilities, solid waste management facilities, or water recycling facilities (for cities and counties that operate such facilities).
Existing law expressly prohibits cities and counties from using design-build for the construction of other infrastructure, including, but not limited to, streets and highways, public rail transit, or water resources facilities and infrastructure [with the exception of b), above].
Because of the existing limitations on design-build, which excludes streets and highways, the City of Long Beach needs specific authority to use design-build for their curb-ramp projects.
- Arguments in Support. The City of Long Beach, sponsor of this bill, states “Work related to accessibility infrastructure improvements continue to progress amid industry-wide construction challenges posed by the COVID-19 pandemic. Construction in the public right-of-way is an essential service, and, as such, the City is obligated to build 4,500 curb ramps by fiscal year end 2022…AB 2932 is vital to the City’s fulfillment of completed self-assessment and transition plan obligations within the set timeframe.
“As the City continues to make great strides toward improving livability, it is imperative to have public infrastructure that is accessible to all residents. The City supports legislation that provides a process for businesses and other governmental entities to implement ADA requirements and fully support people with disabilities. Authorizing the City to utilize the design-build process for the construction of accessible curb ramps, as proposed by AB 2932, would enable the City to efficiently construct infrastructure to support all our residents.”
- Arguments in Opposition. None on file.
REGISTERED SUPPORT / OPPOSITION:
Support
City of Long Beach
Opposition
None on file
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958