AB 430: Housing development: Camp Fire Housing Assistance Act of 2019.
- Session Year: 2019-2020
- House: Assembly
- Latest Version Date: 2019-10-11
Existing law authorizes a development proponent to submit an application for a development permit that is subject to a streamlined, ministerial approval process and not subject to a conditional use permit if the development satisfies specified objective planning standards, including that the development is a multifamily housing development that contains 2 or more residential units.
This bill would authorize a development proponent to submit an application for a residential development, or mixed-use development that includes residential units with a specified percentage of space designated for residential use, within the territorial boundaries or a specialized residential planning area identified in the general plan of, and adjacent to existing urban development within, specified cities that is subject to a similar streamlined, ministerial approval process and not subject to a conditional use permit if the development satisfies specified objective planning standards. The bill would require a local government to notify the development proponent in writing if the local government determines that the development conflicts with any of those objective standards by a specified time; otherwise, the development is deemed to comply with those standards. The bill would provide that if a local government approves a project pursuant to that process, that approval will not expire if that project includes investment in housing affordability, and would otherwise provide that the approval of a project expires automatically after 3 years, unless that project qualifies for a one-time, one-year extension of that approval. The bill would prohibit a city from imposing any automobile parking standards on a development subject to these provisions if the development is located within 1/2 mile of a high-quality bus corridor, as defined, or major transit stop, as defined. The bill would provide that approval pursuant to its provisions would remain valid for 3 years and remain valid thereafter so long as vertical construction of the development has begun and is in progress, and would authorize a discretionary one-year extension, as provided. The bill would require a local government to file a notice of any approval of a development under these provisions with the Office of Planning and Research. The bill would prohibit a local government from adopting any requirement that applies to a project solely or partially on the basis that the project receives ministerial or streamlined approval pursuant to these provisions, except as provided. The bill would repeal these provisions as of January 1, 2026.
This bill would include findings that the changes proposed by this bill address a matter of statewide concern rather than a municipal affair and, therefore, apply to all of the specified cities, including charter cities.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. CEQA does not apply to the approval of ministerial projects.
By establishing a streamlined, ministerial approval process for certain housing developments, this bill would expand the exemption for the ministerial approval of projects under CEQA.
This bill would make legislative findings and declarations as to the necessity of a special statute for the cities specified in the bill.
By imposing new duties on specified local agencies with respect to the streamlined, ministerial approval process described above, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
This act shall be known, and may be cited, as the Camp Fire Housing Assistance Act of 2019.
SEC. 2.The Legislature finds and declares all of the following:
(a)The Camp Fire, which started on November 8, 2018, in the County of Butte, is the deadliest and most destructive wildfire in California.
(b)The fire displaced over 50,000 people and the surrounding areas do not have sufficient capacity to absorb this population.
(c)To provide timely housing relief for the area, it is necessary to streamline the building process within specified cities in the impacted region.
SEC. 3.Section 65913.15 is added to the Government Code, to read:65913.15.(a)Notwithstanding Section 65913.4, a development proponent may submit an application for a development that is subject to the streamlined, ministerial approval process provided by subdivision (b) and is not subject to a conditional use permit if the development satisfies all of the following objective planning standards:
(1)The development is located within the territorial boundaries or a specialized residential planning area identified in the general plan of, and adjacent to existing urban development within, any of the following:
(A)The City of Biggs.
(B)The City of Corning.
(C)The City of Gridley.
(D)The City of Live Oak.
(E)The City of Orland.
(F)The City of Oroville.
(G)The City of Willows.
(H)The City of Yuba City.
(2)The development is either a residential development or a mixed-use development that includes residential units with at least two-thirds of the square footage of the development designated for residential use, not including any land that may be devoted to open-space or mitigation requirements.
(3)The development proponent has held at least one public meeting on the proposed development before submitting an application pursuant to this subdivision.
(4)The development has a minimum density of at least four units per acre.
(5)The development is located on a site that meets both of the following requirements:
(A)The site is no more than 50 acres.
(B)The site is zoned for residential use or residential mixed-use development.
(6)The development, excluding any additional density or any other concessions, incentives, or waivers of development standards granted pursuant to the Density Bonus Law in Section 65915, is consistent with objective zoning standards, objective subdivision standards, and objective design review standards in effect at the time that the development is submitted to the local government pursuant to this section.
(7)The development will achieve sustainability standards sufficient to receive a gold certification under the United States Green Building Councils Leadership in Energy and Environmental Design for Homes rating system or, in the case of a mixed-use development, the Neighborhood Development or the New Construction rating system, or the comparable rating under the GreenPoint rating system or voluntary tier under the California Green Building Code (Part 11 (commencing with Section 101) of Title 24 of the California Code of Regulations).
(8)The development is not located on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation that is protected pursuant to the California Land Conservation Act of 1965 (Chapter 7 (commencing with Section 51200) of Part 1 of Division 1 of Title 5), or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the Department of Forestry and Fire Protection pursuant to Section 51178, or within a high or very high fire hazard severity zone as indicated on maps adopted by the Department of Forestry and Fire Protection pursuant to Section 4202 of the Public Resources Code.
(D)A hazardous waste site that is listed pursuant to Section 65962.5 or a hazardous waste site designated by the Department of Toxic Substances Control pursuant to Section 25356 of the Health and Safety Code, unless the Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the development complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2.
(F)Within a special flood hazard area subject to inundation by the 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a development proponent is able to satisfy all applicable federal qualifying criteria in order to provide that the site satisfies this subparagraph and is otherwise eligible for streamlined approval under this section, a local government shall not deny the application on the basis that the development proponent did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A development may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency.
(H)Lands identified for conservation in an adopted natural community conservation plan adopted on or before January 1, 2019, pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by state or federal agencies, fully protected species, or species protected by any of the following:
(i)The federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.).
(ii)The California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).
(iii)The Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(9)The development does not require the demolition of a historic structure that was placed on a national, state, or local historic register.
(10)The development shall not be upon an existing parcel of land or site that is governed under any of the following:
(A)The Mobilehome Residency Law (Chapter 2.5 (commencing with Section 798) of Title 2 of Part 2 of Division 2 of the Civil Code).
(B)The Recreational Vehicle Park Occupancy Law (Chapter 2.6 (commencing with Section 799.20) of Title 2 of Part 2 of Division 2 of the Civil Code).
(C)The Mobilehome Parks Act (Part 2.1 (commencing with Section 18200) of Division 13 of the Health and Safety Code).
(D)The Special Occupancy Parks Act (Part 2.3 (commencing with Section 18860) of Division 13 of the Health and Safety Code).
(11)(A)If the development would require the demolition of any affordable housing units, the development shall replace those units by providing at least the same number of units of equivalent size to be made available at affordable housing cost to, and occupied by, persons and families in the same income category as those households in occupancy. If the income category of the household in occupancy is not known, it shall be rebuttably presumed that lower income households occupied the units in the same proportion of lower income households to all households within the jurisdiction, as determined by the most recently available data from the United States Department of Housing and Urban Developments Comprehensive Housing Affordability Strategy database. All replacement calculations resulting in fractional units shall be rounded to the next whole number.
(B)For purposes of this paragraph, equivalent size means that the replacement units contain at least the same total number of bedrooms as the units being replaced.
(b)(1)If a local government determines that a development submitted pursuant to this section is in conflict with any of the objective planning standards specified in subdivision (a), it shall provide the development proponent written documentation of which standard or standards the development conflicts with, and an explanation for the reason or reasons the development conflicts with that standard or standards, as follows:
(A)Within 60 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
(B)Within 90 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
(2)If the local government fails to provide the required documentation pursuant to paragraph (1), the development shall be deemed to satisfy the objective planning standards specified in subdivision (a).
(c)Any design review or public oversight of the development may be conducted by the local governments planning commission or any equivalent commission responsible for review and approval of development projects or the city council, as appropriate. That design review or public oversight shall be objective and be strictly focused on assessing compliance with criteria required for streamlined projects, as well as any reasonable objective design standards published and adopted by ordinance or resolution by a local government before submission of a development application, and shall be broadly applicable to development within the jurisdiction. That design review or public oversight shall be completed as follows and shall not in any way inhibit, chill, or preclude the ministerial approval provided by this section or its effect, as applicable:
(1)Within 90 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
(2)Within 180 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
(d)Notwithstanding any other law, a city, whether or not it has adopted an ordinance governing automobile parking requirements for multifamily developments, shall not impose automobile parking standards for a streamlined development that was approved pursuant to this section if the development is located within one-half mile from a high-quality bus corridor or major transit stop.
(e)(1)If a local government approves a development pursuant to this section, then, notwithstanding any other law, that approval shall not expire if the project includes public investment in housing affordability and 50 percent of the units are affordable to households making below 80 percent of the area median income. For purposes of this paragraph, public investment in housing affordability does not include tax credits.
(2)If a local government approves a development pursuant to this section and the project does not include 50 percent of the units affordable to households making below 80 percent of the area median income, that approval shall automatically expire after three years, except that a project may receive a one-time, one-year extension if the project proponent provides documentation that there has been significant progress toward getting the development construction ready, such as filing a building permit application.
(3)If a local government approves a development pursuant to this section, that approval shall remain valid for three years from the date of the final action establishing that approval and shall remain valid thereafter for a project so long as vertical construction of the development has begun and is in progress. Additionally, the development proponent may request, and the local government shall have discretion to grant, an additional one-year extension to the original three-year period. The local governments action and discretion in determining whether to grant the foregoing extension shall be limited to considerations and process set forth in this section.
(4)If a local government approves a development pursuant to this section, the local government shall file a notice of that approval with the Office of Planning and Research.
(f)(1)A local government shall not adopt any requirement, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval pursuant to this section.
(2)Notwithstanding paragraph (1), if the local government has adopted a local ordinance that requires that a specified percentage of the units of a housing development project be dedicated to households making below 80 percent of the area median income, that local ordinance applies.
(g)This section does not affect a development proponents ability to use any alternative streamlined by right permit processing adopted by a local government, including the provisions of subdivision (i) of Section 65583.2.
(h)For purposes of this section, the following terms have the following meanings:
(1)Affordable housing means housing available at affordable housing cost, and occupied by, persons and families of low or moderate income as defined by Section 50093 of the Health and Safety Code, lower income households as defined by Section 50079.5 of the Health and Safety Code, very low income households as defined by Section 50105 of the Health and Safety Code, and extremely low income households as defined by Section 50106 of the Health and Safety Code, for a period of 55 years for rental housing and 45 years for owner-occupied housing.
(2)Affordable housing cost has the same meaning as affordable housing cost described in Section 50052.5 of the Health and Safety Code.
(3)Area median income means area median income as periodically established by the Department of Housing and Community Development pursuant to Section 50093 of the Health and Safety Code.
(4)Development proponent means the developer who submits an application for streamlined approval pursuant to this section.
(5)High-quality bus corridor means a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.
(6)Local government means a city or a county, including a charter city or a charter county, that has jurisdiction over a development for which a development proponent submits an application pursuant to this section.
(7)Major transit stop means a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods. Major transit stop shall also include major transit stops included in a regional transportation plan adopted pursuant to Chapter 2.5 (commencing with Section 65080).
(8)(A)Objective zoning standards, objective subdivision standards, and objective design review standards mean standards that involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal. These standards may be embodied in alternative objective land use specifications adopted by a local government, and may include, but are not limited to, housing overlay zones, specific plans, inclusionary zoning ordinances, and density bonus ordinances, subject to subparagraph (B).
(B)A development shall be deemed consistent with the objective zoning standards related to housing density, as applicable, if the density proposed is consistent with the allowable residential density within that land use designation, notwithstanding any specified unit allocation.
(i)This section shall remain in effect only until January 1, 2026, and as of that date is repealed.
SEC. 4.The Legislature finds and declares that, for the reasons stated in Section 2 of this act, Section 3 of this act adding Section 65913.15 to the Government Code addresses a matter of statewide concern rather than a municipal affair as that term is used in Section 5 of Article XI of the California Constitution. Therefore, Section 3 of this act adding Section 65913.15 to the Government Code applies to all cities specified in that section, including charter cities.
SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the findings and declarations set forth in Section 2 of this act.
SEC. 6.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
|
Date
|
Status
|
|---|---|
| Oct 11, 2019 | Chaptered by Secretary of State - Chapter 745, Statutes of 2019. |
| Oct 11, 2019 | Approved by the Governor. |
| Sep 11, 2019 | Enrolled and presented to the Governor at 3:30 p.m. |
| Sep 5, 2019 | Senate amendments concurred in. To Engrossing and Enrolling. |
| Sep 3, 2019 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after September 5 pursuant to Assembly Rule 77. |
| Sep 3, 2019 | Read third time. Passed. Ordered to the Assembly. |
| Aug 28, 2019 | Read second time. Ordered to third reading. |
| Aug 27, 2019 | Read third time and amended. Ordered to second reading. |
| Aug 27, 2019 | Read second time. Ordered to third reading. |
| Aug 26, 2019 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Aug 19, 2019 | In committee: Hearing postponed by committee. |
| Aug 13, 2019 | Read second time and amended. Re-referred to Com. on APPR. |
| Aug 12, 2019 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (July 10). |
| Jul 8, 2019 | Read second time and amended. Re-referred to Com. on GOV. & F. |
| Jul 5, 2019 | From committee: Amend, and do pass as amended and re-refer to Com. on GOV. & F. (Ayes 5. Noes 1.) (July 3). |
| Jun 20, 2019 | Read second time and amended. Re-referred to Com. on EQ. |
| Jun 19, 2019 | From committee: Amend, and do pass as amended and re-refer to Com. on EQ. (Ayes 10. Noes 0.) (June 18). |
| Jun 10, 2019 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on HOUSING. |
| May 29, 2019 | Referred to Coms. on HOUSING, EQ. and GOV. & F. |
| May 20, 2019 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 20, 2019 | Read third time. Passed. Ordered to the Senate. |
| May 16, 2019 | Read second time. Ordered to third reading. |
| May 15, 2019 | From committee: Do pass. (Ayes 16. Noes 0.) (May 15). |
| May 13, 2019 | Joint Rule 62(a), file notice suspended. (Page 1609.) |
| May 1, 2019 | Re-referred to Com. on APPR. |
| Apr 30, 2019 | Read second time and amended. |
| Apr 29, 2019 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 9. Noes 1.) (April 22). |
| Apr 22, 2019 | Re-referred to Com. on NAT. RES. |
| Apr 11, 2019 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Apr 8, 2019 | In committee: Testimony taken. Hearing postponed by committee. |
| Mar 20, 2019 | Re-referred to Com. on NAT. RES. |
| Mar 19, 2019 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Feb 15, 2019 | Referred to Com. on NAT. RES. |
| Feb 8, 2019 | From printer. May be heard in committee March 10. |
| Feb 7, 2019 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 5, 2019 | AB 430 Gallagher Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 3, 2019 | Assembly 3rd Reading AB430 Gallagher et al. By Nielsen | Senate Floor |
Passed |
|
| Jul 10, 2019 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Governance and Finance |
Passed |
|
| Jul 3, 2019 | Do pass as amended, but first amend, and re-refer to the Committee on [Governance and Finance] | Senate Standing Committee on Environmental Quality |
Passed |
|
| Jun 18, 2019 | Do pass as amended, but first amend, and re-refer to the Committee on [Environmental Quality] | Senate Standing Committee on Housing |
Passed |
|
| May 20, 2019 | AB 430 Gallagher Assembly Third Reading | Assembly Floor |
Passed |
|
| May 15, 2019 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 22, 2019 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 430
Author:(Gallagher)
As Amended Ver:August 27, 2019
Majority vote
SUMMARY:
Establishes a ministerial approval process for residential and mixed-use developments within or near the cities of Biggs, Corning, Gridley, Live Oak, Orland, Oroville, Willows, and Yuba City, so that these projects are not subject to review under the California Environmental Quality Act (CEQA).
The Senate Amendments:
- Remove the City of Chico and add the cities of Corning, Live Oak, Willows, and Yuba City.
- Require the development proponent to hold at least one public meeting on the proposed development.
- Require the development to replace any affordable housing units demolished as a result of the development.
- Require a city approving a development pursuant to the bill to file a notice of that approval with the Office of Planning and Research.
- Add related definitions and clarifications.
COMMENTS:
In 2017, the Legislature passed three bills to streamline the CEQA process for affordable housing projects. SB 35 established a ministerial approval process (i.e., not subject to CEQA) for certain multifamily affordable housing projects that are proposed in local jurisdictions that have not met regional housing needs. SB 540 authorizes a city or county to establish a Workforce Housing Opportunity Zone (WHOZ) by preparing an environmental impact report (EIR) and by adopting a specific plan. Once a WHOZ is established, and for five years thereafter, eligible housing developments within a WHOZ must be approved within 60 days without requiring the preparation of an EIR or negative declaration under CEQA. AB 73 authorizes a city or county to create a Housing Sustainability District (HSD) to complete upfront zoning and environmental review in order to receive incentive payments for residential and mixed-use development projects with an affordable housing component. Once the city or county has prepared an EIR for the HSD, then housing projects within, and consistent with, a designated HSD are exempt from CEQA. In 2018, AB 1804 codified an existing categorical exemption for infill projects, expanding the exemption to apply to multi-family residential and mixed-use housing projects on infill sites in unincorporated urbanized areas or urban clusters.
While this bill is modeled on SB 35, it leaves out some of the key elements of SB 35, including:
- Not limited to multi-family, includes all residential and mixed-use projects.
- Not limited to infill sites.
- No affordable housing requirements.
- Not contingent on the local government's regional housing needs assessment status.
- No public work/prevailing wage requirements.
According to the Author:
The Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in state history. The fire displaced 50,000 people from the communities of Paradise, Concow, and Magalia and destroyed almost 20,000 buildings.
It will take years for these communities to rebuild, and in the meantime, evacuees need to be able to find stable housing. While some will choose to rebuild, others will try to find permanent housing in surrounding areas. However, the Camp Fire destroyed 14% of Butte County's housing stock, exacerbating the housing crisis in the area and making it difficult for many of these families to find affordable housing. The rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in the county to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties.
Current law allows some housing projects to be permitted by city or county planning staff ministerially, requiring only an administrative review process to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. However, most large housing projects, such as what is needed in Butte County, would not qualify for a ministerial process under current law. Instead, these projects are vetted through both public hearings and administrative review. Most housing projects that require discretionary review and approval are subject to CEQA review, while projects permitted ministerially generally are not. This can significantly delay and increase the cost of these vital projects.
AB 430 will authorize housing developments in eight designated cities to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires that the development be located in a city that is designated as an urban area or urban cluster. Additionally, the project must be consistent with zoning standards and the city's general plan. The bill also disqualifies projects that have major detrimental environmental impacts by excluding projects that are located in coastal zones, floodplains and floodways, prime farmland, and lands identified for conservation, among others.
Arguments in Support:
Supporters argue that this bill will help encourage construction of critical housing units in appropriate areas within the eight designated communities near the Camp Fire.
Arguments in Opposition:
Opponents argue the bill would hinder efforts to address the extreme lack of affordable housing (made even worse by the fire) because it would not allow local officials to require inclusionary zoning in any developments under fifty acres. This loss of local control is most egregious part of the bill. (Note opposition is based on the City of Chico's inclusion in the bill, and Chico has since been removed from the bill.)
FISCAL COMMENTS:
According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
VOTES:
ASM NATURAL RESOURCES: 9-1-1
YES: Friedman, Flora, Chau, Eggman, Limón, Mathis, McCarty, Melendez, Muratsuchi
NO: Mark Stone
ABS, ABST OR NV: Cristina Garcia
ASM APPROPRIATIONS: 16-0-2
YES: Gonzalez, Bigelow, Bloom, Bonta, Calderon, Carrillo, Chau, Diep, Eggman, Fong, Gabriel, Maienschein, Obernolte, Petrie-Norris, Quirk, Robert Rivas
ABS, ABST OR NV: Brough, Eduardo Garcia
ASSEMBLY FLOOR: 70-1-9
YES: Aguiar-Curry, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Friedman, Gabriel, Gallagher, Gipson, Gloria, Gray, Grayson, Holden, Irwin, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, O'Donnell, Obernolte, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Ting, Voepel, Waldron, Wicks, Wood, Rendon
NO: Mark Stone
ABS, ABST OR NV: Arambula, Cooley, Frazier, Cristina Garcia, Eduardo Garcia, Gonzalez, Jones-Sawyer, Kalra, Weber
SENATE FLOOR: 33-1-6
YES: Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dahle, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jones, Leyva, McGuire, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stone, Umberg, Wiener, Wilk
NO: Wieckowski
ABS, ABST OR NV: Allen, Lena Gonzalez, Jackson, Mitchell, Monning, Stern
UPDATED:
VERSION: August 27, 2019
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0001847
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 430 |
THIRD READING
Bill No: AB 430
Amended: 8/27/19 in Senate
SENATE HOUSING COMMITTEE: 10-0, 6/18/19
AYES: Wiener, Morrell, Bates, Caballero, Durazo, McGuire, Moorlach, Roth, Skinner, Umberg
NO VOTE RECORDED: Wieckowski
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 5-1, 7/3/19
AYES: Bates, Dahle, Hill, Skinner, Stern
NOES: Wieckowski
NO VOTE RECORDED: Allen
SENATE GOVERNANCE & FIN. COMMITTEE: 7-0, 7/10/19
AYES: McGuire, Moorlach, Beall, Hertzberg, Hurtado, Nielsen, Wiener
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 70-1, 5/20/19 - See last page for vote
SUBJECT: Housing development: Camp Fire Housing Assistance Act of 2019
DIGEST:
This bill creates a streamlined ministerial approval process for specified housing developments in the Cities of Biggs, Corning, Gridley, Live Oak, Orland, Oroville, Willows, and Yuba City.
Senate Floor Amendments of 8/27/19 prohibit a local government from imposing parking requirements on housing developments subject to streamlined, ministerial approval if the development is within one-half mile from a high-quality bus corridor or major transit stop.
Existing law:
- Establishes a ministerial, streamlined approval process for certain infill, multifamily housing projects that are proposed in local jurisdictions that have not met regional housing needs.
- Provides that supportive housing, in which 100% of units are dedicated to low-income households (up to 80% area median income (AMI)) and are receiving public funding to ensure affordability, shall be a use by-right in all zones where multifamily and mixed uses are allowed, as specified.
This bill:
- Provides that a development proponent may submit an application for a development that is subject to a streamlined, ministerial approval process and not subject to a conditional use permit if the development satisfies the following objective planning standards:
- The development is located in the following cities: Biggs, Corning, Gridley, Live Oak, Orland, Oroville, Willows, and Yuba City.
- The development is either a residential development or mixed-use that includes.
- The development proponent has held at least one public meeting before submitting an application.
- The development has a minimum density of at least four units per acre.
- The development is located on a site is either no more than 50 acres and either zoned residential or mixed-use or consistent with the general plan and general plan policies and has a general plan designation that allows residential use or mixed-use, with at least 2/3 of the square footage of the development designated for residential use.
- The development, excluding any additional density or incentives or concessions from density bonus law, is consistent with objective zoning standards, as specified.
- The development will achieve sustainability standards sufficient to receive a gold LEED standard.
- The development is not located on any of the following:
- Prime farmland, farmland of prime importance, or land zoned or designated for agricultural protection or preservation.
- Wetlands.
- Within a very high fire severity zone, as specified.
- A hazardous waste site.
- Within a delineated earthquake fault zone.
- Within a special flood hazard area, as specified.
- Within a regulatory floodway, as specified.
- Lands identified for conservation in an adopted natural community conservation plan, as specified.
- Habitat for protected species, as specified.
- Lands under conservation easement.
- The development does not require the demolition of a historic structure that was placed on a national, state, or local historic register.
- Provides that if any units are demolished, the development shall replace those units by providing at least the same number of units of equivalent size, determined by the number of bedrooms, and made available and affordable at affordable housing cost to and occupied persons and families in the same income category as those households in occupancy.
- Provides that if a local government determines that a development seeking streamlined approval is in conflict with any of the objective planning standards, it shall provide the developer with written documentation of which standard or standards the development conflicts with and an explanation as follows:
- Within 60 days of submittal of the development to the local government if the development contains 150 units or fewer.
- Within 90 days of submittal of the development to the local government if the development contains more than 150 units.
- If the local government fails to provide the required information, the development shall be deemed to satisfy the objective planning standards.
- Provides that a local government’s planning commission may conduct any design review or public oversight, as specified. Design review or public oversight shall be completed as follows and shall not in any way inhibit, chill, or preclude the ministerial approval as applicable:
- Within 90 days of submittal of the development to the local government if the development contains 150 units or fewer.
- Within 180 days of submittal of the development to the local government if the development contains more than 150 units.
- Provides that a development approval shall not expire if the project includes public investment in housing affordability and 50% of the units are affordable to households making below 80% area median income. Otherwise, the development approval shall automatically expire after three years, except that a project may receive a one-time, one-year extension, as specified.
- Prohibits a local government from adopting any requirement, including, but not limited to, increased fees or inclusionary housing requirements that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval. Requires that, if a local government has adopted an inclusionary ordinance, that ordinance shall apply.
- Prohibits a local government from imposing parking requirements on housing developments subject to streamlined, ministerial approval if the development is within one-half mile from a high-quality bus corridor or major transit stop.
- Provides that the development shall be deemed consistent with the objective zoning standards related to housing density, if applicable if the density proposed is consistent with the allowable residential density within that land use designation.
- Provides that this bill sunsets on January 1, 2026 and is repealed on that date.
Comments
- Purpose of the bill. According to the author, “The Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in State History, displacing 50,000 people. The fire destroyed almost 20,000 buildings (14% of Butte County’s housing stock), exacerbating the housing crisis in the area and making it difficult for many of the fire victims and others to find affordable housing in surrounding areas. In some areas, the rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in impacted areas to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties. [This bill] will authorize housing developments in impacted areas to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires the development to be located within specified cities or specialized planning areas. Additionally, projects must be consistent with zoning standards and the city’s general plan. The bill also disqualifies projects that have detrimental environmental impacts by excluding projects that are located in floodplains and floodways, prime farmland, and lands identified for conservation, among others.”
- Housing needs and approvals generally. Every city and county in California is required to develop a general plan that outlines the community’s vision of future development through a series of policy statements and goals. A community’s general plan lays the foundation for all future land use decisions, as these decisions must be consistent with the plan. General plans are comprised of several elements that address various land use topics. Seven elements are mandated by state law: land use, circulation, housing, conservation, open-space, noise, and safety. Each community’s general plan must include a housing element, which outlines a long-term plan for meeting the community’s existing and projected housing needs. The housing element demonstrates how the community plans to accommodate its “fair share” of its region’s housing needs. To do so, each community establishes an inventory of sites designated for new housing that is sufficient to accommodate its fair share. Communities also identify regulatory barriers to housing development and propose strategies to address those barriers. State law requires cities and counties to update their housing elements every eight years.
Cities and counties enact zoning ordinances to implement their general plans. Zoning determines the type of housing that can be built. In addition, before building new housing, housing developers must obtain one or more permits from local planning departments and must also obtain approval from local planning commissions, city councils, or county board of supervisors.
Some housing projects can be permitted by city or county planning staff ministerially or without further approval from elected officials. Projects reviewed ministerially require only an administrative review designed to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. Most large housing projects are not allowed ministerial review. Instead, these projects are vetted through both public hearings and administrative review. Most housing projects that require discretionary review and approval are subject to review under the California Environmental Quality Act (CEQA), while projects permitted ministerially generally are not.
- Prior streamlining proposals. In recent years, the legislature has passed several measures to streamline approvals for housing. For example, AB 2162 (Chiu, Chapter 753, Statutes of 2018) provided that supportive housing, in which 100% of units are dedicated to low-income households (up to 80% AMI) and are receiving public funding to ensure affordability, shall be a use by-right in all zones where multifamily and mixed uses are allowed, as specified. AB 2162 applies to all areas of the state, urban and rural, and would apply regardless of whether a local government has met its RHNA.
This bill is substantially similar to SB 35 (Wiener, Chapter 366, Statutes of 2017), which requires local jurisdictions that have not met their above moderate income or lower income regional housing needs assessment (RHNA) to streamline certain infill developments. This bill differs from SB 35 in several ways: a) it is not limited to multifamily developments; b) not limited to infill sites; c) provides no affordable housing requirements, absent any locally adopted inclusionary ordinances; d) is not contingent on the local government's RHNA status; e) there are no public work/prevailing wage requirements; and f) requires an elevated environmental standard. By placing less stringent requirements on developments to be eligible for streamlining, this bill can help the cities affected by the Camp Fire build as much housing in as little time as possible.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
Adventist Health
Bay Area Builders Exchange
Build.Com
Butte-Glenn Medical Society
California Apartment Association
California Association of Realtors
California Building Industry Association
California Chamber of Commerce
Chico Builders Association
Chico Chamber of Commerce
City of Biggs
City of Corning
City of Gridley
City of Orland
City of Oroville
City of Willows
City of Yuba City
Civil Justice Association of California
County of Butte
Downtown Chico Business Association
Enloe Medical Center
North Valley Property Owners Association
Placer County Contractors & Building Exchange
Rural County Representatives of California
Sacramento Regional Builders Exchange
San Gabriel Valley Economic Partnership
Shasta Builders Exchange
Sierra North Valley Realtors
Sustainability Management Association
Sutter Yuba Association of Realtors
Valley Builders Exchange
Valley Contractors Exchange
Yuba Sutter Chamber of Commerce
OPPOSITION: (Verified 8/27/19)
City of Chico
Northern California Environmental Defense Center
6 Individuals
ASSEMBLY FLOOR: 70-1, 5/20/19
AYES: Aguiar-Curry, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooper, Cunningham, Dahle, Daly, Diep, Eggman, Flora, Fong, Friedman, Gabriel, Gallagher, Gipson, Gloria, Gray, Grayson, Holden, Irwin, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Ting, Voepel, Waldron, Wicks, Wood, Rendon
NOES: Mark Stone
NO VOTE RECORDED: Arambula, Cooley, Frazier, Cristina Garcia, Eduardo Garcia, Gonzalez, Jones-Sawyer, Kalra, Weber
Prepared by: Alison Hughes / HOUSING / (916) 651-4124
8/29/19 14:38:45
**** END ****
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Mike McGuire, Chair
2019 - 2020 Regular
Bill No: | AB 430 | Hearing Date: | 7/10/19 |
Author: | Gallagher | Tax Levy: | No |
Version: | 7/8/19 | Fiscal: | Yes |
Consultant: | Favorini-Csorba | ||
Housing development: Camp Fire Housing Assistance Act of 2019
Establishes a streamlined, ministerial approval process for housing development in specified cities in Northern California until January 1, 2026.
Background
Planning and approving new housing is mainly a local responsibility. The California Constitution allows cities and counties to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public—including land use authority.
Planning and Zoning Law. State law provides additional powers and duties for cities and counties regarding land use. The Planning and Zoning Law requires every county and city to adopt a general plan that sets out planned uses for all of the area covered by the plan. A general plan must include specified mandatory “elements,” including a housing element that establishes the locations and densities of housing, among other requirements. Cities’ and counties’ major land use decisions—including most zoning ordinances and other aspects of development permitting—must be consistent with their general plans. The Planning and Zoning Law also establishes a planning agency in each city and county, which may be a separate planning commission, administrative body, or the legislative body of the city or county itself. Cities and counties must provide a path to appeal a decision to the planning commission and/or the city council or county board of supervisors.
Zoning and approval processes. Local governments use their police power to enact zoning ordinances that shape development, such as setting maximum heights and densities for housing units, minimum numbers of required parking spaces, setbacks to preserve privacy, lot coverage ratios to increase open space, and others. These ordinances can also include conditions on development to address aesthetics, community impacts, or other particular site-specific considerations.
Local governments have broad authority to define the specific approval processes needed to satisfy these considerations. Some housing projects can be permitted by city or county planning staff “ministerially” or without further approval from elected officials, but most large housing projects require “discretionary” approvals from local governments, such as a conditional use permit or a change in zoning laws. This process requires hearings by the local planning commission and public notice and may require additional approvals.
Projects reviewed ministerially require only an administrative review designed to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. Most large housing projects are not allowed ministerial review. Instead, these projects are vetted through both public hearings and administrative review, including design review and appeals processes. Most housing projects that require discretionary review and approval are subject to California Environmental Quality Act (CEQA), while projects permitted ministerially are not.
SB 35 (Wiener, 2017). In 2017, the Legislature enacted a substantial package of legislation aimed at addressing housing issues in the state. Among other legislation, the Legislature enacted SB 35 (Wiener, 2017) to provide for a streamlined, ministerial process for approving housing developments that are in compliance with the applicable objective local planning standards—including the general plan, zoning ordinances, and objective design review standards. To be eligible for streamlining under SB 35, a specified percentage of the total housing units in the development must be affordable to lower-income households (those under 80 percent of area median income), as follows:
- 10 percent, if the locality has not issued building permits for enough above moderate-income—greater than 120 percent of area median income (AMI)—units to meet their regional housing needs allocation (RHNA);
- 50 percent, if the locality has not issued building permits for enough lower-income units to meet their RHNA; or
- The percentage in a local inclusionary zoning ordinance if it is higher than the requirements above.
An eligible project must also include certain requirements for labor standards, such as the use of a skilled and trained workforce, and cannot be located on sensitive environmental sites, such as the prime agricultural land, floodplains, high and very high fire hazard severity zones, and lands with conservation easements.
SB 35 spells out the timelines for approval, design review processes that local agencies can conduct, and the length of time that an SB 35 approval remains valid. SB 35 also sunsets on January 1, 2026.
SB 35 was intended to enable developments that face local opposition, but are consistent with local objective development standards, to be constructed. All but 13 cities and counties in California are subject to some streamlining under SB 35 because they have not issued enough building permits to meet their RHNA at one or more income levels.
2018 Camp Fire. The Camp Fire in November 2018 became California’s most destructive and deadliest wildfire, which caused the deaths of 86 people and destroyed nearly 19,000 structures, predominantly in the Town of Paradise. The Camp Fire destroyed approximately 80% of the single family homes in Paradise, and rebuilding efforts are ongoing: of the 10,737 parcels that that the California Office of Emergency Services has received authorization to clean up from property owners, approximately 6,400 parcels have been cleared of debris and 1,900 parcels have been fully cleaned up. Between January 1, 2018, and January 1, 2019, the population of the Town of Paradise had decreased by 21,833 people, or 83 percent. Many of those residents relocated to nearby communities. The author wants to speed up development of new housing in those communities to accommodate the influx of new residents by creating an approval process similar to SB 35.
Proposed Law
Assembly Bill 430 enacts the Camp Fire Housing Assistance Act of 2019, which establishes a streamlined, ministerial approval process not subject to a conditional use permit for housing developments that meet various conditions and are located in specified cities in Northern California until January 1, 2026. The bill only applies to a development that is:
- Located within the territorial boundaries or a specialized residential planning area identified in the general plan of, and adjacent to existing urban development within, the cities of Biggs, Gridley, and Oroville in Butte County; the cities of Orland and Willows in Glenn County; the cities of Live Oak and Yuba City in Sutter County; and the city of Corning in Tehama County.
- Either a residential development or a mixed-use development that includes residential units with at least two-thirds of the square footage of the development designated for residential use.
- No more than 50 acres, with a density of at least four units per acre.
- Either zoned for residential use or residential mixed-use development, or consistent with the general plan and has a general plan designation that allows residential use or a mix of residential and nonresidential uses.
- Consistent with objective development standards, including zoning standards, among others.
Developments must also meet sustainability standards sufficient to receive a gold certification under the United States Green Building Council’s Leadership in Energy and Environmental Design for Homes rating system, or other equivalent standards.
The development cannot be located on a site that is:
- Either prime farmland or farmland of statewide importance, as defined, or land zoned or designated for agricultural protection or preservation.
- Wetlands.
- Within a high or very high fire hazard severity zone, unless the development meets specified criteria in existing law.
- A hazardous waste site.
- Within a delineated earthquake fault zone, unless the development meets specified criteria in existing law.
- Within a special flood hazard area subject to inundation by a 100-year flood, unless the development meets specified criteria in existing law.
- Within a regulatory floodway, unless the development meets specified criteria in existing law.
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan.
- Habitat for species protected under the state or federal Endangered Species Acts or the Native Plant Protection Act.
- Lands under conservation easement.
- A mobilehome park.
AB 430 also prohibits the demolition of a historic structure that was placed on a national, state, or local historic register. Additionally, if the development requires the demolition of affordable housing units, the development proponent must replace those units. The developer must also hold at least one public meeting on the proposed development prior to submitting an application for the bill’s streamlined, ministerial approval process.
AB 430 establishes timelines for approval, design review processes, and the length of time that an approval remains valid in the same manner as provided under existing law for SB 35. In addition, AB 430 requires a local government that approves a development under the bill to notify the Governor’s Office of Planning and Research. AB 430 provides that it does not affect a development proponent’s ability to request alternative streamlining processes.
AB 430 also prohibits a city from adopting any requirement, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval. However, if the local government has adopted an ordinance requiring a percentage of units to be affordable to low-income households, that ordinance applies.
AB 430’s provisions sunset on January 1, 2026, and the bill makes findings and declarations to support its purposes.
State Revenue Impact
No estimate.
Comments
1. Purpose of the bill. According to the author, “the Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in State History, displacing 50,000 people. The fire destroyed almost 20,000 buildings (14% of Butte County’s housing stock), exacerbating the housing crisis in the area and making it difficult for many of the fire victims and others to find affordable housing in surrounding areas. In some areas, the rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in impacted areas to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties. AB 430 will authorize housing developments in impacted areas to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires the development to be located within specified cities or specialized planning areas. Additionally, projects must be consistent with local zoning. The bill also disqualifies projects that have detrimental environmental impacts by excluding projects that are located in floodplains and floodways, prime farmland, and lands identified for conservation, among others.”
2. How much of a benefit? Local governments have wide latitude when it comes to setting the rules that developers must meet to get their projects approved. For example, they can adopt zoning ordinances that allow for ministerial approval, without any enabling state legislation. However, making this change at the local level comes with strings: such an action is subject to CEQA, and individuals concerned about new development can encourage their elected officials to vote against the changes. AB 430 grants ministerial approval to housing projects that meet certain conditions in order to speed up much needed housing development. By establishing this process through state legislation, the cities in the bill gain the benefits of the streamlined approval process without threat from CEQA lawsuits or NIMBYs. However, some developments may still face these challenges even with the passage of AB 430. Specifically, there are other discretionary approval processes that larger projects must go through, such as the Subdivision Map Act, which is the process that local officials use to ensure new subdivisions of five or more parcels have adequate infrastructure. Since discretionary approvals trigger CEQA, developers that seek to build large subdivisions may find that this bill is less useful than they would like.
3. What’s different? AB 430 is modeled after SB 35 and applies many of that bill’s provisions. However, several significant differences exist, including:
- SB 35 requires certain minimum affordability requirements; AB 430 does not require any affordable units for an eligible project.
- SB 35 requires the use of a skilled and trained workforce and payment of prevailing wage; AB 430 does not include this requirement.
- SB 35 is restricted to specified infill sites; AB 430 instead requires the site to be adjacent to existing development and within the boundaries of specified cities, or contained within a specialized residential planning area identified in the general plan of those cities. AB 430 also requires a minimum density for the project of four units per acre and limits the maximum size of a project.
- SB 35 does not require any green building standards beyond the California Building Code’s requirements; AB 430 requires developments to meet an elevated environmental standard.
- SB 35 requires a project to be located on a site zoned for residential or mixed-use development and to be consistent with the zoning for the site; AB 430 includes these requirements but also allows a project to be consistent with the general plan and has a general plan designation that allows residential uses.
These differences are intended to make the bill more suitable for use in a rural context, while addressing concerns over inducing sprawl. Many of these differences make sense in the context of the bill. However, it is unclear what standards a development must meet if it is only required to be consistent with the general plan, which does not contain the same specificity as a zoning ordinance. The Committee may wish to consider amending AB 430 to remove this alternative provision.
4. Getting it right. SB 35 excluded many sensitive sites from the bill’s streamlined ministerial process. However, SB 35 also allowed for exceptions to these exclusions in a few cases. Of note, developers that meet state building standards for fire prone areas can still use SB 35 in high and very high fire hazard severity zones, and SB 35 still applies to projects in floodways, as long as they show that the projects won’t make floods worse. Since these standards are relatively low, these off-ramps allow projects to continue to be built in harm’s way. AB 430 copies these provisions of SB 35. To ensure that projects are adequately protected from the risk of natural disasters, the Committee may wish to consider amending AB 430 to instead prohibit the bill from applying in high and very high fire hazard severity zones and in floodways, regardless of mitigation levels.
5. Special legislation. Section 16 of Article Four of the California Constitution prohibits special legislation when a general law can apply. AB 430 contains findings and declarations explaining the need for legislation that applies only to the cities specified in the bill.
6. Mandate. The California Constitution generally requires the state to reimburse local agencies for their costs when the state imposes new programs or additional duties on them. Because AB 430 increases the duties of local officials regarding approval of streamlined developments under the bill, Legislative Counsel says it imposes a new state mandate. But AB 430 disclaims the state’s responsibility for reimbursement by citing local governments’ authority to charge for the costs of implementing the bill's provisions.
7. Charter city. The California Constitution allows cities that adopt charters to control their own “municipal affairs.” In all other matters, charter cities must follow the general, statewide laws. Because the Constitution doesn’t define “municipal affairs,” the courts determine whether a topic is a municipal affair or whether it's an issue of statewide concern. AB 430 says that its statutory provisions apply to charter cities. To support this assertion, the bill includes a legislative finding that the bill addresses a matter of statewide concern.
8. Incoming! The Senate Rules Committee has ordered a triple-referral of AB 430: first to the Housing Committee, which approved the bill at its June 18th meeting on a vote of 10 to 0; second to the Environmental Quality Committee, which approved the bill at its July 3rd meeting on a vote of 5-1; and then to the Governance and Finance Committee. The Committee is hearing the bill as the committee of third reference.
Assembly Actions
Assembly Natural Resources Committee: 9-1
Assembly Appropriations Committee: 16-0
Assembly Floor: 70-1
Support and Opposition
(7/9/19)
Support: Adventist Health; Bay Area Builders Exchange; Build.Com; Build.Com, Inc; Butte-Glenn Medical Society; Butte; County Of; California Apartment Association; California Association Of Realtors; California Building Industry Association; California Chamber Of Commerce; Chico Builders Association; Chico Chamber Of Commerce; City Of Biggs; City Of Corning; City Of Gridley; City Of Orland; City Of Oroville; City Of Willows; City Of Yuba City; Civil Justice Association Of California; Downtown Chico Business Association; Enloe Medical Center; North Valley Property Owners Association; Placer County Contractors & Building Exchange; Rural County Representatives Of California; Sacramento Regional Builders Exchange; San Gabriel Valley Economic Partnership; Shasta Builders Exchange; Sierra North Valley Realtors; Sustainability Management Association; Sutter Yuba Association Of Realtors; Valley Builders Exchange; Valley Contractors Exchange; Yuba Sutter Chamber Of Commerce
Opposition: Butte Environmental Council; City Of Chico; Northern California Environmental Defense Center; Planning and Conservation League
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Allen, Chair
2019 - 2020 Regular
Bill No: AB 430
Author: | Gallagher | ||
Version: | 6/20/2019 | Hearing Date: | 7/3/2019 |
Urgency: | No | Fiscal: | Yes |
Consultant: | Genevieve M. Wong | ||
SUBJECT: Housing development: Camp Fire Housing Assistance Act of 2019
DIGEST: Establishes a streamlined, ministerial approval process for residential and mixed-use developments within the cities of Biggs, Gridley, and Oroville in Butte County, the cities of Orland and Willows in Glenn County, the city of Corning in Tehama County, and the cities of Live Oak and Yuba City in Sutter County, so that these projects are not subject to review under the California Environmental Quality Act (CEQA).
ANALYSIS:
Existing law:
- The California Environmental Quality Act (CEQA):
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code §21000 et seq.). If there is substantial evidence, in light of the whole record before a lead agency, that a project may have a significant effect on the environment, the lead agency must prepare a draft EIR. (CEQA Guidelines §15064(a)(1), (f)(1)).
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code §21000 et seq.). If there is substantial evidence, in light of the whole record before a lead agency, that a project may have a significant effect on the environment, the lead agency must prepare a draft EIR. (CEQA Guidelines §15064(a)(1), (f)(1)).
- The Land Use and Planning Law:
- Requires every city and county to prepare and adopt a general plan, including a housing element, to guide the future growth of a community. The housing element must identify and analyze existing and projected housing needs, identify adequate sites with appropriate zoning to meet the housing needs of all income segments of the community, and ensure that regulatory systems provide opportunities for, and do not unduly constrain, housing development (Government Code (Gov. C.) §65583).
- Establishes a ministerial approval process for certain multifamily affordable housing projects that are proposed in local jurisdictions that have not met regional housing needs (Gov. C. §65913.4).
- Requires every city and county to prepare and adopt a general plan, including a housing element, to guide the future growth of a community. The housing element must identify and analyze existing and projected housing needs, identify adequate sites with appropriate zoning to meet the housing needs of all income segments of the community, and ensure that regulatory systems provide opportunities for, and do not unduly constrain, housing development (Government Code (Gov. C.) §65583).
This bill:
- Authorizes a development proponent to submit an application for a development that is subject to a streamlined, ministerial approval process and is not subject to a conditional use permit if the development satisfies all of the following:
- The development is located within the territorial boundaries or a specialized residential planning area identified in the general plan of, and adjacent to existing urban development within, the cities of Biggs, Gridley, and Oroville in Butte County, the cities of Orland and Willows in Glenn County, the cities of Live Oak and Yuba City in Sutter County, and the city of Corning in Tehama County.
- The development is either a residential development or a mixed-use development that includes residential units with at least two-thirds of the square footage of the development designated for residential use.
- The development has a minimum density of at least four units per acre.
- The development is located on a site that is no more than 50 acres.
- The development is located on a site that either:
- Is zoned for residential use or residential mixed-use development.
- Is consistent with the general plan and has a general plan designation that allows residential use or a mix of residential and nonresidential uses, with at least two-thirds of the square footage of the development designated for residential use, not including any land that may be devoted to open space or mitigation requirements.
- The development, excluding any additional density or any other concessions, incentives, or waivers of development standards granted pursuant to the Density Bonus Law, is consistent with objective zoning standards, objective subdivision standards, and objective design review standards in effect at the time that the development is submitted to the local government.
- The development will achieve sustainability standards sufficient to receive a gold certification under the United States Green Building Council’s Leadership in Energy and Environmental Design for Homes rating system, or the comparable rating under the GreenPoint rating system or voluntary tier under the California Green Building Code (Part 11 (commencing with Section 101) of Title 24 of the California Code of Regulations.
- The development is not located on a site that is any of the following:
- Either prime farmland or farmland of statewide importance, as defined, or land zoned or designated for agricultural protection or preservation.
- Wetlands.
- Within a high or very high fire hazard severity zone.
- A hazardous waste site.
- Within a delineated earthquake fault zone.
- Within a special flood hazard area subject to inundation by a 100-year flood.
- Within a regulatory floodway.
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan.
- Habitat for species protected under the state or federal Endangered Species Acts or the Native Plant Protection Act.
- Lands under conservation easement.
- The development does not require the demolition of a historic structure that was placed on a national, state, or local historic register.
- The development shall not be upon an existing parcel of land or site that is governed under the Mobilehome Residency Law, the Recreational Vehicle Park Occupancy Law, the Mobilehome Parks Act, or the Special Occupancy Parks Act.
- If the development would require the demolition of affordable housing units, requires the development to replace those units.
- The development is located within the territorial boundaries or a specialized residential planning area identified in the general plan of, and adjacent to existing urban development within, the cities of Biggs, Gridley, and Oroville in Butte County, the cities of Orland and Willows in Glenn County, the cities of Live Oak and Yuba City in Sutter County, and the city of Corning in Tehama County.
- Requires a city, if it determines that a development is in conflict with any of the objective planning standards specified above, to provide the development proponent written documentation of which standard or standards the development conflicts with, and an explanation for the reason or reasons the development conflicts with that standard or standards, as follows:
- Within 60 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
- If the city fails to provide the required documentation, the development shall be deemed to satisfy the objective planning standards.
- Authorizes the city’s planning commission or any equivalent commission responsible for review and approval of development projects, or the city council to conduct any design review or public oversight of the development. Requires that design review or public oversight to be objective and strictly focused on assessing compliance with criteria required for streamlined projects, as well as any reasonable objective design standards published and adopted by ordinance or resolution by a local jurisdiction before submission of a development application, and broadly applicable to development within the jurisdiction. Requires that design review or public oversight to be completed as follows and prohibits it from in any way inhibiting, chilling, or precluding the ministerial approval of the project:
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 180 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
- Provides that city approval of a development shall not expire if the project includes public investment, excluding tax credits, in housing affordability and 50 percent of the units are affordable to households making below 80 percent of the area median income.
- Provides that city approval of a development not meeting these affordability thresholds shall automatically expire after three years, except that a project may receive a one-time, one-year extension if the project proponent provides documentation that there has been significant progress toward getting the development construction ready, such as filing a building permit application.
- Provides that city approval of a development shall remain valid for three years from the date of the final action establishing that approval and shall remain valid thereafter for a project so long as vertical construction of the development has begun and is in progress.
- Prohibits a city from adopting any requirement, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval.
- Sunsets January 1, 2026.
Background
- Background on CEQA.
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
- What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary. Also, CEQA stipulates that the environmental impacts must be measured against existing physical conditions within the project area, not future, allowable conditions.
- CEQA provides a hub for multi-disciplinary regulatory process. An environmental review provides a forum for all the described issue areas to be considered together rather than siloed from one another. It provides a comprehensive review of the project, considering all applicable environmental laws and how those laws interact with one another. For example, it would be prudent for a lead agency to know that a proposal to mitigate a significant impact (i.e. alleviate temporary traffic congestion, due to construction of a development project, by detouring traffic to an alternative route) may trigger a new significant impact (i.e. the detour may redirect the impact onto a sensitive resource, such as a habitat of an endangered species). The environmental impact caused by the proposed mitigation measure should be evaluated as well. CEQA provides the opportunity to analyze a broad spectrum of a project’s potential environmental impacts and how each impact may intertwine with one another.
- What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary. Also, CEQA stipulates that the environmental impacts must be measured against existing physical conditions within the project area, not future, allowable conditions.
- Land use planning and permitting. The Planning and Zoning Law requires every county and city to adopt a general plan that sets out planned uses for all of the area covered by the plan. A general plan must include seven mandatory elements, including a housing element that establishes the locations and densities of housing, among other requirements, and must incorporate environmental justice concerns. Cities’ and counties’ major land use decisions—including most zoning ordinances and other aspects of development permitting— must be consistent with their general plans. In this way, the general plan is a blueprint for future development.
- Ministerial approvals. Cities and counties enact zoning ordinances to implement their general plans. Zoning determines the type of housing that can be built. Some local ordinances provide “ministerial” processes for approving projects. Projects reviewed ministerially require only an administrative review designed to ensure they are consistent with the existing general plan and zoning rules, as well as meeting standards for building quality, health, and safety. Most large housing projects are not allowed ministerial review. Instead, these projects are vetted through both public hearings and administrative review.
Ministerial approvals remove a project from all discretionary decisions of a local government, including an environmental review under CEQA. Thus, establishing processes to approve certain types of projects ministerially, also creates exemptions from CEQA.
- CEQA and Planning and Zoning.
- Residential projects that are consistent with a specific plan. A residential project, such as those covered by AB 430, that is implementing, and is consistent with, a specific plan for which an EIR has been certified is exempt from CEQA (Gov. C. §65457(a)). However, if after the adoption of the specific plan, there are substantial changes that would require major revisions of the EIR, substantial changes occur with respect to the circumstances under which the project is being undertaken which will require major revisions in the EIR, or new information which was not known and could not have been known at the time of the EIR was certified becomes available, this exemption does not apply until a supplemental EIR for the specific plan is prepared and certified in accordance with CEQA.
- Development projects that are consistent with a general plan. If a development project is consistent with a local government’s general plan and an EIR that was certified for that general plan, the application of CEQA to the approval of that project is limited to effects on the environment that are particular to the parcel or to the project and which either (1) were not addressed as significant effects in the prior EIR or (2) substantial new evidence shows will be more significant than when described in the prior EIR (PRC §21083.3).
- Residential projects that are consistent with a specific plan. A residential project, such as those covered by AB 430, that is implementing, and is consistent with, a specific plan for which an EIR has been certified is exempt from CEQA (Gov. C. §65457(a)). However, if after the adoption of the specific plan, there are substantial changes that would require major revisions of the EIR, substantial changes occur with respect to the circumstances under which the project is being undertaken which will require major revisions in the EIR, or new information which was not known and could not have been known at the time of the EIR was certified becomes available, this exemption does not apply until a supplemental EIR for the specific plan is prepared and certified in accordance with CEQA.
- Infill development. “Infill development” occurs in already built-up areas with existing transportation and utility infrastructure, often repurposes or replaces existing buildings, parking lots, or other impervious areas, and adds homes and/or businesses near the center of cities and towns. Examples of infill project locations include a disused parking lot, an old commercial property, or a former industrial site. Infill development is considered a vital strategy for efficient growth.
Infill builds within an existing footprint of development, which can reduce development pressure on outlying areas, helping to safeguard lands that serve important ecological functions and preserve open space and prevent conversion of agricultural land; can reduce the amount that people drive, improving air quality and reducing GHG emissions; and can lead to the cleanup and reuse of formerly economically viable but now abandoned sites, including those contaminated with hazardous substances. Also, by locating new developments near population centers and amenities, communities can take advantage of existing water, sewer, and transportation systems, avoiding the cost of installing expensive new infrastructure.
According to the US Environmental Protection Agency (US EPA), several trends point to a sustained increase in demand for infill development and a market opportunity for developers. Consumer preferences for the amenities that infill locations offer are likely to grow as changing demographics affect the housing market. In the next couple of decades, the needs and preferences of aging baby boomers, new households, and one-person households will drive real estate market trends – and infill locations are likely to attract many of these people. As more people choose to live in infill neighborhoods, employers are following, and vice versa. Many corporations are moving to infill locations, in part because they recognize the competitive advantages of being closer to the central city. (US EPA, “Smart Growth and Economic Success: Investing in Infill Development,” February 2014.)
The Strategic Growth Council (SGC), as a part of its broader legislative mandate, has identified “infill” development as an important strategy for achieving AB 32 (Núñez, Pavley, Chapter 488, Statutes of 2006) greenhouse gas (GHG) emissions reduction targets. While contributing to reductions of GHG emissions, achieving infill development can confer a broad range of benefits, such as increased economic vitality of the state’s urban centers; decreased consumption of energy, water, and other natural resources; reduced conversion of farmland and natural habitat areas; and the opportunity for more efficient infrastructure investment and delivery of municipal services.
- CEQA and development. A pair of studies from the firm Holland & Knight reviewed CEQA lawsuits filed between 2010-2012 and 2013-2015, respectively. The studies conclude that CEQA litigation is disproportionately directed towards the types of projects that the state encourages, such as infill.
However, overall litigation rates regarding CEQA are low. In 2016, BAE Urban Economics did a quantitative analysis of the effects of CEQA on California’s economy generally, including the specific effects on housing development. The report found “no evidence” to support the argument that CEQA represents a major barrier to development. To the contrary, the report found that only 0.7 percent of all CEQA projects undergoing environmental review were involved in litigation. To help put this in perspective, the total number of CEQA cases filed make up approximately 0.02% of 1,100,000 civil cases filed annually in California. The report indicated that California’s affordable housing production ranked 9th among the 50 states. In fact, the report concluded that the CEQA process also helped ensure that affordable housing is developed in a way that does not compromise the health and safety of an already vulnerable population.
In October 2017, this committee published the results of a survey it had conducted of state agencies regarding CEQA to gain a better understanding of CEQA compliance and litigation. The survey, covering Fiscal Years 2011/12 to 2015/16, showed over 90% of projects lead by state agencies were exempt from CEQA; and only 1% required an EIR. Further, out of a total of 15,783 projects, only 207 CEQA cases were brought against state agencies within those 5 years. With multiple cases brought against some of the same projects, it is estimated that less than 1% of projects were litigated. The survey results suggest that CEQA litigation is not a significant burden on projects where the state is the lead agency.
Two recent studies conducted by faculty at UC Berkley illustrate how aspects of the approval process that are independent of CEQA drive project approval timelines. CEQA requires project applicants to secure all applicable permits and approvals necessary to carry out the project, as well as to comply with any other environmental review required under applicable federal, state, local laws, regulations, or policies. These requirements apply independently of CEQA, but are also incorporated into the CEQA process. The results of the first study, done in residential development projects in five Bay Area cities, led to the conclusion that, among other facts “what drives whether and how environmental review occurs for residential projects is local land-use law.” The second study, which focused on the building permit process in four Los Angeles area cities, found that different cities chose to apply CEQA differently with regard to residential development and that overall relatively few projects within the study area required a full EIR.
Finally, the Association of Environmental Professionals recently surveyed 46 cities and counties throughout the state to determine CEQA’s impact on housing production. The survey found that under 6% of the housing projects in those jurisdictions were required to undergo a full EIR, which took 15 months on average to complete. Instead, the survey found that cities and counties are successfully using alternatives to EIRs that expedite housing projects: 35.9% of projects were reviewed by MNDs, which took just 8 months to complete, while 42.3% were reviewed under streamlining provisions or exemptions for affordable housing, infill, and transit-priority projects, which took just 6 months to complete. Another 9.3% were determined to be eligible for other exemptions. The survey respondents also indicated that, among the barriers to increased housing production in California, CEQA is not a major cause. The costs of building, lack of available sites, and lack of financing for affordable housing were all cited as primary barriers for housing production.
- The Camp Fire. Labeled as the deadliest and most destructive wildlife in California history to date, the Camp Fire started November 8, 2018, in Butte County and took 17 days to reach 100% containment. The fire resulted in 85 civilian fatalities, 3 missing people, 12 injured civilians, and 5 injured firefighters. It covered an area of 153,336 acres, almost 240 square miles, and destroyed 18,804 structures. According to the Department of Finance’s (DOF) state demographic report released on May 1, 2019, over 14,600 housing units were destroyed.
Comments
- Purpose of Bill. According to the author, “The Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in State History, displacing 50,000 people. The fire destroyed almost 20,000 buildings (14% of Butte County’s housing stock), exacerbating the housing crisis in the area and making it difficult for many of the fire victims and others to find affordable housing in surrounding areas. In some areas, the rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in impacted areas to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties. AB 430 will authorize housing developments in impacted areas to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires the development to be located within specified cities or specialized planning areas. Additionally, projects must be consistent with zoning standards and the city’s general plan. The bill also disqualifies projects that have detrimental environmental impacts by excluding projects that are located in floodplains and floodways, prime farmland, and lands identified for conservation, among others.”
- Displaced residents of Paradise. According to DOF’s state demographic report released on May 1, 2019, Paradise had reported a population of 26,423 residents January 1, 2018. On January 1, 2019, after the Camp Fire, there were 4,590 residents. Thus, 21,833 residents were displaced from Paradise following the Camp Fire, plus those from the neighboring areas.
AB 430 seeks to ministerially approve an unknown quantity of residential and mixed-use projects in nearby cities to accommodate the anticipated need for housing for the displaced residents of Paradise. The chart below shows the increase in population each of the cities before and after the Camp Fire, including Chico which requested to be removed from the bill.
City | 2018 Population | 2019 Population | Numeric change | Percentage change |
Biggs | 1,894 | 2,066 | +172 | +1.1% |
Chico (removed from bill) | 92,861 | 112,111 | +19,250 | +20.7% |
Corning | 7,561 | 7,590 | +29 | +1% |
Gridley | 6,921 | 7,224 | +303 | +4.3% |
Live Oak | 8,799 | 8,840 | +41 | +0.4% |
Orland | 7,998 | 8,337 | +339 | +4.2% |
Oroville | 18,091 | 21,773 | +3,682 | +20.3% |
Willows | 6,273 | 6,282 | +9 | >0.1% |
Yuba City | 67,354 | 67,536 | +180 | +0.2% |
Source: Department of Finance State Demographic Report released May 1, 2019.
According to the DOF, Oroville and Chico saw the largest increase in population, most likely as a result of the displaced Paradise residents. Chico’s population jumped from 92,861 in 2018 to 112, 222 in 2019, a 20.7% increase; and Oroville’s population went from 18,091 in 2018 to 21,773 in 2019, a 20.4% increase. These two cities were probably impacted the most because they are the closest major cities to Paradise. Other cities that would be eligible for the streamlined, ministerial review provided under AB 430 have seen more tempered increase in population, ranging from an additional 9 people in Willows to an additional 339 people in Orland.
Given that most of the residents seem to be relocating to Chico, with Oroville a distant second, does it make sense to relax the local planning process and environmental review standards in all these cities if it is not clear that this is where displaced residents are going?
The chicken or the egg? According to the author, these additional cities are necessary due to the removal of Chico from the bill. Expediting the construction of residential and mixed-use housing in these cities will help to provide additional housing choices and flexibility on relocation opportunities. As the housing options in the closer cities reach capacity, it is argued, people will look at farther options. However, whether Paradise residents will relocate to these cities is speculative and, in the meantime, otherwise appears to be a free pass for development in the area. Some say that development will not occur in the cities unless there is a need for it; but the flip side of that argument is - will residents move to a city that does not already have the housing and development available? Isn’t that one of the main reasons why they have predominately and initially relocated to Chico and Oroville?
- What do we lose when we remove the environmental review of CEQA?
Cumulative impacts. Under AB 430, local governments will not be able to analyze the cumulative impacts of the projects that would be ministerially approved under this bill. Generally, CEQA Guidelines §15064(h)(1) provides that a project may have a significant impact if (1) cumulative impacts maybe significant and (2) the project’s effects are “cumulatively considerable.” Cumulatively considerable means that incremental effects are considerable when viewed together the effects of past, current, and probably future projects. CEQA Guidelines §15130(b)(1) also requires consideration of “probable future projects” in pending applications. If a cumulative impact was adequately addressed in a prior EIR for a community plan, zoning action, or general plan, then an EIR for a current project need not further analyze the cumulative impact.
Cities covered by AB 430. According to the DOF State Demographic Report, each of the cities covered by AB 430, with the exception of Oroville and Yuba City, currently have less than 10,000 residents. Without environmental review, how will the affected cities ensure that they are able to provide for the basic necessities for the increased population? Things such as the provision of safe drinking water, wastewater treatment capacity, sewage capacity, landfill capacity, and public services such as fire and police protection; all of which a city needs to provide its residents with a minimum quality of life. One of the things specifically considered in an environmental review is whether the project would induce substantial unplanned population growth in the area, either directly or indirectly. But all these would not be addressed with a ministerial approval process. Giving such large projects a ministerial approval process not only presents an opportunity for project proponents to abuse the process, but could likely result in negatively affecting the quality of life of the residents involved if the city cannot provide for the basic necessities to support the growing population.
The author asserts that these concerns would be addressed by the city’s general plan, which takes into account the anticipated population growth of a city over time, and by other zoning and planning laws that are still at play such as the Subdivision Map Act. The chart below, based on information from the Butte County Association of Government’s website, shows the estimated population growth for some of the cities that are covered by the bill over the past 10 years.
City | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 |
Biggs | 1,107 | 1,715 | 1,704 | 1,710 | 1,697 | 1,752 | 1,879 | 1,889 | 1,894 | 2,066 |
Chico | 86,187 | 86,952 | 87,895 | 88,664 | 89,037 | 89,873 | 90,556 | 92,022 | 92,861 | 112,111 |
Gridley | 6,584 | 6,613 | 6,609 | 6,812 | 6,831 | 6,835 | 6,842 | 6,900 | 6,921 | 7,224 |
Oroville | 15,546 | 15,527 | 15,554 | 15,747 | 15,914 | 16,161 | 17,814 | 17,893 | 18,091 | 21,773 |
Population growth for the cities covered by AB 430 between 2010 and 2018 was minimal. With the exception of a couple of outlier years in Biggs between 2010/11 and 2015/16, most population growths hoover at about 1% or less. Given unique situation of displacement from Paradise and migration to surrounding cities, it is unlikely that there is a general plan that has factored in a 20% growth rate in a single year.
And while it can be said that developers could be required to mitigate the effects of the increased population resulting from their development through the payment of development impact fees, those fees are often paid into a larger fund for future infrastructure development. A substantial increase in the population at an accelerated rate has the potential to outpace existing infrastructure and while development impact fees can potentially help mitigate the long term impacts, they do nothing to address the immediate impacts felt by the existing residents and city while infrastructure catches up with the population growth.
AB 430 projects. AB 430 would subject an unknown quantity of residential and mixed-use development projects to a ministerial approval process. Each of these projects have the potential to be very large in size – maxing out at 50 acres, each, with a minimum density of at least 4 units per acre. If a purely residential development, this would provide for a minimum 200 unit development or more, depending on the particular density ordinance of the city, spanning over potentially 50 acres - all without environmental review. Further, can a developer have different “projects,” each subject to its own ministerial approval, and each with 200 units developed, that are essentially different “phases” of a larger, overarching project?
While AB 430 contains some environmental safeguards that would generally apply to projects, such as LEED Gold certification for homes and restrictions on the types of land that can be built on, those safeguards do not take into consideration the unique circumstances of a particular project site or the cumulative environmental impacts of the projects. Will it lead to more cars on the road, increasing stormwater runoff and affecting the jurisdiction’s ability to comply with federally-required stormwater permits? Could these new developments potentially lead to new and unsustainable public water systems? Could unchecked new development make it difficult for the cities to comply with other environmental laws, exposing those cities to liability? How will the cities know if the project is on a site that a tribal cultural resource?
How will the cities be fully aware of the impacts that result from the sudden and substantial population growth such as is intended under AB 430? How will the cities know if the project would expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes; which is a specific concern addressed in the environmental review? How will a local government know the effects substantial population growth will have on emergency evacuation routes? Will a city know if its underlying infrastructure can support the boost in development that AB 430 strives for and if it can provide for its residents basic necessities? Should the local governments that are covered by AB 430 be allowed to be willfully unaware to the potential consequences, both individually and cumulatively, of a project? As demonstrated by the devasting events that has happened over the past few years; including the Camp Fire, the Tubbs Fire, the Woolsey Fire, the Oroville Dam spillway failure; more and better planning and environmental review is needed, not less. In the long run, is eliminating certain local planning processes and eliminating the environmental review process what is best for the community?
While it can be said that there are other ways to ensure things such as infrastructure capacity are considered, CEQA provides for the documentation and consideration of all these things into one consolidated document, allowing for the local government officials to address the environmental impacts in a comprehensive, transparent manner; and not siloed off from one another. Following the terrible events of the wildfires and the Oroville Dam spillway failure, the Legislature has strived to promote the reduction of wildfire risk, loss of life, and sound land use. Does AB 430, as written, promote these policies?
Lastly, between the large project sizes and the minimum density requirements, AB 430 has the high potential to encourage sprawl. The Legislature has a history of promoting sound land use through infill development. As currently written, AB 430 is not consistent with this principle.
- LEED Certification. LEED certification offers the following categories for certification:
- Building Design & Construction
- Building Operations and Maintenance
- Interior Design and Construction
- Homes
- Neighborhood development.
AB 430 currently requires LEED Gold Certification for Homes, but the bill also covers mixed-use residential projects, which would not eligible for the Homes category. The most appropriate certification may be certification for Neighborhood Development or Building Design & Construction.
- Apples and oranges. AB 430 provides for expedited judicial review for residential and mixed-use projects in specified cities that meet certain standards, including that the development will achieve sustainability standards sufficient to receive LEED Gold certification for Homes rating system, or the comparable rating under the GreenPoint rating system or voluntary tier under the California Green Building Code (CalGreen). The intent behind providing these alternatives to LEED Gold is to allow the project proponent flexibility in meeting the bill’s requirements and presumes that it will be up to the local government’s permitting agency to determine what is comparable.
GreenPoint and CalGreen, which are based on the construction and infrastructure of the building itself; considers things such as energy efficiency and indoor air quality. These can be tracked and calculated as the development is being constructed. On other hand, the LEED certification process for Homes takes place after the project has been completed. LEED also mandates minimum energy efficiency and water efficiency as a prerequisite, and gives additional points based on whether a project contains additional desirable attributes such as proximity to transit, walkability, compatibility with bicycles, access to mixed-uses, redevelopment, historic resource preservation, preservation of trees, etc. It is noted that because certification takes place after the construction of the building, enforcement of such provisions is tricky.
Nonetheless, because of the different metrics that are used between the systems, what level of GreenPoint or CalGreen is comparable to LEED Gold? How will a local government know what is the proper comparable rating? If left up to local governments, will there be inconsistent application? Each of the cities covered by the bill have an interest in building, and want to build, residential and mixed-use projects as quickly as possible. What prevents these cities from simply finding that a certain rating is comparable to LEED Gold just for the sake of expediting the projects?
- Committee amendments, If the committee decides that bypassing the local planning process and environmental review is appropriate for these communities in light of the Camp Fire, the committee may wish to amend the bill to do all of the following:
- Limit the projects size to a maximum of 10 acres.
- Require the project have a minimum density of 20 units per acre.
- Require the project be on a site in an area with per capita vehicle miles traveled at least 15% below the regional average.
- Require the permitting agency to file a notice with OPR; and require project proponent to hold at least one public meeting before the application is submitted to give the public opportunity to provide appropriate and relevant information relating to a particular development.
- Require the author to work with the appropriate stakeholders to ensure that tribal cultural resources are not adversely impacted by the ministerial approval process.
- Specify that LEED certification for new construction or neighborhood development, or its equivalent, is required for the mixed-use projects.
Related/Prior Legislation
SB 25 (Caballero) establishes expedited administrative and judicial review of environmental review and approvals granted for projects that are funded by opportunity zone funds or public agencies that meet certain standards, including LEED gold certification. SB 25 is has been referred to the Assembly Natural Resources Committee.
AB 394 (Obernolte) exempts from CEQA, until 2025, egress route projects or activities that are specifically recommended by the State Board of Forestry and Fire Protection that improve the fire safety of an existing subdivision if certain conditions are met. AB 394 passed out of this committee with a vote of 4 – 0 and has been referred to the Senate Natural Resources Committee.
AB 2267 (Wood, 2018) would have established, until 2024, expedited administrative and judicial review for CEQA actions or proceedings on the adoption or approval of amendments to the Downtown Station Area Specific Plan for the City of Santa Rosa and for the adoption or approval of a specified planning document for incorporated or unincorporated areas of Sonoma County in the “RED Area.” AB 2267 did not pass the Senate Floor.
TRIPLE REFERRAL
This measure was heard in the Senate Housing Committee on June 18, 2019, and passed out of committee with a vote of 10 - 0. If this measure is approved by the Senate Environmental Quality Committee, the do pass motion must include the action to re-refer the bill to the Senate Governance and Finance Committee.
SOURCE:
Author
SUPPORT:
Adventist Health
Bay Area Builders Exchange
Build.com
Butte County Board of Supervisors
Butte-Glenn Medical Society
CalChamber
California Apartment Association
California Association of Realtors
California Building Industry Association
Chico Builders Association
Chico Chamber of Commerce
Chico Downtown Business Association
City of Biggs
City of Corning
City of Gridley
City of Orland
City of Oroville
City of Willows
Civil Justice Association of California
Downtown Chico Business Association
Enloe Medical Center
Nevada County Contractor’s Association
North Valley Property Owners Association
Placer County Contractors & Builders Exchange
Rural County Representatives of California
Sacramento Regional Builders Exchange
San Gabriel Valley Economic Partnership
Shasta Builders’ Exchange
Sierra North Valley Realtors
Sustainability Management Association
Valley Builders Exchange, Inc.
Valley Contractors Exchange
Yuba Sutter Chamber of Commerce
OPPOSITION:
City of Chico
2 Individuals
-- END --
SENATE COMMITTEE ON HOUSING
Senator Scott Wiener, Chair
2019 - 2020 Regular
Bill No: AB 430 Hearing Date: 6/18/2019
Author: | Gallagher | ||
Version: | 6/10/2019 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Alison Hughes | ||
SUBJECT: Housing development: Camp Fire Housing Assistance Act of 2019
DIGEST: This bill creates a streamlined ministerial approval process for specified housing developments in the Cities of Biggs, Corning, Gridley, Live Oak, Orland, Oroville, Willows, and Yuba City.
ANALYSIS:
Existing law:
- Establishes a ministerial, streamlined approval process for certain infill, multifamily housing projects that are proposed in local jurisdictions that have not met regional housing needs.
- Provides that supportive housing, in which 100% of units are dedicated to low-income households (up to 80% area median income (AMI)) and are receiving public funding to ensure affordability, shall be a use by-right in all zones where multifamily and mixed uses are allowed, as specified.
This bill:
- Provides that a development proponent may submit an application for a development that is subject to a streamlined, ministerial approval process and not subject to a conditional use permit if the development satisfies the following objective planning standards:
- The development is located in the following cities: Biggs, Corning, Gridley, Live Oak, Orland, Oroville, Willows, and Yuba City.
- The development is either a residential development or mixed-use that includes residential units with at least 2/3 of the square footage of the development designed for residential use, not including any land that may be devoted to open-space or mitigation requirements.
- The development has a minimum density of at least four units per acre.
- The development is located on a site is either no more than 50 acres and either zoned residential or mixed-use or consistent with the general plan and general plan policies and has a general plan designation that allows residential use or mixed-use, with at least 2/3 of the square footage of the development designated for residential use.
- The development, excluding any additional density or incentives or concessions from density bonus law, is consistent with objective zoning standards, as specified.
- The development will achieve sustainability standards sufficient to receive a gold LEED standard.
- The development is not located on any of the following:
- Prime farmland, farmland of prime importance, or land zoned or designated for agricultural protection or preservation.
- Wetlands.
- Within a very high fire severity zone, as specified.
- A hazardous waste site.
- Within a delineated earthquake fault zone.
- Within a special flood hazard area, as specified.
- Within a regulatory floodway, as specified.
- Lands identified for conservation in an adopted natural community conservation plan, as specified.
- Habitat for protected species, as specified.
- Lands under conservation easement.
- The development does not require the demolition of a historic structure that was placed on a national, state, or local historic register.
- Provides that if any units are demolished, the development shall replace those units by providing at least the same number of units of equivalent size, determined by the number of bedrooms, and made available and affordable at affordable housing cost to and occupied persons and families in the same income category as those households in occupancy.
- Provides that if a local government determines that a development seeking streamlined approval is in conflict with any of the objective planning standards, it shall provide the developer with written documentation of which standard or standards the development conflicts with and an explanation as follows:
- Within 60 days of submittal of the development to the local government if the development contains 150 units or fewer
- Within 90 days of submittal of the development to the local government if the development contains more than 150 units.
- If the local government fails to provide the required information, the development shall be deemed to satisfy the objective planning standards.
- Provides that a local government’s planning commission may conduct any design review or public oversight, as specified. Design review or public oversight shall be completed as follows and shall not in any way inhibit, chill, or preclude the ministerial approval as applicable:
- Within 90 days of submittal of the development to the local government if the development contains 150 units or fewer.
- Within 180 days of submittal of the development to the local government if the development contains more than 150 units.
- Provides that a development approval shall not expire if the project includes public investment in housing affordability and 50% of the units are affordable to households making below 80% area median income. Otherwise, the development approval shall automatically expire after three years, except that a project may receive a one-time, one-year extension, as specified.
- Prohibits a local government from adopting any requirement, including, but not limited to, increased fees or inclusionary housing requirements that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval.
- Provides that the development shall be deemed consistent with the objective zoning standards related to housing density, if applicable if the density proposed is consistent with the allowable residential density within that land use designation.
- Provides that this bill sunsets on January 1, 2026 and is repealed on that date.
COMMENTS
- Purpose of the bill. According to the author, “The Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in State History, displacing 50,000 people. The fire destroyed almost 20,000 buildings (14% of Butte County’s housing stock), exacerbating the housing crisis in the area and making it difficult for many of the fire victims and others to find affordable housing in surrounding areas. In some areas, the rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in impacted areas to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties. [This bill] will authorize housing developments in impacted areas to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires the development to be located within specified cities or specialized planning areas. Additionally, projects must be consistent with zoning standards and the city’s general plan. The bill also disqualifies projects that have detrimental environmental impacts by excluding projects that are located in floodplains and floodways, prime farmland, and lands identified for conservation, among others.”
- Housing needs and approvals generally. Every city and county in California is required to develop a general plan that outlines the community’s vision of future development through a series of policy statements and goals. A community’s general plan lays the foundation for all future land use decisions, as these decisions must be consistent with the plan. General plans are comprised of several elements that address various land use topics. Seven elements are mandated by state law: land use, circulation, housing, conservation, open-space, noise, and safety. Each community’s general plan must include a housing element, which outlines a long-term plan for meeting the community’s existing and projected housing needs. The housing element demonstrates how the community plans to accommodate its “fair share” of its region’s housing needs. To do so, each community establishes an inventory of sites designated for new housing that is sufficient to accommodate its fair share. Communities also identify regulatory barriers to housing development and propose strategies to address those barriers. State law requires cities and counties to update their housing elements every eight years.
Cities and counties enact zoning ordinances to implement their general plans. Zoning determines the type of housing that can be built. In addition, before building new housing, housing developers must obtain one or more permits from local planning departments and must also obtain approval from local planning commissions, city councils, or county board of supervisors.
Some housing projects can be permitted by city or county planning staff ministerially or without further approval from elected officials. Projects reviewed ministerially require only an administrative review designed to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. Most large housing projects are not allowed ministerial review. Instead, these projects are vetted through both public hearings and administrative review. Most housing projects that require discretionary review and approval are subject to review under the California Environmental Quality Act (CEQA), while projects permitted ministerially generally are not.
- Prior streamlining proposals. In recent years, the legislature has passed several measures to streamline approvals for housing. For example, AB 2162 (Chiu, 2018) provided that supportive housing, in which 100% of units are dedicated to low-income households (up to 80% AMI) and are receiving public funding to ensure affordability, shall be a use by-right in all zones where multifamily and mixed uses are allowed, as specified. AB 2162 applies to all areas of the state, urban and rural, and would apply regardless of whether a local government has met its RHNA.
This bill is substantially similar to SB 35 (Wiener, 2017), which requires local jurisdictions that have not met their above moderate income or lower income regional housing needs assessment (RHNA) to streamline certain infill developments. This bill differs from SB 35 in several ways: a) it is not limited to multifamily developments; b) not limited to infill sites; c) provides no affordable housing requirements; d) is not contingent on the local government's RHNA status; and e) there are no public work/prevailing wage requirements. By placing less stringent requirements on developments to be eligible for streamlining, this bill can help the cities affected by the Camp Fire build as much housing in as little time as possible.
- Do local inclusionary ordinances apply? The author will accept amendments to clarify that if a local jurisdiction has passed an inclusionary ordinance, that ordinance shall apply to a streamlined development permitted by this bill.
- Opposition. The City of Chico wrote in opposition to the prior version of the bill “because of the loss of CEQA review, the loss of local control, and the loss of ability of the public to comment on housing development.” The City requested to be removed from the bill. The recent set of amendments remove the City from the bill.
- Triple referral. This bill has also been referred to the Environmental Quality Committee and the Governance and Finance Committee.
Related Legislation:
AB 168 (Aguiar-Curry, 2019) — adds a site that is a tribal, cultural resource to the list of sites that are not eligible for a streamlined, ministerial approval process under SB 35 (Wiener, Chapter 366, Statutes of 2017). This bill will be heard today in this committee.
AB 1485 (Wicks, 2019) — allows for streamlining approval of housing developments that limit 20% of the units to up to 120% of area median income (AMI). This bill will be heard today in this committee.
SB 744 (Caballero, 2019) — specifies that an existing streamlined approval process for permanent supportive housing projects also applies to services projects tied to a housing development. This bill is currently at the Assembly Desk.
AB 2162 (Chiu, Chapter 753, 2018) — streamlined affordable housing developments that include a percentage of supportive housing units and onsite services
SB 35 (Wiener, Chapter 366, Statutes of 2017) — created a streamlined, ministerial approval process for infill developments in localities that have failed to meet their regional housing needs assessment (RHNA) numbers.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
POSITIONS: (Communicated to the committee before noon on Wednesday,
June 12, 2019.)
SUPPORT:
Adventist Health
Bay Area Builders Exchange
Biggs; City Of
Build.Com
Butte-Glenn Medical Society
Butte; County Of
California Apartment Association
California Association Of Realtors
California Building Industry Association
California Chamber Of Commerce
Chico Builders Association
Chico Chamber Of Commerce
Civil Justice Association Of California
Corning; City Of
Downtown Chico Business Association
Enloe Medical Center
Gridley; City Of
North Valley Property Owners Association
Orland; City Of
Oroville; City Of
Placer County Contractors & Building Exchange
Rural County Representatives Of California
Sacramento Regional Builders Exchange
San Gabriel Valley Economic Partnership
Shasta Builders Exchange
Sierra North Valley Realtors
Sustainability Management Association
Valley Builders Exchange
Valley Contractors Exchange
Willows; City Of
Yuba City; City Of
Yuba Sutter Chamber Of Commerce
OPPOSITION:
Butte Environmental Council
Chico; City Of
Northern California Environmental Defense Center
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 430
Author:(Gallagher)
As Amended Ver:April 30, 2019
Majority vote
SUMMARY:
Establishes a ministerial approval process for residential and mixed-use developments within or near the cities of Biggs, Chico, Gridley, and Oroville in Butte County, as well as Orland in Glenn County, so that these projects are not subject to review under the California Environmental Quality Act (CEQA).
Major Provisions
- Authorizes a development proponent to submit an application for a development that is subject to a streamlined, ministerial approval process and is not subject to a conditional use permit if the development satisfies all of the following objective planning standards:
- The development is located within the boundaries, or within a specialized residential planning area adjacent to existing urban development, of the cities of Biggs, Chico, Gridley, and Oroville in Butte County, as well as Orland in Glenn County.
- The development is either a residential development or a mixed use development that includes residential units, with a minimum density of at least four units per acre.
- The development is located on a site that is no more than 50 acres, zoned for residential use or residential mixed-use development, is consistent with the general plan, and has a general plan designation that allows residential use or a mix of residential and nonresidential uses, with at least two-thirds of the square footage of the development designated for residential use, not including any land that may be devoted to open space or mitigation requirements.
- The development, excluding any additional density or any other concessions, incentives, or waivers of development standards granted pursuant to the Density Bonus Law, is consistent with objective zoning standards, objective subdivision standards, and objective design review standards in effect at the time that the development is submitted to the local government.
- The development is not located on a site that is any of the following:
- Either prime farmland or farmland of statewide importance, as defined, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
- Wetlands.
- Within a high or very high fire hazard severity zone, unless the site is excluded from that zone by a local agency or the site has adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the development.
- A hazardous waste site, as defined, unless the Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
- Within a delineated earthquake fault zone, unless the development complies with applicable seismic protection building code standards.
- Within a special flood hazard area subject to inundation by a 100-year flood, as determined by the Federal Emergency Management Agency (FEMA), unless the site meets specified exceptions.
- Within a regulatory floodway as determined by FEMA, unless the development has received a no-rise certification.
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan.
- Habitat for species protected under the state or federal Endangered Species Acts or the Native Plant Protection Act.
- Lands under conservation easement.
- The development does not require the demolition of a historic structure that was placed on a national, state, or local historic register.
- The development is not on an existing parcel of land or site that is governed under the Mobilehome Residency Law, the Recreational Vehicle Park Occupancy Law, the Mobilehome Parks Act, or the Special Occupancy Parks Act.
- Requires a city, if it determines that a development is in conflict with any of the objective planning standards specified above, to provide the development proponent written documentation of which standard or standards the development conflicts with, and an explanation for the reason or reasons the development conflicts with that standard or standards, as follows:
- Within 60 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
If the city fails to provide the required documentation, the development shall be deemed to satisfy the objective planning standards.
- Authorizes the city's planning commission or any equivalent commission responsible for review and approval of development projects, or the city council to conduct any design review or public oversight of the development. Requires that design review or public oversight to be objective and strictly focused on assessing compliance with criteria required for streamlined projects, as well as any reasonable objective design standards published and adopted by ordinance or resolution by a local jurisdiction before submission of a development application, and broadly applicable to development within the jurisdiction. Requires that design review or public oversight to be completed as follows and prohibits it from in any way inhibiting, chilling, or precluding the ministerial approval of the project:
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 180 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
- Prohibits a city from imposing automobile parking standards for a streamlined development in any of the following instances:
- The development is located within one-half mile of public transit.
- The development is located within an architecturally and historically significant historic district.
- When on-street parking permits are required but not offered to the occupants of the development.
- When there is a car share vehicle located within one block of the development.
If the development does not fall within any of the categories described in paragraph 1), prohibits the city from imposing automobile parking requirements for streamlined developments that exceed one parking space per unit.
- Provides that city approval of a development shall not expire if the project includes public investment, excluding tax credits, in housing affordability and 50% of the units are affordable to households making below 80% of the area median income.
- Provides that city approval of a development not meeting these affordability thresholds shall automatically expire after three years, except that a project may receive a one-time, one-year extension if the project proponent provides documentation that there has been significant progress toward getting the development construction ready, such as filing a building permit application.
- Provides that city approval of a development shall remain valid for three years from the date of the final action establishing that approval and shall remain valid thereafter for a project so long as vertical construction of the development has begun and is in progress.
- Prohibits a city from adopting any requirement, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval.
- Sunsets January 1, 2026.
COMMENTS:
CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines, for housing projects. For example, any residential development project, including any subdivision, or any zoning change that is consistent with an adopted specific plan is exempt from CEQA pursuant to a statute enacted in 1984.
In 2017, the Legislature passed three bills to streamline the CEQA process for affordable housing projects. SB 35 (Wiener), Chapter 366, Statutes of 2017 established a ministerial approval process (i.e., not subject to CEQA) for certain multifamily affordable housing projects that are proposed in local jurisdictions that have not met regional housing needs. SB 540 (Roth), Chapter 369, Statutes of 2017 authorizes a city or county to establish a Workforce Housing Opportunity Zone (WHOZ) by preparing an environmental impact report (EIR) and by adopting a specific plan. Once a WHOZ is established, and for five years thereafter, eligible housing developments within a WHOZ must be approved within 60 days without requiring the preparation of an EIR or negative declaration under CEQA. AB 73(Chiu), Chapter 371, Statutes of 2017 authorizes a city or county to create a Housing Sustainability District (HSD) to complete upfront zoning and environmental review in order to receive incentive payments for residential and mixed-use development projects with an affordable housing component. Once the city or county has prepared an EIR for the HSD, then housing projects within, and consistent with, a designated HSD are exempt from CEQA. In 2018, AB 1804 codified an existing categorical exemption for infill projects, expanding the exemption to apply to multi-family residential and mixed-use housing projects on infill sites in unincorporated urbanized areas or urban clusters.
While this bill is modeled on SB 35, it leaves out some of the key elements of SB 35, including:
- Not limited to multi-family, includes all residential and mixed-use projects.
- Not limited to infill sites.
- No affordable housing requirements.
- Not contingent on the local government's RHNA status.
- No protection from demolition of existing affordable or rent-controlled housing.
- No public work/prevailing wage requirements.
According to the Author:
The Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in state history. The fire displaced 50,000 people from the communities of Paradise, Concow, and Magalia and destroyed almost 20,000 buildings.
It will take years for these communities to rebuild, and in the meantime, evacuees need to be able to find stable housing. While some will choose to rebuild, others will try to find permanent housing in surrounding areas. However, the Camp Fire destroyed 14% of Butte County's housing stock, exacerbating the housing crisis in the area and making it difficult for many of these families to find affordable housing. The rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in the county to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties.
Current law allows some housing projects to be permitted by city or county planning staff ministerially, requiring only an administrative review process to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. However, most large housing projects, such as what is needed in Butte County, would not qualify for a ministerial process under current law. Instead, these projects are vetted through both public hearings and administrative review. Most housing projects that require discretionary review and approval are subject to CEQA review, while projects permitted ministerially generally are not. This can significantly delay and increase the cost of these vital projects.
This bill will authorize housing developments in Butte County to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires that the development be located in a city that is designated as an urban area or urban cluster. Additionally, the project must be consistent with zoning standards and the city's general plan. The bill also disqualifies projects that have major detrimental environmental impacts by excluding projects that are located in coastal zones, floodplains and floodways, prime farmland, and lands identified for conservation, among others.
Arguments in Support:
Supporters argue that this bill will help encourage construction of critical housing units in appropriate areas throughout Butte County.
Arguments in Opposition:
The City of Chico requests removal from the bill because of the loss of CEQA review, the loss of local control, and the loss of ability of the public to comment on housing development.
FISCAL COMMENTS:
According to the Assembly Appropriations Committee, no additional state costs.
VOTES:
ASM NATURAL RESOURCES: 9-1-1
YES: Friedman, Flora, Chau, Eggman, Limón, Mathis, McCarty, Melendez, Muratsuchi
NO: Mark Stone
ABS, ABST OR NV: Cristina Garcia
ASM APPROPRIATIONS: 16-0-2
YES: Gonzalez, Bigelow, Bloom, Bonta, Calderon, Carrillo, Chau, Diep, Eggman, Fong, Gabriel, Maienschein, Obernolte, Petrie-Norris, Quirk, Robert Rivas
ABS, ABST OR NV: Brough, Eduardo Garcia
UPDATED:
VERSION: April 30, 2019
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916)319-2092 FN: 0000468
Date of Hearing: May 15, 2019
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 430
Author:(Gallagher) – As Amended Ver:April 30, 2019
Policy Committee: | Natural Resources | Vote: | 9 - 1 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
Establishes a ministerial approval process for residential and mixed-use developments within or near the cities of Biggs, Chico, Gridley, and Oroville in Butte County, as well as Orland in Glenn County, so that these projects are not subject to review under the California Environmental Quality Act (CEQA).
FISCAL EFFECT:
No additional state costs.
COMMENTS:
Background and Purposes. CEQA includes various statutory exemptions, as well as categorical exemptions for housing projects in the CEQA Guidelines. For example, any residential development project, including any subdivision, or any zoning change that is consistent with an adopted specific plan is exempt from CEQA.
SB 1925, Chapter 1039, Statutes of 2002, established CEQA exemptions for certain residential projects providing affordable urban or agricultural housing, or located on an infill site within an urbanized area and meeting specified unit and acreage criteria.
Since SB 1925, additional legislation provided CEQA exemptions and streamlining for residential (including, but not limited to, affordable housing) and certain other projects in infill areas.
SB 375, Chapter 728, Statutes of 2008, provided a CEQA exemption for a narrow set of eligible residential projects in infill areas adjacent to transit. SB 226, Chapter 469, Statutes of 2011, provided abbreviated CEQA review procedures for a broader set of urban infill projects, including retail, commercial and public buildings. SB 743,Chapter 386, Statutes of 2013, established a new exemption for residential, mixed-use and "employment center" projects located within one-half mile of a major transit stop, if the project is consistent with an adopted specific plan and specified elements of an SB 375 strategy. SB 743 also required the Office of Planning and Research (OPR) to propose revisions to the CEQA Guidelines for transportation impacts to better support infill development.
In 2017, the Legislature passed three bills to streamline the CEQA process for affordable housing projects. SB 35, Chapter 366, Statutes of 2017, established a ministerial approval process (i.e., not subject to CEQA) for certain multifamily affordable housing projects proposed in local jurisdictions that have not met regional housing needs.
SB 540, Chapter 369, Statutes of 2017, authorizes a city or county to establish a workforce housing opportunity zone (WHOZ) by preparing an environmental impact report (EIR) and by adopting a specific plan. Once a WHOZ is established, and for five years thereafter, eligible housing developments within a WHOZ must be approved within 60 days without requiring the preparation of an EIR or negative declaration under CEQA.
AB 73, Chapter 371, Statutes of 2017 authorizes a city or county to create a housing sustainability district (HSD) to complete upfront zoning and environmental review in order to receive incentive payments for residential and mixed-use development projects with an affordable housing component. Once the city or county has prepared an EIR for the HSD, then housing projects within, and consistent with, a designated HSD are exempt from CEQA.
In 2018, AB 1804, Chapter 670, Statutes of 2018, codified an existing categorical exemption for infill projects, expanding the exemption to apply to multi-family residential and mixed-use housing projects on infill sites in unincorporated urbanized areas or urban clusters.
AB 430 is modeled after SB 35 of 2017. The authorizes a developer to submit an application subject to a streamlined, ministerial approval process, not subject to a conditional use permit, if the development satisfies numerous enumerated objective planning standards. AB 430 bill applies to five cities impacted by the Camp fire and sunsets on January 1, 2026.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 22, 2019
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
ABPCA Bill Id:AB 430 (
Author:Gallagher) – As Amended Ver:April 11, 2019
SUBJECT: Housing development: Camp Fire Housing Assistance Act of 2019
SUMMARY: Establishes a ministerial approval process for residential and mixed-use developments within or near the cities of Biggs, Chico, Gridley, and Oroville in Butte County, as well as Orland in Glenn County, so that these projects are not subject to review under the California Environmental Quality Act (CEQA).
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines).
- Exempts from CEQA any residential development project, including any subdivision, or any zoning change that is undertaken to implement and is consistent with a specific plan for which an EIR has been certified after January 1, 1980, unless substantial changes or new information require the preparation of a supplemental EIR for the specific plan, in which case the exemption applies once the supplemental EIR is certified.
- Exempts from CEQA specified residential housing projects which meet detailed criteria established to ensure the project does not have a significant effect on the environment. [SB 1925 (Sher), Chapter 1039, Statutes of 2002] The SB 1925 exemptions are available to:
- Affordable agricultural housing projects not more than 45 units within a city, or 20 units within an agricultural zone, on a site not more than five acres in size;
- Urban affordable housing projects not more than 100 units on a site not more than five acres in size; and,
- Urban infill housing projects not more than 100 units on a site not more than four acres in size which is within one-half mile of a major transit stop.
- Affordable agricultural housing projects not more than 45 units within a city, or 20 units within an agricultural zone, on a site not more than five acres in size;
- Requires metropolitan planning organizations (MPOs) to include a sustainable communities strategy (SCS), as defined, in their regional transportation plans, or an alternative planning strategy (APS), for the purpose of reducing GHG emissions, aligns planning for transportation and housing, and creates specified incentives for the implementation of the strategies, including CEQA exemption or abbreviated review for residential or mixed-use residential "transit priority projects" if the project is consistent with the use designation, density, building intensity, and applicable policies specified for the project area in either an approved SCS or APS. [SB 375 (Steinberg), Chapter 728, Statutes of 2008]
- Establishes abbreviated CEQA review procedures for specified infill projects, where only specific or more significant effects on the environment which were not addressed in a prior planning-level EIR need be addressed. An EIR for such a project need not consider alternative locations, densities, and building intensities or growth-inducing impacts. Infill projects may include residential, retail, commercial, transit station, school, or public office building projects located within an urban area. [SB 226 (Simitian), Chapter 469, Statutes of 2011] SB 226 requires Office of Planning and Research (OPR) to develop CEQA guidelines to implement its infill provisions, including statewide standards to promote smart growth, reduction of GHG emissions, reduction in water use, energy efficiency improvements, and protection of public health.
- Exempts from CEQA residential, mixed-use, and "employment center" projects, as defined, located within "transit priority areas," as defined, if the project is consistent with an adopted specific plan and specified elements of an SCS or APS adopted pursuant to SB 375. [SB 743 (Steinberg), Chapter 386, Statutes of 2013]
- Establishes a ministerial approval process (i.e., not subject to CEQA) for certain multifamily affordable housing projects that are proposed in local jurisdictions that have not met regional housing needs. [SB 35 (Wiener), Chapter 366, Statutes of 2017]
- Authorizes a city or county to establish a Workforce Housing Opportunity Zone (WHOZ) by preparing an EIR and by adopting a specific plan. Once a WHOZ is established, and for five years thereafter, requires approval of eligible housing developments within a WHOZ within 60 days without requiring the preparation of an EIR or negative declaration under CEQA. [SB 540 (Roth), Chapter 369, Statutes of 2017]
- Authorizes a city or county to create a "housing sustainability district" (HSD) to complete upfront zoning and environmental review in order to receive incentive payments for residential and mixed-use development projects with an affordable housing component. Requires the city or county to prepare an EIR when designating an HSD, then "housing projects" within, and consistent with, a designated HSD are exempt from CEQA. [AB 73 (Chiu), Chapter 371, Statutes of 2017]
- Exempts from CEQA multi-family residential and mixed-use housing projects on infill sites within cities and unincorporated areas that are within the boundaries of an urbanized area or urban cluster. [AB 1804 (Berman), Chapter 670, Statutes of 2018]
THIS BILL:
Authorizes a development proponent to submit an application for a development that is subject to a streamlined, ministerial approval process and is not subject to a conditional use permit if the development satisfies all of the following objective planning standards:
- The development is located within the boundaries of sphere of influence of the cities of Biggs, Chico, Gridley, and Oroville in Butte County, as well as Orland in Glenn County.
- The development is either a residential development or a mixed use development that includes residential units.
- The development is located on a site that either:
- Is zoned for residential use or residential mixed-use development.
- Is consistent with the general plan and has a general plan designation that allows residential use or a mix of residential and nonresidential uses, with at least two-thirds of the square footage of the development designated for residential use, not including any land that may be devoted to open space or mitigation requirements.
- The development, excluding any additional density or any other concessions, incentives, or waivers of development standards granted pursuant to the Density Bonus Law, is consistent with objective zoning standards, objective subdivision standards, and objective design review standards in effect at the time that the development is submitted to the local government.
- The development is not located on a site that is any of the following:
- Either prime farmland or farmland of statewide importance, as defined, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
- Wetlands.
- Within a high or very high fire hazard severity zone, unless the site is excluded from that zone by a local agency or the site has adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the development.
- A hazardous waste site, as defined, unless the Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
- Within a delineated earthquake fault zone, unless the development complies with applicable seismic protection building code standards.
- Within a special flood hazard area subject to inundation by a 100-year flood, as determined by the Federal Emergency Management Agency (FEMA), unless the site meets specified exceptions.
- Within a regulatory floodway as determined by FEMA, unless the development has received a no-rise certification.
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan.
- Habitat for species protected under the state or federal Endangered Species Acts or the Native Plant Protection Act.
- Lands under conservation easement.
- The development does not require the demolition of a historic structure that was placed on a national, state, or local historic register.
- The development shall not be upon an existing parcel of land or site that is governed under the Mobilehome Residency Law, the Recreational Vehicle Park Occupancy Law, the Mobilehome Parks Act, or the Special Occupancy Parks Act.
- Requires a city, if it determines that a development is in conflict with any of the objective planning standards specified above, to provide the development proponent written documentation of which standard or standards the development conflicts with, and an explanation for the reason or reasons the development conflicts with that standard or standards, as follows:
- Within 60 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
If the city fails to provide the required documentation, the development shall be deemed to satisfy the objective planning standards.
- Authorizes the city’s planning commission or any equivalent commission responsible for review and approval of development projects, or the city council to conduct any design review or public oversight of the development. Requires that design review or public oversight to be objective and strictly focused on assessing compliance with criteria required for streamlined projects, as well as any reasonable objective design standards published and adopted by ordinance or resolution by a local jurisdiction before submission of a development application, and broadly applicable to development within the jurisdiction. Requires that design review or public oversight to be completed as follows and prohibits it from in any way inhibiting, chilling, or precluding the ministerial approval of the project:
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 180 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
- Prohibits a city from imposing automobile parking standards for a streamlined development in any of the following instances:
- The development is located within one-half mile of public transit.
- The development is located within an architecturally and historically significant historic district.
- When on-street parking permits are required but not offered to the occupants of the development.
- When there is a car share vehicle located within one block of the development.
If the development does not fall within any of the categories described in paragraph (1), prohibits the city from imposing automobile parking requirements for streamlined developments that exceed one parking space per unit.
- Provides that city approval of a development shall not expire if the project includes public investment, excluding tax credits, in housing affordability and 50 percent of the units are affordable to households making below 80 percent of the area median income.
- Provides that city approval of a development not meeting these affordability thresholds shall automatically expire after three years, except that a project may receive a one-time, one-year extension if the project proponent provides documentation that there has been significant progress toward getting the development construction ready, such as filing a building permit application.
- Provides that city approval of a development shall remain valid for three years from the date of the final action establishing that approval and shall remain valid thereafter for a project so long as vertical construction of the development has begun and is in progress.
- Prohibits a city from adopting any requirement, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval.
- Sunsets January 1, 2026.
FISCAL EFFECT: Unknown
COMMENTS:
- CEQA exemptions for housing. CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines, for housing projects. For example, any residential development project, including any subdivision, or any zoning change that is consistent with an adopted specific plan is exempt from CEQA pursuant to a statute enacted in 1984.
In 2002, SB 1925 established CEQA exemptions for certain residential projects providing affordable urban or agricultural housing, or located on an infill site within an urbanized area, and meeting specified unit and acreage criteria.
Since SB 1925, additional legislation has provided CEQA exemptions and streamlining for residential (including, but not limited to, affordable housing) and certain other projects in infill areas. SB 375 provided a CEQA exemption for a narrow set of eligible residential projects in infill areas adjacent to transit. SB 226 provided abbreviated CEQA review procedures for a broader set of urban infill projects, including retail, commercial, and public buildings. SB 743 established a new exemption for residential, mixed-use and "employment center" projects located within one-half mile of a major transit stop, if the project is consistent with an adopted specific plan and specified elements of an SB 375 strategy. SB 743 also required OPR to propose revisions to the CEQA Guidelines for transportation impacts to better support infill development.
In 2017, the Legislature passed three bills to streamline the CEQA process for affordable housing projects. SB 35 established a ministerial approval process (i.e., not subject to CEQA) for certain multifamily affordable housing projects that are proposed in local jurisdictions that have not met regional housing needs. SB 540 authorizes a city or county to establish a WHOZ by preparing an EIR and by adopting a specific plan. Once a WHOZ is established, and for five years thereafter, eligible housing developments within a WHOZ must be approved within 60 days without requiring the preparation of an EIR or negative declaration under CEQA. AB 73 authorizes a city or county to create an HSD to complete upfront zoning and environmental review in order to receive incentive payments for residential and mixed-use development projects with an affordable housing component. Once the city or county has prepared an EIR for the HSD, then housing projects within, and consistent with, a designated HSD are exempt from CEQA. In 2018, AB 1804 codified an existing categorical exemption for infill projects, expanding the exemption to apply to multi-family residential and mixed-use housing projects on infill sites in unincorporated urbanized areas or urban clusters.
- Author’s statement:
The Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in State history. The fire displaced 50,000 people from the communities of Paradise, Concow, and Magalia and destroyed almost 20,000 buildings.
It will take years for these communities to rebuild, and in the meantime, evacuees need to be able to find stable housing. While some will choose to rebuild, others will try to find permanent housing in surrounding areas. However, the Camp Fire destroyed 14% of Butte County’s housing stock, exacerbating the housing crisis in the area and making it difficult for many of these families to find affordable housing. The rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in the county to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties.
Current law allows some housing projects to be permitted by city or county planning staff ministerially, requiring only an administrative review process to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. However, most large housing projects, such as what is needed in Butte County, would not qualify for a ministerial process under current law. Instead, these projects are vetted through both public hearings and administrative review. Most housing projects that require discretionary review and approval are subject to California Environmental Quality Act review, while projects permitted ministerially generally are not. This can significantly delay and increase the cost of these vital projects.
AB 430 will authorize housing developments in Butte County to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires that the development be located in a city that is designated as an urban area or urban cluster. Additionally, the project must be consistent with zoning standards and the city’s general plan. The bill also disqualifies projects that have major detrimental environmental impacts by excluding projects that are located in coastal zones, floodplains and floodways, prime farmland, and lands identified for conservation, among others.
- SB 35 lite. In 2017, SB 35 created a streamlined approval process for multi-family residential projects on infill sites in localities that have failed to produce sufficient housing to meet their Regional Housing Needs Assessment (RHNA) numbers. The streamlined approval process requires some level of affordable housing to be included in the housing development. To receive the streamlined process for housing developments, the developer must demonstrate that the development meets a number of requirements. Localities must provide written documentation to the developer if there is a failure to meet the specifications for streamlined approval, within specified periods of time. If the locality does not meet those deadlines, the development shall be deemed to satisfy the requirements for streamlined approval.
While this bill is modeled on SB 35, it leaves out some of the key elements of SB 35, including:
- Not limited to multi-family, includes all residential and mixed-use projects.
- Not limited to infill sites.
- No affordable housing requirements.
- Not contingent on the local government’s RHNA status.
- No protection from demolition of existing affordable or rent-controlled housing.
- No public work/prevailing wage requirements.
- Round two. This bill was heard by this committee on April 8, but no vote was taken. Subsequent to the hearing, the author amended the bill to revise its application from all of Butte County to the five cities (four in Butte, one in Glenn County), including the cities’ spheres of influence. The author also added provisions consistent with SB 35 regarding exclusion of sites that include flood-prone areas, wetlands, or habitat for protected species. In addition, the author shortened the sunset from 2030 to 2026.
- Suggested amendments. In lieu of limiting the bill to multi-family development in infill sites, as SB 35, the author and the committee may wish to consider the following amendments:
- Limit parcel size for each development to 25 acres.
- Require minimum density of at least six units per acre.
- Limit developments to within city limits or area of pending annexation and adjacent to existing development, rather than within sphere of influence (the spheres of influence for these cities includes parcels far from existing or city-planned development that is subject to county land-use authority).
- Require developments to achieve sustainability ratings above mandatory building standards, such as CalGreen voluntary tiers, GreenPoint or Leadership in Energy and Environmental Design (LEED) for Homes.
REGISTERED SUPPORT / OPPOSITION:
Support
Bay Area Builders Exchange
Build.com
California Apartment Association
California Association of Realtors
California Building Industry Association
California Chamber of Commerce
Chico Builders Association
Chico Chamber of Commerce
City of Biggs
City of Gridley
City of Orland
City of Oroville
Civil Justice Association of California
County of Butte
Downtown Chico Business Association
Enloe Medical Center
Nevada County Contractors' Association
North Valley Property Owners Association
Placer County Contractors & Building Exchange
Rural County Representatives of California
Sacramento Regional Builders Exchange
Shasta Builders Exchange
Sierra North Valley Realtors
Sustainability Management Association
Valley Builders Exchange
Valley Contractors Exchange
Opposition
Sierra Club California (unless amended)
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Date of Hearing: April 8, 2019
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
ABPCA Bill Id:AB 430 (
Author:Gallagher) – As Amended Ver:March 19, 2019
SUBJECT: Housing development: Camp Fire Housing Assistance Act of 2019
SUMMARY: Establishes a ministerial approval process for residential and mixed-use developments in Butte County so that these projects are not subject to review under the California Environmental Quality Act (CEQA).
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines).
- Exempts from CEQA any residential development project, including any subdivision, or any zoning change that is undertaken to implement and is consistent with a specific plan for which an EIR has been certified after January 1, 1980, unless substantial changes or new information require the preparation of a supplemental EIR for the specific plan, in which case the exemption applies once the supplemental EIR is certified.
- Exempts from CEQA specified residential housing projects which meet detailed criteria established to ensure the project does not have a significant effect on the environment. [SB 1925 (Sher), Chapter 1039, Statutes of 2002] The SB 1925 exemptions are available to:
- Affordable agricultural housing projects not more than 45 units within a city, or 20 units within an agricultural zone, on a site not more than five acres in size;
- Urban affordable housing projects not more than 100 units on a site not more than five acres in size; and,
- Urban infill housing projects not more than 100 units on a site not more than four acres in size which is within one-half mile of a major transit stop.
- Affordable agricultural housing projects not more than 45 units within a city, or 20 units within an agricultural zone, on a site not more than five acres in size;
- Requires metropolitan planning organizations (MPOs) to include a sustainable communities strategy (SCS), as defined, in their regional transportation plans, or an alternative planning strategy (APS), for the purpose of reducing GHG emissions, aligns planning for transportation and housing, and creates specified incentives for the implementation of the strategies, including CEQA exemption or abbreviated review for residential or mixed-use residential "transit priority projects" if the project is consistent with the use designation, density, building intensity, and applicable policies specified for the project area in either an approved SCS or APS. [SB 375 (Steinberg), Chapter 728, Statutes of 2008]
- Establishes abbreviated CEQA review procedures for specified infill projects, where only specific or more significant effects on the environment which were not addressed in a prior planning-level EIR need be addressed. An EIR for such a project need not consider alternative locations, densities, and building intensities or growth-inducing impacts. Infill projects may include residential, retail, commercial, transit station, school, or public office building projects located within an urban area. [SB 226 (Simitian), Chapter 469, Statutes of 2011] SB 226 requires Office of Planning and Research (OPR) to develop CEQA guidelines to implement its infill provisions, including statewide standards to promote smart growth, reduction of GHG emissions, reduction in water use, energy efficiency improvements, and protection of public health.
- Exempts from CEQA residential, mixed-use, and "employment center" projects, as defined, located within "transit priority areas," as defined, if the project is consistent with an adopted specific plan and specified elements of an SCS or APS adopted pursuant to SB 375. [SB 743 (Steinberg), Chapter 386, Statutes of 2013]
- Establishes a ministerial approval process (i.e., not subject to CEQA) for certain multifamily affordable housing projects that are proposed in local jurisdictions that have not met regional housing needs. [SB 35 (Wiener), Chapter 366, Statutes of 2017]
- Authorizes a city or county to establish a Workforce Housing Opportunity Zone (WHOZ) by preparing an EIR and by adopting a specific plan. Once a WHOZ is established, and for five years thereafter, requires approval of eligible housing developments within a WHOZ within 60 days without requiring the preparation of an EIR or negative declaration under CEQA. [SB 540 (Roth), Chapter 369, Statutes of 2017]
- Authorizes a city or county to create a "housing sustainability district" (HSD) to complete upfront zoning and environmental review in order to receive incentive payments for residential and mixed-use development projects with an affordable housing component. Requires the city or county to prepare an EIR when designating an HSD, then "housing projects" within, and consistent with, a designated HSD are exempt from CEQA. [AB 73 (Chiu), Chapter 371, Statutes of 2017]
- Exempts from CEQA multi-family residential and mixed-use housing projects on infill sites within cities and unincorporated areas that are within the boundaries of an urbanized area or urban cluster. [AB 1804 (Berman), Chapter 670, Statutes of 2018]
THIS BILL:
Authorizes a development proponent to submit an application for a development that is subject to a streamlined, ministerial approval process and is not subject to a conditional use permit if the development satisfies all of the following objective planning standards:
- The development is located in the County of Butte.
- The development is either a residential development or a mixed use development that includes residential units.
- The development is located on a site that satisfies all of the following:
- A site that is a legal parcel or parcels located in a city if, and only if, the city boundaries include some portion of either of the following:
- An urbanized area or urban cluster, as designated by the United States Census Bureau.
- An unincorporated area that contains a legal parcel or parcels wholly within the boundaries of an urbanized area or urban cluster, as designated by the Census Bureau.
- A site that either:
- Is zoned for residential use or residential mixed-use development.
- Has a general plan designation that allows residential use or a mix of residential and nonresidential uses, with at least two-thirds of the square footage of the development designated for residential use, not including any land that may be devoted to open space or mitigation requirements.
- A site that is a legal parcel or parcels located in a city if, and only if, the city boundaries include some portion of either of the following:
- The development, excluding any additional density or any other concessions, incentives, or waivers of development standards granted pursuant to the Density Bonus Law, is consistent with objective zoning standards, objective subdivision standards, and objective design review standards in effect at the time that the development is submitted to the local government.
- The development is not located on a site that is any of the following:
- A coastal zone.
- Either prime farmland or farmland of statewide importance, as defined, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
- Within a high or very high fire hazard severity zone, unless the site is excluded from that zone by a local agency or the site has adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the development.
- A hazardous waste site, as defined, unless the Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
- Within a delineated earthquake fault zone, unless the development complies with applicable seismic protection building code standards.
- Within a floodplain as determined by maps promulgated by the Federal Emergency Management Agency (FEMA), unless the development has been issued a floodplain development permit.
- Within a floodway as determined by FEMA, unless the development has received a no-rise certification.
- Lands identified for conservation in an adopted natural community conservation plan, habitat conservation plan, or other adopted natural resource protection plan.
- Lands under conservation easement.
- The development does not require the demolition of a historic structure that was placed on a national, state, or local historic register.
- The development shall not be upon an existing parcel of land or site that is governed under the Mobilehome Residency Law, the Recreational Vehicle Park Occupancy Law, the Mobilehome Parks Act, or the Special Occupancy Parks Act.
- Requires a local government, if it determines that a development is in conflict with any of the objective planning standards specified above, to provide the development proponent written documentation of which standard or standards the development conflicts with, and an explanation for the reason or reasons the development conflicts with that standard or standards, as follows:
- Within 60 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
If the local government fails to provide the required documentation, the development shall be deemed to satisfy the objective planning standards.
- Authorizes the local government’s planning commission or any equivalent board or commission responsible for review and approval of development projects, or the city council or board of supervisors to conduct any design review or public oversight of the development. Requires that design review or public oversight to be objective and strictly focused on assessing compliance with criteria required for streamlined projects, as well as any reasonable objective design standards published and adopted by ordinance or resolution by a local jurisdiction before submission of a development application, and broadly applicable to development within the jurisdiction. Requires that design review or public oversight to be completed as follows and prohibits it from in any way inhibiting, chilling, or precluding the ministerial approval of the project:
- Within 90 days of submittal of the development to the local government pursuant to this section if the development contains 150 or fewer housing units.
- Within 180 days of submittal of the development to the local government pursuant to this section if the development contains more than 150 housing units.
- Prohibits a local government from imposing automobile parking standards for a streamlined development in any of the following instances:
- The development is located within one mile of public transit.
- The development is located within an architecturally and historically significant historic district.
- When on-street parking permits are required but not offered to the occupants of the development.
- When there is a car share vehicle located within one block of the development.
If the development does not fall within any of the categories described in paragraph (1), prohibits the local government from imposing automobile parking requirements for streamlined developments that exceed one parking space per unit.
- Provides that local government approval of a development shall not expire if the project includes public investment, excluding tax credits, in housing affordability and 50 percent of the units are affordable to households making below 80 percent of the area median income.
- Provides that local government approval of a development not meeting these affordability thresholds shall automatically expire after three years, except that a project may receive a one-time, one-year extension if the project proponent provides documentation that there has been significant progress toward getting the development construction ready, such as filing a building permit application.
- Provides that local government approval of a development shall remain valid for three years from the date of the final action establishing that approval and shall remain valid thereafter for a project so long as vertical construction of the development has begun and is in progress.
- Prohibits a local government from adopting any requirement, including, but not limited to, increased fees or inclusionary housing requirements, that applies to a project solely or partially on the basis that the project is eligible to receive ministerial or streamlined approval.
- Sunsets January 1, 2030.
FISCAL EFFECT: Unknown
COMMENTS:
- CEQA exemptions for housing. CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines, for housing projects. For example, any residential development project, including any subdivision, or any zoning change that is consistent with an adopted specific plan is exempt from CEQA pursuant to a statute enacted in 1984.
In 2002, SB 1925 established CEQA exemptions for certain residential projects providing affordable urban or agricultural housing, or located on an infill site within an urbanized area, and meeting specified unit and acreage criteria.
Since SB 1925, additional legislation has provided CEQA exemptions and streamlining for residential (including, but not limited to, affordable housing) and certain other projects in infill areas. SB 375 provided a CEQA exemption for a narrow set of eligible residential projects in infill areas adjacent to transit. SB 226 provided abbreviated CEQA review procedures for a broader set of urban infill projects, including retail, commercial, and public buildings. SB 743 established a new exemption for residential, mixed-use and "employment center" projects located within one-half mile of a major transit stop, if the project is consistent with an adopted specific plan and specified elements of an SB 375 strategy. SB 743 also required OPR to propose revisions to the CEQA Guidelines for transportation impacts to better support infill development.
In 2017, the Legislature passed three bills to streamline the CEQA process for affordable housing projects. SB 35 established a ministerial approval process (i.e., not subject to CEQA) for certain multifamily affordable housing projects that are proposed in local jurisdictions that have not met regional housing needs. SB 540 authorizes a city or county to establish a WHOZ by preparing an EIR and by adopting a specific plan. Once a WHOZ is established, and for five years thereafter, eligible housing developments within a WHOZ must be approved within 60 days without requiring the preparation of an EIR or negative declaration under CEQA. AB 73 authorizes a city or county to create an HSD to complete upfront zoning and environmental review in order to receive incentive payments for residential and mixed-use development projects with an affordable housing component. Once the city or county has prepared an EIR for the HSD, then housing projects within, and consistent with, a designated HSD are exempt from CEQA. In 2018, AB 1804 codified an existing categorical exemption for infill projects, expanding the exemption to apply to multi-family residential and mixed-use housing projects on infill sites in unincorporated urbanized areas or urban clusters.
- Author’s statement:
The Camp Fire, which started in Butte County in November 2018, is the most destructive and deadliest fire in State history. The fire displaced 50,000 people from the communities of Paradise, Concow, and Magalia and destroyed almost 20,000 buildings.
It will take years for these communities to rebuild, and in the meantime, evacuees need to be able to find stable housing. While some will choose to rebuild, others will try to find permanent housing in surrounding areas. However, the Camp Fire destroyed 14% of Butte County’s housing stock, exacerbating the housing crisis in the area and making it difficult for many of these families to find affordable housing. The rental market vacancy rate, which was around 3% before the fire, fell to nearly zero percent after the fire. Many evacuees have had to resort to buying trailers or RVs, renting individual bedrooms, or leaving the area completely. It is essential to build more housing in the county to make up for the massive housing loss from the Camp Fire and to allow evacuees the ability to stay in the area where they have jobs, family, and community ties.
Current law allows some housing projects to be permitted by city or county planning staff ministerially, requiring only an administrative review process to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. However, most large housing projects, such as what is needed in Butte County, would not qualify for a ministerial process under current law. Instead, these projects are vetted through both public hearings and administrative review. Most housing projects that require discretionary review and approval are subject to California Environmental Quality Act review, while projects permitted ministerially generally are not. This can significantly delay and increase the cost of these vital projects.
AB 430 will authorize housing developments in Butte County to utilize a streamlined ministerial process at the local level if they meet qualifying criteria. The bill does not encourage urban sprawl, because it requires that the development be located in a city that is designated as an urban area or urban cluster. Additionally, the project must be consistent with zoning standards and the city’s general plan. The bill also disqualifies projects that have major detrimental environmental impacts by excluding projects that are located in coastal zones, floodplains and floodways, prime farmland, and lands identified for conservation, among others.
- SB 35 lite. In 2017, SB 35 created a streamlined approval process for multi-family residential projects on infill sites in localities that have failed to produce sufficient housing to meet their Regional Housing Needs Assessment (RHNA) numbers. The streamlined approval process requires some level of affordable housing to be included in the housing development. To receive the streamlined process for housing developments, the developer must demonstrate that the development meets a number of requirements. Localities must provide written documentation to the developer if there is a failure to meet the specifications for streamlined approval, within specified periods of time. If the locality does not meet those deadlines, the development shall be deemed to satisfy the requirements for streamlined approval.
While this bill is modeled on SB 35, it leaves out many of the key elements of SB 35, including:
- Not limited to multi-family, includes all residential and mixed-use projects.
- Not limited to infill sites.
- No affordable housing requirements.
- Not contingent on the local government’s RHNA status.
- No exclusion of sites that include wetlands or habitat for protected species.
- Weaker exclusion of sites in flood-prone areas.
- No protection from demolition of existing affordable or rent-controlled housing.
- No public work/prevailing wage requirements.
- Longer sunset (2030 rather than 2026).
REGISTERED SUPPORT / OPPOSITION:
Support
Bay Area Builders Exchange
California Association of Realtors
Chico Builders Association
Chico Chamber of Commerce
City of Oroville
Civil Justice Association of California
Nevada County Contractor’s Association
Placer County Contractors & Building Exchange
Rural County Representatives of California
Sacramento Regional Builders Exchange
Shasta Builders Exchange
Sierra North Valley Realtors
Sustainability Management Association
Valley Builder’s Exchange, Inc.
Valley Contractors Exchange
Opposition
Sierra Club California (unless amended)
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Bill Author
Bill Co-Author(s):