SB 1301: Tijuana River Valley: watershed action plan.
- Session Year: 2019-2020
- House: Senate
- Latest Version Date: 2020-09-30
|
Date
|
Status
|
|---|---|
| Sep 30, 2020 | Chaptered by Secretary of State. Chapter 368, Statutes of 2020. |
| Sep 30, 2020 | Approved by the Governor. |
| Sep 10, 2020 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 30, 2020 | Assembly amendments concurred in. (Ayes 39. Noes 0.) Ordered to engrossing and enrolling. |
| Aug 28, 2020 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 26, 2020 | Read third time. Passed. (Ayes 66. Noes 1. Page 5226.) Ordered to the Senate. |
| Aug 25, 2020 | Read second time. Ordered to third reading. |
| Aug 24, 2020 | Read second time and amended. Ordered to second reading. |
| Aug 20, 2020 | From committee: Do pass as amended. (Ayes 14. Noes 0.) (August 20). |
| Aug 18, 2020 | August 18 set for first hearing. Placed on suspense file. |
| Aug 11, 2020 | Read second time and amended. Re-referred to Com. on APPR. |
| Aug 10, 2020 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (August 6). |
| Jul 27, 2020 | July 29 hearing postponed by committee. |
| Jun 29, 2020 | Referred to Com. on NAT. RES. |
| Jun 26, 2020 | In Assembly. Read first time. Held at Desk. |
| Jun 26, 2020 | Read third time. Passed. (Ayes 37. Noes 0. Page 3881.) Ordered to the Assembly. |
| Jun 22, 2020 | Read second time. Ordered to third reading. |
| Jun 18, 2020 | From committee: Do pass as amended. (Ayes 6. Noes 0. Page 3771.) (June 18). |
| Jun 11, 2020 | Set for hearing June 18. |
| Jun 9, 2020 | June 9 hearing: Placed on APPR. suspense file. |
| Jun 3, 2020 | Set for hearing June 9. |
| May 27, 2020 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 6. Noes 0. Page 3596.) (May 26). Re-referred to Com. on APPR. |
| May 15, 2020 | Set for hearing May 26. |
| May 11, 2020 | Re-referred to Com. on N.R. & W. |
| Mar 26, 2020 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 5, 2020 | Referred to Com. on RLS. |
| Feb 24, 2020 | From printer. May be acted upon on or after March 25. |
| Feb 21, 2020 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 30, 2020 | Unfinished Business SB1301 Hueso Concurrence | Senate Floor |
Passed |
|
| Aug 26, 2020 | SB 1301 Hueso Senate Third Reading By Gloria | Assembly Floor |
Passed |
|
| Aug 20, 2020 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Aug 6, 2020 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Jun 26, 2020 | Senate 3rd Reading SB1301 Hueso | Senate Floor |
Passed |
|
| Jun 18, 2020 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Jun 9, 2020 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| May 26, 2020 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Natural Resources and Water |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1301 |
UNFINISHED BUSINESS
Bill No: SB 1301
Author: Hueso (D)
Amended: 8/24/20
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 6-0, 5/26/20
AYES: Stern, Allen, Caballero, Hertzberg, Jackson, Monning
NO VOTE RECORDED: Jones, Borgeas, Hueso
SENATE APPROPRIATIONS COMMITTEE: 6-0, 6/18/20
AYES: Portantino, Bates, Bradford, Hill, Leyva, Wieckowski
NO VOTE RECORDED: Jones
SENATE FLOOR: 37-0, 6/26/20
AYES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Lena Gonzalez, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Leyva, McGuire, Melendez, Mitchell, Monning, Moorlach, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Umberg, Wieckowski, Wiener, Wilk
NO VOTE RECORDED: Dahle, Jones, Morrell
ASSEMBLY FLOOR: 66-1, 8/26/20 - See last page for vote
SUBJECT: San Diego River Conservancy: Tijuana River Valley: binational watershed management plan
SOURCE: Author
DIGEST:
This bill, upon an appropriation of funds from the Legislature, directs the California Environmental Protection Agency (CalEPA) and the California Natural Resources Agency (CNRA), including their subsidiary agencies, to collaborate to create a Tijuana River Valley Watershed Action Plan (TRV Plan), as specified, and then to consult with the US and Mexican governments and specified state and local governments, to develop a common watershed action plan to address issues in the Tijuana River and its watershed.
Assembly Amendments:
- Direct CalEPA and CNRA, including their subsidiary agencies, to collaborate to create a TRV Plan.
- Require the TRV Plan to be drawn from existing and ongoing watershed planning efforts in both the US and Mexico and to be reviewed and updated on a three-year cycle.
- Clarify and expand components of the TRV Plan, including by requiring the TRV Plan, to the extent feasible, to:
- Identify potential projects that may be implemented in both the US and Mexico and tie the identification of short and long-term goals and targets to those potential projects.
- Include methods and strategies, including target dates or milestones, interagency or public/private partnerships, and binational collaboration, to ensure implementation of the plan in Mexico and the US, to the extent feasible.
- Direct CalEPA and CNRA, upon completing the TRV Plan, to consult with the US and Mexican governments, San Diego City and County, Imperial Beach, the State of Baja California, Tijuana, and Tecate to develop a common watershed action plan to address issues in the Tijuana River and its entire watershed, on both sides of the border, including, but not limited to, issues relating to water quality, wildlife and fishery habitat, stormwater management, riverside development and management, wastewater discharge, and water supply.
- Eliminate the requirement to seek relevant information and advice by conducting appropriate public outreach and by establishing and consulting an advisory body composed of federal, state, and local agencies and nongovernmental organizations.
- Eliminate the provision that would allow the plan to be used to satisfy a requirement for the Tijuana River Watershed Advisory Panel, convened by the San Diego River Conservancy, to prepare a strategic plan for the Tijuana River watershed.
ANALYSIS: Existing federal law establishes the Clean Water Act (CWA) to regulate discharges of pollutants into the waters of the United States and regulate quality standards for surface waters. CWA prohibits the discharge of any pollutant from a point source into navigable waters without a permit.
Existing state law:
- Establishes CNRA to oversee various natural resources-related departments, boards, and conservancies. CNRA seeks to restore, protect and manage the state's natural, historical and cultural resources.
- Establishes the San Diego River Conservancy (Conservancy), under CNRA, to acquire and manage public lands within the San Diego River area, and provide recreational opportunities, open space, wildlife habitat and species restoration and protection, among others, in the San Diego River and its watershed, tributaries, and historic flumes, as specified.
- Directs the Conservancy to establish the San Diego Rivers Watershed Consortium Program to create advisory panels to work cooperatively with local public agencies and other entities to identify potential project funding, including grant funding, to restore the consortium watershed area and to improve public access to public lands. Under this program, the Tijuana River Watershed Advisory Panel must prepare a strategic plan for the Tijuana River watershed, as specified.
- Establishes CalEPA to oversee various environmental quality-related departments. CalEPA seeks to restore, protect and enhance the environment, to ensure public health, environmental quality and economic vitality.
- Establishes the State Water Resources Control Board (SWRCB), under CalEPA, and regional water quality control boards to preserve, enhance, and restore the quality of California's water resources and drinking water for the protection of the environment, public health, and all beneficial uses, and to ensure proper water resource allocation and efficient use, for the benefit of present and future generations.
This bill:
- Directs, upon an appropriation from the Legislature, CalEPA and CNRA, including their subsidiary agencies, to collaborate to create a Tijuana River Valley Watershed Action Plan, known as the Tijuana River Plan, and review and update that plan on a three-year cycle.
- Requires the Tijuana River Plan to draw from existing and ongoing watershed planning efforts in both the US and Mexico. Further, the plan must include, to the extent practicable, all of the following:
- Identification of key stakeholders and partnerships for data collection and information sharing.
- Identification of issues of concern and potential projects that may be implemented in the Tijuana River Valley watershed in both the US and Mexico.
- Identification of short-term and long-term goals and targets for projects that may be implemented through the plan.
- Methods and strategies to restore water quality or water supply in degraded areas and to protect overall watershed health.
- Methods and strategies to protect the public health and limit beach closures.
- Methods and strategies, including target dates or milestones, interagency or public/private partnerships, and binational collaboration, to ensure implementation of the plan in Mexico and the US, to the extent feasible.
- Directs CalEPA and CNRA, upon completing the Tijuana River Plan, to consult with the governments for the US, Mexico, the State of Baja California, the County of San Diego, and the Cities of San Diego, Imperial Beach, Tijuana, and Tecate to develop a common watershed action plan to address issues in the Tijuana River and its entire watershed, on both sides of the border, including, but not limited to, issues relating to water quality, wildlife and fishery habitat, stormwater management, riverside development and management, wastewater discharge, and water supply.
- Provides that the section added by the bill does not require the expenditure of state funding or the development of any specific project without an appropriation from the Legislature.
Comments
Is this bill necessary? Existing federal and state efforts are already in process to seek to address the cross-border pollution issue. Most notably:
- Federal action. The US Environmental Protection Action (USEPA) submitted an expenditure plan on May 12, 2020, to Congress to dedicate a $300 million appropriation from the United States-Mexico-Canada Agreement Implementation Act (HR 5430) to address the problem of toxic sewage flowing across the border into San Diego County. The USEPA would use the funding to engineer, plan, design and construct wastewater infrastructure at the border. The San Diego Congressional delegation also announced on May 12, 2020, that it had secured an additional $25 million for the USEPA's border water infrastructure program, and authorization for the North American Development Bank to fund additional projects related to water pollution and wastewater treatment.
- State Action. The Legislature appropriated $15 million from Proposition 68 to the State Coastal Conservancy for the Tijuana River Border Pollution Control Project in the 2019 Budget Act. Also, The San Diego River Conservancy, as directed by SB 1367 (Atkins, 2018), established the Tijuana River Watershed Advisory Panel to prepare a strategic plan for the Tijuana River watershed. The intention of the plan is to help guide future investment and project decisions. The strategic plan is still in the very early stages of development although sources indicated it could be completed within 18 months.
It is unclear what additional value the proposed planning efforts, which would constrain severely limited resources, would add. The Senate may wish to consider deferring any additional legislative action until stakeholders complete existing processes and identify potential next steps for state action.
Related/Prior Legislation
SB 690 (Hueso, Chapter 381, Statutes of 2019) related to funding prioritization for purposes of addressing transboundary flows and pollution in the Tijuana River Valley (TRV).
SR 57 (Hueso, Adopted, 2019) made findings regarding the public health and environmental impacts of the discharge of raw sewage and other waste through the TRV and requested that Governor Newsom explore all available state resources, where feasible, to address the sewage crisis affecting the TRV, the Tijuana River Estuary, and surrounding residents.
AB 74 (Ting, Chapter 23, Statutes of 2019) appropriated $15 million from Proposition 68 to SCC for the Tijuana River Border Pollution Control Project.
SB 1367 (Atkins, Chapter 738, Statutes of 2018) directed the Conservancy to establish the Tijuana River Watershed Advisory Panel and prepare a strategic plan with specified information relating to the Tijuana River watershed.
SB 507 (Hueso, Chapter 542, Statutes of 2017) appropriated $500,000 to San Diego County to update the 2012 TRV Recovery Team’s “Recovery Strategy: Living with the Water.”
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
Unknown.
SUPPORT: (Verified 8/26/20)
San Diego County Water Authority
OPPOSITION: (Verified 8/26/20)
None received
ARGUMENTS IN SUPPORT: According to the author:
For more than 30 years, our state’s southernmost coastline has been ravaged by discharge of trash, sediment and wastewater. Since 1993, the City of San Diego has declared an ongoing state of emergency due to the serious public health risks that arise from untreated and partially treated human and industrial waste flowing through our waters. For decades, the communities of Imperial Beach, San Ysidro and Chula Vista have seen firsthand how damaging these flows can be. In 2016, I authored SB 507, which authorized San Diego County to conduct a needs and assessment report on the Tijuana River Valley. The findings of this report have encouraged greater stakeholder discussion from those involved and have just been recently released. Last year, the state made a historic investment in the Tijuana River Valley by allocating $15 million to fund projects to improve the Tijuana River Valley. In December of last year, as Congress was negotiating the recent USMCA, San Diego Congressional representatives were able to secure $300 million in funding for a Border Water Infrastructure Project to address transboundary flows in the Tijuana River Valley. Inaction at the federal level and from the Mexican government have long exacerbated this issue. We are at a point in time where action must be taken now to ensure that transboundary flows do not continue to plague the Tijuana River Valley and our southernmost beaches for another 30 years. In this year, transboundary flows have averaged 50-60 million gallons per day in dry weather alone. That is why California needs to develop a watershed action plan, that is updated every three years, and pulls from existing and ongoing planning efforts to provide recommendations on short-term and long-term methods, strategies, and projects that not only reduce the transboundary flows in the Tijuana River Valley but that improve binational cooperation to tackle this issue from both sides of the border. This threat on the people’s public health and our environment sees no borders, or does not slow down based on who is in office, and that is why we must create framework to work with the Government of Mexico and the US federal government to improve the overall health of the Tijuana River Watershed for decades to come.
ASSEMBLY FLOOR: 66-1, 8/26/20
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bloom, Boerner Horvath, Bonta, Burke, Calderon, Carrillo, Cervantes, Chau, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Daly, Flora, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager, Kiley, Lackey, Levine, Limón, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Waldron, Weber, Wood, Rendon
NOES: Brough
NO VOTE RECORDED: Bigelow, Chen, Megan Dahle, Diep, Eggman, Fong, Frazier, Gray, Low, Patterson, Voepel, Wicks
Prepared by: Catherine Baxter / N.R. & W. / (916) 651-4116
8/29/20 18:12:12
**** END ****
SENATE THIRD READING
STR Bill Id:SB 1301
Author:(Hueso)
As Amended Ver:August 24, 2020
Majority vote
SUMMARY:
Requires the California Environmental Protection Agency (CalEPA) and the Natural Resources Agency (NRA) to create a Tijuana River Valley Watershed Action Plan (Plan).
Major Provisions
- Requires CalEPA and the NRA, including their subsidiary agencies, to collaborate to create the Plan, upon appropriation. The Plan shall be drawn from existing and ongoing watershed planning efforts in both the United States and Mexico.
- Specifies that the Plan be reviewed and updated on a three-year cycle.
- Requires the Plan to include:
- Identification of key stakeholders and partnerships for data collection and information sharing;
- Identification of issues of concern and potential projects that may be implemented in the Tijuana River Valley wastershed in both the United States and Mexico;
- Identification of short-term and long-term goals and targets for projects that may be implemented through the Plan;
- Methods and strategies to restore water quality or water supply in degraded areas and to protect overall watershed health;
- Methods and strategies to protect the public health and limit beach closures; and,
- Methods and strategies, including target dates or milestones, interagency or public/private partnerships, and binational collaboration, to ensure implementation of the plan in Mexico and the United States, to the extent feasible.
- Upon completion of the Plan, requires CalEPA and the NRA to consult with the governments of the United States, the County of San Diego, the City of San Diego, the City of Imperial Beach, Mexico, the State of Baja California, the City of Tijuana, and the City of Tecate to develop a common watershed action plan to address issued in the Tijuana River and its entire watershed on both sides of the border, including issues relating to water quality, wildlife and fishery habitat, stormwater management, riverside development and management, wastewater discharge, and water supply.
- Specifies that the bill does not require the expenditure of state funding or the development o any specific project without appropriation from the Legislature.
COMMENTS:
Tijuana River Watershed crosses the border between the US and Mexico, flowing through highly urbanized areas in Mexico before entering the Tijuana Estuary to the Pacific Ocean, passing through San Diego. The Tijuana Estuary is the largest functioning wetland in southern California, providing habitat for at least six endangered species and many threatened species of wildlife and vegetation. It is an exceptionally rich and invaluable natural resource, designated as a "Wetlands of International Importance" by the United Nations.
The TRV includes the lower six miles of the Tijuana River and the Tijuana Estuary (collectively known as the TRV) and are listed as impaired water bodies pursuant to the Clean Water Act due to excessive levels of bacteria, heavy metals, trash, and sediment, among other pollutants entering the river in Mexico, which flow across the border into the TRV. In addition to their direct impacts, sediment and trash convey numerous other pollutants to the river and estuary due to the strong tendency of many pollutants to bind to sediment particles and trash. For this reason, reducing sediment and trash flows has the additional benefit of reducing the introduction of additional pollutants into the TRV.
Numerous federal and state efforts are already in process to address the cross-border pollution issue.
According to the Author:
For more than 30 years, our state's southernmost coastline has been ravaged by discharge of trash, sediment and wastewater. Since 1993, the City of San Diego has declared an ongoing state of emergency due to the serious public health risks that arise from untreated and partially treated human and industrial waste flowing through our waters. For decades, the communities of Imperial Beach, San Ysidro, and Chula Vista have seen firsthand how damaging these flows can be. In 2017, I authored SB 507 [(Hueso),] Chapter 542, Statutes of 2017, which authorized San Diego County to conduct a needs and assessment report on the Tijuana River Valley. The findings of this report have encouraged greater stakeholder discussion from those involved and have just been recently released. Last year, the state made a historic investment in the Tijuana River Valley by allocating $15 million to fund projects to improve the Tijuana River Valley. This became one of the largest investments the state had made into the Tijuana River Valley. In December of last year, as Congress was negotiating the recent [United States-Mexico-Canada Agreement] (USMCA), San Diego Congressional representatives were able to secure $300 million in funding for a Border Water Infrastructure Project to address transboundary flows in the Tijuana River Valley. Inaction at the federal level and from the Mexican government have long exacerbated this issue. We are at a point in time where action must be taken now to ensure that transboundary flows do not continue to plague the Tijuana River Valley and our southernmost beaches for another 30 years. In this year, transboundary flows have averaged 50-60 million gallons per day in dry weather alone. California must still continue to demonstrate attentiveness to issues that have been plaguing our state for decades.
Arguments in Support:
According to the San Diego County Water Authority, SB 1301 would encourage California to engage stakeholders through a binational water management plan in order to ensure that adequate steps are being taken by all parties to protect public health and natural resources including San Diego waterways. For this reason, we strongly support SB 1301.
Arguments in Opposition:
None on file
FISCAL COMMENTS:
Unknown
VOTES:
SENATE FLOOR: 37-0-3
YES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Lena Gonzalez, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Leyva, McGuire, Melendez, Mitchell, Monning, Moorlach, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Umberg, Wieckowski, Wiener, Wilk
ABS, ABST OR NV: Dahle, Jones, Morrell
ASM NATURAL RESOURCES: 10-0-1
YES: Friedman, Flora, Chau, Eggman, Cristina Garcia, Luz Rivas, Mathis, McCarty, Muratsuchi, Mark Stone
ABS, ABST OR NV: Cunningham
ASM APPROPRIATIONS: 14-0-4
YES: Gonzalez, Bauer-Kahan, Bloom, Bonta, Calderon, Carrillo, Chau, Diep, Eggman, Gabriel, Eduardo Garcia, Petrie-Norris, Quirk, Robert Rivas
ABS, ABST OR NV: Bigelow, Megan Dahle, Fong, Voepel
UPDATED:
VERSION: August 24, 2020
CONSULTANT: Elizabeth MacMillan / NAT. RES. / (916) 319-2092 FN: 0003330
Date of Hearing: August 18, 2020
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
SBPCA Bill Id:SB 1301
Author:(Hueso) – As Amended Ver:August 11, 2020
Policy Committee: | Natural Resources | Vote: | 10 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill requires CalEPA, upon an appropriation by the Legislature, to work with the State Water Resources Control Board (State Water Board), the State Coastal Conservancy (SCC), and the San Diego River Conservancy (Conservancy) to create a binational watershed development plan (Plan) for the Tijuana River Valley (TRV) which should be developed in coordination with the appropriate Mexican entities to encapsulate the whole watershed. Specifically, this bill:
- Requires the Plan to include:
- Identification of key stakeholders and partnerships for data collection.
- Identification of issues of concern for the TRV in both the United States and Mexican portions.
- Short-term and long-term goals and targets for the Plan.
- Methods and strategies to seek to restore water quality in degraded areas and to protect overall watershed health.
- Methods and strategies to protect public health and limit beach closures and to ensure implementation of the plan on the Mexican side, to the extent feasible.
- Requires CalEPA to seek relevant input and advice through consultation and outreach with various federal, state and local agencies, nongovernmental organizations including, but not limited to the San Diego Regional Water Quality Control Board, the California-Mexico Border Relations Council and the Tijuana River Watershed Advisory Panel.
- Allows the Plan to be used by the Tijuana River Watershed Advisory Panel to satisfy or further the requirement to prepare a strategic plan.
FISCAL EFFECT:
- One-time CalEPA costs of between $150,000 and $250,000 to develop the Plan (GF or special fund).
- Unknown, one-time costs, likely in the range of $100,000 (GF or special fund) for the State Water Board, SCC and Conservancy to work with CalEPA to develop the plan.
- Unknown costs pressures, likely in the tens of millions of dollars, to implement the Plan once it is completed.
This bill is contingent upon an appropriation by the Legislature.
COMMENTS:
- Purpose. According to the author:
In 2016, I authored SB 507, which authorized San Diego County to conduct a needs and assessment report on the Tijuana River Valley. The findings of this report have encouraged greater stakeholder discussion from those involved and have just been recently released. Last year, the state made a historic investment in the Tijuana River Valley by allocating $15 million to fund projects to improve the Tijuana River Valley. This became one of the largest investments the state had made into the Tijuana River Valley. In December of last year, as Congress was negotiating the recent USMCA, San Diego Congressional representatives were able to secure $300 million in funding for a Border Water Infrastructure Project to address transboundary flows in the Tijuana River Valley. Inaction at the federal level and from the Mexican government have long exacerbated this issue. We are at a point in time where action must be taken now to ensure that transboundary flows do not continue to plague the Tijuana River Valley and our southernmost beaches for another 30 years
- Background. The Tijuana River Watershed crosses the border between the US and Mexico, flowing through highly urbanized areas in Mexico before entering the Tijuana Estuary on its way to the Pacific Ocean, passing through San Diego. The Tijuana Estuary is the largest functioning wetland in southern California, providing habitat for at least six endangered species and many threatened species of wildlife and vegetation. It is an exceptionally rich and invaluable natural resource, designated as a “Wetlands of International Importance” by the United Nations.
The TRV includes the lower six miles of the Tijuana River and the Tijuana Estuary (collectively known as the TRV) both of which are listed as impaired water bodies pursuant to the Clean Water Act due to excessive levels of bacteria, heavy metals, trash, and sediment, among other pollutants entering the river in Mexico, which flow across the border into the TRV.
Numerous federal and state efforts are already in process to address the cross-border pollution issue. It is unclear what additional value the proposed binational planning effort, which would further strain limited resources, would add.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: August 6, 2020
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
SBPCA Bill Id:SB 1301
Author:(Hueso) – As Amended Ver:June 18, 2020
SENATE VOTE: 37-0
SUBJECT: San Diego River Conservancy: Tijuana River Valley: binational watershed management plan
SUMMARY: Requires the San Diego River Conservancy (Conservancy) to develop a binational watershed management plan (Plan) for the Tijuana River Valley (TRV), as specified.
EXISTING LAW:
- Established the Conservancy in 2002 in the Natural Resources Agency and authorized the Conservancy to acquire and accept donations of land or interests in land that are located within one-half mile of the San Diego River and its tributaries, historic flumes, and otherwise within the San Diego River Watershed.
- Authorizes the Conservancy to acquire land or interests in land and to hold real property or an interest in real property that is acquired through gift, exchange, donation, or dedication. Authorizes the Conservancy to improve and develop land for the purposes of protecting the natural environment.
- Prohibits the Conservancy from levying taxes, regulating land use, and exercising the power of eminent domain.
- Authorizes the Conservancy to award grants to any local public agency, state agency, and nonprofit organization consistent with the purposes specified by law.
- Requires the Conservancy to prepare and submit to the Governor and the Legislature a biennial report that includes all of the following:
- A description of, and the amount of money expended for, every project funded or undertaken by the Conservancy, directly or by an entity under its direction, during the two years prior to the date of the report;
- A description of the progress made in accomplishing the purposes of the Conservancy during the two years prior to the date of the report; and,
- Recommendations regarding legislative actions that may be needed to provide funding or other resources to enable the Conservancy to more effectively and efficiently carry out its mission, goals, and objectives.
- Requires the Conservancy to establish the Tijunana River Watershed Advisory Panel (Panel) comprised of the following members:
- A Conservancy board member, or the member’s designee;
- A representative of the City of Imperial Beach, appointed by its city council;
- A representative of the City of San Diego, appointed by its city council;
- A representative of the County of San Diego, appointed by the Board of Supervisors of San Diego County;
- A representative of the San Diego Regional Water Quality Control Board, appointed by that board;
- A representative of the Department of Parks and Recreation, appointed by the Director of Parks and Recreation;
- A representative of the Kumeyaay Diegueño Land Conservancy, appointed by that conservancy;
- A representative of a university or college in the San Diego area, appointed by the president of the university or college; and,
- A representative of the San Diego Unified Port District, appointed by the governing board of the port district.
- Requires the Panel to prepare a strategic plan containing:
- A system for prioritizing each desgnated river watershed that shall give priority to watershed-wide projects that create and expand opportunities to protect, enhance, and restore the natural, historical, cultural, educational, and recreational resources of the watershed;
- A summary of the policies and priorities for the river watershed;
- A description of the watershed identifying underused, existing public open spaces, trailes, and other facilities, and recommendations for ways to provide better public use and enjoyment of the designated areas; and,
- A plan for implementing the program in conformace with all related general and specific plans and zoning regulations of the local and regional municipalities within the watershed.
THIS BILL:
- Upon appropriation of funds, requires the Conservancy to work with the State Water Resources Control Board (SWRCB), the State Coastal Conservancy (SCC), and the Califonria Environmental Protection Agency (CalEPA) to create the Plan for the TRV. Specfies that the Plan should be developed in coordination with the appropriate Mexican entities to encapsulate the whole watershed.
- Requires the Plan to include:
- Identification of key stakeholders and partnerships for data collection;
- Identification of issues of concern for the TRV in both the United States and Mexican portions;
- Short-term and long-term goals and targets for the plan;
- Methods and strategies to seek to restore water quality in degraded areas and to protect overall watershed health; and,
- Methods and strategies to protect public health and limit beach closures.
- While preparing the Plan, requires the Conservancy to seek relevant information and advice by conducting appropriate public outeach and by establishing and consulting an advisory body that includes the appropriate and relevant state agencies, local governments, nongovernmental organizations, and the federal government.
- Specifies that the Plan may be used by the Tijuana River Watershed Advisory Panel to satisfy or further the requirement to prepare a strategic plan.
FISCAL EFFECT: According to the Senate Appropriations Committee:
- Cost pressure of roughly $140,000 (special fund or bond fund) annually for the Conservancy to implement this bill.
- SWRCB, the SCC, and CalEPA estimate costs would be minor and absorbable.
- Unknown cost pressure, likely in the tens of millions of dollars, to implement the Plan once completed.
COMMENTS:
- Author’s statement:
For more than 30 years, our state’s southernmost coastline has been ravaged by discharge of trash, sediment and wastewater. Since 1993, the City of San Diego has declared an ongoing state of emergency due to the serious public health risks that arise from untreated and partially treated human and industrial waste flowing through our waters. For decades, the communities of Imperial Beach, San Ysidro and Chula Vista have seen firsthand how damaging these flows can be. In 2016, I authored SB 507, which authorized San Diego County to conduct a needs and assessment report on the Tijuana River Valley. The findings of this report have encouraged greater stakeholder discussion from those involved and have just been recently released. Last year, the state made a historic investment in the Tijuana River Valley by allocating $15 million to fund projects to improve the Tijuana River Valley. This became one of the largest investments the state had made into the Tijuana River Valley. In December of last year, as Congress was negotiating the recent USMCA, San Diego Congressional representatives were able to secure $300 million in funding for a Border Water Infrastructure Project to address transboundary flows in the Tijuana River Valley. Inaction at the federal level and from the Mexican government have long exacerbated this issue. We are at a point in time where action must be taken now to ensure that transboundary flows do not continue to plague the Tijuana River Valley and our southernmost beaches for another 30 years. In this year, transboundary flows have averaged 50-60 million gallons per day in dry weather alone. California must still continue to demonstrate attentiveness to issues that have been plaguing our state for decades.
- The Tijuana River Valley and water quality. The Tijuana River Watershed crosses the border between the US and Mexico, flowing through highly urbanized areas in Mexico before entering the Tijuana Estuary to the Pacific Ocean, passing through San Diego. The Tijuana Estuary is the largest functioning wetland in southern California, providing habitat for at least six endangered species and many threatened species of wildlife and vegetation. It is an exceptionally rich and invaluable natural resource, designated as a “Wetlands of International Importance” by the United Nations.
The TRV includes the lower six miles of the Tijuana River and the Tijuana Estuary (collectively known as the TRV) and are listed as impaired water bodies pursuant to the Clean Water Act due to excessive levels of bacteria, heavy metals, trash, and sediment, among other pollutants entering the river in Mexico, which flow across the border into the TRV.
- The International Boundary and Water Commission (IBWC). Pursuant to a 1944 Treaty between the US and Mexico, the purpose of the IBWC is to work to address and resolve water quality issues at border and trans-border rivers and streams. The IBWC consists of a US section (US-IBWC) and a Mexico section. Each section has exclusive jurisdiction and control on its respective side of the border over works constructed, acquired, or used in the fulfillment of obligations under the treaty.
- IBWC Minute 283 and the NPDES Permit. The US-IBWC and the Mexico section can amend the 1944 Treaty by issuing Minutes, which both countries must approve. IBWC Minute 283, approved by both governments on July 2, 1990, laid the foundation to construct and operate the South Bay International Wastewater Treatment Plant (South Bay Plant), a secondary treatment sewage plant owned by the US-IBWC. Minute 283 also initiated specified actions to address the discharge of uncontrolled sewage. On June 26, 2014, the San Diego Water Board adopted updated waste discharge requirements and an NPDES permit for the US-IBWC’s discharges of secondary treated wastewater from the South Bay Plant to the Pacific Ocean.
- Sedimentation and trash. In addition to their direct impacts, sediment and trash convey numerous other pollutants to the river and estuary due to the strong tendency of many pollutants to bind to sediment particles and trash. For this reason, reducing sediment and trash flows has the additional benefit of reducing the introduction of additional pollutants into the TRV.
- Total maximum daily loads. The San Diego Water Board is required to develop total maximum daily loads (TMDLs), or an alternative approach with comparable results, for impaired waters like the TRV. A TMDL is a calculation of the maximum amount of a pollutant that a water body can receive and still meet water quality objectives. The San Diego Water Board must also identify an implementation strategy to attain the TMDL, water quality objectives, and to restore beneficial uses. In 2007, the San Diego Water Board initiated the development of a sedimentation and trash TMDL for the TRV, and the United States Environmental Protection Agency funded a preliminary investigation of the problems associated with meeting the TMDL.
The San Diego Water Board convened its first sediment and trash workshop with stakeholders in June 2009, which led to the creation of the TRV Recovery Team (Recovery Team), a consensus-based collaboration of over thirty federal, state, and local government agencies, environmental and science communities, and other interested organizations and stakeholders from both sides of the border. Common amongst all members was the desire to address sediment and trash flows.
- Recovery strategy. In 2012, the TRV Recovery Team published its “Recovery Strategy: Living with the Water.” The strategy summarizes the first phase of actions to cleanup the TRV and restore beneficial uses. The strategy also outlines the necessary steps to help stakeholders, policy makers, and potential funders better understand the problems and solutions for the TRV. The strategy acknowledges that resolution will require partnerships between the US and Mexico to provide watershed-based solutions. It also recognizes that source control and pollution prevention activities are often the best and most economically feasible long-term solutions to sediment, trash, and other water quality problems.
- Ongoing litigation. The US-IBWC has repeatedly failed to stop transboundary flows and protect local communities from massive discharges of pollutants. On May 14, 2018, the California Attorney General and the San Diego Water Board submitted a 60-Day Notice of Intent to Sue the US-IBWC for violations of the CWA and the US-IBWC’s NPDES permit. Since 2015, these violations have allowed more than 12 million gallons of untreated wastewater to flow from Mexico into California. The litigation is still active, and the plaintiffs are negotiating with the US Department of Justice and the US-IBWC.
- Duplicative or complementary? Numerous federal and state efforts are already in process to address the cross-border pollution issue. It is unclear what additional value the proposed binational planning effort, which would further strain severely limited resources, would add.
SB 1367 (Atkins, Chapter 738, Statutes of 2018) directed the Conservancy to establish the Tijuana River Watershed Advisory Panel to prepare a strategic plan for the Tijuana River Watershed. The plan is intended to help guide future investment and project decisions. The Advisory Panel met for the first time in October of last year for a non-substantive convening session. Its planned April 2020 meeting was cancelled due to COVID-19. The strategic plan is still in the very early stages of development; it is expected to be completed within 18 months. It is unclear how this bill’s binational watershed management plan would relate to this planning effort.
There have been previous efforts to establish binational watershed management plans for the Tijuana River Watershed and updated in 2013 (Tijuana River Watershed Binational Vision). The Binational Vision convened key stakeholders and the public in the US and Mexico to develop and update the plan. Additionally, recent efforts on the US side of the border include a needs assessment released by San Diego County in March 2020 for the TRV that identifies 27 potential projects and includes feasibility and cost-benefit analyses. SB 1301 does not appear to incorporate or build upon these planning efforts and may duplicate or conflict with them.
In addition to the Binational Watershed Vision, the US and Mexico have undertaken other watershed planning efforts. Mexico struggles with implementation of these plans due to a near total lack of land use planning, project funding, and operations and maintenance funding for agencies or organizations to sustain investments. It is unclear how this bill’s proposed binational planning effort could address this issue.
- Too complex for the Conservancy? The complexity of watershed planning is magnified in the Tijuana River Watershed by international boundaries and disparate cultures. It requires intensive, continuous effort and it is not clear that the Conservancy has the staffing or expertise necessary to develop a plan in a binational watershed.
- Funding. Item 3760-101-6088 in the 2019 Budget Act [AB 74 (Ting), Chapter 23, Statutes of 2019] appropriated $15 million from Proposition 68 to the State Coastal Conservancy for the Tijuana River Border Pollution Control Project. The State Coastal Conservancy may use up to $1.5 million for program delivery and $750,000 for planning and monitoring.
On May 12, 2020, the US Environmental Protection Action (USEPA) submitted an expenditure plan to Congress to appropriate $300 million from the United States-Mexico-Canada Agreement Implementation Act to address the problem of sewage flowing across the border into San Diego County. The USEPA plans to use the funding to engineer, plan, design and construct wastewater infrastructure at the border. The San Diego Congressional delegation also announced on May 12, 2020, that it had secured an additional $25 million for the USEPA's border water infrastructure program and authorization for the North American Development Bank to fund additional projects related to water pollution and wastewater treatment.
The author argues state action is necessary because the USEPA has been slow to allocate $300 million for a new treatment facility on the US side. However, Congress only approved the funding in the last year and the expenditure plan was only submitted by USEPA in May.
- Previous legislation:
- SB 690 (Hueso), Chapter 381, Statutes of 2019 encourages the SCC, when granting specified funds for the purposes of addressing transboundary flows and pollution in the TRV, to prioritize, to the extent feasible, those projects identified in statutorily required studies on the TRV.
- SR 57 (Hueso, 2019) makes findings regarding the public health and environmental impacts of the discharge of raw sewage and other waste through the TRV and requested that Governor Newsom explore all available state resources, where feasible, to address the sewage crisis affecting the TRV, the Tijuana River Estuary, and surrounding residents.
- AB 74 (Ting), Chapter 23, Statutes of 2019 appropriated $15 million from Proposition 68 to the SCC for the Tijuana River Border Pollution Control Project.
- SB 1367 (Atkins), Chapter 738, Statutes of 2018 directs the San Diego River Conservancy to establish the Tijuana River Watershed Advisory Panel and prepare a strategic plan with specified information relating to the Tijuana River Watershed.
- SB 507 (Hueso), Chapter 542, Statutes of 2017 appropriated $500,000 to the County of San Diego to update the 2012 TRV Recovery Team’s “Recovery Strategy: Living with the Water” to include issues related to wastewater and runoff and a study focused on the improvement and protection of natural lands, including the main river channel, in the TRV.
- SCR 90 (Hueso), Resolution Chapter 80, Statutes of 2014 declared the Legislature’s intent to work with the TRV Recovery Team to take various actions to protect and preserve the TRV, to encourage collaboration with the team to protect and enhance our natural resources through improved management of sediment and trash, flood control, and ecosystem management.
- Suggested amendments: Concerns have been raised regarding the appropriate entity to prepare the plan required by this bill and about potential conflict with other, ongoing planning efforts. In order to address those concerns and ensure that this bill is focused on improving water quality by improving development planning on both sides of the border, the committee may wish to amend the bill to direct CalEPA to prepare a binational watershed development plan; direct CalEPA to consult with the San Diego Regional Water Board, the Border Relations Council, and the Tijuana River Watershed Advisory Panel when preparing the plan; include methods and strategies to ensure implementation of the plan on the Mexican side of the border, to the extent feasible, in the plan; and, make related technical and clarifying changes.
REGISTERED SUPPORT / OPPOSITION:
Support
San Diego County Water Authority
Opposition
None on file
Analysis Prepared by: Elizabeth MacMillan / NAT. RES. /
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1301 |
THIRD READING
Bill No: SB 1301
Author: Hueso (D)
Amended: 6/18/20
Vote: 21
SENATE NATURAL RES. & WATER COMMITTEE: 6-0, 5/26/20
AYES: Stern, Allen, Caballero, Hertzberg, Jackson, Monning
NO VOTE RECORDED: Jones, Borgeas, Hueso
SENATE APPROPRIATIONS COMMITTEE: 6-0, 6/18/20
AYES: Portantino, Bates, Bradford, Hill, Leyva, Wieckowski
NO VOTE RECORDED: Jones
SUBJECT: San Diego River Conservancy: Tijuana River Valley: binational watershed management plan
SOURCE: Author
DIGEST:
This bill, upon an appropriation of funding from the Legislature, directs the San Diego River Conservancy (Conservancy) to work with the State Water Resources Control Board (SWRCB), State Coastal Conservancy (SCC), and the California Environmental Protection Agency (CalEPA) to create, as prescribed, a binational watershed management plan for the Tijuana River Valley (TRV).
ANALYSIS: Existing federal law establishes the Clean Water Act (CWA) to regulate discharges of pollutants into the waters of the United States and regulate quality standards for surface waters. CWA prohibits the discharge of any pollutant from a point source into navigable waters without a permit.
Existing state law:
- Establishes the SWRCB and regional water quality control boards to preserve, enhance, and restore the quality of California's water resources and drinking water for the protection of the environment, public health, and all beneficial uses, and to ensure proper water resource allocation and efficient use, for the benefit of present and future generations.
- Establishes the Conservancy, under the California Natural Resources Agency (CNRA), to acquire and manage public lands within the San Diego River area, and provide recreational opportunities, open space, wildlife habitat and species restoration and protection, among others, in the San Diego River and its watershed, tributaries, and historic flumes, as specified.
- Directs the Conservancy to establish the San Diego Rivers Watershed Consortium Program to create advisory panels to work cooperatively with local public agencies and other entities to identify potential project funding, including grant funding, to restore the consortium watershed area and to improve public access to public lands. Under this program, the Tijuana River Watershed Advisory Panel must prepare a strategic plan for the Tijuana River watershed, as specified.
This bill:
- Requires the Conservancy, upon an appropriation of funding from the Legislature, to work with SWRCB, SCC, and CalEPA to create, as prescribed, a binational watershed management plan for the TRV.
- Requires the Conservancy to seek relevant information and advice by conducting appropriate public outreach and establishing and consulting an advisory body, as specified.
- Authorizes the Tijuana River Watershed Advisory Panel to use the plan to satisfy or further an existing requirement that the panel prepare a strategic plan for the Tijuana River watershed.
Comments
Is this bill necessary? Existing federal and state efforts are already in process to seek to address the cross-border pollution issue. It is unclear what additional value the proposed binational planning effort, which would constrain severely limited resources, would add. The Senate may wish to consider deferring any additional legislative action until stakeholders complete existing planning processes and identify potential next steps. Further detail provided below:
- Linkage between proposed plan and an existing planning effort is unclear. SB 1367 (Atkins, Chapter 738, Statutes of 2018) directed the Conservancy to establish the Tijuana River Watershed Advisory Panel to prepare a strategic plan for the Tijuana River watershed. The intention of the plan is to help guide future investment and project decisions. To date, the Advisory Panel met once in October 2019 for a non-substantive convening session and a planned April 2020 meeting was cancelled due to COVID-19. The strategic plan is still in the very early stages of development although sources indicated it could be completed within 18 months. It is unclear how the SB 1301 binational watershed management plan would connect to this planning effort.
- Linkage between proposed plan and previous plans is unclear and potentially duplicative. The bill does not acknowledge two previous iterations of binational watershed management planning for the Tijuana River watershed funded by Proposition 13 and updated in 2013 (Tijuana River Watershed Binational Vision). The Binational Vision convened key stakeholders and the public in Mexico and the U.S. to develop and update the plan. It also does not recognize other planning efforts on the U.S. side, including, most recently, a needs assessment released by San Diego County in March 2020 for the TRV that identifies 27 potential projects and includes feasibility and cost-benefit analyses. SB 1301 does not appear to incorporate or build from these planning efforts and may duplicate them.
- Mexico has struggled to implement previous binational plans. In addition to the aforementioned Binational Watershed Vision, the U.S. and Mexico have undertaken other watershed planning efforts. Mexico struggles with implementation of these plans due to a near total lack of land use planning, project funding, and operations and maintenance funding for agencies or organizations to sustain investments. It is questionable whether the proposed binational planning effort could address this issue.
- Conservancy lacks capacity to conduct binational planning effort. The complexity of watershed planning is magnified in the Tijuana River watershed by international boundaries and disparate cultures. It requires intensive, continuous effort and it is not clear that the Conservancy has the staffing or expertise to develop a plan in a binational watershed.
- Federal government has approved $300 million for treatment plant. The author argues state action is necessary because the U.S. Environmental Protection Agency (USEPA) has been slow to allocate $300 million for a new treatment facility on the U.S. side. That is debatable as Congress only approved the funding in the last year and on May 12, 2020, the USEPA submitted an expenditure plan to Congress that would dedicate the entire $300 million to address the issue. The San Diego Congressional delegation also announced on May 12, 2020, that it had secured an additional $25 million for the USEPA's border water infrastructure program, and authorization for the North American Development Bank to fund additional projects related to water pollution and wastewater treatment.
Where is the funding? Recent amendments ensure the Conservancy would not be required to implement the bill until the Legislature had appropriated the necessary funding. Under current budget conditions, however, it may be difficult to find a suitable funding source.
Related/Prior Legislation
SB 690 (Hueso, Chapter 381, Statutes of 2019) related to funding prioritization for purposes of addressing transboundary flows and pollution in the TRV.
SR 57 (Hueso, Adopted, 2019) made findings regarding the public health and environmental impacts of the discharge of raw sewage and other waste through the TRV and requested that Governor Newsom explore all available state resources, where feasible, to address the sewage crisis affecting the TRV, the Tijuana River Estuary, and surrounding residents.
AB 74 (Ting, Chapter 23, Statutes of 2019) appropriated $15 million from Proposition 68 to SCC for the Tijuana River Border Pollution Control Project.
SB 1367 (Atkins, Chapter 738, Statutes of 2018) directed the Conservancy to establish the Tijuana River Watershed Advisory Panel and prepare a strategic plan with specified information relating to the Tijuana River watershed.
SB 507 (Hueso, Chapter 542, Statutes of 2017) appropriated $500,000 to San Diego County to update the 2012 TRV Recovery Team’s “Recovery Strategy: Living with the Water.”
SCR 90 (Hueso, Resolution Chapter 80, Statutes of 2014) declared the Legislature’s intent to work with the TRV Recovery Team to take various actions to protect and preserve the TRV, to encourage collaboration with the team to protect and enhance our natural resources through improved management of sediment and trash, flood control, and ecosystem management.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee:
- Cost pressure of roughly $140,000 (special fund or bond fund) annually for the San Diego River Conservancy to implement this bill.
- The State Coastal Conservancy, the State Water Resources Control Board, and the California Environmental Protection Agency estimate costs would be minor and absorbable.
- Unknown cost pressure, likely in the tens of millions of dollars, to implement the watershed management plan once completed.
SUPPORT: (Verified 6/18/20)
None received
OPPOSITION: (Verified 6/18/20)
None received
ARGUMENTS IN SUPPORT: According to the author:
“For more than 30 years, our state’s southernmost coastline has been ravaged by discharge of trash, sediment and wastewater. Since 1993, the City of San Diego has declared an ongoing state of emergency due to the serious public health risks that arise from untreated and partially treated human and industrial waste flowing through our waters. The International Boundary and Water Commission’s irresponsible behavior in its failure to build the necessary infrastructure to fix this problem and its complete disregard of the state’s investigative order to monitor these waters is unacceptable – and it’s putting public health at risk… The USEPA has the authority to invest $300 million into the Tijuana River Valley, assisting in the construction of [a] diverter and putting an end to this 30 year disaster, but they have yet to allocate those funds. Further inaction from the federal government could result in another 30 years of pollution, and the people of Imperial Beach and San Ysidro deserve better. With Mexico and the federal government’s failure to protect the public, it is now in the best interest of the people of California that we engage stakeholders through a binational water management plan in order to
ensure that adequate steps are being taken by all parties to protect public health and our natural resources.”
Prepared by: Catherine Baxter / N.R. & W. / (916) 651-4116
6/23/20 17:14:02
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2019 - 2020 Regular Session
SB 1301 (Hueso) - San Diego River Conservancy: Tijuana River Valley: binational watershed management plan
Version: March 26, 2020 | Policy Vote: N.R. & W. 6 - 0 |
Urgency: No | Mandate: No |
Hearing Date: June 18, 2020 | Consultant: Ashley Ames |
Bill Summary:
This bill would require the San Diego River Conservancy (Conservancy) to work with the State Water Resources Control Board, State Coastal Conservancy, and the California Environmental Protection Agency to create, as prescribed, a binational watershed management plan for the Tijuana River Valley.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on June 18, 2020
Fiscal Impact:
- Cost pressure of roughly $140,000 (special fund or bond fund) annually for the San Diego River Conservancy to implement this bill.
- The State Coastal Conservancy, the State Water Resources Control Board, and the California Environmental Protection Agency estimate costs would be minor and absorbable.
- Unknown cost pressure, likely in the tens of millions of dollars, to implement the watershed management plan once completed.
Author Amendments:
The author’s amendments would make this bill contingent upon an appropriation by the legislature.
-- END --
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2019 - 2020 Regular Session
SB 1301 (Hueso) - San Diego River Conservancy: Tijuana River Valley: binational watershed management plan
Version: March 26, 2020 | Policy Vote: N.R. & W. 6 - 0 |
Urgency: No | Mandate: No |
Hearing Date: June 9, 2020 | Consultant: Ashley Ames |
Bill Summary:
This bill would require the San Diego River Conservancy (Conservancy) to work with the State Water Resources Control Board, State Coastal Conservancy, and the California Environmental Protection Agency to create, as prescribed, a binational watershed management plan for the Tijuana River Valley.
Fiscal Impact:
- The San Diego River Conservancy estimates it would need to add one full-time position at a cost of about $137,000 (special fund or bond fund) annually to implement this bill.
- The State Coastal Conservancy, the State Water Resources Control Board, and the California Environmental Protection Agency estimate costs would be minor and absorbable.
- Unknown cost pressure, likely in the tens of millions of dollars, to implement the watershed management plan once completed.
Background:
Existing federal and state efforts are already in process to seek to address the cross-border pollution issue.
SB 1367 (Atkins, 2018) directed the Conservancy to establish the Tijuana River Watershed Advisory Panel to prepare a strategic plan for the Tijuana River watershed. The intention of the plan is to help guide future investment and project decisions. To date, the Advisory Panel met once in October 2019 for a non-substantive convening session and a planned April 2020 meeting was cancelled due to COVID-19. The strategic plan is still in the very early stages of development although sources indicated it could be completed within 18 months.
There have also been two previous iterations of binational watershed management planning for the Tijuana River watershed funded by Proposition 13 and updated in 2013 (Tijuana River Watershed Binational Vision). The Binational Vision convened key stakeholders and the public in Mexico and the U.S. to develop and update the plan. It also does not recognize other planning efforts on the U.S. side, including, most recently, a needs assessment released by San Diego County in March 2020 for the Tijuana River Valley (funded by SB 507 (Hueso, 2017) that identifies 27 potential projects and includes feasibility and cost-benefit analyses.
Proposed Law:
This bill would require the Conservancy to work with the SWRCB, State Coastal Conservancy, and the California Environmental Protection Agency to create, as prescribed, a binational watershed management plan for the Tijuana River Valley. The bill would require the Conservancy to seek relevant information and advice by conducting appropriate public outreach and establishing and consulting an advisory body, as specified. The bill would also authorize the Tijuana River Watershed Advisory Panel to use the plan to satisfy or further an existing requirement that the panel prepare a strategic plan for the Tijuana River watershed.
Related Legislation:
SB 690 (Hueso, 2019) relates to funding prioritization for purposes of addressing transboundary flows and pollution in the TRV.
SR 57 (Hueso, 2019) makes findings regarding the public health and environmental impacts of the discharge of raw sewage and other waste through the TRV and requested that Governor Newsom explore all available state resources, where feasible, to address the sewage crisis affecting the TRV, the Tijuana River Estuary, and surrounding residents.
AB 74 (Ting, 2019) appropriated $15 million from Proposition 68 to the State Coastal Conservancy for the Tijuana River Border Pollution Control Project.
SB 1367 (Atkins, 2018) directs the San Diego River Conservancy to establish the Tijuana River Watershed Advisory Panel and prepare a strategic plan with specified information relating to the Tijuana River watershed.
SB 507 (Hueso, 2017) appropriated $500,000 to the County of San Diego to update the 2012 TRV Recovery Team’s “Recovery Strategy: Living with the Water” to include issues related to wastewater and runoff and a study focused on the improvement and protection of natural lands, including the main river channel, in the TRV.
SCR 90 (Hueso, 2014) declared the Legislature’s intent to work with the TRV Recovery Team to take various actions to protect and preserve the TRV, to encourage collaboration with the team to protect and enhance our natural resources through improved management of sediment and trash, flood control, and ecosystem management.
Staff Comments:
The author has not identified a funding source for this bill and likely will struggle to do so under current budget conditions. The Conservancy notes that if permanent additional funding is not provided, the bill would impose a requirement that may be difficult if not impossible to implement considering the Conservancy’s existing budget or post COVID-19 budget. Completion of this plan would likely result in cost pressure to implement plan components and build recommended infrastructure in the TRV.
-- END --
SENATE COMMITTEE ON NATURAL RESOURCES AND WATER
Senator Henry Stern, Chair
2019 - 2020 Regular
Bill No: SB Hearing Date: May 26, 2020
Author: | Hueso | ||
Version: | March 26, 2020 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Catherine Baxter | ||
Subject: San Diego River Conservancy: Tijuana River Valley: binational watershed management plan
Due to the COVID-19 Pandemic and the unprecedented nature of the 2020 Legislative Session, all Senate Policy Committees are working under a compressed timeline. This timeline does not allow this bill to be referred and heard by more than one committee as a typical timeline would allow. In order to fully vet the contents of this measure for the benefit of Senators and the public, this analysis includes information from the Senate Environmental Quality Committee.
BACKGROUND AND EXISTING LAW
Under existing federal law
- The Clean Water Act (CWA) establishes the structure to regulate discharges of pollutants into the waters of the United States and regulates quality standards for surface waters. It is unlawful to discharge any pollutant from a point source into navigable waters without a permit. The National Pollutant Discharge Elimination System (NPDES) permit program regulates point source discharges of pollutants into U.S. waters. An NPDES permit sets specific discharge limits for point sources discharging pollutants into U.S. waters and establishes monitoring and reporting requirements, and special conditions. States may implement and enforce the NPDES permit program if the state's provisions are as stringent as federal requirements. In California, the State Water Resources Control Board (SWRCB) is the delegate agency responsible for the NPDES permit program.
Under existing state law
- The Porter-Cologne Water Quality Control Act establishes the SWRCB and regional water quality control boards, including the San Diego Regional Water Quality Control Board (San Diego Water Board) to preserve, enhance, and restore the quality of California's water resources and drinking water for the protection of the environment, public health, and all beneficial uses, and to ensure proper water resource allocation and efficient use, for the benefit of present and future generations.
- The San Diego River Conservancy (Conservancy), established under the Natural Resources Agency, acquires and manages public lands within the San Diego River area, and provides recreational opportunities, open space, wildlife habitat and species restoration and protection, wetland protection and restoration, protection of historical and cultural resources, and protection, maintenance, and improvements of the quality of the waters in the San Diego River and its watershed, its tributaries, and historic flumes emanating from the river for all beneficial uses, lands for educational uses within the area, and natural floodwater conveyance. Public Resources Code (PRC) §32630 et seq.
- The Conservancy must establish the San Diego Rivers Watershed Consortium Program to create advisory panels to work cooperatively with local public agencies and other entities to identify potential project funding, including grant funding, to restore the consortium watershed area and to improve public access to public lands. Under this program, the Tijuana River Watershed Advisory Panel must prepare a strategic plan for the Tijuana River watershed that provides:
- A system to prioritize each designated river watershed, prioritizing watershed-wide projects that create and expand opportunities to protect, enhance, and restore the natural, historical, cultural, educational, and recreational resources of the watershed.
- A summary of the policies and priorities for each river watershed.
- A description of each watershed that identifies underused, existing public open spaces, trails, and other facilities, and recommends ways to provide better public use and enjoyment in the designated areas.
- A plan to implement the program in conformance with all related general and specific plans and zoning regulations of the local and regional municipalities within each watershed. PRC §32659 et seq.
Background
- Pollution problems in the Tijuana River Valley (TRV). The Tijuana River watershed straddles the international border between the U.S. and Mexico, flowing through highly urbanized areas in Mexico before entering into the Tijuana Estuary and the Pacific Ocean through San Diego in the U.S. The Tijuana Estuary is the largest functioning wetland in southern California, providing habitat for at least six endangered species and many threatened species of wildlife and vegetation. It is an exceptionally rich and invaluable natural resource, designated as a “Wetlands of International Importance” by the United Nations.
The lower six miles of the Tijuana River and the Tijuana Estuary (collectively referred to as the Tijuana River Valley) are listed as impaired water bodies (referred to as “303(d) listed water bodies) pursuant to the CWA due to excessive levels of bacteria, heavy metals, trash, and sediment, among other pollutants flowing into the river in Mexico and then across the border into the TRV in the U.S.
- The International Boundary and Water Commission (IBWC). Pursuant to a 1944 Treaty between the U.S. and Mexico, the purpose of the IBWC is to work to address and resolve water quality issues at border and trans-border rivers and streams. The IBWC consists of a U.S. section (US-IBWC) and a Mexico section. Each section has exclusive jurisdiction and control on its respective side of the border over works constructed, acquired, or used in the fulfillment of obligations under the treaty.
- IBWC Minute 283 and the NPDES Permit. The US-IBWC and the Mexico section can amend the 1944 Treaty by issuing Minutes, which both countries must approve. IBWC Minute 283, approved by both governments on July 2, 1990, laid the foundation to construct and operate the South Bay International Wastewater Treatment Plant (South Bay Plant), a secondary treatment sewage plan owned by the US-IBWC. Minute 283 also initiated concrete actions to address the uncontrolled sewage. Later, On June 26, 2014, the San Diego Water Board adopted updated waste discharge requirements and an NPDES permit for the US-IBWC’s discharges of secondary treated wastewater from the South Bay Plant to the Pacific Ocean.
- Sedimentation and trash. In addition to their direct impacts, sediment and trash convey numerous other pollutants to the river and estuary due to the strong tendency of many pollutants to bind to sediment particles and trash. For this reason, reducing sediment and trash flows will also reduce the introduction of numerous other pollutants to the TRV.
The San Diego Water Board is required to develop total maximum daily loads (TMDLs), or an alternative approach with comparable results, for impaired waters like the TRV. A TMDL is a calculation of the maximum amount of a pollutant that a water body can receive and still meet water quality objectives. The San Diego Water Board must also identify an implementation strategy to attain the TMDL, water quality objectives, and to restore beneficial uses. In 2007, the San Diego Water Board initiated the development of a sedimentation and trash TMDL for the TRV, and the United States Environmental Protection Agency funded a preliminary investigation of the problem.
- Tijuana River Valley Recovery Team. The San Diego Water Board convened its first sediment and trash workshop with stakeholders in June 2009, which led to the creation of the TRV Recovery Team (Recovery Team or TRVRT), a consensus-based collaboration of over thirty federal, state, and local government agencies, environmental and science communities, and other interested organizations and stakeholders from both sides of the border. Common amongst all members was the desire to address sediment and trash flows.
- Recovery strategy. In 2012, the TRV Recovery Team published its “Recovery Strategy: Living with the Water.” The strategy summarizes the first phase of actions to cleanup the TRV and restore beneficial uses. The strategy also outlines the necessary steps to help stakeholders, policy makers, and potential funders better understand the problems and solutions for the TRV. The strategy acknowledges that resolution will require partnerships between the U.S. and Mexico to provide watershed-based solutions. It also recognizes that source control and pollution prevention activities are often the best and most economically feasible long-term solutions to sediment, trash, and other water quality problems.
- State sues the US-IBWC. The US-IBWC has repeatedly failed to stop transboundary flows and protect local communities from massive pollutant discharge. On May 14, 2018, the California Attorney General and the San Diego Water Board submitted a 60-Day Notice of Intent to Sue the US-IBWC for violations of the CWA and the US-IBWC’s NPDES permit. Since 2015, these violations have allowed more than 12 million gallons of untreated wastewater to flow from Mexico into California. The litigation is still active, and the plaintiffs are negotiating with the US Department of Justice and the IBWC.
- 2019 Budget. Item 3760-101-6088 in the 2019 Budget Act (AB 74, 2019) appropriated $15 million from Proposition 68 to the State Coastal Conservancy for the Tijuana River Border Pollution Control Project. The State Coastal Conservancy may use up to $1.5 million for program delivery and $750,000 for planning and monitoring.
- $300 million for second treatment plant. On May 12, 2020, the U.S. Environmental Protection Action (USEPA) submitted an expenditure plan to Congress to dedicate a $300 million appropriation from the United States-Mexico-Canada Agreement Implementation Act to address the problem of toxic sewage flowing across the border into San Diego County. The USEPA would use the funding to engineer, plan, design and construct wastewater infrastructure at the border. The San Diego Congressional delegation also announced on May 12, 2020, that it had secured an additional $25 million for the USEPA's border water infrastructure program, and authorization for the North American Development Bank to fund additional projects related to water pollution and wastewater treatment.
PROPOSED LAW
This bill would require the Conservancy to work with the SWRCB, State Coastal Conservancy, and the California Environmental Protection Agency (CalEPA) to create, as prescribed, a binational watershed management plan for the Tijuana River Valley. The bill would require the Conservancy to seek relevant information and advice by conducting appropriate public outreach and establishing and consulting an advisory body, as specified. The bill would also authorize the Tijuana River Watershed Advisory Panel to use the plan to satisfy or further an existing requirement that the panel prepare a strategic plan for the Tijuana River watershed.
ARGUMENTS IN SUPPORT
According to the author, “For more than 30 years, our state’s southernmost coastline has been ravaged by discharge of trash, sediment and wastewater. Since 1993, the City of San Diego has declared an ongoing state of emergency due to the serious public health risks that arise from untreated and partially treated human and industrial waste flowing through our waters. The International Boundary and Water Commission’s irresponsible behavior in its failure to build the necessary infrastructure to fix this problem and its complete disregard of the state’s investigative order to monitor these waters is unacceptable – and it’s putting public health at risk… The US EPA has the authority to invest $300 million into the Tijuana River Valley, assisting in the construction of [a] diverter and putting an end to this 30 year disaster, but they have yet to allocate those funds. Further inaction from the federal government could result in another 30 years of pollution, and the people of Imperial Beach and San Ysidro deserve better. With Mexico and the federal government’s failure to protect the public, it is now in the best interest of the people of California that we engage stakeholders through a binational water management plan in order to ensure that adequate steps are being taken by all parties to protect public health and our natural resources.”
ARGUMENTS IN OPPOSITION
None received.
COMMENTS
Is this bill necessary? Existing federal and state efforts are already in process to seek to address the cross-border pollution issue. It is unclear what additional value the proposed binational planning effort, which would constrain severely limited resources, would add. The committee may wish to consider deferring any additional legislative action until stakeholders complete existing planning processes and identify potential next steps. Further detail provided below:
- Linkage between proposed plan and an existing planning effort is unclear. SB 1367 (Atkins, 2018) directed the Conservancy to establish the Tijuana River Watershed Advisory Panel to prepare a strategic plan for the Tijuana River watershed. The intention of the plan is to help guide future investment and project decisions. To date, the Advisory Panel met once in October 2019 for a non-substantive convening session and a planned April 2020 meeting was cancelled due to COVID-19. The strategic plan is still in the very early stages of development although sources indicated it could be completed within 18 months. It is unclear how the SB 1301 binational watershed management plan would connect to this planning effort.
- Linkage between proposed plan and previous plans is unclear and potentially duplicative. The bill does not acknowledge two previous iterations of binational watershed management planning for the Tijuana River watershed funded by Proposition 13 and updated in 2013 (Tijuana River Watershed Binational Vision). The Binational Vision convened key stakeholders and the public in Mexico and the U.S. to develop and update the plan. It also does not recognize other planning efforts on the U.S. side, including, most recently, a needs assessment released by San Diego County in March 2020 for the Tijuana River Valley (funded by SB 507 (Hueso, 2017) that identifies 27 potential projects and includes feasibility and cost-benefit analyses. SB 1301 does not appear to incorporate or build from these planning efforts and may duplicate them.
- Mexico has struggled to implement previous binational plans. In addition to the aforementioned Binational Watershed Vision, the U.S. and Mexico have undertaken other watershed planning efforts. Mexico struggles with implementation of these plans due to a near total lack of land use planning, project funding, and operations and maintenance funding for agencies or organizations to sustain investments. It is questionable whether the proposed binational planning effort could address this issue.
- Conservancy lacks capacity and funding to conduct binational planning effort. The complexity of watershed planning is magnified in the Tijuana River watershed by international boundaries and disparate cultures. It requires intensive, continuous effort and it is not clear that the Conservancy has the staffing or expertise to develop a plan in a binational watershed. Also, the author has not identified funding for this bill and likely will struggle to under current budget conditions.
- Federal government has approved $300 million for treatment plant. The author argues state action is necessary because the USEPA has been slow to allocate $300 million for a new treatment facility on the U.S. side. That is debatable as Congress only approved the funding in the last year and on May 12, 2020, the USEPA submitted an expenditure plan to Congress that would dedicate the entire $300 million to address the issue. The San Diego Congressional delegation also announced on May 12, 2020, that it had secured an additional $25 million for the USEPA's border water infrastructure program, and authorization for the North American Development Bank to fund additional projects related to water pollution and wastewater treatment.
Recent legislation
SB 690 (Hueso, 2019) relates to funding prioritization for purposes of addressing transboundary flows and pollution in the TRV.
SR 57 (Hueso, 2019) makes findings regarding the public health and environmental impacts of the discharge of raw sewage and other waste through the TRV and requested that Governor Newsom explore all available state resources, where feasible, to address the sewage crisis affecting the TRV, the Tijuana River Estuary, and surrounding residents.
AB 74 (Ting, 2019) appropriated $15 million from Proposition 68 to the State Coastal Conservancy for the Tijuana River Border Pollution Control Project.
SB 1367 (Atkins, 2018) directs the San Diego River Conservancy to establish the Tijuana River Watershed Advisory Panel and prepare a strategic plan with specified information relating to the Tijuana River watershed.
SB 507 (Hueso, 2017) appropriated $500,000 to the County of San Diego to update the 2012 TRV Recovery Team’s “Recovery Strategy: Living with the Water” to include issues related to wastewater and runoff and a study focused on the improvement and protection of natural lands, including the main river channel, in the TRV.
SCR 90 (Hueso, 2014) declared the Legislature’s intent to work with the TRV Recovery Team to take various actions to protect and preserve the TRV, to encourage collaboration with the team to protect and enhance our natural resources through improved management of sediment and trash, flood control, and ecosystem management.
SUGGESTED AMENDMENTS
None.
SUPPORT
None received
OPPOSITION
None received
-- END --
Bill Author
Bill Co-Author(s):