SB 167: Electrical corporations: wildfire mitigation plans.
- Session Year: 2019-2020
- House: Senate
- Latest Version Date: 2019-10-02
|
Date
|
Status
|
|---|---|
| Oct 2, 2019 | Chaptered by Secretary of State. Chapter 403, Statutes of 2019. |
| Oct 2, 2019 | Approved by the Governor. |
| Sep 17, 2019 | Enrolled and presented to the Governor at 2 p.m. |
| Sep 6, 2019 | Assembly amendments concurred in. (Ayes 39. Noes 0.) Ordered to engrossing and enrolling. |
| Sep 6, 2019 | Ordered to special consent calendar. |
| Sep 5, 2019 | In Senate. Concurrence in Assembly amendments pending. |
| Sep 5, 2019 | Read third time. Passed. Ordered to the Senate. |
| Aug 30, 2019 | Read third time and amended. |
| Aug 26, 2019 | From consent calendar on motion of Assembly Member Calderon. |
| Aug 22, 2019 | Read second time. Ordered to consent calendar. |
| Aug 21, 2019 | From committee: Do pass. Ordered to consent calendar. (Ayes 17. Noes 0.) (August 21). |
| Aug 14, 2019 | August 14 hearing postponed by committee. |
| Aug 12, 2019 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on APPR. |
| Jul 11, 2019 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 15. Noes 0.) (July 10). Re-referred to Com. on APPR. |
| May 9, 2019 | Referred to Com. on U. & E. |
| Apr 25, 2019 | In Assembly. Read first time. Held at Desk. |
| Apr 25, 2019 | Read third time. Passed. (Ayes 37. Noes 0.) Ordered to the Assembly. |
| Apr 23, 2019 | Read second time. Ordered to third reading. |
| Apr 22, 2019 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Apr 11, 2019 | Set for hearing April 22. |
| Apr 8, 2019 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 4, 2019 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 0.) (March 27). |
| Mar 15, 2019 | Set for hearing March 27. |
| Feb 6, 2019 | Referred to Com. on E., U. & C. |
| Jan 29, 2019 | From printer. May be acted upon on or after February 28. |
| Jan 28, 2019 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 6, 2019 | Unfinished Business SB167 Dodd et al. Concurrence | Senate Floor |
Passed |
|
| Sep 5, 2019 | SB 167 Dodd Senate Third Reading By Quirk | Assembly Floor |
Passed |
|
| Aug 21, 2019 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 10, 2019 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| Apr 25, 2019 | Senate 3rd Reading SB167 Dodd et al. | Senate Floor |
Passed |
|
| Mar 27, 2019 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 167 |
UNFINISHED BUSINESS
Bill No: SB 167
Amended: 8/30/19
SENATE ENERGY, U. & C. COMMITTEE: 13-0, 3/27/19
AYES: Hueso, Moorlach, Bradford, Chang, Dodd, Hertzberg, Hill, McGuire, Rubio, Skinner, Stern, Stone, Wiener
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 37-0, 4/25/19
AYES: Allen, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
NO VOTE RECORDED: Archuleta
ASSEMBLY FLOOR: 79-0, 9/5/19 - See last page for vote
SUBJECT: Electrical corporations: wildfire mitigation plans
DIGEST:
This bill requires electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their electric distribution system within their wildfire mitigation plans.
Assembly Amendments
stipulate that an electrical corporation is not prevented from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority. Additionally, this bill incorporates chaptering amendments with SB 70 (Nielsen) and SB 560 (McGuire).
Existing law:
- Provides that the California Public Utilities Commission (CPUC) has regulatory authority over public utilities, including electric corporations. (California Constitution, Article XII)
- Requires the CPUC to develop formal procedures to incorporate safety in a rate case application by an electrical corporation or gas corporations. (Public Utilities Code §750)
- Requires each electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the CPUC for review and approval. Requires those wildfire mitigation plans to include specified information, including protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure. (Public Utilities Code §8386)
- Establishes the California Alternate Rates for Energy (CARE) program for assistance to low-income electric and gas customers with annual household incomes that are no greater than 200 percent of the federal poverty guideline levels to ensure low-income ratepayers are not jeopardized or overburdened by monthly energy expenditures. (Public Utilities Code §§382 and 739.1)
- Requires the CPUC to establish a standard limited allowance in addition to the baseline quantity and higher energy allocation of gas and electricity for residential customers dependent on life-support equipment and patients being treated for a life-threatening illness or who have a compromised immune system, if a medical professional, as specified, certifies in writing to the utility that the additional heating or cooling allowance is medically necessary to sustain life or prevent deterioration of the person’s medical condition. (Public Utilities Code §739 (2)(c))
This bill:
- Requires electrical corporations to include additional information as part of the protocols for deenergizing portions of their distribution system within their wildfire mitigation plans filed at the CPUC.
- Requires each electrical corporation, as part of those protocols, to additionally include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on customers who are receiving medical baseline
allowances. - Authorizes electrical corporations to deploy backup electrical resources or provide financial assistance for backup electrical resources to those customers receiving medical baseline allowances and who meet specified requirements related to demonstrating financial need.
Background
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. According to the California Department of Forestry and Fire Protection (Cal FIRE), power lines were the second-leading cause of wildfires in 2013. In recent years, California has experienced a number of catastrophic wildfires, including several that ignited by electrical utility infrastructure, including the 2007 Witch Fire in San Diego County, the 2015 Butte Fire, several of the 2017 fires that ravaged the state.
Deenergizing electric lines and deactivating reclosers. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of power. However, the risk of fire caused by electric utility infrastructure can pose a greater risk than to shutoff the power to certain circuits. Utilities have the ability to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of power to households, businesses, traffic signals, communication systems, critical facilities, water treatment facilities, emergency services and others. Therefore, efforts to deenergize electric lines is, generally, done in a manner that balances the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas that are served by the line(s). Utilities use automatic reclosers, which are similar to circuit breakers. These devices are set to shoot pulses of electricity through electric lines that may have tripped off. The automatic reclosers would automatically restart power if conditions on the line seemed normal. However, the use of automatic reclosers can also pose a fire threat if the lines are in contact with branches or brush, since the pulses of electricity can ignite a fire. By deactivating the reclosers, a utility can reduce the risk of fire.
Use of power shutoffs, known as Public Safety Power Shutoff. In 2007, San Diego Gas & Electric (SDG&E)’s electric infrastructure ignited three destructive fires. In response to that experience, SDG&E requested approval from the CPUC for a number of mitigation efforts, including roughly a billion dollars of ratepayer funds to invest in a state-of-the-art weather center and monitoring network, as well as, the authority to deenergize power lines during high wildfire risk days. After the 2017 fires ravaged several parts of the state, in July 2018, the CPUC expanded the requirements on the power shutoffs it has for SDG&E, including requirements related to specified notifications and reasonableness review, to the state’s other investor-owned electric utilities (IOUs), including Southern California Edison (SCE) and Pacific Gas & Electric (PG&E). Known as the Public Safety Power Shutoff program, after a power shutoff event, per the CPUC requirements, the utility must inspect the lines of the circuits that were shutoff before it can restore power. As such, the power shutoff event may last several days, leaving the affected customers without power during the full duration of the event. In the fall of 2018, both SCE and PG&E exercised their authority for power shutoffs, under the new CPUC requirements, to various communities in their service territory during high wildfire risk days. In Northern California, community response to the extended power shutoffs (they lasted multiple days) were generally not receptive to the new policy as stores, businesses, schools and others had to close during the event.
Power shutoffs effects on vulnerable populations. On December 13, 2018, the CPUC opened a new rulemaking (R.18-12-005) to examine utilities' de-energization processes and practices, the impacts on communities and vulnerable populations, efforts to reduce the need for de-energization, and mitigate measures to reduce the impacts when implemented. The rulemaking will also review and improve existing reporting requirements. Further, the CPUC has directed the utilities to contact customers with medical conditions when there are power outages, regardless of the cause.
Medical baseline allowance. The medical baseline allowance provides residential customers who have qualifying medical conditions with additional energy allowance at the lowest tiered rate. Per the statute, IOUs are required to provide additional baseline allowance of gas or electric service for customers facing specified medical conditions, including life-threatening conditions or who are on life-support. Additionally, the medical baseline allowance provides these households with advance notice of power outages since members of the households may be dependent on energy to survive. All three of the large IOUs currently administer medical baseline, and, as such, have existing processes for identifying these customers, including requiring physicians and other medical personnel to certify as to the medical condition. Customers on medical baseline are also provided the opportunity to amortize their bill payments, for a period up to 12 months, in order to avoid disconnection of service. Per SB 598 (Hueso, Chapter 362, Statutes of 2017), utilities are prohibited from disconnecting service to customers with life-threatening conditions, on life support or hospice care, and who cannot pay and are willing to enter into a payment schedule. SB 1338 (Hueso, Chapter 518, Statutes of 2018) required the CPUC to develop rules requiring each of the four largest energy utilities to demonstrate that they are working with the medical community to increase outreach to persons eligible for the medical baseline allowance.
CARE. Existing law requires the CPUC to establish the CARE program, which provides assistance to low-income electric and gas customers with annual household incomes less than 200 percent of federal poverty guideline levels. The cost of this program is spread across multiple classes of customers. AB 327 (Perea, Chapter 611, Statutes of 2013) restructured the rate design for residential electric customers, including directing the CPUC to establish rates for the CARE program customers of the large IOUs. The set rates must effectively give a discount between 30 percent and 35 percent to eligible customers of electrical corporations with 100,000 or more customer accounts. Electrical corporations with fewer than 100,000 customer accounts offer a 20 percent discount. Utility customers may also be eligible for the CARE discount if they are enrolled in public assistance programs, such as: Medicaid/Medi-Cal, WIC (Women, Infant, Children Program), Healthy Families A&B, National School Lunch’s Free Lunch Program, Food Stamps/SNAP, Low Income Home Energy Assistance Program, Head Start Income Eligible, Supplemental Security Income, Bureau of Indian Affairs General Assistance, and Temporary Assistance for Needy Families.
Preparing for the loss of power. Power shutoffs are intended as a utility’s last resort to mitigate the risk of fire. However, the growing threats of catastrophic wildfires and recent experience of the devastation and liability posed by the wildfires means the utility’s voluntary use of power shutoffs is likely to increase. California residents face a number of other causes for power shutoffs, especially the very real threat of a large earthquake. Additionally, communities in the Sierras also have weather events, such as heavy snowstorms, that can wreak havoc on the electrical infrastructure and cause involuntary power shutoffs for extended days. As a result, Californians must generally be better prepared to live without power without much advance notice. Nonetheless, most residents are not likely to be prepared for such events, particularly if the events endure for multiple days. However, in the case of critical care and medically vulnerable customers, the need to be prepared for the loss of power, due to any cause, may be vital to sustain life. While hospitals maintain back-up power systems, often in the form of diesel generators, many customers may not have their own source of back-up power at home.
Impacts to ratepayers. This bill requires utilities to develop protocols to mitigate the loss of power to customers who depend on electricity to sustain life, including those who may be on life-support. Importantly, the support is limited to customers who demonstrate financial need and who do not have other options for the back-up power. By limiting the universe of customers who are eligible to receive the financial support for back-up power, the author’s intent is to limit the ratepayer costs. Although the bill also stipulates that an electrical corporation is not prevented from deploying backup electrical resources or providing financial assistance for backup electrical resources under any other authority.
Related/Prior Legislation
AB 1144 (Friedman, 2019) requires the CPUC to support resiliency during a deenergization event for communities in high fire threat districts by allocating at least ten percent ($16.6 million) of the annual allocation of the self-generation incentive program (SGIP) in 2020 for the installation of energy storage and other distributed energy resources for customers that operate a critical facility or critical infrastructure in these communities. The bill is pending consideration before the full Senate.
SB 1338 (Hueso, Chapter 518, Statutes of 2018) authorized a physician assistant to certify to the electric or gas utility that disconnecting service is medically necessary to sustain the life of the customer. The bill also required the CPUC to develop rules requiring each of the four largest energy utilities to demonstrate that they are working with the medical community to increase outreach to persons eligible for the medical baseline allowance.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, wildfire mitigation plans by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual wildfire mitigation plans and requires the CPUC to review and comment on those plans.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee, there are minor costs, if any, to the CPUC.
California Fire Chiefs Association
City of Thousand Oaks
Coalition of California Utility Employees
El Dorado Irrigation District
Fire Districts Association of California
MCE Clean Energy
National Association of Social Workers, California Chapter
Rural County Representatives of California
San Diego Gas & Electric
None received
ARGUMENTS IN SUPPORT: According to the author, “Deenergization of electrical transmission and distribution equipment creates certain risks of its own. Among those risks is the interruption of power needed to operate life support equipment, including, but not limited to artificial means to sustain, restore, or supplant a vital bodily function. California’s three largest investor owned utilities serve in excess of 150,000 critical care, medical baseline customers who rely on life support equipment. Many of these critical care customers are low-income with household incomes below 200 percent of the federal poverty level, and who receive discounts under the CARE program. As the likelihood of deenergizing electrical transmission and distribution equipment grows, it is a matter of health and safety to assist low-income, critical care medical baseline customers purchase and install sources of emergency backup power that can operate life support equipment for the duration of a power outage.”
ASSEMBLY FLOOR: 79-0, 9/5/19
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Boerner Horvath, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Daly, Diep, Eggman, Flora, Fong, Frazier, Friedman, Gabriel, Gallagher, Cristina Garcia, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kamlager-Dove, Kiley, Lackey, Levine, Limón, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Muratsuchi, Nazarian, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Mark Stone, Ting, Voepel, Waldron, Weber, Wicks, Wood, Rendon
Prepared by: Nidia Bautista / E., U., & C. / (916) 651-4107
9/5/19 17:30:34
SENATE THIRD READING
STR Bill Id:SB 167
Author:(Dodd)
As Amended Ver:August 30, 2019
Majority vote
SUMMARY:
This bill expands the protocols required of electrical corporations (IOUs) for disabling reclosers and deenergizing portions of electrical lines as part of wildfire mitigation plans (WMP) filed with the California Public Utilities Commission (CPUC).
Major Provisions
As a result of this bill IOU protocols for deenergizing of electrical lines must specifically address the impacts on customers who receive medical baseline allowances as part of their electric service. The IOUs would also be permitted to deploy backup electrical resources or provide financial assistance for backup electrical resources for medical baseline customers who: rely on life support powered by electricity; have financial need; and who have no other financial assistance upon which they can rely for the backup generation.
This bill also addresses potential statutory conflicts with SB 70 (Nielsen) of the current legislative session and SB 560 (McGuire) of the current legislative session.
COMMENTS:
In response to persistent fire risk, the CPUC has authorized IOUs to deenergize distribution lines as a fire risk mitigation measure. That is, the utility may discontinue power to a line, or, it may disable reclosers. (A recloser is a high-powered electric switch, in some ways similar to an electric fuse that disconnects in response to certain stresses, such as an electric surge, and automatically allows electricity to again flow under certain conditions.) Current law requires an IOU's WMP to include protocols for disabling reclosers and deenergizing portions of the IOU's electrical distribution system and to consider as part of those the effects of these actions on public safety, including effects on critical first responders and on health and communication infrastructure.
The CPUC has adopted protocols for deenergizing which apply to all IOUs. The focus of the protocols is on who should receive notice and when; who should be responsible for notification; how different customer groups should be identified; the information that should be included in notifications in advance of and directly preceding a deenergizing event; the methods of communication; and how the IOUs should communicate and coordinate with public safety partners before and during an event.
Clearly some home medical devices may be impacted or shut down when the electricity is turned off. To date, the CPUC has required the IOUs and public safety partners to assist those customers who rely on electrically-powered medical devices to develop a deenergization action plan. The IOUs are also providing charging centers during deenergizing events much like the cooling centers now provided to communities during heat storms. The CPUC has not yet required the IOUs to facilitate access to back-up generation.
The IOUs are also required to help critical facility and critical infrastructure representatives to assess the need for backup generation and determine whether additional equipment is needed, including providing generators to facilities that are not well prepared for a power shut off. Responsibility for the cost of backup generation has not been explored but is among a host of issues for the next phase of the CPUC's proceeding. They will evaluate deployment of other power sources to critical facilities and possibly other sensitive populations; evaluate backup generation options, and the effectiveness of backup generation for multi-day, deenergization events.
This bill does not directly mandate that the IOU's deploy back generation for customers on life support with financial need. It does however provide the IOU's with a statutory foundation that may bolster an application to the CPUC to develop programs aimed at achieving this objective. The IOU's can already propose to the CPUC programs for backup generation or financial assistance for these customers. Any approved program would be revenue generating for shareholders and paid for by all ratepayers.
According to the Author:
The author opines that as use of deenergizing events grows, "it is a matter of health and safety to assist low-income, critical care medical baseline customers to purchase and install sources of emergency backup power that can operate life support equipment for the duration of a power outage." The targeted population is medical baseline customers who also enroll in a utility's program of financial assistance for low-income customers.
Arguments in Support:
The California State Association of Counties writes in support of this bill that they support the use of deenergizing events to "decrease the likelihood of catastrophic wildfires" but find that the events "may leave vulnerable populations without power for prolonged periods of time" and that the use of back up energy systems will decrease the likelihood of harm caused by deenergizing. The California Fire Chiefs Association also supports the bill and states that it is "needed to ensure emergency back-up power is available to operate life-support systems for those citizens requiring such equipment during power outages.
Arguments in Opposition:
There is no registered opposition to this bill.
FISCAL COMMENTS:
According to the Assembly Appropriations Committee, this bill will result in minor costs, if any, to the CPUC.
VOTES:
SENATE FLOOR: 37-0-1
YES: Allen, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
ABS, ABST OR NV: Archuleta
ASM UTILITIES AND ENERGY: 15-0-0
YES: Holden, Patterson, Burke, Carrillo, Chen, Cunningham, Eggman, Cristina Garcia, Eduardo Garcia, Mayes, Muratsuchi, Quirk, Reyes, Santiago, Ting
ASM APPROPRIATIONS: 17-0-1
YES: Gonzalez, Bigelow, Bloom, Bonta, Brough, Calderon, Carrillo, Chau, Diep, Eggman, Fong, Gabriel, Maienschein, Obernolte, Petrie-Norris, Quirk, Robert Rivas
ABS, ABST OR NV: Eduardo Garcia
UPDATED:
VERSION: August 30, 2019
CONSULTANT: Kellie Smith / U. & E. / (916) 319-2083 FN: 0001558
SENATE THIRD READING
STR Bill Id:SB 167
Author:(Dodd)
As Amended Ver:August 12, 2019
Majority vote
SUMMARY:
This bill expands the protocols required of electrical corporations (IOUs) for disabling reclosers and deenergizing portions of electrical lines as part of wildfire mitigation plans filed with the California Public Utilities Commission (CPUC).
Major Provisions
As a result of this bill, IOU protocols for deenergizing of electrical lines must specifically address the impacts on customers who receive medical baseline allowances as part of their electric service. The IOUs would also be permitted to deploy backup electrical resources or provide financial assistance for backup electrical resources to medical baseline customers who: rely on life support powered by electricity; have financial need; and who have no other financial assistance upon which they can rely for the backup generation.
COMMENTS:
In response to persistent fire risk, the CPUC has authorized IOUs to deenergize distribution lines as a fire risk mitigation measure. That is, the utility may discontinue power to a line, or, it may disable reclosers. (A recloser is a high-powered electric switch, in some ways similar to an electric fuse that disconnects in response to certain stresses, such as an electric surge, and automatically allows electricity to again flow under certain conditions.) Current law requires an IOU's wildfire mitigation plan to include protocols for disabling reclosers and deenergizing portions of the corporation’s electrical distribution system and to consider as part of those the effects of these actions on public safety, including effects on critical first responders and on health and communication infrastructure.
The CPUC has adopted protocols for deenergizing which apply to all IOUs. The focus of the protocols is on who should receive notice and when; who should be responsible for notification; how different customer groups should be identified; the information that should be included in notifications in advance of and directly preceding a deenergizing event; the methods of communication, and how the IOUs should communicate and coordinate with public safety partners before and during an event.
Clearly home medical devices may be impacted or shut down when the electricity power is turned off. To date, the CPUC has required the IOUs and public safety partners to assist those customers who rely on electrically-powered medical devices to develop a deenergization action plan. The IOUs are also providing charging centers during deenergizing events much like the cooling centers now provided to communities during heat storms. The CPUC has not yet required the IOUs to facilitate access to back-up generation.
The IOUs are also required to help critical facility and critical infrastructure representatives to assess the need for backup generation and determine whether additional equipment is needed, including providing generators to facilities that are not well prepared for a power shut off. Responsibility for the cost of backup generation has not been explored but is among a host of issues for the next phase of the CPUC's proceeding. They will evaluate deployment of other power sources to critical facilities and possibly other sensitive populations; evaluate backup generation options, and the effectiveness of backup generation for multi-day, deenergization events.
This bill does not directly mandate that the IOU's deploy back generation for customers on life support with financial need. It does however provide the IOU's with a statutory foundation that may bolster an application to the CPUC to develop programs aimed at achieving this objective. The IOU's can already propose to the CPUC programs for backup generation or financial assistance for these customers. Any approved program would be revenue generating for shareholders and paid for by all ratepayers.
According to the Author:
The author opines that as use of deenergizing events grows, "it is a matter of health and safety to assist low-income, critical care medical baseline customers to purchase and install sources of emergency backup power that can operate life support equipment for the duration of a power outage." The targeted population is medical baseline customers who also enroll in the utility's program of financial assistance for low-income customers.
Arguments in Support:
The California State Association of Counties writes in support of this bill that they support the use of deenergizing events to "decrease the likelihood of catastrophic wildfires" but find that the events "may leave vulnerable populations without power for prolonged periods of time" and that the use of back up energy systems will decrease the likelihood of harm caused by deenergizing. The California Fire Chiefs Association also supports the bill and states that it is "needed to ensure emergency back-up power is available to operate life-support systems for those citizens requiring such equipment during power outages.
Arguments in Opposition:
There is no registered opposition to this bill.
FISCAL COMMENTS:
According to the Assembly Appropriations Committee, this bill will result in minor costs, if any, to the CPUC.
VOTES:
SENATE FLOOR: 37-0-1
YES: Allen, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
ABS, ABST OR NV: Archuleta
ASM UTILITIES AND ENERGY: 15-0-0
YES: Holden, Patterson, Burke, Carrillo, Chen, Cunningham, Eggman, Cristina Garcia, Eduardo Garcia, Mayes, Muratsuchi, Quirk, Reyes, Santiago, Ting
ASM APPROPRIATIONS: 17-0-1
YES: Gonzalez, Bigelow, Bloom, Bonta, Brough, Calderon, Carrillo, Chau, Diep, Eggman, Fong, Gabriel, Maienschein, Obernolte, Petrie-Norris, Quirk, Robert Rivas
ABS, ABST OR NV: Eduardo Garcia
UPDATED:
VERSION: August 12, 2019
CONSULTANT: Kellie Smith / U. & E. / (916) 319-2083 FN: 0001525
Date of Hearing: August 21, 2019
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
SBPCA Bill Id:SB 167
Author:(Dodd) – As Amended Ver:August 12, 2019
Policy Committee: | Utilities and Energy | Vote: | 15 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill modifies the requirement in existing law that an electrical corporation include, as part of its statutorily required wildfire mitigation plan, protocols related to mitigating the public safety effects of disabling reclosers and deenergizing distribution lines.
Specifically, this bill requires the protocols to include consideration of the public safety effects of disabling reclosers and deenergizing distribution lines on customers who receive medical baseline allowances.
It also authorizes an electrical corporation to deploy backup electrical resources or provide financial assistance for such resources to a customer who receives a medical baseline allowance if the customer meets all the following conditions: (a) the customer relies on life-support equipment that operates on electricity to sustain life; (b) the customer demonstrates financial need; (c) the customer is not eligible for backup electrical resources provided through medical resources, medical insurance or community resources.
Finally, the bill requires the protocols to include appropriate and feasible procedures for notifying any customer described above who might be affected by disabling of reclosers and deenergizing distribution lines.
FISCAL EFFECT:
Minor costs, if any, to the California Public Utilities Commission (CPUC).
COMMENTS:
Background and Purpose. In 2016, the Legislature passed legislation—SB 1028 (Hill), Chapter 598, to require the state’s electrical corporations, such as Pacific Gas and Electric (PG&E), Southern California Edison (SCE) and San Diego Gas and Electric (SDG&E), to annually file wildfire mitigation plans with the CPUC. Subsequent legislation modified the planning requirement to include additional and more detailed information and assigned additional responsibilities to the CPUC and Calfire, among others.
In response to persistent fire risk, the CPUC has authorized electrical utilities to deenergize distribution lines as a fire risk mitigation measure. That is, the utility may discontinue power to a line, or, it my disable reclosers. (A recloser is a high-powered electric switch, in some ways similar to an electric fuse, that disconnects in response to certain stresses, such as an electric surge, and automatically allows electricity to again flow under certain conditions.) Statute requires an electrical corporation’s wildfire mitigation plan to include protocols for disabling reclosers and deenergizing portions of the corporation’s electrical distribution system. Statute requires the protocols to consider the effects of these actions on public safety, including effects on critical first responders and on health and communication infrastructure.
This bill additionally requires the protocols to consider the effect of these actions on customers who receive medical baseline allowances and authorizes an electrical utility to deploy backup electrical resources, or financial assistance for such resources, to those customers. According to the author:
It is a matter of health and safety to assist low-income, critical care medical baseline customers to purchase and install sources of emergency backup power that can operate life support equipment for the duration of a power outage.
The author’s statement is noncontroversial as a general statement of principal. However, it is less clear the ratepayers of an electrical corporation should pay the purchase cost of backup power for low-income, critical care medical baseline customers in every instance. This analysis assumes the CPUC retains discretion to approve, modify or reject an electrical corporation’s request for cost recovery based on the justness and reasonableness of the request and the totality of applicable law.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: July 10, 2019
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Chris Holden, Chair
SBPCA Bill Id:SB 167
Author:(Dodd) – As Amended Ver:April 8, 2019
SENATE VOTE: 37-0
SUBJECT: Electrical corporations: wildfire mitigation plans
SUMMARY: Requires electrical corporations (IOUs) to include protocols to mitigate the impacts of deenergizing events on specified customers as part of wildfire mitigation plans (WMPs) filed with the California Public Utilities Commission (CPUC). Specifically, this bill:
- Requires IOUs to include protocols in WMPs related to mitigating the public safety impacts of deenergizing events on medical baseline customers.
- Expands the customer notice requirements for deenergizing events to specifically include customers on a medical baseline rate.
EXISTING LAW:
- Requires IOUs to construct, maintain, and operate electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment and annually prepare and submit WMPs to the CPUC for review and approval. (Public Utilities Code § 8386)
- Requires each IOU WMP to specifically include protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols including impacts on critical first responders and on health and communication infrastructure. (Public Utilities Code § 8386 [c][6])
- Requires each IOU WMP to specifically include appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines including consideration of the need to notify, as a priority, critical first responders, heath care facilities, and operators of telecommunications infrastructure. (Public Utilities Code § 8386 [c][7])
- Establishes a standard allowance of gas or electricity for customers on life-support equipment and other customers with specified physical and health conditions. The program is commonly referred to as “medical baseline.” (Public Utilities Code § 739 [c])
- Establishes the California Alternate Rates for Energy (CARE) program which provides a bill credit to low-income electric and gas customers with annual household incomes that are no greater than 200 percent of the federal poverty guideline levels. (Public Utilities Code § 739.1)
- Appropriates $75 million to the Office of Emergency Services to improve resiliency of the state's critical infrastructure in response to IOU-led deenergizing events.
FISCAL EFFECT: According to the Senate Appropriations Committee, this bill was not heard per rule 28.8 because it was found to cause no significant reduction in revenues, or additional state costs are not significant and do not require the appropriation of additional state funds.
BACKGROUND:
What is Deenergizing? An intentional action of an electric utility to implement an "unplanned outage" by turning off power to distribution lines in a proactive effort to prevent fires, typically during high wind events, which could blow down distribution lines or cause vegetation to come into contact with those lines.
Deenergizing Policies & Protocols – California is experiencing an increase in wildfire events due to a number of factors, including an extended period of drought, upwards of ten years, increased fuel for fires, and unprecedented conditions that are leading to extreme weather events. Exacerbating wildfire conditions are energized power lines and the potential of these lines to either spark or worsen an existing wildfire. To mitigate these and other risks, the CPUC has authorized the IOUs to use the option of proactively shutting down power to specific power lines to limit the impact or damage of these lines to communities in situations where the utilities are aware of dangerous conditions. Deenergization of distribution lines under certain circumstances is now expected of all electric utilities in the state and the program is now referred to as the Public Power Safety Shut-off (PSPS).
CPUC Action on Deenergizing – The CPUC first considered and allowed San Diego Gas & Electric (SDG&E) to engage in proactive deenergization in a 2012 decision which allowed the utility to shut off power as a fire prevention measure against severe Santa Ana winds. In July of 2018, the CPUC extended the deenergization notice, reporting and reasonableness review requirements to all electric IOUs and adopted additional measures to supplement the requirements approved in the 2012 decision. The new measures included more detailed reporting and additional public outreach, notification and mitigation. After a six month review of the program impacts, the CPUC adopted formal guidelines in order to promote safe, effective and consistent deenergization of power lines across the service territories of the IOUs under the Commission’s jurisdiction. The focus of the guidelines is primarily on issues of notice and communication in advance of a PSPS event but also includes high-level guidelines for communication during the deenergization event itself and during reenergization; however, these issues, among others, will be more fully explored in Phase 2 of the rulemaking.
SDG&E has used deenergizing since 2013. Edison and PG&E are in the early and rough stages of implementing the PSPS.
Medical Baseline Allowance – All residential customers are billed a certain amount of their natural gas and electricity use at their utility company's lowest residential rate. This is called the "Baseline Allowance" and it is set depending on what climate zone your home is in and whether it is the utility's "winter" or "summer" season. Extra allowances of natural gas and electricity are billed at the lowest rate for customers who rely on life support equipment, or those who have life threatening illnesses or compromised immune systems. The extra allowances are called “medical baseline.”
Pacific Gas & Electric (PG&E), Southern California Edison (SCE), and SDG&E all offer advanced notices of power outages and notification calls in case of state-directed power outages that could affect customers who are vulnerable to extreme temperatures.
COMMENTS:
- Author’s Statement. According to the author, in an environment of climate change the risk of California wildfires is growing. Despite the growing risk of wildfire, electric utilities have an obligation to serve, and must construct and operate electric transmission and distribution systems in areas of high wildfire risk. That electrical equipment can be a source of wildfire ignition during extreme weather events. It is likely, with climate change and the establishment of formal protocols to deenergize power lines, the frequency of power outages will grow.
Deenergization of electrical transmission and distribution equipment creates certain risks of its own. Among those risks is the interruption of power needed to operate life support equipment, including, but not limited to artificial means to sustain, restore, or supplant a vital bodily function. California’s three IOUs serve in excess of 150,000 critical care, medical baseline customers who rely on life support equipment. Many of these critical care customers are low-income with household incomes below 200% of the federal poverty level, and who receive discounts under the CARE program.
- Author’s Intent – Deploy Backup Generation. The author opines that as use of PSPS events grows, “it is a matter of health and safety to assist low-income, critical care medical baseline customers to purchase and install sources of emergency backup power that can operate life support equipment for the duration of a power outage.” The targeted population is medical baseline customers who are also on the CARE program.
The IOUs report the following numbers for medical baseline customers in high fire threat districts (HFTD): SCE 26,211; PG&E 20,218; and SDG&E 9,455. These numbers will be higher when the circuits that cover HFTDs are included; the numbers will be reduced by those who are enrolled in the CARE program for implementation of this bill.
It is important for the Committee to consider that SDG&E has been utilizing PSPS since 2013 without the deployment of backup generation for residential customers. The Committee should also consider the ratepayer impacts associated with IOU deployment of back up generation. It would be paid for by all ratepayers in the IOU territory.
- CPUC Action. The overarching principles of the CPUC’s established protocols for customers and deenergizing events is for any customers to understand the purpose of proactive deenergization, the IOUs’ process for initiating it, how to manage safely through a deenergization event, and the impacts if deployed. They want to ensure that customers know what’s coming, when it’s coming, and how they can prepare for the electric outages associated with PSPS events in advance. The CPUC’s recent decision focuses on who should receive notice and when; who should be responsible for notification; how different customer groups should be identified; the information that should be included in notifications in advance of and directly preceding a PSPS event; the methods of communication, and how the IOUs should communicate and coordinate with public safety partners before and during an event.
Clearly home medical devices may be impacted or shut down when power is turned off. To date, the CPUC has required the IOUs and public safety partners to assist those customers in developing a deenergization action plan. The IOUs are also providing charging centers during PSPS events much like the cooling centers now provided to communities during heat storms. The CPUC has not required the IOUs to facilitate access to back-up generation.
The IOUs are also required to help critical facility and critical infrastructure representatives to assess the need for backup generation and determine whether additional equipment is needed, including providing generators to facilities that are not well prepared for a power shut off. Responsibility for the cost of backup generation has not been explored but is among a host of issues for the next phase of the CPUC’s proceeding. They will evaluate deployment of other power sources to critical facilities and possibly other sensitive population; evaluate backup generation options, and the effectiveness of backup generation for multi-day de-energization events.
- Bill Necessity. This bill does not directly mandate that the IOU’s deploy back generation at customer premises that are receiving a medical baseline allowance and are on the CARE program. It does however provide the IOU’s a statutory foundation that may bolster an application to the CPUC to develop programs aimed at achieving this objective. The IOU’s can already propose to the CPUC programs for backup generation or financial assistance for customers receiving a medical baseline allowance on the CARE program. They do not need statutory authority. Any approved program would also be revenue generating for shareholders and paid for by all ratepayers.
- Related Legislation.
AB 868 (Bigelow) Expands IOU protocols for deenergizing events to require notice to specific customers including residential, business customers and “critical customers,” such as water suppliers, wastewater agencies, law enforcement and hospitals, designed to minimize effects on those customers. Status: Held in Assembly Appropriations Committee.
AB 1054 (Holden, Burke, Mayes) Among the provisions, modifies WMP requirements to requires that annual plans cover at least a three-year period.
SB 560 (McGuire) Expands the protocols required as a result of a deenergizing of electrical lines initiated by an IOU or POU to mitigate the impact of the event on specified customers and critical services.
- Prior Legislation.
SB 901 (Dodd) Establishes a comprehensive framework to address and prevent catastrophic wildfires including prevention and planning by the state's electric utilities, management of the state's forests, chaparrals, and other lands to prevent and defend against wildfires, and standards to stabilize IOUs in the event of extensive liability resulting from claims under inverse condemnation. Status: Chapter 626, Statutes of 2018.
SB 1028 (Hill) Requires IOUs to file annual wildfire mitigation plans and requires the CPUC to review and comment on those plans. Also required POUs and electrical co-ops to determine their risk of catastrophic wildfire that can be caused by their electric lines and equipment and, if a risk exists, submit wildfire mitigation plans to their governing board for approval. Status: Chapter 598, Statutes of 2016.
REGISTERED SUPPORT / OPPOSITION:
Support
California State Association Of Counties
City Of Thousand Oaks
Coalition Of California Utility Employees
Fire Districts Association Of California
Marin Clean Energy
National Association Of Social Workers, California Chapter
Rural County Representatives Of California
Sempra Energy Utilities
Thousand Oaks; City Of
Opposition
None on file.
Analysis Prepared by: Kellie Smith / U. & E. /
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 167 |
THIRD READING
Bill No: SB 167
Amended: 4/8/19
SENATE ENERGY, U. & C. COMMITTEE: 13-0, 3/27/19
AYES: Hueso, Moorlach, Bradford, Chang, Dodd, Hertzberg, Hill, McGuire, Rubio, Skinner, Stern, Stone, Wiener
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: Electrical corporations: wildfire mitigation plans
DIGEST:
This bill requires electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their electric distribution system within their wildfire mitigation plans filed at the California Public Utilities Commission (CPUC).
Existing law:
- Provides that the CPUC has regulatory authority over public utilities, including electric corporations. (California Constitution, Article XII)
- Requires the CPUC to develop formal procedures to incorporate safety in a rate case application by an electrical corporation or gas corporations. (Public Utilities Code §750)
- Requires each electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the CPUC for review and approval. Requires those wildfire mitigation plans to include specified information, including protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure. (Public Utilities Code §8386)
- Establishes the California Alternate Rates for Energy (CARE) program for assistance to low-income electric and gas customers with annual household incomes that are no greater than 200 percent of the federal poverty guideline levels to ensure low-income ratepayers are not jeopardized or overburdened by monthly energy expenditures. (Public Utilities Code §§382 and 739.1)
- Requires the CPUC to establish a standard limited allowance in addition to the baseline quantity and higher energy allocation of gas and electricity for residential customers dependent on life-support equipment and patients being treated for a life-threatening illness or who have a compromised immune system, if a medical professional, as specified, certifies in writing to the utility that the additional heating or cooling allowance is medically necessary to sustain life or prevent deterioration of the person’s medical condition. (Public Utilities Code §739 (2)(c))
This bill:
- Requires electrical corporations to include additional information as part of the protocols for deenergizing portions of their distribution system within their wildfire mitigation plans filed at the CPUC.
- Requires each electrical corporation, as part of those protocols, to additionally include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on customers who are receiving medical baseline
allowances. - Authorizes electrical corporations to deploy backup electrical resources or provide financial assistance for backup electrical resources to those customers receiving medical baseline allowances and who meet specified requirements related to demonstrating financial need.
Background
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. According to the California Department of Forestry and Fire Protection (CAL FIRE), power lines were the second-leading cause of wildfires in 2013. In recent years, California has experienced a number of catastrophic wildfires, including several that ignited by electrical utility infrastructure, including the 2007 Witch Fire in San Diego County, the 2015 Butte Fire, several of the 2017 fires that ravaged the state.
Deenergizing electric lines and deactivating reclosers. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of power. However, the risk of fire caused by electric utility infrastructure can pose a greater risk than to shutoff the power to certain circuits. Utilities have the ability to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of power to households, businesses, traffic signals, communication systems, critical facilities, water treatment facilities, emergency services and others. Therefore, efforts to deenergize electric lines is, generally, done in a manner that balances the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas that are served by the line(s). Utilities use automatic reclosers, which are similar to circuit breakers. These devices are set to shoot pulses of electricity through electric lines that may have tripped off. The automatic reclosers would automatically restart power if conditions on the line seemed normal. However, the use of automatic reclosers can also pose a fire threat if the lines are in contact with branches or brush, since the pulses of electricity can ignite a fire. By deactivating the reclosers, a utility can reduce the risk of fire.
Use of power shutoffs, known as Public Safety Power Shutoff. In 2007, San Diego Gas & Electric (SDG&E)’s electric infrastructure ignited three destructive fires. In response to that experience, SDG&E requested approval from the CPUC for a number of mitigation efforts, including roughly a billion dollars of ratepayer funds to invest in a state-of-the-art weather center and monitoring network, as well as, the authority to deenergize power lines during high wildfire risk days. After the 2017 fires ravaged several parts of the state, in July 2018, the CPUC expanded the requirements on the power shutoffs it has for SDG&E, including requirements related to specified notifications and reasonableness review, to the state’s other investor-owned electric utilities (IOUs), including Southern California Edison (SCE) and Pacific Gas & Electric (PG&E). Known as the Public Safety Power Shutoff program, after a power shutoff event, per the CPUC requirements, the utility must inspect the lines of the circuits that were shutoff before it can restore power. As such, the power shutoff event may last several days, leaving the affected customers without power during the full duration of the event. In the fall of 2018, both SCE and PG&E exercised their authority for power shutoffs, under the new CPUC requirements, to various communities in their service territory during high wildfire risk days. In Northern California, community response to the extended power shutoffs (they lasted multiple days) were generally not receptive to the new policy as stores, businesses, schools and others had to close during the event.
Power shutoffs effects on vulnerable populations. On December 13, 2018, the CPUC opened a new rulemaking (R.18-12-005) to examine utilities' de-energization processes and practices, the impacts on communities and vulnerable populations, efforts to reduce the need for de-energization, and mitigate measures to reduce the impacts when implemented. The rulemaking will also review and improve existing reporting requirements. Further, the CPUC has directed the utilities to contact customers with medical conditions when there are power outages, regardless of the cause.
Medical baseline allowance. The medical baseline allowance provides residential customers who have qualifying medical conditions with additional energy allowance at the lowest tiered rate. Per the statute, IOUs are required to provide additional baseline allowance of gas or electric service for customers facing specified medical conditions, including life-threatening conditions or who are on life-support. Additionally, the medical baseline allowance provides these households with advance notice of power outages since members of the households may be dependent on energy to survive. All three of the large IOUs currently administer medical baseline, and, as such, have existing processes for identifying these customers, including requiring physicians and other medical personnel to certify as to the medical condition. Customers on medical baseline are also provided the opportunity to amortize their bill payments, for a period up to 12 months, in order to avoid disconnection of service. Per SB 598 (Hueso, Chapter 362, Statutes of 2017), utilities are prohibited from disconnecting service to customers with life-threatening conditions, on life support or hospice care, and who cannot pay and are willing to enter into a payment schedule. SB 1338 (Hueso, Chapter 518, Statutes of 2018) required the CPUC to develop rules requiring each of the four largest energy utilities to demonstrate that they are working with the medical community to increase outreach to persons eligible for the medical baseline allowance.
CARE. Existing law requires the CPUC to establish the CARE program, which provides assistance to low-income electric and gas customers with annual household incomes less than 200 percent of federal poverty guideline levels. The cost of this program is spread across multiple classes of customers. AB 327 (Perea, Chapter 611, Statutes of 2013) restructured the rate design for residential electric customers, including directing the CPUC to establish rates for the CARE program customers of the large IOUs. The set rates must effectively give a discount between 30 percent and 35 percent to eligible customers of electrical corporations with 100,000 or more customer accounts. Electrical corporations with fewer than 100,000 customer accounts offer a 20 percent discount. Utility customers may also be eligible for the CARE discount if they are enrolled in public assistance programs, such as: Medicaid/Medi-Cal, WIC (Women, Infant, Children Program), Healthy Families A&B, National School Lunch’s Free Lunch Program, Food Stamps/SNAP, Low Income Home Energy Assistance Program, Head Start Income Eligible, Supplemental Security Income, Bureau of Indian Affairs General Assistance, and Temporary Assistance for Needy Families.
Preparing for the loss of power. Power shutoffs are intended as a utility’s last resort to mitigate the risk of fire. However, the growing threats of catastrophic wildfires and recent experience of the devastation and liability posed by the wildfires means the utility’s voluntary use of power shutoffs is likely to increase. California residents face a number of other causes for power shutoffs, especially the very real threat of a large earthquake. Additionally, communities in the Sierras also have weather events, such as heavy snowstorms, that can wreak havoc on the electrical infrastructure and cause involuntary power shutoffs for extended days. As a result, Californians must generally be better prepared to live without power without much advance notice. Nonetheless, most residents are not likely to be prepared for such events, particularly if the events endure for multiple days. However, in the case of critical care and medically vulnerable customers, the need to be prepared for the loss of power, due to any cause, may be vital to sustain life. While hospitals maintain back-up power systems, often in the form of diesel generators, many customers may not have their own source of back-up power at home.
Impacts to ratepayers. This bill requires utilities to develop protocols to mitigate the loss of power to customers who depend on electricity to sustain life, including those who may be on life-support. Importantly, the support is limited to customers who demonstrate financial need and who do not have other options for the back up power. By limiting the universe of customers who are eligible to receive the financial support for back up power, the author’s intent is to limit the ratepayer costs.
Related/Prior Legislation
SB 1338 (Hueso, Chapter 518, Statutes of 2018) authorized a physician assistant to certify to the electric or gas utility that disconnecting service is medically necessary to sustain the life of the customer. The bill also required the CPUC to develop rules requiring each of the four largest energy utilities to demonstrate that they are working with the medical community to increase outreach to persons eligible for the medical baseline allowance.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, wildfire mitigation plans by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual wildfire mitigation plans and requires the CPUC to review and comment on those plans.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
California Fire Chiefs Association
Coalition of California Utility Employees
El Dorado Irrigation District
Fire Districts Association of California
MCE Clean Energy
National Association of Social Workers, California Chapter
Rural County Representatives of California
San Diego Gas & Electric
OPPOSITION: (Verified 4/22/19)
None received
ARGUMENTS IN SUPPORT: According to the author, “Deenergization of electrical transmission and distribution equipment creates certain risks of its own. Among those risks is the interruption of power needed to operate life support equipment, including, but not limited to artificial means to sustain, restore, or supplant a vital bodily function. California’s three largest investor owned utilities serve in excess of 150,000 critical care, medical baseline customers who rely on life support equipment. Many of these critical care customers are low-income with household incomes below 200 percent of the federal poverty level, and who receive discounts under the California Alternative Rate Energy (CARE) program. As the likelihood of deenergizing electrical transmission and distribution equipment grows, it is a matter of health and safety to assist low-income, critical care medical baseline customers purchase and install sources of emergency backup power that can operate life support equipment for the duration of a power outage.”
Prepared by: Nidia Bautista / E., U., & C. / (916) 651-4107
4/24/19 16:25:14
**** END ****
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2019 - 2020 Regular
Bill No: SB 167 Hearing Date: 3/27/2019
Author: | Dodd | ||
Version: | 1/28/2019 As Introduced | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Nidia Bautista | ||
SUBJECT: Electrical corporations: wildfire mitigation plans
DIGEST: This bill requires electrical corporations to include impacts on customers enrolled in specified programs as part of the protocols for deenergizing portions of their distribution system within their wildfire mitigation plans filed at the California Public Utilities Commission (CPUC).
ANALYSIS:
Existing law:
- Provides that the CPUC has regulatory authority over public utilities, including electric corporations. (California Constitution, Article 3 and 4)
- Requires the CPUC to develop formal procedures to incorporate safety in a rate case application by an electrical corporation or gas corporations. (Public Utilities Code §750)
- Requires each electrical corporation to construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment. Requires each electrical corporation to annually prepare and submit a wildfire mitigation plan to the CPUC for review and approval. Requires those wildfire mitigation plans to include specified information, including protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure. (Public Utilities Code §8386)
- Establishes the California Alternate Rates for Energy (CARE) program for assistance to low-income electric and gas customers with annual household incomes that are no greater than 200 percent of the federal poverty guideline levels to ensure low-income ratepayers are not jeopardized or overburdened by monthly energy expenditures. Requires the CARE discount for electrical corporations with 100,000 or more customer accounts in California is not less than 30 percent or more than 35 percent of the revenues that would have been produced for the same billed usage by non-CARE customers and requires the entire discount to be provided in the form of a reduction in the overall bill for the eligible CARE customer. (Public Utilities Code §§382 and 739.1)
- Requires the CPUC to establish a standard limited allowance in addition to the baseline quantity and higher energy allocation of gas and electricity for residential customers dependent on life-support equipment and patients being treated for a life-threatening illness or who have a compromised immune system, if a licensed physician and surgeon or a person licensed pursuant to the Osteopathic Initiative Act certifies in writing to the utility that the additional heating or cooling allowance is medically necessary to sustain life or prevent deterioration of the person’s medical condition. (Public Utilities Code §739 (2)(c))
This bill:
- Requires electrical corporations to include additional information as part of the protocols for deenergizing portions of their distribution system within their wildfire mitigation plans filed at the CPUC.
- Specifically, this bill requires electric corporations to include impacts on customers enrolled in the California Alternative Rates for Energy (CARE) program, receiving medical baseline allowances of electricity or gas, and who the electrical corporation has identified as critical care customers relying on life-support equipment.
Background
California wildfire and electric utility infrastructure. Electrical equipment, including downed power lines, arcing, and conductor contact with trees and grass, can act as an ignition source. Although electric systems do not routinely cause catastrophic fires, they are known to cause hundreds of small fires every year. Risks for wildfires also increased with the extended drought and bark beetle infestation that has increased tree mortalities and, as a result, increased the fuel, and risk for wildfires. According to California Department of Forestry and Fire Protection (CAL FIRE), power lines were the second-leading cause of wildfires in 2013. In recent years, California has experienced a number of catastrophic wildfires, including several that were ignited by electrical utility infrastructure, including the 2007 Witch Fire in San Diego County, the 2015 Butte Fire, several of the 2017 fires that ravaged the state.
CPUC efforts to address wildfires. The CPUC’s rulemaking efforts to address wildfires and electric systems have been active since 2008, with several phases, in two separate proceedings. These efforts have resulted in the adoption of over 70 proposed rule changes with often prescriptive standards – such as dictating clearances between power lines and trees. Additionally, the CPUC has embarked on incorporating wildfire mitigation analysis into the Risk Assessment and Mitigation Phase (RAMP) filings of the utilities. The RAMP filing is meant to incorporate a risk-informed approach to the electrical utility’s general rate case.
SB 1028 (Hill, Chapter 598, Statutes of 2016). In 2016, SB 1028 (Hill) was signed into law. The bill requires electric utilities regulated by the CPUC to submit wildfire mitigation plans for review and comment by the CPUC and for publicly owned utilities (POU) to have their governing board adopt wildfire mitigation plans, if the utility believes they operate in an area where there is a threat of wildfires. SB 1028 is an effort to establish more performance or risk-based safety rules that focus on identification of hazards and goal setting, while providing utilities flexibility in achieving the goals. The intent is to have performance-based goals compliment the prescriptive rules related to wildfire prevention.
Deenergizing electric lines and deactivating reclosers. Generally, electric utilities attempt to maintain power and ensure continued reliability of the flow of power. However, the risk of fire caused by electric utility infrastructure can pose a greater risk than to shutoff the power to certain circuits. Utilities have the ability to deenergize electric lines in order to prevent harm or threats of harm. However, deenergizing electric lines can result in the loss of power to households, businesses, traffic signals, communication systems, critical facilities, water treatment facilities, emergency services and others. Therefore, efforts to deenergize electric lines must be done in a manner that balances the potential harm of the energized lines causing a wildfire against the safety hazards associated with eliminating electricity to the areas that are served by the line(s). Utilities use automatic reclosers which are similar to circuit breakers. These devices are set to shoot pulses of electricity through electric lines that may have tripped off. The automatic reclosers would automatically restart power if conditions on the line seemed normal. However, the use of automatic reclosers can also pose a fire threat if the lines are in contact with branches or brush, since the pulses of electricity can ignite a fire. By deactivating the reclosers, a utility can reduce the risk of fire.
Use of power shutoffs. In 2007, San Diego Gas & Electric (SDG&E)’s electric infrastructure ignited three destructive fires. In response to that experience, SDG&E requested approval from the CPUC for a number of mitigation efforts, including roughly a billion dollars of ratepayer funds to invest in a state-of-the-art weather center and monitoring network, as well as, the authority to deenergize power lines during high wildfire risk days. After the 2017 fires ravaged several parts of the state, in July 2018, the CPUC expanded the requirements on the power shutoffs it has for SDG&E, including requirements related to specified notifications and reasonableness review, to the state’s other investor-owned electric utilities (IOUs), including Southern California Edison (SCE) and Pacific Gas & Electric (PG&E). Known as the Public Safety Power Shutoff (PSPS) program, after a power shutoff event, per the CPUC requirements, the utility must inspect the lines of the circuits that were shutoff before it can restore power. As such, the power shutoff event may last several days, leaving the affected customers without power during the full time of the event. In the fall of 2018, both SCE and PG&E exercised their authority for power shutoffs, under the new CPUC requirements, to various communities in their service territory during high wildfire risk days. In Northern California, community response to the extended power shutoffs (they lasted multiple days) were generally not receptive to the new policy as stores, businesses, schools and others had to close during the event. The passage of SB 901 (Dodd, Chapter 626, Statutes of 2018) further expanded the requirements of the protocols related to the power shutoffs as part of the electric utility’s wildfire mitigation plans currently under review.
Power shutoffs effects on vulnerable populations. On December 13, 2018, the CPUC opened a new rulemaking (R.18-12-005) to examine utilities' de-energization processes and practices, the impacts on communities and vulnerable populations, efforts to reduce the need for de-energization, and mitigate measures to reduce the impacts when implemented. The rulemaking will also review and improve existing reporting requirements. Further, the CPUC has directed the utilities to contact people with medical conditions when there are outages, regardless of cause.
Medical baseline allowance. The medical baseline allowance provides residential customers who have qualifying medical conditions with additional energy allowance at the lowest tiered rate. Per statute, IOUs) are required to provide additional baseline allowance of gas or electric service for customers facing specified medical conditions, including life-threatening conditions or who are on life-support. Additionally, the medical baseline allowance provides these households with advance notice of power outages since members of the households may be dependent on power to survive. All utilities currently administer medical baseline, and, as such, have existing processes for identifying these customers, including requiring physicians and other medical personnel to certify as to the medical condition. Customers on medical baseline are also provided the opportunity to amortize their bill payments, for a period up to 12 months, in order to avoid disconnection of service. Per SB 598 (Hueso, Chapter 362, Statutes of 2017), utilities are prohibited from disconnecting service to customers with life-threatening conditions, on life support or hospice care, and who can not pay and are willing to enter into a payment schedule. SB 1338 (Hueso, Chapter 518, Statutes of 2018) requires the CPUC to develop rules requiring each of the four largest energy utilities to demonstrate that they are working with the medical community to increase outreach to persons eligible for the medical baseline allowance.
CARE. Existing law requires the CPUC to establish the CARE program, which provides assistance to low-income electric and gas customers with annual household incomes less than 200 percent of federal poverty guideline levels. The cost of this program is spread across multiple classes of customers. AB 327 (Perea, Chapter 611, Statutes of 2013) restructured the rate design for residential electric customers, including directing the CPUC to establish rates for the CARE program customers of the large IOUs. The set rates must effectively give a discount between 30 percent and 35 percent to eligible customers of electrical corporations with 100,000 or more customer accounts. Electrical corporations with fewer than 100,000 customer accounts offer a 20 percent discount. Utility customers may also be eligible for the CARE discount if they are enrolled in public assistance programs, such as: Medicaid/Medi-Cal, Women, Infant, Children Program (WIC), Healthy Families A&B, National School Lunch’s Free Lunch Program, Food Stamps/SNAP, Low Income Home Energy Assistance Program, Head Start Income Eligible, Supplemental Security Income, Bureau of Indian Affairs General Assistance, and Temporary Assistance for Needy Families (TANF).
Preparing for the loss of power. Power shutoffs are intended as a utility’s last resort to mitigate the risk of fire. However, the growing threats of catastrophic wildfires and recent experience of the devastation and liability posed by the wildfires means the utility’s voluntary use of power shutoffs is likely to increase. California residents face a number of other causes for power shutoffs, especially the very real threat of a large earthquake. Additionally, communities in the Sierras also have weather events, such as heavy snowstorms, that can wreak havoc on the electrical infrastructure and cause involuntary power shutoffs for extended days. As a result, Californians must generally be better prepared to live without power without much advance notice. Nonetheless, most residents are not likely to be prepared for such events, particularly if they endure for multiple days. However, in the case of critical care and medically vulnerable customers, the need to be well-prepared for the loss of power, due to any cause, may be vital to sustain life. While hospitals maintain back-up power systems, often in the form of diesel generators, many customers may not have their own source of back-up power at home.
Impacts to ratepayers. This bill would require utilities to develop protocols to mitigate the loss of power to critical care customers, CARE customers and medical baseline customers potentially including the purchase of back-up power for these customers. Currently, none of these programs authorize the use of ratepayer funds to pay for back-up power for any of these populations. As such, depending on the number of eligible customers and the type of back-up power purchased, the impacts to ratepayers could be significant.
Technical amendments needed. As currently drafted, this bill would encompass a much wider universe of customers than intended by the author. In order to limit the potential costs to ratepayers and to better prioritize the most vulnerable populations, the author and committee may wish to amend this bill with the attached draft amendments that narrow the universe of customers to the most vulnerable who require specified protocols which may include temporary deployment of back-up power. The amendments also require the utility to consider whether other funding or resources are available to the customer, including through their medical insurance or services.
Prior/Related Legislation
SB 1338 (Hueso, Chapter 518, Statutes of 2018) authorized a physician assistant to certify to the electric or gas utility that disconnecting service is medically necessary to sustain the life of the customer. The bill also required the CPUC to develop rules requiring each of the four largest energy utilities to demonstrate that they are working with the medical community to increase outreach to persons eligible for the medical baseline allowance.
SB 901 (Dodd, Chapter 626, Statutes of 2018) addressed numerous issues concerning wildfire prevention, response and recovery, including funding for mutual aid, fuel reduction and forestry policies, wildfire mitigation plans by electric utilities, and cost recovery by electric corporations of wildfire-related damages.
SB 1028 (Hill, Chapter 598, Statutes of 2016) required electric CPUC-regulated utilities to file annual wildfire mitigation plans and requires the CPUC to review and comment on those plans.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
MCE Clean Energy
National Association of Social Workers, California Chapter
Rural County Representatives of California
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the author:
“Deenergization of electrical transmission and distribution equipment creates certain risks of its own. Among those risks is the interruption of power needed to operate life support equipment, including, but not limited to artificial means to sustain, restore, or supplant a vital bodily function. California’s three largest investor owned utilities serve in excess of 150,000 critical care, medical baseline customers who rely on life support equipment. Many of these critical care customers are low-income with household incomes below 200 percent of the federal poverty level, and who receive discounts under the California Alternative Rate Energy (CARE) program. As the likelihood of deenergizing electrical transmission and distribution equipment grows, it is a matter of health and safety to assist low-income, critical care medical baseline customers purchase and install sources of emergency backup power that can operate life support equipment for the duration of a power outage.”
-- END --
Attached Amendments
SECTION 1.
Section 8386 of the Public Utilities Code is amended to read:
8386.
(a) Each electrical corporation shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of catastrophic wildfire posed by those electrical lines and equipment.
(b) Each electrical corporation shall annually prepare and submit a wildfire mitigation plan to the commission for review and approval, according to a schedule established by the commission, which may allow for the staggering of compliance periods for each electrical corporation. The Department of Forestry and Fire Protection shall consult with the commission on the review of each wildfire mitigation plan. Prior to approval, the commission may require modifications of the plans. Following approval, the commission shall oversee compliance with the plans pursuant to subdivision (h).
(c) The wildfire mitigation plan shall include:
(1) An accounting of the responsibilities of persons responsible for executing the plan.
(2) The objectives of the plan.
(3) A description of the preventive strategies and programs to be adopted by the electrical corporation to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.
(4) A description of the metrics the electrical corporation plans to use to evaluate the plan’s performance and the assumptions that underlie the use of those metrics.
(5) A discussion of how the application of previously identified metrics to previous plan performances has informed the plan.
(6) Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety. As part of the protocols, each electrical corporation shall include protocols related to mitigating the public safety impacts of disabling reclosers and deenergizing portions of the electrical distribution system that consider the impacts on:
(A) Critical first responders
(B) Health and communication infrastructure
(C) Customers who are identified through the electrical corporation’s medical baseline program pursuant to Section 739.1 as critical care customers. The electrical corporation may temporarily deploy back-up power to critical care customers who meet all the following criteria:
(i) rely on life-support equipment to sustain life
(ii) demonstrate financial need, including enrollment in the California Alternative Rates for Energy (CARE) program created pursuant to Section 739.1 and
(iii) are not eligible for back-up power resources provided through medical services, medical insurance, or community resources. as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on responders, on customers enrolled in the California Alternative Rates for Energy (CARE) program created pursuant to Section 739.1, receiving medical baseline allowances pursuant to Section 739, and who the electrical corporation has identified as critical care customers relying on life-support equipment, and on health and communication infrastructure. and on customers enrolled in the California Alternative Rates for Energy (CARE) program created pursuant to Section 739.1, receiving medical baseline allowances pursuant to Section 739, and who the electrical corporation has identified as critical care customers relying on life-support equipment, and on
(7) Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines, including specified procedures for the critical care customers identified above. The procedures shall consider th the need the to notify, as a priority, critical first responders, health care facilities, and operators of telecommunications infrastructure.
(8) Plans for vegetation management.
(9) Plans for inspections of the electrical corporation’s electrical infrastructure.
(10) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the electrical corporation’s service territory, including all relevant wildfire risk and risk mitigation information that is part of the Safety Model Assessment Proceeding and the Risk Assessment Mitigation Phase filings. The list shall include, but not be limited to, both of the following:
(A) Risks and risk drivers associated with design, construction, operations, and maintenance of the electrical corporation’s equipment and facilities.
(B) Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the electrical corporation’s service territory.
(11) A description of how the plan accounts for the wildfire risk identified in the electrical corporation’s Risk Assessment Mitigation Phase filing.
(12) A description of the actions the electrical corporation will take to ensure its system will achieve the highest level of safety, reliability, and resiliency, and to ensure that its system is prepared for a major event, including hardening and modernizing its infrastructure with improved engineering, system design, standards, equipment, and facilities, such as undergrounding, insulation of distribution wires, and pole replacement.
(13) A showing that the utility has an adequate sized and trained workforce to promptly restore service after a major event, taking into account employees of other utilities pursuant to mutual aid agreements and employees of entities that have entered into contracts with the utility.
(14) Identification of any geographic area in the electrical corporation’s service territory that is a higher wildfire threat than is currently identified in a commission fire threat map, and where the commission should consider expanding the high fire threat district based on new information or changes in the environment.
(15) A methodology for identifying and presenting enterprise-wide safety risk and wildfire-related risk that is consistent with the methodology used by other electrical corporations unless the commission determines otherwise.
(16) A description of how the plan is consistent with the electrical corporation’s disaster and emergency preparedness plan prepared pursuant to Section 768.6, including both of the following:
(A) Plans to prepare for, and to restore service after, a wildfire, including workforce mobilization and prepositioning equipment and employees.
(B) Plans for community outreach and public awareness before, during, and after a wildfire, including language notification in English, Spanish, and the top three primary languages used in the state other than English or Spanish, as determined by the commission based on the United States Census data.
(17) A statement of how the electrical corporation will restore service after a wildfire.
(18) Protocols for compliance with requirements adopted by the commission regarding activities to support customers during and after a wildfire, outage reporting, support for low-income customers, billing adjustments, deposit waivers, extended payment plans, suspension of disconnection and nonpayment fees, repair processing and timing, access to utility representatives, and emergency communications.
(19) A description of the processes and procedures the electrical corporation will use to do all of the following:
(A) Monitor and audit the implementation of the plan.
(B) Identify any deficiencies in the plan or the plan’s implementation and correct those deficiencies.
(C) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, carried out under the plan and other applicable statutes and commission rules.
(20) Any other information that the commission may require.
(d) The commission shall accept comments on each plan from the public, other local and state agencies, and interested parties, and verify that the plan complies with all applicable rules, regulations, and standards, as appropriate.
(e) The commission shall approve each plan within three months of its submission, unless the commission makes a written determination, including reasons supporting the determination, that the three-month deadline cannot be met and issues an order extending the deadline. Each electrical corporation’s approved plan shall remain in effect until the commission approves the electrical corporation’s subsequent plan. At the time it approves each plan, the commission shall authorize the utility to establish a memorandum account to track costs incurred to implement the plan.
(f) The commission’s approval of a plan does not establish a defense to any enforcement action for a violation of a commission decision, order, or rule.
(g) The commission shall consider whether the cost of implementing each electrical corporation’s plan is just and reasonable in its general rate case application. Nothing in this section shall be interpreted as a restriction or limitation on Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(h) The commission shall conduct an annual review of each electrical corporation’s compliance with its plan as follows:
(1) Three months after the end of an electrical corporation’s initial compliance period as established by the commission pursuant to subdivision (b), and annually thereafter, each electrical corporation shall file with the commission a report addressing its compliance with the plan during the prior calendar year.
(2) (A) Before March 1, 2021, and before each March 1 thereafter, the commission, in consultation with the Department of Forestry and Fire Protection, shall make available a list of qualified independent evaluators with experience in assessing the safe operation of electrical infrastructure.
(B) (i) Each electrical corporation shall engage an independent evaluator listed pursuant to subparagraph (A) to review and assess the electrical corporation’s compliance with its plan. The engaged independent evaluator shall consult with, and operate under the direction of, the Safety and Enforcement Division of the commission. The independent evaluator shall issue a report on July 1 of each year in which a report required by paragraph (1) is filed. As a part of the independent evaluator’s report, the independent evaluator shall determine whether the electrical corporation failed to fund any activities included in its plan.
(ii) The commission shall consider the independent evaluator’s findings, but the independent evaluator’s findings are not binding on the commission, except as otherwise specified.
(iii) The independent evaluator’s findings shall be used by the commission to carry out its obligations under Article 1 (commencing with Section 451) of Chapter 3 of Part 1 of Division 1.
(iv) The independent evaluator’s findings shall not apply to events that occurred before the initial plan is approved for the electrical corporation.
(3) The commission shall authorize the electrical corporation to recover in rates the costs of the independent evaluator.
(4) The commission shall complete its compliance review within 18 months after the submission of the electrical corporation’s compliance report.
(i) An electrical corporation shall not divert revenues authorized to implement the plan to any activities or investments outside of the plan.
(j) Each electrical corporation shall establish a memorandum account to track costs incurred for fire risk mitigation that are not otherwise covered in the electrical corporation’s revenue requirements. The commission shall review the costs in the memorandum accounts and disallow recovery of those costs the commission deems unreasonable.
SEC. 2.
No reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII B of the California Constitution.