SB 288: California Environmental Quality Act: exemptions: transportation-related projects.
- Session Year: 2019-2020
- House: Senate
- Latest Version Date: 2020-09-28
|
Date
|
Status
|
|---|---|
| Sep 28, 2020 | Chaptered by Secretary of State. Chapter 200, Statutes of 2020. |
| Sep 28, 2020 | Approved by the Governor. |
| Sep 10, 2020 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 31, 2020 | Assembly amendments concurred in. (Ayes 32. Noes 5.) Ordered to engrossing and enrolling. |
| Aug 30, 2020 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 30, 2020 | Read third time. Passed. (Ayes 65. Noes 3. Page 5288.) Ordered to the Senate. |
| Aug 24, 2020 | Read second time. Ordered to third reading. |
| Aug 20, 2020 | From committee: Do pass. (Ayes 16. Noes 2.) (August 20). |
| Aug 12, 2020 | Read second time and amended. Re-referred to Com. on APPR. |
| Aug 11, 2020 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 1.) (August 6). |
| Jul 27, 2020 | Re-referred to Com. on NAT. RES. pursuant to Assembly Rule 96. |
| Jun 15, 2020 | Re-referred to Com. on RLS. pursuant to Assembly Rule 96. |
| Jun 3, 2020 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E. & R. |
| Sep 4, 2019 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E. & R. |
| Aug 19, 2019 | Read third time and amended. |
| Jul 10, 2019 | Read second time. Ordered to third reading. |
| Jul 9, 2019 | Read second time and amended. Ordered to second reading. |
| Jul 8, 2019 | From committee: Do pass as amended. (Ayes 4. Noes 0.) (July 3). |
| Jun 24, 2019 | From committee: Be re-referred to Com. on E. & R. (Ayes 12. Noes 0.) (June 24). Re-referred to Com. on E. & R. |
| Jun 20, 2019 | Re-referred to Com. on RLS. pursuant to Assembly Rule 96. |
| Jun 19, 2019 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 18, 2019 | July 10 set for second hearing canceled at the request of author. |
| Jun 18, 2019 | June 26 set for first hearing canceled at the request of author. |
| Jun 6, 2019 | Referred to Com. on U. & E. |
| May 24, 2019 | In Assembly. Read first time. Held at Desk. |
| May 23, 2019 | Read third time. Passed. (Ayes 37. Noes 0.) Ordered to the Assembly. |
| May 20, 2019 | Read second time. Ordered to third reading. |
| May 17, 2019 | From committee: Do pass as amended. (Ayes 4. Noes 2.) (May 16). |
| May 14, 2019 | Set for hearing May 16. |
| May 13, 2019 | May 13 hearing: Placed on APPR. suspense file. |
| May 3, 2019 | Set for hearing May 13. |
| May 1, 2019 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 30, 2019 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (April 10). |
| Mar 28, 2019 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U. & C. |
| Mar 26, 2019 | Set for hearing April 10. |
| Mar 25, 2019 | April 2 hearing postponed by committee. |
| Mar 21, 2019 | Set for hearing April 2. |
| Feb 21, 2019 | Referred to Com. on E., U. & C. |
| Feb 14, 2019 | From printer. May be acted upon on or after March 16. |
| Feb 13, 2019 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 31, 2020 | Unfinished Business SB288 Wiener et al. Concurrence | Senate Floor |
Passed |
|
| Aug 30, 2020 | SB 288 Wiener Senate Third Reading By Friedman | Assembly Floor |
Passed |
|
| Aug 20, 2020 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Aug 6, 2020 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Jul 3, 2019 | Do pass as amended. | Assembly Standing Committee on Elections and Redistricting |
Passed |
|
| Jun 24, 2019 | Be re-referred to the Committee on [Elections and Redistricting] | Assembly Standing Committee on Rules |
Passed |
|
| May 23, 2019 | Senate 3rd Reading SB288 Wiener et al. | Senate Floor |
Passed |
|
| May 16, 2019 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| May 13, 2019 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 10, 2019 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 288 |
UNFINISHED BUSINESS
Bill No: SB 288
Author: Wiener (D), et al.
Amended: 8/12/20
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 11-0, 4/10/19
AYES: Hueso, Moorlach, Chang, Dodd, Hill, McGuire, Rubio, Skinner, Stern, Stone, Wiener
NO VOTE RECORDED: Bradford, Hertzberg
SENATE APPROPRIATIONS COMMITTEE: 4-2, 5/16/19
AYES: Portantino, Bradford, Hill, Wieckowski
NOES: Bates, Jones
SENATE FLOOR: 38-0, 5/23/19
AYES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
ASSEMBLY FLOOR: 65-3, 8/30/20 - See last page for vote
SUBJECT: California Environmental Quality Act: exemptions: transportation-related projects
SOURCE: Bay Area Council
San Francisco Planning and Urban Research Association
Silicon Valley Leadership Group
DIGEST:
This bill exempts from the California Environmental Quality Act (CEQA), until 2023, various transit-related projects such as pedestrian and bicycle facilities projects, transit prioritization projects, and projects for the institution or increase of new bus rapid transit, bus, or light rail service on existing public rights-of-way or existing highway rights-of-way.
Assembly Amendments
delete the bill’s contents, which previously related to the Democratic Party of California, and insert amendments that create various CEQA exemptions for transit-related projects.
ANALYSIS:
Existing law, under CEQA:
- Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (Public Resources Code (PRC) §21000 et seq.).
- Exempts from CEQA, until January 1, 2021, bicycle transportation plans for an urbanized area for restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and related signage for bicycles, pedestrians, and vehicles under certain conditions (PRC §21080.20).
- Contains other exemptions relating to transit, for example:
- Projects for the institution or increase of passenger or commuter services on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities (PRC §21080(b)(10)).
- Projects for the institution or increase of passenger or commuter service on high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities (PRC §21080(b)(11)).
- Facility extensions not to exceed four miles in length which are required for the transfer of passengers from or to exclusive mass transit guideway or busway public transit services (PRC §21080(b)(12)).
- Projects for the development of a regional transportation improvement program, the state transportation improvement program, or a congestion management program (PRC §21080(b)(13)); however construction projects implementing these programs are subject to CEQA.
- Restriping of streets or highways to relieve traffic congestion (PRC §21080.19).
This bill:
- Extends the bicycle transportation plan exemption an additional 9 years, until January 1, 2030, and removes the requirement that a lead agency prepare an assessment of traffic and safety impacts and include measures in the plan to mitigate vehicular traffic impacts and bicycle and pedestrian safety impacts.
- Exempts from CEQA, until January 1, 2023, the following projects:
- Pedestrian and bicycle facilities, including new facilities.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- On highways with existing public transit service or that will be implementing public transit service within six months of the conversion, a project for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes, for use either during peak congestion hours or all day.
- A project for the institution or increase of new bus rapid transit, bus, or light rail service, including the construction of stations, on existing public rights-of-way or existing highway rights-of-way, whether or not the right-of-way is in use for public mass transit.
- A project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, provided the project meets certain conditions.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project described in (a) through (f).
- A project that consists exclusively of a combination of (a) through (g).
- A project carried out by a city or county to reduce minimum parking requirements.
- Subjects each of the projects described in (2), except a project described in (i), to the following requirements:
- Be carried out by a public agency and the public agency is the lead agency.
- Be located in an urbanized area.
- Be located on or within an existing public right-of-way.
- Must not add physical infrastructure that increases new automobile capacity on existing rights-of-way, except as provided.
- Does not require demolition of affordable housing units.
- The lead agency certifies that the project will be completed by a skilled and trained workforce, except as provided.
- Requires a project exceeding $100,000,000 to also meet all of the following:
- Must be incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the project.
- Construction impacts are fully mitigated consistent with applicable law.
- The lead agency completes and considers results of a project business case and a racial equity analysis, as specified.
- The lead agency holds noticed public hearings, as prescribed by the bill.
- Requires the lead agency to file a notice of exemption with the Office of Planning and Research and the county clerk of the county in which the project is located if the lead agency determines the project is not subject to CEQA pursuant to the bill.
Background
- Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration (ND). If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an environmental impact report (EIR).
- CEQA and the National Environmental Protection Act (NEPA). NEPA is the federal equivalent of CEQA. If the project involves a “major federal action” with significant impacts, an environmental impact statement (EIS) under NEPA may be required. Some transit projects, such as highway improvement projects, are also funded with federal funds and are therefore also subject to NEPA.
- Categorical exemptions. In addition to statutory exemptions, CEQA Guidelines include categorical exemptions that apply to some transit projects, including:
- Work on existing facilities where there is negligible expansion of an existing use, specifically including "(e)xisting highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities, … and other alterations such as the addition of bicycle facilities, including but not limited to bicycle parking, bicycle-share facilities and bike lanes, transit improvements such as bus lanes, pedestrian crossings, street trees, and other similar alterations that do not create additional automobile lanes." (Sec. 15301(c), CEQA Guidelines);
- Replacement or reconstruction of existing structures or facilities on the same site and with substantial same purpose and capacity (Sec. 15302, CEQA Guidelines);
- Construction or placement of minor structures accessory to existing commercial, industrial, or institutional facilities, specifically including on-premises signs, small parking lots, and seasonal or temporary use structures in facilities designed for public use (Sec. 15311, CEQA Guidelines);
- Minor public or private alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees, except for forestry or agricultural purposes, specifically including the creation of bicycle lanes on existing rights-of-way (Sec. 15304 (h), CEQA Guidelines).
Unlike statutory exemptions, categorical exemptions are not absolute. A categorical exemption may be denied or challenged if any of the following apply:
- The project results in damage to scenic resources within a highway officially designated as a state scenic highway.
- The project site is on a hazardous waste site.
- The project may cause substantial adverse change in the significance of a historical resource.
- There is a reasonable possibility of significant effect on the environment due to unusual circumstances;
- Significant cumulative impacts from projects of the same type will result; or
- For certain categorical exemptions, the project will have impacts on a uniquely sensitive environment.
- CEQA Survey of State Agencies. In October 2017, the Senate Environmental Quality Committee conducted a survey of state agencies regarding CEQA in ordr to gain a better understanding of CEQA compliance and litigation. The survey covered a period of five years, Fiscal Years 2011/12 to 2015/16. State agencies were asked to provide the following:
- The number of projects of which the agency was the lead agency over the five-year time period, and of these, the number that were:
- Exempt from CEQA through either a categorical exemption or a statutory exemption.
- Subject to a ND or mitigated ND.
- Subject to an EIR.
- Of the projects for which an EIR was prepared, how many were also subject to NEPA.
- The number of CEQA lawsuits filed against them.
According to the results, the Department of Transportation (DOT) reported 3,259 projects during the five year period. Of those 3,259 projects, DOT reported 29 CEQA lawsuits being filed. It is noted that multiple lawsuits could have been filed for a single project. The DOT also reported the following:
- Required an EIR: 62 projects
- Categorical exemptions: 2,890 projects
- Statutory exemptions: 44 projects
- ND/MND: 263 projects
Comments
- Purpose of Bill. According to the author, “SB 288 will jumpstart sustainable transportation projects as an essential part of California’s economic recovery from COVID-19. Now is the time to accelerate common-sense projects that create jobs, revive local economies, improve transportation, connect communities, improve public health, and reduce greenhouse gas emissions. In addition, SB 288 is a no-cost stimulus for the state. Many projects already have local funding. These targeted exemptions can shave project timelines by 6 months to 4 years, putting dollars–and people–to work more quickly. Better certainty and lower costs also make projects more competitive for federal funding. Additionally, investments in bicycle lanes, complete streets and public transit are proven job generators, creating 10-13 jobs per million dollars spent and a 5 to 1 economic return in direct and indirect spending. As cities around the world begin to reopen their economies, many are moving swiftly to invest in sustainable transportation and transit. With SB 288, California can continue its commitment to global leadership and more quickly deliver the safe and affordable transportation that people want and need.”
- What do we lose when we remove the environment review of CEQA? Often groups will seek a CEQA exemption to expedite construction of a particular type of project and reduce costs. Providing an exemption, however, can overlook the benefits of environmental review: to inform decisionmakers and the public about project impacts and identify ways to avoid or significantly reduce environmental damage. Environmental review includes considerations such as air quality, impacts to neighboring facilities, pressure on underlying infrastructure, and analyzes those impacts in the context of one another.
Projects considered environmentally beneficial, such as improving bicycle transportation in urbanized areas or new light rail service lines and stations, may also have significant impacts on the environment.
“CEQA operates, not by dictating pro-environmental outcomes, but rather by mandating that ‘decision makers and the public’ study the likely environmental effects of contemplated government actions and thus make fully informed decisions regarding those actions. … In other words, CEQA does not care what decision is made as long as it is an informed one.” (Citizens Coalition Los Angeles v. City of Los Angeles (2018) 26 Cal. App. 5th 561, 577.)
- Codifying categorical exemptions for many transit-related projects. According to the CEQA survey, almost 90% of DOT projects were approved as a categorical exemption. This bill would codify many of these types of projects, making them statutory exemptions. As noted above, unlike a categorical exemption, a statutory exemption cannot be denied or challenged for reasons such as cumulative impacts and unusual circumstances.
- CEQA litigation. The only tool for enforcing CEQA is civil litigation. So, eliminating the possibility of litigation means taking away the ability for anyone to enforce the law.
Some cite CEQA litigation as a problem but do not indicate the result of that litigation. For example, were significant impacts that were not evaluated in the initial document ultimately addressed? What would have been the result if those impacts had not been mitigated (e.g. exposure of people to hazards, congestion, or inadequate public services)?
The volume of CEQA litigation is low considering the thousands of projects subject to CEQA each year as well as the volume of civil litigation in general statewide. In its report, CEQA in the 21st Century, BAE Urban Economics found that less than 1% of projects reviewed under CEQA were subject to litigation. The CEQA State Agency Survey, published by this committee in October 2017, found similar results for DOT projects (see above). And if a project is the subject of litigation, perhaps the cause of action has merit and ensures compliance with the law.
- Mega projects that have been incorporated into a program EIR. A program EIR is an EIR prepared for a series of actions that can be characterized as one large project.
A program EIR, however, does not shield a project from subsequent environmental review. Generally, an agency must examine the individual project that is subject to the program EIR and determine whether additional environmental review is required. The agency’s determination is based on (a) whether the project is within the overall scope of the program EIR, (b) whether the project will result in environmental effects that were not examined in the program EIR, (c) whether there are changes in the project or in the circumstances that require evaluation of new significant environmental effects, and (d) the availability of new information that was not known and could not have been known when the previous EIR was prepared.
A project that is more than $100,000,000 and incorporated into a programmatic EIR, but is exempt from CEQA pursuant to this bill, would not be subject to further environmental review if any of the above factors are triggered.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Assembly Appropriations Committee, there will be negligible state impact.
SUPPORT: (Verified 8/30/20)
Bay Area Council (co-source)
San Francisco Bay Area Planning and Urban Research Association (co-source)
Silicon Valley Leadership Group (co-source)
Alameda-Contra Costa Transit District
Altamont Corridor Express
American Planning Association, California Chapter
Amply Power, Inc.
California Bicycle Coalition
California Downtown Association
California Hydrogen Coalition
California Transit Association
California YIMBY
CALSTART INC.
Circulate San Diego
City of Oakland
City of San Jose
City of Santa Monica
Council of California Goodwill Industries
East Bay for Everyone
East Bay Leadership Council
Greater Sacramento Economic Council
Greenbelt Alliance
Greenpower Motor Company
League of Women Voters of California
Livermore Amador Valley Transit Authority
Los Angeles Area Chamber of Commerce
Los Angeles County Metropolitan Transportation Authority
Marin County Bicycle Coalition
Mayor Eric Garcetti, City of Los Angeles
Mayor of City & County of San Francisco London Breed
Metropolitan Transit System
Metropolitan Transportation Commission
Monterey Bay Economic Partnership
Move LA
Napa Valley Transportation Authority
Natural Resources Defense Fund
North Bay Leadership Council
Paired Power, INC.
Peninsula Corridor Joint Powers Board (Caltrain)
Rails to Trails Conservancy
REACH
Regional Economic Association Leaders Coalition
Sacramento Area Council of Governments
San Bernardino County Transportation Authority
San Diego Metropolitan Transit System
San Diego Regional Chamber of Commerce
San Francisco Bay Area Water Emergency Transportation Authority
San Francisco Municipal Transportation Agency
San Gabriel Valley Economic Partnership
San Joaquin Regional Rail Authority
San Joaquin Valley Regional Transportation Planning Agencies
San Mateo County Transit District
San Mateo County Transportation Authority
Santa Cruz Area Chamber of Commerce
Santa Rosa Metro Chamber of Commerce
Seamless Bay Area
Silicon Valley Organization
Solano Transportation Authority
Southern California Contractors Association
Southern California Leadership Council
SPUR
Sunline Transit Agency
The Lion Electric Co.
Transbay Coalition
Transportation Authority of Marin
Tranzito
Tri Valley-San Joaquin Valley Regional Rail Authority
Tri-Valley Wheels
Ventura County Transportation Commission
OPPOSITION: (Verified 8/30/20)
California Environmental Justice Alliance
Center on Race, Poverty & the Environment
City of Rancho Palos Verdes
Communities for A Better Environment
Physicians for Social Responsibility - Los Angeles
People Organizing to Demand Environmental and Economic Rights
SF Ocean Edge
Sunset-Parkside Education and Action Committee
ASSEMBLY FLOOR: 65-3, 8/30/20
AYES: Arambula, Bauer-Kahan, Berman, Bigelow, Bloom, Bonta, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Chiu, Choi, Chu, Cooley, Cooper, Cunningham, Megan Dahle, Daly, Diep, Flora, Fong, Friedman, Gabriel, Gallagher, Eduardo Garcia, Gipson, Gloria, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kalra, Kiley, Lackey, Levine, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Mullin, Nazarian, Obernolte, O'Donnell, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Ting, Waldron, Weber, Wood, Rendon
NOES: Brough, Muratsuchi, Mark Stone
NO VOTE RECORDED: Aguiar-Curry, Boerner Horvath, Eggman, Frazier, Cristina Garcia, Kamlager, Limón, Patterson, Reyes, Voepel, Wicks
Prepared by: Genevieve M. Wong / E.Q. / (916) 651-4108
8/31/20 0:45:12
**** END ****
SENATE THIRD READING
STR Bill Id:SB 288
Author:(Wiener)
As Amended Ver:August 12, 2020
Majority vote
SUMMARY:
Exempts specified transit, bicycle, and pedestrian projects from the California Environmental Quality Act (CEQA).
Major Provisions
- Exempts the following transportation project types:
- Pedestrian and bicycle facilities, including bicycle parking, bicycle sharing facilities, and bikeways.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects, as defined.
- On highways with existing public transit service or that will be implementing public transit service within six months of the conversion, a project for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes, for use either during peak congestion hours or all day.
- A project for the institution or increase of new bus rapid transit, bus, or light rail service, including the construction of stations, on existing public rights-of-way or existing highway rights-of-way, whether or not the right-of-way is in use for public mass transit.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project listed above.
- A project to construct or maintain infrastructure to charge or refuel zero-emission transit buses, as specified.
- A project that combines any of the components of a project listed above.
- A project carried out by a city or county to reduce minimum parking requirements.
- Requires exempt projects meet all of the following criteria:
- A public agency is carrying out the project and is the lead agency for the project.
- The project is located in an urbanized area, as defined.
- The project is located on or within an existing public right-of-way.
- The project does not add physical infrastructure that increases new automobile capacity on existing rights-of-way except for minor modifications needed for the efficient and safe movement of transit vehicles, such as extended merging lanes. The project shall not include the addition of any auxiliary lanes.
- The construction of the project does not require the demolition of affordable housing units, including rent-controlled units and units occupied by low-income tenants.
- Requires a project exceeding $100 million to also meet all of the following criteria:
- The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- Construction impacts are fully mitigated.
- The lead agency completes and considers the results of a project business case and a racial equity analysis.
- The lead agency holds specified public meetings.
- Requires the lead agency to certify that the project will be completed by a skilled and trained workforce, as specified.
- Sunsets the section adding the exemptions above on January 1, 2023.
- Extends the sunset of the exemption for bicycle transportation plans from 2021 to 2030, and repeals the requirement for the lead agency to prepare an assessment of any traffic and safety impacts of the project and include measures in the bicycle transportation plan to mitigate potential vehicular traffic impacts and bicycle and pedestrian safety impacts.
COMMENTS:
CEQA includes statutory exemptions for certain transportation project types. In addition, the CEQA Guidelines include categorical exemptions that apply to some transportation projects, including: (1) work on existing facilities where there is negligible expansion of an existing use, specifically including "(e)xisting highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities" (Section 15301(c), CEQA Guidelines); and (2) minor public or private alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees, except for forestry or agricultural purposes, specifically including the creation of bicycle lanes on existing rights-of-way (Section 15304 (h), CEQA Guidelines).
If a project is not exempt from CEQA, but the initial study shows that it would not result in a significant effect on the environment, the lead agency must prepare a negative declaration, and no EIR is required.
According to the Author:
SB 288 will jumpstart sustainable transportation projects as an essential part of California’s economic recovery from COVID-19, unlocking opportunities for getting people and economy back to work. We cannot afford to delay common-sense projects that create jobs, revive local economies, improve transportation, connect communities, improve public health, and reduce greenhouse gas emissions.
Arguments in Support:
SB 288 would save critical time and money by creating statutory exemptions from CEQA for projects that make streets safer for walking and bicycling, speed up transit service in the public right of way, modernize and build new transit stations, repair eligible bridges and install zero-emission infrastructure.
Arguments in Opposition:
SB 288 would allow a large list of transportation projects that will likely bring significant environmental impacts to be exempt from CEQA, thereby circumventing the law’s important public participation and environmental health requirements. Although the bill as amended (on June 3, 2020) purportedly promotes sustainable transportation projects, it would in fact exempt large-scale projects from undergoing a critical environmental review and accountability processes that will likely bring long-term, significant air quality and other environmental and environmental health impacts.
FISCAL COMMENTS:
According to the Assembly Appropriations Committee, negligible state impact.
VOTES:
SENATE FLOOR: Vote not relevant
ASM RULES: 12-0-0
YES: Cooley, Cunningham, Carrillo, Flora, Grayson, Kamlager-Dove, Maienschein, Mathis, Quirk-Silva, Ramos, Robert Rivas, Wicks
ASM ELECTIONS AND REDISTRICTING: 4-0-3
YES: Berman, Calderon, Mullin, Weber
ABS, ABST OR NV: Gallagher, Low, Mayes
ASM NATURAL RESOURCES: 7-1-3
YES: Friedman, Flora, Chau, Eggman, Luz Rivas, Mathis, McCarty
NO: Mark Stone
ABS, ABST OR NV: Cristina Garcia, Muratsuchi, Cunningham
ASM APPROPRIATIONS: 16-2-0
YES: Gonzalez, Bloom, Bonta, Calderon, Carrillo, Chau, Megan Dahle, Diep, Eggman, Fong, Gabriel, Eduardo Garcia, Petrie-Norris, Quirk, Robert Rivas, Voepel
NO: Bigelow, Bauer-Kahan
UPDATED:
VERSION: August 12, 2020
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0003280
Date of Hearing: August 20, 2020
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
SBPCA Bill Id:SB 288
Author:(Wiener) – As Amended Ver:August 12, 2020
Policy Committee: | Natural Resources | Vote: | 7 - 1 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill exempts specified toll lane, transit, bicycle, and pedestrian projects from the California Environmental Quality Act (CEQA) and extends the sunset of the CEQA exemption for bicycle transportation plans, from 2021 to 2030. Specifically, this bill:
- Exempts from CEQA the following transportation project types:
- Pedestrian and bicycle facilities, including bicycle parking, bicycle sharing facilities, and bikeways.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects.
- On highways with existing public transit service or that will be implementing public transit service within six months of the conversion, a project for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes, for use either during peak congestion hours or all day.
- A project for the institution or increase of new bus rapid transit, bus, or light rail service, including the construction of stations, on existing public rights-of-way or existing highway rights-of-way, whether or not the right-of-way is in use for public mass transit.
- A project to construct or maintain infrastructure to charge or refuel zero-emission transit busses, provided the project is carried out by a public transit agency that is subject to, and in compliance with , the State Air Resources Board’s Clean Transit regulations and the project is located on property that is owned by the transit agency.
- The maintenance, repair, relocation, replacement or removal of any utility infrastructure associated with a project listed above.
- A project that consists exclusively of a combination of any of the components of a project listed above.
- A project carried out by a city of county to reduce minimum parking requirements.
- Except as provided, requires exempt projects meet all of the following criteria:
- A public agency is carrying out the project and is the lead agency for the project.
- The project is located in an urbanized area, as defined.
- The project is located on or within existing public rights-of-way.
- The project does not add physical infrastructure that increases new automobile capacity on existing rights-of-way except for minor modifications needed for the efficient and safe movement of transit vehicles, such as extended merging lanes. The project shall not include the addition of any auxiliary lanes.
- The construction of the project does not require the demolition of affordable housing units, including rent-controlled units and units occupied by low-income tenants.
- Requires a project exceeding $100 million to also meet all of the following criteria:
- The project is incorporated in a regional transportation plan, sustainable communities’ strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- The lead agency completes and considers the results of a project business case and a racial equity analysis.
- The lead agency holds specified public meetings.
- Requires the lead agency to certify that the project will be completed by a skilled and trained workforce, as specified.
- Requires the lead agency to file a notice of exemption with the Office of Planning and Research and the county clerk of the county in which the project is located.
- Sunsets this exemption on January 1, 2023
- Extends the sunset of the CEQA exemption for bicycle transportation plans from 2021 to 2030, and repeals the requirement for the lead agency to prepare an assessment of any traffic and safety impacts of the project and include measures in the bicycle transportation plan to mitigate potential vehicular traffic impacts and bicycle and pedestrian safety impacts.
FISCAL EFFECT:
Negligible state impact.
COMMENTS:
- Purpose. According to the author:
SB 288 will jumpstart sustainable transportation projects as an essential part of California’s economic recovery from COVID-19, unlocking opportunities for getting people and economy back to work. We cannot afford to delay common-sense projects that create jobs, revive local economies, improve transportation, connect communities, improve public health, and reduce greenhouse gas emissions.
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects approved or undertaken by public agencies. For a project not exempt from CEQA, an initial study is prepared to determine if the project may have a significant impact on the environment. If the initial study shows no significant impacts, a negative declaration is issued. If the project may significantly impact the environment, a full Environmental Impact Report (EIR) must be prepared, including the identification of environmental impacts and required mitigation, compliance and reporting measures intended to reduce the environmental impacts to the extent feasible. CEQA also provides for public process and legal challenges.
CEQA actions taken by public agencies can be challenged in superior court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Generally, a petition must be filed within 30 to 35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing.
CEQA includes statutory exemptions for certain transportation project types (listed above). In addition, the CEQA Guidelines include categorical exemptions that apply to some transportation projects, including: (a) work on existing facilities where there is negligible expansion of an existing use, and (b) minor public or private alterations in the condition of land, water, and vegetation which do not involve removal of healthy, mature, scenic trees, except for forestry or agricultural purposes, specifically including the creation of bicycle lanes on existing rights-of-way.
If a project is not exempt from CEQA, but the initial study shows that it would not result in a significant effect on the environment, the lead agency must prepare a negative declaration, and no EIR is required.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: August 6, 2020
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Laura Friedman, Chair
SBPCA Bill Id:SB 288
Author:(Wiener) – As Amended Ver:July 27, 2020
SENATE VOTE: 38-0 (not relevant)
SUBJECT: California Environmental Quality Act: exemptions: transportation-related projects
SUMMARY: Exempts specified toll lane, transit, bicycle, and pedestrian projects from the California Environmental Quality Act (CEQA).
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA.
- Exempts specified transportation project types, including the following:
- Approval of a bicycle transportation plan for an urbanized area for restriping of streets and highways, bicycle parking and storage, signal timing, and related signage, until January 1, 2021.
- A bicycle lane project in an urbanized area that is consistent with a local bicycle transportation plan, until January 1, 2021.
- A project for the institution or increase of passenger or commuter service on rail or highway rights-of-way already in use, including modernization of existing stations and parking facilities.
- A project for the institution or increase of passenger or commuter service on high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities.
- Facility extensions not to exceed four miles in length which are required for the transfer of passengers from or to exclusive public mass transit guideway or busway public transit services.
THIS BILL:
- Exempts the following transportation project types:
- Pedestrian and bicycle facilities, including bicycle parking, bicycle sharing facilities, and bikeways.
- Projects that improve customer information and wayfinding for transit riders, bicyclists, or pedestrians.
- Transit prioritization projects and facilities that improve reliability and reduce delay, including, but not limited to, signal priority and train control systems or transportation communications networks.
- On highways with existing public transit service or that will be implementing public transit service within three years of the conversion, a project for the designation and conversion of existing general purpose lanes to exclusive lanes for high-occupancy vehicle lanes or high occupancy toll lanes, or for the conversion of high-occupancy vehicle lanes to high occupancy toll lanes.
- On highways with existing public transit service or that will be implementing public transit service within six months of the conversion, a project for the designation and conversion of general purpose lanes or highway shoulders to bus-only lanes, for use either during peak congestion hours or all day.
- A project for the institution or increase of new bus rapid transit, bus, or light rail service, including the construction of stations, on existing public rights-of-way or existing highway rights-of-way, whether or not the right-of-way is in use for public mass transit.
- The maintenance, repair, relocation, replacement, or removal of any utility infrastructure associated with a project listed above.
- A project that combines any of the components of a project listed above.
- Requires exempt projects meet all of the following criteria:
- A public agency is carrying out the project and is the lead agency for the project.
- The project is located in an urbanized area, as defined.
- The project is located on or within an existing public right-of-way.
- The project does not add physical infrastructure that increases new automobile capacity on existing rights-of-way except for minor modifications needed for the efficient and safe movement of transit vehicles, such as extended merging lanes. The project shall not include the addition of any auxiliary lanes.
- The construction of the project does not require the demolition of affordable housing units, including rent-controlled units and units occupied by low-income tenants.
- Requires a project exceeding $100,000,000 to also meet all of the following criteria:
- The project is incorporated in a regional transportation plan, sustainable communities strategy, general plan, or other plan that has undergone a programmatic-level environmental review within 10 years of the approval of the project.
- The lead agency completes and considers the results of a project business case and a racial equity analysis.
- The lead agency holds specified public meetings.
- Requires the lead agency to certify that the project will be completed by a skilled and trained workforce, as specified.
- Extends the sunset of the exemption for bicycle transportation plans from 2021 to 2030, and repeals the requirement for the lead agency to prepare an assessment of any traffic and safety impacts of the project and include measures in the bicycle transportation plan to mitigate potential vehicular traffic impacts and bicycle and pedestrian safety impacts.
FISCAL EFFECT: Unknown
COMMENTS:
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
CEQA actions taken by public agencies can be challenged in superior court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Generally, a petition must be filed within 30 to 35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing.
CEQA includes statutory exemptions for certain transportation project types (listed above). In addition, the CEQA Guidelines include categorical exemptions that apply to some transportation projects, including: (1) work on existing facilities where there is negligible expansion of an existing use, specifically including "(e)xisting highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities" (Section 15301(c), CEQA Guidelines); and (2) minor public or private alterations in the condition of land, water, and/or vegetation which do not involve removal of healthy, mature, scenic trees, except for forestry or agricultural purposes, specifically including the creation of bicycle lanes on existing rights-of-way (Section 15304 (h), CEQA Guidelines).
If a project is not exempt from CEQA, but the initial study shows that it would not result in a significant effect on the environment, the lead agency must prepare a negative declaration, and no EIR is required.
- Author's statement:
SB 288 will jumpstart sustainable transportation projects as an essential part of California’s economic recovery from COVID-19, unlocking opportunities for getting people and economy back to work. We cannot afford to delay common-sense projects that create jobs, revive local economies, improve transportation, connect communities, improve public health, and reduce greenhouse gas emissions.
- Suggested amendments. The author and the committee may wish to consider the following amendments:
- Specify transit prioritization project types that are eligible for exemption – i.e., signal priority and train control systems or transportation communications networks.
- Eliminate exemption for conversion of existing lanes to high-occupancy vehicle lanes or high occupancy toll lanes.
- Require the lead agency to determine that a project claiming an exemption:
- Is consistent with the applicable general plan and regional transportation plan for which an EIR has been certified.
- Construction impacts are fully mitigated consistent with applicable law.
- Amend the definition of “urbanized area” so that it is consistent with the existing CEQA definition (Section 21071 of the Public Resources Code), rather than the U.S. Census Bureau definition.
- Require a notice of exemption to be filed with the Office of Planning and Research, in addition to the county where the project is located.
- Sunset the new exemptions on January 1, 2023.
REGISTERED SUPPORT / OPPOSITION:
Support
Alameda-Contra Costa Transit District
City & County of San Francisco Mayor London Breed
City of Oakland
Greenbelt Alliance
Metropolitan Transportation Commission
Napa Valley Transportation Authority
Sacramento Area Council of Governments
San Bernardino Associated Governments
San Diego Regional Chamber of Commerce
Seamless Bay Area
Shasta Living Streets
Silicon Valley Leadership Group
Transbay Coalition
Ventura County Transportation Commission
Opposition
Associated Builders and Contractors - Southern California Chapter (unless amended)
California Environmental Justice Alliance (unless amended)
Center on Race, Poverty & the Environment (unless amended)
Communities for a Better Environment (unless amended)
Physicians for Social Responsibility - Los Angeles (unless amended)
Plumbing-Heating-Cooling Contractors Association of California (unless amended)
Sierra Club California
Sunset-Parkside Education and Action Committee (SPEAK)
Western Electrical Contractors Association (unless amended)
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
SENATE THIRD READING
STR Bill Id:SB 288
Author:(Wiener)
As Amended Ver:July 9, 2019
Majority vote
SUMMARY:
Allows a person who is not registered as a Democrat to be appointed to serve on a Democratic county central committee, if permitted by the bylaws of the committee.
Major Provisions
- Provides that a person who is not registered to vote as a Democrat is eligible to be appointed to a county central committee if such an appointment is permitted by the bylaws of that committee, notwithstanding a separate provision of law that provides that a person is not eligible for appointment or election to a Democratic county central committee if the person is not registered as affiliated with the Democratic party at the time of his or her appointment or election.
- Declares the intent of the Legislature to enact legislation to permit a person who is not a United States (US) citizen to be elected to and to serve as a member of a county central committee of the Democratic Party, if permitted by that committee.
COMMENTS:
According to information provided by the author's office, this bill came about in part after a person who is not a US citizen was appointed to the San Francisco Democratic Central Committee in January of this year. While the action of appointing that person to the county central committee appears to be prohibited by existing state law (since state law provides that a person is not eligible to be appointed to a county central committee of the Democratic Party of California if the person is not registered as affiliated with the Democratic Party at the time of the person's appointment, and a person must be a US citizen in order to register to vote), the bylaws of the San Francisco Democratic Central Committee permit a person who is ineligible to vote to serve on the committee if the person "has declared [their] intention to register as a Democrat upon becoming eligible to register as a voter." In light of relevant case law, it could be argued that a state law requiring a person to be registered to vote with the Democratic Party in order to be appointed to a Democratic county central committee is unconstitutional or otherwise unenforceable where the county central committee wishes to permit individuals who are not eligible to register to vote to serve on the committee.
State law also requires a person to be registered with the Democratic Party in order for that person to be eligible to be elected to a county central committee. While this requirement has the potential to interfere with the county central committee's determination of the structure which best allows it to pursue its political goals, having statutory eligibility requirements for being elected to a county central committee also serves a necessary purpose. Specifically, county central committees typically do not run their own elections to elect central committee members; instead, county central committees generally choose to have those elections conducted by county elections officials. That being the case, county elections officials need a mechanism to determine whether a candidate for an office that will appear on the ballot is eligible to be elected to that office.
According to the Author:
"Senate Bill 288 will ensure that DREAMers and other undocumented immigrants are able to serve in official positions with the California Democratic Party (CDP), including as county central committee members… While existing law does not explicitly require that CDP delegates and central committee members be U.S. citizens, it does specify that, in order to be elected or appointed to a position with the CDP, a person must already be registered or affiliated with the party (Elections Code §7209)… Since the affidavit must show the facts necessary to establish voter eligibility, including that the registrant is a U.S. citizen, it is impossible for an undocumented immigrant to register, and, by extension, serve as a…central committee member...
SB 288 simply allows DREAMers and other undocumented immigrants to take on…leadership roles in the CDP."
Arguments in Support:
In support of a prior version of this bill, the California Immigrant Policy Center wrote, "SB 288 is essential for providing qualified immigrants with the opportunity to serve their communities and ensure that outdated, discriminatory laws are updated to reflect California's values of inclusivity…By granting all Californians the right to serve in… leadership roles in the California Democratic Party, we can promote civic engagement and directly strengthen our democratic institutions."
Arguments in Opposition:
In opposition to a prior version of this bill, Election Integrity Project California, Inc. wrote, "SB 288 opens the very inner workings of one of the two major political parties to access by non-citizens and even illegal aliens. This is the very definition of 'foreign intervention.' While many non-citizens live and work in our society, until they become citizens they are not permitted by either the California or U.S. Constitution to vote. A person who cannot vote certainly cannot be elected to office."
FISCAL COMMENTS:
None. This bill is keyed non-fiscal by the Legislative Counsel.
VOTES:
SENATE FLOOR: 38-0-0
YES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
ASM RULES: 12-0-0
YES: Cooley, Cunningham, Carrillo, Flora, Grayson, Kamlager-Dove, Maienschein, Mathis, Quirk-Silva, Ramos, Robert Rivas, Wicks
ASM ELECTIONS AND REDISTRICTING: 4-0-3
YES: Berman, Calderon, Mullin, Weber
ABS, ABST OR NV: Gallagher, Low, Mayes
UPDATED:
VERSION: July 9, 2019
CONSULTANT: Ethan Jones / E. & R. / (916) 319-2094 FN: 0001242
Date of Hearing: July 3, 2019
ASSEMBLY COMMITTEE ON ELECTIONS AND REDISTRICTING
Marc Berman, Chair
SBPCA Bill Id:SB 288
Author:(Wiener) – As Amended Ver:June 19, 2019
SENATE VOTE: (vote not relevant)
SUBJECT: Democratic Party of California: county central committee members and delegates to the state central committee.
SUMMARY: Allows a person who is not a United States (US) citizen to serve on a Democratic county central committee, notwithstanding the fact that the person is not registered to vote as a Democrat. Specifically, this bill:
- Provides that a person who is not a US citizen is eligible to serve as a member of a county central committee or as a delegate to the state central committee of the Democratic Party of California, provided that the rules and bylaws of the Democratic Party of California permit the person to serve in that capacity.
- Requires a county central committee of the Democratic Party to allow a person who is not a US citizen to serve on the county central committee if the rules and bylaws of the Democratic Party of California permit such a person to serve as a member of a county central committee or as a delegate to the state central committee.
EXISTING LAW:
- Requires the Legislature, pursuant to the California Constitution, to provide for partisan elections for political party central committees.
- Permits a political party to choose to have the members of its county central committees be elected in each county at every presidential primary election.
- Prohibits a declaration of candidacy for membership on a county central committee of a political party from being filed by a candidate unless both of the following are true:
- At the time of presentation of the declaration and continuously for not less than three months immediately prior to that time, or for as long as the candidate has been eligible to register to vote in the state, the candidate is shown by their affidavit of registration to be affiliated with that political party.
- The candidate has not been registered as affiliated with any other qualified political party within 12 months.
Permits a county central committee of a political party, notwithstanding this law and subject to the bylaws of the state central committee, to establish the length of time that a candidate for membership on that committee must be shown by the candidate’s affidavit of registration to be affiliated with the political party of that committee, and may establish the length of time that a candidate for membership on that committee must not have been registered as affiliated with a qualified political party other than the political party of that committee.
- Provides that a person is not eligible to be appointed or elected to a county central committee of the Democratic Party of California if the person is not registered as affiliated with the Democratic Party at the time of the person’s appointment or election.
FISCAL EFFECT: None. This bill is keyed non-fiscal by the Legislative Counsel.
COMMENTS:
- Purpose of the Bill: According to the author:
Senate Bill 288 will ensure that DREAMers and other undocumented immigrants are able to serve in official positions with the California Democratic Party (CDP), including as county central committee members and delegates to the statewide central committee.
While existing law does not explicitly require that CDP delegates and central committee members be U.S. citizens, it does specify that, in order to be elected or appointed to a position with the CDP, a person must already be registered or affiliated with the party (Elections Code §7209). Registered voters’ party preference is shown on their affidavits of registration at the time they register to vote. Since the affidavit must show the facts necessary to establish voter eligibility, including that the registrant is a U.S. citizen, it is impossible for an undocumented immigrant to register, and, by extension, serve as a delegate or central committee member in the CDP.
SB 288 simply allows DREAMers and other undocumented immigrants to take on both state and local leadership roles in the CDP. This important measure will help ensure that, in a party committed to empowering immigrants, DREAMer and immigrant perspectives will have a seat at the table.
- County Central Committees and Public Elections: Notwithstanding the fact that political party central committee members are not public officials, the state constitution explicitly recognizes political party central committees and requires the Legislature to provide for partisan elections for those offices. Specifically, Proposition 14, which was approved by the voters on the June 2010 statewide primary election ballot, is best known as the measure that implemented a “top two” primary election system in California for most elective state and federal offices. However, in addition to establishing the top two primary system, Proposition 14 also amended Article II, Section 5 of the California Constitution to provide that “[t]he Legislature shall provide for partisan elections for…party central committees.”
- Internal Governance of Political Parties: In Eu v. San Francisco County Democratic Central Committee (1989), 489 U.S. 214, the US Supreme Court examined the right of a state to impose laws relating to the internal affairs of political parties. The Court found that laws burdening the associational rights of political parties and their members must serve a compelling state interest. Therefore, because a state has a compelling interest in preserving the integrity of its election process, it may properly enact laws that interfere with a political party’s internal affairs when necessary to ensure that elections are fair and honest. (For example, a state may properly impose certain eligibility requirements for voters in the general election where such requirements are necessary to ensure that elections are fair and honest, even though those requirements limit the ability of political parties to garner support and members.) However, a state cannot justify regulating a party’s internal affairs without showing that such regulation is necessary to ensure an election that is fair and orderly.
In Eu, the Court reiterated that a political party’s determination of the structure which best allows it to pursue its political goals is protected by the Federal Constitution (Tashijian v. Republican Party of Connecticut (1986), 479 U.S. 208 at 224) and further held that freedom of association also encompasses a political party’s decisions about the identity of, and the process for electing, its leaders. Thus, unless the state can show that the particular internal party structure would interfere with the integrity of the electoral process or some other compelling state interest, the political parties have a constitutional right to be free from state regulations in the matter of their internal affairs.
In 2009, the California Court of Appeals for the Second District reaffirmed the Supreme Court’s holding in Eu in the case of Wilson v. San Luis Obispo County Democratic Central Committee (2009) 175 Cal. App. 4th 489. The Wilson case dealt with a situation where the San Luis Obispo County Democratic Central Committee had adopted bylaws regarding the removal of central committee members and the membership of the central committee that were in conflict with provisions of the Elections Code. The court in Wilson ruled in favor of the San Luis Obispo County Democratic Central Committee, finding that it had the right to adopt those conflicting bylaws pursuant to Eu.
In light of the constitutionally protected rights of political parties, the Legislature frequently has changed provisions of the Elections Code at the request of political parties to reflect those parties’ desired methods of electing members to party central committees, and generally has removed unnecessary provisions of state law that otherwise could interfere with the internal structure of political parties (see “Related and Previous Legislation” below). - County Central Committee Membership of Persons who are not US Citizens: According to information provided by the author’s office, this bill came about in part after a person who is not a US citizen was appointed to the San Francisco Democratic Central Committee in January of this year. While the action of appointing that person to the county central committee appears to be prohibited by existing state law (since, as described above, state law provides that a person is not eligible to be appointed to a county central committee of the Democratic Party of California if the person is not registered as affiliated with the Democratic Party at the time of the person’s appointment, and a person must be a US citizen in order to register to vote), the bylaws of the San Francisco Democratic Central Committee permit a person who is ineligible to vote to serve on the committee if the person “has declared [their] intention to register as a Democrat upon becoming eligible to register as a voter.” Committee staff is not aware of any challenge being made to that appointment. Furthermore, in light of Eu and related case law, it could be argued that a state law requiring a person to be registered to vote with the Democratic Party in order to be appointed to a Democratic county central committee is unconstitutional or otherwise unenforceable where the county central committee wishes to permit individuals who are not eligible to register to vote to serve on the committee.
State law also requires a person to be registered with the Democratic Party in order for that person to be eligible to be elected to a county central committee. While this requirement has the potential to interfere with the county central committee’s determination of the structure which best allows it to pursue its political goals, having statutory eligibility requirements for being elected to a county central committee also serves a necessary purpose. Specifically, county central committees typically do not run their own elections to elect central committee members; instead, county central committees generally choose to have those elections conducted by county elections officials. That being the case, county elections officials need a mechanism to determine whether a candidate for an office that will appear on the ballot is eligible to be elected to that office. Furthermore, since county central committee elections are consolidated with elections for public office, the elections officials need to be able to conduct the election in a manner that is fair and honest, and that protects the integrity of the election.
The requirements that currently exist under state law for a person to run as a candidate for a political party’s county central committee make it relatively easy for the elections official to determine whether a person is eligible to be a candidate for central committee. Specifically, Section 8001 of the Elections Code prohibits a person from being a candidate for membership on a county central committee of a political party unless that person has been registered to vote with that political party for a specified period of time (three months, in most cases), and has not been registered with any other political party during the last 12 months (though central committees have some leeway to establish different time periods through their bylaws). Additionally, as noted above, Section 7209 of the Elections Code prohibits a person from being elected to a Democratic county central committee unless that person is affiliated with the Democratic Party at the time of the person’s election. Since county elections officials maintain voter registration lists and have access to a voter’s registration history, the elections official can determine whether a person is eligible to be a candidate for a party’s county central committee using records that are readily available to the elections official. This allows the elections official to make that determination easily, and without unnecessary entanglement into the internal affairs and operations of the political party.
By contrast, it would be much more difficult for an elections official to determine whether a person was eligible to be a candidate for central committee under this bill. As currently in print, this bill permits a person who is not a US citizen to serve as a member of a county central committee if the rules and bylaws of the Democratic Party of California permit the person to serve in that capacity. This provision is potentially problematic for a couple of reasons. First, the rules and bylaws of the Democratic Party of California do not establish eligibility requirements for serving on a Democratic county central committee, since county central committees are independent organizations and are not subject to the control of the state party. In fact, allowing the state party to have this type of control over the operations and membership of county central committees could jeopardize the status of county central committees as independent organizations under federal campaign finance law.
Second, it is unclear how an elections official would know whether a person who is not a US citizen is eligible to file as a candidate for county central committee under this bill. Nothing in this bill requires political parties to notify county elections officials of whether their bylaws permit people who are not US citizens to serve on county central committees. Even if such a requirement were added to this bill, county elections officials still would need a mechanism for determining whether a specific person who is not a US citizen meets any eligibility requirements established by the party in order to determine whether the person is eligible to file as a candidate. To the extent that such eligibility requirements are subjective (e.g., if the party allowed a person who is not a US citizen to serve on the central committee only if the person supported and promoted the goals of the party), requiring the county elections official to make a determination of whether a particular person is eligible to be a candidate for central committee would result in a significant entanglement of the government in the internal operations of a political party. Establishing eligibility requirements that are objective would avoid that entanglement, but the elections official would still need to know what those eligibility requirements are, and would need a mechanism that is not overly burdensome for verifying whether a person meets those eligibility requirements.
Furthermore, the language of this bill potentially presents other challenges. This bill would require a Democratic county central committee to allow a person who is not a US citizen to serve on the county central committee if the rules and bylaws of the Democratic Party of California permit such a person to serve as a member of a county central committee or as a delegate to the state central committee. As indicated above, however, county central committees are independent of the state party, and requiring them to comply with membership eligibility rules established by the state party could jeopardize their status as independent organizations under federal campaign finance law. Additionally, this bill seeks to establish statutory criteria governing eligibility for serving as a delegate to the state central committee of the Democratic Party. Nothing in state law, however, governs eligibility for serving as a delegate to the state central committee, and since the government does not conduct elections to elect delegates to the state central committee, there is no obvious governmental interest in having statutory eligibility criteria for serving as a member of a private organization such as the state central committee. In fact, the lack of a state interest in regulating the internal conduct of the state central committee was the rationale given for previously-adopted legislation (AB 1396 (Torres), Chapter 392, Statutes of 2009, which is described in more detail below) that eliminated provisions of the Elections Code that governed the membership and operations of the state central committee. - Federal Campaign Law: Generally speaking, the primary purposes and activities of political party county central committees is to promote voter registration with the political party, to encourage turnout among members of the party, and to participate in elections in an effort to promote the party’s candidates and values in the electoral process. As a result, membership on a county central committee often involves participation in various electoral activities. In at least some cases, such electoral involvement by a person who is not a US citizen and who is not lawfully admitted for permanent residence in the country could subject the person to federal legal liability.
For example, according to the Federal Election Commission, federal law prohibits campaigns from soliciting or accepting contributions from foreign nationals. The term “foreign national” is defined to include any individual who is not a US citizen and not lawfully admitted for permanent residence. Federal law prohibits contributions, donations, expenditures and disbursements solicited, directed, received or made directly or indirectly by or from foreign nationals in connection with any election — federal, state or local. This prohibition includes contributions or donations made to political committees.
In light of this federal prohibition, it may be illegal for a person who is not a US citizen and who is not lawfully admitted for permanent residence in the country to participate in actions that commonly are undertaken by central committee members. For example, such a person would be unable to make financial contributions to the party or to solicit funds on behalf of the party. In some cases, membership dues that are required to be paid by members of political party central committees can be considered campaign contributions. In such a situation, a person who is not a US citizen and who is not lawfully admitted for permanent residence in the country would be unable to legally pay their required central committee dues.
While nothing in state law or in this bill requires that political party central committee members pay dues or make campaign contributions, it is possible that messaging surrounding legislation to make it legal for a person who is not a US citizen to run for and serve on political party central committees could create a mistaken impression that it is legal for a person who is not a US citizen and is a member of a political party central committee to participate in all customary central committee activities. In light of that concern, and the potential criminal and civil (including immigration) consequences for violations of federal law, if state law is amended to allow individuals who are not US citizens to be candidates for political party central committees, it may be appropriate to require that candidates be provided with information about these and other relevant provisions of federal law that may otherwise limit the central committee activities in which they are able to legally participate. - Eligibility to Vote in Central Committee Elections: While this bill seeks to allow people who are not US citizens to be candidates for Democratic county central committees, nothing in this bill would permit a person who is not a US citizen to vote in such elections or otherwise change the eligibility for voting in any type of publicly-conducted election in the state. Changing the eligibility rules for voting in publicly-conducted elections would present additional policy considerations that are not addressed in this analysis.
- Potential Amendments for a Path Forward: Because county central committee elections are scheduled to take place at the presidential primary election next March, the author of this bill has expressed a desire to make necessary changes to state law in time to allow individuals who are not US citizens to be candidates for the Democratic county central committees at that election, if permitted by the central committees. Candidate filing for the March presidential primary election ends later this year, so any change in eligibility rules for that election not only would need to be enacted this year, but also likely would need to be enacted in an urgency measure to ensure that the new eligibility rules are in place before the candidate filing deadline.
As detailed in this analysis, however, the current version of the bill may fail to accomplish the author’s intended goal while presenting a number of other policy questions and concerns. In order to facilitate further discussions on the policy questions presented by this bill without advancing bill language that could create complications for election administration, the author and the committee may wish to consider amending this bill to replace the current contents of the bill with the following language:
SECTION 1. Section 7209 of the Elections Code is amended to read:
7209. A person shall not be eligible for appointment or election to a committee who is not registered as affiliated with this party at the time of his or her appointment or the person’s election.
As noted above, because the government has no role in the process of people being appointed to county central committees, imposing statutory eligibility criteria for a person to be appointed to the Democratic county central committee arguably is unconstitutional or otherwise unenforceable if it is inconsistent with rules adopted by the committee. Accordingly, this language could help avoid situations where state law improperly seeks to regulate the internal affairs of political parties in a manner that is inconsistent with case law. Additionally, this language has the benefit of directly addressing the provision of state law at issue in the situation that was the impetus for this bill. That is, this language would allow a county central committee to permit the appointment of a person who is not registered to vote as a Democrat to the committee without raising questions about the legal permissibility of such an appointment. This change in law would not, however, require a Democratic county central committee to permit the appointment of people who are not registered to vote with the Democratic Party; instead, it would only remove a statutory prohibition against such an appointment.
Approving the bill in this proposed amended form would not prevent further policy discussions from occurring between relevant stakeholders—including elections officials and central committees—about how best to implement a policy to allow people who are not US citizens to be candidates for county central committees. To the extent that such discussions take place and the relevant policy issues can be worked-out, this bill could be amended and re-referred to this policy committee if appropriate for consideration of those amendments.
- Arguments in Support: In support of this bill, the California Immigrant Policy Center writes:
SB 288 is essential for providing qualified immigrants with the opportunity to serve their communities and ensure that outdated, discriminatory laws are updated to reflect California's values of inclusivity. The California Legislature has already taken significant steps towards advancing immigrant integration in our state by enacting laws that have removed the bar on qualified and trained undocumented immigrants applying for professional licenses, provided equal access to in-state tuition and many public grants regardless of immigration status, and created eligibility for drivers licenses for all Californians. This bill represents a sensible next step on the path towards bringing California closer to full immigrant inclusion and integration by enabling all Californians to serve on a public board or commission or run for public office. Diversity and equal representation in leadership lead to better outcomes by promoting creative thinking that leads to better solutions that more accurately respond to the needs of an immigrant-rich society. In addition, recognizing all Californians as citizens of our state promotes civic engagement and strengthens our democratic institutions.
By granting all Californians the right to serve in local and state leadership roles in the California Democratic Party, we can promote civic engagement and directly strengthen our democratic institutions.
- Related and Previous Legislation: AB 334 (Obernolte), Chapter 6, Statutes of 2019, repeals requirements that members of a county central committee of the California Republican Party shall assume office and hold their first meeting during the month of December or January following a general election, and hold office for a two-year term commencing with that first meeting held in December or January following a general election. This committee approved AB 334 on consent by a 7-0 vote on March 13, 2019.
AB 1148 (B. Gaines), Chapter 111, Statutes of 2015, required Republican county central committee members in Placer County to be elected by supervisorial district, and provided for seven members to be elected from each district.
AB 1200 (Ma), Chapter 8, Statutes of 2012, changed the manner in which Republican county central committee members are elected in the City and County of San Francisco, and the manner in which Democratic county central committee members are elected in Alameda and Sacramento counties and the City and County of San Francisco, among other provisions.
AB 1396 (Torres), Chapter 392, Statutes of 2009, repealed various provisions of the Elections Code governing the membership and operations of the state central committee of the Democratic Party of California, and instead required that the standing rules and bylaws of the Party govern the membership and operations of the state central committee.
AB 965 (Anderson), Chapter 60, Statutes of 2007, provided that the membership of the state central committee of the California Republican Party (CRP) shall be as set forth in the standing rules and bylaws of the CRP, among other provisions.
REGISTERED SUPPORT / OPPOSITION:
Support
California Immigrant Policy Center
California Young Democrats Latino Caucus
San Francisco Latino Democratic Club
11 individuals
Opposition
None on file.
Analysis Prepared by: Ethan Jones / E. & R. / (916) 319-2094
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 288 |
THIRD READING
Bill No: SB 288
Author: Wiener (D) and Nielsen (R), et al.
Amended: 5/17/19
SENATE ENERGY, U. & C. COMMITTEE: 11-0, 4/10/19
AYES: Hueso, Moorlach, Chang, Dodd, Hill, McGuire, Rubio, Skinner, Stern, Stone, Wiener
NO VOTE RECORDED: Bradford, Hertzberg
SENATE APPROPRIATIONS COMMITTEE: 4-2, 5/16/19
AYES: Portantino, Bradford, Hill, Wieckowski
NOES: Bates, Jones
SUBJECT: Electricity: renewable resource self-generation and storage
SOURCE: California Solar & Storage Association
DIGEST:
This bill requires specified electric utilities to establish streamlined and standardized processes to review requests to interconnect to the electrical grid from customers seeking to install renewable energy and energy storage systems on the customer-side of the meter.
Existing law:
- Requires electrical corporations and publicly owned utilities (POUs), among others, to develop, and make available to eligible customer-generators, standard contracts or tariffs for net-energy metering (NEM) if the total generation capacity used by eligible customer-generators exceeds five percent of those utilities’ aggregate customer peak demand. Requires the California Public Utilities Commission (CPUC) to develop a standard contract or tariff which may include NEM, for eligible customer-generators with a renewable electrical generation facility that are customers of a large electrical corporation, as defined, to be offered to eligible customer-generators beginning January 1, 2017, or prior to that date if ordered to do so by the CPUC because the customer-generator has reached the five percent limit. (Public Utilities Code §2827.1)
- Authorizes the CPUC, in consultation with the California Energy Commission, to annually collect not more than double the amount authorized for the self-generation incentive program (SGIP) in the 2008 calendar year, through December 31, 2024. Requires the CPUC to require the administration of the program for distributed energy resources (DERs) originally established by AB 970 (Ducheny, Chapter 329, Statutes of 2000) until January 1, 2026. Limits the incentives of the SGIP to DERs that the CPUC, in consultation with the California Air Resources Board, determine will achieve reductions in emissions of greenhouse gases (GHG). (Public Utilities Code §379.6)
- Authorizes the CPUC to establish an expedited distribution grid interconnection dispute resolution process with the goal of resolving disputes over interconnection applications that are within the jurisdiction of the CPUC in no more than 60 days from the time the dispute is formally brought to the CPUC. If the CPUC establishes an expedited distribution grid interconnection dispute resolution process, the CPUC may provide exceptions to the 60-day time period when more than 60 days are needed, to fairly and safely address a dispute. (Public Utilities Code §769.5)
This bill:
- Makes several findings and declarations concerning the potential benefits of distributed energy resources and the need to reduce impediments to interconnecting these resources to the electrical grid.
- Requires the governing boards of specified POUs and the CPUC for the electrical corporations to establish a streamlined and standardized process for review by those utilities of requests to interconnect to the electrical grid from customers seeking to install renewable energy and energy storage systems on the customer-side of the meter. Requires the review process to minimize uncertainty, the time and cost of the review, as specified.
Background
Connecting to the electrical distribution grid. Investor-owned utilities (IOUs) and POUs own the utility lines that serve local areas, also known as the distribution grid. The interconnection is the physical connection between a distributed energy resource (DER) and the grid. Disputes can arise when the utility who owns, manages, and maintains the grid won’t connect DERs projects. A typical dispute occurs when the utility requires system improvements for safety purposes and the DERs may object to some or all of the costs of the improvements.
Electric Rule 21 Interconnection Tariff. CPUC Electric Tariff Rule 21 is a tariff that describes the interconnection, operating and metering requirements for generation facilities to be connected to a utility’s distribution system. The tariff provides customers wishing to install generating or storage facilities (types of DERs) on their premises with access to the electric grid while protecting the safety and reliability of the distribution and transmission systems at the local and system levels. As with most tariffs, each IOU is responsible for administration of Rule 21 in its service territory and maintains its own version of the rule. Applicants wishing to interconnect to the grid can select two evaluation processes, depending on eligibility requirements: Fast Track or Detailed Study. The Fast Track process is for projects under three megawatts, non-exporting generation facilities, and NEM facilities. For all other projects, a detailed study is required that requires more evaluation and assessment. The intent of the evaluations for both processes are to:
- Ensure the electric distribution system is capable of managing export generation from DERs.
- Ensure the DERs will not have adverse impacts on the existing electric distribution system that would jeopardize safe and reliable electric service
- Determine whether upgrades are needed to accommodate the DERs on the electric distribution system at a specific location.
Solar-paired storage projects follow the same general interconnection processes. As part of the application, the applicant selects an operational mode for their storage system. The specific review process is dependent on the project size and operational mode of the project. Rule 21 also establishes a dispute resolution process that first provides a structure for bilateral negotiations between representatives of a generation facility and the IOU, and then directs unresolved disputes to the CPUC's Alternative Dispute Resolution process, which is administered by the CPUC's Administrative Law Judge Division. AB 2861 (Ting, Chapter 672, Statutes of 2016) established an expedited distribution grid interconnection dispute resolution process with the goal of resolving disputes over interconnection applications that are within the jurisdiction of the CPUC in no more than 60 days from the time the dispute is formally brought to the CPUC. Additionally the CPUC has addressed interconnection issues through Order Instituting Rulemaking to Consider Streamlining Interconnection of Distributed Energy Resources and Improvements to Rule 21 (R. 17-07-007). The CPUC is currently in an active proceeding in the new successor to the NEM Tariff, which is also expected to address potential improvements to streamline the interconnection process, as necessary.
Is a bill necessary? According to the sponsor, the California Solar & Storage Association, there have been some challenges with the ability of DERs owners to connect to the distribution grid. The sponsor provided some examples including two industrial/commercial class projects that experienced repeated delays in their efforts to connect within Pacific Gas & Electric’s distribution grid. These projects required upgrades to the distribution grid that the sponsor of this bill believe were unnecessarily delayed for weeks and months. The sponsors also noted an agricultural customer’s experience to connect a project that the utility said would require a $1.3 million upgrade to the substation to interconnect a 230 kilowatts (kW) solar system. While the utility estimated the upgrades would take 14 to 20 months, the sponsor alleges that the utility then redesigned the upgrade after 20 months, adding another year the timeline. After repeated calls and meetings, according to the sponsor of this bill, the utility has allowed a partial use of the solar system at 45 kW of generation. Aside from these two examples, the sponsor of this bill notes other concerns with interconnection efforts across the state. Generally, the concerns noted are about the time it takes for temporary disconnection for a contractor to do electrical work (citing a San Diego Gas & Electric case where a customer waited three and a half months) and a general lack of communication from the IOUs. In terms of complaints with POUs, the sponsor also noted delayed and inconvenient interconnection. Specifically, the sponsors noted challenges with some POUs who require wet-signatures and multiple copies, requiring hard copies of documents, requiring fees are paid by check, and differences in load justification policies among the POUs. The sponsor of this bill also provided the following examples and claims of issues interconnecting DERs to POUs:
- the City of Colton lacks an effective online portal.
- Imperial Irrigation District has “excessive rigidity with design requirements and is at times unresponsive”.
- Banning Electric Utility lacks a process for interconnection of battery storage and are slow to review plans.
- Glendale requires an energy storage meter not required by other utilities.
- City of Redding requires three wet-signed original interconnection agreements mailed to their office.
- Silicon Valley Power requires wet-signed or faxed documents, but not email.
POUs. This bill requires each electric IOU and specified POUs to establish a streamlined process to review customer requests to interconnect their DER to the electrical grid. This bill exempts the smaller POUs, those with an annual electrical demand less than 700 gigawatt hours over three years, beginning in 2016 through 2019. As a result, the requirements of this bill are likely to be limited to the same POUs who are required to submit an Integrated Resources Plan:
- Burbank Water and Power
- City & County of San Francisco
- City of Anaheim
- City of Palo Alto
- City of Pasadena
- City of Riverside
- City of Vernon
- Glendale Water and Power
- Imperial Irrigation District
- Los Angeles Department of Water and Power
- Modesto Irrigation District
- Redding Electric Utility
- Roseville Electric
- Silicon Valley Power
- Sacramento Municipal Utility District
- Turlock Irrigation District
Related/Prior Legislation
SB 700 (Weiner, Chapter 839, Statutes of 2018) extended the sunset date for the SGIP by five years, required the CPUC to adopt requirements for storage systems to ensure that they reduce GHG emissions, and prohibited generation technologies using non-renewable fuels from obtaining SGIP incentives as of January 1, 2020.
AB 2861 (Ting, Chapter 672, Statutes of 2016) authorized the CPUC to establish an expedited distribution grid interconnection dispute resolution process to resolve disputes within 60 days, unless it determines more time is needed. Specified the elements to be included in the dispute resolution process and requires the CPUC to establish a technical panel, a review panel, and a public process for each dispute.
AB 1637 (Low, Chapter 658, Statutes of 2016) doubled the annual funding authorization for SGIP and revised and extended the NEM program for fuel cells by five years.
AB 1478 (Committee on Budget, Chapter 664, Statutes of 2014) extended the sunset to collect SGIP funds through 2019 and extended the program’s sunset to 2021.
SB 861 (Committee on Budget and Fiscal Review, Chapter 35, Statutes of 2014) established SGIP eligibility restrictions for distributed generation resources and required the CPUC to establish a capacity factor for distributed energy resource technologies.
AB 327 (Perea, Chapter 611, Statutes of 2013), among its many provisions, requires the CPUC to develop a new standard contract or tariff for new NEM customers of the large IOUs by July 1, 2015, that must be used beginning January 1, 2017, or earlier if the NEM cap has been reached. The CPUC will be required to ensure that the new standard contract or tariff for rates, terms of service, and billing rules is based on the electrical system costs and benefits received by nonparticipating customers and prevents a cost shift to non-NEM customers.
AB 970 (Ducheny, Chapter 329, Statutes of 2000) enacted the California Energy Security and Reliability Act of 2000 to expedite siting of certain power plants and implement new energy conservation and demand management programs. The bill required the CPUC to establish incentives for distributed generation resources.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, there are minor fiscal impacts.
SUPPORT: (Verified 5/16/19 – prior version of bill)
California Solar & Storage Association (source)
350: Bay Area Action, Chico, Inyo, Sacramento, Silicon Valley, South Bay Los Angeles, SoCal, Ventura County Climate Hub
Advanced Energy Economy
Almond Alliance of California
Almont Orchards Inc.
Aztec Solar
Bar ALE, Inc.
Borrego Solar Systems
Brightline Defense Project
Building Owners and Managers of California
California Alliance for Community Energy
California Building Industry Association
California Business Properties Association
California Democratic Party’s Environmental Caucus
California Energy Storage Alliance
California Environmental Justice Alliance
California Housing Partnership Corp.
California League of Conservation Voters
Carriere Family Farms
Center for Climate Protection
Center for Sustainable Energy
Ceres
Coalition for Adequate School Housing
Coalition to Protect San Luis Obispo County
Crain Orchards, Inc.
Designing Accessible Communities
El Dorado County Farm Trails
Empire Farming Company
ENGIE Energy Services
Environment California
Fossil Free California
Green Technical Education and Employment
GRID Alternatives
Gyppo Ale Mill
Indivisible: CA-43, California Green Team, Marin, Napa, Peninsula CA-14, Resistance, Elk Grove CA-07 Committee, San Francisco, Sausalito, South Bay – LA, West Marin
Jim Faulbaum Construction
Keyawa Orchards, Inc.
Lagorio Brothers, Inc.
Loch & Union Distilling
Martin Orchards, Inc.
Merced City School District
Micro Paradox
Mothers Out Front
Napa Climate Now
NBN Properties LLC
Orlando Family, LLC
Paiva Farm Management, Inc.
Peninsula Clean Energy
Peoples’ Environmental Network, Tuolumne County
POLIT Farms
Premier Mushrooms Inc.
Prima Frutta Packing Inc.
Progressive Democrats of the Santa Monica Mountains
Rising Sun Center for Opportunity
Rooted in Resistance
Silicon Valley Leadership Group
Solar and Fire Education S.A.F.E.
Solar Energy Industries Association
Solar Richmond
Solar Rights Alliance
Solar United Neighbors
SunPower
Sunrun Inc.
Sustaenable
Taylor Brothers Farms, Inc.
TechNet
Tesla
The Greenlining Institute
The Hignell Companies
The Resistance – Northridge, Indivisible
Violich Farms
Vivint Solar
Vote Solar
White Rock Vineyards
OPPOSITION: (Verified 5/22/19 – prior version of bill)
Imperial Irrigation District
Independent Energy Producers
Pacific Gas and Electric Company
Sacramento Municipal Utility District
The Utility Reform Network
ARGUMENTS IN SUPPORT: The author has noted the benefits of a streamlined interconnection process as proposed by this bill, stating that SB 288 will ensure that all California residents and businesses can easily procure clean, cheap electricity from onsite distributed energy resources or “DERs,” including solar power and energy storage. This bill also addresses a main barrier to greater deployment of DERs: delayed interconnection to the grid that can take months or even years. By ensuring timely interconnection, SB 288 will “guarantee that all California consumers can exercise their right to purchase the cleanest, cheapest power available.”
ARGUMENTS IN OPPOSITION: The entities opposed to this bill raise several issues, most of which deal with language that is no longer in the bill. However, as it relates to the language remaining in the bill, the entities opposed have expressed concerns that they do not understand where and what problems exist that this bill seeks to address, and several utilities cite the improvements and investments made over the years to address interconnection issues.
Prepared by: Nidia Bautista / E., U., & C. / (916) 651-4107
5/23/19 10:31:12
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2019 - 2020 Regular Session
SB 288 (Wiener) - Electricity: renewable resource self-generation and storage
Version: May 1, 2019 | Policy Vote: E., U., & C. 11 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: May 16, 2019 | Consultant: Paul Jacobs |
Bill Summary:
This bill would require a number of provisions to support the deployment of customer-sited distributed energy resources, specifically energy storage systems, including requiring electric utilities to establish standardized processes to interconnect to the electric grid, requiring new tariffs and compensation to sell stored energy to the grid and into the wholesale electricity market.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 16, 2019
Fiscal Impact:
Minor fiscal impacts.
Committee Amendments:
Deletes Section 4 requiring CPUC and POUs to create tariffs for distributed energy resources and to ensure that certain customers are not subject to discriminatory fees or charges. Deletes Section 2 requiring CPUC and CEC to report to the Legislature.
-- END --
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2019 - 2020 Regular Session
SB 288 (Wiener) - Electricity: renewable resource self-generation and storage
Version: May 1, 2019 | Policy Vote: E., U., & C. 11 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: May 13, 2019 | Consultant: Paul Jacobs |
Bill Summary:
This bill would require a number of provisions to support the deployment of customer-sited distributed energy resources, specifically energy storage systems, including requiring electric utilities to establish standardized processes to interconnect to the electric grid, requiring new tariffs and compensation to sell stored energy to the grid and into the wholesale electricity market.
Fiscal Impact:
- Ongoing special fund costs (PUC Utilities Reimbursement Account) of around $1 million annually for the California Public Utilities Commission (CPUC) to conduct proceedings and create reports, among other requirements in the bill.
- Ongoing special fund costs (Energy Resources Program Account) of around $150,000 annually for the California Energy Commission for rulemaking, collecting and verifying data, and completing a report annually.
Background:
Investor-owned utilities (IOUs) and publicly-owned utilities (POUs) own the utility lines that serve local areas, also known as the distribution grid. The interconnection is the physical connection between a distributed energy resource (DER) and the grid. Disputes can arise when the utility who owns, manages, and maintains the grid won’t connect DERs projects. A typical dispute occurs when the utility requires system improvements for safety purposes and the DERs may object to some or all of the costs of the improvements.
CPUC‘s Electric Tariff Rule 21 is a tariff that describes the interconnection, operating and metering requirements for generation facilities to be connected to a utility’s distribution system. The tariff provides customers wishing to install generating or storage facilities (types of DERs) on their premises with access to the electric grid while protecting the safety and reliability of the distribution and transmission systems at the local and system levels. As with most tariffs, each IOU is responsible for administration of Rule 21 in its service territory and maintains its own version of the rule.
Customers who install small solar, wind, biogas, and fuel cell generation facilities to serve all or a portion of onsite electricity needs are eligible for the state's net metering program (NEM). NEM allows customers who generate their own energy ("customer-generators") to serve their energy needs directly onsite and to receive a financial credit on their electric bills for any surplus energy fed back to their utility. Additionally, CPUC established the self-generation incentive program (SGIP) established incentives for distributed generation resources. The program provides incentives for installation of DERs that are located at a customer's side of the meter and sized no larger than what is needed to meet on-site energy needs. SGIP provides rebates for qualifying distributed energy systems installed on the customer's side of the utility meter. While SGIP has provided incentives for a variety of DERs, the program largely focuses on energy storage systems.
Proposed Law:
This bill:
- Requires the CPUC, on or before June 1, 2020, and on or before June 1 of each year thereafter, to submit an annual report evaluating electrical corporations’ performance of interconnection review to the Legislature, including specified data.
- Requires the CEC, on or before June 1, 2020, and on or before June 1 of each year thereafter, to submit an annual report evaluating POUs’ performance of interconnection review to the Legislature containing specified data.
- Requires the CPUC and CEC to establish for the electrical corporations and POUs, respectively, a streamlined and standardized process for reviewing by those utilities of interconnection requests for customers seeking to install renewable energy and energy storage systems on the customer side of the meter to minimize uncertainty, the time and cost of the review, as specified.
- Requires the CPUC and the governing board of certain POUs, by January 1, 2021, to, among other things, create one or more tariffs that offer fair compensation for customer-sited energy storage systems that export electricity to the electrical grid and to consider one or more tariffs for customer-sited energy storage and renewable energy renewable energy and energy storage systems to support grid reliability and community resiliency in the event of emergencies or grid outages.
- Requires CPUC and the governing board of each local publicly owned electric utility to establish a streamlined and standardized process for the review of interconnection requests for customers seeking to install renewable energy and energy storage systems on the customer side of the point of interconnection to minimize uncertainty and the amount of time and cost of the review while maintaining electric system safety and reliability.
- Requires the CPUC and the governing board of certain POUs to ensure that customers with onsite customer-sited renewable energy or energy storage systems can take certain related actions and are not subject to discriminatory fees or charges.
Staff Comments:
According to CPUC, this bill would create fairly extensive new workload for the commission as follows:
- extending the current or creating a new Rule 21 proceeding
- create a new Legislative report on all customer-side interconnections
- develop a process for resolution of interconnection disputes
- potentially approve and oversee the electrical corporations’ administration of tariffs
According to CEC, funding for the requirements in this bill will come from the Energy Resources Program Account, which is in a structural deficit and cannot absorb new costs.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2019 - 2020 Regular
Bill No: SB 288 Hearing Date: 4/10/2019
Author: | Wiener | ||
Version: | 3/28/2019 As Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Nidia Bautista | ||
SUBJECT: Electricity: renewable resource self-generation and storage
DIGEST: This bill would require a number of provisions to support the deployment of customer-sited distributed energy resources, specifically energy storage systems, including requiring electric utilities to establish standardized processes to interconnect to the electric grid, requiring new tariffs and compensation to sell stored energy to the grid and into the wholesale electricity market.
ANALYSIS:
Existing law:
- Requires electrical corporations and publicly owned utilities (POUs), among others, to develop, and make available to eligible customer-generators, standard contracts or tariffs for net-energy metering (NEM) if the total generation capacity used by eligible customer-generators exceeds five percent of those utilities’ aggregate customer peak demand. Requires the California Public Utilities Commission (CPUC) to develop a standard contract or tariff which may include NEM, for eligible customer-generators with a renewable electrical generation facility that are customers of a large electrical corporation, as defined, to be offered to eligible customer-generators beginning January 1, 2017, or prior to that date if ordered to do so by the CPUC because the customer-generator has reached the five percent limit. (Public Utilities Code §2827.1)
- Authorizes the CPUC, in consultation with the California Energy Commission (CEC), to annually collect not more than double the amount authorized for the self-generation incentive program (SGIP) in the 2008 calendar year, through December 31, 2024. Requires the CPUC to require the administration of the program for distributed energy resources (DERs) originally established by AB 970 (Ducheny, Chapter 329, Statutes of 2000) until January 1, 2026. Limits the incentives of the SGIP to DERs that the CPUC, in consultation with the California Air Resources Board (ARB), determine will achieve reductions in emissions of greenhouse gases (GHG). (Public Utilities Code §379.6)
- Authorizes the CPUC to establish an expedited distribution grid interconnection dispute resolution process with the goal of resolving disputes over interconnection applications that are within the jurisdiction of the CPUC in no more than 60 days from the time the dispute is formally brought to the CPUC. If the CPUC establishes an expedited distribution grid interconnection dispute resolution process, the CPUC may provide exceptions to the 60-day time period when more than 60 days are needed, to fairly and safely address a dispute. (Public Utilities Code §769.5)
This bill:
- Makes several findings and declarations stating that California residents, businesses, nonprofits, and government entities have the fundamental right to generate and store renewable energy and to reduce and shape their use of electricity obtained from the electrical grid, whether their facilities are off-grid or interconnected to the grid.
- Requires the CPUC, on or before June 1, 2020, and on or before June 1 of each year thereafter, to submit an annual report evaluating electrical corporations’ performance of interconnection review to the Legislature, including specified data.
- Requires the CEC, on or before June 1, 2020, and on or before June 1 of each year thereafter, to submit an annual report evaluating POUs’ performance of interconnection review to the Legislature containing specified data.
- Requires the CPUC and CEC to establish for the electrical corporations and POUs, respectively, a streamlined and standardized process for reviewing by those utilities of interconnection requests for customers seeking to install renewable energy and energy storage systems on the customer side of the meter to minimize uncertainty, the time and cost of the review, as specified.
- Requires the CPUC and the governing board of each POU, by January 1, 2021, to, among other things, create one or more tariffs that offer fair compensation for customer-sited energy storage systems that export electricity to the electrical grid and to consider one or more tariffs for customer-sited energy storage and renewable energy renewable energy and energy storage systems to support grid reliability and community resiliency in the event of emergencies or grid outages.
- Requires the CPUC to collaborate with the California Independent System Operator (CAISO) to modify existing tariffs to remove barriers to the participation of customer-sited renewable energy and energy storage systems in programs intended to provide energy, capacity, and ancillary services for the bulk power system.
- Requires the CPUC and the governing board of each POU to ensure that customers with onsite customer-sited renewable energy or energy storage systems can take certain related actions and are not subject to discriminatory fees or charges. By imposing addition additional duties on POUs, this bill would impose a state-mandated local program.
Background
Connecting to the distribution grid. Investor-owned utilities (IOUs) and POUs own the utility lines that serve local areas, also known as the distribution grid. The interconnection is the physical connection between a distributed energy resource (DER) and the grid. Disputes can arise when the utility who owns, manages, and maintains the grid won’t connect DERs projects. A typical dispute occurs when the utility requires system improvements for safety purposes and the DERs may object to some or all of the costs of the improvements.
Rule 21 Interconnection. CPUC Electric Tariff Rule 21 is a tariff that describes the interconnection, operating and metering requirements for generation facilities to be connected to a utility’s distribution system. The tariff provides customers wishing to install generating or storage facilities (types of DERs) on their premises with access to the electric grid while protecting the safety and reliability of the distribution and transmission systems at the local and system levels. As with most tariffs, each IOU is responsible for administration of Rule 21 in its service territory and maintains its own version of the rule. Applicants wishing to interconnect to the grid can select two evaluation processes, depending on eligibility requirements: Fast Track or Detailed Study. The Fast Track process is for projects under three megawatts (MW), non-exporting generation facilities, and NEM facilities. For all other projects, a detailed study is required that requires more evaluation and assessment. The intent of the evaluations for both processes are to:
- Ensure the electric distribution system is capable of managing export generation from DERs.
- Ensure the DERs will not have adverse impacts on the existing electric distribution system that would jeopardize safe and reliable electric service
- Determine whether upgrades are needed to accommodate the DERs on the electric distribution system at a specific location.
Solar-paired storage projects follow the same general interconnection processes. As part of the application, the applicant selects an operational mode for their storage system. The specific review process is dependent on the project size and operational mode of the project. Rule 21 also establishes a dispute resolution process that first provides a structure for bilateral negotiations between representatives of a generation facility and the IOU, and then directs unresolved disputes to the CPUC's Alternative Dispute Resolution (ADR) process, which is administered by the CPUC's Administrative Law Judge Division. AB 2861 (Ting, Chapter 672, Statutes of 2016) established an expedited distribution grid interconnection dispute resolution process with the goal of resolving disputes over interconnection applications that are within the jurisdiction of the CPUC in no more than 60 days from the time the dispute is formally brought to the CPUC. Additionally the CPUC has addressed interconnection issues through Order Instituting Rulemaking to Consider Streamlining Interconnection of Distributed Energy Resources and Improvements to Rule 21 (R. 17-07-007). The CPUC is currently in an active proceeding in the new successor to the NEM Tariff, which is also expected to address potential improvements to streamline the interconnection process, as necessary.
NEM. Customers who install small solar, wind, biogas, and fuel cell generation facilities to serve all or a portion of onsite electricity needs are eligible for the state's net metering program. NEM allows customers who generate their own energy ("customer-generators") to serve their energy needs directly onsite and to receive a financial credit on their electric bills for any surplus energy fed back to their utility. Participation in the NEM does not limit a customer-generator's eligibility for any other rebate, incentive, or credit provided by an electric utility. NEM provides customer-generators full retail rate credits for energy exported to the grid and requires them to pay a few charges that align NEM customer costs more closely with non-NEM customer costs.
SGIP. The CPUC established SGIP pursuant to AB 970 (Ducheny), which directed the CPUC to establish incentives for distributed generation resources. The program provides incentives for installation of DERs that are located at a customer's side of the meter and sized no larger than what is needed to meet on-site energy needs. SGIP provides rebates for qualifying distributed energy systems installed on the customer's side of the utility meter. While SGIP has provided incentives for a variety of DERs, the program largely focuses on energy storage systems. The CPUC was authorized to direct IOUs to collect $166 million annually from ratepayers through 2019 to fund SGIP and to administer the program until January 1, 2021. SB 700 (Weiner, Chapter 839, Statutes of 2018) extended each of these sunset dates by five years to 2024 and 2026, respectively.
Energy storage systems can increase GHG emissions. Energy storage stores energy generated at one time of the day and discharges that energy at a later point in time. Energy storage can be used as a tool to conduct energy arbitrage, a process by which lower cost energy is stored at one point in time and that energy is discharged at a point in time when electricity generation is more costly. Distributed energy storage can facilitate greater integration of intermittent renewable energy resources and shave peak demand by storing excess renewable energy at one point in time and discharging that energy at a time of day when the grid relies more heavily on fossil fuel generation to meet demand. However, while energy storage systems can reduce GHG emissions by lowering the need for fossil fuel electricity generation, this benefit is not always realized. Recent studies have shown that energy systems may increase demand for electricity and result in a net increase of GHG emissions. These demand and GHG increases are largely associated with the use of less efficient energy storage systems and ineffective energy arbitrage price signals that lead storage owners to store electricity when the grid contains a higher mix of fossil fuel generation and discharge that energy at a point in time when the mix contains greater renewable generation. As a result, SB 700 (Weiner) also included language to ensure the SGIP incentives addressed the potential for increased GHG emissions.
Is a bill necessary? According to the sponsor, there have been some challenges with the ability of DERs owners to connect to the distribution grid. The sponsor provided some examples including two industrial/commercial class projects that experienced repeated delays in their efforts to connect within Pacific Gas & Electric’s (PG&E’s) distribution grid. These projects required upgrades to the distribution grid that the sponsor of this bill believe were unnecessarily delayed for weeks and months. The sponsors also noted an agricultural customer’s experience to connect a project that the utility said would require a $1.3 million upgrade to the substation to interconnect a 230 kilowatts (kW) solar system. While the utility estimated the upgrades would take 14 to 20 months, the sponsor alleges that the utility then redesigned the upgrade after 20 months, adding another year the timeline. After repeated calls and meetings, according to the sponsor of this bill, the utility has allowed a partial use of the solar system at 45 kW of generation. Aside from these two examples, the sponsor of this bill notes other concerns with interconnection efforts across the state. Generally, the concerns noted are about the time it takes for temporary disconnection for a contractor to do electrical work (citing a San Diego Gas & Electric (SDG&E) case where a customer waited three and a half months) and a general lack of communication from the IOUs. In terms of complaints with POUs, the sponsor also noted delayed and inconvenient interconnection. Specifically, the sponsors noted challenges with some POUs who require wet-signatures and multiple copies, requiring hard copies of documents, requiring fees are paid by check, and differences in load justification policies among the POUs. The sponsor of this bill also provided the following examples and claims of issues interconnecting DERs to POUs:
- the City of Colton lacks an effective online portal
- Imperial Irrigation District has “excessive rigidity with design requirements and is at times unresponsive”
- Banning Electric Utility lacks a process for interconnection of battery storage and are slow to review plans
- Glendale requires an energy storage meter not required by other utilities
- City of Redding requires three wet-signed original interconnection agreements mailed to their office
- Silicon Valley Power requires wet-signed or faxed documents, but not email.
This bill. SB 288 proposes a number of new requirements with the goal to streamline, standardize, and provide compensation to DERs, specifically energy storage. Some of this bill’s requirements may be duplicative of current efforts at the CPUC to address related issues. The specific reporting requirements in this bill are likely duplicative or overlap with the quarterly reporting requirements on IOUs related to interconnections. Additionally, as drafted, this bill requires the CEC to evaluate the POUs interconnection efforts. The POUs are staunchly opposed to such an approach as they believe these are decisions that should be determined by their local governing boards. In order to be consistent with other reporting requirements on POUs, the author and committee may wish to amend this bill to instead have the local governing boards of the POUs file their reports with the CEC. The author has also noted their willingness to exempt the smaller POUs from participation in the requirements of this bill. The author and committee may wish to amend this bill to exempt smaller POUs from all requirements in recognition that these POUs may have very limited capacity to address these issues.
Stand-alone energy storage. As currently drafted, this bill proposes to authorize customers who have stand-alone energy storage to receive some compensation for selling energy back to the grid. While energy storage has the potential to help shape load, as noted above, in some studies the use of energy storage has also shown to have the potential to increase GHGs. With that said, it may be premature to require compensation from this energy from stand-alone energy storage until the state, including the CPUC, ARB, CEC, CAISO, have a better understanding of how energy storage can be effectively deployed. The SGIP program, in particular, will provide more information as to the GHG performance of energy storage and information. Moreover, additional information to ensure all ratepayers are benefitting from energy storage deployments could help ensure that any compensation is reflective of the ability of energy storage to provide overall benefits to the electric grid. The author and committee may wish to amend this bill to remove the language authorizing compensation for stand-alone energy storage.
Potential for cost-shifts to non-participating customers. As drafted, this bill does not require specific compensation for DERs. While acknowledging the potential benefits of DERs to the electric grid, this bill may be premature in assuming these benefits and may not fully acknowledge the potential costs DERs can pose to the grid. As noted above, the state has been supportive of deploying DERs through various policies, including the California Solar Initiative (CSI), Single-Family Affordable Homes Program (SASH), the Multi-Family Solar Homes Program (MASH), Solar on Affordable Multi-Housing Program (SOMAH), and new programs adopted by the CPUC to further deploy renewable energy in disadvantaged communities. Additionally, as noted above, the state has supported incentives for energy storage through SGIP, and compensation to sell energy back to the grid through NEM Tariffs. Several of the utilities raise concerns that the current compensation rates are resulting in significant cost-shifts to non-participating customers. Some utilities allege that the costs shifts from NEM alone are double and triple any costs shifts associated with serving low-income (enrolled CARE) customers in their service territory. While the sponsor is correct to note that this bill is not requiring a specific compensation rate, some of the language does have the potential to result in cost shifts to nonparticipating customers. As such, the author and committee may wish to amend this bill to incorporate language to ensure there are no cost-shifts to non-participating customers.
Discriminatory fees. Additionally, this bill would prohibit utilities from adopting discriminatory fees or charges on DERs. As DERs become increasingly ubiquitous, the sponsor of this bill is concerned that some utilities may seek to charge specific fees to DER customers not charged to other customers. Their concerns that utilities may seek to impose DER specific fees might be justified. The Sacramento Municipal Utility District (SMUD) has proposed (but not, yet, adopted) a grid charge fee on solar customers. SMUD notes that these customers use the grid more frequently but do not pay their fair share of the costs to operate and maintain the grid. The sponsor would like to prohibit the types of fees and any other utilities from future specific fee proposals for DERs. While not making a determination about SMUD’s specific proposal, it is understandable that the sponsor may be wary of discriminatory fees. However, there is also cause for caution in having the state outright prohibit any fee that may very well be justified to support the maintenance and operation of the electric grid which the DER still connects to and is generally always available to a DER customer as it is to other customers. Of note, some Community Choice Aggregators (CCAs) have selected to delay enrollment of legacy NEM customers in their territory noting that “solar customers cost somewhat more to serve than the revenues they return, (they generate much of their own electricity and purchase energy during peak periods when it’s more expensive to provide).” This is further example that the need to manage load for all customers will need to be balanced against ensuring fees are fairly attributed but still collected to safely maintain and operate the electric grid. As such, this committee may wish to be cautious in approaching these issues. To that end, the author and committee may wish to amend this bill to add language that clarifies the utility’s ability to charge fees that are justified.
Implications with federally-regulated wholesale electricity markets. As currently drafted, this bill proposes to require the CAISO to provide modify rules to allow for compensation of DERs in the bulk power system. Such compensation would likely invite Federal Energy Regulatory Commission (FERC) involvement who has jurisdiction over the wholesale electricity markets. As noted by the author and sponsor, there are current efforts underway to address these issues at the CAISO and CPUC. Until there are more details concerning the specific issues, the author and committee may wish to amend this bill to remove this language.
Need for additional amendments. The author and committee may wish to further amend this bill to ensure:
- The language suggesting DERs interconnection is a fundamental right may be better stated as ensuring access to DERs. As noted by The Utility Reform Network (TURN), this language does not address the rights of non-participating customers.
- The language in the findings and declarations can be clarified to speak to the potential of DERs to provide benefits to the grid, instead of specific claims suggesting DERs automatically provide these benefits.
- The language requiring tariffs are modified, should instead assess whether to modify existing tariffs.
- Add language to recognize that utilities may institute a prioritization mechanism to respond to interconnection requests.
- Add language concerning the recognition of DERs to perform as certified stating “when installed to applicable codes.”
Prior/Related Legislation
SB 700 (Weiner, Chapter 839, Statutes of 2018) extended the sunset date for the SGIP by five years, requires the CPUC to adopt requirements for storage systems to ensure that they reduce GHG emissions, and prohibits generation technologies using non-renewable fuels from obtaining SGIP incentives as of January 1, 2020.
AB 2861 (Ting, Chapter 672, Statutes of 2016) authorizes the CPUC to establish an expedited distribution grid interconnection dispute resolution process to resolve disputes within 60 days, unless it determines more time is needed. Specifies the elements to be included in the dispute resolution process and requires the CPUC to establish a technical panel, a review panel, and a public process for each dispute.
AB 327 (Perea, Chapter 611, Statutes of 2013 ) among its many provisions, requires the CPUC to develop a new standard contract or tariff for new NEM customers of the large IOUs by July 1, 2015, that must be used beginning January 1, 2017, or earlier if the NEM cap has been reached. The CPUC will be required to ensure that the new standard contract or tariff for rates, terms of service, and billing rules is based on the electrical system costs and benefits received by nonparticipating customers and prevents a cost shift to non-NEM customers.
AB 1637 (Low, Chapter 658, Statutes of 2016) doubled the annual funding authorization for SGIP and revised and extended the NEM program for fuel cells by five years.
AB 1478 (Committee on Budget, Chapter 664, Statutes of 2014) extended the sunset to collect SGIP funds through 2019 and extended the program’s sunset to 2021.
SB 861 (Committee on Budget and Fiscal Review, Chapter 35, Statutes of 2014) established SGIP eligibility restrictions for distributed generation resources and required the CPUC to establish a capacity factor for distributed energy resource technologies.
AB 970 (Ducheny, Chapter 329, Statutes of 2000) enacted the California Energy Security and Reliability Act of 2000 to expedite siting of certain power plants and implement new energy conservation and demand management programs. The bill required the CPUC to establish incentives for distributed generation resources.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
350 Bay Area Action
350 Chico
350 Inyo
350 Sacramento
350 Silicon Valley
350 South Bay Los Angeles
350 SoCal
350 Ventura County Climate Hub
Almond Alliance of California
Almont Orchards Inc.
Aztec Solar
Bar ALE, Inc.
Borrego Solar Systems
Brightline Defense Project
Building Owners and Managers of California
California Alliance for Community Energy
California Building Industry Association
California Business Properties Association
California Democratic Party’s Environmental Caucus
California Energy Storage Alliance
California Environmental Justice Alliance
California Housing Partnership Corp.
California League of Conservation Voters
California Solar & Storage Association
Carriere Family Farms
Center for Climate Protection
Center for Sustainable Energy
Ceres
Coalition for Adequate School Housing
Coalition to Protect San Luis Obispo County
Crain Orchards, Inc.
Designing Accessible Communities
El Dorado County Farm Trails
Empire Farming Company
ENGIE Energy Services
Environment California
Fossil Free California
Green Technical Education and Employment
GRID Alternatives
Gyppo Ale Mill
Indivisible CA-43
Indivisible California Green Team
Indivisible Marin
Indivisible Napa
Indivisible Peninsula CA-14
Indivisible/Resistance, Elk Grove CA-07 Committee
Indivisible San Francisco
Indivisible Sausalito
Indivisible South Bay – LA
Indivisible West Marin
Jim Faulbaum Construction
Keyawa Orchards, Inc.
Lagorio Brothers, Inc.
Loch & Union Distilling
Martin Orchards, Inc.
Merced City School District
Micro Paradox
Mothers Out Front
Napa Climate Now
NBN Properties LLC
Orlando Family, LLC
Paiva Farm Management, Inc.
Peoples’ Environmental Network, Tuolumne County
Peninsula Clean Energy
POLIT Farms
Premier Mushrooms Inc.
Prima Frutta Packing Inc.
Progressive Democrats of the Santa Monica Mountains
Rising Sun Center for Opportunity
Rooted in Resistance
Silicon Valley Leadership Group
Solar and Fire Education S.A.F.E.
Solar Energy Industries Association
Solar Richmond
Solar Rights Alliance
Solar United Neighbors
SunPower
Sunrun Inc.
Sustaenable
Taylor Brothers Farms, Inc.
TechNet
Tesla
The Greenlining Institute
The Hignell Companies
The Resistance – Northridge, Indivisible
Violich Farms
Vivint Solar
Vote Solar
White Rock Vineyards
OPPOSITION:
California Municipal Utilities Association, unless amended
Imperial Irrigation District
Independent Energy Producers
Northern California Power Agency
Pacific Gas and Electric Company
Sacramento Municipal Utility District, unless amended
San Diego Gas & Electric
Southern California Edison
Southern California Public Power Authority, unless amended
The Utility Reform Network
ARGUMENTS IN SUPPORT: According to the author:
“SB 288 will ensure that all California residents and businesses can easily procure clean, cheap electricity from onsite distributed energy resources or “DERs,” including solar power and energy storage. This measure also addresses two of the main barriers to greater deployment of DERs: delayed interconnection to the grid that can take months or even years, and outdated tariffs that often do not adequately (if at all) compensate DERs for the value of the grid services they can provide. By ensuring timely interconnection and fair compensation for these resources, SB 288 will guarantee that all California consumers can exercise their right to purchase the cleanest, cheapest power available.”
ARGUMENTS IN OPPOSITION: The entities opposed to this bill raise several issues including:
- Many of those opposed do not understand where and what problems exist that this bill seeks to address.
- The POUs opposed to this bill raise concerns about the proposal subordinating their regulatory authority (and local control) over their solar programs.
- Several utilities cite the improvements and investments made over the years to address interconnection issues.
- All who oppose raise concerns about the potential of this bill to result in significant cost shifts to non-participating customers that would not be justified.
- Many of those opposed state this bill is not necessary and cite the existing incentive programs that are available to support customer-sited storage and renewable energy.
- All who oppose take issue with this bill establishing a fundamental right to customer-sited renewable energy and storage which could have unintended consequences.
- Some who oppose this bill express concerns with the language related to selling energy into the wholesale electricity market and the implications for federal jurisdiction.
-- END --
Bill Author
Bill Co-Author(s):