SB 297: School facilities: approval of plans: preliminary build contract.
- Session Year: 2019-2020
- House: Senate
- Latest Version Date: 2019-07-01
|
Date
|
Status
|
|---|---|
| Jul 3, 2019 | July 10 set for first hearing canceled at the request of author. |
| Jul 1, 2019 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on ED. |
| Jun 26, 2019 | From committee: Do pass and re-refer to Com. on ED. (Ayes 12. Noes 0.) (June 25). Re-referred to Com. on ED. |
| Jun 13, 2019 | June 19 hearing postponed by committee. |
| Jun 13, 2019 | Re-referred to Coms. on HIGHER ED. and ED. pursuant to Assembly Rule 96. |
| May 24, 2019 | Referred to Coms. on ED. and HIGHER ED. |
| May 9, 2019 | In Assembly. Read first time. Held at Desk. |
| May 9, 2019 | Read third time. Passed. (Ayes 37. Noes 0.) Ordered to the Assembly. |
| Apr 9, 2019 | Read second time. Ordered to third reading. |
| Apr 8, 2019 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Mar 29, 2019 | Set for hearing April 8. |
| Mar 27, 2019 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0.) (March 27). Re-referred to Com. on APPR. |
| Mar 7, 2019 | Set for hearing March 27. |
| Feb 28, 2019 | Referred to Com. on ED. |
| Feb 15, 2019 | From printer. May be acted upon on or after March 17. |
| Feb 14, 2019 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jun 25, 2019 | Do pass and be re-referred to the Committee on [Education] | Assembly Standing Committee on Higher Education |
Passed |
|
| May 9, 2019 | Senate 3rd Reading SB297 Pan | Senate Floor |
Passed |
|
| Mar 27, 2019 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Education |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: June 25, 2019
ASSEMBLY COMMITTEE ON HIGHER EDUCATION
Jose Medina, Chair
SBPCA Bill Id:SB 297
Author:(Pan) – As Introduced Ver:February 14, 2019
[Note: This bill is doubled referred to the Assembly Education Committee and will be heard by that Committee as it relates to issues under its jurisdiction.]
SENATE VOTE: 38-0
SUBJECT: School facilities: approval of plans.
SUMMARY: Authorizes school and community college districts to award construction contracts, but not perform any construction, prior to approval of the plan from the State Architect.
EXISTING LAW:
- Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building (Education Code (EC) Section 17294).
- Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building (EC Sections 17295 and 81133).
- Requires the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval (EC Section 17297).
- Provides community college districts with the authority, until January 1, 2020, to enter into design-build contracts, according to a specified process (EC Section 81700, et seq.).
- Stipulates that for any K-12 district, state agency, or local government design build project, a design-build entity shall not be prequalified or shortlisted absent a commitment by that entity and all subcontractors to meet “skilled and trained workforce” requirements. (Education Code (EC) Section 17250.25(c)(1), Public Contract Code (PCC) Sections 10191(c)(1) and 22164(c)(1).)
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS: Background. According to information provided by the author, school and community college districts have struggled to meet various construction deadlines before their students arrive to school or campus for the start of a new term. The result being additional costs and displaced students. The first few weeks of contractor activity under a newly awarded contract typically are focused on the preliminary work of awarding subcontracts, making submittals of shop drawings or samples, obtaining approval of those submittals, ordering approved materials and equipment, and delivering them to the construction sites.
It is found that summer breaks offer a brief window for contractors to complete projects with little to zero tolerance for delays. Costs during the summer months tend to be higher and projects end up competing against each other as labor shortages cause districts to pay premiums to keep projects on schedule.
The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the "Field Act." The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the California Building Standards Code.
The Field Act requires the Division of the State Architect (DSA) within the DGS to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
Purpose of this measure. According to the author, “Some readings of the existing Field Act provisions would prohibit schools and community colleges from obtaining the benefit of early price guarantee”.
This measure amends the Field Act to permit school and community college districts to award construction contracts prior to DSA approval.
The author contends that being able to award subcontracts and complete other preliminary work in the winter months when construction work is slow means better prices can be obtained, the subsequent summer construction work will be better planned, and materials can be delivered and ready for construction. The ability to operate under this revised regulation will allow school and community college districts to more efficiently provide much-needed space for students in a timely manner.
Arguments in support. According to the sponsors of this measure, Sacramento Regional Builders Exchange, “SB 297 offers a no-cost way for school and community college districts to more efficiently spend state and local monies which go into school new-construction, modernization, and major maintenance projects. Also, SB 297 protects the important Filed Act requirement that no school or community college construction based on plans requiring DSA’s approval can occur until those plans are approved by DSA”.
Arguments in opposition. According to the Construction Employers’ Association (CEA), “CEA members appreciate the desire to expedite school construction. Unfortunately, this is not the answer. Specifically, pursuant to this measure, school districts would be entitled to award contracts based on incomplete plans and specifications subject to change by DGS and DSA. To the extent the plans are changed, which is common place, changes would be addressed through extensive and costly change orders, which invariably result in more disputes and litigation”.
REGISTERED SUPPORT / OPPOSITION:
Support
Association of California Construction Managers
Coalition for Adequate School Housing
Community College Facility Coalition
Sacramento Regional Builders Exchange (Sponsor)
San Juan Unified School District
Small School Districts Association
Opposition
California Association of Sheet Metal & Air Conditioning Contractors National Association
California Chapters of the National Electrical Contractors Association
California Legislative Conference of Plumbing, Heating & Piping Industry
California State Council of Laborers
Construction Employers' Association
Northern California Carpenters Regional Council
Northern California District Council - IIWU
Southern California Contractors Association
United Contractors (UCON)
Wall and Ceiling Alliance
Western Wall and Ceiling Contractors Association (WWCCA)
Analysis Prepared by: Jeanice Warden / HIGHER ED. / (916) 319-3960
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 297 |
THIRD READING
Bill No: SB 297
Introduced: 2/14/19
SENATE EDUCATION COMMITTEE: 7-0, 3/27/19
AYES: Leyva, Wilk, Chang, Durazo, Glazer, McGuire, Pan
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: School facilities: approval of plans
DIGEST:
This bill allows school and community college districts to award construction contracts, but not perform any construction, prior to receiving plan approval from the State Architect.
Existing law:
- Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building.
- Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building.
- Requires, generally, the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval and pay all associated fees.
- Establishes alternative methods for awarding school construction contracts, including lease-leaseback and design-build contracting.
- Allows, for lease-leaseback and design-build contracting, the governing board of a school or community college district to award construction contracts prior to obtaining plan approval by DGS.
This bill allows school and community college districts to award construction contracts, but not perform any construction, prior to receiving plan approval from the State Architect.
Comments
- Need for the bill. According to the author, “For decades, school districts have struggled to meet construction deadlines ahead of students arriving for classes in the fall, often resulting in additional costs and displaced students (e.g. leased portable housing, seasonal prices, and labor shortages). The first few weeks of contractor activity under a newly awarded construction contract are focused on the preliminary work of awarding subcontracts, making submittals of shop drawings or samples, obtaining approval of those submittals, ordering approved materials and equipment, and delivering them to the construction site. Summer breaks offer a brief window for contractors to complete projects with little to no tolerance for delays. Costs during the summer months are typically higher and projects end up competing against each other as labor shortages cause districts to pay premiums to keep projects on schedule.
“SB 297 amends the Education Code to permit districts to award construction contracts prior to Division of the State Architect (DSA) approval. Being able to award subcontracts and complete other preliminary work in the winter months when construction work is slow means better prices can be obtained, the subsequent summer construction work will be better planned, and materials can be delivered and ready for construction. The ability to operate under this revised regulation will allow school districts to operate more efficiently and provide much-needed space for students in a timely manner.”
- Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with California's building codes (Title 24 of the California Code of Regulations). The majority of DSA's plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA’s plan review ensures the project’s compliance with code requirements related to:
- Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake.
- Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistive building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access.
- Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities.
- Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
- The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the "Field Act." The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the California Building Standards Code.
The Field Act requires the DSA within the DGS to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
- This bill codifies one of the recommendations from DSA’s Alternate Delivery Task Force. In February 2014, the Alternate Project Delivery Task Force was established by the State Architect to review the procedures by which DSA administers school construction projects differently from traditional project delivery methods, including design-build, lease-leaseback, and other related alternative project delivery methods. The objective of the Task Force was to uncover issues in implementing alternative project delivery methods, clarify the role of DSA, and suggest clarifications and revisions to existing law. The Task Force included contractors, inspectors, program managers, engineers and architects, and DSA staff, representing diverse perspectives on alternative project delivery.
The changes proposed in this bill were included in the recommendations section of DSA’s task force report. According to the report, “In managing design and construction programs, particularly in the months when students are absent or fewer, schools and community colleges are prohibited from awarding projects timely if State architect approval is still pending, so that construction planning and scheduling, preparation of shop drawings and submittals, and inspection and testing can be provided for. Thus the construction is rushed at a risk of lesser construction execution, quality, and safety. This bill would allow award in time to do the planning to allow better planning and quality execution. Some Design Build provisions contradict some Field Act provisions. This bill would correct those contradictions. Some readings of the existing Field Act provisions would prohibit schools and community colleges from obtaining the benefit of early price guarantee. This bill would grant that benefit.”
- Would this bill have a significant impact on school projects? Supporters of this bill cite reduced construction costs, increased efficiencies, reduced delays, and additional classroom time for students resulting from this bill. However, given that local educational agencies (LEAs) can already perform a wide array of preconstruction services before obtaining DSA plan approval—those services not necessitating an executed construction contract—the benefits of this bill may be overstated. Further, by allowing LEAs to execute construction contracts before their plans are approved, this bill could result in additional change orders to the extent that a DSA plan review requires substantive project modifications.
Even so, given that this bill will not infringe upon DSA’s authority to enforce the state’s building codes, and there may be specific instances where school and community college districts could save money by bidding and awarding their projects in advance of plan approval, the changes included in this bill have merit.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
Association of California Construction Managers
Coalition for Adequate School Housing
Sacramento Regional Builders Exchange
Construction Employers’ Association
Prepared by: Ian Johnson / ED. /
4/10/19 15:11:00
**** END ****
SENATE COMMITTEE ON EDUCATION
Senator Connie Leyva, Chair
2019 - 2020 Regular
Bill No: SB 297 Hearing Date: March 27, 2019
Author: | Pan | ||
Version: | February 14, 2019 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Ian Johnson | ||
Subject: School facilities: approval of plans.
SUMMARY
This bill allows school and community college districts to award construction contracts, but not perform any construction, prior to receiving plan approval from the State Architect.
BACKGROUND
Existing law:
- Defines “construction or alteration” for purposes of school facilities projects to include any construction, reconstruction, or alteration of, or addition to, any school building.
- Requires the Department of General Services (DGS) to pass upon and approve or reject all plans for the construction or, if the estimated cost exceeds $100,000, the alteration of any school building.
- Generally requires the governing board of each school and community college district, before adopting construction or alteration plans, to submit the plans to DGS for approval and pay all associated fees.
- Establishes alternative methods for awarding school construction contracts, including lease-leaseback and design-build contracting.
- Allows, for lease-leaseback and design-build contracting, the governing board of a school or community college district to award construction contracts prior to obtaining plan approval by DGS.
ANALYSIS
This bill allows school and community college districts to award construction contracts, but not perform any construction, prior to receiving plan approval from the State Architect.
STAFF COMMENTS
- Need for the bill. According to the author, “For decades, school districts have struggled to meet construction deadlines ahead of students arriving for classes in the fall, often resulting in additional costs and displaced students (e.g. leased portable housing, seasonal prices, and labor shortages). The first few weeks of contractor activity under a newly awarded construction contract are focused on the preliminary work of awarding subcontracts, making submittals of shop drawings or samples, obtaining approval of those submittals, ordering approved materials and equipment, and delivering them to the construction site. Summer breaks offer a brief window for contractors to complete projects with little to no tolerance for delays. Costs during the summer months are typically higher and projects end up competing against each other as labor shortages cause districts to pay premiums to keep projects on schedule.
SB 297 amends the Education Code to permit districts to award construction contracts prior to Division of the State Architect (DSA) approval. Being able to award subcontracts and complete other preliminary work in the winter months when construction work is slow means better prices can be obtained, the subsequent summer construction work will be better planned, and materials can be delivered and ready for construction. The ability to operate under this revised regulation will allow school districts to operate more efficiently and provide much-needed space for students in a timely manner.”
- Plan review for construction projects. The DSA reviews plans for public school construction and certain other state-funded building projects to ensure that plans, specifications, and construction comply with California's building codes (Title 24 of the California Code of Regulations). The majority of DSA's plan review and construction oversight focuses on new construction and alteration projects for California school and community college districts. DSA’s plan review ensures the project’s compliance with code requirements related to:
- Structural safety, ensuring that facilities meet the high standards set in the Field Act to withstand an earthquake.
- Fire and life safety, addressing the safety of occupants in buildings, as related to fire resistive building materials, fire alarms, fire suppression equipment, safe occupant egress, and firefighting equipment access.
- Access compliance, ensuring that public schools and state-funded construction projects meet accessibility requirements for people with disabilities.
- Energy efficiency, including compliance with applicable California Green Building Standards Code requirements for sustainability.
- The Field Act. All school facilities must be built in compliance with specified earthquake safety standards, commonly known as the "Field Act." The Field Act was enacted following a severe earthquake in Long Beach in 1933. The Field Act requires a comprehensive design specification and construction inspection process for K-12 public school educational facilities. Community college facilities may be constructed in accordance with either the Field Act or the California Building Standards Code.
The Field Act requires the Division of the State Architect (DSA) within the Department of General Services (DGS) to review the construction plans for school buildings and requires school districts to hire onsite construction inspectors to ensure compliance with the structural safety standards. School and community college construction contracts may only be awarded after DSA approval of the plans and specifications on which the contracts are based.
- This bill would codify one of the recommendations from DSA’s Alternate Delivery Task Force. In February 2014, the Alternate Project Delivery Task Force was established by the State Architect to review the procedures by which DSA administers school construction projects differently from traditional project delivery methods, including design-build, lease-leaseback, and other related alternative project delivery methods. The objective of the Task Force was to uncover issues in implementing alternative project delivery methods, clarify the role of DSA, and suggest clarifications and revisions to existing law. The Task Force included contractors, inspectors, program managers, engineers and architects, and DSA staff, representing diverse perspectives on alternative project delivery.
The changes proposed in this bill were included in the recommendations section of DSA’s task force report. According to the report, “In managing design and construction programs, particularly in the months when students are absent or fewer, schools and community colleges are prohibited from awarding projects timely if State architect approval is still pending, so that construction planning and scheduling, preparation of shop drawings and submittals, and inspection and testing can be provided for. Thus the construction is rushed at a risk of lesser construction execution, quality, and safety. This bill would allow award in time to do the planning to allow better planning and quality execution. Some Design Build provisions contradict some Field Act provisions. This bill would correct those contradictions. Some readings of the existing Field Act provisions would prohibit schools and community colleges from obtaining the benefit of early price guarantee. This bill would grant that benefit.”
- Would this bill have a significant impact on school projects? Supporters of this bill cite reduced construction costs, increased efficiencies, reduced delays, and additional classroom time for students resulting from this bill. However, given that local educational agencies (LEAs) can already perform a wide array of preconstruction services before obtaining DSA plan approval—those services not necessitating an executed construction contract—the benefits of this bill may be overstated. Further, by allowing LEAs to execute construction contracts before their plans are approved, this bill could result in additional change orders to the extent that a DSA plan review requires substantive project modifications.
Even so, given that this bill would not infringe upon DSA’s authority to enforce the state’s building codes, and there may be specific instances where school and community college districts could save money by bidding and awarding their projects in advance of plan approval, the changes included in this bill have merit.
SUPPORT
Association of California Construction Managers
Coalition for Adequate School Housing
Sacramento Regional Builders Exchange
OPPOSITION
Construction Employers’ Association
-- END --
Bill Author
Bill Co-Author(s):