SB 457: Biomethane: gas corporations.
- Session Year: 2019-2020
- House: Senate
- Latest Version Date: 2019-10-02
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law requires the commission to adopt policies and programs that promote the in-state production and distribution of biomethane, as defined, and that facilitate the development of a variety of sources of in-state biomethane. The commission has adopted 2 decisions implementing these requirements, the 2nd of which adopted a 5-year monetary incentive program effective June 11, 2015, for biomethane projects. Existing law requires the commission to modify the monetary incentive program in specified respects and to extend the program, as modified, until December 31, 2021.
This bill would require the commission to extend the program until December 31, 2026, or until all available program funds are expended, whichever occurs first.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the bill extends the monetary incentive program and requires continuation of action by the commission to implement certain requirements, and because failure to comply with these commission actions would be a crime, the bill would impose a state-mandated local program by extending the operation of a crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)The commission shall modify, and extend until December 31, 2026, or until all available program funds are expended, whichever occurs first, the monetary incentive program for biomethane projects adopted in Decision 15-06-029 (June 11, 2015), Decision Regarding the Costs of Compliance with Decision 14-01-034 and Adoption of Biomethane Promotion Policies and Program, as follows:
(1)Except for a dairy cluster biomethane project, the total available incentive limitation for a project shall be increased from one million five hundred thousand dollars ($1,500,000) to three million dollars ($3,000,000).
(2)For a dairy cluster biomethane project, the total available incentive limitation shall be raised to five million dollars ($5,000,000), which may be used for interconnection costs and costs incurred for gathering lines to help reduce emissions of short-lived climate pollutants pursuant to Section 39730 of the Health and Safety Code. For purposes of this subdivision, a dairy cluster biomethane project means a biomethane project of three or more dairies in close proximity to one another employing multiple facilities for the capture of biogas that is transported by multiple gathering lines to a centralized processing facility where the biogas is processed to meet the biomethane standards adopted by the commission pursuant to subdivisions (c) and (d) of Section 25421 of the Health and Safety Code and injected into the pipeline of the gas corporation through a single interconnection.
(b)This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2027, deletes or extends that date.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Oct 2, 2019 | Chaptered by Secretary of State. Chapter 479, Statutes of 2019. |
| Oct 2, 2019 | Approved by the Governor. |
| Sep 19, 2019 | Enrolled and presented to the Governor at 3 p.m. |
| Sep 11, 2019 | Assembly amendments concurred in. (Ayes 34. Noes 0.) Ordered to engrossing and enrolling. |
| Sep 10, 2019 | In Senate. Concurrence in Assembly amendments pending. |
| Sep 10, 2019 | Read third time. Passed. Ordered to the Senate. |
| Jun 27, 2019 | Read second time. Ordered to third reading. |
| Jun 26, 2019 | From committee: Do pass. (Ayes 15. Noes 0.) (June 26). |
| Jun 18, 2019 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 17, 2019 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (June 12). |
| Jun 6, 2019 | Referred to Com. on U. & E. |
| May 24, 2019 | In Assembly. Read first time. Held at Desk. |
| May 23, 2019 | Read third time. Passed. (Ayes 38. Noes 0.) Ordered to the Assembly. |
| May 21, 2019 | Ordered to special consent calendar. |
| May 16, 2019 | From committee: Do pass. (Ayes 6. Noes 0.) (May 16). |
| May 10, 2019 | Set for hearing May 16. |
| Apr 22, 2019 | April 22 hearing: Placed on APPR. suspense file. |
| Apr 5, 2019 | Set for hearing April 22. |
| Apr 2, 2019 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 12. Noes 0.) (April 2). Re-referred to Com. on APPR. |
| Mar 26, 2019 | Set for hearing April 2. |
| Mar 25, 2019 | March 27 hearing postponed by committee. |
| Mar 15, 2019 | Set for hearing March 27. |
| Mar 7, 2019 | Referred to Com. on E., U. & C. |
| Feb 22, 2019 | From printer. May be acted upon on or after March 24. |
| Feb 21, 2019 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 11, 2019 | Unfinished Business SB457 Hueso Concurrence | Senate Floor |
Passed |
|
| Sep 10, 2019 | SB 457 Hueso Senate Third Reading By Eduardo Garcia | Assembly Floor |
Passed |
|
| Jun 26, 2019 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 12, 2019 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| May 23, 2019 | Special Consent SB457 | Senate Floor |
Passed |
|
| May 16, 2019 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 22, 2019 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 2, 2019 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 457 |
UNFINISHED BUSINESS
Bill No: SB 457
Amended: 6/18/19
SENATE ENERGY, U. & C. COMMITTEE: 12-0, 4/2/19
AYES: Hueso, Moorlach, Bradford, Chang, Dodd, Hertzberg, Hill, McGuire, Rubio, Skinner, Stone, Wiener
NO VOTE RECORDED: Stern
SENATE APPROPRIATIONS COMMITTEE: 6-0, 5/16/19
AYES: Portantino, Bates, Bradford, Hill, Jones, Wieckowski
SENATE FLOOR: 38-0, 5/23/19
AYES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
ASSEMBLY FLOOR: 60-9, 9/10/19 - See last page for vote
SUBJECT: Biomethane: gas corporations
DIGEST:
This bill extends the sunset date, by five additional years, of an existing incentive program for biomethane projects administered by the California Public Utilities Commission (CPUC).
Assembly Amendments
add language to qualify the sunset date extension to either the date in this bill or until all available program funds are expended, whichever occurs first.
Existing law:
- Establishes the CPUC has regulatory authority over public utilities, including gas corporations. (California Constitution, Article XII)
- Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Public Utilities Code §451)
- Requires the CPUC to modify the monetary incentive program adopted in Decision 15-06-029 (June 11, 2015), in specified respects and to extend the program, as modified, until December 31, 2021. (Public Utilities Code §399.19)
- Requires the CPUC to adopt policies and programs that promote the in-state production and distribution of biomethane. (Public Utilities Code §399.24)
- Requires the CPUC to adopt pipeline access rules that ensure that each gas corporation provides nondiscriminatory open access to its gas pipeline system to any party for the purposes of physically interconnecting with the gas pipeline system and effecting the delivery of gas. (Public Utilities Code §784)
- Requires the CPUC, in consultation with the Air Resources Board (ARB), to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. Requires the CPUC to take certain actions in regards to the development and procurement of the targets or goals. (Health and Safety Code §25421)
- Requires the California Energy Commission (CEC) to hold public hearings to identify in its Integrated Energy Policy Report impediments that limit procurement of biomethane in California, including, but not limited to, impediments to interconnection, and to offer solutions. (Public Resources Code §25326)
- Requires the CPUC to adopt standards that specify the concentrations of constituents of concern that are found in biomethane, and to adopt monitoring, testing, reporting, and recordkeeping protocols, to ensure the protection of human health and the integrity and safety of pipelines and pipeline facilities. (Health & Safety Code §25421 et seq.)
This bill:
- Extends the sunset date of an existing CPUC administered program for biomethane from 2021 to 2026, or until all available program funds are expended, whichever occurs first.
- Extends the date by when the existing statutory section for the incentive program for biomethane projects requires repeal from January 1, 2022, to January 1, 2027.
Background
What is biomethane? Biomethane is an energy source, in the form of a biogas that has been cleaned and processed to remove impurities and made available from materials derived from biological sources. These sources include biomass waste including forest and other wood waste, agriculture and food processing waste, organic urban waste, waste and emissions from wastewater treatment facilities, landfill gas and other organic wastes sources. This type of waste can be used for liquid fuels, as the breakdown of carbon-based material results in a gaseous mixture of carbon dioxide (CO2) and methane. Although this process occurs naturally, resulting in significant greenhouse gas (GHG) emissions, the gas can be captured and utilized through anaerobic digesters that speed up the process. In addition, the natural decomposition of organic materials in municipal solid waste landfills provides an opportunity to capture landfill gas. This captured gas (or biogas) contains methane and CO2, along with other gasses. Biogas can be processed further to remove CO2 and other impurities and be converted to pipeline quality methane (or biomethane). Although the combustion of biogas releases CO2, it also destroys methane, which is a more potent GHG than CO2 because of its global warming potential. Biomethane is considered carbon neutral because CO2 that would be released into the atmosphere is utilized and thereby removed from the atmosphere. The usage of biomethane can also displace energy consumption from fossil fuels, thereby decreasing carbon intensity.
CPUC Biomethane Projects Incentive Program. The CPUC adopted a five-year monetary incentive program effective June 11, 2015 (CPUC Decision 15-06-029) to encourage biomethane producers to design, construct, and to successfully operate biomethane projects that interconnect with the gas utilities' pipeline systems. The program was codified by the Legislature in AB 2313 (Williams, Chapter 571, Statutes of 2016). AB 2313 also increased the incentive amount per project from $1.5 million to up to $3 million for a single production facility and $5 million for a dairy cluster biomethane project, defined as three or more dairies in close proximity, to allow for the inclusion of gathering line costs as a qualifying interconnection expense. Under the program, eligible biomethane projects can receive up to 50 percent of the project's interconnection costs only after the projects are built and operating. The statewide funding for the monetary incentive program is capped at $40 million total.
The CPUC identifies three types of costs that a biomethane project is likely to encounter. These costs consist of the following:
- The pre-injection costs incurred prior to the injection of biomethane into the utility pipeline;
- The interconnection costs incurred in order to interconnect the biomethane facility with the utility pipeline; and
- The post-injection ongoing costs of maintaining and operating the biomethane facility and the pipeline access.
Need for extension of the sunset date. The monetary incentive is available to eligible projects until December 31, 2021, or earlier if the program has exhausted its $40 million capped funding. According to the CPUC, there have been interconnection incentives awarded to two separate production facilities. The amount of incentive money remaining is $34 million. There is no project queue for the interconnection incentive because the CPUC awards the monetary incentives as a reimbursement, only once a project has been interconnected to the pipeline system and gas flows for 30 out of 40 days (depending on the interconnection agreement). The CPUC is, however, aware that there are several planned and under-development biomethane production projects that intend to utilize the incentive but need more time to complete their project and demonstrate production before they can be awarded the incentive. These projects are not likely to be completed and flowing gas until after the current December 31, 2021 sunset.
This bill will maintain the current funding cap on the Biomethane Incentive Program, and, therefore, only allows for the use of the remaining $34 million of the monetary funds. By extending the sunset date of the program by five years, the funding will ensure that projects currently in development and those looking to develop are afforded a few more years to complete, connect, and operate their interconnection projects.
Related/Prior Legislation
SB 1440 (Hueso, Chapter 739, Statutes of 2018) required the CPUC, in consultation with the ARB, to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. The bill also required the CPUC to take certain actions in regards to the development of the targets or goals and the procurement of the biomethane to meet those targets or goals.
AB 2313 (Williams, Chapter 571, Statutes of 2016) increased the monetary incentive amounts available to biomethane projects and directs the CPUC to consider whether to allow the costs of utility infrastructure for biomethane interconnection with the natural gas pipeline network recovery to be recovered in utility rates.
AB 1900 (Gatto, Chapter 602, Statutes of 2012) required the CPUC to adopt new health and safety standards for landfill gas, to hold public hearings to identify impediments to in-state biomethane use, and develop policies and programs to increase the in-state use of biomethane.
AB 2196 (Chesbro, Chapter 605, Statutes of 2012) clarified the definition of an eligible renewable electrical generation facility to include a facility that generates electricity utilizing biomethane delivered through a common carrier pipeline if the source and delivery of the fuel can be verified by the CEC.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
- Negligible costs to individual state government agencies as ratepayers of the state's natural gas investor-owned utilities (IOUs), and minor collective costs for all state agencies.
According to the CPUC, there remains $34 million to be awarded by the biomethane interconnection program. If the program is not extended, the $34 million necessary to fund the award will not be collected from IOU natural gas ratepayers. However, program costs are assessed on IOU natural gas procurement. For the most part, the Department of General Services, not a natural gas IOU, procures natural gas on behalf of state agencies, which is delivered using IOU infrastructure. Therefore, in most cases, a state agency will not incur the costs of this program.
- Minor costs to the CPUC to continue administering the program.
Agricultural Energy Consumers Association
City of Torrance
Coalition for Renewable Natural Gas
Harvest Power Energy Group
Pacific Gas and Electric Company
Sanitation Districts of Los Angeles County
Southern California Gas Company
California Environmental Justice Alliance
Center for Community Action & Environmental Justice
Center for Food Safety
Food & Water Watch
Leadership Counsel for Justice & Accountability
People Demanding Action
Progressive Democrats of America
Progressive Democrats of America, California
Sierra Club California
ARGUMENTS IN SUPPORT: According to the author, “This bill is a modest extension of the sunset date for an existing biomethane incentive program administered by the CPUC. This bill does not increase the available funding beyond what was originally established, $40 million. Instead, this bill attempts to better align the availability of the incentive program with newly established policy in SB 1440 (Hueso, 2018).”
ARGUMENTS IN OPPOSITION: Those opposed to this bill express concerns about the promotion of renewable natural gas stating that “digesters and the biogas they produce create more obstacles toward achieving a cleaner energy future than they resolve.” The opponents raise concerns about the impacts of factory farms in California and concerns that this bill will help “incentivize expansion of large dairy operations, and the pollution and other adverse impacts that accompany them.” The organizations opposed to the bill raise concerns about the local impacts of these operations in communities in the San Joaquin Valley, in particular. The opposition also raise concerns about the state’s cumulative efforts to invest in dairy digesters and their desire to have the state (taxpayers and ratepayers) to instead incentivize farming practices that promote environmental and human health.
ASSEMBLY FLOOR: 60-9, 9/10/19
AYES: Aguiar-Curry, Arambula, Bauer-Kahan, Berman, Bigelow, Bonta, Brough, Burke, Calderon, Carrillo, Cervantes, Chau, Chen, Cooley, Cooper, Cunningham, Daly, Diep, Eggman, Flora, Fong, Frazier, Gallagher, Eduardo Garcia, Gipson, Gonzalez, Gray, Grayson, Holden, Irwin, Jones-Sawyer, Kiley, Lackey, Levine, Low, Maienschein, Mathis, Mayes, Medina, Melendez, Mullin, Obernolte, O'Donnell, Patterson, Petrie-Norris, Quirk, Quirk-Silva, Ramos, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Salas, Santiago, Smith, Ting, Voepel, Waldron, Wood, Rendon
NOES: Bloom, Boerner Horvath, Cristina Garcia, Gloria, Kalra, Kamlager-Dove, Nazarian, Mark Stone, Wicks
NO VOTE RECORDED: Chiu, Choi, Chu, Friedman, Gabriel, Limón, McCarty, Muratsuchi, Reyes, Weber
Prepared by: Nidia Bautista / E., U., & C. / (916) 651-4107
9/10/19 22:08:35
**** END ****
SENATE THIRD READING
STR Bill Id:SB 457
Author:(Hueso)
As Amended Ver:June 18, 2019
Majority vote
SUMMARY:
This bill extends by five years, from December 31, 2021, to December 31, 2026, an existing monetary incentive program, administered by the California Public Utilities Commission (CPUC), for interconnection of a biomethane project to a utility's natural gas pipeline system.
Major Provisions
Extends two sunset dates of an existing biomethane incentive program administered by the CPUC from: 1) December 31, 2021 to December 31, 2026 for the incentive projects; and 2) January 1, 2022 to January 1, 2027 for the overall provisions of the program.
COMMENTS:
Background and Purpose. Bioenergy is renewable energy produced from biomass wastes including forest and other wood waste, agriculture and food processing wastes, organic urban waste, waste and emissions from water treatment facilities, landfill gas and other organic waste sources. Biomass waste can be used to generate renewable electricity, liquid fuels and biogas.
From an environmental perspective, biogas has several advantages over conventional natural gas. Combustion of natural gas, including biogas, releases carbon dioxide (CO2) into the atmosphere. However, the combustion of natural gas destroys methane, a gas that is a much more potent greenhouse gas (GHG) than is CO2. In addition to destroying methane, the combustion of biogas, for CO2 accounting purposes, is considered carbon neutral. This is because the carbon in biogas, unlike the carbon in conventional natural gas, was so recently present in the atmosphere. In addition, biogas can be used to displace the use of fossil fuels, such as conventional natural gas, thereby further decreasing its carbon intensity.
Biogas can be converted to biomethane by removing carbon dioxide and other impurities. Current law defines "biomethane" as biogas that meets the standards, adopted by the CPUC in keeping with statute, for injection into a common carrier pipeline. Biomethane can replace fossil sources of natural gas in homes and factories and compressed or liquefied as natural gas used in vehicles. Biomethane can also be used to produce renewable hydrogen in fuel cells.
The state has numerous programs to promote or financially incentivize the production and use of biomethane. Among those programs is a $40 million ratepayer-funded program to offset a portion of the costs to gas producers of connecting to utility pipelines. Program funding will pay up to 50% of a biomethane project's interconnection costs, up to $3 million per project, except in the case of a dairy cluster biomethane project, for which the per-project limit is $5 million.
According to the CPUC, the program has made awards to two biomethane connection projects, for a total award amount of $6 million. This leaves $34 million in authorized award monies. The CPUC reports there is no project queue; nor is there a "pot" of unused program monies. This is because an eligible project applies for program funding only after the project has interconnected with an IOU natural gas pipeline and has delivered gas for a specified period, and the CPUC authorizes an IOU to collect monies from ratepayers only after program monies have been awarded. However, the CPUC says it is aware of several planned and under-development biomethane production projects that intend to utilize the incentive but need more time to complete their project and demonstrate production before they can apply for the incentive. The program extension provided by this bill would allow completion and interconnection of those projects, which would then apply for program awards.
According to the Author:
"This bill is a modest extension of the sunset date for an existing biomethane incentive program administered by the CPUC. This bill does not increase the available funding beyond what was originally established, $40 million. Instead, this bill attempts to better align the availability of the incentive program with newly established policy in SB 1440."
Arguments in Support:
According to the County Sanitation Districts of Los Angeles County, SB 457 would simply extend an existing $40 million program that was first approved by the CPUC in 2015 and modified in 2016 by AB 2313 (Williams). This extension is necessary because projects such as these often take years to bring to fruition. However, far more demand is anticipated in the next 10 years as organic waste project to implement new statutes, such as SB 1383 (Lara), are implemented. This interconnection incentive program is a critical element to make these important projects cost-effective."
Arguments in Opposition:
According to the Environmental Justice Alliance: "Senate Bill 457 extends a subsidy to the biogas industry that will cost ratepayers money, enrich a handful of interests, and exacerbate environmental and environmental justice threats while undermining our state's climate goals. SB 457 does not further California's path towards sustainability, environmental health and environmental justice. Rather, it hinders it."
FISCAL COMMENTS:
According to the Assembly Appropriations Committee:
- "Negligible costs to individual state government agencies as ratepayers of the state's natural gas investor-owned utilities (IOUs), and minor collective costs for all state agencies.
According to the CPUC, there remains $34 million to be awarded by the biomethane interconnection program. If the program is not extended, the $34 million necessary to fund the award will not be collected from IOU natural gas ratepayers. However, program costs are assessed on IOU natural gas procurement. For the most part, the Department of General Services, not a natural gas IOU, procures natural gas on behalf of state agencies, which is delivered using IOU infrastructure. Therefore, in most cases, a state agency will not incur the costs of this program.
- Minor costs to the CPUC to continue administering the program."
VOTES:
SENATE FLOOR: 38-0-0
YES: Allen, Archuleta, Atkins, Bates, Beall, Borgeas, Bradford, Caballero, Chang, Dodd, Durazo, Galgiani, Glazer, Grove, Hertzberg, Hill, Hueso, Hurtado, Jackson, Jones, Leyva, McGuire, Mitchell, Monning, Moorlach, Morrell, Nielsen, Pan, Portantino, Roth, Rubio, Skinner, Stern, Stone, Umberg, Wieckowski, Wiener, Wilk
ASM UTILITIES AND ENERGY: 12-0-3
YES: Holden, Patterson, Burke, Carrillo, Chen, Cunningham, Eggman, Eduardo Garcia, Mayes, Quirk, Santiago, Ting
ABS, ABST OR NV: Cristina Garcia, Muratsuchi, Reyes
ASM APPROPRIATIONS: 15-0-3
YES: Gonzalez, Bigelow, Bloom, Bonta, Carrillo, Chau, Diep, Eggman, Fong, Gabriel, Maienschein, Obernolte, Petrie-Norris, Quirk, Robert Rivas
ABS, ABST OR NV: Brough, Calderon, Eduardo Garcia
UPDATED:
VERSION: June 18, 2019
CONSULTANT: Mary McDonald / U. & E. / (916) 319-2083 FN: 0001171
Date of Hearing: June 26, 2019
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
SBPCA Bill Id:SB 457
Author:(Hueso) – As Amended Ver:June 18, 2019
Policy Committee: | Utilities and Energy | Vote: | 12 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill extends by five years, from December 31, 2021, to December 31, 2026, an existing monetary incentive program, administered by the California Public Utilities Commission (CPUC), for interconnection of a biomethane project to a utility’s natural gas pipeline system.
FISCAL EFFECT:
- Negligible costs to individual state government agencies as ratepayers of the state’s natural gas investor-owned utilities (IOUs), and minor collective costs for all state agencies.
According to the CPUC, there remains $34 million to be awarded by the biomethane interconnection program. If the program is not extended, the $34 million necessary to fund the award will not be collected from IOU natural gas ratepayers. However, program costs are assessed on IOU natural gas procurement. For the most part, the Department of General Services, not a natural gas IOU, procures natural gas on behalf of state agencies, which is delivered using IOU infrastructure. Therefore, in most cases, a state agency will not incur the costs of this program.
- Minor costs to the CPUC to continue administering the program.
COMMENTS:
- Background and Purpose. Bioenergy is renewable energy produced from biomass wastes including forest and other wood waste, agriculture and food processing wastes, organic urban waste, waste and emissions from water treatment facilities, landfill gas and other organic waste sources. Biomass waste can be used to generate renewable electricity, liquid fuels and biogas.
From an environmental perspective, biogas has several advantages over conventional natural gas. Combustion of natural gas, including biogas, releases carbon dioxide (CO2) into the atmosphere. However, the combustion of natural gas destroys methane, a gas that is a much more potent GHG than is CO2. In addition to destroying methane, the combustion of biogas, for CO2 accounting purposes, is considered carbon neutral. This is because the carbon in biogas, unlike the carbon in conventional natural gas, was so recently present in the atmosphere. In addition, biogas can be used to displace the use of fossil fuels, such as conventional natural gas, thereby further decreasing its carbon intensity.
Biogas can be converted to biomethane by removing carbon dioxide and other impurities. Current law defines “biomethane” as biogas that meets the standards, adopted by the CPUC in keeping with statute, for injection into a common carrier pipeline. Biomethane can replace fossil sources of natural gas in homes and factories and compressed or liquefied as natural gas used in vehicles. Biomethane can also be used to produce renewable hydrogen in fuel cells.
The state has numerous programs to promote or financially incentivize the production and use of biomethane. Among those programs is a $40 million ratepayer-funded program to offset a portion of the costs to gas producers of connecting to utility pipelines. Program funding will pay up to 50% of a biomethane project’s interconnection costs, up to $3 million per project, except in the case of a dairy cluster biomethane project, for which the per-project limit is $5 million.
According to the CPUC, the program has made awards to two biomethane connection projects, for a total award amount of $6 million. This leaves $34 million in authorized award monies. The CPUC reports there is no project queue; nor is there a “pot” of unused program monies. This is because an eligible project applies for program funding only after the project has interconnected with an IOU natural gas pipeline and has delivered gas for a specified period, and the CPUC authorizes an IOU to collect monies from ratepayers only after program monies have been awarded. However, the CPUC says it is aware of several planned and under-development biomethane production projects that intend to utilize the incentive but need more time to complete their project and demonstrate production before they can apply for the incentive. The program extension provided by this bill would allow completion and interconnection of those projects, which would then apply for program awards.
- Related Legislation. AB 2313 (Williams), Chapter 571, Statutes of 2016 increased the monetary incentive amounts available to biomethane interconnection projects and directed the CPUC to consider whether to allow the costs of utility infrastructure for biomethane interconnection with the natural gas pipeline network recovery to be recovered in utility rates.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: June 12, 2019
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Chris Holden, Chair
SBPCA Bill Id:SB 457
Author:(Hueso) – As Introduced Ver:February 21, 2019
SENATE VOTE: 38-0
SUBJECT: Biomethane: gas corporations
SUMMARY: This bill extends the sunset date, by five additional years, of an existing incentive program for biomethane projects administered by the California Public Utilities Commission (CPUC).
Specifically, this bill: Extends two sunset dates of an existing biomethane incentive program administered by the CPUC from: 1) December 31, 2021 to December 31, 2026 for the incentive projects; and 2) January 1, 2022 to January 1, 2027 for the overall provisions of the program.
EXISTING LAW:
- Requires the CPUC to modify the monetary incentive program adopted in Decision 15-06-029 (June 11, 2015), in specified respects and to extend the program, as modified, until December 31, 2021. (Public Utilities Code §399.19) The provisions of this measure modify these dates.
- Requires the CPUC to adopt policies and programs that promote the in-state production and distribution of biomethane. (Public Utilities Code §399.24)
- Requires the CPUC to adopt pipeline access rules that ensure that each gas corporation provides nondiscriminatory open access to its gas pipeline system to any party for the purposes of physically interconnecting with the gas pipeline system and effecting the delivery of gas. (Public Utilities Code §784)
- Requires the CPUC, in consultation with the Air Resources Board (ARB), to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. Requires the CPUC to take certain actions in regards to the development and procurement of the targets or goals. (Health and Safety Code §25421)
- Requires the California Energy Commission (CEC) to hold public hearings to identify in its Integrated Energy Policy Report impediments that limit procurement of biomethane in California, including, but not limited to, impediments to interconnection, and to offer solutions. (Public Resources Code §25326)
- Requires the CPUC to adopt standards that specify the concentrations of constituents of concern that are found in biomethane, and to adopt monitoring, testing, reporting, and recordkeeping protocols, to ensure the protection of human health and the integrity and safety of pipelines and pipeline facilities. (Health & Safety Code §25421 et seq.)
BACKGROUND:
Bioenergy & Program Mandates. Bioenergy is renewable energy produced from biomass wastes including forest and other wood waste, agriculture and food processing wastes, organic urban waste, waste and emissions from water treatment facilities, landfill gas, and other organic waste sources. Biomass waste can be used to generate renewable electricity, liquid fuels, and biogas.
From an environmental perspective, biogas has several advantages over conventional natural gas. Combustion of natural gas, including biogas, releases carbon dioxide (CO2) into the atmosphere. However, the combustion of natural gas destroys methane, a gas that is a much more potent greenhouse gas (GHG) than is CO2. In addition to destroying methane, the combustion of biogas, for CO2 accounting purposes, is considered carbon neutral. Biogas can be used to displace the use of fossil fuels, such as conventional natural gas, thereby further decreasing its carbon intensity.
CPUC Biomethane Projects Incentive Program. The CPUC adopted a five-year monetary incentive program effective June 11, 2015 (Decision 15-06-029) to encourage biomethane producers to design, construct, and to successfully operate biomethane projects that interconnect with the gas utilities' pipeline systems. The program was codified by the Legislature in AB 2313 (Williams, Chapter 571, Statutes of 2016). AB 2313 also increased the incentive amount per project from $1.5 million to up to $3 million for a single production facility and $5 million for a dairy cluster biomethane project, defined as three or more dairies in close proximity, to allow for the inclusion of gathering line costs as a qualifying interconnection expense. Under the program, eligible biomethane projects can receive up to 50 percent of the project's interconnection costs only after the projects are built and operating. The statewide funding for the monetary incentive program is capped at $40 million total.
In addition to the Biomethane Projects Incentive Program, biomethane production and distribution currently receives, what could be considered, a substantial level of state support. Below is a list of many of the existing state policies and programs:
- Renewable Portfolio Standard – Includes bioenergy related electric generation facilities (including from biomethane) to count towards the procurement targets created by this standard which is currently 60% if each load serving entity (IOUs, community choice aggregators and electric service providers) and public owned utilities (with exemptions) retail electric sales must be derived from eligible renewable resources by 2030.
- Dairy Digester Research and Development program – Administered by the California Department of Food and Agriculture and funded by the Greenhouse Gas Reduction Funds, provides direct incentives to fund the development of dairy digester projects.
- Energy Research & Development Programs – Administered by the Energy Commission and funded by the electric and natural gas IOU ratepayers, these programs have and continue to provide grants to bioenergy projects. For example, the Electric Program Investment Charge has provided grants to at least three landfill biomethane projects, several wastewater treatment anaerobic digester projects and many biomass electric generation demonstration projects.
- Greenhouse Gas Reduction Revolving Loan Program – Administered by CalRecycle and funded by the Greenhouse Gas Reduction Fund, provides grants to organic waste digester biomethane projects.
- Alternative & Renewable Fuel & Vehicle Transportation Program – Administered by the Energy Commission and funded by vehicle licensing fees, has and continues to provide grants to organic waste digester biomethane projects for transportation fuel. For example, the Energy Commission has provided grants to seven commercial scale organic waste biomethane digester projects.
- Bioenergy Market Adjustment Tariff – Administered by the electric IOUs and overseen by the CPUC, provides a standard contract with a fixed price for small scale electric generators that utilize biomass and/or biomethane from landfills, wastewater treatment facilities and dairy digesters with a cap of 250 MWs.
- Dairy Digester Pilot Programs – Administered by the natural gas IOUs and overseen by the CPUC, this program will fund no less than five dairy digester projects that interconnect to the natural gas IOU common carrier pipeline. The CPUC approved 6 dairy digest cluster pilot projects in December 2018.
- Biomethane Procurement Targets or Goals – Pursuant to SB 1440 (Hueso, 2018), the CPUC has the authority to establish cost-effective biomethane procurement goals or targets on natural gas IOUs to further decarbonize the state’s natural gas sector with the intent of achieving California’s leading greenhouse gas (GHG) emission and Short-Lived Climate Pollutant (SLCP) reduction goals. This bill also appropriately recognized that if the CPUC does move forward with the establishment of these goals or target, they must be justified through a thoughtful public process and supported by empirical evidence.
FISCAL EFFECT:
According to Senate Appropriations Committee: “Annual costs (General Fund and special funds) likely in the low hundreds of thousands of dollars to the state incurred as a natural gas ratepayer. Minor special fund costs (Ratepayer Funds) for the continuing CPUC oversight of this program.”
COMMENTS:
- Author’s Statement. “This bill is a modest extension of the sunset date for an existing biomethane incentive program administered by the CPUC. This bill does not increase the available funding beyond what was originally established, $40 million. Instead, this bill attempts to better align the availability of the incentive program with newly established policy in SB 1440 (Hueso, 2018).”
- Projects Under development or the Pipeline. The $40 million biomethane interconnection incentive program sunset date of Dec. 31, 2021, established in existing statute, has not provided the current under-development biomethane dairy digester projects sufficient time to utilize the totality of funding available. According to the CPUC, a legislative amendment to extend the biomethane interconnection incentive program sunset date (as proposed by this bill to Dec. 31, 2026) is required, since the current sunset date was codified by the Legislature in years past. Therefore, a legislative amendment to extend the sunset date (as proposed by this bill to Dec. 31, 2026) is required in order to extend the duration of the program, despite other CPUC broad statutory authority encouraging the development of biomethane production in-state.
- Remaining Funds. According to the CPUC, the amount of incentive money remaining in the Biomethane Projects Incentive Program is $34 million. There is no “project queue” for the interconnection incentive because the CPUC awards the monetary incentives as a reimbursement, only once a project has been interconnected to the pipeline system and gas flows for 30 out of 40 days (depending on the interconnection agreement). The CPUC is, however, aware that there are several planned and under-development biomethane production projects that intend to utilize the incentive but need more time to complete their project and demonstrate production before they can be awarded the incentive. These projects are not likely to be completed and flowing gas until after the current December 31, 2021 sunset.
There is a possibility that the program funds are distributed prior to the dates specified in the measure to the program extension of January 1, 2027. As such, it is appropriate to sunset the program prior to that date if the funds have been distributed. Additionally, terminating the program when the funds are depleted should also forestall further request for additional ratepayer funding of the program.
The Committee may wish to consider amending the measure to reflect that the program shall terminate within one year after the fund distribution or by January 1, 2027 at the latest.
- Related/Prior Legislation.
SB 1440 (Hueso, Chapter 739, Statutes of 2018) required the CPUC, in consultation with the ARB, to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. The bill also requires the CPUC to take certain actions in regards to the development of the targets or goals and the procurement of the biomethane to meet those targets or goals.
AB 2313 (Williams, Chapter 571, Statutes of 2016) increased the monetary incentive amounts available to biomethane projects and directs the CPUC to consider whether to allow the costs of utility infrastructure for biomethane interconnection with the natural gas pipeline network recovery to be recovered in utility rates.
AB 1900 (Gatto, Chapter 602, Statutes of 2012) required the CPUC to adopt new health and safety standards for landfill gas, to hold public hearings to identify impediments to in-state biomethane use, and develop policies and programs to increase the in-state use of biomethane.
AB 2196 (Chesbro, Chapter 605, Statutes of 2012) clarified the definition of an eligible renewable electrical generation facility to include a facility that generates electricity utilizing biomethane delivered through a common carrier pipeline if the source and delivery of the fuel can be verified by the CEC.
REGISTERED SUPPORT / OPPOSITION:
Support
City of Torrance
Coalition For Renewable Natural Gas
Harvest Power Energy Group
Pacific Gas and Electric Company
Renewable Natural Gas
Sanitation Districts of Los Angeles County
Sempra Energy Utilities
Southern California Gas Company
Opposition
Association of Irritated Residents
California Environmental Justice Alliance
Center For Community Action And Environmental Justice
Center For Food Safety
Center of Race, Poverty And The Environment
Central California Asthma Collaborative
Central Coast Alliance United For A Sustainable Economy
Central Valley Air Quality Coalition
Community Alliance For Agroecology
Earthjustice
Food & Water Watch
Leadership Counsel For Justice And Accountability
People Demanding Action
Poder
Progressive Democrats Of America
Progressive Democrats Of America, California
Sierra Club Of California
Analysis Prepared by: Mary McDonald / U. & E. /
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 457 |
THIRD READING
Bill No: SB 457
Introduced: 2/21/19
SENATE ENERGY, U. & C. COMMITTEE: 12-0, 4/2/19
AYES: Hueso, Moorlach, Bradford, Chang, Dodd, Hertzberg, Hill, McGuire, Rubio, Skinner, Stone, Wiener
NO VOTE RECORDED: Stern
SENATE APPROPRIATIONS COMMITTEE: 6-0, 5/16/19
AYES: Portantino, Bates, Bradford, Hill, Jones, Wieckowski
SUBJECT: Biomethane: gas corporations
DIGEST:
This bill extends the sunset date, by five additional years, of an existing incentive program for biomethane projects administered by the California Public Utilities Commission (CPUC).
Existing law:
- Establishes the CPUC has regulatory authority over public utilities, including gas corporations. (California Constitution, Article XII)
- Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Public Utilities Code §451)
- Requires the CPUC to modify the monetary incentive program adopted in Decision 15-06-029 (June 11, 2015), in specified respects and to extend the program, as modified, until December 31, 2021. (Public Utilities Code §399.19)
- Requires the CPUC to adopt policies and programs that promote the in-state production and distribution of biomethane. (Public Utilities Code §399.24)
- Requires the CPUC to adopt pipeline access rules that ensure that each gas corporation provides nondiscriminatory open access to its gas pipeline system to any party for the purposes of physically interconnecting with the gas pipeline system and effecting the delivery of gas. (Public Utilities Code §784)
- Requires the CPUC, in consultation with the Air Resources Board (ARB), to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. Requires the CPUC to take certain actions in regards to the development and procurement of the targets or goals. (Health and Safety Code §25421)
- Requires the California Energy Commission (CEC) to hold public hearings to identify in its Integrated Energy Policy Report impediments that limit procurement of biomethane in California, including, but not limited to, impediments to interconnection, and to offer solutions. (Public Resources Code §25326)
- Requires the CPUC to adopt standards that specify the concentrations of constituents of concern that are found in biomethane, and to adopt monitoring, testing, reporting, and recordkeeping protocols, to ensure the protection of human health and the integrity and safety of pipelines and pipeline facilities. (Health & Safety Code §25421 et seq.)
This bill:
- Extends the sunset date of an existing CPUC administered program for biomethane from 2021 to 2026.
- Extends the date by when the existing statutory section for the incentive program for biomethane projects requires repeal from January 1, 2022, to January 1, 2027.
Background
What is biomethane? Biomethane is an energy source, in the form of a biogas that has been cleaned and processed to remove impurities and made available from materials derived from biological sources. These sources include biomass waste including forest and other wood waste, agriculture and food processing waste, organic urban waste, waste and emissions from wastewater treatment facilities, landfill gas and other organic wastes sources. This type of waste can be used for liquid fuels, as the breakdown of carbon-based material results in a gaseous mixture of carbon dioxide (CO2) and methane. Although this process occurs naturally, resulting in significant greenhouse gas (GHG) emissions, the gas can be captured and utilized through anaerobic digesters that speed up the process. In addition, the natural decomposition of organic materials in municipal solid waste landfills provides an opportunity to capture landfill gas. This captured gas (or biogas) contains methane and CO2, along with other gasses. Biogas can be processed further to remove CO2 and other impurities and be converted to pipeline quality methane (or biomethane). Although the combustion of biogas releases CO2, it also destroys methane, which is a more potent GHG than CO2 because of its global warming potential. Biomethane is considered carbon neutral because CO2 that would be released into the atmosphere is utilized and thereby removed from the atmosphere. The usage of biomethane can also displace energy consumption from fossil fuels, thereby decreasing carbon intensity.
CPUC Biomethane Projects Incentive Program. The CPUC adopted a five-year monetary incentive program effective June 11, 2015 (CPUC Decision 15-06-029) to encourage biomethane producers to design, construct, and to successfully operate biomethane projects that interconnect with the gas utilities' pipeline systems. The program was codified by the Legislature in AB 2313 (Williams, Chapter 571, Statutes of 2016). AB 2313 also increased the incentive amount per project from $1.5 million to up to $3 million for a single production facility and $5 million for a dairy cluster biomethane project, defined as three or more dairies in close proximity, to allow for the inclusion of gathering line costs as a qualifying interconnection expense. Under the program, eligible biomethane projects can receive up to 50 percent of the project's interconnection costs only after the projects are built and operating. The statewide funding for the monetary incentive program is capped at $40 million total.
The CPUC identifies three types of costs that a biomethane project is likely to encounter. These costs consist of the following:
- The pre-injection costs incurred prior to the injection of biomethane into the utility pipeline;
- The interconnection costs incurred in order to interconnect the biomethane facility with the utility pipeline; and
- The post-injection ongoing costs of maintaining and operating the biomethane facility and the pipeline access.
Need for extension of the sunset date. The monetary incentive is available to eligible projects until December 31, 2021, or earlier if the program has exhausted its $40 million capped funding. According to the CPUC, there have been interconnection incentives awarded to two separate production facilities. The amount of incentive money remaining is $34 million. There is no project queue for the interconnection incentive because the CPUC awards the monetary incentives as a reimbursement, only once a project has been interconnected to the pipeline system and gas flows for 30 out of 40 days (depending on the interconnection agreement). The CPUC is, however, aware that there are several planned and under-development biomethane production projects that intend to utilize the incentive but need more time to complete their project and demonstrate production before they can be awarded the incentive. These projects are not likely to be completed and flowing gas until after the current December 31, 2021 sunset.
This bill will maintain the current funding cap on the Biomethane Incentive Program, and, therefore, only allows for the use of the remaining $34 million of the monetary funds. By extending the sunset date of the program by five years, the funding will ensure that projects currently in development and those looking to develop are afforded a few more years to complete, connect, and operate their interconnection projects.
Related/Prior Legislation
SB 1440 (Hueso, Chapter 739, Statutes of 2018) required the CPUC, in consultation with the ARB, to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. The bill also required the CPUC to take certain actions in regards to the development of the targets or goals and the procurement of the biomethane to meet those targets or goals.
AB 2313 (Williams, Chapter 571, Statutes of 2016) increased the monetary incentive amounts available to biomethane projects and directs the CPUC to consider whether to allow the costs of utility infrastructure for biomethane interconnection with the natural gas pipeline network recovery to be recovered in utility rates.
AB 1900 (Gatto, Chapter 602, Statutes of 2012) required the CPUC to adopt new health and safety standards for landfill gas, to hold public hearings to identify impediments to in-state biomethane use, and develop policies and programs to increase the in-state use of biomethane.
AB 2196 (Chesbro, Chapter 605, Statutes of 2012) clarified the definition of an eligible renewable electrical generation facility to include a facility that generates electricity utilizing biomethane delivered through a common carrier pipeline if the source and delivery of the fuel can be verified by the CEC.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, annual costs (General Fund and special funds) likely in the low hundreds of thousands of dollars to the state incurred as a natural gas ratepayer. Minor special fund costs (Ratepayer Funds) for the continuing CPUC oversight of this program.
Coalition for Renewable Natural Gas
Pacific Gas and Electric Company
Southern California Gas Company
OPPOSITION: (Verified 5/16/19)
California Environmental Justice Alliance
Center for Community Action & Environmental Justice
Center for Food Safety
Food & Water Watch
Leadership Counsel for Justice & Accountability
People Demanding Action
Progressive Democrats Of America
Progressive Democrats Of America, California
Sierra Club California
ARGUMENTS IN SUPPORT: According to the author, “This bill is a modest extension of the sunset date for an existing biomethane incentive program administered by the CPUC. This bill does not increase the available funding beyond what was originally established, $40 million. Instead, this bill attempts to better align the availability of the incentive program with newly established policy in SB 1440 (Hueso, 2018).”
ARGUMENTS IN OPPOSITION: Those opposed to this bill express concerns about the promotion of renewable natural gas stating that “digesters and the biogas they produce create more obstacles toward achieving a cleaner energy future than they resolve.” The opponents raise concerns about the impacts of factory farms in California and concerns that this bill will help “incentivize expansion of large dairy operations, and the pollution and other adverse impacts that accompany them.” The organizations opposed to the bill raise concerns about the local impacts of these operations in communities in the San Joaquin Valley, in particular. The opposition also raise concerns about the state’s cumulative efforts to invest in dairy digesters and their desire to have the state (taxpayers and ratepayers) to instead incentivize farming practices that promote environmental and human health.
Prepared by: Nidia Bautista / E., U., & C. / (916) 651-4107
5/18/19 12:57:32
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2019 - 2020 Regular Session
SB 457 (Hueso) - Biomethane: gas corporations
Version: February 21, 2019 | Policy Vote: E., U., & C. 12 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: April 22, 2019 | Consultant: Paul Jacobs |
Bill Summary:
This bill would extend the sunset date, by five additional years, of an existing incentive program for biomethane projects administered by the California Public Utilities Commission (CPUC).
Fiscal Impact:
Annual costs (General Fund and special funds) likely in the low hundreds of thousands of dollars to the state incurred as a natural gas ratepayer. Minor special fund costs (Ratepayer Funds) for the continuing CPUC oversight of this program.
Background:
Biomethane is an energy source made available from materials derived from biological sources such forest, agriculture, and food processing waste, among others. In 2015, the CPUC adopted a five-year financial incentive program to encourage biomethane producers to design, construct, and to successfully operate biomethane projects that interconnect with the gas utilities' pipeline systems. The program was codified by the Legislature in AB 2313 (Williams), Chapter 571, Statutes of 2016, and AB 2313 also increased the incentive amount. The program is capped at $40 million and the utilities may recover the monetary incentive amount in rates, plus interest, from its customers.
Proposed Law:
This bill would extend the sunset date of the CPUC Biomethane Projects Incentive Program from 2021 to 2026.
Related Legislation:
AB 2313 (Williams, Chapter 571, Statutes of 2016) increased the monetary incentive amounts available to biomethane projects and directs the CPUC to consider whether to allow the costs of utility infrastructure for biomethane interconnection with the natural gas pipeline network recovery to be recovered in utility rates.
Staff Comments:
According to the CPUC, the amount of incentive money remaining in the Biomethane Projects Incentive Program is $34 million. There is no “project queue” for the interconnection incentive because the CPUC awards the monetary incentives as a reimbursement, only once a project has been interconnected to the pipeline system and gas flows for 30 out of 40 days (depending on the interconnection agreement). The CPUC is, however, aware that there are several planned and under-development biomethane production projects that intend to utilize the incentive but need more time to complete their project and demonstrate production before they can be awarded the incentive. These projects are not likely to be completed and flowing gas until after the current December 31, 2021 sunset.
If this program was allowed to sunset on December 31, 2021 according to current law, the remaining $34 million would be refunded back to natural gas investor-owned utility (IOU) ratepayers. Historically, state agencies account for approximately 3 percent to 4 percent of total natural gas use provided by IOUs in California. If SB 457 were to be enacted, staff estimates that the state would forgo revenue for its portion of the remaining $34 million in the form of ratepayer refunds (approximately $200,000-$300,000 annually).
The CPUC Biomethane Projects Incentive Program is administered by the state’s natural gas IOUs. CPUC staff oversees the program, and according to CPUC, enacting SB 457 will only result in the continuation of minor costs as this workload is embedded in other staff responsibilities related to renewable natural gas and biomethane programs.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2019 - 2020 Regular
Bill No: SB 457 Hearing Date: 4/2/2019
Author: | Hueso | ||
Version: | 2/21/2019 As Introduced | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Nidia Bautista | ||
SUBJECT: Biomethane: gas corporations
DIGEST: This bill extends the sunset date, by five additional years, of an existing incentive program for biomethane projects administered by the California Public Utilities Commission (CPUC).
ANALYSIS:
Existing law:
- Establishes the CPUC has regulatory authority over public utilities, including gas corporations. (California Constitution, Article XII)
- Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Public Utilities Code §451)
- Requires the CPUC to modify the monetary incentive program adopted in Decision 15-06-029 (June 11, 2015), in specified respects and to extend the program, as modified, until December 31, 2021. (Public Utilities Code §399.19)
- Requires the CPUC to adopt policies and programs that promote the in-state production and distribution of biomethane. (Public Utilities Code §399.24)
- Requires the CPUC to adopt pipeline access rules that ensure that each gas corporation provides nondiscriminatory open access to its gas pipeline system to any party for the purposes of physically interconnecting with the gas pipeline system and effecting the delivery of gas. (Public Utilities Code §784)
- Requires the CPUC, in consultation with the California Air Resources Board (ARB), to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. Requires the CPUC to take certain actions in regards to the development and procurement of the targets or goals. (Health and Safety Code §25421)
- Requires the California Energy Commission (CEC) to hold public hearings to identify in its Integrated Energy Policy Report impediments that limit procurement of biomethane in California, including, but not limited to, impediments to interconnection, and to offer solutions. (Public Resources Code §25326)
- Requires the CPUC to adopt standards that specify the concentrations of constituents of concern that are found in biomethane, and to adopt monitoring, testing, reporting, and recordkeeping protocols, to ensure the protection of human health and the integrity and safety of pipelines and pipeline facilities. (Health & Safety Code §25421 et seq.)
This bill:
- Extends the sunset date of an existing CPUC administered program for biomethane from 2021 to 2026.
- Extends the date by when the existing statutory section for the incentive program for biomethane projects requires repeal from January 1, 2022 to January 1, 2027.
Background
What is biomethane? Biomethane is biogas that has been cleaned and processed to remove impurities. Biomethane is an energy source made available from materials derived from biological sources. These sources include biomass waste including forest and other wood waste, agriculture and food processing waste, organic urban waste, waste and emissions from wastewater treatment facilities, landfill gas and other organic wastes sources. This type of waste can be used for liquid fuels, as the breakdown of carbon-based material results in a gaseous mixture of carbon dioxide (CO2) and methane. Although this process occurs naturally, resulting in significant greenhouse gas (GHG) emissions, the gas can be captured and utilized through anaerobic digesters that speed up the process. In addition, the natural decomposition of organic materials in municipal solid waste landfills provides an opportunity to capture landfill gas. This captured gas, or “biogas”, contains methane and CO2, along with other gasses. Biogas can be processed further to remove CO2 and other impurities and be converted to “pipeline” quality methane or “biomethane.” Although the combustion of biogas releases CO2, it also destroys methane, which is a more potent GHG than CO2 because of its global warming potential. Biomethane is considered carbon neutral because CO2 that would be released into the atmosphere is utilized and thereby removed from the atmosphere. The usage of biomethane can also displace energy consumption from fossil fuels, thereby decreasing carbon intensity.
CPUC Biomethane Projects Incentive Program. The CPUC adopted a five-year monetary incentive program effective June 11, 2015 (Decision 15-06-029) to encourage biomethane producers to design, construct, and to successfully operate biomethane projects that interconnect with the gas utilities' pipeline systems. The program was codified by the Legislature in AB 2313 (Williams, Chapter 571, Statutes of 2016). AB 2313 also increased the incentive amount per project from $1.5 million to up to $3 million for a single production facility and $5 million for a dairy cluster biomethane project, defined as three or more dairies in close proximity, to allow for the inclusion of gathering line costs as a qualifying interconnection expense. Under the program, eligible biomethane projects can receive up to 50 percent of the project's interconnection costs only after the projects are built and operating. The statewide funding for the monetary incentive program is capped at $40 million total.
According to the CPUC there are three types of costs that one is likely to encounter in developing and operating a biomethane project in California. These costs consist of the following:
- The pre-injection costs incurred prior to the injection of biomethane into the utility pipeline;
- The interconnection costs incurred in order to interconnect the biomethane facility with the utility pipeline; and
- The post-injection ongoing costs of maintaining and operating the biomethane facility and the pipeline access.
Need for extension of the sunset date. The monetary incentive is available to eligible projects until December 31, 2021, or until the program has exhausted its $40 million cap. According to the CPUC, there have been interconnection incentives awarded to two separate production facilities. The amount of incentive money remaining is $34 million. There is no “project queue” for the interconnection incentive because the CPUC awards the monetary incentives as a reimbursement, only once a project has been interconnected to the pipeline system and gas flows for 30 out of 40 days (depending on the interconnection agreement). The CPUC is, however, aware that there are several planned and under-development biomethane production projects that intend to utilize the incentive but need more time to complete their project and demonstrate production before they can be awarded the incentive. These projects are not likely to be completed and flowing gas until after the current December 31, 2021 sunset.
This bill will maintain the current cap on the Biomethane Incentive Program, and, therefore, only allows for the remaining $34 million of the monetary funds. By extending the sunset date of the program by five years, the funding will ensure that projects currently in development and those looking to develop are afforded a few more years to complete, connect, and operate their interconnection projects.
Prior/Related Legislation
SB 1440 (Hueso, Chapter 739, Statutes of 2018) required the CPUC, in consultation with the ARB, to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. The bill also requires the CPUC to take certain actions in regards to the development of the targets or goals and the procurement of the biomethane to meet those targets or goals.
AB 2313 (Williams, Chapter 571, Statutes of 2016) increased the monetary incentive amounts available to biomethane projects and directs the CPUC to consider whether to allow the costs of utility infrastructure for biomethane interconnection with the natural gas pipeline network recovery to be recovered in utility rates.
AB 1900 (Gatto, Chapter 602, Statutes of 2012) required the CPUC to adopt new health and safety standards for landfill gas, to hold public hearings to identify impediments to in-state biomethane use, and develop policies and programs to increase the in-state use of biomethane.
AB 2196 (Chesbro, Chapter 605, Statutes of 2012) clarified the definition of an eligible renewable electrical generation facility to include a facility that generates electricity utilizing biomethane delivered through a common carrier pipeline if the source and delivery of the fuel can be verified by the CEC.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
Coalition For Renewable Natural Gas
Southern California Gas Company
OPPOSITION:
California Environmental Justice Alliance
Center For Community Action & Environmental Justice
Center For Food Safety
Food & Water Watch
Leadership Counsel For Justice And Accountability
People Demanding Action
Progressive Democrats Of America
Progressive Democrats Of America, California
Sierra Club California
ARGUMENTS IN SUPPORT: According to the author:
“This bill is a modest extension of the sunset date for an existing biomethane incentive program administered by the CPUC. This bill does not increase the available funding beyond what was originally established, $40 million. Instead, this bill attempts to better align the availability of the incentive program with newly established policy in SB 1440 (Hueso, 2018).”
ARGUMENTS IN OPPOSITION: Those opposed to this bill express concerns about the promotion of “renewable natural gas” stating that “digesters and the biogas they produce create more obstacles toward achieving a cleaner energy future than they resolve.” The opponents raise concerns about the impacts of factory farms in California and concerns that this bill will help “incentivize expansion of large dairy operations, and the pollution and other adverse impacts that accompany them.” The organizations raise concerns about the local impacts of these operations in communities in the San Joaquin Valley, in particular. The opposition also raise concerns about the state’s cumulative efforts to invest in dairy digesters and their desire to have the state (taxpayers and ratepayers) to instead incentivize farming practices that promote environmental and human health.
-- END --
Bill Author
Bill Co-Author(s):