| Aug 30, 2019 | August 30 hearing postponed by committee. |
| Aug 14, 2019 | August 14 set for first hearing. Placed on APPR. suspense file. |
| Jul 11, 2019 | (Received at desk July 10 pursuant to JR 61(a)(10)). |
| Jun 26, 2019 | July 3 hearing postponed by committee. |
| Jun 13, 2019 | Referred to Com. on G.O. |
| May 24, 2019 | In Assembly. Read first time. Held at Desk. |
| May 23, 2019 | Read third time. Passed. (Ayes 38. Noes 0.) Ordered to the Assembly. |
| May 21, 2019 | Ordered to special consent calendar. |
| May 16, 2019 | From committee: Do pass. (Ayes 6. Noes 0.) (May 16). |
| May 10, 2019 | Set for hearing May 16. |
| May 6, 2019 | May 6 hearing: Placed on APPR. suspense file. |
| Apr 26, 2019 | Set for hearing May 6. |
| Apr 23, 2019 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (April 23). Re-referred to Com. on APPR. |
| Apr 10, 2019 | Set for hearing April 23. |
| Apr 3, 2019 | Re-referred to Com. on G.O. |
| Mar 25, 2019 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Mar 7, 2019 | Referred to Com. on RLS. |
| Feb 22, 2019 | From printer. May be acted upon on or after March 24. |
| Feb 21, 2019 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jul 10, 2019 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Governmental Organization |
Passed |
|
| May 23, 2019 | Special Consent SB465 | Senate Floor |
Passed |
|
| May 16, 2019 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| May 6, 2019 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 23, 2019 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Governmental Organization |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: August 14, 2019
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
SBPCA Bill Id:SB 465
Author:(Bates) – As Amended Ver:June 26, 2019
Policy Committee: | Governmental Organization | Vote: | 21 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill requires Southern California Edison (SCE), the Governor’s Office of Emergency Services (Cal OES) and the State Controller’s Office (SCO) to ensure that local governments receive continued funding for costs incurred in carrying out activities for the safety and welfare of the communities surrounding the San Onofre Nuclear Generating Station (SONGS). Specifically, this bill:
- Requires local jurisdictions to plan for emergency situations at SONGS, even during the decommissioning process.
- Requires SCE to pay its share of actual or anticipated local agency costs to the SCO for deposit into the Nuclear Planning Assessment Account and requires SCO to pay locals costs upon certification by Cal OES.
- Authorizes SCO, upon appropriation by the Legislature, to disburse up to 80% of a fiscal year allocation in advance for anticipated local expenses. Cal OES must review program expenses and the SCO must pay a portion or the remaining balance based on those approved expenditures.
- Requires, every three years, an independent audit by an entity agreed to by SCE and local governments.
- Sunsets this bill’s funding provisions when all nuclear waste and radiological fuel have been removed from SONGS and transported out of the counties of San Diego and Orange.
FISCAL EFFECT:
- Ongoing costs of approximately $230,000 (General Fund) to OES for additional personnel to ensure that the local governments continue to receive the resources required by this bill.
- Potential cost pressure of nearly $1.8 million for the state to ensure that local governments receive continued funding for costs incurred for carrying out activities for the safety and welfare of the communities surrounding SONGS. These funds would need to be provided even in the absence of the current Memorandum of Understanding (MOU) between SCE and the relevant counties and cities.
COMMENTS:
- Background. SCE, the majority owner of SONGS, announced in June 2013 that it had retired its remaining nuclear power plants and had begun the process to decommission the facility. The estimated data for closure, which includes tearing down the existing infrastructure, is 2030.
- Local emergency planning. Local governments near reactors are required to develop and maintain radiological emergency preparedness and response plans to safeguard the public around a nuclear power plant. Utilities are also required to develop radiological emergency preparedness and response plans in coordination with state and local governments.
In June 2015, the US Nuclear Regulatory Commission (NRC) granted SCE an exemption from certain emergency planning requirements because of the reduced risk associated with the SONGS facility. Following this designation, which eliminated state and federal funding opportunities, SCE and surrounding local agencies entered into an MOU to continue collaborative management of the radiological emergency preparedness and response activities related to SONGS. Under the 7-year MOU, SCE agreed to fund local jurisdictions starting with the below amounts for 2015-16:
- Orange County: $853,000
- San Diego County: $325,000
- City of San Clemente: $193,600
- City of Dana Point: $193,600
- City of San Juan Capistrano: $193,600
- Remaining issues and concerns. SB 465 replaces the need for a new MOU between SCE and local agencies and continues funding for affected local governments well into the future. There are a number of concerns and outstanding issues with this bill and its interference with what arguably should be a negotiation between non-state entities. These issues include:
- Glide-down levels. Under the current MOU, SCE’s share of local costs will be reduced once all fuel at SONGS has been placed in long-term dry storage. The MOU states that SCE’s share of local costs will fall from 100% in 2019-20 to 75% in 2020-21 and to 50% in 2021-22. Moreover, the MOU states a future MOU will decide cost sharing for later years, with the assumption that SCE’s share will further fall as local risks from SONGS continue to subside.
SB 465 does not specify glide-down levels. It is this committee’s understanding that stakeholders agree on when SCE’s share of costs will be reduced to 50%, but there is disagreement for how long that 50% funding level will last and whether the funding share should be reduced further in later years.
- No review of costs. This bill does not explicitly allow for the California Public Utilities Commission (CPUC) review authority if SCE seeks to recover expenses from ratepayers. Explicitly allowing for this would serve as a check that these funds are being spent appropriately.
- No ends in sight. This bill ensures this funding will be provided to local agencies until “all nuclear waste and radiological fuel have been removed” from SONGS and transported out of San Diego and Orange counties. Practically speaking, this means this funding is likely to last into the foreseeable future, as there are no immediate plans to move the nuclear waste and fuel from the site offsite.
- Unclear SCO role. As drafted, SB 465 creates a vague and unworkable requirement for SCO and creates unnecessary state cost pressures. The bill requires SCO and Cal OES to “ensure” that funding is provided to affected local agencies, which implies an oversight responsibly for SCO that is not appropriate in this context.
Analysis Prepared by: Luke Reidenbach / APPR. / (916) 319-2081
Date of Hearing: July 10, 2019
ASSEMBLY COMMITTEE ON GOVERNMENTAL ORGANIZATION
Adam Gray, Chair
SBPCA Bill Id:SB 465
Author:(Bates) – As Amended Ver:June 26, 2019
SENATE VOTE: 38-0
SUBJECT: San Onofre Nuclear Generating Station: emergency planning funding
SUMMARY: Requires the California State Controller (Controller) to ensure that local governments receive continued funding for costs incurred in carrying out activities for the safety and welfare of the communities surrounding the San Onofre Nuclear Generating Station (SONGS). Specifically, this bill:
1) Declares the intent of the Legislature is to: (1) continue the funding of offsite emergency response organizations at SONGS; (2) continue coordination between Southern California Edison (SCE) and local government agencies throughout the decommissioning process; and (3) adjust future funding for offsite emergency planning as risk declines and spent nuclear fuel is transferred to dry cask storage and ultimately off the SONGS site.
2) Requires the Controller to ensure that local governments receive continued funding for costs incurred to them in carrying out activities for the safety and welfare of the communities surrounding SONGS based upon a statement of costs submitted to Cal OES.
3) Requires the Controller, upon appropriation by the Legislature, to deposit the funds needs to carry out the provisions of this bill into the Nuclear Planning Assessment Special Account (NPASA).
4) Requires, every three years, an independent audit by an entity agreed to by SCE and the local governments.
5) Provides that reimbursements of local government costs for safety and welfare in communities surrounding SONGS cease once all nuclear waste and radiological fuel have been removed from the SONGS site and transported out of the Counties of Orange and San Diego.
6) Requires the California Public Utilities Commission (CPUC) to notify the Secretary of State once all nuclear waste and radiological fuel have been removed from the SONGS site and transported out of the Counties of Orange and San Diego.
7) Requires local jurisdictions to plan for emergency situations at SONGS, even during the decommissioning process.
EXISTING LAW:
1) Creates, within the office of the Governor, the California Office of Emergency Services (Cal OES), which is responsible for addressing natural, technological, or manmade disasters and emergencies, including responsibility for activities necessary to prevent, respond to, recover from, and mitigate the effects of emergencies and disasters to people and property.
2) Establishes the Controller as the chief fiscal officer of California with responsibility for accountability and disbursement of the state’s financial resources.
3) Requires, under the Radiation Protection Act of 1999, local governments to develop radiological emergency preparedness plans to safeguard the public in the emergency planning zone around a nuclear power plant.
4) Requires, under the California Emergency Services Act, local costs to ensure safety and welfare of communities near nuclear power plants that are not reimbursed by federal funds, be borne by an electrical corporation operating the nuclear power plant.
5) Requires each local government to submit to Cal OES a statement of its costs in carrying out those activities.
6) Requires an electrical corporation, upon notification by Cal OES of the amount of its share of the actual or anticipated local agency costs, to pay that amount to the Controller for deposit in the Nuclear Planning Assessment Special Account (NPASA).
7) Requires the Controller, upon appropriation by the Legislature, to reimburse local governments for those costs.
8) Set, until January 1, 2019, the maximum annual amount available for disbursement for local costs for the SONGS site at $1,600,000.
FISCAL EFFECT: Unknown
COMMENTS:
Purpose of the bill: According to the author’s office, “in 2013, SCE shut down their remaining two units at the SONGS. With the closure of their units the decision pushed SCE to commence the nuclear decommissioning process. While SONGS was operational, SCE was responsible for providing local agencies with Nuclear Power Preparedness funds. These funds were used by counties and cities to plan, prepare, drill and respond to any emergency incidents regarding the nuclear sites.”
The author adds, “decommissioned plants are not responsible for providing such funding, even though the risks associated with stored nuclear fuel remains. Funding for functioning nuclear generators is addressed through state legislation, but there is a gap where decommissioning plants are concerned. SB 465 ensures that local governments continue to receive funding for offsite emergency response planning, training and exercises related to the SONGS.
Background: In 2015, the County entered into a seven year nuclear funding agreement with SONGS/SCE which continued emergency planning and emergency response capability related to SONGS, creating a short term solution to the funding gap. This agreement maintained funding, previously provided by legislation, at 100% until 2019. Beginning in 2020, funding would glide down first to 75% and then 50% by 2022. Under this previous agreement, the signatory parties would reconvene to negotiate a successor agreement when SONGS implemented the next phase of their nuclear emergency plan. The signatory parties reconvened in late 2017 to negotiate a successor document to the existing agreement. According to the Counties of Orange and San Diego and SCE, the parties have met multiple times but haven’t arrived at a consensus yet.
SCE: SCE is an Edison International company, and is one of the nation’s largest electric utilities, serving a population of approximately 15 million via 5 million customer accounts in a 50,000-square-mile service area within Central, Coastal and Southern California.
SONGS: SONGS is operated by SCE, is approximately four miles south of San Clemente and 50 miles north-northwest of San Diego, located between Interstate 5 and the Pacific Ocean within the boundary of the Camp Pendleton military reserve. According to the United States Nuclear Regulatory Commission (NRC), the site originally comprised three nuclear power plants, known respectively as Unit 1, Unit 2, and Unit 3. Unit 1 commenced operation in 1968, and shut down in 1992. Dismantlement of Unit 1 is essentially complete.
A ten-year project to replace the steam generators in both Unit 2 and Unit 3 was completed in 2011. In January, 2012, Unit 3 experienced a tube leak in one of the two steam generators. The leak was unexpected, and the unit was shut down in accordance with plant procedures. During follow-up inspections of the tubes, unexpected wear was discovered, including significant tube-to-tube wear in the free span areas of over 100 tubes. Pre-planned testing of 100 percent of Unit 2 tubes was in progress as part of a regularly scheduled refueling outage when the event occurred in Unit 3. Testing results from Unit 2 also revealed unexpected tube wear. Additional analysis and testing ultimately resulted in identifying two tubes with tube-to-tube wear similar to what was observed in Unit 3.
SCE, majority owner of the San Onofre nuclear plant, announced in June 2013 that it had retired San Onofre Units 2 and 3 and had begun the process to decommission the facility. During its operation, SONGS provided about 20 percent of the power to large portions of Southern California.
Decommissioning: The NRC requires the licensee to decommission the nuclear plant after it ceases operations and sets rules for the cleanup of radioactively contaminated plant systems and structures and the removal of the radioactive fuel. In March of this year, the California State Lands Commission approved plans to remove onshore and offshore infrastructure from SONGS. The estimated date for closure is 2030, however, the full timeline of future activates for final site restoration is unknown.
Storage of spent nuclear fuel: The NRC allows two storage methods for spent fuel after it is removed from the reactor core: spent fuel pools and dry cask storage. Spent fuel pools are specially designed pools at individual reactor sites across the country. Dry cask storage systems are used at independent spent fuel storage facilities (ISFSIs). SONGS is one of four ISFSI sites located in California.
Nuclear waste at SONGS: In a 2017 settlement, SCE acknowledged its “shared interest” with citizens who want the spent nuclear fuel sent away from the Pacific Ocean. Under the settlement, SCE maintains ownership of the nuclear waste until the federal government decides what to do with it – a decision for nuclear plants nationwide. Fuel transfers have been on hold since the August 3, 2018 canister-loading incident at SONGS.
The NRC recently announced that SCE can safely resume transfer of spent nuclear fuel from wet storage to passive dry storage. This is a key step in packaging the fuel for eventual transportation to an off-site facility licensed by the federal government. To date, 29 canisters have been transitioned into dry storage, another 44 remain.
Emergency preparedness for communities near nuclear reactors: Local governments near reactors are required to develop and maintain radiological emergency preparedness and response plans to safeguard the public around a nuclear power plant. Utilities are also required to develop radiological emergency preparedness and response plans in coordination with state and local governments. In the event of an emergency at one of California’s nuclear power plants, Cal OES is the lead State agency to mobilize state resources and to request and coordinate federal resources to mitigate the effects of radiation released into the atmosphere.
While Cal OES is the lead State agency, all incidents are local. A fundamental of California’s standardized emergency management system and the national incident management system is all incidents begin and end at the local level. According to local emergency managers in the Counties of Orange and San Diego, there are several plausible scenarios that will require local response capabilities. For example, if there is a fire on plant grounds as crews work to deconstruct the massive “containment domes” the public will expect locals to perform radiological monitoring and report on the public health risk. Additionally, if another incident occurs in the transfer of spent fuel locals will need to perform radiological monitoring.
Funding for emergency planning near nuclear reactors: In June, 2015, the NRC granted an exemption to SCE from certain emergency planning requirements. Based on the exemptions granted to SCE, the NRC no longer required the Federal Emergency Management Agency (FEMA) to monitor, review, or report on off-site radiological emergency planning. Current state law requires specified local costs associated with emergency planning around nuclear power plants to be borne by utilities operating nuclear power plants with generating capacity of 50 megawatts or more.
Prior Legislation: AB 361 (Achadjian) Chapter 399, Statutes of 2015. Extended the sunset data for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
AB 292 (Blakeslee) Chapter 492, Statues of 2007. Extended the sunset date on the NPASA from July 1, 2009, to July 1, 2019; and, revised funding levels payable as specified.
SB 2141 (O’Connell) Chapter 543, Statutes of 1998. The Radiation Protection Act of 1999 extended the sunset date on the NPASA from July 1, 1999, to July 1, 2009; and, specified the amounts to be disbursed, and authorized advance allocations for certain anticipated local expenses, as specified.
SB 876 (Hart) Chapter 759, Statues of 1993. The Radiation Protection Act of 1993 extended the sunset date on the NPASA until July 1, 1999; and, authorized payment from the account of specific sums of money over the next five years, as specified.
Arguments in support: The Orange County Sheriff writes in support, “while SONGS was in operation, the Sheriff’s Department’s Emergency Management Division was responsible for emergency preparedness and mandated drills in Orange County. Even in the decommissioning stage, the risk to the public of an emergency incident at the site remains, and thus continued emergency planning is essential.”
The San Diego Board of Supervisors adds, “On June 7, 2013, Southern California Edison announced the decommissioning of SONGS Units 2 and 3. With the decommissioning of SONGS, the Nuclear Regulatory Commission approved a revised emergency plan for SONGS, stating that due to the reduced radiological risk at the site there was no longer a need to maintain pre-planned, off-site radiological emergency preparedness plans or the 10-mile emergency planning zone around the site. However, since there is still spent nuclear fuel and radiological waste onsite, the Counties of San Diego and Orange must continue planning for response to emergencies at SONGS.”
REGISTERED SUPPORT / OPPOSITION:
Support
City of Mission Viejo
Orange County Board of Supervisors
San Diego County Board of Supervisors
Orange County Sheriff’s Department
Opposition
None on file.
Analysis Prepared by: Mike Dayton / G.O. / (916) 319-2531
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 465 |
THIRD READING
Bill No: SB 465
Amended: 3/25/19
SENATE GOVERNMENTAL ORG. COMMITTEE: 15-0, 4/23/19
AYES: Dodd, Wilk, Allen, Archuleta, Borgeas, Bradford, Chang, Galgiani, Glazer, Hill, Jones, Nielsen, Portantino, Rubio, Wiener
NO VOTE RECORDED: Hueso
SENATE APPROPRIATIONS COMMITTEE: 6-0, 5/16/19
AYES: Portantino, Bates, Bradford, Hill, Jones, Wieckowski
SUBJECT: San Onofre Nuclear Generating Station: emergency planning funding
DIGEST:
This bill requires the California Office of Emergency Services (OES), and the California State Controller (Controller), to ensure that local governments receive continued funding for costs incurred in carrying out activities for the safety and welfare of the communities surrounding the San Onofre Nuclear Generating Station (SONGS).
Existing law:
- Requires, pursuant to the Radiation Protection Act of 1999, local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear power plant.
- Requires, pursuant to the California Emergency Services Act, local costs to carry out activities under the Radiation Protection Act of 1999 that are not reimbursed by federal funds to be borne by an electrical corporation operating a nuclear power plant with a generating capacity of 50 or more megawatts.
- Sets, until January 1, 2019, the maximum annual amount available for disbursement for local costs for the SONGS site at $1.6 million.
This bill:
- Requires OES and the Controller to ensure that local governments receive continued funding for costs incurred by them in carrying out activities for the safety and welfare of the communities surrounding SONGS, as specified.
- Includes Legislative findings and declarations relating to the decommissioning of SONGS and the need for a special statute because of the unique circumstances involving the SONGS site.
- Provides that it is the intent of the Legislature to ensure continued funding of offsite emergency response related to SONGS and the continued coordination, information sharing, and partnership between Southern California Edison and local government agencies.
Background
The San Onofre Nuclear Generating Station. SONGS, operated by Southern California Edison (SCE), is approximately four miles south of San Clemente, 50 miles north-northwest of San Diego, and located between Interstate 5 and the Pacific Ocean within the boundary of the Camp Pendleton military reserve. According to the United States Nuclear Regulatory Commission (NRC), the site originally comprised three nuclear power plants, known respectively as Unit 1, Unit 2, and Unit 3. Unit 1 commenced operation in 1968, and shut down in 1992.
In January, 2012, Unit 3 experienced a tube leak in one of the two steam generators. The leak was unexpected, and the unit was shut down in accordance with plant procedures. During follow-up inspections of the tubes, unexpected wear was discovered, including significant tube-to-tube wear in the free span areas of over 100 tubes. Testing results from Unit 2 also revealed unexpected tube wear. Additional analysis and testing ultimately resulted in identifying two tubes with tube-to-tube wear similar to what was observed in Unit 3. In June, 2013, SCE announced plans to permanently retire Units 2 and 3. During its operation, SONGS provided about 20 percent of the power to large portions of Southern California.
As one of the conditions for an operating license, the NRC requires the licensee to decommission the nuclear plant after it ceases operations. The NRC has strict rules governing nuclear power plant decommissioning, involving cleanup of radioactively contaminated plant systems and structures and the removal of the radioactive fuel. In March of this year, the California State Lands Commission approved plans to remove onshore and offshore infrastructure from SONGS. The final step to start tearing down infrastructure will be for the California Coastal Commission to issue a permit. According to the NRC’s Internet Web site, the estimated date for closure is 2030, however, the full timeline of future activates for final site restoration is unknown.
Spent nuclear fuel. Following the termination of the Yucca Mountain nuclear waste repository plan, nuclear waste has been stored on site at SONGS. There are two acceptable storage methods for spent fuel: Spent Fuel Pools (wet storage), which are specially designed pools at individual reactor sites around the country; and, Dry Cask Storage (dry storage), which licensees may store at the reactor or away from the reactor either at another decommissioned reactor site or a consolidated interim storage facility. According to the NRC, nuclear waste must sit in these wet storage pools for five years in order to cool.
In a 2017 settlement, SCE acknowledged its “shared interest” with citizens who want the spent nuclear fuel sent away from the Pacific Ocean. Under the settlement, SCE maintains ownership of the nuclear waste until the federal government decides what to do with it – a decision for nuclear plants nationwide. Transfer of spent nuclear waste at SONGS from on-site wet storage to on-site dry storage began in 2018. However, transfer of the storage canisters halted following an incident in August, 2018. To date, 29 canisters have been transitioned into dry storage, another 44 remain.
Nuclear Power Plant Regulation. Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in Emergency Planning Zones (EPZs) around a nuclear power plant, and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Memorandum of Understanding for Support of Radiological Emergency Planning and Response. In 2015, SCE entered into a Memorandum of Understanding (MOU) with the Counties of Orange and San Diego and the cities of San Clemente, San Juan Capistrano, and Dana Point. The stated purpose of the MOU is to document the mutual agreement of all signatory parties to continue collaborative and cooperative management of the radiological emergency preparedness, planning, response and recovery activities related to SONGS, and to outline a cooperative funding agreement between the signatory local governments and SCE for such activities.
Under the seven year MOU, SCE agreed to fund the local jurisdictions that are signatories utilizing the 2015-16 fiscal year (Year 1) baseline budget as follows:
- Orange County: $853,000
- San Diego County: $325,000
- City of San Clemente: $193,600
- City of Dana Point: $193,600
- City of San Juan Capistrano: $193,600
SCE agreed to provide funding at these levels until either fiscal year 2019-20, or when all spent fuel has been removed from the Spent Fuel Pools – whichever is later. Once all signatories are in agreement that all fuel at SONGS has been removed from the Spent Fuel Pools and placed in long term dry storage, SCE agreed to continue an appropriate level of funding for local radiological emergency preparedness and planning. Funding levels will glide down until fiscal year 2021-22 as set forth in the MOU. Funding levels for Year 8 and beyond are to be determined per a successor MOU. To date a successor MOU has not been established.
Purpose of the bill. According to the author’s office, “in 2013, Southern California Edison (SCE) shut down their remaining two units at SONGS. With the closure of their units the decision pushed SCE to commence the nuclear decommissioning process. While SONGS was operational, SCE was responsible for providing local agencies with Nuclear Power Preparedness funds. These funds were used by counties and cities to plan, prepare, drill, and respond to any emergency incidents regarding the nuclear sites.”
Further, the author’s office states that “decommissioned plants are not responsible for providing such funding, even though the risks associated with stored nuclear fuel remains. Funding for functioning nuclear generators is addressed through state legislation, but there is a gap where decommissioning plants are concerned. SB 465 ensures that local governments continue to receive funding for offsite emergency response planning, training, and exercises related to SONGS.”
Staff comments. In June, 2015, the NRC granted an exemption to SCE from certain emergency planning requirements. Based on the exemptions granted to SCE, the NRC no longer required the Federal Emergency Management Agency (FEMA) to monitor, review, or report on off-site radiological emergency planning. Current state law requires specified local costs associated with emergency planning around nuclear power plants to be borne by utilities operating nuclear power plants with generating capacity of 50 megawatts or more.
This bill, as written, requires OES and the Controller to ensure that local governments receive continued funding for costs related to a utility operating a nuclear power plant with a generating capacity of 50 megawatts or more. According to the NRC’s Internet Web site, SONGS current license status is DECON which is a “method of decommissioning, in which structures, systems, and components that contain radioactive contamination are removed from a site and safely disposed at a commercially operated low-level waste disposal facility, or decontaminated to a level that permits the site to be released for unrestricted use shortly after it ceases operation.”
Due to the current status of SONGS and existing law, it is unclear if this bill as currently written would achieve the author’s goal of ensuring that local governments continue to receive funding for offsite emergency response planning, training, and exercises related to SONGS.
Additionally, under the existing MOU, and presumably under a successor MOU, OES and the Controller are not, and would not be, involved in the payment of funds from SCE to the local jurisdictions. This bill requires OES and the Controller to “ensure that local governments receive continued funding,” but does not provide a framework for either OES or the Controller to do so, nor provide any consequence for noncompliance.
Related/Prior Legislation
AB 361 (Achadjian, Chapter 399, Statutes of 2015) extended the sunset date for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
AB 292 (Blakeslee, Chapter 492, Statues of 2007) extended the sunset date on the NPASA from July 1, 2009, to July 1, 2019; and, revised funding levels payable as specified.
SB 2141 (O’Connell, Chapter 543, Statutes of 1998) the Radiation Protection Act of 1999 extended the sunset date on the NPASA from July 1, 1999, to July 1, 2009; and, specified the amounts to be disbursed, and authorized advance allocations for certain anticipated local expenses, as specified.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee:
- Potential cost pressure of nearly $1.8 million for the state to ensure that local governments receive continued funding for costs incurred for carrying out activities for the safety and welfare of the communities surrounding SONGS. These funds would need to be provided even in the absence of the current Memorandum of Understanding (MOU) between Southern California Edison (SCE) and the relevant counties and cities.
- Ongoing costs of approximately $230,000 to OES for additional personnel to ensure that the local governments continue to receive the necessary resources. (GF)
County of Orange
County of San Diego
Orange County Sheriff’s Department
OPPOSITION: (Verified 5/16/19)
None received
ARGUMENTS IN SUPPORT: In support of the bill, the County of San Diego writes that, “[w]ith the decommissioning of SONGS, the Nuclear Regulatory Commission approved a revised emergency plan for SONGS, stating that due to the reduced radiological risk at the site there was no longer a need to maintain pre-planned, off-site radiological emergency preparedness plans or the 10-mile emergency planning zone around the site. However, since there is still spent nuclear fuel and radiological waste onsite, the Counties of San Diego and Orange must continue planning for response to emergencies at SONGS. The current Memorandum of Understanding (MOU) between the County and SCE expires once all nuclear fuel is transferred from the spent fuel pools to dry cask. SB 465 would help ensure local governments continue to receive funding throughout the decommissioning process.”
Prepared by: Brian Duke / G.O. / (916) 651-1530
5/18/19 11:05:00
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anthony Portantino, Chair
2019 - 2020 Regular Session
SB 465 (Bates) - San Onofre Nuclear Generating Station: emergency planning funding
Version: March 25, 2019 | Policy Vote: G.O. 15 - 0 |
Urgency: No | Mandate: No |
Hearing Date: May 6, 2019 | Consultant: Debra Cooper |
Bill Summary:
SB 465 would require the Office of Emergency Services (OES) and the California State Controller (Controller) to ensure that local governments receive continued funding for costs incurred in carrying out activities for the safety and welfare of the communities surrounding the San Onofre Nuclear Generating Station (SONGS).
Fiscal Impact:
- Potential cost pressure of nearly $1.8 million for the state to ensure that local governments receive continued funding for costs incurred for carrying out activities for the safety and welfare of the communities surrounding SONGS. These funds would need to be provided even in the absence of the current Memorandum of Understanding (MOU) between Southern California Edison (SCE) and the relevant counties and cities.
- Ongoing costs of approximately $230,000 to OES for additional personnel to ensure that the local governments continue to receive the necessary resources. (GF)
Background:
SONGS, operated by SCE, is approximately four miles south of San Clemente and 50 miles north-northwest of San Diego, located between Interstate 5 and the Pacific Ocean within the boundary of the Camp Pendleton military reserve. The site originally comprised three nuclear power plants – Unit 1, Unit 2, and Unit 3. Unit 1 shut down in 1992 and dismantlement is essentially complete. In January, 2012, Unit 3 experienced a tube leak in one of the two steam generators; during follow-up inspections of the tubes, unexpected wear was discovered, including significant tube-to-tube wear in the free span areas of over 100 tubes. Results from pre-planned testing of Unit 2 also revealed unexpected tube wear. In June, 2013, SCE announced plans to permanently retire Units 2 and 3. The United States Nuclear Regulatory Commission (NRC) requires a licensee to decommission the nuclear plant after it ceases operations. In March of this year, the California State Lands Commission approved plans to remove onshore and offshore infrastructure from SONGS. The final step to start tearing down infrastructure will be for the California Coastal Commission to issue a permit. According to the NRC’s Internet Web site, the estimated date for closure is 2030.
Following the termination of the Yucca Mountain nuclear waste repository plan, nuclear waste has been stored on site at SONGS. There are two acceptable storage methods for spent fuel: Spent Fuel Pools (wet storage), and Dry Cask Storage (dry storage) – which licensees may store at the reactor or away from the reactor either at another decommissioned reactor site or a consolidated interim storage facility.
In 2015, SCE entered into a MOU with the counties of Orange and San Diego and the three cities of San Clemente, San Juan Capistrano, and Dana Point. The stated purpose of the MOU is to document the mutual agreement of all signatory parties to continue collaborative and cooperative management of the radiological emergency preparedness, planning, response and recovery activities related to SONGS, and to outline a cooperative funding agreement between the signatory local governments and SCE for such activities.
Under the seven year MOU, SCE agreed to fund the local jurisdictions that are signatories utilizing the 2015-16 fiscal year (Year 1) baseline budget as follows:
- Orange County: $853,000
- San Diego County: $325,000
- City of San Clemente: $193,600
- City of Dana Point: $193,600
- City of San Juan Capistrano: $193,600
SCE agreed to provide funding at these levels until either fiscal year 2019-20, or when all spent fuel has been removed from the Spent Fuel Pools – whichever is later. Once all signatories are in agreement that all fuel at SONGS has been removed from the Spent Fuel Pools and placed in long term dry storage, SCE agreed to continue an appropriate level of funding for local radiological emergency preparedness and planning. Funding levels will glide down until fiscal year 2021-22 as set forth in the MOU. Funding levels for Year 8 and beyond are to be determined per a successor MOU. According to the author’s office, SCE and the counties of Orange and San Diego conducted nine subsequent meetings, the most recent occurring in late 2017. As of the date of the bill hearing, a successor MOU has not been established.
Proposed Law:
This bill would require OES and the Controller to ensure that local governments receive continued funding for costs incurred by them in carrying out activities for the safety and welfare of the communities surrounding SONGS, as specified. This bill would also provide that it is the intent of the Legislature to ensure continued funding of offsite emergency response related to SONGS and the continued coordination, information sharing, and partnership between Southern California Edison and local government agencies.
Related Legislation:
AB 361 (Achadjian, Chapter 399, Statutes of 2015) extended the sunset date for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
AB 292 (Blakeslee, Chapter 492, Statues of 2007) extended the sunset date on the NPASA from July 1, 2009, to July 1, 2019; and revised funding levels payable as specified.
SB 2141 (O’Connell, Chapter 543, Statutes of 1998) the Radiation Protection Act of 1999 extended the sunset date on the NPASA from July 1, 1999, to July 1, 2009; and specified the amounts to be disbursed, and authorized advance allocations for certain anticipated local expenses, as specified.
SB 876 (Hart, Chapter 759, Statues of 1993) the Radiation Protection Act of 1993 extended the sunset date on the NPASA until July 1, 1999; and authorized payment from the account of specific sums of money over the next five years, as specified.
-- END --
SENATE COMMITTEE ON GOVERNMENTAL ORGANIZATION
Senator Bill Dodd
Chair
2019 - 2020 Regular
Bill No: SB 465 Hearing Date: 4/23/2019
Author: | Bates | ||
Version: | 3/25/2019 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Brian Duke | ||
SUBJECT: San Onofre Nuclear Generating Station: emergency planning funding
DIGEST: This bill requires the California Office of Emergency Services (OES), and the California State Controller (Controller), to ensure that local governments receive continued funding for costs incurred in carrying out activities for the safety and welfare of the communities surrounding the San Onofre Nuclear Generating Station (SONGS).
ANALYSIS:
Existing law:
- The Radiation Protection Act of 1999 requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear power plant.
- The California Emergency Services Act requires local costs to carry out activities under the Radiation Protection Act of 1999 that are not reimbursed by federal funds to be borne by an electrical corporation operating a nuclear power plant with a generating capacity of 50 or more megawatts.
- The California Emergency Services Act requires each local government to submit to OES a statement of its costs in carrying out those activities.
- Requires an electrical corporation, upon notification by OES of the amount of its share of the actual or anticipated local agency costs, to pay that amount to the Controller for deposit in the Nuclear Planning Assessment Special Account (NPASA).
- Requires the Controller, upon appropriation by the Legislature, to reimburse local governments for those costs.
- Set, until January 1, 2019, the maximum annual amount available for disbursement for local costs for the SONGS site at $1,600,000.
- Establishes OES in the office of the Governor and provides that OES is responsible for the state’s emergency and disaster response services for natural, technological, or manmade disasters and emergencies.
- Establishes the Controller as the chief fiscal officer of California with responsibility for accountability and disbursement of the state’s financial resources.
This bill:
- Requires OES and the Controller to ensure that local governments receive continued funding for costs incurred by them in carrying out activities for the safety and welfare of the communities surrounding SONGS, as specified.
- Includes Legislative findings and declarations relating to the decommissioning of SONGS and the need for a special statute because of the unique circumstances involving the SONGS site.
- Provides that it is the intent of the Legislature to ensure continued funding of offsite emergency response related to SONGS and the continued coordination, information sharing, and partnership between Southern California Edison and local government agencies.
Background
Purpose of the bill. According to the author’s office, “in 2013, Southern California Edison (SCE) shut down their remaining two units at SONGS. With the closure of their units the decision pushed SCE to commence the nuclear decommissioning process. While SONGS was operational, SCE was responsible for providing local agencies with Nuclear Power Preparedness funds. These funds were used by counties and cities to plan, prepare, drill, and respond to any emergency incidents regarding the nuclear sites.”
Further, the author’s office states that “decommissioned plants are not responsible for providing such funding, even though the risks associated with stored nuclear fuel remains. Funding for functioning nuclear generators is addressed through state legislation, but there is a gap where decommissioning plants are concerned. SB 465 ensures that local governments continue to receive funding for offsite emergency response planning, training, and exercises related to SONGS.”
The San Onofre Nuclear Generating Station. SONGS, operated by SCE, is approximately four miles south of San Clemente and 50 miles north-northwest of San Diego, located between Interstate 5 and the Pacific Ocean within the boundary of the Camp Pendleton military reserve. According to the United States Nuclear Regulatory Commission (NRC), the site originally comprised three nuclear power plants, known respectively as Unit 1, Unit 2, and Unit 3. Unit 1 commenced operation in 1968, and shut down in 1992. Dismantlement of Unit 1 is essentially complete.
A ten-year project to replace the steam generators in both Unit 2 and Unit 3 was completed in 2011. In January, 2012, Unit 3 experienced a tube leak in one of the two steam generators. The leak was unexpected, and the unit was shut down in accordance with plant procedures. During follow-up inspections of the tubes, unexpected wear was discovered, including significant tube-to-tube wear in the free span areas of over 100 tubes. Pre-planned testing of 100 percent of Unit 2 tubes was in progress as part of a regularly scheduled refueling outage when the event occurred in Unit 3. Testing results from Unit 2 also revealed unexpected tube wear. Additional analysis and testing ultimately resulted in identifying two tubes with tube-to-tube wear similar to what was observed in Unit 3.
For both Units 2 and 3, this was the first cycle of operation with the new replacement steam generators. In June, 2013, SCE announced plans to permanently retire Units 2 and 3. During its operation, SONGS provided about 20 percent of the power to large portions of Southern California.
As one of the conditions for an operating license, the NRC requires the licensee to decommission the nuclear plant after it ceases operations. The NRC has strict rules governing nuclear power plant decommissioning, involving cleanup of radioactively contaminated plant systems and structures and the removal of the radioactive fuel. In March of this year, the California State Lands Commission approved plans to remove onshore and offshore infrastructure from SONGS. The final step to start tearing down infrastructure will be for the California Coastal Commission to issue a permit. According to the NRC’s Internet Web site, the estimated date for closure is 2030, however, the full timeline of future activates for final site restoration is unknown.
Spent nuclear fuel. Following the termination of the Yucca Mountain nuclear waste repository plan, nuclear waste has been stored on site at SONGS. There are two acceptable storage methods for spent fuel: Spent Fuel Pools (wet storage), which are specially designed pools at individual reactor sites around the country; and, Dry Cask Storage (dry storage), which licensees may store at the reactor or away from the reactor either at another decommissioned reactor site or a consolidated interim storage facility. According to the NRC, nuclear waste must sit in these wet storage pools for five years in order to cool.
In a 2017 settlement, SCE acknowledged its “shared interest” with citizens who want the spent nuclear fuel sent away from the Pacific Ocean. Under the settlement, SCE maintains ownership of the nuclear waste until the federal government decides what to do with it – a decision for nuclear plants nationwide. Transfer of spent nuclear waste at SONGS from on-site wet storage to on-site dry storage began in 2018. However, transfer of the storage canisters halted following an incident in August, 2018. To date, 29 canisters have been transitioned into dry storage, another 44 remain.
Nuclear Power Plant Regulation. In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that OES, together with the California Department of Public Health (CDPH) and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, Emergency Planning Zones (EPZ) around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program (NPPA) has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
There remains one operating nuclear power plant in California, the Diablo Canyon Power Plant. The power plant is licensed by the NRC to operate until 2024 and 2025, respectively, for units 1 and 2.
Emergency Response and Recovery. In the event of an emergency at one of California’s nuclear power plants, OES is the lead agency to mobilize state resources and to request and coordinate federal resources to mitigate the effects of radiation released into the atmosphere. The CDPH would be responsible for providing radiological assessments during all phases of such emergencies and will be the technical lead during “ingestion pathway” and “recovery” phases of an emergency.
Memorandum of Understanding for Support of Radiological Emergency Planning and Response. In 2015, SCE entered into a Memorandum of Understanding (MOU) with the counties of Orange and San Diego and the three cities of San Clemente, San Juan Capistrano, and Dana Point. The stated purpose of the MOU is to document the mutual agreement of all signatory parties to continue collaborative and cooperative management of the radiological emergency preparedness, planning, response and recovery activities related to SONGS, and to outline a cooperative funding agreement between the signatory local governments and SCE for such activities.
Under the seven year MOU, SCE agreed to fund the local jurisdictions that are signatories utilizing the 2015-16 fiscal year (Year 1) baseline budget as follows:
- Orange County: $853,000
- San Diego County: $325,000
- City of San Clemente: $193,600
- City of Dana Point: $193,600
- City of San Juan Capistrano: $193,600
SCE agreed to provide funding at these levels until either fiscal year 2019-20, or when all spent fuel has been removed from the Spent Fuel Pools – whichever is later. Once all signatories are in agreement that all fuel at SONGS has been removed from the Spent Fuel Pools and placed in long term dry storage, SCE agreed to continue an appropriate level of funding for local radiological emergency preparedness and planning. Funding levels will glide down until fiscal year 2021-22 as set forth in the MOU. Funding levels for Year 8 and beyond are to be determined per a successor MOU. According to the author’s office, SCE and the counties of Orange and San Diego conducted nine subsequent meetings, the most recent occurring in late 2017. As of the date of the bill hearing, a successor MOU has not been established.
Staff comments. In June, 2015, the NRC granted an exemption to SCE from certain emergency planning requirements. Based on the exemptions granted to SCE, the NRC no longer required the Federal Emergency Management Agency (FEMA) to monitor, review, or report on off-site radiological emergency planning. Current state law requires specified local costs associated with emergency planning around nuclear power plants to be borne by utilities operating nuclear power plants with generating capacity of 50 megawatts or more.
This bill, as written, requires OES and the Controller to ensure that local governments receive continued funding for costs related to a utility operating a nuclear power plant with a generating capacity of 50 megawatts or more. According to the NRC’s Internet Web site, SONGS current license status is DECON which is a “method of decommissioning, in which structures, systems, and components that contain radioactive contamination are removed from a site and safely disposed at a commercially operated low-level waste disposal facility, or decontaminated to a level that permits the site to be released for unrestricted use shortly after it ceases operation.”
Due to the current status of SONGS and existing law, it is unclear if the bill as currently written would achieve the author’s goal of ensuring that local governments continue to receive funding for offsite emergency response planning, training, and exercises related to SONGS.
Additionally, under the existing MOU, and presumably under a successor MOU, OES and the Controller are not, and would not be, involved in the payment of funds from SCE to the local jurisdictions. This bill requires OES and the Controller to “ensure that local governments receive continued funding,” but does not provide a framework for either OES or the Controller to do so, nor provide any consequence for noncompliance.
Prior/Related Legislation
AB 361 (Achadjian, Chapter 399, Statutes of 2015) extended the sunset data for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
AB 292 (Blakeslee, Chapter 492, Statues of 2007) extended the sunset date on the NPASA from July 1, 2009, to July 1, 2019; and, revised funding levels payable as specified.
SB 2141 (O’Connell, Chapter 543, Statutes of 1998) the Radiation Protection Act of 1999 extended the sunset date on the NPASA from July 1, 1999, to July 1, 2009; and, specified the amounts to be disbursed, and authorized advance allocations for certain anticipated local expenses, as specified.
SB 876 (Hart, Chapter 759, Statues of 1993) the Radiation Protection Act of 1993 extended the sunset date on the NPASA until July 1, 1999; and, authorized payment from the account of specific sums of money over the next five years, as specified.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
SUPPORT:
Orange County Sheriff’s Department
San Diego County Board of Supervisors
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: In support of the bill, the San Diego County Board of Supervisors writes that with “the decommissioning of SONGS, the Nuclear Regulatory Commission approved a revised emergency plan for SONGS, stating that due to the reduced radiological risk at the site there was no longer a need to maintain pre-planned, off-site radiological emergency preparedness plans or the 10-mile emergency planning zone around the site. However, since there is still spent nuclear fuel and radiological waste onsite, the Counties of San Diego and Orange must continue planning for response to emergencies at SONGS. The current Memorandum of Understanding (MOU) between the County and SCE expires once all nuclear fuel is transferred from the spent fuel pools to dry cask. SB 465 would help ensure local governments continue to receive funding throughout the decommissioning process.”
Bill Author
Bill Co-Author(s):