AB 2454: Energy: procurement plans.
- Session Year: 2015-2016
- House: Assembly
- Latest Version Date: 2016-09-29
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified requirements and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would require the electrical corporation, in determining the availability of cost-effective, reliable, and feasible demand reduction resources, to consider the findings of the Demand Response Potential Study required by a specific order of the commission, as specified. The bill would require the commission, prior to approving a contract for any new gas-fired generating unit, to require the electrical corporation to demonstrate compliance with its approved procurement plan.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate changes to Section 454.5 of the Public Utilities Code proposed by both this bill and AB 1937, which would become operative only if both bills are enacted and become effective on or before January 1, 2017, and this bill is chaptered last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified requirements and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would require the electrical corporation, in determining the availability of cost-effective, reliable, and feasible demand reduction resources, to consider the findings of the Demand Response Potential Study required by a specific order of the commission, as specified. The bill would require the commission, prior to approving a contract for any new gas-fired generating unit, to require the electrical corporation to demonstrate compliance with its approved procurement plan.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate changes to Section 454.5 of the Public Utilities Code proposed by both this bill and AB 1937, which would become operative only if both bills are enacted and become effective on or before January 1, 2017, and this bill is chaptered last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified requirements and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would require the electrical corporation, in determining the availability of cost-effective, reliable, and feasible demand reduction resources, to consider the findings of the Demand Response Potential Study required by a specific order of the commission, as specified. The bill would require the commission, prior to approving a contract for any new or repowered gas-fired generation resources, generating unit, to require the electrical corporation to demonstrate compliance with above requirement regarding meeting its unmet needs. its approved procurement plan.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
This bill would incorporate changes to Section 454.5 of the Public Utilities Code proposed by both this bill and AB 1937, which would become operative only if both bills are enacted and become effective on or before January 1, 2017, and this bill is chaptered last.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified requirements and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would require the electrical corporation, in determining the availability of cost-effective, reliable, and feasible demand reduction resources, to consider the findings of the Demand Response Potential Study required by a specific order of the commission, as specified. The bill would require the commission, prior to approving a contract for any new or repowered gas-fired generation resources, to require the electrical corporation to demonstrate compliance with above requirement regarding meeting its unmet needs.
Under existing law, to the extent that additional procurement is authorized for an electrical corporation, as specified, the commission is required to ensure that the costs are allocated in a fair and equitable manner to all customers, that there is no cost-shifting among customers of load-serving entities, that community choice aggregators may self-provide renewable integration resources, and that unmet resource needs are met through available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would require the commission, prior to approving a contract for any new or repowered gas-fired generation resources, to require the electrical corporation to demonstrate that it has undertaken all feasible efforts to meet identified resources needs through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, requirements and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would require the electrical corporation, in determining the availability of cost-effective, reliable, and feasible demand reduction resources, to consider the findings of the Demand Response Potential Study required by a specific order of the commission, as specified.
Under existing law, to the extent that additional procurement is authorized for an electrical corporation, as specified, the commission is required to ensure that the costs are allocated in a fair and equitable manner to all customers, that there is no cost-shifting among customers of load-serving entities, that community choice aggregators may self-provide renewable integration resources, and that unmet resource needs are met through available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would also require the commission to demonstrate to the Legislature, if the commission approves new capacity additions in excess of 100 megawatts, that the electrical corporation met its unmet needs through all available energy efficiency and demand reduction resources that were cost effective, reliable, and feasible. The bill would require the commission, prior to approving a contract for any new or repowered gas-fired generation resources, to require the electrical corporation to demonstrate that it has undertaken all feasible efforts to meet identified resources needs through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would require the electrical corporation, in determining the availability of cost-effective, reliable, and feasible demand reduction resources, to consider the findings of the Demand Response Potential Study required by a specific order of the commission, as specified.
Under existing law, to the extent that additional procurement is authorized for an electrical corporation, as specified, the commission is required to ensure that the costs are allocated in a fair and equitable manner to all customers, that there is no cost-shifting among customers of load-serving entities, that community choice aggregators may self-provide renewable integration resources, and that unmet resource needs are met through available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would also require the commission to demonstrate to the Legislature, if the commission approves new capacity additions in excess of 100 megawatts, that the electrical corporation met its unmet needs through all available energy efficiency and demand reduction resources that were cost effective, reliable, and feasible. The bill would require the commission, prior to approving a contract for any new or repowered gas-fired generation resources, to require the electrical corporation to demonstrate that it has undertaken all feasible efforts to meet identified resources needs through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would also require the electrical corporations proposed procurement plan to include a showing that it will first meet its unmet needs through all available demand response resources. The bill would require the electrical corporation corporation, in determining the availability of cost-effective, reliable, and feasible demand reduction and demand response resources, to consider the findings of the Demand Response Potential Study required by a specific order of the commission, and to also consider both load-modifying and supply-side demand response resources. commission, as specified.
Under existing law, to the extent that additional procurement is authorized for an electrical corporation, as specified, the commission is required to ensure that the costs are allocated in a fair and equitable manner to all customers, that there is no cost-shifting among customers of load-serving entities, that community choice aggregators may self-provide renewable integration resources, and that unmet resource needs are met through available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would also require the commission to demonstrate to the Legislature, for if the commission approves new capacity additions authorized in excess of 500,000 watts, 100 megawatts, that the electrical corporation met its unmet needs through all available energy efficiency and demand reduction and demand response resources that were cost effective, reliable, and feasible.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would recharacterize the term demand reduction as demand response, as specified, for purposes of this provision. also require the electrical corporations proposed procurement plan to include a showing that it will first meet its unmet needs through all available demand response resources. The bill would require the electrical corporation in determining the availability of cost-effective, reliable, and feasible demand reduction and demand response resources, to consider the findings of a specified study due to the commission in 2016, the Demand Response Potential Study required by a specific order of the commission, and to also consider both load-modifying and supply-side demand response resources.
Under existing law, to the extent that additional procurement is authorized for an electrical corporation, as specified, the commission is required to ensure that the costs are allocated in a fair and equitable manner to all customers, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources. resources, and that unmet resource needs are met through available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would also require the commission to demonstrate to the Legislature, as specified, for capacity additions authorized in excess of 500,000 watts, that the electrical corporation met its unmet needs through all available energy efficiency and demand reduction and demand response resources that were cost effective, reliable, and feasible.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. The act requires that an electrical corporations proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
This bill would recharacterize the term demand reduction as demand response, as specified, for purposes of this provision. The bill would require the electrical corporation in determining the availability of cost-effective, reliable, and feasible demand response resources, to consider the findings of a specified study due to the commission in 2016, and to consider both load-modifying and supply-side demand response resources.
Under existing law, to the extent that additional procurement is authorized for an electrical corporation, as specified, the commission is required to ensure that the costs are allocated in a fair and equitable manner to all customers, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources.
This bill would also require the commission to demonstrate to the Legislature, as specified, that the electrical corporation met its unmet needs through all available energy efficiency and demand response resources that were cost effective, reliable, and feasible.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)(i)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii)In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required pursuant to this section, including the elements described in subparagraph (C) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5-percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
(l)Prior to approving an electrical corporations contract for any new gas-fired generating unit, the commission shall require the electrical corporation to demonstrate compliance with its approved procurement plan.
SEC. 1.5.Section 454.5 of the Public Utilities Code is amended to read:454.5.(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)(i)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii)In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D)(i) The electrical corporation, in soliciting bids for new gas-fired generating units, shall actively seek bids for resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(ii)In considering bids for, or negotiating contracts for, new gas-fired generating units, the electrical corporation shall provide greater preference to resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(iii)This subparagraph does not apply to contracts signed by an electrical corporation and approved by the commission prior to January 1, 2017.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required by this section, including the elements described in subparagraphs (C) and (D) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5-percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
(l)Prior to approving an electrical corporations contract for any new gas-fired generating unit, the commission shall require the electrical corporation to demonstrate compliance with its approved procurement plan.
SEC. 2.Section 1.5 of this bill incorporates amendments to Section 454.5 of the Public Utilities Code proposed by both this bill and Assembly Bill 1937. It shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2017, (2) each bill amends Section 454.5 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 1937, in which case Section 1 of this bill shall not become operative.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)(i)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii)In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required pursuant to this section, including the elements described in subparagraph (C) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5-percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
(l)Prior to approving an electrical corporations contract for any new gas-fired generating unit, the commission shall require the electrical corporation to demonstrate compliance with its approved procurement plan.
SEC. 1.5.Section 454.5 of the Public Utilities Code is amended to read:454.5.(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)(i)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii)In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D)(i) The electrical corporation, in soliciting bids for new gas-fired generating units, shall actively seek bids for resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(ii)In considering bids for, or negotiating contracts for, new gas-fired generating units, the electrical corporation shall provide greater preference to resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(iii)This subparagraph does not apply to contracts signed by an electrical corporation and approved by the commission prior to January 1, 2017.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required by this section, including the elements described in subparagraphs (C) and (D) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5-percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
(l)Prior to approving an electrical corporations contract for any new gas-fired generating unit, the commission shall require the electrical corporation to demonstrate compliance with its approved procurement plan.
SEC. 2.Section 1.5 of this bill incorporates amendments to Section 454.5 of the Public Utilities Code proposed by both this bill and Assembly Bill 1937. It shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2017, (2) each bill amends Section 454.5 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 1937, in which case Section 1 of this bill shall not become operative.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)(i)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii)In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(iii)Prior to approving a contract for any new or repowered gas-fired generation resource, the commission shall require the electrical corporation to demonstrate compliance with clause (i).
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required pursuant to this section, including the elements described in subparagraph (D) (C) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent 5-percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
(l)Prior to approving an electrical corporations contract for any new gas-fired generating unit, the commission shall require the electrical corporation to demonstrate compliance with its approved procurement plan.
SEC. 1.5.Section 454.5 of the Public Utilities Code is amended to read:454.5.(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)(i)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii)In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D)(i) The electrical corporation, in soliciting bids for new gas-fired generating units, shall actively seek bids for resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(ii)In considering bids for, or negotiating contracts for, new gas-fired generating units, the electrical corporation shall provide greater preference to resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(iii)This subparagraph does not apply to contracts signed by an electrical corporation and approved by the commission prior to January 1, 2017.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan. plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required by this section, including the elements described in subparagraphs (C) and (D) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent 5-percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination, combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the State Energy Resources Conservation and Development Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
(l)Prior to approving an electrical corporations contract for any new gas-fired generating unit, the commission shall require the electrical corporation to demonstrate compliance with its approved procurement plan.
SEC. 2.Section 1.5 of this bill incorporates amendments to Section 454.5 of the Public Utilities Code proposed by both this bill and Assembly Bill 1937. It shall only become operative if (1) both bills are enacted and become effective on or before January 1, 2017, (2) each bill amends Section 454.5 of the Public Utilities Code, and (3) this bill is enacted after Assembly Bill 1937, in which case Section 1 of this bill shall not become operative.
SEC. 2.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)(i)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. In
(ii)In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D)(i)The electrical corporation shall undertake all feasible efforts to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
(ii)
(iii)Prior to approving a contract for any new or repowered gas-fired generation resource, the commission shall require the electrical corporation to demonstrate compliance with clause (i).
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required pursuant to this section, including the elements described in subparagraph (D) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D)(i)The electrical corporation shall undertake all feasible efforts to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
(ii)Prior to approving a contract for any new or repowered gas-fired generation resource, the commission shall require the electrical corporation to demonstrate compliance with clause (i).
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required pursuant to this section, including the elements described in subparagraph (D) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
SEC. 2.Section 921 is added to the Public Utilities Code, to read:921.To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall demonstrate to the Legislature, in a report submitted pursuant to Section 9795 of the Government Code not more than 60 days after the commission issues a final decision approving new capacity additions in excess of 100 megawatts, that the prioritized procurement of energy efficiency and demand reduction resources required by subparagraph (C) of paragraph (9) of subdivision (b) of Section 454.5 is achieved.
SEC. 3.SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the electrical corporation commission shall consider the findings regarding technical, economic, and technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by subsequent other demand reduction potential studies, studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D)(i)The electrical corporation shall undertake all feasible efforts to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
(ii)Prior to approving a contract for any new or repowered gas-fired generation resource, the commission shall require the electrical corporation to demonstrate compliance with clause (i).
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan. plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required pursuant to this section, including the elements described in subparagraph (D) of paragraph (9) of subdivision (b). The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination, combination of these, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
SEC. 2.Section 921 is added to the Public Utilities Code, to read:921.To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall demonstrate to the Legislature, in a report submitted pursuant to Section 9795 of the Government Code not more than 60 days after the commission issues a final decision approving new capacity additions in excess of 100 megawatts, that the prioritized procurement of energy efficiency and demand reduction resources required by subparagraph (C) of paragraph (9) of subdivision (b) of Section 454.5 is achieved.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan authorized pursuant to either this section or Section 454.52 shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions and demand responses, reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction and demand response products.
(C)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction and demand response resources that are cost effective, reliable, and feasible. In determining the availability of cost-effective, reliable, and feasible demand reduction and demand response resources, the electrical corporation shall consider the findings regarding technical, economic, and achievable demand reduction and demand response potential in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by subsequent demand response reduction potential studies, and shall consider both load-modifying and supply-side demand reduction and demand response resources. to the extent that any demand reduction is consistent with commission policy.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan. The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
SEC. 2.Section 921 is added to the Public Utilities Code, to read:921.To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall demonstrate to the Legislature, in a report submitted pursuant to Section 9795 of the Government Code not more than 60 days after the commission issues a final decision approving new capacity additions in excess of 500,000 watts, 100 megawatts, that the prioritized procurement of energy efficiency and demand reduction and demand response resources required by subparagraph (C) of paragraph (9) of subdivision (b) of Section 454.5 is achieved.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan authorized pursuant to either this section or Section 454.52 shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions and demand responses, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction and demand response products.
(C)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction and demand response resources that are cost effective, reliable, and feasible. In determining the availability of cost- effective, cost-effective, reliable, and feasible demand reduction and demand response resources, the electrical corporation shall consider the findings of the study of regarding technical, economic, and achievable demand reduction and demand response potential that is due to the commission in 2016, in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by subsequent demand response potential studies, and shall consider both load-modifying and supply-side demand reduction and demand response resources.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan. The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
SEC. 2.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(I)Meet the energy efficiency and demand response targets established by the commission in concert with the Energy Commission pursuant to Section 454.56 and Section 25310 of the Public Resources Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply-side resources, and demand-response resources that may be categorized as either load modifying or supply side, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand response products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand response products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall demonstrate to the Legislature, in a report submitted pursuant to Section 9795 of the Government Code not more than 60 days after the commission issues a final decision approving new capacity additions in excess of 500,000 watts, that the prioritized procurement of energy efficiency and demand response resources required by subparagraph (C) of paragraph (9) of subdivision (b) of Section 454.5 is achieved, that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 2.Section 921 is added to the Public Utilities Code, to read:921.To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall demonstrate to the Legislature, in a report submitted pursuant to Section 9795 of the Government Code not more than 60 days after the commission issues a final decision approving new capacity additions in excess of 500,000 watts, that the prioritized procurement of energy efficiency and demand reduction and demand response resources required by subparagraph (C) of paragraph (9) of subdivision (b) of Section 454.5 is achieved.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporations proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commissions adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b)An electrical corporations proposed procurement plan authorized pursuant to either this section or Section 454.52 shall include, but not be limited to, all of the following:
(1)An assessment of the price risk associated with the electrical corporations portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, responses, and electricity-related products and the remaining open position to be served by spot market transactions.
(2)A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3)The duration of the plan.
(4)The duration, timing, and range of quantities of each product to be procured.
(5)A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6)An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7)The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commissions review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8)Procedures for updating the procurement plan.
(9)A showing that the procurement plan will achieve the following:
(A)The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B)The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction response products.
(C)The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction response resources that are cost effective, reliable, and feasible. In determining the availability of cost- effective, reliable, and feasible demand response resources, the electrical corporation shall consider the findings of the study of technical, economic, and achievable demand response potential that is due to the commission in 2016, and shall consider both load-modifying and supply-side demand response resources.
(10)The electrical corporations risk management policy, strategy, and practices, including specific measures of price stability.
(11)A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12)A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c)The commission shall review and accept, modify, or reject each electrical corporations procurement plan. The commissions review shall consider each electrical corporations individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporations creditworthiness or would lead to a deterioration of an electrical corporations creditworthiness:
(1)A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2)An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporations performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3)Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d)A procurement plan approved by the commission shall accomplish each of the following objectives:
(1)Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2)Eliminate the need for after-the-fact reasonableness reviews of an electrical corporations actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3)Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporations actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4)Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5)Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporations procurement plan.
(e)The commission shall provide for the periodic review and prospective modification of an electrical corporations procurement plan.
(f)The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g)The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporations proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h)Nothing in this section alters, modifies, or amends the commissions oversight of affiliate transactions under its rules and decisions or the commissions existing authority to investigate and penalize an electrical corporations alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the State Energy Resources Conservation and Development Commissions existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i)An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j)(1)Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporations procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2)Any electrical corporations procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3)Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k)The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
SEC. 2.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Commencing in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, to ensure that load-serving entities do the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B)Procure at least 50 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability.
(F)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(G)Enhance distribution systems and demand-side energy management.
(H)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(I)Meet the energy efficiency and demand response targets established by the commission in concert with the Energy Commission pursuant to Section 454.56 and Section 25310 of the Public Resources Code.
(2)(A)The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side supply-side resources, and demand-response resources that may be categorized as either demand-side resources or supply side resources, load modifying or supply side, taking into account the differing electrical corporations geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow the provisions of Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction response products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction response products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure demonstrate to the Legislature, in a report submitted pursuant to Section 9795 of the Government Code not more than 60 days after the commission issues a final decision approving new capacity additions in excess of 500,000 watts, that the prioritized procurement of energy efficiency and demand response resources required by subparagraph (C) of paragraph (9) of subdivision (b) of Section 454.5 is achieved, that the costs are allocated in a fair and equitable manner to all customers consistent with 454.51, that there is no cost-shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d)In order to eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Sep 2, 2016 | Enrolled and presented to the Governor at 12 p.m. |
| Aug 25, 2016 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 56. Noes 21. Page 6296.). |
| Aug 25, 2016 | Senate amendments concurred in. To Engrossing and Enrolling. |
| Aug 23, 2016 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 25 pursuant to Assembly Rule 77. |
| Aug 22, 2016 | Read third time. Passed. Ordered to the Assembly. (Ayes 26. Noes 13. Page 5248.). |
| Aug 22, 2016 | Read third time. Passed. Ordered to the Assembly. |
| Aug 17, 2016 | Read second time. Ordered to third reading. |
| Aug 16, 2016 | Read third time and amended. Ordered to second reading. |
| Aug 9, 2016 | Read second time. Ordered to third reading. |
| Aug 8, 2016 | From committee: Be placed on second reading file pursuant to Senate Rule 28.8. |
| Aug 2, 2016 | Read second time and amended. Re-referred to Com. on APPR. |
| Aug 1, 2016 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 6. Noes 3.) (June 27). |
| Jun 16, 2016 | In committee: Hearing postponed by committee. |
| Jun 9, 2016 | Referred to Com. on E., U., & C. |
| Jun 6, 2016 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 2, 2016 | Read third time. Passed. Ordered to the Senate. (Ayes 58. Noes 20. Page 5193.) |
| Jun 2, 2016 | Read third time. Passed. Ordered to the Senate. (Ayes 58. Noes 20.) |
| Jun 2, 2016 | Read third time. Passed. Ordered to the Senate. |
| Jun 1, 2016 | Read second time. Ordered to third reading. |
| May 31, 2016 | Read second time and amended. Ordered returned to second reading. |
| May 27, 2016 | From committee: Amend, and do pass as amended. (Ayes 15. Noes 5.) (May 27). |
| May 18, 2016 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 5, 2016 | Re-referred to Com. on APPR. |
| May 4, 2016 | From committee chair, with author's amendments: Amend, and re-refer to Com. on APPR. Read second time and amended. |
| Apr 27, 2016 | Re-referred to Com. on APPR. |
| Apr 26, 2016 | Read second time and amended. |
| Apr 25, 2016 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 10. Noes 3.) (April 20). |
| Apr 4, 2016 | In committee: Set, second hearing. Hearing canceled at the request of author. |
| Mar 28, 2016 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Mar 28, 2016 | Re-referred to Com. on U. & C. |
| Mar 17, 2016 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & C. Read second time and amended. |
| Mar 8, 2016 | Referred to Com. on U. & C. |
| Feb 22, 2016 | Read first time. |
| Feb 21, 2016 | From printer. May be heard in committee March 22. |
| Feb 19, 2016 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 25, 2016 | AB 2454 WILLIAMS Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 22, 2016 | Assembly 3rd Reading AB2454 Williams By Hueso | Senate Floor |
Passed |
|
| Jun 27, 2016 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| Jun 2, 2016 | AB 2454 WILLIAMS Assembly Third Reading | Assembly Floor |
Passed |
|
| May 27, 2016 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 20, 2016 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Commerce |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 2454
Author:(Williams)
As Amended Ver:August 16, 2016
Majority vote
ASSEMBLY: | 58-20 | (June 2, 2016) | SENATE: | 26-13 | (August 22, 2016) |
Original Committee Reference: U. & C.
SUMMARY: Modifies the procurement requirements an electrical corporation regulated by the California Public Utilities Commission (CPUC) must propose and the CPUC must approve. Specifically, this bill:
- Requires electrical corporations to consider the findings in the Demand Response Potential Study, ordered by the CPUC, when determining the availability of cost-effective, reliable, and feasible demand response resources.
- Requires the electrical corporation to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reductions that are cost effective, reliable, and feasible. Requires the CPUC to require the electrical corporation to demonstrate fulfillment of this provision prior to approving a contract for any new or repowered gas-fired generation facility.
- Requires the CPUC to report to the Legislature, 60 days after issuing a final decision approving capacity additions in excess of 100 megawatts (MW) that required prioritized procurement of energy efficiency and demand resources is achieved.
- Establishes chaptering out language for changes proposed by both this bill and AB 1937 (Williams) of the current legislative session to the same section in the Public Utilities Code.
The Senate amendments:
- Remove a requirement that electrical corporations undertake all feasible efforts to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
- Establish chaptering out language and also change reference from "gas-fired generation resources from new facilities" to "new generating units."
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS:
- Purpose: According to the author, demand response (DR) is a valuable tool that can enhance system reliability by reducing peak demand on the grid when it is most expensive to generate electricity, provide economic alternatives to generation, reduce greenhouse gas emissions, help with renewable resource integration, and provide customers options for managing their energy needs. This bill will ensure demand response resources are integrated into the wholesale market as supply-side resources to address transmission level reliability issues and used on the distribution system to address local reliability needs.
- Background: Under existing law, each electrical corporation is required to file a proposed procurement plan with the CPUC and the CPUC is required to review and accept, modify or reject the proposed plan based on specific requirements.
In 2014, the CPUC issued a decision indicating its intention to adopt a firm DR goal specific to each utility to increase participation in DR. To that end, the CPUC authorized the undertaking of a DR Potential Study to determine the amount of the DR capacity in California. This report is due to be completed in 2016.
DR refers to altering energy usage in response to an event or a schedule. By altering demand for energy at a given time in a specified amount, DR can help maintain reliable operation of the electricity grid. Used correctly, it can also reduce the overall cost of energy procurement because generally it has been true that the electricity demanded when load is highest is always the most expensive electricity. A reduction in demand can avoid the need for that most expensive electricity.
Analysis Prepared by: Sue Kateley / U. & C. / (916) 319-2083 FN: 0004527
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 2454
:
SENATE ENERGY, U. & C. COMMITTEE: 6-3, 6/27/16
AYES: Hertzberg, Hill, Lara, Leyva, McGuire, Pavley
NOES: Morrell, Cannella, Gaines
NO VOTE RECORDED: Hueso, Wolk
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 58-20, 6/2/16 - See last page for vote
DIGEST: This bill directs the California Public Utilities Commission (CPUC), to (1) require an investor-owned utility (IOU) to demonstrate that it will first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible; (2) require an IOU to demonstrate compliance with its approved procurement plan prior to approving the IOU’s contract for any new gas-fired generating unit, and (3) consider the findings of the Demand Response Potential Study.
Senate Floor Amendments of 8/16/16 add a new section that include the provisions of AB 2454 itself, as well as the provisions of another bill – AB 1937 (Gomez) – that also affects Public Utilities Code Section 454.5. The amendments also add a contingency clause stating that this bill only becomes effective if (1) both it and AB 1937 are enacted, (2) each bill amends Public Utilities Code Section 454.5, and (3) this bill is enacted after AB 1937. Finally, the amendments also change reference from “gas-fired generation resources from new facilities” to “new generating units.” The author intends the change to encompass bids for new facilitates as well as bids for new generating units at existing facilities.
Existing law:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires each IOU to file an electricity procurement plan with the CPUC, and requires the CPUC to review and accept, modify or reject each IOU’s proposed electricity procurement plan.
- Provides that, among other elements, the procurement plan must include a showing that it will achieve the IOU first meeting its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. (Public Utilities Code §454.5)
- Requires the CPUC to adopt a process for each IOU to file an integrated resource plan (IRP) to ensure IOUs meet the greenhouse gas (GHG) emissions reduction targets for the electricity sector; procure at least 50 percent eligible renewable energy resources by December 31, 2030; enable each IOU to fulfill its obligation to serve its customers at just and reasonable rates; minimize impacts on ratepayers’ bills; ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emissions, with early priority on disadvantaged communities. (Public Resources Code §454.52)
This bill:
- Requires the CPUC, prior to approving a contract for any new or repowered gas-fired generation resource, to require an IOU to demonstrate that it will first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
- Requires the CPUC to review and accept, modify, or reject any updates or amendments to each IOU’s procurement plan.
- Requires the CPUC, in determining the availability of energy demand reduction resources that are cost effective, reliable, and feasible for purposes of reviewing an IOU’s procurement plan, to consider the findings in specified studies and the extent that any demand reduction is consistent with commission policy.
Background
Procurement plans tell how an IOU will procure electricity to meet the needs of its customers. The CPUC describes its long-term procurement plan (LTPP) proceedings as intended to ensure a safe, reliable and cost-effective electricity supply in California through integration and refinement of a comprehensive set of procurement policies, practices and procedures. LTPP proceedings take a 10-year-ahead look at system, local, and flexible needs. Proceeding assumptions are revised every two years to incorporate changes in the resource mix and revisions to state policies.
An IOU’s procurement plan – part of an LTPP proceeding – details what energy resources an IOU is going to procure and how it will procure them. These plans must adhere to state policies, including the loading order, which mandates that utilities seek to meet need first though cost-effective energy efficiency and demand response, followed by procurement of renewable energy and, lastly, procurement of fossil-fuel-generated electricity. If an IOU’s procurement plan does not comply with state policies or adequately balance safety, reliability, cost, and environmental goals, the CPUC orders the IOU to modify the plan.
Current law requires an IOU’s procurement plan to show that the IOU will first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. This bill adds new teeth to the requirement, stating that the CPUC shall require the IOU to demonstrate compliance with the preceding requirement before approving a contract for any new gas-fired generation unit. But new teeth might not be needed.
In 2015, the Legislature passed SB 350 (De León, Chapter 547, Statutes of 2015). In addition to significantly increasing the state’s commitment to renewable energy and energy efficiency, the statute requires the IOUs (as well as the publicly owned utilities) to develop and regularly update integrated resources plans (IRPs). The plans, which the CPUC must review and approve, are to detail how each IOU is to meet the state’s clean energy and environmental objectives. The CPUC, in approving an IOU’s proposed procurement, is to ensure the proposal is consistent with the IOU’s IRP.
If the IRP process works as intended, then there would seem to be no need for this bill. This is because, according to the CPUC, the IRP process will subsume the LTPP. The IRP process is in its early stages of development. It is as yet unknown how effectively the IRP process will function.
Demand response. Demand response refers to a variety of mechanisms by which an electricity customer may vary its demand for electricity in response to signals, such as a change in price or the availability of incentives. For example, time-of-use rates use price signals to encourage customers to reduce their use of electricity when the relative availability of electricity is low or, in some cases, to increase their electricity use when relative supply is abundant.
The CPUC is currently considering establishing binding demand response goals applicable to the state’s regulated electric utilities. As part of that consideration, the CPUC authorized a study to determine the potential of demand response as a resource to meet California’s energy needs. In April of this year, a team at Lawrence Berkeley National Laboratories issued phase one of the study. [file:///C:/Users/dickenjm/Downloads/CPUC%20CA%20DR%20Potential%20Study_Phase1%20(1).pdf.] The team will issue subsequent phases of the study. This bill seeks to ensure that the CPUC considers the study’s findings regarding technically and economically achievable demand reduction when it review the IOU’s procurement plans.
Related/Prior Legislation
AB 1937 (Gomez, 2016) requires an electric IOU bids for new gas-fired generation resources to consider, and give preference to, bids for resources that are not gas-fired generation resources located in communities that suffer from cumulative pollution burdens. The bill was passed by the Senate Committee on Energy, Utilities and Communications by a vote of 7-3 and is pending consideration by the full Senate.
SB 350 (De León, Chapter 547, Statutes of 2015) created, among other things, the obligation that IOUs develop and regularly update IRPs, which the CPUC must review and approve, and are to detail how each IOU is to meet the state’s clean energy and environmental objectives.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
Clean Power Campaign (source)
Advanced Energy Management Alliance
EnerNOC
Environmental Defense Fund
Silicon Valley Leadership Group
TechNet
OPPOSITION: (Verified 8/16/16)
None received
ARGUMENTS IN SUPPORT: According to the author:
The LTPP proceeding develops assumptions and forecasts of resource availability and determines if the existing planned mix of resources is sufficient to meet future needs. An IOU’s proposed procurement plan must include certain elements, including a requirement that it will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
Demand response is defined as changes in electricity use by customers from their normal consumption pattern in response to fluctuations in the price of electricity, financial incentives to reduce consumption, changes in wholesale market prices, or changes in grid conditions. In other words, demand response reduces energy demand when power is needed most, rather than increasing supply from carbon-emitting fuels. As of 2014, the CPUC bifurcated demand response programs take two forms:
- Load modifying resources (LMR) modify load through customers’ behavioral change; for example, time-of-use rates, and are administered by the IOUs or third-party providers.
- Supply-side resources reduce or increase demand at a particular time and location and by a specific amount and can be scheduled and dispatched into the CAISO energy markets when and where needed, for example; the Base Interruptible Program.
In December 2014, the CPUC authorized the undertaking of a demand response Potential Study to determine the amount of demand response that is potentially available in the State.
The Potential Study is currently being completed by the Lawrence Berkeley National Lab and will answer some of the most fundamental questions about the potential of demand response and will consider all forms of demand response that may be available to IOUs or the CAISO, as well as the potential for integrating demand response with other distributed energy resources, such as electric vehicles and solar, to meet a broader range of system needs. The Potential Study will be a transparent framework that associates numbers in gigawatts with every demand response end use, how many hours of avoided generation are available, and a forecast of costs. These models will extend to 2025 to provide a comprehensive overview of the role that demand response can provide to meet California’s GHG reduction goals.
However, before the study’s completion, the CPUC adopted a decision (R13-09-011) in November 2015 that significantly devalued certain LMR programs and prohibited IOUs from attributing any capacity value to these programs. This preemptive decision significantly impacts the ability for IOUs to incorporate demand response into the LTTP process.
AB 2454 highlights the significant challenge that demand reduction has faced as an under-utilized resource in danger of being prematurely undervalued by the CPUC. This bill solidifies the role demand reduction has in the LTPP proceeding by clarifying that the CPUC shall take the results of the study into account when IOUs include demand reduction in their required portfolio of short and long term strategies.
ASSEMBLY FLOOR: 58-20, 6/2/16
AYES: Alejo, Travis Allen, Arambula, Atkins, Baker, Bloom, Bonilla, Bonta, Brown, Burke, Calderon, Campos, Chang, Chau, Chiu, Chu, Cooley, Cooper, Dababneh, Daly, Dodd, Eggman, Frazier, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Roger Hernández, Holden, Irwin, Jones-Sawyer, Lackey, Levine, Lopez, Low, Maienschein, McCarty, Medina, Mullin, Nazarian, O'Donnell, Quirk, Ridley-Thomas, Rodriguez, Salas, Santiago, Mark Stone, Thurmond, Ting, Waldron, Weber, Williams, Wood, Rendon
NOES: Achadjian, Bigelow, Brough, Chávez, Dahle, Beth Gaines, Gallagher, Grove, Harper, Jones, Linder, Mathis, Mayes, Melendez, Obernolte, Olsen, Patterson, Steinorth, Wagner, Wilk
NO VOTE RECORDED: Hadley, Kim
8/17/16 16:42:58
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB |
THIRD READING
Bill No: AB 2454
:
SENATE ENERGY, U. & C. COMMITTEE: 6-3, 6/27/16
AYES: Hertzberg, Hill, Lara, Leyva, McGuire, Pavley
NOES: Morrell, Cannella, Gaines
NO VOTE RECORDED: Hueso, Wolk
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 58-20, 6/2/16 - See last page for vote
DIGEST: This bill requires the California Public Utilities Commission (CPUC), to (1) require an investor-owned utility (IOU) to demonstrate that it will first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible; (2) review and accept, modify, or reject any updates for amendments to each IOU’s procurement plan; and (3) consider the findings of the Demand Response Potential Study.
Existing law:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires each IOU to file an electricity procurement plan with the CPUC, and requires the CPUC to review and accept, modify or reject each IOU’s proposed electricity procurement plan.
- Provides that, among other elements, the procurement plan must include a showing that it will achieve the IOU first meeting its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. (Public Utilities Code §454.5)
- Requires the CPUC to adopt a process for each IOU to file an integrated resource plan (IRP) to ensure IOUs meet the greenhouse gas (GHG) emissions reduction targets for the electricity sector; procure at least 50 percent eligible renewable energy resources by December 31, 2030; enable each IOU to fulfill its obligation to serve its customers at just and reasonable rates; minimize impacts on ratepayers’ bills; ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emissions, with early priority on disadvantaged communities. (Public Resources Code §454.52)
This bill:
- Requires the CPUC, prior to approving a contract for any new or repowered gas-fired generation resource, to require an IOU to demonstrate that it will first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
- Requires the CPUC to review and accept, modify, or reject any updates or amendments to each IOU’s procurement plan.
- Requires the CPUC, in determining the availability of energy demand reduction resources that are cost effective, reliable, and feasible for purposes of reviewing an IOU’s procurement plan, to consider the findings in specified studies and the extent that any demand reduction is consistent with commission policy.
Background
Procurement plans tell how an IOU will procure electricity to meet the needs of its customers. The CPUC describes its long-term procurement plan (LTPP) proceedings as intended to ensure a safe, reliable and cost-effective electricity supply in California through integration and refinement of a comprehensive set of procurement policies, practices and procedures. LTPP proceedings take a 10-year-ahead look at system, local, and flexible needs. Proceeding assumptions are revised every two years to incorporate changes in the resource mix and revisions to state policies.
An IOU’s procurement plan – part of an LTPP proceeding – details what energy resources an IOU is going to procure and how it will procure them. These plans must adhere to state policies, including the loading order, which mandates that utilities seek to meet need first though cost-effective energy efficiency and demand response, followed by procurement of renewable energy and, lastly, procurement of fossil-fuel-generated electricity. If an IOU’s procurement plan does not comply with state policies or adequately balance safety, reliability, cost, and environmental goals, the CPUC orders the IOU to modify the plan.
Current law requires an IOU’s procurement plan to show that the IOU will first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. This bill adds new teeth to the requirement, stating that the CPUC shall require the IOU to demonstrate compliance with the preceding requirement before approving a contract for any new or repowered gas-fired generation resource. But new teeth might not be needed.
In 2015, the Legislature passed SB 350 (De León, Chapter 547, Statutes of 2015). In addition to significantly increasing the state’s commitment to renewable energy and energy efficiency, the statute requires the IOUs (as well as the publicly owned utilities) to develop and regularly update integrated resources plans (IRPs). The plans, which the CPUC must review and approve, are to detail how each IOU is to meet the state’s clean energy and environmental objectives. The CPUC, in approving an IOU’s proposed procurement, is to ensure the proposal is consistent with the IOU’s IRP.
If the IRP process works as intended, then there would seem to be no need for this bill. This is because, according to the CPUC, the IRP process will subsume the LTPP. The IRP process is in its early stages of development. It is as yet unknown how effectively the IRP process will function.
Demand response. Demand response refers to a variety of mechanisms by which an electricity customer may vary its demand for electricity in response to signals, such as a change in price or the availability of incentives. For example, time-of-use rates use price signals to encourage customers to reduce their use of electricity when the relative availability of electricity is low or, in some cases, to increase their electricity use when relative supply is abundant.
The CPUC is currently considering establishing binding demand response goals applicable to the state’s regulated electric utilities. As part of that consideration, the CPUC authorized a study to determine the potential of demand response as a resource to meet California’s energy needs. In April of this year, a team at Lawrence Berkeley National Laboratories issued phase one of the study. [file:///C:/Users/dickenjm/Downloads/CPUC%20CA%20DR%20Potential%20Study_Phase1%20(1).pdf.] The team will issue subsequent phases of the study. This bill seeks to ensure that the CPUC considers the study’s findings regarding technically and economically achievable demand reduction when it review the IOU’s procurement plans.
Related/Prior Legislation
AB 1937 (Gomez, 2016) requires an electric IOU bids for new gas-fired generation resources to consider, and give preference to, bids for resources that are not gas-fired generation resources located in communities that suffer from cumulative pollution burdens. The bill was passed by the Senate Committee on Energy, Utilities and Communications by a vote of 7-3 and is pending consideration by the full Senate.
SB 350 (De León, Chapter 547, Statutes of 2015) created, among other things, the obligation that IOUs develop and regularly update IRPs, which the CPUC must review and approve, and are to detail how each IOU is to meet the state’s clean energy and environmental objectives.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
Clean Power Campaign (source)
Advanced Energy Management Alliance
EnerNOC
Environmental Defense Fund
Silicon Valley Leadership Group
TechNet
None received
ARGUMENTS IN SUPPORT: According to the author:
The LTPP proceeding develops assumptions and forecasts of resource availability and determines if the existing planned mix of resources is sufficient to meet future needs. An IOU’s proposed procurement plan must include certain elements, including a requirement that it will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
Demand response is defined as changes in electricity use by customers from their normal consumption pattern in response to fluctuations in the price of electricity, financial incentives to reduce consumption, changes in wholesale market prices, or changes in grid conditions. In other words, demand response reduces energy demand when power is needed most, rather than increasing supply from carbon-emitting fuels. As of 2014, the CPUC bifurcated demand response programs take two forms:
- Load modifying resources (LMR) modify load through customers’ behavioral change; for example, time-of-use rates, and are administered by the IOUs or third-party providers.
- Supply-side resources reduce or increase demand at a particular time and location and by a specific amount and can be scheduled and dispatched into the CAISO energy markets when and where needed, for example; the Base Interruptible Program.
In December 2014, the CPUC authorized the undertaking of a demand response Potential Study to determine the amount of demand response that is potentially available in the State.
The Potential Study is currently being completed by the Lawrence Berkeley National Lab and will answer some of the most fundamental questions about the potential of demand response and will consider all forms of demand response that may be available to IOUs or the CAISO, as well as the potential for integrating demand response with other distributed energy resources, such as electric vehicles and solar, to meet a broader range of system needs. The Potential Study will be a transparent framework that associates numbers in gigawatts with every demand response end use, how many hours of avoided generation are available, and a forecast of costs. These models will extend to 2025 to provide a comprehensive overview of the role that demand response can provide to meet California’s GHG reduction goals.
However, before the study’s completion, the CPUC adopted a decision (R13-09-011) in November 2015 that significantly devalued certain LMR programs and prohibited IOUs from attributing any capacity value to these programs. This preemptive decision significantly impacts the ability for IOUs to incorporate demand response into the LTTP process.
AB 2454 highlights the significant challenge that demand reduction has faced as an under-utilized resource in danger of being prematurely undervalued by the CPUC. This bill solidifies the role demand reduction has in the LTPP proceeding by clarifying that the CPUC shall take the results of the study into account when IOUs include demand reduction in their required portfolio of short and long term strategies.
ASSEMBLY FLOOR: 58-20, 6/2/16
AYES: Alejo, Travis Allen, Arambula, Atkins, Baker, Bloom, Bonilla, Bonta, Brown, Burke, Calderon, Campos, Chang, Chau, Chiu, Chu, Cooley, Cooper, Dababneh, Daly, Dodd, Eggman, Frazier, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Roger Hernández, Holden, Irwin, Jones-Sawyer, Lackey, Levine, Lopez, Low, Maienschein, McCarty, Medina, Mullin, Nazarian, O'Donnell, Quirk, Ridley-Thomas, Rodriguez, Salas, Santiago, Mark Stone, Thurmond, Ting, Waldron, Weber, Williams, Wood, Rendon
NOES: Achadjian, Bigelow, Brough, Chávez, Dahle, Beth Gaines, Gallagher, Grove, Harper, Jones, Linder, Mathis, Mayes, Melendez, Obernolte, Olsen, Patterson, Steinorth, Wagner, Wilk
NO VOTE RECORDED: Hadley, Kim
8/10/16 16:00:48
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2015 - 2016 Regular
Bill No: AB 2454 Hearing Date: 6/27/2016
Author: | Williams | ||
Version: | 5/31/2016 As Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Jay Dickenson | ||
SUBJECT: Energy: procurement plans
DIGEST: This bill requires an investor-owned utility (IOU) to demonstrably undertake all feasible efforts to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable and feasible prior to contracting for any new or repowered gas-fired generation resources.
ANALYSIS:
Existing law:
- Requires electric utilities to procure 50 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires each IOU to file with the California Public Utilities Commission (CPUC), and requires the CPUC to review and accept, modify or reject each IOU’s proposed electricity procurement plan.
- Among other elements, the procurement plan must include a showing that it will achieve the IOU first meeting its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(Public Utilities Code §454.5)
- Requires the CPUC to adopt a process for each IOU to file an integrated resource plan (IRP) to ensure IOUs meet the greenhouse gas (GHG) emissions reduction targets for the electricity sector; procure at least 50 percent eligible renewable energy resources by December 31, 2030; enable each IOU to fulfill its obligation to serve its customers at just and reasonable rates; minimize impacts on ratepayers’ bills; ensure system and local reliability; strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities; enhance distribution systems and demand-side energy management; and minimize localized air pollutants and other GHG emissions, with early priority on disadvantaged communities. (Public Resources Code §454.52)
This bill:
- Requires an IOU’s procurement plan to make a showing, in addition to the showings required by existing law, that the IOU will undertake all feasible efforts to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
- Requires the CPUC, prior to approving a contract for any new or repowered gas-fired generation resource, to require the IOU demonstrate compliance with the preceding requirement.
- Requires the CPUC, in determining the availability of energy demand reduction resources that are cost effective, reliable, and feasible for purposes of reviewing an IOU’s procurement plan, to consider the findings regarding technically and economically achievable demand reduction in specified studies and to the extent that any demand reduction is consistent with commission policy.
Background
Procurement plans tell how an IOU will procure electricity to meet the needs of its customers. The CPUC describes its long-term procurement plan (LTPP) proceedings as intended to ensure a safe, reliable and cost-effective electricity supply in California through integration and refinement of a comprehensive set of procurement policies, practices and procedures. LTPP proceedings take a 10-year-ahead look at system, local, and flexible needs. Proceeding assumptions are revised every two years to incorporate changes in the resource mix and revisions to state policies.
An IOU’s procurement plan – part of an LTPP proceeding – details what and how an IOU is going to procure. These plans must adhere to state policies, including the loading order, which mandates that utilities seek to meet need first though cost-effective energy efficiency and demand response, followed by procurement of renewable energy and, lastly, procurement of fossil-fuel-generated electricity. If an IOU’s procurement plan does not comply with state policies or adequately balance safety, reliability, cost, and environmental goals, the CPUC orders the IOU to modify the plan.
Demand response. Demand response refers to a variety of mechanisms by which an electricity customer may vary its demand for electricity in response to signals, such as a change in price or the availability of incentives. For example, time-of-use rates use price signals to encourage customers to reduce their use of electricity when the relative availability of electricity is low or, in some cases, to increase their electricity use when relative supply is abundant.
The CPUC is currently considering establishing binding demand response goals applicable to the state’s regulated electric utilities. As part of that consideration, the CPUC authorized a study to determine the potential of demand response as a resource to meet California’s energy needs. In April of this year, a team at Lawrence Berkeley National Laboratories issued phase one of the study.[1] The team will issue subsequent phases of the study. This bill seeks to ensure that the CPUC considers the study’s findings regarding technically and economically achievable demand reduction when it review the IOU’s procurement plans.
Putting it into law: energy storage, demand response and the loading order. California utilities have procured increasing amounts of electricity from renewable resources, in response to the state’s RPS mandates. Much of this electricity has come from solar and wind energy resources. Such resources can be described as intermittent, meaning that they are not available at all times of the day and can experience difficult-to-predict upward or downward swings in electricity production. This intermittency creates challenges for management of the electric grid, one of which is the need to quickly respond to changes in demand for energy.
The California Independent System Operator (CAISO) reports that, to reliably manage the electricity grid with increasing amounts of intermittent generation resources, it needs flexible resources with certain characteristics. One flexible resource that provides many of the characteristics CAISO says will be needed to reliably manage the electricity grid is energy storage, which allows energy generated at one time to be used later.
Current law requires an IOU’s procurement plan to show that the IOU will first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible. This bill adds an additional requirement that is at once very similar from existing law yet somewhat difference. Whereas current law addresses and IOU’s “unmet resource needs,” this bill addresses “identified resource need,” by requiring an IOU’s procurement plan to show how the IOU will take all feasible efforts to meet any “identified resource need” through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible. In addition, this bill adds new teeth to the requirement, stating that the CPUC shall require the IOU to demonstrate compliance with the preceding requirement before approving a contract for any new or repowered gas-fired generation resource.
It is unclear how “unmet resource needs,” as used in existing law, differs from “identified resource need” as used in this bill. The author’s office indicated that it viewed the terms the same. In that case, the author may wish to amend this bill to combine the requirements, as follows:
Public Resources Code §454.5(b)(9)
(C) (i) The electrical corporation shall first meet its unmet resource needs through all available renewable energy, energy storage, energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii) In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D) (i) The electrical corporation shall undertake all feasible efforts to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reduction resources that are cost effective, reliable, and feasible.
(ii) (iii) Prior to approving a contract for any new or repowered gas-fired generation resource, the commission shall require the electrical corporation to demonstrate compliance with clause (i).
This changes to Public Resources Code §454.5(b)(9)(C)(i) will align the law with state policy and the CPUC’s practice.
This bill also provides the CPUC with a mechanism to ensure compliance with “unmet resource needs” requirement. However, it is not clear the CPUC needs such enforcement authority. In 2015, the Legislature passed SB 350 (De León, Chapter 547, Statutes of 2015). In addition to significantly increasing the state’s commitment to renewable energy and energy efficiency, the statute requires the IOUs (as well as the publicly owned utilities) to develop and regularly update IRPs. The plans, which the CPUC must review and approve, are to detail how each IOU is to meet the state’s clean energy and environmental objectives. The CPUC, in approving an IOU’s proposed procurement, is to ensure the proposal is consistent with the IOU’s IRP. If the IRP process works as intended, then it is unclear there is a need for this bill.
The IRP process is in its early stages of development. It is as yet unknown how effectively the process will function.
Prior/Related Legislation
SB 350 (De León, Chapter 547, Statutes of 2015) created, among other things, the obligation that IOUs develop and regularly update IRPs, which the CPUC must review and approve, and are to detail how each IOU is to meet the state’s clean energy and environmental objectives.
AB 1937 (Gomez, 2016) requires an electric IOU bids for new gas-fired generation resources to consider, and give preference to, bids for resources that are not gas-fired generation resources located in communities that suffer from cumulative pollution burdens. The bill was passed by this committee by a vote of 7-3 and is pending consideration by the Senate Committee on Environmental Quality.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
Clean Power Campaign (Source)
Advanced Energy Management Alliance
EnerNOC
Environmental Defense Fund
Silicon Valley Leadership Group
TechNet
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the author:
The LTPP proceeding develops assumptions and forecasts of resource availability and determines if the existing planned mix of resources is sufficient to meet future needs. An IOU’s proposed procurement plan must include certain elements, including a requirement that it will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
Demand response is defined as changes in electricity use by customers from their normal consumption pattern in response to fluctuations in the price of electricity, financial incentives to reduce consumption, changes in wholesale market prices, or changes in grid conditions. In other words, demand response reduces energy demand when power is needed most, rather than increasing supply from carbon-emitting fuels. As of 2014, the CPUC bifurcated demand response programs take two forms:
- Load modifying resources (LMR) modify load through customers’ behavioral change; for example, time-of-use rates, and are administered by the IOUs or third-party providers.
- Supply-side resources reduce or increase demand at a particular time and location and by a specific amount and can be scheduled and dispatched into the CAISO energy markets when and where needed, for example; the Base Interruptible Program.
In December 2014, the CPUC authorized the undertaking of a demand response Potential Study to determine the amount of demand response that is potentially available in the State.
The Potential Study is currently being completed by the Lawrence Berkeley National Lab and will answer some of the most fundamental questions about the potential of demand response and will consider all forms of demand response that may be available to IOUs or the CAISO, as well as the potential for integrating demand response with other distributed energy resources, such as electric vehicles and solar, to meet a broader range of system needs. The Potential Study will be a transparent framework that associates numbers in gigawatts with every demand response end use, how many hours of avoided generation are available, and a forecast of costs. These models will extend to 2025 to provide a comprehensive overview of the role that demand response can provide to meet California’s GHG reduction goals.
However, before the study’s completion, the CPUC adopted a decision (R13-09-011) in November 2015 that significantly devalued certain LMR programs and prohibited IOUs from attributing any capacity value to these programs. This preemptive decision significantly impacts the ability for IOUs to incorporate demand response into the LTTP process.
AB 2454 highlights the significant challenge that demand reduction has faced as an under-utilized resource in danger of being prematurely undervalued by the CPUC. This bill solidifies the role demand reduction has in the LTPP proceeding by clarifying that the CPUC shall take the results of the study into account when IOUs include demand reduction in their required portfolio of short and long term strategies.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 2454
Author:(Williams)
As Amended Ver:May 31, 2016
Majority vote
Committee | Votes | Ayes | Noes |
Utilities | 10-3 | Gatto, Burke, Eggman, Cristina Garcia, Eduardo Garcia, Roger Hernández, Obernolte, Quirk, Santiago, Williams | Patterson, Chávez, Dahle |
Appropriations | 15-5 | Gonzalez, Bloom, Bonilla, Bonta, Calderon, Chang, Daly, Eggman, Eduardo Garcia, Roger Hernández, Holden, Quirk, Santiago, Weber, Wood | Bigelow, Gallagher, Jones, Obernolte, Wagner |
SUMMARY: Modifies the procurement requirements an electrical corporations regulated by the California Public Utilities Commission (CPUC) must propose and the CPUC must approve. Specifically, this bill:
- Requires electrical corporations to consider the findings in the Demand Response Potential Study, ordered by the CPUC, when determining the availability of cost-effective, reliable, and feasible demand response resources.
- Requires the electrical corporation to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reductions that are cost effective, reliable, and feasible. Requires the CPUC to require the electrical corporation to demonstrate fulfillment of this provision prior to approving a contract for any new or repowered gas-fired generation facility.
FISCAL EFFECT: According to the Assembly Appropriations Committee, the CPUC anticipates this bill will require an additional staff analyst to track procurement decisions across numerous sections, including storage, self-generation incentive program, combined heat and power, and others to demonstrate the procurement prioritized demand reduction and energy efficiency resources. This bill will also require an administrative law judge to ensure the decisions contain the analysis necessary to satisfy the requirements.
COMMENTS:
- Purpose: According to the author, demand response is a valuable tool that can enhance system reliability by reducing peak demand on the grid when it is most expensive to generate electricity, provide economic alternatives to generation, reduce greenhouse gas emissions, help with renewable resource integration, and provide customers options for managing their energy needs. This bill will ensure demand response resources are integrated into the wholesale market as supply-side resources to address transmission level reliability issues and used on the distribution system to address local reliability needs.
- Background: Under existing law, each electrical corporation is required to file a proposed procurement plan with the CPUC and the CPUC is required to review and accept, modify or reject the proposed plan based on specific requirements.
In 2014, the CPUC issued a decision indicating its intention to adopt a firm demand response (DR) goal specific to each utility to increase participation in DR. To that end, the CPUC authorized the undertaking of a DR Potential Study to determine the amount of the DR capacity in California. This report is due to be completed in 2016.
DR refers to altering energy usage in response to an event or a schedule. By altering demand for energy at a given time in a specified amount, DR can help maintain reliable operation of the electricity grid. Used correctly, it can also reduce overall cost of energy procurement because it has been generally true that the electricity demanded when load is highest is always the most expensive electricity. A reduction in demand can avoid the need for that most expensive electricity.
Analysis Prepared by: Sue Kateley / U. & C. / (916) 319-2083 FN: 0003229
Date of Hearing: May 18, 2016
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 2454
Author:(Williams) – As Amended Ver:May 4, 2016
Policy Committee: | Utilities and Commerce | Vote: | 10 - 3 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill modifies the procurement requirements an electrical corporations regulated by the California Public Utilities Commission (PUC) must propose and the PUC must approve. Specifically this bill:
- Requires electrical corporations to consider the findings in the Demand Response Potential Study, ordered by the PUC, when determining the availability of cost-effective, reliable, and feasible demand response resources.
- Requires the electrical corporation to meet any identified resource need through available renewable energy, energy storage, energy efficiency, and demand reductions that are cost effective, reliable, and feasible. This bill requires the PUC to require the electrical corporation to demonstrate fulfillment of this provision prior to approving a contract for any new or repowered gas-fired generation facility.
- Requires the PUC to report to the Legislature, 60 days after issuing a final decision approving capacity additions in excess of 100 MW that required prioritized procurement of energy efficiency and demand resources is achieved.
FISCAL EFFECT:
Increased annual costs to the PUC of approximately $320,000 to comply with the reporting requirements (Public Utilities Commission Utilities Fund.)
The PUC anticipates this bill will require an additional staff analyst to track procurement decisions across numerous sections, including storage, self-generation incentive program, combined heat and power, and others to demonstrate the procurement prioritized demand reduction and energy efficiency resources. This bill will also require an administrative law judge to ensure the decisions contain the analysis necessary to satisfy the requirements.
COMMENTS:
- Purpose. According to the author, demand response is a valuable tool that can enhance system reliability by reducing peak demand on the grid when it is most expensive to generate electricity, provide economic alternatives to generation, reduce greenhouse gas emissions, help with renewable resource integration, and provide customers options for managing their energy needs. This bill will ensure demand response resources are integrated into the wholesale market as supply-side resources to address transmission level reliability issues and used on the distribution system to address local reliability needs.
- Background. Under existing law, each electrical corporation is required to file a proposed procurement plan with the PUC and the PUC is required to review and accept, modify or reject the proposed plan based on specific requirements.
In 2014, the PUC issued a decision indicating its intention to adopt a firm demand response (DR) goal specific to each utility to increase participation in DR. To that end, the PUC authorized the undertaking of a DR Potential Study to determine the amount of the DR capacity in California. This report is due to be completed in 2016.
Demand response refers to altering energy usage in response to an event or a schedule. By altering demand for energy at a given time in a specified amount, DR can help maintain reliable operation of the electricity grid. Used correctly, it can also reduce overall cost of energy procurement because it has been generally true that the electricity demanded when load is highest is always the most expensive electricity. A reduction in demand can avoid the need for that most expensive electricity.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 20, 2016
ASSEMBLY COMMITTEE ON UTILITIES AND COMMERCE
Mike Gatto, Chair
ABPCA Bill Id:AB 2454 (
Author:Williams) – As Introduced Ver:February 19, 2016
SUBJECT: Energy: procurement plans
SUMMARY: Modifies the procurement plans that electrical corporations must propose and that the California Public Utilities Commission (CPUC) must approve, as specified. Specifically, this bill:
- Includes "demand response" in existing requirements for electrical corporation to first meet their need resource needs in their procurement proposals.
- Requires electrical corporations, in determining the availability of cost-effective, reliable, and feasible demand response resources, to consider the findings of a study authorized by the CPUC.
- Requires the CPUC to demonstrate to report to the Legislature, 60 days after the CPUC issues a final decision approving new capacity additions in excess of 500 thousand watts, that the prioritized procurement of energy efficiency and demand response resources is achieved.
EXISTING LAW:
- Requires the CPUC to specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporation’s proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the CPUC not later than 60 days after the CPUC specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the CPUC's adoption of a procurement plan, the CPUC shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section. (Public Utilities Code Section 454.5)
FISCAL EFFECT: Unknown.
COMMENTS:
- Author's Statement: "Demand response is a valuable tool that can enhance system reliability by reducing peak demand on the grid when it is most expensive to generate electricity, provide economic alternatives to generation, reduce greenhouse gas emissions, help with renewable resource integration, and provide customers options for managing their energy needs. Demand response (DR) occurs when customers change their electricity usage (typically reducing use or shifting use to other times in the day) at certain times in response to economic incentives, price signals, or other conditions."
- Background: In 2014, the CPUC issued a decision indicating its intention to adopt a firm DR goal specific to each utility to increase participation in DR. To that end, the CPUC authorized the undertaking of a DR Potential Study to determine the amount of the DR capacity in California. This report is due to be completed in 2016. In order to ensure that the CPUC does not reach decisions that could reduce the potential of DR, this bill requires utilities take into account the facts and findings of the DR potential study during the Long Term Procurement Planning proceeding as they consider how to meet unmet need with preferred resources like efficiency and DR.
The bill additionally requires the CPUC to report to the Legislature every time they approve 500 megawatts (MW) of new generation. While existing statute (Public Utilities Code Section 454.5 (b)(9)(c)) requires procurement of all cost-effective, feasible and reliable energy efficiency and demand response first, before other resources are purchased, there has not been any way of ensuring that the existing statute is enforced. Therefore, the CPUC should notify the Legislature when they approve the equivalent of a new gas-fired power plant instead of preferred resources.
- What is Demand Response? Demand response refers to altering energy usage in response to an event or a schedule. By altering demand for energy at a given time in a specified amount DR can help maintain reliable operation of the electricity grid. Used correctly, it can also reduce overall cost of energy procurement because it has been generally true that the electricity demanded when load is highest is always the most expensive electricity. A reduction in demand can avoid the need for that most expensive electricity.
According to a CPUC description of DR in one of its decisions:
- A DR supply resource could include, but not be limited to the use of on-site or local solar generation, energy storage, or other types of clean energy generation (such as a fuel cell that uses biogas).
- A load-modifying DR resource includes, but is not limited to base interruptible rates, agricultural pump controller, and air conditioner cycling programs, critical peak pricing, real time pricing, time-of-use rates, permanent load shifting, and peak time rebates.
- Back Up Generation (BUGs): At this time the CPUC has not yet completed a proceeding on how it will address DR and BUGs. The CPUC stated in a recent decision (D.14-12-024) "the [CPUC's] action to bar fossil-fueled BUGs both furthers the intent of SB 1414 [Wolk, 2014] and meets the EPA's stationary source requirements."
In this same decision the CPUC points out that federal law does not preempt the CPUC's action to bar fossil-fueled BUGs.
As the CPUC has not yet reached a final decision on many aspects of DR. The CPUC is currently examining, among other things:
- Goals for DR (including how to measure and increase participation in demand response);
- Resource Adequacy Concerns (including the cause of these concerns and recommendations for resolving them);
- California Independent System Operator (CAISO);
- Market Integration Costs (Determine whether the estimated costs are considered high, and the extent to which they are a barrier to CAISO market integration);
- Supply Resources Issues (Determine the characteristics of each DR program the CPUC should use to categorize the current and future DR programs and develop, pilot, and implement a competitive procurement mechanism for DR design new programs that meet forecasted needs); and
- Determine the roles of the Utilities and Third Party Providers in administering the supply resources.
The author may wish to consider an amendment that would 1) require the CPUC to, when determining the availability of cost-effective, reliable, and feasible demand reduction resources, require electrical corporations to consider the findings regarding technical, economic, and achievable demand reduction in the Demand Response Potential Study required pursuant to CPUC D.14-12-024, to the extent those findings are not superseded by subsequent demand reduction potential studies and to the extent that any demand reduction is consistent with CPUC policy and 2) increase the CPUC's reporting requirement from 500,000 watts to 100 MW.
- Arguments in Support: Supporters state that DR encourages customers to conserve energy during times when power plants are pushed to their limits. They also state that DR resources are being integrated into the wholesale market as supply-side resources to address transmission level reliability issues and can be used on the distribution system to address local reliability needs.
- Arguments in Opposition: Opponents are concerned that this bill will establish a process that will unnecessarily delay the procurement of resources necessary to maintain reliability.
- Suggested Amendments:
SECTION 1. Section 454.5 of the Public Utilities Code is amended to read:
454.5. (a) The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporation’s proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commission’s adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b) An electrical corporation’s proposed procurement plan authorized pursuant to either this section or Section 454.52 shall include, but not be limited to, all of the following:
(1) An assessment of the price risk associated with the electrical corporation’s portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions and demand responses, and electricity-related products and the remaining open position to be served by spot market transactions.
(2) A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3) The duration of the plan.
(4) The duration, timing, and range of quantities of each product to be procured.
(5) A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6) An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7) The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commission’s review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8) Procedures for updating the procurement plan.
(9) A showing that the procurement plan will achieve the following:
(A) The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B) The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction and demand response products.
(C) The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction and demand response resources that are cost effective, reliable, and feasible. In determining the availability of cost-effective, reliable, and feasible demand reduction and demand response resources, the electrical corporation shall consider the findings regarding technical, economic, and achievable demand reduction and demand response potential in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by subsequent demand response potential studies, and shall consider both load-modifying and supply-side demand reduction and demand response resources. In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the electrical corporation shall consider the findings regarding technical, economic, and achievable demand reduction in the Demand Response Potential Study required pursuant to Commission D.14-12-024, to the extent those findings are not superseded by subsequent demand reduction potential studies and to the extent that any demand reduction is consistent with commission policy.
(10) The electrical corporation’s risk management policy, strategy, and practices, including specific measures of price stability.
(11) A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12) A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c) The commission shall review and accept, modify, or reject each electrical corporation’s procurement plan. The commission’s review shall consider each electrical corporation’s individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporation’s creditworthiness or would lead to a deterioration of an electrical corporation’s creditworthiness:
(1) A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2) An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporation’s performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3) Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d) A procurement plan approved by the commission shall accomplish each of the following objectives:
(1) Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2) Eliminate the need for after-the-fact reasonableness reviews of an electrical corporation’s actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3) Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporation’s actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5 percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4) Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5) Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporation’s procurement plan.
(e) The commission shall provide for the periodic review and prospective modification of an electrical corporation’s procurement plan.
(f) The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g) The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporation’s proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination, provided that the Office of Ratepayer Advocates and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h) Nothing in this section alters, modifies, or amends the commission’s oversight of affiliate transactions under its rules and decisions or the commission’s existing authority to investigate and penalize an electrical corporation’s alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commission’s existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i) An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j) (1) Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporation’s procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2) Any electrical corporation’s procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3) Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k) The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) of subdivision (a) of Section 399.13.
SEC. 2. Section 921 is added to the Public Utilities Code, to read:
921. To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall demonstrate to the Legislature, in a report submitted pursuant to Section 9795 of the Government Code not more than 60 days after the commission issues a final decision approving new capacity additions in excess of 500,000 watts one hundred megawatts, that the prioritized procurement of energy efficiency and demand reduction and demand response resources required by subparagraph (C) of paragraph (9) of subdivision (b) of Section 454.5 is achieved.
REGISTERED SUPPORT / OPPOSITION:
Support
Clean Power Campaign (Sponsor)
Advanced Energy Management Alliance
Environmental Defense Fund
EnerNOC
TechNet
Opposition
Independent Energy Producers
Analysis Prepared by: Sue Kateley / U. & C. / (916) 319-2083