SB 646: Local agency utility services: extension of utility services.
- Session Year: 2019-2020
- House: Senate
- Latest Version Date: 2019-07-10
|
Date
|
Status
|
|---|---|
| Jul 10, 2019 | Chaptered by Secretary of State. Chapter 78, Statutes of 2019. |
| Jul 10, 2019 | Approved by the Governor. |
| Jul 5, 2019 | Enrolled and presented to the Governor at 3:30 p.m. |
| Jun 27, 2019 | In Senate. Ordered to engrossing and enrolling. |
| Jun 27, 2019 | Read third time. Passed. Ordered to the Senate. |
| Jun 20, 2019 | Read second time. Ordered to consent calendar. |
| Jun 19, 2019 | From committee: Do pass. Ordered to consent calendar. (Ayes 8. Noes 0.) (June 19). |
| May 30, 2019 | Referred to Com. on L. GOV. |
| May 13, 2019 | In Assembly. Read first time. Held at Desk. |
| May 13, 2019 | Read third time. Passed. (Ayes 37. Noes 0.) Ordered to the Assembly. |
| May 7, 2019 | Read second time and amended. Ordered to third reading. |
| May 6, 2019 | From committee: Do pass as amended. (Ayes 7. Noes 0. Page 904.) (May 1). |
| Apr 18, 2019 | Set for hearing May 1. |
| Apr 17, 2019 | April 24 set for first hearing canceled at the request of author. |
| Apr 12, 2019 | Set for hearing April 24. |
| Apr 11, 2019 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on GOV. & F. |
| Mar 14, 2019 | Referred to Com. on GOV. & F. |
| Feb 25, 2019 | Read first time. |
| Feb 25, 2019 | From printer. May be acted upon on or after March 27. |
| Feb 22, 2019 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jun 27, 2019 | SB 646 Morrell Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Jun 19, 2019 | Do pass. To Consent Calendar. | Assembly Standing Committee on Local Government |
Passed |
|
| May 13, 2019 | Senate 3rd Reading SB646 Morrell | Senate Floor |
Passed |
|
| May 1, 2019 | Do pass as amended | Senate Standing Committee on Governance and Finance |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: June 19, 2019
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Cecilia Aguiar-Curry, Chair
SBPCA Bill Id:SB 646
Author:(Morrell) – As Amended Ver:May 7, 2019
SENATE VOTE: 37-0
SUBJECT: Local agency utility services: extension of utility services.
SUMMARY: Requires connection fees to bear a fair or reasonable relationship to the water or sewer connection that they fund.
EXISTING LAW:
- Provides, under Article XIII C of the California Constitution, that:
- All levies, charges, or exactions of any kind are taxes, except for the following:
- A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege;
- A charge imposed for a specific government service or product provided directly
to the payor that is not provided to those not charged, and which does not exceed
the reasonable costs to the local government of providing the service or product; - A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof;
- A charge imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property;
- A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government, as a result of a violation of law;
- A charge imposed as a condition of property development; and,
- Assessments and property-related fees imposed in accordance with the provisions of Article XIII D of the California Constitution.
- The local government bears the burden of proving by a preponderance of the evidence that a levy, charge, or other exaction is not a tax, that the amount is no more than necessary to cover the reasonable costs of the governmental activity, and that the manner in which those costs are allocated to a payor bear a fair or reasonable relationship to the payor’s burdens on, or benefits received from, the governmental activity.
- All levies, charges, or exactions of any kind are taxes, except for the following:
- Allows local governments to require applicants for development projects to pay fees to mitigate the project’s effects, known as mitigation fees.
- Requires local agencies to deposit mitigation fees to fund a capital improvement associated with a development in a separate account or fund.
- Defines “fee” to mean a fee for the physical facilities necessary to make a water connection or sewer connection, including, but not limited to, meters, meter boxes, and pipelines from the structure or project to a water distribution line or sewer main, and that does not exceed the estimated reasonable cost of labor and materials for installation of those facilities.
FISCAL EFFECT: None
COMMENTS:
- Bill Summary and Author’s Statement. This bill requires the estimated reasonable cost
of labor and materials for installation of facilities associated with a water or sewer connection to bear a fair or reasonable relationship to the payor’s burdens on, or benefits received from, the water connection or sewer connection. This bill is sponsored by the author.
According to the author, “SB 646 will eliminate the confusion in the Mitigation Fee Act by enumerating the principle that was established in Propositions 218 and 26, that any utility connection fee charged to a property owner by a city must bear a fair or reasonable relationship to the payer’s burdens on, or benefits received from, the utility connection.”
- Mitigation Fee Act. When approving development projects, counties and cities can require the applicants to mitigate the project's effects by paying fees, known as mitigation fees, impact fees, or developer fees. The California courts have upheld mitigation fees for sidewalks, parks, school construction, and many other public purposes. When establishing, increasing, or imposing a fee as a condition of approving a development project, the Mitigation Fee Act requires local officials to:
- Identify the fee's purpose;
- Identify the fee's use, including the public facilities to be financed;
- Determine a reasonable relationship between the fee's use and the development; and,
- Determine a reasonable relationship between the public facility's need and the development.
When imposing a fee as a condition of approving a development project, the Mitigation
Fee Act also requires local officials to determine a reasonable relationship between the fee's amount and the cost of the public facility. In its 1987 Nollan decision, the U.S. Supreme Court said that there must be an "essential nexus" between a project's impacts and the conditions for approval. In the 1994 Dolan decision, the U.S. Supreme Court said that conditions on development must have a "rough proportionality" to a project's impacts.
In the 1996 Ehrlich decision, the California Supreme Court distinguished between "legislatively enacted" conditions that apply to all projects and "ad hoc" conditions imposed on a project-by-project basis. Ehrlich applied the "essential nexus" test from Nollan and the "rough proportionality" test from Dolan to "ad hoc" conditions. The Court did not apply the Nollan and Dolan tests to the conditions that were "legislatively enacted." In other words, local officials face greater scrutiny when they impose conditions on a project-by-project basis.
As a result of these decisions and the Mitigation Fee Act, local governments must conduct a nexus study to ensure that any proposed development fees meet these legal tests. Other requirements in the Mitigation Fee Act ensure that development fees are appropriately levied and spent, including that a local agency must:
- Hold at least one open and public meeting prior to levying a new fee or increasing an existing one;
- Adopt capital improvement plans;
- Deposit and spend the fees within five years of collecting them; and,
- Refund fees or make specific findings on when and how the fees will be spent for construction, if the fees are not spent within five years of collection.
- Arguments in Support. According to the Howard Jarvis Taxpayers Association, “SB 646 eliminates ambiguity in the Mitigation Fee Act of 1987 by codifying this statute to the constitutional provisions found in both Propositions 218 and 26. Despite recent rains, groundwater supplies remain limited forcing some homeowners to connect to municipal and wastewater systems. Under current law, municipalities are able to charge connection fees for such services that represent the “proportional benefit to the person or property being charged.” SB 646 would alter this language to clarify that any utility connection fee must bear a fair or reasonable relationship to the payer’s burdens on, or benefits received from, the utility connection.
“Beyond creating a fair straightforward standard for water and sewer connection pricing,
SB 646 also brings the Mitigation Fee Act in line with the California Constitution and two voter approved ballot measures.”
- Arguments in Opposition. None on file.
REGISTERED SUPPORT / OPPOSITION:
Support
California Apartment Association
California Association of Realtors
Howard Jarvis Taxpayers Association
Opposition
None on file
Analysis Prepared by: Jimmy MacDonald / L. GOV. / (916) 319-3958
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 646 |
THIRD READING
Bill No: SB 646
Amended: 5/7/19
SENATE GOVERNANCE & FIN. COMMITTEE: 7-0, 5/1/19
AYES: McGuire, Moorlach, Beall, Hertzberg, Hurtado, Nielsen, Wiener
SUBJECT: Local agency utility services: extension of utility services
DIGEST:
This bill requires connection fees to bear a fair or reasonable relationship to the water or sewer connection that they fund.
Existing law:
- Provides, under the Article XIII C of the California Constitution, that:
- All levies, charges, or exactions of any kind are taxes, except for the following:
- A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege.
- A charge imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product.
- A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.
- A charge imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property.
- A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government, as a result of a violation of law.
- A charge imposed as a condition of property development.
- Assessments and property-related fees imposed in accordance with the provisions of Article XIII D of the California Constitution.
- The local government bears the burden of proving by a preponderance of the evidence that a levy, charge, or other exaction is not a tax, that the amount is no more than necessary to cover the reasonable costs of the governmental activity, and that the manner in which those costs are allocated to a payor bear a fair or reasonable relationship to the payor’s burdens on, or benefits received from, the governmental activity.
- All levies, charges, or exactions of any kind are taxes, except for the following:
- Allows local governments to require applicants for development projects to pay fees to mitigate the project’s effects, known as mitigation fees.
- Requires, under the Mitigation Fee Act, local officials that are establishing, increasing, or imposing a fee as a condition of approving a development project to:
- Identify the fee's purpose.
- Identify the fee's use, including the public facilities to be financed.
- Determine a reasonable relationship between the fee's use and the development.
- Determine a reasonable relationship between the public facility's need and the development.
- Determine a reasonable relationship between the fee's amount and the cost of the public facility.
- Hold at least one open and public meeting prior to levying a new fee or increasing an existing one.
- Adopt capital improvement plans.
- Deposit and spend the fees within five years of collecting them.
- Refund fees or make specific findings on when and how the fees will be spent for construction, if the fees aren’t spent within five years of collection.
- Requires local agencies to deposit mitigation fees to fund a capital improvement associated with a development in a separate account or fund.
- Defines “fee” to mean a fee for the physical facilities necessary to make a water connection or sewer connection, including, but not limited to, meters, meter boxes, and pipelines from the structure or project to a water distribution line or sewer main, and that does not exceed the estimated reasonable cost of labor and materials for installation of those facilities.
This bill requires the estimated reasonable cost of labor and materials for installation of facilities associated with a water or sewer connection to bear a fair or reasonable relationship to the payor’s burdens on, or benefits received from, the water connection or sewer connection.
Background
Articles XIIIC and XIIID are complicated, and like many provisions of law added by initiative measures, have required extensive court interpretation. In particular, the question of whether connection fees and capacity charges are property-related fees has been the subject of litigation. In 2004, the California Supreme Court ruled that water capacity charges or connection fees are not “property related fees” subject to Article XIIID (Richmond v. Shasta Community Services District). When voters approved Proposition 26, new questions arose: one prominent case decided by the California Supreme Court in 2017 established that a fee that was not subject to Article XIIID’s proportionality requirement must still adhere to the fair or reasonable relationship standard added by Proposition 26 (City of San Buenaventura v. United Water Conservation District). The author wants to ensure that water and sewer fees meet Proposition 26’s fair or reasonable relationship standard.
Comments
- Purpose of the bill. Cities and counties know that they have leverage over developers when they want to connect to their existing water and sewer systems. The Mitigation Fee Act is supposed to protect against this. But in at least one recent case, a dispute has arisen over whether a city has gone beyond what the law—and the Constitution—allows by requiring a developer to install infrastructure to serve potential future development capacity. SB 646 strengthens the Mitigation Fee Act by incorporating the California Constitution’s requirements for developer fees to be fair or reasonable. SB 646 protects developers from unreasonable fees and charges at a time when housing is already far too expensive for most Californians, and it ensures that the intent of voters in adopting Proposition 26 is fully carried out.
- Law of unintended consequences. Developer fees must already meet stringent constitutional and statutory controls that require developer fees to bear a reasonable relationship to the impact of the new development and require costs to be allocated in a manner that reflects the benefit from or burden on the governmental activity. Even though these requirements don’t appear exactly in the Mitigation Fee Act, they still apply—and if a local government exceeds them, litigation is the appropriate path forward. SB 646 incorporates requirements from Proposition 26 directly into the Act. But in trying to do so in a grammatical manner, it does not translate exactly and may unintentionally change how the law works. SB 646 potentially creates new problems for local governments and taxpayers that are just starting to get clarity from courts on how to apply Proposition 26’s standards.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
California Association of Realtors
California Building Industry Association
Howard Jarvis Taxpayers Association
Prepared by: Anton Favorini-Csorba / GOV. & F. / (916) 651-4119
5/8/19 15:24:17
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Mike McGuire, Chair
2019 - 2020 Regular
Bill No: | SB 646 | Hearing Date: | 5/1/19 |
Author: | Morrell | Tax Levy: | No |
Version: | 4/11/19 | Fiscal: | No |
Consultant: | Favorini-Csorba | ||
Local agency utility services: extension of utility services
Restates the requirements of Proposition 218 and Proposition 26 within the Mitigation Fee Act.
Background
Mitigation Fee Act. When approving development projects, counties and cities can require the applicants to mitigate the project's effects by paying fees—known as mitigation fees, impact fees, or developer fees. The California courts have upheld mitigation fees for sidewalks, parks, school construction, and many other public purposes.
When establishing, increasing, or imposing a fee as a condition of approving a development project, the Mitigation Fee Act requires local officials to:
- Identify the fee's purpose.
- Identify the fee's use, including the public facilities to be financed.
- Determine a reasonable relationship between the fee's use and the development.
- Determine a reasonable relationship between the public facility's need and the development.
When imposing a fee as a condition of approving a development project, the Act also requires local officials to determine a reasonable relationship between the fee's amount and the cost of the public facility. In its 1987 Nollan decision, the U.S. Supreme Court said that there must be an "essential nexus" between a project's impacts and the conditions for approval. In the 1994 Dolan decision, the U.S. Supreme Court said that conditions on development must have a "rough proportionality" to a project's impacts.
In the 1996 Ehrlich decision, the California Supreme Court distinguished between "legislatively enacted" conditions that apply to all projects and "ad hoc" conditions imposed on a project-by-project basis. Ehrlich applied the "essential nexus" test from Nollan and the "rough proportionality" test from Dolan to "ad hoc" conditions. The Court didn't apply the Nollan and Dolan tests to the conditions that were "legislatively enacted." In other words, local officials face greater scrutiny when they impose conditions on a project-by-project basis.
As a result of these decisions and the Mitigation Fee Act, local governments must conduct a nexus study to ensure that any proposed development fees meet these legal tests. Other requirements in the Mitigation Fee Act ensure that development fees are appropriately levied and spent, including that a local agency must:
- Hold at least one open and public meeting prior to levying a new fee or increasing an existing one;
- Adopt capital improvement plans;
- Deposit and spend the fees within five years of collecting them; and
- Refund fees or make specific findings on when and how the fees will be spent for construction, if the fees aren’t spent within five years of collection.
If a local agency levies a developer fee to fund a capital improvement associated with a development, it must deposit the fees with any other fees for that improvement in a separate account or fund and expend those funds solely for the purposes for which the fees were collected.
Local governments impose two kinds of developer fees for water and sewer service under the Mitigation Fee Act: connection fees and capacity charges. A connection fee pays for the infrastructure needed to connect the development to the existing water system, which cannot exceed the estimated reasonable cost of labor and materials for installation of the facilities. A capacity charge pays for either: (1) the past investment in the system by other payors that the new development would benefit from, or (2) new public facilities to be acquired or constructed in the future that are of proportional benefit to the person or property being charged.
Constitutional tax and fee limitations. Proposition 62 (1986) and Proposition 218 (1996) require voter approval for new and increased local taxes. Proposition 62 added statutes to the California Government Code that prohibit a local government from imposing a new general or special tax, or increasing or extending an existing one, without voter approval. Proposition 218 added Article XIIIC to the California Constitution to define the difference between general taxes and special taxes and impose voter approval requirements that are similar to Proposition 62’s statutory provisions.
Proposition 218 also added Article XIIID to the California Constitution, which imposed voter approval requirements for most “property-related fees”—any levy other than an ad valorem tax, a special tax, or an assessment imposed by an agency on a parcel or on a person as an incident of property ownership, including a user fee or charge for a property-related service. The revenues derived from the fee or charge cannot exceed the funds required to provide the service, nor may they be used for any purpose other than that for which the fee or charge was imposed. Article XIIID also prohibits the amount of the charge from exceeding the proportional cost of the service attributable to the parcel. Article XIIID exempts property-related fees for water, sewer, and refuse collection services from the Constitution’s voter-approval requirements, but the other requirements added by Proposition 218 still apply.
In November 2010, voters approved Proposition 26, which amended Article XIIIC to expand the definitions of local taxes and tax increases that require voter approval. Proposition 26 defined any levy, charge, or exaction of any kind imposed by a local government as a tax, requiring voter approval, with seven exceptions:
- A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege.
- A charge imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product.
- A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.
- A charge imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property.
- A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government, as a result of a violation of law.
- A charge imposed as a condition of property development.
- Assessments and property-related fees imposed in accordance with the provisions of Article XIIID.
Under Article XIIIC, the local government bears the burden of proving that a levy, charge, or other exaction is not a tax, that the amount is no more than necessary to cover the reasonable costs of the governmental activity, and that the manner in which those costs are allocated to a payor bear a fair or reasonable relationship to the payor’s burdens on, or benefits received from, the governmental activity.
Articles XIIIC and XIIID are complicated, and like many provisions of law added by initiative measures, have required extensive court interpretation. In particular, the question of whether connection fees and capacity charges are property-related fees has been the subject of litigation. In 2004, the California Supreme Court ruled that water capacity charges or connection fees are not “property related fees” subject to Article XIIID (Richmond v. Shasta Community Services District). When voters approved Proposition 26, new questions arose: one prominent case decided by the California Supreme Court in 2017 established that a fee that was not subject to Article XIIID’s proportionality requirement must still adhere to the fair or reasonable relationship standard added by Proposition 26 (City of San Buenaventura v. United Water Conservation District).
The author wants to incorporate Proposition 26’s fair or reasonable relationship standard into the Mitigation Fee Act and ensure that fees collected for a specific purpose are used for that purpose.
Proposed Law
Senate Bill 646 adds to the definition of connection fee that the fee bears a fair or reasonable relationship to the payor’s burdens on, or benefits received from, the water connection or sewer connection. SB 646 also provides that any fee or charge for the extension of water or sewer service cannot be utilized for facilities or services other than those for which the fee or charge is imposed.
The bill states the intent of the Legislature to incorporate the requirements of Article XIIIC into the definition of connection fee and to incorporate the requirements of Article XIIID into the Mitigation Fee Act.
State Revenue Impact
No estimate.
Comments
1. Purpose of the bill. Cities and counties know that they have leverage over developers when they want to connect to their existing water and sewer systems. The Mitigation Fee Act is supposed to protect against this. But in at least one recent case, a dispute has arisen over whether a city has gone beyond what the law—and the Constitution—allows by requiring a developer to install infrastructure to serve potential future development capacity. SB 646 strengthens the Mitigation Fee Act by incorporating the California Constitution’s requirements for developer fees to be fair or reasonable, and to only be used for the facilities or services that the fee is supposed to fund. SB 646 protects developers from unreasonable fees and charges at a time when housing is already far too expensive for most Californians, and it ensures that the intent of voters in adopting Proposition 218 and Proposition 26 is fully carried out.
2. Law of unintended consequences. Developer fees must already meet stringent constitutional and statutory controls that require developer fees to bear a reasonable relationship to the impact of the new development and require costs to be allocated in a manner that reflects the benefit from or burden on the governmental activity. Even though these requirements don’t appear directly in the Mitigation Fee Act, they still apply—and if a local government exceeds them, litigation is the appropriate path forward. SB 646 attempts to incorporate requirements from Proposition 218 and Proposition 26 directly into the Act. But in trying to do so in a grammatical manner, it does not translate exactly and instead introduces confusing language that may change how the law works. Moreover, SB 646 incorrectly applies Proposition 218’s prohibition on using property-related fees for unrelated purposes to connection fees and capacity charges, even though the California Supreme Court has ruled that the standards don’t apply, and the Mitigation Fee Act already requires local agencies to expend development fees solely for the purposes for which they are collected. SB 646 potentially creates new problems for local governments and taxpayers that are just starting to get clarity from courts on how to apply Proposition 218’s and Proposition 26’s standards. The Committee may wish to consider whether SB 646 is necessary.
3. Let’s get technical. The intent language in SB 646 makes three circular references that should be corrected if the bill moves forward:
- On page 7, line 39, and on page 8, line 5, the bill references Section 2 when it should reference Section 1.
- On page 8, line 6, the bill references “subdivision,” when it should reference the “section.”
Support and Opposition
(4/26/19)
Support: Unknown.
Opposition: Unknown.
-- END --