AB 537: Communications: wireless telecommunications and broadband facilities.
- Session Year: 2021-2022
- House: Assembly
- Latest Version Date: 2021-10-04
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed.
This bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant makes the first required submission or takes the first required step, as specified. The bill would prohibit, where a city or county requires a traffic control plan, or other submission or permit related to either obstruction or safety in the public right-of-way, the applicant from beginning construction before complying with that requirement, and the city or county would be prohibited from unreasonably withholding, conditioning, or delaying the approval of any submission related to this requirement. The bill would require that a city or county not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed.
This bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant makes the first required submission or takes the first required step, as specified. The bill would prohibit, where a city or county requires a traffic control plan, or other submission or permit related to either obstruction or safety in the public right-of-way, the applicant from beginning construction before complying with that requirement, and the city or county would be prohibited from unreasonably withholding, conditioning, or delaying the approval of any submission related to this requirement. The bill would require that a city or county not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed. Existing law authorizes the city or county to seek judicial review of the operation of this provision within 30 days of being provided with notice that the reasonable time period for acting on the application has lapsed. Under existing law, eligible facilities requests, defined to include any request for modification of an existing wireless tower or base station that involves collocation of new transmission equipment, removal of transmission equipment, or replacement of transmission equipment, are exempt from these requirements.
This bill would remove the exemption for eligible facilities requests defined above. The bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant makes the first required submission or takes the first required step, as specified. The bill would prohibit the commencement of construction during the 30 days within which the city or county is authorized to seek judicial review after being notified that the reasonable time period for acting on the application has lapsed, or until the court rules on any motion for a preliminary injunction or temporary restraining order filed by the city or county. The bill would prohibit, where a city or county requires a traffic control plan, or other submission or permit related to either safety or obstruction or safety in the public right-of-way, the applicant from beginning construction before complying with that requirement, and the city or county would be prohibited from unreasonably withholding, conditioning, or delaying the approval of any submission related to this requirement. The bill would require that a city or county not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed. Existing law authorizes the city or county to seek judicial review of the operation of this provision within 30 days of being provided with notice that the reasonable time period for acting on the application has lapsed. Under existing law, eligible facilities requests, defined to include any request for modification of an existing wireless tower or base station that involves collocation of new transmission equipment, removal of transmission equipment, or replacement of transmission equipment, are exempt from these requirements.
This bill would remove the exemption for eligible facilities requests defined above. The bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant makes the first required submission or takes the first required step, as specified. The bill would prohibit the commencement of construction during the 30 days within which the city or county is authorized to seek judicial review after being notified that the reasonable time period for acting on the application has lapsed. lapsed, or until the court rules on any motion for a preliminary injunction or temporary restraining order filed by the city or county. The bill would prohibit, where a city or county requires a traffic control plan, or other submission or permit related to either safety or obstruction in the public right-of-way, the applicant from beginning construction before complying with that requirement, and the city or county would be prohibited from unreasonably withholding, conditioning, or delaying the approval of any submission related to this requirement. The bill would require that a city or county not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed. Existing law authorizes the city or county to seek judicial review of the operation of this provision within 30 days of being provided with notice that the reasonable time period for acting on the application has lapsed. Under existing law, eligible facilities requests, defined to include any request for modification of an existing wireless tower or base station that involves collocation of new transmission equipment, removal of transmission equipment, or replacement of transmission equipment, are exempt from these requirements.
This bill would remove the exemption for eligible facilities requests defined above. The bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant makes the first required submission or takes the first required step, as specified. The bill would prohibit the commencement of construction during the 30 days within which the city or county is authorized to seek judicial review after being notified that the reasonable time period for acting on the application has lapsed. The bill would prohibit, where a city or county requires a traffic control plan plan, or other submission or permit related to either safety or obstruction in the public right-of-way, the applicant from beginning construction before complying with that requirement, and the city or county would be prohibited from unreasonably withholding, conditioning, or delaying the approval of any submission related to this requirement. The bill would require that a city or county not prohibit or unreasonably discriminate in favor of, or against, any particular technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed. Under existing law, eligible facilities requests, defined to include any request for modification of an existing wireless tower or base station that involves collocation of new transmission equipment, removal of transmission equipment, or replacement of transmission equipment, are exempt from these requirements.
This bill would remove the exemption for eligible facilities requests defined above. The bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant takes the first procedural step that the city or county requires as part of its applicable regulatory review process. makes the first required submission or takes the first required step, as specified. The bill would require prohibit, where a city or county requires a traffic control plan or other submission or permit related to safety is required by construction or obstruction in the public right-of-way, the applicant to comply with that requirement and the city or county would be authorized to condition approval of the application on compliance from beginning construction before complying with that requirement, and the city or county would be required to issue approval for any submission related to that requirement without delay. prohibited from unreasonably withholding, conditioning, or delaying the approval of any submission related to this requirement. The bill would require that a city or county not prohibit or unreasonably discriminate in favor of, or against, any particular technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed. Under existing law, eligible facilities requests, defined to include any request for modification of an existing wireless tower or base station that involves collocation of new transmission equipment, removal of transmission equipment, or replacement of transmission equipment, are exempt from these requirements.
This bill would remove the exemption for eligible facilities requests defined above. The bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant takes the first procedural step that the city or county requires as part of its applicable regulatory review process. The bill would require that where a traffic control plan or other permit submission related to safety is required by the construction, construction in the public right-of-way, the applicant shall obtain the permit, which to comply with that requirement and the city or county would be authorized to condition approval of the application on compliance with that requirement, and the city or county shall would be required to issue approval for any submission related to that requirement without delay. The bill would require that a city or county not prohibit or unreasonably discriminate in favor of, or against, any particular technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The bill would require that a city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Pursuant to existing federal law, the Federal Communications Commission (FCC) has adopted decisions and rules establishing reasonable time periods within which a local government is required to act on a collocation or siting application for certain wireless communications facilities.
Existing law requires a collocation or siting application for a wireless telecommunications facility be deemed approved if a city or county fails to approve or disapprove the application within the time periods specified in applicable FCC decisions, all required public notices have been provided regarding the application, and the applicant has provided a notice to the city or county that the time period has lapsed. Under existing law, eligible facilities requests, defined to include any request for modification of an existing wireless tower or base station that involves collocation of new transmission equipment, removal of transmission equipment, or replacement of transmission equipment, are exempt from these requirements.
This bill would remove the exemption for eligible facilities requests defined above. The bill would require that the time periods described above be determined pursuant to specified FCC rules. The bill would require that the city, county, or city and county notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules. The bill would require that the time period for a city or county to approve or disapprove a collocation or siting application commence when the applicant takes the first procedural step that the city or county requires as part of its applicable regulatory review process. The bill would require that where a traffic control plan or other permit related to safety is required by the construction, the applicant shall obtain the permit, which the city or county shall issue without delay.
The bill would require that a city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular technology. By imposing new duties on cities and counties, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the California Advanced Services Fund in the State Treasury with the goal of approving funding for infrastructure projects that will provide broadband access to California households.Existing law expressly authorizes a county service area, as defined, to acquire, construct, improve, maintain, and operate broadband internet access services.Existing law, the Permit Streamlining Act, governs the approval process that a city or county is required to follow when approving, among other things, a permit for construction for a development project for a wireless telecommunications facility.This bill would declare the intent of the Legislature to enact legislation that would accelerate the completion of broadband projects, so that high-speed internet projects can be quickly constructed to benefit local communities, and would provide related findings and declarations.Existing law establishes the California Advanced Services Fund in the State Treasury with the goal of approving funding for infrastructure projects that will provide broadband access to California households.
Existing law expressly authorizes a county service area, as defined, to acquire, construct, improve, maintain, and operate broadband internet access services.
Existing law, the Permit Streamlining Act, governs the approval process that a city or county is required to follow when approving, among other things, a permit for construction for a development project for a wireless telecommunications facility.
This bill would declare the intent of the Legislature to enact legislation that would accelerate the completion of broadband projects, so that high-speed internet projects can be quickly constructed to benefit local communities, and would provide related findings and declarations.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Each local jurisdiction in California has its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before a project can provide high-speed internet service to local communities.
(e)Some local jurisdictions approve permits for broadband projects very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall be deemed approved if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application.
(b)Where a city or county requires a traffic control plan, or other submission or permit related to either obstruction or safety in the public right-of-way, the applicant shall not begin construction before complying with this requirement. The city or county shall not unreasonably withhold, condition, or delay approval of any submission required by this subdivision.(c)This section does not apply to eligible facilities requests for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of the tower or base station as described in Section 1455 of Title 47 of the United States Code and applicable FCC rules.
(d)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(e)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(f)As used in this section, applicable FCC rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(g)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(h)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology.
(i)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(j)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant makes the first required submission, or if the city or county requires a preapplication meeting, communication, or similar step before submission, when the applicant takes that first required step.
(k)Nothing in this section shall supersede, nullify, or otherwise alter the requirements to comply with safety standards, including, but not limited to, both of the following:
(1)Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1.
(2)The Public Utilities Commissions General Order No. 128, Rules for Construction of Underground Electric Supply and Communication Systems, or successor rules adopted by the commission.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Each local jurisdiction in California has its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before a project can provide high-speed internet service to local communities.
(e)Some local jurisdictions approve permits for broadband projects very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall be deemed approved if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application.
(b)Where a city or county requires a traffic control plan, or other submission or permit related to either obstruction or safety in the public right-of-way, the applicant shall not begin construction before complying with this requirement. The city or county shall not unreasonably withhold, condition, or delay approval of any submission required by this subdivision.(c)This section does not apply to eligible facilities requests for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of the tower or base station as described in Section 1455 of Title 47 of the United States Code and applicable FCC rules.
(d)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(e)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(f)As used in this section, applicable FCC rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(g)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(h)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology.
(i)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(j)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant makes the first required submission, or if the city or county requires a preapplication meeting, communication, or similar step before submission, when the applicant takes that first required step.
(k)Nothing in this section shall supersede, nullify, or otherwise alter the requirements to comply with safety standards, including, but not limited to, both of the following:
(1)Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1.
(2)The Public Utilities Commissions General Order No. 128, Rules for Construction of Underground Electric Supply and Communication Systems, or successor rules adopted by the commission.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Each local jurisdiction in California has its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before a project can provide high-speed internet service to local communities.
(e)Some local jurisdictions approve permits for broadband projects very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall, except as provided in subdivision (b), be deemed approved, and all necessary permits shall be deemed issued and the applicant may begin construction, shall be deemed approved if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application. Construction shall not occur pursuant to an application that is deemed approved pursuant to this section until 30 days have elapsed since the provision of notice pursuant to subparagraph (A), or until the court rules on any motion for a preliminary injunction or temporary restraining order filed by the city or county. The court shall consider any such motion on an expedited basis.
(b)Notwithstanding subdivision (a), where Where a city or county requires a traffic control plan, or other submission or permit related to either safety or obstruction or safety in the public right-of-way, the applicant shall not begin construction before complying with this requirement. The city or county shall not unreasonably withhold, condition, or delay approval of any submission required by this subdivision.(c)This section does not apply to eligible facilities requests for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of the tower or base station as described in Section 1455 of Title 47 of the United States Code and applicable FCC rules.
(c)(d)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(d)(e)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(e)(f)As used in this section, Applicable applicable FCC rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(f)(g)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(g)(h)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology.
(h)(i)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(i)(j)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant makes the first required submission, or if the city or county requires a preapplication meeting, communication, or similar step before submission, when the applicant takes that first required step.
(j)(k)Nothing in this section shall supersede, nullify, or otherwise alter the requirements to comply with safety standards, including, but not limited to, both of the following:
(1)Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1.
(2)The Public Utilities Commissions General Order No. 128, Rules for Construction of Underground Electric Supply and Communication Systems, or successor rules adopted by the commission.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Each local jurisdiction in California has its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before a project can provide high-speed internet service to local communities.
(e)Some local jurisdictions approve permits for broadband projects very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall, except as provided in subdivision (b), be deemed approved, and all necessary permits shall be deemed issued and the applicant may begin construction, if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application. Construction shall not occur pursuant to an application that is deemed approved pursuant to this section until 30 days have elapsed since the provision of notice pursuant to subparagraph (A). (A), or until the court rules on any motion for a preliminary injunction or temporary restraining order filed by the city or county. The court shall consider any such motion on an expedited basis.
(b)Where Notwithstanding subdivision (a), where a city or county requires a traffic control plan, or other submission or permit related to either safety or obstruction in the public right-of-way, the applicant shall not begin construction before complying with this requirement. The city or county shall not unreasonably withhold, condition, or delay approval of any submission required by this subdivision.
(c)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(d)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(e)As used in this section, Applicable FCC rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(f)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(g)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular wireless technology.
(h)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(i)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant makes the first required submission, or if the city or county requires a preapplication meeting, communication, or similar step before submission, when the applicant takes that first required step.
(j)Nothing in this section shall supersede, nullify, or otherwise alter the requirements to comply with safety standards, including, but not limited to, both of the following:
(1)Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1.
(2)Public Utilities Commissions General Order No. 128, Rules for Construction of Underground Electric Supply and Communication Systems, or successor rules adopted by the commission.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Each local jurisdiction in California has its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before a project can provide high-speed internet service to local communities.
(e)Some local jurisdictions approve permits for broadband projects very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall, except as provided in subdivision (b), be deemed approved, and all necessary permits shall be deemed issued and the applicant may begin construction, if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application. Construction shall not occur pursuant to an application that is deemed approved pursuant to this section until 30 days have elapsed since the provision of notice pursuant to subparagraph (A).
(b)Where a city or county requires a traffic control plan plan, or other submission or permit related to either safety or obstruction in the public right-of-way, the applicant shall not begin construction before complying with this requirement. The city or county shall not unreasonably withhold, condition, or delay approval of any submission required by this subdivision.
(c)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(d)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(e)As used in this section, Applicable FCC rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(f)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(g)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular technology.
(h)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(i)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant makes the first required submission, or if the city or county requires a preapplication meeting, communication, or similar step before submission, when the applicant takes that first required step.
(j)Nothing in this section shall supersede, nullify, or otherwise alter the requirements to comply with safety standards, including, but not limited to, both of the following:
(1)Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1.
(2)Public Utilities Commissions General Order No. 128, Rules for Construction of Underground Electric Supply and Communication Systems, or successor rules adopted by the commission.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Each local jurisdiction in California has its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before a project can provide high-speed internet service to local communities.
(e)Some local jurisdictions approve permits for broadband projects very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall shall, except as provided in subdivision (b), be deemed approved, and all necessary permits shall be deemed issued, issued and the applicant may begin construction construction, if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application.
(b)Where a city or county requires a traffic control plan or other submission or permit related to safety is required by construction or obstruction in the public right-of-way, the applicant shall comply with the requirement, and the city or county may condition approval of the application on compliance not begin construction before complying with this requirement. The city or county shall issue approval for any submission required by this subdivision without delay. not unreasonably withhold, condition, or delay approval of any submission required by this subdivision.
(c)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(d)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(e)As used in this section, Applicable FCC rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(f)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(g)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular technology.
(h)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(i)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant takes the first procedural step that the city or county requires as part of its applicable regulatory review process. makes the first required submission, or if the city or county requires a preapplication meeting, communication, or similar step before submission, when the applicant takes that first required step.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Each local jurisdiction in California has its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before a project can provide high-speed internet service to local communities.
(e)Some local jurisdictions approve permits for broadband projects very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st Century century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall be deemed approved, all necessary permits shall be deemed issued, and the applicant may begin construction if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application.
(4)(b)Where a traffic control plan or other permit submission related to safety is required by the construction, construction in the public right-of-way, the applicant shall obtain the permit, which the comply with the requirement, and the city or county may condition approval of the application on compliance with this requirement. The city or county shall issue approval for any submission required by this subdivision without delay.
(b)(c)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(c)(d)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(d)(e)As used in this section, Applicable FCC rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(e)(f)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(f)(g)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular technology.
(g)(h)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(h)(i)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant takes the first procedural step that the city or county requires as part of its applicable regulatory review process.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on broadband infrastructure high-speed internet access for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate broadband deployment. the deployment of broadband infrastructure.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Every Each local jurisdiction in California has their its own permitting process and timeline. Examples of local jurisdictions include cities, counties, cities and counties, state agencies, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The permitting of broadband projects by local jurisdictions determines how long it will take The length of time it takes for local jurisdictions to process permits for broadband projects directly impacts the length of time it takes before each a project has the ability to can provide high-speed internet service to local communities.
(e)Some local jurisdictions take 60 to 90 days to approve permits for broadband projects but other very quickly. Other jurisdictions take months or years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Even though the federal government mandates that certain broadband project permits be approved within certain timeframes, many local jurisdictions use methods to work around those requirements to delay and deny high-speed internet projects that could be benefiting local residents.(h)Expediting the removal of permitting barriers at the local level is the fastest and most cost-effective way to accelerate the deployment of high-speed internet access for Californians.(g)Given the heightened importance of robust connectivity for access to opportunity in the 21st Century global information economy, as well as for California families in a world of increasing work-from-home and learn-from-home expectations, it is in the public interest to encourage the rapid deployment of broadband projects.
SEC. 2.It is the intent of the Legislature to enact legislation that would accelerate the completion of broadband projects, so that high-speed internet projects can be quickly constructed to benefit local communities.SEC. 2.Section 65964.1 of the Government Code is amended to read:65964.1.(a)A collocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall be deemed approved approved, all necessary permits shall be deemed issued, and the applicant may begin construction if all of the following occur:
(1)The city or county fails to approve or disapprove the application within a reasonable period of time in accordance with the time periods and procedures established by applicable FCC decisions. rules. The reasonable period of time may be tolled to accommodate timely requests for information required to complete the application or may be extended by mutual agreement between the applicant and the local government, consistent with applicable FCC decisions. rules.
(2)The applicant has provided all public notices regarding the application that the applicant is required to provide under applicable laws consistent with the public notice requirements for the application.
(3)(A)The applicant has provided notice to the city or county that the reasonable time period has lapsed and that the application is deemed approved pursuant to this section.
(B)Within 30 days of the notice provided pursuant to subparagraph (A), the city or county may seek judicial review of the operation of this section on the application.
(4)Where a traffic control plan or other permit related to safety is required by the construction, the applicant shall obtain the permit, which the city or county shall issue without delay.
(b)This section does not apply to eligible facilities requests.(b)The city, county, or city and county, shall notify the applicant of the incompleteness of an application within the time periods established by applicable FCC rules.
(c)The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
(d)As used in this section, the following terms have the following meanings: (1) section, Applicable FCC decisions means In re Petition for Declaratory Ruling, 24 FCC Rcd. 13994 (2009) and In the Matter of Acceleration of Broadband Deployment by Improving Wireless Facilities Siting Policies, Report and Order, 29 FCC Rcd. 12865 (2014). rules means those regulations contained in Subpart U (commencing with Section 1.6001) of Part 1 of Subchapter A of Chapter I of Title 47 of the Code of Federal Regulations.
(2)Eligible facilities request has the same meaning as in Section 1455 of Title 47 of the United States Code.(e)Except as provided in subdivision (a), nothing in this section limits or affects the authority of a city or county over decisions regarding the placement, construction, and modification of a wireless telecommunications facility.
(f)A city or county shall not prohibit or unreasonably discriminate in favor of, or against, any particular technology.
(f)(g)Due to the unique duties and infrastructure requirements for the swift and effective deployment of firefighters, this section does not apply to a collocation or siting application for a wireless telecommunications facility where the project is proposed for placement on fire department facilities.
(h)For purposes of this section, the time period for a city or county to approve or disapprove a collocation or siting application shall commence when the applicant takes the first procedural step that the city or county requires as part of its applicable regulatory review process.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The Legislature finds and declares all of the following:
(a)The publics increased reliance on broadband infrastructure for remote work and school, telehealth, emergency response, and commerce due to the COVID-19 pandemic demonstrates the need for legislation to accelerate broadband deployment.
(b)Nearly 42 percent of California families said that unreliable internet access was a challenge for them during distance learning according to a recent poll by EdSource and FM3 Research.
(c)Every local jurisdiction in California has their own permitting process and timeline. Examples of local jurisdictions include cities, counties, state agencies, and any other entity that may be required to issue a permit for a broadband project, including water districts, special districts, and municipal utilities.
(d)The permitting of broadband projects by local jurisdictions determines how long it will take before each project has the ability to provide high-speed internet service to local communities.
(e)Some local jurisdictions take 60 to 90 days to approve permits for broadband projects but other jurisdictions take years to approve the same type of project.
(f)There are currently over 1,000 broadband permits pending with local jurisdictions in California that would improve internet connectivity for several million residents.
(g)Even though the federal government mandates that certain broadband project permits be approved within certain timeframes, many local jurisdictions use methods to work around those requirements to delay and deny high-speed internet projects that could be benefiting local residents.
(h)Expediting the removal of permitting barriers at the local level is the fastest and most cost-effective way to accelerate the deployment of high-speed internet access for Californians.
SEC. 2.It is the intent of the Legislature to enact legislation that would accelerate the completion of broadband projects, so that high-speed internet projects can be quickly constructed to benefit local communities.
|
Date
|
Status
|
|---|---|
| Oct 4, 2021 | Chaptered by Secretary of State - Chapter 467, Statutes of 2021. |
| Oct 4, 2021 | Approved by the Governor. |
| Sep 10, 2021 | Enrolled and presented to the Governor at 4 p.m. |
| Sep 2, 2021 | Assembly Rule 77 suspended. (Ayes 57. Noes 14. Page 2703.) |
| Sep 1, 2021 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after September 3 pursuant to Assembly Rule 77. |
| Sep 1, 2021 | Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0. Page 2286.). |
| Aug 30, 2021 | Read second time. Ordered to third reading. |
| Aug 26, 2021 | From committee: Amend, and do pass as amended. (Ayes 6. Noes 0.) (August 26). |
| Aug 16, 2021 | In committee: Referred to suspense file. |
| Jul 13, 2021 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 12, 2021 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 5. Noes 0.) (July 8). |
| Jul 1, 2021 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on GOV. & F. |
| Jun 22, 2021 | From committee: Do pass and re-refer to Com. on GOV. & F. (Ayes 10. Noes 0.) (June 21). Re-referred to Com. on GOV. & F. |
| Jun 9, 2021 | Referred to Coms. on E., U. & C. and GOV. & F. |
| Jun 2, 2021 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 1, 2021 | Read third time. Passed. Ordered to the Senate. (Ayes 74. Noes 1. Page 1713.) |
| May 27, 2021 | Read third time and amended. Ordered to third reading. (Page 1577.) |
| May 20, 2021 | Read second time. Ordered to third reading. |
| May 19, 2021 | From committee: Do pass. (Ayes 14. Noes 0.) (May 19). |
| Apr 29, 2021 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 13. Noes 0.) (April 28). Re-referred to Com. on APPR. |
| Apr 15, 2021 | From committee: Do pass and re-refer to Com. on C. & C. (Ayes 8. Noes 0.) (April 14). Re-referred to Com. on C. & C. |
| Apr 5, 2021 | Re-referred to Com. on L. GOV. |
| Mar 30, 2021 | From committee chair, with author's amendments: Amend, and re-refer to Com. on L. GOV. Read second time and amended. |
| Mar 15, 2021 | Re-referred to Com. on L. GOV. |
| Mar 11, 2021 | Referred to Coms. on L. GOV. and C. & C. |
| Feb 11, 2021 | From printer. May be heard in committee March 13. |
| Feb 10, 2021 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 2, 2021 | AB 537 Quirk Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 1, 2021 | Assembly 3rd Reading AB537 Quirk By Hertzberg | Senate Floor |
Passed |
|
| Jun 1, 2021 | AB 537 Quirk Assembly Third Reading | Assembly Floor |
Passed |