AB 781: Flood control projects: County of Orange: subvention funds.
- Session Year: 2021-2022
- House: Assembly
- Latest Version Date: 2021-09-24
Existing law provides for state cooperation with the federal government in the construction of specified flood control projects, and prescribes requirements to be met prior to state authorization of flood management projects that receive state financial assistance.
This bill would authorize the state to provide subvention funds, as prescribed, to the County of Orange for a specified flood control project at an estimated cost to the state of the sum that may be appropriated for state cooperation by the Legislature and upon a determination by the Department of Water Resources that the project meets specified requirements. The bill would provide that the state assumes no liability for damages that may result from the project by authorizing the provision of subvention funds, or by the appropriation of those subvention funds. The bill would require, as a condition of receiving those subvention funds, the County of Orange to enter into an agreement to indemnify and hold and save harmless the state for any and all liability for damages that may result from the project.
Existing law provides for state cooperation with the federal government in the construction of specified flood control projects, and prescribes requirements to be met prior to state authorization of flood management projects that receive state financial assistance.
This bill would authorize the state to provide subvention funds, as prescribed, to the County of Orange for a specified flood control project at an estimated cost to the state of the sum that may be appropriated for state cooperation by the Legislature and upon a determination by the Department of Water Resources that the project meets specified requirements. The bill would provide that the state assumes no liability for damages that may result from the project by authorizing the provision of subvention funds, or by the appropriation of those subvention funds. The bill would require, as a condition of receiving those subvention funds, the County of Orange to enter into an agreement to indemnify and hold and save harmless the state for any and all liability for damages that may result from the project.
Existing law provides for state cooperation with the federal government in the construction of specified flood control projects, and prescribes requirements to be met prior to state authorization of flood management projects that receive state financial assistance.
This bill would authorize the state to provide subvention funds, as prescribed, to the County of Orange for a specified flood control project at an estimated cost to the state of the sum that may be appropriated for state cooperation by the Legislature and upon a determination by the Department of Water Resources that the project meets specified requirements. The bill would provide that the state assumes no liability for damages that may result from the project by authorizing the provision of subvention funds, or by the appropriation of those subvention funds. The bill would require, as a condition of receiving those subvention funds, the County of Orange to enter into an agreement to indemnify and hold and save harmless the state for any and all liability for damages that may result from the project.
Existing law authorizes specified works of improvement for the control, conservation, and utilization of destructive flood waters and the reclamation and protection of lands that are susceptible to overflow by flood waters. Existing law prohibits, if there are any major project changes, as provided, money from being reallocated by the state in aid of that portion of the project until a revised plan has been reviewed and approved by the Department of Water Resources.This bill would make nonsubstantive changes to these provisions.Existing law authorizes specified works of improvement for the control, conservation, and utilization of destructive flood waters and the reclamation and protection of lands that are susceptible to overflow by flood waters. Existing law prohibits, if there are any major project changes, as provided, money from being reallocated by the state in aid of that portion of the project until a revised plan has been reviewed and approved by the Department of Water Resources.
This bill would make nonsubstantive changes to these provisions.
(a)The state may provide subvention funds in accordance with Section 12585.7 to the County of Orange for the Westminster, East Garden Grove, California Flood Risk Management project, which is authorized by Section 401 of the federal Water Resources Development Act of 2020 (Division AA of Public Law 116-260), and that is substantially in accordance with the recommendations of the Chief of Engineers of the United States Army Corps of Engineers Report, dated July 9, 2020, as follows:
(1)At an estimated cost to the state of the sum that may be appropriated for state cooperation by the Legislature upon the recommendations and advice of the department.
(2)Upon a specific written determination by the department that the project meets the requirements of Section 12582.7.
(b)The state assumes no liability for damages that may result from the project by either of the following:
(1)Authorizing the provision of subvention funds in accordance with this section.
(2)The appropriation by the Legislature of the subvention funds upon the recommendations and advice of the department.
(c)The County of Orange may receive subvention funds under this section only if it enters into an agreement with the department pursuant to which the county agrees to indemnify and hold and save harmless the state and its officers, agents, and employees for any and all liability for damages that may result from the project.
(d)For purposes of this section, liability for damages includes, but is not limited to, liability for damages relating to the construction or operation of the project or the failure of the project to operate as intended.
(a)The state may provide subvention funds in accordance with Section 12585.7 to the County of Orange for the Westminster, East Garden Grove, California Flood Risk Management project, which is authorized by Section 401 of the federal Water Resources Development Act of 2020 (Division AA of Public Law 116-260), and that is substantially in accordance with the recommendations of the Chief of Engineers of the United States Army Corps of Engineers Report, dated July 9, 2020, as follows:
(1)At an estimated cost to the state of the sum that may be appropriated for state cooperation by the Legislature upon the recommendations and advice of the department.
(2)Upon a specific written determination by the department that the project meets the requirements of Section 12582.7.
(b)The state assumes no liability for damages that may result from the project by either of the following:
(1)Authorizing the provision of subvention funds in accordance with this section.
(2)The appropriation by the Legislature of the subvention funds upon the recommendations and advice of the department.
(c)The County of Orange may receive subvention funds under this section only if it enters into an agreement with the department pursuant to which the county agrees to indemnify and hold and save harmless the state and its officers, agents, and employees for any and all liability for damages that may result from the project.
(d)For purposes of this section, liability for damages includes, but is not limited to, liability for damages relating to the construction or operation of the project or the failure of the project to operate as intended.
(a)The state may provide subvention funds in accordance with Section 12585.7 to the County of Orange for the Westminster, East Garden Grove, California Flood Risk Management project, which is authorized by Section 401 of the federal Water Resources Development Act of 2020 (Division AA of Public Law 116-260), and that is substantially in accordance with the recommendations of the Chief of Engineers of the United States Army Corps of Engineers Report, dated July 9, 2020, as follows:
(1)At an estimated cost to the state of the sum that may be appropriated for state cooperation by the Legislature upon the recommendations and advice of the department.
(2)Upon a specific written determination by the department that the project meets the requirements of Section 12582.7.
(b)The state assumes no liability for damages that may result from the project by either of the following:
(1)Authorizing the provision of subvention funds in accordance with this section.
(2)The appropriation by the Legislature of the subvention funds upon the recommendations and advice of the department.
(c)The County of Orange may receive subvention funds under this section only if it enters into an agreement with the department pursuant to which the county agrees to indemnify and hold and save harmless the state and its officers, agents, and employees for any and all liability for damages that may result from the project.
(d)For purposes of this section, liability for damages includes, but is not limited to, liability for damages relating to the construction or operation of the project or the failure of the project to operate as intended.
SECTION 1.Section 12639 of the Water Code is amended to read:12639.(a)The works of improvement for the control, conservation, and utilization of destructive flood waters and the reclamation and protection of lands that are susceptible to overflow by flood waters, which are described in this chapter, are adopted and authorized in the interest of the public welfare of the people of this state to be prosecuted substantially in accordance with the plans in the respective reports designated in this chapter.(b)If there are any major project changes in the plan of improvement originally approved by Congress and adopted and authorized by the state, which changes result in a substantial increase in the estimated cost of lands, easements, and rights-of-way for the project, money shall not be reallocated by the state in aid of that portion of the project until the revised plan has been reviewed and approved by the department. That approval shall be given if the department finds in its judgment that the benefits of the proposed works of improvement for the revised project will exceed the cost thereof and that the revised project appears to be the most economical project plan, considering construction costs, lands, easements and rights-of-way costs, and costs of operation and maintenance.(a)The works of improvement for the control, conservation conservation, and utilization of destructive flood waters and the reclamation and protection of lands that are susceptible to overflow by flood waters, which are described in this chapter, are adopted and authorized in the interest of the public welfare of the people of this State state to be prosecuted substantially in accordance with the plans in the respective reports designated in this chapter.
If, however,(b)If there are any major project changes in the plan of improvement originally approved by the Congress and adopted and authorized by the State, state, which changes result in a substantial increase in the estimated cost of lands, easements easements, and rights-of-way for the project, no money shall not be reallocated by the State state in aid of that portion of the project until the revised plan has been reviewed and approved by the department. Such That approval shall be given if the department finds in its judgment that the benefits of the proposed works of improvement for the revised project will exceed the cost thereof and that the revised project appears to be the most economical project plan, considering construction costs, lands, easements and rights-of-way costs, and costs of operation and maintenance.
|
Date
|
Status
|
|---|---|
| Sep 24, 2021 | Chaptered by Secretary of State - Chapter 302, Statutes of 2021. |
| Sep 24, 2021 | Approved by the Governor. |
| Sep 10, 2021 | Enrolled and presented to the Governor at 4 p.m. |
| Sep 3, 2021 | In Assembly. Ordered to Engrossing and Enrolling. |
| Sep 3, 2021 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0. Page 2391.). |
| Aug 31, 2021 | Ordered to special consent calendar. |
| Aug 26, 2021 | From committee: Do pass. (Ayes 7. Noes 0.) (August 26). |
| Aug 16, 2021 | In committee: Referred to suspense file. |
| Jul 7, 2021 | From committee: Do pass and re-refer to Com. on APPR with recommendation: To Consent Calendar. (Ayes 11. Noes 0.) (July 6). Re-referred to Com. on APPR. |
| Jun 29, 2021 | From committee: Do pass and re-refer to Com. on JUD. with recommendation: To Consent Calendar. (Ayes 9. Noes 0. Page 1720.) (June 29). Re-referred to Com. on JUD. |
| Jun 9, 2021 | Referred to Coms. on N.R. & W. and JUD. |
| May 28, 2021 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 27, 2021 | Read third time. Passed. Ordered to the Senate. (Ayes 78. Noes 0. Page 1608.) |
| May 24, 2021 | Read second time. Ordered to third reading. |
| May 20, 2021 | From committee: Do pass. (Ayes 16. Noes 0.) (May 20). |
| May 12, 2021 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 3, 2021 | In committee: Hearing postponed by committee. |
| Apr 27, 2021 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 15. Noes 0.) (April 26). Re-referred to Com. on APPR. |
| Mar 8, 2021 | Re-referred to Com. on W.,P., & W. |
| Mar 4, 2021 | Referred to Com. on W.,P., & W. |
| Feb 17, 2021 | From printer. May be heard in committee March 19. |
| Feb 16, 2021 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 3, 2021 | Special Consent AB781 | Senate Floor |
Passed |
|
| May 27, 2021 | AB 781 Daly Assembly Third Reading | Assembly Floor |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Bill Author
Bill Co-Author(s):