Existing law provides a person who applies for, or requests, specified hazardous waste permits, variances, or waste classification determinations with the option of paying a specified flat fee amount or entering into a reimbursement agreement to reimburse the Department of Toxic Substances Control for costs incurred in processing the application or response to the request. Those fee amounts are deposited in the Hazardous Waste Control Account and are available to the department upon appropriation by the Legislature.
This bill would eliminate the increase those specified flat fee option and would make conforming changes. amounts.
Existing law provides a person who applies for, or requests, specified hazardous waste permits, variances, or waste classification determinations with the option of paying a flat fee or entering into a reimbursement agreement to reimburse the Department of Toxic Substances Control for costs incurred in processing the application or response to the request.
This bill would eliminate the flat fee option and would make conforming changes.
Existing law requires every residential care facility for the elderly to have one or more carbon monoxide detectors in the facility, as provided.
This bill would make a nonsubstantive change to this provision.
Existing law requires every residential care facility for the elderly to have one or more carbon monoxide detectors in the facility, as provided.
This bill would make a nonsubstantive change to this provision.
(a) (1) Except as otherwise provided in this section, any person who applies for, or requests, one any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:
(A) A new hazardous waste facilities permit, including a standardized permit.
(B) A hazardous waste facilities permit for postclosure.
(C) A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit.
(D) A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.
(E) A variance.
(F) A waste classification determination.
(2) Any agreement required pursuant to paragraph (1) may provide for some, or all, of the reimbursement to be made in advance of the processing of the application or the response to the request.
(3) Any agreement entered into pursuant to this subdivision may include costs of reviewing and overseeing corrective action as set forth in subdivision (b).
(4) This subdivision does not apply to any application or request submitted to the department prior to July 1, 1998. Any person who submitted such an application or request shall pay the applicable fee, if not already paid, for the application or request as required by this chapter as it read prior to January 1, 1998, unless the department and the applicant or requester mutually agree to enter into a reimbursement agreement in lieu of any unpaid portion of the required fee.
(b) The department shall recover all the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.
(c) Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.
(d) (1) In lieu of entering into a reimbursement agreement with the department pursuant to subdivision (a), any person who applies for a new permit, a permit for postclosure, a renewal of an existing permit, or a class 2 or class 3 permit modification may instead elect to pay a fee as follows:
(A) A person submitting a hazardous waste facilities permit application for a land disposal facility shall pay one hundred four thousand one hundred eighty-seven dollars ($104,187) fifty-three thousand nine hundred fifteen dollars ($153,915) for a small facility, two hundred twenty-two thousand one hundred eighty-three dollars ($222,183) three hundred twenty-eight thousand two hundred thirty-one dollars ($328,231) for a medium facility, and three hundred eighty-one thousand six hundred two dollars ($381,602) five hundred sixty-three thousand seven hundred forty-one dollars ($563,741) for a large facility.
(B) A person submitting a hazardous waste facilities permit application for any incinerator shall pay sixty-two thousand seven hundred sixty-two dollars ($62,762) ninety-two thousand seven hundred eighteen dollars ($92,718) for a small facility, one hundred thirty-three thousand sixty dollars ($133,060) ninety-six thousand five hundred seventy dollars ($196,570) for a medium facility, and two hundred twenty-eight thousand four hundred fifty-eight dollars ($228,458) three hundred thirty-seven thousand five hundred one dollars ($337,501) for a large facility.
(C) Except as provided in subparagraph (D), a person submitting a hazardous waste facility permit application for a storage facility, a treatment facility, or a storage and treatment facility shall pay twenty-one thousand three hundred forty dollars ($21,340) thirty-one thousand five hundred twenty-six dollars ($31,526) for a small facility, thirty-eight thousand nine hundred thirteen dollars ($38,913) fifty-seven thousand four hundred eighty-six dollars ($57,486) for a medium facility, and seventy-five thousand three hundred seventeen dollars ($75,317) one hundred eleven thousand two hundred sixty-six dollars ($111,266) for a large facility.
(D) A person submitting an application for a standardized permit for a storage facility, a treatment facility, or a storage and treatment facility, as specified in Section 25201.6, shall pay thirty-two thousand fifty-two dollars ($32,052) forty-seven thousand three hundred fifty dollars ($47,350) for a Series A standardized permit, twenty thousand eleven dollars ($20,011) twenty-nine thousand five hundred sixty-two dollars ($29,562) for a Series B standardized permit, and five thousand three hundred thirty-two dollars ($5,332) seven thousand eight hundred seventy-seven dollars ($7,877) for a Series C standardized permit. The board shall assess the fees specified in this subparagraph, in accordance with paragraph (2), based upon the classifications specified in subdivision (a) of Section 25201.6.
(E) (i) A person submitting a hazardous waste facilities permit application for a transportable treatment unit shall pay sixteen thousand three hundred twenty dollars ($16,320) twenty-four thousand one hundred ten dollars ($24,110) for a small unit, thirty-seven thousand six hundred fifty-seven dollars ($37,657) fifty-five thousand six hundred thirty-one dollars ($55,631) for a medium unit, and seventy-five thousand three hundred seventeen dollars ($75,317) one hundred eleven thousand two hundred sixty-six dollars ($111,266) for a large unit.
(ii) Notwithstanding clause (i), the fee for any application for a new permit, permit modification, or permit renewal for a transportable treatment unit, that was pending before the department as of January 1, 1996, shall be determined according to the type of permit authorizing operation of that unit, as provided by subdivision (d) of Section 25200.2 or the regulations adopted pursuant to subdivision (a) of Section 25200.2. Any standardized permit issued to the operator of a transportable treatment unit after January 1, 1996, that succeeds a full hazardous waste facilities permit issued by the department prior to January 1, 1996, in accordance with subdivision (d) of Section 25200.2 or the regulations adopted pursuant to subdivision (a) of Section 25200.2, shall not be considered to be a new hazardous waste facilities permit.
(F) A person submitting a hazardous waste facilities permit application for a postclosure permit shall pay a fee of ten thousand forty dollars ($10,040) fourteen thousand eight hundred thirty-two dollars ($14,832) for a small facility, twenty-two thousand five hundred ninety-six dollars ($22,596) thirty-three thousand three hundred eighty-one dollars ($33,381) for a medium facility, and thirty-seven thousand six hundred fifty-seven dollars ($37,657) fifty-five thousand six hundred thirty-one dollars ($55,631) for a large facility.
(G) A person submitting an application for one or more class 2 permit modifications, including a class 2 modification to a standardized permit, shall pay a fee equal to 20 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 40 percent for each application, except that each person who applies for one or more class 2 permit modifications for a land disposal facility or an incinerator shall pay a fee equal to 15 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 30 percent for each application.
(H) A person submitting an application for one or more class 3 permit modifications, including a class 3 modification to a standardized permit, shall pay a fee equal to 40 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 80 percent for each application, except that a person who applies for one or more class 3 permit modifications for a land disposal facility or an incinerator shall pay a fee equal to 30 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 60 percent for each application.
(I) A person who submits an application for renewal of any existing permit shall pay an amount equal to the fee that would have been assessed had the person requested the same changes in a modification application, but not less than one-half the fee required for a new permit.
(J) A person who submits a single application for a facility that falls within more than one fee category shall pay only the higher fee.
(2) The fees required by paragraph (1) shall be assessed by the board upon application to the department. For a facility operating pursuant to a grant of interim status, the submittal of the application shall be the submittal of the Part B application in accordance with regulations adopted by the department. The fee shall be nonrefundable, even if the application is withdrawn or denied. The department shall provide the board with any information that is necessary to assess fees pursuant to this section. The fee shall be collected in accordance with Part 22 (commencing with Section 43001) of Division 2 of the Revenue and Taxation Code, and deposited into the Hazardous Waste Control Account.
(3) The amounts stated in this subdivision are the base rates for the 1997 2016 calendar year. Thereafter, the fees shall be adjusted annually by the board to reflect increases or decreases in the cost of living, during the prior fiscal year, as measured by the Consumer Price Index issued by the Department of Industrial Relations, or a successor agency.
(4) Except as provided in paragraph (5), for purposes of this section, and notwithstanding Section 25205.1, any facility or unit is small if it manages 0.5 tons (1,000 pounds) or less of hazardous waste during any one month of the states current fiscal year, medium if it manages more than 0.5 tons (1,000 pounds), but less than 1,000 tons, of hazardous waste during any one month of the states current fiscal year, and large if it manages 1,000 or more tons of hazardous waste during any one month of the states current fiscal year.
(5) For purposes of subparagraph (F) of paragraph (1) of this subdivision and paragraph (8) of subdivision (c) of Section 25205.4, any facility or unit is small if 0.5 tons (1,000 pounds) or less of hazardous waste remain after closure, medium if more than 0.5 tons (1,000 pounds), but less than 1,000 tons of hazardous waste remain after closure, and large if 1,000 or more tons of hazardous waste remain after closure.
(6) The amounts stated in this subdivision are in addition to any amounts required to reimburse the department for the corrective action review and oversight costs required to be recovered pursuant to subdivision (b).
(e) Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.
(f) Subdivisions (a) and (d) do not apply to a permit modification resulting from a revision of a facilitys or operators closure plan if the facility is exempted from fees pursuant to subdivision (e) of Section 25205.3, or if the operator is subject to paragraph (2) or (3) of subdivision (d) of Section 25205.2.
(g) (1) Except as provided in paragraphs (3) and (4), subdivisions (a) and (d) do not apply to any permit or variance to operate a research, development, and demonstration facility, if the duration of the permit or variance is not longer than one year, unless the permit or variance is renewed pursuant to the regulations adopted by the department.
(2) For purposes of this section, a research, development, and demonstration facility is a facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process for which regulations prescribing permit standards have not been adopted.
(3) The exemption provided by this subdivision does not apply to a facility which operates as a medium or large multiuser offsite commercial hazardous waste facility and which does not otherwise possess a hazardous waste facilities permit pursuant to Section 25200.
(4) The fee exemption authorized pursuant to paragraph (1) shall be effective for a total duration of not more than two years.
(h) Subdivisions (a) and (d) do not apply to any of the following:
(1) Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).
(2) A permanent household hazardous waste collection facility.
(3) Any variance issued to a public agency to conduct a collection program for agricultural wastes.
(i) Notwithstanding subdivisions (a) and (b), the department shall not assess any fees or seek any reimbursement for the departments costs in reviewing and overseeing any preliminary site assessment in conjunction with a hazardous waste facilities permit application.
(j) The changes made in this section by Chapter 870 of the Statutes of 1997 do not require amendment of, or otherwise affect, any agreement entered into prior to July 1, 1998, pursuant to which any person has agreed to reimburse the department for the costs incurred by the department in processing applications, responding to requests, or otherwise providing other services pursuant to this chapter.
SECTION 1.Section 25150.84 of the Health and Safety Code is amended to read:25150.84.(a)The department is authorized to collect an annual fee from all metal shredding facilities that are subject to the requirements of this chapter or to the alternative management standards adopted pursuant to Section 25150.82. The department shall establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse the departments costs to implement this chapter as applicable to metal shredder facilities. The fee schedule established by the department may be updated periodically as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department to implement this chapter, as applicable to metal shredder facilities.
(b)The Controller shall establish a separate subaccount in the Hazardous Waste Control Account. The fees collected pursuant to this section shall be deposited into the subaccount and be available for expenditure by the department upon appropriation by the Legislature.
(c)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and for the purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department, whichever occurs sooner.
(d)(1)A metal shredding facility paying an annual fee in accordance with this section shall be exempt from the following fees as the fees pertain to metal shredding activities and the generation, handling, management, transportation, and disposal of metal shredder waste:
(A)A fee imposed pursuant to subdivision (a) of Section 25205.7.
(B)A disposal fee imposed pursuant to Section 25174.1.
(C)A facility fee imposed pursuant to Section 25205.2.
(D)A generator fee imposed pursuant to Section 25205.5.
(E)A transportable treatment unit fee imposed pursuant to Section 25205.14.
(2)A metal shredding facility is not exempt from the fees listed in paragraph (1) for any other hazardous waste the metal shredding facility generates and handles.
SEC. 2.Section 25189.3 of the Health and Safety Code is amended to read:25189.3.(a) For purposes of this section, the term permit means a hazardous waste facilities permit, interim status authorization, or standardized permit.
(b) The department shall suspend the permit of any facility for nonpayment of any facility fee assessed pursuant to Section 25205.2 or activity fee assessed pursuant to Section 25205.7, if the operator of the facility is subject to the fee, and if the State Board of Equalization has certified in writing to all of the following:
(1) The facilitys operator is delinquent in the payment of the fee for one or more reporting periods.
(2) The State Board of Equalization has notified the facilitys operator of the delinquency.
(3) The operator has exhausted the administrative rights of appeal provided by Chapter 3 (commencing with Section 43151) of Part 22 of Division 2 of the Revenue and Taxation Code, and the State Board of Equalization has determined that the operator is liable for the fee, or that the operator has failed to assert those rights.
(c) (1) The department shall suspend the permit of any facility for nonpayment of a penalty assessed upon the owner or operator for failure to comply with this chapter or the regulations adopted pursuant to this chapter, if the penalty has been imposed by a trial court judge or by an administrative hearing officer, if the person has agreed to pay the penalty pursuant to a written agreement resolving a lawsuit or an administrative order, or if the penalty has become final due to the persons failure to respond to the lawsuit or order.
(2) The department may suspend a permit pursuant to this subdivision only if the owner or operator is delinquent in the payment of the penalty and the department has notified the owner or operator of the delinquency pursuant to subdivision (d).
(d) Before suspending a permit pursuant to this section, the department shall notify the owner or operator of its intent to do so, and shall allow the owner or operator a minimum of 30 days in which to cure the delinquency.
(e) The department may deny a new permit or refuse to renew a permit on the same grounds for which the department is required to suspend a permit under this section, subject to the same requirements and conditions.
(f) (1) The department shall reinstate a permit that is suspended pursuant to this section upon payment of the amount due if the permit has not otherwise been revoked or suspended pursuant to any other provision of this chapter or regulation. Until the department reinstates a permit suspended pursuant to this section, if the facility stores, treats, disposes of, or recycles hazardous wastes, the facility shall be in violation of this chapter. If the operator of the facility subsequently pays the amount due, the period of time for which the operator shall have been in violation of this chapter shall be from the date of the activity that is in violation until the day after the owner or operator submits the payment to the department.
(2) Except as otherwise provided in this section, the department is not required to take any other statutory or regulatory procedures governing the suspension of the permit before suspending a permit in compliance with the procedures of this section.
(g) (1) A suspension under this section shall be stayed while an authorized appeal of the fee or penalty is pending before a court or an administrative agency.
(2) For purposes of this subdivision, an authorized appeal means any appeal allowed pursuant to an applicable regulation or statute.
(h) The department may suspend a permit under this section based on a failure to pay the required fee or penalty that commenced prior to January 1, 2002, if the failure to pay has been ongoing for at least 30 days following that date.
(i) Notwithstanding Section 43651 of the Revenue and Taxation Code, the suspension of a permit pursuant to this section, the reason for the suspension, and any documentation supporting the suspension, shall be a matter of public record.
(j) (1) This section does not authorize the department to suspend a permit held by a government agency if the agency does not dispute the payment but nonetheless is unable to process the payment in a timely manner.
(2) This section does not apply to a site owned or operated by a federal agency if the department has entered into an agreement with that federal agency regarding the remediation of that site.
(k) This section does not limit or supersede Section 25186.
SEC. 3.Section 25205.7 of the Health and Safety Code is amended to read:25205.7.(a)(1) Except as otherwise provided in this section, any person who applies for, or requests, any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:
(A)A new hazardous waste facilities permit, including a standardized permit.
(B)A hazardous waste facilities permit for postclosure.
(C)A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit.
(D)A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.
(E)A variance.
(F)A waste classification determination.
(2)Any agreement required pursuant to paragraph (1) may provide for some, or all, of the reimbursement to be made in advance of the processing of the application or the response to the request.
(3)Any agreement entered into pursuant to this subdivision may include costs of reviewing and overseeing corrective action as set forth in subdivision (b).
(4)This subdivision does not apply to any application or request submitted to the department prior to July 1, 1998. Any person who submitted such an application or request shall pay the applicable fee, if not already paid, for the application or request as required by this chapter as it read prior to January 1, 1998, unless the department and the applicant or requester mutually agree to enter into a reimbursement agreement in lieu of any unpaid portion of the required fee.
(b)The department shall recover all the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.
(c)Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.
(d)Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.
(e)Subdivision (a) does not apply to a permit modification resulting from a revision of a facilitys or operators closure plan if the facility is exempted from fees pursuant to subdivision (e) of Section 25205.3, or if the operator is subject to paragraph (2) or (3) of subdivision (d) of Section 25205.2.
(f)(1) Except as provided in paragraphs (3) and (4), subdivision (a) does not apply to any permit or variance to operate a research, development, and demonstration facility, if the duration of the permit or variance is not longer than one year, unless the permit or variance is renewed pursuant to the regulations adopted by the department.
(2) For purposes of this section, a research, development, and demonstration facility is a facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process for which regulations prescribing permit standards have not been adopted.
(3) The exemption provided by this subdivision does not apply to a facility which operates as a medium or large multiuser offsite commercial hazardous waste facility and which does not otherwise possess a hazardous waste facilities permit pursuant to Section 25200.
(4) The fee exemption authorized pursuant to paragraph (1) shall be effective for a total duration of not more than two years.
(g)Subdivision (a) does not apply to any of the following:
(1)Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).
(2)A permanent household hazardous waste collection facility.
(3)Any variance issued to a public agency to conduct a collection program for agricultural wastes.
(h) Notwithstanding subdivisions (a) and (b), the department shall not assess any fees or seek any reimbursement for the departments costs in reviewing and overseeing any preliminary site assessment in conjunction with a hazardous waste facilities permit application.
(i)The changes made in this section by Chapter 870 of the Statutes of 1997 do not require amendment of, or otherwise affect, any agreement entered into prior to July 1, 1998, pursuant to which any person has agreed to reimburse the department for the costs incurred by the department in processing applications, responding to requests, or otherwise providing other services pursuant to this chapter.
SEC. 4.Section 25205.18 of the Health and Safety Code is amended to read:25205.18.(a) If a facility has a permit or an interim status document that sets forth the facilitys allowable capacity for treatment or storage, the facilitys size for purposes of the annual facility fee shall be based upon that capacity, except as provided in subdivision (d).
(b) If a facilitys allowable capacity changes or is initially established as a result of a permit modification, or a submission of a certification pursuant to subdivision (d), the fee that is due for the reporting period in which the change occurs shall be the higher fee.
(c) (1) The department may require the facility to submit an application to modify its permit to provide for an allowable capacity.
(2) Subdivision (a) of Section 25205.7 does not apply to an application for modification required by the department pursuant to this subdivision.
(d) A facility may reduce its allowable capacity below the amounts specified in subdivision (a) or (c) by submitting a certification signed by the owner or operator in which the owner or operator pledges that the facility will not handle hazardous waste at a capacity above the amount specified in the certification. In that case, the facilitys size for purposes of the annual facility fee shall be based upon the capacity specified in the certification, until the certification is withdrawn. Exceeding the capacity limits specified in a certification that has not been withdrawn shall be a violation of the hazardous waste control law and may subject a facility or its operator to a penalty and corrective action as provided in this chapter.
(e) This section shall have no bearing on the imposition of the annual postclosure facility fee.
SEC. 5.Section 25205.19 of the Health and Safety Code is amended to read:25205.19.(a) If a facility has a permit or an interim status document that sets forth the facilitys type, pursuant to Section 25205.1, as either treatment, storage, or disposal, the facilitys type for purposes of the annual facility fee shall be rebuttably presumed to be what is set forth in that permit or document.
(b) If the facilitys type changes as a result of a permit or interim status modification, any change in the annual facility fee shall be effective the reporting period following the one in which the modification becomes effective.
(c) (1) If the facilitys permit or interim status document does not set forth its type, the department may require the facility to submit an application to modify the permit or interim status document to provide for a facility type.
(2) Subdivision (a) of Section 25205.7 does not apply to an application for modification pursuant to this subdivision.
(d) A permit or interim status document may set forth more than one facility type or size. In accordance with subdivision (d) of Section 25205.4, the facility shall be subject only to the highest applicable fee.
SEC. 6.Section 25247 of the Health and Safety Code is amended to read:25247.(a)The department shall review each plan submitted pursuant to Section 25246 and shall approve the plan if it finds that the plan complies with the regulations adopted by the department and complies with all other applicable state and federal regulations.
(b)The department shall not approve the plan until at least one of the following occurs:
(1)The plan has been approved pursuant to Section 13227 of the Water Code.
(2)Sixty days expire after the owner or operator of an interim status facility submits the plan to the department. If the department denies approval of a plan for an interim status facility, this 60-day period shall not begin until the owner or operator resubmits the plan to the department.
(3)The director finds that immediate approval of the plan is necessary to protect public health, safety, or the environment.
(c)Any action taken by the department pursuant to this section is subject to Section 25204.5.
(d)(1)To the extent consistent with the federal act, the department shall impose the requirements of a hazardous waste facility postclosure plan on the owner or operator of a facility through the issuance of an enforcement order, entering into an enforceable agreement, or issuing a postclosure permit.
(A)A hazardous waste facility postclosure plan imposed or modified pursuant to an enforcement order, a permit, or an enforceable agreement shall be approved in compliance with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(B)Before the department initially approves or significantly modifies a hazardous waste facility postclosure plan pursuant to this subdivision, the department shall provide a meaningful opportunity for public involvement, which, at a minimum, shall include public notice and an opportunity for public comment on the proposed action.
(C)For the purposes of subparagraph (B), a significant modification is a modification that the department determines would constitute a class 3 permit modification if the change were being proposed to a hazardous waste facilities permit. In determining whether the proposed modification would constitute a class 3 modification, the department shall consider the similarity of the modification to class 3 modifications codified in Appendix I of Chapter 20 (commencing with Section 66270.1) of Division 4.5 of Title 22 of the California Code of Regulations. In determining whether the proposed modification would constitute a class 3 modification, the department shall also consider whether there is significant public concern about the proposed modification, and whether the proposed change is so substantial or complex in nature that the modification requires the more extensive procedures of a class 3 permit modification.
(2)This subdivision does not limit or delay the authority of the department to order any action necessary at a facility to protect public health or safety.
(3)If the department imposes a hazardous waste facility postclosure plan in the form of an enforcement order or enforceable agreement, in lieu of issuing or renewing a postclosure permit, the owner or operator who submits the plan for approval shall, at the time the plan is submitted, enter into a cost reimbursement agreement pursuant to subdivision (a) of Section 25205.7 and upon commencement of the postclosure period shall pay the fee required by paragraph (9) of subdivision (c) of Section 25205.4. For purposes of this paragraph and paragraph (9) of subdivision (c) of Section 25205.4, the commencement of the postclosure period shall be the effective date of the postclosure permit, enforcement order, or enforceable agreement.
(4)In addition to any other remedy available under state law to enforce a postclosure plan imposed in the form of an enforcement order or enforcement agreement, the department may take any of the following actions:
(A)File an action to enjoin a threatened or continuing violation of a requirement of the enforcement order or agreement.
(B)Require compliance with requirements for corrective action or other emergency response measures that the department deems necessary to protect human health and the environment.
(C)Assess or file an action to recover civil penalties and fines for a violation of a requirement of an enforcement order or agreement.
(e)Subdivision (d) does not apply to a postclosure plan for which a final or draft permit has been issued by the department on or before December 31, 2003, unless the department and the facility mutually agree to replace the permit with an enforcement order or enforceable agreement pursuant to the provisions of subdivision (d).
(f)(1)Except as provided in paragraphs (2) and (3), the department may only impose postclosure plan requirements through an enforcement order or an enforceable agreement pursuant to subdivision (d) until January 1, 2009.
(2)This subdivision does not apply to an enforcement order or enforceable agreement issued prior to January 1, 2009, or an order or agreement for which a public notice is issued on or before January 1, 2009.
(3)This subdivision does not apply to the modification on or after January 1, 2009, of an enforcement order or enforceable agreement that meets the conditions in paragraph (2).
(g)If the department determines that a postclosure permit is necessary to enforce a postclosure plan, the department may, at any time, rescind and replace an enforcement order or an enforceable agreement issued pursuant to this section by issuing a postclosure permit for the hazardous waste facility, in accordance with the procedures specified in the departments regulations for the issuance of postclosure permits.
(h)Nothing in this section may be construed to limit or delay the authority of the department to order any action necessary at a facility to protect public health or safety, or the environment.
(a)The department is authorized to collect an annual fee from all metal shredding facilities that are subject to the requirements of this chapter or to the alternative management standards adopted pursuant to Section 25150.82. The department shall establish and adopt regulations necessary to administer this fee and to establish a fee schedule that is set at a rate sufficient to reimburse the departments costs to implement this chapter as applicable to metal shredder facilities. The fee schedule established by the department may be updated periodically as necessary and shall provide for the assessment of no more than the reasonable and necessary costs of the department to implement this chapter, as applicable to metal shredder facilities.
(b)The Controller shall establish a separate subaccount in the Hazardous Waste Control Account. The fees collected pursuant to this section shall be deposited into the subaccount and be available for expenditure by the department upon appropriation by the Legislature.
(c)A regulation adopted pursuant to this section may be adopted as an emergency regulation in accordance with Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, and for the purposes of that chapter, including Section 11349.6 of the Government Code, the adoption of these regulations is an emergency and shall be considered by the Office of Administrative Law as necessary for the immediate preservation of the public peace, health, safety, and general welfare. Notwithstanding Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code, an emergency regulation adopted by the department pursuant to this section shall be filed with, but not be repealed by, the Office of Administrative Law and shall remain in effect for a period of two years or until revised by the department, whichever occurs sooner.
(d)(1)A metal shredding facility paying an annual fee in accordance with this section shall be exempt from the following fees as the fees pertain to metal shredding activities and the generation, handling, management, transportation, and disposal of metal shredder waste:
(A)A fee imposed pursuant to subdivision (a) or (d) of Section 25205.7.
(B)A disposal fee imposed pursuant to Section 25174.1.
(C)A facility fee imposed pursuant to Section 25205.2.
(D)A generator fee imposed pursuant to Section 25205.5.
(E)A transportable treatment unit fee imposed pursuant to Section 25205.14.
(2)A metal shredding facility is not exempt from the fees listed in paragraph (1) for any other hazardous waste the metal shredding facility generates and handles.
SEC. 2.Section 25189.3 of the Health and Safety Code is amended to read:25189.3.(a) For purposes of this section, the term permit means a hazardous waste facilities permit, interim status authorization, or standardized permit.
(b) The department shall suspend the permit of any facility for nonpayment of any facility fee assessed pursuant to Section 25205.2 or activity fee assessed pursuant to subdivision (d) of Section 25205.7, if the operator of the facility is subject to the fee, and if the State Board of Equalization has certified in writing to all of the following:
(1) The facilitys operator is delinquent in the payment of the fee for one or more reporting periods.
(2) The State Board of Equalization has notified the facilitys operator of the delinquency.
(3) The operator has exhausted the administrative rights of appeal provided by Chapter 3 (commencing with Section 43151) of Part 22 of Division 2 of the Revenue and Taxation Code, and the State Board of Equalization has determined that the operator is liable for the fee, or that the operator has failed to assert those rights.
(c) (1) The department shall suspend the permit of any facility for nonpayment of a penalty assessed upon the owner or operator for failure to comply with this chapter or the regulations adopted pursuant to this chapter, if the penalty has been imposed by a trial court judge or by an administrative hearing officer, if the person has agreed to pay the penalty pursuant to a written agreement resolving a lawsuit or an administrative order, or if the penalty has become final due to the persons failure to respond to the lawsuit or order.
(2) The department may suspend a permit pursuant to this subdivision only if the owner or operator is delinquent in the payment of the penalty and the department has notified the owner or operator of the delinquency pursuant to subdivision (d).
(d) Before suspending a permit pursuant to this section, the department shall notify the owner or operator of its intent to do so, and shall allow the owner or operator a minimum of 30 days in which to cure the delinquency.
(e) The department may deny a new permit or refuse to renew a permit on the same grounds for which the department is required to suspend a permit under this section, subject to the same requirements and conditions.
(f) (1) The department shall reinstate a permit that is suspended pursuant to this section upon payment of the amount due, due if the permit has not otherwise been revoked or suspended pursuant to any other provision of this chapter or regulation. Until the department reinstates a permit suspended pursuant to this section, if the facility stores, treats, disposes of, or recycles hazardous wastes, the facility shall be in violation of this chapter. If the operator of the facility subsequently pays the amount due, the period of time for which the operator shall have been in violation of this chapter shall be from the date of the activity that is in violation until the day after the owner or operator submits the payment to the department.
(2) Except as otherwise provided in this section, the department is not required to take any other statutory or regulatory procedures governing the suspension of the permit before suspending a permit in compliance with the procedures of this section.
(g) (1) A suspension under this section shall be stayed while an authorized appeal of the fee or penalty is pending before a court or an administrative agency.
(2) For purposes of this subdivision, an authorized appeal means any appeal allowed pursuant to an applicable regulation or statute.
(h) The department may suspend a permit under this section based on a failure to pay the required fee or penalty that commenced prior to January 1, 2002, if the failure to pay has been ongoing for at least 30 days following that date.
(i) Notwithstanding Section 43651 of the Revenue and Taxation Code, the suspension of a permit pursuant to this section, the reason for the suspension, and any documentation supporting the suspension, shall be a matter of public record.
(j) (1) This section does not authorize the department to suspend a permit held by a government agency if the agency does not dispute the payment but nonetheless is unable to process the payment in a timely manner.
(2) This section does not apply to a site owned or operated by a federal agency if the department has entered into an agreement with that federal agency regarding the remediation of that site.
(k) This section does not limit or supersede Section 25186.
SEC. 3.Section 25205.7 of the Health and Safety Code is amended to read:25205.7.(a)(1) Except as otherwise provided in this section, any person who applies for, or requests, one any of the following shall enter into a written agreement with the department pursuant to which that person shall reimburse the department, pursuant to Article 9.2 (commencing with Section 25206.1), for the costs incurred by the department in processing the application or responding to the request:
(A)A new hazardous waste facilities permit, including a standardized permit.
(B)A hazardous waste facilities permit for postclosure.
(C)A renewal of an existing hazardous waste facilities permit, including a standardized permit or postclosure permit.
(D)A class 2 or class 3 modification of an existing hazardous waste facilities permit or grant of interim status, including a standardized permit or grant of interim status or a postclosure permit.
(E)A variance.
(F)A waste classification determination.
(2)Any agreement required pursuant to paragraph (1) may provide for some, or all, of the reimbursement to be made in advance of the processing of the application or the response to the request.
(3)Any agreement entered into pursuant to this subdivision may include costs of reviewing and overseeing corrective action as set forth in subdivision (b).
(4)This subdivision does not apply to any application or request submitted to the department prior to July 1, 1998. Any person who submitted such an application or request shall pay the applicable fee, if not already paid, for the application or request as required by this chapter as it read prior to January 1, 1998, unless the department and the applicant or requester mutually agree to enter into a reimbursement agreement in lieu of any unpaid portion of the required fee.
(b)The department shall recover all the departments costs in reviewing and overseeing any corrective action program described in the application for a standardized permit pursuant to subparagraph (C) of paragraph (2) of subdivision (c) of Section 25201.6 or required pursuant to subdivision (b) of Section 25200.10, and in reviewing and overseeing any corrective action work undertaken at the facility pursuant to that corrective action program.
(c)Any reimbursements received pursuant to this section shall be placed in the Hazardous Waste Control Account for appropriation in accordance with Section 25174.
(d) (1) In lieu of entering into a reimbursement agreement with the department pursuant to subdivision (a), any person who applies for a new permit, a permit for postclosure, a renewal of an existing permit, or a class 2 or class 3 permit modification may instead elect to pay a fee as follows:
(A) A person submitting a hazardous waste facilities permit application for a land disposal facility shall pay one hundred four thousand one hundred eighty-seven dollars ($104,187) for a small facility, two hundred twenty-two thousand one hundred eighty-three dollars ($222,183) for a medium facility, and three hundred eighty-one thousand six hundred two dollars ($381,602) for a large facility.
(B) A person submitting a hazardous waste facilities permit application for any incinerator shall pay sixty-two thousand seven hundred sixty-two dollars ($62,762) for a small facility, one hundred thirty-three thousand sixty dollars ($133,060) for a medium facility, and two hundred twenty-eight thousand four hundred fifty-eight dollars ($228,458) for a large facility.
(C) Except as provided in subparagraph (D), a person submitting a hazardous waste facility permit application for a storage facility, a treatment facility, or a storage and treatment facility shall pay twenty-one thousand three hundred forty dollars ($21,340) for a small facility, thirty-eight thousand nine hundred thirteen dollars ($38,913) for a medium facility, and seventy-five thousand three hundred seventeen dollars ($75,317) for a large facility.
(D) A person submitting an application for a standardized permit for a storage facility, a treatment facility, or a storage and treatment facility, as specified in Section 25201.6, shall pay thirty-two thousand fifty-two dollars ($32,052) for a Series A standardized permit, twenty thousand eleven dollars ($20,011) for a Series B standardized permit, and five thousand three hundred thirty-two dollars ($5,332) for a Series C standardized permit. The board shall assess the fees specified in this subparagraph, in accordance with paragraph (2), based upon the classifications specified in subdivision (a) of Section 25201.6.
(E) (i) A person submitting a hazardous waste facilities permit application for a transportable treatment unit shall pay sixteen thousand three hundred twenty dollars ($16,320) for a small unit, thirty-seven thousand six hundred fifty-seven dollars ($37,657) for a medium unit, and seventy-five thousand three hundred seventeen dollars ($75,317) for a large unit.
(ii) Notwithstanding clause (i), the fee for any application for a new permit, permit modification, or permit renewal for a transportable treatment unit, that was pending before the department as of January 1, 1996, shall be determined according to the type of permit authorizing operation of that unit, as provided by subdivision (d) of Section 25200.2 or the regulations adopted pursuant to subdivision (a) of Section 25200.2. Any standardized permit issued to the operator of a transportable treatment unit after January 1, 1996, that succeeds a full hazardous waste facilities permit issued by the department prior to January 1, 1996, in accordance with subdivision (d) of Section 25200.2 or the regulations adopted pursuant to subdivision (a) of Section 25200.2, shall not be considered to be a new hazardous waste facilities permit.
(F) A person submitting a hazardous waste facilities permit application for a postclosure permit shall pay a fee of ten thousand forty dollars ($10,040) for a small facility, twenty-two thousand five hundred ninety-six dollars ($22,596) for a medium facility, and thirty-seven thousand six hundred fifty-seven dollars ($37,657) for a large facility.
(G) A person submitting an application for one or more class 2 permit modifications, including a class 2 modification to a standardized permit, shall pay a fee equal to 20 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 40 percent for each application, except that each person who applies for one or more class 2 permit modifications for a land disposal facility or an incinerator shall pay a fee equal to 15 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 30 percent for each application.
(H) A person submitting an application for one or more class 3 permit modifications, including a class 3 modification to a standardized permit, shall pay a fee equal to 40 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 80 percent for each application, except that a person who applies for one or more class 3 permit modifications for a land disposal facility or an incinerator shall pay a fee equal to 30 percent of the fee for a new permit for that facility for each unit directly impacted by the modifications, up to a maximum of 60 percent for each application.
(I) A person who submits an application for renewal of any existing permit shall pay an amount equal to the fee that would have been assessed had the person requested the same changes in a modification application, but not less than one-half the fee required for a new permit.
(J) A person who submits a single application for a facility that falls within more than one fee category shall pay only the higher fee.
(2) The fees required by paragraph (1) shall be assessed by the board upon application to the department. For a facility operating pursuant to a grant of interim status, the submittal of the application shall be the submittal of the Part B application in accordance with regulations adopted by the department. The fee shall be nonrefundable, even if the application is withdrawn or denied. The department shall provide the board with any information that is necessary to assess fees pursuant to this section. The fee shall be collected in accordance with Part 22 (commencing with Section 43001) of Division 2 of the Revenue and Taxation Code, and deposited into the Hazardous Waste Control Account.
(3) The amounts stated in this subdivision are the base rates for the 1997 calendar year. Thereafter, the fees shall be adjusted annually by the board to reflect increases or decreases in the cost of living, during the prior fiscal year, as measured by the Consumer Price Index issued by the Department of Industrial Relations, or a successor agency.
(4) Except as provided in paragraph (5), for purposes of this section, and notwithstanding Section 25205.1, any facility or unit is small if it manages 0.5 tons (1,000 pounds) or less of hazardous waste during any one month of the states current fiscal year, medium if it manages more than 0.5 tons (1,000 pounds), but less than 1,000 tons, of hazardous waste during any one month of the states current fiscal year, and large if it manages 1,000 or more tons of hazardous waste during any one month of the states current fiscal year.
(5) For purposes of subparagraph (F) of paragraph (1) of this subdivision and paragraph (8) of subdivision (c) of Section 25205.4, any facility or unit is small if 0.5 tons (1,000 pounds) or less of hazardous waste remain after closure, medium if more than 0.5 tons (1,000 pounds), but less than 1,000 tons of hazardous waste remain after closure, and large if 1,000 or more tons of hazardous waste remain after closure.
(6) The amounts stated in this subdivision are in addition to any amounts required to reimburse the department for the corrective action review and oversight costs required to be recovered pursuant to subdivision (b).
(e)
(d)Subdivision (a) does not apply to any variance granted pursuant to Article 4 (commencing with Section 66263.40) of Chapter 13 of Division 4.5 of Title 22 of the California Code of Regulations.
(f)
(e)Subdivisions Subdivision (a) and (d) do does not apply to a permit modification resulting from a revision of a facilitys or operators closure plan if the facility is exempted from fees pursuant to subdivision (e) of Section 25205.3, or if the operator is subject to paragraph (2) or (3) of subdivision (d) of Section 25205.2.
(g)
(f)(1) Except as provided in paragraphs (3) and (4), subdivisions subdivision (a) and (d) do does not apply to any permit or variance to operate a research, development, and demonstration facility, if the duration of the permit or variance is not longer than one year, unless the permit or variance is renewed pursuant to the regulations adopted by the department.
(2) For purposes of this section, a research, development, and demonstration facility is a facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process for which regulations prescribing permit standards have not been adopted.
(3) The exemption provided by this subdivision does not apply to a facility which operates as a medium or large multiuser offsite commercial hazardous waste facility and which does not otherwise possess a hazardous waste facilities permit pursuant to Section 25200.
(4) The fee exemption authorized pursuant to paragraph (1) shall be effective for a total duration of not more than two years.
(h)
(g)Subdivisions Subdivision (a) and (d) do does not apply to any of the following:
(1)Any variance issued to a public agency to transport wastes for purposes of operating a household hazardous waste collection facility, or to transport waste from a household hazardous waste collection facility, which receives household hazardous waste or hazardous waste from conditionally exempted small quantity generators pursuant to Article 10.8 (commencing with Section 25218).
(2)A permanent household hazardous waste collection facility.
(3)Any variance issued to a public agency to conduct a collection program for agricultural wastes.
(i)
(h) Notwithstanding subdivisions (a) and (b), the department shall not assess any fees or seek any reimbursement for the departments costs in reviewing and overseeing any preliminary site assessment in conjunction with a hazardous waste facilities permit application.
(j)
(i)The changes made in this section by Chapter 870 of the Statutes of 1997 do not require amendment of, or otherwise affect, any agreement entered into prior to July 1, 1998, pursuant to which any person has agreed to reimburse the department for the costs incurred by the department in processing applications, responding to requests, or otherwise providing other services pursuant to this chapter.
SEC. 4.Section 25205.18 of the Health and Safety Code is amended to read:25205.18.(a) If a facility has a permit or an interim status document which that sets forth the facilitys allowable capacity for treatment or storage, the facilitys size for purposes of the annual facility fee shall be based upon that capacity, except as provided in subdivision (d).
(b) If a facilitys allowable capacity changes or is initially established as a result of a permit modification, or a submission of a certification pursuant to subdivision (d), the fee that is due for the reporting period in which the change occurs shall be the lower fee until December 31, 1994. After that date, the fee that is due for the reporting period in which a change occurs shall be the higher fee.
(c) (1) The department may require the facility to submit an application to modify its permit to provide for an allowable capacity.
(2) Subdivisions Subdivision (a) and (d) of Section 25205.7 do does not apply to an application for modification required by the department pursuant to this subdivision.(d) A facility may reduce its allowable capacity below the amounts specified in subdivision (a) or (c) by submitting a certification signed by the owner or operator in which the owner or operator pledges that the facility will not handle hazardous waste at a capacity above the amount specified in the certification. In that case, the facilitys size for purposes of the annual facility fee shall be based upon the capacity specified in the certification, until the certification is withdrawn. Exceeding the capacity limits specified in a certification that has not been withdrawn shall be a violation of the hazardous waste control law and may subject a facility or its operator to a penalty and corrective action as provided in this chapter, including, but not limited to, an augmentation pursuant to Section 25191.1. chapter.
(e) This section shall have no bearing on the imposition of the annual postclosure facility fee.
SEC. 5.Section 25205.19 of the Health and Safety Code is amended to read:25205.19.(a) If a facility has a permit or an interim status document which that sets forth the facilitys type, pursuant to Section 25205.1, as either treatment, storage, or disposal, the facilitys type for purposes of the annual facility fee shall be rebuttably presumed to be what is set forth in that permit or document.
(b) If the facilitys type changes as a result of a permit or interim status modification, any change in the annual facility fee shall be effective the reporting period following the one in which the modification becomes effective.
(c) (1) If the facilitys permit or interim status document does not set forth its type, the department may require the facility to submit an application to modify the permit or interim status document to provide for a facility type.
(2) Subdivisions Subdivision (a) and (d) of Section 25205.7 do does not apply to an application for modification pursuant to this subdivision.(d) A permit or interim status document may set forth more than one facility type or size. In accordance with subdivision (e) (d) of Section 25205.4, the facility shall be subject only to the highest applicable fee.
SEC. 6.Section 25247 of the Health and Safety Code is amended to read:25247.(a)The department shall review each plan submitted pursuant to Section 25246 and shall approve the plan if it finds that the plan complies with the regulations adopted by the department and complies with all other applicable state and federal regulations.
(b)The department shall not approve the plan until at least one of the following occurs:
(1)The plan has been approved pursuant to Section 13227 of the Water Code.
(2)Sixty days expire after the owner or operator of an interim status facility submits the plan to the department. If the department denies approval of a plan for an interim status facility, this 60-day period shall not begin until the owner or operator resubmits the plan to the department.
(3)The director finds that immediate approval of the plan is necessary to protect public health, safety, or the environment.
(c)Any action taken by the department pursuant to this section is subject to Section 25204.5.
(d)(1)To the extent consistent with the federal act, the department shall impose the requirements of a hazardous waste facility postclosure plan on the owner or operator of a facility through the issuance of an enforcement order, entering into an enforceable agreement, or issuing a postclosure permit.
(A)A hazardous waste facility postclosure plan imposed or modified pursuant to an enforcement order, a permit, or an enforceable agreement shall be approved in compliance with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(B)Before the department initially approves or significantly modifies a hazardous waste facility postclosure plan pursuant to this subdivision, the department shall provide a meaningful opportunity for public involvement, which, at a minimum, shall include public notice and an opportunity for public comment on the proposed action.
(C)For the purposes of subparagraph (B), a significant modification is a modification that the department determines would constitute a class 3 permit modification if the change were being proposed to a hazardous waste facilities permit. In determining whether the proposed modification would constitute a class 3 modification, the department shall consider the similarity of the modification to class 3 modifications codified in Appendix I of Chapter 20 (commencing with Section 66270.1) of Division 4.5 of Title 22 of the California Code of Regulations. In determining whether the proposed modification would constitute a class 3 modification, the department shall also consider whether there is significant public concern about the proposed modification, and whether the proposed change is so substantial or complex in nature that the modification requires the more extensive procedures of a class 3 permit modification.
(2)This subdivision does not limit or delay the authority of the department to order any action necessary at a facility to protect public health or safety.
(3)If the department imposes a hazardous waste facility postclosure plan in the form of an enforcement order or enforceable agreement, in lieu of issuing or renewing a postclosure permit, the owner or operator who submits the plan for approval shall, at the time the plan is submitted, pay the same fee specified in subparagraph (F) of paragraph (1) of subdivision (d) of Section 25205.7, or enter into a cost reimbursement agreement pursuant to subdivision (a) of Section 25205.7 and upon commencement of the postclosure period shall pay the fee required by paragraph (9) of subdivision (c) of Section 25205.4. For purposes of this paragraph and paragraph (9) of subdivision (c) of Section 25205.4, the commencement of the postclosure period shall be the effective date of the postclosure permit, enforcement order, or enforceable agreement.
(4)In addition to any other remedy available under state law to enforce a postclosure plan imposed in the form of an enforcement order or enforcement agreement, the department may take any of the following actions:
(A)File an action to enjoin a threatened or continuing violation of a requirement of the enforcement order or agreement.
(B)Require compliance with requirements for corrective action or other emergency response measures that the department deems necessary to protect human health and the environment.
(C)Assess or file an action to recover civil penalties and fines for a violation of a requirement of an enforcement order or agreement.
(e)Subdivision (d) does not apply to a postclosure plan for which a final or draft permit has been issued by the department on or before December 31, 2003, unless the department and the facility mutually agree to replace the permit with an enforcement order or enforceable agreement pursuant to the provisions of subdivision (d).
(f)(1)Except as provided in paragraphs (2) and (3), the department may only impose postclosure plan requirements through an enforcement order or an enforceable agreement pursuant to subdivision (d) until January 1, 2009.(2)This subdivision does not apply to an enforcement order or enforceable agreement issued prior to January 1, 2009, or an order or agreement for which a public notice is issued on or before January 1, 2009.(3)This subdivision does not apply to the modification on or after January 1, 2009, of an enforcement order or enforceable agreement that meets the conditions in paragraph (2).(g)If the department determines that a postclosure permit is necessary to enforce a postclosure plan, the department may, at any time, rescind and replace an enforcement order or an enforceable agreement issued pursuant to this section by issuing a postclosure permit for the hazardous waste facility, in accordance with the procedures specified in the departments regulations for the issuance of postclosure permits.(h)Nothing in this section may be construed to limit or delay the authority of the department to order any action necessary at a facility to protect public health or safety, or the environment.SECTION 1.Section 1569.311 of the Health and Safety Code is amended to read:1569.311.A residential care facility for the elderly shall have one or more carbon monoxide detectors in the facility that meet the standards established in Chapter 8 (commencing with Section 13260) of Part 2 of Division 12. The department shall account for the presence of these detectors during inspections.
Every A residential care facility for the elderly shall have one or more carbon monoxide detectors in the facility that meet the standards established in Chapter 8 (commencing with Section 13260) of Part 2 of Division 12. The department shall account for the presence of these detectors during inspections.
|
Date
|
Status
|
|---|---|
| May 27, 2016 | In committee: Held under submission. |
| May 4, 2016 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 13, 2016 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 4. Noes 0.) (April 12). Re-referred to Com. on APPR. |
| Apr 6, 2016 | Re-referred to Com. on E.S. & T.M. |
| Apr 5, 2016 | From committee chair, with author's amendments: Amend, and re-refer to Com. on E.S. & T.M. Read second time and amended. |
| Mar 28, 2016 | Re-referred to Com. on E.S. & T.M. |
| Mar 17, 2016 | Referred to Com. on E.S. & T.M. |
| Mar 17, 2016 | From committee chair, with author's amendments: Amend, and re-refer to Com. on E.S. & T.M. Read second time and amended. |
| Feb 22, 2016 | Read first time. |
| Feb 21, 2016 | From printer. May be heard in committee March 22. |
| Feb 19, 2016 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 12, 2016 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Environmental Safety and Toxic Materials |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: May 4, 2016
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Lorena Gonzalez, Chair
ABPCA Bill Id:AB 2794
Author:(Santiago) – As Amended Ver:April 5, 2016
Policy Committee: | Environmental Safety and Toxic Materials | Vote: | 4 - 0 |
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill increases the statutorily specified flat fee options for a person applying for various hazardous waste permits or modifications from the Department of Toxic Substance Control (DTSC).
FISCAL EFFECT:
Although the author intends this bill to raise flat fee rates, the flat fee rates proposed in this bill would result in an approximate 8% decrease in the fee rate. According the Board of Equalization (BOE), flat-rate application fees over the last three fiscal years averaged at $333,333. If flat-rate fees in the bill were adopted, DTSC would lose on average approximately $27,000 annually from permitting actions.
COMMENTS:
- Purpose. According to the author, the flat fee payment amounts outlined in existing law were last revised in 1997 by SB 660 (Sher), and have not kept pace with inflation. As an example, one provision provides for a flat fee of $104,187 which in 2016 dollars amounts to $153,918.28.
This bill is intended to increase flat fees to ensure DTSC is better able to recover costs associated with its permit decisions.
- Background. The Board of Equalization (BOE) administers six hazardous waste fee programs in cooperation with DTSC under the Hazardous Substances Tax Law. Five of the fees are: 1) the environmental fee on certain types of organizations based on their use, storage, generation, or activities connected to hazardous materials; 2) the facility fee imposed on the storage, treatment, or disposal of hazardous waste; 3) the generator fee based on the generation of hazardous waste at a specific site;4) the transportable treatment unit (TTU) fee imposed on a per treatment unit, not per facility; and 5) and the disposal fee assessed on hazardous waste disposed of by depositing on, or into, land.
The sixth fee (activity fee) is essentially an application processing fee imposed on any person that applies for a new hazardous waste facilities permit, a postclosure hazardous waste facilities permit, the renewal of an existing hazardous waste permit, a class 2 or class 3 permit modification, or a variance or waste classification determination.
The applicant pays the fee either by entering into a reimbursement agreement with DTSC, or paying a one-time, flat-rate fee to the BOE. The fee is non-refundable, even if the application is withdrawn or the permit or the modification is denied. The fee is tiered based on the permitted level of the facility and the type of permit activity.
- Independent Review Panel (IRP). The 2015-16 Budget Act created a three-person IRP to oversee DTSC's permitting, enforcement, and fiscal management.. The IRP released its first report on January 28, 2016, and provided various recommendations including the need for DTSC to obtain full cost recovery from permit decisions.
It is estimated that DTSC recoups about 40% of its costs when applicants use a flat fee. Therefore, payment of a flat fee can prevent DTSC from recouping the entirety of its incurred costs, thus burdening taxpayers with the costs that the applicants should be paying.
The author is working on revisions to this bill to ensure the flat fees are adjusted for inflation and improve cost recovery.
Analysis Prepared by: Jennifer Galehouse / APPR. / (916) 319-2081
Date of Hearing: April 12, 2016
ASSEMBLY COMMITTEE ON ENVIRONMENTAL SAFETY AND TOXIC MATERIALS
Luis Alejo, Chair
ABPCA Bill Id:AB 2794 (
Author:Santiago) – As Amended Ver:April 5, 2016
SUBJECT: Hazardous waste: facilities permitting: fees
SUMMARY: Increases statutorily specified flat fee options for a person applying for a new permit, a permit for post closure, a renewal of an existing permit, or a class 2 or class 3 permit modification and states that the flat fees are base rates for the 1997 calendar year.
EXISTING LAW:
- Establishes the intent of the Legislature that the Secretary for the California Environmental Protection Agency (CalEPA) shall convene a task force to review the California Department of Toxic Substances Control's (DTSC) hazardous waste fee structure and make recommendations on a new fee system by January 1, 1997. (SB 1222, Calderon, Chapter 638, Statutes of 1995)
- Establishes an Environmental Fee on organizations including corporations, limited liability companies, limited partnerships, limited liability partnerships, general partnerships, and sole proprietorships that generate, store, or conduct activities in this state related to hazardous materials. (Health & Safety Code (H&S) § 25205.6)
- Requires any person who applies for a new hazardous waste facilities permit, a hazardous waste facilities permit for post closure, a renewal of an existing hazardous waste facilities permit, a modification of an existing hazardous waste facilities permit or grant of interim status, a variance, or a waste classification determination to reimburse DTSC for the costs incurred by DTSC for processing the application. (H&S § 25205.7(a)(1))
- Authorizes a person applying for a new permit, a permit for post closure, a renewal of an existing permit, or a class 2 or class 3 permit modification to choose whether to reimburse DTSC's costs with either a reimbursement agreement with DTSC, or a flat fee delineated in statute. (H&S § 25205.7(d))
- Requires the fees established at a base rate for the 1997 calendar year to be annually adjusted to reflect increases or decreases in the cost of living, during the prior fiscal year, as measured by the Consumer Price Index issued by the Department of Industrial Relations. (H&S § 25205.7. (d)(1)(J)(3))
- Establishes within DTSC an independent review panel (IRP), comprising of three members, to review and make recommendations regarding improvements to DTSC's permitting, enforcement, public outreach, and fiscal management. Requires the IRP to review and make recommendations regarding improvements to DTSC’s permitting, and to report to the Governor and the Legislature on permitting backlogs. (H&S § 57014(a) and (f))
FISCAL EFFECT: Unknown.
COMMENTS:
Need for the bill: According to the author, "The flat fee payment amounts outlined in Health and Safety Code § 25205.7(d) were last revised in 1997 by SB 660 (Sher) and have not kept pace with inflation (from 1997-2016, cumulative inflation is 47.7%). As an example, one provision in this code section provides for a flat fee of $104,187; in 2016 dollars this amounts to $153,918.28.
DTSC is unable to obtain full cost recovery when hazardous waste permit applicants utilize this outdated flat fee structure. AB 2794 increases these flat fees, ensuring DTSC is better able to recover costs associated with its permit decisions."
History of DTSC fee reform: An Environmental Fee was established in 1989 by Senate Bill (SB) 475 (Chapter 269, Statutes of 1989) to provide DTSC with a broad-based revenue source to supplement the fees it was already receiving from businesses that generate, store, transport or dispose of hazardous waste.
Prior to 1998, the Environmental Fee was used to fund both hazardous waste management and site mitigation program activities. In 1995, SB 1222 (Calderon, Chapter 638, Statutes of 1995) required the Secretary for CalEPA to convene a task force to review DTSC’s hazardous waste fee structure and make recommendations on a new fee system by January 1, 1997. The Fee Reform Task Force was composed of representatives from regulated businesses, general industry, labor unions, the Legislature, and environmental organizations. The Task Force concluded that DTSC’s regulatory costs should be funded from fees on regulated industries and that DTSC’s site mitigation costs should be funded from the parties responsible for contaminating the sites.
In 1997, SB 660 (Sher, Chapter 870, Statutes of 1997) enacted the Environmental Cleanup and Fee Reform Act of 1997 and implemented many of the recommendations made by the Fee Reform Task Force mandated by SB 1222. Effective January 1, 1998, SB 660 eliminated certain fees and restructured the Generator Fee, Disposal Fee, Facility Fee and the Environmental Fee. In addition, the fees for a preliminary endangerment assessment for site mitigation, extremely hazardous waste, border zone property assessment, waste classification, variance, and class I modifications were eliminated; variances, waste classifications, and preliminary endangerment assessments became cost reimbursement activities.
Funding sources that support DTSC’s hazardous waste regulatory costs include the generator fee, disposal fee, activity fee (facility permit activity), annual facility fee, Environmental Protection Agency identification fee, manifest fee, and money collected from cost recovery efforts for corrective actions. In contrast, funding for DTSC’s site cleanup and pollution prevention activities comes from the Environmental Fee, fines and penalties collected from actions brought by DTSC, recovery of DTSC’s costs to oversee cleanup activity of contaminated sites, interest and other revenue, and, until 2001, General Fund revenue.
According to DTSC's September 2000 Department of Toxic Substances Control
Pollution Prevention Report and 2-Year Workplan, "[o]f perhaps more significance is the effect of SB 660. The fee structure established at that time has resulted in disposal fees that are consistently the lowest in DTSC’s history. Between 1997 and 1998, disposal fees for RCRA wastes dropped nearly 30%. Disposal fees for non-RCRA wastes fell 57%."
Independent Review Panel: The 2015-16 Budget Act created a three-person IRP to oversee DTSC's permitting, enforcement, and fiscal management. The IRP is tasked to report every 90-days for a defined period of time on DTSC's performance, specifically related to permitting, enforcement backlog reductions, and meeting legislative mandates. The IRP released its first report on January 28, 2016, and provided various recommendations on the aforementioned categories. Among the recommendations in that initial report include the following:
"Require that the DTSC obtain full cost recovery connected with its Hazardous Waste Facility Permit decisions. The DTSC reports that the DTSC’s existing Health Safety Code § 25205.7(d) fee collection for permitting statute does not ensure that it achieves full cost recovery connected with its Hazardous Waste Facility Permit actions."
Under current law, a person who applies for a hazardous waste facility permit, a hazardous waste permit for postclosure, a hazardous waste facility permit renewal, a modified permit, a variance or a waste classification permit must reimburse DTSC for its administrative costs incurred for reviewing the application. That same law allows a permit applicant to either pay a reimbursement fee or a flat fee as currently delineated in statute (H&S § 25205.7(d)).
Unofficially, DTSC recoups about 40% of its costs when applicants use a flat fee. Therefore, payment of a flat fee can prevent DTSC from recouping the entirety of its incurred costs, thus burdening taxpayers with the costs that the applicants should be paying.
AB 2794 proposes to codify an iteration of the IRP's recommendation by increasing the flat fees to adjust for inflation.
Consumer Price Index (CPI): The CPI measures changes in the price level of a market basket of consumer goods and services purchased by households. The CPI is a statistical estimate constructed using a sample of representative items whose prices are collected periodically.
DTSC (via the Board of Equalization (BOE)) has the authority to adjust most of its fees based on the Consumer Price Index (CPI), including those permit application fees in H&S § 25205.7. Every year, DTSC increases or decreases the fees, based on the CPI, and annually releases an "Annual Fee Summary" to conveniently summarize state law as it relates to fees charged by DTSC or collected by BOE for DTSC and what the current calendar year rate is for each fee.
How do the rates compare? AB 2153 proposes increasing all of the statutorily outlined fees based on today's inflation, but retaining DTSC's authority to adjust the fees against the CPI.
Below are the current fee rates for the calendar year January 1, 2016 through December 31, 2016, according to the December 5, 2015, Annual Fee Summary, and the base rate fees for 2016 as proposed by AB 2794:
Permit Application | Type of Applicant/Activity | Applicant Size/Type | 1997 Base Rates | 2016 Rates | AB 2794 as amended 04/05/16 |
|---|---|---|---|---|---|
Hazardous Waste Facilities Permit Application | Land Disposal Facility | Small Facility Medium Facility Large Facility | $104,187 $222,183 $381,602 | $166,596 $355,272 $610,183 | $153,915 $328,231 $563,741 |
Incinerator | Small Facility Medium Facility Large Facility | $62,762 $133,060 $228,458 | $100,357 $212,762 $365,310 | $92,718 $196,570 $337,501 | |
Storage Facility, Treatment Facility, or Storage and Treatment Facility | Small Facility Medium Facility Large Facility | $21,340 $38,913 $75,317 | $34,123 $62,225 $120,431 | $31,526 $57,486 $111,266 | |
Transportable Treatment Unit | Small Unit Medium Unit Large Unit | $16,320 $37,657 $75,317 | $26,095 $60,214 $120,431 | $24,110 $55,631 $111,266 | |
Postclosure Permit | Small Facility Medium Facility Large Facility | $10,040 $22,596 $37,657 | $16,055 $36,131 $62,214 | $14,832 $33,381 $55,631 | |
Standardized Permit Application | Storage Facility Treatment Facility Storage and Treatment Facility | Series A Series B Series C | $32,052 $20,011 $5,332 | $51,254 $31,999 $8,526 | $47,350 $29,562 $7,877 |
The proposed 2016 base rates in AB 2794 are in fact lower than the current fees. While the bill could result in higher fees once the BOE adjusts them for the CPI, it is more likely that it will result in lower fees compared to today's rates.
Once the author understands the material impact of the proposed fee increases in the bill, he may wish to consider amendments, if necessary to retain the intent of the bill.
Board of Equalization (BOE): Under the current fee structure, all flat fees paid pursuant to H&S § 25205.7 are remitted to the Board of Equalization (BOE). All reimbursement agreements with DTSC are paid directly to DTSC.
When fees are remitted to the BOE, the BOE is allowed to retain a percentage to cover its administrative costs of managing the remittances.
According to a BOE analysis of its collection of these flat fees, there has been an average of nine one-time, flat-rate application billings in the last three fiscal years, with average revenues of $333,333.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file.
Opposition (to a previous version of the bill)
Alhambra Chamber of Commerce
Automotive Specialty Products Alliance
California Business Properties Association
California Cement Manufacturers Environmental Coalition
California Manufacturers and Technology Association
California Metals Coalition
Chemical Industry Council of California
Clean Harbors Environmental Services, Inc.
Consumer Specialty Products Association
Greater Fresno Area Chamber of Commerce
Industrial Environmental Association
Institute of Scrap Recycling Industries
Metal Finishing Association of Northern California
Metal Finishing Association of Southern California
North Orange County Chamber
Oxnard Chamber of Commerce
Palm Desert Area Chamber of Commerce
Rancho Cordova Chamber of Commerce
Redondo Beach Chamber of Commerce & Visitors Bureau
Safety-Kleen, Inc.
San Diego Regional Chamber of Commerce
South Bay Association of Chambers of Commerce
Southwest California Legislative Council
Simi Valley Chamber of Commerce
Torrance Chamber of Commerce
West Coast Lumber & Building Material Association
Western Plant Health Association
Western States Petroleum Association
Analysis Prepared by: Paige Brokaw / E.S. & T.M. / (916) 319-3965
Bill Author