AB 955: Highways: encroachment permits: broadband facilities.
- Session Year: 2021-2022
- House: Assembly
- Latest Version Date: 2021-10-08
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. The departments failure to notify an applicant within that 60-day period that the permit is denied is deemed to constitute approval of the permit.
This bill would establish additional procedures for the departments review of an application for an encroachment permit for a broadband facility. Under the bill, these procedures would require the department, among other things, to notify an applicant in writing whether the application is complete within 30 days of receiving the application, to take certain actions if it deems an application incomplete, and to approve or deny an application that requires supplemental information within 30 days after receiving that information. If the department fails to notify the applicant that the application is incomplete within that 30-day time period, the bill would deem the departments failure to notify to constitute a finding that the permit application is complete.
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. The departments failure to notify an applicant within that 60-day period that the permit is denied is deemed to constitute approval of the permit.
This bill would establish additional procedures for the departments review of an application for an encroachment permit for a broadband facility. Under the bill, these procedures would require the department, among other things, to notify an applicant in writing whether the application is complete within 30 days of receiving the application, to take certain actions if it deems an application incomplete, and to approve or deny an application that requires supplemental information within 30 days after receiving that information. If the department fails to notify the applicant that the application is incomplete within that 30-day time period, the bill would deem the departments failure to notify to constitute a finding that the permit application is complete.
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. The departments failure to notify an applicant within that 60-day period that the permit is denied is deemed to constitute approval of the permit.
This bill would establish additional procedures for the departments review of an application for an encroachment permit for a broadband facility. Under the bill, these procedures would require the department, among other things, to notify an applicant in writing whether the application is complete within 30 days of receiving an the application, to take certain actions if it deems an application incomplete, and to approve or deny an application that requires supplemental information within 30 days after receiving that information. If the department fails to notify the applicant that the application is incomplete or denied, as applicable, incomplete within those that 30-day time periods, period, the bill would deem the departments failure to notify to constitute approval of the permit. a finding that the permit application is complete.
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. The departments failure to notify an applicant within that 60-day period that the permit is denied is deemed to constitute approval of the permit.
This bill would establish additional procedures for the departments review of an application for an encroachment permit for a broadband facility. Under the bill, these procedures would require the department, among other things, to notify an applicant in writing whether the application is complete within 30 days of receiving an application, to take certain actions if it deems an application incomplete, and to approve or deny an application that requires supplemental information within 30 days after receiving that information. If the department fails to notify the applicant that the application is incomplete or denied, as applicable, within those 30-day time periods, the bill would deem the departments failure to notify to constitute approval of the permit.
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. The departments failure to notify an applicant within that 60-day period that the permit is denied is deemed to constitute approval of the permit.
This bill would establish additional procedures for the departments review of an application for an encroachment permit for a broadband facility. Under the bill, these procedures would require the department, among other things, to notify an applicant in writing whether the application is complete within 30 days of receiving an application, to take certain actions if it deems an application incomplete, and to approve or deny an application that requires supplemental information within 30 days after receiving that information. If the department fails to notify the applicant that the application is incomplete or denied, as applicable, within those 30-day time periods, the bill would deem the departments failure to notify to constitute approval of the permit.
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. The departments failure to notify an applicant within that 60-day period that the permit is denied is deemed to constitute approval of the permit.
This bill would establish additional procedures for the departments review of an application for an encroachment permit for a broadband facility. Under the bill, these procedures would require the department, among other things, to notify an applicant in writing whether the application is complete within 30 days of receiving an application, to take certain actions if it deems an application incomplete, and to approve or deny an application that requires supplemental information within 30 days after receiving that information. If the department fails to notify the applicant that the application is incomplete or denied, as applicable, within those 30-day time periods, the bill would deem the departments failure to notify to constitute approval of the permit.
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. If the department denies an application for an encroachment permit, existing law requires the department, at the time of notifying the applicant of the denial, to furnish to the applicant a detailed explanation of the reason for the denial. The departments failure to notify an applicant within that 60-day period that the permit is denied is deemed to constitute approval of the permit.
This bill would make a nonsubstantive change to the latter provision. establish additional procedures for the departments review of an application for an encroachment permit for a broadband facility. Under the bill, these procedures would require the department, among other things, to notify an applicant in writing whether the application is complete within 30 days of receiving an application, to take certain actions if it deems an application incomplete, and to approve or deny an application that requires supplemental information within 30 days after receiving that information. If the department fails to notify the applicant that the application is incomplete or denied, as applicable, within those 30-day time periods, the bill would deem the departments failure to notify to constitute approval of the permit.
Under existing law, the Department of Transportation may issue permits authorizing encroachments, as defined, on highways. Existing law requires the department to either approve or deny an application for an encroachment permit within 60 days of receiving a completed application. If the department denies an application for an encroachment permit, existing law requires the department, at the time of notifying the applicant of the denial, to furnish to the applicant a detailed explanation of the reason for the denial.
This bill would make a nonsubstantive change to the latter provision.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)All of the following shall apply to the departments review of an application for an encroachment permit for a broadband facility:
(1)The department shall specify in writing all permit application criteria. It is the intent of the Legislature to ensure a streamlined, predictable, and expeditious process by which the department reviews broadband facility permit applications in order to achieve the rapid deployment of broadband facilities on highways.
(2)Within 30 days after an application for an encroachment permit for a broadband facility is submitted, the department shall notify the applicant in writing whether the permit application is deemed complete. If the department does not notify the applicant within that 30-day period that the application is incomplete, the failure to notify shall be deemed to constitute a finding that the permit application is complete.
(3)If the department deems a permit application incomplete, the department shall do all of the following:
(A)At the time of notifying the applicant that the application is incomplete, furnish to the applicant a detailed explanation why the application is incomplete, with reference to the specific application criteria that the application does not meet.
(B)Identify all supplemental information necessary to complete the application.
(C)In a timely manner and no later than 14 days after a meeting is requested by the applicant, meet with the applicant to discuss any outstanding supplemental information necessary to complete the application. The department shall not be required to participate in more than three individual meetings with the applicant and shall not be required to meet in excess of four hours for each permit application.
(D)Provide the applicant with no less than 30 days to resubmit its application with the supplemental information that the department identified in the notice. The applicants failure to respond with additional information during that period shall be deemed to constitute a withdrawal of the application.
(4)Within 30 days after receiving supplemental information from an applicant pursuant to paragraph (3), the department shall approve or deny the application.
(c)If the department denies an application for an encroachment permit, the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(d)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(e)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)All of the following shall apply to the departments review of an application for an encroachment permit for a broadband facility:
(1)The department shall specify in writing all permit application criteria. It is the intent of the Legislature to ensure a streamlined, predictable, and expeditious process by which the department reviews broadband facility permit applications in order to achieve the rapid deployment of broadband facilities on highways.
(2)Within 30 days after an application for an encroachment permit for a broadband facility is submitted, the department shall notify the applicant in writing whether the permit application is deemed complete. If the department does not notify the applicant within that 30-day period that the application is incomplete, the failure to notify shall be deemed to constitute a finding that the permit application is complete.
(3)If the department deems a permit application incomplete, the department shall do all of the following:
(A)At the time of notifying the applicant that the application is incomplete, furnish to the applicant a detailed explanation why the application is incomplete, with reference to the specific application criteria that the application does not meet.
(B)Identify all supplemental information necessary to complete the application.
(C)In a timely manner and no later than 14 days after a meeting is requested by the applicant, meet with the applicant to discuss any outstanding supplemental information necessary to complete the application. The department shall not be required to participate in more than three individual meetings with the applicant and shall not be required to meet in excess of four hours for each permit application.
(D)Provide the applicant with no less than 30 days to resubmit its application with the supplemental information that the department identified in the notice. The applicants failure to respond with additional information during that period shall be deemed to constitute a withdrawal of the application.
(4)Within 30 days after receiving supplemental information from an applicant pursuant to paragraph (3), the department shall approve or deny the application.
(c)If the department denies an application for an encroachment permit, the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(d)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(e)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)Notwithstanding any other provision of this section or procedures set forth in the Utility Encroachments Permit Application Guide, all All of the following shall apply to the departments review of an application for an encroachment permit for a broadband facility:
(1)The department shall specify in writing and provide public notice of all permit application criteria. The department shall not impose any new or different permit application criteria to a broadband facility encroachment permit application after that application is initially submitted. It is the intent of the Legislature to ensure a streamlined, predictable, and expeditious process by which the department reviews broadband facility permit applications in order to achieve the rapid deployment of broadband facilities on highways.
(2)Within 30 days after an application for an encroachment permit for a broadband facility is submitted, the department shall notify the applicant in writing whether the permit application is deemed complete. If the department does not notify the applicant within that 30-day period that the application is complete or incomplete, the failure to notify shall be deemed to constitute an approval of the permit. a finding that the permit application is complete.
(3)If the department deems a permit application incomplete, the department shall do all of the following:
(A)Provide a written notice to the applicant that explains At the time of notifying the applicant that the application is incomplete, furnish to the applicant a detailed explanation why the application is incomplete, with reference to the specific application criteria that the application does not meet.
(B)Provide a specific written description identifying Identify all supplemental information necessary to complete the application.
(C)In a timely manner and no later than 14 days after a meeting is requested by the applicant, meet with the applicant to discuss any outstanding supplemental information necessary to complete the application. The department shall not be required to participate in more than three individual meetings with the applicant and shall not be required to meet in excess of four hours for each permit application.
(D)Provide the applicant with no less than 30 days to resubmit its application with the supplemental information that the department identified in the notice. The applicants failure to respond with additional information during that period shall be deemed to constitute a withdrawal of the application.
(4)Within 30 days after receiving supplemental information from an applicant, applicant pursuant to paragraph (3), the department shall approve or deny the application. The departments failure to notify an applicant within that 30-day period that the permit is denied shall be deemed to constitute an approval of the permit.
(c)If the department denies an application for an encroachment permit, the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(d)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(e)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)Notwithstanding any other provision of this section or procedures set forth in the Utility Encroachments Permit Application Guide, all of the following shall apply to the departments review of an application for an encroachment permit for a broadband facility:
(1)The department shall specify in writing and provide public notice of all permit application criteria. The department shall not impose any new or different permit application criteria to a broadband facility encroachment permit application after that application is initially submitted.
(2)Within 30 days after an application for an encroachment permit for a broadband facility is submitted, the department shall notify the applicant in writing whether the permit application is deemed complete. If the department does not notify the applicant within that 30-day period that the application is complete or incomplete, the failure to notify shall be deemed to constitute an approval of the permit.
(3)If the department deems a permit application incomplete, the department shall do all of the following:
(A)Provide a written notice to the applicant that explains why the application is incomplete, with reference to the specific application criteria that the application does not meet.
(B)Provide a specific written description identifying all supplemental information necessary to complete the application.
(C)In a timely manner and no later than 14 days after a meeting is requested by the applicant, meet with the applicant to discuss any outstanding supplemental information necessary to complete the application.
(D)Provide the applicant with no less than 30 days to resubmit its application with the supplemental information that the department identified in the notice.
(4)Within 30 days after receiving supplemental information from an applicant, the department shall approve or deny the application. The departments failure to notify an applicant within that 30-day period that the permit is denied shall be deemed to constitute an approval of the permit.
(5)If a proposed broadband facility requires an encroachment permit but does not require any additional approval from a city or county, the department shall offer to act as the lead agency for purposes of ensuring compliance with the California Environmental Quality Act.(c)If the department denies an application for an encroachment permit, the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(d)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(e)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)Notwithstanding any other provision of this section or procedures set forth in the Utility Encroachments Permit Application Guide, all of the following shall apply to the departments review of an application for an encroachment permit for a broadband facility:
(1)The department shall specify in writing and provide public notice of all permit application criteria. The department shall not impose any new or different permit application criteria to a broadband facility encroachment permit application after that application is initially submitted.
(2)Within 30 days after an application for an encroachment permit for a broadband facility is submitted, the department shall notify the applicant in writing whether the permit application is deemed complete. If the department does not notify the applicant within that 30-day period that the application is complete or incomplete, the failure to notify shall be deemed to constitute an approval of the permit.
(3)If the department deems a permit application incomplete, the department shall do all of the following:
(A)Provide a written notice to the applicant that explains why the application is incomplete, with reference to the specific application criteria that the application does not meet.
(B)Provide a specific written description identifying all supplemental information necessary to complete the application.
(C)In a timely manner and no later than 14 days after a meeting is requested by the applicant, meet with the applicant to discuss any outstanding supplemental information necessary to complete the application.
(D)Provide the applicant with no less than 30 days to resubmit its application with the supplemental information that the department identified in the notice.
(4)Within 30 days after receiving supplemental information from an applicant, the department shall approve or deny the application. The departments failure to notify an applicant within that 30-day period that the permit is denied shall be deemed to constitute an approval of the permit.
(5)If a proposed broadband facility requires an encroachment permit but does not require any additional approval from a city or county, the department shall offer to act as the lead agency for purposes of ensuring compliance with the California Environmental Quality Act. If the department does not serve as lead agency, the Public Utilities Commission may act as lead agency.
(c)If the department denies an application for an encroachment permit, the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(d)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(e)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)Notwithstanding any other provision of this section or procedures set forth in the Utility Encroachments Permit Application Guide, all of the following shall apply to the departments review of an application for an encroachment permit for a broadband facility:
(1)The department shall specify in writing and provide public notice of all permit application criteria. The department shall not impose any new or different permit application criteria to a broadband facility encroachment permit application after that application is initially submitted.
(2)Within 30 days after an application for an encroachment permit for a broadband facility is submitted, the department shall notify the applicant in writing whether the permit application is deemed complete. If the department does not notify the applicant within that 30-day period that the application is complete or incomplete, the failure to notify shall be deemed to constitute an approval of the permit.
(3)If the department deems a permit application incomplete, the department shall do all of the following:
(A)Provide a written notice to the applicant that explains why the application is incomplete, with reference to the specific application criteria that the application does not meet.
(B)Provide a specific written description identifying all supplemental information necessary to complete the application.
(C)In a timely manner and no later than _____ 14 days after providing the written notice, a meeting is requested by the applicant, meet with the applicant to discuss any outstanding supplemental information necessary to complete the application.
(D)Provide the applicant with no less than 30 days to resubmit its application with the supplemental information that the department identified in the notice.
(4)Within 30 days after receiving supplemental information from an applicant, the department shall approve or deny the application. The departments failure to notify an applicant within that 30-day period that the permit is denied shall be deemed to constitute an approval of the permit.
(5)If a proposed broadband facility requires an encroachment permit but does not require any additional approval from a city or county, the department shall offer to act as the lead agency for purposes of ensuring compliance with the California Environmental Quality Act. If the department does not serve as lead agency, the Public Utilities Commission may act as lead agency.
(c)If the department denies an application for an encroachment permit, the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(d)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(e)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)Notwithstanding any other provision of this section or procedures set forth in the Utility Encroachments Permit Application Guide, all of the following shall apply to the departments review of an application for an encroachment permit for a broadband facility:
(1)The department shall specify in writing and provide public notice of all permit application criteria. The department shall not impose any new or different permit application criteria to a broadband facility encroachment permit application after that application is initially submitted.
(2)Within 30 days after an application for an encroachment permit for a broadband facility is submitted, the department shall notify the applicant in writing whether the permit application is deemed complete. If the department does not notify the applicant within that 30-day period that the application is complete or incomplete, the failure to notify shall be deemed to constitute an approval of the permit.
(3)If the department deems a permit application incomplete, the department shall do all of the following:
(A)Provide a written notice to the applicant that explains why the application is incomplete, with reference to the specific application criteria that the application does not meet.
(B)Provide a specific written description identifying all supplemental information necessary to complete the application.
(C)In a timely manner and no later than _____ days after providing the written notice, meet with the applicant to discuss any outstanding supplemental information necessary to complete the application.
(D)Provide the applicant with no less than 30 days to resubmit its application with the supplemental information that the department identified in the notice.
(4)Within 30 days after receiving supplemental information from an applicant, the department shall approve or deny the application. The departments failure to notify an applicant within that 30-day period that the permit is denied shall be deemed to constitute an approval of the permit.
(5)If a proposed broadband facility requires an encroachment permit but does not require any additional approval from a city or county, the department shall offer to act as the lead agency for purposes of ensuring compliance with the California Environmental Quality Act. If the department does not serve as lead agency, the Public Utilities Commission may act as lead agency.
(b)(c)If the department denies an application for an encroachment permit, the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(c)(d)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(d)(e)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
(a)The department shall either approve or deny an application from an applicant for an encroachment permit within 60 days of receiving a completed application, as determined by the department. An application for an encroachment permit is complete when all other statutory requirements, including the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code), have been complied with. The departments failure to notify the applicant within that 60-day period that the permit is denied shall be deemed to constitute approval of the permit. Thereafter, upon notifying the department, the applicant may act in accordance with its permit application, as if the permit had been approved.
(b)If the department denies an application for an encroachment permit, it the department shall, at the time of notifying the applicant of the denial, furnish to the applicant a detailed explanation of the reason for the denial.
(c)The department shall adopt regulations prescribing procedures for an applicant to appeal to the director for a final determination of the departments denial of an application. The appeal shall be made in writing to the director. There shall be a final written determination by the director within 60 calendar days after receipt of the applicants written appeal. The adopted regulations shall require the appellant to pay to the department a fee of not more than 50 percent of the estimated administrative cost to the department of conducting the appeal.
(d)Nothing in this section precludes an applicant and the department from mutually agreeing to an extension of any time limit provided by this section.
|
Date
|
Status
|
|---|---|
| Oct 8, 2021 | Chaptered by Secretary of State - Chapter 670, Statutes of 2021. |
| Oct 8, 2021 | Approved by the Governor. |
| Sep 15, 2021 | Enrolled and presented to the Governor at 5 p.m. |
| Sep 8, 2021 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 78. Noes 0. Page 2908.). |
| Sep 8, 2021 | Assembly Rule 77 suspended. (Ayes 59. Noes 17. Page 2875.) |
| Sep 7, 2021 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after September 9 pursuant to Assembly Rule 77. |
| Sep 7, 2021 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0. Page 2460.). |
| Sep 2, 2021 | Read second time. Ordered to third reading. |
| Sep 1, 2021 | Read third time and amended. Ordered to second reading. |
| Aug 30, 2021 | Read second time. Ordered to third reading. |
| Aug 26, 2021 | From committee: Amend, and do pass as amended. (Ayes 7. Noes 0.) (August 26). |
| Jul 5, 2021 | In committee: Referred to suspense file. |
| Jun 24, 2021 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (June 24). Re-referred to Com. on APPR. |
| Jun 16, 2021 | Referred to Com. on TRANS. |
| Jun 2, 2021 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 1, 2021 | Read third time. Passed. Ordered to the Senate. (Ayes 79. Noes 0. Page 1778.) |
| May 25, 2021 | Read second time. Ordered to third reading. |
| May 24, 2021 | Read second time and amended. Ordered returned to second reading. |
| May 20, 2021 | From committee: Amend, and do pass as amended. (Ayes 12. Noes 0.) (May 20). |
| May 12, 2021 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 29, 2021 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 13. Noes 0.) (April 28). Re-referred to Com. on APPR. |
| Apr 13, 2021 | From committee: Do pass and re-refer to Com. on C. & C. with recommendation: To Consent Calendar. (Ayes 15. Noes 0.) (April 12). Re-referred to Com. on C. & C. |
| Apr 7, 2021 | Re-referred to Com. on TRANS. |
| Apr 6, 2021 | From committee chair, with author's amendments: Amend, and re-refer to Com. on TRANS. Read second time and amended. |
| Mar 23, 2021 | Re-referred to Com. on TRANS. |
| Mar 22, 2021 | From committee chair, with author's amendments: Amend, and re-refer to Com. on TRANS. Read second time and amended. |
| Mar 18, 2021 | Referred to Coms. on TRANS. and C. & C. |
| Feb 18, 2021 | From printer. May be heard in committee March 20. |
| Feb 17, 2021 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 8, 2021 | AB 955 Quirk Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 7, 2021 | Assembly 3rd Reading AB955 Quirk By Dodd | Senate Floor |
Passed |
|
| Jun 1, 2021 | AB 955 Quirk Assembly Third Reading | Assembly Floor |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Bill Author
Bill Co-Author(s):