AB 323: California Environmental Quality Act: exemption: roadway improvement.
- Session Year: 2015-2016
- House: Assembly
- Latest Version Date: 2015-07-06
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2016, exempts a project or an activity to repair, maintain, or make minor alterations to an existing roadway, as defined, if the project or activity is carried out by a city or county with a population of less than 100,000 persons to improve public safety and meets other specified requirements.
This bill would extend the above exemption to January 1, 2020.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2016, exempts a project or an activity to repair, maintain, or make minor alterations to an existing roadway, as defined, if the project or activity is carried out by a city or county with a population of less than 100,000 persons to improve public safety and meets other specified requirements.
This bill would extend the above exemption to January 1, 2020.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2016, exempts a project or an activity to repair, maintain, or make minor alterations to an existing roadway, as defined, if the project or activity is carried out by a city or county with a population of less than 100,000 persons to improve public safety and meets other specified requirements.
This bill would extend the above exemption indefinitely. to January 1, 2020.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of, an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
CEQA, until January 1, 2016, exempts a project or an activity to repair, maintain, or make minor alterations to an existing roadway, as defined, if the project or activity is carried out by a city or county with a population of less than 100,000 persons to improve public safety and meets other specified requirements.
This bill would extend the above exemption indefinitely.
(a)This division does not apply to a project or an activity to repair, maintain, or make minor alterations to an existing roadway if all of the following conditions are met:
(1)The project is carried out by a city or county with a population of less than 100,000 persons to improve public safety.
(2)(A)The project does not cross a waterway.
(B)For purposes of this paragraph, waterway means a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline.
(3)The project involves negligible or no expansion of an existing use beyond that existing at the time of the lead agencys determination.
(4)The roadway is not a state roadway.
(5)(A)The site of the project does not contain wetlands or riparian areas and does not have significant value as a wildlife habitat, and the project does not harm any species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), or the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), and the project does not cause the destruction or removal of any species protected by a local ordinance.
(B)For the purposes of this paragraph:
(i)Riparian areas mean those areas transitional between terrestrial and aquatic ecosystems and that are distinguished by gradients in biophysical conditions, ecological processes, and biota. A riparian area is an area through which surface and subsurface hydrology connect waterbodies with their adjacent uplands. A riparian area includes those portions of terrestrial ecosystems that significantly influence exchanges of energy and matter with aquatic ecosystems. A riparian area is adjacent to perennial, intermittent, and ephemeral streams, lakes, and estuarine-marine shorelines.
(ii)Significant value as a wildlife habitat includes wildlife habitat of national, statewide, regional, or local importance; habitat for species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531, et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code); habitat identified as candidate, fully protected, sensitive, or species of special status by local, state, or federal agencies; or habitat essential to the movement of resident or migratory wildlife.
(iii)Wetlands has the same meaning as in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(iv)Wildlife habitat means the ecological communities upon which wild animals, birds, plants, fish, amphibians, and invertebrates depend for their conservation and protection.
(6)The project does not impact cultural resources.
(7)The roadway does not affect scenic resources, as provided pursuant to subdivision (c) of Section 21084.
(b)Prior to determining that a project is exempt pursuant to this section, the lead agency shall do both of the following:
(1)Include measures in the project to mitigate potential vehicular traffic and safety impacts and bicycle and pedestrian safety impacts.
(2)Hold a noticed public hearing on the project to hear and respond to public comments. The hearing on the project may be conducted with another noticed lead agency public hearing. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code, by the public agency in a newspaper of general circulation in the area.
(c)For purposes of this section, roadway means a roadway as defined pursuant to Section 530 of the Vehicle Code and the previously graded and maintained shoulder that is within a roadway right-of-way of no more than five feet from the edge of the roadway.
(d)Whenever a local agency determines that a project is not subject to this division pursuant to this section, and it approves or determines to carry out that project, the local agency shall file a notice with the Office of Planning and Research, and with the county clerk in the county in which the project will be located in the manner specified in subdivisions (b) and (c) of Section 21152.
(e)This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.
(a)This division does not apply to a project or an activity to repair, maintain, or make minor alterations to an existing roadway if all of the following conditions are met:
(1)The project is carried out by a city or county with a population of less than 100,000 persons to improve public safety.
(2)(A)The project does not cross a waterway.
(B)For purposes of this paragraph, waterway means a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline.
(3)The project involves negligible or no expansion of an existing use beyond that existing at the time of the lead agencys determination.
(4)The roadway is not a state roadway.
(5)(A)The site of the project does not contain wetlands or riparian areas and does not have significant value as a wildlife habitat, and the project does not harm any species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), or the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), and the project does not cause the destruction or removal of any species protected by a local ordinance.
(B)For the purposes of this paragraph:
(i)Riparian areas mean those areas transitional between terrestrial and aquatic ecosystems and that are distinguished by gradients in biophysical conditions, ecological processes, and biota. A riparian area is an area through which surface and subsurface hydrology connect waterbodies with their adjacent uplands. A riparian area includes those portions of terrestrial ecosystems that significantly influence exchanges of energy and matter with aquatic ecosystems. A riparian area is adjacent to perennial, intermittent, and ephemeral streams, lakes, and estuarine-marine shorelines.
(ii)Significant value as a wildlife habitat includes wildlife habitat of national, statewide, regional, or local importance; habitat for species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531, et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code); habitat identified as candidate, fully protected, sensitive, or species of special status by local, state, or federal agencies; or habitat essential to the movement of resident or migratory wildlife.
(iii)Wetlands has the same meaning as in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(iv)Wildlife habitat means the ecological communities upon which wild animals, birds, plants, fish, amphibians, and invertebrates depend for their conservation and protection.
(6)The project does not impact cultural resources.
(7)The roadway does not affect scenic resources, as provided pursuant to subdivision (c) of Section 21084.
(b)Prior to determining that a project is exempt pursuant to this section, the lead agency shall do both of the following:
(1)Include measures in the project to mitigate potential vehicular traffic and safety impacts and bicycle and pedestrian safety impacts.
(2)Hold a noticed public hearing on the project to hear and respond to public comments. The hearing on the project may be conducted with another noticed lead agency public hearing. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code, by the public agency in a newspaper of general circulation in the area.
(c)For purposes of this section, roadway means a roadway as defined pursuant to Section 530 of the Vehicle Code and the previously graded and maintained shoulder that is within a roadway right-of-way of no more than five feet from the edge of the roadway.
(d)Whenever a local agency determines that a project is not subject to this division pursuant to this section, and it approves or determines to carry out that project, the local agency shall file a notice with the Office of Planning and Research, and with the county clerk in the county in which the project will be located in the manner specified in subdivisions (b) and (c) of Section 21152.
(e)This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.
(a)This division does not apply to a project or an activity to repair, maintain, or make minor alterations to an existing roadway if all of the following conditions are met:
(1)The project is carried out by a city or county with a population of less than 100,000 persons to improve public safety.
(2)(A)The project does not cross a waterway.
(B)For purposes of this paragraph, waterway means a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline.
(3)The project involves negligible or no expansion of an existing use beyond that existing at the time of the lead agencys determination.
(4)The roadway is not a state roadway.
(5)(A)The site of the project does not contain wetlands or riparian areas and does not have significant value as a wildlife habitat, and the project does not harm any species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), or the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), and the project does not cause the destruction or removal of any species protected by a local ordinance.
(B)For the purposes of this paragraph:
(i)Riparian areas mean those areas transitional between terrestrial and aquatic ecosystems and that are distinguished by gradients in biophysical conditions, ecological processes, and biota. A riparian area is an area through which surface and subsurface hydrology connect waterbodies with their adjacent uplands. A riparian area includes those portions of terrestrial ecosystems that significantly influence exchanges of energy and matter with aquatic ecosystems. A riparian area is adjacent to perennial, intermittent, and ephemeral streams, lakes, and estuarine-marine shorelines.
(ii)Significant value as a wildlife habitat includes wildlife habitat of national, statewide, regional, or local importance; habitat for species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531, et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code); habitat identified as candidate, fully protected, sensitive, or species of special status by local, state, or federal agencies; or habitat essential to the movement of resident or migratory wildlife.
(iii)Wetlands has the same meaning as in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(iv)Wildlife habitat means the ecological communities upon which wild animals, birds, plants, fish, amphibians, and invertebrates depend for their conservation and protection.
(6)The project does not impact cultural resources.
(7)The roadway does not affect scenic resources, as provided pursuant to subdivision (c) of Section 21084.
(b)Prior to determining that a project is exempt pursuant to this section, the lead agency shall do both of the following:
(1)Include measures in the project to mitigate potential vehicular traffic and safety impacts and bicycle and pedestrian safety impacts.
(2)Hold a noticed public hearing on the project to hear and respond to public comments. The hearing on the project may be conducted with another noticed lead agency public hearing. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code, by the public agency in a newspaper of general circulation in the area.
(c)For purposes of this section, roadway means a roadway as defined pursuant to Section 530 of the Vehicle Code and the previously graded and maintained shoulder that is within a roadway right-of-way of no more than five feet from the edge of the roadway.
(d)Whenever a local agency determines that a project is not subject to this division pursuant to this section, and it approves or determines to carry out that project, the local agency shall file a notice with the Office of Planning and Research, and with the county clerk in the county in which the project will be located in the manner specified in subdivisions (b) and (c) of Section 21152.
(e)This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.
(a)This division does not apply to a project or an activity to repair, maintain, or make minor alterations to an existing roadway if all of the following conditions are met:
(1)The project is carried out by a city or county with a population of less than 100,000 persons to improve public safety.
(2)(A)The project does not cross a waterway.
(B)For purposes of this paragraph, waterway means a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline.
(3)The project involves negligible or no expansion of an existing use beyond that existing at the time of the lead agencys determination.
(4)The roadway is not a state roadway.
(5)(A)The site of the project does not contain wetlands or riparian areas and does not have significant value as a wildlife habitat, and the project does not harm any species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code), or the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), and the project does not cause the destruction or removal of any species protected by a local ordinance.
(B)For the purposes of this paragraph:
(i)Riparian areas mean those areas transitional between terrestrial and aquatic ecosystems and that are distinguished by gradients in biophysical conditions, ecological processes, and biota. A riparian area is an area through which surface and subsurface hydrology connect waterbodies with their adjacent uplands. A riparian area includes those portions of terrestrial ecosystems that significantly influence exchanges of energy and matter with aquatic ecosystems. A riparian area is adjacent to perennial, intermittent, and ephemeral streams, lakes, and estuarine-marine shorelines.
(ii)Significant value as a wildlife habitat includes wildlife habitat of national, statewide, regional, or local importance; habitat for species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531, et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code); habitat identified as candidate, fully protected, sensitive, or species of special status by local, state, or federal agencies; or habitat essential to the movement of resident or migratory wildlife.
(iii)Wetlands has the same meaning as in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(iv)Wildlife habitat means the ecological communities upon which wild animals, birds, plants, fish, amphibians, and invertebrates depend for their conservation and protection.
(6)The project does not impact cultural resources.
(7)The roadway does not affect scenic resources, as provided pursuant to subdivision (c) of Section 21084.
(b)Prior to determining that a project is exempt pursuant to this section, the lead agency shall do both of the following:
(1)Include measures in the project to mitigate potential vehicular traffic and safety impacts and bicycle and pedestrian safety impacts.
(2)Hold a noticed public hearing on the project to hear and respond to public comments. The hearing on the project may be conducted with another noticed lead agency public hearing. Publication of the notice shall be no fewer times than required by Section 6061 of the Government Code, by the public agency in a newspaper of general circulation in the area.
(c)For purposes of this section, roadway means a roadway as defined pursuant to Section 530 of the Vehicle Code and the previously graded and maintained shoulder that is within a roadway right-of-way of no more than five feet from the edge of the roadway.
(d)Whenever a local agency determines that a project is not subject to this division pursuant to this section, and it approves or determines to carry out that project, the local agency shall file a notice with the Office of Planning and Research, and with the county clerk in the county in which the project will be located in the manner specified in subdivisions (b) and (c) of Section 21152.
(e)This section shall remain in effect only until January 1, 2016, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2016, deletes or extends that date.
|
Date
|
Status
|
|---|---|
| Jul 6, 2015 | Chaptered by Secretary of State - Chapter 52, Statutes of 2015. |
| Jul 6, 2015 | Approved by the Governor. |
| Jun 26, 2015 | Enrolled and presented to the Governor at 11 a.m. |
| Jun 23, 2015 | In Assembly. Ordered to Engrossing and Enrolling. |
| Jun 22, 2015 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0. Page 1548.). |
| Jun 22, 2015 | Read third time. Passed. Ordered to the Assembly. |
| Jun 18, 2015 | Read second time. Ordered to Consent Calendar. |
| Jun 17, 2015 | From committee: Do pass. To Consent Calendar. (Ayes 7. Noes 0.) (June 17). |
| May 7, 2015 | Referred to Com. on E.Q. |
| Apr 27, 2015 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Apr 27, 2015 | Read third time. Passed. Ordered to the Senate. (Ayes 79. Noes 0. Page 1145.) |
| Apr 27, 2015 | Read third time. Passed. Ordered to the Senate. |
| Apr 22, 2015 | Read second time. Ordered to Consent Calendar. |
| Apr 21, 2015 | From committee: Do pass. To Consent Calendar. (Ayes 15. Noes 0.) (April 20). |
| Apr 7, 2015 | Re-referred to Com. on TRANS. |
| Apr 6, 2015 | Read second time and amended. |
| Mar 26, 2015 | From committee: Amend, and do pass as amended and re-refer to Com. on TRANS. (Ayes 9. Noes 0.) (March 23). |
| Feb 23, 2015 | Referred to Coms. on NAT. RES. and TRANS. |
| Feb 17, 2015 | From printer. May be heard in committee March 19. |
| Feb 13, 2015 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jun 22, 2015 | Consent Calendar 2nd AB323 Olsen | Senate Floor |
Passed |
|
| Jun 17, 2015 | Do pass and be ordered to the Consent Calendar | Senate Standing Committee on Environmental Quality |
Passed |
|
| Apr 27, 2015 | AB 323 OLSEN Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Apr 20, 2015 | Do pass. To Consent Calendar. | Assembly Standing Committee on Transportation |
Passed |
|
| Mar 23, 2015 | Do pass as amended and be re-referred to the Committee on [Transportation] | Assembly Standing Committee on Natural Resources |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
AB 323
Page 7
|
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 |
CONSENT
Bill No: AB 323
Amended: 4/6/15 in Assembly
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 6/17/15
AYES: Wieckowski, Gaines, Bates, Hill, Jackson, Leno, Pavley
ASSEMBLY FLOOR: 79-0, 4/27/15 (Consent) - See last page for vote
SUBJECT: California Environmental Quality Act: exemption: roadway improvement
DIGEST: This bill extends the January 1, 2016 sunset date to January 1, 2020, on an exemption from the California Environmental Quality Act (CEQA) for projects to repair, maintain, and make minor alterations to existing roadways under specified conditions.
Existing
law, under CEQA:
Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
Requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or EIR
for this project, unless the project is exempt from CEQA.
Exempts from CEQA, until January 1, 2016, minor roadway repairs, maintenance and minor alterations as follows (PRC §21080.37):
Requires the project to meet the following conditions:
The project is carried out by a city or county with a population of less than 100,000 to improve public safety.
The project does not cross a “waterway” (defined as a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline).
The project involves negligible or no expansion of an existing use.
The project is not on a state roadway.
The site of the project does not contain wetlands, riparian areas, or significant wildlife habitat value and does not harm any protected species, impact cultural resources, or affect scenic resources.
Requires the lead agency to:
Include measures in the project to mitigate potential vehicular traffic and safety impacts and bicycle and pedestrian safety impacts.
Hold a noticed public hearing on the project to hear and respond to public comments.
File a notice of exemption with the Office of Planning and Research (OPR).
This
bill extends the January 1, 2016 sunset date to January 1, 2020, on
an exemption from CEQA, pursuant to PRC §21080.37, for projects to
repair, maintain, and make minor alterations to existing roadways
under specified conditions.
Background
CEQA: Environmental review process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, then the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received an environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
If a mitigation measure would cause one or more significant effects in addition to those that would be caused by the proposed project, the effects of the mitigation measure must be discussed but in less detail than the significant effects of the proposed project.
What is analyzed in an environmental review? Pursuant to CEQA, an environmental review analyzing the significant direct and indirect environmental impacts of a proposed project, may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, cultural resources, and tribal cultural resources.
The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary. Also, CEQA stipulates that the environmental impacts must be measured against existing physical conditions within the project area, not future, allowable conditions.
Comments
Purpose of Bill. According to the author, “California has four times as many traffic fatalities on rural non-interstate roads compared to all other roads. Oftentimes, small communities come across minor or emergency roadway repairs that need to be made quickly. To delay or halt those repairs is to impact the safety and economic health of small communities that may have limited road alternatives. AB 323 would allow the streamlined process to continue to save lives.”
Has this exemption been used yet? AB 890 (Olsen, Chapter 528, Statutes of 2012) established the exemption, which is the subject of AB 323. Among the conditions, AB 890 required lead agencies claiming this exemption to file a notice of exemption with OPR. OPR reports no notices filed to date, so it appears that the AB 890 exemption has yet to be used. To preserve the Legislature’s ability to periodically evaluate the effects of this exemption, AB 323 extends the sunset to January 1, 2020.
What is lost with a CEQA exemption? It is not unusual for certain interests to assert that a particular exemption will expedite construction of a particular type of project and reduce costs. This, however, frequently overlooks the benefits of adequate environmental review where lead and responsible agencies are legally accountable for their actions to:
Inform decisionmakers and the public about project impacts;
Identify ways to avoid or significantly reduce environmental damage;
Prevent environmental damage by requiring feasible alternatives or mitigation measures;
Disclose to the public reasons why an agency approved a project if significant environmental effects are involved;
Involve public agencies in the process; and,
Increase public participation in the environmental review and the planning processes.
If a project is exempt from CEQA, certain issues should be
addressed. For example:
How can decisionmakers and the public be aware of impacts, mitigation measures, and alternatives of a project because of the exemption?
Is it appropriate for the public to live with the consequences when a project is exempt and impacts may not be mitigated and alternatives may not be considered regarding certain matters, such as air quality, water quality, and noise impacts?
Because adverse project impacts do not disappear when they are not identified and mitigated, does an exemption result in a direct transfer of responsibility for mitigating impacts from the applicant to the public (i.e., taxpayers) if impacts are ultimately addressed after completion of the project?
If taxpayers, rather than the project applicant, are ultimately responsible for mitigating certain impacts of such a project after project completion, what assessments or taxes will be increased to fund mitigation or pay for alternatives at a later date?
It is also not unusual for certain interests to blame CEQA lawsuits.
However, according to a study on the issue, “Despite criticisms
that CEQA often results in litigation, CEQA-related litigation is
relatively rare.” The study noted that the number of lawsuits to
the number of CEQA reviews “yields an estimate of one lawsuit per
354 CEQA reviews.”
Those citing CEQA and CEQA litigation
as a problem do not indicate the result of that litigation. Were
significant impacts that were not evaluated in the initial document
ultimately addressed? What would have been the result if those
impacts had not been mitigated (e.g., flooding, exposure of people to
hazards, inadequate public services, congestion)?
Related/Prior Legislation
AB 890 (Olsen, Chapter 528, Statutes of 2012) exempted a project or activity from CEQA to repair, maintain, or make minor alterations to an existing roadway if certain conditions are met, and sunsets January 1, 2016.
FISCAL EFFECT: Appropriation: No Fiscal Com.: No Local: No
American Society of Civil Engineers Region 9
Association of California Cities – Orange County
California Association of Councils of Governments
California Chamber of Commerce
California Central Valley Flood Control Association
California Construction Trucking Association
California Council for Environmental and Economic Balance
California State Association of Counties
City of Camarillo
City of Fountain Valley
City of Indian Wells
City of Ventura
County of Tuolumne
League of California Cities
Rural County Representatives of California
Southwest California Legislative Council
Town of Danville
Transportation Agency for Monterey County
United Contractors
OPPOSITION: (Verified 6/18/15)
None received
ASSEMBLY FLOOR: 79-0, 4/27/15
AYES: Achadjian, Alejo, Travis Allen, Baker, Bigelow, Bloom, Bonilla, Bonta, Brough, Brown, Burke, Calderon, Chang, Chau, Chávez, Chiu, Chu, Cooley, Cooper, Dababneh, Dahle, Daly, Dodd, Eggman, Frazier, Beth Gaines, Gallagher, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Grove, Hadley, Harper, Roger Hernández, Holden, Irwin, Jones, Jones-Sawyer, Kim, Lackey, Levine, Linder, Lopez, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Nazarian, Obernolte, O'Donnell, Olsen, Patterson, Perea, Quirk, Rendon, Ridley-Thomas, Rodriguez, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Wagner, Waldron, Weber, Wilk, Williams, Wood, Atkins
NO VOTE RECORDED: Campos
Prepared by: Joanne Roy / E.Q. / (916) 651-4108
6/18/15 13:44:55
AB 323 (Olsen) Page 6 of 6
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Wieckowski, Chair
2015 - 2016 Regular
Bill No: AB 323
Author: |
Olsen |
||
Version: |
4/6/2015 |
Hearing Date: |
6/17/2015 |
Urgency: |
No |
Fiscal: |
No |
Consultant: |
Joanne Roy |
||
SUBJECT: California Environmental Quality Act: exemption: roadway improvement
ANALYSIS:
Existing
law, under the California Environmental Quality Act (CEQA):
Requires lead agencies with the principal responsibility for carrying out or approving a proposed discretionary project to prepare a negative declaration, mitigated declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) §21000 et seq.).
Requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this project, unless the project is exempt from CEQA.
Exempts from CEQA, until January 1, 2016, minor roadway repairs, maintenance and minor alterations as follows (PRC §21080.37):
Requires the project to meet the following conditions:
The project is carried out by a city or county with a population of less than 100,000 to improve public safety.
The project does not cross a “waterway” (defined as a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline).
The project involves negligible or no expansion of an existing use.
The project is not on a state roadway.
The site of the project does not contain wetlands, riparian areas, or significant wildlife habitat value and does not harm any protected species, impact cultural resources, or affect scenic resources.
Requires the lead agency to:
Include measures in the project to mitigate potential vehicular traffic and safety impacts and bicycle and pedestrian safety impacts.
Hold a noticed public hearing on the project to hear and respond to public comments.
File a notice of exemption with the Office of Planning and Research (OPR).
This
bill extends the January 1, 2016 sunset date to January 1, 2020 on an
exemption from CEQA, pursuant to PRC §21080.37, for projects to
repair, maintain, and make minor alterations to existing roadways
under specified conditions.
Background
CEQA: Environmental review process.
CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, then the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received an environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
If a mitigation measure would cause one or more significant effects in addition to those that would be caused by the proposed project, the effects of the mitigation measure must be discussed but in less detail than the significant effects of the proposed project.
What is analyzed in an environmental review?
Pursuant to CEQA, an environmental review analyzing the significant direct and indirect environmental impacts of a proposed project, may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, cultural resources, and tribal cultural resources.
The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated. A study area for a proposed project must not be limited to the footprint of the project because many environmental impacts of a development extend beyond the identified project boundary. Also, CEQA stipulates that the environmental impacts must be measured against existing physical conditions within the project area, not future, allowable conditions.
Comments
Purpose of Bill.
According to the author, “California has four times as many traffic fatalities on rural non-interstate roads compared to all other roads. Oftentimes, small communities come across minor or emergency roadway repairs that need to be made quickly. To delay or halt those repairs is to impact the safety and economic health of small communities that may have limited road alternatives. AB 323 would allow the streamlined process to continue to save lives.”
Has this exemption been used yet?
AB 890 (Olsen, Chapter 528, Statutes of 2012), established the exemption, which is the subject of AB 323. Among the conditions, AB 890 required lead agencies claiming this exemption to file a notice of exemption with OPR. OPR reports no notices filed to date, so it appears that the AB 890 exemption has yet to be used. To preserve the Legislature’s ability to periodically evaluate the effects of this exemption, AB 323 extends the sunset to January 1, 2020.
What is lost with a CEQA exemption?
It is not unusual for certain interests to assert that a particular exemption will expedite construction of a particular type of project and reduce costs. This, however, frequently overlooks the benefits of adequate environmental review where lead and responsible agencies are legally accountable for their actions to:
Inform decisionmakers and the public about project impacts;
Identify ways to avoid or significantly reduce environmental damage;
Prevent environmental damage by requiring feasible alternatives or mitigation measures;
Disclose to the public reasons why an agency approved a project if significant environmental effects are involved;
Involve public agencies in the process; and,
Increase public participation in the environmental review and the planning processes.
If
a project is exempt from CEQA, certain issues should be addressed.
For example:
How can decisionmakers and the public be aware of impacts, mitigation measures, and alternatives of a project because of the exemption?
Is it appropriate for the public to live with the consequences when a project is exempt and impacts may not be mitigated and alternatives may not be considered regarding certain matters, such as air quality, water quality, and noise impacts?
Because adverse project impacts do not disappear when they are not identified and mitigated, does an exemption result in a direct transfer of responsibility for mitigating impacts from the applicant to the public (i.e., taxpayers) if impacts are ultimately addressed after completion of the project?
If taxpayers, rather than the project applicant, are ultimately responsible for mitigating certain impacts of such a project after project completion, what assessments or taxes will be increased to fund mitigation or pay for alternatives at a later date?
It
is also not unusual for certain interests to blame CEQA lawsuits.
However, according to a study on the issue, “Despite criticisms
that CEQA often results in litigation, CEQA-related litigation is
relatively rare.” The study noted that the number of lawsuits to
the number of CEQA reviews “yields an estimate of one lawsuit per
354 CEQA reviews.”
Those citing CEQA and CEQA litigation
as a problem do not indicate the result of that litigation. Were
significant impacts that were not evaluated in the initial document
ultimately addressed? What would have been the result if those
impacts had not been mitigated (e.g., flooding, exposure of people to
hazards, inadequate public services, congestion)?
Related/Prior Legislation
AB
890 (Olsen, Chapter 528, Statutes of 2012), exempted a project or
activity from CEQA to repair, maintain, or make minor alterations to
an existing roadway if certain conditions are met, and sunsets
January 1, 2016.
SOURCE:
Author
SUPPORT:
American Society of Civil Engineers Region 9
Association of California Cities – Orange County
California Chamber of Commerce
California Central Valley Flood Control Association
California State Association of Counties
California Construction Trucking Association
City of Camarillo
City of Fountain Valley
City of Indian Wells
League of California Cities
Rural County Representatives of California
Southwest California Legislative Council
Town of Danville
Tuolumne County Board of Supervisors
OPPOSITION:
None received
-- END --
AB 323
Page 3
Date of Hearing: April 20, 2015
ASSEMBLY COMMITTEE ON TRANSPORTATION
Jim Frazier, Chair
AB 323
(Olsen) – As Amended April 6, 2015
SUBJECT: California Environmental Quality Act: exemption: roadway improvement
SUMMARY: Extends the January 1, 2016, sunset date, until January 1, 2020, on an exemption from the California Environmental Quality Act (CEQA) for projects to repair, maintain, and make minor alterations to existing roadways.
EXISTING LAW:
Requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this project, unless the project is exempt from CEQA.
Exempts from CEQA, until January 1, 2016, minor roadway repairs, maintenance and minor alterations meeting the following conditions:
The project is carried out by a city or county with a population of less than 100,000 to improve public safety.
The project does not cross a "waterway" (defined as a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline).
The project involves negligible or no expansion of an existing use.
The project is not on a state highway.
The site of the project does not contain wetlands, riparian areas, or significant wildlife habitat value and does not harm any protected species, impact cultural resources, or affect scenic resources.
Requires the lead agency to: include measures in the project to mitigate potential vehicular traffic and safety impacts and bicycle and pedestrian safety impacts, hold a noticed public hearing on the project to hear and respond to public comments, and file a notice of exemption with the Office of Planning and Research (OPR).
Exempts from CEQA any emergency project undertaken by a public agency to maintain, repair, or restore an existing highway that has been damaged as a result of fire, flood, storm, earthquake, land subsidence, gradual earth movement, or landslide, within one year of the damage.
FISCAL EFFECT: Unknown
COMMENTS: CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR. Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the project.
Legislation enacted in 2012, AB 890 (Olsen), Chapter 528, Statutes of 2012, exempted from CEQA minor highway repair projects carried out by a local government, until January 1, 2016. This exemption is consistent with other existing CEQA exemptions. For example, CEQA guidelines provide a categorical exemption for work on existing facilities where there is negligible expansion of an existing use, specifically including existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities. Additionally, emergency projects undertaken by a public agency to maintain, repair, or restore an existing highway that has been damaged as a result of fire, flood, storm, earthquake, land subsidence, gradual earth movement or landslide are exempt from CEQA if carried out within one year of the damage.
AB 890 included a
provision that requires lead agencies claiming the exemption to file
a notice with OPR. According to the Assembly Natural Resources
Committee analysis, where this bill was heard previously, OPR reports
no notices filed to date related to the AB 890 exemption.
Consequently, it appears the AB 890 exemption has not been used yet.
To preserve the Legislature's ability to periodically evaluate the
effects of this exemption, AB 323 includes a
four-year sunset,
until January 1, 2020.
Supporters assert that, while the need for environmental review on major projects is without question, less intensive safety projects, such as installing or replacing a guardrail within the existing footprint of a local street, have few if any environmental impacts. They support AB 323 because it has the potential to save money and time, especially for local authorities in rural areas of the state.
Double-referral:
This bill passed out of the Assembly Natural Resources Committee
on
March 23, 2015, with a 9-0 vote.
Previous legislation: AB 890 (Olsen), Chapter 528, Statutes of 2012, provided the original CEQA exemption for minor repairs of existing roadwork.
REGISTERED SUPPORT / OPPOSITION:
Support
Association of California Cities—Orange County
California Central Valley Flood Control Association
California Chamber of Commerce
California Construction Trucking Association
California State Association of Counties
League of California Cities
Rural County Representatives of California
Southwest California Legislative Council
Tuolumne County Board of Supervisors
Opposition
None on file
Analysis Prepared by: Janet Dawson / TRANS. / (916) 319-2093
AB 323
Page 2
Date of Hearing: March 23, 2015
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Das Williams, Chair
AB 323
(Olsen) – As Introduced February 13, 2015
SUBJECT: California Environmental Quality Act: exemption: roadway improvement
SUMMARY: Repeals the January 1, 2016 sunset on an exemption from the California Environmental Quality Act (CEQA) for projects to repair, maintain, and make minor alterations to existing roadways, provided the project is carried out by a city or county with a population of less than 100,000 to improve public safety and meets other specified conditions.
EXISTING LAW:
Requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines).
Exempts, until January 1, 2016, minor roadway repairs, maintenance and minor alterations meeting the following conditions:
The project is carried out by a city or county with a population of less than 100,000 to improve public safety.
The project does not cross a "waterway" (defined as a bay, estuary, lake, pond, river, slough, or a perennial, intermittent, or ephemeral stream, lake, or estuarine-marine shoreline).
Exclude projects on state roadways; sites containing wetlands, riparian areas, and significant wildlife habitat value; and that harm any protected species, impact cultural resources, or affect scenic resources.
Require the lead agency to mitigate potential vehicular traffic and safety impacts, and bicycle and pedestrian safety impacts; hold a noticed public hearing on the project to hear and respond to public comments; and to file a notice of exemption with the Office of Planning and Research (OPR).
FISCAL EFFECT: Non-fiscal
COMMENTS:
Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. Prior to approving any project that has received environmental review, an agency must make certain findings. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
It should be noted that CEQA already provides alternatives to comprehensive environmental review for minor projects. First, the CEQA Guidelines provide a categorical exemption for work on existing facilities where there is negligible expansion of an existing use, specifically including "(e)xisting highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities," (CEQA Guidelines, Section 15301(c)). Second, if the project is not exempt from CEQA, but the initial study shows that it would not result in a significant effect on the environment, the lead agency must prepare a negative declaration, and no EIR is required.
Jury is out on the AB 890 exemption. In 2012, AB 890 (Olsen) established the minor roadway exemption that is the subject of this bill. AB 890 included a January 1, 2016 sunset. Among its conditions, AB 890 required lead agencies claiming exemption to file a notice with OPR. OPR reports no notices filed to date, so it appears the AB 890 exemption has not been used yet. To preserve the Legislature's ability to periodically evaluate the effects of this exemption, the author and the committee may wish to consider extending the sunset by four years, to January 1, 2020, rather than eliminating it.
REGISTERED SUPPORT / OPPOSITION:
Support
California Central Valley Flood Control Association
California Chamber of Commerce
Rural County Representatives of California
Southwest California Legislative Council
Opposition
None on file
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. / (916) 319-2092
Bill Author
Bill Co-Author(s):