The ZBerg-Nejedly Forest Practice Act of 1973 prohibits a person from conducting timber operations, as defined, unless a timber harvesting plan prepared by a registered professional forester has been submitted to, and is approved by, the Department of Forestry and Fire Protection. Existing law requires a timber harvesting plan that is approved by the department on or after July 1, 2012, to be effective for a period of not more than 5 years, unless extended for 2 years, as provided. Existing law allows for a timber harvesting plan that is approved by the department from January 1, 2010, to August 31, 2012, inclusive, to be extended for 2 years, and up to a total of 4 years, if certain conditions are met.
This bill would eliminate extensions for timber harvesting plans approved by the department from January 1, 2010, to August 31, 2012, inclusive, and instead allow for a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2015, inclusive, to be extended for an additional 2 years if certain conditions are met. The bill would also make nonsubstantive changes to these provisions.
This bill would declare that it is to take effect immediately as an urgency statute.
The ZBerg-Nejedly Forest Practice Act of 1973 prohibits a person from conducting timber operations, as defined, unless a timber harvesting plan prepared by a registered professional forester has been submitted to, and is approved by, the Department of Forestry and Fire Protection. Existing law requires a timber harvesting plan that is approved by the department on or after July 1, 2012, to be effective for a period of not more than 5 years, unless extended for 2 years, as provided. Existing law allows for a timber harvesting plan that is approved by the department from January 1, 2010, to August 31, 2012, inclusive, to be extended for 2 years, and up to a total of 4 years, if certain conditions are met.
This bill would eliminate extensions for timber harvesting plans approved by the department from January 1, 2010, to August 31, 2012, inclusive, and instead allow for a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2015, inclusive, to be extended for an additional 2 years if certain conditions are met. The bill would also make nonsubstantive changes to these provisions.
This bill would declare that it is to take effect immediately as an urgency statute.
The ZBerg-Nejedly Forest Practice Act of 1973 prohibits a person from conducting timber operations, as defined, unless a timber harvesting plan prepared by a registered professional forester has been submitted to, and is approved by, the Department of Forestry and Fire Protection. Existing law requires a timber harvesting plan that is approved by the department on or after July 1, 2012, to be effective for a period of not more than 5 years, unless extended for 2 years, as provided. Existing law allows for a timber harvesting plan that is approved by the department from January 1, 2010, to August 31, 2012, inclusive, to be extended for 2 years, and up to a total of 4 years, if certain conditions are met.
This bill would eliminate extensions for timber harvesting plans approved by the department from January 1, 2010, to August 31, 2012, inclusive, and instead allow for a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2015, inclusive, to be extended for an additional 2 years if certain conditions are met. The bill would make other nonsubstantive changes to these provisions.
This bill would declare that it is to take effect immediately as an urgency statute.
The ZBerg-Nejedly Forest Practice Act of 1973 prohibits a person from conducting timber operations, as defined, unless a timber harvesting plan prepared by a registered professional forester has been submitted to, and is approved by, the Department of Forestry and Fire Protection. Existing law requires a timber harvesting plan that is approved by the department on or after July 1, 2012, to be effective for a period of not more than 5 years, unless extended for 2 years, as provided. Existing law allows for a timber harvesting plan that is approved by the department from January 1, 2010, to August 31, 2012, inclusive, to be extended for 2 years, and up to a total of 4 years, if certain conditions are met.
This bill would eliminate extensions for timber harvesting plans approved by the department from January 1, 2010, to August 31, 2021, 2012, inclusive, and instead allow for a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2016, 2015, inclusive, to be extended for an additional 2 years if certain conditions are met. The bill would make other nonsubstantive changes to these provisions.
The ZBerg-Nejedly Forest Practice Act of 1973 prohibits a person from conducting timber operations, as defined, unless a timber harvesting plan prepared by a registered professional forester has been submitted to, and is approved by, the Department of Forestry and Fire Protection. Existing law requires a timber harvesting plan that is approved by the department on or after July 1, 2012, to be effective for a period of not more than 5 years, unless extended for 2 years, as provided. Existing law allows for a timber harvesting plan that is approved by the department from January 1, 2010, to August 31, 2012, inclusive, to be extended for 2 years, and up to a total of 4 years, if certain conditions are met.
This bill would eliminate extensions for timber harvesting plans approved by the department from January 1, 2010, to August 31, 2021, inclusive, and instead allow for a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2016, inclusive, to be extended for an additional 2 years if certain conditions are met. The bill would make other nonsubstantive changes to these provisions.
(a)(1)A timber harvesting plan approved by the department on or after July 1, 2012, is effective for a period of not more than five years, unless extended pursuant to paragraph (2).
(2)A timber harvesting plan, pursuant to which timber operations have commenced, but have not been completed, may be extended by amendment for two years in order to complete the timber operations, if both of the following conditions are met:
(A)Good cause is shown.
(B)All timber operations are in conformance with the timber harvesting plan, this chapter, and all applicable rules and regulations, upon the filing of the notice of extension as required by this section.
(b)The extension shall apply to any area covered by the timber harvesting plan for which a report has not been submitted under Section 4585. The notice of extension shall be provided to the department not sooner than 140 days, but at least 10 days, prior to the expiration date of the timber harvesting plan. The notice shall include the circumstances that prevented a timely completion of the timber operations under the timber harvesting plan and, consistent with Section 4583, an agreement to comply with this chapter and the rules and regulations of the board as these exist on the date the extension notice is filed.
(c)Stocking work may continue for more than the effective period of a timber harvesting plan under subdivision (a), but shall be completed within five years after the conclusion of other work.
(d)In addition to the extension authorized by paragraph (2) of subdivision (a), a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2015, inclusive, may be extended by amendment for an additional two years in order to complete the timber operations, if the timber harvesting plan complies with subparagraphs (A) and (B) of paragraph (2) of subdivision (a) and the notice of extension, pursuant to subdivision (b), includes written certification by a registered professional forester that neither of the conditions in subdivision (e) has occurred.
(e)The department shall not approve an extension of a timber harvesting plan pursuant to subdivision (a) or (d) if either of the following has occurred:
(1)Listed species, as defined in Article 1 (commencing with Section 2050) of Chapter 1.5 of Division 3 of the Fish and Game Code or the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.), have been discovered in the logging area of the timber harvesting plan since approval of the plan.
(2)Significant physical changes to the harvest area or adjacent areas have occurred since the timber harvesting plans cumulative impacts were originally assessed.
(f)An extension of a timber harvesting plan for which either of the conditions in subdivision (e) has occurred may be obtained only pursuant to Section 1039 of Title 14 of the California Code of Regulations.
SEC. 2.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order for this act to be applicable as soon as possible to protect Californias forests and promote responsible forest management at the earliest possible time, it is necessary that this act take effect immediately.
(a)(1)A timber harvesting plan approved by the department on or after July 1, 2012, is effective for a period of not more than five years, unless extended pursuant to paragraph (2).
(2)A timber harvesting plan, pursuant to which timber operations have commenced, but have not been completed, may be extended by amendment for two years in order to complete the timber operations, if both of the following conditions are met:
(A)Good cause is shown.
(B)All timber operations are in conformance with the timber harvesting plan, this chapter, and all applicable rules and regulations, upon the filing of the notice of extension as required by this section.
(b)The extension shall apply to any area covered by the timber harvesting plan for which a report has not been submitted under Section 4585. The notice of extension shall be provided to the department not sooner than 140 days, but at least 10 days, prior to the expiration date of the timber harvesting plan. The notice shall include the circumstances that prevented a timely completion of the timber operations under the timber harvesting plan and, consistent with Section 4583, an agreement to comply with this chapter and the rules and regulations of the board as these exist on the date the extension notice is filed.
(c)Stocking work may continue for more than the effective period of a timber harvesting plan under subdivision (a), but shall be completed within five years after the conclusion of other work.
(d)In addition to the extension authorized by paragraph (2) of subdivision (a), a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2015, inclusive, may be extended by amendment for an additional two years in order to complete the timber operations, if the timber harvesting plan complies with subparagraphs (A) and (B) of paragraph (2) of subdivision (a) and the notice of extension, pursuant to subdivision (b), includes written certification by a registered professional forester that neither of the conditions in subdivision (e) has occurred.
(e)The department shall not approve an extension of a timber harvesting plan pursuant to subdivision (a) or (d) if either of the following has occurred:
(1)Listed species, as defined in Article 1 (commencing with Section 2050) of Chapter 1.5 of Division 3 of the Fish and Game Code or the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.), have been discovered in the logging area of the timber harvesting plan since approval of the plan.
(2)Significant physical changes to the harvest area or adjacent areas have occurred since the timber harvesting plans cumulative impacts were originally assessed.
(f)An extension of a timber harvesting plan for which either of the conditions in subdivision (e) has occurred may be obtained only pursuant to Section 1039 of Title 14 of the California Code of Regulations.
SEC. 2.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order for this act to be applicable as soon as possible to protect Californias forests and promote responsible forest management at the earliest possible time, it is necessary that this act take effect immediately.
(a)(1)A timber harvesting plan approved by the department on or after July 1, 2012, is effective for a period of not more than five years, unless extended pursuant to paragraph (2).
(2)A timber harvesting plan, pursuant to which timber operations have commenced, but have not been completed, may be extended by amendment for two years in order to complete the timber operations, if both of the following conditions are met:
(A)Good cause is shown.
(B)All timber operations are in conformance with the timber harvesting plan, this chapter, and all applicable rules and regulations, upon the filing of the notice of extension as required by this section.
(b)The extension shall apply to any area covered by the timber harvesting plan for which a report has not been submitted under Section 4585. The notice of extension shall be provided to the department not sooner than 140 days, but at least 10 days, prior to the expiration date of the timber harvesting plan. The notice shall include the circumstances that prevented a timely completion of the timber operations under the timber harvesting plan and, consistent with Section 4583, an agreement to comply with this chapter and the rules and regulations of the board as these exist on the date the extension notice is filed.
(c)Stocking work may continue for more than the effective period of a timber harvesting plan under subdivision (a), but shall be completed within five years after the conclusion of other work.
(d)In addition to the extension authorized by paragraph (2) of subdivision (a), a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2015, inclusive, may be extended by amendment for an additional two years in order to complete the timber operations, if the timber harvesting plan complies with subparagraphs (A) and (B) of paragraph (2) of subdivision (a) and the notice of extension, pursuant to subdivision (b), includes written certification by a registered professional forester that neither of the conditions in subdivision (e) has occurred.
(e)The department shall not approve an extension of a timber harvesting plan pursuant to subdivision (a) or (d) if either of the following has occurred:
(1)Listed species, as defined in Article 1 (commencing with Section 2050) of Chapter 1.5 of Division 3 of the Fish and Game Code or the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.), have been discovered in the logging area of the timber harvesting plan since approval of the plan.
(2)Significant physical changes to the harvest area or adjacent areas have occurred since the timber harvesting plans cumulative impacts were originally assessed.
(f)An extension of a timber harvesting plan for which either of the conditions in subdivision (e) has occurred may be obtained only pursuant to Section 1039 of Title 14 of the California Code of Regulations.
SEC. 2.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order for this act to be applicable as soon as possible to protect Californias forests and promote responsible forest management at the earliest possible time, it is necessary that this act take effect immediately.
(a)(1)A timber harvesting plan approved by the department on or after July 1, 2012, is effective for a period of not more than five years, unless extended pursuant to paragraph (2).
(2)A timber harvesting plan, pursuant to which timber operations have commenced, but have not been completed, may be extended by amendment for two years in order to complete the timber operations, if both of the following conditions are met:
(A)Good cause is shown.
(B)All timber operations are in conformance with the timber harvesting plan, this chapter, and all applicable rules and regulations, upon the filing of the notice of extension as required by this section.
(b)The extension shall apply to any area covered by the timber harvesting plan for which a report has not been submitted under Section 4585. The notice of extension shall be provided to the department not sooner than 140 days, but at least 10 days, prior to the expiration date of the timber harvesting plan. The notice shall include the circumstances that prevented a timely completion of the timber operations under the timber harvesting plan and, consistent with Section 4583, an agreement to comply with this chapter and the rules and regulations of the board as these exist on the date the extension notice is filed.
(c)Stocking work may continue for more than the effective period of a timber harvesting plan under subdivision (a), but shall be completed within five years after the conclusion of other work.
(d)In addition to the extension authorized by paragraph (2) of subdivision (a), a timber harvesting plan that is approved by the department from January 1, 2014, to December 31, 2016, 2015, inclusive, may be extended by amendment for an additional two years in order to complete the timber operations, if the timber harvesting plan complies with subparagraphs (A) and (B) of paragraph (2) of subdivision (a) and the notice of extension, pursuant to subdivision (b), includes written certification by a registered professional forester that neither of the conditions in subdivision (e) has occurred.
(e)The department shall not approve an extension of a timber harvesting plan pursuant to subdivision (a) or (d) if either of the following has occurred:
(1)Listed species, as defined in Article 1 (commencing with Section 2050) of Chapter 1.5 of Division 3 of the Fish and Game Code or the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.), have been discovered in the logging area of the timber harvesting plan since approval of the plan.
(2)Significant physical changes to the harvest area or adjacent areas have occurred since the timber harvesting plans cumulative impacts were originally assessed.
(f)An extension of a timber harvesting plan for which either of the conditions in subdivision (e) has occurred may be obtained only pursuant to Section 1039 of Title 14 of the California Code of Regulations.
(a)(1)A timber harvesting plan approved by the department on or after July 1, 2012, is effective for a period of not more than five years, unless extended pursuant to paragraph (2).
(2)A timber harvesting plan, on pursuant to which timber operations have commenced commenced, but have not been completed, may be extended by amendment for a two-year period two years in order to complete the timber operations, if both of the following occur: conditions are met:
(A)Good cause is shown.
(B)All timber operations are in conformance with the timber harvesting plan, this chapter, and all applicable rules and regulations, upon the filing of the notice of extension as required by this section.
(b)The extension shall apply to any area covered by the timber harvesting plan for which a report has not been submitted under Section 4585. The notice of extension shall be provided to the department not sooner than 140 days, but at least 10 days, prior to the expiration date of the timber harvesting plan. The notice shall include the circumstances that prevented a timely completion of the timber operations under the timber harvesting plan and, consistent with Section 4583, an agreement to comply with this chapter and the rules and regulations of the board as these exist on the date the extension notice is filed.
(c)Stocking work may continue for more than the effective period of the a timber harvesting plan under subdivision (a), but shall be completed within five years after the conclusion of other work.
(d)A In addition to the extension authorized by paragraph (2) of subdivision (a), a timber harvesting plan that is approved on or after by the department from January 1, 2010, to August 2014, to December 31, 2012, 2016, inclusive, may be extended by amendment for a two-year period an additional two years in order to complete the timber operations, up to a maximum of two 2-year extensions, if the timber harvesting plan complies with subparagraphs (A) and (B) of paragraph (2) of subdivision (a) and the notice of extension, pursuant to subdivision (b), includes written certification by a registered professional forester that neither of the conditions in subdivision (e) has occurred.
(e)The department shall not approve an extension of a timber harvesting plan pursuant to subdivision (a) or (d) if either of the following has occurred:
(1)Listed species, as defined in Article 1 (commencing with Section 2050) of Chapter 1.5 of Division 3 of the Fish and Game Code or the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.), have been discovered in the logging area of the timber harvesting plan since approval of the timber harvesting plan.
(2)Significant physical changes to the harvest area or adjacent areas have occurred since the timber harvesting plans cumulative impacts were originally assessed.
(f)An extension of a timber harvesting plan on for which either of the conditions in subdivision (e) has occurred may be obtained only pursuant to Section 1039 of Title 14 of the California Code of Regulations.
|
Date
|
Status
|
|---|---|
| Oct 8, 2021 | Chaptered by Secretary of State. Chapter 734, Statutes of 2021. |
| Oct 8, 2021 | Approved by the Governor. |
| Sep 9, 2021 | Enrolled and presented to the Governor at 1 p.m. |
| Sep 1, 2021 | Urgency clause adopted. |
| Aug 26, 2021 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 23, 2021 | Read third time. Urgency clause adopted. Passed. (Ayes 71. Noes 0. Page 2474.) Ordered to the Senate. |
| Jul 15, 2021 | Read third time and amended. |
| Jul 1, 2021 | Read second time. Ordered to consent calendar. |
| Jun 30, 2021 | From committee: Do pass. Ordered to consent calendar. (Ayes 14. Noes 0.) (June 30). |
| Jun 9, 2021 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 11. Noes 0.) (June 9). Re-referred to Com. on APPR. |
| May 20, 2021 | Referred to Com. on NAT. RES. |
| May 10, 2021 | In Assembly. Read first time. Held at Desk. |
| May 10, 2021 | Read third time. Passed. (Ayes 37. Noes 0. Page 1061.) Ordered to the Assembly. |
| May 5, 2021 | Read second time. Ordered to consent calendar. |
| May 4, 2021 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8 and ordered to consent calendar. |
| Apr 21, 2021 | Set for hearing May 3. |
| Apr 15, 2021 | From committee: Do pass and re-refer to Com. on APPR with recommendation: To consent calendar. (Ayes 9. Noes 0. Page 817.) (April 15). Re-referred to Com. on APPR. |
| Apr 5, 2021 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on N.R. & W. |
| Mar 24, 2021 | Set for hearing April 15. |
| Mar 3, 2021 | Referred to Com. on N.R. & W. |
| Feb 22, 2021 | Art. IV. Sec. 8(a) of the Constitution dispensed with. |
| Feb 22, 2021 | From printer. May be acted upon on or after March 24. |
| Feb 19, 2021 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 1, 2021 | Unfinished Business SB709 Dahle Urgency Clause Concurrence | Senate Floor |
Passed |
|
| Aug 23, 2021 | SB 709 Dahle Third Reading Urgency By Megan Dahle | Assembly Floor |
Passed |
|
| May 10, 2021 | Consent Calendar SB709 | Senate Floor |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Bill Author
Bill Co-Author(s):