SB 733: Gas corporations: renewable gas procurement.
- Session Year: 2021-2022
- House: Senate
- Latest Version Date: 2022-06-29
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including gas corporations. Existing law requires the commission, in consultation with the State Air Resources Board, to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. Existing law requires that the commission, before establishing biomethane procurement targets or goals, find that the targets or goals are cost-effective means of achieving the reductions in emissions of short-lived climate pollutants and other greenhouse gases forecast pursuant to specified laws and that the targets or goals comply with all applicable state and federal laws.
Existing law authorizes the commission to establish rules and to fix the rates and charges for all public utilities, subject to control by the Legislature, and requires that the rates and charges of a public utility be just and reasonable. Existing law requires the commission and the State Energy Resources Conservation and Development Commission to undertake specified actions to advance the states clean energy and pollution reduction objectives, including, where feasible, cost effective, and consistent with other state policy objectives, increasing the use of large- and small-scale energy storage with a variety of technologies, including green electrolytic hydrogen, as defined.
This bill would require the commission to open a new proceeding, or a new phase of an existing proceeding, to consider establishing procurement goals for renewable hydrogen, as defined, and consider requiring each gas corporation and core transport agent to annually procure a proportionate share of renewable hydrogen to meet those goals. The bill would require the commission to make specified findings before establishing renewable hydrogen procurement targets or goals. The bill would also require the commission to evaluate whether authorizing a gas corporation to recover in its rate base expenses incurred from investments in infrastructure to interconnect facilities producing biomethane, renewable hydrogen, or both, is just and reasonable, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including gas corporations. Existing law requires the commission, in consultation with the State Air Resources Board, to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. Existing law requires that the commission, before establishing biomethane procurement targets or goals, find that the targets or goals are cost-effective means of achieving the reductions in emissions of short-lived climate pollutants and other greenhouse gases forecast pursuant to specified laws and that the targets or goals comply with all applicable state and federal laws.
Existing law authorizes the commission to establish rules and to fix the rates and charges for all public utilities, subject to control by the Legislature, and requires that the rates and charges of a public utility be just and reasonable. Existing law requires the commission and the State Energy Resources Conservation and Development Commission to undertake specified actions to advance the states clean energy and pollution reduction objectives, including, where feasible, cost effective, and consistent with other state policy objectives, increasing the use of large- and small-scale energy storage with a variety of technologies, including green electrolytic hydrogen, as defined.
This bill would require the commission to open a new proceeding, or a new phase of an existing proceeding, to establish consider establishing procurement goals for renewable hydrogen, as defined, and require consider requiring each gas corporation and core transport agent to annually procure a proportionate share of renewable hydrogen to meet those goals. The bill would require the commission to make specified findings before establishing renewable hydrogen procurement targets or goals. The bill would also require the commission to approve, or modify and approve, a gas corporations application evaluate whether authorizing a gas corporation to recover in the its rate base expenses incurred from investments in infrastructure to deliver interconnect facilities producing biomethane, renewable hydrogen, or both, as provided, and authorize the recovery of those expenses from the gas corporations customers. is just and reasonable, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including gas corporations. Existing law requires the commission, in consultation with the State Air Resources Board, to consider adopting specific biomethane procurement targets or goals for each gas corporation, as specified. Existing law requires that the commission, before establishing biomethane procurement targets or goals, find that the targets or goals are cost-effective means of achieving the reductions in emissions of short-lived climate pollutants and other greenhouse gases forecast pursuant to specified laws and that the targets or goals comply with all applicable state and federal laws.
Existing law authorizes the commission to establish rules and to fix the rates and charges for all public utilities, subject to control by the Legislature, and requires that the rates and charges of a public utility be just and reasonable. Existing law requires the commission and the State Energy Resources Conservation and Development Commission to undertake specified actions to advance the states clean energy and pollution reduction objectives, including, where feasible, cost effective, and consistent with other state policy objectives, increasing the use of large- and small-scale energy storage with a variety of technologies, including green electrolytic hydrogen, as defined.
This bill would require the commission to open a new proceeding, or a new phase of an existing proceeding, to establish procurement goals for renewable hydrogen, as defined, and require each gas corporation to annually procure a proportionate share of renewable hydrogen to meet those goals. The bill would also require the commission to approve, or modify and approve, a gas corporations application to recover in the rate base expenses incurred from investments in infrastructure to deliver biomethane, renewable hydrogen, or both, as provided, and authorize the recovery of those expenses from the gas corporations customers.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and because a violation of an order or decision of the commission implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law establishes the State Energy Resources Conservation and Development Commission consisting of 5 members and establishes various duties and responsibilities of the commission relating to energy usage in the state. Existing law requires the Governor to designate a chair of the commission and requires the chair to direct the adviser, the executive director, and other staff of the commission in the performance of their duties in conformance with the policies and guidelines established by the commission.This bill would require the chair of the commission to appear annually before the appropriate policy committees of the Legislature to report on activities of the commission, as specified.Existing law establishes the State Energy Resources Conservation and Development Commission consisting of 5 members and establishes various duties and responsibilities of the commission relating to energy usage in the state. Existing law requires the Governor to designate a chair of the commission and requires the chair to direct the adviser, the executive director, and other staff of the commission in the performance of their duties in conformance with the policies and guidelines established by the commission.
This bill would require the chair of the commission to appear annually before the appropriate policy committees of the Legislature to report on activities of the commission, as specified.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to open a proceeding to determine appropriate targets, if any, for each load-serving entity, defined as including electrical corporations, community choice aggregators, and electric service providers, to procure viable and cost-effective energy storage systems to be achieved by December 31, 2015, and December 31, 2020. If determined to be appropriate, the commission is required to adopt the procurement targets, by October 1, 2013, and to reevaluate the determinations not less than once every 3 years. Pursuant to these requirements, the commission has adopted decisions establishing procurement targets for load-serving entities.This bill would additionally require the commission to determine appropriate targets for each load-serving entity to procure viable and cost-effective energy storage systems to be achieved by December 31, 2030. The bill would require the commission to evaluate the role of energy storage systems that require a long lead time for successful deployment, including pumped storage hydroelectric generation facilities, within the states electrical system, and include those resources in any procurement targets adopted by the commission.Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because this bill would require action by the commission to implement its requirements, the bill would impose a state-mandated local program by expanding the scope of a crime.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law requires the commission to open a proceeding to determine appropriate targets, if any, for each load-serving entity, defined as including electrical corporations, community choice aggregators, and electric service providers, to procure viable and cost-effective energy storage systems to be achieved by December 31, 2015, and December 31, 2020. If determined to be appropriate, the commission is required to adopt the procurement targets, by October 1, 2013, and to reevaluate the determinations not less than once every 3 years. Pursuant to these requirements, the commission has adopted decisions establishing procurement targets for load-serving entities.
This bill would additionally require the commission to determine appropriate targets for each load-serving entity to procure viable and cost-effective energy storage systems to be achieved by December 31, 2030. The bill would require the commission to evaluate the role of energy storage systems that require a long lead time for successful deployment, including pumped storage hydroelectric generation facilities, within the states electrical system, and include those resources in any procurement targets adopted by the commission.
Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because this bill would require action by the commission to implement its requirements, the bill would impose a state-mandated local program by expanding the scope of a crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)For purposes of this section, article, renewable hydrogen means any of the following: hydrogen where all energy inputs and feedstock used in the production and delivery of the hydrogen are consistent with the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3). Any electricity used shall be from an eligible renewable energy resource, as defined in Section 399.12. Any nonelectric energy input or feedstock shall be from a source included in paragraph (1) of subdivision (a) of Section 25741 of the Public Resources Code.
(1)Green electrolytic hydrogen, as defined in Section 400.2.(2)Hydrogen derived from biomethane.(3)Hydrogen derived from the noncombustion thermal conversion of any of the following materials when separated from other waste:(A)Agricultural crop residue.(B)Bark or lawn, yard, and garden clippings.(C)Leaves, silvicultural residue, forest thinnings, and tree and brush prunings.(D)Wood, wood chips, and wood waste.(E)Nonrecyclable pulp or nonrecyclable paper materials.(F)Livestock waste.(G)Municipal sewage sludge or biosolids.(4)Hydrogen derived from splitting water by any process that receives only renewable energy as the primary input, including, but not limited to, direct photochemical conversion using solar energy.(5)Any other process yielding hydrogen from only renewable inputs, as determined by the commission.(b)The commission shall open a new proceeding, or a new phase of an existing proceeding, to do all of the following:
(1)Consider establishing renewable hydrogen procurement goals for each gas corporation and core transport agent.
(2)Consider requiring each gas corporation and core transport agent to annually procure a proportionate share of renewable hydrogen to meet the procurement goals established pursuant to paragraph (1).
(3)Before establishing renewable hydrogen procurement targets or goals, the commission shall make the following findings:
(A)The targets or goals are a cost-effective means of achieving the forecasted reduction in the emissions of short-lived climate pollutants pursuant to Section 39730.5 of the Health and Safety Code and other greenhouse gases pursuant to Division 25.5 (commencing with Section 38500) of the Health and Safety Code.
(B)The targets or goals comply with all applicable state and federal laws.
(C)The safety risk of using renewable hydrogen in pipelines will be appropriately regulated, mitigated, and monitored. Projects Hydrogen shall not use be transported in pipelines until the commission acts to set safety standards and the pipelines meet those standards.
(D)Combustion end uses that may be affected by the addition of hydrogen to pipelines are appropriately regulated and controlled to avoid increased emissions of oxides of nitrogen or any other air pollutant.
SEC. 3.Section 653 is added to the Public Utilities Code, to read:653.(a)The commission, in furtherance of the goals of Sections 399.24 and 651, shall evaluate whether authorizing a gas corporation to recover in its rate base expenses incurred from investments in infrastructure to interconnect facilities producing biomethane, renewable hydrogen, or both, from the point of receipt to the pipeline system is just and reasonable.
(b)As part of the evaluation pursuant to subdivision (a), the commission may shall consider to what extent a gas corporations investments in infrastructure and its potential recovery of expenses impact the unit price of biomethane or renewable hydrogen, the effect on the gas corporations customer rates and bills, the impact on market competition, competition with nonutility enterprises, the ability to achieve state greenhouse gas reduction goals, and other relevant impacts, effects, or considerations determined by the commission.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, renewable hydrogen means any of the following:
(1)Green electrolytic hydrogen, as defined in Section 400.2.
(2)Hydrogen derived from biomethane.
(3)Hydrogen derived from the noncombustion thermal conversion of any of the following materials when separated from other waste:
(A)Agricultural crop residue.
(B)Bark or lawn, yard, and garden clippings.
(C)Leaves, silvicultural residue, forest thinnings, and tree and brush prunings.
(D)Wood, wood chips, and wood waste.
(E)Nonrecyclable pulp or nonrecyclable paper materials.
(F)Livestock waste.
(G)Municipal sewage sludge or biosolids.
(4)Methanated renewable hydrogen.(5)(4)Hydrogen derived from splitting water by any process that receives only renewable energy as the primary input, including, but not limited to, direct photochemical conversion using solar energy.
(6)(5)Any other process yielding hydrogen from only renewable inputs, as determined by the commission.
(b)The commission shall open a new proceeding, or a new phase of an existing proceeding, to do both all of the following:
(1)Establish Consider establishing renewable hydrogen procurement goals for each gas corporation. corporation and core transport agent.
(2)Require Consider requiring each gas corporation and core transport agent to annually procure a proportionate share of renewable hydrogen to meet the procurement goals established pursuant to paragraph (1).
(3)Before establishing renewable hydrogen procurement targets or goals, the commission shall make the following findings:
(A)The targets or goals are a cost-effective means of achieving the forecasted reduction in the emissions of short-lived climate pollutants pursuant to Section 39730.5 of the Health and Safety Code and other greenhouse gases pursuant to Division 25.5 (commencing with Section 38500) of the Health and Safety Code.
(B)The targets or goals comply with all applicable state and federal laws.
(C)The safety risk of using renewable hydrogen in pipelines will be appropriately regulated, mitigated, and monitored. Projects shall not use pipelines until the commission acts to set safety standards and the pipelines meet those standards.
SEC. 3.Section 653 is added to the Public Utilities Code, to read:653.(a)The commission, in furtherance of the goals of Sections 399.24, 651, and 652, 399.24 and 651, shall approve, or modify and approve, a gas corporations application evaluate whether authorizing a gas corporation to recover in the its rate base expenses incurred from investments in infrastructure to deliver interconnect facilities producing biomethane, renewable hydrogen, or both, from a producer from the point of receipt to the pipeline system, including, but not limited to, the point of receipt downstream, and authorize the recovery of expenses from the gas corporations customers. system is just and reasonable.
(b)As part of the evaluation pursuant to subdivision (a), the commission may consider to what extent a gas corporations investments in infrastructure and its potential recovery of expenses impact the unit price of biomethane or renewable hydrogen, the effect on the gas corporations customer rates and bills, the impact on market competition, the ability to achieve state greenhouse gas reduction goals, and other relevant impacts, effects, or considerations determined by the commission.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)For purposes of this section, renewable hydrogen means any of the following:
(1)Green electrolytic hydrogen, as defined in Section 400.2.
(2)Hydrogen derived from biomethane.
(3)Hydrogen derived from the noncombustion thermal conversion of any of the following materials when separated from other waste:
(A)Agricultural crop residue.
(B)Bark or lawn, yard, and garden clippings.
(C)Leaves, silvicultural residue, forest thinnings, and tree and brush prunings.
(D)Wood, wood chips, and wood waste.
(E)Nonrecyclable pulp or nonrecyclable paper materials.
(F)Livestock waste.
(G)Municipal sewage sludge or biosolids.
(4)Methanated renewable hydrogen.
(5)Hydrogen derived from splitting water by any process that receives only renewable energy as the primary input, including, but not limited to, direct photochemical conversion using solar energy.
(6)Any other process yielding hydrogen from only renewable inputs, as determined by the commission.
(b)The commission shall open a new proceeding, or a new phase of an existing proceeding, to do both of the following:
(1)Establish renewable hydrogen procurement goals for each gas corporation.
(2)Require each gas corporation to annually procure a proportionate share of renewable hydrogen to meet the procurement goals established pursuant to paragraph (1).
SEC. 3.Section 653 is added to the Public Utilities Code, to read:653.The commission, in furtherance of the goals of Sections 399.24, 651, and 652, shall approve, or modify and approve, a gas corporations application to recover in the rate base expenses incurred from investments in infrastructure to deliver biomethane, renewable hydrogen, or both, from a producer to the pipeline system, including, but not limited to, the point of receipt downstream, and authorize the recovery of expenses from the gas corporations customers.
SEC. 4.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 25217.5 of the Public Resources Code is amended to read:25217.5.(a) The chair of the commission shall direct the adviser, the executive director, and other staff in the performance of their duties in conformance with the policies and guidelines established by the commission.(b)(1)The chair of the commission shall appear annually before the appropriate policy committees of the Legislature to report on the commissions plans to carry out the commissions responsibilities, including, but not limited to, its activities regarding all of the following:(A)Research, development, and demonstration.(B)Building and appliance efficiency standards.(C)Electricity and natural gas demand forecasts.(D)Siting of thermal powerplants.(E)Implementation of the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code) and energy labeling.(F)Transportation fuels and alternative fuel vehicles.(2)The chair of the commission shall also report on the activities taken by the commission in the previous year and the processes instituted to solicit input from Californians in diverse regions of the state.(3)The chair shall report on the successes and challenges encountered in carrying out the responsibilities specified in paragraph (1) and the instituted activities and processes reported pursuant to paragraph (2).(a) The chair of the commission shall direct the adviser, the executive director, and other staff in the performance of their duties in conformance with the policies and guidelines established by the commission.
(b)(1)The chair of the commission shall appear annually before the appropriate policy committees of the Legislature to report on the commissions plans to carry out the commissions responsibilities, including, but not limited to, its activities regarding all of the following:
(A)Research, development, and demonstration.
(B)Building and appliance efficiency standards.
(C)Electricity and natural gas demand forecasts.
(D)Siting of thermal powerplants.
(E)Implementation of the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code) and energy labeling.
(F)Transportation fuels and alternative fuel vehicles.
(2)The chair of the commission shall also report on the activities taken by the commission in the previous year and the processes instituted to solicit input from Californians in diverse regions of the state.
(3)The chair shall report on the successes and challenges encountered in carrying out the responsibilities specified in paragraph (1) and the instituted activities and processes reported pursuant to paragraph (2).
SECTION 1.Section 2836 of the Public Utilities Code is amended to read:2836.(a)(1)On or before March 1, 2012, the commission shall open a proceeding to determine appropriate targets, if any, for each load-serving entity to procure viable and cost-effective energy storage systems to be achieved by December 31, 2015, December 31, 2020, and December 31, 2030. As part of this proceeding, the commission may consider a variety of possible policies to encourage the cost-effective deployment of energy storage systems, including refinement of existing procurement methods to properly value energy storage systems.(2)The commission shall adopt the procurement targets, if determined to be appropriate pursuant to paragraph (1), by October 1, 2013.(3)The commission shall reevaluate the determinations made pursuant to this subdivision not less than once every three years.(4)The commission shall evaluate the role of energy storage systems that require a long lead time for successful deployment, including pumped storage hydroelectric generation facilities, within the states electrical system, and include those resources in any procurement targets adopted by the commission.(5)Nothing in this section prohibits the commissions evaluation and approval of any application for funding or recovery of costs of any ongoing or new development, trialing, and testing of energy storage projects or technologies outside of the proceeding required by this chapter.(b)(1)On or before March 1, 2012, the governing board of each local publicly owned electric utility shall initiate a process to determine appropriate targets, if any, for the utility to procure viable and cost-effective energy storage systems to be achieved by December 31, 2016, and December 31, 2020. As part of this proceeding, the governing board may consider a variety of possible policies to encourage the cost-effective deployment of energy storage systems, including refinement of existing procurement methods to properly value energy storage systems.(2)The governing board shall adopt the procurement targets, if determined to be appropriate pursuant to paragraph (1), by October 1, 2014.(3)The governing board shall reevaluate the determinations made pursuant to this subdivision not less than once every three years.SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.(a)(1)On or before March 1, 2012, the commission shall open a proceeding to determine appropriate targets, if any, for each load-serving entity to procure viable and cost-effective energy storage systems to be achieved by December 31, 2015, and December 31, 2020. 2020, and December 31, 2030. As part of this proceeding, the commission may consider a variety of possible policies to encourage the cost-effective deployment of energy storage systems, including refinement of existing procurement methods to properly value energy storage systems.
(2)The commission shall adopt the procurement targets, if determined to be appropriate pursuant to paragraph (1), by October 1, 2013.
(3)The commission shall reevaluate the determinations made pursuant to this subdivision not less than once every three years.
(4)The commission shall evaluate the role of energy storage systems that require a long lead time for successful deployment, including pumped storage hydroelectric generation facilities, within the states electrical system, and include those resources in any procurement targets adopted by the commission.
(4)(5)Nothing in this section prohibits the commissions evaluation and approval of any application for funding or recovery of costs of any ongoing or new development, trialing, and testing of energy storage projects or technologies outside of the proceeding required by this chapter.
(b)(1)On or before March 1, 2012, the governing board of each local publicly owned electric utility shall initiate a process to determine appropriate targets, if any, for the utility to procure viable and cost-effective energy storage systems to be achieved by December 31, 2016, and December 31, 2020. As part of this proceeding, the governing board may consider a variety of possible policies to encourage the cost-effective deployment of energy storage systems, including refinement of existing procurement methods to properly value energy storage systems.
(2)The governing board shall adopt the procurement targets, if determined to be appropriate pursuant to paragraph (1), by October 1, 2014.
(3)The governing board shall reevaluate the determinations made pursuant to this subdivision not less than once every three years.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Aug 11, 2022 | August 11 hearing: Held in committee and under submission. |
| Aug 3, 2022 | August 3 set for first hearing. Placed on suspense file. |
| Jun 29, 2022 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 28, 2022 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 7. Noes 1.) (June 27). |
| Jun 23, 2022 | From committee: Do pass and re-refer to Com. on NAT. RES. (Ayes 9. Noes 2.) (June 22). Re-referred to Com. on NAT. RES. |
| Jun 13, 2022 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 9, 2022 | Re-referred to Coms. on U. & E. and NAT. RES. |
| Jun 21, 2021 | Re-referred to Com. on RLS. pursuant to Assembly Rule 96. |
| May 20, 2021 | Referred to Com. on U. & E. |
| May 13, 2021 | In Assembly. Read first time. Held at Desk. |
| May 13, 2021 | Read third time. Passed. (Ayes 38. Noes 0. Page 1093.) Ordered to the Assembly. |
| May 11, 2021 | Read second time. Ordered to consent calendar. |
| May 10, 2021 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8 and ordered to consent calendar. |
| Apr 30, 2021 | Set for hearing May 10. |
| Apr 27, 2021 | From committee: Do pass and re-refer to Com. on APPR with recommendation: To consent calendar. (Ayes 14. Noes 0. Page 916.) (April 26). Re-referred to Com. on APPR. |
| Apr 22, 2021 | Set for hearing April 26. |
| Apr 19, 2021 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U. & C. |
| Mar 3, 2021 | Referred to Com. on E., U. & C. |
| Feb 22, 2021 | Art. IV. Sec. 8(a) of the Constitution dispensed with. |
| Feb 22, 2021 | From printer. May be acted upon on or after March 24. |
| Feb 19, 2021 | Introduced. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| May 13, 2021 | Consent Calendar SB733 | Senate Floor |
Passed |