Existing law, the California Emergency Services Act, authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions. Existing law, the Radiation Protection Act of 1999, requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant, and generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the Radiation Protection Act of 1999. The California Emergency Services Act, until July 1, 2019, prescribes a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
This bill, operative July 1, 2019, would extend, until August 26, 2025, the method for funding state and local costs for emergency service activities associated with a nuclear powerplant, as described above, with respect to a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more, thereby extending an amount, as specified, available for disbursement for local costs for the Diablo Canyon site.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility, and requires that those rates and charges be just and reasonable. Existing law requires the commission, for purposes of establishing rates for any electrical corporation, to disallow expenses reflecting the direct or indirect costs resulting from any unreasonable error or omission relating to the planning, construction, or operation of any portion of the corporations plant which cost, or is estimated to have cost, more than $50,000,000, including any expenses resulting from delays caused by any unreasonable error or omission. For these purposes, planning includes activities related to the initial and subsequent assessments of the need for a plant construction project and includes investigation and interpretation of environmental factors such as seismic conditions.
This bill would require the commission to convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law, the California Emergency Services Act, authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions. Existing law, the Radiation Protection Act of 1999, requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant, and generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the Radiation Protection Act of 1999. The California Emergency Services Act, until July 1, 2019, prescribes a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
This bill, operative July 1, 2019, would extend, until August 26, 2025, the method for funding state and local costs for emergency service activities associated with a nuclear powerplant, as described above, with respect to a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more, thereby extending an amount, as specified, available for disbursement for local costs for the Diablo Canyon site.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility, and requires that those rates and charges be just and reasonable. Existing law requires the commission, for purposes of establishing rates for any electrical corporation, to disallow expenses reflecting the direct or indirect costs resulting from any unreasonable error or omission relating to the planning, construction, or operation of any portion of the corporations plant which cost, or is estimated to have cost, more than $50,000,000, including any expenses resulting from delays caused by any unreasonable error or omission. For these purposes, planning includes activities related to the initial and subsequent assessments of the need for a plant construction project and includes investigation and interpretation of environmental factors such as seismic conditions.
This bill would require the commission to convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law, the California Emergency Services Act, authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions. Existing law, the Radiation Protection Act of 1999, requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant, and generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the Radiation Protection Act of 1999. The California Emergency Services Act, until July 1, 2019, prescribes a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
This bill, operative July 1, 2019, would extend, until August 26, 2025, the method for funding state and local costs for emergency service activities associated with a nuclear powerplant, as described above, with respect to a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more, thereby extending an amount, as specified, available for disbursement for local costs for the Diablo Canyon site.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility, and requires that those rates and charges be just and reasonable. Existing law requires the commission, for purposes of establishing rates for any electrical corporation, to disallow expenses reflecting the direct or indirect costs resulting from any unreasonable error or omission relating to the planning, construction, or operation of any portion of the corporations plant which cost, or is estimated to have cost, more than $50,000,000, including any expenses resulting from delays caused by any unreasonable error or omission. For these purposes, planning includes activities related to the initial and subsequent assessments of the need for a plant construction project and includes investigation and interpretation of environmental factors such as seismic conditions.
This bill would require the commission to convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law, the California Emergency Services Act, authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions. Existing law, the Radiation Protection Act of 1999, requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant, and generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the Radiation Protection Act of 1999. The California Emergency Services Act, until July 1, 2019, prescribes a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
This bill, operative July 1, 2019, would extend, until July 1, August 26, 2025, the method for funding state and local costs for emergency service activities associated with a nuclear powerplant, as described above, with respect to a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more, thereby extending an amount, as specified, available for disbursement for local costs for the Diablo Canyon site.
Existing law, the California Emergency Services Act, authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions. Existing law, the Radiation Protection Act of 1999, requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant powerplant, and generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the Radiation Protection Act of 1999. The California Emergency Services Act, until July 1, 2019, prescribes a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
This bill, operative July 1, 2019, would extend, until July 1, 2024, 2025, the method for funding state and local costs for emergency service activities associated with a nuclear powerplant, as described above, with respect to a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more, thereby extending an amount, as specified, available for disbursement for local costs for the Diablo Canyon site.
Existing law, the California Emergency Services Act, authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions. Existing law, the Radiation Protection Act of 1999, requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant and generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the Radiation Protection Act of 1999. The California Emergency Services Act, until January 1, 2020, July 1, 2019, prescribes a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
This bill, operative July 1, 2019, would make technical, nonsubstantive changes to the funding of state and local costs, described above. extend, until July 1, 2024, the method for funding state and local costs for emergency service activities associated with a nuclear powerplant, as described above, with respect to a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more, thereby extending an amount, as specified, available for disbursement for local costs for the Diablo Canyon site.
Existing law, the California Emergency Services Act, authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions. Existing law, the Radiation Protection Act of 1999, requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant and generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the Radiation Protection Act of 1999. The California Emergency Services Act, until January 1, 2020, prescribes a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
This bill would make technical, nonsubstantive changes to the funding of state and local costs, described above.
(a)For purposes of this section:
(1)Office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the office pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)(1)The total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f).
(2)Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 200910 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
(2)The amounts paid by a utility under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)The amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (h), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become operative on July 1, 2019.
(h)This section shall become inoperative on August 26, 2025, and, as of January 1, 2026, is repealed.
(i)When this section becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utilitys ratepayers.
SEC. 2.Section 712 is added to the Public Utilities Code, to read:712.(a)The commission shall convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
(b)The independent peer review panel shall contract with the Energy Commission, the California Geological Survey of the Department of Conservation, the California Coastal Commission, the Alfred E. Alquist Seismic Safety Commission, the Office of Emergency Services, and the County of San Luis Obispo to participate on the panel and provide expertise.
(c)The independent peer review panel shall review the seismic studies and hold public meetings.
(d)The commission shall make reports by the independent peer review panel publicly available on the Internet Web site maintained by the commission.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
The Public Utilities Commission in Decision 10-08-003 (August 12, 2010) convened an independent peer review panel to review the seismic studies conducted on behalf of Pacific Gas and Electric Company relative to the Diablo Canyon Units 1 and 2 powerplant. The independent peer review panel, in addition to providing valuable expertise to the commission in evaluating the seismic studies, also operates to assure the public that the seismic studies are being performed in an appropriate manner. Because (1) the commissions current contracts for the independent peer review panel are set to expire on November 30, 2015, the Diablo Canyon Units 1 and 2 powerplant is authorized to operate until August 26, 2025, by the federal Nuclear Regulatory Commission, and there continues to be enhanced seismic studies and surveys conducted that warrant review by the independent peer review panel to ensure the safety of the public, and (2) continuing the Nuclear Planning Assessment Special Account beyond the July 1, 2019, expiration date is vital to provide the public assurance that the maintenance of the states nuclear emergency programs is in place, and will provide certainty for emergency planning and response preparedness should an emergency occur, it is necessary that this act take effect immediately.
(a)For purposes of this section:
(1)Office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the office pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)(1)The total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f).
(2)Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 200910 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
(2)The amounts paid by a utility under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)The amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (h), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become operative on July 1, 2019.
(h)This section shall become inoperative on August 26, 2025, and, as of January 1, 2026, is repealed.
(i)When this section becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utilitys ratepayers.
SEC. 2.Section 712 is added to the Public Utilities Code, to read:712.(a)The commission shall convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
(b)The independent peer review panel shall contract with the Energy Commission, the California Geological Survey of the Department of Conservation, the California Coastal Commission, the Alfred E. Alquist Seismic Safety Commission, the Office of Emergency Services, and the County of San Luis Obispo to participate on the panel and provide expertise.
(c)The independent peer review panel shall review the seismic studies and hold public meetings.
(d)The commission shall make reports by the independent peer review panel publicly available on the Internet Web site maintained by the commission.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
The Public Utilities Commission in Decision 10-08-003 (August 12, 2010) convened an independent peer review panel to review the seismic studies conducted on behalf of Pacific Gas and Electric Company relative to the Diablo Canyon Units 1 and 2 powerplant. The independent peer review panel, in addition to providing valuable expertise to the commission in evaluating the seismic studies, also operates to assure the public that the seismic studies are being performed in an appropriate manner. Because (1) the commissions current contracts for the independent peer review panel are set to expire on November 30, 2015, the Diablo Canyon Units 1 and 2 powerplant is authorized to operate until August 26, 2025, by the federal Nuclear Regulatory Commission, and there continues to be enhanced seismic studies and surveys conducted that warrant review by the independent peer review panel to ensure the safety of the public, and (2) continuing the Nuclear Planning Assessment Special Account beyond the July 1, 2019, expiration date is vital to provide the public assurance that the maintenance of the states nuclear emergency programs is in place, and will provide certainty for emergency planning and response preparedness should an emergency occur, it is necessary that this act take effect immediately.
(a)For purposes of this section:
(1)Office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the office pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)(1)The total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f).
(2)Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 200910 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
(2)The amounts paid by a utility under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)The amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (h), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become operative on July 1, 2019.
(h)This section shall become inoperative on August 26, 2025, and, as of January 1, 2026, is repealed.
(i)When this section becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utilitys ratepayers.
SEC. 2.Section 712 is added to the Public Utilities Code, to read:712.(a)The commission shall convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
(b)The independent peer review panel shall contract with the Energy Commission, the California Geological Survey of the Department of Conservation, the California Coastal Commission, the Alfred E. Alquist Seismic Safety Commission, the Office of Emergency Services, and the County of San Luis Obispo to participate on the panel and provide expertise.
(c)The independent peer review panel shall review the seismic studies and hold public meetings.
(d)The commission shall make reports by the independent peer review panel publicly available on the Internet Web site maintained by the commission.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
The Public Utilities Commission in Decision 10-08-003 (August 12, 2010) convened an independent peer review panel to review the seismic studies conducted on behalf of Pacific Gas and Electric Company relative to the Diablo Canyon Units 1 and 2 powerplant. The independent peer review panel, in addition to providing valuable expertise to the commission in evaluating the seismic studies, also operates to assure the public that the seismic studies are being performed in an appropriate manner. Because (1) the commissions current contracts for the independent peer review panel are set to expire on November 30, 2015, the Diablo Canyon Units 1 and 2 powerplant is authorized to operate until August 26, 2025, by the federal Nuclear Regulatory Commission, and there continues to be enhanced seismic studies and surveys conducted that warrant review by the independent peer review panel to ensure the safety of the public, and (2) continuing the Nuclear Planning Assessment Special Account beyond the July 1, 2019, expiration date is vital to provide the public assurance that the maintenance of the states nuclear emergency programs is in place, and will provide certainty for emergency planning and response preparedness should an emergency occur, it is necessary that this act take effect immediately.
(a)For purposes of this section:
(1)Office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the office pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)(1)The total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f).
(2)Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 200910 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
(2)The amounts paid by a utility under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)The amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (h), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become operative on July 1, 2019.
(h)This section shall become inoperative on July 1, August 26, 2025, and, as of January 1, 2026, is repealed.
(i)When this section becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utilitys ratepayers.
(a)For purposes of this section:
(1)Office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the office pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)(1)The total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f).
(2)Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 200910 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
(2)The amounts paid by a utility under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)The amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (h), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become operative on July 1, 2019.
(h)This section shall become inoperative on July 1, 2024, 2025, and, as of January 1, 2025, 2026, is repealed.
(i)When this section becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utilitys ratepayers.
(a)For purposes of this section:
(1)Office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the office pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)The total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f).
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
(2)The amounts paid by a utility under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)The amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (h), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become operative on July 1, 2019.
(h)This section shall become inoperative on July 1, 2024, and, as of January 1, 2025, is repealed.
(i)When this section becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utilitys ratepayers.
SECTION 1.Section 8610.5 of the Government Code is amended to read:8610.5.(a)For purposes of this section, the following definitions shall apply:
(1)Agency or office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code, and utilities means more than one electrical corporation.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing the utilities operating the powerplants for their reasonable pro rata share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon each utilitys notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, the utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the agency pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)(1)The total annual disbursement of state costs from the utilities operating the nuclear powerplants within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f), to be shared equally among the utilities.
(2)Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 200910 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from the utilities shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site and one million six hundred thousand dollars ($1,600,000) for the San Onofre site.
(2)The amounts paid by the utilities under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)(1)Except as provided in paragraph (2), the amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the percentage increase in the California Consumer Price Index of the previous fiscal year.
(2)For the Diablo Canyon site, the amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (g), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become inoperative on July 1, 2019, and, as of January 1, 2020, is repealed, unless a later enacted statute, which becomes effective on or before July 1, 2019, deletes or extends the dates on which it becomes inoperative and is repealed.
(h)Upon inoperation of this section, any amounts remaining in the special account shall be refunded pro rata to the utilities contributing to it, to be credited to the utilitys ratepayers.
(a)For purposes of this section, the following definitions shall apply:
(1)Agency or office means the Office of Emergency Services.
(2)Previous fiscal year means the fiscal year immediately prior to the current fiscal year.
(3)Utility means an electrical corporation as defined in Section 218 of the Public Utilities Code, and utilities means more than one electrical corporation.
(b)(1)State and local costs to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code that are not reimbursed by federal funds shall be borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
(2)The Public Utilities Commission shall develop and transmit to the office an equitable method of assessing the utilities operating the powerplants for their reasonable pro rata share of state agency costs specified in paragraph (1).
(3)Each local government involved shall submit a statement of its costs specified in paragraph (1), as required, to the office.
(4)Upon each utilitys notification by the office, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, the utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account, which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The Controller shall pay from this account the state and local costs relative to carrying out this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, upon certification thereof of the costs by the office.
(5)Upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the Nuclear Planning Assessment Special Account, in advance, for anticipated local expenses, as certified by the agency pursuant to paragraph (4). The office shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
(c)(1)The total annual disbursement of state costs from the utilities operating the nuclear powerplants within the state for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, subject to subdivisions (e) and (f), to be shared equally among the utilities.
(2)Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 200910 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
(d)(1)The total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from the utilities shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code. The maximum annual amount available for disbursement for local costs, subject to subdivisions (e) and (f), shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site and one million six hundred thousand dollars ($1,600,000) for the San Onofre site.
(2)The amounts paid by the utilities under this section shall be allowed for ratemaking purposes by the Public Utilities Commission.
(e)(1)Except as provided in paragraph (2), the amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the percentage increase in the California Consumer Price Index of the previous fiscal year.
(2)For the Diablo Canyon site, the amounts available for disbursement for state and local costs as specified in this section shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
(f)Through the inoperative date specified in subdivision (g), the amounts available for disbursement for state and local costs as specified in this section shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current years funding cap is exceeded.
(g)This section shall become inoperative on July 1, 2019, and, as of January 1, 2020, is repealed, unless a later enacted statute, which becomes effective on or before July 1, 2019, deletes or extends the dates on which it becomes inoperative and is repealed.
(h)Upon inoperation of this section, any amounts remaining in the special account shall be refunded pro rata to the utilities contributing thereto, to it, to be credited to the utilitys ratepayers.
|
Date
|
Status
|
|---|---|
| Oct 1, 2015 | Chaptered by Secretary of State - Chapter 399, Statutes of 2015. |
| Oct 1, 2015 | Approved by the Governor. |
| Sep 23, 2015 | Enrolled and presented to the Governor at 4 p.m. |
| Sep 11, 2015 | Urgency clause adopted. Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 76. Noes 0. Page 3200.). |
| Sep 11, 2015 | Assembly Rule 63 suspended. (Page 3199.) |
| Sep 11, 2015 | Urgency clause adopted. Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 76. Noes 0.). |
| Sep 11, 2015 | Urgency clause adopted. Senate amendments concurred in. To Engrossing and Enrolling. |
| Sep 11, 2015 | Assembly Rule 63 suspended. |
| Sep 11, 2015 | Ordered to the unfinished business file. |
| Sep 11, 2015 | Action rescinded whereby the bill was re-referred to Com. on U. & C. pursuant to Assembly Rule 77.2. |
| Sep 9, 2015 | Re-referred to Com. on U. & C. pursuant to Assembly Rule 77.2. |
| Sep 8, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. (Ayes 40. Noes 0. Page 2595.). |
| Sep 8, 2015 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after September 10 pursuant to Assembly Rule 77. |
| Sep 8, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. |
| Sep 4, 2015 | Read second time. Ordered to third reading. |
| Sep 3, 2015 | Read third time and amended. Ordered to second reading. |
| Aug 31, 2015 | Read second time. Ordered to third reading. |
| Aug 27, 2015 | From committee: Do pass. (Ayes 7. Noes 0.) (August 27). |
| Aug 17, 2015 | In committee: Referred to APPR. suspense file. |
| Jul 7, 2015 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (July 7). Re-referred to Com. on APPR. |
| Jun 29, 2015 | From committee: Do pass and re-refer to Com. on E., U., & C. with recommendation: To Consent Calendar. (Ayes 12. Noes 0.) (June 29). Re-referred to Com. on E., U., & C. |
| Jun 11, 2015 | Referred to Coms. on G.O. and E., U., & C. |
| Jun 2, 2015 | Read third time. Passed. Ordered to the Senate. (Ayes 75. Noes 0. Page 1800.) |
| Jun 2, 2015 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Jun 1, 2015 | Read second time. Ordered to third reading. |
| May 28, 2015 | Read second time and amended. Ordered returned to second reading. |
| May 28, 2015 | From committee: Amend, and do pass as amended. (Ayes 17. Noes 0.) (May 28). |
| May 20, 2015 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 20, 2015 | In committee: Set, first hearing. Referred to suspense file. |
| Apr 30, 2015 | Re-referred to Com. on APPR. |
| Apr 29, 2015 | Read second time and amended. |
| Apr 28, 2015 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 15. Noes 0.) (April 27). |
| Apr 23, 2015 | From committee: Do pass and re-refer to Com. on U. & C. with recommendation: To Consent Calendar. (Ayes 20. Noes 0.) (April 22). Re-referred to Com. on U. & C. |
| Apr 6, 2015 | Re-referred to Com. on G.O. |
| Mar 26, 2015 | From committee chair, with author's amendments: Amend, and re-refer to Com. on G.O. Read second time and amended. |
| Mar 26, 2015 | Referred to Coms. on G.O. and U. & C. |
| Feb 18, 2015 | From printer. May be heard in committee March 20. |
| Feb 17, 2015 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 11, 2015 | AB 361 ACHADJIAN Concurrence - Urgency Added | Assembly Floor |
Passed |
|
| Sep 8, 2015 | Assembly 3rd Reading AB361 Achadjian By Monning Urgency Clause | Senate Floor |
Passed |
|
| Aug 27, 2015 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 17, 2015 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jul 7, 2015 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| Jun 29, 2015 | Do pass, but first be re-referred to the Committee on [Energy, Utilities and Communications] with the recommendation: To Consent Calendar | Senate Standing Committee on Governmental Organization |
Passed |
|
| Jun 2, 2015 | AB 361 ACHADJIAN Assembly Third Reading | Assembly Floor |
Passed |
|
| May 28, 2015 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 27, 2015 | Do pass as amended, and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Commerce |
Passed |
|
| Apr 22, 2015 | Do pass and be re-referred to the Committee on [Utilities and Commerce] with recommendation: To Consent Calendar | Assembly Standing Committee on Governmental Organization |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
AB 361
Page 3
CONCURRENCE IN SENATE AMENDMENTS
AB 361
(Achadjian)
As Amended September 3, 2015
2/3 vote. Urgency
ASSEMBLY: |
75-0 |
June 2, 2015) |
SENATE: |
40-0 |
(September 8, 2015) |
Original Committee Reference: G.O.
SUMMARY: Extends the sunset date for the Nuclear Planning Assessment Special Account (NPASA) from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County. In addition, requires the Public Utilities Commission (PUC) to convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage, as defined.
The Senate amendments:
The PUC shall convene, or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
Provide the independent peer review panel shall contract with the Energy Commission, the California Geological Survey of the Department of Conservation, the California Coastal Commission, the Alfred E. Alquist Seismic Safety Commission, the Office of Emergency Services, and the County of San Luis Obispo to participate on the panel and provide expertise, as specified.
Add coauthors.
Add urgency clause.
EXISTING LAW:
Grants PUC with the regulatory authority over public utilities, including electrical corporations.
Requires the development and maintenance of a nuclear powerplant emergency response program by state and local governments based on federal and state criteria.
The California Emergency Services Act (Act) authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions.
The RPA requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant and generally makes Cal OES responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the RPA.
Provides under the Act, until July 1, 2019, a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
Requires PUC to equitably allocate the non-reimbursed state costs associated with the preparation and implementation of the NPASA between the utilities. Costs for state administration and reimbursements to local governments are specified, capped, and paid for by utility customers.
Provides that the PUC has regulatory authority over public utilities, including electrical corporations.
Authorizes PUC to fix the rates and charges for every public utility, and requires that those rates and charges be just and reasonable. Requires PUC, for purposes of establishing rates for any electrical corporation, to disallow expenses reflecting the direct or indirect costs resulting from any unreasonable error or omission relating to the planning, construction, or operation of any portion of the corporation’s plant which cost, or is estimated to have cost, more than $50,000,000, including any expenses resulting from delays caused by any unreasonable error or omission, as specified.
AS PASSED BY THE ASSEMBLY, this bill extended the sunset date for the Nuclear Planning Assessment Special Account (NPASA) from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
FISCAL EFFECT: According to the Senate Appropriations Committee, total revenues of $8.5 million to the NPASA (special) to cover OES's costs between 2019 and 2024. In addition, a pass-through of $13.3 million to the NPASA (special) that is collected and distributed by OES on behalf of local agencies for their costs between 2019 and 2024.
COMMENTS: This bill as amended is consistent with Assembly actions.
Purpose of this bill: According to the author, the Diablo Canyon power plant pays into the NPASA under the OES. They are currently scheduled to stop paying into the account on July 1, 2019, which is before their current license expires on August 26, 2025. Therefore, the author argues, "the nuclear power plant could still be in operation without having to contribute to the costs of emergency planning or response should an emergency occur."
The author further argues that, "if the plant were to continue in operation without funding, then emergency preparedness and response will be jeopardized. Continuing this account is vital to assure the maintenance of the State’s nuclear emergency programs, which has been a model program established to safeguard public health and safety in California."
Nuclear Power Plant Regulation: In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that OES, together with the California Department of Public Health (CDPH) and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, Emergency Planning Zones (EPZ) around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Emergency Response and Recover: In the event of an emergency at one of California's nuclear power plants, OES is the lead agency to mobilize state resources and to request and coordinate federal resources to mitigate the effects of radiation released into the atmosphere. The CDPH would be responsible for providing radiological assessments during all phases of such emergencies and will be the technical lead during "ingestion pathway" and "recovery" phases of an emergency.
Prior Legislation: AB 292 (Blakeslee), Chapter 492, Statutes of 2007 extended the sunset date on the NPASA from July 1, 2009, to July 1, 2019, and the repeals date from January 1, 2010, to January 1, 2020. This bill also revised the funding levels payable from the account beginning fiscal year 2009-10 and required that any money remaining in the account when it becomes inoperative be returned to the contributing utility for rebates to the ratepayers.
SB 2141 (O'Connell), Chapter 543, Statutes of 1998. Stipulated that OES shall continue to have prime responsibility for coordinating and integrating all levels of emergency planning and response within a "joint" state and local government decision-making process. Modified the method for providing funding to those state agencies responsible with implementing various aspects of the NPASA. Authorized the State Controller, upon appropriation by the Legislature, to advance up to 80% of a fiscal year allocation from the Account to the agencies for anticipated local costs. Extended, by 10 years, the current sunset (July 1, 1999).
SB 876 (Hart), Chapter 759, Statutes of 1993. Updated the state's NPERP by revising and reallocating responsibilities between the Office of Emergency Response, Department of Health Services, utilities, local jurisdictions, and other agencies. The bill extended the sunset on the NPASA until July 1, 1999, and authorizes payment from the account of specific sums of money over the next five years to state and local agencies for the purposes of implementing the plan. Revenues to the account are derived from fees imposed on parties owning and operating nuclear powerplants
Analysis Prepared by: Eric Johnson / G.O. / (916) 319-2531 FN: 0002235
AB 361
Page 8
|
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 |
THIRD READING
Bill No: AB 361
Amended: 9/3/15 in Senate
SENATE GOVERNMENTAL ORG. COMMITTEE: 12-0, 6/29/15
AYES: Hall, Berryhill, Block, Gaines, Glazer, Hernandez, Hill, Hueso, Lara, McGuire, Runner, Vidak
NO VOTE RECORDED: Galgiani
SENATE ENERGY, U. & C. COMMITTEE: 11-0, 7/7/15
AYES: Hueso, Fuller, Cannella, Hertzberg, Hill, Lara, Leyva, McGuire, Morrell, Pavley, Wolk
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/27/15
AYES: Lara, Bates, Beall, Hill, Leyva, Mendoza, Nielsen
ASSEMBLY FLOOR: 75-0, 6/2/15 - See last page for vote
SOURCE: Alliance for Nuclear Responsibility
DIGEST: This bill extends the sunset date for the Nuclear Planning Assessment Special Account (NPASA) from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County. In addition, this bill requires the California Public Utilities Commission (CPUC) to convene, or continue, until August 26, 2025, the independent peer review panel (IPRP) to review Pacific Gas and Electric’s (PG&E) seismic studies of PG&E’s Diablo Canyon Power Plant, a nuclear facility on the central coast.
Senate Floor Amendments of 9/3/15 require the CPUC to convene, or continue, until August 26, 2025, the IPRP to review PG&E’s seismic studies of the Diablo Canyon Power Plant. In addition, the amendments require that the IPRP contract with various state entities to participate on the panel and provide expertise, require the IPRP to review seismic studies and hold public meetings, and require the CPUC to make reports by the IPRP publicly available on the Internet Web site maintained by the CPUC. Finally, the amendments add Senator Jackson as coauthor and add an urgency clause.
The amendments are similar to language from SB 655 (Monning, 2015), which passed the Senate Floor on a 38-0 vote but was never heard in the Assembly.
Existing law:
Authorizes, under the California Emergency Services Act (CESA), local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions.
Requires, under the Radiation Protection Act of 1999 (RPA), local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone (EPZ) around a nuclear powerplant, and generally makes the Office of Emergency Services (OES) responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the RPA.
Requires OES to coordinate the activities of all state agencies in preparing and implementing the state nuclear power plant emergency response plan and to perform other related duties.
Prescribes, under CESA, a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
Defines an “electrical corporation” as every corporation or person owning, controlling, operating, or managing any electrical plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others.
Grants the Public Utilities Commission (PUC) with the regulatory authority over public utilities.
Requires the development and maintenance of a nuclear powerplant emergency response program by state and local governments based on federal and state criteria.
Requires the California Energy Commission (CEC) to compile and assess scientific studies to determine the potential vulnerability of the state's largest generating plants due to aging or a major seismic event, assess the potential state and local costs associated with accumulating waste at California's nuclear power plants, and adopt the assessment by November 1, 2008.
Requires all charges demanded or received by any public utility for any product or commodity furnished or any service rendered be just and reasonable, and further requires every public utility to furnish and maintain such adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public.
This bill:
Extends the sunset date for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
Provides that State and local costs to carry out activities pursuant to this bill and the RPA that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
Requires the PUC to develop and transmit to OES an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs.
Specifies that each local government involved shall submit a statement of its costs, as required, to OES.
Specifies that upon notification by OES, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the State Controller for deposit in the NPASA, which is continued in existence, for allocation by the State Controller, upon appropriation by the Legislature, to carry out activities pursuant to this bill and the RPA.
Specifies that the State Controller shall pay from the NPASA the state and local costs relative to carrying out the provisions of this bill and the RPA.
Specifies that upon appropriation by the Legislature, the State Controller may disburse up to 80 percent of a fiscal year allocation from the NPASA, in advance, for anticipated local expenses. The OES shall review program expenditures related to the balance of the funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
Specifies that the total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this bill and RPA, shall not exceed the lesser of the actual costs or the maximum funding levels established under the provisions of this bill.
Specifies that of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 2009-10 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of OES for activities pursuant to this bill and the RPA, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the California Department of Public Health (CDPH) for activities pursuant to this bill and the RPA.
Specifies that the total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this bill, in support of activities pursuant to this bill and the RPA. The maximum annual amount available for disbursement for local costs shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
Specifies that the amounts paid by a utility under this bill shall be allowed for ratemaking purposes by the PUC.
Provides that the amounts available for disbursement for state and local costs shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed five percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
Specifies that the amounts available for disbursement for state and local costs as specified shall be cumulative biennially. Any unexpected funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current year’s funding cap is exceeded.
Provides that when this bill becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utility’s ratepayers.
Requires the CPUC to convene, or continue, until August 26, 2025, the IPRP to review PG&E’s seismic studies of the Diablo Canyon Power Plant, including the surrounding areas of the facility and areas of nuclear waste storage.
Requires the IPRP to contract with the CEC, the California Geological Survey, the Coastal Commission, the Alfred E. Alquist Seismic Safety Commission, the OES, and the County of San Luis Obispo to participate on the panel and provide expertise.
Requires the IPRP to review the seismic studies and hold public meetings.
Requires the CPUC to make reports by the IPRP publicly available on the Internet Web site maintained by the CPUC.
Includes an urgency clause.
Background
Nuclear Power Plant Regulation. In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that OES, together with the CDPH and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, EPZs around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Diablo Canyon – nuclear power on the seismically active Central Coast. Diablo Canyon Power Plant is a two-unit nuclear powerplant located in San Luis Obispo County. The power production facility and support operations sit on approximately 900 acres adjacent to the Pacific Ocean between Avila Beach and Montano del Oro State Park. According to PG&E, the plant produces approximately 10 percent of California’s energy load and about 20 percent of PG&E’s overall electricity production. The powerplant is licensed by the federal Nuclear Regulatory Commission (NRC) to operate until 2024 and 2025, respectively, for units 1 and 2.
Since the initial siting of Diablo Canyon, PG&E and the state have been aware that the plant lies within a seismically active zone. Recently, seismologists have become aware of the possibility of an earthquake directly beneath the powerplant.
In 2008, in response to statutory direction, the CEC released its assessment of the potential vulnerability of Diablo Canyon to a major disruption due to a seismic event. As part of that assessment, the CEC recommended that PG&E use three-dimensional geophysical seismic reflection mapping and other advanced techniques to supplement ongoing seismic research programs; and that CEC and other appropriate state agencies evaluate whether these studies should be required as part of the Diablo Canyon license renewal feasibility studies for the CPUC. Soon after, the CPUC directed PG&E to incorporate the recommendations from the CEC report into its feasibility study to extend the operating licenses of Diablo Canyon.
In 2009, PG&E filed an application with NRC to extend Diablo Canyon’s operation by 20 years. The licensing decision rests wholly with the NRC. However, the CPUC will decide the reasonableness of PG&E’s request to recover the costs for continued operation of the powerplant.
In 2010, the CPUC formally decided to convene, via contract, its IPRP, composed of itself, the CEC, the California Geological Survey, the California Coastal Commission, and the California Seismic Safety Commission. The IPRP would conduct an independent review of PG&E’s seismic studies to enhance CPUC’s ability to assess the reasonableness of Diablo Canyon’s proposed license renewal.
The IPRP has conducted several reports assessing PG&E’s seismic studies of Diablo Canyon. Following the 2011 earthquake in Japan that severely damaged the Fukushima Daiichi nuclear power plant, NRC required PG&E to conduct additional, advanced seismic studies of the area around and underneath Diablo Canyon. PG&E requested that NRC delay its decision on PG&E’s relicensing request so that PG&E could conduct the seismic studies. The NRC agreed. The contract for the IPRP expires on November 30, 2015. PG&E’s advanced seismic studies are ongoing. They will likely continue past 2015.
Related Legislation
SB 657 (Monning 2015) requires the CPUC to convene, or continue, until August 26, 2025, the IPRP to review PG&E’s seismic studies of the Diablo Canyon Power Plant, including the surrounding areas of the facility and areas of nuclear waste storage. (Held in Assembly Rules Committee)
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee, the provisions dealing with extending the sunset date for the NPASA would result in total revenues of $8.5 million to the NPASA (special) to cover OES’s costs between 2019 and 2024. In addition, a passthrough of $13.3 million to the NPASA (special) that is collected and distributed by OES on behalf of local agencies for their costs between 2019 and 2024.
The provisions dealing with the requirement that the CPUC convene the IPRP would result in approximate annual costs of $200,000 until fiscal year 2025-26 to the Public Utilities Reimbursement Account (special) for IPRP contract costs. All costs are anticipated to be reimbursed by PG&E.
Alliance for Nuclear Responsibility
None received
ASSEMBLY FLOOR: 75-0, 6/2/15
AYES: Achadjian, Alejo, Travis Allen, Baker, Bigelow, Bloom, Bonilla, Bonta, Brown, Burke, Calderon, Campos, Chang, Chau, Chiu, Chu, Cooley, Dababneh, Dahle, Daly, Dodd, Eggman, Frazier, Beth Gaines, Gallagher, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Hadley, Roger Hernández, Holden, Irwin, Jones, Jones-Sawyer, Kim, Lackey, Levine, Linder, Lopez, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Nazarian, Obernolte, O'Donnell, Olsen, Patterson, Perea, Quirk, Rendon, Ridley-Thomas, Rodriguez, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Wagner, Waldron, Weber, Wilk, Williams, Wood, Atkins
NO VOTE RECORDED: Brough, Chávez, Cooper, Grove, Harper
Prepared by: Felipe Lopez / G.O. / (916) 651-1530
9/4/15 18:25:56
**** END ****
AB 361
Page 8
|
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 |
THIRD READING
Bill No: AB 361
Amended: 9/3/15 in Senate
SENATE GOVERNMENTAL ORG. COMMITTEE: 12-0, 6/29/15
AYES: Hall, Berryhill, Block, Gaines, Glazer, Hernandez, Hill, Hueso, Lara, McGuire, Runner, Vidak
NO VOTE RECORDED: Galgiani
SENATE ENERGY, U. & C. COMMITTEE: 11-0, 7/7/15
AYES: Hueso, Fuller, Cannella, Hertzberg, Hill, Lara, Leyva, McGuire, Morrell, Pavley, Wolk
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/27/15
AYES: Lara, Bates, Beall, Hill, Leyva, Mendoza, Nielsen
ASSEMBLY FLOOR: 75-0, 6/2/15 - See last page for vote
SOURCE: Alliance for Nuclear Responsibility
DIGEST: This bill extends the sunset date for the Nuclear Planning Assessment Special Account (NPASA) from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County. In addition, this bill requires the California Public Utilities Commission (CPUC) to convene, or continue, until August 26, 2025, the independent peer review panel (IPRP) to review Pacific Gas and Electric’s (PG&E) seismic studies of PG&E’s Diablo Canyon Power Plant, a nuclear facility on the central coast.
Senate Floor Amendments of 9/3/15 require the CPUC to convene, or continue, until August 26, 2025, the IPRP to review PG&E’s seismic studies of the Diablo Canyon Power Plant. In addition, the amendments require that the IPRP contract with various state entities to participate on the panel and provide expertise, require the IPRP to review seismic studies and hold public meetings, and require the CPUC to make reports by the IPRP publicly available on the Internet Web site maintained by the CPUC. Finally, the amendments add Senator Jackson as coauthor and add an urgency clause.
The amendments are similar to language from SB 655 (Monning, 2015), which passed the Senate Floor on a 38-0 vote but was never heard in the Assembly.
Existing law:
Authorizes, under the California Emergency Services Act (CESA), local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions.
Requires, under the Radiation Protection Act of 1999 (RPA), local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone (EPZ) around a nuclear powerplant, and generally makes the Office of Emergency Services (OES) responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the RPA.
Requires OES to coordinate the activities of all state agencies in preparing and implementing the state nuclear power plant emergency response plan and to perform other related duties.
Prescribes, under CESA, a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
Defines an “electrical corporation” as every corporation or person owning, controlling, operating, or managing any electrical plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others.
Grants the Public Utilities Commission (PUC) with the regulatory authority over public utilities.
Requires the development and maintenance of a nuclear powerplant emergency response program by state and local governments based on federal and state criteria.
Requires the California Energy Commission (CEC) to compile and assess scientific studies to determine the potential vulnerability of the state's largest generating plants due to aging or a major seismic event, assess the potential state and local costs associated with accumulating waste at California's nuclear power plants, and adopt the assessment by November 1, 2008.
Requires all charges demanded or received by any public utility for any product or commodity furnished or any service rendered be just and reasonable, and further requires every public utility to furnish and maintain such adequate, efficient, just, and reasonable service, instrumentalities, equipment, and facilities as are necessary to promote the safety, health, comfort, and convenience of its patrons, employees, and the public.
This bill:
Extends the sunset date for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
Provides that State and local costs to carry out activities pursuant to this bill and the RPA that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
Requires the PUC to develop and transmit to OES an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs.
Specifies that each local government involved shall submit a statement of its costs, as required, to OES.
Specifies that upon notification by OES, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the State Controller for deposit in the NPASA, which is continued in existence, for allocation by the State Controller, upon appropriation by the Legislature, to carry out activities pursuant to this bill and the RPA.
Specifies that the State Controller shall pay from the NPASA the state and local costs relative to carrying out the provisions of this bill and the RPA.
Specifies that upon appropriation by the Legislature, the State Controller may disburse up to 80 percent of a fiscal year allocation from the NPASA, in advance, for anticipated local expenses. The OES shall review program expenditures related to the balance of the funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
Specifies that the total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this bill and RPA, shall not exceed the lesser of the actual costs or the maximum funding levels established under the provisions of this bill.
Specifies that of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 2009-10 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of OES for activities pursuant to this bill and the RPA, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the California Department of Public Health (CDPH) for activities pursuant to this bill and the RPA.
Specifies that the total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this bill, in support of activities pursuant to this bill and the RPA. The maximum annual amount available for disbursement for local costs shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
Specifies that the amounts paid by a utility under this bill shall be allowed for ratemaking purposes by the PUC.
Provides that the amounts available for disbursement for state and local costs shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed five percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
Specifies that the amounts available for disbursement for state and local costs as specified shall be cumulative biennially. Any unexpected funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current year’s funding cap is exceeded.
Provides that when this bill becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utility’s ratepayers.
Requires the CPUC to convene, or continue, until August 26, 2025, the IPRP to review PG&E’s seismic studies of the Diablo Canyon Power Plant, including the surrounding areas of the facility and areas of nuclear waste storage.
Requires the IPRP to contract with the CEC, the California Geological Survey, the Coastal Commission, the Alfred E. Alquist Seismic Safety Commission, the OES, and the County of San Luis Obispo to participate on the panel and provide expertise.
Requires the IPRP to review the seismic studies and hold public meetings.
Requires the CPUC to make reports by the IPRP publicly available on the Internet Web site maintained by the CPUC.
Includes an urgency clause.
Background
Nuclear Power Plant Regulation. In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that OES, together with the CDPH and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, EPZs around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Diablo Canyon – nuclear power on the seismically active Central Coast. Diablo Canyon Power Plant is a two-unit nuclear powerplant located in San Luis Obispo County. The power production facility and support operations sit on approximately 900 acres adjacent to the Pacific Ocean between Avila Beach and Montano del Oro State Park. According to PG&E, the plant produces approximately 10 percent of California’s energy load and about 20 percent of PG&E’s overall electricity production. The powerplant is licensed by the federal Nuclear Regulatory Commission (NRC) to operate until 2024 and 2025, respectively, for units 1 and 2.
Since the initial siting of Diablo Canyon, PG&E and the state have been aware that the plant lies within a seismically active zone. Recently, seismologists have become aware of the possibility of an earthquake directly beneath the powerplant.
In 2008, in response to statutory direction, the CEC released its assessment of the potential vulnerability of Diablo Canyon to a major disruption due to a seismic event. As part of that assessment, the CEC recommended that PG&E use three-dimensional geophysical seismic reflection mapping and other advanced techniques to supplement ongoing seismic research programs; and that CEC and other appropriate state agencies evaluate whether these studies should be required as part of the Diablo Canyon license renewal feasibility studies for the CPUC. Soon after, the CPUC directed PG&E to incorporate the recommendations from the CEC report into its feasibility study to extend the operating licenses of Diablo Canyon.
In 2009, PG&E filed an application with NRC to extend Diablo Canyon’s operation by 20 years. The licensing decision rests wholly with the NRC. However, the CPUC will decide the reasonableness of PG&E’s request to recover the costs for continued operation of the powerplant.
In 2010, the CPUC formally decided to convene, via contract, its IPRP, composed of itself, the CEC, the California Geological Survey, the California Coastal Commission, and the California Seismic Safety Commission. The IPRP would conduct an independent review of PG&E’s seismic studies to enhance CPUC’s ability to assess the reasonableness of Diablo Canyon’s proposed license renewal.
The IPRP has conducted several reports assessing PG&E’s seismic studies of Diablo Canyon. Following the 2011 earthquake in Japan that severely damaged the Fukushima Daiichi nuclear power plant, NRC required PG&E to conduct additional, advanced seismic studies of the area around and underneath Diablo Canyon. PG&E requested that NRC delay its decision on PG&E’s relicensing request so that PG&E could conduct the seismic studies. The NRC agreed. The contract for the IPRP expires on November 30, 2015. PG&E’s advanced seismic studies are ongoing. They will likely continue past 2015.
Related Legislation
SB 657 (Monning 2015) requires the CPUC to convene, or continue, until August 26, 2025, the IPRP to review PG&E’s seismic studies of the Diablo Canyon Power Plant, including the surrounding areas of the facility and areas of nuclear waste storage. (Held in Assembly Rules Committee)
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee, the provisions dealing with extending the sunset date for the NPASA would result in total revenues of $8.5 million to the NPASA (special) to cover OES’s costs between 2019 and 2024. In addition, a passthrough of $13.3 million to the NPASA (special) that is collected and distributed by OES on behalf of local agencies for their costs between 2019 and 2024.
The provisions dealing with the requirement that the CPUC convene the IPRP would result in approximate annual costs of $200,000 until fiscal year 2025-26 to the Public Utilities Reimbursement Account (special) for IPRP contract costs. All costs are anticipated to be reimbursed by PG&E.
Alliance for Nuclear Responsibility
California Public Utilities Commission
None received
ASSEMBLY FLOOR: 75-0, 6/2/15
AYES: Achadjian, Alejo, Travis Allen, Baker, Bigelow, Bloom, Bonilla, Bonta, Brown, Burke, Calderon, Campos, Chang, Chau, Chiu, Chu, Cooley, Dababneh, Dahle, Daly, Dodd, Eggman, Frazier, Beth Gaines, Gallagher, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Hadley, Roger Hernández, Holden, Irwin, Jones, Jones-Sawyer, Kim, Lackey, Levine, Linder, Lopez, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Nazarian, Obernolte, O'Donnell, Olsen, Patterson, Perea, Quirk, Rendon, Ridley-Thomas, Rodriguez, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Wagner, Waldron, Weber, Wilk, Williams, Wood, Atkins
NO VOTE RECORDED: Brough, Chávez, Cooper, Grove, Harper
Prepared by: Felipe Lopez / G.O. / (916) 651-1530
9/4/15 19:09:13
**** END ****
AB 361
Page 7
|
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 |
THIRD READING
Bill No: AB 361
Amended: 5/28/15 in Assembly
SENATE GOVERNMENTAL ORG. COMMITTEE: 12-0, 6/29/15
AYES: Hall, Berryhill, Block, Gaines, Glazer, Hernandez, Hill, Hueso, Lara, McGuire, Runner, Vidak
NO VOTE RECORDED: Galgiani
SENATE ENERGY, U. & C. COMMITTEE: 11-0, 7/7/15
AYES: Hueso, Fuller, Cannella, Hertzberg, Hill, Lara, Leyva, McGuire, Morrell, Pavley, Wolk
SENATE APPROPRIATIONS COMMITTEE: 7-0, 8/27/15
AYES: Lara, Bates, Beall, Hill, Leyva, Mendoza, Nielsen
ASSEMBLY FLOOR: 75-0, 6/2/15 - See last page for vote
SUBJECT: California Emergency Services Act: nuclear powerplants
SOURCE: Alliance for Nuclear Responsibility
DIGEST: This bill extends the sunset date for the Nuclear Planning Assessment Special Account (NPASA) from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
ANALYSIS:
Existing law:
Authorizes, under the California Emergency Services Act (CESA), local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions.
Requires, under the Radiation Protection Act of 1999 (RPA), local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant, and generally makes the Office of Emergency Services (OES) responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the RPA.
Requires OES to coordinate the activities of all state agencies in preparing and implementing the state nuclear power plant emergency response plan and to perform other related duties.
Prescribes, under CESA, a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
Defines an “electrical corporation” as every corporation or person owning, controlling, operating, or managing any electrical plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others.
Grants the Public Utilities Commission (PUC) with the regulatory authority over public utilities.
Requires the development and maintenance of a nuclear powerplant emergency response program by state and local governments based on federal and state criteria.
This bill:
Extends the sunset date for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
Provides that State and local costs to carry out activities pursuant to this bill and the RPA that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
Requires the PUC to develop and transmit to OES an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs.
Specifies that each local government involved shall submit a statement of its costs, as required, to OES.
Specifies that upon notification by OES, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the State Controller for deposit in the NPASA, which is continued in existence, for allocation by the State Controller, upon appropriation by the Legislature, to carry out activities pursuant to this bill and the RPA.
Specifies that the State Controller shall pay from the NPASA the state and local costs relative to carrying out the provisions of this bill and the RPA.
Specifies that upon appropriation by the Legislature, the State Controller may disburse up to 80 percent of a fiscal year allocation from the NPASA, in advance, for anticipated local expenses. The OES shall review program expenditures related to the balance of the funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
Specifies that the total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this bill and RPA, shall not exceed the lesser of the actual costs or the maximum funding levels established under the provisions of this bill.
Specifies that of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 2009-10 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of OES for activities pursuant to this bill and the RPA, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the California Department of Public Health (CDPH) for activities pursuant to this bill and the RPA.
Specifies that the total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this bill, in support of activities pursuant to this bill and the RPA. The maximum annual amount available for disbursement for local costs shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
Specifies that the amounts paid by a utility under this bill shall be allowed for ratemaking purposes by the PUC.
Provides that the amounts available for disbursement for state and local costs shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed five percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
Specifies that the amounts available for disbursement for state and local costs as specified shall be cumulative biennially. Any unexpected funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current year’s funding cap is exceeded.
Provides that when this bill becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utility’s ratepayers.
Background
Purpose of this bill. According to the author, the Diablo Canyon power plant pays into the NPASA under the OES. They are currently scheduled to stop paying into the account on July 1, 2019, which is before their current license expires on August 26, 2025. Therefore, the author argues, “the nuclear power plant could still be in operation without having to contribute to the costs of emergency planning or response should an emergency occur.”
The author further argues that, “if the plant were to continue in operation without funding, then emergency preparedness and response will be jeopardized. Continuing this account is vital to assure the maintenance of the State’s nuclear emergency programs, which has been a model program established to safeguard public health and safety in California.”
Nuclear Power Plant Regulation. In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that OES, together with the CDPH and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, Emergency Planning Zones (EPZ) around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Emergency Response and Recovery. In the event of an emergency at one of California’s nuclear power plants, OES is the lead agency to mobilize state resources and to request and coordinate federal resources to mitigate the effects of radiation released into the atmosphere. The CDPH would be responsible for providing radiological assessments during all phases of such emergencies and will be the technical lead during “ingestion pathway” and “recovery” phases of an emergency.
Prior Legislation
AB 292 (Blakeslee, Chapter 492, Statutes of 2007) extended the sunset date on the NPASA from July 1, 2009, to July 1, 2019, and the repeals date from January 1, 2010, to January 1, 2020. The bill also revised the funding levels payable from the account beginning fiscal year 2009-10 and required that any money remaining in the account when it becomes inoperative be returned to the contributing utility for rebates to the ratepayers.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee, total revenues of $8.5 million to the NPASA (special) to cover OES’s costs between 2019 and 2024. In addition, a passthrough of $13.3 million to the NPASA (special) that is collected and distributed by OES on behalf of local agencies for their costs between 2019 and 2024.
Alliance for Nuclear Responsibility (source)
County of San Luis Obispo
County of Santa Barbara
Mothers for Peace
Pacific Gas and Electric Company
Physicians for Social Responsibility – Los Angeles
San Luis Obispo Mothers for Peace Action
Sierra Club, Santa Lucia Chapter
Seven individuals
OPPOSITION: (Verified 8/28/15)
None received
ARGUMENTS IN SUPPORT: According to the Alliance for Nuclear Responsibility (A4NR), this bill “will ensure the current structure for maintaining and funding the San Luis Obispo County’s Office of Emergency Services (SLO OES) through all of 2014. Prior to this bill being introduced, the funding mechanism for SLO OES, which provides the vital role of protecting the county and state in the event of an incident at the Diablo Canyon Nuclear Power Plant, would have been allowed to ‘sunset’ five years before the plant’s current operating license expires. Since the SLO OES’ budget is 90% dependent on its funding because of the presence of Diablo Canyon, the shortfall would have left the county with inadequate resources to serve this vital role.” The A4NR further argues that, “One of the tragic lessons from the Fukushima disaster highlighted the need for of a well prepared and coordinated emergency response effort. While we all hope such an incident will never occur on our beloved central coast, this legislation will make sure our local first responders are fully funded and prepared for any eventuality.”
ASSEMBLY FLOOR: 75-0, 6/2/15
AYES: Achadjian, Alejo, Travis Allen, Baker, Bigelow, Bloom, Bonilla, Bonta, Brown, Burke, Calderon, Campos, Chang, Chau, Chiu, Chu, Cooley, Dababneh, Dahle, Daly, Dodd, Eggman, Frazier, Beth Gaines, Gallagher, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Hadley, Roger Hernández, Holden, Irwin, Jones, Jones-Sawyer, Kim, Lackey, Levine, Linder, Lopez, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Nazarian, Obernolte, O'Donnell, Olsen, Patterson, Perea, Quirk, Rendon, Ridley-Thomas, Rodriguez, Salas, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Wagner, Waldron, Weber, Wilk, Williams, Wood, Atkins
NO VOTE RECORDED: Brough, Chávez, Cooper, Grove, Harper
Prepared by: Felipe Lopez / G.O. / (916) 651-1530
8/31/15 12:47:59
**** END ****
AB 361 (Achadjian) Page 2 of 2
SENATE COMMITTEE ON APPROPRIATIONS
Senator Ricardo Lara, Chair
2015 - 2016 Regular Session
AB 361 (Achadjian) - California Emergency Services Act: nuclear powerplants.
|
|
Version: May 28, 2015 |
Policy Vote: G.O. 12 - 0, E., U., & C. 11 - 0 |
Urgency: No |
Mandate: No |
Hearing Date: August 17, 2015 |
Consultant: Marie Liu |
This bill meets the criteria for referral to the Suspense File.
Bill Summary:
AB 361 would extend the sunset date on the requirement that state and local costs associated with preparing for and responding to accidents at nuclear powerplants be borne by utilities operating those powerplants.
Fiscal Impact:
Total revenues of $8.5 million to the Nuclear Planning Assessment Special Account (special) to cover OES’s costs between 2019 and 2024.
Passthrough of $13.3 million to the Nuclear Planning Assessment Special Account (special) that is collected and distributed by OES on behalf of local agencies for their costs between 2019 and 2024.
Background:
The Radiation Protection Act (HSC §§114650) establishes the responsibilities of OES, the Department of Health Services, and local governments in preparing and responding to accidents at nuclear powerplants. Section 8610.5 of the Government Code requires utilities operating a nuclear powerplant with a generating capacity of 50 megawatts or more to cover state and local costs from preparing and responding to accidents at the powerplant that are not reimbursed by federal funds. In order to collect these costs, the California Public Utilities Commission (CPUC) is to develop an equitable method of assessing the utilities their reasonable pro rata share of state agency costs and providing this method to OES. Local agencies are also responsible for reporting their costs to OES. Then OES will periodically collect payments from the utilities for their share of the local and state costs. Payments are deposited into the Nuclear Planning Assessment Special Account (account). Section 8610.5 specifies that OES is to receive up to $1,094,000 for the support of its duties in the 2009-10 fiscal year and the Department of Public Health is to receive up to $953,000 for its duties. Additionally, local governments can receive up to $1,732,000 for the Diablo Canyon nuclear powerplant and up to $1,600,000 for the San Onofre site. These amounts are to be adjusted for subsequent years according to the Consumer Price Index or the percentage change in the prevailing wage for San Luis Obispo County employees in the case of the Diablo Canyon.
Payments to the local governments are made out of the account by the Controller. Up to 80% of the fund can be disbursed in advance for anticipated costs while the balance is paid out for OES approved expenditures.
These provisions for the recovery of state and local costs become inoperative on July 1, 2019. Any remaining funds in the account at that time shall be credited to the utility’s ratepayers.
There remains only one operating nuclear powerplant in California – Pacific Gas and Electric’s (PG&E) Diablo Canyon Powerplant. The powerplant is licensed by the federal Nuclear Regulatory Commission (NRC) to operate until 2024 and 2024 for units 1 and 2, respectively. In 2009, PG&E filed an application with NRC to expend Diablo Canyon’s operation by 20 years.
Proposed Law:
This bill would extend the sunset date of the cost recovery provisions until August 26, 2025 and would make technical amendments to reflect that the state now only has one operating nuclear powerplant.
Staff Comments:
This bill would align the statutory requirements for state and local cost recovery with the existing operating license for PG&E’s nuclear facility, which expires in 2024 and 2025 for units 1 and 2, respectively. By extending the sunset date on the cost recovery provisions, the state will be ensured a mechanism to recover its costs associated with the Radiation Protection Act from PG&E. Between 2019 and 2024, OES anticipates a total of $8.5 million in cost recovery.
As this bill would also extend the ability for OES to collect payments on behalf local governments and then disburse those funds as reimbursements, this bill will also technically extend costs to the Nuclear Planning Assessment Special Account. However, staff notes that there should ultimately be no net costs to the state for these provisions.
-- END --
AB 361 (Achadjian) Page 3 of 3
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Ben Hueso, Chair
2015 - 2016 Regular
Bill No: AB 361 Hearing Date: 7/7/2015
Author: |
Achadjian |
||
Version: |
5/28/2015 As Amended |
||
Urgency: |
No |
Fiscal: |
Yes |
Consultant: |
Jay Dickenson |
||
SUBJECT: California Emergency Services Act: nuclear powerplants
DIGEST: This bill extends the sunset date on statute requiring a utility that operates a nuclear powerplant to fund state and local emergency response.
ANALYSIS:
Existing law:
Defines the roles and responsibilities of state and local agencies in preparing for and responding to accidents at nuclear powerplants. (Health and Safety Code §§114650 – 114685)
Requires a utility operating a nuclear powerplant to cover state and local costs, not reimbursed by federal funds, to prepare for and respond to accidents at nuclear powerplants.
Provides a method by which the California Public Utilities Commission (CPUC) is to assess the reasonable share for such an activity and directs the Office of Emergency Services to periodically notify a utility of those costs.
Requires such a utility to pay the assessed amount, to be paid by utility customers, to the Controller for deposit in the Nuclear Planning Assessment Special Account, the funds of which, upon appropriation, cover state and local costs, up to specified caps, to prepare for and respond to accidents at nuclear power plants.
Sunsets these provisions on July 1, 2019. (Government Code §8610.5)
This bill:
Extends the sunset date to August 26, 2025.
Revises language specifying cost caps to refer to only the Diablo Canyon nuclear facility, the state’s lone operating nuclear powerplant.
Background
Current state law requires a utility that operates a nuclear power plant periodically to pay an amount, determined by the CPUC, into the Nuclear Special Assessment Account. Funds in the account are to cover the state and local costs to prepare for and respond to accidents at nuclear powerplants. The statute requiring such utilities to pay into the fund sunsets on July 1, 2019.
There remains one operating nuclear powerplant in California – Pacific Gas and Electric’s (PG&E) Diablo Canyon Power Plant. The power production facility and support operations sit on approximately 900 acres adjacent to the Pacific Ocean between Avila Beach and Montano del Oro State Park. According to PG&E, the plant produces approximately 10 percent of California’s energy load and about 20 percent of PG&E’s overall electricity production. The powerplant is licensed by the federal Nuclear Regulatory Commission (NRC) to operate until 2024 and 2025, respectively, for units 1 and 2. In 2009, PG&E filed an application with NRC to extend Diablo Canyon’s operation by 20 years. This bill seeks to align the statutory requirement that PG&E fund state and local emergency response to an accident at a nuclear powerplant with the existing operating license for PG&E’s nuclear facility.
Prior/Related Legislation
AB 292 (Blakeslee, Chapter 492, Statutes of 2007) extended the sunset date, from July 1, 2009 to July 1, 2019, on the requirement that a utility that operates a nuclear powerplant fund state and local emergency response.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
PRIOR VOTES:
Senate Governmental Organization Committee (12-0)
Assembly Floor (75-0)
Assembly Appropriations Committee (17-0)
Assembly Utilities and Commerce Committee (15-0)
Assembly Governmental Organization Committee (20-0)
SUPPORT:
Alliance for Nuclear Responsibility (source)
County of San Luis Obispo
County of Santa Barbara
Mothers for Peace
Pacific Gas and Electric Company
Physicians for Social Responsibility Los Angeles
Sierra Club – Santa Lucia Chapter
8 individuals
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the sponsor, the state should require a utility that operates a nuclear powerplant to fund state and local emergency response to a nuclear accident at least as long as the powerplant continues to operate.
-- END --
AB 361 (Achadjian) Page 6 of 6
SENATE COMMITTEE ON GOVERNMENTAL ORGANIZATION
Senator Isadore Hall, III
Chair
2015 - 2016 Regular
Bill No: AB 361 Hearing Date: 6/29/2015
Author: |
Achadjian |
||
Version: |
5/28/2015 Amended |
||
Urgency: |
No |
Fiscal: |
Yes |
Consultant: |
Felipe Lopez |
||
SUBJECT: California Emergency Services Act: nuclear powerplants
DIGEST: This bill extends the sunset date for the Nuclear Planning Assessment Special Account (NPASA) from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
ANALYSIS:
Existing law:
Authorizes, under the California Emergency Services Act (CESA), local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions.
Requires, under the Radiation Protection Act of 1999 (RPA), local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant, and generally makes the Office of Emergency Services (OES) responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the RPA.
Requires OES to coordinate the activities of all state agencies in preparing and implementing the state nuclear power plant emergency response plan and to perform other related duties.
Prescribes, under CESA, a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
Defines an “electrical corporation” as every corporation or person owning, controlling, operating, or managing any electrical plant for compensation within this state, except where electricity is generated on or distributed by the producer through private property solely for its own use or the use of its tenants and not for sale or transmission to others.
Grants the Public Utilities Commission (PUC) with the regulatory authority over public utilities.
Requires the development and maintenance of a nuclear powerplant emergency response program by state and local governments based on federal and state criteria.
This bill:
Extends the sunset date for the NPASA from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
Provides that State and local costs to carry out activities pursuant to this bill and the RPA that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
Requires the PUC to develop and transmit to OES an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs.
Specifies that each local government involved shall submit a statement of its costs, as required, to OES.
Specifies that upon notification by OES, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the State Controller for deposit in the NPASA, which is continued in existence, for allocation by the State Controller, upon appropriation by the Legislature, to carry out activities pursuant to this bill and the RPA.
Specifies that the State Controller shall pay from the NPASA the state and local costs relative to carrying out the provisions of the bill and the RPA.
Specifies that upon appropriation by the Legislature, the State Controller may disburse up to 80 percent of a fiscal year allocation from the NPASA, in advance, for anticipated local expenses. The OES shall review program expenditures related to the balance of the funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
Specifies that the total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this bill and RPA, shall not exceed the lesser of the actual costs or the maximum funding levels established under the provisions of this bill.
Specifies that of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 2009-10 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of OES for activities pursuant to this bill and the RPA, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this bill and the RPA.
Specifies that the total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this bill, in support of activities pursuant to this bill and the RPA. The maximum annual amount available for disbursement for local costs shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
Specifies that the amounts paid by a utility under this bill shall be allowed for ratemaking purposes by the PUC.
Provides that the amounts available for disbursement for state and local costs shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
Specified that the amounts available for disbursement for state and local costs as specified shall be cumulative biennially. Any unexpected funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current year’s funding cap is exceeded.
Provides that when this bill becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utility’s ratepayers.
Background
Purpose of the bill. According to the author, the Diablo Canyon power plant pays into the NPASA under the OES. They are currently scheduled to stop paying into the account on July 1, 2019, which is before their current license expires on August 26, 2025. Therefore, the author argues, “the nuclear power plant could still be in operation without having to contribute to the costs of emergency planning or response should an emergency occur.”
The author further argues that, “if the plant were to continue in operation without funding, then emergency preparedness and response will be jeopardized. Continuing this account is vital to assure the maintenance of the State’s nuclear emergency programs, which has been a model program established to safeguard public health and safety in California.”
Nuclear Power Plant Regulation. In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that OES, together with the California Department of Public Health (CDPH) and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, Emergency Planning Zones (EPZ) around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program (NPPA) has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Emergency Response and Recovery. In the event of an emergency at one of California’s nuclear power plants, OES is the lead agency to mobilize state resources and to request and coordinate federal resources to mitigate the effects of radiation released into the atmosphere. The CDPH would be responsible for providing radiological assessments during all phases of such emergencies and will be the technical lead during “ingestion pathway” and “recovery” phases of an emergency.
Prior/Related Legislation
AB 292 (Blakeslee, Chapter 492, Statutes of 2007) extended the sunset date on the NPASA from July 1, 2009 to July 1, 2019 and the repeals date from January 1, 2010 to January 1, 2020. The bill also revised the funding levels payable from the account beginning fiscal year 2009-10 and required that any money remaining in the account when it becomes inoperative be returned to the contributing utility for rebates to the ratepayers.
SB 2141 (O'Connell, Chapter 543, Statutes of 1998) specified that OES shall continue to have prime responsibility for coordinating and integrating all levels of emergency planning and response within a "joint" state and local government decision-making process. The bill also modified the method for providing funding to those state agencies responsible with implementing various aspects of the NPASA.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
SUPPORT:
Alliance for Nuclear Responsibility (Source)
County of San Luis Obispo
County of Santa Barbara
Mothers for Peace
Pacific Gas and Electric Company
Physicians for Social Responsibility – Los Angeles
San Luis Obispo Mothers for Peace Action
Sierra Club, Santa Lucia Chapter
7 individuals
OPPOSITION:
None received
ARGUMENTS IN SUPPORT: According to the Alliance for Nuclear Responsibility (A4NR), this bill “will ensure the current structure for maintaining and funding the San Luis Obispo County’s Office of Emergency Services (SLO OES) through all of 2014. Prior to this bill being introduced, the funding mechanism for SLO OES, which provides the vital role of protecting the county and state in the event of an incident at the Diablo Canyon Nuclear Power Plant, would have been allowed to ‘sunset’ five years before the plant’s current operating license expires. Since the SLO OES’ budget is 90% dependent on its funding because of the presence of Diablo Canyon, the shortfall would have left the county with inadequate resources to serve this vital role.” The A4NR further argues that, “One of the tragic lessons from the Fukushima disaster highlighted the need for of a well prepared and coordinated emergency response effort. While we all hope such an incident will never occur on our beloved central coast, this legislation will make sure our local first responders are fully funded and prepared for any eventuality.”
DUAL REFERRAL: Senate Energy, Utilities and Communications Committee
AB 361
Page 4
ASSEMBLY THIRD READING
AB 361
(Achadjian)
As Amended May 28, 2015
Majority vote
Committee |
Votes |
Ayes |
Noes |
Governmental Organization |
20-0 |
Gray, Linder, Achadjian, Alejo, Bigelow, Cooley, Cooper, Daly, Cristina Garcia, Eduardo Garcia, Gipson, Roger Hernández, Jones-Sawyer, Levine, Mayes, Perea, Salas, Steinorth, Waldron, Wilk |
|
Utilities |
15-0 |
Rendon, Patterson, Achadjian, Bonilla, Burke, Dahle, Eggman, Cristina Garcia, Hadley, Roger Hernández, Obernolte, Quirk, Santiago, Ting, Williams |
|
Appropriations |
17-0 |
Gomez, Bigelow, Bonta, Calderon, Chang, Daly, Eggman, Gallagher, Eduardo Garcia, Gordon, Holden, Jones, Quirk, Rendon, Wagner, Weber, Wood |
|
SUMMARY: Extends the sunset date for the Nuclear Planning Assessment Special Account (NPASA) from July 1, 2019, to August 26, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County. Specifically, this bill:
Provides that state and local costs to carry out activities pursuant to this bill and the Radiation Protection Act of 1999 (RPA) that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
States that the Public Utilities Commission (PUC) shall develop and transmit to the Office of Emergency Services (Cal OES) an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs, as specified. Provides that each local government involved shall submit a statement of its costs, as required, to Cal OES. The amounts paid by a utility shall be allowed for ratemaking purposes by PUC.
States that upon notification by Cal OES, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the State Controller (Controller) for deposit in the Nuclear Planning Assessment Special Account (NPASA), which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this bill and the RPA.
Provides upon appropriation by the Legislature, the Controller may disburse up to 80% of a fiscal year allocation from the NPASA, in advance, for anticipated local expenses, as defined in law. Cal OES shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
Provides that the total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this bill and RPA. The maximum annual amount available for disbursement for local costs, as defined, shall, for the fiscal year beginning July 1, 2009, be $1.732 million for the Diablo Canyon site.
Provides that the annual amount of $2.047 million for the 2009–10 fiscal year, the sum of $1.094 million shall be for support of the office for activities, as defined, and the sum of $953,000 shall be for support of the State Department of Public Health, as specified.
Provides that this bill shall become operative on July 1, 2019, and shall become inoperative on August 26, 2025, and, as of January 1, 2026, is repealed. When this bill becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utility’s ratepayers.
EXISTING LAW:
Grants PUC with the regulatory authority over public utilities, including electrical corporations.
Requires the development and maintenance of a nuclear powerplant emergency response program by state and local governments based on federal and state criteria.
The California Emergency Services Act (Act) authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions.
The RPA requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant and generally makes Cal OES responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the RPA.
Provides under the Act, until July 1, 2019, a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
Requires PUC to equitably allocate the non-reimbursed state costs associated with the preparation and implementation of the NPASA between the utilities. Costs for state administration and reimbursements to local governments are specified, capped, and paid for by utility customers.
FISCAL EFFECT: According to the Assembly Appropriations Committee, the NPASA had expenditures of approximately $5.5 million per year since FY 2011-12, funded entirely through regulatory fees.
COMMENTS:
Purpose of the bill: According to the author, existing law requires utility companies operating a nuclear powerplant to pay for anticipated state and local agency costs to the Controller, into what is called the NPASA. Utility companies pay the actual expenses up to the maximum allowed under an established funding cap. The utilities do not pay for these costs directly; rather they are authorized by the PUC to pass these costs on to consumers as a function of their utility rates. The expenditure of these funds is authorized, upon appropriation by the Legislature, on an annual basis to address planning and response issues, and administered by Cal OES. The inoperative date of these provisions ends on July 1, 2019.
Currently, the Diablo Canyon power plant pays into the NPASA but is scheduled to cease payments into the account on July 1, 2019, which is before their current license expires in July 1, 2024. Therefore, the nuclear power plant could still be in operation without having to contribute to the costs of emergency planning or response should an emergency occur.
The author states, "If the power plant was to continue in operation without funding, then emergency preparedness and response will be jeopardized. Continuing this account is vital to assure the maintenance of the State’s nuclear emergency programs, which has been a model program established to safeguard public health and safety in California."
The author maintains this bill will assist local governments with the costs associated with emergency planning and response in areas surrounding the Diablo Canyon site by extending the "sunset date" of the NPASA from July 1, 2019, to August 26, 2025. This extension will ensure that these critical programs are funded to match the duration of the nuclear power plant’s license and are vital to our local communities to guarantee that they have the resources necessary to plan and react to any emergency.
Background: In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that the Cal OES, together with the California Department of Public Health (CDPH) and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, Emergency Planning Zones (EPZ) around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program (NPPA) has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Nuclear Power Plant Program: The Nuclear Power Plant Program (NPPP) covers emergency planning issues related to the state’s one operating nuclear power plant – Diablo Canyon Power Plant (DCPP) and one decommissioning nuclear power plant – San Onofre Nuclear Generating Station (SONGS). The NPPP also continues coordination with the two retired nuclear power plants - Humboldt Bay Nuclear Power Plant and Rancho Seco Nuclear Generating Station. NPPP works with federal, state, local and utility officials in emergency planning, training, and exercises to test emergency readiness.
Emergency Plans: Federal regulations require nuclear power plants, states and surrounding counties have a federally tested and approved emergency response plan. The Federal Emergency Management Agency (FEMA) is responsible for ensuring adherence to emergency planning and exercise requirements by emergency response organizations outside of the power plant boundaries, which is referred to as "offsite." Radiation releases are monitored and controlled by strict Environmental Protection Agency (EPA) guidelines to keep the public and emergency responders safe.
In the event of an emergency at one of California’s nuclear power plants, Cal OES is the lead agency to mobilize state resources and to request and coordinate federal resources to mitigate the effects of radiation released into the atmosphere.
Prior legislation: AB 2791 (Governmental Organization Committee), Chapter 618, Statutes of 2010. Made various statutory and technical changes to reflect the merger of the former Office of Emergency Services and the former Office of Homeland Security into the California Emergency Management Agency in January 1, 2009.
AB 292 (Blakeslee), Chapter 492, Statutes of 2007. Extended the sunset date on the NPASA from July 1, 2009, to July 1, 2019, and the repeals date from January 1, 2010, to January 1, 2020. Revises the funding levels payable from the account beginning fiscal year 2009-10. Required that any money remaining in the account when it becomes inoperative be returned to the contributing utility for rebates to the ratepayers.
SB 2141 (O'Connell), Chapter 543, Statutes of 1998. Stipulated that OES shall continue to have prime responsibility for coordinating and integrating all levels of emergency planning and response within a "joint" state and local government decision making process. Modified the method for providing funding to those state agencies responsible with implementing various aspects of the NPASA. Authorized the State Controller, upon appropriation by the Legislature, to advance up to 80% of a fiscal year allocation from the Account to the agencies for anticipated local costs. Extended, by 10 years, the current sunset (July 1, 1999).
SB 876 (Hart), Chapter 759, Statutes of 1993. Updated the state's NPERP by revising and reallocating responsibilities between the Office of Emergency Response, Department of Health Services, utilities, local jurisdictions, and other agencies. The bill extended the sunset on the NPASA until July 1, 1999, and authorizes payment from the account of specific sums of money over the next five years to state and local agencies for the purposes of implementing the plan. Revenues to the account are derived from fees imposed on parties owning and operating nuclear powerplants.
Analysis Prepared by: Eric Johnson / G.O. / (916) 319-2531 FN: 0000795
AB 361
Page 1
Date of Hearing: May 20, 2015
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Jimmy Gomez, Chair
AB 361
(Achadjian) – As Amended April 29, 2015
Policy Committee: |
Governmental Organization |
Vote: |
20 - 0 |
|
Utilities and Commerce |
|
15 - 0 |
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill extends the sunset date for the Nuclear Planning Assessment Special Account from July 1, 2019 to July 1, 2025, to continue funding emergency service programs and planning activities for the Diablo Canyon Power Plant in San Luis Obispo County.
FISCAL EFFECT:
The Nuclear Planning Assessment Special Account had expenditures of approximately $5.5 million per year since FY 2011-12, funded entirely through regulatory fees.
COMMENTS:
Purpose. According to the author, Pacific Gas & Electric (PG&E) pays into the Nuclear Planning Assessment Special Account under the Office of Emergency Services. PG&E is currently scheduled to stop paying into the account on July 1, 2019, which is before its license to operate the Diablo Canyon facility, the state's only operating nuclear power plant, expires in July 2024. As a result, the Diablo Canyon facility could remain in operation without having to contribute the costs of emergency planning. AB 316 addresses this issue by extending the sunset date of the account, ensuring emergency programs remain funded throughout the duration of the Diablo Canyon facility license.
Utilities do not ultimately pay the fees associated with this fund, but rather are authorized by the Public Utilities Commission to pass them along to customers.
Analysis Prepared by: Joel Tashjian / APPR. / (916) 319-2081
AB 361
Page 2
Date of Hearing: April 27, 2015
ASSEMBLY COMMITTEE ON UTILITIES AND COMMERCE
Anthony Rendon, Chair
AB 361
(Achadjian) – As Amended March 26, 2015
SUBJECT: California Emergency Services Act: nuclear powerplants
SUMMARY: This bill extends the sunset date of the Nuclear Planning Assessment Special Account from July 1, 2019 to July 1, 2024, to continue funding emergency planning programs for the Diablo Canyon Power Plant.
EXISTING LAW:
Authorizes local government entities to create disaster councils and develop disaster plans, and prescribes funding methods for state and local costs for carrying out these activities. (Government Code Section 8550)
Requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear power plant. (Health and Safety Code Section 114660)
Generally makes the Office of Emergency Services responsible for the coordination and integration of all emergency planning programs and response plans. (Health and Safety Code Chapter 4)
FISCAL EFFECT: Unknown.
COMMENTS:
Need for the bill: Pacific Gas & Electric pays into the Nuclear Planning Assessment Special Account under the Office of Emergency Planning. They are currently scheduled to stop paying into the account on July 1, 2019, which is before their current license expires in July, 2024. Therefore, the nuclear power plant could still be in operation without having to contribute to the costs of emergency planning should an emergency occur. AB 316 addresses that disparity by extending the sunset date of the Nuclear Planning Assessment Special Account, and confirms that emergency programs are funded to match the duration of the nuclear power plant’s license.
Suggested Amendments: The author may wish to consider the following clarifying amendments:
On page 3, in line 11, after “(c)” insert:
(1)
Amend subsection (c), insert:
(2) Of the annual amount of two million forty-seven thousand dollars ($2,047,000) for the 2009–10 fiscal year, the sum of one million ninety-four thousand dollars ($1,094,000) shall be for support of the office for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code, and the sum of nine hundred fifty-three thousand dollars ($953,000) shall be for support of the State Department of Public Health for activities pursuant to this section and Chapter 4 (commencing with Section 114650) of Part 9 of Division 104 of the Health and Safety Code.
Amend subsection (h) to read:
This section shall become inoperative on July 1, 2024
2025, and, as of January 1, 2025 2026,
is repealed.
REGISTERED SUPPORT / OPPOSITION:
Support
Alliance for Nuclear Responsibility
Physicians for Social Responsibility of Los Angeles
Sierra Club
Opposition
None on file.
Analysis Prepared by: Allegra Roth / U. & C. / (916) 319-2083
AB 361
Page 5
Date of Hearing: April 22, 2015
ASSEMBLY COMMITTEE ON GOVERNMENTAL ORGANIZATION
Adam Gray, Chair
AB 361
(Achadjian) – As Amended March 26, 2015
SUBJECT: California Emergency Services Act: nuclear powerplants
SUMMARY: Extends, until July 1, 2024, the method for funding state and local costs for emergency service activities associated with a nuclear powerplant, with respect to a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more, thereby extending an amount, as specified, available for disbursement for local costs for the Diablo Canyon site. Specifically, this bill:
1) States “Office” means the Office of Emergency Services (Cal OES).
2) States “Previous fiscal year” means the fiscal year immediately prior to the current fiscal year.
3) States “Utility” means an “electrical corporation” as defined in Section 218 of the Public Utilities Code.
4) Provides that State and local costs to carry out activities pursuant to this bill and the Radiation Protection Act of 1999 that are not reimbursed by federal funds shall be borne by a utility operating a nuclear powerplant with a generating capacity of 50 megawatts or more.
5) States that the Public Utilities Commission (PUC) shall develop and transmit to the office an equitable method of assessing a utility operating a powerplant for its reasonable share of state agency costs, as specified.
6) States that each local government involved shall submit a statement of its costs, as required, to Cal OES.
7) States that upon notification by Cal OES, from time to time, of the amount of its share of the actual or anticipated state and local agency costs, a utility shall pay this amount to the Controller for deposit in the Nuclear Planning Assessment Special Account (NPASA), which is continued in existence, for allocation by the Controller, upon appropriation by the Legislature, to carry out activities pursuant to this bill and Radiation Protection Act of 1999.
8) Provides upon appropriation by the Legislature, the Controller may disburse up to 80 percent of a fiscal year allocation from the NPASA, in advance, for anticipated local expenses, as defined in law. Cal OES shall review program expenditures related to the balance of funds in the account and the Controller shall pay the portion, or the entire balance, of the account, based upon those approved expenditures.
9) Provides that the total annual disbursement of state costs from a utility operating a nuclear powerplant within the state for activities pursuant to this bill and the Radiation Protection Act (RPA) of 1999, shall not exceed the lesser of the actual costs or the maximum funding levels, as defined in current law.
10) Provides that the total annual disbursement for each fiscal year, commencing July 1, 2009, of local costs from a utility shall not exceed the lesser of the actual costs or the maximum funding levels established in this section, in support of activities pursuant to this bill and RPA. The maximum annual amount available for disbursement for local costs, as defined, shall, for the fiscal year beginning July 1, 2009, be one million seven hundred thirty-two thousand dollars ($1,732,000) for the Diablo Canyon site.
11) States that the amounts paid by a utility under this bill shall be allowed for ratemaking purposes by the PUC.
12) Provides that the amounts available for disbursement for state and local costs as specified in this bill shall be adjusted and compounded each fiscal year by the larger of the percentage change in the prevailing wage for San Luis Obispo County employees, not to exceed 5 percent, or the percentage increase in the California Consumer Price Index from the previous fiscal year.
13) States that until July 1, 2024, the amounts available for disbursement for state and local costs as specified in this bill shall be cumulative biennially. Any unexpended funds from a year shall be carried over for one year. The funds carried over from the previous year may be expended when the current year’s funding cap is exceeded.
14) Provides that this bill shall become operative on July 1, 2019 and shall become inoperative on July 1, 2024, and, as of January 1, 2025, is repealed. When this bill becomes inoperative, any amounts remaining in the special account shall be refunded to a utility contributing to it, to be credited to the utility’s ratepayers.
EXISTING LAW:
1) Grants the California Public Utilities Commission (PUC) with the regulatory authority over public utilities, including electrical corporations.
2) Requires the development and maintenance of a nuclear powerplant emergency response program by state and local governments based on federal and state criteria.
3) The California Emergency Services Act (Act) authorizes local government entities to create disaster councils by ordinance and in turn develop disaster plans specific to their jurisdictions.
4) The RPA requires local governments to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the emergency planning zone around a nuclear powerplant and generally makes Cal OES responsible for the coordination and integration of all emergency planning programs and response plans created pursuant to the RPA.
5) Provides under the Act, until July 1, 2019, a method for funding state and local costs for carrying out these activities that are not reimbursed by federal funds, with the costs borne by utilities operating nuclear powerplants with a generating capacity of 50 megawatts or more.
6) Requires PUC to equitably allocate the non-reimbursed state costs associated with the preparation and implementation of the NPASA between the utilities. Costs for state administration and reimbursements to local governments are specified, capped, and paid for by utility customers.
FISCAL EFFECT: Unknown
COMMENTS:
Purpose of the bill: According to the author, existing law requires utility companies operating a nuclear powerplant to pay for anticipated state and local agency costs to the State Controller, into what is called the Nuclear Planning Assessment Special Account (NPASA). Utility companies pay the actual expenses up to the maximum allowed under an established funding cap. The utilities do not pay for these costs directly; rather they are authorized by the PUC to pass these costs on to consumers as a function of their utility rates. The expenditure of these funds is authorized, upon appropriation by the Legislature, on an annual basis to address planning and response issues, and administered by Cal OES. The inoperative date of these provisions ends on July 1, 2019.
Currently, the Diablo Canyon power plant pays into the NPASA but is scheduled to cease payments into the account on July 1, 2019, which is before their current license expires in July 1, 2024. Therefore, the nuclear power plant could still be in operation without having to contribute to the costs of emergency planning or response should an emergency occur.
The author states, "If the power plant was to continue in operation without funding, then emergency preparedness and response will be jeopardized. Continuing this account is vital to assure the maintenance of the State’s nuclear emergency programs, which has been a model program established to safeguard public health and safety in California."
The author maintains this bill will assist local governments with the costs associated with emergency planning and response in areas surrounding the Diablo Canyon site by extending the "sunset date" of the NPASA from July 1, 2019 to December 31, 2025. This extension will ensure that these critical programs are funded to match the duration of the nuclear power plant’s license and are vital to our local communities to guarantee that they have the resources necessary to plan and react to any emergency.
Background:
In 1979, following the accident at Three Mile Island nuclear power plant in Pennsylvania, the California State Legislature mandated that the Cal OES, together with the California Department of Public Health (CDPH) and affected counties, investigate the consequences of a serious nuclear power plant accident. Based on site-specific studies in 1980, Emergency Planning Zones (EPZ) around the plant sites were established in detail and integrated plans were developed. Legislation mandating the Nuclear Power Plant Program (NPPA) has been continuous since 1979, enacted as Government Code and Health and Safety Code sections, called the Radiation Protection Act.
Local governments are also required to develop and maintain radiological emergency preparedness and response plans to safeguard the public in the EPZ around a nuclear power plant and to take specified actions within that zone. Utilities also have a role to play, including developing and maintaining radiological emergency preparedness and response plans in coordination with state and local governments and to coordinate with state and local governments in maintaining nuclear power plant education information.
Nuclear Power Plant Program: The Nuclear Power Plant Program (NPPP) covers emergency planning issues related to the State’s one operating nuclear power plant – Diablo Canyon Power Plant (DCPP) and one decommissioning nuclear power plant - San Onofre Nuclear Generating Station (SONGS). The NPPP also continues coordination with the two retired nuclear power plants - Humboldt Bay Nuclear Power Plant and Rancho Seco Nuclear Generating Station (RSNGS). The NPPP works with federal, state, local and utility officials in emergency planning, training and exercises to test emergency readiness.
Emergency Response and Recovery: In the event of an emergency at one of California’s nuclear power plants, Cal OES is the lead agency to mobilize state resources and to request and coordinate federal resources to mitigate the effects of radiation released into the atmosphere. CDPH will provide radiological assessments during all phases of such emergencies and will be the technical lead during “ingestion pathway” and “recovery” phases of an emergency.
Emergency Plans: Federal regulations require nuclear power plants, states and surrounding counties have a federally tested and approved emergency response plan. The Federal Emergency Management Agency (FEMA) is responsible for ensuring adherence to emergency planning and exercise requirements by emergency response organizations outside of the power plant boundaries, which is referred to as “offsite." Radiation releases are monitored and controlled by strict Environmental Protection Agency (EPA) guidelines to keep the public and emergency responders safe.
Emergency Notification: In the event of a nuclear power plant (NPP) incident, the power plant (utility company) immediately notifies the California State Warning Center (CSWC) and counties in the Plume Exposure Pathway Emergency Planning Zones (EPZ). The CSWC continues the notification process to other agencies according to procedures for NPP incidents. The power plant provides the emergency classification level and plant information to the CSWC for updates along the notification chain.
Emergency Classification Levels (ECL): Federal guidelines classify emergency conditions at U.S. nuclear power plants into four levels. They are listed below in order from the least to the most serious: Notification of Unusual Event, Alert, Site Area Emergency and General Emergency.
Emergency Planning Zones: The EPZ is the area surrounding a nuclear power plant for which plans/procedures exist to ensure that prompt and effective actions occur to protect the health and safety of the public in case of an incident.
Double referral: This bill has been double referred and should it pass will be sent to the Assembly Committee on Utilities and Commerce.
Prior legislation: AB 2791 (AB 2791 (Governmental Organization Committee), Chapter 618, Statutes of 2010. Made various statutory and technical changes to reflect the merger of the former Office of Emergency Services and the former Office of Homeland Security into the California Emergency Management Agency in January 1, 2009.
AB 292 (Blakeslee), Chapter 492, Statutes of 2007. Extended the sunset date on the NPASA from July 1, 2009 to July 1, 2019 and the repeals date from January 1, 2010 to January 1, 2020. Revises the funding levels payable from the account beginning fiscal year 2009-10. Required that any money remaining in the account when it becomes inoperative be returned to the contributing utility for rebates to the ratepayers.
SB 2141 (O'Connell), Chapter 543, Statutes of 1998. Stipulated that OES shall continue to have prime responsibility for coordinating and integrating all levels of emergency planning and response within a "joint" state and local government decisionmaking process. Modified the method for providing funding to those state agencies responsible with implementing various aspects of the NPASA. Authorized the State Controller, upon appropriation by the Legislature, to advance up to 80% of a fiscal year allocation from the Account to the agencies for anticipated local costs. Extended, by 10 years, the current sunset (July 1, 1999).
SB 876 (Hart), Chapter 759, Statutes of 1993. Updated the state's NPERP by revising and reallocating responsibilities between the Office of Emergency Response, Department of Health Services, utilities, local jurisdictions, and other agencies. The bill extended the sunset on the NPASA until 7/1/99 and authorizes payment from the account of specific sums of money over the next five years to state and local agencies for the purposes of implementing the plan. Revenues to the account are derived from fees imposed on parties owning and operating nuclear powerplants.
REGISTERED SUPPORT / OPPOSITION:
Support
Physicians for Social Responsibility – Los Angeles
Santa Lucia Chapter of the Sierra Club
Opposition
None on file
Analysis Prepared by: Eric Johnson / G.O. / (916) 319-2531
Discussed in Hearing
Assembly Floor
Senate Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Energy, Utilities and Communications
Assembly Floor
Assembly Standing Committee on Governmental Organization
Bill Author
Bill Co-Author(s):