(1)Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information, including an overview of major energy trends and issues facing the state.
This bill would require, as part of the 2025 edition of the integrated energy policy report, the Energy Commission, in consultation with the Public Utilities Commission (PUC), to assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
Existing law establishes the Voluntary Offshore Wind and Coastal Resources Protection Program that is administered by the Energy Commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities and requires the program to award moneys to public and private entities through various mechanisms. Existing law authorizes the Energy Commission to allocate moneys under the program for various purposes.
The bill would additionally authorize the Energy Commission to allocate moneys under the program for workforce development grants in consultation with the California Workforce Development Board.
(2)Existing law requires the PUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the PUC to adopt a process for each electrical corporation, electric service provider, or community choice aggregator to file an integrated resource plan and a schedule for periodic updates to the plan, and to ensure that those entities meet other specified requirements.
This bill would require that the portfolio of resources ensure a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner, as specified. The bill would require the PUC, on or before September 1, 2024, and consistent with a certain process and schedule, to determine if there is a need for the procurement of eligible energy resources, as described, would require the PUC to specify the eligible energy resources that should be procured to meet that need, and would authorize the PUC, within 6 months of making that determination, to request the Department of Water Resources to procure those specified resources that meet the portfolio of resources, as specified. The bill would authorize the department to procure those resources pursuant to that request only before January 1, 2035, as provided. The bill would authorize the PUC to order the procurement of resources with specific attributes by electrical corporations, electric service providers, and community choice aggregators as a result of the integrated resource planning process and require the PUC to enforce any resource procurement requirements on a nondiscriminatory basis.
(3)Existing law prohibits an electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the PUC a certificate that the present or future public convenience and necessity require or will require that construction. Under existing law, the extension, expansion, upgrade, or other modification of an existing electrical transmission facility, including transmission lines and substations, does not require a certificate that the present or future public convenience and necessity requires or will require its construction.
This bill would require the PUC, in a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, to establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if specified requirements are satisfied.
(4)Existing law requires each local publicly owned electric utility serving end-use customers to prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers.
This bill would authorize a local publicly owned electric utility to meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources, as specified.
(5)Existing law establishes the Department of Water Resources Electricity Supply Reliability Reserve Fund and continuously appropriates moneys in the fund to the department for purposes of (A) implementing projects, purchases, and contracts to carry out specified purposes, (B) constructing, owning, and operating, or contracting for the construction and operation of, contracting for the purchase of electricity from, or financing through loans, reimbursement agreements, or other contracts actions to secure resources for summer reliability or to preserve the option to extend the life of specified facilities, and (C) reimbursing electrical corporations for the value of imported energy or import capacity products that were delivered or capable of being delivered between July 1, 2022, and on or before October 31, 2023, and were procured at above-market costs or in excess of procurement authorizations set by the PUC and above the requirements needed to serve the electrical corporations bundled customers in support of summer electric service reliability.
This bill would require the PUC, on and before June 30, 2027, if the department determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet a load-serving entitys identified reliability need, to annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements, as specified. The bill would require the Energy Commission, on or before January 31, 2024, in consultation with the PUC, to submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin and specified system resource adequacy requirements. Upon the submission of that report, the bill would require the executive director of the Energy Commission, on and before June 30, 2027, if the department determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet an identified reliability need, to annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin, as specified. The bill would authorize the Energy Commission to adopt regulations for this purpose, as specified. The bill would establish the Load-Serving Entity Capacity Payment Account and the Local Publicly Owned Electric Utility Capacity Payment Account in the Department of Water Resources Electricity Supply Reliability Reserve Fund, and would specify that moneys in those accounts would, upon appropriation by the Legislature, be used for certain purposes. The bill would require capacity payments collected by the department from load-serving entities and local publicly owned electric utilities to be deposited into those 2 accounts, as provided.
This bill would require the PUC, if the PUC requests the department to procure eligible energy resources and the department elects to conduct competitive solicitations or enter into contracts for eligible energy resources, to develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department. The bill would require the department, in evaluating bids received through a solicitation to consider certain factors. The bill would require bids for the development of an eligible energy resource project to include the bidders certification that certain labor requirements are met and that a skilled and trained workforce will be used to perform all construction work on the eligible energy resource project, as provided. The bill would, at the request of the department, authorize the PUC to require an electrical corporation to act as the agent for the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new eligible energy resource procurement. The bill would authorize the department to establish a schedule and mechanism for a local publicly owned electric utility to voluntarily obtain from the department eligible energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis. The bill would provide electrical corporations, electric service providers, and community choice aggregators with a voluntary option to obtain incremental eligible energy resources from the department, as provided. At the request of the department, the bill would authorize the PUC to order an electrical corporation to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as an agent of the department, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department. The bill would establish the Eligible Energy Resource Central Procurement Fund and continuously appropriate moneys in the fund to the department for specified purposes. By establishing a continuously appropriated fund, the bill would make an appropriation. The bill would require that all moneys collected by electrical corporations, electric service providers, community choice aggregators, and local publicly owned electric utilities and remitted to the department for eligible energy resources, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of those resources, be deposited into the fund. The bill would authorize the department, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of eligible energy resources, to issue bonds for purposes of, among other things, financing the procurement of those resources supporting the fund and other related expenses incurred by the department, as specified. The bill would authorize the department to adopt regulations for purposes of administering these provisions.
(6)This bill would provide that, upon appropriation by the Legislature, the sum of no less than $6,000,000 from the General Fund is available in the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation. The bill would provide that, upon appropriation by the Legislature, additional moneys from the General Fund will be made available for the 202425 fiscal year and subsequent fiscal years to support the California Coastal Commissions coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the bureau, pending future legislation. The bill would state the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of a specified assessment.
(7)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(8)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information, including an overview of major energy trends and issues facing the state.
This bill would require, as part of the 2025 edition of the integrated energy policy report, the Energy Commission, in consultation with the Public Utilities Commission (PUC), to assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
Existing law establishes the Voluntary Offshore Wind and Coastal Resources Protection Program that is administered by the Energy Commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities and requires the program to award moneys to public and private entities through various mechanisms. Existing law authorizes the Energy Commission to allocate moneys under the program for various purposes.
The bill would additionally authorize the Energy Commission to allocate moneys under the program for workforce development grants in consultation with the California Workforce Development Board.
(2)Existing law requires the PUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the PUC to adopt a process for each electrical corporation, electric service provider, or community choice aggregator to file an integrated resource plan and a schedule for periodic updates to the plan, and to ensure that those entities meet other specified requirements.
This bill would require that the portfolio of resources ensure a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner, as specified. The bill would require the PUC, on or before September 1, 2024, and consistent with a certain process and schedule, to determine if there is a need for the procurement of eligible energy resources, as described, would require the PUC to specify the eligible energy resources that should be procured to meet that need, and would authorize the PUC, within 6 months of making that determination, to request the Department of Water Resources to procure those specified resources that meet the portfolio of resources, as specified. The bill would authorize the department to procure those resources pursuant to that request only before January 1, 2035, as provided. The bill would authorize the PUC to order the procurement of resources with specific attributes by electrical corporations, electric service providers, and community choice aggregators as a result of the integrated resource planning process and require the PUC to enforce any resource procurement requirements on a nondiscriminatory basis.
(3)Existing law prohibits an electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the PUC a certificate that the present or future public convenience and necessity require or will require that construction. Under existing law, the extension, expansion, upgrade, or other modification of an existing electrical transmission facility, including transmission lines and substations, does not require a certificate that the present or future public convenience and necessity requires or will require its construction.
This bill would require the PUC, in a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, to establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if specified requirements are satisfied.
(4)Existing law requires each local publicly owned electric utility serving end-use customers to prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers.
This bill would authorize a local publicly owned electric utility to meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources, as specified.
(5)Existing law establishes the Department of Water Resources Electricity Supply Reliability Reserve Fund and continuously appropriates moneys in the fund to the department for purposes of (A) implementing projects, purchases, and contracts to carry out specified purposes, (B) constructing, owning, and operating, or contracting for the construction and operation of, contracting for the purchase of electricity from, or financing through loans, reimbursement agreements, or other contracts actions to secure resources for summer reliability or to preserve the option to extend the life of specified facilities, and (C) reimbursing electrical corporations for the value of imported energy or import capacity products that were delivered or capable of being delivered between July 1, 2022, and on or before October 31, 2023, and were procured at above-market costs or in excess of procurement authorizations set by the PUC and above the requirements needed to serve the electrical corporations bundled customers in support of summer electric service reliability.
This bill would require the PUC, on and before June 30, 2027, if the department determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet a load-serving entitys identified reliability need, to annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements, as specified. The bill would require the Energy Commission, on or before January 31, 2024, in consultation with the PUC, to submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin and specified system resource adequacy requirements. Upon the submission of that report, the bill would require the executive director of the Energy Commission, on and before June 30, 2027, if the department determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet an identified reliability need, to annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin, as specified. The bill would authorize the Energy Commission to adopt regulations for this purpose, as specified. The bill would establish the Load-Serving Entity Capacity Payment Account and the Local Publicly Owned Electric Utility Capacity Payment Account in the Department of Water Resources Electricity Supply Reliability Reserve Fund, and would specify that moneys in those accounts would, upon appropriation by the Legislature, be used for certain purposes. The bill would require capacity payments collected by the department from load-serving entities and local publicly owned electric utilities to be deposited into those 2 accounts, as provided.
This bill would require the PUC, if the PUC requests the department to procure eligible energy resources and the department elects to conduct competitive solicitations or enter into contracts for eligible energy resources, to develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department. The bill would require the department, in evaluating bids received through a solicitation to consider certain factors. The bill would require bids for the development of an eligible energy resource project to include the bidders certification that certain labor requirements are met and that a skilled and trained workforce will be used to perform all construction work on the eligible energy resource project, as provided. The bill would, at the request of the department, authorize the PUC to require an electrical corporation to act as the agent for the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new eligible energy resource procurement. The bill would authorize the department to establish a schedule and mechanism for a local publicly owned electric utility to voluntarily obtain from the department eligible energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis. The bill would provide electrical corporations, electric service providers, and community choice aggregators with a voluntary option to obtain incremental eligible energy resources from the department, as provided. At the request of the department, the bill would authorize the PUC to order an electrical corporation to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as an agent of the department, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department. The bill would establish the Eligible Energy Resource Central Procurement Fund and continuously appropriate moneys in the fund to the department for specified purposes. By establishing a continuously appropriated fund, the bill would make an appropriation. The bill would require that all moneys collected by electrical corporations, electric service providers, community choice aggregators, and local publicly owned electric utilities and remitted to the department for eligible energy resources, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of those resources, be deposited into the fund. The bill would authorize the department, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of eligible energy resources, to issue bonds for purposes of, among other things, financing the procurement of those resources supporting the fund and other related expenses incurred by the department, as specified. The bill would authorize the department to adopt regulations for purposes of administering these provisions.
(6)This bill would provide that, upon appropriation by the Legislature, the sum of no less than $6,000,000 from the General Fund is available in the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation. The bill would provide that, upon appropriation by the Legislature, additional moneys from the General Fund will be made available for the 202425 fiscal year and subsequent fiscal years to support the California Coastal Commissions coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the bureau, pending future legislation. The bill would state the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of a specified assessment.
(7)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(8)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information, including an overview of major energy trends and issues facing the state.
This bill would require, as part of the 2025 edition of the integrated energy policy report, the Energy Commission, in consultation with the Public Utilities Commission (PUC), to assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
Existing law establishes the Voluntary Offshore Wind and Coastal Resources Protection Program that is administered by the Energy Commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities and requires the program to award moneys to public and private entities through various mechanisms. Existing law authorizes the Energy Commission to allocate moneys under the program for various purposes.
The bill would additionally authorize the Energy Commission to allocate moneys under the program for workforce development grants in consultation with the California Workforce Development Board.
(2)Existing law requires the PUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the PUC to adopt a process for each electrical corporation, electric service provider, or community choice aggregator to file an integrated resource plan and a schedule for periodic updates to the plan, and to ensure that load-serving entities meet other specified requirements.
This bill would require that the portfolio of resources ensure a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner, as specified. The bill would require the PUC, on or before September 1, 2024, and consistent with a certain process and schedule, to determine if there is a need for the procurement of diverse clean eligible energy resources, as defined, described, would require the PUC to specify the diverse clean eligible energy resources that should be procured to meet that need, and would authorize the PUC, within 6 months of making that determination, to request the Department of Water Resources to procure those specified resources that meet the portfolio of resources, as specified. The bill would authorize the department to procure those resources pursuant to that request only before January 1, 2035, as provided. The bill would authorize the PUC to order the procurement of resources with specific attributes by electrical corporations, electric service providers, and community choice aggregators as a result of the integrated resource planning process and require the PUC to enforce any resource procurement requirements on a nondiscriminatory basis.
(3)Existing law prohibits an electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the PUC a certificate that the present or future public convenience and necessity require or will require that construction. Under existing law, the extension, expansion, upgrade, or other modification of an existing electrical transmission facility, including transmission lines and substations, does not require a certificate that the present or future public convenience and necessity requires or will require its construction.
This bill would require the PUC, in a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, to establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if specified requirements are satisfied.
(4)Existing law requires each local publicly owned electric utility serving end-use customers to prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers.
This bill would authorize a local publicly owned electric utility to meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources, as specified.
(5)Existing law establishes the Department of Water Resources Electricity Supply Reliability Reserve Fund and continuously appropriates moneys in the fund to the department for purposes of (A) implementing projects, purchases, and contracts to carry out specified purposes, (B) constructing, owning, and operating, or contracting for the construction and operation of, contracting for the purchase of electricity from, or financing through loans, reimbursement agreements, or other contracts actions to secure resources for summer reliability or to preserve the option to extend the life of specified facilities, and (C) reimbursing electrical corporations for the value of imported energy or import capacity products that were delivered or capable of being delivered between July 1, 2022, and on or before October 31, 2023, and were procured at above-market costs or in excess of procurement authorizations set by the PUC and above the requirements needed to serve the electrical corporations bundled customers in support of summer electric service reliability.
This bill would require the PUC, on and before June 30, 2027, if the department determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources were used in a given month to meet a load-serving entitys identified reliability need, to annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements, as specified. The bill would require the Energy Commission, on or before January 31, 2024, in consultation with the PUC, to submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin and specified system resource adequacy requirements. Upon the submission of that report, the bill would require the executive director of the Energy Commission, on and before June 30, 2027, if the department determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources were used in a given month to meet an identified reliability need, to annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin, as specified. The bill would authorize the Energy Commission to adopt regulations for this purpose, as specified. The bill would establish the Load-Serving Entity Capacity Payment Account and the Local Publicly Owned Electric Utility Capacity Payment Account in the Department of Water Resources Electricity Supply Reliability Reserve Fund, and would specify that moneys in those accounts would, upon appropriation by the Legislature, be used for certain purposes. The bill would require capacity payments collected by the department from load-serving entities and local publicly owned electric utilities to be deposited in those 2 accounts, as provided.
This bill would require the PUC, if the PUC requests the department to procure diverse clean eligible energy resources and the department elects to conduct competitive solicitations or enter into contracts for diverse clean eligible energy resources, to develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department. The bill would require the department, in evaluating bids received through a solicitation to consider certain factors. The bill would requires bids for the development of a diverse clean an eligible energy resource project to include the bidders certification that certain labor requirements are met and that a skilled and trained workforce will be used to perform all construction work on the diverse clean eligible energy resource project, as provided. The bill would, at the request of the department, authorize the PUC to require an electrical corporation to act as the agent for the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new diverse clean eligible energy resource procurement. The bill would authorize the department to establish a schedule and mechanism for a local publicly owned electric utility to voluntarily obtain from the department diverse clean eligible energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis. The bill would provide electrical corporations, electric service providers, and community choice aggregators with a voluntary option to obtain incremental diverse clean eligible energy resources from the department, as provided. At the request of the department, the bill would authorize the PUC to order an electrical corporation to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as an agent of the department, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department. The bill would establish the Diverse Clean Eligible Energy Resource Central Procurement Fund and continuously appropriate moneys in the fund to the department for specified purposes. By establishing a continuously appropriated fund, the bill would make an appropriation. The bill would require that all moneys collected by electrical corporations, electric service providers, community choice aggregators, and local publicly owned electric utilities and remitted to the department for diverse clean eligible energy resources, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of those resources, be deposited into the fund. The bill would authorize the department, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of offshore wind and geothermal energy resources, to issue bonds for purposes of, among other things, financing the procurement of those resources supporting the fund and other related expenses incurred by the department, as specified. The bill would authorize the department to adopt regulations for purposes of administering these provisions.
(6)This bill would provide that, upon appropriation by the Legislature, the sum of no less than $6,000,000 from the General Fund is available in the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation. The bill would provide that, upon appropriation by the Legislature, additional moneys from the General Fund will be made available for the 202425 fiscal year and subsequent fiscal years to support the California Coastal Commissions coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the bureau, pending future legislation. The bill would state the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of a specified assessment.
(7)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(8)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with specified entities, to adopt a biennial integrated energy policy report containing certain information, including an overview of major energy trends and issues facing the state.
This bill would require, as part of the 2025 edition of the integrated energy policy report, the Energy Commission, in consultation with the Public Utilities Commission (PUC), to assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
Existing law establishes the Voluntary Offshore Wind and Coastal Resources Protection Program that is administered by the Energy Commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities and requires the program to award moneys to public and private entities through various mechanisms. Existing law authorizes the Energy Commission to allocate moneys under the program for various purposes.
The bill would additionally authorize the Energy Commission to allocate moneys under the program for workforce development grants in consultation with the California Workforce Development Board.
(1)(2)Existing law requires the Public Utilities Commission (PUC) PUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the PUC to adopt a process for each electrical corporation, electric service provider, or community choice aggregator to file an integrated resource plan and a schedule for periodic updates to the plan, and to ensure that load-serving entities meet other specified requirements.
This bill would require that the portfolio of resources ensure a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner, as specified. The bill would require the PUC, on or before September 1, 2024, and biennially thereafter, consistent with a certain process and schedule, to determine if there is a need for the procurement of additional offshore wind and geothermal diverse clean energy resources, as defined, would require the PUC to specify the diverse clean energy resources that should be procured to meet that need, and would authorize the PUC, within 6 months of making that determination, to request the Department of Water Resources to procure offshore wind and geothermal energy those specified resources that meet the portfolio of resources, as specified. The bill would authorize the department to procure those resources pursuant to that request only until January 1, 2030, and would authorize the department to issue bonds for that purpose, as specified. before January 1, 2035, as provided. The bill would authorize the PUC to order the procurement of resources with specific attributes by electrical corporations, electric service providers, and community choice aggregators as a result of the integrated resource planning process and require the PUC to enforce any resource procurement requirements on a nondiscriminatory basis.
(3)Existing law prohibits an electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the PUC a certificate that the present or future public convenience and necessity require or will require that construction. Under existing law, the extension, expansion, upgrade, or other modification of an existing electrical transmission facility, including transmission lines and substations, does not require a certificate that the present or future public convenience and necessity requires or will require its construction.
This bill would require the PUC, in a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, to establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if specified requirements are satisfied.
(2)(4)Existing law requires each local publicly owned electric utility serving end-use customers to prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers.
This bill would authorize a local publicly owned electric utility to meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources, as specified.
(3)(5)Existing law establishes the Department of Water Resources Electricity Supply Reliability Reserve Fund and continuously appropriates moneys in the fund to the department for purposes of (A) implementing projects, purchases, and contracts to carry out specified purposes, (B) constructing, owning, and operating, or contracting for the construction and operation of, contracting for the purchase of electricity from, or financing through loans, reimbursement agreements, or other contracts actions to secure resources for summer reliability or to preserve the option to extend the life of specified facilities, and (C) reimbursing electrical corporations for the value of imported energy or import capacity products that were delivered or capable of being delivered between July 1, 2022, and on or before September 30, 2022, October 31, 2023, and were procured at above-market costs or in excess of procurement authorizations set by the PUC and above the requirements needed to serve the electrical corporations bundled customers in support of summer electric service reliability.
This bill would require the PUC, on and before June 30, 2027, if the department determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being were used in a given month to meet an a load-serving entitys identified reliability need, to annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements, as specified. The bill would require the State Energy Resources Conservation and Development Commission (Energy Commission), Energy Commission, on or before January 31, 2024, in consultation with the PUC, to submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin and specified system resource adequacy requirements. Upon the submission of that report, the bill would require the executive director of the Energy Commission, on and before June 30, 2027, if the department determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being were used in a given month to meet an identified reliability need, to annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin, as specified. The bill would authorize the Energy Commission to adopt regulations for this purpose, as specified. The bill would require the department to collect any capacity payment assessed pursuant to those requirements and to deposit those payments into the Department of Water Resources Electricity Supply Reliability Reserve Fund, thereby making an appropriation. The bill would establish the Load-Serving Entity Capacity Payment Account and the Local Publicly Owned Electric Utility Capacity Payment Account in the Department of Water Resources Electricity Supply Reliability Reserve Fund, and would specify that moneys in those accounts would, upon appropriation by the Legislature, be used for certain purposes. The bill would require capacity payments collected by the department from load-serving entities and local publicly owned electric utilities to be deposited in those 2 accounts, as provided.
This bill would authorize the department, following a determination from the PUC, in consultation with the Energy Commission and the Independent System Operator, that it is necessary for the department to develop and conduct one or more competitive solicitations to procure energy, capacity, ancillary services, and all associated attributes, to conduct those solicitations until December 31, 2029, as specified. The bill would require the department to require, as a condition of the solicitations, that bids include a charge payable to the Offshore Wind Workforce Development Fund, which the bill would establish to award grants, upon appropriation by the Legislature, for purposes of educating, training, maintaining, and strengthening the workforce needed for offshore wind energy development, as specified. TheThis bill would require the PUC, if the PUC requests the department to procure diverse clean energy resources and the department elects to conduct competitive solicitations or enter into contracts for diverse clean energy resources, to develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department. The bill would require the department, in evaluating bids received through a solicitation to consider certain factors. The bill would requires bids for the development of a diverse clean energy resource project to include the bidders certification that certain labor requirements are met and that a skilled and trained workforce will be used to perform all construction work on the diverse clean energy resource project, as provided. The bill would, at the request of the department, authorize the PUC to require an electrical corporation to act as the agent for the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new diverse clean energy resource procurement. The bill would authorize the department to establish a schedule and mechanism for an electrical corporation, electric service provider, community choice aggregator, or a local publicly owned electric utility to voluntarily obtain from the department energy, capacity, or ancillary services diverse clean energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis. The bill would provide electrical corporations, electric service providers, and community choice aggregators with a voluntary option to obtain incremental diverse clean energy resources from the department, as provided. At the request of the department, the bill would authorize the PUC to order an electrical corporation to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as an agent of the department, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department. The bill would establish the Diverse Clean Energy Central Procurement Fund and continuously appropriate moneys in the fund to the department for specified purposes. By establishing a continuously appropriated fund, the bill would make an appropriation. The bill would require that all moneys collected by electrical corporations, electric service providers, community choice aggregators, and local publicly owned electric utilities and remitted to the department with respect to certain offshore wind and geothermal for diverse clean energy resources, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of those resources, be deposited into the fund. The bill would authorize the department, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of offshore wind and geothermal energy resources, to issue bonds for purposes of, among other things, financing the procurement of those resources supporting the fund and other related expenses incurred by the department, as specified. The bill would authorize the department to adopt regulations for purposes of administering these provisions.
(6)This bill would provide that, upon appropriation by the Legislature, the sum of no less than $6,000,000 from the General Fund is available in the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation. The bill would state the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of a specified assessment.
(4)(7)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(5)(8)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law requires the Public Utilities Commission (PUC) to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the PUC to adopt a process for each load-serving entity, as defined, electrical corporation, electric service provider, or community choice aggregator to file an integrated resource plan and a schedule for periodic updates to the plan, and to ensure that load-serving entities meet other specified requirements.
This bill would require that the portfolio of resources ensure a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner, as specified. The bill would require the PUC, on or before September 1, 2024, and biennially thereafter, to determine if there is a need for the procurement of additional offshore wind and geothermal energy resources, and would authorize the PUC to direct an electrical corporation, and PUC, within 6 months of making that determination, to request the Department of Water Resources, Resources to procure diverse clean energy resources, as defined by the PUC, offshore wind and geothermal energy resources that satisfy meet the portfolio of resources, as specified. The bill would authorize the department to procure those resources pursuant to that request only until January 1, 2030, and would authorize the department to issue bonds for that purpose, as specified. The bill would authorize the PUC to order resource the procurement of resources with specific attributes by electrical corporations, electric service providers, and community choice aggregators as a result of the integrated resource planning process and require the PUC to enforce any resource procurement requirements on a nondiscriminatory basis.
(2)Existing law requires each local publicly owned electric utility serving end-use customers to prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers.
This bill would authorize a local publicly owned electric utility to meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources, as specified.
(2)(3)Existing law establishes the Department of Water Resources Electricity Supply Reliability Reserve Fund and continuously appropriates moneys in the fund to the department for purposes of implementing projects, purchases, and contracts to carry out specified purposes, including, but not limited to, the Distributed Electricity Backup Assets Program and the Demand Side Grid Support Program. constructing, owning, and operating, or contracting for the construction and operation of, contracting for the purchase of electricity from, or financing through loans, reimbursement agreements, or other contracts actions to secure resources for summer reliability or to preserve the option to extend the life of specified facilities, and reimbursing electrical corporations for the value of imported energy or import capacity products that were delivered or capable of being delivered between July 1, 2022, and on or before September 30, 2022, and were procured at above-market costs or in excess of procurement authorizations set by the PUC and above the requirements needed to serve the electrical corporations bundled customers in support of summer electric service reliability.
This bill would require the PUC PUC, on and before June 30, 2027, if the department determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being used in a given month to meet an identified reliability need, to annually assess a capacity payment for the use of the fund by on each load-serving entity that during that same month fails to meet its system resource adequacy requirements during a month in which resources procured using moneys from the fund were used to meet a reliability need. The requirements, as specified. The bill would require the State Energy Resources Conservation and Development Commission (Energy Commission), on or before January 31, 2024, in consultation with the PUC, to submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin and specified system resource adequacy requirements. Upon the submission of that report, the bill would require the executive director of the Energy Commission Commission, on and before June 30, 2027, if the department determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being used in a given month to meet an identified reliability need, to annually assess a capacity payment for the use of the fund by on each local publicly owned electric utility that during that same month fails to meet its minimum planning reserve margin during a month in which resources procured using moneys from the fund were used to meet a reliability need, and margin, as specified. The bill would authorize the Energy Commission to adopt regulations for this purpose, as specified. The bill would require the department to collect any capacity payment ordered assessed pursuant to those requirements and to deposit those payments into the fund, Department of Water Resources Electricity Supply Reliability Reserve Fund, thereby making an appropriation.
This bill would authorize the department, following a determination from the PUC, in consultation with the Energy Commission and the Independent System Operator, that it is necessary for the department to develop and conduct one or more competitive solicitations to procure energy, capacity, ancillary services, and all associated attributes, to conduct those solicitations, solicitations until December 31, 2029, as specified. The bill would require the department to require, as a condition of the solicitations, that bids include a charge payable to the Offshore Wind Workforce Development Fund, which the bill would establish to award grants, upon appropriation by the Legislature, for purposes of educating, training, maintaining, and strengthening the workforce needed for offshore wind energy development, as specified. The bill would authorize the department to establish a schedule and mechanism for any an electrical corporation, electric service provider, community choice aggregator, or local publicly owned electric utility to voluntarily obtain from the department energy, capacity, or ancillary services to be acquired by the department through its central procurement function on a contract-by-contract basis. At the request of the department, the bill would authorize the PUC to order an electrical corporation to transmit or provide for the transmission of of, and distribute all electricity made available by the department, and, as an agent of the department, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department. The bill would establish the Clean Energy Central Procurement Fund and continuously appropriate moneys in the fund to the department for specified purposes. By establishing a continuously appropriated fund, the bill would make an appropriation. The bill would require that all moneys collected by load-serving entities electrical corporations, electric service providers, community choice aggregators, and local publicly owned electric utilities and remitted to the department with respect to certain diverse clean offshore wind and geothermal energy resources, and all moneys paid directly or indirectly to or for the account of the department with respect to the for any sale, exchange, transfer, or disposition of certain energy, those resources, be deposited into the fund. The bill would authorize the department, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of diverse clean offshore wind and geothermal energy resources, to issue bonds for purposes of, among other things, financing the procurement of diverse clean energy those resources supporting the fund and other related expenses incurred by the department, as specified. The bill would authorize the department to adopt regulations for purposes of administering these provisions.
(3)(4)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(5)This bill would declare that it is to take effect immediately as an urgency statute.
(1)Existing law requires the Public Utilities Commission (PUC) to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner. Existing law requires the PUC to adopt a process for each load-serving entity, as defined, to file an integrated resource plan and a schedule for periodic updates to the plan, and to ensure that load-serving entities meet other specified requirements.
This bill would require that the portfolio of resources ensure a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner, as specified. The bill would authorize the PUC to direct an electrical corporation, and request the Department of Water Resources, to procure diverse clean energy resources, as defined by the PUC, that satisfy the portfolio of resources, as specified. The bill would authorize the PUC to order resource procurement as a result of the integrated resource planning process and require the PUC to enforce any resource procurement requirements on a nondiscriminatory basis.
(2)Existing law establishes the Department of Water Resources Electricity Supply Reliability Reserve Fund and continuously appropriates moneys in the fund to the department for purposes of implementing projects, purchases, and contracts to carry out specified purposes, including, but not limited to, the Distributed Electricity Backup Assets Program and the Demand Side Grid Support Program.
This bill would require the PUC to annually assess a capacity payment for the use of the fund by each load-serving entity that fails to meet its system resource adequacy requirements during a month in which resources procured using moneys from the fund were used to meet a reliability need. The bill would require the executive director of the Energy Commission to annually assess a capacity payment for the use of the fund by each local publicly owned electric utility that fails to meet its minimum planning reserve margin during a month in which resources procured using moneys from the fund were used to meet a reliability need, and authorize the Energy Commission to adopt regulations for this purpose, as specified. The bill would require the department to collect any capacity payment ordered pursuant to those requirements and to deposit those payments into the fund, thereby making an appropriation.
This bill would authorize the department, following a determination from the PUC, in consultation with the Energy Commission and the Independent System Operator, that it is necessary for the department to develop and conduct one or more competitive solicitations to procure energy, capacity, ancillary services, and all associated attributes, to conduct those solicitations, as specified. The bill would authorize the department to establish a schedule and mechanism for any local publicly owned electric utility to voluntarily obtain from the department energy, capacity, or ancillary services to be acquired by the department through its central procurement function on a contract-by-contract basis. At the request of the department, the bill would authorize the PUC to order an electrical corporation to provide for the transmission of and distribute all electricity made available by the department, and, as an agent of the department, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department. The bill would establish the Clean Energy Central Procurement Fund and continuously appropriate moneys in the fund to the department for specified purposes. By establishing a continuously appropriated fund, the bill would make an appropriation. The bill would require that all moneys collected by load-serving entities and remitted to the department with respect to certain diverse clean energy resources, and all moneys paid directly or indirectly to the department with respect to the sale, exchange, transfer, or disposition of certain energy, be deposited into the fund. The bill would authorize the department, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of diverse clean energy resources, to issue bonds for purposes of, among other things, financing the procurement of diverse clean energy resources supporting the fund and other related expenses incurred by the department, as specified. The bill would authorize the department to adopt regulations for purposes of administering these provisions.
(3)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the Public Utilities Commission, the Independent System Operator, and the State Air Resources Board, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified. Existing law requires that the assessment, among other things, evaluate the use of energy storage to achieve those goals.This bill would require the assessment to instead be submitted on or before June 30, 2024, and would limit the requirement to evaluate the use of energy storage in the assessment to an evaluation of the use of long-duration and multiday energy storage.Existing law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the Public Utilities Commission, the Independent System Operator, and the State Air Resources Board, on or before December 31, 2023, to submit to the Legislature an assessment of the firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045, as specified. Existing law requires that the assessment, among other things, evaluate the use of energy storage to achieve those goals.
This bill would require the assessment to instead be submitted on or before June 30, 2024, and would limit the requirement to evaluate the use of energy storage in the assessment to an evaluation of the use of long-duration and multiday energy storage.
Sections 10295 and 10297 do not apply to any contract entered into by the Department of Water Resources under Part 3 (commencing with Section 11100) of Division 6, Chapter 8 (commencing with Section 12930) of Part 6 of Division 6, Division 29 (commencing with Section 80700), or Division 29.5 (commencing with Section 80800), of the Water Code for the acquisition, sale, or transmission of power, or for services to facilitate those activities.
SEC. 2.Section 25302.6 is added to the Public Resources Code, to read:25302.6.As part of the 2025 edition of the integrated energy policy report, the commission, in consultation with the Public Utilities Commission, shall assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
SEC. 3.Section 25795 of the Public Resources Code is amended to read:25795.(a)Beginning on January 31, 2023, and on May 1, August 1, and December 1 annually thereafter, the commission shall issue a written report to the Joint Legislative Budget Committee detailing the actions undertaken by the commission in the period since the previous report pursuant to this chapter through that date, including, but not limited to, all of the following:
(1)Amount of funds expended.
(2)Purpose of funds expended.
(3)Status of actions funded.
(4)For new and expanded resources, the amount by megawatt, resource type, operational date, and expected lifetime of that capacity.
(5)The frequency at which resources funded by the Department of Water Resources or the commission have been used and the extent to which they complied with the requirements of this chapter.
(6)In consultation with the state board, an estimate or the best available information on the emissions of greenhouse gases, criteria air pollutants, and toxic air contaminants emitted by the resources funded by the Department of Water Resources or the commission over the period since the previous report.
(7)Summary of contracts, grants, and loans issued pursuant to this chapter.
(b)Each report submitted pursuant to this section shall be submitted to the Joint Legislative Budget Committee at the same time and in the same manner as reports submitted pursuant to Section 80730 of the Water Code.
SEC. 4.Section 25992.10 of the Public Resources Code is amended to read:25992.10.(a)(1)The Voluntary Offshore Wind and Coastal Resources Protection Program is hereby established to be administered by the commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities, including federal laws providing for offshore wind lease conditions of the bureau. The program shall award moneys to public and private entities, including, but not limited to, state agencies, tribal entities, local governmental agencies, research institutions, and nonprofit entities, through various mechanisms, including, but not limited to, grants.
(2)Moneys from the fund and account shall be available for allocation by the commission for purposes of this chapter.
(b)The commission may allocate moneys for any of the following:
(1)Increasing the ability of state agencies to engage in postlease assessments and studies of impacts, including surveys and plans, and ongoing review of project compliance and monitoring, including administrative costs.
(2)Research facilitation and coordination, including, but not limited to, funding to support state agencies to work collaboratively with the bureau and other federal, state, and tribal entities to ensure that lessees construction and operations plans incorporate strategies and specific plans for comprehensive monitoring and adaptive management, and to ensure that the strategies and plans are implemented appropriately, including funding to contract with technical experts to be retained by state agencies to consult and collaborate on strategies and specific plans for comprehensive monitoring and adaptive management.
(3)(A)Contracts with technical experts to assist the bureau and the state in their review of survey and sampling and analysis plans, survey data and analysis, construction and operation plans, and other planning, project development, and project implementation activities and documents.
(B)The purpose of the technical experts is to review current research on survey methodologies, monitoring approaches and technologies, adaptive management strategies, and other relevant topics for floating offshore wind, to provide the bureau and the state with recommendations, suggested guidelines, and best practices, and to fulfill additional research needs, during all phases of floating offshore wind development and implementation with the overall goal of avoiding and minimizing impacts to coastal resources.
(4)Environmental impacts monitoring, including, but not limited to, any of the following:
(A)Collecting, analyzing, and reporting baseline and postdevelopment environmental data to assess large-scale changes and cumulative impacts to marine species, habitats, and uses from floating offshore wind development and related activities with a goal of enabling the bureau and the state to accurately assess, mitigate, and adaptively manage those impacts.
(B)Data collection at a regional scale that integrates data with information and data provided by lessees or the bureau and other relevant data to provide a comprehensive understanding of how floating offshore wind development is affecting the marine environment and coastal uses.
(5)Infrastructure readiness commitments, including, but not limited to, activities associated with the bureaus lease requirements for lessees to support infrastructure readiness, such as ports, waterfront facilities, and transmission for floating offshore wind generation facilities.
(6)Workforce development grants consistent with subdivisions (r) to (t), inclusive, of Section 14005 of the Unemployment Insurance Code and in consultation with the California Workforce Development Board.
(c)Moneys in the fund and the account shall not be allocated by the commission to another state or local agency for that agencys costs that are otherwise recoverable from project proponents in administering a regulatory or entitlement program.
SEC. 5.Section 365.1 of the Public Utilities Code is amended to read:365.1.(a)Except as expressly authorized by this section, and subject to the limitations in subdivisions (b) and (c), the right of retail end-use customers pursuant to this chapter to acquire service from other providers is suspended until the Legislature, by statute, lifts the suspension or otherwise authorizes direct transactions. For purposes of this section, other provider means any person, corporation, or other entity that is authorized to provide electric service within the service territory of an electrical corporation pursuant to this chapter, and includes an aggregator, broker, or marketer, as defined in Section 331, and an electric service provider, as defined in Section 218.3. Other provider does not include a community choice aggregator, as defined in Section 331.1, and the limitations in this section do not apply to the sale of electricity by other providers to a community choice aggregator for resale to community choice aggregation electricity consumers pursuant to Section 366.2.
(b)The commission shall authorize individual retail nonresidential end-use customers to acquire electric service from other providers in each electrical corporations distribution service territory, up to a maximum allowable total kilowatthours annual limit. The maximum allowable annual limit shall be established by the commission for each electrical corporation at the maximum total kilowatthours supplied by all other providers to distribution customers of that electrical corporation during any sequential 12-month period between April 1, 1998, and October 11, 2009. Within six months of October 11, 2009, the commission shall adopt and implement a reopening schedule that commences immediately and will phase in the allowable amount of increased kilowatthours over a period of not less than three years, and not more than five years, raising the allowable limit of kilowatthours supplied by other providers in each electrical corporations distribution service territory from the number of kilowatthours provided by other providers as of October 11, 2009, to the maximum allowable annual limit for that electrical corporations distribution service territory. The commission shall review and, if appropriate, modify its currently effective rules governing direct transactions, but that review shall not delay the start of the phase-in schedule.
(c)Once the commission has authorized additional direct transactions pursuant to subdivision (b), it shall do both of the following:
(1)Ensure that other providers are subject to the same requirements that apply to the states three largest electrical corporations under any programs or rules adopted by the commission to implement the resource adequacy provisions of Section 380, the renewables portfolio standard provisions of Article 16 (commencing with Section 399.11), the requirements for the electricity sector adopted by the State Air Resources Board pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code), and the requirements of the integrated resource planning process as specified in Sections 454.52 to 454.54, inclusive. This requirement applies notwithstanding any prior decision of the commission to the contrary.
(2)(A)Ensure that, in the event that the commission authorizes, in the situation of a contract with a third party, or orders, in the situation of utility-owned generation, an electrical corporation to obtain generation resources that the commission determines are needed to meet system or local area reliability needs for the benefit of all customers in the electrical corporations distribution service territory, the net capacity costs of those generation resources are allocated on a fully nonbypassable basis consistent with departing load provisions as determined by the commission, to all of the following:
(i)Bundled service customers of the electrical corporation.
(ii)Customers that purchase electricity through a direct transaction with other providers.
(iii)Customers of community choice aggregators.
(B)If the commission authorizes or orders an electrical corporation to obtain generation resources pursuant to subparagraph (A), the commission shall ensure that those resources meet a system or local reliability need in a manner that benefits all customers of the electrical corporation. The commission shall allocate the costs of those generation resources to ratepayers in a manner that is fair and equitable to all customers, whether they receive electric service from the electrical corporation, a community choice aggregator, or an electric service provider.
(C)The resource adequacy benefits of generation resources acquired by an electrical corporation pursuant to subparagraph (A) shall be allocated to all customers who pay their net capacity costs. Net capacity costs shall be determined by subtracting the energy and ancillary services value of the resource from the total costs paid by the electrical corporation pursuant to a contract with a third party or the annual revenue requirement for the resource if the electrical corporation directly owns the resource. An energy auction shall not be required as a condition for applying this allocation, but may be allowed as a means to establish the energy and ancillary services value of the resource for purposes of determining the net costs of capacity to be recovered from customers pursuant to this paragraph, and the allocation of the net capacity costs of contracts with third parties shall be allowed for the terms of those contracts.
(D)It is the intent of the Legislature, in enacting this paragraph, to provide additional guidance to the commission with respect to the implementation of subdivision (g) of Section 380, and to ensure that the customers to whom the net costs and benefits of capacity are allocated are not required to pay for the cost of electricity they do not consume.
(d)(1)If the commission approves a centralized resource adequacy mechanism pursuant to subdivisions (h) and (i) of Section 380, upon the implementation of the centralized resource adequacy mechanism the requirements of paragraph (2) of subdivision (c) shall be suspended. If the commission later orders that electrical corporations cease procuring capacity through a centralized resource adequacy mechanism, the requirements of paragraph (2) of subdivision (c) shall again apply.
(2)If the use of a centralized resource adequacy mechanism is authorized by the commission and has been implemented as set forth in paragraph (1), the net capacity costs of generation resources that the commission determines are required to meet urgent system or urgent local grid reliability needs, and that the commission authorizes to be procured outside of the Section 380 or Section 454.5 processes, shall be recovered according to paragraph (2) of subdivision (c).
(3)This subdivision does not supplant the resource adequacy requirements of Section 380 or the resource procurement procedures established in Section 454.5.
(e)On or before June 1, 2019, the commission shall issue an order regarding direct transactions that provides as follows:
(1)Increase the maximum allowable total kilowatthours annual limit by 4,000 gigawatthours and apportion that increase among the service territories of the electrical corporations.
(2)All residential and nonresidential customer accounts that are on direct access as of January 1, 2019, remain authorized to participate in direct transactions.
SEC. 6.Section 380 of the Public Utilities Code is amended to read:380.(a)The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities.
(b)In establishing resource adequacy requirements, the commission shall ensure the reliability of electrical service in California while advancing, to the extent possible, the states goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. The resource adequacy program shall achieve all of the following objectives:
(1)Facilitate development of new generating, nongenerating, and hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economical and needed for reliability and to achieve the state policy specified in Section 454.53.
(2)Establish new, or maintain existing, demand response products and tariffs that facilitate the economical dispatch and use of demand response that can either meet or reduce an electrical corporations resource adequacy requirements, as determined by the commission.
(3)Equitably allocate the cost of generating capacity and demand response in a manner that prevents the shifting of costs between customer classes.
(4)Minimize enforcement requirements and costs.
(5)Maximize the ability of community choice aggregators to determine the generation resources used to serve their customers.
(c)Each load-serving entity shall maintain physical generating capacity and electrical demand response adequate to meet its load requirements, including, but not limited to, peak demand and planning and operating reserves. The generating capacity or electrical demand response shall be deliverable to locations and at times as may be necessary to maintain electrical service system reliability, local area reliability, and flexibility.
(d)Each load-serving entity shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the board of directors of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(e)The commission shall implement and enforce the resource adequacy requirements established in accordance with this section in a nondiscriminatory manner. Each load-serving entity shall be subject to the same requirements for resource adequacy, the renewables portfolio standard program, and the integrated resource planning process pursuant to Section 454.52 that apply to electrical corporations pursuant to this section, or are otherwise required by law or by order or decision of the commission. The commission shall exercise its enforcement powers to ensure compliance by all load-serving entities.
(f)(1)The commission shall require sufficient information, including, but not limited to, anticipated load, actual load, and measures undertaken by a load-serving entity to ensure resource adequacy, to be reported to enable the commission to determine compliance with the resource adequacy requirements established by the commission.
(2)The commission shall calculate and publish annually on its internet website, in a new report or as part of another report, the percentage of each load-serving entitys local and system resource adequacy requirements from the previous calendar year that was met with capacity from eligible renewable energy resources pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11)), other zero-carbon resources, including large hydroelectric and nuclear resources, or energy storage resources. In determining the percentage of each load-serving entitys resource adequacy requirements, the commission shall include all directly owned or contracted resources and each load-serving entitys allocation of any centrally procured resources or allocation of resources pursuant to any other mechanism that involves an assignment or allocation of resources purchased or owned by a single buyer, and shall exclude any share of a load-serving entitys resources that were allocated to another load-serving entity.
(g)An electrical corporations costs of meeting or reducing resource adequacy requirements, including, but not limited to, the costs associated with system reliability, local area reliability, or flexible resource adequacy, that are determined to be reasonable by the commission, or are otherwise recoverable under a procurement plan approved by the commission pursuant to Section 454.5, shall be fully recoverable from those customers on whose behalf the costs are incurred, as determined by the commission, at the time the commitment to incur the cost is made, on a fully nonbypassable basis, as determined by the commission. The commission shall exclude any amounts authorized to be recovered pursuant to Section 366.2 when authorizing the amount of costs to be recovered from customers of a community choice aggregator or from customers that purchase electricity through a direct transaction pursuant to this subdivision.
(h)The commission shall determine and authorize the most efficient and equitable means for achieving all of the following:
(1)Meeting the objectives of this section.
(2)Ensuring that investment is made in new generating capacity.
(3)Ensuring that existing generating capacity that is economical is retained.
(4)Ensuring that the cost of generating capacity and demand response is allocated equitably.
(5)Ensuring that community choice aggregators can determine the generation resources used to serve their customers.
(6)Ensuring that investments are made in new and existing demand response resources that are cost effective and help to achieve electrical grid reliability and the states goals for reducing emissions of greenhouse gases.
(7)Minimizing the need for backstop procurement by the Independent System Operator.
(i)In making the determination pursuant to subdivision (h), the commission may consider a centralized resource adequacy mechanism among other options.
(j)The commission shall ensure appropriate valuation of both supply and load modifying demand response resources. The commission, in an existing or new proceeding, shall establish a mechanism to value load modifying demand response resources, including, but not limited to, the ability of demand response resources to help meet distribution needs and transmission system needs and to help reduce a load-serving entitys resource adequacy obligation pursuant to this section. In determining this value, the commission shall consider how these resources further the states electrical grid reliability and the states goals for reducing emissions of greenhouse gases. The commission, Energy Commission, and Independent System Operator shall jointly ensure that changes in demand caused by load modifying demand response are expeditiously and comprehensively reflected in the Energy Commissions Integrated Energy Policy Report forecast and in planning proceedings and associated analyses, and shall encourage reflection of these changes in demand in the operation of the grid.
(k)For purposes of this section, load-serving entity means an electrical corporation, electric service provider, or community choice aggregator. Load-serving entity does not include any of the following:
(1)A local publicly owned electric utility.
(2)The State Water Resources Development System commonly known as the State Water Project.
(3)Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, if the customer generation, or the load it serves, meets one of the following criteria:
(A)It takes standby service from the electrical corporation on a commission-approved rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(B)It is not physically interconnected to the electrical transmission or distribution grid, so that, if the customer generation fails, backup electricity is not supplied from the electrical grid.
(C)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
SEC. 7.Section 454.51 of the Public Utilities Code is amended to read:454.51.The commission shall do all of the following:
(a)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy and resource diversity in a cost-effective manner. The portfolio shall be used by the commission to establish integrated resource planning-based procurement requirements that rely on zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve the state policy specified in Section 454.53 and any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources or diverse resources, procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration and diverse resources need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need identified in subdivision (a) or (d), as applicable, shall be borne by the load-serving entity, as defined in Section 380, that failed to perform.
SEC. 8.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability on a near-term, mid-term, and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.
(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H)Enhance distribution systems and demand-side energy management.
(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(J)Maintain a diverse portfolio of energy resources, which may include eligible energy resources procured by the Department of Water Resources.
(2)(A)The commission may authorize all source procurement for load-serving entities that includes various resource types including demand-side resources, supply-side resources, and resources that may be either demand-side resources or supply-side resources, taking into account the differing load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(4)(A)On or before September 1, 2024, and consistent with the process and schedule adopted pursuant to paragraph (1), the commission, in consultation with the Energy Commission and the Independent System Operator, shall determine if there is a need for the procurement of eligible energy resources based on a review of the integrated resource plans submitted by load-serving entities in compliance with the requirements of this section and Section 454.53 and the progress towards meeting the portfolio of resources identified pursuant to subdivision (a) of Section 454.51.
(B)If the commission determines that there is a need for the procurement of eligible energy resources, the commission shall specify the eligible energy resources that should be procured to meet that need.
(C)Within six months of determining that there is a need for the procurement of eligible energy resources, the commission may request the Department of Water Resources to exercise its central procurement function to procure those eligible energy resources specified pursuant to subparagraph (B) that meet the portfolio of resources identified in subdivision (a) of Section 454.51.
(D)(i)Upon receiving a request pursuant to subparagraph (C), the Department of Water Resources, before January 1, 2035, may exercise its central procurement function to conduct one or more competitive solicitations and enter into contracts to procure eligible energy resources in order to achieve the policy of the state specified in Section 454.53.
(ii)Any contract entered into by the Department of Water Resources pursuant to clause (i) and approved by the commission pursuant to Section 80821 of the Water Code before January 1, 2035, shall remain in force for the duration of the contract.
(E)The Department of Water Resources exercising of its central procurement function to procure eligible energy resources pursuant to this paragraph shall be conducted in accordance with Division 29.5 (commencing with Section 80800) of the Water Code.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of short-term and long-term electricity, electricity-related, and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.
(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.
(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.
(h)(1)Only a new energy resource that meets all of the following requirements is eligible to be procured by the Department of Water Resources pursuant to this section:
(A)The resource directly supports attainment of the goals specified in Section 454.53 without increasing the states dependence on any fossil fuel-based resources.
(B)The resource is determined by the commission to not be under contract at sufficient levels as shown in load-serving entities most recent individual integrated resource plans submitted to and reviewed by the commission pursuant to this section to achieve the goals specified in Section 454.53.
(C)The resource has a construction and development lead time of at least five years.
(D)The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
(E)The resource does not use combustion to generate electricity, unless that combustion use is ancillary and necessary to facilitate geothermal electricity generation.
(2)Resources from a pump hydroelectric facility may be procured by the Department of Water Resources pursuant to this section if the pump hydroelectric facility does not exceed 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.
(i)For purposes of this section, load-serving entity has the same meaning as defined in Section 380.
SEC. 9.Section 913.21 is added to the Public Utilities Code, to read:913.21.Notwithstanding Section 10231.5 of the Government Code, the commission shall annually submit a report to the Governor and the Legislature on the types, amounts, and costs to ratepayers of eligible energy resources procured pursuant to Section 454.52.
SEC. 10.Section 1001.1 is added to the Public Utilities Code, to read:1001.1.In a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, the commission shall establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if all of the following are satisfied:
(a)The Independent System Operator governing board has made explicit findings regarding the need for the proposed transmission project and has determined that the proposed project is the most cost-effective transmission solution.
(b)The Independent System Operator is a party to the proceeding.
(c)The Independent System Operator governing board-approved need evaluation is submitted to the commission within sufficient time to be included within the scope of the proceeding.
(d)There has been no substantial change to the scope, estimated cost, or timeline of the proposed transmission project as approved by the Independent System Operator governing board.
SEC. 11.Section 9620 of the Public Utilities Code is amended to read:9620.(a)Each local publicly owned electric utility serving end-use customers shall prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers. Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, shall not be subject to these requirements if the customer generation, or the load it serves, meets one of the following criteria:
(1)It takes standby service from the local publicly owned electric utility on a rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(2)It is not physically interconnected to the electric transmission or distribution grid, so that, if the customer generation fails, backup power is not supplied from the electricity grid.
(3)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
(b)Each local publicly owned electric utility serving end-use customers shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the Board of Trustees of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(c)Each local publicly owned electric utility shall prudently plan for and procure energy storage systems that are adequate to meet the requirements of Section 2836.
(d)A local publicly owned electric utility serving end-use customers shall, upon request, provide the Energy Commission with any information the Energy Commission determines is necessary to evaluate the progress made by the local publicly owned electric utility in meeting the requirements of this section, consistent with the annual targets established pursuant to subdivision (c) of Section 25310 of the Public Resources Code.
(e)The Energy Commission shall report to the Legislature, to be included in each integrated energy policy report prepared pursuant to Section 25302 of the Public Resources Code, regarding the progress made by each local publicly owned electric utility serving end-use customers in meeting the requirements of this section.
(f)A local publicly owned electric utility may meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources if that aggregation or pooling is defined in a contractual arrangement and each participating local publicly owned electric utility meets its individual minimum planning reserve margin based on its share of the resource portfolio pool.
SEC. 12.Section 80713 is added to the Water Code, to read:80713.(a)(1)On and before June 30, 2027, if the Department of Water Resources determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet a load-serving entitys identified reliability need, the Public Utilities Commission shall annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements pursuant to Section 380 of the Public Utilities Code. The capacity payment is not a penalty and does not prohibit the Public Utilities Commission from assessing a penalty on a load-serving entity for a failure to comply with any resource adequacy requirement.
(2)If a load-serving entity fails to comply with its system resource adequacy requirements pursuant to Section 380 in a month when resources procured by the Department of Water Resources through the Electricity Supply Strategic Reliability Reserve Program are used to meet the load-serving entitys identified reliability need and a penalty is assessed by the commission on the load-serving entity for that failure, then, on and before June 30, 2027, both of the following requirements shall apply:
(A)If the penalty is less than the capacity payment, the capacity payment shall be reduced by the amount of the penalty and the penalty shall be deposited into the Load-Serving Entity Capacity Payment Account.
(B)If the penalty is more than the capacity payment, then an amount of the penalty equal to the otherwise applicable capacity payment shall be deposited into the Load-Serving Entity Capacity Payment Account.
(3)The annual capacity payment shall be remitted to the Load-Serving Entity Capacity Payment Account by a load-serving entity that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the commission notifying the load-serving entity.
(b)The Public Utilities Commission, in consultation with the commission, shall determine a capacity payment unit cost in kilowatt per month for load-serving entities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, including the Load-Serving Entity Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the load-serving entity was deficient in its system resource adequacy requirements during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used, based on the resource adequacy program rules, requirements, and resource counting conventions in place at the time of the deficiency, after crediting the deficient load-serving entity with its share of any reliability resources procured by other entities on its behalf. The Public Utilities Commission may make any further adjustments to the capacity values of any nonperforming resources included in a load-serving entitys portfolio when determining the amount of this deficiency. Any adjustments made by the Public Utilities Commission shall align with any adjustments made by the commission as authorized by subdivision (b) of Section 80714.
(c)This section shall become operative on January 31, 2024.
SEC. 13.Section 80714 is added to the Water Code, to read:80714.(a)(1)Upon the submission of the report pursuant to subdivision (d) and on and before June 30, 2027, if the Department of Water Resources determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet an identified reliability need, the executive director of the commission shall annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin.
(2)The annual capacity payment shall be remitted to the Local Publicly Owned Electric Utility Capacity Payment Account by a local publicly owned electric utility that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the executive director notifying the local publicly owned electric utility.
(b)Upon the submission of the report pursuant to subdivision (d), the commission, in consultation with the Public Utilities Commission, shall determine a capacity payment unit cost in kilowatt per month for local publicly owned electric utilities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, including the Local Publicly Owned Electric Utility Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the local publicly owned electric utility was deficient in its minimum planning reserve margin during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used using the same resource counting conventions applied by the Public Utilities Commission pursuant to subdivision (b) of Section 80713, after crediting the deficient local publicly owned electric utilities with their share of any reliability resources procured by other entities on their behalf. The commission may make any further adjustments to the capacity values of any nonperforming resources included in a local publicly owned electric utilitys portfolio when determining the amount of this deficiency. Any adjustments made by the commission shall align with any adjustments made by the Public Utilities Commission as authorized by subdivision (b) of Section 80713.
(c)Upon the submission of the report pursuant to subdivision (d), the commission may adopt regulations to implement this section.
(d)On or before January 31, 2024, the commission, in consultation with the Public Utilities Commission, shall submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin for 2023 and the system resource adequacy requirements from June 1, 2023, to September 30, 2023, inclusive, that the Public Utilities Commission established for load-serving entities pursuant to Section 380 of the Public Utilities Code and adopted in Public Utilities Commission Decision 22-06-050 (June 23, 2022) Decision Adopting Local Capacity Obligations for 20232025, Flexible Capacity Obligations for 2023, and Reform Track Framework.
(e)For purposes of this section, minimum planning reserve margin means a local publicly owned electric utilitys planning reserve margin, as described in Section 9620 of the Public Utilities Code, unless the local publicly owned electric utility revises that planning reserve margin based on recommendations from the commission pursuant to subdivision (b) of Section 25704.5 of the Public Resources Code, in which case minimum planning reserve margin means the local publicly owned electric utilitys revised minimum planning reserve margin.
SEC. 14.Section 80720 of the Water Code is amended to read:80720.(a)There is hereby established in the State Treasury the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(b)Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated to the department, without regard to fiscal years, and shall be available for the purposes of Chapter 2 (commencing with Section 80710).
(c)Obligations authorized and expenses incurred by the department in administering this division shall be payable solely from the fund.
(d)Except as specified in subdivisions (h) and (i), all revenues payable to the department for activities undertaken by the department under Chapter 2 (commencing with Section 80710) shall be deposited into the fund.
(e)The fund shall be separate and distinct from any other fund and moneys administered by the department and any interest earned on the moneys in the fund shall be used solely for purposes of this division.
(f)When fixed assets procured under the authority of this division are sold or otherwise disposed of, the revenue from the sale or disposition, including any gain or loss, measured by the difference between book value and selling price, shall be deposited into the fund and available to the department for purposes of Chapter 2 (commencing with Section 80710). Any remaining revenue from the sale or other disposition of fixed assets procured under the authority of this division shall be returned to the General Fund once all obligations of the department are satisfied after the wind down of this division and the closure of the fund. While any obligation of the department incurred under this division remains outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of or parties to those obligations.
(g)(1)For activities undertaken by the department pursuant to Chapter 2 (commencing with Section 80710), the department may obtain applicable credits pursuant to the federal Inflation Reduction Act of 2022 (Public Law 117-169). If the department elects for direct payment of those applicable credits, those payments shall be deposited directly into the fund.
(2)Within 10 days of any payments being deposited into the fund, described in paragraph (1), the department shall provide written notice to the Joint Legislative Budget Committee, who shall provide a copy of the notice to the relevant policy committees. The notice shall include the source, purpose, timeliness, and other relevant information as determined by the department.
(3)Use of the payments shall be consistent with all of the following:
(A)The payments shall be expended for a purpose that is consistent with state law.
(B)Acceptance of the payments does not impose on the state any requirement to commit or expend new state funds for any program or purpose.
(C)The need exists to expend the payments during the 202324 fiscal year.
(D)The use of the payments shall be consistent with the priorities described in subdivision (a) of Section 38590.1 of the Health and Safety Code.
(h)(1)The Load-Serving Entity Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Load-Serving Entity Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80713 shall be deposited into the Load-Serving Entity Capacity Payment Account.
(i)(1)The Local Publicly Owned Electric Utility Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Local Publicly Owned Electric Utility Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80714 shall be deposited into the Local Publicly Owned Electric Utility Capacity Payment Account.
SEC. 15.Division 29.5 (commencing with Section 80800) is added to the Water Code, to read:29.5.ELIGIBLE ENERGY RESOURCE CENTRAL PROCUREMENT1.General Provisions80800.This division does not reduce or modify an electrical corporations obligation to serve.
80801.The commission shall issue orders it determines are necessary to carry out this division.
80802.(a)The Legislature finds and declares all of the following:
(1)California has significantly reduced the emissions of greenhouse gases from its electricity sector by fostering the development of renewable and zero-carbon energy resources through the establishment of ambitious goals and policies. These efforts have fundamentally transformed the states portfolio of energy resources and the day-to-day operations of the states electrical system.
(2)The state has enabled the expansion of electrical retail choice for customers served in electrical corporation service territory, bringing new market entrants and innovation to Californias evolving retail electricity market.
(3)The states electrical system also faces the risk of increased disruption due to more frequent and intense extreme weather events fueled by a rapidly changing climate.
(4)For California to achieve its long-term greenhouse gas emission reduction goals, while maintaining a reliable electrical system and providing customers with greater choice in electricity retail providers, the state must establish a new, limited central procurement function within the department that enables the development of a more diverse portfolio of renewable and zero-carbon energy resources.
(b)In enacting this division, it is the intent of the Legislature to do all of the following:
(1)Create a central procurement function within the department that would only be exercised if, pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission determines that there is a need for the procurement of additional eligible energy resources and requests the department to procure those resources and, in response to that request, the department elects to exercise that central procurement function to procure those resources pursuant to this division.
(2)If the department exercises that central procurement function, as described in paragraph (1), provide an opportunity for local publicly owned electric utilities to elect for the department to procure eligible energy resources on their behalf pursuant to Section 80822.
(3)Prohibit the department from recovering funds pursuant to a nonbypassable charge on the ratepayers of a load-serving entity for purposes other than providing for the departments acquisition costs for eligible energy resources, including transmission, scheduling, financing, program administration, and other related costs, pursuant to Section 80821.
(4)Prohibit the department from selling any eligible energy resources it acquires pursuant to this division at more than the departments acquisition costs, including transmission, scheduling, financing, program administration, and other related costs, when selling those resources under a long-term contract.
(5)Pursuant to Section 80821, prohibit the department from pursuing procurement activities, including, if authorized, the issuance of bonds, except upon a finding from the commission that the recovery of costs through charges on customers, the issuance of bonds, and the material terms of such bonds, including interest rates, rating, amortization, and maturity, do not unreasonably increase costs to customers on a net present value basis.
(6)Require the department to prioritize investments that do not compete with the procurement of eligible energy resources already planned for development and disclosed by load-serving entities or local publicly owned electric utilities.
80803.The development and operation of a central procurement function program by the department, as provided in this division, is in all respects for the welfare and benefit of the people of the state, to protect the public peace, health, and safety, and constitutes an essential government purpose.
80804.This division shall be liberally construed in a manner so as to effectuate its purposes and objectives.
80805.(a)The powers and responsibilities of the department established pursuant to this division are separate from, and not governed by, the provisions relating to the State Water Resources Development System, including, but not limited to, those powers and responsibilities granted pursuant to Part 3 (commencing with Section 11100) of Division 6 and the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6).
(b)This division does not subject the department to the jurisdictional authority of the commission or expand the jurisdiction of the commission, including that state water resources development system facilities subject to the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6) and the departments other electrical generation projects or power contracts outside of those funded through the fund, remain outside the jurisdiction of the commission.
80806.The department may adopt regulations for purposes of administering this division.
2.Definitions80810.For purposes of this division, the following definitions apply:
(a)Bond means any bond, note, or other written evidence of indebtedness issued solely for purposes of supporting the fund and other related expenses incurred by the department pursuant to this division, or for reimbursing expenditures from the fund for those purposes, establishing or maintaining reserves in connection with a bond, costs of issuance of a bond or incidental to its payment or security, capitalized interest, or renewing or refunding any bonds.
(b)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(c)Commission means the Public Utilities Commission.
(d)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(e)Eligible energy resource means an energy resource eligible to be procured by the Department of Water Resources pursuant to Section 454.52 of the Public Utilities Code that has a first point of interconnection with a California balancing authority.
(f)Energy Commission means the State Energy Resources Conservation and Development Commission.
(g)Fund means the Eligible Energy Resource Central Procurement Fund established in Section 80830.
(h)Independent System Operator means the Independent System Operator described in Article 3 (commencing with Section 345) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code.
(i)Load-serving entity has the same meaning as defined in Section 380 of the Public Utilities Code.
(j)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
3.Department Powers80820.(a)(1)Consistent with Sections 380, 454.51, 454.52, 454.53, and 454.54 of the Public Utilities Code and this division, if the commission requests the department to procure eligible energy resources, and the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts for eligible energy resources pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission, in consultation with the department, shall develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department pursuant to this division.
(2)The commission and the department shall establish a procurement group to advise the department on the procurement undertaken pursuant to this division.
(3)The department shall not enter into new contracts pursuant to this division on or after January 1, 2035.
(b)In evaluating the bids received through a solicitation, the department shall consider all of the following:
(1)For eligible energy resources dependent on the development of a project, that projects viability, including, but not limited to, developer experience, developer financial strength and creditworthiness sufficient to eliminate financing contingencies, and the status of required permits and licenses, including a commitment to submit a consistency certification provided pursuant to the federal Coastal Zone Management Act of 1972 (16 U.S.C. Sec. 1451 et seq.) to the California Coastal Commission for offshore wind energy development projects, to the extent required.
(2)The ability to meet in-service dates offered during the solicitation and the ability to meet those in-service dates without escalation in cost.
(3)The useful life of the project.
(4)The capability to supply energy, capacity, and ancillary services at locations, times of day, and for durations that meet the states energy resource needs, as determined by the department and the commission.
(5)The bidders economic and local community impact, workforce development needs and opportunities, environmental impact mitigation plan, and equipment acquisition and supply chain investment plan.
(6)A plan to contribute to large-scale, regional, or statewide baseline and ongoing monitoring of coastal waters and wildlife, if applicable.
(7)Any other criteria determined by the commission or the department.
(c)Every bid for the development of an eligible energy resource project selected by the department shall include the bidders certification that either of the following are true:
(1)The entirety of the construction of the eligible energy resource project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2)The construction of the eligible energy resource project is not in its entirety a public work for which prevailing wages are required to be paid pursuant to Article 1 (commencing with Section 1720) of Chapter 1 of Part 7 of Division 2 of the Labor Code, but all construction workers employed on the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the eligible energy resource project is subject to this paragraph, for those portions of the eligible energy resource project that are not a public work, all of the following requirements shall apply:
(A)The bidder shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(B)All contractors and subcontractors shall pay to all construction workers employed in the construction of the eligible energy resource project at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(C)All contractors and subcontractors performing construction work on the eligible energy resource project shall employ apprentices at no less than the ratio required in Section 1777.5 of the Labor Code.
(D)Except as specified in subparagraph (F), all contractors and subcontractors performing construction work shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code, make those records available for inspection and copying pursuant to Section 1776 of the Labor Code, and furnish those payroll records to the Labor Commissioner pursuant to Section 1771.4 of the Labor Code.
(E)Except as specified in subparagraph (F), the obligation of the contractors and subcontractors to pay prevailing wages and employ apprentices may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee though a civil action pursuant to Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(F)Subparagraphs (D) and (E) do not apply if all contractors and subcontractors performing construction work on the eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(i)Provisions requiring payment of prevailing wages to all construction workers employed in the construction of the eligible energy resource project and for enforcement of that obligation through an arbitration procedure.
(ii)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a relevant local agency.
(iii)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required in Section 1777.5 of the Labor Code.
(iv)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the multicraft core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(d)Every bid for the development of an eligible energy resource project selected by the department shall include the bidders certification that a skilled and trained workforce will be used to perform all construction work on the eligible energy resource project, consistent with all of the following requirements:
(1)The bidder shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the eligible energy resource project.
(2)Every contractor and subcontractor shall use a skilled and trained workforce to construct the eligible energy resource project.
(3)Except as specified in subdivision (c), contractors and subcontractors that fail to use a skilled and trained workforce shall be subject to the penalties provided in Section 2603 of the Public Contract Code. Penalties for a contractors or subcontractors failure to comply with the requirement to use a skilled and trained workforce may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 2603 of the Public Contract Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(4)For purposes of this subdivision, a bidder shall be considered to be an awarding body under Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. Except as specified in paragraph (5), the bidder shall retain records, including copies of monthly reports, that demonstrate compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code while the eligible energy resource project or contract is being performed and for three years after completion of the eligible energy resource project or contract. The bidder shall submit these records immediately upon request of the commission. When submitted to the commission, these records shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection.
(5)Paragraphs (3) and (4) do not apply if all contractors and subcontractors performing work on the eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(A)Provisions requiring compliance with the skilled and trained workforce requirement and for enforcement of that obligation through an arbitration procedure.
(B)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a local agency.
(C)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required by Section 1777.5 of the Labor Code.
(D)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the Multi-Craft Core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(e)For purposes of this section, the following definitions apply:
(1)Construction means any new construction work and subsequent construction and construction maintenance work following initial completion that is contracted out to a contractor in the construction industry, including construction work on a barge, construction staging area, or construction area when being used as a construction work platform and the rigging and hoisting of construction materials directly from a barge, construction staging area, or construction area into the construction process for a construction project. Construction does not include the loading and unloading of cargo to and from vessels and the movement of cargo to and from vessels at any port facility to the cargos point of rest.
(2)Project labor agreement has the same meaning as defined in Section 2500 of the Public Contract Code.
(3)Skilled and trained workforce has the same meaning as defined in Section 2601 of the Public Contract Code.
80821.(a)(1)When conducting a solicitation pursuant to Section 80820, the department shall confer with the commission and other parties, including local publicly owned electric utilities that are voluntarily participating pursuant to Section 80822 and load-serving entities, for eligible energy resource procurement activities of an identified scope and duration. The department shall recover costs related to conducting the requested solicitations and all supporting work. Cost recovery may be effectuated, if determined to be just and reasonable by the commission before the procurement, through a nonbypassable charge approval process for load-serving entities and pursuant to Section 80822 for local publicly owned electric utilities.
(2)At the request of the department, the commission may require an electrical corporation to act as the agent of the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new eligible energy resource procurement. The electrical corporation shall be reimbursed by the department for its reasonable costs, as determined by the commission.
(b)If the departments costs associated with the procurement of eligible energy resources pursuant to this division, including the costs related to bonds issued pursuant to Chapter 5 (commencing with Section 80840), costs related to contracting for eligible energy resources, and other costs to implement and administer this division, will be recovered through a commission proceeding, the commission shall review the procurement undertaken pursuant to this division and, if approved, issue an order governing the recovery of the departments costs before the consummation of the contract only if both of the following conditions are satisfied:
(1)The recovery of the departments costs, including those costs associated with the procurement process, the resulting transactions, and the associated costs, has been found to be just and reasonable and to be in the public interest.
(2)The recovery of the departments costs, including, if authorized, costs associated with the issuance of bonds and the material terms of those bonds, including, without limitation, interest rates, rating, amortization, and maturity, through charges on customers does not unreasonably increase costs to customers on a net present value basis.
(c)If the commission determines that a nonbypassable charge necessary to fund activities conducted by the department pursuant to this division is just and reasonable, the department shall ensure it has entered into an agreement with the commission for that nonbypassable charge before it begins to incur costs related to a specific activity under this division. If the purpose of the nonbypassable charge is to recover the departments revenue requirement related to bond issuance debt service, the department shall ensure the agreement has the force and effect of an irrevocable financing order adopted in accordance with Article 5.5 (commencing with Section 840) of Chapter 4 of Part 1 of Division 1 of the Public Utilities Code or that the commission has separately issued an irrevocable financing order related to the nonbypassable charge.
(d)Any agreement between the department and the commission under this section shall provide for the administration of the nonbypassable charge, including both of the following requirements:
(1)The department shall notify the commission each year of the annual collections received by the department and the amount of any excess or deficiency in collections above or below the revenue requirement. The commission shall adjust charges in the subsequent year to reflect that excess or deficiency.
(2)During any period, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund the revenue requirement established pursuant to Section 80842, the department shall notify the commission in writing and the commission shall act within 60 days of receiving that notice to increase the nonbypassable charge so that the amounts collected during that period are sufficient to meet those obligations.
(e)Any agreement between the department and the commission pursuant to this section that is solely for the purpose of imposing a nonbypassable charge to recover the departments revenue requirement related to bond issuance debt service shall include a provision stating that the commissions just and reasonable determination with respect to the revenue requirement is in effect for the duration of the bond term.
80822.(a)Pursuant to Section 80820, the department may establish a schedule and mechanism for a local publicly owned electric utility to voluntarily obtain from the department eligible energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis.
(b)In order to voluntarily participate, a local publicly owned electric utility shall commit to the imposition of a nonbypassable charge on its ratepayers sufficient at all times to fund its participation and on terms and conditions as set forth in Section 80826.
80822.5.(a)Load-serving entities shall have a voluntary option to obtain incremental eligible energy resources from the department beyond the amounts allocated to the load-serving entity from procurement pursuant to paragraph (1) of subdivision (a) of Section 80820, subject to the approval of the commission and a specific determination by the commission that sufficient capacity is available to accommodate the request to obtain amounts beyond those allocated to the load-serving entity.
(b)The department, in consultation with the commission, may establish a schedule for load-serving entities to provide advance notice of an intent to obtain incremental eligible energy resources. Any load-serving entity exercising its option to voluntarily participate shall be obligated to impose a nonbypassable charge on its ratepayers sufficient to fund its allocated share of the costs of incremental eligible energy resources for the duration of the contract, as determined by the department and approved by the commission, if applicable.
80823.At the request of the department, the commission may order an electrical corporation, or its successor in the performance of a related service, to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as agent of the department, provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department.
80824.The commission may issue rules regulating the enforcement of the agency function pursuant to Section 80823, including the collection of nonbypassable charges and payment into the fund on behalf of the department.
80825.(a)If the department has executed an agreement with the commission pursuant to subdivision (c) of Section 80821, the department may recover its costs, as a revenue requirement, in the amounts sufficient and at the times necessary to fund the revenue requirement established pursuant to Section 80842, and shall advise the commission and each voluntarily participating local publicly owned electric utility, as the department determines to be appropriate and subject to the terms of the agreement.
(b)For purposes of this division and except as otherwise provided in subdivision (a), the commissions authority as set forth in Section 451 of the Public Utilities Code shall apply.
80826.(a)A local publicly owned electric utility that voluntarily participates in the departments central procurement function pursuant to Section 80822 shall enter into an agreement with the department for the revenue requirement to fund its participation and that agreement shall have the force and effect of an irrevocable financing order.
(b)The agreement shall provide for the administration of the revenue requirement, including both of the following:
(1)A requirement that the department annually notify the local publicly owned electric utility of the annual collections received by the department with respect to the revenue requirement and the amount of any excess or deficiency in collections above or below the revenue requirement. The local publicly owned electric utility shall adjust charges in the subsequent year to reflect any such excess or deficiency.
(2)During any revenue requirement period, a requirement that, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund the revenue requirement established pursuant to Section 80842, the department notify the local publicly owned electric utility in writing and the local publicly owned electric utility shall act within 30 days of receiving that notice to increase the charge so that the amount collected during the period is sufficient to meet those obligations.
80827.All moneys collected by load-serving entities and local publicly owned electric utilities and remitted to the department for any eligible energy resources acquired and sold pursuant to this division, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of eligible energy resources acquired pursuant to this division, shall be deposited into the fund.
80828.The department may fix and establish the procedure and charges for the sale or other disposal of eligible energy resources purchased by the department.
4.Eligible Energy Resource Central Procurement Fund80830.(a)There is hereby established in the State Treasury the Eligible Energy Resource Central Procurement Fund. Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated, without regard to fiscal year, to the department for purposes of this division.
(b)All revenues payable to the department pursuant to this division, including proceeds of bonds issued pursuant to Chapter 5 (commencing with Section 80840), shall be deposited into the fund. Notwithstanding any other law, interest accruing on the moneys in the fund shall be deposited into the fund and shall be used for purposes of this division.
(c)The fund, and the moneys in the fund, are separate and distinct from any other fund and moneys administered by the department.
(d)Payments from the fund may be made only for the following purposes:
(1)Payment of any bonds or other contractual obligations authorized by this division.
(2)The cost of energy and transmission, scheduling, and other related expenses incurred by the department.
(3)The expenses incurred by the department in administering this division, including costs of personnel, contracts, or arrangements to carry out the departments duties and responsibilities pursuant to this division.
(e)Obligations authorized pursuant to this division shall be payable solely from the fund. Neither the full faith and credit nor the taxing power of the state are, or may be, pledged for any payment under any obligation authorized by this division.
(f)While any obligations of the department incurred pursuant to this division remain outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of, or parties to, those obligations. The department may include this pledge and undertaking of the state in the departments obligations.
5.Bonds80840.(a)(1)If the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts to procure eligible energy resources pursuant to this division, as authorized by paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, due to the timing of cost recovery processes, the department may determine that it is necessary or desirable to issue bonds to support activities for the procurement of eligible energy resources pursuant to this division.
(2)Upon making the determination described in paragraph (1), the department may issue bonds for purposes of financing the procurement of eligible energy resources in support of the fund and other related expenses incurred by the department pursuant to this division, and subsequent to the department having entered into an agreement with the commission regarding a revenue requirement. Bonds shall not be issued in an amount the debt service on which, to the extent payable from the fund, is estimated by the department to exceed the amounts estimated to be available in the fund for the payment of the bonds.
(b)Before the issuance of bonds in a public offering, the department shall ensure the bonds have an investment grade rating from at least one nationally recognized investment ratings firm and the document authorizing the issuance of the bonds shall provide for repayment from pledged revenues.
(c)The commission shall have an opportunity to review the trust agreement or other documents pursuant to which the bonds are issued and revenues are pledged, and shall consult with the department regarding the trust agreement or other documents regarding any relevant considerations of the commission and to ensure its consistency with the revenue requirement agreement between the department and commission.
(d)In addition to any other purposes for which bonds may be issued pursuant to this division, bonds may be issued for the following purposes:
(1)Refunding bonds to obtain a lower interest rate.
(2)Refunding bonds bearing a variable interest rate with bonds bearing interest at a fixed rate.
(3)Refunding bonds if a nationally recognized investment ratings firm reduces or withdraws, or proposes to reduce or withdraw, the rating assigned to securities that are secured by bond insurance policies, credit, or liquidity facilities issued by the provider of a bond insurance policy, or a credit or liquidity facility securing the bonds being refunded.
(4)Refunding bonds issued to preserve a federal income tax exemption or to qualify or maintain other federal income tax benefits.
80841.(a)Whenever the director determines that the issuance of bonds is necessary or desirable to accomplish the goals set forth in this division, including financing the procurement of eligible energy resources, the director shall issue a written determination authorizing the issuance of bonds by the department. The department, in consultation with the Department of Finance, shall notify the Chairperson of the Joint Legislative Budget Committee and the chairpersons of the fiscal committees of each house of the Legislature of its written determination. The bonds shall be sold in the manner, and on the terms and conditions, specified in that determination, and the determination may contain or authorize any other provision, condition, or limitation not inconsistent with this division and those provisions as may be deemed reasonable and proper for the security of the bondholders. Bonds may mature at the time or times, and bear interest at the rate or rates, which may be fixed or variable and be determined by reference to an index or such other method, and may be federally tax exempt, as specified in the determination. Neither the person executing the determination to issue bonds nor any person executing bonds shall be personally liable therefor or be subject to any personal liability or accountability by reason of the issuance of the bonds.
(b)In the discretion of the department, bonds may be secured by a trust agreement by and between the department and a trustee, which may be any trust company or bank having trust powers within or outside the state, or the Treasurer. Notwithstanding any other law, the Treasurer shall not be deemed to have a conflict of interest by reason of acting as the trustee. The department may enter into contracts or arrangements in connection with the issuance and sale of bonds, or with respect to any outstanding bonds for so long as those bonds remain outstanding, as it shall deem to be necessary or desirable for the issuance and further security of the bonds, including, but not limited to, credit enhancement agreements, dealer agreements, purchase contracts, escrow agreements, and similar arrangements.
(c)Bonds shall be legal investments for all trust funds, the funds of all insurance companies, savings and commercial banks, trust companies, executors, administrators, trustees, and other fiduciaries, for state school funds, pension funds, and for any funds that may be invested in county, school, or municipal bonds.
(d)Notwithstanding that bonds may be payable from a special fund, the bonds shall be deemed to be negotiable instruments for all purposes.
(e)Any bonds, and the transfer of and income derived from those bonds, shall at all times be free from taxation of every kind by the state and by the political subdivisions of the state.
(f)Bonds shall not be deemed to constitute a debt or liability of the state or of any political subdivision thereof, other than the department, or a pledge of the full faith and credit of the state or of any such political subdivision, but shall be payable solely from the revenues described in paragraph (1) of subdivision (g). All bonds shall contain a statement to the following effect: Neither the faith and credit nor the taxing power of the State of California is pledged to the payment of the principal of or interest on this bond. The issuance of bonds shall not directly or indirectly or contingently obligate the state or any political subdivision thereof to levy or to pledge any form of taxation whatever therefor or to make any appropriation for their payment.
(g)(1)The department may pledge and apply all or any part of revenues of any nature whatever accruing to the department, from orders issued, charges imposed, or contracts entered into pursuant to or in furtherance of this division, or the right to receive the same, to the payment or security of any or all of the principal of the bonds or the interest thereon, in the manner and upon terms that the department deems advisable.
(2)(A)It is the intent of the Legislature that any pledge of moneys, revenues, or property made by the department shall be valid and binding from the time when the pledge is made if the commission finds the pledge was just and reasonable, and that the moneys, revenues, or property so pledged and thereafter collected from retail end-use customers, or paid directly or indirectly to or for the account of the department, is hereby made, and shall immediately be, subject to the lien of that pledge without any physical delivery thereof or further act.
(B)It is the intent of the Legislature that the lien of any such pledge shall be valid and binding against all parties having claims of any kind in tort, contract, or otherwise against the department irrespective of whether those parties have notice thereof, and that no resolution or instrument by which the pledge or lien created pursuant to this subdivision is expressed, confirmed, or approved need be filed or recorded in order to perfect the pledge or lien.
(C)It is the intent of the Legislature that this paragraph, in all respects, govern the creation, perfection, priority, and enforcement of any lien created pursuant to this division.
80842.(a)The department shall, and in any obligation entered into pursuant to this division may covenant to, at least annually, and more frequently as required, establish and revise revenue requirements sufficient, together with any moneys deposited into the fund, to provide all of the following:
(1)The amounts necessary to pay the principal of, and premium, if any, and interest on, all bonds as and when the same shall become due.
(2)The amounts necessary to pay for electricity purchased by it and to deliver it to purchasers, including the cost of electricity, transmission, scheduling, and other related expenses incurred by the department, or to make payments under any other contracts, agreements, or obligations entered into by it pursuant to this division, in the amounts and at the times the same shall become due.
(3)Reserves in amount as may be determined by the department from time to time to be necessary or desirable.
(4)The pooled money investment rate on funds advanced for electricity purchases before the receipt of payment for those purchases by the purchasing entity.
(5)The administrative costs of the department and other state agencies, including the costs and fees for professional services, bond issuance and sale, and other miscellaneous costs, incurred in connection with the issuance of bonds or the administration of this division.
(b)The department shall notify the commission of its revenue requirement pursuant to the agreement required pursuant to Section 80821 and that revenue requirement shall be satisfied by the recovery of its costs through a nonbypassable charge.
6.Termination of Authority to Contract80850.(a)On or after January 1, 2035, the department shall not contract under this division for the purchase of electrical power.
(b)This section does not affect the authority of the department to administer contracts entered into before that date or any of the departments outstanding bond obligations.
SEC. 16.(a)Upon appropriation of the Legislature, the sum of no less than six million dollars ($6,000,000) from the General Fund shall be available for the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
(b)Upon appropriation by the Legislature, additional moneys from the General Fund shall be made available for the 202425 fiscal year and subsequent fiscal years to support the California Coastal Commissions coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
(c)It is the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of the assessment referenced in Section 1 of Chapter 51 of the Statutes of 2023.
SEC. 17.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 18.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
To ensure the procurement of eligible energy resources that the state needs to meet its reliability needs, which have been identified as being delayed or needing a secure development path, it is necessary to establish a central procurement entity within the Department of Water Resources and for this act to take effect immediately.
Sections 10295 and 10297 do not apply to any contract entered into by the Department of Water Resources under Part 3 (commencing with Section 11100) of Division 6, Chapter 8 (commencing with Section 12930) of Part 6 of Division 6, Division 29 (commencing with Section 80700), or Division 29.5 (commencing with Section 80800), of the Water Code for the acquisition, sale, or transmission of power, or for services to facilitate those activities.
SEC. 2.Section 25302.6 is added to the Public Resources Code, to read:25302.6.As part of the 2025 edition of the integrated energy policy report, the commission, in consultation with the Public Utilities Commission, shall assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
SEC. 3.Section 25795 of the Public Resources Code is amended to read:25795.(a)Beginning on January 31, 2023, and on May 1, August 1, and December 1 annually thereafter, the commission shall issue a written report to the Joint Legislative Budget Committee detailing the actions undertaken by the commission in the period since the previous report pursuant to this chapter through that date, including, but not limited to, all of the following:
(1)Amount of funds expended.
(2)Purpose of funds expended.
(3)Status of actions funded.
(4)For new and expanded resources, the amount by megawatt, resource type, operational date, and expected lifetime of that capacity.
(5)The frequency at which resources funded by the Department of Water Resources or the commission have been used and the extent to which they complied with the requirements of this chapter.
(6)In consultation with the state board, an estimate or the best available information on the emissions of greenhouse gases, criteria air pollutants, and toxic air contaminants emitted by the resources funded by the Department of Water Resources or the commission over the period since the previous report.
(7)Summary of contracts, grants, and loans issued pursuant to this chapter.
(b)Each report submitted pursuant to this section shall be submitted to the Joint Legislative Budget Committee at the same time and in the same manner as reports submitted pursuant to Section 80730 of the Water Code.
SEC. 4.Section 25992.10 of the Public Resources Code is amended to read:25992.10.(a)(1)The Voluntary Offshore Wind and Coastal Resources Protection Program is hereby established to be administered by the commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities, including federal laws providing for offshore wind lease conditions of the bureau. The program shall award moneys to public and private entities, including, but not limited to, state agencies, tribal entities, local governmental agencies, research institutions, and nonprofit entities, through various mechanisms, including, but not limited to, grants.
(2)Moneys from the fund and account shall be available for allocation by the commission for purposes of this chapter.
(b)The commission may allocate moneys for any of the following:
(1)Increasing the ability of state agencies to engage in postlease assessments and studies of impacts, including surveys and plans, and ongoing review of project compliance and monitoring, including administrative costs.
(2)Research facilitation and coordination, including, but not limited to, funding to support state agencies to work collaboratively with the bureau and other federal, state, and tribal entities to ensure that lessees construction and operations plans incorporate strategies and specific plans for comprehensive monitoring and adaptive management, and to ensure that the strategies and plans are implemented appropriately, including funding to contract with technical experts to be retained by state agencies to consult and collaborate on strategies and specific plans for comprehensive monitoring and adaptive management.
(3)(A)Contracts with technical experts to assist the bureau and the state in their review of survey and sampling and analysis plans, survey data and analysis, construction and operation plans, and other planning, project development, and project implementation activities and documents.
(B)The purpose of the technical experts is to review current research on survey methodologies, monitoring approaches and technologies, adaptive management strategies, and other relevant topics for floating offshore wind, to provide the bureau and the state with recommendations, suggested guidelines, and best practices, and to fulfill additional research needs, during all phases of floating offshore wind development and implementation with the overall goal of avoiding and minimizing impacts to coastal resources.
(4)Environmental impacts monitoring, including, but not limited to, any of the following:
(A)Collecting, analyzing, and reporting baseline and postdevelopment environmental data to assess large-scale changes and cumulative impacts to marine species, habitats, and uses from floating offshore wind development and related activities with a goal of enabling the bureau and the state to accurately assess, mitigate, and adaptively manage those impacts.
(B)Data collection at a regional scale that integrates data with information and data provided by lessees or the bureau and other relevant data to provide a comprehensive understanding of how floating offshore wind development is affecting the marine environment and coastal uses.
(5)Infrastructure readiness commitments, including, but not limited to, activities associated with the bureaus lease requirements for lessees to support infrastructure readiness, such as ports, waterfront facilities, and transmission for floating offshore wind generation facilities.
(6)Workforce development grants consistent with subdivisions (r) to (t), inclusive, of Section 14005 of the Unemployment Insurance Code and in consultation with the California Workforce Development Board.
(c)Moneys in the fund and the account shall not be allocated by the commission to another state or local agency for that agencys costs that are otherwise recoverable from project proponents in administering a regulatory or entitlement program.
SEC. 5.Section 365.1 of the Public Utilities Code is amended to read:365.1.(a)Except as expressly authorized by this section, and subject to the limitations in subdivisions (b) and (c), the right of retail end-use customers pursuant to this chapter to acquire service from other providers is suspended until the Legislature, by statute, lifts the suspension or otherwise authorizes direct transactions. For purposes of this section, other provider means any person, corporation, or other entity that is authorized to provide electric service within the service territory of an electrical corporation pursuant to this chapter, and includes an aggregator, broker, or marketer, as defined in Section 331, and an electric service provider, as defined in Section 218.3. Other provider does not include a community choice aggregator, as defined in Section 331.1, and the limitations in this section do not apply to the sale of electricity by other providers to a community choice aggregator for resale to community choice aggregation electricity consumers pursuant to Section 366.2.
(b)The commission shall authorize individual retail nonresidential end-use customers to acquire electric service from other providers in each electrical corporations distribution service territory, up to a maximum allowable total kilowatthours annual limit. The maximum allowable annual limit shall be established by the commission for each electrical corporation at the maximum total kilowatthours supplied by all other providers to distribution customers of that electrical corporation during any sequential 12-month period between April 1, 1998, and October 11, 2009. Within six months of October 11, 2009, the commission shall adopt and implement a reopening schedule that commences immediately and will phase in the allowable amount of increased kilowatthours over a period of not less than three years, and not more than five years, raising the allowable limit of kilowatthours supplied by other providers in each electrical corporations distribution service territory from the number of kilowatthours provided by other providers as of October 11, 2009, to the maximum allowable annual limit for that electrical corporations distribution service territory. The commission shall review and, if appropriate, modify its currently effective rules governing direct transactions, but that review shall not delay the start of the phase-in schedule.
(c)Once the commission has authorized additional direct transactions pursuant to subdivision (b), it shall do both of the following:
(1)Ensure that other providers are subject to the same requirements that apply to the states three largest electrical corporations under any programs or rules adopted by the commission to implement the resource adequacy provisions of Section 380, the renewables portfolio standard provisions of Article 16 (commencing with Section 399.11), the requirements for the electricity sector adopted by the State Air Resources Board pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code), and the requirements of the integrated resource planning process as specified in Sections 454.52 to 454.54, inclusive. This requirement applies notwithstanding any prior decision of the commission to the contrary.
(2)(A)Ensure that, in the event that the commission authorizes, in the situation of a contract with a third party, or orders, in the situation of utility-owned generation, an electrical corporation to obtain generation resources that the commission determines are needed to meet system or local area reliability needs for the benefit of all customers in the electrical corporations distribution service territory, the net capacity costs of those generation resources are allocated on a fully nonbypassable basis consistent with departing load provisions as determined by the commission, to all of the following:
(i)Bundled service customers of the electrical corporation.
(ii)Customers that purchase electricity through a direct transaction with other providers.
(iii)Customers of community choice aggregators.
(B)If the commission authorizes or orders an electrical corporation to obtain generation resources pursuant to subparagraph (A), the commission shall ensure that those resources meet a system or local reliability need in a manner that benefits all customers of the electrical corporation. The commission shall allocate the costs of those generation resources to ratepayers in a manner that is fair and equitable to all customers, whether they receive electric service from the electrical corporation, a community choice aggregator, or an electric service provider.
(C)The resource adequacy benefits of generation resources acquired by an electrical corporation pursuant to subparagraph (A) shall be allocated to all customers who pay their net capacity costs. Net capacity costs shall be determined by subtracting the energy and ancillary services value of the resource from the total costs paid by the electrical corporation pursuant to a contract with a third party or the annual revenue requirement for the resource if the electrical corporation directly owns the resource. An energy auction shall not be required as a condition for applying this allocation, but may be allowed as a means to establish the energy and ancillary services value of the resource for purposes of determining the net costs of capacity to be recovered from customers pursuant to this paragraph, and the allocation of the net capacity costs of contracts with third parties shall be allowed for the terms of those contracts.
(D)It is the intent of the Legislature, in enacting this paragraph, to provide additional guidance to the commission with respect to the implementation of subdivision (g) of Section 380, and to ensure that the customers to whom the net costs and benefits of capacity are allocated are not required to pay for the cost of electricity they do not consume.
(d)(1)If the commission approves a centralized resource adequacy mechanism pursuant to subdivisions (h) and (i) of Section 380, upon the implementation of the centralized resource adequacy mechanism the requirements of paragraph (2) of subdivision (c) shall be suspended. If the commission later orders that electrical corporations cease procuring capacity through a centralized resource adequacy mechanism, the requirements of paragraph (2) of subdivision (c) shall again apply.
(2)If the use of a centralized resource adequacy mechanism is authorized by the commission and has been implemented as set forth in paragraph (1), the net capacity costs of generation resources that the commission determines are required to meet urgent system or urgent local grid reliability needs, and that the commission authorizes to be procured outside of the Section 380 or Section 454.5 processes, shall be recovered according to paragraph (2) of subdivision (c).
(3)This subdivision does not supplant the resource adequacy requirements of Section 380 or the resource procurement procedures established in Section 454.5.
(e)On or before June 1, 2019, the commission shall issue an order regarding direct transactions that provides as follows:
(1)Increase the maximum allowable total kilowatthours annual limit by 4,000 gigawatthours and apportion that increase among the service territories of the electrical corporations.
(2)All residential and nonresidential customer accounts that are on direct access as of January 1, 2019, remain authorized to participate in direct transactions.
SEC. 6.Section 380 of the Public Utilities Code is amended to read:380.(a)The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities.
(b)In establishing resource adequacy requirements, the commission shall ensure the reliability of electrical service in California while advancing, to the extent possible, the states goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. The resource adequacy program shall achieve all of the following objectives:
(1)Facilitate development of new generating, nongenerating, and hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economical and needed for reliability and to achieve the state policy specified in Section 454.53.
(2)Establish new, or maintain existing, demand response products and tariffs that facilitate the economical dispatch and use of demand response that can either meet or reduce an electrical corporations resource adequacy requirements, as determined by the commission.
(3)Equitably allocate the cost of generating capacity and demand response in a manner that prevents the shifting of costs between customer classes.
(4)Minimize enforcement requirements and costs.
(5)Maximize the ability of community choice aggregators to determine the generation resources used to serve their customers.
(c)Each load-serving entity shall maintain physical generating capacity and electrical demand response adequate to meet its load requirements, including, but not limited to, peak demand and planning and operating reserves. The generating capacity or electrical demand response shall be deliverable to locations and at times as may be necessary to maintain electrical service system reliability, local area reliability, and flexibility.
(d)Each load-serving entity shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the board of directors of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(e)The commission shall implement and enforce the resource adequacy requirements established in accordance with this section in a nondiscriminatory manner. Each load-serving entity shall be subject to the same requirements for resource adequacy, the renewables portfolio standard program, and the integrated resource planning process pursuant to Section 454.52 that apply to electrical corporations pursuant to this section, or are otherwise required by law or by order or decision of the commission. The commission shall exercise its enforcement powers to ensure compliance by all load-serving entities.
(f)(1)The commission shall require sufficient information, including, but not limited to, anticipated load, actual load, and measures undertaken by a load-serving entity to ensure resource adequacy, to be reported to enable the commission to determine compliance with the resource adequacy requirements established by the commission.
(2)The commission shall calculate and publish annually on its internet website, in a new report or as part of another report, the percentage of each load-serving entitys local and system resource adequacy requirements from the previous calendar year that was met with capacity from eligible renewable energy resources pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11)), other zero-carbon resources, including large hydroelectric and nuclear resources, or energy storage resources. In determining the percentage of each load-serving entitys resource adequacy requirements, the commission shall include all directly owned or contracted resources and each load-serving entitys allocation of any centrally procured resources or allocation of resources pursuant to any other mechanism that involves an assignment or allocation of resources purchased or owned by a single buyer, and shall exclude any share of a load-serving entitys resources that were allocated to another load-serving entity.
(g)An electrical corporations costs of meeting or reducing resource adequacy requirements, including, but not limited to, the costs associated with system reliability, local area reliability, or flexible resource adequacy, that are determined to be reasonable by the commission, or are otherwise recoverable under a procurement plan approved by the commission pursuant to Section 454.5, shall be fully recoverable from those customers on whose behalf the costs are incurred, as determined by the commission, at the time the commitment to incur the cost is made, on a fully nonbypassable basis, as determined by the commission. The commission shall exclude any amounts authorized to be recovered pursuant to Section 366.2 when authorizing the amount of costs to be recovered from customers of a community choice aggregator or from customers that purchase electricity through a direct transaction pursuant to this subdivision.
(h)The commission shall determine and authorize the most efficient and equitable means for achieving all of the following:
(1)Meeting the objectives of this section.
(2)Ensuring that investment is made in new generating capacity.
(3)Ensuring that existing generating capacity that is economical is retained.
(4)Ensuring that the cost of generating capacity and demand response is allocated equitably.
(5)Ensuring that community choice aggregators can determine the generation resources used to serve their customers.
(6)Ensuring that investments are made in new and existing demand response resources that are cost effective and help to achieve electrical grid reliability and the states goals for reducing emissions of greenhouse gases.
(7)Minimizing the need for backstop procurement by the Independent System Operator.
(i)In making the determination pursuant to subdivision (h), the commission may consider a centralized resource adequacy mechanism among other options.
(j)The commission shall ensure appropriate valuation of both supply and load modifying demand response resources. The commission, in an existing or new proceeding, shall establish a mechanism to value load modifying demand response resources, including, but not limited to, the ability of demand response resources to help meet distribution needs and transmission system needs and to help reduce a load-serving entitys resource adequacy obligation pursuant to this section. In determining this value, the commission shall consider how these resources further the states electrical grid reliability and the states goals for reducing emissions of greenhouse gases. The commission, Energy Commission, and Independent System Operator shall jointly ensure that changes in demand caused by load modifying demand response are expeditiously and comprehensively reflected in the Energy Commissions Integrated Energy Policy Report forecast and in planning proceedings and associated analyses, and shall encourage reflection of these changes in demand in the operation of the grid.
(k)For purposes of this section, load-serving entity means an electrical corporation, electric service provider, or community choice aggregator. Load-serving entity does not include any of the following:
(1)A local publicly owned electric utility.
(2)The State Water Resources Development System commonly known as the State Water Project.
(3)Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, if the customer generation, or the load it serves, meets one of the following criteria:
(A)It takes standby service from the electrical corporation on a commission-approved rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(B)It is not physically interconnected to the electrical transmission or distribution grid, so that, if the customer generation fails, backup electricity is not supplied from the electrical grid.
(C)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
SEC. 7.Section 454.51 of the Public Utilities Code is amended to read:454.51.The commission shall do all of the following:
(a)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy and resource diversity in a cost-effective manner. The portfolio shall be used by the commission to establish integrated resource planning-based procurement requirements that rely on zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve the state policy specified in Section 454.53 and any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources or diverse resources, procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration and diverse resources need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need identified in subdivision (a) or (d), as applicable, shall be borne by the load-serving entity, as defined in Section 380, that failed to perform.
SEC. 8.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability on a near-term, mid-term, and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.
(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H)Enhance distribution systems and demand-side energy management.
(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(J)Maintain a diverse portfolio of energy resources, which may include eligible energy resources procured by the Department of Water Resources.
(2)(A)The commission may authorize all source procurement for load-serving entities that includes various resource types including demand-side resources, supply-side resources, and resources that may be either demand-side resources or supply-side resources, taking into account the differing load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(4)(A)On or before September 1, 2024, and consistent with the process and schedule adopted pursuant to paragraph (1), the commission, in consultation with the Energy Commission and the Independent System Operator, shall determine if there is a need for the procurement of eligible energy resources based on a review of the integrated resource plans submitted by load-serving entities in compliance with the requirements of this section and Section 454.53 and the progress towards meeting the portfolio of resources identified pursuant to subdivision (a) of Section 454.51.
(B)If the commission determines that there is a need for the procurement of eligible energy resources, the commission shall specify the eligible energy resources that should be procured to meet that need.
(C)Within six months of determining that there is a need for the procurement of eligible energy resources, the commission may request the Department of Water Resources to exercise its central procurement function to procure those eligible energy resources specified pursuant to subparagraph (B) that meet the portfolio of resources identified in subdivision (a) of Section 454.51.
(D)(i)Upon receiving a request pursuant to subparagraph (C), the Department of Water Resources, before January 1, 2035, may exercise its central procurement function to conduct one or more competitive solicitations and enter into contracts to procure eligible energy resources in order to achieve the policy of the state specified in Section 454.53.
(ii)Any contract entered into by the Department of Water Resources pursuant to clause (i) and approved by the commission pursuant to Section 80821 of the Water Code before January 1, 2035, shall remain in force for the duration of the contract.
(E)The Department of Water Resources exercising of its central procurement function to procure eligible energy resources pursuant to this paragraph shall be conducted in accordance with Division 29.5 (commencing with Section 80800) of the Water Code.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of short-term and long-term electricity, electricity-related, and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.
(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.
(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.
(h)(1)Only a new energy resource that meets all of the following requirements is eligible to be procured by the Department of Water Resources pursuant to this section:
(A)The resource directly supports attainment of the goals specified in Section 454.53 without increasing the states dependence on any fossil fuel-based resources.
(B)The resource is determined by the commission to not be under contract at sufficient levels as shown in load-serving entities most recent individual integrated resource plans submitted to and reviewed by the commission pursuant to this section to achieve the goals specified in Section 454.53.
(C)The resource has a construction and development lead time of at least five years.
(D)The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
(E)The resource does not use combustion to generate electricity, unless that combustion use is ancillary and necessary to facilitate geothermal electricity generation.
(2)Resources from a pump hydroelectric facility may be procured by the Department of Water Resources pursuant to this section if the pump hydroelectric facility does not exceed 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.
(i)For purposes of this section, load-serving entity has the same meaning as defined in Section 380.
SEC. 9.Section 913.21 is added to the Public Utilities Code, to read:913.21.Notwithstanding Section 10231.5 of the Government Code, the commission shall annually submit a report to the Governor and the Legislature on the types, amounts, and costs to ratepayers of eligible energy resources procured pursuant to Section 454.52.
SEC. 10.Section 1001.1 is added to the Public Utilities Code, to read:1001.1.In a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, the commission shall establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if all of the following are satisfied:
(a)The Independent System Operator governing board has made explicit findings regarding the need for the proposed transmission project and has determined that the proposed project is the most cost-effective transmission solution.
(b)The Independent System Operator is a party to the proceeding.
(c)The Independent System Operator governing board-approved need evaluation is submitted to the commission within sufficient time to be included within the scope of the proceeding.
(d)There has been no substantial change to the scope, estimated cost, or timeline of the proposed transmission project as approved by the Independent System Operator governing board.
SEC. 11.Section 9620 of the Public Utilities Code is amended to read:9620.(a)Each local publicly owned electric utility serving end-use customers shall prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers. Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, shall not be subject to these requirements if the customer generation, or the load it serves, meets one of the following criteria:
(1)It takes standby service from the local publicly owned electric utility on a rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(2)It is not physically interconnected to the electric transmission or distribution grid, so that, if the customer generation fails, backup power is not supplied from the electricity grid.
(3)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
(b)Each local publicly owned electric utility serving end-use customers shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the Board of Trustees of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(c)Each local publicly owned electric utility shall prudently plan for and procure energy storage systems that are adequate to meet the requirements of Section 2836.
(d)A local publicly owned electric utility serving end-use customers shall, upon request, provide the Energy Commission with any information the Energy Commission determines is necessary to evaluate the progress made by the local publicly owned electric utility in meeting the requirements of this section, consistent with the annual targets established pursuant to subdivision (c) of Section 25310 of the Public Resources Code.
(e)The Energy Commission shall report to the Legislature, to be included in each integrated energy policy report prepared pursuant to Section 25302 of the Public Resources Code, regarding the progress made by each local publicly owned electric utility serving end-use customers in meeting the requirements of this section.
(f)A local publicly owned electric utility may meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources if that aggregation or pooling is defined in a contractual arrangement and each participating local publicly owned electric utility meets its individual minimum planning reserve margin based on its share of the resource portfolio pool.
SEC. 12.Section 80713 is added to the Water Code, to read:80713.(a)(1)On and before June 30, 2027, if the Department of Water Resources determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet a load-serving entitys identified reliability need, the Public Utilities Commission shall annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements pursuant to Section 380 of the Public Utilities Code. The capacity payment is not a penalty and does not prohibit the Public Utilities Commission from assessing a penalty on a load-serving entity for a failure to comply with any resource adequacy requirement.
(2)If a load-serving entity fails to comply with its system resource adequacy requirements pursuant to Section 380 in a month when resources procured by the Department of Water Resources through the Electricity Supply Strategic Reliability Reserve Program are used to meet the load-serving entitys identified reliability need and a penalty is assessed by the commission on the load-serving entity for that failure, then, on and before June 30, 2027, both of the following requirements shall apply:
(A)If the penalty is less than the capacity payment, the capacity payment shall be reduced by the amount of the penalty and the penalty shall be deposited into the Load-Serving Entity Capacity Payment Account.
(B)If the penalty is more than the capacity payment, then an amount of the penalty equal to the otherwise applicable capacity payment shall be deposited into the Load-Serving Entity Capacity Payment Account.
(3)The annual capacity payment shall be remitted to the Load-Serving Entity Capacity Payment Account by a load-serving entity that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the commission notifying the load-serving entity.
(b)The Public Utilities Commission, in consultation with the commission, shall determine a capacity payment unit cost in kilowatt per month for load-serving entities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, including the Load-Serving Entity Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the load-serving entity was deficient in its system resource adequacy requirements during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used, based on the resource adequacy program rules, requirements, and resource counting conventions in place at the time of the deficiency, after crediting the deficient load-serving entity with its share of any reliability resources procured by other entities on its behalf. The Public Utilities Commission may make any further adjustments to the capacity values of any nonperforming resources included in a load-serving entitys portfolio when determining the amount of this deficiency. Any adjustments made by the Public Utilities Commission shall align with any adjustments made by the commission as authorized by subdivision (b) of Section 80714.
(c)This section shall become operative on January 31, 2024.
SEC. 13.Section 80714 is added to the Water Code, to read:80714.(a)(1)Upon the submission of the report pursuant to subdivision (d) and on and before June 30, 2027, if the Department of Water Resources determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet an identified reliability need, the executive director of the commission shall annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin.
(2)The annual capacity payment shall be remitted to the Local Publicly Owned Electric Utility Capacity Payment Account by a local publicly owned electric utility that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the executive director notifying the local publicly owned electric utility.
(b)Upon the submission of the report pursuant to subdivision (d), the commission, in consultation with the Public Utilities Commission, shall determine a capacity payment unit cost in kilowatt per month for local publicly owned electric utilities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, including the Local Publicly Owned Electric Utility Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the local publicly owned electric utility was deficient in its minimum planning reserve margin during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used using the same resource counting conventions applied by the Public Utilities Commission pursuant to subdivision (b) of Section 80713, after crediting the deficient local publicly owned electric utilities with their share of any reliability resources procured by other entities on their behalf. The commission may make any further adjustments to the capacity values of any nonperforming resources included in a local publicly owned electric utilitys portfolio when determining the amount of this deficiency. Any adjustments made by the commission shall align with any adjustments made by the Public Utilities Commission as authorized by subdivision (b) of Section 80713.
(c)Upon the submission of the report pursuant to subdivision (d), the commission may adopt regulations to implement this section.
(d)On or before January 31, 2024, the commission, in consultation with the Public Utilities Commission, shall submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin for 2023 and the system resource adequacy requirements from June 1, 2023, to September 30, 2023, inclusive, that the Public Utilities Commission established for load-serving entities pursuant to Section 380 of the Public Utilities Code and adopted in Public Utilities Commission Decision 22-06-050 (June 23, 2022) Decision Adopting Local Capacity Obligations for 20232025, Flexible Capacity Obligations for 2023, and Reform Track Framework.
(e)For purposes of this section, minimum planning reserve margin means a local publicly owned electric utilitys planning reserve margin, as described in Section 9620 of the Public Utilities Code, unless the local publicly owned electric utility revises that planning reserve margin based on recommendations from the commission pursuant to subdivision (b) of Section 25704.5 of the Public Resources Code, in which case minimum planning reserve margin means the local publicly owned electric utilitys revised minimum planning reserve margin.
SEC. 14.Section 80720 of the Water Code is amended to read:80720.(a)There is hereby established in the State Treasury the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(b)Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated to the department, without regard to fiscal years, and shall be available for the purposes of Chapter 2 (commencing with Section 80710).
(c)Obligations authorized and expenses incurred by the department in administering this division shall be payable solely from the fund.
(d)Except as specified in subdivisions (h) and (i), all revenues payable to the department for activities undertaken by the department under Chapter 2 (commencing with Section 80710) shall be deposited into the fund.
(e)The fund shall be separate and distinct from any other fund and moneys administered by the department and any interest earned on the moneys in the fund shall be used solely for purposes of this division.
(f)When fixed assets procured under the authority of this division are sold or otherwise disposed of, the revenue from the sale or disposition, including any gain or loss, measured by the difference between book value and selling price, shall be deposited into the fund and available to the department for purposes of Chapter 2 (commencing with Section 80710). Any remaining revenue from the sale or other disposition of fixed assets procured under the authority of this division shall be returned to the General Fund once all obligations of the department are satisfied after the wind down of this division and the closure of the fund. While any obligation of the department incurred under this division remains outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of or parties to those obligations.
(g)(1)For activities undertaken by the department pursuant to Chapter 2 (commencing with Section 80710), the department may obtain applicable credits pursuant to the federal Inflation Reduction Act of 2022 (Public Law 117-169). If the department elects for direct payment of those applicable credits, those payments shall be deposited directly into the fund.
(2)Within 10 days of any payments being deposited into the fund, described in paragraph (1), the department shall provide written notice to the Joint Legislative Budget Committee, who shall provide a copy of the notice to the relevant policy committees. The notice shall include the source, purpose, timeliness, and other relevant information as determined by the department.
(3)Use of the payments shall be consistent with all of the following:
(A)The payments shall be expended for a purpose that is consistent with state law.
(B)Acceptance of the payments does not impose on the state any requirement to commit or expend new state funds for any program or purpose.
(C)The need exists to expend the payments during the 202324 fiscal year.
(D)The use of the payments shall be consistent with the priorities described in subdivision (a) of Section 38590.1 of the Health and Safety Code.
(h)(1)The Load-Serving Entity Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Load-Serving Entity Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80713 shall be deposited into the Load-Serving Entity Capacity Payment Account.
(i)(1)The Local Publicly Owned Electric Utility Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Local Publicly Owned Electric Utility Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80714 shall be deposited into the Local Publicly Owned Electric Utility Capacity Payment Account.
SEC. 15.Division 29.5 (commencing with Section 80800) is added to the Water Code, to read:29.5.ELIGIBLE ENERGY RESOURCE CENTRAL PROCUREMENT1.General Provisions80800.This division does not reduce or modify an electrical corporations obligation to serve.
80801.The commission shall issue orders it determines are necessary to carry out this division.
80802.(a)The Legislature finds and declares all of the following:
(1)California has significantly reduced the emissions of greenhouse gases from its electricity sector by fostering the development of renewable and zero-carbon energy resources through the establishment of ambitious goals and policies. These efforts have fundamentally transformed the states portfolio of energy resources and the day-to-day operations of the states electrical system.
(2)The state has enabled the expansion of electrical retail choice for customers served in electrical corporation service territory, bringing new market entrants and innovation to Californias evolving retail electricity market.
(3)The states electrical system also faces the risk of increased disruption due to more frequent and intense extreme weather events fueled by a rapidly changing climate.
(4)For California to achieve its long-term greenhouse gas emission reduction goals, while maintaining a reliable electrical system and providing customers with greater choice in electricity retail providers, the state must establish a new, limited central procurement function within the department that enables the development of a more diverse portfolio of renewable and zero-carbon energy resources.
(b)In enacting this division, it is the intent of the Legislature to do all of the following:
(1)Create a central procurement function within the department that would only be exercised if, pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission determines that there is a need for the procurement of additional eligible energy resources and requests the department to procure those resources and, in response to that request, the department elects to exercise that central procurement function to procure those resources pursuant to this division.
(2)If the department exercises that central procurement function, as described in paragraph (1), provide an opportunity for local publicly owned electric utilities to elect for the department to procure eligible energy resources on their behalf pursuant to Section 80822.
(3)Prohibit the department from recovering funds pursuant to a nonbypassable charge on the ratepayers of a load-serving entity for purposes other than providing for the departments acquisition costs for eligible energy resources, including transmission, scheduling, financing, program administration, and other related costs, pursuant to Section 80821.
(4)Prohibit the department from selling any eligible energy resources it acquires pursuant to this division at more than the departments acquisition costs, including transmission, scheduling, financing, program administration, and other related costs, when selling those resources under a long-term contract.
(5)Pursuant to Section 80821, prohibit the department from pursuing procurement activities, including, if authorized, the issuance of bonds, except upon a finding from the commission that the recovery of costs through charges on customers, the issuance of bonds, and the material terms of such bonds, including interest rates, rating, amortization, and maturity, do not unreasonably increase costs to customers on a net present value basis.
(6)Require the department to prioritize investments that do not compete with the procurement of eligible energy resources already planned for development and disclosed by load-serving entities or local publicly owned electric utilities.
80803.The development and operation of a central procurement function program by the department, as provided in this division, is in all respects for the welfare and benefit of the people of the state, to protect the public peace, health, and safety, and constitutes an essential government purpose.
80804.This division shall be liberally construed in a manner so as to effectuate its purposes and objectives.
80805.(a)The powers and responsibilities of the department established pursuant to this division are separate from, and not governed by, the provisions relating to the State Water Resources Development System, including, but not limited to, those powers and responsibilities granted pursuant to Part 3 (commencing with Section 11100) of Division 6 and the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6).
(b)This division does not subject the department to the jurisdictional authority of the commission or expand the jurisdiction of the commission, including that state water resources development system facilities subject to the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6) and the departments other electrical generation projects or power contracts outside of those funded through the fund, remain outside the jurisdiction of the commission.
80806.The department may adopt regulations for purposes of administering this division.
2.Definitions80810.For purposes of this division, the following definitions apply:
(a)Bond means any bond, note, or other written evidence of indebtedness issued solely for purposes of supporting the fund and other related expenses incurred by the department pursuant to this division, or for reimbursing expenditures from the fund for those purposes, establishing or maintaining reserves in connection with a bond, costs of issuance of a bond or incidental to its payment or security, capitalized interest, or renewing or refunding any bonds.
(b)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(c)Commission means the Public Utilities Commission.
(d)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(e)Eligible energy resource means an energy resource eligible to be procured by the Department of Water Resources pursuant to Section 454.52 of the Public Utilities Code that has a first point of interconnection with a California balancing authority.
(f)Energy Commission means the State Energy Resources Conservation and Development Commission.
(g)Fund means the Eligible Energy Resource Central Procurement Fund established in Section 80830.
(h)Independent System Operator means the Independent System Operator described in Article 3 (commencing with Section 345) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code.
(i)Load-serving entity has the same meaning as defined in Section 380 of the Public Utilities Code.
(j)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
3.Department Powers80820.(a)(1)Consistent with Sections 380, 454.51, 454.52, 454.53, and 454.54 of the Public Utilities Code and this division, if the commission requests the department to procure eligible energy resources, and the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts for eligible energy resources pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission, in consultation with the department, shall develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department pursuant to this division.
(2)The commission and the department shall establish a procurement group to advise the department on the procurement undertaken pursuant to this division.
(3)The department shall not enter into new contracts pursuant to this division on or after January 1, 2035.
(b)In evaluating the bids received through a solicitation, the department shall consider all of the following:
(1)For eligible energy resources dependent on the development of a project, that projects viability, including, but not limited to, developer experience, developer financial strength and creditworthiness sufficient to eliminate financing contingencies, and the status of required permits and licenses, including a commitment to submit a consistency certification provided pursuant to the federal Coastal Zone Management Act of 1972 (16 U.S.C. Sec. 1451 et seq.) to the California Coastal Commission for offshore wind energy development projects, to the extent required.
(2)The ability to meet in-service dates offered during the solicitation and the ability to meet those in-service dates without escalation in cost.
(3)The useful life of the project.
(4)The capability to supply energy, capacity, and ancillary services at locations, times of day, and for durations that meet the states energy resource needs, as determined by the department and the commission.
(5)The bidders economic and local community impact, workforce development needs and opportunities, environmental impact mitigation plan, and equipment acquisition and supply chain investment plan.
(6)A plan to contribute to large-scale, regional, or statewide baseline and ongoing monitoring of coastal waters and wildlife, if applicable.
(7)Any other criteria determined by the commission or the department.
(c)Every bid for the development of an eligible energy resource project selected by the department shall include the bidders certification that either of the following are true:
(1)The entirety of the construction of the eligible energy resource project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2)The construction of the eligible energy resource project is not in its entirety a public work for which prevailing wages are required to be paid pursuant to Article 1 (commencing with Section 1720) of Chapter 1 of Part 7 of Division 2 of the Labor Code, but all construction workers employed on the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the eligible energy resource project is subject to this paragraph, for those portions of the eligible energy resource project that are not a public work, all of the following requirements shall apply:
(A)The bidder shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(B)All contractors and subcontractors shall pay to all construction workers employed in the construction of the eligible energy resource project at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(C)All contractors and subcontractors performing construction work on the eligible energy resource project shall employ apprentices at no less than the ratio required in Section 1777.5 of the Labor Code.
(D)Except as specified in subparagraph (F), all contractors and subcontractors performing construction work shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code, make those records available for inspection and copying pursuant to Section 1776 of the Labor Code, and furnish those payroll records to the Labor Commissioner pursuant to Section 1771.4 of the Labor Code.
(E)Except as specified in subparagraph (F), the obligation of the contractors and subcontractors to pay prevailing wages and employ apprentices may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee though a civil action pursuant to Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(F)Subparagraphs (D) and (E) do not apply if all contractors and subcontractors performing construction work on the eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(i)Provisions requiring payment of prevailing wages to all construction workers employed in the construction of the eligible energy resource project and for enforcement of that obligation through an arbitration procedure.
(ii)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a relevant local agency.
(iii)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required in Section 1777.5 of the Labor Code.
(iv)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the multicraft core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(d)Every bid for the development of an eligible energy resource project selected by the department shall include the bidders certification that a skilled and trained workforce will be used to perform all construction work on the eligible energy resource project, consistent with all of the following requirements:
(1)The bidder shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the eligible energy resource project.
(2)Every contractor and subcontractor shall use a skilled and trained workforce to construct the eligible energy resource project.
(3)Except as specified in subdivision (c), contractors and subcontractors that fail to use a skilled and trained workforce shall be subject to the penalties provided in Section 2603 of the Public Contract Code. Penalties for a contractors or subcontractors failure to comply with the requirement to use a skilled and trained workforce may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 2603 of the Public Contract Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(4)For purposes of this subdivision, a bidder shall be considered to be an awarding body under Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. Except as specified in paragraph (5), the bidder shall retain records, including copies of monthly reports, that demonstrate compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code while the eligible energy resource project or contract is being performed and for three years after completion of the eligible energy resource project or contract. The bidder shall submit these records immediately upon request of the commission. When submitted to the commission, these records shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection.
(5)Paragraphs (3) and (4) do not apply if all contractors and subcontractors performing work on the eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(A)Provisions requiring compliance with the skilled and trained workforce requirement and for enforcement of that obligation through an arbitration procedure.
(B)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a local agency.
(C)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required by Section 1777.5 of the Labor Code.
(D)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the Multi-Craft Core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(e)For purposes of this section, the following definitions apply:
(1)Construction means any new construction work and subsequent construction and construction maintenance work following initial completion that is contracted out to a contractor in the construction industry, including construction work on a barge, construction staging area, or construction area when being used as a construction work platform and the rigging and hoisting of construction materials directly from a barge, construction staging area, or construction area into the construction process for a construction project. Construction does not include the loading and unloading of cargo to and from vessels and the movement of cargo to and from vessels at any port facility to the cargos point of rest.
(2)Project labor agreement has the same meaning as defined in Section 2500 of the Public Contract Code.
(3)Skilled and trained workforce has the same meaning as defined in Section 2601 of the Public Contract Code.
80821.(a)(1)When conducting a solicitation pursuant to Section 80820, the department shall confer with the commission and other parties, including local publicly owned electric utilities that are voluntarily participating pursuant to Section 80822 and load-serving entities, for eligible energy resource procurement activities of an identified scope and duration. The department shall recover costs related to conducting the requested solicitations and all supporting work. Cost recovery may be effectuated, if determined to be just and reasonable by the commission before the procurement, through a nonbypassable charge approval process for load-serving entities and pursuant to Section 80822 for local publicly owned electric utilities.
(2)At the request of the department, the commission may require an electrical corporation to act as the agent of the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new eligible energy resource procurement. The electrical corporation shall be reimbursed by the department for its reasonable costs, as determined by the commission.
(b)If the departments costs associated with the procurement of eligible energy resources pursuant to this division, including the costs related to bonds issued pursuant to Chapter 5 (commencing with Section 80840), costs related to contracting for eligible energy resources, and other costs to implement and administer this division, will be recovered through a commission proceeding, the commission shall review the procurement undertaken pursuant to this division and, if approved, issue an order governing the recovery of the departments costs before the consummation of the contract only if both of the following conditions are satisfied:
(1)The recovery of the departments costs, including those costs associated with the procurement process, the resulting transactions, and the associated costs, has been found to be just and reasonable and to be in the public interest.
(2)The recovery of the departments costs, including, if authorized, costs associated with the issuance of bonds and the material terms of those bonds, including, without limitation, interest rates, rating, amortization, and maturity, through charges on customers does not unreasonably increase costs to customers on a net present value basis.
(c)If the commission determines that a nonbypassable charge necessary to fund activities conducted by the department pursuant to this division is just and reasonable, the department shall ensure it has entered into an agreement with the commission for that nonbypassable charge before it begins to incur costs related to a specific activity under this division. If the purpose of the nonbypassable charge is to recover the departments revenue requirement related to bond issuance debt service, the department shall ensure the agreement has the force and effect of an irrevocable financing order adopted in accordance with Article 5.5 (commencing with Section 840) of Chapter 4 of Part 1 of Division 1 of the Public Utilities Code or that the commission has separately issued an irrevocable financing order related to the nonbypassable charge.
(d)Any agreement between the department and the commission under this section shall provide for the administration of the nonbypassable charge, including both of the following requirements:
(1)The department shall notify the commission each year of the annual collections received by the department and the amount of any excess or deficiency in collections above or below the revenue requirement. The commission shall adjust charges in the subsequent year to reflect that excess or deficiency.
(2)During any period, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund the revenue requirement established pursuant to Section 80842, the department shall notify the commission in writing and the commission shall act within 60 days of receiving that notice to increase the nonbypassable charge so that the amounts collected during that period are sufficient to meet those obligations.
(e)Any agreement between the department and the commission pursuant to this section that is solely for the purpose of imposing a nonbypassable charge to recover the departments revenue requirement related to bond issuance debt service shall include a provision stating that the commissions just and reasonable determination with respect to the revenue requirement is in effect for the duration of the bond term.
80822.(a)Pursuant to Section 80820, the department may establish a schedule and mechanism for a local publicly owned electric utility to voluntarily obtain from the department eligible energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis.
(b)In order to voluntarily participate, a local publicly owned electric utility shall commit to the imposition of a nonbypassable charge on its ratepayers sufficient at all times to fund its participation and on terms and conditions as set forth in Section 80826.
80822.5.(a)Load-serving entities shall have a voluntary option to obtain incremental eligible energy resources from the department beyond the amounts allocated to the load-serving entity from procurement pursuant to paragraph (1) of subdivision (a) of Section 80820, subject to the approval of the commission and a specific determination by the commission that sufficient capacity is available to accommodate the request to obtain amounts beyond those allocated to the load-serving entity.
(b)The department, in consultation with the commission, may establish a schedule for load-serving entities to provide advance notice of an intent to obtain incremental eligible energy resources. Any load-serving entity exercising its option to voluntarily participate shall be obligated to impose a nonbypassable charge on its ratepayers sufficient to fund its allocated share of the costs of incremental eligible energy resources for the duration of the contract, as determined by the department and approved by the commission, if applicable.
80823.At the request of the department, the commission may order an electrical corporation, or its successor in the performance of a related service, to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as agent of the department, provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department.
80824.The commission may issue rules regulating the enforcement of the agency function pursuant to Section 80823, including the collection of nonbypassable charges and payment into the fund on behalf of the department.
80825.(a)If the department has executed an agreement with the commission pursuant to subdivision (c) of Section 80821, the department may recover its costs, as a revenue requirement, in the amounts sufficient and at the times necessary to fund the revenue requirement established pursuant to Section 80842, and shall advise the commission and each voluntarily participating local publicly owned electric utility, as the department determines to be appropriate and subject to the terms of the agreement.
(b)For purposes of this division and except as otherwise provided in subdivision (a), the commissions authority as set forth in Section 451 of the Public Utilities Code shall apply.
80826.(a)A local publicly owned electric utility that voluntarily participates in the departments central procurement function pursuant to Section 80822 shall enter into an agreement with the department for the revenue requirement to fund its participation and that agreement shall have the force and effect of an irrevocable financing order.
(b)The agreement shall provide for the administration of the revenue requirement, including both of the following:
(1)A requirement that the department annually notify the local publicly owned electric utility of the annual collections received by the department with respect to the revenue requirement and the amount of any excess or deficiency in collections above or below the revenue requirement. The local publicly owned electric utility shall adjust charges in the subsequent year to reflect any such excess or deficiency.
(2)During any revenue requirement period, a requirement that, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund the revenue requirement established pursuant to Section 80842, the department notify the local publicly owned electric utility in writing and the local publicly owned electric utility shall act within 30 days of receiving that notice to increase the charge so that the amount collected during the period is sufficient to meet those obligations.
80827.All moneys collected by load-serving entities and local publicly owned electric utilities and remitted to the department for any eligible energy resources acquired and sold pursuant to this division, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of eligible energy resources acquired pursuant to this division, shall be deposited into the fund.
80828.The department may fix and establish the procedure and charges for the sale or other disposal of eligible energy resources purchased by the department.
4.Eligible Energy Resource Central Procurement Fund80830.(a)There is hereby established in the State Treasury the Eligible Energy Resource Central Procurement Fund. Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated, without regard to fiscal year, to the department for purposes of this division.
(b)All revenues payable to the department pursuant to this division, including proceeds of bonds issued pursuant to Chapter 5 (commencing with Section 80840), shall be deposited into the fund. Notwithstanding any other law, interest accruing on the moneys in the fund shall be deposited into the fund and shall be used for purposes of this division.
(c)The fund, and the moneys in the fund, are separate and distinct from any other fund and moneys administered by the department.
(d)Payments from the fund may be made only for the following purposes:
(1)Payment of any bonds or other contractual obligations authorized by this division.
(2)The cost of energy and transmission, scheduling, and other related expenses incurred by the department.
(3)The expenses incurred by the department in administering this division, including costs of personnel, contracts, or arrangements to carry out the departments duties and responsibilities pursuant to this division.
(e)Obligations authorized pursuant to this division shall be payable solely from the fund. Neither the full faith and credit nor the taxing power of the state are, or may be, pledged for any payment under any obligation authorized by this division.
(f)While any obligations of the department incurred pursuant to this division remain outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of, or parties to, those obligations. The department may include this pledge and undertaking of the state in the departments obligations.
5.Bonds80840.(a)(1)If the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts to procure eligible energy resources pursuant to this division, as authorized by paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, due to the timing of cost recovery processes, the department may determine that it is necessary or desirable to issue bonds to support activities for the procurement of eligible energy resources pursuant to this division.
(2)Upon making the determination described in paragraph (1), the department may issue bonds for purposes of financing the procurement of eligible energy resources in support of the fund and other related expenses incurred by the department pursuant to this division, and subsequent to the department having entered into an agreement with the commission regarding a revenue requirement. Bonds shall not be issued in an amount the debt service on which, to the extent payable from the fund, is estimated by the department to exceed the amounts estimated to be available in the fund for the payment of the bonds.
(b)Before the issuance of bonds in a public offering, the department shall ensure the bonds have an investment grade rating from at least one nationally recognized investment ratings firm and the document authorizing the issuance of the bonds shall provide for repayment from pledged revenues.
(c)The commission shall have an opportunity to review the trust agreement or other documents pursuant to which the bonds are issued and revenues are pledged, and shall consult with the department regarding the trust agreement or other documents regarding any relevant considerations of the commission and to ensure its consistency with the revenue requirement agreement between the department and commission.
(d)In addition to any other purposes for which bonds may be issued pursuant to this division, bonds may be issued for the following purposes:
(1)Refunding bonds to obtain a lower interest rate.
(2)Refunding bonds bearing a variable interest rate with bonds bearing interest at a fixed rate.
(3)Refunding bonds if a nationally recognized investment ratings firm reduces or withdraws, or proposes to reduce or withdraw, the rating assigned to securities that are secured by bond insurance policies, credit, or liquidity facilities issued by the provider of a bond insurance policy, or a credit or liquidity facility securing the bonds being refunded.
(4)Refunding bonds issued to preserve a federal income tax exemption or to qualify or maintain other federal income tax benefits.
80841.(a)Whenever the director determines that the issuance of bonds is necessary or desirable to accomplish the goals set forth in this division, including financing the procurement of eligible energy resources, the director shall issue a written determination authorizing the issuance of bonds by the department. The department, in consultation with the Department of Finance, shall notify the Chairperson of the Joint Legislative Budget Committee and the chairpersons of the fiscal committees of each house of the Legislature of its written determination. The bonds shall be sold in the manner, and on the terms and conditions, specified in that determination, and the determination may contain or authorize any other provision, condition, or limitation not inconsistent with this division and those provisions as may be deemed reasonable and proper for the security of the bondholders. Bonds may mature at the time or times, and bear interest at the rate or rates, which may be fixed or variable and be determined by reference to an index or such other method, and may be federally tax exempt, as specified in the determination. Neither the person executing the determination to issue bonds nor any person executing bonds shall be personally liable therefor or be subject to any personal liability or accountability by reason of the issuance of the bonds.
(b)In the discretion of the department, bonds may be secured by a trust agreement by and between the department and a trustee, which may be any trust company or bank having trust powers within or outside the state, or the Treasurer. Notwithstanding any other law, the Treasurer shall not be deemed to have a conflict of interest by reason of acting as the trustee. The department may enter into contracts or arrangements in connection with the issuance and sale of bonds, or with respect to any outstanding bonds for so long as those bonds remain outstanding, as it shall deem to be necessary or desirable for the issuance and further security of the bonds, including, but not limited to, credit enhancement agreements, dealer agreements, purchase contracts, escrow agreements, and similar arrangements.
(c)Bonds shall be legal investments for all trust funds, the funds of all insurance companies, savings and commercial banks, trust companies, executors, administrators, trustees, and other fiduciaries, for state school funds, pension funds, and for any funds that may be invested in county, school, or municipal bonds.
(d)Notwithstanding that bonds may be payable from a special fund, the bonds shall be deemed to be negotiable instruments for all purposes.
(e)Any bonds, and the transfer of and income derived from those bonds, shall at all times be free from taxation of every kind by the state and by the political subdivisions of the state.
(f)Bonds shall not be deemed to constitute a debt or liability of the state or of any political subdivision thereof, other than the department, or a pledge of the full faith and credit of the state or of any such political subdivision, but shall be payable solely from the revenues described in paragraph (1) of subdivision (g). All bonds shall contain a statement to the following effect: Neither the faith and credit nor the taxing power of the State of California is pledged to the payment of the principal of or interest on this bond. The issuance of bonds shall not directly or indirectly or contingently obligate the state or any political subdivision thereof to levy or to pledge any form of taxation whatever therefor or to make any appropriation for their payment.
(g)(1)The department may pledge and apply all or any part of revenues of any nature whatever accruing to the department, from orders issued, charges imposed, or contracts entered into pursuant to or in furtherance of this division, or the right to receive the same, to the payment or security of any or all of the principal of the bonds or the interest thereon, in the manner and upon terms that the department deems advisable.
(2)(A)It is the intent of the Legislature that any pledge of moneys, revenues, or property made by the department shall be valid and binding from the time when the pledge is made if the commission finds the pledge was just and reasonable, and that the moneys, revenues, or property so pledged and thereafter collected from retail end-use customers, or paid directly or indirectly to or for the account of the department, is hereby made, and shall immediately be, subject to the lien of that pledge without any physical delivery thereof or further act.
(B)It is the intent of the Legislature that the lien of any such pledge shall be valid and binding against all parties having claims of any kind in tort, contract, or otherwise against the department irrespective of whether those parties have notice thereof, and that no resolution or instrument by which the pledge or lien created pursuant to this subdivision is expressed, confirmed, or approved need be filed or recorded in order to perfect the pledge or lien.
(C)It is the intent of the Legislature that this paragraph, in all respects, govern the creation, perfection, priority, and enforcement of any lien created pursuant to this division.
80842.(a)The department shall, and in any obligation entered into pursuant to this division may covenant to, at least annually, and more frequently as required, establish and revise revenue requirements sufficient, together with any moneys deposited into the fund, to provide all of the following:
(1)The amounts necessary to pay the principal of, and premium, if any, and interest on, all bonds as and when the same shall become due.
(2)The amounts necessary to pay for electricity purchased by it and to deliver it to purchasers, including the cost of electricity, transmission, scheduling, and other related expenses incurred by the department, or to make payments under any other contracts, agreements, or obligations entered into by it pursuant to this division, in the amounts and at the times the same shall become due.
(3)Reserves in amount as may be determined by the department from time to time to be necessary or desirable.
(4)The pooled money investment rate on funds advanced for electricity purchases before the receipt of payment for those purchases by the purchasing entity.
(5)The administrative costs of the department and other state agencies, including the costs and fees for professional services, bond issuance and sale, and other miscellaneous costs, incurred in connection with the issuance of bonds or the administration of this division.
(b)The department shall notify the commission of its revenue requirement pursuant to the agreement required pursuant to Section 80821 and that revenue requirement shall be satisfied by the recovery of its costs through a nonbypassable charge.
6.Termination of Authority to Contract80850.(a)On or after January 1, 2035, the department shall not contract under this division for the purchase of electrical power.
(b)This section does not affect the authority of the department to administer contracts entered into before that date or any of the departments outstanding bond obligations.
SEC. 16.(a)Upon appropriation of the Legislature, the sum of no less than six million dollars ($6,000,000) from the General Fund shall be available for the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
(b)Upon appropriation by the Legislature, additional moneys from the General Fund shall be made available for the 202425 fiscal year and subsequent fiscal years to support the California Coastal Commissions coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
(c)It is the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of the assessment referenced in Section 1 of Chapter 51 of the Statutes of 2023.
SEC. 17.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 18.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
To ensure the procurement of eligible energy resources that the state needs to meet its reliability needs, which have been identified as being delayed or needing a secure development path, it is necessary to establish a central procurement entity within the Department of Water Resources and for this act to take effect immediately.
Sections 10295 and 10297 do not apply to any contract entered into by the Department of Water Resources under Part 3 (commencing with Section 11100) of Division 6, Chapter 8 (commencing with Section 12930) of Part 6 of Division 6, Division 29 (commencing with Section 80700), or Division 29.5 (commencing with Section 80800), of the Water Code for the acquisition, sale, or transmission of power, or for services to facilitate those activities.
SEC. 2.Section 25302.6 is added to the Public Resources Code, to read:25302.6.As part of the 2025 edition of the integrated energy policy report, the commission, in consultation with the Public Utilities Commission, shall assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
SEC. 3.Section 25795 of the Public Resources Code is amended to read:25795.(a)Beginning on January 31, 2023, and on May 1, August 1, and December 1 annually thereafter, the commission, commission shall issue a written report to the Joint Legislative Budget Committee detailing the actions undertaken by the commission in the period since the previous report pursuant to this chapter through that date, including, but not limited to, all of the following:
(1)Amount of funds expended.
(2)Purpose of funds expended.
(3)Status of actions funded.
(4)For new and expanded resources, the amount by megawatt, resource type, operational date, and expected lifetime of that capacity.
(5)The frequency at which resources funded by the Department of Water Resources or the commission have been used and the extent to which they complied with the requirements of this chapter.
(6)In consultation with the state board, an estimate or the best available information on the emissions of greenhouse gases, criteria air pollutants, and toxic air contaminants emitted by the resources funded by the Department of Water Resources or the commission over the period since the previous report.
(7)Summary of contracts, grants, and loans issued pursuant to this chapter.
(b)Each report submitted pursuant to this section shall be submitted to the Joint Legislative Budget Committee at the same time and in the same manner as reports submitted pursuant to Section 80730 of the Water Code.
SEC. 4.Section 25992.10 of the Public Resources Code is amended to read:25992.10.(a)(1)The Voluntary Offshore Wind and Coastal Resources Protection Program is hereby established to be administered by the commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities, including federal laws providing for offshore wind lease conditions of the bureau. The program shall award moneys to public and private entities, including, but not limited to, state agencies, tribal entities, local governmental agencies, research institutions, and nonprofit entities, through various mechanisms, including, but not limited to, grants.
(2)Moneys from the fund and account shall be available for allocation by the commission for purposes of this chapter.
(b)The commission may allocate moneys for any of the following:
(1)Increasing the ability of state agencies to engage in postlease assessments and studies of impacts, including surveys and plans, and ongoing review of project compliance and monitoring, including administrative costs.
(2)Research facilitation and coordination, including, but not limited to, funding to support state agencies to work collaboratively with the bureau and other federal, state, and tribal entities to ensure that lessees construction and operations plans incorporate strategies and specific plans for comprehensive monitoring and adaptive management, and to ensure that the strategies and plans are implemented appropriately, including funding to contract with technical experts to be retained by state agencies to consult and collaborate on strategies and specific plans for comprehensive monitoring and adaptive management.
(3)(A)Contracts with technical experts to assist the bureau and the state in their review of survey and sampling and analysis plans, survey data and analysis, construction and operation plans, and other planning, project development, and project implementation activities and documents.
(B)The purpose of the technical experts is to review current research on survey methodologies, monitoring approaches and technologies, adaptive management strategies, and other relevant topics for floating offshore wind, to provide the bureau and the state with recommendations, suggested guidelines, and best practices, and to fulfill additional research needs, during all phases of floating offshore wind development and implementation with the overall goal of avoiding and minimizing impacts to coastal resources.
(4)Environmental impacts monitoring monitoring, including, but not limited to, any of the following:
(A)Collecting, analyzing, and reporting baseline and postdevelopment environmental data to assess large-scale changes and cumulative impacts to marine species, habitats, and uses from floating offshore wind development and related activities with a goal of enabling the bureau and the state to accurately assess, mitigate, and adaptively manage those impacts.
(B)Data collection at a regional scale that integrates data with information and data provided by lessees or the bureau and other relevant data to provide a comprehensive understanding of how floating offshore wind development is affecting the marine environment and coastal uses.
(5)Infrastructure readiness commitments, including, but not limited to, activities associated with the bureaus lease requirements for lessees to support infrastructure readiness, such as ports, waterfront facilities, and transmission for floating offshore wind generation facilities.
(6)Workforce development grants consistent with subdivisions (r) to (t), inclusive, of Section 14005 of the Unemployment Insurance Code and in consultation with the California Workforce Development Board.
(c)Moneys in the fund and the account shall not be allocated by the commission to another state or local agency for that agencys costs that are otherwise recoverable from project proponents in administering a regulatory or entitlement program.
SEC. 5.Section 365.1 of the Public Utilities Code is amended to read:365.1.(a)Except as expressly authorized by this section, and subject to the limitations in subdivisions (b) and (c), the right of retail end-use customers pursuant to this chapter to acquire service from other providers is suspended until the Legislature, by statute, lifts the suspension or otherwise authorizes direct transactions. For purposes of this section, other provider means any person, corporation, or other entity that is authorized to provide electric service within the service territory of an electrical corporation pursuant to this chapter, and includes an aggregator, broker, or marketer, as defined in Section 331, and an electric service provider, as defined in Section 218.3. Other provider does not include a community choice aggregator, as defined in Section 331.1, and the limitations in this section do not apply to the sale of electricity by other providers to a community choice aggregator for resale to community choice aggregation electricity consumers pursuant to Section 366.2.
(b)The commission shall authorize individual retail nonresidential end-use customers to acquire electric service from other providers in each electrical corporations distribution service territory, up to a maximum allowable total kilowatthours annual limit. The maximum allowable annual limit shall be established by the commission for each electrical corporation at the maximum total kilowatthours supplied by all other providers to distribution customers of that electrical corporation during any sequential 12-month period between April 1, 1998, and October 11, 2009. Within six months of October 11, 2009, the commission shall adopt and implement a reopening schedule that commences immediately and will phase in the allowable amount of increased kilowatthours over a period of not less than three years, and not more than five years, raising the allowable limit of kilowatthours supplied by other providers in each electrical corporations distribution service territory from the number of kilowatthours provided by other providers as of October 11, 2009, to the maximum allowable annual limit for that electrical corporations distribution service territory. The commission shall review and, if appropriate, modify its currently effective rules governing direct transactions, but that review shall not delay the start of the phase-in schedule.
(c)Once the commission has authorized additional direct transactions pursuant to subdivision (b), it shall do both of the following:
(1)Ensure that other providers are subject to the same requirements that apply to the states three largest electrical corporations under any programs or rules adopted by the commission to implement the resource adequacy provisions of Section 380, the renewables portfolio standard provisions of Article 16 (commencing with Section 399.11), the requirements for the electricity sector adopted by the State Air Resources Board pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code), and the requirements of the integrated resource planning process as specified in Sections 454.52 to 454.54, inclusive. This requirement applies notwithstanding any prior decision of the commission to the contrary.
(2)(A)Ensure that, in the event that the commission authorizes, in the situation of a contract with a third party, or orders, in the situation of utility-owned generation, an electrical corporation to obtain generation resources that the commission determines are needed to meet system or local area reliability needs for the benefit of all customers in the electrical corporations distribution service territory, the net capacity costs of those generation resources are allocated on a fully nonbypassable basis consistent with departing load provisions as determined by the commission, to all of the following:
(i)Bundled service customers of the electrical corporation.
(ii)Customers that purchase electricity through a direct transaction with other providers.
(iii)Customers of community choice aggregators.
(B)If the commission authorizes or orders an electrical corporation to obtain generation resources pursuant to subparagraph (A), the commission shall ensure that those resources meet a system or local reliability need in a manner that benefits all customers of the electrical corporation. The commission shall allocate the costs of those generation resources to ratepayers in a manner that is fair and equitable to all customers, whether they receive electric service from the electrical corporation, a community choice aggregator, or an electric service provider.
(C)The resource adequacy benefits of generation resources acquired by an electrical corporation pursuant to subparagraph (A) shall be allocated to all customers who pay their net capacity costs. Net capacity costs shall be determined by subtracting the energy and ancillary services value of the resource from the total costs paid by the electrical corporation pursuant to a contract with a third party or the annual revenue requirement for the resource if the electrical corporation directly owns the resource. An energy auction shall not be required as a condition for applying this allocation, but may be allowed as a means to establish the energy and ancillary services value of the resource for purposes of determining the net costs of capacity to be recovered from customers pursuant to this paragraph, and the allocation of the net capacity costs of contracts with third parties shall be allowed for the terms of those contracts.
(D)It is the intent of the Legislature, in enacting this paragraph, to provide additional guidance to the commission with respect to the implementation of subdivision (g) of Section 380, and to ensure that the customers to whom the net costs and benefits of capacity are allocated are not required to pay for the cost of electricity they do not consume.
(d)(1)If the commission approves a centralized resource adequacy mechanism pursuant to subdivisions (h) and (i) of Section 380, upon the implementation of the centralized resource adequacy mechanism the requirements of paragraph (2) of subdivision (c) shall be suspended. If the commission later orders that electrical corporations cease procuring capacity through a centralized resource adequacy mechanism, the requirements of paragraph (2) of subdivision (c) shall again apply.
(2)If the use of a centralized resource adequacy mechanism is authorized by the commission and has been implemented as set forth in paragraph (1), the net capacity costs of generation resources that the commission determines are required to meet urgent system or urgent local grid reliability needs, and that the commission authorizes to be procured outside of the Section 380 or Section 454.5 processes, shall be recovered according to paragraph (2) of subdivision (c).
(3)This subdivision does not supplant the resource adequacy requirements of Section 380 or the resource procurement procedures established in Section 454.5.
(e)On or before June 1, 2019, the commission shall issue an order regarding direct transactions that provides as follows:
(1)Increase the maximum allowable total kilowatthours annual limit by 4,000 gigawatthours and apportion that increase among the service territories of the electrical corporations.
(2)All residential and nonresidential customer accounts that are on direct access as of January 1, 2019, remain authorized to participate in direct transactions.
SEC. 6.Section 380 of the Public Utilities Code is amended to read:380.(a)The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities.
(b)In establishing resource adequacy requirements, the commission shall ensure the reliability of electrical service in California while advancing, to the extent possible, the states goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. The resource adequacy program shall achieve all of the following objectives:
(1)Facilitate development of new generating, nongenerating, and hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economical and needed for reliability and to achieve the state policy specified in Section 454.53.
(2)Establish new, or maintain existing, demand response products and tariffs that facilitate the economical dispatch and use of demand response that can either meet or reduce an electrical corporations resource adequacy requirements, as determined by the commission.
(3)Equitably allocate the cost of generating capacity and demand response in a manner that prevents the shifting of costs between customer classes.
(4)Minimize enforcement requirements and costs.
(5)Maximize the ability of community choice aggregators to determine the generation resources used to serve their customers.
(c)Each load-serving entity shall maintain physical generating capacity and electrical demand response adequate to meet its load requirements, including, but not limited to, peak demand and planning and operating reserves. The generating capacity or electrical demand response shall be deliverable to locations and at times as may be necessary to maintain electrical service system reliability, local area reliability, and flexibility.
(d)Each load-serving entity shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the board of directors of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(e)The commission shall implement and enforce the resource adequacy requirements established in accordance with this section in a nondiscriminatory manner. Each load-serving entity shall be subject to the same requirements for resource adequacy, the renewables portfolio standard program, and the integrated resource planning process pursuant to Section 454.52 that apply to electrical corporations pursuant to this section, or are otherwise required by law or by order or decision of the commission. The commission shall exercise its enforcement powers to ensure compliance by all load-serving entities.
(f)(1)The commission shall require sufficient information, including, but not limited to, anticipated load, actual load, and measures undertaken by a load-serving entity to ensure resource adequacy, to be reported to enable the commission to determine compliance with the resource adequacy requirements established by the commission.
(2)The commission shall calculate and publish annually on its internet website, in a new report or as part of another report, the percentage of each load-serving entitys local and system resource adequacy requirements from the previous calendar year that was met with capacity from eligible renewable energy resources pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11)), other zero-carbon resources, including large hydroelectric and nuclear resources, or energy storage resources. In determining the percentage of each load-serving entitys resource adequacy requirements, the commission shall include all directly owned or contracted resources and each load-serving entitys allocation of any centrally procured resources or allocation of resources pursuant to any other mechanism that involves an assignment or allocation of resources purchased or owned by a single buyer, and shall exclude any share of a load-serving entitys resources that were allocated to another load-serving entity.
(g)An electrical corporations costs of meeting or reducing resource adequacy requirements, including, but not limited to, the costs associated with system reliability, local area reliability, or flexible resource adequacy, that are determined to be reasonable by the commission, or are otherwise recoverable under a procurement plan approved by the commission pursuant to Section 454.5, shall be fully recoverable from those customers on whose behalf the costs are incurred, as determined by the commission, at the time the commitment to incur the cost is made, on a fully nonbypassable basis, as determined by the commission. The commission shall exclude any amounts authorized to be recovered pursuant to Section 366.2 when authorizing the amount of costs to be recovered from customers of a community choice aggregator or from customers that purchase electricity through a direct transaction pursuant to this subdivision.
(h)The commission shall determine and authorize the most efficient and equitable means for achieving all of the following:
(1)Meeting the objectives of this section.
(2)Ensuring that investment is made in new generating capacity.
(3)Ensuring that existing generating capacity that is economical is retained.
(4)Ensuring that the cost of generating capacity and demand response is allocated equitably.
(5)Ensuring that community choice aggregators can determine the generation resources used to serve their customers.
(6)Ensuring that investments are made in new and existing demand response resources that are cost effective and help to achieve electrical grid reliability and the states goals for reducing emissions of greenhouse gases.
(7)Minimizing the need for backstop procurement by the Independent System Operator.
(i)In making the determination pursuant to subdivision (h), the commission may consider a centralized resource adequacy mechanism among other options.
(j)The commission shall ensure appropriate valuation of both supply and load modifying demand response resources. The commission, in an existing or new proceeding, shall establish a mechanism to value load modifying demand response resources, including, but not limited to, the ability of demand response resources to help meet distribution needs and transmission system needs and to help reduce a load-serving entitys resource adequacy obligation pursuant to this section. In determining this value, the commission shall consider how these resources further the states electrical grid reliability and the states goals for reducing emissions of greenhouse gases. The commission, Energy Commission, and Independent System Operator shall jointly ensure that changes in demand caused by load modifying demand response are expeditiously and comprehensively reflected in the Energy Commissions Integrated Energy Policy Report forecast and in planning proceedings and associated analyses, and shall encourage reflection of these changes in demand in the operation of the grid.
(k)For purposes of this section, load-serving entity means an electrical corporation, electric service provider, or community choice aggregator. Load-serving entity does not include any of the following:
(1)A local publicly owned electric utility.
(2)The State Water Resources Development System commonly known as the State Water Project.
(3)Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, if the customer generation, or the load it serves, meets one of the following criteria:
(A)It takes standby service from the electrical corporation on a commission-approved rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(B)It is not physically interconnected to the electrical transmission or distribution grid, so that, if the customer generation fails, backup electricity is not supplied from the electrical grid.
(C)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
SEC. 7.Section 454.51 of the Public Utilities Code is amended to read:454.51.The commission shall do all of the following:
(a)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy and resource diversity in a cost-effective manner. The portfolio shall be used by the commission to establish integrated resource planning-based procurement requirements that rely on zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve the state policy specified in Section 454.53 and any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources or diverse resources, procured by an electrical corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration and diverse resources need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need identified in subdivision (a) or (d), as applicable, shall be borne by the load-serving entity, as defined in Section 380, that failed to perform.
SEC. 8.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability on a near-term, mid-term, and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.
(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H)Enhance distribution systems and demand-side energy management.
(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(J)Maintain a diverse portfolio of energy resources, which may include diverse clean eligible energy resources procured by the Department of Water Resources.
(2)(A)The commission may authorize all source procurement for load-serving entities that includes various resource types including demand-side resources, supply-side resources, and resources that may be either demand-side resources or supply-side resources, taking into account the differing load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(4)(A)On or before September 1, 2024, and consistent with the process and schedule adopted pursuant to paragraph (1), the commission, in consultation with the Energy Commission and the Independent System Operator, shall determine if there is a need for the procurement of diverse clean eligible energy resources based on a review of the integrated resource plans submitted by load-serving entities in compliance with the requirements of this section and Section 454.53 and the progress towards meeting the portfolio of resources identified pursuant to subdivision (a) of Section 454.51.
(B)If the commission determines that there is a need for the procurement of diverse clean eligible energy resources, the commission shall specify the diverse clean eligible energy resources that should be procured to meet that need.
(C)Within six months of determining that there is a need for the procurement of diverse clean eligible energy resources, the commission may request the Department of Water Resources to exercise its central procurement function to procure those diverse clean eligible energy resources specified pursuant to subparagraph (B) that meet the portfolio of resources identified in subdivision (a) of Section 454.51.
(D)(i)Upon receiving a request pursuant to subparagraph (C), the Department of Water Resources, before January 1, 2035, may exercise its central procurement function to conduct one or more competitive solicitations and enter into contracts to procure diverse clean eligible energy resources in order to achieve the policy of the state specified in Section 454.53.
(ii)Any contract entered into by the Department of Water Resources pursuant to clause (i) and approved by the commission pursuant to Section 80821 of the Water Code before January 1, 2035, shall remain in force for the duration of the contract.
(E)The Department of Water Resources exercising of its central procurement function to procure diverse clean eligible energy resources pursuant to this paragraph shall be conducted in accordance with Division 29.5 (commencing with Section 80800) of the Water Code.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of short-term and long-term electricity, electricity-related, and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.
(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.
(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.
(h)For purposes of this section, both of the following definitions apply:(1)(A)Diverse clean energy resource means a new resource that is procured by the Department of Water Resources that meets all of the following requirements:(h)(1)Only a new energy resource that meets all of the following requirements is eligible to be procured by the Department of Water Resources pursuant to this section:
(i)(A)The resource directly supports attainment of the goals specified in Section 454.53 without increasing the states dependence on any fossil fuel-based resources.
(ii)(B)The resource is determined by the commission to not be under contract at sufficient levels as shown in load-serving entities most recent individual integrated resource plans submitted to and reviewed by the commission pursuant to this section to achieve the goals specified in Section 454.53.
(iii)(C)The resource has a construction and development lead time of at least five years.
(iv)(D)The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
(v)(E)The resource does not use combustion to generate electricity, unless that combustion use is ancillary and necessary to facilitate geothermal electricity generation.
(B)A(2)Resources from a pump hydroelectric facility may only qualify as a diverse clean energy resource may be procured by the Department of Water Resources pursuant to this section if it the pump hydroelectric facility does not exceed 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.
(2)Load-serving(i)For purposes of this section, load-serving entity has the same meaning as defined in Section 380.
SEC. 9.Section 913.21 is added to the Public Utilities Code, to read:913.21.Notwithstanding Section 10231.5 of the Government Code, the commission shall annually submit a report to the Governor and the Legislature on the types, amounts, and costs to ratepayers of diverse clean eligible energy resources procured pursuant to Section 454.52.
SEC. 10.Section 1001.1 is added to the Public Utilities Code, to read:1001.1.In a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, the commission shall establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if all of the following are satisfied:
(a)The Independent System Operator governing board has made explicit findings regarding the need for the proposed transmission project and has determined that the proposed project is the most cost-effective transmission solution.
(b)The Independent System Operator is a party to the proceeding.
(c)The Independent System Operator governing board-approved need evaluation is submitted to the commission within sufficient time to be included within the scope of the proceeding.
(d)There has been no substantial change to the scope, estimated cost, or timeline of the proposed transmission project as approved by the Independent System Operator governing board.
SEC. 11.Section 9620 of the Public Utilities Code is amended to read:9620.(a)Each local publicly owned electric utility serving end-use customers shall prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers. Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, shall not be subject to these requirements if the customer generation, or the load it serves, meets one of the following criteria:
(1)It takes standby service from the local publicly owned electric utility on a rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(2)It is not physically interconnected to the electric transmission or distribution grid, so that, if the customer generation fails, backup power is not supplied from the electricity grid.
(3)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
(b)Each local publicly owned electric utility serving end-use customers shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the Board of Trustees of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(c)Each local publicly owned electric utility shall prudently plan for and procure energy storage systems that are adequate to meet the requirements of Section 2836.
(d)A local publicly owned electric utility serving end-use customers shall, upon request, provide the Energy Commission with any information the Energy Commission determines is necessary to evaluate the progress made by the local publicly owned electric utility in meeting the requirements of this section, consistent with the annual targets established pursuant to subdivision (c) of Section 25310 of the Public Resources Code.
(e)The Energy Commission shall report to the Legislature, to be included in each integrated energy policy report prepared pursuant to Section 25302 of the Public Resources Code, regarding the progress made by each local publicly owned electric utility serving end-use customers in meeting the requirements of this section.
(f)A local publicly owned electric utility may meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources if that aggregation or pooling is defined in a contractual arrangement and each participating local publicly owned electric utility meets its individual minimum planning reserve margin based on its share of the resource portfolio pool.
SEC. 12.Section 80713 is added to the Water Code, to read:80713.(a)(1)On and before June 30, 2027, if the Department of Water Resources determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet a load-serving entitys identified reliability need, the Public Utilities Commission shall annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements pursuant to Section 380 of the Public Utilities Code. The capacity payment is not a penalty and does not prohibit the Public Utilities Commission from assessing a penalty on a load-serving entity for a failure to comply with any resource adequacy requirement.
(2)If a load-serving entity fails to comply with its system resource adequacy requirements pursuant to Section 380 in a month when resources procured by the Department of Water Resources through the Electricity Supply Strategic Reliability Reserve Program are used to meet the load-serving entitys identified reliability need and a penalty is assessed by the commission on the load-serving entity for that failure, then, on and before June 30, 2027, both of the following requirements shall apply:
(A)If the penalty is less than the capacity payment, the capacity payment shall be reduced by the amount of the penalty and the penalty shall be deposited into the Load-Serving Entity Capacity Payment Account.
(B)If the penalty is more than the capacity payment, then an amount of the penalty equal to the otherwise applicable capacity payment shall be deposited into the Load-Serving Entity Capacity Payment Account.
(3)The annual capacity payment shall be remitted to the Load-Serving Entity Capacity Payment Account by a load-serving entity that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the commission notifying the load-serving entity.
(b)The Public Utilities Commission, in consultation with the commission, shall determine a capacity payment unit cost in kilowatt per month for load-serving entities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, including the Load-Serving Entity Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the load-serving entity was deficient in its system resource adequacy requirements during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used, based on the resource adequacy program rules, requirements, and resource counting conventions in place at the time of the deficiency, after crediting the deficient load-serving entity with its share of any reliability resources procured by other entities on its behalf. The Public Utilities Commission may make any further adjustments to the capacity values of any nonperforming resources included in a load-serving entitys portfolio when determining the amount of this deficiency. Any adjustments made by the Public Utilities Commission shall align with any adjustments made by the commission as authorized by subdivision (b) of Section 80714.
(c)This section shall become operative on January 31, 2024.
SEC. 13.Section 80714 is added to the Water Code, to read:80714.(a)(1)Upon the submission of the report pursuant to subdivision (d) and on and before June 30, 2027, if the Department of Water Resources determines that resources it procured through the Electricity Supply Strategic Reliability Reserve Program were used in a given month to meet an identified reliability need, the executive director of the commission shall annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin.
(2)The annual capacity payment shall be remitted to the Local Publicly Owned Electric Utility Capacity Payment Account by a local publicly owned electric utility that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the executive director notifying the local publicly owned electric utility.
(b)Upon the submission of the report pursuant to subdivision (d), the commission, in consultation with the Public Utilities Commission, shall determine a capacity payment unit cost in kilowatt per month for local publicly owned electric utilities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, including the Local Publicly Owned Electric Utility Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the local publicly owned electric utility was deficient in its minimum planning reserve margin during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used using the same resource counting conventions applied by the Public Utilities Commission pursuant to subdivision (b) of Section 80713, after crediting the deficient local publicly owned electric utilities with their share of any reliability resources procured by other entities on their behalf. The commission may make any further adjustments to the capacity values of any nonperforming resources included in a local publicly owned electric utilitys portfolio when determining the amount of this deficiency. Any adjustments made by the commission shall align with any adjustments made by the Public Utilities Commission as authorized by subdivision (b) of Section 80713.
(c)Upon the submission of the report pursuant to subdivision (d), the commission may adopt regulations to implement this section.
(d)On or before January 31, 2024, the commission, in consultation with the Public Utilities Commission, shall submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin for 2023 and the system resource adequacy requirements from June 1, 2023, to September 30, 2023, inclusive, that the Public Utilities Commission established for load-serving entities pursuant to Section 380 of the Public Utilities Code and adopted in Public Utilities Commission Decision 22-06-050 (June 23, 2022) Decision Adopting Local Capacity Obligations for 20232025, Flexible Capacity Obligations for 2023, and Reform Track Framework.
(e)For purposes of this section, minimum planning reserve margin means a local publicly owned electric utilitys planning reserve margin, as described in Section 9620 of the Public Utilities Code, unless the local publicly owned electric utility revises that planning reserve margin based on recommendations from the commission pursuant to subdivision (b) of Section 25704.5 of the Public Resources Code, in which case minimum planning reserve margin means the local publicly owned electric utilitys revised minimum planning reserve margin.
SEC. 14.Section 80720 of the Water Code is amended to read:80720.(a)There is hereby established in the State Treasury the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(b)Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated to the department, without regard to fiscal years, and shall be available for the purposes of Chapter 2 (commencing with Section 80710).
(c)Obligations authorized and expenses incurred by the department in administering this division shall be payable solely from the fund.
(d)Except as specified in subdivisions (h) and (i), all revenues payable to the department for activities undertaken by the department under Chapter 2 (commencing with Section 80710) or Chapter 5 (commencing with Section 80740) shall be deposited into the fund.
(e)The fund shall be separate and distinct from any other fund and moneys administered by the department and any interest earned on the moneys in the fund shall be used solely for purposes of this division.
(f)When fixed assets procured under the authority of this division are sold or otherwise disposed of, the revenue from the sale or disposition, including any gain or loss, measured by the difference between book value and selling price, shall be deposited into the fund and available to the department for purposes of Chapter 2 (commencing with Section 80710). Any remaining revenue from the sale or other disposition of fixed assets procured under the authority of this division shall be returned to the General Fund once all obligations of the department are satisfied after the wind down of this division and the closure of the fund. While any obligation of the department incurred under this division remains outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of or parties to those obligations.
(g)(1)For activities undertaken by the department pursuant to Chapter 2 (commencing with Section 80710), the department may obtain applicable credits pursuant to the federal Inflation Reduction Act of 2022 (Public Law 117-169). If the department elects for direct payment of those applicable credits, those payments shall be deposited directly into the fund.
(2)Within 10 days of any payments being deposited into the fund, described in paragraph (1), the department shall provide written notice to the Joint Legislative Budget Committee, who shall provide a copy of the notice to the relevant policy committees. The notice shall include the source, purpose, timeliness, and other relevant information as determined by the department.
(3)Use of the payments shall be consistent with all of the following:
(A)The payments shall be expended for a purpose that is consistent with state law.
(B)Acceptance of the payments does not impose on the state any requirement to commit or expend new state funds for any program or purpose.
(C)The need exists to expend the payments during the 202324 fiscal year.
(D)The use of the payments shall be consistent with the priorities described in subdivision (a) of Section 38590.1 of the Health and Safety Code.
(h)(1)The Load-Serving Entity Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Load-Serving Entity Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80713 shall be deposited into the Load-Serving Entity Capacity Payment Account.
(i)(1)The Local Publicly Owned Electric Utility Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Local Publicly Owned Electric Utility Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80714 shall be deposited into the Local Publicly Owned Electric Utility Capacity Payment Account.
SEC. 15.Division 29.5 (commencing with Section 80800) is added to the Water Code, to read:29.5.DIVERSE CLEAN ELIGIBLE ENERGY RESOURCE CENTRAL PROCUREMENT1.General Provisions80800.This division does not reduce or modify an electrical corporations obligation to serve.
80801.The commission shall issue orders it determines are necessary to carry out this division.
80802.(a)The Legislature finds and declares all of the following:
(1)California has significantly reduced the emissions of greenhouse gases from its electricity sector by fostering the development of renewable and zero-carbon energy resources through the establishment of ambitious goals and policies. These efforts have fundamentally transformed the states portfolio of energy resources and the day-to-day operations of the states electrical system.
(2)The state has enabled the expansion of electrical retail choice for customers served in electrical corporation service territory, bringing new market entrants and innovation to Californias evolving retail electricity market.
(3)The states electrical system also faces the risk of increased disruption due to more frequent and intense extreme weather events fueled by a rapidly changing climate.
(4)For California to achieve its long-term greenhouse gas emission reduction goals, while maintaining a reliable electrical system and providing customers with greater choice in electricity retail providers, the state must establish a new, limited central procurement function within the department that enables the development of a more diverse portfolio of renewable and zero-carbon energy resources.
(b)In enacting this division, it is the intent of the Legislature to do all of the following:
(1)Create a central procurement function within the department that would only be exercised if, pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission determines that there is a need for the procurement of additional diverse clean eligible energy resources and requests the department to procure those resources and, in response to that request, the department elects to exercise that central procurement function to procure those resources pursuant to this division.
(2)If the department exercises that central procurement function, as described in paragraph (1), provide an opportunity for local publicly owned electric utilities to elect for the department to procure diverse clean eligible energy resources on their behalf pursuant to Section 80822.
(3)Prohibit the department from recovering funds pursuant to a nonbypassable charge on the ratepayers of a load-serving entity for purposes other than providing for the departments acquisition costs for diverse clean eligible energy resources, including transmission, scheduling, financing, program administration, and other related costs, pursuant to Section 80821.
(4)Prohibit the department from selling any diverse clean eligible energy resources it acquires pursuant to this division at more than the departments acquisition costs, including transmission, scheduling, financing, program administration, and other related costs, when selling those resources under a long-term contract.
(5)Pursuant to Section 80821, prohibit the department from pursuing procurement activities, including, if authorized, the issuance of bonds, except upon a finding from the commission that the recovery of costs through charges on customers, the issuance of bonds, and the material terms of such bonds, including interest rates, rating, amortization, and maturity, do not unreasonably increase costs to customers on a net present value basis.
(6)Require the department to prioritize investments that do not compete with the procurement of diverse clean eligible energy resources already planned for development and disclosed by load-serving entities or local publicly owned electric utilities.
80803.The development and operation of a central procurement function program by the department, as provided in this division, is in all respects for the welfare and benefit of the people of the state, to protect the public peace, health, and safety, and constitutes an essential government purpose.
80804.This division shall be liberally construed in a manner so as to effectuate its purposes and objectives.
80805.(a)The powers and responsibilities of the department established pursuant to this division are separate from, and not governed by, the provisions relating to the State Water Resources Development System, including, but not limited to, those powers and responsibilities granted pursuant to Part 3 (commencing with Section 11100) of Division 6 and the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6).
(b)This division does not subject the department to the jurisdictional authority of the commission or expand the jurisdiction of the commission, including that state water resources development system facilities subject to the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6) and the departments other electrical generation projects or power contracts outside of those funded through the fund, remain outside the jurisdiction of the commission.
80806.The department may adopt regulations for purposes of administering this division.
2.Definitions80810.For purposes of this division, the following definitions apply:
(a)Bond means any bond, note, or other written evidence of indebtedness issued solely for purposes of supporting the fund and other related expenses incurred by the department pursuant to this division, or for reimbursing expenditures from the fund for those purposes, establishing or maintaining reserves in connection with a bond, costs of issuance of a bond or incidental to its payment or security, capitalized interest, or renewing or refunding any bonds.
(b)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(c)Commission means the Public Utilities Commission.
(d)Diverse clean energy resource means a diverse clean energy resource as defined in Section 454.52 of the Public Utilities Code that has a first point of interconnection with a California balancing authority.(e)(d)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(e)Eligible energy resource means an energy resource eligible to be procured by the Department of Water Resources pursuant to Section 454.52 of the Public Utilities Code that has a first point of interconnection with a California balancing authority.
(f)Energy Commission means the State Energy Resources Conservation and Development Commission.
(g)Fund means the Diverse Clean Eligible Energy Resource Central Procurement Fund established in Section 80830.
(h)Independent System Operator means the Independent System Operator described in Article 3 (commencing with Section 345) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code.
(i)Load-serving entity has the same meaning as defined in Section 380 of the Public Utilities Code.
(j)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
3.Department Powers80820.(a)(1)Consistent with Sections 380, 454.51, 454.52, 454.53, and 454.54 of the Public Utilities Code and this division, if the commission requests the department to procure diverse clean eligible energy resources, and the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts for diverse clean eligible energy resources pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission, in consultation with the department, shall develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department pursuant to this division.
(2)The commission and the department shall establish a procurement group to advise the department on the procurement undertaken pursuant to this division.
(3)The department shall not enter into new contracts pursuant to this division on or after January 1, 2035.
(b)In evaluating the bids received through a solicitation, the department shall consider all of the following:
(1)For diverse clean eligible energy resources dependent on the development of a project, that projects viability, including, but not limited to, developer experience, developer financial strength and creditworthiness sufficient to eliminate financing contingencies, and the status of required permits and licenses, including a commitment to submit a consistency certification provided pursuant to the federal Coastal Zone Management Act of 1972 (16 U.S.C. Sec. 1451 et seq.) to the California Coastal Commission for offshore wind energy development projects, to the extent required.
(2)The ability to meet in-service dates offered during the solicitation and the ability to meet those in-service dates without escalation in cost.
(3)The useful life of the project.
(4)The capability to supply energy, capacity, and ancillary services at locations, times of day, and for durations that meet the states energy resource needs, as determined by the department and the commission.
(5)The bidders economic and local community impact, workforce development needs and opportunities, environmental impact mitigation plan, and equipment acquisition and supply chain investment plan.
(6)A plan to contribute to large-scale, regional, or statewide baseline and ongoing monitoring of coastal waters and wildlife, if applicable.
(7)Any other criteria determined by the commission or the department.
(c)Every bid for the development of a diverse clean an eligible energy resource project selected by the department shall include the bidders certification that either of the following are true:
(1)The entirety of the construction of the diverse clean eligible energy resource project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2)The construction of the diverse clean eligible energy resource project is not in its entirety a public work for which prevailing wages are required to be paid pursuant to Article 1 (commencing with Section 1720) of Chapter 1 of Part 7 of Division 2 of the Labor Code, but all construction workers employed on the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the diverse clean eligible energy resource project is subject to this paragraph, for those portions of the diverse clean eligible energy resource project that are not a public work, all of the following requirements shall apply:
(A)The bidder shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(B)All contractors and subcontractors shall pay to all construction workers employed in the construction of the diverse clean eligible energy resource project at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(C)All contractors and subcontractors performing construction work on the diverse clean eligible energy resource project shall employ apprentices at no less than the ratio required in Section 1777.5 of the Labor Code.
(D)Except as specified in subparagraph (F), all contractors and subcontractors performing construction work shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code, make those records available for inspection and copying pursuant to Section 1776 of the Labor Code, and furnish those payroll records to the Labor Commissioner pursuant to Section 1771.4 of the Labor Code.
(E)Except as specified in subparagraph (F), the obligation of the contractors and subcontractors to pay prevailing wages and employ apprentices may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee though a civil action pursuant to Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(F)Subparagraphs (D) and (E) do not apply if all contractors and subcontractors performing construction work on the diverse clean eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(i)Provisions requiring payment of prevailing wages to all construction workers employed in the construction of the diverse clean eligible energy resource project and for enforcement of that obligation through an arbitration procedure.
(ii)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a relevant local agency.
(iii)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required in Section 1777.5 of the Labor Code.
(iv)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the multicraft core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(d)Every bid for the development of a diverse clean an eligible energy resource project selected by the department shall include the bidders certification that a skilled and trained workforce will be used to perform all construction work on the diverse clean eligible energy resource project, consistent with all of the following requirements:
(1)The bidder shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the diverse clean eligible energy resource project.
(2)Every contractor and subcontractor shall use a skilled and trained workforce to construct the diverse clean eligible energy resource project.
(3)Except as specified in subdivision (c), contractors and subcontractors that fail to use a skilled and trained workforce shall be subject to the penalties provided in Section 2603 of the Public Contract Code. Penalties for a contractors or subcontractors failure to comply with the requirement to use a skilled and trained workforce may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 2603 of the Public Contract Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(4)For purposes of this subdivision, a bidder shall be considered to be an awarding body under Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. Except as specified in paragraph (5), the bidder shall retain records, including copies of monthly reports, that demonstrate compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code while the diverse clean eligible energy resource project or contract is being performed and for three years after completion of the diverse clean eligible energy resource project or contract. The bidder shall submit these records immediately upon request of the commission. When submitted to the commission, these records shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection.
(5)Paragraphs (3) and (4) do not apply if all contractors and subcontractors performing work on the diverse clean eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(A)Provisions requiring compliance with the skilled and trained workforce requirement and for enforcement of that obligation through an arbitration procedure.
(B)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a local agency.
(C)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required by Section 1777.5 of the Labor Code.
(D)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the Multi-Craft Core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(e)For purposes of this section, the following definitions apply:
(1)Construction includes means any new construction work and subsequent construction and construction maintenance work following initial completion that is contracted out to a contractor in the construction industry. industry, including construction work on a barge, construction staging area, or construction area when being used as a construction work platform and the rigging and hoisting of construction materials directly from a barge, construction staging area, or construction area into the construction process for a construction project. Construction does not include the loading and unloading of cargo to and from vessels and the movement of cargo to and from vessels at any port facility to the cargos point of rest.
(2)Project labor agreement has the same meaning as defined in Section 2500 of the Public Contract Code.
(3)Skilled and trained workforce has the same meaning as defined in Section 2601 of the Public Contract Code.
80821.(a)(1)When conducting a solicitation pursuant to Section 80820, the department shall confer with the commission and other parties, including local publicly owned electric utilities that are voluntarily participating pursuant to Section 80822 and load-serving entities, for diverse clean eligible energy resource procurement activities of an identified scope and duration. The department shall recover costs related to conducting the requested solicitations and all supporting work. Cost recovery may be effectuated, if determined to be just and reasonable by the commission before the procurement, through a nonbypassable charge approval process for load-serving entities and pursuant to Section 80822 for local publicly owned electric utilities.
(2)At the request of the department, the commission may require an electrical corporation to act as the agent of the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new diverse clean eligible energy resource procurement. The electrical corporation shall be reimbursed by the department for its reasonable costs, as determined by the commission.
(b)If the departments costs associated with the procurement of diverse clean eligible energy resources pursuant to this division, including the costs related to bonds issued pursuant to Chapter 5 (commencing with Section 80840), costs related to contracting for diverse clean eligible energy resources, and other costs to implement and administer this division, will be recovered through a commission proceeding, the commission shall review the procurement undertaken pursuant to this division and, if approved, issue an order governing the recovery of the departments costs before the consummation of the contract only if both of the following conditions are satisfied:
(1)The recovery of the departments costs, including those costs associated with the procurement process, the resulting transactions, and the associated costs, has been found to be just and reasonable and to be in the public interest.
(2)The recovery of the departments costs, including, if authorized, costs associated with the issuance of bonds and the material terms of those bonds, including, without limitation, interest rates, rating, amortization, and maturity, through charges on customers does not unreasonably increase costs to customers on a net present value basis.
(c)If the commission determines that a nonbypassable charge necessary to fund activities conducted by the department pursuant to this division is just and reasonable, the department shall ensure it has entered into an agreement with the commission for that nonbypassable charge before it begins to incur costs related to a specific activity under this division. If the purpose of the nonbypassable charge is to recover the departments revenue requirement related to bond issuance debt service, the department shall ensure the agreement has the force and effect of an irrevocable financing order adopted in accordance with Article 5.5 (commencing with Section 840) of Chapter 4 of Part 1 of Division 1 of the Public Utilities Code or that the commission has separately issued an irrevocable financing order related to the nonbypassable charge.
(d)Any agreement between the department and the commission under this section shall provide for the administration of the nonbypassable charge, including both of the following requirements:
(1)The department shall notify the commission each year of the annual collections received by the department and the amount of any excess or deficiency in collections above or below the revenue requirement. The commission shall adjust charges in the subsequent year to reflect that excess or deficiency.
(2)During any period, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund the revenue requirement established pursuant to Section 80842, the department shall notify the commission in writing and the commission shall act within 60 days of receiving that notice to increase the nonbypassable charge so that the amounts collected during that period are sufficient to meet those obligations.
(e)Any agreement between the department and the commission pursuant to this section that is solely for the purpose of imposing a nonbypassable charge to recover the departments revenue requirement related to bond issuance debt service shall include a provision stating that the commissions just and reasonable determination with respect to the revenue requirement is in effect for the duration of the bond term.
80822.(a)Pursuant to Section 80820, the department may establish a schedule and mechanism for a local publicly owned electric utility to voluntarily obtain from the department diverse clean eligible energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis.
(b)In order to voluntarily participate, a local publicly owned electric utility shall commit to the imposition of a nonbypassable charge on its ratepayers sufficient at all times to fund its participation and on terms and conditions as set forth in Section 80826.
80822.5.(a)Load-serving entities shall have a voluntary option to obtain incremental diverse clean eligible energy resources from the department beyond the amounts allocated to the load-serving entity from procurement pursuant to paragraph (1) of subdivision (a) of Section 80820, subject to the approval of the commission and a specific determination by the commission that sufficient capacity is available to accommodate the request to obtain amounts beyond those allocated to the load-serving entity.
(b)The department, in consultation with the commission, may establish a schedule for load-serving entities to provide advance notice of an intent to obtain incremental diverse clean eligible energy resources. Any load-serving entity exercising its option to voluntarily participate shall be obligated to impose a nonbypassable charge on its ratepayers sufficient to fund its allocated share of the costs of incremental diverse clean eligible energy resources for the duration of the contract, as determined by the department and approved by the commission, if applicable.
80823.At the request of the department, the commission may order an electrical corporation, or its successor in the performance of a related service, to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as agent of the department, provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department.
80824.The commission may issue rules regulating the enforcement of the agency function pursuant to Section 80823, including the collection of nonbypassable charges and payment into the fund on behalf of the department.
80825.(a)If the department has executed an agreement with the commission pursuant to subdivision (c) of Section 80821, the department may recover its costs, as a revenue requirement, in the amounts sufficient and at the times necessary to fund the revenue requirement established pursuant to Section 80842, and shall advise the commission and each voluntarily participating local publicly owned electric utility, as the department determines to be appropriate and subject to the terms of the agreement.
(b)For purposes of this division and except as otherwise provided in subdivision (a), the commissions authority as set forth in Section 451 of the Public Utilities Code shall apply.
80826.(a)A local publicly owned electric utility that voluntarily participates in the departments central procurement function pursuant to Section 80822 shall enter into an agreement with the department for the revenue requirement to fund its participation and that agreement shall have the force and effect of an irrevocable financing order.
(b)The agreement shall provide for the administration of the revenue requirement, including both of the following:
(1)A requirement that the department annually notify the local publicly owned electric utility of the annual collections received by the department with respect to the revenue requirement and the amount of any excess or deficiency in collections above or below the revenue requirement. The local publicly owned electric utility shall adjust charges in the subsequent year to reflect any such excess or deficiency.
(2)During any revenue requirement period, a requirement that, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund the revenue requirement established pursuant to Section 80842, the department notify the local publicly owned electric utility in writing and the local publicly owned electric utility shall act within 30 days of receiving that notice to increase the charge so that the amount collected during the period is sufficient to meet those obligations.
80827.All moneys collected by load-serving entities and local publicly owned electric utilities and remitted to the department for any diverse clean eligible energy resources acquired and sold pursuant to this division, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of diverse clean eligible energy resources acquired pursuant to this division, shall be deposited into the fund.
80828.The department may fix and establish the procedure and charges for the sale or other disposal of diverse clean eligible energy resources purchased by the department.
4.Diverse Clean Eligible Energy Resource Central Procurement Fund80830.(a)There is hereby established in the State Treasury the Diverse Clean Eligible Energy Resource Central Procurement Fund. Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated, without regard to fiscal year, to the department for purposes of this division.
(b)All revenues payable to the department pursuant to this division, including proceeds of bonds issued pursuant to Chapter 5 (commencing with Section 80840), shall be deposited into the fund. Notwithstanding any other law, interest accruing on the moneys in the fund shall be deposited into the fund and shall be used for purposes of this division.
(c)The fund, and the moneys in the fund, are separate and distinct from any other fund and moneys administered by the department.
(d)Payments from the fund may be made only for the following purposes:
(1)Payment of any bonds or other contractual obligations authorized by this division.
(2)The cost of energy and transmission, scheduling, and other related expenses incurred by the department.
(3)The expenses incurred by the department in administering this division, including costs of personnel, contracts, or arrangements to carry out the departments duties and responsibilities pursuant to this division.
(e)Obligations authorized pursuant to this division shall be payable solely from the fund. Neither the full faith and credit nor the taxing power of the state are, or may be, pledged for any payment under any obligation authorized by this division.
(f)While any obligations of the department incurred pursuant to this division remain outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of, or parties to, those obligations. The department may include this pledge and undertaking of the state in the departments obligations.
5.Bonds80840.(a)(1)If the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts to procure diverse clean eligible energy resources pursuant to this division, as authorized by paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, due to the timing of cost recovery processes, the department may determine that it is necessary or desirable to issue bonds to support activities for the procurement of diverse clean eligible energy resources pursuant to this division.
(2)Upon making the determination described in paragraph (1), the department may issue bonds for purposes of financing the procurement of diverse clean eligible energy resources in support of the fund and other related expenses incurred by the department pursuant to this division, and subsequent to the department having entered into an agreement with the commission regarding a revenue requirement. Bonds shall not be issued in an amount the debt service on which, to the extent payable from the fund, is estimated by the department to exceed the amounts estimated to be available in the fund for the payment of the bonds.
(b)Before the issuance of bonds in a public offering, the department shall ensure the bonds have an investment grade rating from at least one nationally recognized investment ratings firm and the document authorizing the issuance of the bonds shall provide for repayment from pledged revenues.
(c)The commission shall have an opportunity to review the trust agreement or other documents pursuant to which the bonds are issued and revenues are pledged, and shall consult with the department regarding the trust agreement or other documents regarding any relevant considerations of the commission and to ensure its consistency with the revenue requirement agreement between the department and commission.
(d)In addition to any other purposes for which bonds may be issued pursuant to this division, bonds may be issued for the following purposes:
(1)Refunding bonds to obtain a lower interest rate.
(2)Refunding bonds bearing a variable interest rate with bonds bearing interest at a fixed rate.
(3)Refunding bonds if a nationally recognized investment ratings firm reduces or withdraws, or proposes to reduce or withdraw, the rating assigned to securities that are secured by bond insurance policies, credit, or liquidity facilities issued by the provider of a bond insurance policy, or a credit or liquidity facility securing the bonds being refunded.
(4)Refunding bonds issued to preserve a federal income tax exemption or to qualify or maintain other federal income tax benefits.
80841.(a)Whenever the director determines that the issuance of bonds is necessary or desirable to accomplish the goals set forth in this division, including financing the procurement of diverse clean eligible energy resources, the director shall issue a written determination authorizing the issuance of bonds by the department. The department, in consultation with the Department of Finance, shall notify the Chairperson of the Joint Legislative Budget Committee and the chairpersons of the fiscal committees of each house of the Legislature of its written determination. The bonds shall be sold in the manner, and on the terms and conditions, specified in that determination, and the determination may contain or authorize any other provision, condition, or limitation not inconsistent with this division and those provisions as may be deemed reasonable and proper for the security of the bondholders. Bonds may mature at the time or times, and bear interest at the rate or rates, which may be fixed or variable and be determined by reference to an index or such other method, and may be federally tax exempt, as specified in the determination. Neither the person executing the determination to issue bonds nor any person executing bonds shall be personally liable therefor or be subject to any personal liability or accountability by reason of the issuance of the bonds.
(b)In the discretion of the department, bonds may be secured by a trust agreement by and between the department and a trustee, which may be any trust company or bank having trust powers within or outside the state, or the Treasurer. Notwithstanding any other law, the Treasurer shall not be deemed to have a conflict of interest by reason of acting as the trustee. The department may enter into contracts or arrangements in connection with the issuance and sale of bonds, or with respect to any outstanding bonds for so long as those bonds remain outstanding, as it shall deem to be necessary or desirable for the issuance and further security of the bonds, including, but not limited to, credit enhancement agreements, dealer agreements, purchase contracts, escrow agreements, and similar arrangements.
(c)Bonds shall be legal investments for all trust funds, the funds of all insurance companies, savings and commercial banks, trust companies, executors, administrators, trustees, and other fiduciaries, for state school funds, pension funds, and for any funds that may be invested in county, school, or municipal bonds.
(d)Notwithstanding that bonds may be payable from a special fund, the bonds shall be deemed to be negotiable instruments for all purposes.
(e)Any bonds, and the transfer of and income derived from those bonds, shall at all times be free from taxation of every kind by the state and by the political subdivisions of the state.
(f)Bonds shall not be deemed to constitute a debt or liability of the state or of any political subdivision thereof, other than the department, or a pledge of the full faith and credit of the state or of any such political subdivision, but shall be payable solely from the revenues described in paragraph (1) of subdivision (g). All bonds shall contain a statement to the following effect: Neither the faith and credit nor the taxing power of the State of California is pledged to the payment of the principal of or interest on this bond. The issuance of bonds shall not directly or indirectly or contingently obligate the state or any political subdivision thereof to levy or to pledge any form of taxation whatever therefor or to make any appropriation for their payment.
(g)(1)The department may pledge and apply all or any part of revenues of any nature whatever accruing to the department, from orders issued, charges imposed, or contracts entered into pursuant to or in furtherance of this division, or the right to receive the same, to the payment or security of any or all of the principal of the bonds or the interest thereon, in the manner and upon terms that the department deems advisable.
(2)(A)It is the intent of the Legislature that any pledge of moneys, revenues, or property made by the department shall be valid and binding from the time when the pledge is made if the commission finds the pledge was just and reasonable, and that the moneys, revenues, or property so pledged and thereafter collected from retail end-use customers, or paid directly or indirectly to or for the account of the department, is hereby made, and shall immediately be, subject to the lien of that pledge without any physical delivery thereof or further act.
(B)It is the intent of the Legislature that the lien of any such pledge shall be valid and binding against all parties having claims of any kind in tort, contract, or otherwise against the department irrespective of whether those parties have notice thereof, and that no resolution or instrument by which the pledge or lien created pursuant to this subdivision is expressed, confirmed, or approved need be filed or recorded in order to perfect the pledge or lien.
(C)It is the intent of the Legislature that this paragraph, in all respects, govern the creation, perfection, priority, and enforcement of any lien created pursuant to this division.
80842.(a)The department shall, and in any obligation entered into pursuant to this division may covenant to, at least annually, and more frequently as required, establish and revise revenue requirements sufficient, together with any moneys deposited into the fund, to provide all of the following:
(1)The amounts necessary to pay the principal of, and premium, if any, and interest on, all bonds as and when the same shall become due.
(2)The amounts necessary to pay for electricity purchased by it and to deliver it to purchasers, including the cost of electricity, transmission, scheduling, and other related expenses incurred by the department, or to make payments under any other contracts, agreements, or obligations entered into by it pursuant to this division, in the amounts and at the times the same shall become due.
(3)Reserves in amount as may be determined by the department from time to time to be necessary or desirable.
(4)The pooled money investment rate on funds advanced for electricity purchases before the receipt of payment for those purchases by the purchasing entity.
(5)The administrative costs of the department and other state agencies, including the costs and fees for professional services, bond issuance and sale, and other miscellaneous costs, incurred in connection with the issuance of bonds or the administration of this division.
(b)The department shall notify the commission of its revenue requirement pursuant to the agreement required pursuant to Section 80821 and that revenue requirement shall be satisfied by the recovery of its costs through a nonbypassable charge.
6.Termination of Authority to Contract80850.(a)On or after January 1, 2035, the department shall not contract under this division for the purchase of electrical power.
(b)This section does not affect the authority of the department to administer contracts entered into before that date or any of the departments outstanding bond obligations.
SEC. 16.(a)Upon appropriation of the Legislature, the sum of no less than six million dollars ($6,000,000) from the General Fund shall be available for the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
(b)Upon appropriation by the Legislature, additional moneys from the General Fund shall be made available for the 202425 fiscal year and subsequent fiscal years to support the California Coastal Commissions coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
(b)(c)It is the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of the assessment referenced in Section 1 of Chapter 51 of the Statutes of 2023.
SEC. 17.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 18.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
To ensure the procurement of diverse clean eligible energy resources that the state needs to meet its reliability needs, which have been identified as being delayed or needing a secure development path, it is necessary to establish a central procurement entity within the Department of Water Resources and for this act to take effect immediately.
Sections 10295 and 10297 do not apply to any contract entered into by the Department of Water Resources under Part 3 (commencing with Section 11100) of Division 6, Chapter 8 (commencing with Section 12930) of Part 6 of Division 6, Division 29 (commencing with Section 80700), or Division 29.5 (commencing with Section 80800), of the Water Code for the acquisition, sale, or transmission of power, or for services to facilitate those activities.
SEC. 2.Section 25302.6 is added to the Public Resources Code, to read:25302.6.As part of the 2025 edition of the integrated energy policy report, the commission, in consultation with the Public Utilities Commission, shall assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes, as appropriate.
SEC. 3.Section 25795 of the Public Resources Code is amended to read:25795.(a)Beginning on January 31, 2023, and on May 1, August 1, and December 1 annually thereafter, the department commission, shall issue a written report to the Joint Legislative Budget Committee detailing the actions undertaken by the department commission in the period since the previous report pursuant to this chapter through that date, including, but not limited to, all of the following:
(a)(1)Amount of funds expended.
(b)(2)Purpose of funds expended.
(c)(3)Status of actions funded.
(d)(4)For new and expanded resources, the amount by megawatt, resource type, operational date, and expected lifetime of that capacity.
(e)(5)The frequency at which resources funded by the department Department of Water Resources or the commission have been used and the extent to which they complied with the requirements of this chapter.
(f)(6)In consultation with the state board, an estimate or the best available information on the emissions of greenhouse gases, criteria air pollutants, and toxic air contaminants emitted by the resources funded by the department Department of Water Resources or the commission over the period since the previous report.
(g)(7)Summary of contracts, grants, and loans issued pursuant to this chapter.
(b)Each report submitted pursuant to this section shall be submitted to the Joint Legislative Budget Committee at the same time and in the same manner as reports submitted pursuant to Section 80730 of the Water Code.
SEC. 4.Section 25992.10 of the Public Resources Code is amended to read:25992.10.(a)(1)The Voluntary Offshore Wind and Coastal Resources Protection Program is hereby established to be administered by the commission for the purpose of supporting state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities, including federal laws providing for offshore wind lease conditions of the bureau. The program shall award moneys to public and private entities, including, but not limited to, state agencies, tribal entities, local governmental agencies, research institutions, and nonprofit entities, through various mechanisms, including, but not limited to, grants.
(2)Moneys from the fund and account shall be available for allocation by the commission for purposes of this chapter.
(b)The commission may allocate moneys for any of the following:
(1)Increasing the ability of state agencies to engage in postlease assessments and studies of impacts, including surveys and plans, and ongoing review of project compliance and monitoring, including administrative costs.
(2)Research facilitation and coordination, including, but not limited to, funding to support state agencies to work collaboratively with the bureau and other federal, state, and tribal entities to ensure that lessees construction and operations plans incorporate strategies and specific plans for comprehensive monitoring and adaptive management, and to ensure that the strategies and plans are implemented appropriately, including funding to contract with technical experts to be retained by state agencies to consult and collaborate on strategies and specific plans for comprehensive monitoring and adaptive management.
(3)(A)Contracts with technical experts to assist the bureau and the state in their review of survey and sampling and analysis plans, survey data and analysis, construction and operation plans, and other planning, project development, and project implementation activities and documents.
(B)The purpose of the technical experts is to review current research on survey methodologies, monitoring approaches and technologies, adaptive management strategies, and other relevant topics for floating offshore wind and wind, to provide the bureau and the state with recommendations, suggested guidelines, and best practices, and to fulfill additional research needs, during all phases of floating offshore wind development and implementation with the overall goal of avoiding and minimizing impacts to coastal resources.
(4)Environmental impacts monitoring including, but not limited to, any of the following:
(A)Collecting, analyzing, and reporting baseline and postdevelopment environmental data to assess large-scale changes and cumulative impacts to marine species, habitats, and uses from floating offshore wind development and related activities with a goal of enabling the bureau and the state to accurately assess, mitigate, and adaptively manage those impacts.
(B)Data collection at a regional scale that integrates data with information and data provided by lessees or the bureau and other relevant data to provide a comprehensive understanding of how floating offshore wind development is affecting the marine environment and coastal uses.
(5)Infrastructure readiness commitments, including, but not limited to, activities associated with the bureaus lease requirements for lessees to support infrastructure readiness, such as ports, waterfront facilities, and transmission for floating offshore wind generation facilities.
(6)Workforce development grants consistent with subdivisions (r) to (t), inclusive, of Section 14005 of the Unemployment Insurance Code and in consultation with the California Workforce Development Board.
(c)Moneys in the fund and the account shall not be allocated by the commission to another state or local agency for that agencys costs that are otherwise recoverable from project proponents in administering a regulatory or entitlement program.
SEC. 2.SEC. 5.Section 365.1 of the Public Utilities Code is amended to read:365.1.(a)Except as expressly authorized by this section, and subject to the limitations in subdivisions (b) and (c), the right of retail end-use customers pursuant to this chapter to acquire service from other providers is suspended until the Legislature, by statute, lifts the suspension or otherwise authorizes direct transactions. For purposes of this section, other provider means any person, corporation, or other entity that is authorized to provide electric service within the service territory of an electrical corporation pursuant to this chapter, and includes an aggregator, broker, or marketer, as defined in Section 331, and an electric service provider, as defined in Section 218.3. Other provider does not include a community choice aggregator, as defined in Section 331.1, and the limitations in this section do not apply to the sale of electricity by other providers to a community choice aggregator for resale to community choice aggregation electricity consumers pursuant to Section 366.2.
(b)The commission shall authorize individual retail nonresidential end-use customers to acquire electric service from other providers in each electrical corporations distribution service territory, up to a maximum allowable total kilowatthours annual limit. The maximum allowable annual limit shall be established by the commission for each electrical corporation at the maximum total kilowatthours supplied by all other providers to distribution customers of that electrical corporation during any sequential 12-month period between April 1, 1998, and October 11, 2009. Within six months of October 11, 2009, the commission shall adopt and implement a reopening schedule that commences immediately and will phase in the allowable amount of increased kilowatthours over a period of not less than three years, and not more than five years, raising the allowable limit of kilowatthours supplied by other providers in each electrical corporations distribution service territory from the number of kilowatthours provided by other providers as of October 11, 2009, to the maximum allowable annual limit for that electrical corporations distribution service territory. The commission shall review and, if appropriate, modify its currently effective rules governing direct transactions, but that review shall not delay the start of the phase-in schedule.
(c)Once the commission has authorized additional direct transactions pursuant to subdivision (b), it shall do both of the following:
(1)Ensure that other providers are subject to the same requirements that apply to the states three largest electrical corporations under any programs or rules adopted by the commission to implement the resource adequacy provisions of Section 380, the renewables portfolio standard provisions of Article 16 (commencing with Section 399.11), the requirements for the electricity sector adopted by the State Air Resources Board pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code), and the requirements of the integrated resource planning process as specified in Sections 454.52 to 454.54, inclusive. This requirement applies notwithstanding any prior decision of the commission to the contrary.
(2)(A)Ensure that, in the event that the commission authorizes, in the situation of a contract with a third party, or orders, in the situation of utility-owned generation, an electrical corporation to obtain generation resources that the commission determines are needed to meet system or local area reliability needs for the benefit of all customers in the electrical corporations distribution service territory, the net capacity costs of those generation resources are allocated on a fully nonbypassable basis consistent with departing load provisions as determined by the commission, to all of the following:
(i)Bundled service customers of the electrical corporation.
(ii)Customers that purchase electricity through a direct transaction with other providers.
(iii)Customers of community choice aggregators.
(B)If the commission authorizes or orders an electrical corporation to obtain generation resources pursuant to subparagraph (A), the commission shall ensure that those resources meet a system or local reliability need in a manner that benefits all customers of the electrical corporation. The commission shall allocate the costs of those generation resources to ratepayers in a manner that is fair and equitable to all customers, whether they receive electric service from the electrical corporation, a community choice aggregator, or an electric service provider.
(C)The resource adequacy benefits of generation resources acquired by an electrical corporation pursuant to subparagraph (A) shall be allocated to all customers who pay their net capacity costs. Net capacity costs shall be determined by subtracting the energy and ancillary services value of the resource from the total costs paid by the electrical corporation pursuant to a contract with a third party or the annual revenue requirement for the resource if the electrical corporation directly owns the resource. An energy auction shall not be required as a condition for applying this allocation, but may be allowed as a means to establish the energy and ancillary services value of the resource for purposes of determining the net costs of capacity to be recovered from customers pursuant to this paragraph, and the allocation of the net capacity costs of contracts with third parties shall be allowed for the terms of those contracts.
(D)It is the intent of the Legislature, in enacting this paragraph, to provide additional guidance to the commission with respect to the implementation of subdivision (g) of Section 380, and to ensure that the customers to whom the net costs and benefits of capacity are allocated are not required to pay for the cost of electricity they do not consume.
(d)(1)If the commission approves a centralized resource adequacy mechanism pursuant to subdivisions (h) and (i) of Section 380, upon the implementation of the centralized resource adequacy mechanism the requirements of paragraph (2) of subdivision (c) shall be suspended. If the commission later orders that electrical corporations cease procuring capacity through a centralized resource adequacy mechanism, the requirements of paragraph (2) of subdivision (c) shall again apply.
(2)If the use of a centralized resource adequacy mechanism is authorized by the commission and has been implemented as set forth in paragraph (1), the net capacity costs of generation resources that the commission determines are required to meet urgent system or urgent local grid reliability needs, and that the commission authorizes to be procured outside of the Section 380 or Section 454.5 processes, shall be recovered according to the provisions of paragraph (2) of subdivision (c).
(3)This subdivision does not supplant the resource adequacy requirements of Section 380 or the resource procurement procedures established in Section 454.5.
(e)On or before June 1, 2019, the commission shall issue an order regarding direct transactions that provides as follows:
(1)Increase the maximum allowable total kilowatthours annual limit by 4,000 gigawatthours and apportion that increase among the service territories of the electrical corporations.
(2)All residential and nonresidential customer accounts that are on direct access as of January 1, 2019, remain authorized to participate in direct transactions.
SEC. 3.SEC. 6.Section 380 of the Public Utilities Code is amended to read:380.(a)The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities.
(b)In establishing resource adequacy requirements, the commission shall ensure the reliability of electrical service in California while advancing, to the extent possible, the states goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. The resource adequacy program shall achieve all of the following objectives:
(1)Facilitate development of new generating, nongenerating, and hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economical and needed for reliability and to achieve the state policy specified in Section 454.53.
(2)Establish new, or maintain existing, demand response products and tariffs that facilitate the economical dispatch and use of demand response that can either meet or reduce an electrical corporations resource adequacy requirements, as determined by the commission.
(3)Equitably allocate the cost of generating capacity and demand response in a manner that prevents the shifting of costs between customer classes.
(4)Minimize enforcement requirements and costs.
(5)Maximize the ability of community choice aggregators to determine the generation resources used to serve their customers.
(c)Each load-serving entity shall maintain physical generating capacity and electrical demand response adequate to meet its load requirements, including, but not limited to, peak demand and planning and operating reserves. The generating capacity or electrical demand response shall be deliverable to locations and at times as may be necessary to maintain electrical service system reliability, local area reliability, and flexibility.
(d)Each load-serving entity shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the board of directors of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(e)The commission shall implement and enforce the resource adequacy requirements established in accordance with this section in a nondiscriminatory manner. Each load-serving entity shall be subject to the same requirements for resource adequacy, the renewables portfolio standard program, and the integrated resource planning process pursuant to Section 454.52 that apply to electrical corporations pursuant to this section, or are otherwise required by law, law or by order or decision of the commission. The commission shall exercise its enforcement powers to ensure compliance by all load-serving entities.
(f)(1)The commission shall require sufficient information, including, but not limited to, anticipated load, actual load, and measures undertaken by a load-serving entity to ensure resource adequacy, to be reported to enable the commission to determine compliance with the resource adequacy requirements established by the commission.
(2)The commission shall calculate and publish annually on its internet website, in a new report or as part of another report, the percentage of each load-serving entitys local and system resource adequacy requirements from the previous calendar year that was met with capacity from eligible renewable energy resources pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11)), other zero-carbon resources, including large hydroelectric and nuclear resources, or energy storage resources. In determining the percentage of each load-serving entitys resource adequacy requirements, the commission shall include all directly owned or contracted resources and each load-serving entitys allocation of any centrally procured resources or allocation of resources pursuant to any other mechanism that involves an assignment or allocation of resources purchased or owned by a single buyer, and shall exclude any share of a load-serving entitys resources that were allocated to another load-serving entity.
(g)An electrical corporations costs of meeting or reducing resource adequacy requirements, including, but not limited to, the costs associated with system reliability, local area reliability, or flexible resource adequacy, renewable integration, or resource diversity portfolio requirements, that are determined to be reasonable by the commission, or are otherwise recoverable under a procurement plan approved by the commission pursuant to Section 454.5, shall be fully recoverable from those customers on whose behalf the costs are incurred, as determined by the commission, at the time the commitment to incur the cost is made, on a fully nonbypassable basis, as determined by the commission. The commission shall exclude any amounts authorized to be recovered pursuant to Section 366.2 when authorizing the amount of costs to be recovered from customers of a community choice aggregator or from customers that purchase electricity through a direct transaction pursuant to this subdivision.
(h)The commission shall determine and authorize the most efficient and equitable means for achieving all of the following:
(1)Meeting the objectives of this section.
(2)Ensuring that investment is made in new generating capacity, including the capacity needed to achieve the state policy specified in Section 454.53. capacity.
(3)Ensuring that existing generating capacity that is economic is retained, including the capacity needed to maintain reliability while achieving the state policy specified in Section 454.53. economical is retained.
(4)Ensuring that the cost of generating capacity and demand response is allocated equitably.
(5)Ensuring that community choice aggregators can determine the generation resources used to serve their customers.
(6)Ensuring that investments are made in new and existing demand response resources that are cost effective and help to achieve electrical grid reliability and the states goals for reducing emissions of greenhouse gases.
(7)Minimizing the need for backstop procurement by the Independent System Operator.
(i)In making the determination pursuant to subdivision (h), the commission may consider a centralized resource adequacy mechanism among other options.
(j)The commission shall ensure appropriate valuation of both supply and load modifying demand response resources. The commission, in an existing or new proceeding, shall establish a mechanism to value load modifying demand response resources, including, but not limited to, the ability of demand response resources to help meet distribution needs and transmission system needs and to help reduce a load-serving entitys resource adequacy obligation pursuant to this section. In determining this value, the commission shall consider how these resources further the states electrical grid reliability and the states goals for reducing emissions of greenhouse gases. The commission, Energy Commission, and Independent System Operator shall jointly ensure that changes in demand caused by load modifying demand response are expeditiously and comprehensively reflected in the Energy Commissions Integrated Energy Policy Report forecast and in planning proceedings and associated analyses, and shall encourage reflection of these changes in demand in the operation of the grid.
(k)For purposes of this section, load-serving entity means an electrical corporation, electric service provider, or community choice aggregator. Load-serving entity does not include any of the following:
(1)A local publicly owned electric utility.
(2)The State Water Resources Development System commonly known as the State Water Project.
(3)Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, if the customer generation, or the load it serves, meets one of the following criteria:
(A)It takes standby service from the electrical corporation on a commission-approved rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(B)It is not physically interconnected to the electrical transmission or distribution grid, so that, if the customer generation fails, backup electricity is not supplied from the electrical grid.
(C)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
SEC. 4.SEC. 7.Section 454.51 of the Public Utilities Code is amended to read:454.51.The commission shall do all of the following:
(a)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy and resource diversity in a cost-effective manner. The portfolio shall be used by the commission to establish integrated resource planning-based procurement requirements that rely on zero carbon-emitting zero-carbon-emitting resources to the maximum extent reasonable and be designed to achieve the state policy specified in Section 454.53 and any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources or clean energy resources, as defined in Section 454.52, diverse resources, procured by an electrical corporation, or the Department of Water Resources, corporation to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need identified in subdivision (a) or (d), as applicable, shall be borne by the load-serving entity, as defined in Section 380, that failed to perform.
SEC. 5.SEC. 8.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability on a near-term, mid-term, and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.
(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H)Enhance distribution systems and demand-side energy management.
(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(J)Maintain a diverse portfolio of energy resources, which may include diverse clean energy resources procured by the Department of Water Resources.
(2)(A)The commission may authorize all source procurement for load-serving entities that includes various resource types including demand-side resources, supply side supply-side resources, and resources that may be either demand-side resources or supply side supply-side resources, taking into account the differing load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(4)(A)On or before September 1, 2024, and biennially thereafter, the commission consistent with the process and schedule adopted pursuant to paragraph (1), the commission, in consultation with the Energy Commission and the Independent System Operator, shall determine if there is a need for the procurement of additional diverse clean energy resources based on a review of the integrated resource plans submitted by load-serving entities in compliance with the requirements of this section and Section 454.53 and the progress towards meeting the portfolio of resources identified in pursuant to subdivision (a) of Section 454.51.
(B)If the commission determines that there is a need for the procurement of additional diverse clean energy resources, the commission shall specify the diverse clean energy resources that should be procured to meet that need.
(C)Within six months of determining that there is a need for the procurement of additional diverse clean energy resources, the commission may request the Department of Water Resources to exercise its central procurement function to procure those diverse clean energy resources specified pursuant to subparagraph (B) that meet the portfolio of resources identified in subdivision (a) of Section 454.51.
(D)The Department of Water Resources may procure clean energy resources pursuant to subparagraph (C) only until January 1, 2030.(5)If the commission requests the Department of Water Resources to procure clean energy resources pursuant to paragraph (4), the commission, in consultation with the Department of Water Resources, shall develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the Department of Water Resources and align with Division 29.5 (commencing with Section 80800) of the Water Code. The commission and the Department of Water Resources shall ensure that a procurement group is established to advise on the procurement undertaken pursuant to paragraph (4). The commission shall review that procurement and, if approved, issue an order governing the recovery of the Department of Water Resources costs only if both of the following conditions are satisfied:(A)The recovery of costs to satisfy the revenue requirement of the Department of Water Resources has been found by the commission in a public proceeding to be just and reasonable and is in the public interest.(B)The recovery of costs through charges on customers, including, if authorized, the issuance of bonds and the material terms of those bonds, including interest rates, rating, amortization, and maturity, does not unreasonably increase costs to customers on a net present value basis compared with the procurement of clean energy resources by an electrical corporation pursuant to paragraph (4).(6)Pursuant to Section 80840 of the Water Code, the department may issue bonds for purposes of this subdivision.(D)(i)Upon receiving a request pursuant to subparagraph (C), the Department of Water Resources, before January 1, 2035, may exercise its central procurement function to conduct one or more competitive solicitations and enter into contracts to procure diverse clean energy resources in order to achieve the policy of the state specified in Section 454.53.
(ii)Any contract entered into by the Department of Water Resources pursuant to clause (i) and approved by the commission pursuant to Section 80821 of the Water Code before January 1, 2035, shall remain in force for the duration of the contract.
(E)The Department of Water Resources exercising of its central procurement function to procure diverse clean energy resources pursuant to this paragraph shall be conducted in accordance with Division 29.5 (commencing with Section 80800) of the Water Code.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.
(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.
(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.
(h)For purposes of this section, both of the following definitions apply:
(1)Clean energy resources means offshore wind and geothermal energy resources.(1)(A)Diverse clean energy resource means a new resource that is procured by the Department of Water Resources that meets all of the following requirements:
(i)The resource directly supports attainment of the goals specified in Section 454.53 without increasing the states dependence on any fossil fuel-based resources.
(ii)The resource is determined by the commission to not be under contract at sufficient levels as shown in load-serving entities most recent individual integrated resource plans submitted to and reviewed by the commission pursuant to this section to achieve the goals specified in Section 454.53.
(iii)The resource has a construction and development lead time of at least five years.
(iv)The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
(v)The resource does not use combustion to generate electricity, unless that combustion use is ancillary and necessary to facilitate geothermal electricity generation.
(B)A pump hydroelectric facility may only qualify as a diverse clean energy resource if it does not exceed 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.
(2)Load-serving entity has the same meaning as defined in Section 380.
SEC. 9.Section 913.21 is added to the Public Utilities Code, to read:913.21.Notwithstanding Section 10231.5 of the Government Code, the commission shall annually submit a report to the Governor and the Legislature on the types, amounts, and costs to ratepayers of diverse clean energy resources procured pursuant to Section 454.52.
SEC. 10.Section 1001.1 is added to the Public Utilities Code, to read:1001.1.In a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, the commission shall establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if all of the following are satisfied:
(a)The Independent System Operator governing board has made explicit findings regarding the need for the proposed transmission project and has determined that the proposed project is the most cost-effective transmission solution.
(b)The Independent System Operator is a party to the proceeding.
(c)The Independent System Operator governing board-approved need evaluation is submitted to the commission within sufficient time to be included within the scope of the proceeding.
(d)There has been no substantial change to the scope, estimated cost, or timeline of the proposed transmission project as approved by the Independent System Operator governing board.
SEC. 6.SEC. 11.Section 9620 of the Public Utilities Code is amended to read:9620.(a)Each local publicly owned electric utility serving end-use customers shall prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers. Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, shall not be subject to these requirements if the customer generation, or the load it serves, meets one of the following criteria:
(1)It takes standby service from the local publicly owned electric utility on a rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(2)It is not physically interconnected to the electric transmission or distribution grid, so that, if the customer generation fails, backup power is not supplied from the electricity grid.
(3)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
(b)Each local publicly owned electric utility serving end-use customers shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the Board of Trustees of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(c)Each local publicly owned electric utility shall prudently plan for and procure energy storage systems that are adequate to meet the requirements of Section 2836.
(d)A local publicly owned electric utility serving end-use customers shall, upon request, provide the Energy Commission with any information the Energy Commission determines is necessary to evaluate the progress made by the local publicly owned electric utility in meeting the requirements of this section, consistent with the annual targets established pursuant to subdivision (c) of Section 25310 of the Public Resources Code.
(e)The Energy Commission shall report to the Legislature, to be included in each integrated energy policy report prepared pursuant to Section 25302 of the Public Resources Code, regarding the progress made by each local publicly owned electric utility serving end-use customers in meeting the requirements of this section.
(f)A local publicly owned electric utility may meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources if that aggregation or pooling is defined in a contractual arrangement and each participating local publicly owned electric utility meets its individual minimum planning reserve margin based on its share of the resource portfolio pool.
SEC. 7.Section 80700.5 is added to the Water Code, to read:80700.5.This division shall be known, and may be cited, as the Electricity Supply Strategic Reliability Reserve Program.SEC. 8.SEC. 12.Section 80713 is added to the Water Code, to read:80713.(a)(1)On and before June 30, 2027, if the Department of Water Resources determines that resources have been it procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being were used in a given month to meet an a load-serving entitys identified reliability need, the Public Utilities Commission shall annually assess a capacity payment on each load-serving entity that during that same month fails to meet its system resource adequacy requirements pursuant to Section 380 of the Public Utilities Code. The capacity payment is not a penalty and does not prohibit the Public Utilities Commission from assessing a penalty on a load-serving entity for a failure to comply with any resource adequacy requirement.
(2)If a load-serving entity fails to comply with its system resource adequacy requirements pursuant to Section 380 in a month when resources procured by the Department of Water Resources through the Electricity Supply Strategic Reliability Reserve Program are used to meet the load-serving entitys identified reliability need and a penalty is assessed by the commission on the load-serving entity for that failure, then, on and before June 30, 2027, both of the following requirements shall apply:
(A)If the penalty is less than the capacity payment, the capacity payment shall be reduced by the amount of the penalty and the penalty shall be deposited into the Department of Water Resources Electricity Supply Reliability Reserve Fund. Load-Serving Entity Capacity Payment Account.
(B)If the penalty is more than the capacity payment, then an amount of the penalty equal to the otherwise applicable capacity payment shall be deposited into the Department of Water Resources Electricity Supply Reliability Reserve Fund. Load-Serving Entity Capacity Payment Account.
(3)The annual capacity payment shall be remitted to the Department of Water Resources Electricity Supply Reliability Reserve Fund Load-Serving Entity Capacity Payment Account by a load-serving entity that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the commission notifying the load-serving entity.
(b)The Public Utilities Commission, in consultation with the commission, shall determine a capacity payment calculation methodology for load-serving entities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund relative to the amount the load-serving entity was deficient in its system resource adequacy requirements on a proportional basis. Any calculation or modification to the calculation made by the Public Utilities Commission shall align with any calculation or modification to the calculation made by the commission pursuant to subdivision (b) of Section 80714.(b)The Public Utilities Commission, in consultation with the commission, shall determine a capacity payment unit cost in kilowatt per month for load-serving entities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, including the Load-Serving Entity Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the load-serving entity was deficient in its system resource adequacy requirements during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used, based on the resource adequacy program rules, requirements, and resource counting conventions in place at the time of the deficiency, after crediting the deficient load-serving entity with its share of any reliability resources procured by other entities on its behalf. The Public Utilities Commission may make any further adjustments to the capacity values of any nonperforming resources included in a load-serving entitys portfolio when determining the amount of this deficiency. Any adjustments made by the Public Utilities Commission shall align with any adjustments made by the commission as authorized by subdivision (b) of Section 80714.
(c)This section shall become operative on January 31, 2024.
SEC. 9.SEC. 13.Section 80714 is added to the Water Code, to read:80714.(a)(1)Upon the submission of the report pursuant to subdivision (d) and on and before June 30, 2027, if the Department of Water Resources determines that resources have been it procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being were used in a given month to meet an identified reliability need, the executive director of the commission shall annually assess a capacity payment on each local publicly owned electric utility in the Independent System Operator balancing area that during that same month fails to meet its minimum planning reserve margin.
(2)The annual capacity payment shall be remitted to the Department of Water Resources Electricity Supply Reliability Reserve Fund Local Publicly Owned Electric Utility Capacity Payment Account by a local publicly owned electric utility that was assessed a capacity payment pursuant to paragraph (1) within 30 days of the executive director notifying the local publicly owned electric utility.
(b)Upon the submission of the report pursuant to subdivision (d), the commission, in consultation with the Public Utilities Commission, shall determine a capacity payment calculation methodology unit cost in kilowatt per month for local publicly owned electric utilities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund relative to the amount the local publicly owned electric utility was deficient in its minimum planning reserve margin on a proportional basis. Any calculation or modification to the calculation made by the commission shall align with any calculation or modification to the calculation made by the Public Utilities Commission pursuant to Fund, including the Local Publicly Owned Electric Utility Capacity Payment Account, with the total costs weighted two-thirds for June through September and one-third for the remaining eight months, and this unit cost shall be multiplied by the amount of kilowatts that the local publicly owned electric utility was deficient in its minimum planning reserve margin during the same month the Electricity Supply Strategic Reliability Reserve Program resources were used using the same resource counting conventions applied by the Public Utilities Commission pursuant to subdivision (b) of Section 80713, after crediting the deficient local publicly owned electric utilities with their share of any reliability resources procured by other entities on their behalf. The commission may make any further adjustments to the capacity values of any nonperforming resources included in a local publicly owned electric utilitys portfolio when determining the amount of this deficiency. Any adjustments made by the commission shall align with any adjustments made by the Public Utilities Commission as authorized by subdivision (b) of Section 80713.
(c)Upon the submission of the report pursuant to subdivision (d), the commission may adopt regulations to implement this section.
(d)On or before January 31, 2024, the commission, in consultation with the Public Utilities Commission, shall submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin for 2023 and the system resource adequacy requirements from June 1, 2023, to September 30, 2023, inclusive, that the Public Utilities Commission established for load-serving entities pursuant to Section 380 of the Public Utilities Code and adopted in Public Utilities Commission decision Decision 22-06-050 (June 23, 2022) Decision Adopting Local Capacity Obligations for 2023-2025, 20232025, Flexible Capacity Obligations for 2023, and Reform Track Framework.
(e)For purposes of this section, minimum planning reserve margin means a local publicly owned electric utilitys planning reserve margin, as described in Section 9620 of the Public Utilities Code, unless the local publicly owned electric utility revises that planning reserve margin based on recommendations from the commission pursuant to subdivision (b) of Section 25704.5 of the Public Resources Code, in which case minimum planning reserve margin means the local publicly owned electric utilitys revised minimum planning reserve margin.
SEC. 10.Section 80720 of the Water Code is amended to read:80720.(a)There is hereby established in the State Treasury the Department of Water Resources Electricity Supply Reliability Reserve Fund.(b)Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated to the department, without regard to fiscal years, and shall be available for the purposes of Chapter 2 (commencing with Section 80710).(c)Obligations authorized and expenses incurred by the department in administering this division shall be payable solely from the fund.(d)All revenues payable to the department for activities undertaken by the department under Chapter 2 (commencing with Section 80710) or Chapter 5 (commencing with Section 80740) shall be deposited into the fund.(e)The fund shall be separate and distinct from any other fund and moneys administered by the department and any interest earned on the moneys in the fund shall be used solely for purposes of this division.(f)When fixed assets procured under the authority of this division are sold or otherwise disposed of, the revenue from the sale or disposition, including any gain or loss, measured by the difference between book value and selling price, shall be deposited into the fund and available to the department for purposes of Chapter 2 (commencing with Section 80710). Any remaining revenue from the sale or other disposition of fixed assets procured under the authority of this division shall be returned to the General Fund once all obligations of the department are satisfied after the wind down of this division and the closure of the fund. While any obligation of the department incurred under this division remains outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of or parties to those obligations.SEC. 14.Section 80720 of the Water Code is amended to read:80720.(a)There is hereby established in the State Treasury the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(b)Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated to the department, without regard to fiscal years, and shall be available for the purposes of Chapter 2 (commencing with Section 80710).
(c)Obligations authorized and expenses incurred by the department in administering this division shall be payable solely from the fund.
(d)All Except as specified in subdivisions (h) and (i), all revenues payable to the department for activities undertaken by the department under Chapter 2 (commencing with Section 80710) or Chapter 5 (commencing with Section 80740) shall be deposited into the fund.
(e)The fund shall be separate and distinct from any other fund and moneys administered by the department and any interest earned on the moneys in the fund shall be used solely for purposes of this division.
(f)When fixed assets procured under the authority of this division are sold or otherwise disposed of, the revenue from the sale or disposition, including any gain or loss, measured by the difference between book value and selling price, shall be deposited into the fund and available to the department for purposes of Chapter 2 (commencing with Section 80710). Any remaining revenue from the sale or other disposition of fixed assets procured under the authority of this division shall be returned to the General Fund once all obligations of the department are satisfied after the wind down of this division and the closure of the fund. While any obligation of the department incurred under this division remains outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of or parties to those obligations.
(g)(1)For activities undertaken by the department pursuant to Chapter 2 (commencing with Section 80710), the department may obtain applicable credits pursuant to the federal Inflation Reduction Act of 2022 (Public Law 117-169). If the department elects for direct payment of those applicable credits, those payments shall be deposited directly into the fund.
(2)Within 10 days of any payments being deposited into the fund, described in paragraph (1), the department shall provide written notice to the Joint Legislative Budget Committee, who shall provide a copy of the notice to the relevant policy committees. The notice shall include the source, purpose, timeliness, and other relevant information as determined by the department.
(3)Use of the payments shall be consistent with all of the following:
(A)The payments shall be expended for a purpose that is consistent with state law.
(B)Acceptance of the payments does not impose on the state any requirement to commit or expend new state funds for any program or purpose.
(C)The need exists to expend the payments during the 202324 fiscal year.
(D)The use of the payments shall be consistent with the priorities described in subdivision (a) of Section 38590.1 of the Health and Safety Code.
(h)(1)The Load-Serving Entity Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Load-Serving Entity Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80713 shall be deposited into the Load-Serving Entity Capacity Payment Account.
(i)(1)The Local Publicly Owned Electric Utility Capacity Payment Account is hereby established in the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)Upon appropriation by the Legislature, moneys in the Local Publicly Owned Electric Utility Capacity Payment Account shall be available for purposes of Chapter 2 (commencing with Section 80710).
(3)All revenues payable to the department pursuant to Section 80714 shall be deposited into the Local Publicly Owned Electric Utility Capacity Payment Account.
SEC. 11.Chapter 5 (commencing with Section 80740) is added to Division 29 of the Water Code, to read:5.Collection and Use of Capacity Payment 80740.The department shall collect any capacity payment assessed pursuant to Section 80713 or 80714. Payments received shall be deposited into the Department of Water Resources Electricity Supply Reliability Reserve Fund established pursuant to Section 80720 and shall be used solely for purposes of this division.SEC. 12.SEC. 15.Division 29.5 (commencing with Section 80800) is added to the Water Code, to read:29.5.DIVERSE CLEAN ENERGY CENTRAL PROCUREMENT1.General Provisions80800.This division does not reduce or modify an electrical corporations obligation to serve.
80801.The commission shall issue orders it determines are necessary to carry out this division.
80802.(a)The Legislature finds and declares all of the following:
(1)California has significantly reduced the emissions of greenhouse gases from its electricity sector by fostering the development of renewable and zero-carbon energy resources through the establishment of ambitious goals and policies. These efforts have fundamentally transformed the states portfolio of energy resources and the day-to-day operations of the states electrical system.
(2)The state has enabled the expansion of electrical retail choice for customers served in electrical corporation service territory, bringing new market entrants and innovation to Californias evolving retail electricity market.
(3)The states electrical system also faces the risk of increased disruption due to more frequent and intense extreme weather events fueled by a rapidly changing climate.
(4)For California to achieve its long-term greenhouse gas emission reduction goals, while maintaining a reliable electrical system and providing customers with greater choice in electricity retail providers, the state must establish a new, limited central procurement function within the department that enables the development of a more diverse portfolio of renewable and zero-carbon energy resources.
(b)In enacting this division, it is the intent of the Legislature to do all of the following:
(1)Create a central procurement function within the department that would only be exercised upon request by the commission and only if the commission finds that it is necessary to procure clean energy resources beyond those procured by load-serving entities to achieve the state policy specified in Section 454.53 of the Public Utilities Code. if, pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission determines that there is a need for the procurement of additional diverse clean energy resources and requests the department to procure those resources and, in response to that request, the department elects to exercise that central procurement function to procure those resources pursuant to this division.
(2)If the department exercises its that central procurement function, as described in paragraph (1), provide an opportunity for load-serving entities and local publicly owned electric utilities to elect for the department to procure diverse clean energy resources on their behalf. behalf pursuant to Section 80822.
(3) Except as provided in paragraph (4), require the department to sell, at market value, clean energy resources and all attributes produced by a clean energy resource and not otherwise procured by a load-serving entity or local publicly owned electric utility, as described in paragraph (2), and to use the resulting revenues to offset costs for purposes of calculating a nonbypassable charge imposed pursuant to this division.(3)Prohibit the department from recovering funds pursuant to a nonbypassable charge on the ratepayers of a load-serving entity for purposes other than providing for the departments acquisition costs for diverse clean energy resources, including transmission, scheduling, financing, program administration, and other related costs, pursuant to Section 80821.
(4)Prohibit the department from selling any diverse clean energy resources it acquires pursuant to this division at more than the departments acquisition costs, including transmission, scheduling, financing, program administration, and other related costs, when selling those resources under a long-term contract.
(5)Prohibit Pursuant to Section 80821, prohibit the department from pursuing procurement activities, including, if authorized, the issuance of bonds, except upon a finding from the commission that the recovery of costs through charges on customers, the issuance of bonds, and the material terms of such bonds, including interest rates, rating, amortization, and maturity, do not unreasonably increase costs to customers on a net present value basis compared with procurement of a clean energy resource procured by an electrical corporation. basis.
(6)Require the department to prioritize investments that do not compete with the procurement of diverse clean energy resources already planned for development and disclosed by load-serving entities or local publicly owned electric utilities.
80803.The development and operation of a central procurement function program by the department, as provided in this division division, is in all respects for the welfare and benefit of the people of the state, to protect the public peace, health, and safety, and constitutes an essential government purpose.
80804.This division shall be liberally construed in a manner so as to effectuate its purposes and objectives.
80805.(a)The powers and responsibilities of the department established pursuant to this division are separate from, and not governed by, the provisions relating to the State Water Resources Development System, including, but not limited to, those powers and responsibilities granted pursuant to Part 3 (commencing with Section 11100) of Division 6 and the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6).
(b)The Clean Energy Central Procurement Fund established in Section 80830, and the moneys in that fund, are separate and distinct from any other fund and moneys administered by the department.(c)(b)This division does not subject the department to the jurisdictional authority of the Public Utilities Commission commission or expand the jurisdiction of the Public Utilities Commission, commission, including that state water resources development system facilities subject to the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6) and the departments other electrical generation projects or power contracts outside of those funded through the Clean Energy Central Procurement Fund, fund, remain outside the jurisdiction of the commission.
80806.The department may adopt regulations for purposes of administering this division.
2.Definitions80810.For purposes of this division, the following definitions apply:
(a)Bond means any bond, note, or other written evidence of indebtedness issued solely for purposes of supporting the Clean Energy Central Procurement Fund fund and other related expenses incurred by the department pursuant to this division, or for reimbursing expenditures from the fund for those purposes, establishing or maintaining reserves in connection with a bond, costs of issuance of a bond or incidental to its payment or security, capitalized interest, or renewing or refunding any bonds.
(b)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(c)Clean energy resources has the same meaning as defined in Section 454.52 of the Public Utilities Code. Clean energy resources includes, but is not limited to, those clean energy resources, as defined, that have a first point of interconnection with the transmission grid or the distribution grid within a California balancing authority.(d)(c)Commission means the Public Utilities Commission.
(d)Diverse clean energy resource means a diverse clean energy resource as defined in Section 454.52 of the Public Utilities Code that has a first point of interconnection with a California balancing authority.
(e)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(f)Energy Commission means the State Energy Resources Conservation and Development Commission.
(g)Fund means the Diverse Clean Energy Central Procurement Fund established in Section 80830.
(h)Independent System Operator means the Independent System Operator described in Article 3 (commencing with Section 345) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code.
(i)Load-serving entity has the same meaning as defined in Section 380 of the Public Utilities Code.
(j)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
3.Department Powers80820.(a)In accordance (1)Consistent with Sections 380, 454.51, 454.52, 454.53, and 454.54 of the Public Utilities Code, following a determination from the commission, in consultation with the Energy Commission and the Independent System Operator, that it is necessary for the department to develop and conduct one or more competitive solicitations to procure energy, capacity, ancillary services, and all associated attributes, the department may, until December 31, 2029, conduct those solicitations. The purpose of these competitive solicitations is to make available to the state clean energy resources. Code and this division, if the commission requests the department to procure diverse clean energy resources, and the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts for diverse clean energy resources pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission, in consultation with the department, shall develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department pursuant to this division.
(2)The commission and the department shall establish a procurement group to advise the department on the procurement undertaken pursuant to this division.
(3)The department shall not enter into new contracts pursuant to this division on or after January 1, 2035.
(b)In evaluating the bids received through the a solicitation, the department shall consider all of the following:
(1)For diverse clean energy resources dependent on the development of a project, that projects viability, including, but not limited to, developer experience, developer financial strength and creditworthiness sufficient to eliminate financing contingencies, and the status of required permits and licenses. licenses, including a commitment to submit a consistency certification provided pursuant to the federal Coastal Zone Management Act of 1972 (16 U.S.C. Sec. 1451 et seq.) to the California Coastal Commission for offshore wind energy development projects, to the extent required.
(2)The ability to meet in-service dates offered during the solicitation and the ability to meet those in-service dates without escalation in cost.
(3)The useful life of the project.
(4)The capability to supply energy, capacity, and ancillary services at locations, times of day, and for durations that meet the states energy resource needs, as determined by the department and the commission.
(5)The bidders economic and local community impact, workforce development needs and opportunities, environmental impact mitigation plan, and equipment acquisition and supply chain investment plan.
(6)A plan to contribute to large-scale, regional, or statewide baseline and ongoing monitoring of coastal waters and wildlife, if applicable.
(5)(7)Any other criteria determined by the commission or the department.
(c)The department shall require, as a condition of the solicitation, that bids include a charge payable to the Offshore Wind Workforce Development Fund established in Section 80831.(c)Every bid for the development of a diverse clean energy resource project selected by the department shall include the bidders certification that either of the following are true:
(1)The entirety of the construction of the diverse clean energy resource project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2)The construction of the diverse clean energy resource project is not in its entirety a public work for which prevailing wages are required to be paid pursuant to Article 1 (commencing with Section 1720) of Chapter 1 of Part 7 of Division 2 of the Labor Code, but all construction workers employed on the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the diverse clean energy resource project is subject to this paragraph, for those portions of the diverse clean energy resource project that are not a public work, all of the following requirements shall apply:
(A)The bidder shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(B)All contractors and subcontractors shall pay to all construction workers employed in the construction of the diverse clean energy resource project at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(C)All contractors and subcontractors performing construction work on the diverse clean energy resource project shall employ apprentices at no less than the ratio required in Section 1777.5 of the Labor Code.
(D)Except as specified in subparagraph (F), all contractors and subcontractors performing construction work shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code, make those records available for inspection and copying pursuant to Section 1776 of the Labor Code, and furnish those payroll records to the Labor Commissioner pursuant to Section 1771.4 of the Labor Code.
(E)Except as specified in subparagraph (F), the obligation of the contractors and subcontractors to pay prevailing wages and employ apprentices may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee though a civil action pursuant to Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(F)Subparagraphs (D) and (E) do not apply if all contractors and subcontractors performing construction work on the diverse clean energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(i)Provisions requiring payment of prevailing wages to all construction workers employed in the construction of the diverse clean energy resource project and for enforcement of that obligation through an arbitration procedure.
(ii)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a relevant local agency.
(iii)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required in Section 1777.5 of the Labor Code.
(iv)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the multicraft core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(d)Every bid for the development of a diverse clean energy resource project selected by the department shall include the bidders certification that a skilled and trained workforce will be used to perform all construction work on the diverse clean energy resource project, consistent with all of the following requirements:
(1)The bidder shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the diverse clean energy resource project.
(2)Every contractor and subcontractor shall use a skilled and trained workforce to construct the diverse clean energy resource project.
(3)Except as specified in subdivision (c), contractors and subcontractors that fail to use a skilled and trained workforce shall be subject to the penalties provided in Section 2603 of the Public Contract Code. Penalties for a contractors or subcontractors failure to comply with the requirement to use a skilled and trained workforce may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 2603 of the Public Contract Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(4)For purposes of this subdivision, a bidder shall be considered to be an awarding body under Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. Except as specified paragraph (5), the bidder shall retain records, including copies of monthly reports, that demonstrate compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code while the diverse clean energy resource project or contract is being performed and for three years after completion of the diverse clean energy resource project or contract. The bidder shall submit these records immediately upon request of the commission. When submitted to the commission, these records shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection.
(5)Paragraphs (3) and (4) do not apply if all contractors and subcontractors performing work on the diverse clean energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(A)Provisions requiring compliance with the skilled and trained workforce requirement and for enforcement of that obligation through an arbitration procedure.
(B)Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a local agency.
(C)Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required by Section 1777.5 of the Labor Code.
(D)Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the Multi-Craft Core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(e)For purposes of this section, the following definitions apply:
(1)Construction includes any new construction work and subsequent construction work following initial completion that is contracted out to a contractor in the construction industry.
(2)Project labor agreement has the same meaning as defined in Section 2500 of the Public Contract Code.
(3)Skilled and trained workforce has the same meaning as defined in Section 2601 of the Public Contract Code.
80821.(a)(1)When conducting a solicitation pursuant to Section 80820, the department shall confer with the commission and other parties, including load-serving entities and local publicly owned electric utilities that are voluntarily participating pursuant to Section 80822, 80822 and load-serving entities, for diverse clean energy resource procurement activities of an identified scope and duration. The department shall recover costs related to conducting the requested solicitations and all supporting work. Cost recovery may be effectuated, if determined to be just and reasonable by the commission, commission before the procurement, through a nonbypassable charge approval process or for load-serving entities and pursuant to Section 80822 for load-serving entities and 80822 for local publicly owned electric utilities.
(2)At the request of the department, the commission may require an electrical corporation to act as the agent of the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new diverse clean energy resource procurement. The electrical corporation shall be reimbursed by the department for its costs. reasonable costs, as determined by the commission.
(b)If cost recovery for a contract for clean energy resources is determined through a commission proceeding, the department shall recover its costs if the commission determines that the procurement process, the resulting transactions, and the associated costs are just and reasonable. Those costs may include costs related to bond issuance incurred pursuant to Chapter 5 (commencing with Section 80840), costs related to contracting for clean energy resources, and other costs to implement this division.(b)If the departments costs associated with the procurement of diverse clean energy resources pursuant to this division, including the costs related to bonds issued pursuant to Chapter 5 (commencing with Section 80840), costs related to contracting for diverse clean energy resources, and other costs to implement and administer this division, will be recovered through a commission proceeding, the commission shall review the procurement undertaken pursuant to this division and, if approved, issue an order governing the recovery of the departments costs before the consummation of the contract only if both of the following conditions are satisfied:
(1)The recovery of the departments costs, including those costs associated with the procurement process, the resulting transactions, and the associated costs, has been found to be just and reasonable and to be in the public interest.
(2)The recovery of the departments costs, including, if authorized, costs associated with the issuance of bonds and the material terms of those bonds, including, without limitation, interest rates, rating, amortization, and maturity, through charges on customers does not unreasonably increase costs to customers on a net present value basis.
(c)If the commission determines that a nonbypassable charge necessary to fund activities conducted by the department pursuant to this division is just and reasonable, the department shall ensure it has entered into an agreement with the commission for that nonbypassable charge before it begins to incur costs related to a specific activity under this division. If the purpose of the nonbypassable charge is to recover the departments revenue requirement related to bond issuance debt service, the department shall ensure the agreement has the force and effect of an irrevocable financing order adopted in accordance with Article 5.5 (commencing with Section 840) of Chapter 4 of Part 1 of Division 1 of the Public Utilities Code or that the commission has separately issued an irrevocable financing order related to the nonbypassable charge.
(d)Any agreement between the department and the commission under this section shall provide for the administration of the nonbypassable charge, including both of the following requirements:
(1)The department shall notify the commission each year of the annual collections received by the department and the amount of any excess or deficiency in collections above or below the revenue requirement. The commission shall adjust charges in the subsequent year to reflect that excess or deficiency.
(2)During any period, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund any of the amounts specified in Section 80842 or subdivision (b) of Section 80830, the revenue requirement established pursuant to Section 80842, the department shall notify the commission in writing and the commission shall act within 60 days of receiving that notice to increase the nonbypassable charge so that the amounts collected during that period are sufficient to meet those obligations.
(e)Any agreement between the department and the commission pursuant to this section that is solely for the purpose of imposing a nonbypassable charge to recover the departments revenue requirement related to bond issuance debt service shall include a provision stating that the commissions just and reasonable determination with respect to the revenue requirement is in effect for the duration of the bond term.
80822.(a)Pursuant to Section 80820, the department may establish a schedule and mechanism for any load-serving entity or a local publicly owned electric utility to voluntarily obtain from the department energy, capacity, or ancillary services diverse clean energy resources to be acquired by the department through its central procurement function on a contract-by-contract basis.
(b)In order to voluntarily participate, a load-serving entity or local publicly owned electric utility shall commit to the imposition of a nonbypassable charge on its ratepayers sufficient at all times to fund its participation and on terms and conditions as set forth in Section 80826.
80822.5.(a)Load-serving entities shall have a voluntary option to obtain incremental diverse clean energy resources from the department beyond the amounts allocated to the load-serving entity from procurement pursuant to paragraph (1) of subdivision (a) of Section 80820, subject to the approval of the commission and a specific determination by the commission that sufficient capacity is available to accommodate the request to obtain amounts beyond those allocated to the load-serving entity.
(b)The department, in consultation with the commission, may establish a schedule for load-serving entities to provide advance notice of an intent to obtain incremental diverse clean energy resources. Any load-serving entity exercising its option to voluntarily participate shall be obligated to impose a nonbypassable charge on its ratepayers sufficient to fund its allocated share of the costs of incremental diverse clean energy resources for the duration of the contract, as determined by the department and approved by the commission, if applicable.
80823.At the request of the department, the commission may order an electrical corporation, or its successor in the performance of a related service, to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as agent of the department, provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department.
80824.The commission may issue rules regulating the enforcement of the agency function pursuant Section 80823 and this division, including to Section 80823, including the collection of nonbypassable charges and payment into the fund on behalf of the department.
80825.(a)If the department has executed an agreement with the commission pursuant to subdivision (c) of Section 80821, the department may recover its costs, as a revenue requirement, in the amounts sufficient and at the times necessary to enable it to comply with fund the revenue requirement established pursuant to Section 80842, and shall advise the commission and each applicable load-serving entity or voluntarily participating local publicly owned electric utility, as the department determines to be appropriate and subject to the terms of the agreement.
(b)For purposes of this division and except as otherwise provided in this section, subdivision (a), the commissions authority as set forth in Section 451 of the Public Utilities Code shall apply.
80826.(a)A load-serving entity or local publicly owned electric utility that voluntarily participates in the departments central procurement function pursuant to Section 80822 shall enter into an agreement with the department for the revenue requirement to fund its participation and that agreement shall have the force and effect of an irrevocable financing order.
(b)The agreement shall provide for the administration of the revenue requirement, including both of the following:
(1)A requirement that the department annually notify the load-serving entity or local publicly owned electric utility of the annual collections received by the department with respect to the revenue requirement and the amount of any excess or deficiency in collections above or below the revenue requirement. The load-serving entity or local publicly owned electric utility shall adjust charges in the subsequent year to reflect any such excess or deficiency.
(2)During any revenue requirement period, a requirement that, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund any of the amounts described in the revenue requirement established pursuant to Section 80842, the department notify the load-serving entity or local publicly owned electric utility in writing and the load-serving entity or local publicly owned electric utility shall act within 30 days of receiving that notice to increase the charge so that the amount collected during the period are is sufficient to meet those obligations.
80827.All moneys collected by load-serving entities and local publicly owned electric utilities and remitted to the department for any diverse clean energy resources acquired and sold pursuant to this division, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of diverse clean energy resources acquired pursuant to this division, shall be deposited into the fund in accordance with Section 80830. fund.
80828.The department may fix and establish the procedure and charges for the sale or other disposal of diverse clean energy resources purchased by the department.
4.Funds Diverse Clean Energy Central Procurement Fund80830.(a)There is hereby established in the State Treasury the Diverse Clean Energy Central Procurement Fund. Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated, without regard to fiscal year, to the department and shall be available for purposes of this division.
(b)Except as otherwise specified in Section 80820, all All revenues payable to the department under pursuant to this division, including proceeds of bonds issued pursuant to Chapter 5 (commencing with Section 80840), shall be deposited into the fund. Notwithstanding any other law, interest accruing on the moneys in the fund shall be deposited into the fund and shall be used for purposes of this division.
(c)The fund, and the moneys in the fund, are separate and distinct from any other fund and moneys administered by the department.
(c)(d)Payments from the fund may be made only for the following purposes:
(1)Payment of any bonds or other contractual obligations authorized by this division.
(2)The cost of energy and transmission, scheduling, and other related expenses incurred by the department.
(3)The expenses incurred by the department in administering this division, including costs of personnel, contracts, or arrangements to carry out the departments duties and responsibilities pursuant to this division.
(d)(e)Obligations authorized pursuant to this division shall be payable solely from the fund. Neither the full faith and credit nor the taxing power of the state are, or may be, pledged for any payment under any obligation authorized by this division.
(e)(f)While any obligations of the department incurred pursuant to this division remain outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of, or parties to, those obligations. The department may include this pledge and undertaking of the state in the departments obligations.
80831.(a)There is hereby established in the State Treasury the Offshore Wind Workforce Development Fund.(b)Moneys in the fund may be used, upon appropriation by the Legislature, to award grants for purposes of educating, training, maintaining, and strengthening the workforce needed for offshore wind energy development.(c)Pursuant to Section 80820, revenues from the charge imposed as a condition of the solicitation are payable to the Offshore Wind Workforce Development Fund.(d)Entities eligible for a grant from the Offshore Wind Workforce Development Fund include, but are not limited to, all of the following entities:(1)Postsecondary educational institutions, as defined in Section 66261.5 of the Education Code.(2)California Native American tribes, as defined in Section 21073 of the Public Resources Code.(3)Regional workforce development teams.5.Bonds80840.(a)(1)If the commission requests the department to engage in central procurement activities pursuant to paragraph (5) the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts to procure diverse clean energy resources pursuant to this division, as authorized by paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, or the department conducts competitive solicitations pursuant to this division, due to the timing of cost recovery processes, the department may determine that it is necessary or desirable to issue bonds to support activities for the procurement of diverse clean energy resources pursuant to this division.
(2)Upon making a the determination pursuant to described in paragraph (1), the department may issue bonds for purposes of financing the procurement of diverse clean energy resources supporting in support of the fund and other related expenses incurred by the department pursuant to this division, and subsequent to the department having entered into an agreement with the commission regarding a revenue requirement. Bonds shall not be issued in an amount the debt service on which, to the extent payable from the fund, is estimated by the department to exceed the amounts estimated to be available in the fund for their payment. the payment of the bonds.
(b)Before the issuance of bonds in a public offering, the department shall ensure the bonds have an investment grade rating from at least one nationally recognized investment ratings firm and the document authorizing the issuance of the bonds shall provide for repayment from pledged revenues.
(c)The commission shall have an opportunity to review the trust agreement or other document documents pursuant to which the bonds are issued and revenues are pledged, and shall consult with the department regarding the trust agreement or other document, documents regarding any relevant considerations of the commission and to ensure its consistency with the revenue requirement agreement between the department and commission.
(d)In addition to any other purposes for which bonds may be issued pursuant to this division, bonds may be issued for the following purposes:
(1)Refunding bonds to obtain a lower interest rate.
(2)Refunding bonds bearing a variable interest rate with bonds bearing interest at a fixed rate.
(3)Refunding bonds if a nationally recognized investment ratings firm reduces or withdraws, or proposes to reduce or withdraw, the rating assigned to securities that are secured by bond insurance policies, credit, or liquidity facilities issued by the provider of a bond insurance policy, or a credit or liquidity facility securing the bonds being refunded.
(4)Refunding bonds issued to preserve a federal income tax exemption or to qualify or maintain other federal income tax benefits.
80841.(a)Whenever the director determines that the issuance of bonds is necessary or desirable to accomplish the goals set forth in this division, including financing the procurement of diverse clean energy resources, the director shall issue a written determination authorizing the issuance of bonds by the department. The department, in consultation with the Department of Finance, shall notify the Chairperson of the Joint Legislative Budget Committee and the chairpersons of the fiscal committees of each house of the Legislature of its written determination. The bonds shall be sold in the manner, and on the terms and conditions, specified in that determination, and the determination may contain or authorize any other provision, condition, or limitation not inconsistent with this division and those provisions as may be deemed reasonable and proper for the security of the bondholders. Bonds may mature at the time or times, and bear interest at the rate or rates, which may be fixed or variable and be determined by reference to an index or such other method, and may be federally tax exempt, as specified in the determination. Neither the person executing the determination to issue bonds nor any person executing bonds shall be personally liable therefor or be subject to any personal liability or accountability by reason of the issuance of the bonds.
(b)In the discretion of the department, bonds may be secured by a trust agreement by and between the department and a trustee, which may be any trust company or bank having trust powers within or outside the state, or the Treasurer. Notwithstanding any other law, the Treasurer shall not be deemed to have a conflict of interest by reason of acting as the trustee. The department may enter into contracts or arrangements in connection with the issuance and sale of bonds, or with respect to any outstanding bonds for so long as those bonds remain outstanding, as it shall deem to be necessary or desirable for the issuance and further security of the bonds, including, but not limited to, credit enhancement agreements, dealer agreements, purchase contracts, escrow agreements, and similar arrangements.
(c)Bonds shall be legal investments for all trust funds, the funds of all insurance companies, savings and commercial banks, trust companies, executors, administrators, trustees, and other fiduciaries, for state school funds, pension funds, and for any funds that may be invested in county, school, or municipal bonds.
(d)Notwithstanding that bonds may be payable from a special fund, the bonds shall be deemed to be negotiable instruments for all purposes.
(e)Any bonds, and the transfer of and income derived from those bonds, shall at all times be free from taxation of every kind by the state and by the political subdivisions of the state.
(f)Bonds shall not be deemed to constitute a debt or liability of the state or of any political subdivision thereof, other than the department, or a pledge of the full faith and credit of the state or of any such political subdivision, but shall be payable solely from the revenues described in paragraph (1) of subdivision (g). All bonds shall contain a statement to the following effect: Neither the faith and credit nor the taxing power of the State of California is pledged to the payment of the principal of or interest on this bond. The issuance of bonds shall not directly or indirectly or contingently obligate the state or any political subdivision thereof to levy or to pledge any form of taxation whatever therefor or to make any appropriation for their payment.
(g)(1)The department may pledge and apply all or any part of revenues of any nature whatever accruing to the department, from orders issued, charges imposed, or contracts entered into pursuant to or in furtherance of this division, or the right to receive the same, to the payment or security of any or all of the principal of the bonds or the interest thereon, in the manner and upon terms that the department deems advisable.
(2)(A)It is the intent of the Legislature that any pledge of moneys, revenues, or property made by the department shall be valid and binding from the time when the pledge is made if the commission finds the pledge was just and reasonable, and that the moneys, revenues, or property so pledged and thereafter collected from retail end use end-use customers, or paid directly or indirectly to or for the account of the department, is hereby made, and shall immediately be, subject to the lien of that pledge without any physical delivery thereof or further act.
(B)It is the intent of the Legislature that the lien of any such pledge shall be valid and binding against all parties having claims of any kind in tort, contract, or otherwise against the department irrespective of whether those parties have notice thereof, and that no resolution or instrument by which the pledge or lien created pursuant to this subdivision is expressed, confirmed, or approved need be filed or recorded in order to perfect the pledge or lien.
(C)It is the intent of the Legislature that this paragraph, in all respects, govern the creation, perfection, priority, and enforcement of any lien created pursuant to this division.
80842.(a)The department shall, and in any obligation entered into pursuant to this division may covenant to, at least annually, and more frequently as required, establish and revise revenue requirements sufficient, together with any moneys deposited into the fund, to provide all of the following:
(1)The amounts necessary to pay the principal of, and premium, if any, and interest on, all bonds as and when the same shall become due.
(2)The amounts necessary to pay for electricity purchased by it and to deliver it to purchasers, including the cost of electricity, transmission, scheduling, and other related expenses incurred by the department, or to make payments under any other contracts, agreements, or obligations entered into by it pursuant to this division, in the amounts and at the times the same shall become due.
(3)Reserves in amount as may be determined by the department from time to time to be necessary or desirable.
(4)The pooled money investment rate on funds advanced for electricity purchases before the receipt of payment for those purchases by the purchasing entity.
(5)The administrative costs of the department and other state agencies, including the costs and fees for professional services, bond issuance and sale, and other miscellaneous costs, incurred in connection with the issuance of bonds or the administration of this division.
(b)The department shall notify the commission of its revenue requirement pursuant to the agreement required pursuant to Section 80821 and that revenue requirement shall be satisfied by the recovery of its costs through a nonbypassable charge.
6.Repeal80850.This division shall remain in effect only until January 1, 2050, and as of that date is repealed.6.Termination of Authority to Contract80850.(a)On or after January 1, 2035, the department shall not contract under this division for the purchase of electrical power.
(b)This section does not affect the authority of the department to administer contracts entered into before that date or any of the departments outstanding bond obligations.
SEC. 16.(a)Upon appropriation of the Legislature, the sum of no less than six million dollars ($6,000,000) from the General Fund shall be available for the 202425 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
(b)It is the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of the assessment referenced in Section 1 of Chapter 51 of the Statutes of 2023.
SEC. 13.SEC. 17.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 14.SEC. 18.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to To ensure the procurement of diverse clean energy resources that the state needs to meet its reliability needs, which have been identified as being delayed or needing a secure development path, it is necessary to establish a central procurement entity within the Department of Water Resources and for this act to take effect immediately.
Sections 10295 and 10297 do not apply to any contract entered into by the Department of Water Resources under Part 3 (commencing with Section 11100) of Division 6, Chapter 8 (commencing with Section 12930) of Part 6 of Division 6, Division 29 (commencing with Section 80700), or Division 29.5 (commencing with Section 80800), of the Water Code for the acquisition, sale, or transmission of power, or for services to facilitate those activities.
SEC. 2.Section 365.1 of the Public Utilities Code is amended to read:365.1.(a)Except as expressly authorized by this section, and subject to the limitations in subdivisions (b) and (c), the right of retail end-use customers pursuant to this chapter to acquire service from other providers is suspended until the Legislature, by statute, lifts the suspension or otherwise authorizes direct transactions. For purposes of this section, other provider means any person, corporation, or other entity that is authorized to provide electric service within the service territory of an electrical corporation pursuant to this chapter, and includes an aggregator, broker, or marketer, as defined in Section 331, and an electric service provider, as defined in Section 218.3. Other provider does not include a community choice aggregator, as defined in Section 331.1, and the limitations in this section do not apply to the sale of electricity by other providers to a community choice aggregator for resale to community choice aggregation electricity consumers pursuant to Section 366.2.
(b)The commission shall authorize individual retail nonresidential end-use customers to acquire electric service from other providers in each electrical corporations distribution service territory, up to a maximum allowable total kilowatthours annual limit. The maximum allowable annual limit shall be established by the commission for each electrical corporation at the maximum total kilowatthours supplied by all other providers to distribution customers of that electrical corporation during any sequential 12-month period between April 1, 1998, and October 11, 2009. Within six months of October 11, 2009, the commission shall adopt and implement a reopening schedule that commences immediately and will phase in the allowable amount of increased kilowatthours over a period of not less than three years, and not more than five years, raising the allowable limit of kilowatthours supplied by other providers in each electrical corporations distribution service territory from the number of kilowatthours provided by other providers as of October 11, 2009, to the maximum allowable annual limit for that electrical corporations distribution service territory. The commission shall review and, if appropriate, modify its currently effective rules governing direct transactions, but that review shall not delay the start of the phase-in schedule.
(c)Once the commission has authorized additional direct transactions pursuant to subdivision (b), it shall do both of the following:
(1)Ensure that other providers are subject to the same requirements that apply to the states three largest electrical corporations under any programs or rules adopted by the commission to implement the resource adequacy provisions of Section 380, the renewables portfolio standard provisions of Article 16 (commencing with Section 399.11), the requirements for the electricity sector adopted by the State Air Resources Board pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code), and the requirements of the integrated resource planning process as specified in Sections 454.5 to 454.6, 454.52 to 454.54, inclusive. This requirement applies notwithstanding any prior decision of the commission to the contrary.
(2)(A)Ensure that, in the event that the commission authorizes, in the situation of a contract with a third party, or orders, in the situation of utility-owned generation, an electrical corporation to obtain generation resources that the commission determines are needed to meet system or local area reliability needs for the benefit of all customers in the electrical corporations distribution service territory, the net capacity costs of those generation resources are allocated on a fully nonbypassable basis consistent with departing load provisions as determined by the commission, to all of the following:
(i)Bundled service customers of the electrical corporation.
(ii)Customers that purchase electricity through a direct transaction with other providers.
(iii)Customers of community choice aggregators.
(B)If the commission authorizes or orders an electrical corporation to obtain generation resources pursuant to subparagraph (A), the commission shall ensure that those resources meet a system or local reliability need in a manner that benefits all customers of the electrical corporation. The commission shall allocate the costs of those generation resources to ratepayers in a manner that is fair and equitable to all customers, whether they receive electric service from the electrical corporation, a community choice aggregator, or an electric service provider.
(C)The resource adequacy benefits of generation resources acquired by an electrical corporation pursuant to subparagraph (A) shall be allocated to all customers who pay their net capacity costs. Net capacity costs shall be determined by subtracting the energy and ancillary services value of the resource from the total costs paid by the electrical corporation pursuant to a contract with a third party or the annual revenue requirement for the resource if the electrical corporation directly owns the resource. An energy auction shall not be required as a condition for applying this allocation, but may be allowed as a means to establish the energy and ancillary services value of the resource for purposes of determining the net costs of capacity to be recovered from customers pursuant to this paragraph, and the allocation of the net capacity costs of contracts with third parties shall be allowed for the terms of those contracts.
(D)It is the intent of the Legislature, in enacting this paragraph, to provide additional guidance to the commission with respect to the implementation of subdivision (g) of Section 380, and to ensure that the customers to whom the net costs and benefits of capacity are allocated are not required to pay for the cost of electricity they do not consume.
(d)(1)If the commission approves a centralized resource adequacy mechanism pursuant to subdivisions (h) and (i) of Section 380, upon the implementation of the centralized resource adequacy mechanism the requirements of paragraph (2) of subdivision (c) shall be suspended. If the commission later orders that electrical corporations cease procuring capacity through a centralized resource adequacy mechanism, the requirements of paragraph (2) of subdivision (c) shall again apply.
(2)If the use of a centralized resource adequacy mechanism is authorized by the commission and has been implemented as set forth in paragraph (1), the net capacity costs of generation resources that the commission determines are required to meet urgent system or urgent local grid reliability needs, and that the commission authorizes to be procured outside of the Section 380 or Section 454.5 processes, shall be recovered according to the provisions of paragraph (2) of subdivision (c).
(3)This subdivision does not supplant the resource adequacy requirements of Section 380 or the resource procurement procedures established in Section 454.5.
(e)On or before June 1, 2019, the commission shall issue an order regarding direct transactions that provides as follows:
(1)Increase the maximum allowable total kilowatthours annual limit by 4,000 gigawatthours and apportion that increase among the service territories of the electrical corporations.
(2)All residential and nonresidential customer accounts that are on direct access as of January 1, 2019, remain authorized to participate in direct transactions.
SEC. 3.Section 380 of the Public Utilities Code is amended to read:380.(a)The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities.
(b)In establishing resource adequacy requirements, the commission shall ensure the reliability of electrical service in California while advancing, to the extent possible, the states goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. The resource adequacy program shall achieve all of the following objectives:
(1)Facilitate development of new generating, nongenerating, and hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economical and needed for reliability and to achieve the state policy specified in Section 454.53.
(2)Establish new, or maintain existing, demand response products and tariffs that facilitate the economical dispatch and use of demand response that can either meet or reduce an electrical corporations resource adequacy requirements, as determined by the commission.
(3)Equitably allocate the cost of generating capacity and demand response in a manner that prevents the shifting of costs between customer classes.
(4)Minimize enforcement requirements and costs.
(5)Maximize the ability of community choice aggregators to determine the generation resources used to serve their customers.
(c)Each load-serving entity shall maintain physical generating capacity and electrical demand response adequate to meet its load requirements, including, but not limited to, peak demand and planning and operating reserves. The generating capacity or electrical demand response shall be deliverable to locations and at times as may be necessary to maintain electrical service system reliability, local area reliability, and flexibility.
(d)Each load-serving entity shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the board of directors of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(e)The commission shall implement and enforce the resource adequacy requirements established in accordance with this section in a nondiscriminatory manner. Each load-serving entity shall be subject to the same requirements for resource adequacy, the renewables portfolio standard program, and the integrated resource planning process pursuant to Section 454.52 that apply to electrical corporations pursuant to this section, or otherwise required by law, or by order or decision of the commission. The commission shall exercise its enforcement powers to ensure compliance by all load-serving entities.
(f)(1)The commission shall require sufficient information, including, but not limited to, anticipated load, actual load, and measures undertaken by a load-serving entity to ensure resource adequacy, to be reported to enable the commission to determine compliance with the resource adequacy requirements established by the commission.
(2)The commission shall calculate and publish annually on its internet website, in a new report or as part of another report, the percentage of each load-serving entitys local and system resource adequacy requirements from the previous calendar year that was met with capacity from eligible renewable energy resources pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11)), other zero-carbon resources, including large hydroelectric and nuclear resources, or energy storage resources. In determining the percentage of each load-serving entitys resource adequacy requirements, the commission shall include all directly owned or contracted resources and each load-serving entitys allocation of any centrally procured resources or allocation of resources pursuant to any other mechanism that involves an assignment or allocation of resources purchased or owned by a single buyer, and shall exclude any share of a load-serving entitys resources that were allocated to another load-serving entity.
(g)An electrical corporations costs of meeting or reducing resource adequacy requirements, including, but not limited to, the costs associated with system reliability, local area reliability, flexible resource adequacy, renewable integration, or resource diversity portfolio requirements, that are determined to be reasonable by the commission, or are otherwise recoverable under a procurement plan approved by the commission pursuant to Section 454.5, shall be fully recoverable from those customers on whose behalf the costs are incurred, as determined by the commission, at the time the commitment to incur the cost is made, on a fully nonbypassable basis, as determined by the commission. The commission shall exclude any amounts authorized to be recovered pursuant to Section 366.2 when authorizing the amount of costs to be recovered from customers of a community choice aggregator or from customers that purchase electricity through a direct transaction pursuant to this subdivision.
(h)The commission shall determine and authorize the most efficient and equitable means for achieving all of the following:
(1)Meeting the objectives of this section.
(2)Ensuring that investment is made in new generating capacity, including the capacity needed to achieve the state policy specified in Section 454.53.
(3)Ensuring that existing generating capacity that is economic is retained, including the capacity needed to maintain reliability while achieving the state policy specified in Section 454.53.
(4)Ensuring that the cost of generating capacity and demand response is allocated equitably.
(5)Ensuring that community choice aggregators can determine the generation resources used to serve their customers.
(6)Ensuring that investments are made in new and existing demand response resources that are cost effective and help to achieve electrical grid reliability and the states goals for reducing emissions of greenhouse gases.
(7)Minimizing the need for backstop procurement by the Independent System Operator.
(i)In making the determination pursuant to subdivision (h), the commission may consider a centralized resource adequacy mechanism among other options.
(j)The commission shall ensure appropriate valuation of both supply and load modifying demand response resources. The commission, in an existing or new proceeding, shall establish a mechanism to value load modifying demand response resources, including, but not limited to, the ability of demand response resources to help meet distribution needs and transmission system needs and to help reduce a load-serving entitys resource adequacy obligation pursuant to this section. In determining this value, the commission shall consider how these resources further the states electrical grid reliability and the states goals for reducing emissions of greenhouse gases. The commission, Energy Commission, and Independent System Operator shall jointly ensure that changes in demand caused by load modifying demand response are expeditiously and comprehensively reflected in the Energy Commissions Integrated Energy Policy Report forecast and in planning proceedings and associated analyses, and shall encourage reflection of these changes in demand in the operation of the grid.
(k)For purposes of this section, load-serving entity means an electrical corporation, electric service provider, or community choice aggregator. Load-serving entity does not include any of the following:
(1)A local publicly owned electric utility.
(2)The State Water Resources Development System commonly known as the State Water Project.
(3)Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, if the customer generation, or the load it serves, meets one of the following criteria:
(A)It takes standby service from the electrical corporation on a commission-approved rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(B)It is not physically interconnected to the electrical transmission or distribution grid, so that, if the customer generation fails, backup electricity is not supplied from the electrical grid.
(C)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
SEC. 4.Section 454.51 of the Public Utilities Code is amended to read:454.51.The commission shall do all of the following:
(a)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy and resource diversity in a cost-effective manner. The portfolio shall be used by the commission to establish integrated resource planning-based procurement requirements that rely on zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve the state policy specified in Section 454.53 and any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration resources or diversification resources clean energy resources, as defined in Section 454.52, procured by an electrical corporation, or the Department of Water Resources, to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need identified in subdivision (a) or (d), as applicable, shall be borne by the load-serving entity, as defined in Section 380, that failed to perform.
SEC. 5.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, entity to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability on both a near-term a near-term, mid-term, and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.
(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H)Enhance distribution systems and demand-side energy management.
(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(J)Maintain a diverse portfolio of energy resources, which may include clean energy resources procured by the Department of Water Resources.
(2)(A)The commission may authorize all source procurement for load-serving entities that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(4)Upon (A)On or before September 1, 2024, and biennially thereafter, the commission shall determine if there is a need for the procurement of additional clean energy resources based on a review of the integrated resource plans submitted by load-serving entities in compliance with the requirements of this section and Section 454.53 and the progress towards meeting the portfolio of resources identified in subdivision (a) of Section 454.51, the 454.51.
(B)If the commission determines that there is a need for the procurement of additional clean energy resources, the commission shall specify the clean energy resources that should be procured to meet that need.
(C)Within six months of determining that there is a need for the procurement of additional clean energy resources, the commission may direct an electrical corporation, or request the Department of Water Resources, Resources to procure diverse those clean energy resources, as defined by the commission, resources specified pursuant to subparagraph (B) that meet the portfolio of resources identified in subdivision (a) of Section 454.51.
(D)The Department of Water Resources may procure clean energy resources pursuant to subparagraph (C) only until January 1, 2030.
(5)If the commission requests the Department of Water Resources to procure diverse clean energy resources pursuant to paragraph (4), the commission, in consultation with the Department of Water Resources, shall develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the Department of Water Resources and align with Division 29.5 (commencing with Section 80800) of the Water Code. The commission and the Department of Water Resources shall ensure that a procurement group is established to advise on the procurement undertaken pursuant to paragraph (4). The commission may shall review that procurement and, if approved, issue an order governing the recovery of the Department of Water Resources costs only if both of the following conditions are satisfied:
(A)The recovery of costs to satisfy the revenue requirement of the Department of Water Resources has been found by the commission in a public proceeding to be just and reasonable and is in the public interest.
(B)The recovery of costs through charges on customers, including, if authorized, the issuance of bonds and the material terms of those bonds, including interest rates, rating, amortization, and maturity, does not unreasonably increase costs to customers on a net present value basis compared with the procurement of diverse clean energy resources by an electrical corporation pursuant to paragraph (4).
(6)Pursuant to Section 80840 of the Water Code, the department may issue bonds for purposes of this subdivision.
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order resource the procurement of resources with specific attributes by load-serving entities as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis. Enforcement may include the assessment of penalties for noncompliance.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.
(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.
(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.
(h)For purposes of this section, both of the following definitions apply:
(1)Clean energy resources means offshore wind and geothermal energy resources.
(2)Load-serving entity has the same meaning as defined in Section 380.
SEC. 6.Section 9620 of the Public Utilities Code is amended to read:9620.(a)Each local publicly owned electric utility serving end-use customers, customers shall prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers. Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, shall not be subject to these requirements if the customer generation, or the load it serves, meets one of the following criteria:
(1)It takes standby service from the local publicly owned electric utility on a rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(2)It is not physically interconnected to the electric transmission or distribution grid, so that, if the customer generation fails, backup power is not supplied from the electricity grid.
(3)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
(b)Each local publicly owned electric utility serving end-use customers shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the Board of Trustees of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(c)Each local publicly owned electric utility shall prudently plan for and procure energy storage systems that are adequate to meet the requirements of Section 2836.
(d)A local publicly owned electric utility serving end-use customers shall, upon request, provide the Energy Commission with any information the Energy Commission determines is necessary to evaluate the progress made by the local publicly owned electric utility in meeting the requirements of this section, consistent with the annual targets established pursuant to subdivision (c) of Section 25310 of the Public Resources Code.
(e)The Energy Commission shall report to the Legislature, to be included in each integrated energy policy report prepared pursuant to Section 25302 of the Public Resources Code, regarding the progress made by each local publicly owned electric utility serving end-use customers in meeting the requirements of this section.
(f)A local publicly owned electric utility may meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources if that aggregation or pooling is defined in a contractual arrangement and each participating local publicly owned electric utility meets its individual minimum planning reserve margin based on its share of the resource portfolio pool.
SEC. 7.Section 80700.5 is added to the Water Code, to read:80700.5.This division shall be known, and may be cited, as the Electricity Supply Strategic Reliability Reserve Program.
SEC. 6.SEC. 8.Section 80713 is added to the Water Code, to read:80713.(a)(1)The On and before June 30, 2027, if the Department of Water Resources determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being used in a given month to meet an identified reliability need, the Public Utilities Commission shall annually assess a capacity payment for the use of the Department of Water Resources Electricity Supply Reliability Reserve Fund established pursuant to Section 80720 by on each load-serving entity that during that same month fails to meet its system resource adequacy requirements pursuant to Section 380 of the Public Utilities Code during any month in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used to meet a reliability need. The purpose of the capacity payment is to replenish the Department of Water Resources Electricity Supply Reliability Reserve Fund. Code. The capacity payment is not a penalty and does not prohibit the Public Utilities Commission from assessing a penalty on a load-serving entity for a failure to comply with any resource adequacy requirement.
(2)If a load-serving entity fails to comply with its system resource adequacy requirements pursuant to Section 380 in a month when resources procured by the Department of Water Resources through the Electricity Supply Strategic Reliability Reserve Program are used to meet the load-serving entitys identified reliability need and a penalty is assessed by the commission on the load-serving entity for that failure, then, on and before June 30, 2027, both of the following requirements shall apply:
(A)If the penalty is less than the capacity payment, the capacity payment shall be reduced by the amount of the penalty and the penalty shall be deposited into the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(B)If the penalty is more than the capacity payment, then an amount of the penalty equal to the otherwise applicable capacity payment shall be deposited into the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(2)(3)The annual capacity payment shall be remitted to the Department of Water Resources Electricity Supply Reliability Reserve Fund by a load-serving entity that fails to meet its system resource adequacy requirements was assessed a capacity payment pursuant to paragraph (1) within 30 days of the commission notifying the load-serving entity.
(3)Unless a different calculation methodology is specified pursuant to subdivision (b), the capacity payment for each load-serving entity shall be calculated by the Public Utilities Commission as follows:(A)A dollar amount equal to the per-kilowatt monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, which shall be calculated as the annual cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund weighted such that two-thirds of that amount reflects the costs of resources procured for summer months, which includes June to September, inclusive, and one-third of that amount reflects the costs of resources procured for other months.(B)The dollar amount calculated pursuant to subparagraph (A) shall be multiplied by the maximum difference between the load-serving entitys load and the resources it procured to meet its load during the period in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used, as determined by the commission with input from the Independent System Operator.(C)Adjusted to reflect the load-serving entitys estimated load minus any reductions resulting from any resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund.(D)Adjusted for any resources procured by electrical corporations on behalf of, and paid for by, the load-serving entity.(b)The Public Utilities Commission, in consultation with the commission, may modify the shall determine a capacity payment calculation methodology specified in paragraph (3) of subdivision (a). for load-serving entities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund relative to the amount the load-serving entity was deficient in its system resource adequacy requirements on a proportional basis. Any calculation or modification to the calculation made by the Public Utilities Commission shall align with any calculation or modification to the calculation made by the commission as authorized by pursuant to subdivision (b) of Section 80714.
SEC. 7.SEC. 9.Section 80714 is added to the Water Code, to read:80714.(a)(1)The Upon the submission of the report pursuant to subdivision (d) and on and before June 30, 2027, if the Department of Water Resources determines that resources have been procured through the Electricity Supply Strategic Reliability Reserve Program and that those resources are being used in a given month to meet an identified reliability need, the executive director of the commission shall annually assess a capacity payment for the use of the Department of Water Resources Electricity Supply Reliability Reserve Fund established pursuant to Section 80720 by on each local publicly owned electric utility that during that same month fails to meet its minimum planning reserve margin established in accordance with Section 9620 of the Public Utilities Code or subdivision (b) of Section 25704.5 of the Public Resources Code, during any month in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used to meet a reliability need. margin.
(2)The annual capacity payment shall be remitted to the Department of Water Resources Electricity Supply Reliability Reserve Fund by a local publicly owned electric utility that fails to meet its minimum planning reserve margin was assessed a capacity payment pursuant to paragraph (1) within 30 days of the executive director notifying the local publicly owned electric utility.
(3)Unless a different calculation methodology is specified pursuant to subdivision (b), the capacity payment for each local publicly owned electric utility shall be calculated by the commission as follows:(A)A dollar amount equal to the per-kilowatt monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, which shall be calculated as the annual cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund weighted such that two-thirds of that amount reflects the costs of resources procured for summer months, which includes June through September, inclusive, and one-third of that amount reflects the costs of resources procured for other months.(B)The dollar amount calculated pursuant to subparagraph (A) shall be multiplied by the maximum difference between the local publicly owned electric utilitys load and the resources it procured to meet its load during the period in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used, as determined by the commission with input from the Independent System Operator.(C)Adjusted to reflect the local publicly owned electric utilitys estimated load minus any reductions resulting from any resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund.(b)The Upon the submission of the report pursuant to subdivision (d), the commission, in consultation with the Public Utilities Commission, may modify the shall determine a capacity payment calculation methodology specified in paragraph (3) of subdivision (a). for local publicly owned electric utilities that is based on the monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund relative to the amount the local publicly owned electric utility was deficient in its minimum planning reserve margin on a proportional basis. Any calculation or modification to the calculation made by the commission shall align with any calculation or modification to the calculation made by the Public Utilities Commission as authorized by pursuant to subdivision (b) of Section 80713.
(c)The Upon the submission of the report pursuant to subdivision (d), the commission may adopt regulations to implement this section. In order to ensure the commission implements this section coincident with the Public Utilities Commissions implementation of Section 80713, thereby ensuring that load-serving entities and local publicly owned electric utilities are treated equally and assessed charges in a similar timeframe, the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code) does not apply to any commission action to implement this section.
(d)On or before January 31, 2024, the commission, in consultation with the Public Utilities Commission, shall submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each local publicly owned electric utility exceeded, met, or failed to meet its minimum planning reserve margin and the system resource adequacy requirements from June 1, 2023, to September 30, 2023, inclusive, that the Public Utilities Commission established for load-serving entities pursuant to Section 380 of the Public Utilities Code and adopted in Public Utilities Commission decision 22-06-050 (June 23, 2022) Decision Adopting Local Capacity Obligations for 2023-2025, Flexible Capacity Obligations for 2023, and Reform Track Framework.
(e)For purposes of this section, minimum planning reserve margin means a local publicly owned electric utilitys planning reserve margin, as described in Section 9620 of the Public Utilities Code, unless the local publicly owned electric utility revises that planning reserve margin based on recommendations from the commission pursuant to subdivision (b) of Section 25704.5 of the Public Resources Code, in which case minimum planning reserve margin means the local publicly owned electric utilitys revised minimum planning reserve margin.
SEC. 8.SEC. 10.Section 80720 of the Water Code is amended to read:80720.(a)There is hereby established in the State Treasury the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(b)Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated to the department, without regard to fiscal years, and shall be available for the purposes of Chapter 2 (commencing with Section 80710).
(c)Obligations authorized and expenses incurred by the department in administering this division shall be payable solely from the fund.
(d)All revenues payable to the department for activities undertaken by the department under Chapter 2 (commencing with Section 80710) or Chapter 5 (commencing with Section 80740) shall be deposited into the fund.
(e)The fund shall be separate and distinct from any other fund and moneys administered by the department and any interest earned on the moneys in the fund shall be used solely for purposes of this division.
(f)When fixed assets procured under the authority of this division are sold or otherwise disposed of, the revenue from the sale or disposition, including any gain or loss, measured by the difference between book value and selling price, shall be deposited into the fund and available to the department for purposes of Chapter 2 (commencing with Section 80710). Any remaining revenue from the sale or other disposition of fixed assets procured under the authority of this division shall be returned to the General Fund once all obligations of the department are satisfied after the wind down of this division and the closure of the fund. While any obligation of the department incurred under this division remains outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of or parties to those obligations.
SEC. 9.SEC. 11.Chapter 5 (commencing with Section 80740) is added to Division 29 of the Water Code, to read:5.Collection and Use of Capacity Payment 80740.The department shall collect any capacity payment ordered assessed pursuant to Section 80713 or 80714. Payments received shall be deposited into the Department of Water Resources Electricity Supply Reliability Reserve Fund established pursuant to Section 80720 and shall be used solely for the purposes of this division.
SEC. 10.SEC. 12.Division 29.5 (commencing with Section 80800) is added to the Water Code, to read:29.5.CLEAN ENERGY CENTRAL PROCUREMENT1.General Provisions80800.This division does not reduce or modify an electrical corporations obligation to serve.
80801.The commission shall issue orders it determines are necessary to carry out this division.
80802.(a)The Legislature finds and declares all of the following:
(1)California has significantly reduced the emissions of greenhouse gases from its electricity sector by fostering the development of renewable and zero-carbon energy resources through the establishment of ambitious goals and policies. These efforts have fundamentally transformed the states portfolio of energy resources and the day-to-day operations of the states electrical system.
(2)The state has enabled the expansion of electrical retail choice for customers served in electrical corporation service territory, bringing new market entrants and innovation to Californias evolving retail electricity market.
(3)The states electrical system also faces the risk of increased disruption due to more frequent and intense extreme weather events fueled by a rapidly changing climate.
(4)For California to achieve its long-term greenhouse gas emission reduction goals, while maintaining a reliable electrical system and providing customers with greater choice in electricity retail providers, the state must establish a new new, limited central procurement function within the department that enables the development of a more diverse portfolio of renewable and zero-carbon energy resources.
(b)In enacting this division, it is the intent of the Legislature to do all of the following:
(1)Create a central procurement function within the department that would only be exercised upon request by the commission and only if the commission finds that it is necessary to procure diverse clean energy resources beyond those procured by load-serving entities to achieve the state policy specified in Section 454.53 of the Public Utilities Code.
(2)If the department exercises its central procurement function, as described in paragraph (1), provide an opportunity for load-serving entities and local publicly owned electric utilities to elect for the department to procure diverse clean energy resources on their behalf.
(3) Except as provided in paragraph (4), require the department to sell, at market value, clean energy resources and all attributes produced by a clean energy resource and not otherwise procured by a load-serving entity or local publicly owned electric utility, as described in paragraph (2), and to use the resulting revenues to offset costs for purposes of calculating a nonbypassable charge imposed pursuant to this division.
(3)(4)Prohibit the department from selling any clean energy resources it acquires pursuant to this division at more than the departments acquisition costs, including transmission, scheduling, financing, program administration, and other related costs. costs, when selling those resources under a long-term contract.
(4)(5)Prohibit the department from pursuing procurement activities, including, if authorized, the issuance of bonds, except upon a finding from the commission that the recovery of costs through charges on customers, the issuance of bonds, and the material terms of such bonds, including interest rates, rating, amortization, and maturity, do not unreasonably increase costs to customers on a net present value basis compared with procurement of a diverse clean energy resource procured by an electrical corporation.
(5)(6)Require the department to prioritize investments that do not compete with the procurement of diverse clean energy resources already planned for development and disclosed by load-serving entities or local publicly owned electric utilities.
80803.The development and operation of a central procurement function program as provided in this division is in all respects for the welfare and benefit of the people of the state, to protect the public peace, health, and safety, and constitutes an essential government purpose.
80804.This division shall be liberally construed in a manner so as to effectuate its purposes and objectives.
80805.(a)The powers and responsibilities of the department established pursuant to this division are separate from, and not governed by, the provisions relating to the State Water Resources Development System, including, but not limited to, those powers and responsibilities granted pursuant to Part 3 (commencing with Section 11100) of Division 6 and the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6).
(b)The Clean Energy Central Procurement Fund established in Section 80830, and the moneys in that fund, are separate and distinct from any other fund and moneys administered by the department.
(c)This division does not subject the department to the jurisdictional authority of the Public Utilities Commission or expand the jurisdiction of the Public Utilities Commission, including that state water resources development system facilities subject to the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6) and the departments other electrical generation projects or power contracts outside of those funded through the Clean Energy Central Procurement Fund, remain outside the jurisdiction of the commission.
80806.The department may adopt regulations for purposes of administering this division.
2.Definitions80810.For purposes of this division, the following definitions apply:
(a)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of a balancing area within California. The balancing authority maintains load resource balance within this area.(b)(a)Bond means any bond, note, or other written evidence of indebtedness issued solely for purposes of supporting the Clean Energy Central Procurement Fund and other related expenses incurred by the department pursuant to this division, or for reimbursing expenditures from the fund for those purposes, establishing or maintaining reserves in connection with a bond, costs of issuance of a bond or incidental to its payment or security, capitalized interest, or renewing or refunding any bonds.
(b)California balancing authority has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(c)Clean energy resources has the same meaning as defined in Section 454.52 of the Public Utilities Code. Clean energy resources includes, but is not limited to, those clean energy resources, as defined, that have a first point of interconnection with the transmission grid or the distribution grid within a California balancing authority.
(c)(d)Commission means the Public Utilities Commission.
(d)(e)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(e)(f)Energy Commission means the State Energy Resources Conservation and Development Commission.
(f)(g)Fund means the Clean Energy Central Procurement Fund established in Section 80830.
(g)(h)Independent System Operator means the Independent System Operator described in Article 3 (commencing with Section 345) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code.
(h)(i)Load-serving entity has the same meaning as defined in Section 380 of the Public Utilities Code.
(i)(j)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
3.Department Powers80820.(a)In accordance with Sections 380, 454.51, 454.52, 454.53, and 454.54 of the Public Utilities Code, following a determination from the commission, in consultation with the Energy Commission and the Independent System Operator, that it is necessary for the department to develop and conduct one or more competitive solicitations to procure energy, capacity, ancillary services, and all associated attributes, the department may may, until December 31, 2029, conduct those solicitations. The purpose of these competitive solicitations is to make available to the state diverse clean energy resources that meet criteria determined by the commission, which shall include, but not be limited to, energy resources that have a first point of interconnection with the transmission grid or the distribution grid within a balancing authority area. resources.
(b)In evaluating the bids received through the solicitation, the department shall consider all of the following:
(1)For diverse clean energy resources dependent on the development of a project, that projects viability, including, but not limited to, developer experience, developer financial strength and creditworthiness sufficient to eliminate financing contingencies, and the status of required permits and licenses.
(2)The ability to meet in-service dates offered during the solicitation and the ability to meet those in-service dates without escalation in cost.
(3)The useful life of the project.
(4)The capability to supply energy, capacity, and ancillary services at locations, times of day, and for durations that meet the states energy resource needs, as determined by the department and the commission.
(5)Any other criteria determined by the commission or the department.
(c)The department shall require, as a condition of the solicitation, that bids include a charge payable to the Offshore Wind Workforce Development Fund established in Section 80831.
80821.(a)(1)When conducting a solicitation pursuant to Section 80820, the department shall confer with the commission and other parties, including load-serving entities and local publicly owned electric utilities participating pursuant to Section 80822, for diverse clean energy resource procurement activities of an identified scope and duration. The department shall recover costs related to conducting the requested solicitations and all supporting work. Cost recovery may be effectuated, if determined to be appropriate just and reasonable by the commission, through a nonbypassable charge approval process or pursuant to Section 80822 for load-serving entities and local publicly owned electric utilities.
(2)At the request of the department, the commission may require an electrical corporation to act as the agent of the department or to assist the department in conducting the solicitation, bid evaluation, or contract negotiation for new clean energy resource procurement. The electrical corporation shall be reimbursed by the department for its costs.
(b)If cost recovery for a contract for clean energy resources is determined through a commission proceeding, the department shall recover its costs if the commission determines those that the procurement process, the resulting transactions, and the associated costs are just and reasonable. Those costs may include costs related to bond issuance incurred pursuant to Chapter 5 (commencing with Section 80840), costs related to contracting for diverse clean energy resources, and other costs to implement this division.
(c)If the commission determines that a nonbypassable charge necessary to fund activities conducted by the department pursuant to this division is just and reasonable, the department shall ensure it has entered into an agreement with the commission for that nonbypassable charge before it begins to incur costs related to a specific activity under this division. If the purpose of the nonbypassable charge is to recover the departments revenue requirement related to bond issuance debt service, the department shall ensure the agreement has the force and effect of an irrevocable financing order adopted in accordance with Article 5.5 (commencing with Section 840) of Chapter 4 of Part 1 of Division 1 of the Public Utilities Code or that the commission has separately issued an irrevocable financing order related to the nonbypassable charge.
(d)Any agreement between the department and the commission under this section shall provide for the administration of the nonbypassable charge, including both of the following requirements:
(1)The department shall notify the commission each year of the annual collections received by the department and the amount of any excess or deficiency in collections above or below the revenue requirement. The commission shall adjust charges in the subsequent year to reflect that excess or deficiency.
(2)During any period, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund any of the amounts specified in Section 80842 or subdivision (b) of Section 80830, the department shall notify the commission in writing and the commission shall act within 60 days of receiving that notice to increase the nonbypassable charge so that the amounts collected during that period are sufficient to meet those obligations.
(e)Any agreement between the department and the commission pursuant to this section that is solely for the purpose of imposing a nonbypassable charge to recover the departments revenue requirement related to bond issuance debt service shall include a provision stating that the commissions just and reasonable determination with respect to the revenue requirement is in effect for the duration of the bond term.
80822.(a)Pursuant to Section 80820, the department may establish a schedule and mechanism for any load-serving entity or local publicly owned electric utility to voluntarily obtain from the department energy, capacity, or ancillary services to be acquired by the department through its central procurement function on a contract-by-contract basis.
(b)In order to voluntarily participate, a load-serving entity or local publicly owned electric utility shall commit to the imposition of a nonbypassable charge on its ratepayers sufficient at all times to fund its participation in the program and on terms and conditions as set forth in Section 80826.
80823.At the request of the department, the commission may order an electrical corporation, or its successor in the performance of a related service, to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as agent of the department, provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department.
80824.The commission may issue rules regulating the enforcement of the agency function pursuant Section 80823 and this division, including collection of nonbypassable charges and payment into the fund on behalf of the department.
80825.(a)If the department has executed an agreement with the commission pursuant to subdivision (c) of Section 80821, the department may recover its costs, as a revenue requirement, in the amounts and at the times necessary to enable it to comply with Section 80842, and shall advise the commission and each applicable load-serving entity or local publicly owned electric utility, as the department determines to be appropriate and subject to the terms of the agreement.
(b)For purposes of this division and except as otherwise provided in this section, the commissions authority as set forth in Section 451 of the Public Utilities Code shall apply.
80826.(a)A load-serving entity or local publicly owned electric utility that voluntarily participates in the departments central procurement function pursuant to Section 80822 shall enter into an agreement with the department for the revenue requirement to fund its participation and that agreement shall have the force and effect of an irrevocable financing order.
(b)The agreement shall provide for the administration of the revenue requirement, including both of the following:
(1)A requirement that the department annually notify the load-serving entity or local publicly owned electric utility of the annual collections received by the department with respect to the revenue requirement and the amount of any excess or deficiency in collections above or below the revenue requirement. The load-serving entity or local publicly owned electric utility shall adjust charges in the subsequent year to reflect any such excess or deficiency.
(2)During any revenue requirement period, a requirement that, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund any of the amounts described in Section 80842, the department notify the load-serving entity or local publicly owned electric utility in writing and the load-serving entity or local publicly owned electric utility shall act within 30 days of receiving that notice to increase the charge so that the amount collected during the period are sufficient to meet those obligations.
80827.All moneys collected by load-serving entities and local publicly owned electric utilities and remitted to the department for any diverse clean energy resources acquired and sold pursuant to this division, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of clean energy resources acquired pursuant to this division, shall be deposited into the fund in accordance with Section 80830.
80828.The department may fix and establish the procedure and charges for the sale or other disposal of clean energy resources purchased by the department.
4.Clean Energy Central Procurement Fund Funds80830.(a)There is hereby established in the State Treasury the Clean Energy Central Procurement Fund. Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated, without regard to fiscal year, to the department and shall be available for purposes of this division.
(b)All Except as otherwise specified in Section 80820, all revenues payable to the department under this division, including proceeds of bonds issued pursuant to Chapter 5 (commencing with Section 80840), shall be deposited into the fund. Notwithstanding any other law, interest accruing on the moneys in the fund shall be deposited into the fund and shall be used for purposes of this division.
(c)Payments from the fund may be made only for the following purposes:
(1)Payment of any bonds or other contractual obligations authorized by this division.
(2)The cost of energy and transmission, scheduling, and other related expenses incurred by the department.
(3)The expenses incurred by the department in administering this division, including costs of personnel, contracts, or arrangements to carry out the departments duties and responsibilities pursuant to this division.
(d)Obligations authorized pursuant to this division shall be payable solely from the fund. Neither the full faith and credit nor the taxing power of the state are, or may be, pledged for any payment under any obligation authorized by this division.
(e)While any obligations of the department incurred pursuant to this division remain outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of, or parties to, those obligations. The department may include this pledge and undertaking of the state in the departments obligations.
80831.(a)There is hereby established in the State Treasury the Offshore Wind Workforce Development Fund.
(b)Moneys in the fund may be used, upon appropriation by the Legislature, to award grants for purposes of educating, training, maintaining, and strengthening the workforce needed for offshore wind energy development.
(c)Pursuant to Section 80820, revenues from the charge imposed as a condition of the solicitation are payable to the Offshore Wind Workforce Development Fund.
(d)Entities eligible for a grant from the Offshore Wind Workforce Development Fund include, but are not limited to, all of the following entities:
(1)Postsecondary educational institutions, as defined in Section 66261.5 of the Education Code.
(2)California Native American tribes, as defined in Section 21073 of the Public Resources Code.
(3)Regional workforce development teams.
5.Bonds80840.(a)(1)If the commission requests the department to engage in central procurement activities pursuant to paragraph (5) of subdivision (a) of Section 454.52 of the Public Utilities Code, or the department conducts competitive solicitations pursuant to this division, due to the timing of cost recovery processes, the department may determine that it is necessary or desirable to issue bonds to support activities for the procurement of diverse clean energy resources pursuant to this division.
(2)Upon making a determination pursuant to paragraph (1), the department may issue bonds for purposes of financing the procurement of diverse clean energy resources supporting the fund and other related expenses incurred by the department pursuant to this division, and subsequent to the department having entered into an agreement with the commission regarding a revenue requirement. Bonds shall not be issued in an amount the debt service on which, to the extent payable from the fund, is estimated by the department to exceed the amounts estimated to be available in the fund for their payment.
(b)Before the issuance of bonds in a public offering, the department shall ensure the bonds have an investment grade rating from at least one nationally recognized investment ratings firm and the document authorizing the issuance of the bonds shall provide for repayment from pledged revenues.
(c)The commission shall have an opportunity to review the trust agreement or other document pursuant to which the bonds are issued and revenues are pledged, and shall consult with the department regarding the trust agreement or other document, to ensure its consistency with the revenue requirement agreement between the department and commission.
(d)In addition to any other purposes for which bonds may be issued pursuant to this division, bonds may be issued for the following purposes:
(1)Refunding bonds to obtain a lower interest rate.
(2)Refunding bonds bearing a variable interest rate with bonds bearing interest at a fixed rate.
(3)Refunding bonds if a nationally recognized investment ratings firm reduces or withdraws, or proposes to reduce or withdraw, the rating assigned to securities that are secured by bond insurance policies, credit, or liquidity facilities issued by the provider of a bond insurance policy, or a credit or liquidity facility securing the bonds being refunded.
(4)Refunding bonds issued to preserve a federal income tax exemption or to qualify or maintain other federal income tax benefits.
80841.(a)Whenever the director determines that the issuance of bonds is necessary or desirable to accomplish the goals set forth in this division, including financing the procurement of diverse clean energy resources, the director shall issue a written determination authorizing the issuance of bonds by the department. The department, in consultation with the Department of Finance, shall notify the Chairperson of the Joint Legislative Budget Committee and the chairpersons of the fiscal committees of each house of the Legislature of its written determination. The bonds shall be sold in the manner, and on the terms and conditions, specified in that determination, and the determination may contain or authorize any other provision, condition, or limitation not inconsistent with this division and those provisions as may be deemed reasonable and proper for the security of the bondholders. Bonds may mature at the time or times, and bear interest at the rate or rates, which may be fixed or variable and be determined by reference to an index or such other method, and may be federally tax exempt, as specified in the determination. Neither the person executing the determination to issue bonds nor any person executing bonds shall be personally liable therefor or be subject to any personal liability or accountability by reason of the issuance of the bonds.
(b)In the discretion of the department, bonds may be secured by a trust agreement by and between the department and a trustee, which may be any trust company or bank having trust powers within or outside the state, or the Treasurer. Notwithstanding any other law, the Treasurer shall not be deemed to have a conflict of interest by reason of acting as the trustee. The department may enter into contracts or arrangements in connection with the issuance and sale of bonds, or with respect to any outstanding bonds for so long as those bonds remain outstanding, as it shall deem to be necessary or desirable for the issuance and further security of the bonds, including, but not limited to, credit enhancement agreements, dealer agreements, purchase contracts, escrow agreements, and similar arrangements.
(c)Bonds shall be legal investments for all trust funds, the funds of all insurance companies, savings and commercial banks, trust companies, executors, administrators, trustees, and other fiduciaries, for state school funds, pension funds, and for any funds that may be invested in county, school, or municipal bonds.
(d)Notwithstanding that bonds may be payable from a special fund, the bonds shall be deemed to be negotiable instruments for all purposes.
(e)Any bonds, and the transfer of and income derived from those bonds, shall at all times be free from taxation of every kind by the state and by the political subdivisions of the state.
(f)Bonds shall not be deemed to constitute a debt or liability of the state or of any political subdivision thereof, other than the department, or a pledge of the full faith and credit of the state or of any such political subdivision, but shall be payable solely from the revenues described in paragraph (1) of subdivision (g). All bonds shall contain a statement to the following effect: Neither the faith and credit nor the taxing power of the State of California is pledged to the payment of the principal of or interest on this bond. The issuance of bonds shall not directly or indirectly or contingently obligate the state or any political subdivision thereof to levy or to pledge any form of taxation whatever therefor or to make any appropriation for their payment.
(g)(1)The department may pledge and apply all or any part of revenues of any nature whatever accruing to the department, from orders issued, charges imposed, or contracts entered into pursuant to or in furtherance of this division, or the right to receive the same, to the payment or security of any or all of the principal of the bonds or the interest thereon, in the manner and upon terms that the department deems advisable.
(2)(A)It is the intent of the Legislature that any pledge of moneys, revenues, or property made by the department shall be valid and binding from the time when the pledge is made; made if the commission finds the pledge was just and reasonable, and that the moneys, revenues, or property so pledged and thereafter collected from retail end use customers, or paid directly or indirectly to or for the account of the department, is hereby made, and shall immediately be, subject to the lien of that pledge without any physical delivery thereof or further act.
(B)It is the intent of the Legislature that the lien of any such pledge shall be valid and binding against all parties having claims of any kind in tort, contract, or otherwise against the department irrespective of whether those parties have notice thereof, and that no resolution or instrument by which the pledge or lien created pursuant to this subdivision is expressed, confirmed, or approved need be filed or recorded in order to perfect the pledge or lien.
(C)It is the intent of the Legislature that this paragraph, in all respects, govern the creation, perfection, priority, and enforcement of any lien created pursuant to this division.
80842.(a)The department shall, and in any obligation entered into pursuant to this division may covenant to, at least annually, and more frequently as required, establish and revise revenue requirements sufficient, together with any moneys deposited into the fund, to provide all of the following:
(1)The amounts necessary to pay the principal of, and premium, if any, and interest on, all bonds as and when the same shall become due.
(2)The amounts necessary to pay for electricity purchased by it and to deliver it to purchasers, including the cost of electricity, transmission, scheduling, and other related expenses incurred by the department, or to make payments under any other contracts, agreements, or obligations entered into by it pursuant to this division, in the amounts and at the times the same shall become due.
(3)Reserves in amount as may be determined by the department from time to time to be necessary or desirable.
(4)The pooled money investment rate on funds advanced for electricity purchases before the receipt of payment for those purchases by the purchasing entity.
(5)The administrative costs of the department and other state agencies, including the costs and fees for professional services, bond issuance and sale, and other miscellaneous costs, incurred in connection with the issuance of bonds or the administration of this division.
(b)The department shall notify the commission of its revenue requirement pursuant to the agreement required pursuant to Section 80821 and that revenue requirement shall be satisfied by the recovery of its costs through a nonbypassable charge.
6.Repeal80850.This division shall remain in effect only until January 1, 2050, and as of that date is repealed.
SEC. 11.SEC. 13.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SEC. 14.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to ensure the procurement of clean energy resources that the state needs to meet its reliability needs, which have been identified as being delayed or needing a secure development path, it is necessary to establish a central procurement entity within the Department of Water Resources and for this act to take effect immediately.
Sections 10295 and 10297 do not apply to any contract entered into by the Department of Water Resources under Part 3 (commencing with Section 11100) of Division 6 or 6, Chapter 8 (commencing with Section 12930) of Part 6 of Division 6 6, Division 29 (commencing with Section 80700), or Division 29.5 (commencing with Section 80800), of the Water Code for the acquisition, sale, or transmission of power, or for services to facilitate those activities.
SEC. 2.Section 365.1 of the Public Utilities Code is amended to read:365.1.(a)Except as expressly authorized by this section, and subject to the limitations in subdivisions (b) and (c), the right of retail end-use customers pursuant to this chapter to acquire service from other providers is suspended until the Legislature, by statute, lifts the suspension or otherwise authorizes direct transactions. For purposes of this section, other provider means any person, corporation, or other entity that is authorized to provide electric service within the service territory of an electrical corporation pursuant to this chapter, and includes an aggregator, broker, or marketer, as defined in Section 331, and an electric service provider, as defined in Section 218.3. Other provider does not include a community choice aggregator, as defined in Section 331.1, and the limitations in this section do not apply to the sale of electricity by other providers to a community choice aggregator for resale to community choice aggregation electricity consumers pursuant to Section 366.2.
(b)The commission shall allow authorize individual retail nonresidential end-use customers to acquire electric service from other providers in each electrical corporations distribution service territory, up to a maximum allowable total kilowatthours annual limit. The maximum allowable annual limit shall be established by the commission for each electrical corporation at the maximum total kilowatthours supplied by all other providers to distribution customers of that electrical corporation during any sequential 12-month period between April 1, 1998, and the effective date of this section. October 11, 2009. Within six months of the effective date of this section, or by July 1, 2010, whichever is sooner, the October 11, 2009, the commission shall adopt and implement a reopening schedule that commences immediately and will phase in the allowable amount of increased kilowatthours over a period of not less than three years, and not more than five years, raising the allowable limit of kilowatthours supplied by other providers in each electrical corporations distribution service territory from the number of kilowatthours provided by other providers as of the effective date of this section, October 11, 2009, to the maximum allowable annual limit for that electrical corporations distribution service territory. The commission shall review and, if appropriate, modify its currently effective rules governing direct transactions, but that review shall not delay the start of the phase-in schedule.
(c)Once the commission has authorized additional direct transactions pursuant to subdivision (b), it shall do both of the following:
(1)Ensure that other providers are subject to the same requirements that are applicable apply to the states three largest electrical corporations under any programs or rules adopted by the commission to implement the resource adequacy provisions of Section 380, the renewables portfolio standard provisions of Article 16 (commencing with Section 399.11), and the requirements for the electricity sector adopted by the State Air Resources Board pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code). Code), and the requirements of the integrated resource planning process as specified in Sections 454.5 to 454.6, inclusive. This requirement applies notwithstanding any prior decision of the commission to the contrary.
(2)(A)Ensure that, in the event that the commission authorizes, in the situation of a contract with a third party, or orders, in the situation of utility-owned generation, an electrical corporation to obtain generation resources that the commission determines are needed to meet system or local area reliability needs for the benefit of all customers in the electrical corporations distribution service territory, the net capacity costs of those generation resources are allocated on a fully nonbypassable basis consistent with departing load provisions as determined by the commission, to all of the following:
(i)Bundled service customers of the electrical corporation.
(ii)Customers that purchase electricity through a direct transaction with other providers.
(iii)Customers of community choice aggregators.
(B)If the commission authorizes or orders an electrical corporation to obtain generation resources pursuant to subparagraph (A), the commission shall ensure that those resources meet a system or local reliability need in a manner that benefits all customers of the electrical corporation. The commission shall allocate the costs of those generation resources to ratepayers in a manner that is fair and equitable to all customers, whether they receive electric service from the electrical corporation, a community choice aggregator, or an electric service provider.
(C)The resource adequacy benefits of generation resources acquired by an electrical corporation pursuant to subparagraph (A) shall be allocated to all customers who pay their net capacity costs. Net capacity costs shall be determined by subtracting the energy and ancillary services value of the resource from the total costs paid by the electrical corporation pursuant to a contract with a third party or the annual revenue requirement for the resource if the electrical corporation directly owns the resource. An energy auction shall not be required as a condition for applying this allocation, but may be allowed as a means to establish the energy and ancillary services value of the resource for purposes of determining the net costs of capacity to be recovered from customers pursuant to this paragraph, and the allocation of the net capacity costs of contracts with third parties shall be allowed for the terms of those contracts.
(D)It is the intent of the Legislature, in enacting this paragraph, to provide additional guidance to the commission with respect to the implementation of subdivision (g) of Section 380, as well as and to ensure that the customers to whom the net costs and benefits of capacity are allocated are not required to pay for the cost of electricity they do not consume.
(d)(1)If the commission approves a centralized resource adequacy mechanism pursuant to subdivisions (h) and (i) of Section 380, upon the implementation of the centralized resource adequacy mechanism the requirements of paragraph (2) of subdivision (c) shall be suspended. If the commission later orders that electrical corporations cease procuring capacity through a centralized resource adequacy mechanism, the requirements of paragraph (2) of subdivision (c) shall again apply.
(2)If the use of a centralized resource adequacy mechanism is authorized by the commission and has been implemented as set forth in paragraph (1), the net capacity costs of generation resources that the commission determines are required to meet urgent system or urgent local grid reliability needs, and that the commission authorizes to be procured outside of the Section 380 or Section 454.5 processes, shall be recovered according to the provisions of paragraph (2) of subdivision (c).
(3)This subdivision does not supplant the resource adequacy requirements of Section 380 or the resource procurement procedures established in Section 454.5.
(e)On or before June 1, 2019, the commission shall issue an order regarding direct transactions that provides as follows:
(1)Increase the maximum allowable total kilowatthours annual limit by 4,000 gigawatthours and apportion that increase among the service territories of the electrical corporations.
(2)All residential and nonresidential customer accounts that are on direct access as of January 1, 2019, remain authorized to participate in direct transactions.
(f)(1)On or before June 1, 2020, the commission shall provide recommendations to the Legislature on implementing a further direct transactions reopening schedule, including, but not limited to, the phase-in period over which the further direct transactions shall occur for all remaining nonresidential customer accounts in each electrical corporations service territory. (2)In developing the recommendations pursuant to paragraph (1), the commission shall find all of the following: (A)The recommendations are consistent with the states greenhouse gas emission reduction goals. (B)The recommendations do not increase emissions of criteria air pollutants and toxic air contaminants. (C)The recommendations ensure electrical system reliability. (D)The recommendations do not cause undue shifting of costs to bundled service customers of an electrical corporation or to direct transaction customers. (3)(A)The recommendations shall be provided in compliance with Section 9795 of the Government Code. (B)Pursuant to Section 10231.5 of the Government Code, this subdivision is inoperative on June 1, 2024. SEC. 3.Section 380 of the Public Utilities Code is amended to read:380.(a)The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities.
(b)In establishing resource adequacy requirements, the commission shall ensure the reliability of electrical service in California while advancing, to the extent possible, the states goals for clean energy, reducing air pollution, and reducing emissions of greenhouse gases. The resource adequacy program shall achieve all of the following objectives:
(1)Facilitate development of new generating, nongenerating, and hybrid capacity and retention of existing generating, nongenerating, and hybrid capacity that is economic economical and needed. needed for reliability and to achieve the state policy specified in Section 454.53.
(2)Establish new, or maintain existing, demand response products and tariffs that facilitate the economic economical dispatch and use of demand response that can either meet or reduce an electrical corporations resource adequacy requirements, as determined by the commission.
(3)Equitably allocate the cost of generating capacity and demand response in a manner that prevents the shifting of costs between customer classes.
(4)Minimize enforcement requirements and costs.
(5)Maximize the ability of community choice aggregators to determine the generation resources used to serve their customers.
(c)Each load-serving entity shall maintain physical generating capacity and electrical demand response adequate to meet its load requirements, including, but not limited to, peak demand and planning and operating reserves. The generating capacity or electrical demand response shall be deliverable to locations and at times as may be necessary to maintain electrical service system reliability, local area reliability, and flexibility.
(d)Each load-serving entity shall, at a minimum, meet the most recent minimum planning reserve and reliability criteria approved by the board of directors of the Western Systems Coordinating Council or the Western Electricity Coordinating Council.
(e)The commission shall implement and enforce the resource adequacy requirements established in accordance with this section in a nondiscriminatory manner. Each load-serving entity shall be subject to the same requirements for resource adequacy and adequacy, the renewables portfolio standard program program, and the integrated resource planning process pursuant to Section 454.52 that are applicable apply to electrical corporations pursuant to this section, or otherwise required by law, or by order or decision of the commission. The commission shall exercise its enforcement powers to ensure compliance by all load-serving entities.
(f)(1)The commission shall require sufficient information, including, but not limited to, anticipated load, actual load, and measures undertaken by a load-serving entity to ensure resource adequacy, to be reported to enable the commission to determine compliance with the resource adequacy requirements established by the commission.
(2)The commission shall calculate and publish annually on its internet website, in a new report or as part of another report, the percentage of each load-serving entitys local and system resource adequacy requirements from the previous calendar year that was met with capacity from eligible renewable energy resources pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11)), other zero-carbon resources, including large hydroelectric and nuclear resources, or energy storage resources. In determining the percentage of each load-serving entitys resource adequacy requirements, the commission shall include all directly owned or contracted resources and each load-serving entitys allocation of any centrally procured resources or allocation of resources pursuant to any other mechanism that involves an assignment or allocation of resources purchased or owned by a single buyer, and shall exclude any share of a load-serving entitys resources that were allocated to another load-serving entity.
(g)An electrical corporations costs of meeting or reducing resource adequacy requirements, including, but not limited to, the costs associated with system reliability, local area reliability, and flexibility, flexible resource adequacy, renewable integration, or resource diversity portfolio requirements, that are determined to be reasonable by the commission, or are otherwise recoverable under a procurement plan approved by the commission pursuant to Section 454.5, shall be fully recoverable from those customers on whose behalf the costs are incurred, as determined by the commission, at the time the commitment to incur the cost is made, on a fully nonbypassable basis, as determined by the commission. The commission shall exclude any amounts authorized to be recovered pursuant to Section 366.2 when authorizing the amount of costs to be recovered from customers of a community choice aggregator or from customers that purchase electricity through a direct transaction pursuant to this subdivision.
(h)The commission shall determine and authorize the most efficient and equitable means for achieving all of the following:
(1)Meeting the objectives of this section.
(2)Ensuring that investment is made in new generating capacity. capacity, including the capacity needed to achieve the state policy specified in Section 454.53.
(3)Ensuring that existing generating capacity that is economic is retained. retained, including the capacity needed to maintain reliability while achieving the state policy specified in Section 454.53.
(4)Ensuring that the cost of generating capacity and demand response is allocated equitably.
(5)Ensuring that community choice aggregators can determine the generation resources used to serve their customers.
(6)Ensuring that investments are made in new and existing demand response resources that are cost effective and help to achieve electrical grid reliability and the states goals for reducing emissions of greenhouse gases.
(7)Minimizing the need for backstop procurement by the Independent System Operator.
(i)In making the determination pursuant to subdivision (h), the commission may consider a centralized resource adequacy mechanism among other options.
(j)The commission shall ensure appropriate valuation of both supply and load modifying demand response resources. The commission, in an existing or new proceeding, shall establish a mechanism to value load modifying demand response resources, including, but not limited to, the ability of demand response resources to help meet distribution needs and transmission system needs and to help reduce a load-serving entitys resource adequacy obligation pursuant to this section. In determining this value, the commission shall consider how these resources further the states electrical grid reliability and the states goals for reducing emissions of greenhouse gases. The commission, Energy Commission, and Independent System Operator shall jointly ensure that changes in demand caused by load modifying demand response are expeditiously and comprehensively reflected in the Energy Commissions Integrated Energy Policy Report forecast, forecast and in planning proceedings and associated analyses, and shall encourage reflection of these changes in demand in the operation of the grid.
(k)For purposes of this section, load-serving entity means an electrical corporation, electric service provider, or community choice aggregator. Load-serving entity does not include any of the following:
(1)A local publicly owned electric utility.
(2)The State Water Resources Development System commonly known as the State Water Project.
(3)Customer generation located on the customers site or providing electric service through arrangements authorized by Section 218, if the customer generation, or the load it serves, meets one of the following criteria:
(A)It takes standby service from the electrical corporation on a commission-approved rate schedule that provides for adequate backup planning and operating reserves for the standby customer class.
(B)It is not physically interconnected to the electrical transmission or distribution grid, so that, if the customer generation fails, backup electricity is not supplied from the electrical grid.
(C)There is physical assurance that the load served by the customer generation will be curtailed concurrently and commensurately with an outage of the customer generation.
SEC. 4.Section 454.51 of the Public Utilities Code is amended to read:454.51.The commission shall do all of the following:
(a)Identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy and resource diversity in a cost-effective manner. The portfolio shall be used by the commission to establish integrated resource planning-based procurement requirements that rely upon on zero carbon-emitting resources to the maximum extent reasonable and be designed to achieve the state policy specified in Section 454.53 and any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) or any successor legislation.
(b)Direct each electrical corporation to include, as part of its proposed procurement plan, a strategy for procuring best-fit and least-cost resources to satisfy the portfolio needs identified by the commission pursuant to subdivision (a).
(c)Ensure that the net costs of any incremental renewable energy integration or diversification resources procured by an electrical corporation corporation, or the Department of Water Resources, to satisfy the need identified in subdivision (a) are allocated on a fully nonbypassable basis consistent with the treatment of costs identified in paragraph (2) of subdivision (c) of Section 365.1.
(d)Permit community choice aggregators to submit proposals for satisfying their portion of the renewable integration need identified in subdivision (a). If the commission finds this need is best met through long-term procurement commitments for resources, community choice aggregators shall also be required to make long-term commitments for resources. The commission shall approve proposals pursuant to this subdivision if it finds all of the following:
(1)The resources proposed by a community choice aggregator will provide equivalent integration of renewable energy.
(2)The resources proposed by a community choice aggregator will promote the efficient achievement of state energy policy objectives, including reductions in greenhouse gas emissions.
(3)Bundled customers of an electrical corporation will be indifferent from the approval of the community choice aggregator proposals.
(e)Ensure that all costs resulting from nonperformance to satisfy the need identified in subdivision (a) or (d), as applicable, shall be borne by the electrical corporation or community choice aggregator load-serving entity, as defined in Section 380, that failed to perform.
SEC. 5.Section 454.52 of the Public Utilities Code is amended to read:454.52.(a)(1)Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do all of the following:
(A)Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sectors percentage in achieving the economywide greenhouse gas emissions reductions pursuant to Section 38566 of the Health and Safety Code.
(B)Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with the state policy specified in Section 454.53 and Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C)Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D)Minimize impacts on ratepayers bills.
(E)Ensure system and local reliability on both a near-term and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380, and require sufficient, predictable resource procurement and development to avoid unplanned energy supply shortfalls by taking into account impacts due to climate change, forecasted levels of building and transportation electrification, and other factors that can result in those shortfalls.
(F)Comply with paragraph (1) of subdivision (b) of Section 399.13.
(G)Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.
(H)Enhance distribution systems and demand-side energy management.
(I)Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2)(A)The commission may authorize all source procurement for electrical corporations load-serving entities that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations load-serving entities geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B)The commission may approve procurement of resource types that will reduce the overall emissions of greenhouse gases from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3)In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the states energy goals at the least cost to ratepayers.
(4)Upon review of the requirements of Section 454.53 and the progress towards meeting the portfolio of resources identified in subdivision (a) of Section 454.51, the commission may direct an electrical corporation, or request the Department of Water Resources, to procure diverse clean energy resources, as defined by the commission, that meet the portfolio of resources identified in subdivision (a) of Section 454.51.
(5)If the commission requests the Department of Water Resources to procure diverse clean energy resources pursuant to paragraph (4), the commission, in consultation with the Department of Water Resources, shall develop and adopt procedures and requirements that govern procurement by, obligations on, and recovery of costs incurred by the Department of Water Resources and align with Division 29.5 (commencing with Section 80800) of the Water Code. The commission may review that procurement and, if approved, issue an order governing the recovery of the Department of Water Resources costs only if both of the following conditions are satisfied:
(A)The recovery of costs to satisfy the revenue requirement of the Department of Water Resources has been found to be just and reasonable and is in the public interest.
(B)The recovery of costs through charges on customers, including, if authorized, the issuance of bonds and the material terms of those bonds, including interest rates, rating, amortization, and maturity, does not unreasonably increase costs to customers on a net present value basis compared with the procurement of diverse clean energy resources by an electrical corporation pursuant to paragraph (4).
(b)(1)Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2)Each electrical corporations plan shall follow Section 454.5.
(3)The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve all of the following:
(A)Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B)A diversified procurement portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(C)The resource adequacy requirements established pursuant to Section 380.
(4)The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c)To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51. The commission may order resource procurement as a result of the integrated resource planning process and shall enforce any resource procurement requirements on a nondiscriminatory basis.
(d)To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e)This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.
(f)(1)The commission shall not include the energy, capacity, or any attribute from Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025, in the adopted integrated resource plan portfolios, resource stacks, or preferred system plans.
(2)The commission shall disallow a load-serving entity from including in their adopted integrated resource plan any energy, capacity, or any attribute from the Diablo Canyon Unit 1 beyond November 1, 2024, or Unit 2 beyond August 26, 2025.
(g)For a thermal powerplant that uses nuclear fission technology not constructed in the twenty-first century, all resource attributes shall be retired on January 1, 2031, and shall be reported as a separate, line item resource for purposes of complying with Section 398.4.
SEC. 6.Section 80713 is added to the Water Code, to read:80713.(a)(1)The Public Utilities Commission shall annually assess a capacity payment for the use of the Department of Water Resources Electricity Supply Reliability Reserve Fund established pursuant to Section 80720 by each load-serving entity that fails to meet its system resource adequacy requirements pursuant to Section 380 of the Public Utilities Code during any month in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used to meet a reliability need. The purpose of the capacity payment is to replenish the Department of Water Resources Electricity Supply Reliability Reserve Fund. The capacity payment is not a penalty and does not prohibit the Public Utilities Commission from assessing a penalty on a load-serving entity for a failure to comply with any resource adequacy requirement.
(2)The capacity payment shall be remitted to the Department of Water Resources Electricity Supply Reliability Reserve Fund by a load-serving entity that fails to meet its system resource adequacy requirements within 30 days of the commission notifying the load-serving entity.
(3)Unless a different calculation methodology is specified pursuant to subdivision (b), the capacity payment for each load-serving entity shall be calculated by the Public Utilities Commission as follows:
(A)A dollar amount equal to the per-kilowatt monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, which shall be calculated as the annual cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund weighted such that two-thirds of that amount reflects the costs of resources procured for summer months, which includes June to September, inclusive, and one-third of that amount reflects the costs of resources procured for other months.
(B)The dollar amount calculated pursuant to subparagraph (A) shall be multiplied by the maximum difference between the load-serving entitys load and the resources it procured to meet its load during the period in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used, as determined by the commission with input from the Independent System Operator.
(C)Adjusted to reflect the load-serving entitys estimated load minus any reductions resulting from any resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(D)Adjusted for any resources procured by electrical corporations on behalf of, and paid for by, the load-serving entity.
(b)The Public Utilities Commission, in consultation with the commission, may modify the capacity payment calculation methodology specified in paragraph (3) of subdivision (a). Any modification made by the Public Utilities Commission shall align with any modification made by the commission as authorized by subdivision (b) of Section 80714.
SEC. 7.Section 80714 is added to the Water Code, to read:80714.(a)(1)The executive director of the commission shall annually assess a capacity payment for the use of the Department of Water Resources Electricity Supply Reliability Reserve Fund established pursuant to Section 80720 by each local publicly owned electric utility that fails to meet its minimum planning reserve margin established in accordance with Section 9620 of the Public Utilities Code or subdivision (b) of Section 25704.5 of the Public Resources Code, during any month in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used to meet a reliability need.
(2)The capacity payment shall be remitted to the Department of Water Resources Electricity Supply Reliability Reserve Fund by a local publicly owned electric utility that fails to meet its minimum planning reserve margin within 30 days of the executive director notifying the local publicly owned electric utility.
(3)Unless a different calculation methodology is specified pursuant to subdivision (b), the capacity payment for each local publicly owned electric utility shall be calculated by the commission as follows:
(A)A dollar amount equal to the per-kilowatt monthly cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund, which shall be calculated as the annual cost of the resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund weighted such that two-thirds of that amount reflects the costs of resources procured for summer months, which includes June through September, inclusive, and one-third of that amount reflects the costs of resources procured for other months.
(B)The dollar amount calculated pursuant to subparagraph (A) shall be multiplied by the maximum difference between the local publicly owned electric utilitys load and the resources it procured to meet its load during the period in which resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund were used, as determined by the commission with input from the Independent System Operator.
(C)Adjusted to reflect the local publicly owned electric utilitys estimated load minus any reductions resulting from any resources procured using moneys from the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(b)The commission, in consultation with the Public Utilities Commission, may modify the capacity payment calculation methodology specified in paragraph (3) of subdivision (a). Any modification made by the commission shall align with any modification made by the Public Utilities Commission as authorized by subdivision (b) of Section 80713.
(c)The commission may adopt regulations to implement this section. In order to ensure the commission implements this section coincident with the Public Utilities Commissions implementation of Section 80713, thereby ensuring that load-serving entities and local publicly owned electric utilities are treated equally and assessed charges in a similar timeframe, the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code) does not apply to any commission action to implement this section.
SEC. 8.Section 80720 of the Water Code is amended to read:80720.(a)There is hereby established in the State Treasury the Department of Water Resources Electricity Supply Reliability Reserve Fund.
(b)Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated to the department, without regard to fiscal years, and shall be available for the purposes of Chapter 2 (commencing with Section 80710).
(c)Obligations authorized and expenses incurred by the department in administering this division shall be payable solely from the fund.
(d)All revenues payable to the department for activities undertaken by the department under Chapter 2 (commencing with Section 80710) or Chapter 5 (commencing with Section 80740) shall be deposited into the fund.
(e)The fund shall be separate and distinct from any other fund and moneys administered by the department and any interest earned on the moneys in the fund shall be used solely for purposes of this division.
(f)When fixed assets procured under the authority of this division are sold or otherwise disposed of, the revenue from the sale or disposition, including any gain or loss, measured by the difference between book value and selling price, shall be deposited into the fund and available to the department for purposes of Chapter 2 (commencing with Section 80710). Any remaining revenue from the sale or other disposition of fixed assets procured under the authority of this division shall be returned to the General Fund once all obligations of the department are satisfied after the wind down of this division and the closure of the fund. While any obligation of the department incurred under this division remains outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of or parties to those obligations.
SEC. 9.Chapter 5 (commencing with Section 80740) is added to Division 29 of the Water Code, to read:5.Collection and Use of Capacity Payment 80740.The department shall collect any capacity payment ordered pursuant to Section 80713 or 80714. Payments received shall be deposited into the Department of Water Resources Electricity Supply Reliability Reserve Fund established pursuant to Section 80720 and shall be used solely for the purposes of this division.
SEC. 10.Division 29.5 (commencing with Section 80800) is added to the Water Code, to read:29.5.CLEAN ENERGY CENTRAL PROCUREMENT1.General Provisions80800.This division does not reduce or modify an electrical corporations obligation to serve.
80801.The commission shall issue orders it determines are necessary to carry out this division.
80802.(a)The Legislature finds and declares all of the following:
(1)California has significantly reduced the emissions of greenhouse gases from its electricity sector by fostering the development of renewable and zero-carbon energy resources through the establishment of ambitious goals and policies. These efforts have fundamentally transformed the states portfolio of energy resources and the day-to-day operations of the states electrical system.
(2)The state has enabled the expansion of electrical retail choice for customers served in electrical corporation service territory, bringing new market entrants and innovation to Californias evolving retail electricity market.
(3)The states electrical system also faces the risk of increased disruption due to more frequent and intense extreme weather events fueled by a rapidly changing climate.
(4)For California to achieve its long-term greenhouse gas emission reduction goals, while maintaining a reliable electrical system and providing customers with greater choice in electricity retail providers, the state must establish a new central procurement function within the department that enables the development of a more diverse portfolio of renewable and zero-carbon energy resources.
(b)In enacting this division, it is the intent of the Legislature to do all of the following:
(1)Create a central procurement function within the department that would only be exercised upon request by the commission and only if the commission finds that it is necessary to procure diverse clean energy resources beyond those procured by load-serving entities to achieve the state policy specified in Section 454.53 of the Public Utilities Code.
(2)If the department exercises its central procurement function, as described in paragraph (1), provide an opportunity for local publicly owned electric utilities to elect for the department to procure diverse clean energy resources on their behalf.
(3)Prohibit the department from selling any energy it acquires pursuant to this division at more than the departments acquisition costs, including transmission, scheduling, financing, program administration, and other related costs.
(4)Prohibit the department from pursuing procurement activities, including, if authorized, the issuance of bonds, except upon a finding from the commission that the recovery of costs through charges on customers, the issuance of bonds, and the material terms of such bonds, including interest rates, rating, amortization, and maturity, do not unreasonably increase costs to customers on a net present value basis compared with procurement of a diverse clean energy resource procured by an electrical corporation.
(5)Require the department to prioritize investments that do not compete with the procurement of diverse clean energy resources already planned for development and disclosed by load-serving entities or local publicly owned electric utilities.
80803.The development and operation of a central procurement function program as provided in this division is in all respects for the welfare and benefit of the people of the state, to protect the public peace, health, and safety, and constitutes an essential government purpose.
80804.This division shall be liberally construed in a manner so as to effectuate its purposes and objectives.
80805.(a)The powers and responsibilities of the department established pursuant to this division are separate from, and not governed by, the provisions relating to the State Water Resources Development System, including, but not limited to, those powers and responsibilities granted pursuant to Part 3 (commencing with Section 11100) of Division 6 and the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6).
(b)The Clean Energy Central Procurement Fund established in Section 80830, and the moneys in that fund, are separate and distinct from any other fund and moneys administered by the department.
(c)This division does not subject the department to the jurisdictional authority of the Public Utilities Commission or expand the jurisdiction of the Public Utilities Commission, including that state water resources development system facilities subject to the California Water Resources Development Bond Act (Chapter 8 (commencing with Section 12930) of Part 6 of Division 6) and the departments other electrical generation projects or power contracts outside of those funded through the Clean Energy Central Procurement Fund, remain outside the jurisdiction of the commission.
80806.The department may adopt regulations for purposes of administering this division.
2.Definitions80810.For purposes of this division, the following definitions apply:
(a)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of a balancing area within California. The balancing authority maintains load resource balance within this area.
(b)Bond means any bond, note, or other written evidence of indebtedness issued solely for purposes of supporting the Clean Energy Central Procurement Fund and other related expenses incurred by the department pursuant to this division, or for reimbursing expenditures from the fund for those purposes, establishing or maintaining reserves in connection with a bond, costs of issuance of a bond or incidental to its payment or security, capitalized interest, or renewing or refunding any bonds.
(c)Commission means the Public Utilities Commission.
(d)Electrical corporation has the same meaning as defined in Section 218 of the Public Utilities Code.
(e)Energy Commission means the State Energy Resources Conservation and Development Commission.
(f)Fund means the Clean Energy Central Procurement Fund established in Section 80830.
(g)Independent System Operator means the Independent System Operator described in Article 3 (commencing with Section 345) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code.
(h)Load-serving entity has the same meaning as defined in Section 380 of the Public Utilities Code.
(i)Local publicly owned electric utility has the same meaning as defined in Section 224.3 of the Public Utilities Code.
3.Department Powers80820.(a)In accordance with Sections 380, 454.51, 454.52, 454.53, and 454.54 of the Public Utilities Code, following a determination from the commission, in consultation with the Energy Commission and the Independent System Operator, that it is necessary for the department to develop and conduct one or more competitive solicitations to procure energy, capacity, ancillary services, and all associated attributes, the department may conduct those solicitations. The purpose of these competitive solicitations is to make available to the state diverse clean energy resources that meet criteria determined by the commission, which shall include, but not be limited to, energy resources that have a first point of interconnection with the transmission grid or the distribution grid within a balancing authority area.
(b)In evaluating the bids received through the solicitation, the department shall consider all of the following:
(1)For diverse clean energy resources dependent on the development of a project, that projects viability, including, but not limited to, developer experience, developer financial strength and creditworthiness sufficient to eliminate financing contingencies, and the status of required permits and licenses.
(2)The ability to meet in-service dates offered during the solicitation and the ability to meet those in-service dates without escalation in cost.
(3)The useful life of the project.
(4)The capability to supply energy, capacity, and ancillary services at locations, times of day, and for durations that meet the states energy resource needs, as determined by the department and the commission.
(5)Any other criteria determined by the commission or the department.
80821.(a)When conducting a solicitation pursuant to Section 80820, the department shall confer with the commission and other parties, including local publicly owned electric utilities participating pursuant to Section 80822, for diverse clean energy resource procurement activities of an identified scope and duration. The department shall recover costs related to conducting the requested solicitations and all supporting work. Cost recovery may be effectuated, if determined to be appropriate by the commission, through a nonbypassable charge approval process or pursuant to Section 80822 for local publicly owned electric utilities.
(b)If cost recovery is determined through a commission proceeding, the department shall recover its costs if the commission determines those costs are just and reasonable. Those costs may include costs related to bond issuance incurred pursuant to Chapter 5 (commencing with Section 80840), costs related to contracting for diverse clean energy resources, and other costs to implement this division.
(c)If the commission determines that a nonbypassable charge necessary to fund activities conducted by the department pursuant to this division is just and reasonable, the department shall ensure it has entered into an agreement with the commission for that nonbypassable charge before it begins to incur costs related to a specific activity under this division. If the purpose of the nonbypassable charge is to recover the departments revenue requirement related to bond issuance debt service, the department shall ensure the agreement has the force and effect of an irrevocable financing order adopted in accordance with Article 5.5 (commencing with Section 840) of Chapter 4 of Part 1 of Division 1 of the Public Utilities Code or that the commission has separately issued an irrevocable financing order related to the nonbypassable charge.
(d)Any agreement between the department and the commission under this section shall provide for the administration of the nonbypassable charge, including both of the following requirements:
(1)The department shall notify the commission each year of the annual collections received by the department and the amount of any excess or deficiency in collections above or below the revenue requirement. The commission shall adjust charges in the subsequent year to reflect that excess or deficiency.
(2)During any period, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund any of the amounts specified in Section 80842 or subdivision (b) of Section 80830, the department shall notify the commission in writing and the commission shall act within 60 days of receiving that notice to increase the nonbypassable charge so that the amounts collected during that period are sufficient to meet those obligations.
(e)Any agreement between the department and the commission pursuant to this section that is solely for the purpose of imposing a nonbypassable charge to recover the departments revenue requirement related to bond issuance debt service shall include a provision stating that the commissions just and reasonable determination with respect to the revenue requirement is in effect for the duration of the bond term.
80822.(a)Pursuant to Section 80820, the department may establish a schedule and mechanism for any local publicly owned electric utility to voluntarily obtain from the department energy, capacity, or ancillary services to be acquired by the department through its central procurement function on a contract-by-contract basis.
(b)In order to voluntarily participate, a local publicly owned electric utility shall commit to the imposition of a nonbypassable charge on its ratepayers sufficient at all times to fund its participation in the program and on terms and conditions as set forth in Section 80826.
80823.At the request of the department, the commission may order an electrical corporation, or its successor in the performance of a related service, to transmit or provide for the transmission of, and distribute all electricity made available by the department, and, as agent of the department, provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the department.
80824.The commission may issue rules regulating the enforcement of the agency function pursuant Section 80823 and this division, including collection of nonbypassable charges and payment into the fund on behalf of the department.
80825.(a)If the department has executed an agreement with the commission pursuant to subdivision (c) of Section 80821, the department may recover its costs, as a revenue requirement, in the amounts and at the times necessary to enable it to comply with Section 80842, and shall advise the commission and each applicable local publicly owned electric utility, as the department determines to be appropriate and subject to the terms of the agreement.
(b)For purposes of this division and except as otherwise provided in this section, the commissions authority as set forth in Section 451 of the Public Utilities Code shall apply.
80826.(a)A local publicly owned electric utility that voluntarily participates in the departments central procurement function pursuant to Section 80822 shall enter into an agreement with the department for the revenue requirement to fund its participation and that agreement shall have the force and effect of an irrevocable financing order.
(b)The agreement shall provide for the administration of the revenue requirement, including both of the following:
(1)A requirement that the department annually notify the local publicly owned electric utility of the annual collections received by the department with respect to the revenue requirement and the amount of any excess or deficiency in collections above or below the revenue requirement. The local publicly owned electric utility shall adjust charges in the subsequent year to reflect any such excess or deficiency.
(2)During any revenue requirement period, a requirement that, if the department forecasts that the revenue requirement for that period will not be met and that collections will not be sufficient to fund any of the amounts described in Section 80842, the department notify the local publicly owned electric utility in writing and the local publicly owned electric utility shall act within 30 days of receiving that notice to increase the charge so that the amount collected during the period are sufficient to meet those obligations.
80827.All moneys collected by load-serving entities and remitted to the department for any diverse clean energy resources acquired and sold pursuant to this division, and all moneys paid directly or indirectly to or for the account of the department for any sale, exchange, transfer, or disposition of energy acquired pursuant to this division, shall be deposited into the fund in accordance with Section 80830.
80828.The department may fix and establish the procedure and charges for the sale or other disposal of energy purchased by the department.
4.Clean Energy Central Procurement Fund80830.(a)There is hereby established in the State Treasury the Clean Energy Central Procurement Fund. Notwithstanding Section 13340 of the Government Code, all moneys in the fund are continuously appropriated, without regard to fiscal year, to the department and shall be available for purposes of this division.
(b)All revenues payable to the department under this division, including proceeds of bonds issued pursuant to Chapter 5 (commencing with Section 80840), shall be deposited into the fund. Notwithstanding any other law, interest accruing on the moneys in the fund shall be deposited into the fund and shall be used for purposes of this division.
(c)Payments from the fund may be made only for the following purposes:
(1)Payment of any bonds or other contractual obligations authorized by this division.
(2)The cost of energy and transmission, scheduling, and other related expenses incurred by the department.
(3)The expenses incurred by the department in administering this division, including costs of personnel, contracts, or arrangements to carry out the departments duties and responsibilities pursuant to this division.
(d)Obligations authorized pursuant to this division shall be payable solely from the fund. Neither the full faith and credit nor the taxing power of the state are, or may be, pledged for any payment under any obligation authorized by this division.
(e)While any obligations of the department incurred pursuant to this division remain outstanding and not fully performed or discharged, the rights, powers, duties, and existence of the department shall not be diminished or impaired in any manner that will adversely affect the interests and rights of the holders of, or parties to, those obligations. The department may include this pledge and undertaking of the state in the departments obligations.
5.Bonds80840.(a)(1)If the commission requests the department to engage in central procurement activities pursuant to paragraph (5) of subdivision (a) of Section 454.52 of the Public Utilities Code, due to the timing of cost recovery processes, the department may determine that it is necessary or desirable to issue bonds to support activities for the procurement of diverse clean energy resources pursuant to this division.
(2)Upon making a determination pursuant to paragraph (1), the department may issue bonds for purposes of financing the procurement of diverse clean energy resources supporting the fund and other related expenses incurred by the department pursuant to this division, and subsequent to the department having entered into an agreement with the commission regarding a revenue requirement. Bonds shall not be issued in an amount the debt service on which, to the extent payable from the fund, is estimated by the department to exceed the amounts estimated to be available in the fund for their payment.
(b)Before the issuance of bonds in a public offering, the department shall ensure the bonds have an investment grade rating from at least one nationally recognized investment ratings firm and the document authorizing the issuance of the bonds shall provide for repayment from pledged revenues.
(c)The commission shall have an opportunity to review the trust agreement or other document pursuant to which the bonds are issued and revenues are pledged, and shall consult with the department regarding the trust agreement or other document, to ensure its consistency with the revenue requirement agreement between the department and commission.
(d)In addition to any other purposes for which bonds may be issued pursuant to this division, bonds may be issued for the following purposes:
(1)Refunding bonds to obtain a lower interest rate.
(2)Refunding bonds bearing a variable interest rate with bonds bearing interest at a fixed rate.
(3)Refunding bonds if a nationally recognized investment ratings firm reduces or withdraws, or proposes to reduce or withdraw, the rating assigned to securities that are secured by bond insurance policies, credit, or liquidity facilities issued by the provider of a bond insurance policy, or a credit or liquidity facility securing the bonds being refunded.
(4)Refunding bonds issued to preserve a federal income tax exemption or to qualify or maintain other federal income tax benefits.
80841.(a)Whenever the director determines that the issuance of bonds is necessary or desirable to accomplish the goals set forth in this division, including financing the procurement of diverse clean energy resources, the director shall issue a written determination authorizing the issuance of bonds by the department. The department, in consultation with the Department of Finance, shall notify the Chairperson of the Joint Legislative Budget Committee and the chairpersons of the fiscal committees of each house of the Legislature of its written determination. The bonds shall be sold in the manner, and on the terms and conditions, specified in that determination, and the determination may contain or authorize any other provision, condition, or limitation not inconsistent with this division and those provisions as may be deemed reasonable and proper for the security of the bondholders. Bonds may mature at the time or times, and bear interest at the rate or rates, which may be fixed or variable and be determined by reference to an index or such other method, and may be federally tax exempt, as specified in the determination. Neither the person executing the determination to issue bonds nor any person executing bonds shall be personally liable therefor or be subject to any personal liability or accountability by reason of the issuance of the bonds.
(b)In the discretion of the department, bonds may be secured by a trust agreement by and between the department and a trustee, which may be any trust company or bank having trust powers within or outside the state, or the Treasurer. Notwithstanding any other law, the Treasurer shall not be deemed to have a conflict of interest by reason of acting as the trustee. The department may enter into contracts or arrangements in connection with the issuance and sale of bonds, or with respect to any outstanding bonds for so long as those bonds remain outstanding, as it shall deem to be necessary or desirable for the issuance and further security of the bonds, including, but not limited to, credit enhancement agreements, dealer agreements, purchase contracts, escrow agreements, and similar arrangements.
(c)Bonds shall be legal investments for all trust funds, the funds of all insurance companies, savings and commercial banks, trust companies, executors, administrators, trustees, and other fiduciaries, for state school funds, pension funds, and for any funds that may be invested in county, school, or municipal bonds.
(d)Notwithstanding that bonds may be payable from a special fund, the bonds shall be deemed to be negotiable instruments for all purposes.
(e)Any bonds, and the transfer of and income derived from those bonds, shall at all times be free from taxation of every kind by the state and by the political subdivisions of the state.
(f)Bonds shall not be deemed to constitute a debt or liability of the state or of any political subdivision thereof, other than the department, or a pledge of the full faith and credit of the state or of any such political subdivision, but shall be payable solely from the revenues described in paragraph (1) of subdivision (g). All bonds shall contain a statement to the following effect: Neither the faith and credit nor the taxing power of the State of California is pledged to the payment of the principal of or interest on this bond. The issuance of bonds shall not directly or indirectly or contingently obligate the state or any political subdivision thereof to levy or to pledge any form of taxation whatever therefor or to make any appropriation for their payment.
(g)(1)The department may pledge and apply all or any part of revenues of any nature whatever accruing to the department, from orders issued, charges imposed, or contracts entered into pursuant to or in furtherance of this division, or the right to receive the same, to the payment or security of any or all of the principal of the bonds or the interest thereon, in the manner and upon terms that the department deems advisable.
(2)(A)It is the intent of the Legislature that any pledge of moneys, revenues, or property made by the department shall be valid and binding from the time when the pledge is made; that the moneys, revenues, or property so pledged and thereafter collected from retail end use customers, or paid directly or indirectly to or for the account of the department, is hereby made, and shall immediately be, subject to the lien of that pledge without any physical delivery thereof or further act.
(B)It is the intent of the Legislature that the lien of any such pledge shall be valid and binding against all parties having claims of any kind in tort, contract, or otherwise against the department irrespective of whether those parties have notice thereof, and that no resolution or instrument by which the pledge or lien created pursuant to this subdivision is expressed, confirmed, or approved need be filed or recorded in order to perfect the pledge or lien.
(C)It is the intent of the Legislature that this paragraph, in all respects, govern the creation, perfection, priority, and enforcement of any lien created pursuant to this division.
80842.(a)The department shall, and in any obligation entered into pursuant to this division may covenant to, at least annually, and more frequently as required, establish and revise revenue requirements sufficient, together with any moneys deposited into the fund, to provide all of the following:
(1)The amounts necessary to pay the principal of, and premium, if any, and interest on, all bonds as and when the same shall become due.
(2)The amounts necessary to pay for electricity purchased by it and to deliver it to purchasers, including the cost of electricity, transmission, scheduling, and other related expenses incurred by the department, or to make payments under any other contracts, agreements, or obligations entered into by it pursuant to this division, in the amounts and at the times the same shall become due.
(3)Reserves in amount as may be determined by the department from time to time to be necessary or desirable.
(4)The pooled money investment rate on funds advanced for electricity purchases before the receipt of payment for those purchases by the purchasing entity.
(5)The administrative costs of the department and other state agencies, including the costs and fees for professional services, bond issuance and sale, and other miscellaneous costs, incurred in connection with the issuance of bonds or the administration of this division.
(b)The department shall notify the commission of its revenue requirement pursuant to the agreement required pursuant to Section 80821 and that revenue requirement shall be satisfied by the recovery of its costs through a nonbypassable charge.
SEC. 11.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.Section 25216.7 of the Public Resources Code is amended to read:25216.7.(a)On or before June 30, 2024, the commission, in consultation with the Public Utilities Commission, Independent System Operator, and State Air Resources Board, shall submit to the Legislature an assessment of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy described in Section 454.53 of the Public Utilities Code.(b)The assessment shall do all of the following:(1)Identify all available, commercially feasible and near-commercially feasible firm zero-carbon resources that could support a clean, reliable, and resilient electrical grid, and distinguish which resources are capable of addressing system reliability needs and local reliability needs, with an emphasis on reducing the emissions of greenhouse gases, toxic air contaminants, and criteria air pollutants.(2)Evaluate the magnitude of potential needs for and role of firm zero-carbon resources using a reasonable range of resource cost and performance assumptions that reflect emerging technology trends in order to help integrate generation from eligible renewable energy resources into the electrical grid on a daily, multiday, and seasonal basis.(3)Identify barriers to the development of firm zero-carbon resources and possible solutions to address those barriers, including pathways for additional procurement of those resources by load-serving entities, including joint procurements by electrical corporations, community choice aggregators, direct access customers, local publicly owned electric utilities, and other public entities, or a central procurement entity.(4)Recommend changes to research and development projects, demonstration projects, and energy incentives to support the contributions of firm zero-carbon resources to the near-, mid-, and long-term reliability and resiliency of Californias electrical grid, consistent with Californias goals to reduce localized air pollutants and emissions of greenhouse gases, including early priority in disadvantaged communities.(5)Evaluate the reliability of load-serving entities integrated resource plans under multiday extreme and atypical weather events, which shall include, at minimum, events with extended periods of low renewable energy generation and events that occur in all seasons at least as frequently as once per 10 years.(6)Evaluate the use of long-duration and multiday energy storage to achieve the goals pursuant to this section.(c)The assessment shall not affect the process any load-serving entity uses to develop or procure resources to serve its customers.(d)For purposes of this section, the following definitions apply:(1)Eligible renewable energy resources has the same meaning as defined in Section 399.12 of the Public Utilities Code.(2)Firm zero-carbon resources are electrical resources that can individually, or in combination, deliver zero-carbon electricity with high availability for the expected duration of multiday extreme or atypical weather events, including periods of low renewable energy generation, and facilitate integration of eligible renewable energy resources into the electrical grid and the transition to a zero-carbon electrical grid.(3)Load-serving entities has the same meaning as defined in Section 380 of the Public Utilities Code.(e)(1)The assessment to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.(2)Pursuant to Section 10231.5 of the Government Code, this section is repealed on January 1, 2027. CORRECTIONS: DigestVote KeyPage 4.(a)On or before December 31, 2023, June 30, 2024, the commission, in consultation with the Public Utilities Commission, Independent System Operator, and State Air Resources Board, shall submit to the Legislature an assessment of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid in California and will achieve the policy described in Section 454.53 of the Public Utilities Code.
(b)The assessment shall do all of the following:
(1)Identify all available, commercially feasible and near-commercially feasible firm zero-carbon resources that could support a clean, reliable, and resilient electrical grid, and distinguish which resources are capable of addressing system reliability needs and local reliability needs, with an emphasis on reducing the emissions of greenhouse gases, toxic air contaminants, and criteria air pollutants.
(2)Evaluate the magnitude of potential needs for and role of firm zero-carbon resources using a reasonable range of resource cost and performance assumptions that reflect emerging technology trends in order to help integrate generation from eligible renewable energy resources into the electrical grid on a daily, multiday, and seasonal basis.
(3)Identify barriers to the development of firm zero-carbon resources and possible solutions to address those barriers, including pathways for additional procurement of those resources by load-serving entities, including joint procurements by electrical corporations, community choice aggregators, direct access customers, local publicly owned electric utilities, and other public entities, or a central procurement entity.
(4)Recommend changes to research and development projects, demonstration projects, and energy incentives to support the contributions of firm zero-carbon resources to the near-, mid-, and long-term reliability and resiliency of Californias electrical grid, consistent with Californias goals to reduce localized air pollutants and emissions of greenhouse gases, including early priority in disadvantaged communities.
(5)Evaluate the reliability of load-serving entities integrated resource plans under multiday extreme and atypical weather events, which shall include, at minimum, events with extended periods of low renewable energy generation and events that occur in all seasons at least as frequently as once per 10 years.
(6)Evaluate the use of long-duration and multiday energy storage to achieve the goals pursuant to this section.
(c)The assessment shall not affect the process any load-serving entity uses to develop or procure resources to serve its customers.
(d)For purposes of this section, the following definitions apply:
(1)Eligible renewable energy resources has the same meaning as defined in Section 399.12 of the Public Utilities Code.
(2)Firm zero-carbon resources are electrical resources that can individually, or in combination, deliver zero-carbon electricity with high availability for the expected duration of multiday extreme or atypical weather events, including periods of low renewable energy generation, and facilitate integration of eligible renewable energy resources into the electrical grid and the transition to a zero-carbon electrical grid.
(3)Load-serving entities has the same meaning as defined in Section 380 of the Public Utilities Code.
(e)(1)The assessment to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
(2)Pursuant to Section 10231.5 of the Government Code, this section is repealed on January 1, 2026. 2027.
|
Date
|
Status
|
|---|---|
| Oct 7, 2023 | Chaptered by Secretary of State - Chapter 367, Statutes of 2023. |
| Oct 7, 2023 | Approved by the Governor. |
| Sep 22, 2023 | Enrolled and presented to the Governor at 11:30 a.m. |
| Sep 14, 2023 | Urgency clause adopted. Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 62. Noes 16. Page 3588.). |
| Sep 14, 2023 | In Assembly. Concurrence in Senate amendments pending. |
| Sep 14, 2023 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. (Ayes 29. Noes 10. Page 2792.). |
| Sep 13, 2023 | Read second time. Ordered to third reading. |
| Sep 12, 2023 | From committee: Do pass. (Ayes 5. Noes 2.) (September 12). |
| Sep 7, 2023 | Read second time and amended. Re-referred to Com. on APPR. |
| Sep 7, 2023 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 14. Noes 3.) (September 6). |
| Sep 1, 2023 | Joint Rule 61(a)(12) suspended. (Ayes 29. Noes 8. Page 2237.) |
| Aug 31, 2023 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U. & C. |
| Jun 7, 2023 | Referred to Com. on E., U. & C. |
| May 26, 2023 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 26, 2023 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 57. Noes 17. Page 1852.). |
| May 23, 2023 | Read second time. Ordered to third reading. |
| May 22, 2023 | Read second time and amended. Ordered returned to second reading. |
| May 22, 2023 | From committee: Amend, and do pass as amended. (Ayes 11. Noes 4.) (May 18). |
| May 18, 2023 | Joint Rule 62(a), file notice suspended. (Page 1580.) |
| May 17, 2023 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| May 5, 2023 | Measure version as amended on April 13 corrected. |
| Apr 27, 2023 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 8. Noes 2.) (April 26). Re-referred to Com. on APPR. |
| Apr 17, 2023 | Re-referred to Com. on U. & E. |
| Apr 13, 2023 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 27, 2023 | In committee: Hearing postponed by committee. |
| Mar 9, 2023 | Referred to Com. on U. & E. |
| Feb 18, 2023 | From printer. May be heard in committee March 20. |
| Feb 17, 2023 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 14, 2023 | AB 1373 Garcia Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Sep 14, 2023 | Assembly 3rd Reading AB1373 Garcia et al. By Becker Urgency Clause | Senate Floor |
Passed |
|
| Sep 12, 2023 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| Sep 6, 2023 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 26, 2023 | AB 1373 Garcia Third Reading Urgency | Assembly Floor |
Passed |
|
| May 18, 2023 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 26, 2023 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Humboldt: Grass Roots Climate Action | ** Support | |
| Alliance For Retail Energy Markets | ** Against | |
| American Bird Conservancy | ** Support | |
| American Clean Power Association | ** Support | |
| BlueGreen Alliance | ** Support | |
| Business Network for Offshore Wind | ** Support | |
| California Association Of Port Authorities | ** Support | |
| California Chamber Of Commerce | ** Support | |
| California Coastal Protection Network | ** Support | |
| California Community Choice Association | ** Against | |
| California Farm Bureau | ** Against | |
| California Municipal Utilities Association | ** Against | |
| California State Association Of Electrical Workers | ** Support | |
| California State Council Of Laborers | ** Support | |
| California State Pipe Trades Council | ** Support | |
| California Wind Energy Association | ** Support | |
| City and County of San Francisco | ** Against | |
| City of Santa Rosa | ** Support | |
| Clean Air Task Force | ** Support | |
| Clean Power Alliance | ** Against | |
| Clean Power Campaign | ** Support | |
| Coalition of California Utility Employees | ** Support | |
| County Of San Diego | ** Against | |
| Elected Officials Protecting America | ** Support | |
| Environmental Defense Fund | ** Support | |
| Environment California | ** Support | |
| Equinor US | ** Support | |
| Fervo Energy | ** Support | |
| FissionTransition | ** Against | |
| Golden State Wind | ** Support | |
| Humboldt Baykeeper | ** Support | |
| Humboldt County Workforce Development Board | ** Against | |
| IBEW Local Union 639 | ** Support | |
| Independent Energy Producers | ** Against | |
| International Longshore and Warehouse Union | ** Support | |
| INVENERGY | ** Support | |
| Marin Clean Energy | ** Against | |
| Monterey Bay Aquarium | ** Support | |
| National Parks Conservation Association | ** Against | |
| National Wildlife Federation | ** Support | |
| Natural Resources Defense Council | ** Support | |
| Ocean Conservation Research | ** Support | |
| Offshore Wind California | ** Support | |
| Pacific Gas And Electric Company And Its Affiliated Entities | ** Against | |
| RWE | ** Support | |
| San Diego Community Power | ** Against | |
| San Diego County Water Authority | ** Support | |
| San Francisco Public Utilities Commission | ** Against | |
| San Jose Clean Energy | ** Against | |
| Santa Cruz Climate Action Network | ** Support | |
| Sonoma Clean Power | ** Against | |
| Southern California Edison | ** Support | |
| Supervisor Dawn Ortiz-Legg, San Luis Obispo County-District 3 | ** Support | |
| The National Hydropower Association | ** Support | |
| Union Of Concerned Scientists | ** Support | |
| Vineyard Offshore | ** Support | |
| Western State Council of Sheet Metal Workers | ** Support |
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 1373
Author:(Garcia, et al.)
As Amended Ver:September 7, 2023
2/3 vote. Urgency
SUMMARY
Provides the Department of Water Resources (DWR) authority to act as a centralized procurement entity (CPE) until January 1, 2035. Requires the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), as applicable, to assess capacity payments for load-serving entities (LSEs) and local publicly owned electric utilities (POUs) that are deficient in their reliability obligations until June 30, 2027. Finally, authorizes the CPUC additional enforcement and subsequent penalty authority over the LSEs' integrated resource plans (IRP).
Senate Amendments
- Establishes a rebuttable presumption with regard to the need for a proposed transmission project in favor of a CAISO governing board-approved need evaluation, as specified.
- Expands the types of resources eligible for DWR procurement under this measure from offshore wind and geothermal to "eligible energy resources," which are defined as new resources that meet all the following requirements:
- The resource directly supports attainment of the state's goal to achieve 100% zero-carbon and renewable energy resources by 2045, without increasing reliance on the state's dependence on any fossil fuel-based resources.
- The CPUC determines the resource to not be under contract at sufficient levels as shown in LSEs' most recent individual IRPs submitted to and reviewed by the CPUC to achieve the state's 100% clean energy goal.
- The resource has a construction and development lead time of at least five years.
- The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
- The resource does not use combustion to generate electricity (except ancillary and necessary to facility geothermal electricity generation).
- Authorizes a pumped hydroelectric facility to qualify as an eligible energy resource if it does not exceed 500 megawatts (MW) and has been directly appropriated funding by the state before January 1, 2023.
- Adds to the list of DWR considerations when evaluating bids to include a bidder's commitment to submit a consistency certification with the California Coastal Commission (CCC); the bidder's economic and local community impact, workforce development needs and opportunities, environmental impact mitigation plan, and equipment plans; and the bidder's ongoing monitoring plan of coastal waters and wildlife.
- Expands the Voluntary Offshore Wind and Coastal Protection Fund to allow for workforce development consistent with the High Roads training partnership.
- Extends the sunsets for any new DWR-CPE procurement from January 1, 2030 to January 1, 2035.
- Requires eligible CPE projects to either be a public work or have workers paid at least the general prevailing rate, with certain requirements. CPE projects must use a skilled and trained workforce. Exempts loading and unloading of cargo to and from vessels from certain "construction" labor requirements.
- Delays LSE capacity payments until January 31, 2024.
- Commits to a future $6 million appropriation in the 2024-2025 fiscal year to support environmental monitoring and research into offshore wind impacts around the regions where the federal government has leased areas for wind development.
- Commits to a future appropriation in the 2024-2025 fiscal year for state offshore wind permitting workload, including the CCC's coastal development permitting.
- States legislative intent to appropriate additional resources for environmental permitting.
COMMENTS
California has ambitious clean energy goals: 100% renewable and zero-carbon energy-producing resources by December 31, 2045. The state has had some success in this effort, though some emissions from some sectors have proven stubbornly sticky and, arguably, the greatest challenges, and costs, lie ahead.
In August of 2020, California sweltered under an unusually intense and protracted heatwave that extended across the Western United States. In response, the state's electric grid operator – the California Independent System Operator, or CAISO – instituted, for the first time in 20 years, "rolling blackouts," meaning planned, sequenced and limited reductions of electrical supply to prevent widespread collapse of the electrical grid. In early September of 2022, California's electrical grid struggled to meet demand caused by another grueling heatwave, though CAISO was able to avoid instituting rolling blackouts.
In response to this apparent new normal of regularly occurring, intense, widespread and prolonged heatwaves, and in recognition of the state's push to electrify ever more sectors of the economy, the CPUC has ordered LSEs – a catchall term to describe the entities, other than municipal utilities, that, in the context of this bill, procure electricity on behalf of end-use customers—to procure additional electrical capacity to meet clean energy and reliability requirements. Specifically, from November 2019 to February 2023, the CPUC has ordered LSEs to procure approximately 18.8 gigawatts (GW) of electric capacity, all from clean energy resources, to come online between the years 2021 and 2027. The CPUC describes this as the largest single capacity procurement it has ever ordered.
LSEs have had trouble satisfying the CPUC's recent electric capacity procurement orders. Those that have done so have paid very high prices for the electric capacity in what seems to be a seller's market. In recognition of this difficulty, the CEC and the CPUC together recommended the state consider "statutory and regulatory changes to a central procurement mechanism to secure a development path for large, long-lead time clean energy resources." The rationale behind this recommendation is that some resources—and not just long-lead time resources, despite the use of the term—necessary to meet the state's clean energy goals and ensure reliability are too costly and too risky for any one LSE, or small collection of LSEs, to take on, and a centralized procurement mechanism aggregates the buying power of all LSEs and dilutes risk associated with such resources across all LSE customers.
The CPUC, under current law, has the authority to order an electrical corporation, such as Pacific Gas and Electric, Southern California Edison or San Diego Gas and Electric, to act as a centralized procurement entity. This bill additionally authorizes the CPUC to request DWR act as a centralized procurement entity, a role similar to one that DWR has played before, both during the energy crisis at the turn of the millennium and, more recently, last summer as part of the Strategic Reliability Reserve Program.
According to the Author
"California is on the precipice of a clean energy transition that is poised to bring vast new clean energy projects, jobs, and economic development to the state. While the last decades of California's renewable development has favored intermittent renewables, policymakers are overdue in planning for and valuing other renewable development that can better match intermittent resources' profiles. These resources, which include geothermal, large-scale storage, and offshore wind projects, are either just getting started and carry development risks and higher costs, or have historically cost more to operate and maintain. AB 1373 provides a tool – DWR procurement authority – for the CPUC to be able to exercise when planning efforts show these energy resources are needed, but the state utilities are unable to procure them. Using the DWR authority is likely to lead to lower costs to ratepayers for these higher-value resources than the utilities could achieve on their own, due to state bonding authority, state tax breaks, and minimizing project development risk by having a state entity negotiating contracts. Such ratepayer reductions should be encouraged during a time of increased electric and gas unaffordability. AB 1373 provides the path to establish this DWR procurement option to the benefit of California's ratepayers and workforce, and to reliably meet our clean energy goals."
Arguments in Support
This bill is supported by a coalition of energy developers, labor unions, environmental organizations, investor-owned utilities, and business groups, who write that the DWR-CPE portion of the bill will facilitate needed procurement for clean energy resources in the state. The supporters specifically cite the development timeline and risk associated with offshore wind energy as in need of the DWR-CPE mechanism, but note that the CPE "does not foreclose the opportunity for LSEs to procure energy resources on their own." They note the state will need many resources to meet our clean energy and reliability goals, and the mechanisms put forward under this bill will "provide more certainty."
Arguments in Opposition
The California Municipal Utilities Association writes in opposition to the previous version of this bill (8/31/2023) expressing concerns about the structure of the capacity payments for electric POUs, opposing the exclusion of hydrogen energy from the eligible energy resources for the DWR central procurement, and concerns about the requirement to adopt a nonbypassable charge as the cost recovery mechanism for DWR central procurement when POUs exercise this option. Additionally, the Farm Bureau opposes the bill citing uncertainty around how ratepayer costs may be impacted by the legislation.
FISCAL COMMENTS
According to the Senate Appropriations Committee, costs of this bill vary depending on agency, with DWR already appropriated $32 million (AB 102, Ting, Chapter 38, Budget Act of 2023) to initiate and implement the CPE. The CPUC, CEC, California Workforce Development Board, CCC, and California Natural Resources Agency anticipate any costs to be minor and absorbable. The bill does commit to future budget appropriations in 2024-2025, ranging from $6 million to support baseline environmental monitoring, and unspecified funding amount for CCC development permitting for offshore wind resources.
VOTES:
ASM UTILITIES AND ENERGY: 8-2-5
YES: Garcia, Calderon, Wendy Carrillo, Connolly, Muratsuchi, Reyes, Santiago, Schiavo
NO: Chen, Mathis
ABS, ABST OR NV: Jim Patterson, Bauer-Kahan, Holden, Ting, Wallis
ASM APPROPRIATIONS: 11-4-1
YES: Holden, Bryan, Calderon, Wendy Carrillo, Mike Fong, Hart, Lowenthal, Papan, Pellerin, Weber, Ortega
NO: Megan Dahle, Dixon, Mathis, Sanchez
ABS, ABST OR NV: Robert Rivas
ASSEMBLY FLOOR: 57-17-6
YES: Addis, Aguiar-Curry, Alvarez, Arambula, Bauer-Kahan, Bennett, Berman, Bonta, Bryan, Calderon, Juan Carrillo, Cervantes, Connolly, Mike Fong, Friedman, Gabriel, Garcia, Gipson, Grayson, Haney, Hart, Holden, Irwin, Jackson, Jones-Sawyer, Kalra, Lee, Low, Lowenthal, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Pellerin, Petrie‑Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Santiago, Schiavo, Soria, Ting, Valencia, Villapudua, Ward, Wicks, Wilson, Wood, Zbur, Rendon
NO: Alanis, Boerner, Megan Dahle, Davies, Dixon, Essayli, Vince Fong, Gallagher, Hoover, Lackey, Mathis, Jim Patterson, Joe Patterson, Sanchez, Ta, Waldron, Wallis
ABS, ABST OR NV: Bains, Wendy Carrillo, Chen, Flora, Maienschein, Weber
UPDATED
VERSION: September 7, 2023
CONSULTANT: Laura Shybut / U. & E. / (916) 319-2083 FN: 0002413
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1373 |
THIRD READING
Bill No: AB 1373
Author: Garcia (D), Becker (D) and Ting (D), et al.
Amended: 9/7/23 in Senate
Vote: 27 - Urgency
SENATE ENERGY, U. & C. COMMITTEE: 14-3, 9/6/23
AYES: Bradford, Ashby, Becker, Caballero, Dodd, Durazo, Eggman, Gonzalez, McGuire, Min, Newman, Rubio, Skinner, Stern
NOES: Dahle, Seyarto, Wilk
NO VOTE RECORDED: Grove
SENATE APPROPRIATIONS COMMITTEE: 5-2, 9/12/23
AYES: Portantino, Ashby, Bradford, Wahab, Wiener
NOES: Jones, Seyarto
ASSEMBLY FLOOR: 57-17, 5/26/23 - See last page for vote
SUBJECT: Energy
SOURCE: Author
DIGEST:
This bill makes numerous changes to electricity policy, most notably, authorizes the Department of Water Resources (DWR) to serve as a central procurement entity to procure energy resources in order to help the state meet its renewable and zero-carbon energy resources and reliability goals should the California Public Utilities Commission (CPUC) identify a specific procurement need and make a request of DWR. This bill also includes numerous related and additional provisions.
ANALYSIS:
Existing law:
- Requires the CPUC, in consultation with the California Independent System Operator (CAISO), to establish resource adequacy (RA) requirements for all load-serving entities (LSEs), including community choice aggregators (CCAs) and electric service providers (ESPs). Requires the RA program to achieve certain objectives, including maximizing the ability of CCAs to determine the generation resources used to serve their customers. (Public Utilities Code §380)
- Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Public Utilities Code §451)
- Establishes a renewables portfolio standard (RPS) and requires all retail sellers, including investor-owned utilities (IOUs), ESPs, and CCAs, to procure a minimum quantity of electricity products from eligible renewables energy resources, as defined, so that total kilowatt hours of those products sold to their retail end-use customers achieves 25 percent of retail sales by December 31, 2016, 33 percent by December 31, 2020, 44 percent by December 31, 2024, 52 percent by December 31, 2027, and 60 percent by December 31, 2030. (Public Utilities Code §399.15)
- Requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner as part of the integrated resource planning (IRP) process. (Public Utilities Code §454.51)
- Requires the CPUC to adopt a process for each electrical corporation, ESP or CCA to file an IRP and a schedule for periodic updates to the plan, and to ensure that LSEs meet other specified requirements. (Public Utilities Code §454.52)
- Establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90 percent of all retail sales of electricity to California end-use customers by December 31, 2035, 95 percent of all retail sales of electricity to California end-use customers by December 31, 2040, 100 percent of all retail sales of electricity to California end use customers by December 31, 2045. (Public Utilities Code §454.53)
- Establishes the Electricity Supply Strategic Reliability Reserve Program (ESSRRP) and Fund at the DWR that continuously appropriates moneys in the fund to DWR for purposes of implementing projects, purchases, and contracts for the purchase of electricity from resources to support summer reliability. (Water Code §80700 et seq.)
This bill:
- Defines “eligible energy resources” to mean:
- A new resource procured by DWR that meets all of the following requirements:
- The resource directly supports attainment of the state’s goal to achieve 100 percent zero-carbon and renewable energy resources by 2045, without increasing reliance on the state’s dependence on any fossil fuel-based resources.
- The CPUC determines the resource to not be under contract at sufficient levels as shown in LSEs’ most recent individual IRPs submitted to and reviewed by the CPUC to achieve SB 100 (De León, Chapter 312, Statutes of 2018) goals.
- The resource has a construction and development lead time of at least five years.
- The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
- The resource does not use combustion to generate electricity (except ancillary and necessary to facility geothermal electricity generation).
- Authorizes a pumped hydroelectric facility to qualify as an eligible energy resource if it does not exceed 500 megawatts (MW) and has been directly appropriated funding by the state before January 1, 2023.
- A new resource procured by DWR that meets all of the following requirements:
- Requires that the portfolio of resources identified by the CPUC, as part of the IRP process, ensures a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner. Requires the CPUC to use the portfolio to establish procurement requirements to achieve SB 100 goals, in addition to the state’s GHG reduction goals.
- Requires the CPUC to ensure the net costs of any eligible resources procured by electric IOUs to satisfy the IRP identified need are allocated on a nonbypassable basis.
- Clarifies that all costs resulting from nonperformance to satisfy the need are borne by the LSE that failed to perform, instead of solely the electric IOU or CCA.
- Requires the CPUC, on or before September 1, 2024, and consistent with the IRP process and schedule, to determine if there is a need for the procurement of eligible energy resources, requires the CPUC to specify the eligible energy resources that should be procured to meet that need, and authorizes the CPUC, within six months of making that determination, to request the DWR to procure those specified resources that meet the portfolio of resources.
- Authorizes the DWR to procure those resources if DWR elects to do so, before January 1, 2035.
- Establishes the Eligible Energy Central Procurement Fund and continuously appropriates moneys in the fund to the DWR for procurement by DWR as the central procurement entity. Requires that all moneys collected by electric IOUs, ESPs, CCAs, and electric POUs and remitted to the DWR for eligible energy resources, and all moneys paid directly or indirectly to or for the account of the DWR for any sale, exchange, transfer, or disposition of those resources, be deposited into the fund.
- Authorizes the DWR, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of eligible energy resources, to issue bonds for purposes of financing the procurement of those resources supporting the fund and other related expenses incurred by the DWR.
- Establishes a sunset of January 1, 2035 by when DWR’s authority to contract for electrical power ceases.
- Requires the CPUC, on and before June 30, 2027, if the DWR determines that resources have been procured through the ESSRRP and that those resources were used in a given month to meet a LSE’s identified reliability need, to annually assess a capacity payment on each LSE that during that same month fails to meet its system RA requirements.
- Requires the executive director of the CEC, upon the submission of that report, on and before June 30, 2027, if the DWR determines that resources have been procured through the ESSRRP and that those resources were used in a given month to meet an identified reliability need, to annually assess a capacity payment on each electric publicly owned utility (POU) in the CAISO balancing area that during that same month fails to meet its minimum planning reserve margin.
- Establishes the Load-Serving Entity Capacity Payment Account and the Local Publicly Owned Electric Utility Capacity Payment Account in the DWR Electricity Supply Strategic Reliability Reserve Fund (ESSRRF), and specifies that moneys in those accounts would, upon appropriation by the Legislature, be used for contracts related to the ESSRRP. Requires capacity payments collected by the DWR from LSEs and electric POUs to be deposited in those two accounts.
- Clarifies and makes explicit CPUC enforcement over all LSEs, once it has authorized additional direct transactions, to include IRP process specified in Sections 454.52 to 454.54 of the Public Utilities Code. Includes additional clean-up of the Section 365.1 of the Public Utilities Code, including deletion of language referencing an already produced report required in SB 237 (Hertzberg, Chapter 600, Statutes of 2018).
- Makes explicit that RA program shall facilitate development of generating capacity that is needed to achieve the state’s SB 100 policy to achieve 100 percent zero-carbon and renewable energy by 2045. Requires each LSE to be subject to the same requirements for the IRP process, in addition to RA and RPS, that is applicable to electric IOUs.
Background
SB 100 (De León, 2018). SB 100 established the state’s target to meet 100 percent of the state’s electricity retail load with renewable and zero-carbon resources by 2045. SB 1020 (Laird, Chapter 361, Statutes of 2022) established interim goals to meeting the SB 100 target, specifically requiring 90 percent of retail sales by 2035, 95 percent by 2040 to be met with renewable and zero-carbon energy resources. SB 100 Joint Agency Report evaluates the challenges and opportunities in implementing SB 100. It includes an initial assessment of the additional energy resources and the resource building rates needed to achieve 100 percent clean electricity, along with the associated costs. The first report issued on March 2021 identified preliminarily that on average the state may need six gigawatts of new renewable and energy storage annually to meet the SB 100 goals.
IRP process. SB 350 (De León, Chapter 547, Statutes of 2015) required each LSE to file a biennial IRP for approval or certification by the CPUC. The CPUC combines all LSEs’ IRPs to ensure the state is on its path to meet its clean energy procurement goals. POUs are required to file their own IRPs with the CEC. The goal of the IRP is a two-year planning process to ensure that LSEs are meeting targets that allow the electricity sector to contribute to California’s economy-wide GHG emissions reductions goals and that helps to reduce overall costs. The effort is intended to forecast needs on a 10-year horizon. As part of the IRP process, the CPUC has issued several procurement orders on LSEs (summarized in the table below) to address near-term and mid-term procurement needs. Within the procurement orders, the CPUC has directed electric IOUs to serve central procurement entities for local RA and mid-term reliability to serve load to customers, including those of other LSEs.
CPUC IRP Procurement Order | Total MW | Time Horizon (Calendar Years) |
D. 19-11-016 | 3,300 MW | 2021-2023 |
D. 21-06-035 Mid-Term Reliability (MTR) | 11,500 MW | 2023-2028 |
D. 23-02-040 Supplemental | 4,000 MW | 2026-2027 |
Cumulative Procurement | 18,800 MW | 2021-2028 |
Recent budget and other energy “insurance” actions. In response to energy capacity challenges during extreme heat events, including the rotating outages in August 2020, the Legislature, in collaboration with the Newsom Administration, adopted several measures throughout 2022, in addition to previously adopted measures, to continue to help shore-up California’s electricity supply against the impacts from extreme events. (These measures are noted in the table in the policy committee analysis. Note: Not included is other state budget funding to support development of new energy resources, such as long-duration storage, offshore wind, geothermal, and hydrogen or existing procurement mandates, including those for biomass.)
ESSRRP at the DWR (funded at $2.3 billion). In June 2022, Budget Trailer Bills, AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), AB 178 (Ting, Chapter 45, Statutes of 2022), and AB 180 (Ting, Chapter 44, Statutes of 2022), were signed into law. These three pieces of legislation collectively established the ESSRRP and set forth new responsibilities and activities by DWR, funded by the newly established ESSRRF, and separate from the State Water Project. DWR established temporary energy resources and created a new deputy director-level division with 25 staff – the Division of Statewide Water and Energy – which oversees the ESSRRP along with the State Power Augmentation Program which was developed in July 2021 in response to executive order direction to quickly deploy 120 MW of new generation. Under the ESSRRP, DWR acts as contingency insurance to help maintain electricity reliability. As part of the program, DWR contracts directly with power facilities and also enters into agreements with the state’s large electric IOUs to reimburse for the value of imported firm energy resources to support summer reliability.
Comments
Is a new central procurement mechanism needed? The CPUC has existing authority to direct procurement of energy resources as demonstrated by the procurement orders it has issued via the IRP process to direct LSEs to procure energy resources that are needed to meet near- and mid-term reliability. Additionally, the CPUC has utilized longstanding authority to direct electric IOUs to procure energy resources for bundled customers, as well as, customers of other LSEs with the costs collected from all customers served (for example local and system RA). Proponents of this proposal, including Governor Newsom’s Administration, who proposed related budget trailer bill language, contend that additional authority is needed so that energy resources will be procured to meet the state’s clean energy and reliability goals. The proponents argue that electric IOUs may not have the financial ability to finance these larger and long lead-time energy resources, such as offshore wind, geothermal, and pumped storage projects. They view the authority granted to DWR in this proposal as an additional tool to help ensure we meet our clean energy and reliability goals, especially given the anticipated aggressive procurement that may be needed to achieve the state’s goals.
Why DWR? DWR’s primary purpose and mission is to manage the state’s water supply. DWR procures energy resources to operate the state water project (perhaps the state’s largest single source of energy demand). During the 2000-01 energy crisis, DWR was directed to procure resources to help the state address the shortfalls affecting the electrical grid, particularly as the state’s large electric IOUs were in precarious financial situations (including one filing for bankruptcy and another on the verge of filing). However, DWR’s performance in procuring resources at the time has been criticized by some suggesting DWR overpaid for resources, resulting in electric ratepayers having to shoulder the costs for the purchased energy for over two decades on their electric utility bills. Notably, DWR’s procurement during the emergency conditions of the energy crisis may not be a fair comparison as to the procurement envisioned by this proposal, given this proposal envisions this authority as a backstop mechanism that the CPUC can request as part of the IRP process – a forward-looking planning effort.
Diverse energy resource mix? Currently, the language would authorize DWR to procure “eligible energy resources” defined as limited to resources meeting specified criteria. Namely, the language prohibits resources that are derived from fossil fuels, or would increase dependence on fossil-fueled resources, or pumped storage hydroelectricity that are over 500 MW and have never received state funding, and prohibit any resource that uses combustion (except if it is ancillary to the production of geothermal energy). In the case of pumped storage hydroelectricity, the intent is to only capture San Vicente Reservoir project which received funding in the 2021 State Budget. Additionally, the CPUC must determine that the resource is not under contract at sufficient levels to meet the state’s clean energy goals and has a construction and development lead time of at least five years. As such, this proposal does not explicitly call out every eligible resource, but attempts to prohibit and require particular attributes. At a minimum, it is likely offshore wind, geothermal energy resources, and pumped hydroelectricity energy storage under 500 MW would be among the eligible resources DWR could procure. In this regard, the language attempts to narrow DWR’s authority to procure only a subset of potential resources currently available.
Backstop or more than backstop procurement? The proposal would require the CPUC to identify procurement needs through the existing IRP process and authorize the CPUC to request DWR procure needed resources after six months of identifying the need. The intent for the six month window is to allow other LSEs the opportunity to procure their share of their load if they elect to do so. This approach is a long-held principle of CCAs whose primary (if not exclusive) mission is to procure energy on behalf of their load. Such an approach seems appropriate to ensure LSEs exercise their responsibility to procure resources for their load, prior to a state agency stepping in. In this regard, it’s possible the DWR procurement may not ever be used, or perhaps only used when truly necessary because the resource was too difficult for any individual LSE, or a few LSEs, to procure. However, other components of the proposal authorize LSEs and electric POUs to request DWR procure additional incremental procurement on behalf of their load. This option may allow LSEs and POUs to advance towards the state’s clean energy and reliability goals. However, such an approach can also muddle whether procurement by DWR is intended as a backstop tool within the IRP or would enable LSEs and POUs from over-reliance on a state agency to procure resources on their behalf. Importantly, the proposal includes some safeguards to limit this election by LSEs, by requiring the CPUC make determinations as to its necessity and ensuring cost-recovery for these procurements.
Costs. Authorizing DWR to procure energy can have the unintended effect of reducing supply in the energy market and increasing prices overall (particularly in the currently constrained energy market). These costs come home to roost on electric utility customer bills. Additionally, market participants, including LSEs, electric POUs, and generators, may elect to delay procurement transactions so as to position themselves for procurement by DWR. In this regard, the state should tread carefully. This bill attempts to address these challenges by limiting resources to those noted above, including those with at least a five year construction and development horizon – therefore a resource that is less likely to be procured in the current market. This bill also provides an added safeguard that requires the CPUC to determine the procurement by DWR (including any bonds) is just and reasonable prior to the procurement, and if so, recoverable by a nonbypassable charge on customer’s electric utility bills. DWR procurement would be additional costs on customers’ current electric utility bills, though it’s unclear to what extent these would be less than, or more than, what would otherwise be procured to meet the state’s clean energy and reliability goals. Some stakeholders oppose the bill’s proposal to limit the eligible generation resources for central procurement eligibility, including some supporting hydrogen or biomass energy. This bill strictly limits eligible resources for purposes of DWR central procurement, should it be needed. This bill does not limit the resources that can be procured in the larger energy market or via contract among providers and generators, separate from what is envisioned by DWRs’ more narrowly envisioned role in this bill.
Related/Prior Legislation
SB 123 (Committee on Budget, Chapter 52, Statutes of 2023) extended the date, from September 2022 to October 2023, by when electric IOUs may be reimbursed for above-market costs for imported energy and capacity products delivered or capable of being delivered to the state within the ESSRRP.
SB 124 (Committee on Budget, Chapter 53, Statutes of 2023) extended the date, from September 2022 to October 2023, by when electric IOUs may be reimbursed for above-market costs for imported energy and capacity products delivered or capable of being delivered to the state, clarified that DWR must present an investment plan to the CEC, rather than the contracts, and makes additional clarifying changes of the ESSRRP.
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022) establishes the ESSRRP, among its many provisions.
AB 209 (Committee on Budget, Chapter 251, Statutes of 2022) makes additional changes to the ESSRRP, established the Voluntary Offshore Wind and Coastal Resources Protection Program, among its many energy-related provisions.
FISCAL EFFECT: Appropriation: Yes Fiscal Com.: Yes Local: Yes
According to the Senate Committee on Appropriations:
- To the extent that the California Public Utilities Commission (CPUC) assigns a central procurement role to DWR:
- One-time costs of $32 million (General Fund) for DWR to initiate and implement a Central Procurement Function for diverse clean energy resources. This amount was appropriated as part of the 2023-24 Budget. If a determination is made by the CPUC that DWR will not perform this function, the remaining funds must be transferred to the California Energy Commission (CEC) upon order of the Director of Finance.
- Ongoing costs of an unknown amount, possibly in the tens of millions of dollars annually (General Fund, bond funds, and/or special funds), for DWR to operate and administer a central procurement program.
- Unknown, potentially significant ongoing costs (various funds) to the state as an electric utility ratepayer. The State of California is an electricity customer, purchasing roughly one percent of the state’s electricity. As such, the state incurs costs when rates increase. To the extent this bill results in increased electricity rates, there could be additional costs on the state as a ratepayer. (See staff comments.)
- One-time cost pressure of at least $6 million in 2024-25 (General Fund) to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development where offshore wind has been leased by the Bureau of Ocean Energy Management of the U.S. Department of the Interior.
- Ongoing cost pressure in the millions or tens of millions of dollars annually (General Fund and other various funds) to support the California Coastal Commission’s coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, among other things.
- The CPUC, CEC, California Workforce Development Board (CWDB), Coastal Commission, and California Natural Resources Agency anticipate any costs to be minor and absorbable.
SUPPORT: (Verified 9/12/23)
350 Humboldt: Grass Roots Climate Action
American Bird Conservancy
American Clean Power Association
BlueGreen Alliance
Business Network for Offshore Wind
California Association of Port Authorities
California Chamber of Commerce
California Coastal Protection Network
California State Association of Electric Workers
California State Council of Laborers
California State Pipe Trades Council
California Wind Energy Association
City of Santa Rosa
Clean Air Task Force
Clean Power Campaign
Coalition of California Utility Employees
Elected Officials Protecting America
Environment California
Environmental Defense Fund
Equinor US
Fervo Energy
Golden State Wind
Humboldt Baykeeper
Humboldt County Workforce Development Board
IBEW, Local Union 639
Invenergy
International Longshore and Warehouse Union
Monterey Bay Aquarium
National Wildlife Federation
Natural Resources Defense Council
Ocean Conservation Research
Offshore Wind California
RWE
San Diego County Water Authority
Santa Cruz Climate Action Network
Southern California Edison
Supervisor Dawn Ortiz-Legg, San Luis Obispo County-District 3
The National Hydropower Association
Union of Concerned Scientists
Vineyard Offshore
Western State council of Sheet Metal Workers
OPPOSITION: (Verified 9/12/23)
California Farm Bureau
California Municipal Utilities Association
Fission Transition
County of San Diego
ARGUMENTS IN SUPPORT: According to the author:
While the last decades of California’s renewable development has favored intermittent renewables, policymakers are overdue in planning for and valuing other renewable development that can better match intermittent resources’ profiles. These resources, which include geothermal, large-scale storage, and offshore wind projects, are either just getting started and carry development risks and higher costs, or have historically cost more to operate and maintain. AB 1373 provides a tool – DWR procurement authority – for the CPUC to be able to exercise when planning efforts show these diverse clean energy resources are needed, but the state utilities are unable to procure them. Using the DWR authority is likely to lead to lower costs to ratepayers for these higher-value resources than the utilities could achieve on their own, due to state bonding authority, state tax breaks, and minimizing project development risk by having a state entity negotiating contracts. Such ratepayer reductions should be encouraged during a time of increased electric and gas unaffordability.
ARGUMENTS IN OPPOSITION: In opposition to this bill, California Municipal Utilities Association writes in opposition to a recent version of this bill (8/31/2023) expressing concerns about the structure of the capacity payments for electric POUs, opposing the exclusion of hydrogen energy from the eligible energy resources for the DWR central procurement, and concerns about the requirement to adopt a nonbypassable charge as the cost recovery mechanism for DWR central procurement when POUs exercise this option.
The California Farm Bureau (CFB) opposes this bill, expressing concerns about the potential to increase costs to ratepayers; the exclusion of other resources, specifically biomass, from the eligible energy resources that DWR may procure; concerns about the CAISO’s rebuttal presumption granted in this bill; and the ability for DWR to contract electric IOUs to serve as their agent, potentially increasing costs to ratepayers. The CFB states: “ratepayers should not continue to bankroll those initiatives when rates are already escalating at an alarming rate.”
ASSEMBLY FLOOR: 57-17, 5/26/23
AYES: Addis, Aguiar-Curry, Alvarez, Arambula, Bauer-Kahan, Bennett, Berman, Bonta, Bryan, Calderon, Juan Carrillo, Cervantes, Connolly, Mike Fong, Friedman, Gabriel, Garcia, Gipson, Grayson, Haney, Hart, Holden, Irwin, Jackson, Jones-Sawyer, Kalra, Lee, Low, Lowenthal, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Santiago, Schiavo, Soria, Ting, Valencia, Villapudua, Ward, Wicks, Wilson, Wood, Zbur, Rendon
NOES: Alanis, Boerner, Megan Dahle, Davies, Dixon, Essayli, Vince Fong, Gallagher, Hoover, Lackey, Mathis, Jim Patterson, Joe Patterson, Sanchez, Ta, Waldron, Wallis
NO VOTE RECORDED: Bains, Wendy Carrillo, Chen, Flora, Maienschein, Weber
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
9/13/23 19:33:33
**** END ****
SENATE COMMITTEE ON
Senator Anthony Portantino, Chair
2023 - 2024 Regular Session
AB 1373 (Garcia) - Energy
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would make numerous changes to electricity policy; most notably, it would authorize the Department of Water Resources (DWR) to serve as a central procurement entity to procure energy resources in order to help the state meet its renewable and zero-carbon energy resources and reliability goals.
Fiscal Impact:
- To the extent that the California Public Utilities Commission (CPUC) assigns a central procurement role to DWR:
- One-time costs of $32 million (General Fund) for DWR to initiate and implement a Central Procurement Function for diverse clean energy resources. This amount was appropriated as part of the 2023-24 Budget. If a determination is made by the CPUC that DWR will not perform this function, the remaining funds must be transferred to the California Energy Commission (CEC) upon order of the Director of Finance.
- Ongoing costs of an unknown amount, possibly in the tens of millions of dollars annually (General Fund, bond funds, and/or special funds), for DWR to operate and administer a central procurement program.
- Unknown, potentially significant ongoing costs (various funds) to the state as an electric utility ratepayer. The State of California is an electricity customer, purchasing roughly one percent of the state’s electricity. As such, the state incurs costs when rates increase. To the extent this bill results in increased electricity rates, there could be additional costs on the state as a ratepayer. (See staff comments.)
- One-time cost pressure of at least $6 million in 2024-25 (General Fund) to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development where offshore wind has been leased by the Bureau of Ocean Energy Management of the U.S. Department of the Interior.
- Ongoing cost pressure in the millions or tens of millions of dollars annually (General Fund and other various funds) to support the California Coastal Commission’s coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, among other things.
- The CPUC, CEC, California Workforce Development Board (CWDB), Coastal Commission, and California Natural Resources Agency anticipate any costs to be minor and absorbable.
Background:
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric IOUs, ESPs, and now includes CCAs, which did not exist at the time of the crisis. The current RA program consists of system, local, and flexible requirements for each month of a compliance year. In October of each year, LSEs must demonstrate that they have procured 90 percent of their system RA obligations for the five summer months (May-September) of the following year, as well as 100 percent of their local requirements, and 90 percent of their flexible requirements for each month of the coming compliance year. The CPUC has recently adopted changes to RA program, including increasing the planning reserve margin from 15 percent to 17 percent by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22 percent effective planning reserve margin.
Cost Allocation Mechanism. Current law ensures the costs associated with the RA program are recovered on a nonbypassable basis, a process called the Cost Allocation Mechanism (CAM). The CAM is a regulatory process for allocating capacity costs of utility procurement across all benefitting customers. The CAM was conceived in a 2004 CPUC decision, adopted in a 2006 CPUC decision (D.06- 07-029), affected by changes in law (SB 695, Kehoe, Chapter 337, Statutes of 2009), and continues to be adapted to new issues and circumstances. The CAM is a fixture of the CPUC’s Long Term Procurement policy and is based on the principle that costs and benefits of new generation should be shared by all benefitting customers within an electric IOU’s service territory. The mechanism for CAM is a one-way tool; it exists for the IOUs to purchase resources on behalf of all who rely on the electric grid, including customers of ESPs and CCAs. CAM allows the electric IOUs to spread costs of generation resources to the other LSEs.
CAISO backstop procurement. If California RA rules fail to provide sufficient resources, the CAISO is compelled to utilize centralized backstop procurement mechanisms in order to maintain electric system reliability. Centralized backstop procurement is whereby the CAISO contracts with a generator to address the shortfall. Under Federal Energy Regulatory Commission (FERC) rules, the CAISO, like all other balancing authorities, must ensure system reliability or face penalties by FERC. The CAISO has two mechanisms for centralized backstop procurement: Reliability Must Run (RMR) and Capacity Procurement Mechanism (CPM). A resource receiving RMR designation must continue to operate and is compensated by a rate set by the CAISO, per FERC approved tariffs. RMR contracts can be expensive relative to procurement through the CPUC process, especially considering their limited operating parameters. CPM can be used for resources that may be needed in the following year and where the resource is at risk of retirement. Like RMR contracts, CPM contracts are also often at a higher price relative to generation procured through the CPUC process. These costs are generally shouldered by ratepayers in the insufficient Local Capacity Area or by all ratepayers of the LSE(s) lacking the adequate RA.
SB 100 (De León, 2018). SB 100 established the state’s target to meet 100 percent of the state’s electricity retail load with renewable and zero-carbon resources by 2045. SB 1020 (Laird, Chapter 361, Statutes of 2022) established interim goals to meeting the SB 100 target, specifically requiring 90 percent of retail sales by 2035, 95 percent by 2040 to be met with renewable and zero-carbon energy resources. SB 100 Joint Agency Report evaluates the challenges and opportunities in implementing SB 100. It includes an initial assessment of the additional energy resources and the resource building rates needed to achieve 100 percent clean electricity, along with the associated costs. It uses a computer model to analyze these factors under various conditions and technologies. The report is scheduled to be updated every four years. The first report issued on March 2021 identified preliminarily that on average the state may need six gigawatts of new renewable and energy storage annually to meet the SB 100 goals.
IRP process. SB 350 (De León, Chapter 547, Statutes of 2015) required each LSE to file a biennial IRP for approval or certification by the CPUC. The CPUC combines all LSEs’ IRPs to ensure the state is on its path to meet its clean energy procurement goals. POUs are required to file their own IRPs with the CEC. The goal of the IRP is a two-year planning process to ensure that LSEs are meeting targets that allow the electricity sector to contribute to California’s economy-wide GHG emissions reductions goals and that helps to reduce overall costs. The effort is intended to forecast needs on a 10-year horizon. In this regard, the IRP is a forward-looking activity. Whereas the requirements to meet renewable energy standards is a compliance activity to review whether LSEs and POUs have satisfied their three-year compliance obligation under the Renewable Portfolio Standard (RPS) requirements to meet an increasing share of its retail load with eligible renewable energy resources, until achieving 60 percent by 2035. As part of the IRP process, the CPUC has issued several procurement orders on LSEs (summarized in the table below) to address near-term and mid-term procurement needs. Within the procurement orders, the CPUC has directed central procurement for local RA and mid-term reliability by electric IOUs for customers, including those of other LSEs.
CPUC IRP Procurement Order | Total MW | Time Horizon (Calendar Years) |
D. 19-11-016 | 3,300 MW | 2021-2023 |
D. 21-06-035 Mid-Term Reliability (MTR) | 11,500 MW | 2023-2028 |
D. 23-02-040 Supplemental | 4,000 MW | 2026-2027 |
Cumulative Procurement | 18,800 MW | 2021-2028 |
Role of DWR. DWR’s primary purpose and mission is to manage the state’s water supply. DWR procures energy resources to operate the state water project (perhaps the state’s largest single source of energy demand). During the 2000-01 energy crisis, DWR was directed to procure resources to help the state address the shortfalls affecting the electrical grid, particularly as the state’s large electric IOUs were in precarious financial situations (including one filing for bankruptcy and another on the verge of filing). However, DWR’s performance in procuring resources at the time has been criticized by some suggesting DWR overpaid for resources, resulting in electric ratepayers having to shoulder the costs for the purchased energy for over two decades on their electric utility bills. Notably, DWR’s procurement during the emergency conditions of the energy crisis may not be a fair comparison as to the procurement envisioned by this proposal, given this proposal envisions this authority as a backstop mechanism that the CPUC can request as part of the IRP process – a forward-looking planning effort.
More recently, DWR has been tasked to administer the Electricity Supply Strategic Reliability Reserve Program (ESSRRP) and Fund as an “insurance” of sorts for the electric grid during extreme events.
Current law establishes the ESSRRP and Fund at DWR and continuously appropriates moneys in the fund to DWR for purposes of implementing projects, purchases, and contracts to carry out specified purposes, constructing, owning, and operating, or contracting for the construction and operation of, contracting for the purchase of electricity from, or financing through loans, reimbursement agreements, or other contracts actions to secure resources for summer reliability or to preserve the option to extend the life of specified facilities, and reimbursing electrical corporations for the value of imported energy or import capacity products that were delivered or capable of being delivered between July 1, 2022, and on or before October 31, 2023, and were procured at above-market costs or in excess of procurement authorizations set by the CPUC and above the requirements needed to serve the electrical corporation’s bundled customers in support of summer electric service reliability. (Water Code §80700 et seq.)
Recent budget and other energy “insurance” actions. In response to energy capacity challenges during extreme heat events, including the rotating outages in August 2020, the Legislature, in collaboration with the Newsom Administration, adopted several measures throughout 2022, in addition to previously adopted measures, to continue to help shore-up California’s electricity supply against the impacts from extreme events. These measures are noted in the table with additional details provided below. (Important note: Not included is other state budget funding to support development of new energy resources, such as long-duration storage, offshore wind, geothermal, and hydrogen. Also not detailed are the plethora of transmission-related efforts to streamline and expedite transmission and interconnection build-outs and approvals to support achieving the state’s clean energy targets and reliability needs.)
Program | Agency | State Budget/Ratepayer Funding | Status |
Electricity Supply Strategic Reliability Reserve Program | DWR | $2.37 billion State Budget | Contracts underway |
Demand Side Grid Support Program | CEC | $295 million State Budget | Launched August 2022 |
Distributed Electric Backup Assets Program | CEC | $700 million State Budget | In Development |
Diablo Canyon Nuclear PowerPlant | CPUC and Various | Ratepayer and $1.4 billion State Budget | Licensing is being pursued; initial federal funding approved, active CPUC proceeding |
Clean Energy Reliability Investment Plan | CEC | ~$1 billion State Budget | Plan developed and adopted. $100 million budgeted (including $32 million for DWR central procurement mechanism). |
Emergency Load Reduction Program | CPUC | ~$186 million in 2022 and 2023 (intended as five year program) Ratepayer | Launched in 2021. |
Smart Thermostat Incentive Program | CPUC | $22.5 million Ratepayer | Launched in 2022 |
ESSRRP funded at $2.3 billion. In June 2022, Budget Trailer Bills, AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), AB 178 (Ting, Chapter 45, Statutes of 2022), and AB 180 (Ting, Chapter 44, Statutes of 2022), were signed into law. These three pieces of legislation collectively established the ESSRRP and set forth new responsibilities and activities by DWR, funded by the newly established ESSRRF, and separate from the State Water Project. DWR established temporary energy resources and created a new deputy director-level division with 25 staff – the Division of Statewide Water and Energy – which oversees the ESSRRP along with the State Power Augmentation Program which was developed in July 2021 in response to executive order direction to quickly deploy 120 MW of new generation. Under the ESSRRP, DWR acts as contingency insurance to help maintain electricity reliability. As part of the program, DWR contracts directly with power facilities and also enters into agreements with the state’s large electric IOUs to reimburse for the value of imported firm energy resources to support summer reliability.
Proposed Law:
This bill would make numerous changes to electricity policy; most notably, it would authorize DWR to serve as a central procurement entity to procure energy resources in order to help the state meet its renewable and zero-carbon energy resources and reliability goals. Specifically, this bill would:
- Define “eligible energy resource” to mean:
- A new resource procured by DWR that meets all of the following requirements:
- The resource directly supports attainment of the state’s goal to achieve 100 percent zero-carbon and renewable energy resources by 2045, without increasing reliance on the state’s dependence on any fossil fuel-based resources.
- The CPUC determines the resource to not be under contract at sufficient levels as shown in LSEs’ most recent individual IRPs submitted to and reviewed by the CPUC to achieve SB 100 (De León, Chapter 312, Statutes of 2018) goals.
- The resource has a construction and development lead time of at least five years.
- The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
- The resource does not use combustion to generate electricity (except ancillary and necessary to facility geothermal electricity generation).
- Authorize a pumped hydroelectric facility to be procured by DWR as specified if the pump hydroelectric facility does not exceed 500 megawatts (MW) and has been directly appropriated funding by the state before January 1, 2023.
- A new resource procured by DWR that meets all of the following requirements:
- Require that the portfolio of resources identified by the CPUC, as part of the IRP process, ensures a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner. Require the CPUC to use the portfolio to establish procurement requirements to achieve SB 100 goals, in addition to the state’s GHG reduction goals.
- Require the CPUC to ensure the net costs of any diverse resources procured by electric IOUs to satisfy the IRP identified need are allocated on a nonbypassable basis.
- Clarify that all costs resulting from nonperformance to satisfy the need are borne by the LSE that failed to perform, instead of solely the electric IOU or CCA.
- Require the CPUC, on or before September 1, 2024, and consistent with the IRP process and schedule, to determine if there is a need for the procurement of eligible energy resources, as defined, requires the CPUC to specify the eligible energy resources that should be procured to meet that need, and authorizes the CPUC, within six months of making that determination, to request DWR to procure those specified resources that meet the portfolio of resources.
- Authorize DWR to procure those resources if DWR elects to do so, before January 1, 2035.
- Authorize the CPUC to order the procurement of resources with specific attributes by electrical corporations, ESPs, and CCAs as a result of the IRP process and require the CPUC to enforce any resource procurement requirements on a nondiscriminatory basis. Provide that enforcement may include the assessment of penalties for noncompliance.
- Require the CPUC to annually submit a report to the Governor and Legislature on the types, amounts, and costs to ratepayers of eligible energy resources procured by DWR.
- Require the CPUC, if the CPUC requests DWR to procure eligible energy resources and DWR elects to conduct competitive solicitations or enter into contracts for eligible energy resources, to develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by DWR.
- Require DWR, in evaluating bids received through a solicitation to consider the project’s viability, ability to meet in-service dates, and the useful life, among other factors. Requires bids for the development of a eligible energy resource project to include the bidder’s certification that certain labor requirements are met and that a skilled and trained workforce will be used to perform all construction work on the eligible energy resource project, as provided.
- Authorize the CPUC, at the request of DWR, to require an electric IOU to act as the agent for DWR or to assist DWR in conducting the solicitation, bid evaluation, or contract negotiation for new eligible energy resource procurement.
- Authorize DWR to establish a schedule and mechanism for an electric POU to voluntarily obtain from DWR eligible energy resources to be acquired by DWR through its central procurement function on a contract-by-contract basis. Provides electric IOUs, ESPs, and CCAs with a voluntary option to obtain incremental eligible energy resources from DWR, as provided.
- Authorize the CPUC, at the request of DWR, to order an electric IOU to transmit or provide for the transmission of, and distribute all electricity made available by DWR, and, as an agent of DWR, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to DWR.
- Establish the Diverse Clean Energy Central Procurement Fund and continuously appropriates moneys in the fund to DWR for procurement by DWR as the central procurement entity. Make an appropriation by establishing a continuously appropriated fund. Require that all moneys collected by electric IOUs, ESPs, CCAs, and electric POUs and remitted to DWR for eligible energy resources, and all moneys paid directly or indirectly to or for the account of DWR for any sale, exchange, transfer, or disposition of those resources, be deposited into the fund.
- Authorize DWR, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of eligible energy resources, to issue bonds for purposes of financing the procurement of those resources supporting the fund and other related expenses incurred by DWR. Authorize DWR to adopt regulations for purposes of administering these provisions.
- Exempt DWR contracts for energy resources used as the central procurement entity from review and approval required by the Department of General Services.
- Establish a sunset of January 1, 2035 by when DWR’s authority to contract for electrical power ceases.
- Require the CPUC, on and before June 30, 2027, if DWR determines that resources have been procured through the ESSRRP and that those resources were used in a given month to meet a LSE’s identified reliability need, to annually assess a capacity payment on each LSE that during that same month fails to meet its system RA requirements.
- Require the CEC, on or before January 31, 2024, in consultation with the CPUC, to submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each electric POU exceeded, met, or failed to meet its minimum planning reserve margin and specified system RA requirements. Require the executive director of the CEC, upon the submission of that report, on and before June 30, 2027, if DWR determines that resources have been procured through the ESSRRP and that those resources were used in a given month to meet an identified reliability need, to annually assess a capacity payment on each electric POU in the CAISO balancing area that during that same month fails to meet its minimum planning reserve margin.
- Establish the Load-Serving Entity Capacity Payment Account and the Local Publicly Owned Electric Utility Capacity Payment Account in DWR Electricity Supply Strategic Reliability Reserve Fund (ESSRRF), and specify that moneys in those accounts would, upon appropriation by the Legislature, be used for contracts related to the ESSRRP. Require capacity payments collected by DWR from LSEs and electric POUs to be deposited in those two accounts.
- Require the CPUC in proceedings evaluating the issuance of certificates of public convenience and necessity for transmission projects, to establish a rebuttable presumption with regard to need for the project in favor of a CAISO governing board-approved need evaluation if certain requirements are satisfied.
- Authorize an electric POU to meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources.
- Clarify and make explicit CPUC enforcement over all LSEs, once it has authorized additional direct transactions, to include IRP process specified in Sections 454.52 to 454.54 of the Public Utilities Code. Include additional clean-up of the Section 365.1 of the Public Utilities Code, including deletion of language referencing an already produced report required in SB 237 (Hertzberg, Chapter 600, Statutes of 2018).
- Make explicit that RA program shall facilitate development of generating capacity that is needed to achieve the state’s SB 100 policy to achieve 100 percent zero-carbon and renewable energy by 2045. Require each LSE to be subject to the same requirements for the IRP process, in addition to RA and RPS, that is applicable to electric IOUs.
- Require, as part of the 2025 edition of the Integrated Energy Resources Policy report, the CEC, in consultation with the CPUC, to assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes.
- Authorize the CEC to allocate moneys under the program Voluntary Offshore Wind and Coastal Resources Protection Program for workforce development grants in consultation with the California Workforce Development Board, consistent with “high road jobs” definitions in statute.
- Require, upon appropriation by the Legislature, that no less than $6 million from the General Fund is available for the 2024-25 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development where offshore wind has been leased by the Bureau of Ocean Energy Management of the U.S. Department of the Interior.
- Require, upon appropriation by the Legislature, that additional moneys from the General Fund be made available for the 2024–25 fiscal year and subsequent fiscal years to support the California Coastal Commission’s coastal development permitting of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
- State the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of the assessment required in budget bill, SB 122 (2023), for offshore wind permitting.
- Make changes to a required report regarding the use of funds from the ESSRRP, clarifies the report is from the CEC, not DWR, but consistent with a required report from DWR.
Related Legislation:
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022) among its many provisions, establishes the ESSRRP.
AB 209 (Committee on Budget, Chapter 251, Statutes of 2022) among its many energy-related provisions, makes additional changes to the ESSRRP, established the Voluntary Offshore Wind and Coastal Resources Protection Program.
SB 123 (Committee on Budget, Chapter 52, Statutes of 2023), among its many provisions, extended the date, from September 2022 to October 2023, by when electric IOUs may be reimbursed for above-market costs for imported energy and capacity products delivered or capable of being delivered to the state within the ESSRRP.
SB 124 (Committee on Budget, Chapter 53, Statutes of 2023), among its many provisions, extended the date, from September 2022 to October 2023, by when electric IOUs may be reimbursed for above-market costs for imported energy and capacity products delivered or capable of being delivered to the state, clarified that DWR must present an investment plan to the CEC, rather than the contracts, and makes additional clarifying changes of the ESSRRP.
AB 56 (E. Garcia, 2019) would have required the CPUC to empower the CAEATFA to undertake backstop procurement of electricity that would otherwise be performed by an electric IOU to meet state RA, IRP, and RPS goals not satisfied by retail sellers or LSEs. The bill failed passage in the Senate Energy, Utilities & Communications Committee.
Staff Comments:
The State of California is an electricity customer, purchasing roughly one percent of the state’s electricity. As such, the state incurs costs when rates increase. To the extent this bill results in increased electricity rates, there could be additional costs on the state as a ratepayer. According to the analysis from the Senate Energy, Utilities & Communications Committee, "authorizing DWR to procure energy can have the unintended effect of reducing supply in the energy market and increasing prices overall (particularly in the currently constrained energy market). These costs come home to roost on electric utility customer bills. Additionally, market participants, including LSEs, electric POUs, and generators, may elect to delay procurement transactions so as to position themselves for procurement by DWR. In this regard, the state should tread carefully. This proposal attempts to address these challenges by limiting resources to those noted above, including those with at least a five year construction and development horizon – therefore a resource that is less likely to be procured in the current market. The proposal also provides an added safeguard that requires the CPUC to determine the procurement by DWR (including any bonds) is just and reasonable prior to the procurement, and if so, recoverable by a nonbypassable charge on customer’s electric utility bills. DWR procurement would be additional costs on customers’ current electric utility bills, though it’s unclear to what extent these would be less than or more than what would otherwise be procured to meet the state’s clean energy and reliability goals.”
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Steven Bradford, Chair
2023 - 2024 Regular
Bill No: Hearing Date: 9/6/2023
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill makes numerous changes to electricity policy, most notably, authorizes the Department of Water Resources (DWR) to serve as a central procurement entity to procure energy resources in order to help the state meet its renewable and zero-carbon energy resources and reliability goals. This bill also includes numerous related and additional provisions.
ANALYSIS:
Existing law:
- Establishes the California Public Utilities Commission (CPUC) with jurisdiction over all public utilities, including electrical and gas corporations. Grants the CPUC certain general powers over all public utilities, subject to control by the Legislature. (Article XII of the California Constitution)
- Establishes the DWR to manage the state’s water supply. (Water Code §100 et seq.)
- Establishes the State Energy Resources Conservation and Development Commission, also known as the California Energy Commission (CEC) and requires the CEC to assess trends in energy consumption and analyze the social, economic, and environmental consequences of these trends. (Public Resources Code §25200 et seq.)
- Establishes the California Independent System Operator (CAISO) as a nonprofit public benefit corporation, and requires the CAISO to ensure the efficient use and reliable operation of the electrical transmission grid consistent with the achievement of planning and operating reserve criteria, as specified. (Public Utilities Code §345 et seq.)
- Requires the CPUC, in consultation with the CAISO, to establish resource adequacy (RA) requirements for all load-serving entities (LSEs), including community choice aggregators (CCAs) and electric service providers (ESPs). Requires the RA program to achieve certain objectives, including maximizing the ability of CCAs to determine the generation resources used to serve their customers. Requires the CPUC to determine and authorize the most efficient and equitable means for achieving certain goals, including meeting the RA requirement objectives, ensuring that CCAs can determine the generation resources used to service their customers, and minimizing the need for backstop procurement by the CAISO. (Public Utilities Code §380)
- Authorizes the CPUC to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. (Public Utilities Code §451)
- Establishes a renewables portfolio standard (RPS) and requires all retail sellers, including investor-owned utilities (IOUs), ESPs, and CCAs, to procure a minimum quantity of electricity products from eligible renewables energy resources, as defined, so that total kilowatt hours of those products sold to their retail end-use customers achieves 25 percent of retail sales by December 31, 2016, 33 percent by December 31, 2020, 44 percent by December 31, 2024, 52 percent by December 31, 2027, and 60 percent by December 31, 2030. (Public Utilities Code §399.15)
- Requires the CPUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy in a cost-effective manner as part of the integrated resource planning (IRP) process. (Public Utilities Code §454.51)
- Requires the CPUC to adopt a process for each electrical corporation, ESP or CCA to file an IRP and a schedule for periodic updates to the plan, and to ensure that LSEs meet other specified requirements. (Public Utilities Code §454.52)
- Establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90 percent of all retail sales of electricity to California end-use customers by December 31, 2035, 95 percent of all retail sales of electricity to California end-use customers by December 31, 2040, 100 percent of all retail sales of electricity to California end use customers by December 31, 2045. (Public Utilities Code §454.53)
- Requires that the IRP of each LSE contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy resources in a cost-effective manner, meets the emissions reduction targets for greenhouse gases (GHG) established by the California Air Resources Board (CARB) for the electricity sector, and prevents cost shifting among LSEs. (Public Utilities Code §454.54)
- Requires each electric publicly owned utility (POU) serving end-use customers to prudently plan for and procure resources that are adequate to meet its planning reserve margin and peak demand and operating reserves, sufficient to provide reliable electric service to its customers. (Public Utilities Code §25704.5)
- Prohibits an electrical IOU from beginning the construction of a line, plant, or system, or of any extension thereof, without having first obtained from the CPUC a certificate that the present or future public convenience and necessity require or will require its construction, as specified. Under existing law, the extension, expansion, upgrade, or other modification of an existing electrical transmission facility, including transmission lines and substations, does not require a certificate that the present or future public convenience and necessity requires or will require its construction. (Public Utilities Code §1001)
- Establishes the Electricity Supply Strategic Reliability Reserve Program (ESSRRP) and Fund at the DWR and continuously appropriates moneys in the fund to DWR for purposes of implementing projects, purchases, and contracts to carry out specified purposes, constructing, owning, and operating, or contracting for the construction and operation of, contracting for the purchase of electricity from, or financing through loans, reimbursement agreements, or other contracts actions to secure resources for summer reliability or to preserve the option to extend the life of specified facilities, and reimbursing electrical corporations for the value of imported energy or import capacity products that were delivered or capable of being delivered between July 1, 2022, and on or before October 31, 2023, and were procured at above-market costs or in excess of procurement authorizations set by the CPUC and above the requirements needed to serve the electrical corporation’s bundled customers in support of summer electric service reliability. (Water Code §80700 et seq.)
- Requires the CEC to adopt a biennial integrated energy policy report containing certain information, including an overview of major energy trends and issues facing the state. (Public Resources Code §25300 et seq.)
- Establishes the Voluntary Offshore Wind and Coastal Resources Protection Program and Fund, administered by the CEC to support state activities that complement and are in furtherance of federal laws related to the development of offshore wind facilities. Requires the CEC to award and allocate moneys under the program for various purposes. Authorizes the CEC to accept federal and private funding for the purposes of the program. (Public Resources Code §25992.10 and §25992.20)
This bill:
- Defines “diverse clean energy resources” to mean:
- A new resource procured by DWR that meets all of the following requirements:
- The resource directly supports attainment of the state’s goal to achieve 100 percent zero-carbon and renewable energy resources by 2045, without increasing reliance on the state’s dependence on any fossil fuel-based resources.
- The CPUC determines the resource to not be under contract at sufficient levels as shown in LSEs’ most recent individual IRPs submitted to and reviewed by the CPUC to achieve SB 100 (De León, Chapter 312, Statutes of 2018) goals.
- The resource has a construction and development lead time of at least five years.
- The resource does not generate electricity using fossil fuels or fuels derived from fossil fuels.
- The resource does not use combustion to generate electricity (except ancillary and necessary to facility geothermal electricity generation).
- Authorizes a pumped hydroelectric facility to qualify as a diverse clean energy resource if it does not exceed 500 megawatts (MW) and has been directly appropriated funding by the state before January 1, 2023.
- A new resource procured by DWR that meets all of the following requirements:
- Requires that the portfolio of resources identified by the CPUC, as part of the IRP process, ensures a reliable electricity supply that also provides optimal integration of resource diversity in a cost-effective manner. Requires the CPUC to use the portfolio to establish procurement requirements to achieve SB 100 goals, in addition to the state’s GHG reduction goals.
- Requires the CPUC to ensure the net costs of any diverse resources procured by electric IOUs to satisfy the IRP identified need are allocated on a nonbypassable basis.
- Clarifies that all costs resulting from nonperformance to satisfy the need are borne by the LSE that failed to perform, instead of solely the electric IOU or CCA.
- Requires the CPUC, on or before September 1, 2024, and consistent with the IRP process and schedule, to determine if there is a need for the procurement of diverse clean energy resources, as defined, requires the CPUC to specify the diverse clean energy resources that should be procured to meet that need, and authorizes the CPUC, within six months of making that determination, to request the DWR to procure those specified resources that meet the portfolio of resources.
- Authorizes the DWR to procure those resources if DWR elects to do so, before January 1, 2035.
- Authorizes the CPUC to order the procurement of resources with specific attributes by electrical corporations, ESPs, and CCAs as a result of the IRP process and requires the CPUC to enforce any resource procurement requirements on a nondiscriminatory basis. Provides that enforcement may include the assessment of penalties for noncompliance.
- Requires the CPUC to annually submit a report to the Governor and Legislature on the types, amounts, and costs to ratepayers of diverse clean energy resources procured by DWR.
- Requires the CPUC, if the CPUC requests the DWR to procure diverse clean energy resources and the DWR elects to conduct competitive solicitations or enter into contracts for diverse clean energy resources, to develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the DWR.
- Requires the DWR, in evaluating bids received through a solicitation to consider the project’s viability, ability to meet in-service dates, and the useful life, among other factors. Requires bids for the development of a diverse clean energy resource project to include the bidder’s certification that certain labor requirements are met and that a skilled and trained workforce will be used to perform all construction work on the diverse clean energy resource project, as provided.
- Authorizes the CPUC, at the request of the DWR, to require an electric IOU to act as the agent for the DWR or to assist the DWR in conducting the solicitation, bid evaluation, or contract negotiation for new diverse clean energy resource procurement.
- Authorizes the DWR to establish a schedule and mechanism for an electric POU to voluntarily obtain from the DWR diverse clean energy resources to be acquired by the DWR through its central procurement function on a contract-by-contract basis. Provides electric IOUs, ESPs, and CCAs with a voluntary option to obtain incremental diverse clean energy resources from the DWR, as provided.
- Authorizes the CPUC, at the request of DWR, to order an electric IOU to transmit or provide for the transmission of, and distribute all electricity made available by the DWR, and, as an agent of the DWR, to provide billing, collection, and other related services on terms and conditions that reasonably compensate the electrical corporation for its services and adequately secure payment to the DWR.
- Establishes the Diverse Clean Energy Central Procurement Fund and continuously appropriates moneys in the fund to the DWR for procurement by DWR as the central procurement entity. Makes an appropriation by establishing a continuously appropriated fund. Requires that all moneys collected by electric IOUs, ESPs, CCAs, and electric POUs and remitted to the DWR for diverse clean energy resources, and all moneys paid directly or indirectly to or for the account of the DWR for any sale, exchange, transfer, or disposition of those resources, be deposited into the fund.
- Authorizes the DWR, upon determining that it is necessary or desirable to issue bonds to support activities for the procurement of diverse clean energy resources, to issue bonds for purposes of financing the procurement of those resources supporting the fund and other related expenses incurred by the DWR. Authorizes the DWR to adopt regulations for purposes of administering these provisions.
- Exempts DWR contracts for energy resources used as the central procurement entity from review and approval required by the Department of General Services.
- Establishes a sunset of January 1, 2035 by when DWR’s authority to contract for electrical power ceases.
- Requires the CPUC, on and before June 30, 2027, if the DWR determines that resources have been procured through the ESSRRP and that those resources were used in a given month to meet a LSE’s identified reliability need, to annually assess a capacity payment on each LSE that during that same month fails to meet its system RA requirements.
- Requires the CEC, on or before January 31, 2024, in consultation with the CPUC, to submit a report to the appropriate policy and budget committees of the Legislature that includes an assessment of whether each electric POU exceeded, met, or failed to meet its minimum planning reserve margin and specified system RA requirements. Requires the executive director of the CEC, upon the submission of that report, on and before June 30, 2027, if the DWR determines that resources have been procured through the ESSRRP and that those resources were used in a given month to meet an identified reliability need, to annually assess a capacity payment on each electric POU in the CAISO balancing area that during that same month fails to meet its minimum planning reserve margin.
- Establishes the Load-Serving Entity Capacity Payment Account and the Local Publicly Owned Electric Utility Capacity Payment Account in the DWR Electricity Supply Strategic Reliability Reserve Fund (ESSRRF), and specifies that moneys in those accounts would, upon appropriation by the Legislature, be used for contracts related to the ESSRRP. Requires capacity payments collected by the DWR from LSEs and electric POUs to be deposited in those two accounts.
- Requires the CPUC in proceedings evaluating the issuance of certificates of public convenience and necessity for transmission projects, to establish a rebuttable presumption with regard to need for the project in favor of a CAISO governing board-approved need evaluation if certain requirements are satisfied.
- Authorizes an electric POU to meet its minimum planning reserve margin through individual contractual procurement or through an aggregated or pooled portfolio of resources.
- Clarifies and makes explicit CPUC enforcement over all LSEs, once it has authorized additional direct transactions, to include IRP process specified in Sections 454.52 to 454.54 of the Public Utilities Code. Includes additional clean-up of the Section 365.1 of the Public Utilities Code, including deletion of language referencing an already produced report required in SB 237 (Hertzberg, Chapter 600, Statutes of 2018).
- Makes explicit that RA program shall facilitate development of generating capacity that is needed to achieve the state’s SB 100 policy to achieve 100 percent zero-carbon and renewable energy by 2045. Requires each LSE to be subject to the same requirements for the IRP process, in addition to RA and RPS, that is applicable to electric IOUs.
- Requires, as part of the 2025 edition of the Integrated Energy Resources Policy report, the CEC, in consultation with the CPUC, to assess barriers to electricity interconnection and energization and provide recommendations on how to accelerate those processes.
- Authorizes the CEC to allocate moneys under the program Voluntary Offshore Wind and Coastal Resources Protection Program for workforce development grants in consultation with the California Workforce Development Board, consistent with “high road jobs” definitions in statute.
- Requires, upon appropriation by the Legislature, that no less than $6 million from the General Fund is available for the 2024-25 fiscal year to support comprehensive, regional baseline environmental monitoring and research into the impacts of prospective offshore wind energy development where offshore wind has been leased by the Bureau of Ocean Energy Management of the U.S. Department of the Interior.
- States the intent of the Legislature to appropriate additional resources for environmental permitting and related needs across applicable state entities upon the submission and review of the assessment required in budget bill, SB 122 (2023), for offshore wind permitting.
- Makes changes to a required report regarding the use of funds from the ESSRRP, clarifies the report is from the CEC, not DWR, but consistent with a required report from DWR.
Background
Resource adequacy (RA). Following the California energy crisis of 2000-01, the California Legislature enacted legislation to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electric generating capacity. Among the reforms adopted in response to the crisis was the adoption of Public Utilities Code §380 as an effort to better ensure reliability of electric supply. The statute directs the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs, including electric IOUs, ESPs, and now includes CCAs, which did not exist at the time of the crisis. The current RA program consists of system, local, and flexible requirements for each month of a compliance year. In October of each year, LSEs must demonstrate that they have procured 90 percent of their system RA obligations for the five summer months (May-September) of the following year, as well as 100 percent of their local requirements, and 90 percent of their flexible requirements for each month of the coming compliance year. The CPUC has recently adopted changes to RA program, including increasing the planning reserve margin from 15 percent to 17 percent by 2024 for all LSEs and in the case of electric IOUs upwards of 20-22 percent effective planning reserve margin.
Cost Allocation Mechanism. Current law ensures the costs associated with the RA program are recovered on a nonbypassable basis, a process called the Cost Allocation Mechanism (CAM). The CAM is a regulatory process for allocating capacity costs of utility procurement across all benefitting customers. The CAM was conceived in a 2004 CPUC decision, adopted in a 2006 CPUC decision (D.06- 07-029), affected by changes in law (SB 695, Kehoe, Chapter 337, Statutes of 2009), and continues to be adapted to new issues and circumstances. The CAM is a fixture of the CPUC’s Long Term Procurement policy and is based on the principle that costs and benefits of new generation should be shared by all benefitting customers within an electric IOU’s service territory. The mechanism for CAM is a one-way tool; it exists for the IOUs to purchase resources on behalf of all who rely on the electric grid, including customers of ESPs and CCAs. CAM allows the electric IOUs to spread costs of generation resources to the other LSEs.
CAISO backstop procurement. If California RA rules fail to provide sufficient resources, the CAISO is compelled to utilize centralized backstop procurement mechanisms in order to maintain electric system reliability. Centralized backstop procurement is whereby the CAISO contracts with a generator to address the shortfall. Under Federal Energy Regulatory Commission (FERC) rules, the CAISO, like all other balancing authorities, must ensure system reliability or face penalties by FERC. The CAISO has two mechanisms for centralized backstop procurement: Reliability Must Run (RMR) and Capacity Procurement Mechanism (CPM). A resource receiving RMR designation must continue to operate and is compensated by a rate set by the CAISO, per FERC approved tariffs. RMR contracts can be expensive relative to procurement through the CPUC process, especially considering their limited operating parameters. CPM can be used for resources that may be needed in the following year and where the resource is at risk of retirement. Like RMR contracts, CPM contracts are also often at a higher price relative to generation procured through the CPUC process. These costs are generally shouldered by ratepayers in the insufficient Local Capacity Area or by all ratepayers of the LSE(s) lacking the adequate RA.
SB 100 (De León, 2018). SB 100 established the state’s target to meet 100 percent of the state’s electricity retail load with renewable and zero-carbon resources by 2045. SB 1020 (Laird, Chapter 361, Statutes of 2022) established interim goals to meeting the SB 100 target, specifically requiring 90 percent of retail sales by 2035, 95 percent by 2040 to be met with renewable and zero-carbon energy resources. SB 100 Joint Agency Report evaluates the challenges and opportunities in implementing SB 100. It includes an initial assessment of the additional energy resources and the resource building rates needed to achieve 100 percent clean electricity, along with the associated costs. It uses a computer model to analyze these factors under various conditions and technologies. The report is scheduled to be updated every four years. The first report issued on March 2021 identified preliminarily that on average the state may need six gigawatts of new renewable and energy storage annually to meet the SB 100 goals.
IRP process. SB 350 (De León, Chapter 547, Statutes of 2015) required each LSE to file a biennial IRP for approval or certification by the CPUC. The CPUC combines all LSEs’ IRPs to ensure the state is on its path to meet its clean energy procurement goals. POUs are required to file their own IRPs with the CEC. The goal of the IRP is a two-year planning process to ensure that LSEs are meeting targets that allow the electricity sector to contribute to California’s economy-wide GHG emissions reductions goals and that helps to reduce overall costs. The effort is intended to forecast needs on a 10-year horizon. In this regard, the IRP is a forward-looking activity. Whereas the requirements to meet renewable energy standards is a compliance activity to review whether LSEs and POUs have satisfied their three-year compliance obligation under the Renewable Portfolio Standard (RPS) requirements to meet an increasing share of its retail load with eligible renewable energy resources, until achieving 60 percent by 2035. As part of the IRP process, the CPUC has issued several procurement orders on LSEs (summarized in the table below) to address near-term and mid-term procurement needs. Within the procurement orders, the CPUC has directed central procurement for local RA and mid-term reliability by electric IOUs for customers, including those of other LSEs.
CPUC IRP Procurement Order | Total MW | Time Horizon (Calendar Years) |
D. 19-11-016 | 3,300 MW | 2021-2023 |
D. 21-06-035 Mid-Term Reliability (MTR) | 11,500 MW | 2023-2028 |
D. 23-02-040 Supplemental | 4,000 MW | 2026-2027 |
Cumulative Procurement | 18,800 MW | 2021-2028 |
Recent budget and other energy “insurance” actions. In response to energy capacity challenges during extreme heat events, including the rotating outages in August 2020, the Legislature, in collaboration with the Newsom Administration, adopted several measures throughout 2022, in addition to previously adopted measures, to continue to help shore-up California’s electricity supply against the impacts from extreme events. These measures are noted in the table with additional details provided below. (Important note: Not included is other state budget funding to support development of new energy resources, such as long-duration storage, offshore wind, geothermal, and hydrogen. Also not detailed are the plethora of transmission-related efforts to streamline and expedite transmission and interconnection build-outs and approvals to support achieving the state’s clean energy targets and reliability needs.)
Program | Agency | State Budget/Ratepayer Funding | Status |
Electricity Supply Strategic Reliability Reserve Program | DWR | $2.37 billion State Budget | Contracts underway |
Demand Side Grid Support Program | CEC | $295 million State Budget | Launched August 2022 |
Distributed Electric Backup Assets Program | CEC | $700 million State Budget | In Development |
Diablo Canyon Nuclear PowerPlant | CPUC and Various | Ratepayer and $1.4 billion State Budget | Licensing is being pursued; initial federal funding approved, active CPUC proceeding |
Clean Energy Reliability Investment Plan | CEC | ~$1 billion State Budget | Plan developed and adopted. $100 million budgeted (including $32 million for DWR central procurement mechanism). |
Emergency Load Reduction Program | CPUC | ~$186 million in 2022 and 2023 (intended as five year program) Ratepayer | Launched in 2021. |
Smart Thermostat Incentive Program | CPUC | $22.5 million Ratepayer | Launched in 2022 |
ESSRRP at the DWR (funded at $2.3 billion). In June 2022, Budget Trailer Bills, AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), AB 178 (Ting, Chapter 45, Statutes of 2022), and AB 180 (Ting, Chapter 44, Statutes of 2022), were signed into law. These three pieces of legislation collectively established the ESSRRP and set forth new responsibilities and activities by DWR, funded by the newly established ESSRRF, and separate from the State Water Project. DWR established temporary energy resources and created a new deputy director-level division with 25 staff – the Division of Statewide Water and Energy – which oversees the ESSRRP along with the State Power Augmentation Program which was developed in July 2021 in response to executive order direction to quickly deploy 120 MW of new generation. Under the ESSRRP, DWR acts as contingency insurance to help maintain electricity reliability. As part of the program, DWR contracts directly with power facilities and also enters into agreements with the state’s large electric IOUs to reimburse for the value of imported firm energy resources to support summer reliability.
Comments
Is a new central procurement mechanism needed? The CPUC has existing authority to direct procurement of energy resources as demonstrated by the procurement orders it has issued via the IRP process to direct LSEs to procure energy resources that are needed to meet near- and mid-term reliability. Additionally, the CPUC has utilized longstanding authority to direct electric IOUs to procure energy resources for bundled customers, as well as, customers of other LSEs with the costs collected from all customers served (for example local and system RA). Proponents of this proposal, including Governor Newsom’s Administration, who proposed related budget trailer bill language, contend that additional authority is needed so that energy resources will be procured to meet the state’s clean energy and reliability goals. The proponents argue that electric IOUs may not have the financial ability to finance these larger and long lead-time energy resources, such as offshore wind, geothermal, and pumped storage projects. They view the authority granted to DWR in this proposal as an additional tool to help ensure we meet our clean energy and reliability goals, especially given the anticipated aggressive procurement that may be needed to achieve the state’s goals.
Why DWR? DWR’s primary purpose and mission is to manage the state’s water supply. DWR procures energy resources to operate the state water project (perhaps the state’s largest single source of energy demand). During the 2000-01 energy crisis, DWR was directed to procure resources to help the state address the shortfalls affecting the electrical grid, particularly as the state’s large electric IOUs were in precarious financial situations (including one filing for bankruptcy and another on the verge of filing). However, DWR’s performance in procuring resources at the time has been criticized by some suggesting DWR overpaid for resources, resulting in electric ratepayers having to shoulder the costs for the purchased energy for over two decades on their electric utility bills. Notably, DWR’s procurement during the emergency conditions of the energy crisis may not be a fair comparison as to the procurement envisioned by this proposal, given this proposal envisions this authority as a backstop mechanism that the CPUC can request as part of the IRP process – a forward-looking planning effort.
More recently, DWR has been tasked to administer the ESSRRP and Fund as an “insurance” of sorts for the electric grid during extreme events. DWR has entered into contracts to fulfill these responsibilities, including securing energy capacity from natural gas power plants subject to the State Water Resources Control Board’s once-through-cooling regulations. This procurement has been met with some criticism about whether the state is advancing towards its clean energy goals or continuing to procure fossil-based resources. While DWR may not be an ideal entity to serve the central procurement role, it may be the best available option among the existing agencies and entities. Though some advocates have raised questions as to whether other entities should be considered, including establishing a new entity or re-establishing a now-defunct state financing authority. A previous bill, AB 56 (E. Garcia, 2019) sought to task California Alternative Energy and Advanced Transportation Financing Authority (CAEATFA) within the Treasurer’s Office as a central procurement entity. That bill died in this committee and the Treasurer’s Office raised serious concerns with expanding CAEATFA’s role as into the energy procurement market. Given the timing of when the central procurement mechanism may be utilized, it’s possible those alternatives may take too long to get established, as compared to tasking DWR.
Diverse clean energy resource mix? Currently, the language would authorize DWR to procure “diverse clean energy resources” defined as limited to resources meeting specified criteria. Namely, the language prohibits resources that are derived from fossil fuels, or would increase dependence on fossil-fueled resources, or pumped storage hydroelectricity that are over 500 MW and have never received state funding, and prohibit any resource that uses combustion (except if it is ancillary to the production of geothermal energy). In the case of pumped storage hydroelectricity, the intent is to only capture San Vicente Reservoir project which received funding in the 2021 State Budget. Additionally, the CPUC must determine that the resource is not under contract at sufficient levels to meet the state’s clean energy goals and has a construction and development lead time of at least five years. As such, this proposal does not explicitly call out every eligible resource, but attempts to prohibit and require particular attributes. At a minimum, it is likely offshore wind, geothermal energy resources, and pumped hydroelectricity energy storage under 500 MW would be among the eligible resources DWR could procure. In this regard, the language attempts to narrow DWR’s authority to procure only a subset of potential resources currently available. However, there may be additional eligible resources that meet the proposal’s criteria prior to the sunset in 2035. Some stakeholders oppose the bill’s proposal to add new terminology in the statute, namely “diverse clean energy resources.” They are not opposed to limiting the eligible generation resources for central procurement, but oppose including a new term that could be applied to procurement outside DWR’s central procurement authority or future policy proposals. Additional stakeholders have concerns about not including certain resources, including hydrogen and biomass energy.
Backstop or more than backstop procurement? The proposal would require the CPUC to identify procurement needs through the existing IRP process and authorize the CPUC to request DWR procure needed resources after six months of identifying the need. The intent for the six month window is to allow other LSEs the opportunity to procure their share of their load if they elect to do so. This approach is a long-held principle of CCAs whose primary (if not exclusive) mission is to procure energy on behalf of their load. Such an approach seems appropriate to ensure LSEs exercise their responsibility to procure resources for their load, prior to a state agency stepping in. In this regard, it’s possible the DWR procurement may not ever be used, or perhaps only used when truly necessary because the resource was too difficult for any individual LSE, or a few LSEs, to procure. However, other components of the proposal authorize LSEs and electric POUs to request DWR procure additional incremental procurement on behalf of their load. This option may allow LSEs and POUs to advance towards the state’s clean energy and reliability goals. However, such an approach can also muddle whether procurement by DWR is intended as a backstop tool within the IRP or would enable LSEs and POUs from over-reliance on a state agency to procure resources on their behalf. Importantly, the proposal includes some safeguards to limit this election by LSEs, by requiring the CPUC make determinations as to its necessity and ensuring cost-recovery for these procurements.
Costs. Authorizing DWR to procure energy can have the unintended effect of reducing supply in the energy market and increasing prices overall (particularly in the currently constrained energy market). These costs come home to roost on electric utility customer bills. Additionally, market participants, including LSEs, electric POUs, and generators, may elect to delay procurement transactions so as to position themselves for procurement by DWR. In this regard, the state should tread carefully. This proposal attempts to address these challenges by limiting resources to those noted above, including those with at least a five year construction and development horizon – therefore a resource that is less likely to be procured in the current market. The proposal also provides an added safeguard that requires the CPUC to determine the procurement by DWR (including any bonds) is just and reasonable prior to the procurement, and if so, recoverable by a nonbypassable charge on customer’s electric utility bills. DWR procurement would be additional costs on customers’ current electric utility bills, though it’s unclear to what extent these would be less than or more than what would otherwise be procured to meet the state’s clean energy and reliability goals.
Sunset date. The proposal would authorize the use of DWR as central procurement entity until January 1, 2035, at which point the central procurement mechanism would cease (while authorizing the continued life of any contracts entered into prior to the sunset). The imposition of the sunset provides the Legislature the ability to ensure the mechanism is appropriately working should it be re-authorized and to be terminated should it no longer be needed or not be effective.
Capacity payments for use of ESSRRP. As currently proposed, any near-term LSE’s or POU’s energy resource shortfall that is covered by capacity from the existing ESSRRP (funded in last year’s budget $2.37 billion) requires the LSE or POU to make capacity payments into a new fund, with a sunset date of 2027. The proposal would apply any amounts from RA penalties up until the amount of the capacity payment for the month that the LSE or POU had the shortfall. For any RA penalty above the capacity payment, the delta would be deposited pursuant to the customary approach to penalties. For moneys deposited into the Capacity Payment Account, those funds would require future legislative appropriation, thereby limiting the life of the ESSRRF to the existing funding, unless the Legislature appropriates additional funding.
Need for technical and clarifying amendments. The author and committee may wish to amend the bill with additional amendments as follows:
- Technical clarifying amendment to add the words “and diverse” to Public Utilities Code Section 454.51 (d) which was inadvertently left out: “…their portion of the renewable integration and diverse resources…”
- Add (b) to Section 16 of the bill, and replace the existing (b) with (c) in order to clarify intent language regarding future funding for the Coastal Commission related to permitting and review of offshore wind energy projects:
(b) Upon appropriation of the Legislature, additional resources from the General Fund shall be available for the 2024–25 fiscal year and ongoing to support the coastal development permitting at the California Coastal Commission of prospective offshore wind energy development in and around regions in which offshore wind energy areas have been leased by the Bureau of Ocean Energy Management of the United States Department of the Interior, pending future legislation.
- Technical amendments to Section 8 of the bill, Public Utilities Code Section 454.52 (h)(1)(A) replace “diverse clean energy resources” with “eligible energy resources” and update all related references throughout the bill.
- Add (e) (1) to Section 80820 of the Water Code to clarify the meaning of “construction” for purposes of the energy resource projects:
(e) For purposes of this section, the following definitions apply:
(1) “Construction” means any new construction work and subsequent construction and construction maintenance work following initial completion that is contracted out to a contractor in the construction industry, including the construction work on a barge, construction staging area, or construction area when being used as a construction work platform and the rigging and hoisting of construction materials directly from a barge, construction staging area, or construction area into the construction process for a construction project. “Construction” does not include loading and unloading of cargo to and from vessels and the movement of cargo to and from vessels at any port facility to the cargo’s point of rest.
Prior/Related Legislation
AB 205 (Committee on Budget, Chapter 61, Statutes of 2022) among its many provisions, establishes the ESSRRP.
AB 209 (Committee on Budget, Chapter 251, Statutes of 2022) among its many energy-related provisions, makes additional changes to the ESSRRP, established the Voluntary Offshore Wind and Coastal Resources Protection Program.
SB 123 (Committee on Budget, Chapter 52, Statutes of 2023), among its many provisions, extended the date, from September 2022 to October 2023, by when electric IOUs may be reimbursed for above-market costs for imported energy and capacity products delivered or capable of being delivered to the state within the ESSRRP.
SB 124 (Committee on Budget, Chapter 53, Statutes of 2023), among its many provisions, extended the date, from September 2022 to October 2023, by when electric IOUs may be reimbursed for above-market costs for imported energy and capacity products delivered or capable of being delivered to the state, clarified that DWR must present an investment plan to the CEC, rather than the contracts, and makes additional clarifying changes of the ESSRRP.
AB 56 (E. Garcia, 2019) would have required the CPUC to empower the CAEATFA to undertake backstop procurement of electricity that would otherwise be performed by an electric IOU to meet state RA, IRP, and RPS goals not satisfied by retail sellers or LSEs. The bill failed passage in this committee.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Supervisor Dawn Ortiz-Legg, San Luis Obispo County-District 3
350 Humboldt: Grass Roots Climate Action
American Bird Conservancy
American Clean Power Association
BlueGreen Alliance
Business Network for Offshore Wind
California Association of Port Authorities
California Chamber of Commerce
California Coastal Protection Network
California State Association of Electric Workers
California State Council of Laborers
California State Pipe Trades Council
California Wind Energy Association
City of Santa Rosa
Clean Air Task Force
Clean Power Campaign
Coalition of California Utility Employees
Elected Officials Protecting America
Environment California
Environmental Defense Fund
Equinor US
Fervo Energy
Golden State Wind
Humboldt Baykeeper
IBEW, Local Union 639
Invenergy
Monterey Bay Aquarium
National Wildlife Federation
Natural Resources Defense Council
Ocean Conservation Research
Offshore Wind California
RWE
San Diego County Water Authority
Santa Cruz Climate Action Network
Southern California Edison
The National Hydropower Association
Union of Concerned Scientists
Vineyard Offshore
Western State council of Sheet Metal Workers
OPPOSITION, unless amended:
California Municipal Utilities Association
City and County of San Francisco
County of San Diego
Humboldt County Workforce Development Board
Independent Energy Producers
San Diego Community Power
San Francisco Public Utilities Commission
San Jose Clean Energy
ARGUMENTS IN SUPPORT: According to the author:
California is on the precipice of a clean energy transition that is poised to bring vast new clean energy projects, jobs, and economic development to the state. While the last decades of California’s renewable development has favored intermittent renewables, policymakers are overdue in planning for and valuing other renewable development that can better match intermittent resources’ profiles. These resources, which include geothermal, large-scale storage, and offshore wind projects, are either just getting started and carry development risks and higher costs, or have historically cost more to operate and maintain. AB 1373 provides a tool – DWR procurement authority – for the CPUC to be able to exercise when planning efforts show these diverse clean energy resources are needed, but the state utilities are unable to procure them. Using the DWR authority is likely to lead to lower costs to ratepayers for these higher-value resources than the utilities could achieve on their own, due to state bonding authority, state tax breaks, and minimizing project development risk by having a state entity negotiating contracts. Such ratepayer reductions should be encouraged during a time of increased electric and gas unaffordability. AB 1373 provides the path to establish this DWR procurement option to the benefit of California’s ratepayers and workforce, and to reliably meet our clean energy goals.
ARGUMENTS IN OPPOSITION: In opposition to this bill, the CCAs and SFPUC contend this bill would expand CPUC authority over CCAs, allow electric IOU procurement for other LSE customers, and increase costs for customers by applying capacity payments. Humboldt County Workforce Development Board opposes the language in this bill related to workforce development funding without input or a clear role for existing state, regional, and local workforce development boards. These letters in opposition to this bill were received prior to the most recent amendment. As a result, it is not clear whether the entities opposed still remain opposed.
California Municipal Utilities Association writes in opposition to the most recent version of this bill (8/31/2023) expressing concerns about the structure of the capacity payments for electric POUs, opposing the exclusion of hydrogen energy from the eligible energy resources for the DWR central procurement, and concerns about the requirement to adopt a nonbypassable charge as the cost recovery mechanism for DWR central procurement when POUs exercise this option.
The Independent Energy Producers (IEP) oppose the addition of new terminology as proposed to be added to the code by the bill, namely “diverse clean energy resources.” IEP suggests the new terminology is not needed and may impact other clean energy policies concerning the procurement of eligible renewable energy resources, such as biomass and biomethane, or resources that are under development, such as hydrogen. IEP also raises concerns that the central procurement entity could interfere with the competitive market and potentially “choke off procurement”, such as impacting existing procurement for geothermal and pumped storage.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 1373
Author:(Garcia)
As Amended Ver:May 22, 2023
2/3 vote. Urgency
SUMMARY
Provides the Department of Water Resources (DWR) authority to act as a centralized procurement entity (CPE) until January 1, 2030. Requires the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), as applicable, to assess capacity payments for load-serving entities (LSEs) and local publicly owned electric utilities (POUs) that are deficient in their reliability obligations until June 30, 2027. Finally, authorizes the CPUC additional enforcement and subsequent penalty authority over the LSEs' integrated resource plans (IRP).
Major Provisions
- Applies requirements currently applicable to investor-owned utilities (IOUs) to other LSEs for purposes of the CPUC's ability to monitor and enforce the IRP process. This authority is narrowed in this bill relative to the Governor's January budget trailer bill.
- Establishes a CPE at DWR, and outlines the process of DWR-CPE procurement as:
- CPUC review of LSEs' progress toward meeting their IRPs and the SB 100 Policy requirements;
- CPUC requesting DWR to procure "clean energy resources," as defined as only geothermal and offshore wind resources, that meet the portfolio identified in the IRP;
- If CPUC requests DWR-CPE procurement, the CPUC must first determine, in consultation with the CEC and California Independent System Operator (CAISO), that the procurement is necessary.
- Upon a CPUC determination, DWR would conduct one or more competitive solicitations of "clean energy resources," which shall include resources that have a first point of interconnection with the transmission or distribution grid within a California balancing authority (BA). Provides considerations to DWR when evaluating bids, which include project viability, developer experience and creditworthiness; the ability to meet in-service dates without cost escalation; the project's useful life; resource attributes; or any other criteria to be defined by the CPUC and DWR. DWR shall also require that bids include a charge payable to the Offshore Wind Workforce Development Fund, as established under this bill.
- If CPUC requests DWR-CPE procurement, the CPUC shall develop and adopt procedures and requirements that govern DWR's procurement; may review that procurement; and if approved, issue an order governing the recovery of DWR's costs if the procurement process, the resulting transactions, and the associated costs are found just and reasonable and in the public interest, and the recovery of costs does not unreasonably increase costs to customers as compared with similar resource procurement by an IOU.
- Sunsets any new DWR-CPE procurement by January 1, 2030, and the DWR-CPE on January 1, 2050.
- Requires the CPUC to annually assess a capacity payment for the use of DWR's Strategic Reliability Reserve (SRR) by each LSE that fails to meet its system RA requirements during any month in which SRR resources were used to meet a reliability need. Requires capacity payments to be remitted to DWR's SRR Fund by the LSE that failed to meet its system RA requirements within 30 days of the CPUC notifying the LSE. Specifies that CPUC penalties for RA deficiencies shall be used to offset or cover the capacity payment, as applicable, such that a double charge is not levied for the same deficiency. Sunsets the capacity payments on June 30, 2027.
- Establishes the same process for capacity payments by POUs as by LSEs, except that the executive director of the CEC will annually assess the payment and a POU deficiency will be based upon their minimum planning reserve margin (PRM), as established through an ongoing process at the CEC. Delays any assessing of a capacity payment until the CEC submits a report, due January 31, 2024, regarding whether POUs met the minimum 16% PRM the CPUC established for LSEs in summer 2023. Likewise sunsets the capacity payments on June 30, 2027.
- Provides that the division of statute establishing the CPE shall be "liberally construed in a manner so as to effectuate its purposes and objectives." Sunsets the division on January 1, 2050.
- Allows for POUs and LSEs to voluntarily obtain resources that DWR-CPE acquires on their behalf. POUs and LSEs must submit to a nonbypassable charge sufficient at all times to fund its participation to be able to exercise this option. POUs and LSEs must also enter into an agreement with DWR for a revenue requirement that has the full force and effect of an irrevocable financing order.
- Specifies other details of the DWR-CPE including that IOUs may provide billing, collection, assist DWR in conducting the solicitations and bid evaluations, and other services for DWR; that DWR's contracting under the CPE is exempt from requirements under the Public Contract Code; and that DWR may issue bonds to support its procurement and constrains the bonding amounts to DWR estimations of revenue available, among other issues.
- Establishes the Offshore Wind Workforce Development Fund in the State Treasury, which monies may be used upon legislative appropriation to award grants for educating, training, maintaining, and strengthening the workforce needed for offshore wind energy development.
COMMENTS
California has ambitious clean energy goals: 100% renewable and zero-carbon energy-producing resources by December 31, 2045. The state has had some success in this effort, though some emissions from some sectors have proven stubbornly sticky and, arguably, the greatest challenges, and costs, lie ahead.
In August of 2020, California sweltered under an unusually intense and protracted heatwave that extended across the Western United States. In response, the state's electric grid operator – the California Independent System Operator, or CAISO – instituted, for the first time in 20 years, "rolling blackouts," meaning planned, sequenced and limited reductions of electrical supply to prevent widespread collapse of the electrical grid. In early September of 2022, California's electrical grid struggled to meet demand caused by another grueling heatwave, though CAISO was able to avoid instituting rolling blackouts.
In response to this apparent new normal of regularly occurring, intense, widespread and prolonged heatwaves, and in recognition of the state's push to electrify ever more sectors of the economy, the CPUC has ordered LSEs – a catchall term to describe the entities, other than municipal utilities, that, in the context of this bill, procure electricity on behalf of end-use customers—to procure additional electrical capacity to meet clean energy and reliability requirements. Specifically, from November 2019 to February 2023, the CPUC has ordered LSEs to procure approximately 18.8 gigawatts (GW) of electric capacity, all from clean energy resources, to come online between the years 2021 and 2027. The CPUC describes this as the largest single capacity procurement it has ever ordered.
LSEs have had trouble satisfying the CPUC's recent electric capacity procurement orders. Those that have done so have paid very high prices for the electric capacity in what seems to be a seller's market. In recognition of this difficulty, the CEC and the CPUC together recommended the state consider "statutory and regulatory changes to a central procurement mechanism to secure a development path for large, long-lead time clean energy resources." The rationale behind this recommendation is that some resources—and not just long-lead time resources, despite the use of the term—necessary to meet the state's clean energy goals and ensure reliability are too costly and too risky for any one LSE, or small collection of LSEs, to take on, and a centralized procurement mechanism aggregates the buying power of all LSEs and dilutes risk associated with such resources across all LSE customers.
The CPUC, under current law, has the authority to order an electrical corporation, such as Pacific Gas and Electric, Southern California Edison or San Diego Gas and Electric, to act as a centralized procurement entity. This bill additionally authorizes the CPUC to request DWR act as a centralized procurement entity, a role similar to one that DWR has played before, both during the energy crisis at the turn of the millennium and, more recently, last summer as part of the SRR Program.
According to the Author
"California is on the precipice of a clean energy transition that is poised to bring vast new clean energy projects, jobs, and economic development to the state. While the last decades of California's renewable development has favored intermittent renewables, policymakers are overdue in planning for and valuing other renewable development that can better match intermittent resources' profiles. These resources, which include geothermal, large-scale storage, and offshore wind projects, are either just getting started and carry development risks and higher costs, or have historically cost more to operate and maintain. AB 1373 provides a tool – DWR procurement authority – for the CPUC to be able to exercise when planning efforts show these diverse clean energy resources are needed, but the state utilities are unable to procure them. Using the DWR authority is likely to lead to lower costs to ratepayers for these higher-value resources than the utilities could achieve on their own, due to state bonding authority, state tax breaks, and minimizing project development risk by having a state entity negotiating contracts. Such ratepayer reductions should be encouraged during a time of increased electric and gas unaffordability. AB 1373 provides the path to establish this DWR procurement option to the benefit of California's ratepayers and workforce, and to reliably meet our clean energy goals."
Arguments in Support
This bill is supported by a coalition of energy developers and Environment California, who write that the DWR-CPE portion of the bill will facilitate needed procurement for clean energy resources in the state. The supporters specifically cite the development timeline and risk associated with offshore wind energy as in need of the DWR-CPE mechanism, but note that the CPE "does not foreclose the opportunity for LSEs to procure diverse clean energy resources on their own." They note the state will need many resources to meet our clean energy and reliability goals, and the mechanisms put forward under this bill will "provide more certainty."
Arguments in Opposition
This bill has no registered opposition, but does have a coalition of community choice aggregators, electric service providers, local governments, and POUs writing in Oppose Unless Amended. The coalition seeks guardrails to the DWR-CPE function, a limit to the CPUC expansion of IRP authority, and a removal—or at the least, a restructuring—of the capacity payment mechanism. The National Parks Conservation Association also writes in Oppose Unless Amended, and mirrors some of these concerns. However, all of these positions were filed to a previous version of the bill. Amendments out of Appropriations Committee have sought to address many of these concerns. It is unclear whether or how these organizations' positions will change.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, costs of this bill largely depend upon the CPUC exercising its authority to request DWR to procure energy resources on behalf of LSEs and DWR agreeing to act on that request. The analysis that would lead the CPUC to make such a request is part of CPUC's existing duties. However, DWR estimates it would realize significant costs – $32 million, DWR claims, for the first three years of the program – were it to act as a centralized procurement entity. Similarly, both the CPUC and the CEC would face costs of an unknown, but significant amount to fulfill the duties this bill assigns to each agency, were DWR to act as a centralized procurement entity.
VOTES
ASM UTILITIES AND ENERGY: 8-2-5
YES: Garcia, Calderon, Wendy Carrillo, Connolly, Muratsuchi, Reyes, Santiago, Schiavo
NO: Chen, Mathis
ABS, ABST OR NV: Jim Patterson, Bauer-Kahan, Holden, Ting, Wallis
ASM APPROPRIATIONS: 11-4-1
YES: Holden, Bryan, Calderon, Wendy Carrillo, Mike Fong, Hart, Lowenthal, Papan, Pellerin, Weber, Ortega
NO: Megan Dahle, Dixon, Mathis, Sanchez
ABS, ABST OR NV: Robert Rivas
UPDATED
VERSION: May 22, 2023
CONSULTANT: Laura Shybut / U. & E. / (916) 319-2083 FN: 0000977
Date of Hearing: May 17, 2023
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Chris Holden, Chair
ABPCA Bill Id:AB 1373
Author:(Garcia) – As Amended Ver:April 13, 2023
Policy Committee: | Utilities and Energy | Vote: | 8 - 2 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill, to a large extent, mirrors the budget change proposal included in the Governor’s January budget to provide the Department of Water Resources (DWR) authority to act as a centralized procurement entity (CPE) for long-lead time, diverse and large (LLTDL) energy resources.
Specifically, this bill, among other things, authorizes the California Public Utilities Commission (CPUC) to direct an electrical corporation or request DWR to procure diverse clean energy resources that meet the portfolio of resources identified in energy resource planning documents (known as integrated resource plans) current law requires each load-serving entity (LSE) regularly submit to the CPUC. The bill empowers the CPUC, in consultation with DWR, to adopt procedures regarding procurement by, obligations on, and recovery of costs incurred by DWR. The bill limits the CPUC ability to order recovery of these costs through charges on LSE customers if it finds the recovery (a) is just and reasonable, (b) is in the public interest and (c) does not unreasonably increase costs to customer on a net-present-value basis. The bill also directs DWR, if it exercises this procurement authority, to provide an opportunity for publicly owned electric utilities (POUs) to elect for DWR to procure resources on their behalf, too.
The bill also establishes the DWR Electricity Supply Reliability Reserve Fund, monies in which DWR is to use to meet unmet electrical reliability needs. It also provides a process by which the CPUC, in the case of LSEs, and the California Energy Commission (CEC), in the case of POUs, may order assessments on any LSE that fails to meet its system resource adequacy requirements or on any POU that fails to meet its minimum planning reserve margin, respectively, during any month in which resources procured using moneys from the DWR Electricity Supply Reliability Reserve Fund were used to meet a reliability need.
FISCAL EFFECT:
Costs of this bill largely depend upon the CPUC exercising its authority to request DWR to procure energy resources on behalf of LSEs and DWR agreeing to act on that request. The analysis that would lead the CPUC to make such a request is part of CPUC’s existing duties. However, DWR estimates it would realize significant costs—$32 million, DWR claims, for the first three years of the program—were it to act as a centralized procurement entity. Similarly, both the CPUC and the CEC would face costs of an unknown, but significant amount to fulfill the duties this bill assigns to each agency, were DWR to act as a centralized procurement entity.
COMMENTS:
This bill largely mirrors a budget change proposal submitted by the Governor as part of the administration’s January budget. As this bill implements significant new policy, it seems appropriate it go through the policy bill process, not the budget process. According to the author:
California is on the precipice of a clean energy transition that is poised to bring vast new clean energy projects, jobs, and economic development to the state. While the last decades of California’s renewable development has favored intermittent renewables, policymakers are overdue in planning for and valuing other renewable development that can better match intermittent resources’ profiles. These resources, which include geothermal, large-scale storage, and offshore wind projects, are either just getting started and carry development risks and higher costs, or have historically cost more to operate and maintain. AB 1373 provides a tool – DWR procurement authority – for the CPUC to be able to exercise when planning efforts show these diverse clean energy resources are needed, but the state utilities are unable to procure them. Using the DWR authority is likely to lead to lower costs to ratepayers for these higher-value resources than the utilities could achieve on their own, due to state bonding authority, state tax breaks, and minimizing project development risk by having a state entity negotiating contracts. Such ratepayer reductions should be encouraged during a time of increased electric and gas unaffordability. AB 1373 provides the path to establish this DWR procurement option to the benefit of California’s ratepayers and workforce, and to reliably meet our clean energy goals.
California has ambitious clean energy goals: 100% renewable and zero-carbon energy-producing resources by December 31, 2045. The state has had some success in this effort, though some emissions from some sectors have proven stubbornly sticky and, arguably, the greatest challenges, and costs, lie ahead.
In August of 2020, California sweltered under an unusually intense and protracted heatwave that extended across the Western United States. In response, the state’s electric grid operator—the California Independent System Operator, or CAISO—instituted, for the first time in 20 years, “rolling blackouts,” meaning planned, sequenced and limited reductions of electrical supply to prevent widespread collapse of the electrical grid. In early September of 2022, California’s electrical grid struggled to meet demand caused by another grueling heatwave, though CAISO was able to avoid instituting rolling blackouts.
In response to this apparent new normal of regularly occurring, intense, widespread and prolonged heatwaves, and in recognition of the state’s push to electrify ever more sectors of the economy, the CPUC has ordered LSEs to procure additional electrical capacity to meet clean energy and reliability requirements. Specifically, in November 2019, the CPUC ordered LSEs—a catchall term to describe the entities, other than municipal utilities, that, in the context of this bill, procure electricity on behalf of end-use customers—to procure 3,300 megawatts of capacity by 2023. Then, in June of 2021, the CPUC ordered LSEs to procure an additional 11,500 megawatts of electric capacity, all from clean energy resources, to come online between the years 2023 and 2026. The CPUC describes this as the largest single capacity procurement it has ever ordered. Not long after, in February of 2023, the CPUC ordered LSEs to procure an additional 4,000 megawatts of clean electrical capacity, to come online between the years 2026 and 2027, bringing the total procurement ordered by the CPUC to 18,800 megawatts. The CPUC has recommended an electric resource portfolio with more than 85,000 megawatts of new resources by 2035. These new resource additions include 54,000 megawatts of renewable resources, including 2,000 megawatts of geothermal and 4,700 megawatts of offshore wind.
LSEs have had trouble satisfying the CPUC’s recent electric capacity procurement orders. Those that have done so have paid very high prices for the electric capacity in what seems to be a seller’s market. In recognition of this difficulty, the CEC and the CPUC together recommended the state consider “statutory and regulatory changes to a central procurement mechanism to secure a development path for large, long-lead time clean energy resources.” The rationale behind this recommendation is that some resources—and not just long-lead time resources, despite the use of the term—necessary to meet the state’s clean energy goals and ensure reliability are too costly and too risky for any one LSE, or small collection of LSEs, to take on, and a centralized procurement mechanism aggregates the buying power of all LSEs and dilutes risk associated with such resources across all LSE customers.
The CPUC, under current law, has the authority to order an electrical corporation, such as Pacific Gas and Electric, Southern California Edison or San Diego Gas and Electric, to act as a centralized procurement entity. This bill additionally authorizes the CPUC to request DWR act as a centralized procurement entity, a role similar to one that DWR has played before, both during the energy crisis at the turn of the millennium and, more recently, last summer as part of the Electricity Supply Strategic Reliability Reserve Program.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 26, 2023
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Eduardo Garcia, Chair
ABPCA Bill Id:AB 1373 (
Author:Garcia) – As Amended Ver:April 13, 2023
SUBJECT: Energy
SUMMARY: Provides significant policy changes to electricity market structure and regulation as proposed by the Newsom Administration’s 2023 budget energy trailer bill, including the creation of a central procurement entity (CPE) at the Department of Water Resources (DWR); capacity payments for load-serving entities (LSEs) and local publicly owned electric utilities (POUs) that are deficient in their reliability obligations and DWR’s Strategic Reliability Reserve (SRR) was used to meet their reliability needs; and California Public Utilities Commission (CPUC) enforcement and subsequent penalty authority of LSEs’ integrated resource plans. Specifically, this bill:
- Applies requirements currently applicable to investor-owned utilities (IOUs) to other LSEs for purposes of the CPUC’s ability to monitor and enforce the integrated resource planning (IRP) process. Some of the sections being applied to other LSEs are inclusive of CPUC review of rates and procurement costs.
- Modifies one of the objectives of the CPUC’s resource adequacy (RA) program to state the program shall facilitate new development to meet California’s SB 100 goals (the policy that all of the state's retail electricity be supplied with a mix of Renewables Portfolio Standard (RPS)-eligible and zero-carbon resources by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035, for a total of 100% clean energy).
- Establishes a CPE at DWR, and outlines the process of DWR-CPE procurement as:
- CPUC review of LSEs’ progress toward meeting their IRPs and the SB 100 Policy requirements;
- CPUC directing the IOUs or requesting DWR to procure “diverse clean energy resources,” as defined by the CPUC, that meet the portfolio identified in the IRP;
- If CPUC requests DWR-CPE procurement, the CPUC must first determine, in consultation with the CEC and California Independent System Operator (CAISO), that the procurement is necessary.
- Upon a CPUC determination, DWR would conduct one or more competitive solicitations of “diverse clean energy resources,” as determined by the CPUC, which shall include resources that have a first point of interconnection with the transmission or distribution grid within a California balancing authority (BA) area. Provides considerations to DWR when evaluating bids, which include project viability, developer experience and creditworthiness; the ability to meet in-service dates without cost escalation; the project’s useful life; and resource attributes or any other criteria to be defined by the CPUC and DWR.
- If CPUC requests DWR-CPE procurement, the CPUC shall develop and adopt procedures and requirements that govern DWR’s procurement; may review that procurement; and if approved, issue an order governing the recovery of DWR’s costs if the recovery costs are found just and reasonable and in the public interest, and the recovery of costs does not unreasonably increase costs to customers as compared with similar resource procurement by an IOU.
- Establishes guidelines for DWR procurement costs to be recovered, and if determined to be appropriate by the CPUC, permits recovery through a nonbypassable charge. Cost recovery is specified to be determined through a CPUC proceeding, where costs must be found just and reasonable to be eligible for recovery. Costs may include costs from DWR issuing bonds, costs relating to contracting, and supporting work.
- Requires DWR to have entered into an agreement with the CPUC for the nonbypassable charge before it begins to incur costs, if the CPUC had determined a nonbypassable charge was necessary to fund DWR’s activities to implement this measure. Conditions any agreement on DWR providing the CPUC with annual notifications of collections received and amount of excess or deficiency in collection, and DWR notifying the CPUC in writing—and the CPUC acting within 60 days of receipt—that an increase to the nonbypassable charge is necessary because forecasted revenue needed to meet DWR contract obligations would not be met by collections. Requires the agreement to state the CPUC’s just and reasonable determination with respect to the revenue requirement is in effect for the duration of the bond.
- Requires the CPUC to annually assess a capacity payment for the use of DWR’s SRR by each LSE that fails to meet its system RA requirements during any month in which SRR resources were used to meet a reliability need. Requires capacity payments to be remitted to DWR’s SRR Fund by the LSE that failed to meet its system RA requirements within 30 days of the CPUC notifying the LSE. Specifies a calculation methodology for the capacity payment to be a dollar amount equal to the per-kilowatt monthly cost of resource procurement, weighted for the months when the resource was procured. Specifies other multipliers and adjustments to the capacity payment calculation depending on the LSE’s load or any resources procured on the LSE’s behalf. Permits the CPUC, in consultation with the CEC, to modify the capacity payment calculation methodology.
- Establishes the same process for capacity payments by POUs as by LSEs, except that the executive director of the CEC will annually assess the payment.
- States the purpose of the capacity payment is to replenish DWR’s SRR, and is not a penalty nor does it prohibit the CPUC from assessing a penalty on a LSE for failure to comply with RA requirements.
- Provides that the division of statute establishing the CPE shall be “liberally construed in a manner so as to effectuate its purposes and objectives.”
- Specifies DWR-CPE’s powers and responsibilities are separate from DWR’s authority for the State Water Project. Establishes the Clean Energy Central Procurement Fund and specifies fund moneys are separate and distinct from any other moneys administered by DWR. Additionally clarifies that the CPE authority does not subject DWR “to the jurisdictional authority” of the CPUC or expand the CPUC’s jurisdiction.
- Allows for POUs to voluntarily obtain resources that DWR-CPE acquires on their behalf. POUs must submit to a nonbypassable charge sufficient at all times to fund its participation to be able to exercise this option. POUs must also enter into an agreement with DWR for a revenue requirement that has the full force and effect of an irrevocable financing order.
- Specifies other details of the DWR-CPE including that IOUs may provide billing, collection, and other services for DWR; that DWR’s contracting under the CPE is exempt from requirements under the Public Contract Code; and that DWR may issue bonds to support its procurement and constrains the bonding amounts to DWR estimations of revenue available, among other issues.
EXISTING LAW:
- Requires the CPUC, in consultation with the California Independent System Operator (CAISO), to establish RA requirements for all load-serving entities (LSEs), as defined, in accordance with specified objectives. Further requires each LSE to maintain physical generating capacity adequate to meet its load requirements, including peak demand and planning and operating reserves, deliverable to locations and at times as may be necessary to provide reliable electric service. Requires the CPUC to determine and authorize the most efficient and equitable means for LSEs to achieve specified purposes when meeting their RA requirements. Requires the CPUC, in consultation with the CAISO, to establish RA requirements for all LSEs. (Public Utilities Code § 380)
- Defines “load-serving entities” as IOUs, electric service providers (ESPs), and community choice aggregators (CCAs). (Public Utilities Code § 380 (k))
- Authorizes customers of an IOU to aggregate their electric loads as members of their local community with CCAs. Designates a CCA as solely responsible for all generation procurement activities on behalf of the CCA’s customers, except where other generation procurement arrangements are expressly authorized by statute. (Public Utilities Code § 366.2)
- Requires retail sellers and publicly owned utilities to increase purchases of renewable energy such that at least 60% of retail sales are procured from eligible renewable energy resources by December 31, 2030. This is known as the RPS. (Public Utilities Code § 399.11 et seq.)
- Establishes the policy that all of the state's retail electricity be supplied with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035, for a total of 100% clean energy. Requires the CPUC, in consultation with the CEC, CARB, and all California balancing authorities, to issue a joint report to the Legislature by January 1, 2021, reviewing and evaluating the 100% clean energy policy. (Public Utilities Code § 454.53)
- Requires the CPUC to adopt a process for each LSE to file an integrated resource plan (IRP) and a schedule for a periodic updates to the plan to ensure that LSEs accomplish specified objectives. Requires each LSE to prepare and file an IRP consistent with those objectives on a time schedule directed by the CPUC and subject to CPUC review. (Public Utilities Code § 454.52)
- Requires that the IRP of each LSE contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy resources in a cost-effective manner, meets the emissions reduction targets for greenhouse gases (GHG) established by the State Air Resources Board (ARB) for the electricity sector, and prevents cost shifting among LSEs. (Public Utilities Code § 454.54)
- Defines “eligible renewable energy resource” as an electrical generating facility that uses biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells using renewable fuels, small hydroelectric generation of 30 megawatts (MW) or less, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current, subject to multiple conditions. (Public Utilities Code § 399.12)
- Requires CARB to create a Climate Change Scoping Plan to achieve the maximum technologically feasible and cost-effective reductions in GHG emissions by 2020. CARB must update this Scoping Plan at least once every five years. (California Health and Safety Code § 38561)
- Requires the CEC to adopt the Integrated Energy Policy Report (IEPR) every two years, which must contain an overview of major energy trends and issues facing the state, including, but not limited to, supply, demand, pricing, reliability, efficiency, and impacts on public health and safety, the economy, resources, and the environment. (Public Resources Code §§ 25300-25327)
- Requires the CPUC to work with CAISO to establish RA requirements for LSEs. Existing law specifies the criteria the CPUC must consider when establishing RA requirements and specifies that an electrical corporation’s reasonable costs for meeting RA are recoverable from customers through non-bypassable charges. (Public Utilities Code § 380)
- Establishes the Electricity Supply Strategic Reliability Reserve to implement projects, purchases, and contracts for electricity resources for summer reliability or to meet any reliability need outside of traditional LSE procurement and the CAISO market. (Water Code §§ 80700-80730)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations for its review.
BACKGROUND:
Planning for the Future: the IRP, SB 100, IEPR, and RA – California has a complicated but robust electric planning and procurement regime spread across the CPUC, CEC, and CAISO. This regime guides the current procurement the LSEs conduct, and informs short-, mid-, and long-term procurement strategies. The regime is complementary, where one resource may count toward meeting many facets of an LSE’s procurement requirements and planning goals. The main pieces of the regime are the IRP, the related SB 100 Report, and RA.
The IRP (mid- to long-term procurement) – Since 2015, with the passage of SB 350 (De León, Chapter 547, Statutes of 2015), California regulators have worked to identify a diverse mix of resources to achieve our clean energy goals. SB 350 requires the CPUC to adopt a process for each LSE to file an IRP starting in 2017 and for each publicly-owned utility (POU) to file an IRP by January 1, 2019. The goal of the IRP is to reduce the cost of achieving GHG emission reductions by looking broadly at system needs, rather than at individual LSEs or resource types, in order to identify generation that reduces GHGs, improves reliability, and reduces overall cost. Compliance with the RPS program occurs separately, but in concert with, the resource mixes selected by LSEs’ IRP filings.
The IRP operates on a 2-year planning cycle, and forecasts system need 10 years into the future. The most recent IRP analysis identified almost 86 gigawatts (GW) of new resources needed by 2035,[1] arising from a mix of geothermal, land-based wind, offshore wind, solar, battery storage, pumped storage, and demand response.[2] This portfolio represents a more than doubling within 12 years of the current nameplate capacity on the system; an enormous goal.
SB 100 Report (long-term procurement planning) – While the IRP focuses on what energy mix is best suited to meet our GHG and reliability goals 10 years into the future, the Joint Agency SB 100 Report looks at a planning horizon 22 years out to determine how best to implement the 100%-clean-electricity-by-2045 policy enacted under SB 100 (De León, Chapter 312, Statutes of 2018).[3] The first SB 100 report was finalized in March 2021, and included analyses of many pathways to achieve the state’s 2045 clean energy goal.[4] The SB 100 Report will be updated every four years, with future work focused on system reliability,[5] among other considerations.
The IEPR (demand forecast) – Alongside the IRP and SB 100 Report, which focus on potential mid- and long-term procurement needs for the electricity system, the CEC conducts an IEPR to forecast all aspects of energy industry supply, production, transportation, delivery, distribution, demand, and pricing. The CEC is then required to use these assessments and forecasts to develop energy policies that conserve resources, protect the environment, ensure energy reliability, enhance the state's economy, and protect public health and safety. The CEC adopts an IEPR every two years with updates every other year. The information generated from the IEPR’s demand forecast informs the IRP and RA processes at the CPUC.
RA (short-term procurement) – Running concurrently with these planning streams is the RA process at the CPUC and CAISO. While the IRP and SB 100 Report focus on potential future needs, RA is designed to identify resources needed to ensure reliability today. Following the California energy crisis of 2000-01, the California Legislature enacted AB 380 (Nunez, Chapter 367, Statutes of 2005) to prevent future incidents of widespread blackouts and rolling brownouts due to lack of electricity. This statute established the RA program at the CPUC, which must work in consultation with the CAISO to establish RA requirements for all LSEs. The current RA program consists of system, local, and flexible requirements for each month of a compliance year. System requirements are determined for each LSE based on the CEC’s IEPR electricity forecast plus a 15% planning reserve margin.[6] Local requirements are determined based on an annual CAISO study using a 1-10 (once in ten years) weather year and an N-1-1 contingency.[7] Flexible requirements are based on an annual CAISO study that currently looks at the largest three-hour ramp for each month needed to run the system reliably. In October, LSEs must demonstrate that they have procured 90% of their system RA obligations for the five summer months (May-September) of the following year, as well as 100% of their local requirements, and 90% of their flexible requirements for each month of the coming compliance year. There is an additional monthly reporting requirement for RA, where LSEs must demonstrate they have procured 100% of their monthly system and flexible RA obligation.
The RA market has experienced significant constraint recently, largely driven by resource retirements across the western U.S. as well as extreme weather events causing California energy agencies to increase RA obligations for LSEs, such as the PRM adjusting from 15% to an “effective” 20-22.5% for the three large IOUs for summers 2022 and 2023.[8] These changes have led to a market rush, practically at any cost, to buy resources needed to meet RA obligations for the next few summers. Energy sellers have seemingly taken note. As shown in Figures 1 and 2 below, both system and local RA prices have been increasing significantly over the last few years, and are projected to be even higher for the coming summers.
Figure 1: Weighted Average Price of Figure 2: Weighted Average Prices for
System RA ($/kW-month).[9] Local RA ($/kW-month).[10]
Breaking the Cycle: IRP Procurement Orders – The regulatory framework of the IEPR, IRP (or long-term procurement planning, as it was previously known), and RA has been in place since the early 2000s, operating with relative stability. However, since that time, market fundamentals have changed to the point that it may be prudent for the energy agencies to re-evaluate the planning regime governing the market. Some of these trends include:
- Increased role of CCAs – Procurement decisions are now being made by more than 40 CCAs and ESPs, as well as the six IOUs; with the role of the IOUs in procurement shrinking substantially since the early 2000s. Prior to the expansion of CCAs into procurement, the CPUC relied heavily on the IOUs’ bundled procurement plans to establish and enforce obligations for contracting for existing resources beyond the RA program (i.e., mid- or long-term resources). Via the bundled procurement plans, the CPUC requires the IOUs to contract for a certain amount of forward energy and capacity to minimize financial risk to bundled customers. The CCAs are not similarly obligated to maintain forward contract positions (though many of them do), or share them with the CPUC, for energy and capacity.[11]
- Increased capacity (RA) market tightness – over the last 20 years, over 20 GWs of aging natural gas plants have retired in the state.[12] This statewide trend has been mirrored throughout the west, where aging, inefficient powerplants have been retired due to market and regulatory pressure, leading to capacity tightness across the western U.S. This market tightness has led to increased potential for high energy prices during scarcity conditions, as utilities are no longer adequately hedged, and the potential for energy suppliers to exert market power over buyers desperate for any megawatt to meet RA compliance and ensure reliability. This committee has been made aware of circumstances in the 2023 RA showings where utility buyers offered astronomical prices for resources, and still received no bids from suppliers.
- Increasing GHG reduction goals – California’s utilities will need to contract for significant amounts of new clean energy resources to meet our 2045 100% clean energy policy. Ensuring reliability while these new resources come online, some with potentially significant delays, will be paramount, and will take enormous effort from the energy agencies to ensure a smooth transition.
In light of these trends, and as updates to IEPR demand forecasting and IRP modeling assumptions evolved, the CPUC utilized the IRP proceeding to order new near- and mid-term resources, requiring all LSEs to bear some responsibility for their costs. Beginning in 2019, these procurement orders were issued outside the IRP cadence due to the urgent nature of the procurement need, and resulted in the CPUC calling for 3.3 GWs to incrementally come online from 2021-2023[13] and 11.5 GWs to come online from 2023-2026.[14] Recently the CPUC called for an additional 4 GW to come online from 2026-2027.[15] These orders call for the new resources to be net qualifying capacity (NQC), so the IRP procurement will ensure RA eligibility for these new resource additions. Importantly, the 2021 mid-term order for 11.5 GWs specified certain resource attributes that must be procured, specifically calling for 1 GW of long-duration storage and 1 GW of firm resources.[16] In its 2023 IRP decision, the CPUC extended the delivery timeline for these long-lead time resources to 2028, citing potential delays for these projects.[17]
While these decisions mark an unprecedented level of procurement ordered by the CPUC, at 18.8 GWs over six years, they represent little more than half of the additional resources needed by 2030 to meet the adopted IRP system portfolio, which calls for approximately 35 GWs by the end of the decade.[18] Procurement is needed, urgently. But the procurement orders have raised concerns that the just-in-time, order-by-order approach leads to uncertainty for the LSEs, and presents the potential for the broader market to constrain further or increase costs, as LSEs rush to procure anything and everything to meet the targets. It appears as if the resources called for the meet the 2021-2022 requirements are coming online; while the projects required for 2023 are contracted but their online dates are uncertain.[19] While this progress is positive and demonstrates a level of urgency for procurement not seen in decades, from both the CPUC and LSEs, these procurement orders also suggest that the historic planning efforts of the energy agencies may be inadequate to meet our current needs, and must also urgently evolve to ensure reliability at least-costs while transitioning the electricity sector to meet our clean energy goals.
The Safety Nets: CAISO backstop procurement and DWR’s Strategic Reliability Reserve. RA rules require that where there is a failure to provide sufficient resources, the CAISO is compelled to utilize centralized backstop procurement mechanisms in order to maintain electric system reliability. Centralized backstop procurement occurs when the CAISO contracts with a generator to address the observed shortfall. Under Federal Energy Regulatory Commission (FERC) rules, the CAISO, like all other balancing authorities, must ensure system reliability or face penalties by FERC. The CAISO has two mechanisms for centralized backstop procurement: Reliability Must Run (RMR) and the Capacity Procurement Mechanism (CPM). A resource receiving RMR designation must continue to operate and is compensated by a rate set by the CAISO, per FERC approved tariffs. RMR contracts can be expensive relative to procurement through the CPUC process, especially considering the limited operating parameters of the contracted resources. The use of RMR contracts declined after implementation of the local RA program. For 2023, three powerplants make up the CAISO RMR resource portfolio, as listed in Table 1.
Table 1: 2023 CAISO RMR contracted powerplants.[20]
Owner | Unit | MW |
Starwood Energy Group | Greenleaf II Cogen | 49.2 |
KES Kingsburg, LP | Oakland, Unit 1 | 55 |
Dynegy Oakland, LLC | Oakland, Unit 2 | 55 |
CPM can be used for resources that may be needed in the following year and where the resource is at risk of retirement. Like RMR contracts, CPM contracts are also, generally, at a higher price relative to generation procured through the CPUC process. The CAISO does not currently have any CPM resources for 2023. The procurement costs of both mechanisms are shouldered by ratepayers in the insufficient Local Capacity Area or by all ratepayers of the LSE(s) lacking the adequate RA.
In June 2022, AB 205 (Committee on Budget, Chapter 61, Statutes of 2022), AB 178 (Ting, Budget Act of 2022, Chapter 45, Statutes of 2022), and AB 180 (Ting, Budget Act of 2021, Chapter 44, Statutes of 2022) were signed into law. These three pieces of legislation collectively established the Electricity Supply Strategic Reliability Reserve Program (SRR),[21] which set forth new responsibilities and activities for DWR, separate from the State Water Project, to procure—or even outright own and operate—energy resources to provide backstop reliability for the CAISO balancing area. These resources are meant to operate “outside” of CAISO’s market, meaning they do not regularly schedule into the market, and only operate during grid emergency events, as specified. For 2022 (which only encompassed 6 months of program development, given the June passage of the statute), DWR procured approximately 1.6 gigawatts (GW) of imported energy and 202 MW of emergency and temporary power generators,[22] with an allocated combined budget of roughly $249 million for the year.[23] 2023 activities of the SRR include up to 171 MW of procured emergency and temporary power generation, as well as ongoing negotiations to include retiring once-through cooling natural gas powerplants into the SRR portfolio. Interestingly, some resources previously designated as CAISO RMR are now part of the SRR.[24] Procurement of resources in the SRR is currently paid for through budget appropriation, with the Governor’s January 2023 budget requesting an additional $800 million over 4 years after $1.5 billion was authorized in 2022 to stand up the program.[25] However, the longevity of such appropriation, and the longevity of the SRR itself, remains a topic of ongoing discussion.
COMMENTS:
- Author’s Statement. According to the author, “California is on the precipice of a clean energy transition that is poised to bring vast new clean energy projects, jobs, and economic development to the state. While the last decades of California’s renewable development has favored intermittent renewables, policymakers are overdue in planning for and valuing other renewable development that can better match intermittent resources’ profiles. These resources, which include geothermal, large-scale storage, and offshore wind projects, are either just getting started and carry development risks and higher costs, or have historically cost more to operate and maintain. AB 1373 provides a tool – DWR procurement authority – for the CPUC to be able to exercise when planning efforts show these diverse clean energy resources are needed, but the state utilities are unable to procure them. Using the DWR authority is likely to lead to lower costs to ratepayers for these higher-value resources than the utilities could achieve on their own, due to state bonding authority, state tax breaks, and minimizing project development risk by having a state entity negotiating contracts. Such ratepayer reductions should be encouraged during a time of increased electric and gas unaffordability. AB 1373 provides the path to establish this DWR procurement option to the benefit of California’s ratepayers and workforce, and to reliably meet our clean energy goals.”
- Where’s the Shortfall? As noted above, California has incredibly ambitious clean energy targets that LSEs must meet over the next 20+ years. The most recent IRP analysis identified almost 86 GW of new resources needed by 2035,[26] arising from a mix of geothermal, land-based wind, offshore wind, solar, battery storage, pumped storage, and demand response.[27] This portfolio represents a more than doubling within 12 years of the current nameplate capacity on the system; an enormous goal.
However, recent years have demonstrated that planning alone cannot ensure the state’s ambitious electric sector GHG emission reduction targets will be met. The procurement LSEs need to conduct over the next two decades is enormous, but LSEs are simultaneously faced with a variety of barriers (including land-use issues, financing, and supply chain disruptions) that may make it challenging for new resources to come online on time. The CPUC demonstrated this planning gap when it utilized the IRP proceeding to order new near- and mid-term resources, requiring all LSEs to bear some responsibility for their costs. As noted above, beginning in 2019, these procurement orders were issued outside the IRP cadence due to the urgent nature of the procurement need, and resulted in the CPUC calling for approximately 18.8 GWs over six years. This volume of procurement represents little more than half of the additional resources needed by 2030 to meet the adopted IRP system portfolio, which calls for approximately 35 GWs by the end of the decade.[28]
To meet reliability, procurement is urgently needed. In response to the CPUC orders, LSEs procured over 11GW of new resources, at an NQC of 6 GW to count toward RA obligations between 2020 and 2022.[29] This volume of procurement appears to meet the 2021-2022 order requirements, and are coming online; however it remains unclear how indicative this success is to future procurement schedules, as many of the projects that came online have been suggested to have already been in the development pipeline prior to the CPUC order being adopted. Moreover, most of the new energy resources developed between 2020 and 2022 were solar, battery energy storage, and wind. The pipeline of new energy resources under contract, but not yet online, are similar in terms of technology mix.[30] Yet both the mid-term IRP planning cycles and the long-term SB 100 analysis demonstrate that a more robust resource mix is needed to ensure reliability at least-cost.
As part of its 2021 mid-term order, the CPUC identified specified resource attributes that must be procured as part of the 11.5 GWs called for by 2026; specifically including 1 GW of long-duration storage and 1 GW of firm resources.[31] The resource procurement to date to meet this mid-term order is shown below in Table 2, and demonstrate LSEs are not collectively on track to meet their 2023 requirements; moreover the specific resource attributes called for by 2026 to meet identified system needs are failing to appear. In recognition of this, in January 2023, the CPUC extended the delivery timeline for these long-lead time resources to 2028, citing potential delays for these projects.[32]
Table 2: Mid-Term Reliability Procurement by LSE Type and Online Date.[33]
LSE Type | Obligation 2023 | Claimed | Obligation 2024 | Claimed | Obligation 2025 | Claimed | Obligation 2026 (LLT resource) | Long-duration claimed | Firm zero-carbon claimed | Total Obligated vs. Claimed |
CCA | 620 | 630 | 1,854 | 1,042 | 463 | 409 | 620 | 108 | 120 | 3,556 / 2,308 |
ESP | 126 | 170 | 378 | 71 | 94 | - | 126 | - | - | 724 / 241 |
IOU | 1,087 | 896 | 3,261 | 1,684 | 815 | 105 | 1,087 | - | - | 6,250 / 2,685 |
These recent procurement showings suggest development may not be occurring at the pace needed; moreover that LSE procurement (with exceptions) is not able to deliver needed resource attributes to the system. The Tracking Energy Development taskforce (TED Taskforce) is a joint energy entity-developed effort beginning in late 2021 to help ensure that new resources ordered for reliability were brought online as quickly as possible. The TED Taskforce has observed there are three issues facing all generation projects currently in development in California that are often raised by developers: supply chain disruptions, interconnection approval delays, and permitting delays.[34]
Given these various factors, the CEC and CPUC recommended in their 2023 Joint Agency Reliability Planning Assessment that “statutory and regulatory changes should be considered to create a central procurement mechanism or a new cost-recovery mechanism to secure the development path for certain large, long-lead time clean energy resources.”[35] This bill, originally a budget trailer proposal from the Newsom administration, represents such an approach.
- What Resources are Included? As suggested in the previous section, a new planning and procurement scheme may be needed to address the delay in LSEs procurement of adequate supplies of IRP-selected long-lead time resources. This bill, in proposing a DWR central procurement entity, provides that new tool. However the bill language is lacking description as to what type of resources DWR might be called on to purchase. Rather the bill allows the procurement of “diverse clean energy resources” through the DWR mechanism, and leaves it to the CPUC to define what resources or resource attributes would qualify. As discussed above, LSEs are mostly meeting their procurement targets; it is just specific long-lead time resources that appear delayed. While an argument could be made for leaving the CPUC with the utmost discretion to choose which resources are needed based on their modeling, it may be prudent for the Legislature to appropriately define which resources DWR can procure. It is unclear what DWR’s presence in the electricity market might portend for LSE participation, especially if DWR and the LSEs are negotiating for the same or remarkably similar resources. As a result, the Legislature may wish to consider establishing guards around DWR procurement, permitting long-lead time resources, as defined in the CPUC’s 2021 mid-term reliability order,[36] that will take five years or more to develop.
- Doubling Up on Payments. Under this bill, LSEs that do not procure sufficient energy resources would be required to make a capacity payment to support the SRR. The bill language is explicit that such a capacity payment is not a penalty, and deficiencies in RA procurement or rules would still be levied on top of any capacity payment requirement. The benefit of this double payment is unclear. As described above, the RA market has experienced significant constraint recently, largely driven by resource retirements across the western U.S. as well as extreme weather events causing California energy agencies to increase RA obligations for LSEs.[37] These changes have led to a market rush, practically at any cost, to buy resources needed to meet RA obligations for the next few summers. Energy sellers have seemingly taken note, and increased RA resource costs to staggering levels in some months. In such circumstances, levying a penalty on an LSE that has taken all reasonable action to meet their RA obligation only to face market constraint, and then further charging them a capacity payment to replenish the SRR for its use, would seemingly not drive the LSE toward the desired behavior – that is, procuring RA resources. Rather it would punish them for a market condition outside their control.
While it seems appropriate to have some form of payment from LSEs flow back to the SRR to offset the procurement cost and to retain a financial obligations for LSEs that are deficient; it is unclear why both a payment and a penalty are needed. The Legislature may wish to discuss modifications to this proposal that leads to only one charge being levied against an LSE for an RA deficiency, and having that charge—be it a penalty or a payment—partially go to covering the costs of SRR procurement.
- Which PRM will Meet Compliance? While an LSE’s PRM is a number articulated by the CPUC that guides RA compliance, the PRM of POUs is murkier. POUs are held in statute to criteria established by the Western Electricity Coordinating Council[38] and, if participating in the CAISO market, the PRM of the CAISO. It has been shared with the committee that these values generally indicate a PRM for POUs of approximately 15%. However the actual values of the POUs’ PRMs are unclear. This murkiness led to 2022’s Budget establishing a collaborative process at the CEC to determine an appropriate minimum PRM for POUs within the CAISO BA.[39] While that process is scheduled to conclude in December of this year, POUs report it has barely begun.
This bill ties POU capacity payments to the SRR to this PRM development at the CEC. The timing of such a design is unclear. Should this measure be adopted as a budget trailer bill, it would take effect immediately, meaning POU payments to the SRR for PRM deficiency could foreseeably begin in summer 2023. This would be months before the collaborative process at the CEC is scheduled to conclude, with the stakes of such a process now significantly raised. This has the effect of holding the POUs to a standard still in development, and for the potential that payments will be assessed against a value the POUs were unaware they needed to meet. The Legislature may wish to consider modifications to this structure to enable, at minimum, the POUs to have certainty of what PRM they are meant to achieve for summer 2023.
- Other Matters. This measure has other provisions that require further explanation or detail to understand their intent or impact. These include granting DWR exemptions from Public Contract Code compliance for the contracts they undertake as part of the CPE; the exemption from the Administrative Procedures Act to CEC regulations to implement the capacity payment for POUs; clarifying CPUC sign-off on every procurement contract DWR enters; and whether the IRP enforcement sections are appropriately tailored to provide CPUC the information and compliance tools needed while not infringing upon CCA ratemaking authority. The Legislature may also wish to consider additional requirements to add community benefits, workforce training, manufacturing or other priorities as part of DWR procurement efforts.
- Related Legislation.
AB 1538 (Muratsuchi, 2023) establishes an incentive program, the Clean Energy Reliability Program, to pay LSEs a specified amount for the procurement of eligible resources that exceed the LSEs’ procurement targets as set by the CPUC. Status: pending hearing in the Assembly Committee on Appropriations, after passage in this committee on April 12, 2023 by a 12-2-1 vote.
- Prior Legislation.
AB 205 (Committee on Budget), among its many provisions, established the SRR at DWR to fund procurement of backstop resources to provide reliability to CAISO’s grid. Status: Chapter 61, Statutes of 2022.
SB 846 (Dodd), among its many provisions, directed the CEC to develop a $1 billion investment plan for clean energy resources, subject to subsequent budget appropriations. Status: Chapter 239, Statutes of 2022.
AB 1161 (E. Garcia, 2021) would have required DWR to procure newly developed eligible renewable energy resources or zero-carbon resources, and energy storage associated with those resources, in an amount that satisfies 100% of the electricity procured to serve all state agencies by December 31, 2030. Status: Died – Assembly Committee on Utilities and Energy.
AB 56 (E. Garcia, 2019) would have required the CPUC to empower the CAEATFA to undertake backstop procurement of electricity that would otherwise be performed by an electrical corporation to meet state resource adequacy, integrated resource planning, and renewable portfolio standard goals not satisfied by retail sellers or load-serving entities. Status: Died – Senate Committee on Energy, Utilities, and Communications.
SB 520 (Hertzberg) establishes a provider of last resort as an electric LSE that meets specified requirements, including those determined by the CPUC, to ensure electric service for customers not otherwise served by another LSE. Status: Chapter 408, Statutes of 2019.
SB 100 (De León) established the 100 Percent Clean Energy Act of 2018 which increases the RPS requirement from 50% by 2030 to 60%, and creates the policy of planning to meet all of the state's retail electricity supply with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. Status: Chapter 312, Statutes of 2018.
REGISTERED SUPPORT / OPPOSITION:
Support
American Clean Power Association
California Wind Energy Association
Environment California
Offshore Wind California
Oppose Unless Amended
Alliance for Retail Energy Markets
California Community Choice Association
California Municipal Utilities Association
Clean Power Alliance
Marin Clean Energy (MCE)
National Parks Conservation Association
San Jose Clean Energy
Sonoma Clean Power
Other
Independent Energy Producers Association
Pacific Gas and Electric Company and Its Affiliated Entities
Analysis Prepared by: Laura Shybut / U. & E. / (916) 319-2083
Pg. 47; 30 MMT scenario resource stack; CPUC, Decision Ordering Supplemental Mid-term Reliability Procurement (2026-2027) and Transmitting Electric Resource Portfolios to CAIS for 2023-2024 TPP; D. 23-02-040; February 23, 2023. https://docs.cpuc.ca.gov/SearchRes.aspx?DocFormat=ALL&DocID=502956567 ↑
Pg. 48; CPUC, D. 23-02-040; Ibid. ↑
CEC, CPUC, & CARB; 2021 SB 100 Joint Agency Report: Achieving 100 Percent Clean Electricity in California: An Initial Assessment;” March 2021. ↑
Pg. 12, 2021 SB 100 Report. ↑
Pg. 1, 2021 SB 100 Report. ↑
The CPUC has recently adopted changes to RA, including increasing the planning reserve margin from 15% to 17.5% and in some cases to 21%. ↑
N-1-1 Contingency: A sequence of events consisting of the initial loss of a single generator or transmission component (Primary Contingency), followed by system adjustments, followed by another loss of a single generator, or transmission component (Secondary Contingency). ↑
D. 21-12-015, CPUC, Phase 2 Decision Directing PG&E, SCE, and SDG&E to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2022 and 2023, R. 20-11-003, December 2, 2021. ↑
Figure 4, pg. 29, CPUC, 2021 Resource Adequacy Report, April 2023; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/resource-adequacy-homepage/2021_ra_report_040523.pdf ↑
Figure 5, pg. 31, 2021 Resource Adequacy Report, Ibid. ↑
Pg. 5; McGarry, J.; Ortego, J.; and Raffan, N., CPUC Energy Division Staff Options Paper, “Reliable and Clean Power Procurement Program,” Attachment A to D.23-02-040, R.20-05-003; January 2023. ↑
Pg. 5; McGarry, 2023; Ibid ↑
D. 19-11-016, CPUC, Decision Requiring Electric System Reliability Procurement for 2021-2023, R. 16-02-007, November 7, 2019. ↑
D. 21-06-035, CPUC, Decision Requiring Procurement to Address Mid-term Reliability (2023-2026), R. 20-05-003, June 24, 2021. ↑
D. 23-02-040, CPUC, Decision Ordering Supplemental Mid-term Reliability Procurement (2026-2027) and Transmitting Electric Resource Portfolios to California Independent System Operator for 2023-2024 Transmission Planning Process, R. 20-05-003, February 23, 2023. ↑
Not defined as such, but rather resources that must have no on-site emissions (or are RPS eligible), have at least an 80% capacity factor, and be available continuously during the evening peak and all weathers. ↑
D. 23-02-040, Ibid. ↑
Pg. 8, D. 23-02-040, Ibid. ↑
Pg. 9, D. 23-02-040, Ibid. ↑
Millar, Neil; “Memorandum to ISO Board of Governors RE: Update on results of reliability must-run extensions for 2023,” October 19, 2022; http://www.caiso.com/Documents/ReliabilityMust-RunContractsUpdate-Oct2022.pdf ↑
Confusingly, the administration uses the term Strategic Reliability Reserve (SRR) as an umbrella term for three programs – the Electricity Supply Strategic Reliability Reserve program mentioned here, the Demand Side Grid Support program, and the Distributed Electricity Backup Assets program. ↑
202 MW represents total from both the 82MW from the “>5 MW” generator bucket and the 120MW from the State Power Augmentation Program. ↑
DWR, Progress Report: Electricity Supply Reliability Reserve Fund, January 31, 2023. ↑
The 27.5 MW Channel Islands power was released in December 2022 from the RMR obligations, and now is listed as a 2023 resource in the SRR. ↑
Cornett, Sarah; LAO, The 2023-24 Budget: Proposed Energy Policy Changes, March 2023; https://lao.ca.gov/reports/2023/4735/Proposed-Energy-Policy-Changes-031023.pdf ↑
Pg. 47; 30 MMT scenario resource stack; CPUC, Decision Ordering Supplemental Mid-term Reliability Procurement (2026-2027) and Transmitting Electric Resource Portfolios to CAIS for 2023-2024 TPP; D. 23-02-040; February 23, 2023. https://docs.cpuc.ca.gov/SearchRes.aspx?DocFormat=ALL&DocID=502956567 ↑
Pg. 48; CPUC, D. 23-02-040; Ibid. ↑
Pg. 8, D. 23-02-040, Ibid. ↑
Pg. 29, CEC & CPUC, Joint Agency Reliability Planning Assessment: SB 846 Quarterly Report and AB 205 Report, February 2023; CEC-200-2023-002. ↑
Pg. 30, Reliability Assessment; Ibid. ↑
Not defined as such, but rather resources that must have no on-site emissions (or are RPS eligible), have at least an 80% capacity factor, and be available continuously during the evening peak and all weathers. ↑
D. 23-02-040, Ibid. ↑
Slide 32; CPUC Energy Division Staff Review of IRP August 2022 Data Filing; February 2023; https://www.cpuc.ca.gov/-/media/cpuc-website/divisions/energy-division/documents/integrated-resource-plan-and-long-term-procurement-plan-irp-ltpp/d1911016andd21.pdf ↑
Pg. 36, Reliability Assessment; Ibid. ↑
Pg. 61, Reliability Assessment; Ibid. ↑
D. 21-06-035, CPUC, Decision Requiring Procurement to Address Mid-term Reliability (2023-2026), R. 20-05-003, June 24, 2021. ↑
such as the PRM adjusting from 15% to an “effective” 20-22.5% for the three large IOUs for summers 2022 and 2023D. 21-12-015, CPUC, Phase 2 Decision Directing PG&E, SCE, and SDG&E to Take Actions to Prepare for Potential Extreme Weather in the Summers of 2022 and 2023, R. 20-11-003, December 2, 2021. ↑
PUC § 9620 ↑
AB 209 (Committee on Budget, Chapter 251, Statutes of 2022); PRC § 25704.5 ↑
Discussed in Hearing
Senate Floor
Assembly Floor
Senate Standing Committee on Appropriations
Senate Standing Committee on Energy, Utilities and Communications
Senate Standing Committee on Transportation
Assembly Floor
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):