Existing law authorizes the State Energy Resources Conservation and Development Commission (Energy Commission) to prescribe, by regulation, energy efficiency standards, including appliance efficiency standards. Under this authority, the Energy Commission has established building standards for the installation of photovoltaic systems meeting certain requirements for certain residential and commercial buildings. Existing law requires any building standard that has been adopted by the Energy Commission pursuant to these provisions to be submitted to the California Building Standards Commission for approval.
This bill would exempt a building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress, as specified, if that electricity is carbon free, from the building standards adopted by the Energy Commission, as provided, that require new residential and commercial buildings to be solar ready or to have photovoltaic and battery storage systems installed. Because local entities would determine whether a building qualifies for the exemption, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Trinity Public Utilities District.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law authorizes the State Energy Resources Conservation and Development Commission (Energy Commission) to prescribe, by regulation, energy efficiency standards, including appliance efficiency standards. Under this authority, the commission Energy Commission has established building standards for the installation of photovoltaic systems meeting certain requirements for certain residential and commercial buildings. Existing law requires any standard that has been adopted by the Energy Commission pursuant to these provisions to be submitted to the California Building Standards Commission for approval.
This bill would exempt a building that is constructed in the service territory of a public utility district, as specified, and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress, if that electricity is carbon free, from the building standards adopted by the Energy Commission and the California Building Standards Commission Commission, as provided, that require new residential and commercial buildings to be solar ready or to have photovoltaic and battery storage systems installed. Because local entities would determine whether a building qualifies for the exemption, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Trinity Public Utilities District.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, the California Building Standards Law, establishes the California Building Standards Commission and requires state agencies that adopt or propose adoption of any building standard to submit the building standard to the California Building Standards Commission for approval and adoption. Existing law requires the California Building Standards Commission to approve and adopt building standards, to codify those standards in the California Building Standards Code, and to publish, or cause to be published, editions of the code in its entirety once every 3 years.
Existing law authorizes the State Energy Resources Conservation and Development Commission (Energy Commission) to prescribe, by regulation, energy efficiency standards, including appliance efficiency standards. Under this authority, the commission has established building standards for the installation of photovoltaic systems meeting certain requirements for certain residential and commercial buildings.
This bill would exempt a building that is constructed in the service territory of a public utility district, as specified, and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress, if that electricity is carbon free, from the building standards adopted by the Energy Commission and the California Building Standards Commission that require new residential and commercial buildings to be solar ready. ready or to have photovoltaic and battery storage systems installed. Because local entities would determine whether a building qualifies for the exemption, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Trinity Public Utilities District.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, the California Building Standards Law, establishes the California Building Standards Commission and requires state agencies that adopt or propose adoption of any building standard to submit the building standard to the California Building Standards Commission for approval and adoption. Existing law requires the California Building Standards Commission to approve and adopt building standards, to codify those standards in the California Building Standards Code, and to publish, or cause to be published, editions of the code in its entirety once every 3 years.
Existing law authorizes the State Energy Resources Conservation and Development Commission (Energy Commission) to prescribe, by regulation, energy efficiency standards, including appliance efficiency standards. Under this authority, the commission has established building standards for the installation of photovoltaic systems meeting certain requirements for certain residential and commercial buildings.
This bill would exempt a building that is constructed in the service territory of a public utility district district, as specified, and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress, if that electricity is carbon free, from the building standards adopted by the Energy Commission and the California Building Standards Commission that require new residential and commercial buildings to be solar ready. Because local entities would determine whether a building qualifies for the exemption, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Trinity Public Utilities District.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, the California Building Standards Law, establishes the California Building Standards Commission and requires state agencies that adopt or propose adoption of any building standard to submit the building standard to the California Building Standards Commission for approval and adoption. Existing law requires the California Building Standards Commission to approve and adopt building standards, to codify those standards in the California Building Standards Code, and to publish, or cause to be published, editions of the code in its entirety once every 3 years.
Existing law authorizes the State Energy Resources Conservation and Development Commission (Energy Commission) to prescribe, by regulation, energy efficiency standards, including appliance efficiency standards. Under this authority, the commission has established building standards for the installation of photovoltaic systems meeting certain requirements for certain residential and commercial buildings.
This bill would exempt a building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress, if that electricity is carbon free, from the building standards adopted by the Energy Commission and the California Building Standards Commission that require new residential and commercial buildings to be solar ready. Because local entities would determine whether a building qualifies for the exemption, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the Trinity Public Utilities District.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
A building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955, (Public Law 84-386), if that electricity is carbon free, is exempt from the building standards adopted by the commission, and approved pursuant to Section 25402.2, that require new residential and commercial buildings to be solar ready or to have photovoltaic and battery storage systems installed. This section only applies to a public utility district that files annual disclosures pursuant to Section 398.4 of the Public Utilities Code.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because the Trinity Public Utilities District (TPUD) is unique in that it is the only publicly owned utility that relies solely on hydropower, a completely carbon-free electricity source. Building standards adopted by the State Energy Resources Conservation and Development Commission require that new homes and some commercial spaces be built solar ready. Because TPUDs ratepayers receive entirely carbon-free electricity at extremely low rates pursuant to the Trinity River Division Act of 1955, the installation of rooftop solar results in a net increase in housing costs and carbon emissions in the TPUDs service territory. In order to further Californias climate goals and avoid increasing the cost of housing unnecessarily, it is necessary to exempt buildings in the Trinity Public Utilities Districts service territory from these state building standards.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
A building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955, (Public Law 84-386), if that electricity is carbon free, is exempt from the building standards adopted by the State Energy Resources Conservation and Development Commission and the California Building Standards Commission commission, and approved pursuant to Section 25402.2, that require new residential and commercial buildings to be solar ready or to have photovoltaic and battery storage systems installed. This section only applies to a public utility district that files annual disclosures pursuant to Section 398.4 of the Public Utilities Code.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because the Trinity Public Utilities District (TPUD) is unique in that it is the only publicly owned utility that relies solely on hydropower, a completely carbon-free electricity source. Building standards adopted by the State Energy Resources Conservation and Development Commission require that new homes and some commercial spaces be built solar ready. Because TPUDs ratepayers receive entirely carbon-free electricity at extremely low rates pursuant to the Trinity River Division Act of 1955, the installation of rooftop solar results in a net increase in housing costs and carbon emissions in the TPUDs service territory. In order to further Californias climate goals and avoid increasing the cost of housing unnecessarily, it is necessary to exempt buildings in the Trinity Public Utilities Districts service territory from these state building standards.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
A building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955, (Public Law 84-386), if that electricity is carbon free, is exempt from the building standards adopted by the State Energy Resources Conservation and Development Commission and the California Building Standards Commission that require new residential and commercial buildings to be solar ready. ready or to have photovoltaic and battery storage systems installed. This section only applies to a public utility district that files annual disclosures pursuant to Section 398.4 of the Public Utilities Code.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because the Trinity Public Utilities District (TPUD) is unique in that it is the only publicly owned utility that relies solely on hydropower, a completely carbon-free electricity source. Building standards adopted by the State Energy Resources Conservation and Development Commission require that new homes and some commercial spaces be built solar ready. Because TPUDs ratepayers receive entirely carbon-free electricity at extremely low rates pursuant to the Trinity River Division Act of 1955, the installation of rooftop solar results in a net increase in housing costs and carbon emissions in the TPUDs service territory. In order to further Californias climate goals and avoid increasing the cost of housing unnecessarily, it is necessary to exempt buildings in the Trinity Public Utilities Districts service territory from the these state building standards that require new residential and commercial buildings to be solar ready. standards.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
A building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955, (Public Law 84-386), if that electricity is carbon free, is exempt from the building standards adopted by the State Energy Resources Conservation and Development Commission and the California Building Standards Commission that require new residential and commercial buildings to be solar ready. This section only applies to a public utility district that files annual disclosures pursuant to Section 398.4 of the Public Utilities Code.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because the Trinity Public Utilities District (TPUD) is unique in that it is the only publicly owned utility that relies solely on hydropower, a completely carbon-free electricity source. Building standards adopted by the State Energy Resources Conservation and Development Commission require that new homes and some commercial spaces be built solar ready. Because TPUDs ratepayers receive entirely carbon-free electricity at extremely low rates pursuant to the Trinity River Division Act of 1955, the installation of rooftop solar results in a net increase in housing costs and carbon emissions in the TPUDs service territory. In order to further Californias climate goals and avoid increasing the cost of housing unnecessarily, it is necessary to exempt buildings in the Trinity Public Utilities Districts service territory from the state building standards that require new residential and commercial buildings to be solar ready.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
A building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955 (Public Law 84-386), if that electricity is carbon free, is exempt from the building standards adopted by the State Energy Resources Conservation and Development Commission and the California Building Standards Commission that require new residential and commercial buildings to be solar ready.
SEC. 2.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because the Trinity Public Utilities District (TPUD) is unique in that it is the only publicly owned utility that relies solely on hydropower, a completely carbon-free electricity source. Building standards adopted by the State Energy Resources Conservation and Development Commission require that new homes and some commercial spaces be built solar ready. Because TPUDs ratepayers receive entirely carbon-free electricity at extremely low rates pursuant to the Trinity River Division Act of 1955, the installation of rooftop solar results in a net increase in housing costs and carbon emissions in the TPUDs service territory. In order to further Californias climate goals and avoid increasing the cost of housing unnecessarily, it is necessary to exempt buildings in the Trinity Public Utilities Districts service territory from the state building standards that require new residential and commercial buildings to be solar ready.
SEC. 3.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
|
Date
|
Status
|
|---|---|
| Sep 22, 2024 | Vetoed by Governor. |
| Aug 28, 2024 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 22, 2024 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 60. Noes 0. Page 6436.). |
| Aug 20, 2024 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 22 pursuant to Assembly Rule 77. |
| Aug 19, 2024 | Read third time. Passed. Ordered to the Assembly. (Ayes 40. Noes 0. Page 5204.). |
| Jul 2, 2024 | Read second time. Ordered to third reading. |
| Jul 1, 2024 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jun 17, 2024 | Re-referred to Com. on APPR. |
| Jun 17, 2024 | Withdrawn from committee. |
| Jun 13, 2024 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on HOUSING. |
| Jun 4, 2024 | From committee: Do pass and re-refer to Com. on HOUSING. (Ayes 18. Noes 0.) (June 4). Re-referred to Com. on HOUSING. |
| May 15, 2024 | Referred to Coms. on E., U. & C. and HOUSING. |
| May 2, 2024 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 2, 2024 | Read third time. Passed. Ordered to the Senate. (Ayes 73. Noes 0. Page 5087.) |
| Apr 25, 2024 | Read second time. Ordered to Consent Calendar. |
| Apr 24, 2024 | From committee: Do pass. To Consent Calendar. (Ayes 14. Noes 0.) (April 24). |
| Apr 4, 2024 | Re-referred to Com. on APPR. |
| Apr 3, 2024 | Read second time and amended. |
| Apr 2, 2024 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 18. Noes 0.) (April 2). |
| Mar 19, 2024 | Re-referred to Com. on B. & P. |
| Mar 18, 2024 | Read second time and amended. |
| Mar 14, 2024 | From committee: Amend, and do pass as amended and re-refer to Com. on B. & P. with recommendation: To Consent Calendar. (Ayes 15. Noes 0.) (March 13). |
| Feb 12, 2024 | Referred to Coms. on U. & E. and B. & P. |
| Jan 25, 2024 | From printer. May be heard in committee February 24. |
| Jan 24, 2024 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 22, 2024 | AB 1918 Wood Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 19, 2024 | Assembly 3rd Reading AB1918 Wood By Dahle | Senate Floor |
Passed |
|
| Jun 4, 2024 | Do pass, but first be re-referred to the Committee on [Housing] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 2, 2024 | AB 1918 Wood Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Apr 24, 2024 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 2, 2024 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Business and Professions |
Passed |
|
| Mar 13, 2024 | Do pass as amended, and be re-referred to the Committee on [Business and Professions] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| California Solar & Storage Association | ** Against | |
| Trinity Public Utilities District | ** Support |
GOVERNOR'S VETO
GV Bill Id:AB 1918
Author:(Wood)
As Enrolled Ver:August 26, 2024
2/3 vote
SUMMARY
Exempts a building constructed in the service territory of the Trinity Public Utility District (TPUD) from the requirement that such a building be solar ready or have photovoltaic and battery storage systems installed.
Major Provisions
- Clarifies existing law to require any standard that has been adopted by the California Energy Commission (CEC) pursuant to the requirements in this legislation to be submitted to the California Building Standards Commission for approval.
- Changes the provisions of the bill from the Health and Safety Code to the Public Resources Code.
Governor's Veto Message
This bill would provide a narrow exemption from the California Building Energy Efficiency Standards (Standards) solar ready and battery storage system installation requirements in the Trinity Public Utilities District (PUD).
While I recognize that Trinity PUD is unique among all utilities in the state in being served by 100 percent clean, hydroelectric power, this bill is unnecessary. The California Energy Commission (CEC) has approved Trinity PUD's applications for administrative exemptions from the solar ready and battery storage system requirements over multiple Standards cycles.
Further, the CEC recently adopted an administrative pathway, as part of the 2025 Standards, to lower the burden of Trinity PUD's re-application process when triennial updates to the Standards occur. The CEC's adopted pathway is more broadly applicable than this legislation, achieves the same outcome for Trinity PUD, and thoughtfully balances the objectives of the Standards - lowering consumer energy costs, reducing energy consumption, and avoiding greenhouse gas emissions.
COMMENTS
Title 24. Title 24, also known as the California Building Standards Code of the California Code of Regulations, governs the design and construction of buildings in the state. The California Building Standards Commission approves and adopts the updates to the code every three years. The California Energy Commission (CEC) adopts updates to Part 6 of Title 24, which contains energy conservation standards applicable to most residential and nonresidential buildings throughout California. Current law requires the energy conservation standards be cost effective when considering the value of the water or energy saved, the impact on product efficacy for the consumer and the life-cycle cost of complying with the standard.
2019 Building Standards. In May of 2018, the CEC adopted the 2019 Building standards which were the first in the nation to require solar PV systems for new construction. Statute requires these standards to be cost effective. The CEC also established a few outright exemptions to the new solar requirement. Primarily, homes that are shaded by trees, hills, and other structures are not required to install solar. Also, Homeowners in areas with community solar programs are also exempt from this requirement.
2022 Building Standards. In August of 2021, the CEC updated and adopted the 2022 building standards for newly constructed residential and commercial buildings which require solar PV and battery storage systems for newly constructed nonresidential and high-rise multifamily buildings.
TPUD Exemption. In November 2022, TPUD applied to the CEC for an exemption, arguing "TPUD's low electricity rates make rooftop solar and/or battery storage uneconomic in TPUD's service area." Key to TPUD's position was the ubiquity in the service area of cheap, greenhouse gas-free electricity generated by hydropower. Ultimately, the CEC agreed installation of solar PV and battery storage on new building construction was not cost effective in the TPUD service area and, therefore, granted the utility's request for exemption from the requirement to do so, but for the current three-year period only. Despite this decision, TPUD contends the exemption process was time consuming and costly, and is a process the utility would like to avoid in the future, given conditions in the service area are unlikely to change substantially any time soon. For this reason, TPUD seeks a permanent exemption from the requirements to install solar PV and battery storage on newly constructed buildings.
According to the Author
According to the author, "Trinity Public Utility District is unique in that it is the only Publicly Owned Utility District in the state that generates and distributes 100% hydropower. The Renewables Portfolio Standard is written to exclude the utility district because it is completely carbon-free. Unfortunately, the Building Energy Efficiency Standards enforced by the California Energy Commission do not take a similar approach. Instead, the CEC requires the utility district to apply for an exemption every three years to re-certify that it has not procured any carbon-generating power sources, even though the utility district has operated on 100% hydropower since TPUD formed in 1982. Because TPUD uses a fraction of the hydropower to which it is legally entitled, there are no circumstances in which TPUD will ever need another energy resource. The process of recertifying for an exemption takes a year and a half, is costly, and an immense burden for a small utility district made up of only 25 employees, only six of whom are administrators. Exempting the Trinity Public Utility District from this redundant exercise will allow both the CEC and utility district to devote time and resources to where they are truly needed."
Arguments in Support
The California Municipal Utilities Association supports the legislation stating that, "AB 1918 would allow TPUD to continue to be supplied with clean renewable energy, without the need to install solar panels on new buildings and the subsequent emissions that would come from manufacturing, installing, and maintaining those solar panels."
Arguments in Opposition
The California Energy Storage Association opposes this bill arguing that the solar mandate has become as standard on new homes, and this exemption works against the state's goals of reducing global warming pollutants from buildings.
FISCAL COMMENTS
According to the Senate Committee on Appropriations, the cost of implementing this bill is not significant and resulted in the bill not receiving a fiscal committee hearing pursuant to Senate Rule 28.8.
VOTES
ASM UTILITIES AND ENERGY: 15-0-1
YES: Petrie-Norris, Jim Patterson, Calderon, Chen, Connolly, Friedman, Holden, Joe Patterson, Reyes, Santiago, Schiavo, Ting, Wallis, Wood, Zbur
ABS, ABST OR NV: Bauer-Kahan
ASM BUSINESS AND PROFESSIONS: 18-0-0
YES: Berman, Flora, Alanis, Bains, Juan Carrillo, Chen, Dixon, Grayson, Irwin, Jackson, Low, Lowenthal, McKinnor, Stephanie Nguyen, Pellerin, Sanchez, Soria, Zbur
ASM APPROPRIATIONS: 14-0-1
YES: Wicks, Sanchez, Arambula, Bryan, Calderon, Wendy Carrillo, Dixon, Mike Fong, Grayson, Haney, Hart, Jim Patterson, Pellerin, Ta
ABS, ABST OR NV: Villapudua
ASSEMBLY FLOOR: 73-0-7
YES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Davies, Dixon, Essayli, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Lowenthal, Maienschein, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Wicks, Wilson, Wood, Zbur
ABS, ABST OR NV: Calderon, Megan Dahle, Flora, Low, Mathis, Weber, Robert Rivas
SENATE FLOOR: 40-0-0
YES: Allen, Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Stern, Umberg, Wahab, Wiener, Wilk
ASSEMBLY FLOOR: 60-0-19
YES: Alanis, Alvarez, Arambula, Bains, Bennett, Berman, Boerner, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Hart, Hoover, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Lowenthal, Maienschein, Mathis, Stephanie Nguyen, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Wood, Zbur, Robert Rivas
ABS, ABST OR NV: Addis, Aguiar-Curry, Bauer-Kahan, Bonta, Cervantes, Flora, Mike Fong, Haney, Holden, Irwin, Low, McCarty, McKinnor, Muratsuchi, Ortega, Petrie-Norris, Weber, Wicks, Wilson
UPDATED
VERSION: August 26, 2024
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0005101
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 1918
Author:(Wood)
As Amended Ver:June 13, 2024
Majority vote
SUMMARY
Exempts a building constructed in the service territory of the Trinity Public Utility District (TPUD) from the requirement that such a building be solar ready or have photovoltaic and battery storage systems installed.
Senate Amendments
- Clarifies existing law to require any standard that has been adopted by the California Energy Commission (CEC) pursuant to the requirements in this legislation to be submitted to the California Building Standards Commission for approval.
- Changes the provisions of the bill from the Health and Safety Code to the Public Resources Code.
COMMENTS
Title 24. Title 24, also known as the California Building Standards Code of the California Code of Regulations, governs the design and construction of buildings in the state. The California Building Standards Commission approves and adopts the updates to the code every three years. The California Energy Commission (CEC) adopts updates to Part 6 of Title 24, which contains energy conservation standards applicable to most residential and nonresidential buildings throughout California. Current law requires the energy conservation standards be cost effective when considering the value of the water or energy saved, the impact on product efficacy for the consumer and the life-cycle cost of complying with the standard.
2019 Building Standards. In May of 2018, the CEC adopted the 2019 Building standards which were the first in the nation to require solar PV systems for new construction. Statute requires these standards to be cost effective. The CEC also established a few outright exemptions to the new solar requirement. Primarily, homes that are shaded by trees, hills, and other structures are not required to install solar. Also, Homeowners in areas with community solar programs are also exempt from this requirement.
2022 Building Standards. In August of 2021, the CEC updated and adopted the 2022 building standards for newly constructed residential and commercial buildings which require solar PV and battery storage systems for newly constructed nonresidential and high-rise multifamily buildings.
TPUD Exemption. In November 2022, TPUD applied to the Energy Commission for an exemption, arguing "TPUD's low electricity rates make rooftop solar and/or battery storage uneconomic in TPUD's service area." Key to TPUD's position was the ubiquity in the service area of cheap, greenhouse gas-free electricity generated by hydropower. Ultimately, the CEC agreed installation of solar PV and battery storage on new building construction was not cost effective in the TPUD service area and, therefore, granted the utility's request for exemption from the requirement to do so, but for the current three-year period only. Despite this decision, TPUD contends the exemption process was time consuming and costly, and is a process the utility would like to avoid in the future, given conditions in the service area are unlikely to change substantially any time soon. For this reason, TPUD seeks a permanent exemption from the requirements to install solar PV and battery storage on newly constructed buildings.
According to the Author
According to the author, "Trinity Public Utility District is unique in that it is the only Publicly Owned Utility District in the state that generates and distributes 100% hydropower. The Renewables Portfolio Standard is written to exclude the utility district because it is completely carbon-free. Unfortunately, the Building Energy Efficiency Standards enforced by the California Energy Commission do not take a similar approach. Instead, the CEC requires the utility district to apply for an exemption every three years to re-certify that it has not procured any carbon-generating power sources, even though the utility district has operated on 100% hydropower since TPUD formed in 1982. Because TPUD uses a fraction of the hydropower to which it is legally entitled, there are no circumstances in which TPUD will ever need another energy resource. The process of recertifying for an exemption takes a year and a half, is costly, and an immense burden for a small utility district made up of only 25 employees, only six of whom are administrators. Exempting the Trinity Public Utility District from this redundant exercise will allow both the CEC and utility district to devote time and resources to where they are truly needed."
Arguments in Support
The California Municipal Utilities Association supports the legislation stating that, "AB 1918 would allow TPUD to continue to be supplied with clean renewable energy, without the need to install solar panels on new buildings and the subsequent emissions that would come from manufacturing, installing, and maintaining those solar panels."
Arguments in Opposition
The California Energy Storage Association opposes this bill arguing that the solar mandate has become as standard on new homes, and this exemption works against the state's goals of reducing global warming pollutants from buildings.
FISCAL COMMENTS
According to the Senate Committee on Appropriations, the cost of implementing this bill is not significant and resulted in the bill not receiving a fiscal committee hearing pursuant to Senate Rule 28.8.
VOTES:
ASM UTILITIES AND ENERGY: 15-0-1
YES: Petrie-Norris, Jim Patterson, Calderon, Chen, Connolly, Friedman, Holden, Joe Patterson, Reyes, Santiago, Schiavo, Ting, Wallis, Wood, Zbur
ABS, ABST OR NV: Bauer-Kahan
ASM BUSINESS AND PROFESSIONS: 18-0-0
YES: Berman, Flora, Alanis, Bains, Juan Carrillo, Chen, Dixon, Grayson, Irwin, Jackson, Low, Lowenthal, McKinnor, Stephanie Nguyen, Pellerin, Sanchez, Soria, Zbur
ASM APPROPRIATIONS: 14-0-1
YES: Wicks, Sanchez, Arambula, Bryan, Calderon, Wendy Carrillo, Dixon, Mike Fong, Grayson, Haney, Hart, Jim Patterson, Pellerin, Ta
ABS, ABST OR NV: Villapudua
ASSEMBLY FLOOR: 73-0-7
YES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Davies, Dixon, Essayli, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Lowenthal, Maienschein, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Wicks, Wilson, Wood, Zbur
ABS, ABST OR NV: Calderon, Megan Dahle, Flora, Low, Mathis, Weber, Robert Rivas
SENATE FLOOR: 40-0-0
YES: Allen, Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Stern, Umberg, Wahab, Wiener, Wilk
UPDATED
VERSION: June 13, 2024
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0004242
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 1918 |
THIRD READING
Bill No: AB 1918
Author: Wood (D)
Amended: 6/13/24 in Senate
Vote: 21
SENATE ENERGY, U. & C. COMMITTEE: 18-0, 6/4/24
AYES: Bradford, Dahle, Ashby, Becker, Caballero, Dodd, Durazo, Eggman, Gonzalez, Grove, Limón, Min, Newman, Rubio, Seyarto, Skinner, Stern, Wilk
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 73-0, 5/2/24 (Consent) - See last page for vote
SUBJECT: Solar-ready and photovoltaic and battery storage system requirements: exemption
SOURCE: Trinity Public Utilities District
DIGEST:
This bill exempts from the solar and battery storage requirements, as part of the state’s building standards, new residential and commercial construction within the utility service territory of the Trinity Public Utilities District (TPUD).
ANALYSIS:
Existing law:
- Authorizes the State Energy Resources Conservation and Development Commission (also known as the California Energy Commission (CEC)) to prescribe, by regulation, lighting, insulation, climate control system, and other building design and construction standards that increase efficiency in the use of energy and water for new residential and new nonresidential buildings, and energy and water conservation design standards for new residential and new nonresidential buildings. Under this authority, the CEC has established regulations for the installation of photovoltaic (PV) systems meeting certain requirements for low-rise residential buildings built on or after January 1, 2020. (Public Resources Code §25402)
- Requires the CEC to establish building design and construction standards that increase the efficiency in the use of energy and water for new residential and new nonresidential buildings. The CEC must periodically update the standards. Six months after the CEC certifies an energy conservation manual, cities, counties, and state agencies are prohibited from issuing a building permit for a building that does not comply with the current standards created by the CEC. (Public Resources Code §25402(a)(1))
- Requires the CEC’s building efficiency standards to be cost-effective when taken in their entirety and amortized over the economic life of the structure compared with historic practice. When determining cost-effectiveness, the CEC must consider the value of the water or energy saved, impact on product efficacy for the consumer, and the life-cycle cost of complying with the standard. The CEC must consider other relevant factors, including, but not limited to the standards’ cost on house costs, the total statewide costs and benefits of the standard over its lifetime, economic impacts on California businesses, and alternative approaches and their associated costs. (Public Resources Code §25402(b)(3))
- Requires electric utilities to procure 60 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Establishes, under the California Building Standards Law, the California Building Standards Commission (CBSC) and requires state agencies that adopt or propose adoption of any building standard to submit the building standard to the CBSC for approval and adoption. Requires the CBSC to approve and adopt building standards, to codify those standards in the California Building Standards Code, and to publish, or cause to be published, editions of the code in its entirety once every three years. (Health & Safety Code §18930 et seq.)
- Authorizes the CEC to prescribe, by regulation, energy efficiency standards, including appliance efficiency standards. Under this authority, the CEC has established building standards for the installation of PV systems meeting certain requirements for certain residential and commercial buildings. (Public Resources Code §25402)
- Requires every retail seller of electricity to disclose its electricity sources and the associated greenhouse gases (GHG) emissions intensity for the previous calendar year. (Public Utilities §398.4)
This bill:
- Exempts a building that is constructed in the service territory of a public utility district, that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress, if that electricity is carbon free, from the building standards adopted by the CEC and the CBSC that require new residential and commercial buildings to be solar ready or to have photovoltaic and battery storage systems installed.
- Requires the exemption only applies to a public utility district that files annual disclosures with the CEC regarding its generation sources, pursuant to Public Utilities Code §398.4.
- Imposes a state-mandated local program because local entities would determine whether a building qualifies for the exemption.
- Makes legislative findings and declarations as to the necessity of a special statute for the TPUD.
Background
- California’s building energy efficiency standards. California’s building energy efficiency standards are updated on roughly every three years cycle. The CEC adopted the 2019 Building Energy Efficiency Standards, which went into effect on January 1, 2020, as the first in the nation to require solar PV systems for new construction. The standards also include improved thermal building envelope standards (i.e., insulating the interior), residential and nonresidential ventilation requirements, and nonresidential lighting requirements. For residential buildings, according to the CEC, the standards will result in about 53 percent less energy use than under the 2016 standards. The CEC further estimates that the new standards will reduce GHG emissions by 700,000 metric tons over three years. CEC’s energy efficiency standards are adopted by CBSC as part of the California Building Standards Code, which serves as the basis for building and construction in California. The CEC first adopted building energy efficiency standards in 1977. The CEC reports that the energy efficiency building standards have saved Californians billions of dollars since their first adoption, avoided the need for powerplants and transmission lines, and helped keep California’s per-capita energy consumption flat. The CEC has since adopted the 2022 Building Energy Efficiency Standards which, after January 1, 2023, require newly constructed residential buildings to be electric-ready (including 240-volt outlets and space for electric appliances to replace installed gas appliances). The 2022 standards also allow exceptions to the solar PV standards when roof area is not available. The standards also establish combined solar PV and battery storage standards for select businesses and high-rise multifamily buildings.
The 2022 Energy Code permits the CEC to determine that the solar PV and/or battery storage system requirements applicable to non-residential buildings, and those applicable to multi-family homes with more than three habitable stories, do not apply if the CEC determines that its cost-effectiveness conclusions regarding solar PV and battery storage requirements are unreasonable for such buildings. Importantly, the CEC is currently updating the standards for the 2025 Energy Code which is scheduled to take effect January 1, 2026.
- Statute requires that CEC’s standards must be “cost-effective.” CEC estimates that based on a 30-year mortgage, the new standards will add about $40 per month in costs and result in about $80 per month in reduced energy costs. According to the CEC, on average, a solar system adds about $9,500 to the cost of a new home and will result in a savings of $19,000 in energy costs over 30 years (largely based on pre-COVID numbers). Current prices are tend to range in $15,000 to $20,000 based on news reports. The up-front costs for solar have decreased over the past several years, but experienced some increases since COVID. The CEC established a few exemptions to the new solar requirement. Primarily, homes that are shaded by trees, hills, other structures, etc. are not required to install solar. This may exclude a number of homes impacted by fires in wooded areas. Homeowners in areas with community solar programs are also exempt from the requirement. Additionally, reduced system size is permitted for low-rise residential buildings with two stories and for low-rise multifamily or single-family homes with three or more stories.
- Exemptions to the CEC Solar Mandate. Through a determination process, the CEC may, upon written application or its own motion, determine that the PV or battery storage rules do not apply to particular buildings or service territories. A public agency is required to provide information regarding the differences between its rules regarding utility system costs and revenue requirements, and the cost-effectiveness determinations that the CEC made in adopting the PV and battery storage requirements. The CEC may request additional information to enable a full review of the application. Applications from the public agencies must be submitted to the CEC only after public review within the jurisdiction of the agency or service area of the utility. Once the CEC receives the application from the public agency and deems it complete, the CEC allows a 60-day public comment period. The CEC may again request additional information to evaluate the application. The CEC then proceeds to make a recommendation on the application and any additional information considered to the business meeting calendar for the full commission to consider. The average timeline for this determination process may be closer to a year.
- Trinity County demographics. Trinity County is located midway between Redding in Shasta County and the Northern Redwood Coast. The County is home to about 15,000 residents and is a small a rural community. The percentage of Trinity residents living below the federal poverty level was about twice as high as for California overall (23 percent compared to 12 percent). TPUD is the main service electricity provider serving about 7,200 customers. It is reportedly one of the poorest counties in the state and its remote location can make building construction more expensive than many other places in the state.
- Trinity Public Utilities District electricity generation source. In 1955, Congress passed the Trinity River Act providing dams, reservoirs, and power plants on the Trinity River for the Central Valley Project (CVP). The CVP is a 400-mile complex, multi-purpose network of dams, reservoirs, canals, hydroelectric power plants and other facilities. The CVP reduces flood risk for the Central Valley, and supplies the valley with domestic and industrial water. The U.S Bureau of Reclamation operates the CVP. To compensate Trinity County residents, Congress granted first preferential rights to 25 percent of the net electricity generated by these power plants to electricity users in Trinity County and subsequently TPUD service area has low rates. According to the utility, the generating capacity of approximately 233 MW of electricity provided by TPUD to its customers is 100 percent carbon-free hydropower. Given its unique zero-carbon portfolio, TPUD is exempt from the RPS under Public Utilities Code Section 399.30(g).
Comments
- Exemptions from solar ready and battery storage requirements. This bill would provide that homes that are being built or repaired in the service territory of the TPUD are exempt from the CEC’s solar PV and battery storage building requirements. The RPS, as written today, excludes a POU that receives all of its electricity from hydropower pursuant to the Trinity River Division (TRD) Act. Enacted by Congress in 1955, the TRD Act authorized the United States Government to build the Trinity Dam, which led to the generation of hydropower in Trinity County. The CEC has the authority to exempt public utilities from the application of solar PV requirements of the Building Energy Efficiency standards for residential property, and has exercised this right in recent years. Most recently, in February 2023 and September 2023, the CEC approved exemption for the TPUD from the residential and non-residential solar and battery storage requirements determining that the requirements were not cost-effective.
- The case for exempting Trinity. Given TPUD has a power supply that is 100 percent hydropower (the only utility of its kind in the state), customers in utility’s service territory pay a below market price for its clean energy, averaging approximately 6.5 cents per kWh over the last 10 years. The supporters of this bill note that while the CEC can issue exemptions to utilities, this process takes an immense amount of time, even up to a year. They contend that such a long drawn out effort is incredibly burdensome for small public utilities. Further, even if a utility obtains an exemption, they have to return to the CEC every three years to recertify that they have not begun procuring carbon emitting energy. This creates an unnecessary burden for both CEC and utility staff. In late March the CEC proposed a process to allow for a continued exemption within the regulations. However, the supporters of this bill express concerns that the CEC’s proposed regulatory change, though welcome, does not provide the certainty that would be afforded by this bill to codify a narrow exemption from the Building Energy Efficiency Standards for their service territory.
Related/Prior Legislation
AB 2787 (Patterson, 2024) would exempt homes that are being rebuilt due to a disasters from the solar ready requirements in the building standards. The bill is pending before the full Senate.
AB 704 (Jim Patterson, 2023) was substantially similar to AB 2787. AB 704 was held in the Assembly Committee on Appropriations.
AB 1078 (Patterson, 2022) would have extended the exemption established by AB 178 for one year, until January 1, 2024. The bill was vetoed.
AB 178 (Dahle, Chapter 259, Statutes of 2019) exempted, until January 1, 2023, residential construction from complying with the solar requirements in the recently adopted building standards when the construction is in response to a disaster in an area in which a state of emergency has been proclaimed by the Governor.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 7/2/24)
Trinity Public Utilities District (source)
OPPOSITION: (Verified 7/2/24)
California Solar & Storage Association
ARGUMENTS IN SUPPORT: According to the sponsor:
While TPUD [Trinity Public Utilities District] has been able to obtain temporary exemptions from these standards [solar and battery storage requirements], the effort to do so has been immense for a small public utility district like TPUD. TPUD has 25 employees, only six of whom are administrators responsible for managing TPUD. In its most recent effort to obtain a temporary exemption, there were 74 email exchanges and eight video meetings with CEC staff. These communications generated approximately 240 hours of work for TPUD staff. In addition, TPUD had to retain an attorney to ensure its application was properly filed.
AB 1918 would address this problem by providing TPUD and Trinity County with a permanent exemption to the solar ready program so that time and money is no longer wasted by TPUD or the CEC. Should residents of Trinity County wish to install solar on their buildings despite TPUD’s cleaner and less expensive power AB 1918 would not preclude them from doing so.
ARGUMENTS IN OPPOSITION: The opposition states:
While California should be doubling down on its commitment to solar, AB 1918 would take the state in the opposite direction. For properties in Trinity Public Utilities District, AB 1918 would allow new homes on those properties to be exempt from the solar mandate. The reasoning is that this utility gets its energy from hydropower facilities. However, we are headed for prolonged drought, and even if the utility’s hydroelectric production continues at current levels and customer demand goes down, the utility can sell power to other utilities. Reducing customer demand so that the utility has excess power is not a negative outcome. We would not discourage energy efficiency because the utility has clean generating sources.
ASSEMBLY FLOOR: 73-0, 5/2/24
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Davies, Dixon, Essayli, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Lowenthal, Maienschein, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Wicks, Wilson, Wood, Zbur
NO VOTE RECORDED: Calderon, Megan Dahle, Flora, Low, Mathis, Weber, Robert Rivas
Prepared by: Nidia Bautista / E., U. & C. / (916) 651-4107
7/2/24 15:16:42
**** END ****
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Steven Bradford, Chair
2023 - 2024 Regular
Bill No: AB 1918 Hearing Date: 6/4/2024
Author: | Wood | ||
Version: | 4/3/2024 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Nidia Bautista | ||
SUBJECT: State building standards: solar-ready and photovoltaic and battery storage system requirements: exemption
DIGEST: This bill exempts from the solar and battery storage requirements, as part of the state’s building standards, residential construction to repair or replace a residential building within the utility service territory of the Trinity Public Utilities District (TPUD).
ANALYSIS:
Existing law:
- Authorizes the State Energy Resources Conservation and Development Commission (CEC) to prescribe, by regulation, lighting, insulation, climate control system, and other building design and construction standards that increase efficiency in the use of energy and water for new residential and new nonresidential buildings, and energy and water conservation design standards for new residential and new nonresidential buildings. Under this authority, the CEC has established regulations for the installation of photovoltaic (PV) systems meeting certain requirements for low-rise residential buildings built on or after January 1, 2020. (Public Resources Code §25402)
- Requires the CEC to establish building design and construction standards that increase the efficiency in the use of energy and water for new residential and new nonresidential buildings. The CEC must periodically update the standards. Six months after the CEC certifies an energy conservation manual, cities, counties, and state agencies are prohibited from issuing a building permit for a building that does not comply with the current standards created by the CEC. (Public Resources Code §25402(a)(1))
- Requires the CEC and the Department of Housing and Community Development to issue a joint finding that a building water efficiency standard is equivalent or superior in performance, safety, and for the protection of life, health, and general welfare to existing standards. The finding must also ensure that the standard does not unreasonably or unnecessarily impact Californians’ ability to purchase or rent affordable house by taking into account the overall benefit derived from the standard. (Public Resources Code §25402(a)(2))
- Requires the CEC’s building efficiency standards to be cost-effective when taken in their entirety and amortized over the economic life of the structure compared with historic practice. When determining cost-effectiveness, the CEC must consider the value of the water or energy saved, impact on product efficacy for the consumer, and the life-cycle cost of complying with the standard. The CEC must consider other relevant factors, including, but not limited to the standards’ cost on house costs, the total statewide costs and benefits of the standard over its lifetime, economic impacts on California businesses, and alternative approaches and their associated costs. (Public Resources Code §25402(b)(3))
- Requires electric utilities to procure 60 percent of their retail sales of electricity from renewable energy by 2030. This is known as the Renewable Portfolio Standard (RPS). (Public Utilities Code §399.11 et seq.)
- Requires every electric utility (other than a local public owned utilities (POU) that serves more than 750,000 customers and that also conveys water to its customers) to offer net-energy metering (NEM) to eligible customer-generators, upon request, on a first-come-first-served basis until the total rated generating capacity used by eligible customer-generators exceeds five percent of the electric utility’s aggregate customer peak demand. (Public Utilities Code §2827)
- Directs the California Public Utilities Commission (CPUC) to develop a standard tariff or contract, known as the “successor tariff,” for eligible customer-generators with a renewable electrical generation facility no later than December 31, 2015. Requires, for each large electrical corporation, using the successor tariff, to continue to offer NEM to its customers on July 1, 2017, or upon reaching the five-percent NEM program limit, whichever is earlier. (Public Utilities Code §2827.1)
- Existing law, the California Building Standards Law, establishes the California Building Standards Commission and requires state agencies that adopt or propose adoption of any building standard to submit the building standard to the California Building Standards Commission for approval and adoption. Existing law requires the California Building Standards Commission to approve and adopt building standards, to codify those standards in the California Building Standards Code, and to publish, or cause to be published, editions of the code in its entirety once every three years.
- Existing law authorizes the CEC to prescribe, by regulation, energy efficiency standards, including appliance efficiency standards. Under this authority, the CEC has established building standards for the installation of PV systems meeting certain requirements for certain residential and commercial buildings.
- Requires every retail seller of electricity to disclose its electricity sources and the associated greenhouse gases (GHG) emissions intensity for the previous calendar year. (Public Utilities §398.4)
This bill:
- Exempts a building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress, if that electricity is carbon free, from the building standards adopted by the CEC and the California Building Standards Commission that require new residential and commercial buildings to be solar ready or to have photovoltaic and battery storage systems installed.
- Because local entities would determine whether a building qualifies for the exemption, this bill would impose a state-mandated local program.
- Makes legislative findings and declarations as to the necessity of a special statute for the TPUD.
Background
California’s building energy efficiency standards. California’s building energy efficiency standards are updated on roughly every three years cycle. The CEC adopted the 2019 Building Energy Efficiency Standards, which went into effect on January 1, 2020, as the first in the nation to require solar PV systems for new construction. The standards also include improved thermal building envelope standards (i.e., insulating the interior), residential and nonresidential ventilation requirements, and nonresidential lighting requirements. For residential buildings, according to the CEC, the standards will result in about 53 percent less energy use than under the 2016 standards. The CEC further estimates that the new standards will reduce GHG emissions by 700,000 metric tons over three years. CEC’s energy efficiency standards are adopted by Building Standards Commission as part of the California Building Standards Code, which serves as the basis for building and construction in California. The CEC first adopted building energy efficiency standards in 1977. The CEC reports that the energy efficiency building standards have saved Californians billions of dollars since their first adoption, avoided the need for powerplants and transmission lines, and helped keep California’s per-capita energy consumption flat. The CEC has since adopted the 2022 Building Energy Efficiency Standards which, after January 1, 2023, require newly constructed residential buildings to be electric-ready (including 240-volt outlets and space for electric appliances to replace installed gas appliances). The 2022 standards also allow exceptions to the solar PV standards when roof area is not available. The standards also establish combined solar PV and battery storage standards for select businesses. The 2022 standards specifically:
- Require solar PV and battery storage systems for newly constructed nonresidential and high-rise multifamily buildings.
- Require the use of electric heat pumps for space heating and water heating.
- Establish electric-ready requirements for all buildings, including single-family homes.
- Reinforce and strengthen ventilation standards, particularly above stoves, to improve the quality of indoor air quality.
The 2022 Energy Code permits the CEC to determine that the solar PV and/or battery storage system requirements applicable to non-residential buildings, and those applicable to multi-family homes with more than three habitable stories, do not apply if the CEC determines that its cost-effectiveness conclusions regarding solar PV and battery storage requirements are unreasonable for such buildings.
Importantly, the CEC is currently updating the standards for the 2025 Energy Code which is scheduled to take effect January 1, 2026.
Statute requires that CEC’s standards must be “cost-effective.” CEC estimates that based on a 30-year mortgage, the new standards will add about $40 per month in costs and result in about $80 per month in reduced energy costs. According to the CEC, on average, a solar system adds about $9,500 to the cost of a new home and will result in a savings of $19,000 in energy costs over 30 years (largely based on pre-COVID numbers). Current prices are tend to range in $15,000 to $20,000 based on news reports. The up-front costs for solar have decreased over the past several years, but experienced some increases since COVID. The CEC established a few exemptions to the new solar requirement. Primarily, homes that are shaded by trees, hills, other structures, etc. are not required to install solar. This may exclude a number of homes impacted by fires in wooded areas. Homeowners in areas with community solar programs are also exempt from the requirement. Additionally, reduced system size is permitted for low-rise residential buildings with two stories and for low-rise multifamily or single-family homes with three or more stories.
Exemptions to the CEC Solar Mandate. Through a determination process, the CEC may, upon written application or its own motion, determine that the PV or battery storage rules do not apply to particular buildings or service territories. A public agency is required to provide information regarding the differences between its rules regarding utility system costs and revenue requirements, and the cost-effectiveness determinations that the CEC made in adopting the PV and battery storage requirements. The CEC may request additional information to enable a full review of the application. Applications from the public agencies must be submitted to the CEC only after public review within the jurisdiction of the agency or service area of the utility. Once the CEC receives the application from the public agency and deems it complete, the CEC allows a 60-day public comment period. The CEC may again request additional information to evaluate the application. The CEC then proceeds to make a recommendation on the application and any additional information considered to the business meeting calendar for the full commission to consider. The average timeline for this determination process may be closer to a year.
Trinity County demographics. Trinity County is located midway between Redding in Shasta County and the Northern Redwood Coast. The County is home to about 15,000 residents and is a small a rural community. The percentage of Trinity residents living below the federal poverty level was about twice as high as for California overall (23 percent compared to 12 percent). TPUD is the main service electricity provider serving about 7,200 customers. It is reportedly one of the poorest counties in the state and its remote location can make building construction more expensive than many other places in the state.
Trinity Public Utilities District electricity generation source. In 1955, Congress passed the Trinity River Act providing dams, reservoirs, and power plants on the Trinity River for the Central Valley Project (CVP). The CVP is a 400-mile complex, multi-purpose network of dams, reservoirs, canals, hydroelectric power plants and other facilities. The CVP reduces flood risk for the Central Valley, and supplies the valley with domestic and industrial water. The U.S Bureau of Reclamation operates the CVP. To compensate Trinity County residents, Congress granted first preferential rights to 25 percent of the net electricity generated by these power plants to electricity users in Trinity County and subsequently TPUD service area has low rates. The generating capacity of approximately 233 MW[1]of electricity provided by TPUD to its customers is 100 percent carbon-free hydropower. Given its unique zero-carbon portfolio, TPUD is exempt from the RPS under Public Utilities Code Section 399.30(g).
Comments
Exemptions from solar ready and battery storage requirements. This bill would provide that homes that are being built or repaired in the service territory of the TPUD are exempt from the . The RPS, as written today, excludes a POU that receives all of its electricity from hydropower pursuant to the Trinity River Division (TRD) Act. Enacted by Congress in 1955, the TRD Act authorized the United States Government to build the Trinity Dam, which led to the generation of hydropower in Trinity County. The CEC has the authority to exempt public utilities from the application of solar PV requirements of the Building Energy Efficiency standards for residential property, and has exercised this right in recent years. Most recently, in February 2023 and September 2023, the CEC approved exemption for the TPUD from the residential and non-residential solar and battery storage requirements determining that the requirements were not cost-effective.
Given TPUD has a power supply that is 100 percent hydropower (the only utility of its kind in the state), customers in utility’s service territory pay a below market price for its clean energy, averaging approximately 6.5 cents per kWh over the last 10 years. The supporters of this bill note that while the CEC can issue exemptions to utilities, this process takes an immense amount of time, even up to a year. They contend that such a long drawn out effort is incredibly burdensome for small public utilities. Further, even if a utility obtains an exemption, they have to return to the CEC every three years to recertify that they have not begun procuring carbon emitting energy. This creates an unnecessary burden for both CEC and utility staff. In late March the CEC proposed a process to allow for a continued exemption within the regulations. However, the supporters of this bill express concerns that such a change does not provide the certainty that would be afforded by this bill to codify a narrow exemption from the Building Energy Efficiency Standards for their service territory.
Prior/Related Legislation
AB 2787 (Patterson) would exempt homes that are being rebuilt due to a disasters from the solar ready requirements in the building standards. The bill is pending before this committee.
AB 704 (Jim Patterson, 2023) was substantially similar to AB 2787. AB 704 was held in the Assembly Committee on Appropriations.
AB 1078 (Patterson, 2022) would have extended the exemption established by AB 178 for one year, until January 1, 2024. The bill was vetoed.
AB 178 (Dahle, Chapter 259, Statutes of 2019) exempted, until January 1, 2023, residential construction from complying with the solar requirements in the recently adopted building standards when the construction is in response to a disaster in an area in which a state of emergency has been proclaimed by the Governor.
AB 693 (Eggman, Chapter 582, Statutes of 2016) created the Multifamily Affordable Housing Solar Roofs Program, to provide financial incentives–up to $100 million annually, for qualified solar installations at multifamily affordable housing properties funded from IOU GHG allowances.
AB 217 (Bradford and De León, Chapter 609, Statutes of 2013) extended the low-income programs of the California Solar Initiative from 2016 until 2021, authorizes the collection of an additional $108 million for these programs, and adds additional standards to the program, as specified.
AB 327 (Perea, Chapter 611, Statutes of 2013) restructured the rate design for residential electric customers and revised the NEM program.
SB 1 (Murray, Chapter 132, Statutes of 2006) established the electric portion of the CSI with a 10-year budget of $2.2 billion collected from ratepayers.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
Trinity Public Utilities District, Sponsor
OPPOSITION:
California Solar & Storage Association
ARGUMENTS IN SUPPORT: According to the sponsor:
While TPUD [Trinity Public Utilities District] has been able to obtain temporary exemptions from these standards [solar and battery storage requirements], the effort to do so has been immense for a small public utility district like TPUD. TPUD has 25 employees, only six of whom are administrators responsible for managing TPUD. In its most recent effort to obtain a temporary exemption, there were 74 email exchanges and eight video meetings with CEC staff. These communications generated approximately 240 hours of work for TPUD staff. In addition, TPUD had to retain an attorney to ensure its application was properly filed.
AB 1918 would address this problem by providing TPUD and Trinity County with a permanent exemption to the solar ready program so that time and money is no longer wasted by TPUD or the CEC. Should residents of Trinity County wish to install solar on their buildings despite TPUD’s cleaner and less expensive power AB 1918 would not preclude them from doing so.
ARGUMENTS IN OPPOSITION: The opposition states:
While California should be doubling down on its commitment to solar, AB 1918 would take the state in the opposite direction. For properties in Trinity Public Utilities District, AB 1918 would allow new homes on those properties to be exempt from the solar mandate. The reasoning is that this utility gets its energy from hydropower facilities. However, we are headed for prolonged drought, and even if the utility’s hydroelectric production continues at current levels and customer demand goes down, the utility can sell power to other utilities. Reducing customer demand so that the utility has excess power is not a negative outcome. We would not discourage energy efficiency because the utility has clean generating sources.
-- END --
Pg 21, “Trinity Public Utility District’s Application for a Solar Photovoltaic and Battery Storage Cost-Effectiveness Determination for Nonresidential Buildings.” June 2023 ↑
Date of Hearing: April 24, 2024
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 1918
Author:(Wood) – As Amended Ver:April 3, 2024
Policy Committee: | Utilities and Energy | Vote: | 15 - 0 |
Business and Professions | 18 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill exempts a building constructed in the service territory of the Trinity Public Utility District (TPUD) from the requirement that such a building be solar ready or have photovoltaic and battery storage systems installed.
FISCAL EFFECT:
Negligible state costs, if any. The bill may result in minor cost savings to the Energy Commission, which will no longer need to consider TPUD’s periodic requests for exemption from solar-ready requirements.
COMMENTS:
Background and Purpose. The California Building Standards Code, also known as Title 24 of the California Code of Regulations, governs the design and construction of buildings in the state. Various state agencies develop and propose updates to the code, and the California Building Standards Commission within the Department of General Services approves and adopts the updates to the code every three years.
The Energy Commission adopts updates to Part 6 of Title 24, which contains energy conservation standards applicable to most residential and nonresidential buildings throughout California. Statute requires the energy conservation standards be cost effective when considering the value of the water or energy saved, the impact on product efficacy for the consumer and the life-cycle cost of complying with the standard.
In 2018, the Energy Commission adopted updates to the energy conservation standards that, effective the first day of 2020, generally required installation of solar photovoltaic systems (solar PV) on new building construction. Three years later, the Energy Commission adopted updates to the building standards to generally require solar PV paired with battery storage systems be installed on all newly constructed nonresidential and high-rise multifamily buildings.
The Energy Commission may exempt a building or utility service territory from the energy conservation standards if compliance with the standards is not cost effective. On November 1, 2022, TPUD applied to the Energy Commission for such an exemption, arguing “TPUD's low electricity rates make rooftop solar and/or battery storage uneconomic in TPUD's service area.” Key to TPUD’s position was the ubiquity in the service area of cheap, greenhouse gas-free electricity generated by hydropower.
Ultimately, the Energy Commission agreed installation of solar PV and battery storage on new building construction was not cost effective in the TPUD service area and, therefore, granted the utility’s request for exemption from the requirement to do so, but for the current three-year period only. Despite this victory, TPUD contends the exemption process was time consuming and costly, and is a process the utility would like to avoid in the future, given conditions in the service area are unlikely to change substantially any time soon. For this reason, TPUD seeks a permanent exemption from the requirements to install solar PV and battery storage on newly constructed buildings. As the author puts it:
Trinity Public Utility District is unique in that it is the only Publicly Owned Utility District in the state that generates and distributes 100% hydropower. The Renewables Portfolio Standard is written to exclude the utility district because it is completely carbon-free. Unfortunately, the Building Energy Efficiency Standards enforced by the California Energy Commission do not take a similar approach. Instead, the CEC requires the utility district to apply for an exemption every three years to re-certify that it has not procured any carbon-generating power sources, even though the utility district has operated on 100% hydropower since TPUD formed in 1982. Because TPUD uses a fraction of the hydropower to which it is legally entitled, there are no circumstances in which TPUD will ever need another energy resource. The process of recertifying for an exemption takes a year and a half, is costly, and an immense burden for a small utility district made up of only 25 employees, only six of whom are administrators. Exempting the Trinity Public Utility District from this redundant exercise will allow both the CEC and utility district to devote time and resources to where they are truly needed.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 2, 2024
ASSEMBLY COMMITTEE ON BUSINESS AND PROFESSIONS
Marc Berman, Chair
ABPCA Bill Id:AB 1918
Author:(Wood) – As Introduced Ver:January 24, 2024
SUBJECT: State building standards: solar-ready requirement: exemption.
SUMMARY: Permanently exempts new construction within the service territory of the Trinity Public Utilities District (TPUD), whose electricity is generated by 100% carbon-free hydropower, from state solar ready building standards.
EXISTING LAW:
- Authorizes for the purpose of increasing the supply of water in the Central Valley of California, the construction, operation, and maintenance of a major storage reservoir on the Trinity River, a conveyance system to transport Trinity River water to the Sacramento River, and hydroelectric powerplants and transmission facilities to supply energy to Central Valley Project (CVP) facilities and Trinity County. (Public Law 84-386, Section 1)
- Establishes a preference right for utility customers in Trinity County to purchase up to 25 percent of the net electricity produced by the hydroelectric powerplants constructed pursuant to the Trinity River Division Act. (Public Law 84-386, Section 4)
- Requires the California Energy Commission (CEC; also known as the State Energy Resources Conservation and Development Commission) to prescribe water and energy efficiency and conservation standards for new residential and nonresidential buildings in California. The standards are required to be cost-effective, as specified. (Public Resources Code § 25402)
- Requires every retail supplier that makes an offering to sell electricity that is consumed in California to disclose its electricity sources and the associated greenhouse gas emissions intensity for the previous calendar year. (Public Utilities Code (PUC) § 398.4)
- Deems a public utility district that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress under the Trinity River Division Act of 1955 compliant with the renewable energy procurement requirements of the Renewables Portfolio Standard. (PUC § 399.90(g))
- Requires solar photovoltaic (PV) and battery storage systems to be installed on newly constructed nonresidential and multifamily buildings. (2022 California Building Energy Efficiency Standards §§ 140.0; 140.10; 170.2(f),(g),(h); and 170.1))
- Requires solar PV systems to be installed on newly constructed single-family homes. (2022 California Building Energy Efficiency Standards §§ 150.0(c)14, 150.1(a),(b))
- Requires newly constructed residential and nonresidential buildings, including hotels and motels that are not equipped with solar PV systems, to be “solar ready.” (2022 California Building Energy Efficiency Standards §§ 110.10, 160.8)
- Authorizes the CEC to exempt any building if it finds that 1) substantial funds had been expended in good faith on planning, designing, architecture, or engineering of the building before the adoption date of the provision; and 2) compliance with the requirements of the provision would be impossible without both substantial delays and increases in costs of construction above what is considered to be reasonable. (2022 California Building Energy Efficiency Standards § 10-108(a))
- Authorizes the CEC to, upon written application or its own motion, determine that the solar PV or battery storage requirements do not apply, if the CEC finds that the implementation of public agency rules regarding utility system costs and revenue requirements, compensation for customer-owned generation, interconnection fees, or other factors, cause the CEC’s cost effectiveness conclusions to not hold for particular buildings. (2022 California Building Energy Efficiency Standards § 10-109(k))
THIS BILL:
- Specifies that a building is exempt from solar ready requirements for new construction established by the State Energy Resources Conservation and Development Commission and the California Building Standards Commission if all of the following conditions are met:
- The building is constructed in the service territory of a public utility district.
- The building receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress under the Trinity River Division Act of 1955.
- The electricity that the building receives is carbon-free.
- Conditions the above exemption on the public utility district filing annual resource mix disclosures as required by existing law.
- Makes various findings and declarations.
FISCAL EFFECT: Unknown. This bill has been keyed fiscal by Legislative Counsel.
COMMENTS:
Purpose. This bill is sponsored by the Trinity Public Utility District. According to the author:
Trinity Public Utility District is unique in that it is the only Publicly Owned Utility District in the state that generates and distributes 100% hydropower. The Renewable Portfolio Standard is written to exclude the utility district because it is completely carbon-free. Unfortunately, the Building Energy Efficiency Standards enforced by the California Energy Commission do not take a similar approach. Instead the CEC requires the utility district to apply for an exemption every three years to re-certify that it has not procured any carbon generating power sources, even though the utility district has operated on 100% hydropower since TPUD formed in 1982. Because TPUD uses a fraction of the hydropower to which it is legally entitled, there are no circumstances in which TPUD will ever need another energy resource. The process of recertifying for an exemption takes a year and a half, is costly, and an immense burden for a small utility district made up of only 25 employees, only six of whom are administrators. Exempting the Trinity Public Utility District from this redundant exercise will allow both the CEC and utility district to devote time and resources to where they are truly needed.
Background.
Trinity County’s electricity has for the last six decades been supplied by carbon-free hydropower. In 1955, Congress passed the Trinity River Division Act, which authorized, for the purpose of increasing the supply of water in the Central Valley, the construction, operation, and maintenance of a major storage reservoir on the Trinity River, a conveyance system to transport Trinity River water to the Sacramento River, and hydroelectric powerplants and transmission facilities to supply energy to Central Valley Project (CVP)[1] facilities and Trinity County. The Act granted Trinity County utility customers first right to purchase up to 25 percent of the net electricity produced by the hydroelectric powerplants, approximately 58 megawatts of electricity. The TPUD, which is the main electricity service provider with approximately 7,200 customers, reports that its customers use only a fraction of the energy to which they are legally entitled. The TPUD also reports having the lowest electric rates in the state.[2] Because 100 percent of its electricity is generated by carbon-free hydropower, the TPUD is exempt from the Renewables Portfolio Standard.[3] It is not, however, exempt from the Building Energy Efficiency Standards (California Code of Regulations, Title 24, Part 1, Chapter 10, Part 6; also known as the California Energy Code).
The California Energy Code contains energy and water efficiency requirements for buildings, and currently requires that solar PV and battery storage systems be installed on all newly constructed buildings, unless the building qualifies for an exemption. Newly constructed buildings, including single-family residences, multifamily buildings, hotels/motels, and nonresidential buildings that are not equipped with a solar PV system, most commonly due to an exemption, are generally required to be “solar ready.” The building standards effectively reserve a penetration-free and shade-free portion of the roof of the building for the potential future installation of a solar PV system.[4]
In addition to exemptions specified in the California Energy Code, the CEC may exempt any building if it finds that a significant investment had been made prior to the adoption of a new requirement and compliance with the requirement would be impossible without both substantial delays and increases in costs. Moreover, the CEC may, upon written application or its own motion, determine that the solar PV or battery storage requirements for new construction do not apply if they are found not to be cost-effective. Though the TPUD has successfully obtained exemptions from the solar PV requirements[5] [6] [7], the TPUD reports that doing so has been costly, time-consuming, and resource intensive.
The majority of new construction in Trinity County is likely already to be exempt from solar ready building standards. Single family homes in subdivisions with 10 or more houses and multi-family buildings—the residential buildings to which the solar ready building standards apply—are very uncommon. Moreover, buildings (residential and nonresidential) that are shaded by trees or neighboring buildings may also be exempt. Nonetheless, this bill would permanently exempt buildings within the TPUD service area from the solar ready requirements provided that it files disclosures related to its electricity and emissions as required by law. According to the author’s office, a permanent exemption would lower the cost of housing in Trinity County and result in significant time and cost savings for TPUD.
Current Related Legislation.
AB 2787 (Joe Patterson & Jim Patterson) of 2024, would exempt, until January 1, 2028, residential construction intended to repair, restore, or replace a residential building that was damaged or destroyed as a result of a disaster in an area in which a state of emergency has been proclaimed by the Governor from any additional or conflicting solar requirements that were not in effect or that differ from solar requirements in effect at the time the damaged or destroyed residential building was originally constructed, provided that certain conditions are met. This bill is pending a hearing in the Natural Resources Committee.
Prior Related Legislation.
AB 704 (Joe Patterson & Jim Patterson) of 2023 was identical to AB 2787 of this year. This bill dies in the Assembly Appropriations Committee.
AB 178 (Dahle), Chapter 259, Statutes of 2019, was identical to AB 704 of 2023 and AB 2787 of this year.
ARGUMENTS IN SUPPORT:
The Trinity Public Utilities District (TPUD) writes as the sponsor of this bill:
TPUD provides electricity to virtually all residents and businesses in Trinity County (with a population of only 16,000). The electricity provided by TPUD to its customers is 100% carbon-free hydropower. TPUD’s right to this hydropower source is memorialized in federal law, specifically, the Trinity River Division Act of 1955. TPUD only uses a fraction of the power to which it is legally entitled. Moreover, TPUD forecasts flat or declining load in the foreseeable future. For these reasons, there are quite literally no circumstances in which TPUD will ever require another energy source. Moreover, the electricity supplied by TPUD to its customers is, and will remain, among the least expensive electricity in the state. In short, the installation of rooftop solar in Trinity County results in a net increase in greenhouse gas emissions, increased costs, and runs contrary to the state’s decarbonization goals.
ARGUMENTS IN OPPOSITION:
The California Solar & Storage Association writes in opposition:
While California should be doubling down on its commitment to solar, [this bill] would take the state in the opposite direction. For properties in Trinity Public Utilities District, AB 1918 would allow new homes on those properties to be exempt from the solar mandate. The reasoning is that this utility gets its energy from hydropower facilities. However, we are headed for prolonged drought, and even if the utility’s hydroelectric production continues at current levels and customer demand goes down, the utility can sell power to other utilities. Reducing customer demand so that the utility has excess power is not a negative outcome. We would not discourage energy efficiency because the utility has clean generating sources.
IMPLEMENTATION ISSUES:
Conflating Solar PV and Solar Ready Requirements. The California Energy Code requires new buildings to be equipped with solar PV and battery storage systems. Buildings that are exempt from these requirements may be required to be “solar ready” meaning that the building can accommodate the installation of solar PV system at a later date, but solar panels or other related equipment are not required to be installed during initial construction. It is this committee’s understanding that the author wishes to permanently exempt new buildings in the TPUD service area from the requirement to install solar PV at the time of initial construction in addition to the solar ready requirements that are intended to make it easier for people to install solar PV systems in the future. However, as currently drafted, this bill only exempts new buildings from solar ready building standards.
AMENDMENTS:
To additionally exempt new buildings in the TPUD service area from existing solar PV and battery storage system building standards, the author has agreed to amend the bill as follows:
On page 2, after line 2:
18940.3. A building that is constructed in the service territory of a public utility district and that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955, (Public Law 84-386), if that electricity is carbon free, is exempt from the building standards adopted by the State Energy Resources Conservation and Development Commission and the California Building Standards Commission that require new residential and commercial buildings to be solar ready. ready or to have photovoltaic and battery storage systems installed. This section only applies to a public utility district that files annual disclosures pursuant to Section 398.4 of the Public Utilities Code.
On page 2, after line 14:
SEC. 2. The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because the Trinity Public Utilities District (TPUD) is unique in that it is the only publicly owned utility that relies solely on hydropower, a completely carbon-free electricity source. Building standards adopted by the State Energy Resources Conservation and Development Commission require that new homes and some commercial spaces be built “solar ready.” Because TPUD’s ratepayers receive entirely carbon-free electricity at extremely low rates pursuant to the Trinity River Division Act of 1955, the installation of rooftop solar results in a net increase in housing costs and carbon emissions in the TPUD’s service territory. In order to further California’s climate goals and avoid increasing the cost of housing unnecessarily, it is necessary to exempt buildings in the Trinity Public Utilities District’s service territory from the these state building standards that require new residential and commercial buildings to be solar ready. standards.
REGISTERED SUPPORT:
Trinity Public Utilities District (Sponsor)
REGISTERED OPPOSITION:
California Solar & Storage Association
Analysis Prepared by: Kaitlin Curry / B. & P. / (916) 319-3301
Managed by the Bureau of Reclamation, the CVP is a 400-mile network of dams, reservoirs, canals, hydroelectric powerplants, and other facilities. The role of the CVP is multipurpose: reduce flood risk for the Central Valley, supply water for domestic and commercial use, produce clean energy, offer recreational opportunities, restore and protect fish and wildlife, and enhance water quality. ↑
Trinity PUD Serving Renewable Hydroelectric Energy District History ↑
The Renewable Portfolios Standard sets continuously escalating renewable energy procurement requirements for load serving entities (i.e., electric companies). ↑
2022 Building Energy Efficiency Standards ↑
“Staff Review and Analysis for Trinity Public Utility District's Application for a Solar Photovoltaic Determination,” California Energy Commission, February 2019 ↑
“Staff_Paper_Staff Review and Analysis for Trinity Public Utility District’s Application for a PV Determination,” California Energy Commission, December 2022 ↑
“Revised Staff Review and Analysis of Trinity Public Utility District's 2022 Non Residential Determin,” California Energy Commission, August 2023 ↑
Date of Hearing: March 13, 2024
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 1918 (
Author:Wood) – As Introduced Ver:January 24, 2024
SUBJECT: State building standards: solar-ready requirement: exemption
SUMMARY: Exempts a building that is constructed in the service territory of a public utility district and that receives all of its carbon-free electricity pursuant to a preference right adopted and authorized by the United States Congress from the building standards requirement that new residential and commercial buildings be solar ready, as adopted by the California Energy Commission (CEC) and the California Building Standards Commission.
EXISTING LAW:
- Requires state agencies that adopt or propose adoption of any building standard to submit the building standard to the California Building Standards Commission for approval and adoption. (Health & Safety Code § 18930)
- Requires the CEC to adopt and update Building Energy Efficiency Standards (Energy Code) for most residential and non-residential buildings in the state of California every three years. (Public Resources Code § 25402)
- Requires the CEC to adopt the building energy efficiency standards that are cost-effective when taken in their entirety and when amortized over the economic life of the structure. The CEC shall also consider other relevant factors, as required by Sections 11346.5 and 11357 of the Government Code, including, but not limited to, the impact on housing costs, the total statewide costs and benefits of the standard over its lifetime, economic impact on California businesses, and alternative approaches and their associated costs. (Public Resources Code § 25402(c))
- Modifies the 2022 Building Energy Efficiency Standards (2022 Energy Code) to require solar photovoltaic (PV) systems and battery storage for newly constructed commercial buildings. (2022 Building Energy Efficiency Standards: Section 110.10 (b) through 110.10 (d))
- Requires the CEC to assess the potential for the state to reduce greenhouse gas (GHG) emissions from the state’s residential and commercial building stock by at least 40% below 1990 levels by January 1, 2030. (Public Resources Code § 25403)
- Requires the CEC to develop, and publish on the commission’s internet website, guidance and best practices to help building owners, the construction industry, and local governments overcome barriers to electrification of buildings. (Public Resources Code § 25233.5)
- Requires every retail supplier that makes an offering to sell electricity that is consumed in California shall disclose its electricity sources and the associated greenhouse gas emissions intensity for the previous calendar year. (Public Utilities Code § 398.4)
- Deems a public utility district that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955 (Public Law 84-386) as compliant with the energy procurement requirements of the Renewables Portfolio Standard. (Public Utilities Code § 399.30 (g))
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations for its review.
BACKGROUND:
Energy Code – Adopted in 1976 and updated every three years by the CEC, the building energy efficiency standards for residential and non-residential buildings, otherwise known as the Energy Code or Title 24, Part 6, entails energy and water efficiency standards for newly constructed buildings, additions to existing buildings, and alterations to existing buildings. These standards are updated to ensure that builders use the most energy-efficient technologies and construction, save energy, increase electricity supply reliability, increase indoor comfort, and help preserve the environment.[1] The standards vary by building type and climate zone and are listed in the California Code of Regulations. Conversely, the energy code does not apply to all buildings in the state. Some industrial or agricultural buildings may be exempt from certain provisions of the energy code. Additionally, a building may be exempted if it incurs substantial increases in costs as it works to implement provisions of the energy code. The CEC reports that the energy efficiency building standards have saved Californians billions of dollars since their first adoption, avoided the need for power plants and transmission lines, and helped keep California’s per-capita energy consumption flat.
Solar Requirements in the Energy Code – In May of 2018, the CEC adopted the 2019 Building Energy Efficiency Standards, which went into effect on January 1, 2020. The standards were the first in the nation to require solar PV systems for new construction. These standards also include improved thermal building envelope standards (i.e., insulating the interior), residential and nonresidential ventilation requirements, and nonresidential lighting requirements. For residential buildings, according to the CEC, the standards will result in about 53% less energy use than under the 2016 standards. The CEC further estimated that the new standards will reduce GHG emissions by 700,000 metric tons over three years.
As noted above, statute requires that the CEC standards must be “cost-effective.” The CEC estimated that based on a 30-year mortgage, the 2019 standards will add about $40 per month in costs and result in about $80 per month in reduced energy costs. However, since the adoption of the 2019 standards, both the up-front costs for solar installation and the compensation for customer-owned solar generation have decreased. Should the CEC calculations for “cost-effectiveness” not hold for particular buildings – given differing rates, system costs, interconnection fees, or other factors in utility service territories – the PV requirements would not apply. The CEC also established a few outright exemptions to the new solar requirement. Primarily, homes that are shaded by trees, hills, other structures, etc. are not required to install solar. Homeowners in areas with community solar programs are also exempt from the requirement. Additionally, reduced system size is permitted for low-rise residential with two stories and for low-rise multifamily or single-family homes with three or more stories.
In August 2021, the CEC updated and adopted the 2022 Energy Code standards for newly constructed residential and commercial buildings, as well as additions and alterations to existing buildings set to go into effect January 1, 2023 with a focus on four primary areas:[2]
- Requiring solar PV and battery storage systems for newly constructed nonresidential and high-rise multifamily buildings[3].
- Requiring the use of electric heat pumps for space heating and water heating.
- Establishing electric-ready requirements for all buildings, including single-family homes.
- Reinforcing and strengthening ventilation standards to improve the quality of indoor air quality.
Concurrently, section 10-109(k) of the 2022 Energy Code permits the CEC to determine that the solar PV and/or battery storage system requirements of Section 140.10, applicable to non-residential buildings, and Section 170.2, applicable to multi-family homes with more than three habitable stories, shall not apply if the CEC finds that its cost-effectiveness conclusions regarding solar PV and battery storage requirements are unreasonable for such buildings.
Exemptions to the CEC Solar Mandate – Through a determination process, the CEC may, upon written application or its own motion, determine that the PV or battery storage rules do not apply to particular buildings or service territories. A public agency[4] is required to provide information regarding the differences between its rules regarding utility system costs and revenue requirements, and the cost-effectiveness determinations that the CEC made in adopting the PV and battery storage requirements. The CEC may request additional information to enable a full review of the application. Applications from the public agencies must be submitted to the CEC only after public review within the jurisdiction of the agency or service area of the utility. Once the CEC receives the application from the public agency and deems it as complete, the CEC allows a 60-day public comment period. The CEC may again request additional information to evaluate the application. The CEC then proceeds to make a recommendation on the application and any additional information considered to the business meeting calendar for the full Commission to consider. The average timeline for this determination process may be closer to a year.
Trinity County Demographics – Trinity County is located midway between Redding in Shasta County and the Northern Redwood Coast. The County is home to about 15,000 residents. In 2023, the County reported only 17% of the Trinity County population had adequate access to a supermarket compared to 51% in California. The communities are small and rural. The percentage of Trinity residents living below the Federal Poverty Level was about twice as high as for California overall (23% compared to 12%).[5] In 2023, Trinity County was reported to have the highest childcare cost burden among all California counties.[6] Trinity Public Utilities District[7] is the main service electricity provider serving about 7,200 customers.[8] It is reportedly one of the poorest counties in the state of California, and its remote location makes building construction in that geographic area more expensive than many other places in the state.
Power Source – In 1955, Congress passed the Trinity River Act providing dams, reservoirs, and power plants on the Trinity River for the Central Valley Project (CVP).[9] The Central Valley Project (CVP) is a 400-mile complex, multi-purpose network of dams, reservoirs, canals, hydroelectric power plants and other facilities. The CVP reduces flood risk for the Central Valley, and supplies the valley with domestic and industrial water. The U.S Bureau of Reclamation operates the CVP. To compensate Trinity County residents, Congress granted first preferential rights to 25% of the net electricity generated by these power plants to electricity users in Trinity County and subsequently TPUD service area has low rates. The generating capacity of approximately 233 MW[10]of electricity provided by Trinity Public Utilities District to its customers is 100% carbon-free hydropower. Given its unique zero-carbon portfolio, Trinity Public Utilities District (TPUD) is exempt from the Renewables Portfolio Standard (RPS).[11]
COMMENTS:
- Author’s Statement. According to the author, “Trinity Public Utility District is unique in that it is the only Publicly Owned Utility District in the state that generates and distributes 100% hydropower. The Renewables Portfolio Standard is written to exclude the utility district because it is completely carbon-free. Unfortunately, the Building Energy Efficiency Standards enforced by the California Energy Commission do not take a similar approach. Instead, the CEC requires the utility district to apply for an exemption every three years to re-certify that it has not procured any carbon-generating power sources, even though the utility district has operated on 100% hydropower since TPUD formed in 1982. Because TPUD uses a fraction of the hydropower to which it is legally entitled, there are no circumstances in which TPUD will ever need another energy resource. The process of recertifying for an exemption takes a year and a half, is costly, and an immense burden for a small utility district made up of only 25 employees, only six of whom are administrators. Exempting the Trinity Public Utility District from this redundant exercise will allow both the CEC and utility district to devote time and resources to where they are truly needed.”
- Why this bill? In August 2021, the CEC adopted the 2022 Building Energy Efficiency Standards (2022 Energy Code), which include new solar PV system and battery storage system requirements for all newly constructed nonresidential and high-rise multifamily buildings. TPUD applied for an exemption given that the 2022 Energy Code states that an exemption may be applied if cost-effectiveness does not apply for particular buildings. In this case, TPUD receives its power from a long-standing federal contract for hydroelectric power, making the resource reasonably inexpensive. As a result, CEC staff performed a cost-effectiveness analysis and determined that it would not be cost-effective for TPUD service area to include solar PV system and battery storage system requirements in new buildings.[12] TPUD received an exemption from the 2022 Energy Code. In the effort to get this exemption, TPUD stated it took a year and a half. TPUD also had to retain an attorney to ensure its application was properly filed.
TPUD notes this year-plus timeline was not unique to the 2022 Energy Code exemption; they note a similar timeline when seeking an exemption from the 2020 Energy Code. Given the long timelines with the CEC determination process, TPUD has been seeking to get a permanent exemption from PV system and battery storage system requirements from the CEC. However, the CEC has to date not provided an outright exemption to TPUD.
- Power Content Label (PCL). Energy suppliers are required to annually disclose to their retail customers the mix of resources used to provide electricity service during the previous calendar year.[13] The CEC uses this information, in part, to generate California’s total system power mix, known as “Total California System Electricity.” These disclosures provide the public with clear information about what energy is being provided by their retail supplier, in an effort to increase customer transparency. As stated by the author, TPUD claims to be “100% hydropower” since forming in 1981. However, the last publicly available PCL for TPUD was in 2017. While the PCL did show TPUD as being 100% hydropower, the lack of disclosure over the subsequent seven years provides little transparency into TPUD’s resource claims. While it is likely, given TPUD’s longstanding federal contracts, that its resource mix has remained unchanged over this period, the lack of transparency overlaid with TPUD’s seeking an exemption from solar PV rules via this measure raises scrutiny. In conversations between TPUD and this committee, TPUD has agreed to update its PCL as soon as possible. As such, the author and committee may wish to include language that a permanent exemption to the solar ready requirements of the Building Standards, as this bill provides, shall be realized only upon TPUD filing its annual PCLs.
- Prior Legislation
AB 178 (Dahle) exempts, until January 1, 2023, residential construction from complying with the solar requirements in the building standards when the construction is in response to a disaster in an area in which a state of emergency has been proclaimed by the governor. Status: Chapter 259, Statutes of 2019.
AB 3232 (Friedman) requires the CEC, by January 1, 2021, to assess the potential for the state to reduce GHG emissions from the state’s residential and commercial building stock by 40% below 1990 levels by January 1, 2030. Status: Chapter 373, Statutes of 2018.
- Double Referral. This bill is double-referred; upon passage in this Committee, this bill will be referred to the Assembly Committee on Business and Professions.
REGISTERED SUPPORT / OPPOSITION:
Support
Trinity Public Utilities District
Opposition
None on file.
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
Title 24 Express, “What is 24?” https://www.title24express.com/what-is-title-24/ ↑
Pg. iv, CEC; “ 2022 Building Energy Efficiency Standards for Residential and Nonresidential Buildings,” August 2022 ↑
High-rise multifamily buildings are multifamily buildings that have four or more habitable stories ↑
Government code § 20056 defines public agency as any city, county, district, other local authority or public body of or within the State of California ↑
Pg.2, Trinity County Public Health, “Equity Assessment”. July, 3, 2023 ↑
Ibid ↑
In 1981, Trinity Public Utilities District (TPUD) was formed to serve the residents of Trinity. Public Utility Districts are independent special districts governed under the Public Utility District Act. A PUD may be authorized to acquire, construct, own, operate, control, or use works for supplying light, water, power, heat, transportation, telephone service, or other means of communication, or means for the disposal of garbage and sewage. For decades, the District has spent working to maximize power allocation, protect first preference rights, expand transmission infrastructure, and improve reliability and cost of service to District customers. ↑
Pg.1, “Revised Staff Review and Analysis of Trinity Public Utility District’s Application for a Solar Photovoltaic and Battery Storage Cost Effectiveness Determination for Nonresidential Buildings.” August 2023 ↑
Pg. 2, “Trinity PUD Report”. Filed April 13, 2012 ↑
Pg 21, “Trinity Public Utility District’s Application for a Solar Photovoltaic and Battery Storage Cost-Effectiveness Determination for Nonresidential Buildings.” June 2023 ↑
PUC § 399.30(g) ↑
Pg.13, “Revised Staff Review and Analysis of Trinity Public Utility District’s Application for a Solar Photovoltaic and Battery Storage Cost Effectiveness Determination for Nonresidential Buildings.” August 2023 ↑
Public Utilities Code § 398.4 ↑
Discussed in Hearing
Assembly Floor
Senate Floor
Senate Standing Committee on Energy, Utilities and Communications
Assembly Standing Committee on Business and Professions
Bill Author
Bill Co-Author(s):