AB 2190: California Environmental Quality Act: expedited judicial review: infrastructure projects: hydrogen.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2024-02-07
Current Status:
Failed
(2024-03-19: In committee: Set, first hearing. Hearing canceled at the request of author.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law authorizes the Governor to certify certain projects, including energy infrastructure projects that meet specified requirements, for streamlining benefits related to CEQA, such as the requirement that judicial actions, including any potential appeals, challenging the certification of an EIR or the granting of approval by a lead agency for certified projects be resolved, to the extent feasible, within 270 days after the filing of the certified record of proceedings with the court. Existing law excludes from the definition of energy infrastructure project for these purposes any project using hydrogen as a fuel.
This bill would delete that exclusion, thereby authorizing the Governor to certify energy infrastructure projects that use hydrogen as a fuel for streamlining benefits related to CEQA, as described above. Because the bill would impose additional duties on lead agencies in conducting the environmental review of energy infrastructure projects using hydrogen as a fuel that are certified by the Governor, including the concurrent preparation of the record of proceedings, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
For purposes of this chapter, the following definitions apply:
(a)Applicant means a public or private entity or its affiliates, or a person or entity that undertakes a public works project, that proposes a project and its successors, heirs, and assignees.
(b)Disadvantaged community means an area identified by the California Environmental Protection Agency pursuant to Section 39711 of the Health and Safety Code or an area identified as a disadvantaged unincorporated community pursuant to Section 65302.10 of the Government Code.
(c)Electrical transmission facility project means a project for the construction and operation of an electrical transmission facility the meets either of the following:
(1)An electrical transmission facility project identified by the Independent System Operator in its annual transmission planning process that meets either of the following criteria:
(A)The project will facilitate delivery of electricity from renewable energy resources or zero-carbon resources.
(B)The project will facilitate delivery of electricity from energy storage projects.
(2)An electrical transmission facility project identified by a local publicly owned electric utility that would satisfy a transmission expansion need approved by the governing body of the local publicly owned electric utility and that meets either of the following criteria:
(A)The project will facilitate delivery of electricity from renewable energy resources or zero-carbon resources.
(B)The project will facilitate delivery of electricity from energy storage projects.
(d)(1)Energy infrastructure project means any of the following:
(A)An eligible renewable energy resource, as defined in Section 399.12 of the Public Utilities Code, excluding resources that utilize biomass fuels.
(B)New energy storage systems of 20 megawatts or more, that are capable of discharging for at least two hours, provided that a pumped hydro facility may qualify only if it is less than or equal to 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.
(C)A project for which the applicant has certified that a capital investment of at least two hundred fifty million dollars ($250,000,000) made over a period of five years and the project is for either of the following:
(i)The manufacture, production, or assembly of an energy storage system or component manufacturing, wind system or component manufacturing, and solar photovoltaic energy system or component manufacturing.
(ii)The manufacture, production, or assembly of specialized products, components, or systems that are integral to renewable energy or energy storage technologies.
(D)An electric transmission facility project, provided that nothing in this chapter affects the jurisdiction of the California Coastal Commission pursuant to Division 20 (commencing with Section 30000) to regulate such projects if located in the coastal zone.
(E)An energy infrastructure project does not include projects utilizing hydrogen as a fuel.(2)Any project to develop a facility within the meaning of subdivision (b) of Section 25545 shall meet the requirements of Sections 25545.3.3 and 25545.3.5, except that those requirements shall also apply to solar photovoltaic and terrestrial wind electrical generating power plants with a generating capacity of between 20 and 50 megawatts and energy storage projects capable of storing between 80 and 200 megawatt hours of electrical energy.
(e)Infrastructure project means a project that is certified pursuant to Sections 21189.82 and 21189.83 as any of the following:
(1)An energy infrastructure project.
(2)A semiconductor or microelectronic project.
(3)A transportation-related project.
(4)A water-related project.
(f)Semiconductor or microelectronic project means a project that meets the requirements related to investment in new or expanded facilities and is awarded funds under the federal Creating Helpful Incentives to Produce Semiconductors Act of 2022 (Public Law 117-167), commonly known as the CHIPS Act of 2022, and the requirements of Section 21183.5.
(g)(1)Transportation-related project means a transportation infrastructure project that advances one or more of, and does not conflict with, the following goals related to the Climate Action Plan for Transportation Infrastructure adopted by the Transportation Agency:
(A)Build toward an integrated, statewide rail and transit network.
(B)Invest in networks of safe and accessible bicycle and pedestrian infrastructure.
(C)Include investments in light-, medium-, and heavy-duty zero-emission vehicle infrastructure.
(D)Develop a zero-emission freight transportation system.
(E)Reduce public health and economic harms and maximize community benefits.
(F)Make safety improvements to reduce fatalities and severe injuries of all users towards zero.
(G)Assess and integrate assessments of physical climate risk.
(H)Promote projects that do not significantly increase passenger vehicle travel.
(I)Promote compact infill development while protecting residents and businesses from displacement.
(J)Protect natural and working lands.
(2)Transportation-related projects are public works for the purposes of Section 1720 of the Labor Code and shall comply with the applicable provisions of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(h)(1)Water-related project means any of the following:
(A)A project that is approved to implement a groundwater sustainability plan that the Department of Water Resources has determined is in compliance with Sections 10727.2 and 10727.4 of the Water Code or to implement an interim groundwater sustainability plan adopted pursuant to Section 10735.6 of the Water Code.
(B)(i)A water storage project funded by the California Water Commission pursuant to Chapter 8 (commencing with Section 79750) of Division 26.7 of the Water Code.
(ii)In addition to clause (i), the applicant shall demonstrate that the project will minimize the intake or diversion of water except during times of surplus water and prioritizes the discharge of water for ecological benefits or to mitigate an emergency, including, but not limited to, dam repair, levee repair, wetland restoration, marshland restoration, or habitat preservation, or other public benefits described in Section 79753 of the Water Code.
(C)Projects for the development of recycled water, as defined in Section 13050 of the Water Code.
(D)Contaminant and salt removal projects, including groundwater desalination and associated treatment, storage, conveyance, and distribution facilities. This shall not include seawater desalination.
(E)Projects exclusively for canal or other conveyance maintenance and repair.
(2)Water-related projects are public works for the purposes of Section 1720 of the Labor Code and shall comply with the applicable provisions of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(3)Water-related project does not include the design or construction of through-Delta conveyance facilities of the Sacramento-San Joaquin Delta.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
|
Date
|
Status
|
|---|---|
| Mar 19, 2024 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Feb 26, 2024 | Referred to Coms. on NAT. RES. and JUD. |
| Feb 8, 2024 | From printer. May be heard in committee March 9. |
| Feb 7, 2024 | Read first time. To print. |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Date of Hearing: March 19, 2024
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
ABPCA Bill Id:AB 2190 (
Author:Mathis) – As Introduced Ver:February 7, 2024
SUBJECT: California Environmental Quality Act: expedited judicial review: infrastructure projects: hydrogen
SUMMARY: Deletes the exclusion of hydrogen projects from expedited administrative and judicial review under SB 149 (Caballero), Chapter 60, Statutes of 2023.
EXISTING LAW:
- The California Environmental Quality Act (CEQA) requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code (PRC) 21000, et seq.)
- Authorizes judicial review of CEQA actions taken by public agencies, following the agency's decision to carry out or approve the project. Challenges alleging improper determination that a project may have a significant effect on the environment, or alleging an EIR does not comply with CEQA, must be filed in the superior court within 30 days of filing of the notice of approval. The courts are required to give CEQA actions preference over all other civil actions. Requires the court to regulate the briefing schedule so that, to the extent feasible, hearings commence within one year of the filing of the appeal. Requires the plaintiff to request a hearing within 90 days of filing the petition. Requires the court to establish a briefing schedule and a hearing date, requires briefing to be completed within 90 days of the plaintiff’s request for hearing, and requires the hearing, to the extent feasible, to be held within 30 days thereafter. (PRC 21167, et seq.)
- Requires a court, upon finding a public agency's actions are not in compliance with CEQA, to order one or more of the following:
- A mandate that the determination, finding, or decision be voided by the public agency, in whole or in part;
- If the court finds that a specific project activity or activities will prejudice the consideration or implementation of particular mitigation measures or alternatives to the project, a mandate that the public agency and any real parties in interest suspend any or all specific project activity or activities, pursuant to the determination, finding, or decision, that could result in an adverse change or alteration to the physical environment, until the public agency has taken any actions that may be necessary to bring the determination, finding, or decision into compliance with this division; and
- A mandate that the public agency take specific action as may be necessary to bring the determination, finding, or decision into compliance with CEQA.
Any order shall include only those mandates which are necessary to achieve compliance with CEQA and only those specific project activities in noncompliance with CEQA. (PRC 21168.9)
- SB 149 establishes procedures for expedited administrative review (i.e., concurrent preparation of the record) and judicial review (i.e., requiring the courts to resolve CEQA litigation within 270 days, to the extent feasible) for four categories of public and private infrastructure projects, including energy infrastructure, subject to eligible projects being certified by the governor, approved by the lead agency on or before January 1, 2033, and meeting specified environmental and labor requirements. (PRC 21189.80, et seq.)
- SB 149 defines energy infrastructure projects as renewable energy generation eligible under the Renewables Portfolio Standard (excluding resources that utilize biomass fuels); new energy storage systems of 20 megawatts or more (excluding specified pumped hydro facilities); manufacture, production, or assembly of specified energy storage and renewable energy components; electric transmission facilities (with projects in the Coastal Zone subject to regulation by the Coastal Commission). Explicitly excludes projects utilizing hydrogen as a fuel. (PRC 21189.81)
THIS BILL deletes the exclusion of projects utilizing hydrogen as a fuel from the expedited review provisions of SB 149.
FISCAL EFFECT: Unknown
COMMENTS:
- Background. CEQA provides a process for evaluating the environmental effects of applicable projects undertaken or approved by public agencies. If a project is not exempt from CEQA, an initial study is prepared to determine whether the project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a negative declaration. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
An EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project. If mitigation measures are required or incorporated into a project, the agency must adopt a reporting or monitoring program to ensure compliance with those measures.
Generally, CEQA actions taken by public agencies can be challenged in superior court once the agency approves or determines to carry out the project. CEQA appeals are subject to unusually short statutes of limitations. Under current law, court challenges of CEQA decisions generally must be filed within 30-35 days, depending on the type of decision. The courts are required to give CEQA actions preference over all other civil actions. However, the schedules for briefing, hearing, and decision are less definite. The petitioner must request a hearing within 90 days of filing the petition and, generally, briefing must be completed within 90 days of the request for hearing. There is no deadline specified for the court to render a decision.
Following the precedent of several prior bills that applied to “environmental leadership” and other specific projects and project types, SB 149 offered expedited judicial review to a broad range, and unlimited number, of infrastructure projects falling into four categories – energy, transportation, water, and semiconductor/microelectronic.
CEQA streamlining was part of a larger infrastructure package originally proposed by the Newsom Administration. SB 149 the product of negotiations, and part of the agreement was to exclude hydrogen projects.
- Author’s statement:
AB 2190 is a necessary and common sense measure which authorizes the Governor to certify energy infrastructure projects that use hydrogen as a fuel as eligible for streamlining benefits related to CEQA. In doing so, this bill removes an unnecessary barrier to the development of crucial infrastructure and facilitates the expansion of an environmentally friendly source of energy.
- Hydrogen is not inherently clean. The environmental impacts of hydrogen, including effects on climate and air quality, can range from very favorable to very unfavorable, depending on production, delivery, end use, and the fuel the hydrogen is replacing. For example, hydrogen produced with fossil fuels and used in a combustion application that replaces a renewable energy source is not a good environmental solution. However, hydrogen produced with zero-carbon energy and used in a zero-emission application that replaces diesel combustion has clear climate and air quality benefits.
The source of the hydrogen and the source of the energy used to split hydrogen are significant factors in determining the lifecycle emissions associated with hydrogen use. Today, there are several means of hydrogen production and it is likely that these will evolve as technology advances.
Green hydrogen can result in almost no GHG emissions. Produced by electrolyzing water, green hydrogen is made using 100% renewable electricity to split hydrogen from water molecules. Less than 0.1% of hydrogen production globally comes from water electrolysis.
However, 96% of hydrogen produced today is considered to be gray hydrogen. Gray hydrogen is produced by heating natural gas, or methane, with steam to form syngas (a mixture of hydrogen and carbon monoxide and carbon dioxide). The syngas is separated to produce hydrogen. This process results in relatively high greenhouse gas emissions.
- No evidence that hydrogen projects have been delayed by CEQA litigation. In addition to environmental questions about real-world hydrogen production, another key reason hydrogen projects were not included in SB 149 is that no case was made that hydrogen projects are facing unreasonable delays due to CEQA litigation.
- Double referral. This bill has been double-referred to the Judiciary Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
None on file
Opposition
Asian Pacific Environmental Network
California Environmental Voters
CEJA Action
Center on Race, Poverty, & the Environment
Communities for a Better Environment
Leadership Counsel for Justice & Accountability
Livable California
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Bill Author
Bill Co-Author(s):