AB 281: Planning and zoning: housing: postentitlement phase permits.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2023-10-11
Current Status:
Passed
(2023-10-11: Chaptered by Secretary of State - Chapter 735, Statutes of 2023.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law, which is part of the Planning and Zoning Law, requires a local agency to compile a list of information needed to approve or deny a postentitlement phase permit, to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least 5 types of housing development projects in the jurisdiction, as specified, and to make those items available to all applicants for these permits no later than January 1, 2024. Existing law establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant and whether to approve or deny an application, as specified, and makes any failure to meet these time limits a violation of specified law. Existing law defines various terms for these purposes, including local agency to mean a city, county, or city and county, and postentitlement phase permit, among other things, to exclude a permit required and issued by a special district.
This bill would require a special district that receives an application from a housing development project for service from a special district or an application from a housing development project for a postentitlement phase permit, as specified, to provide written notice to the applicant of next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval. The bill would require the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with 26 units or more. The bill would define various terms for these purposes. By imposing additional duties on special districts, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, which is part of the Planning and Zoning Law, requires a local agency to compile a list of information needed to approve or deny a postentitlement phase permit, to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least 5 types of housing development projects in the jurisdiction, as specified, and to make those items available to all applicants for these permits no later than January 1, 2024. Existing law establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant and whether to approve or deny an application, as specified, and makes any failure to meet these time limits a violation of specified law. Existing law defines various terms for these purposes, including local agency to mean a city, county, or city and county, and postentitlement phase permit, among other things, to exclude a permit required and issued by a special district.
This bill would require a special district that receives an application from a housing development project for service from a special district or an application from a housing development project for a postentitlement phase permit, as specified, to provide written notice to the applicant of next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval. The bill would require the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with 26 units or more. The bill would define various terms for these purposes. By imposing additional duties on special districts, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, which is part of the Planning and Zoning Law, requires a local agency to compile a list of information needed to approve or deny a postentitlement phase permit, to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least 5 types of housing development projects in the jurisdiction, as specified, and to make those items available to all applicants for these permits no later than January 1, 2024. Existing law establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant and whether to approve or deny an application, as specified, and makes any failure to meet these time limits a violation of specified law. Existing law defines various terms for these purposes, including local agency to mean a city, county, or city and county, and postentitlement phase permit, among other things, to exclude a permit required and issued by a special district.
This bill would require a special district that receives an application from a housing development project for service from a special district or an application from a housing development project for a postentitlement phase permit, as specified, to provide written notice to the applicant or local agency of next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval or next steps in the review process. approval. The bill would require the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with more than 25 units. 26 units or more. The bill would define various terms for these purposes. By imposing additional duties on special districts, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, which is part of the Planning and Zoning Law, requires a local agency to compile a list of information needed to approve or deny a postentitlement phase permit, to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least 5 types of housing development projects in the jurisdiction, as specified, and to make those items available to all applicants for these permits no later than January 1, 2024. Existing law establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant and whether to approve or deny an application, as specified, and makes any failure to meet these time limits a violation of specified law. Existing law defines various terms for these purposes, including local agency to mean a city, county, or city and county, and postentitlement phase permit, among other things, to exclude a permit required and issued by a special district.
This bill would include a special district in the definition of local agency and would remove special districts from the exclusion in the definition of postentitlement phase permit. By imposing additional duties on special districts, the bill would impose a state-mandated local program. would require a special district that receives an application for a postentitlement phase permit, as specified, to provide written notice to the applicant or local agency of additional information that may be required to begin to review the application for service or approval or next steps in the review process. The bill would require the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with more than 25 units. By imposing additional duties on special districts, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, which is part of the Planning and Zoning Law, requires a local agency to compile a list of information needed to approve or deny a postentitlement phase permit, to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least 5 types of housing development projects in the jurisdiction, as specified, and to make those items available to all applicants for these permits no later than January 1, 2024. Existing law establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant and whether to approve or deny an application, as specified, and makes any failure to meet these time limits a violation of specified law. Existing law defines various terms for these purposes, including local agency to mean a city, county, or city and county, and postentitlement phase permit, among other things, to exclude a permit required and issued by a special district.
This bill would include a special district in the definition of local agency and would remove special districts from the exclusion in the definition of postentitlement phase permit. By imposing additional duties on special districts, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
(a)This section applies to both of the following:
(1)An application from a housing development project for service from a special district.
(2)An application from a housing development project for a postentitlement phase permit that a local agency deemed complete pursuant to subdivision (b) of Section 65913.3 that requires separate approval from a special district.
(b)A special district that receives an application pursuant to subdivision (a) shall provide written notice to the applicant, pursuant to the timelines specified in subdivision (c), of next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval.
(c)(1)For a housing development with 25 units or fewer, a special district shall provide the written notice required by subdivision (b) within 30 business days of receipt of the application.
(2)For a housing development with 26 units or more, a special district shall provide the written notice required by subdivision (b) within 60 business days of receipt of the application.
(d)(1)After receiving notice that an application requires additional information pursuant to subdivision (b), an applicant may provide the requested information directly to the special district.
(2)A special district that receives additional information pursuant to paragraph (1) shall respond to the applicant with a notice that contains the information or next steps required by subdivision (b) in the applicable time period described by subdivision (c).
(3)A special district shall continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required in the applicable time periods described in subdivision (c) of each submission by the applicant.
(e)This section does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
(f)This section does not require the special district to approve the application or serve the housing development project within a specified time period.
(g)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as defined in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any city, county, or city and county.
(3)Postentitlement phase permit has the same meaning as defined in Section 65913.3.
(4)Special district has the same meaning as defined in Section 56036.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
(a)This section applies to both of the following:
(1)An application from a housing development project for service from a special district.
(2)An application from a housing development project for a postentitlement phase permit that a local agency deemed complete pursuant to subdivision (b) of Section 65913.3 that requires separate approval from a special district.
(b)A special district that receives an application pursuant to subdivision (a) shall provide written notice to the applicant, pursuant to the timelines specified in subdivision (c), of next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval.
(c)(1)For a housing development with 25 units or fewer, a special district shall provide the written notice required by subdivision (b) within 30 business days of receipt of the application.
(2)For a housing development with 26 units or more, a special district shall provide the written notice required by subdivision (b) within 60 business days of receipt of the application.
(d)(1)After receiving notice that an application requires additional information pursuant to subdivision (b), an applicant may provide the requested information directly to the special district.
(2)A special district that receives additional information pursuant to paragraph (1) shall respond to the applicant with a notice that contains the information or next steps required by subdivision (b) in the applicable time period described by subdivision (c).
(3)A special district shall continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required in the applicable time periods described in subdivision (c) of each submission by the applicant.
(e)This section does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
(f)This section does not require the special district to approve the application or serve the housing development project within a specified time period.
(g)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as defined in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any city, county, or city and county.
(3)Postentitlement phase permit has the same meaning as defined in Section 65913.3.
(4)Special district has the same meaning as defined in Section 56036.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
(a)This section applies to an both of the following:
(1)An application from a housing development project for service or approval from a special district or an application for service or approval district.
(2)An application from a housing development project for a postentitlement phase permit that a local agency deemed complete pursuant to subdivision (b) of Section 65913.3 that requires separate approval from a special district.
(b)A special district that receives an application pursuant to subdivision (a) shall provide written notice to the applicant or local agency of applicant, pursuant to the timelines specified in subdivision (c), of next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval or next steps in the review process. approval.
(c)(1)For a housing development with 25 units or fewer, a special district shall provide the written notice required by subdivision (b) within 30 business days of receipt of the application.
(2)For a housing development with more than 25 units, 26 units or more, a special district shall provide the written notice required by subdivision (b) within 60 business days of receipt of the application.
(d)(1)After receiving notice that an application requires additional information pursuant to subdivision (b), an applicant may provide the requested information directly to the special district.
(2)A special district that receives additional information pursuant to paragraph (1) shall respond to the applicant with a notice that contains the information or next steps required by subdivision (b) in the applicable time period described by subdivision (c).
(3)A special district shall continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required in the applicable time periods described in subdivision (c) of each submission by the applicant.
(e)This section does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
(f)This section does not require the special district to approve the application or serve the housing development project within a specified time period.
(g)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as defined in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any city, county, or city and county.
(3)Postentitlement phase permit has the same meaning as defined in Section 65913.3.
(4)Special district has the same meaning as defined in Section 56036.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
(a)This section applies to an application for service or approval from a special district or an application for service or approval that a local agency deemed complete pursuant to subdivision (b) of Section 65913.3 that requires separate approval from a special district.
(b)A special district that receives an application pursuant to subdivision (a) shall provide written notice to the applicant or local agency of additional information that may be required to begin to review the application for service or approval or next steps in the review process.
(c)(1)For a housing development with 25 units or fewer, a special district shall provide the written notice required by subdivision (b) within 30 business days of receipt of the application.
(2)For a housing development with more than 25 units, a special district shall provide the written notice required by subdivision (b) within 60 business days of receipt of the application.
(d)(1)After receiving notice that an application requires additional information pursuant to subdivision (b), an applicant may provide the requested information directly to the special district.
(2)A special district that receives additional information pursuant to paragraph (1) shall respond to the applicant with a notice that contains the information or next steps required by subdivision (b) in the applicable time period described by subdivision (c).
(3)A special district shall continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required in the applicable time periods described in subdivision (c) of each submission by the applicant.
(e)This section does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
(a)(1)A local agency shall compile one or more lists that shall specify in detail the information that will be required from any applicant for a postentitlement phase permit. The local agency may revise the lists of information required from an applicant. Any revised list shall not apply to any permit pending review.
(2)A local agency shall post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least five types of housing development projects in the jurisdiction, including, but not limited to, accessory dwelling unit, duplex, multifamily, mixed use, and townhome.
(3)A local agency shall make the items required by paragraphs (1) and (2) available on the agencys internet website no later than January 1, 2024.
(b)(1)(A)A local agency shall determine whether an application for a postentitlement phase permit is complete and provide written notice of this determination to the applicant not later than 15 business days after the local agency received the application.
(B)If the local agency determines an application is incomplete, the local agency shall provide the applicant with a list of incomplete items and a description of how the application can be made complete. The list shall be limited to incomplete items that are included on the lists required by paragraph (1) of subdivision (a). The list and description shall be provided with the written notice required by subparagraph (A).
(2)(A)After receiving a notice that the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency.
(B)In the review of an application submitted pursuant to subparagraph (A), the local agency shall not require the application to include an item that was not included in the list required by subparagraph (B) of paragraph (1).
(C)If an applicant submits an application pursuant to subparagraph (A), the local agency shall determine whether the additional application has remedied all incomplete items listed in the determination issued pursuant to subparagraph (B) of paragraph (1). This additional application is subject to the timelines and requirements specified in subparagraph (A) of paragraph (1).
(3)If a local agency does not make a timely determination as required by paragraph (1) or (2) and the application or resubmitted application states that it is for a postentitlement phase permit, the application or resubmitted application shall be deemed to be complete for the purposes of this chapter.
(c)(1)For housing development projects with 25 units or fewer, a local agency shall complete the review and either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application on each postentitlement phase permit requested, and immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 30 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(2)For housing development projects with 26 units or more, a local agency shall complete the review and either return in writing a full set of comments to the applicant with a comprehensive request for revisions or return the approved permit application on each postentitlement phase permit requested, and immediately transmit that determination to the applicant by electronic mail and, if applicable, by posting the response on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 not later than 60 business days after the local agency determines that an application for a postentitlement phase permit is complete pursuant to subdivision (b).
(3)(A)The time limits in this subdivision shall not apply if the local agency makes written findings within the time limits specified in paragraph (1) or (2) based on substantial evidence in the record that the proposed postentitlement phase permit might have a specific, adverse impact on public health or safety and that additional time is necessary to process the application.
(B)For the purposes of this paragraph, specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(4)If the local agency requires review of the application by an outside entity, the time limits in this subdivision shall be tolled until the outside entity completes the review and returns the application to the local agency, at which point the local agency shall complete the review within the time remaining under the time limit, provided that the local agency notifies the applicant within three business days by electronic mail and, if applicable, by posting the notification on its internet website in the manner prescribed in subdivision (b) of Section 65913.3.5 of the tolling and resumption of the time limit.
(d)(1)If a local agency finds that a complete application is noncompliant, the local agency shall provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the time limits specified in subdivision (c).
(2)The local agency shall provide the list and description authorized by paragraph (1) when it transmits its determination to the applicant as required by subdivision (c).
(3)If a local agency denies a postentitlement phase permit application based on a determination that the application is noncompliant, the applicant may attempt to remedy the application.
(4)If an applicant submits an application pursuant to paragraph (3), the additional application is subject to the timelines of a new application as specified in subdivision (c).
(e)(1)If a postentitlement phase permit is determined to be incomplete under subdivision (b) or denied or determined to be noncompliant under subdivision (c) or (d), the local agency shall provide a process for the applicant to appeal that decision in writing to the governing body of the agency or, if there is no governing body, to the director of the agency, as provided by that agency. A city or county shall provide that the right of appeal is to the governing body or, at their option, the planning commission, or both.
(2)(A)With respect to a postentitlement phase permit concerning housing development projects with 25 units or fewer, a local agency on the appeal shall provide a final written determination by not later than 60 business days after receipt of the applicants written appeal. The fact that an appeal is permitted to both the planning commission and to the governing body does not extend the 60-business-day period.
(B)With respect to a postentitlement phase permit concerning housing development projects with 26 units or more, a local agency on the appeal shall provide a final written determination by not later than 90 business days after receipt of the applicants written appeal. The fact that an appeal is permitted to both the planning commission and to the governing body does not extend the 90-business-day period.
(f)If a local agency fails to meet the time limits in this section, it shall be in violation of Section 65589.5.
(g)This section does not place limitations on the amount of feedback that a local agency may provide or revisions that a local agency may request of an applicant.
(h)For residential or residential mixed-use developments that are subject to the requirements set forth in Section 65913.4, the provisions of paragraph (2) of subdivision (h) of Section 65913.4 shall apply. Permits for these developments that are subject to paragraph (2) of subdivision (h) of Section 65913.4 shall not be in conflict with the requirements of this section. The local agency shall comply with both sets of standards.
(i)This section does not preclude an applicant and a local agency from mutually agreeing to an extension of any time limit provided by this section. However, a local agency shall not require an agreement as a condition of accepting the application for, or processing of, a postentitlement phase permit, unless the agreement is obtained for the purpose of permitting concurrent processing of related approvals or an environmental review on the same housing development project.
(j)For purposes of this section, the following definitions apply:
(1)Housing development project has the same meaning as in paragraph (3) of subdivision (b) of Section 65905.5.
(2)Local agency means any county, city, or city and county. county, or special district.
(3)(A)Postentitlement phase permit includes all nondiscretionary permits and reviews filed after the entitlement process has been completed that are required or issued by the local agency to begin construction of a development that is intended to be at least two-thirds residential, excluding discretionary and ministerial planning permits, entitlements, and other permits and reviews that are covered under Chapter 4.5 (commencing with Section 65920). A postentitlement phase permit includes, but is not limited to, all of the following:
(i)Building permits, and all inter-departmental review required for the issuance of a building permit.
(ii)Permits for minor or standard off-site improvements.
(iii)Permits for demolition.
(iv)Permits for minor or standard excavation and grading.
(B)A local agency may identify by ordinance a threshold for determining whether a permit constitutes a minor or standard permit for the purposes of this paragraph, which shall be supported by written findings adopted by the jurisdiction.
(C)A postentitlement phase permit does not include a permit required and issued by the California Coastal Commission, a special district, a utility that is not owned and operated by a local agency, or any other entity that is not a city, county, or city and county. county, or special district.
SEC. 2.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
|
Date
|
Status
|
|---|---|
| Oct 11, 2023 | Chaptered by Secretary of State - Chapter 735, Statutes of 2023. |
| Oct 11, 2023 | Approved by the Governor. |
| Sep 12, 2023 | Enrolled and presented to the Governor at 2 p.m. |
| Sep 5, 2023 | In Assembly. Ordered to Engrossing and Enrolling. |
| Sep 5, 2023 | Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0. Page 2369.). |
| Aug 15, 2023 | Read second time. Ordered to third reading. |
| Aug 14, 2023 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Jul 11, 2023 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 11. Noes 0.) (July 10). Re-referred to Com. on APPR. |
| Jun 21, 2023 | From committee: Do pass and re-refer to Com. on HOUSING. (Ayes 8. Noes 0.) (June 21). Re-referred to Com. on HOUSING. |
| Jun 2, 2023 | In committee: Hearing postponed by committee. |
| May 17, 2023 | Referred to Coms. on GOV. & F. and HOUSING. |
| May 4, 2023 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 4, 2023 | Read third time. Passed. Ordered to the Senate. (Ayes 75. Noes 0. Page 1461.) |
| Apr 27, 2023 | Read second time. Ordered to Consent Calendar. |
| Apr 26, 2023 | From committee: Do pass. To Consent Calendar. (Ayes 16. Noes 0.) (April 26). |
| Apr 17, 2023 | Re-referred to Com. on APPR. |
| Apr 13, 2023 | Read second time and amended. |
| Apr 12, 2023 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 8. Noes 0.) (April 12). |
| Mar 23, 2023 | From committee: Do pass and re-refer to Com. on H. & C.D. (Ayes 7. Noes 0.) (March 22). Re-referred to Com. on H. & C.D. |
| Mar 13, 2023 | Re-referred to Com. on L. GOV. |
| Mar 9, 2023 | From committee chair, with author's amendments: Amend, and re-refer to Com. on L. GOV. Read second time and amended. |
| Feb 2, 2023 | Referred to Coms. on L. GOV. and H. & C.D. |
| Jan 25, 2023 | From printer. May be heard in committee February 24. |
| Jan 24, 2023 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Sep 5, 2023 | Assembly 3rd Reading AB281 Grayson et al. By Caballero | Senate Floor |
Passed |
|
| Jul 10, 2023 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Housing |
Passed |
|
| Jun 21, 2023 | Do pass, but first be re-referred to the Committee on [Housing] | Senate Standing Committee on Governance and Finance |
Passed |
|
| May 4, 2023 | AB 281 Grayson Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Apr 26, 2023 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 12, 2023 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Housing and Community Development |
Passed |
|
| Mar 22, 2023 | Do pass and be re-referred to the Committee on [Housing and Community Development] | Assembly Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Abundant Housing LA | ** Support | |
| Bay Area Council | ** Support | |
| California Apartment Association | ** Support | |
| California Building Industry Association | ** Support | |
| California Housing Consortium | ** Support | |
| California YIMBY | ** Support | |
| Circulate San Diego | ** Support | |
| CivicWell | ** Support | |
| Council of Infill Builders | ** Support | |
| Dignitymoves | ** Support | |
| East Bay YIMBY | ** Support | |
| Facebook, Inc. | ** Support | |
| Fieldstead And Company, Inc. | ** Support | |
| Grow the Richmond | ** Support | |
| Habitat For Humanity California | ** Support | |
| Housing Action Coalition | ** Support | |
| How to ADU | ** Support | |
| Meta | ** Support | |
| MidPen Housing | ** Support | |
| Mountain View YIMBY | ** Support | |
| Napa-Solano for Everyone | ** Support | |
| National Association Of Hispanic Real Estate Professionals | ** Support | |
| Non-Profit Housing Association of Northern California | ** Support | |
| Northern Neighbors | ** Support | |
| Peninsula for Everyone | ** Support | |
| People For Housing Orange County | ** Support | |
| Progress Noe Valley | ** Support | |
| Sand Hill Property Company | ** Support | |
| San Francisco-Marin Food Bank | ** Support | |
| San Francisco Yimby | ** Support | |
| Santa Cruz Yimby | ** Support | |
| Santa Rosa Yimby | ** Support | |
| Silicon Valley Leadership Group | ** Support | |
| SLO County YIMBY | ** Support | |
| South Bay Yimby | ** Support | |
| Southside Forward | ** Support | |
| SPUR | ** Support | |
| The Two Hundred | ** Support | |
| Ventura County YIMBY | ** Support | |
| Yimby Action | ** Support |
oSENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 281 |
THIRD READING
Bill No: AB 281
Author: Grayson (D) and Robert Rivas (D)
Amended: 4/13/23 in Assembly
Vote: 21
SENATE GOVERNANCE & FIN. COMMITTEE: 8-0, 6/21/23
AYES: Caballero, Seyarto, Blakespear, Dahle, Durazo, Glazer, Skinner, Wiener
SENATE HOUSING COMMITTEE: 11-0, 7/10/23
AYES: Wiener, Ochoa Bogh, Blakespear, Caballero, Cortese, McGuire, Padilla, Seyarto, Skinner, Umberg, Wahab
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 75-0, 5/4/23 (Consent) - See last page for vote
SUBJECT: Planning and zoning: housing: postentitlement phase permits
SOURCE: Housing Action Coalition
DIGEST:
This bill requires special districts to comply with specified timeframes, similar to those for cities and counties, when reviewing and approving postentitlement phase permit applications from housing developers.
ANALYSIS:
Existing law:
- Allows a city or a county to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public, including land use authority.
- Requires, pursuant to Planning and Zoning Law, every city and county to adopt a general plan that sets out planned uses for all of the area covered by the plan, and requires the general plan to include seven (sometimes eight) mandatory elements, including a land use element.
- Requires major land use decisions by cities and counties, such as development permitting and subdivisions of land, to be consistent with their adopted general plans.
- Establishes the Permit Streamlining Act (PSA), which, among other things, establishes time limits within which state and local government agencies must either approve or disapprove permits to entitle a development.
- Requires cities and counties to review and approve “post-entitlement permits” that are necessary to construct a housing development project within certain timeframes (AB 2234, R. Rivas, Chapter 651, Statutes of 2022). Specifically, a local agency has:
- 15 business days from receiving an application for a post-entitlement permit to determine whether the application is complete and notify the applicant of its determination. If the application is not complete, the city or county must provide the applicant with a list of incomplete items and a description of how the application can be made complete;
- 30 business days after determining an application is complete to approve or deny the application for a project containing 25 units or fewer and 60 business days for projects containing 26 or more units. If the local agency finds the application noncompliant, it must also provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied.
- Requires cities and counties to establish a process for appealing determinations on post-entitlement projects.
- Deems a failure to meet the timelines above a violation of the Housing Accountability Act, and deems an application complete if a city or county fails to make a determination of completeness within the required timeframe.
- Creates various “special districts” as limited-purpose local governments that provide a specific type of governmental service.
This bill:
- Requires special districts to respond in writing to the following inquiries when they receive an application from a housing development for service, or a post-entitlement permit another local agency deemed complete that requires separate approval from the special district:
- Within 30 business days for a housing development project with 25 units or fewer; or
- Within 60 business days for a housing development project with 26 units or more.
- Requires the written response to include the next steps in the review process, including any information required to begin, or continue the review process.
- Requires a special district to review subsequent submissions by the applicant to determine additional relevant information, and provide written notice of the next steps or additional information required within those timeframes.
- Provides that this bill does not:
- Require the special district to approve the application or serve the housing development project within a specified time; or
- Limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
Background
The PSA requires public agencies to act fairly and promptly on applications for development proposals, including housing developments. Under the PSA, public agencies have 30 days to determine whether applications for development projects are complete and to request additional information; failure the public agency to act results in an application being “deemed complete.” The PSA applies to the discretionary approval phase of a development review process. This is the phase where the local agency, in its discretion, decides whether to approve the concept outlined in the development proposal. Since the local agency is exercising discretion, the approval decision is subject to the California Environmental Quality Act.
A development proposal a local agency approves and entitles must still obtain approval for a range of non-discretionary permits to ensure it complies with state and local building codes, and other measures that protect public health, safety and the environment. These post-entitlement permits can cover demolition, paving, site remediation, and other activities necessary for the physical construction of the proposed project and are only applied for and issued after the project has been “entitled”—meaning the project has received the necessary planning approvals.
AB 2234 (R. Rivas, 2022) established procedures and timelines for cities and counties to process applications for post-entitlement permits, as described above. However, these requirements do not apply to special districts, which often must either review post-entitlements or process applications to serve new housing with services such as water, sewer, or electricity. The Housing Action Coalition wants to apply similar requirements for the processing of post-entitlement permits to special districts.
Comments
- Purpose of the bill. According to the author, “AB 2234 (Robert Rivas, 2022) was a straightforward measure that helped standardize the process for the review of post-entitlement building permits, requiring local agencies to post information related to post-entitlement permits for housing projects, and established timelines for local agencies to process these permits, depending on the size of a development. While AB 2234 was an important step to help prevent delays in the post-entitlement process, it did not apply to special districts, who often have to provide feedback to local governments before they issue the post-entitlement permits. AB 281 would apply similar timelines for special districts to provide feedback on a post-entitlement permit that has been deemed complete by a local agency. This is a good government bill that seeks to apply similar standards across the board for the review of post-entitlement permits, and would reduce delays and barriers to housing production.”
- Sure, but will it work? AB 2234 did not apply its expedited post-entitlement review timelines to applications from a housing development for services provided by a special district, or post-entitlement permits another local agency deemed complete that require separate approval from a special district. While AB 281 is similar to AB 2234 in that it requires special districts to process these applications within 30 or 60 days depending on the size of the development, AB 281 does not deem the applications complete when those timeframes expire, or require the special district to begin serving the development according to these timeframes. Instead, it requires special districts to provide development proponents with a written notice within these timeframes explaining the next steps in the review process, and any additional information necessary to process the application. This ensures special districts have to respond to these applications in a timely manner, but does not require them to provide service differently than they otherwise would. However, some special districts may still face challenges complying with AB 281’s 30- or 60-day requirements due to staffing or other resource constraints. When special districts need to increase their capacity to review applications, they may use overtime or contract with third-party firms, and can recover those costs through fees.
Related/Prior Legislation
AB 1114 (Haney, 2023) expands the scope of post-entitlement phase permits subject to mandated processing timelines to include discretionary permits.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 8/16/23)
Housing Action Coalition (source)
Abundant Housing LA
Bay Area Council
California Apartment Association
California Building Industry Association
California Housing Consortium
California YIMBY
Circulate San Diego
CivicWell
Council of Infill Builders
DignityMoves
East Bay YIMBY
Facebook, Inc.
Fieldstead and Company, Inc.
Grow the Richmond
Habitat for Humanity California
How to ADU
Meta
MidPen Housing
Mountain View YIMBY
National Association of Hispanic Real Estate Professionals
Non-Profit Housing Association of Northern California
Northern Neighbors
Peninsula for Everyone
People for Housing Orange County
Progress Noe Valley
San Francisco YIMBY
Sand Hill Property Company
Santa Cruz YIMBY
Santa Rosa YIMBY
Silicon Valley Leadership Group
SLO County YIMBY
South Bay YIMBY
Southside Forward
SPUR
Ventura County YIMBY
YIMBY Action
OPPOSITION: (Verified 8/16/23)
None received
ASSEMBLY FLOOR: 75-0, 5/4/23
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, Mathis, McCarty, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Ward, Weber, Wilson, Wood, Zbur, Rendon
NO VOTE RECORDED: Flora, McKinnor, Muratsuchi, Wallis, Wicks
Prepared by: Anton Favorini-Csorba / GOV. & F. / (916) 651-4119
8/16/23 10:25:04
**** END ****
SENATE COMMITTEE ON HOUSING
Senator Scott Wiener, Chair
2023 - 2024 Regular
Bill No: AB 281 Hearing Date: 7/10/2023
Author: | Grayson | ||
Version: | 4/13/2023 | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Alison Hughes | ||
SUBJECT: Planning and zoning: housing: postentitlement phase permits
DIGEST: This bill requires special districts to comply with specified timeframes, similar to those for cities and counties, when reviewing and approving postentitlement phase permit applications from housing developers.
ANALYSIS:
Existing law:
- Requires major land use decisions by cities and counties, such as development permitting and subdivisions of land, to be consistent with their adopted general plans.
- Establishes the Permit Streamlining Act (PSA), which, among other things, establishes time limits within which state and local government agencies must either approve or disapprove permits to entitle a development.
- Defines “postentitlement phase permit” as follows:
- Includes all nondiscretionary permits required by the local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Building permits, and all inter-departmental review required for the issuance of a building permit;
- Permits for minor or standard off-site improvements;
- Permits for demolition; and
- Permits for minor or standard excavation and grading.
- Excludes discretionary or ministerial planning permits, among others.
- Excludes a permit required and issued by the California Coastal Commission, a special district, or a utility that is not owned and operated by a local agency, or any other entity that is not a city or county.
- Includes all nondiscretionary permits required by the local agency after the entitlement process to begin construction of a development that is intended to be at least two-thirds residential, excluding specified planning permits, entitlements, and other permits. These permits include, but are not limited to, all of the following:
- Requires a local agency, defined to include a city or county, to compile one or more lists of information that will be required from any applicant for a postentitlement phase permit, as specified.
- Specifies a process for approving postentitlement permits, as specified.
This bill:
- Requires a special district to respond to an application from a housing development project for service from the special district or for a post-entitlement phase permit a local agency has deemed complete but requires separate approval from the special district.
- Requires a special district’s response to be in writing and to include, pursuant to the timelines in 3) below, next steps in the review process, including additional information that may be required of the applicant to begin to review the application for service or approval.
- Requires a special district to respond within 30 business days for a housing development project with 25 units or fewer, and within 60 business days for a housing development project with 26 units or more.
- Specifies this bill does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or local agency.
- Specifies this bill does not require a special district to approve an application or serve a housing development within a specified time-period.
COMMENTS:
- Author’s statement. “AB 2234 (Robert Rivas, 2022) was a straightforward measure that helped standardize the process for the review of post-entitlement building permits, requiring local agencies to post information related to post-entitlement permits for housing projects, and established timelines for local agencies to process these permits, depending on the size of a development. While AB 2234 was an important step to help prevent delays in the post-entitlement process, it did not apply to special districts, who often have to provide feedback to local governments before they issue the post-entitlement permits. AB 281 would apply similar timelines for special districts to provide feedback on a post-entitlement permit that has been deemed complete by a local agency. This is a good government bill that seeks to apply similar standards across the board for the review of post-entitlement permits, and would reduce delays and barriers to housing production.”
- Zoning and land use approvals, generally. Cities and counties enact zoning ordinances to implement their general plans. Zoning determines the type of housing that can be built. In addition, before building new housing, housing developers must obtain one or more permits from local planning departments and must also obtain approval from local planning commissions, city councils, or county board of supervisors. A zoning ordinance may be subject to the California Environmental Quality Act (CEQA) if it will have a significant impact upon the environment. The adoption of ADU ordinances, however, are explicitly exempt from CEQA. There are also several statutory exemptions that provide limited environmental review for projects that are consistent with a previously adopted general plan, community plan, specific plan, or zoning ordinance. Some housing projects can be permitted by city or county planning staff ministerially or without further approval from elected officials. Projects reviewed ministerially, or by-right, require only an administrative review designed to ensure they are consistent with existing general plan and zoning rules, as well as meet standards for building quality, health, and safety. Most large housing projects are not allowed ministerial review. Instead, these projects are vetted through both public hearings and administrative review. Most housing projects that require discretionary review and approval are subject to review under the CEQA, while projects permitted ministerially generally are not.
The scale of the proposed development, as well as the existing environmental setting determine the degree of local review that occurs. For larger developments, the local entitlement process commonly requires multiple discretionary decisions regarding the subdivision of land, environmental review per CEQA, design review, and project review by the local agency’s legislative body (city council or county board of supervisors) or by a planning commission, to whom the legislative body has delegated.
- The Permit Streamlining Act. The 1977 Permit Streamlining Act (PSA) requires public agencies to act fairly and promptly on applications for development proposals, including housing developments. Public agencies must develop lists of the information that applicants must provide in order for a development application, including an application for housing, to be complete and explain the criteria they will use to review permit applications. Public agencies have 30 days to determine whether applications for development projects are complete and request additional information; failure to act results in an application being “deemed complete.” If an application is incomplete, the PSA requires local agencies to exhaustively list all information needed to make a development application complete and prohibits local agencies from asking for additional information that was not initially required.
Once a complete application for a development has been submitted, the PSA requires local officials to act within a specific time-period after completing any environmental review documents required under CEQA, ranging between 60 and 180 days. If the local government fails to approve or disapprove the application in the applicable time-period, the application is deemed approved.
- Nondiscretionary Postentitlement Permits. The PSA establishes timelines for agencies to determine whether a permit for an entitlement is complete and timelines for approving or denying a development proposal that is deemed complete. Once a development proposal is approved by the local agency, the developer is still required to submit a range of nondiscretionary permits to the local agency for approval in order to actually complete the work to construct the building. These permits can include building permits and other permits for: demolition; grading; excavation; electrical, plumbing, or mechanical work; encroachment in the public right-of-way; roofing; water and sewer connections or septic systems; fire sprinklers; and home occupations.
The PSA applies to the discretionary approval phase of a development review process, this is the phase where the local agency, in its discretion, decides whether or not it approves of the concept outlined in the development proposal. Because the local agency is exercising discretion, these approval decisions are subject to CEQA. Once the development proposal is approved by the local agency, the next phase of review involves the ministerial review of objective permits associated with the development proposal that ensure the proposal is compliant with state and local building codes and other measures that protect public health, safety and the environment. The timelines established in the PSA do not apply to these nondiscretionary permits.
- Timelines for postentitlement permits. AB 2234 (Rivas, Chapter651, Statutes of 2022) required cities and counties to process non-discretionary permits in an expedited manner. First, the city or county must determine whether an application is complete, and notify the applicant within 15 days after receiving the application. If the local agency determines an application is incomplete, the local agency must provide the applicant with a list of incomplete items and a description of how the application can be made complete. After receiving a notice the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency. Upon receipt of a corrected application, the local agency must notify the applicant within 15 business days whether the additional application has remedied all incomplete items. If a local agency does not meet the timelines required for determining whether an application is complete, and the application or resubmitted application states it is for a postentitlement phase permit, AB 2234 deems complete the application or resubmitted application.
Cities and counties must then complete review of the application within 30 days for projects with 25 units or less, and 60 days for projects 26 units or more, unless the city or county makes a finding the permit might have a specific, adverse impact on public health or safety, within the applicable time limit. Cities and counties must also establish an appeals process. If an applicant appeals, the local agency must make a final determination within specified timelines.
- Special treatment. AB 2234 did not apply to post-entitlement permits issued by special districts. Special districts are limited-purpose local governments – separate from cities and counties. Within their boundaries, special districts provide focused public services such as fire protection, sewers, water supply, electricity, parks, recreation, sanitation, cemeteries, and libraries.
This bill requires special districts to act within certain periods on these post-entitlement projects. Specifically, the special district has to respond within 30 days for a housing project with 25 units or fewer, or 60 days with greater than 26 units. The written notice must include the next steps in the review process, including any information required to begin, or continue the review process. After receiving notice that an application requires additional information, an applicant may provide the requested information directly to the special district. A special district must continue to review each submission to determine additional relevant information and provide written notice of the next steps or additional information required within those timeframes.
- Here, there, and everywhere. This bill was heard in the Senate Governance and Finance Committee on June 21 and received a vote of 8-0.
Related Legislation:
AB 2234 (Rivas, Chapter 651, Statutes of 2022) — required cities and counties to process non-discretionary permits in an expedited manner, as specified.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
POSITIONS: (Communicated to the committee before noon on Wednesday,
July 5, 2023.)
SUPPORT:
Housing Action Coalition (Sponsor)
Abundant Housing LA
Bay Area Council
California Apartment Association
California Building Industry Association (CBIA)
California Housing Consortium
California YIMBY
Circulate San Diego
CivicWell
Council of Infill Builders
Dignitymoves (UNREG)
East Bay YIMBY
Facebook, INC.
Fieldstead and Company, INC.
Grow the Richmond
Habitat for Humanity California
How to ADU
Midpen Housing
Midpen Housing Corporation
Mountain View YIMBY
National Association of Hispanic Real Estate Professionals
Non-profit Housing Association of Northern California (NPH)
Northern Neighbors
Peninsula for Everyone
People for Housing Orange County
Progress Noe Valley
San Francisco Bay Area Planning and Urban Research Association (SPUR)
San Francisco YIMBY
Sand Hill Property Company
Santa Cruz YIMBY
Santa Rosa YIMBY
Silicon Valley Leadership Group
SLO County YIMBY
South Bay YIMBY
Southside Forward
Ventura County YIMBY
YIMBY Action
OPPOSITION:
None received.
-- END --
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Anna M. Caballero, Chair
2023 - 2024 Regular
Bill No: | AB 281 | Hearing Date: | 6/21/23 |
Author: | Grayson | Tax Levy: | No |
Version: | 4/13/23 | Fiscal: | Yes |
Consultant: | Peterson | ||
Planning and zoning: housing: postentitlement phase permits
Requires special districts to comply with specified timeframes, similar to those for cities and counties, when reviewing and approving postentitlement phase permit applications from housing developers.
Background
Planning and Zoning Law. The California Constitution allows cities and counties to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental ‘police power’ that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public, including land use authority. Cities and counties enforce this land use authority through zoning regulations, as well as through an “entitlement process” for obtaining both discretionary and ministerial approvals.
The scale of the proposed development, as well as the environmental setting, determine the degree of local review that occurs. For example, the local entitlement process for larger developments often requires multiple discretionary decisions regarding the subdivision of land, environmental review per the California Environmental Quality Act (CEQA), design review, and project review by the local agency’s legislative body (city council or county board) or by a planning commission the legislative body has delegated this authority to.
The Permit Streamlining Act (PSA). The PSA requires public agencies to act fairly and promptly on applications for development proposals, including housing developments. Under the PSA, public agencies have 30 days to determine whether applications for development projects are complete and to request additional information; failure the public agency to act results in an application being “deemed complete.” The PSA applies to the discretionary approval phase of a development review process. This is the phase where the local agency, in its discretion, decides whether to approve the concept outlined in the development proposal. Since the local agency is exercising discretion, the approval decision is subject to CEQA.
Non-discretionary postentitlement permits. A development proposal a local agency approves and entitles must still r obtain approval for a range of non-discretionary permits to ensure it complies with state and local building codes, and other measures that protect public health, safety and the environment. These postentitlement permits can cover demolition, paving, site remediation, and other activities necessary for the physical construction of the proposed project and are only issued after the project has undergone discretionary review and been approved. This stage of the review process is often ministerial, as these particular postentitlement permits are typically objective in nature.
Generally, once a local agency invests the time and effort to approve and entitle a development proposal, there is an incentive for the agency to process the postentitlement permits in a timely manner. AB 2234 (Rivas, 2022) requires cities and counties to process non-discretionary permits in an expedited manner.
First, the city or county must determine whether an application is complete, and notify the applicant within 15 days after receiving the application. If the local agency determines an application is incomplete, the local agency must provide the applicant with a list of incomplete items and a description of how the application can be made complete, but the local agency cannot request new information that was not on the original list of needed information. After receiving a notice the application was incomplete, an applicant may cure and address the items that are deemed to be incomplete by the local agency. Upon receipt of a corrected application, the local agency must notify the applicant within 15 business days whether the additional application has remedied all incomplete items. If a local agency does not meet the timelines required for determining whether an application is complete, and the application or resubmitted application states it is for a postentitlement phase permit, AB 2234 deems complete the application or resubmitted application.
Cities and counties must then complete review of the application within 30 days for projects with 25 units or less, and 60 days for projects 26 units or more, unless the city or county makes a finding the permit might have a specific, adverse impact on public health or safety, within the applicable time limit. If a city or county finds a complete application is noncompliant, it must provide the applicant with a list of items that are noncompliant and a description of how the application can be remedied by the applicant within the applicable time limit, and must allow the applicant to correct the application. Cities and counties must establish an appeals process. If an applicant appeals, the local agency must make a final determination within:
- 60 business days of the appeal for a project of 25 units or fewer; or
- 90 business days of the appeal for a project of 26 units or more.
AB 2234 also requires cities and counties to compile one or more lists of information that will be required from any applicant for a postentitlement permit. Cities and counties can revise these lists, but revised lists cannot apply to pending permit reviews. The city or county must post an example of a complete set of postentitlement permits for at least five types of housing projects. Cities and counties must post these lists and examples by January 1, 2024.
Special districts. Special districts are limited purpose local governments – separate from cities and counties. Within their boundaries, special districts provide focused public services such as fire protection, sewers, water supply, electricity, parks, recreation, sanitation, cemeteries, and libraries.
AB 2234 does not apply to special districts. The Housing Action Coalition wants to apply provisions of AB 2234 to special districts that approve permits to further expedite the development process.
Proposed Law
Assembly Bill 281 requires special districts to respond in writing to the following inquiries when they receive an application from a housing development for service, or a post entitlement permit another local agency deemed complete that requires separate approval from the special district:
- Within 30 business days for a housing development project with 25 units or fewer; or
- Within 60 business days for a housing development project with 26 units or more.
The written notice must include the next steps in the review process, including any information required to begin, or continue the review process. After receiving notice an application requires additional information, an applicant may provide the requested information directly to the special district. A special district must continue to review each submission to determine additional relevant information, and provide written notice of the next steps or additional information required within those timeframes.
AB 281 does not require the special district to approve the application or serve the housing development project within a specified time.
The measure also provides it does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or to a local agency.
The measure defines its terms.
State Revenue Impact
No estimate.
Comments
1. Purpose of the bill. According to the author, “AB 2234 (Robert Rivas, 2022) was a straightforward measure that helped standardize the process for the review of post-entitlement building permits, requiring local agencies to post information related to post-entitlement permits for housing projects, and established timelines for local agencies to process these permits, depending on the size of a development. While AB 2234 was an important step to help prevent delays in the post-entitlement process, it did not apply to special districts, who often have to provide feedback to local governments before they issue the post-entitlement permits. AB 281 would apply similar timelines for special districts to provide feedback on a post-entitlement permit that has been deemed complete by a local agency. This is a good government bill that seeks to apply similar standards across the board for the review of post-entitlement permits, and would reduce delays and barriers to housing production.”
2. Sure, but will it work? AB 2234 did not extend its expedited postentitlement review timelines to applications from a housing development for services provided by a special district, or post entitlement permits another local agency deemed complete that require separate approval from a special district. While AB 281 is similar to AB 2234 in that it requires special districts to process these applications within 30 or 60 days depending on the size of the development, AB 281 does not deem the applications approved when those timeframes expire, or require the special district to begin serving the development according to these timeframes. Instead, it requires special districts to provide development proponents with a written notice within these timeframes explaining the next steps in the review process, and any additional information necessary to process the application. This ensures special districts have to respond to these applications in a timely manner, but does not require them to provide service differently than they otherwise would. However, some special districts may still face challenges complying with AB 281’s 30- or 60-day requirements due to staffing or other resource constraints. When special districts need to increase their capacity to review applications, they may use overtime or contract with third-party firms, and can recover those costs through fees.
3. Help me help you. Many of the same groups that want to see faster permit processing are also concerned about the fees that local agencies charge to process their applications. AB 281 follows in AB 2234’s footsteps by requiring special districts to review permits within specified timeframes. Complicated building permits may take many staff hours to review, meaning local governments may have to increase staffing to meet the timelines in the bill, and increase fees to support them. These mandates could require additional expenditures by local governments, necessitating a jump in fees particularly in smaller jurisdictions that may not see many permit applications over which they can spread the incremental costs to implement the bill. In addition, local governments that find themselves unable to raise fees as high as necessary to fully fund the increased workload for their building and public works departments may be forced to make up the shortfall with general funds. Do special districts have the resources to comply with AB 281 without having to raise permit fees?
3. Related legislation. AB 1114 (Haney, 2023) expands the scope of postentitlement phase permits subject to mandated processing timelines to include discretionary permits. The bill is also scheduled for the Committee’s June 21st hearing.
4. Mandate. The California Constitution requires the state to reimburse local governments for the costs of new or expanded state mandated local programs. Because AB 281 adds to the duties of special districts, Legislative Counsel states that the bill imposes a new state mandate. The measure states that if the Commission on State Mandates determines that the bill imposes a reimbursable mandate, then reimbursement must be made pursuant to existing statutory provisions.
5. Coming and going. The Senate Rules Committee ordered a double referral of AB 281: first, to this Committee to consider its local government implications, and second to the Housing Committee.
Assembly Actions
Assembly Local Government Committee: 7-0
Assembly Housing and Community Development Committee: 8-0
Assembly Appropriations Committee: 16-0
Assembly Floor: 75-0
Support and Opposition
(6/16/23)
Support: Housing Action Coalition (Sponsor)
Abundant Housing LA
Bay Area Council
California Apartment Association
California Building Industry Association
California Housing Consortium
California Yimby
Circulate San Diego
Civicwell
Council of Infill Builders
Dignitymoves (UNREG)
East Bay Yimby
Facebook, INC.
Fieldstead and Company, INC.
Grow the Richmond
Habitat for Humanity California
How to Adu
Meta
Midpen Housing
Mountain View Yimby
National Association of Hispanic Real Estate Professionals (NAHREP)
Non-profit Housing Association of Northern California (NPH)
Northern Neighbors
Peninsula for Everyone
People for Housing Orange County
Progress Noe Valley
San Francisco Yimby
Sand Hill Property Company
Santa Cruz Yimby
Santa Rosa Yimby
Silicon Valley Leadership Group
Slo County Yimby
South Bay Yimby
Southside Forward
Spur
Ventura County Yimby
Yimby Action
Opposition: None submitted.
-- END --
Date of Hearing: April 26, 2023
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Chris Holden, Chair
ABPCA Bill Id:AB 281
Author:(Grayson) – As Amended Ver:April 13, 2023
Policy Committee: | Local Government | Vote: | 7 - 0 |
Housing and Community Development | 8 - 0 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: Yes
SUMMARY:
This bill requires a special district to respond within specified timeframes, similar to those for cities and counties, to an application from a housing development project for service or a post-entitlement phase permit.
Specifically, this bill:
- Requires a special district to respond to an application from a housing development project for service from the special district or for a post-entitlement phase permit a local agency has deemed complete but requires separate approval from the special district.
- Requires a special district’s response to be in writing and to include, pursuant to the timelines in 3) below, next steps in the review process, including additional information that may be required of the applicant to begin to review the application for service or approval.
- Requires a special district to respond within 30 business days for a housing development project with 25 units or fewer, and within 60 business days for a housing development project with 26 units or more.
- Specifies this bill does not limit the amount of comments, feedback, revisions, or requests for additional information a special district may provide to an applicant or local agency.
- Specifies this bill does require a special district to approve an application or serve a housing development within a specified time period.
FISCAL EFFECT:
- Minor and absorbable costs to the Department of Housing and Community Development.
- Costs to special districts of an unknown, but likely minor, amount to perform existing duties within the response timelines mandated in the bill. These costs are potentially reimbursable by the state, subject to a determination by the Commission on State Mandates, should a district submit a claim.
COMMENTS:
- Purpose. This bill seeks to provide greater certainty for housing developers by applying the process and timeline followed by cities and counties to provide feedback on a post-entitlement phase permit application or a request for service to special districts. According to the author, “This is a good government bill that seeks to apply similar standards across the board for the review of post-entitlement permits, and would reduce delays and barriers to housing production.”
- Background. The entitlement process is used by cities and counties to grant permission for a proposed housing development to be built. Existing state laws, including the Permit Streamlining Act, the Housing Accountability Act, and the Housing Crisis Act of 2019, establish parameters on the entitlement process designed to ensure public agencies act fairly and promptly on applications for housing development proposals. Once a housing project has been entitled by a local government, it enters the “post-entitlement phase.” During this phase, a project must receive additional permits designed to ensure the proposal is compliant with state and local building codes and other measures that protect public health, safety and the environment. Post-entitlement phase permits include, for example, demolition permits and grading permits, as well as all building permits for the new construction.
AB 2234 (Robert Rivas), Chapter 651, Statutes of 2022, established standards and requirements for approving non-discretionary post-entitlement phase permits. These parameters apply to cities and counties, but not special districts. Some permits need to be approved by special districts. In addition, some housing projects may also need approval for services provided by special districts, such as power and water.
This bill applies many of the elements of AB 2234 to a special district engaged in the permit approval process. Specifically, this bill requires a special district to respond when it receives an application for service or approval from either a local government or the proponent of a housing project within 30 days for smaller projects and within 60 days for larger projects. In its response, the special district must provide additional information that may be required to begin to review the application for service or approval or next steps in the review process. This bill does not require a special district to approve permits or agree to provide service in a specified timeframe.
- Special Districts. Special districts are local government entities that provide specialized services such as water, fire protection and public safety, and removal of garbage and wastewater. There are nearly 3,300 special districts in California.
- Related Legislation. AB 1114 (Haney) applies the provisions of AB 2234 to discretionary post-entitlement phase permits. AB 1114 is pending in this committee.
Analysis Prepared by: Jennifer Swenson / APPR. / (916) 319-2081
Date of Hearing: April 12, 2023
ASSEMBLY COMMITTEE ON HOUSING AND COMMUNITY DEVELOPMENT
Buffy Wicks, Chair
ABPCA Bill Id:AB 281 (
Author:Grayson) – As Amended Ver:March 9, 2023
SUBJECT: Planning and zoning: housing: postentitlement phase permits
SUMMARY: Requires special districts to respond, within specified timeframes, to applications from housing development projects for service or approval. Specifically, this bill:
- Requires special districts to respond to applications from housing development projects as follows:
- Requires special districts to respond to each of the following types of requests for service or approval:
- Direct requests from project applicants;
- Requests from local government based on an application for a post-entitlement phase permit received by the local government from a project applicant; and
- Subsequent submissions of additional information provided by an applicant in response to a notice from a special district requesting more information.
- Requires the special district’s response to include additional information that may be required of the applicant to begin to review the application for service or approval or next steps in the review process.
- Provides the following timeframes for the special district to respond in writing:
- Within 30 business days for a housing development project with 25 units or fewer; or
- Within 60 business days for a housing development project with more than 25 units.
- Requires special districts to respond to each of the following types of requests for service or approval:
- Specifies that a housing development applicant may provide additional information requested by a special district directly to the special district.
- Specifies that this bill does not limit the amount of comments, feedback, revisions or requests for additional information that a special district may provide to an applicant or local agency.
- Provides that, if the Commission on State Mandates determines that this bill contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to current law governing state mandated local costs.
EXISTING LAW:
- Defines “special district” to mean an agency of the state, formed pursuant to general law or special act, for the local performance of governmental or proprietary functions within limited boundaries and in areas outside district boundaries, when authorized as specified. A special district includes a county service area, but excludes the state, a county, a city, a school district, a community college district, an assessment district, an improvement district, a community facilities district, an air pollution control district, or an air quality maintenance district (Government Code Section 56036).
- Establishes standards and requirements for the local agencies to review non-discretionary post-entitlement phase permits, including:
- Defining the post-entitlement phase to includes all nondiscretionary permits and reviews filed after the entitlement process has been completed that are required or issued by the local agency to begin construction of a housing development. Such permits include demolition permits, grading permits, and building permits;
- Requires local governments to specify in detail the information that will be required from any applicant for a post-entitlement phase permit, and to post that information on their website;
- Specifies the process for the local government to determine whether a post-entitlement phase application is complete, including specified timelines for review;
- Specifies the process for local governments to complete review of a post-entitlement phase permit, including specified timelines to comment and approve the permit; and
- Specifies a process for an applicant to appeal a decision of a local government to not approve a post-entitlement phase permit (GC Section 65913.3).
FISCAL EFFECT: Unknown.
COMMENTS:
Author’s Statement: According to the author, “AB 2234 (Robert Rivas, 2022) was a straightforward measure that helped standardize the process for the review of post-entitlement building permits, requiring local agencies to post information related to post-entitlement permits for housing projects, and established timelines for local agencies to process these permits, depending on the size of a development. While AB 2234 was an important step to help prevent delays in the post-entitlement process, it did not apply to special districts, who often have to provide feedback to local governments before they issue the post-entitlement permits. AB 281 would apply similar timelines for special districts to provide feedback on a post-entitlement permit that has been deemed complete by a local agency. This is a good government bill that seeks to apply similar standards across the board for the review of post-entitlement permits, and would reduce delays and barriers to housing production.”
Planning for and Entitling Housing: Planning for and entitling new housing is mainly a local responsibility. The California Constitution allows cities and counties to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public – including land use authority. Cities and counties enforce this land use authority through zoning regulations, such as the allowed density and height for a project, parking requirements, and setbacks. Cities and counties also enforce this land use authority through their control of the entitlement process, which is the process by which the city or county grants permission for a proposed housing development to be built.
Existing state laws, including the Permit Streamlining Act, the Housing Accountability Act, and the Housing Crisis Act of 2019, establish parameters on the entitlement process. These parameters are designed to ensure that public agencies act fairly and promptly on applications for housing development proposals. These laws require public agencies to compile lists of information that applicants must provide, and explain the criteria they will use to review permit applications. Once a developer has submitted a complete application for development, these laws require that the project be subject only to the ordinances, policies, and standards adopted and in effect at the time of the application, and require local officials to act within a specific time-period after completing any environmental review documents required under the California Environmental Quality Act.
Approving Post-Entitlement Permits and Service: Once a housing project has been entitled by a local government, it enters the “post-entitlement phase.” During this phase, a project must receive additional permits designed to ensure the health and safety of the future residents of the project and surrounding neighbors. Post-entitlement phase permits include permits to prepare the site for new development, including demolition permits and grading permits. Post-entitlement phase permits also include all the building permits for the new construction.
Until recently, there were no state laws that set parameters for how cities and counties were compelled to act during the post-entitlement phase. This changed with the passage of AB 2234 (Robert Rivas), Chapter 651, Statutes of 2022. AB 2234 established important new parameters for approving post-entitlement permits, including:
- Requiring local governments to specify in detail the information that will be required from any applicant for a post-entitlement phase permit, and to post that information on their website;
- Specifying the process for the local government to determine whether a post-entitlement phase application is complete, including specified timelines for review;
- Specifying the process for local governments to complete review of a post-entitlement phase permit, including specified timelines to comment and approve the permit; and
- Specifying a process for an applicant to appeal a decision of a local government to not approve a post-entitlement phase permit.
Special Districts and Post-Entitlement Permits and Approvals: Special districts are local government entities that provide specialized services such as water and energy, fire protection and public safety, and removal of garbage and wastewater. Special districts may be “independent,” in that they were created and are governed independently of other government agencies. They may also be “dependent,” in that they are affiliated with another government entity, typically by having the same governing body as the local city or county. There are nearly 3,300 special districts in California (as compared to 548 cities and counties).
While AB 2234 established parameters for post-entitlement phase permits approved by cities and counties, it did not speak to post-entitlement phase permits or requests for service that need to be reviewed by special districts. Yet almost all housing development projects require review by special districts, to approve the permits themselves or to agree to provide service to the new housing development.
This bill would replicate elements of AB 2234, but for special districts. It requires the special districts to respond when they receive an application for service or approval from either a local government or the proponent of a housing project. Specifically, this bill requires special districts to respond to inquiries on housing development projects within 30 days for smaller projects with 25 units or fewer and within 60 days for larger projects with greater than 25 units. In their response, the special districts must provide additional information that may be required to begin to review the application for service or approval or next steps in the review process. This bill does not require special districts to approve permits or agree to provide service in a specified timeframe.
Arguments in Support: Supporters of the bill argue that it provides a clearer process for both developers and special districts when dealing with post-entitlement phase permits. According to the Housing Action Coalition (the bill’s sponsor), “This measure streamlines the process a builder may need to develop in a special district. This measure will expedite construction by making all participants aware of the documentation needed to build in a special district.”
Arguments in Opposition: None on file.
Committee Amendments: This bill, like AB 2234, establishes parameters for the post-entitlement permit process that will provide more certainty for proponents of housing developments. However, as currently written, the bill could create process confusion for both project proponents and the special districts charged with approving these permits and/or providing service to the development. As such, the committee may wish to consider the following amendments to the bill, all of which are technical in nature:
- Provide the relevant definitions for housing development project, local agency, and special district;
- Clarify that the law is applicable in the following circumstances:
- When a housing development is applying for service from a special district; and
- When a housing development is applying for approval of a post-entitlement permits from a special district, and a local agency has deemed the permit application to be complete pursuant to the requirements of AB 2234;
- Specify that the special district must reply to requests for service and approval from housing developments directly to the applicant;
- Clarify that the special district needs to respond with information on next steps in their review process, which may include the need for more information from the applicant;
- Specify that this section does not require the special district to approve the application or serve the housing development project within a specified timeframe. The purpose of this language is to distinguish the provisions of this section from the provisions of AB 2234, which require local agencies to approve post-entitlement phase permits within a specified timeframe.
Related Legislation:
AB 1114 (Haney, 2023): This bill would expand the provisions of AB 2234 to apply to discretionary post-entitlement phase permits in addition to non-discretionary post-entitlement phase permits. AB 1114 is pending in this Committee.
AB 2234 (R. Rivas), Chapter 651, Statutes of 2022: Required local agencies to post information related to post-entitlement phase permits for housing development projects, process those permits in a specified time period depending on the size of the housing development, and establish a digital permitting system if the local agency meets a specific population threshold.
Double Referred: This bill was also referred to the Assembly Committee on Local Government, where it was passed on a 7-0 vote.
REGISTERED SUPPORT / OPPOSITION:
Support
Housing Action Coalition (Sponsor)
Abundant Housing LA
California Apartment Association
California Building Industry Association
California Housing Consortium
CBIA
Circulate San Diego
CivicWell
Council of Infill Builders
DignityMoves
East Bay Yimby
Facebook, INC.
Fieldstead and Company, INC.
Grow the Richmond
Habitat for Humanity California
How to ADU
MidPen Housing
Mountain View Yimby
Napa-Solano for Everyone
Non-profit Housing Association of Northern California (NPH)
Northern Neighbors Sf
Peninsula for Everyone
People for Housing - Orange County
Progress Noe Valley
San Francisco Bay Area Planning and Urban Research Association (SPUR)
San Francisco Yimby
San Francisco-Marin Food Bank
San Luis Obispo Yimby
Sand Hill Property Company
Santa Cruz Yimby
Santa Rosa Yimby
Silicon Valley Leadership Group
South Bay YIMBY
Southside Forward
SPUR
The Two Hundred
Ventura County YIMBY
YIMBY Action
Opposition
None on file.
Analysis Prepared by: Steve Wertheim / H. & C.D. / (916) 319-2085
Date of Hearing: March 22, 2023
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Cecilia Aguiar-Curry, Chair
ABPCA Bill Id:AB 281 (
Author:Grayson) – As Amended Ver:March 9, 2023
SUBJECT: Planning and zoning: housing: postentitlement phase permits.
SUMMARY: Requires special districts to respond to inquiries relative to housing development projects within a specified timeframe. Specifically, this bill:
- Places the following obligations on special districts:
- Requires special districts to respond in writing to the following inquiries regarding housing development applications within specified timeframes:
- Initial applications or requests for service or approval on a housing development proposal that a local agency already deemed complete.
- Subsequent submissions of additional information provided by an applicant in response to a notice from a special district requesting more information.
- Requires special districts to respond in writing to inquiries noted above within the following timeframes:
- Within 30 business days for a housing development project with 25 units or fewer.
- Within 60 business days for a housing development project with more than 25 units.
- Requires special districts to continue to review each submission by an applicant to determine additional relevant information and provide written notice of the next steps or additional information required of the applicant within the timeframes noted above.
- Requires special districts to respond in writing to the following inquiries regarding housing development applications within specified timeframes:
- Specifies that a housing development applicant may provide additional information requested by a special district directly to the special district.
- Specifies that this bill does not limit the amount of comments, feedback, revisions or requests for additional information that a special district may provide to an applicant or local agency.
- Provides that, if the Commission on State Mandates determines that this bill contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to current law governing state mandated local costs.
EXISTING LAW:
- Establishes the Permit Streamlining Act, which, among other things, establishes time limits within which state and local government agencies must either approve or disapprove permits to entitle a development (Government Code § 65920 - 65964.5).
- Establishes standards and requirements for the local agencies to review non-discretionary postentitlement phase permits, including time limits within which local agencies must either approve or disapprove permits (Government Code § 65913.3).
FISCAL EFFECT: This bill is keyed fiscal and contains a state-mandated local program.
COMMENTS:
- Planning for and Approval of Housing. Planning for and approving new housing is mainly a local responsibility. The California Constitution allows cities and counties to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public – including land use authority. Cities and counties enforce this land use authority through zoning regulations, as well as through an “entitlement process” for obtaining discretionary as well as ministerial approvals.
The scale of the proposed development, as well as the existing environmental setting determine the degree of local review that occurs. For larger developments, the local entitlement process commonly requires multiple discretionary decisions regarding the subdivision of land, environmental review per the California Environmental Quality Act (CEQA), design review, and project review by the local agency’s legislative body (city council or county board) or by a planning commission delegated by the legislative body.
Navigating through the various stages of local approval requires developers to invest time and resources early in the development process. This creates a certain degree of risk for developers who must bear any costs associated with navigating the local approval process long before they can realize the profits typically associated with a completed development.
- The Permit Streamlining Act. The PSA requires public agencies to act fairly and promptly on applications for development proposals, including housing developments. Under the PSA, public agencies have 30 days to determine whether applications for development projects are complete and request additional information; failure to act results in an application being “deemed complete.” The PSA applies to the discretionary approval phase of a development review process; this is the phase where the agency, in its discretion, decides whether it approves of the concept outlined in the development proposal.
- Non-discretionary Postentitlement Permits. A development proposal that is approved and entitled by a local agency is still required to obtain approval for a range of non-discretionary permits. This includes building permits and other permits related to the physical construction of the development proposal. The timelines established in the PSA do not apply to these non-discretionary permits.
Essentially, the PSA applies to the discretionary approval phase of a development review process. This is the phase where the local agency, in its discretion, decides whether or not it approves of the concept outlined in the development proposal. Because the local agency is exercising discretion, these approval decisions are subject to CEQA. A development proposal that is approved and entitled by a local agency must also obtain approval of objective permits associated with the development proposal. This ensures the proposal is compliant with state and local building codes and other measures that protect public health, safety and the environment. This stage of the review process is often ministerial, as these postentitlement permits are typically objective in nature. Generally, once a local agency invests the time and effort to approve and entitle a development proposal, there is an incentive for the agency to process the postentitlement permits in a timely fashion. In order to expedite this stage of the development approval process, AB 2234 (Robert Rivas), Chapter 651, Statutes of 2022, required local agencies to process non-discretionary permits within 30 days for small housing development projects and 60 days for large housing development projects.
The provisions of AB 2234 do not apply to the permit review process conducted by special districts.
- Bill Summary and Author’s Statement. This bill replicates elements of AB 2234, and applies those requirements to special districts that are engaged in the permit approval process. Specifically, this bill requires special districts to respond to inquiries on housing development projects within 30 days for smaller projects with 25 units or fewer and within 60 days for larger projects with more than 25 units.
This bill is sponsored by the Housing Action Coalition and the Silicon Valley Leadership Group.
According to the author, “Local governments, such as cities and counties, are required to take prompt action on applications for housing developments, including applications for the postentitlement phase of a project. Postentitlement building permits are permits that are issued after discretionary review for certain actions that need to be taken on projects, such as demolition, excavation, grading, and other actions. While AB 2234 was an important step to help prevent delays in the postentitlement process, it did not apply to special districts, who often have to provide feedback to local governments before they issue postentitlement permits. AB 281 would apply similar timelines for special districts to review and return its findings to a local agency for a postentitlement permit. Depending on the size of a development, this bill would give a special district between 30-60 days to return its findings to a local agency. This is a good government bill that seeks to apply similar standards across the board for the review of postentitlement permits, and would reduce delays and barriers to housing production.”
- Arguments in Support. The Housing Action Coalition writes in support, “Under AB 2234 (Rivas and Grayson, 2022), cities and counties are required to determine whether an application for a postentitlement building permit is complete within 15 days of the agency receiving the application. Postentitlement building permits must then be approved by local agencies within 30 or 60 days depending on the size of the development. AB 2234 did not apply these same provisions to special districts, potentially allowing delays to housing projects that, drive up costs and, and prevent construction. AB 281 will apply the same 30/60 day timeline found in AB 2234 to special districts, ensuring that all agencies will be held to the same standard and reducing further delays to critically needed housing.”
- Arguments in Opposition. None on file.
- Related Legislation. AB 1114 (Haney), expands the provisions of AB 2234 to apply to discretionary postentitlement phase permits in addition to non-discretionary postentitlement phase permits. AB 1114 is pending in this Committee.
- Previous Legislation. AB 2234 (R. Rivas), Chapter 651, Statutes of 2022, required local agencies to post information related to postentitlement phase permits for housing development projects, process those permits in a specified time period depending on the size of the housing development, and establish a digital permitting system if the local agency meets a specific population threshold.
- Double-Referral. This bill is double-referred to the Assembly Committee on Housing and Community Development.
REGISTERED SUPPORT / OPPOSITION:
Support
Housing Action Coalition [SPONSOR]
Silicon Valley Leadership Group [SPONSOR]
California Apartment Association
California Building Industry Association
East Bay Yimby
Grow the Richmond
How to ADU
Mountain View Yimby
Napa-Solano for Everyone
The Non-Profit Housing Association of Northern California
Northern Neighbors
Peninsula for Everyone
People for Housing - Orange County
Progress Noe Valley
San Francisco Yimby
San Luis Obispo Yimby
Santa Cruz Yimby
Santa Rosa Yimby
South Bay Yimby
Southside Forward
Ventura County Yimby
Yimby Action
Opposition
None on file
Analysis Prepared by: Hank Brady / L. GOV. / (916) 319-3958
Discussed in Hearing
Senate Floor
Senate Standing Committee on Housing
Senate Standing Committee on Governance and Finance
Assembly Standing Committee on Housing and Community Development
Assembly Standing Committee on Local Government
Bill Author
Bill Co-Author(s):