AB 3246: Electricity: permit to construct: advanced reconductoring: exemption.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2024-06-06
Current Status:
Failed
(2024-08-15: In committee: Held under submission.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical corporations. The commission, through a general order, prohibits an electrical corporation from beginning construction in this state of any electrical line facilities or substations meeting certain requirements without the commission having first authorized the construction of those facilities by issuing a permit to construct.
This bill would require the commission, on or before January 1, 2026, to update the above-described general order to provide an exemption that would instead authorize an electrical corporation to seek the commissions approval of advanced reconductoring, as defined, of its existing electrical transmission facilities through the commissions informal advice letter process, as specified. The bill would require this advice letter to contain certain information, including, among other information, an estimate of the increased capacity expansion. an electrical corporation to seek that commission approval by filing a Tier 2 Advice Letter that follows existing advice letter processes and requirements, and would require the commission, on or before January 1, 2026, to update its Tier 2 Advice Letter process to authorize that filing by an electrical corporation, as specified.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and a violation of a commission action implementing its requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical corporations. The commission, through a general order, prohibits an electrical corporation from beginning construction in this state of any electrical line facilities or substations meeting certain requirements without the commission having first authorized the construction of those facilities by issuing a permit to construct.
This bill would require the commission, on or before January 1, 2026, to update the above-described general order to provide an exemption that would instead authorize an electrical corporation to seek the commissions approval of advanced reconductoring, as defined, of its existing electrical transmission facilities through the commissions informal advice letter process, as specified. The bill would require this advice letter to contain certain information, including, among other information, an estimate of the increased capacity expansion.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the provisions of this bill would be a part of the act and a violation of a commission action implementing its requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical corporations. The Public Utilities Act prohibits any electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the commission a certificate that the present or future public convenience and necessity requires or will require that construction.This bill would state the intent of the Legislature to enact future legislation that will enable the integration of advanced conductor technology with Californias transmission system to maximize system efficiency and reduce ratepayer electricity costs.Existing law vests the Public Utilities Commission with regulatory jurisdiction over public utilities, including electrical corporations. The Public Utilities Act prohibits any electrical corporation from beginning the construction of, among other things, a line, plant, or system, or of any extension thereof, without having first obtained from the commission a certificate that the present or future public convenience and necessity requires or will require that construction.
This bill would state the intent of the Legislature to enact future legislation that will enable the integration of advanced conductor technology with Californias transmission system to maximize system efficiency and reduce ratepayer electricity costs.
The Legislature finds and declares all of the following:
(a)Californias electrical grid has limited capacity, which leads to the curtailment of new renewable energy necessary to reach our climate and clean electrification goals, and requires significant buildout.
(b)California has some of the highest electricity rates in the country and consumers are seeing dramatic bill increases.
(c)New transmission projects require long lead times to be permitted and constructed and often face delays.
(d)There is significant opportunity to expand transmission capacity on existing infrastructure, at lower costs and with shorter timeframes than building new transmission infrastructure.
(e)Climate change and aging transmission infrastructure pose significant risks for wildfire.
(f)Advanced conductors significantly increase transmission capacity and can be used on existing infrastructure.
(g)Advanced conductors have higher reliability than traditionally used aluminum core steel reinforced (ACSR) conductors, decreasing risk of failure, wildfire, and grid outages, and require less maintenance while increasing the life expectancy of the line.
SECTION 1.SEC. 2.Section 565 is added to the Public Utilities Code, to read:565.(a)On or before January 1, 2026, the commission shall update General Order 131-D to provide an exemption from Section III(B) (Permit to Construct) of that general order to instead authorize an electrical corporation to seek the commissions approval of advanced reconductoring of its existing electrical transmission facilities, including electrical transmission lines and substations within existing transmission easements, rights-of-way, or franchise agreements, irrespective of whether the electrical transmission facility is above a 200-kilovolt voltage level, for any electrical transmission facility above a 50-kilovolt voltage level through the commissions informal advice letter process. To the extent that the project also qualifies for a different exception or exemption set forth in General Order 131-D, the electrical corporation may proceed pursuant to any procedures applicable to that exception or exemption.
(b)The electrical corporation shall seek commission approval for advanced reconductoring that is eligible for the advice letter process described in subdivision (a) by filing a Tier 2 Advice Letter that identifies the advanced reconductoring, establishes that the advanced reconductoring meets the requirements of this section, estimates the increased capacity expansion, and demonstrates that the advanced reconductoring is a prudent and reasonable investment. follows the existing advice letter processes and requirements under General Order 96-B and General Order 131-D.
(c)On or before January 1, 2026, the commission shall update the Tier 2 Advice Letter process in General Order 96-B to authorize the filing described in subdivision (b).
(d)As used in this section, the following definitions apply:
(1)Advanced conductor means an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance at least 10 percent lower than existing conductors of a similar diameter on the system.
(2)Advanced reconductoring means replacing an existing transmission or distribution line with an advanced conductor.
SEC. 2.SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
(a)On or before January 1, 2026, the commission shall update General Order 131-D to provide an exemption from Section III(B) (Permit to Construct) of that general order to instead authorize an electrical corporation to seek the commissions approval of advanced reconductoring of its existing electrical transmission facilities, including electrical transmission lines and substations within existing transmission easements, rights-of-way, or franchise agreements, irrespective of whether the electrical transmission facility is above a 200-kilovolt voltage level, through the commissions informal advice letter process.
(b)The electrical corporation shall seek commission approval for advanced reconductoring that is eligible for the advice letter process described in subdivision (a) by filing a Tier 2 Advice Letter that identifies the advanced reconductoring, establishes that the advanced reconductoring meets the requirements of this section, estimates the increased capacity expansion, and demonstrates that the advanced reconductoring is a prudent and reasonable investment.
(c)On or before January 1, 2026, the commission shall update the Tier 2 Advice Letter process in General Order 96-B to authorize the filing described in subdivision (b).
(d)As used in this section, the following definitions apply:
(1)Advanced conductor means an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance at least 10 percent lower than existing conductors of a similar diameter on the system.
(2)Advanced reconductoring means replacing an existing transmission or distribution line with an advanced conductor.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
SECTION 1.It is the intent of the Legislature to enact future legislation that will enable the integration of advanced conductor technology with Californias transmission system to maximize system efficiency and reduce ratepayer electricity costs.It is the intent of the Legislature to enact future legislation that will enable the integration of advanced conductor technology with Californias transmission system to maximize system efficiency and reduce ratepayer electricity costs.
|
Date
|
Status
|
|---|---|
| Aug 15, 2024 | In committee: Held under submission. |
| Aug 5, 2024 | In committee: Referred to suspense file. |
| Jun 25, 2024 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (June 24). Re-referred to Com. on APPR. |
| Jun 6, 2024 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U. & C. |
| Jun 5, 2024 | Referred to Com. on E., U. & C. |
| May 24, 2024 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 23, 2024 | Read third time. Passed. Ordered to the Senate. (Ayes 70. Noes 0. Page 5637.) |
| May 20, 2024 | Read second time. Ordered to third reading. |
| May 16, 2024 | From committee: Do pass. (Ayes 15. Noes 0.) (May 16). |
| May 8, 2024 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Apr 18, 2024 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 16. Noes 0.) (April 17). Re-referred to Com. on APPR. |
| Mar 19, 2024 | Re-referred to Com. on U. & E. |
| Mar 18, 2024 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 18, 2024 | Referred to Com. on U. & E. |
| Feb 17, 2024 | From printer. May be heard in committee March 18. |
| Feb 16, 2024 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 5, 2024 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jun 24, 2024 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Energy, Utilities and Communications |
Passed |
|
| May 23, 2024 | AB 3246 Garcia Assembly Third Reading | Assembly Floor |
Passed |
|
| May 16, 2024 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 17, 2024 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350 Humboldt | ** Support | |
| 350 Sacramento | ** Support | |
| California Energy Storage Alliance | ** Support | |
| California Environmental Voters | ** Support | |
| California Solar & Storage Association | ** Against | |
| California Wind Energy Association | ** Support | |
| Climate Action California | ** Support | |
| Climate Reality Project, California Coalition | ** Support | |
| Environmental Defense Fund | ** Support | |
| Independent Energy Producers Association | ** Support | |
| Large-Scale Solar Association | ** Support | |
| Santa Cruz Climate Action Network | ** Support | |
| Solar Energy Industries Association | ** Support |
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2023 - 2024 Regular Session
AB 3246 (Garcia) - Electricity: permit to construct: advanced reconductoring: exemption
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would require the California Public Utilities Commission (CPUC) to update one of its General Orders to provide an exemption from the permit to construct (PTC) process for advanced reconductoring transmission projects, as specified.
Fiscal Impact:
- The CPUC estimates one-time costs of $6.3 million spread over two years and ongoing costs of $685,000 annually (ratepayer funds) to update General Order (GO) 131-D in order to provide an exemption from the PTC process and instead review Advanced Reconductoring Projects on an expedited basis. Higher upfront costs would largely come from an initial Programmatic EIR and be one-time in nature.
Background:
Electric transmission lines are generally high voltage lines that move electricity from generation resources (power plants) to distribution lines in neighborhoods. Companies, usually electric investor-owned utilities (IOUs), proposing the construction of new transmission, are required to obtain a permit from the CPUC for construction of certain specified infrastructure listed under Public Utilities Code §1001, including transmission projects. The CPUC reviews permit applications under two concurrent processes: (1) an environmental review pursuant to California Environmental Quality Act (CEQA), and (2) the review of project need and costs pursuant to Public Utilities Code §1001 and GO 131-D (Certificate of Public Convenience and Necessity (CPCN)). In order for the state to meet its clean energy goals, including achieving 100 percent clean energy by 2045, electric transmission capacity will likely need to grow significantly.
CPUC’s GO 131-D. GO 131-D was first adopted in 1970 and before a recent update late in 2023, it had not been updated since 1995. It establishes the criteria to be followed to trigger the need for a PTC or renovate electrical facilities, including transmission lines and substations, and also sets out public notice requirements for proposed transmission projects. The level of analysis performed by the CPUC pursuant to GO 131-D varies with the size (measured in voltage) of the transmission project.
GO 131-D Reforms. SB 529 (Hertzberg, Chapter 357, Statutes of 2022) required the CPUC to revise the permitting process for specified transmission projects. The bill directed the CPUC to revise GO 131-D to authorize a utility to use the PTC process or claim an exemption to seek approval to construct an extension, expansion, upgrade, or other modification to its existing transmission facilities regardless of the voltage level by January 1, 2024. However, CEQA still applies. In May 2023, the CPUC opened a rulemaking to solicit comments that would revise the GO 131-D rules. Based on the feedback, the assigned commissioner determined the issues to be considered in the proceeding should be separated into two phases. Phase 1 includes consideration of changes to GO 131-D necessary to conform it to the requirements of SB 529 and updates to outdated references. Phase 1 decision was approved on December 14, 2023.
Proposed Law:
This bill would:
- Require the CPUC, on or before January 1, 2026, to update GO 131-D to provide an exemption that would instead authorize an electrical corporation to seek the CPUC’s approval of advanced reconductoring, as defined, of its existing electrical transmission facilities of over 50 kV through the CPUC’s informal advice letter process.
- Require an electrical corporation to seek that CPUC approval by filing a Tier 2 Advice Letter that follows existing advice letter processes and requirements.
- Require the CPUC, on or before January 1, 2026, to update its Tier 2 Advice Letter process to authorize that filing by an electrical corporation, as specified.
- Define terms.
Related Legislation:
AB 2779 (Petrie-Norris, 2024) requires the CAISO, upon approval of the annual transmission plan, to report on any new use of any grid enhancing technology and its associated cost or efficiency savings.
SB 1006 (Padilla, 2024) requires electrical transmission utilities, by January 1, 2026, to develop a strategic plan for GETs to cost-effectively increase transmission capacity and to complete an evaluation to identify which of its transmission and distribution lines can be reconductored with advanced reconductors. Requires these plans and evaluations are submitted to the CPUC and made publicly available. The bill is pending in the Assembly.
SB 319 (McGuire, Chapter 390, Statutes of 2023) required the CEC and the CPUC, in coordination with the CAISO, to better and regularly coordinate planning and permitting of energy transmission infrastructure to ensure the state meets its clean energy goals and to evaluate and report on that planning and related infrastructure development.
SB 529 (Hertzberg, Chapter 357, Statutes of 2022) exempted an extension, expansion, upgrade, or other modification of an existing transmission line or substations from the requirement of a CPCN and directed the CPUC to revise its GO, by January 1, 2024, to instead use its PTC process for these approvals.
SB 887 (Becker, Chapter 358, Statutes of 2022) required 15-year projections of energy resource portfolios and energy demand to inform transmission planning to achieve the state’s clean energy goals, and required the CAISO to consider approval for specified transmission projects as part of the 2022-23 transmission planning process.
-- END --
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Steven Bradford, Chair
2023 - 2024 Regular
Bill No: Hearing Date: 6/24/2024
Author: | |||
Version: | Amended | ||
Urgency: | Fiscal: | ||
Consultant: | |||
SUBJECT:
DIGEST: This bill requires the California Public Utilities Commission (CPUC), on or before January 1, 2026, to update general order to provide specified exemption from the permit to construct (PTC) process for advanced reconductoring transmission projects.
ANALYSIS:
Existing law:
- Establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90 percent of all retail sales of electricity to California end-use customers by December 31, 2035, 95 percent of all retail sales of electricity to California end-use customers by December 31, 2040, 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045, and 100 percent of electricity procured to serve all state agencies by December 31, 2035. (Public Utilities Code §454.53)
- Provides that the CPUC may supervise and regulate every public utility in the state and may do all things, whether specifically designated or in addition, which are convenient and necessary in the exercise of such power and jurisdiction. (Public Utilities Code §701)
- Prohibits an electrical corporation from beginning the construction of a line, plant, or system, or of any extension thereof, without having first obtained from the CPUC a certificate that the present or future public convenience and necessity require or will require its construction. (Public Utilities Code §1001(a))
- Provides that the extension, expansion, upgrade, or other modification of an existing electrical transmission facility, including transmission lines and substations, does not require a certificate that the present or future public convenience and necessity requires or will require its construction. (Public Utilities Code §1001(b))
- Requires the CPUC, by January 1, 2024, to update General Order (GO)131-D to authorize each public utility electrical corporation to use the permit-to-construct process or claim an exemption under Section III(B) of that general order to seek approval to construct an extension, expansion, upgrade, or other modification to its existing electrical transmission facilities, including electric transmission lines and substations within existing transmission easements, rights of way, or franchise agreements, irrespective of whether the electrical transmission facility is above a 200-kilovolt voltage (kV) level. (Public Utilities Code §564)
This bill:
- Makes several findings and declaration regarding the need to expand transmission capacity and opportunities to deploy advanced reconductors to expand capacity on existing infrastructure.
- Requires the CPUC, on or before January 1, 2026, to update GO 131-D to provide an exemption that would instead authorize an electrical corporation to seek the CPUC’s approval of advanced reconductoring, as defined, of its existing electrical transmission facilities of over 50 kV through the CPUC’s informal advice letter process.
- Requires an electrical corporation to seek that CPUC approval by filing a Tier 2 Advice Letter that follows existing advice letter processes and requirements.
- Requires the CPUC, on or before January 1, 2026, to update its Tier 2 Advice Letter process to authorize that filing by an electrical corporation, as specified.
- Defines “advanced conductors” to mean an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance at least 10 percent lower than existing conductors of a similar diameter on the system.
- Defines “advanced reconductoring” to replace an existing transmission or distribution line with advanced conductor.
Background
Transmission projects. Electric transmission lines are generally high voltage lines that move electricity from generation resources (power plants) to distribution lines in neighborhoods. Companies, usually electric investor-owned utilities (IOUs), proposing the construction of new transmission, are required to obtain a permit from the CPUC for construction of certain specified infrastructure listed under Public Utilities Code §1001, including transmission projects. The CPUC reviews permit applications under two concurrent processes: (1) an environmental review pursuant to California Environmental Quality Act (CEQA), and (2) the review of project need and costs pursuant to Public Utilities Code §1001 and GO 131-D (Certificate of Public Convenience and Necessity (CPCN)).
Need for expanded transmission capacity. In order for the state to meet its clean energy goals, including achieving 100 percent clean energy by 2045, electric transmission capacity will likely need to grow significantly. The California Independent System Operator (CAISO) conducts its transmission planning process to identify potential transmission system limitations as well as opportunities for system reinforcements that improve reliability and efficiency. The annual transmission plan fulfills the CAISO’s core responsibility to identify and plan the development of solutions, transmission or otherwise, to meet the future needs of the electricity grid. The CAISO identifies projects that address grid reliability requirements, identify upgrades needed to successfully meet California’s policy goals, and explore projects that can bring economic benefits to consumers. In 2021, the CAISO created a 20-Year Transmission Outlook for the electric grid, in collaboration with the CPUC and the California Energy Commission (CEC), with the goal of exploring the longer-term grid requirements and options for meeting the state’s SB 100 clean energy objectives reliably and cost-effectively. The 20-Year Transmission Outlook estimates a significant amount, and expense, to construct and expand transmission facilities, including an estimated $10.74 billion in upgrades to existing facilities.
Advanced reconductoring. Reconductoring is the replacement of a transmission line’s existing conductors with advanced conductors, essentially swapping out the Aluminum Conductor Steel Reinforced (ACSR) for smaller composite core conductors that enable higher operating temperatures. According to a November 2023 Energy Institute at Haas paper, “Accelerating Transmission Expansion by Using Advanced Conductors in Existing Right-of-Way” by Emilia Chojkiewicz, et. al (Energy Institute WP 343), reconductoring holds significant potential for rapid transmission expansion. The advanced conductors can carry approximately twice as much power as conventional conductors. Yet, advanced conductors use existing transmission towers and rights of way, thereby circumventing the land acquisition and permitting processes that can impede construction of new transmission lines. However, replacing conventional conductors with advanced conductors requires taking circuits out of service during the replacement or conducting live-line work, which carries additional safety risks. Either approach can be challenging, and in some cases infeasible, when transmission constraints exist. CAISO considers advanced recondutoring among several grid enhancing technologies that can be used to expand existing transmission capacity.
The Transmission Permitting Process. Usually, utilities proposing the construction of new transmission are required to obtain a permit from the CPUC for construction of certain specified infrastructure listed under Public Utilities Code §1001, including transmission projects. The CPUC reviews permit applications under two concurrent processes:
- An environmental review of applicable projects pursuant to CEQA and CPUC environmental rules. To prepare for the environmental review, the utility first conducts and submits a Proponents Environmental Assessment (PEA). The PEA is a preliminary assessment of the project’s potential environmental impacts and alternatives. Some projects may trigger a federal National Environmental Policy Act (NEPA) review if they cross federal land or use federal funds.
- The review of project needs and costs according to Public Utilities Code §1001 and GO 131-D, also known as a CPCN, or — depending on project size — a PTC.
Permit/Certificate Review. Parallel to environmental review under CEQA, the CPUC reviews the utility’s application for a CPCN or a PTC, depending on the size of the project. The CPUC’s decision on the CPCN or PTC cannot be issued until the environmental review is complete, if one is required. But most transmission projects are categorically exempt from CEQA. Most of the CPCN/PTC process is outlined in GO 131-D.
CPUC’s GO 131-D. GO 131-D was first adopted in 1970 and before a recent update late in 2023, it had not been updated since 1995. It establishes the criteria to be followed to trigger the need for a PTC or renovate electrical facilities, including transmission lines and substations, and also sets out public notice requirements for proposed transmission projects. The level of analysis performed by the CPUC pursuant to GO 131-D varies with the size (measured in voltage) of the transmission project.
- Projects below 50 kV are considered distribution line projects and in general, do not require CPUC approval.
- Projects between 50 kV and 200 kV generally require a PTC, which includes an environmental review pursuant to CEQA, if applicable. The CPUC process generally does not require a detailed analysis of the need for or economics of these projects. An application for a PTC must be filed at least nine months before a decision is required.
- Projects over 200 kV generally require a CPCN and are subject to CEQA review, as applicable.
The CPCN process analyzes the need for the project and the economics of the project, as well as, the environmental impacts of the project if CEQA applies. An application for a CPCN must be filed at least 12 months before a decision is required.
GO 131-D Reforms. SB 529 (Hertzberg, Chapter 357, Statutes of 2022) required the CPUC to revise the permitting process for specified transmission projects. The bill directed the CPUC to revise GO 131-D to authorize a utility to use the PTC process or claim an exemption to seek approval to construct an extension, expansion, upgrade, or other modification to its existing transmission facilities regardless of the voltage level by January 1, 2024. However, CEQA still applies. In May 2023, the CPUC opened a rulemaking to solicit comments that would revise the GO 131-D rules. Based on the feedback, the assigned commissioner determined the issues to be considered in the proceeding should be separated into two phases. Phase 1 includes consideration of changes to GO 131-D necessary to conform it to the requirements of SB 529 and updates to outdated references. Phase 1 decision was approved on December 14, 2023.
Phase 2 Staff Proposal. Currently, the CPUC is in Phase 2 of the rulemaking proceeding, which includes consideration of changes to GO 131-D not addressed in the Phase 1. Last month, the CPUC issued a Phase 2 Staff Proposal with recommendations for various approaches to the changes sought in GO 131-D, including consideration of comments submitted in the rulemaking. While still a proposal, not policy adopted by the CPUC, it’s important to note that the rulemaking is actively considering related issues to this bill, including reconductoring an existing transmission line.
Advice Letter. An advice letter is a request by a utility for CPUC approval, authorization, or other relief, including a request for approval to change rates, charges, terms or conditions contained in the utility's tariffs currently in effect. An advice letter is an informal request made to the CPUC outside a formal proceeding such as an application, complaint, investigation, or rulemaking at the CPUC. The advice letter process provides a faster and simplified review of the types of utility requests that are expected neither to be controversial nor to raise important policy questions. CPUC GO 96-B governs the various rules on advice letters. There are three tiers of advice letters as follows:
- Tier 1 advice letter is effective upon publication by the utility.
- Tier 2 advice letter needs to be approved by CPUC staff.
- Tier 3 advice letter needs to be approved by a vote of the CPUC Commissioners.
Comments
Current use of advanced conductors. The UC Energy Institute paper noted above, along with others, including an April 2023 Brattle Group white paper, Building a Better Grid: How Grid-enhancing Technologies Complement Transmission Buildouts, discusses how Grid-enhancing Technologies (GETs), including advanced conductors, can help improve transmission capacity and efficiency. These papers generally state that the use of these technologies have not been as quickly embraced in the United States, whereas their use has been more prevalent in other countries, particularly in European countries and India. In California, advanced conductors have been deployed, particularly by Southern California Edison (SCE) who has deployed reconductoring projects, including the Big Creek-Ventura 220-kV network. In its most recent transmission plan, the CAISO listed out 17 approved transmission projects since 2013-14 transmission plan to deploy GETs, particularly flow controllers, advanced conductors, and dynamic voltage controls.
Federal efforts to encourage use of GETs and advanced conductors. At the federal level, the Federal Energy Regulatory Commission (FERC) recently adopted (May 13, 2024) a transmission and cost allocation rule, Order No. 1920, “Building for the Future Through Electric Regional Transmission Planning and Cost Allocation and Generator Interconnection” (RM21-17-000) which among its provisions requires public utility transmission providers to more fully consider the use of GETs, such as dynamic line ratings, advanced power flow control devices, advanced conductors and transmission switching, in their transmission planning. The CPUC has also shared that they, along with the CEC, CAISO, Pacific Gas & Electric (PG&E), SCE, and Energy Institute at Haas are currently pursuing a Department of Energy Grid Resilience and Innovation Partnership program (GRIP) grant (eight years long) to deploy advanced conductors and two other GETs technologies: dynamic line rating and real-time short circuit duty monitoring. More recently, on May 28th, the White House announced the launch of a Federal-State Modern Grid Deployment Initiative to accelerate improvements to the electric transmission and distribution network to help meet “the country’s objectives for affordable, clean, reliable, and resilient power.” The Initiative involves a commitment from the Federal government and 21 states, including California, to work together to increase cooperation on transmission planning, including specific commitments to expand the use of GETs and advanced conductors. This Initiative is intended to build up a recent Department of Energy announcement to expand a categorical exclusion under the NEPA for upgrading and rebuilding transmission lines, including for reconductoring.
Impacts to ratepayers. The actual savings benefits for the use of advanced conductors will vary by transmission line. Both the Brattle Group and Energy Institute papers cite opportunities for savings and efficiency benefits from the use of GETs and advanced conductors. Advanced conductors have a higher up-front cost as compared to conventional aluminum conductors – roughly two to three times the costs – though they have the potential for long-term savings given the potential to double the capacity of conventional conductors. However, one of the main hurdles of deploying advanced conductors is the need to remove the line from service or attempt in-service work. As stated in the Energy Institute paper, “Transmission networks are complex, and the actual increase in power transfer capacity offered by reconductoring is determined by a multitude of factors beyond the scope of this analysis. We recommend that transmission owners, ISOs, and RTOs perform more detailed studies…to evaluate the wide-scale deployment of advanced conductors in their networks.”
Impacts to existing rulemaking and review process. The dates by when the CPUC must make changes to the GO order and advice letter filing proposed in this bill, January 1, 2026, could affect the existing CPUC rulemaking proceeding. As this bill moves forward the author may wish to consider whether a change in the timing is warranted. Additionally, the opposition to this bill notes concerns about the review process proposed in this bill, authorizing a Tier 2 advice letter process for approval of advanced reconductoring transmission projects. A Tier 2 advice letter process would help expedite the deployment of transmission projects, many which are needed to support the state’s efforts to achieve its climate goals. However, the need for a robust review of costs and impacts will vary by the projects. As such, a Tier 2 advice letter process may not be sufficient in instances where transmission projects could be more complicated and costly and where less expensive alternatives exist.
Prior/Related Legislation
AB 2779 (Petrie-Norris, 2024) requires the CAISO, upon approval of the annual transmission plan, to report on any new use of any grid enhancing technology and its associated cost or efficiency savings. The bill is pending on the Senate Floor.
SB 1006 (Padilla, 2024) requires electrical transmission utilities, by January 1, 2026, to develop a strategic plan for GETs to cost-effectively increase transmission capacity and to complete an evaluation to identify which of its transmission and distribution lines can be reconductored with advanced reconductors. Requires these plans and evaluations are submitted to the CPUC and made publicly available. The bill is pending in the Assembly.
SB 319 (McGuire, Chapter 390, Statutes of 2023) required the CEC and the CPUC, in coordination with the CAISO, to better and regularly coordinate planning and permitting of energy transmission infrastructure to ensure the state meets its clean energy goals and to evaluate and report on that planning and related infrastructure development.
SB 529 (Hertzberg, Chapter 357, Statutes of 2022) exempted an extension, expansion, upgrade, or other modification of an existing transmission line or substations from the requirement of a CPCN and directed the CPUC to revise its GO, by January 1, 2024, to instead use its PTC process for these approvals.
SB 887 (Becker, Chapter 358, Statutes of 2022) required 15-year projections of energy resource portfolios and energy demand to inform transmission planning to achieve the state’s clean energy goals, and required the CAISO to consider approval for specified transmission projects as part of the 2022-23 transmission planning process.
FISCAL EFFECT: Appropriation: Fiscal Com.: Local:
SUPPORT:
Clean Power Campaign, Sponsor
350 Humboldt
350 Sacramento
Advanced Energy United
California Energy Storage Alliance
California Environmental Voters
California Wind Energy Association
Climate Action California
Environment California
Environmental Defense Fund
Independent Energy Producers Association
Large-scale Solar Association
Santa Cruz Climate Action Network
Solar Energy Industries Association
The Climate Reality Project, CA Coalition
Union of Concerned Scientists
OPPOSITION:
California Solar & Storage Association
ARGUMENTS IN SUPPORT: In support of this bill, the Clean Power Campaign states:
While California needs to get a move-on with new transmission lines that take about a decade to complete, there is a more timely need to harden and increase capacity on the existing grid in the nearer term—a modern suite of advanced transmission technologies can offer a solution, as long as we design the policy to enable their deployment. Advanced conductors feature materials like carbon fiber or composite cores, which offer superior conductivity and strength compared to traditional aluminum core lines. These upgraded conductors can offer increased transmission capacity along existing rights-of-way when used to replace aging lines. Their increased structural integrity also means reductions in grid failures and wildfire risk, and cost savings in maintenance and grid efficiency that get passed down to ratepayers. AB 3246 offers an incentive for utilities to use advanced conductors when upgrading their transmission infrastructure. …This greatly reduces the timeline and hurdles around approving these simple but efficient upgrade projects.
ARGUMENTS IN OPPOSITION: In opposition to this bill, the California Solar and Storage Association (CALSSA) states:
AB 3246 would change the approval process for advanced reconductoring to a Tier 2 advice letter. Advanced reconductoring is a process of replacing existing transmission lines with wires using more advanced materials that can carry more electricity. It is an important solution for increasing California’s capacity to transmit power from large-scale renewable energy facilities to population centers. However, advanced conductors cost 2-4 times as much as traditional conductors. Given that utilities have a profit motive to spend more money on transmission, there is a risk that they will undertake projects that are not in the best interests of ratepayers.
CALSSA understands the utilities’ interest in reducing the review process for proposed advanced reconductoring, but a Tier 2 advice letter is not sufficient scrutiny for projects that can cost hundreds of millions of dollars. At a minimum, these projects should receive the level of review and public visibility involved with Commission votes.
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 3246
Author:(Garcia)
As Amended Ver:March 18, 2024
Majority vote
SUMMARY
Directs the California Public Utilities Commission (CPUC) to allow an investor-owned utility (IOU) to use a simplified permitting process to install advanced reconductoring on its existing electrical transmission lines.
Major Provisions
1) Directs the CPUC, on or before January 1, 2026, to provide an exemption to its general order governing permitting construction of transmission lines (GO 131-D) so that an IOU may use the commission's informal advice letter process to seek permission to install advanced reconductoring of a transmission line, even if the transmission line in question is above 200 kilovolts (kV) voltage level.
2) Specifies an IOU seeking such permission is to file with the CPUC a Tier 2 Advice Letter.
3) Defines "advanced conductor" to mean an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance of at least 10% lower than existing conductors of a similar diameter on the system, and "advanced reconductoring" to mean replacing an existing transmission or distribution line with an advanced conductor.
COMMENTS
California's Transmission Development. A recent study by the Clean Air Task Force and the Environmental Defense Fund concluded a doubling — at a minimum — of transmission capacity is needed to interconnect new renewables by 2045. Unfortunately, the current transmission development process is lengthy and complex and can take over a decade from conception to completion as permitting and siting may require approvals from a wide range of stakeholders that include federal, state and local agencies, and landowners.
CPUC GO 131-D. It establishes the rules relating to the planning and construction of electric generation facilities, electric line facilities and substations. The general order distinguishes electrical lines according to their operating capacities: a transmission line being one designed to operate at or above 200 kV, a power line being one designed to operate between 50 kV and 200kV, and a distribution line being one designed to operate under 50 kV. As such, the CPUC makes differing permit requirements applicable to each type of electrical line as follows:
- An IOU seeking to construct a major electric transmission line in California – again, one designed to operate at or above 200kV – must first receive a Certificate of Public Convenience and Necessity (CPCN) from the CPUC.
- An IOU seeking to construct a power line – again, one designed to operate between 50 kV and 200 kV – must first receive from the CPUC a "permit to construct."
- An IOU seeking to construct a distribution line – again, one designed to operate below 50kV – needs neither a CPCN nor a permit to construct; nor does it need a discretionary permit or approval by local governments (though the CPUC general order requires the IOU to communicate with, and obtain the input of, local authorities regarding land use matters and obtain any nondiscretionary local permits).
GO 131-D Reforms. In 2022, the Legislature passed SB 529 (Hertzberg, Chapter 357, Statutes of 2022), which directed the CPUC to revise GO 131-D by January 1, 2024, to authorize a utility to use the Permit to Construct (PTC) process, instead of the CPCN process, or claim an exemption to seek approval to construct an extension, expansion, upgrade or other modification to its existing transmission facilities regardless of the voltage level.
Advanced Reconductoring. Reconductoring can replace an old line with a new one with the identical conductor technology, or it can utilize different conductor technologies. This process can create new transmission capacity faster and more cost-effectively in the absence of new, large-scale transmission facilities. The California Independent System Operator (CAISO) supports the deployment of these technologies and has considered them on a case by case basis as potential alternatives in its annual transmission planning process.
Advice Letter. An advice letter is a request by a utility for CPUC approval, authorization, or other relief, including a request for approval to change rates, charges, terms or conditions contained in the utility's tariffs currently in effect. The advice letter process provides a faster and simplified review of the types of utility requests that are expected neither to be controversial nor to raise important policy questions. There are three tiers of advice letters as follows:
- Tier 1 advice letter is effective upon publication by the utility
- Tier 2 advice letter needs to be approved by CPUC staff
- Tier 3 advice letter needs to be approved by a vote of the CPUC Commissioners
A Tier 2 advice letter as this bill provides is essentially a simpler process to go through than a PTC or a CPCN, and inherently subject to less intense scrutiny as a result.
According to the Author
According to the Author, "California faces a transmission crisis if we are unable to drastically increase the capacity on the existing grid in the near term while awaiting the approval and buildout of new transmission projects (taking on average 10 years), in addition to threats against grid-reliability, affordability, and clean energy curtailment. Advanced conductors can help resolve these problems in both the interim and longer-term, but there are currently little-to-no incentives for IOUs to utilize this technology. AB 3246 offers an easier, shorter permitting route for reconductoring projects that utilize advanced conductors, expanding grid capacity quickly and cost-effectively."
Arguments in Support
This bill is supported by a several energy industry associations and environmental groups, such as the Environmental Defense Fund (EDF), which describes advanced reconductoring as "cost-effective" with an "overall ability to deploy them to add additional capacity on a relatively quick time scale."
Arguments in Opposition
This bill is opposed by California Solar and Storage Alliance (CALSSA), which, "understands the utilities' interest in reducing the review process for proposed advanced reconductoring, but a Tier 2 advice letter is not sufficient scrutiny for projects that can cost hundreds of millions of dollars. At a minimum, these projects should receive the level of review and public visibility involved with Commission votes."
FISCAL COMMENTS
According to the Assembly Appropriations Committee, the CPUC anticipates needing one permanent position in the classification of Public Utilities Regulatory Analyst V, at an annual cost of $210,000 to support the work of this bill. In addition $20,000 would be needed for related travel and training costs annually.
VOTES
ASM UTILITIES AND ENERGY: 16-0-0
YES: Petrie-Norris, Jim Patterson, Bauer-Kahan, Calderon, Chen, Connolly, Friedman, Holden, Joe Patterson, Reyes, Santiago, Schiavo, Ting, Wallis, Wood, Zbur
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Sanchez, Arambula, Bryan, Calderon, Wendy Carrillo, Dixon, Mike Fong, Grayson, Haney, Hart, Jim Patterson, Pellerin, Ta, Villapudua
UPDATED
VERSION: March 18, 2024
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0003249
Date of Hearing: May 8, 2024
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 3246
Author:(Garcia) – As Amended Ver:March 18, 2024
Policy Committee: | Utilities and Energy | Vote: | 16 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill directs the California Public Utilities Commission (CPUC) to allow an investor-owned utility (IOU) to use a less-burdensome permitting process to install advanced reconductoring on its existing electrical transmission lines.
Specifically, this bill:
- Directs the CPUC, on or before January 1, 2026, to provide an exemption to its general order governing permitting construction of transmission lines (GO 131-D) so that an IOU may use the commission’s informal advice letter process to seek permission to install advanced reconductoring of a transmission line, even if the transmission line in question is above 200 kilovolts (kV) voltage level.
- Specifies an IOU seeking such permission is to file with the CPUC a Tier 2 Advice Letter.
- Defines “advanced conductor” to mean an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance at least 10% lower than existing conductors of a similar diameter on the system, and “advanced reconductoring” to mean replacing an existing transmission or distribution line with an advanced conductor.
FISCAL EFFECT:
The CPUC anticipates needing one permanent position in the classification of Public Utilities Regulatory Analyst V, at an annual cost of $210,000, to (1) implement revision of its GO 131-D and (2) support review of advanced reconductoring projects seeking approval via advice letter, in addition to $20,000 annually in related travel and training costs (Public Utilities Commission Utilities Reimbursement Account (PUCURA)).
It seem reasonable to expect the workload of the new CPUC position to diminish to less than full time following revision of GO 131-D. However, CPUC reports it expects this bill to result in the submission of hundreds of additional advice letters per year, so asserts the workload will be ongoing.
COMMENTS:
- Purpose. The author intends this bill to make it easier, and quicker, to permit certain electric line projects, in order to help achieve the state’s clean energy goals. According to the author:
California faces a transmission crisis if we are unable to drastically increase the capacity on the existing grid in the near term while awaiting the approval and buildout of new transmission projects (taking on average 10 years), in addition to threats against grid-reliability, affordability, and clean energy curtailment. Advanced conductors can help resolve these problems in both the interim and longer-term, but there are currently little-to-no incentives for IOUs to utilize this technology. AB 3246 offers an easier, shorter permitting route for reconductoring projects that utilize advanced conductors, expanding grid capacity quickly and cost-effectively.
- Background. Acting on power granted by the Legislature, the CPUC adopted rules governing a utility’s construction of an electrical line. Specifically, CPUC GO131-D establishes the rules relating to the planning and construction of electric generation facilities, electric line facilities and substations. The general order distinguishes electrical lines according to their operating capacities: a transmission line being one designed to operate at or above 200 kV, a power line being one designed to operate between 50 kV and 200kV, and a distribution line being one designed to operate under 50 kV. And the CPUC makes differing permit requirements applicable to each type of electrical line:
- An IOU seeking to construct a major electric transmission line in California—again, one designed to operate at or above 200kV—must first receive a Certificate of Public Convenience and Necessity (CPCN) from the CPUC.
- An IOU seeking to construct a power line—again, one designed to operate between 50 kV and 200 kV—must first receive from the CPUC a “permit to construct.”
- An IOU seeking to construct a distribution line—again, one designed to operate below 50kV—needs neither a CPCN nor a permit to construct; nor does it need a discretionary permit or approval by local governments (though the CPUC general order requires the IOU to communicate with, and obtain the input of, local authorities regarding land use matters and obtain any nondiscretionary local permits).
In 2022, the Legislature passed SB 9 (Hertzberg, Chapter 357, Statutes of 2022), which directed the CPUC to revise GO 131-D to authorize a utility to use the Permit to Construct (PTC) process, instead of the CPCN process, or claim an exemption to seek approval to construct an extension, expansion, upgrade or other modification to its existing transmission facilities regardless of the voltage level by January 1, 2024.
This bill would allow an IOU to use the commission’s informal advice letter process—instead of the PTC process—to seek permission to install advanced reconductoring of a transmission line, even if the transmission line in question is above 200 kV voltage level. The commission’s advice letter process, which is generally less burdensome to the applicant than the PTC process. The CPUC describes an advice letter as:
an informal request by a utility for Commission approval, authorization, or other relief, including an informal request for approval to furnish service under rates, charges, terms or conditions other than those contained in the utility’s tariffs then in effect.
The commission provides for advice letters of increasing scrutiny, depending on the nature of the request to be considered via the advice letters. A tier 1 advice letter is effective upon publication by the utility. A tier 2 advice letter must be approved by staff of the commission’s Energy Division. A tier 3 advice letter must be approved by a vote of the CPUC commissioners.
- Support and Opposition. This bill is supported by a several energy industry associations and environmental groups, such as the Environmental Defense Fund (EDF), which describes advanced reconductoring as “cost-effective” with an “overall ability to deploy them to add additional capacity on a relatively quick time scale,” leading EDF to write it “fundamentally agrees that this type of upgrade is not appropriate for the GO 131 process and that the overall exemption is appropriate.”
The bill is formally opposed by only the California Solar and Storage Alliance (CALSSA), which writes it:
understands the utilities’ interest in reducing the review process for proposed advanced reconductoring, but a Tier 2 advice letter is not sufficient scrutiny for projects that can cost hundreds of millions of dollars. At a minimum, these projects should receive the level of review and public visibility involved with Commission votes.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: April 17, 2024
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 3246 (
Author:Garcia) – As Amended Ver:March 18, 2024
SUBJECT: Electricity: permit to construct: advanced reconductoring: exemption
SUMMARY: Requires the California Public Utilities Commission (CPUC) to revise General Order 131-D to approve requests for the advanced reconductoring of transmission projects through the CPUC’s informal advice letter process.
Specifically, this bill:
- Requires, by January 1, 2026, the CPUC to update General Order 131-D to provide an electrical corporation with an exemption from the requirement to receive a Permit to Construct (PTC) and instead authorize the approval of advanced reconductoring of transmission projects through the informal Tier 2 advice letter process, regardless of whether the voltage of the facility being modified exceeds 200 kilovolts (kV).
- Requires the advice letter to contain specific information, including, an estimate of the increased capacity expansion, and a demonstration that the advanced reconductoring is a prudent and reasonable investment.
- Defines “advanced conductors” to mean electricity wires that decrease electrical resistance by at least 10% and “advanced reconductoring” as the replacement of existing conductors with advanced conductors.
EXISTING LAW:
- Authorizes the CPUC to supervise and regulate every public utility, including electrical corporations, and to do all things that are necessary and convenient in the exercise of that power and jurisdiction. (Public Utilities Code §201 et seq., and §701)
- Requires the CPUC to certify the “public convenience and necessity” for a transmission line over 200 kilovolts (kV) before an electrical corporation may begin construction (This process is known as a Certificate of. Public Convenience and Necessity (CPCN). The CPCN process includes CEQA review of the proposed project, as well as validation of the need for the project. The CPCN confers eminent domain authority for construction of the project. A CPCN is not required for the extension, expansion, upgrade, or other modification of an existing electrical transmission facility, including transmission lines and substations. (Public Utilities Code § 1001)
- Requires an electrical corporation to obtain a discretionary PTC from the CPUC for electrical power line projects between 50-200 kV. A PTC may be exempt from CEQA pursuant to CPUC orders and existing provisions of CEQA. Electrical distribution line projects under 50 kV do not require a CPCN or PTC from the CPUC, nor discretionary approval from local governments, and therefore are not subject to CEQA. (CPUC General Order (GO) 131-D)
- Requires the CPUC, by January 1, 2024, to update GO 131-D to authorize IOUs to use the PTC process or claim an exemption under GO 131-D Section III(B) to seek approval to construct an extension, expansion, upgrade, or other modification to its existing electrical transmission facilities, including electric transmission lines and substations within existing transmission easements, rights of way, or franchise agreements, irrespective of whether the electrical transmission facility is above 200 kV. (Public Utilities Code § 564)
- Establishes the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90% of all retail sales of electricity to California end-use customers by December 31, 2035, 95% of all retail sales of electricity to California end-use customers by December 31, 2040, 100% of all retail sales of electricity to California end-use customers by December 31, 2045, and 100% of electricity procured to serve all state agencies by December 31, 2035. (Public Utilities Code § 454.53)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations for its review.
BACKGROUND:
California’s Ambitious goals. SB 100 (De León, Chapter 312, Statutes of 2018) established the state policy that renewable and zero-carbon resources supply 100% of retail sales and electricity procured to serve all state agencies by 2045.[1] This policy was recently updated under SB 1020 (Laird, Chapter 361, Statutes of 2022) by accelerating the requirement on state agencies to 100% by 2035, and establishing interim targets to meet the sector-wide 100% goal. The updated 2022 Scoping Plan[2] released by the California Air Resources Board (CARB) in December 2022 calls for targets of 38 million metric tons of carbon dioxide equivalent (MMTCO2e) in 2030 and 30 MMTCO2e in 2035 in the electricity sector.[3] These sector-wide targets establish the planning goal that informs all subsequent electricity procurement and transmission planning.
California’s Transmission Development. A recent study by the Clean Air Task Force and the Environmental Defense Fund concluded a doubling — at a minimum — of transmission capacity is needed to interconnect new renewables by 2045.[4] Unfortunately, the current transmission development process is lengthy and complex and can take over a decade from conception to completion as permitting and siting may require approvals from a wide range of stakeholders that include federal, state and local agencies, and landowners.
Transmission Planning Process (TPP). Each year, the California Independent System Operator (CAISO) conducts its TPP to identify potential system limitations as well as transmission projects in need of upgrades or new infrastructure in need of construction to improve reliability and efficiency.[5] The TPP fulfills the CAISO’s core responsibility to identify and develop solutions to meet the future needs of the electricity grid. The TPP relies on the CPUC’s integrated resource plan (IRP) process[6] to identify the optimal mix of system-wide resources capable of meeting greenhouse gas planning targets for the electric sector. CAISO receives the IRP results as inputs into its TPP.
The Transmission Permitting Process. Usually, utilities proposing the construction of new transmission are required to obtain a permit from the CPUC for construction of certain specified infrastructure listed under Public Utilities Code §1001, including transmission projects. The CPUC reviews permit applications under two concurrent processes:
- An environmental review of applicable projects pursuant to CEQA and CPUC environmental rules. To prepare for the environmental review, the utility first conducts and submits a Proponents Environmental Assessment (PEA). The PEA is a preliminary assessment of the project’s potential environmental impacts and alternatives. Some projects may trigger a federal National Environmental Policy Act (NEPA) review if they cross federal land or use federal funds.
- The review of project needs and costs according to Public Utilities Code §1001 and General Order (GO) 131-D, also known as a CPCN, or — depending on project size — a PTC.
Permit/Certificate Review. Parallel to environmental review under CEQA, the CPUC reviews the utility’s application for a CPCN or a PTC, depending on the size of the project. The CPUC’s decision on the CPCN or PTC cannot be issued until the environmental review is complete, if one is required. But most transmission projects are categorically exempt from CEQA.[7] Most of the CPCN/PTC process is outlined in General Order (GO) 131-D.
CPUC’s GO 131-D. GO 131-D was first adopted in 1970 and before a recent update late in 2023, it had not been updated since 1995. It establishes the criteria to be followed to trigger the need for a permit to construct (PTC) or renovate electrical facilities, including transmission lines and substations, and also sets out public notice requirements for proposed transmission projects.[8] The level of analysis performed by the CPUC pursuant to GO 131-D varies with the size (measured in voltage) of the transmission project.
- Projects below 50 kV are considered distribution line projects and in general, do not require CPUC approval.
- Projects between 50 kV and 200 kV generally require a PTC, which includes an environmental review pursuant to CEQA, if applicable. The CPUC process generally does not require a detailed analysis of the need for or economics of these projects. An application for a PTC must be filed at least 9 months before a decision is required.
- Projects over 200 kV generally require a Public Convenience and Necessity (CPCN)and are subject to CEQA review, as applicable. The CPCN process analyzes the need for the project and the economics of the project, as well as, the environmental impacts of the project if CEQA applies. An application for a CPCN must be filed at least 12 months before a decision is required.
GO 131-D Reforms. SB 529 (Hertzberg, Chapter 357, Statutes of 2022)[9] sought to revise the permitting process at the CPUC. The bill directed the CPUC to revise GO 131-D to authorize a utility to use the PTC process or claim an exemption to seek approval to construct an extension, expansion, upgrade, or other modification to its existing transmission facilities regardless of the voltage level by January 1, 2024. However, CEQA still applies. In May 2023, the CPUC opened a rulemaking to solicit comments that would revise the GO 131-D rules to accommodate this legislation.[10] Based on the feedback, the assigned commissioner determined the issues to be considered in the proceeding should be separated into two phases. Phase 1 includes consideration of changes to GO 131-D necessary to conform it to the requirements of SB 529 and updates to outdated references. Phase 1 decision was approved on December 14, 2023. Currently, the CPUC is in Phase 2 of this proceeding, which includes consideration of changes to GO 131-D not addressed in the Phase 1.
Advanced Reconductoring. As eluded earlier in the background, the transmission planning and permitting process can be complex and can take more than a decade from start to finish. As such, some have argued, “[w]ithout revisions to current planning and permitting processes, it will be tremendously difficult for California to authorize new transmission capacity, to connect new clean generation to the grid, and meet its clean energy and climate goals.”[11]Due to these challenges in building new transmission, transmission planners are looking solutions within the existing electric grid infrastructure. However, the current grid infrastructure is aging. In that regard, technology capable of simultaneously addressing both capacity expansion and aging infrastructure needs may be helpful.
Advanced reconductoring means replacing an existing transmission or distribution line with an advanced conductor. Advanced conductors refers to conductive material used in transmission lines with lower-than-average resistance. Reconductoring can replace an old line with a new one with the identical conductor technology, or it can utilize different conductor technologies.[12] This process can create new transmission capacity faster and cost-effectively in the absence of new, large-scale transmission. CAISO supports the deployment of these technologies and has considered them on a case by case basis as potential alternatives in its annual transmission planning processes.[13] One of the primary barriers to the adoption of more advanced conductors is cost.
Advice Letter. An advice letter is a request by a utility for CPUC approval, authorization, or other relief, including a request for approval to change rates, charges, terms or conditions contained in the utility's tariffs currently in effect. An advice letter is an informal request made to the CPUC outside a formal proceeding such as an application, complaint, investigation, or rulemaking at the Commission. The advice letter process provides a faster and simplified review of the types of utility requests that are expected neither to be controversial nor to raise important policy questions. [14] Commission General Order 96-B governs the various rules on advice letters. There are three tiers of advice letters as follows:
- Tier 1 advice letter is effective upon publication by the utility
- Tier 2 advice letter needs to be approved by CPUC staff
- Tier 3 advice letter needs to be approved by a vote of the CPUC Commissioners
This bill would allow requests for approval of advance reconductoring via Tier 2 advice letter.
COMMENTS:
- Author’s Statement. According to the author, “California faces a transmission crisis if we are unable to drastically increase the capacity on the existing grid in the near term while awaiting the approval and buildout of new transmission projects (taking on average 10 years), in addition to threats against grid-reliability, affordability, and clean energy curtailment. Advanced conductors can help resolve these problems in both the interim and longer-term, but there are currently little-to-no incentives for IOUs to utilize this technology. AB 3246 offers an easier, shorter permitting route for reconductoring projects that utilize advanced conductors, expanding grid capacity quickly and cost-effectively."
- Definitions. California has currently not defined advance conductoring and advanced conductor. This bill defines: “advanced conductor” to mean an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance at least 10% lower than existing conductors of a similar diameter on the system, and “Advanced reconductoring” to mean replacing an existing transmission or distribution line with an advanced conductor.
- Faster Approval Process. This bill requires by January 1, 2026, the CPUC to update General Order 131-D, by providing a utility with an exemption from requiring a PTC and instead authorize the approval of advanced reconductoring of transmission projects through the informal Tier 2 advice letter process, which requires CPUC approval at the staff level. The author contends that this process generally reduce permitting timelines for transmission projects. As referenced in the background, transmission projects between 50 kV and 200 kV generally require a PTC, and facilities over 200 kV generally require a CPCN, under existing law. A Tier 2 advice letter is essentially a simpler process to go through than a PTC or a CPCN, but also inherently subject to less intense scrutiny as a result.
- Related Legislation
AB 2779 (Petrie-Norris) would require the CAISO, upon approval of each transmission plan, to report to the CPUC and the Legislature any new use of grid-enhancing technology in the plan and the associated cost or efficiency savings of that deployment. Status: pending hearing in the Assembly Committee on Utilities and Energy. Status: pending hearing in the Senate Committee on Energy, Utilities, and Communications.
AB 3238 (Garcia) among other requirements, exempts projects that would require a certificate of public necessity and convenience (CPCN) from the California Public Utilities Commission (CPUC) and any other electrical infrastructure projects, as defined, from existing requirements to compare prospective projects with cost-effective alternatives such as energy efficiency, distributed generation, and demand response resources. Status: pending hearing in the Assembly Committee on Water, Parks and Wildlife.
SB 1006 (Padilla) would require specified utilities to jointly prepare a grid-enhancing technology strategic plan, and to evaluate which existing circuits may be reconductored cost-effectively, among other changes. Status: pending hearing in the Senate Committee on Energy, Utilities, and Communications.
- Prior Legislation.
SB 1020 (Laird) accelerated the 100% Clean Energy Policy to require electricity procured to serve all state agencies be 100% clean energy by 2035, and established interim targets to meet the sector-wide 100% goal. Status: Chapter 361, Statutes of 2022.
SB 529 (Hertzberg) exempted an extension, expansion, upgrade, or other modification of an existing transmission line or substations from the requirement of a CPCN and directs the CPUC to revise its general orders, by January 1, 2024, to instead use its PTC process for these approvals. Status: Chapter 357, Statutes of 2022.
SB 887 (Becker) directed, among other provisions, the CPUC, on or before January 15, 2023, to request CAISO to identify the highest priority anticipated transmission facilities that are needed to deliver renewable energy resources or zero-carbon resources. Status: Chapter 358, Statutes of 2022.
SB 7 (Atkins) extended the Jobs and Economic Improvement Through Environmental Leadership Act, specifically providing the Governor until January 1, 2024, to certify a project and the Act will be repealed by its own provisions on January 1, 2026. Status: Chapter 19, Statutes of 2021.
SB 100 (de León) established the state policy that renewable and zero-carbon resources supply 100% of retail sales and electricity procured to serve all state agencies by 2045. Status: Chapter 312, Statutes of 2018.
SB 1037 (Kehoe) established a “non-wires” consideration in transmission project approvals at the CPUC. Status: Chapter 366, Statutes of 2005).
REGISTERED SUPPORT / OPPOSITION:
Support
350 Humboldt
350 Sacramento
California Energy Storage Alliance
California Environmental Voters (formerly Clcv)
California Wind Energy Association
Climate Action California
Climate Reality Project, California Coalition
Environmental Defense Fund
Independent Energy Producers Association
Large-scale Solar Association
Santa Cruz Climate Action Network
Solar Energy Industries Association
Oppose Unless Amended
California Solar & Storage Association
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
Public Utilities Code §454.53 ↑
In its previous draft plan, CARB set the electric sector targets at 38 million metric tons of carbon dioxide equivalent (MMTCO2e) in 2030 and 30 MMTCO2e in 2045. ↑
Pg.75, CARB, “DRAFT 2022 Scoping Plan Update,” May 10, 2022 ↑
Lucid Catalyst, Clean Air Task Force, and the Environmental Defense Fund, “California’s Clean Energy Transition: Understanding Today’s Challenges to Reach Tomorrow’s Goals,” presentation January 18, 2022. ↑
There are other transmission planning efforts, including local capacity requirements, special studies, interregional transmission project, and others that are not mentioned here for sake of clarity. ↑
Called for under SB 350 (De León, Chapter 547, Statutes of 2015). IRP provides the umbrella process by which the CPUC oversees long-term procurement for its regulated load-serving entities. ↑
From a data request to the CPUC by this committee on March 29, 2023, in which there were 602 instances between 2012-2023 of projects for which the applicant filed an advice letter at the CPUC noting they were using an exemption to the CEQA document requirement process. There are a variety of exemptions claimed, including categorical exemptions. They CPUC does not track the type of exemptions claimed per advice letter. ↑
Public Utilities Code § 451,701,702,761, 762,768,770, and 1001 ↑
Public Utilities Code §564 ↑
CPUC, “CPUC To Update Transmission Siting Regulations To Address Electricity Reliability and Climate Goals”; https://www.cpuc.ca.gov/news-and-updates/all-news/cpuc-to-update-transmission-siting-regulations-2023 ↑
Pg. 2, “Clean Air Task Force, “Transmission Development in California – What’s the Slowdown?”; January 2023 ↑
Pg. 10, Grid Strategies; Jay Caspary & Jesse Schneider “Advanced Conductors on Existing Transmission Corridors to Accelerate Low Cost Decarbonizaztion”. ↑
Pg. 24, CAISO; “2023-2024 Transmission Plan”. ↑
CPUC, “About Advice Letters” https://www.cpuc.ca.gov/about-cpuc/divisions/water-division/wd-advice-letters-section/wd-about-advice-letters ↑
Discussed in Hearing
Senate Standing Committee on Appropriations
Senate Standing Committee on Energy, Utilities and Communications
Assembly Floor
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):