AB 65: Energy: nuclear generation facilities.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2023-02-14
Current Status:
Failed
(2024-02-01: From committee: Filed with the Chief Clerk pursuant to Joint Rule 56.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law prohibits the State Energy Resources Conservation and Development Commission (Energy Commission) from certifying a nuclear fission thermal powerplant, except for specified powerplants, and provides that a nuclear fission thermal powerplant, except those specified powerplants, is not a permitted land use in California, unless certain conditions are met regarding the existence of technology for the construction and operation of nuclear fuel rod processing plants and of demonstrated technology or means for the disposal of high-level nuclear waste, as specified.
This bill would repeal those provisions. exempt small modular reactors, as defined, from those provisions.
Existing law vests the Public Utilities Commission (PUC) with regulatory authority over electrical corporations and gas corporations. Under existing law, it is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 100% of all retail sales of electricity to California end-use customers and 100% of electricity procured to serve all state agencies by December 31, 2045. Existing law requires the PUC, the Energy Commission, and all other state agencies to incorporate that policy into all relevant planning.
This bill would require the PUC, on or before January 1, 2026, to adopt a plan to increase the procurement of electricity generated from nuclear facilities and to phase out the procurement of electricity generated from natural gas facilities.
Existing law prohibits the State Energy Resources Conservation and Development Commission from certifying a nuclear fission thermal powerplant, except for specified powerplants, and provides that a nuclear fission thermal powerplant, except those specified powerplants, is not a permitted land use in California, unless certain conditions are met regarding the existence of technology for the construction and operation of nuclear fuel rod processing plants and of demonstrated technology or means for the disposal of high-level nuclear waste, as specified.
This bill would repeal those provisions.
(a)Except for the existing Diablo Canyon Units 1 and 2 owned by Pacific Gas and Electric Company and San Onofre Units 2 and 3 owned by Southern California Edison Company and San Diego Gas and Electric Company, no a nuclear fission thermal powerplant requiring the reprocessing of fuel rods, including any to which this chapter does not otherwise apply, excepting any except those having a vested right as defined in this section, shall not be a permitted land use in the state or, where applicable, certified by the commission until both of the following conditions are met:
(1)The commission finds that the United States through its authorized agency has identified and approved, and there exists a technology for the construction and operation of, nuclear fuel rod reprocessing plants.
(2)(A)The commission has reported its findings and the reasons therefor pursuant to paragraph (1) to the Legislature. That report shall be assigned to the appropriate policy committees for review. The commission may proceed to certify nuclear fission thermal powerplants 100 legislative days after reporting its findings unless within those 100 legislative days either house of the Legislature adopts by a majority vote of its members a resolution disaffirming the findings of the commission made pursuant to paragraph (1).
(3)(B)A resolution of disaffirmance shall set forth the reasons for the action and shall provide, to the extent possible, guidance to the commission as to an appropriate method of bringing the commissions findings into conformance with paragraph (1).
(4)(C)If a disaffirming resolution is adopted, the commission shall reexamine its original findings consistent with matters raised in the resolution. On conclusion of its reexamination, the commission shall transmit its findings in writing, with the reasons therefor, to the Legislature.
(5)(D)If the findings are that the conditions of paragraph (1) have been met, the commission may proceed to certify nuclear fission thermal powerplants 100 legislative days after reporting its findings to the Legislature unless within those 100 legislative days both houses of the Legislature act by statute to declare the findings null and void and takes appropriate action.
(6)(E)To allow sufficient time for the Legislature to act, the reports of findings of the commission shall be submitted to the Legislature at least six calendar months prior to before the adjournment of the Legislature sine die.
(b)The commission shall further find on a case-by-case basis that facilities with adequate capacity to reprocess nuclear fuel rods from a certified nuclear facility or to store that fuel if that storage is approved by an authorized agency of the United States are in actual operation or will be in operation at the time that the nuclear facility requires reprocessing or storage; provided, however, that storage if the storage of fuel is in an offsite location to the extent necessary to provide continuous onsite full core reserve storage capacity.
(c)The commission shall continue to receive and process notices of intention and applications for certification pursuant to this division, but shall not issue a decision pursuant to Section 25523 granting a certificate until the requirements of this section have been met. All other permits, licenses, approvals, or authorizations for the entry or use of the land, including orders of court, which that may be required may be processed and granted by the governmental entity concerned, but construction work to install permanent equipment or structures shall not commence until the requirements of this section have been met.
(d)This section does not apply to a small modular reactor. For purposes of this subdivision, small modular reactor means a nuclear reactor with an electrical generating capacity of up to 300 megawatts per unit.
SEC. 2.Section 25524.2 of the Public Resources Code is amended to read:25524.2.(a)Except for the existing Diablo Canyon Units 1 and 2 owned by Pacific Gas and Electric Company and San Onofre Units 2 and 3 owned by Southern California Edison Company and San Diego Gas and Electric Company, no a nuclear fission thermal powerplant, including any to which this chapter does not otherwise apply, but excepting except those exempted herein, shall not be a permitted land use in the state, or state or, where applicable, be certified by the commission until both of the following conditions have been met:
(a)(1)The commission finds that there has been developed and that the United States through its authorized agency has approved and there exists a demonstrated technology or means for the disposal of high-level nuclear waste.
(b)(1)(2)(A)The commission has reported its findings and the reasons therefor pursuant to paragraph (a) (1) to the Legislature. That report shall be assigned to the appropriate policy committees for review. The commission may proceed to certify nuclear fission thermal powerplants 100 legislative days after reporting its findings unless within those 100 legislative days either house of the Legislature adopts by a majority vote of its members a resolution disaffirming the findings of the commission made pursuant to subdivision (a). paragraph (1).
(2)(B)A resolution of disaffirmance shall set forth the reasons for the action and shall provide, to the extent possible, guidance to the commission as to an appropriate method of bringing the commissions findings into conformance with subdivision (a). paragraph (1).
(3)(C)If a disaffirming resolution is adopted, the commission shall reexamine its original findings consistent with matters raised in the resolution. On conclusion of its reexamination, the commission shall transmit its findings in writing, with the reasons therefor, to the Legislature.
(4)(D)If the findings are that the conditions of subdivision (a) paragraph (1) have been met, the commission may proceed to certify nuclear fission thermal powerplants 100 legislative days after reporting its findings to the Legislature unless within those 100 legislative days both houses of the Legislature act by statute to declare the findings null and void and take appropriate action.
(5)(E)To allow sufficient time for the Legislature to act, the reports of findings of the commission shall be submitted to the Legislature at least six calendar months prior to before the adjournment of the Legislature sine die.
(c)As used in subdivision (a),(b)For purposes of this section, technology or means for the disposal of high-level nuclear waste means a method for the permanent and terminal disposition of high-level nuclear waste. Nothing in this This section requires does not require that facilities for the application of that technology or means be available at the time that the commission makes its findings. That disposition of high-level nuclear waste does not preclude the possibility of an approved process for retrieval of the waste.
(d)(c)The commission shall continue to receive and process notices of intention and applications for certification pursuant to this division division, but shall not issue a decision pursuant to Section 25523 granting a certificate until the requirements of this section have been met. All other permits, licenses, approvals, or authorizations for the entry or use of the land, including orders of court, which that may be required may be processed and granted by the governmental entity concerned, but construction work to install permanent equipment or structures shall not commence until the requirements of this section have been met.
(d)This section does not apply to a small modular reactor. For purposes of this subdivision, small modular reactor means a nuclear reactor with an electrical generating capacity of up to 300 megawatts per unit.
SEC. 3.Section 711 is added to the Public Utilities Code, to read:711.On or before January 1, 2026, the commission shall adopt a plan to increase the procurement of electricity generated from nuclear facilities and to phase out the procurement of electricity generated from natural gas facilities.
SECTION 1.Section 25524.1 of the Public Resources Code is repealed.SEC. 2.Section 25524.2 of the Public Resources Code is repealed.|
Date
|
Status
|
|---|---|
| Feb 1, 2024 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2024 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| Apr 11, 2023 | In committee: Set, second hearing. Failed passage. Reconsideration granted. |
| Mar 9, 2023 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Feb 15, 2023 | Re-referred to Com. on NAT. RES. |
| Feb 14, 2023 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Feb 2, 2023 | Referred to Coms. on NAT. RES. and U. & E. |
| Jan 4, 2023 | Read first time. |
| Dec 7, 2022 | From printer. May be heard in committee January 6. |
| Dec 6, 2022 | Introduced. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 10, 2023 | Do pass and be re-referred to the Committee on [Utilities and Energy] | Assembly Standing Committee on Natural Resources |
Failed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Alliance for Nuclear Responsibility | ** Against | |
| California Coastal Protection Network | ** Against | |
| Committee to Bridge the Gap | ** Against | |
| Environmental Working Group | ** Against | |
| FissionTransition | ** Support | |
| Generation Atomic | ** Support |
Date of Hearing: April 10, 2023
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Luz Rivas, Chair
ABPCA Bill Id:AB 65 (
Author:Mathis) – As Amended Ver:February 14, 2023
SUBJECT: Energy: nuclear generation facilities
SUMMARY: Exempts “small modular reactors” (SMR, a nuclear reactor up to 300 megawatts per unit) from the conditional moratorium on permitting new nuclear fission powerplants in California. Requires the Public Utilities Commission to adopt a plan to increase the procurement of electricity generated from nuclear facilities and to phase out the procurement of electricity generated from natural gas facilities.
EXISTING LAW prohibits any new nuclear fission power plant until the California Energy Commission (CEC) has determined that technologies exist for the reprocessing of nuclear fuel rods and the disposal of high-level nuclear waste. (Public Resources Code 25524.1 and 25524.2)
FISCAL EFFECT: Unknown
COMMENTS:
- Background. Since 2012, only one of the four nuclear power plants developed in California by electric utilities has continued to operate: PG&E’s Diablo Canyon powerplant. Two others, PG&E’s Humboldt Bay plant and SMUD’s Rancho Seco plant, have been decommissioned. Developed in the early 1960’s, Humboldt Bay was shut down in 1976 for refueling and never restarted due to seismic and cost issues. Developed in the early 1970’s, Rancho Seco was shut down in 1989 in response to voter referendum. The fourth, the San Onofre Nuclear Generating Station (SONGS) jointly owned by Southern California Edison and San Diego Gas and Electric, was closed in 2012 for repairs, permanently retired in 2013, and is in the process of decommissioning. High-level radioactive waste from these plants’ operation remains stored on site.
In 1976, the Legislature passed AB 2820 (Goggin) and AB 2822 (Nestande) to establish a moratorium on permitting new nuclear powerplants. Since that time, the CEC has not found that a high-level waste disposal technology has been demonstrated or approved. Likewise, the U.S. Nuclear Regulatory Commission (NRC), which regulates commercial nuclear power plants and other uses of nuclear materials, has never made a finding that a demonstrated technology exists for either nuclear fuel rod preprocessing plants or the disposal of high-level nuclear waste.
The moratorium was challenged by PG&E and ultimately reviewed by the U.S. Supreme Court. In PG&E v. Energy Commission, 461 U.S. 190 (1983), the Supreme Court upheld California's moratorium law. A key basis of the Court's decision was a division of authority to make safety determinations (federal) and economic determinations (state). The Court found that the absence of a permanent waste disposal site could lead to unknown negative economic consequences. So the moratorium has remained in effect and no new nuclear plant has been proposed in California since the Diablo Canyon and SONGS units that were in the permitting pipeline at the time the moratorium was enacted.
The federal government is responsible for providing for the permanent disposal of high-level radioactive waste and spent nuclear fuel and was required to begin accepting spent nuclear fuel from nuclear power plants by 1998. However, although Congress selected the Yucca Mountain site in Nevada for a permanent deep geologic repository for the disposal of spent nuclear fuel, the federal waste disposal program has been plagued with technical and legal challenges, managerial problems, licensing delays, persistent weaknesses in quality assurance for the program, and increasing costs.
No repository or reprocessing facility for spent nuclear fuel has been licensed in the U.S. The federal waste disposal program is paid for by the nuclear electricity generators and waste owners. Under the provisions of the federal Nuclear Waste Policy Act, utilities pay regular fees to the Nuclear Waste Fund to pay for siting, construction and operating a federal waste repository. California ratepayers have paid billions to fund a repository that has never been built. Reprocessing (the separation of spent fuel into high-level wastes and reusable fuel) remains substantially more expensive than waste storage and disposal and has adverse implications for the U.S. effort to halt the proliferation of nuclear weapons.
- Author’s statement:
AB 65 will allow the state to capitalize on and maximize the economic, energy security, and environmental benefits of SMRs whilst simultaneously phasing out a reliance on electricity generated from natural gas facilities.
- Is it safer or more economical to manage the spent fuel from SMRs? Although the author has not offered a specific rationale for exempting SMRs, presumably the smaller size and/or more modern design might minimize concerns with the cost and safety of managing the nuclear waste.
However, writing in opposition, the Alliance for Nuclear Responsibility points to a research article, Nuclear waste from small modular reactors, published last May in the Proceedings of the National Academy of Sciences. Quoting from the abstract:
Small modular reactors (SMRs; i.e., nuclear reactors that produce <300 MWelec each) have garnered attention because of claims of inherent safety features and reduced cost. However, remarkably few studies have analyzed the management and disposal of their nuclear waste streams. Here, we compare three distinct SMR designs to an 1,100-MWelec pressurized water reactor in terms of the energy-equivalent volume, (radio-) chemistry, decay heat, and fissile isotope composition of (notional) high-, intermediate-, and low-level waste streams. Results reveal that water-, molten salt–, and sodium-cooled SMR designs will increase the volume of nuclear waste in need of management and disposal by factors of 2 to 30. The excess waste volume is attributed to the use of neutron reflectors and/or of chemically reactive fuels and coolants in SMR designs. That said, volume is not the most important evaluation metric; rather, geologic repository performance is driven by the decay heat power and the (radio-)chemistry of spent nuclear fuel, for which SMRs provide no benefit. SMRs will not reduce the generation of geochemically mobile 129I, 99Tc, and 79Se fission products, which are important dose contributors for most repository designs. In addition, SMR spent fuel will contain relatively high concentrations of fissile nuclides, which will demand novel approaches to evaluating criticality during storage and disposal. Since waste stream properties are influenced by neutron leakage, a basic physical process that is enhanced in small reactor cores, SMRs will exacerbate the challenges of nuclear waste management and disposal. https://www.pnas.org/doi/full/10.1073/pnas.2111833119
- Prior legislation.
AB 1035 (DeVore) exempted from the CEC power plant certification laws the first nuclear power plant to obtain an early site permit from the NRC. Failed in this Committee on April 20, 2009.
AB 1776 (DeVore) repealed the moratorium on the construction of new nuclear fission power plants in California and established new conditions on siting new nuclear plants related to seismic hazard, cooling water outflow and waste storage. Failed in this Committee on April 7, 2008.
AB 2788 (DeVore) exempted from the CEC power plant certification laws the first nuclear power plant to obtain an early site permit from the NRC. Failed in this Committee on April 7, 2008.
AB 719 (DeVore) repealed the moratorium on the construction of new nuclear fission power plants in California. Failed in this Committee on April 16, 2007.
- Double referral. This bill is double-referred to the Assembly Utilities and Energy Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
Generation Atomic
FissionTransition
Opposition
Alliance for Nuclear Responsibility
California Coastal Protection Network
Committee to Bridge the Gap
Environmental Working Group
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Discussed in Hearing
Assembly Standing Committee on Natural Resources
Bill Author
Bill Co-Author(s):