AB 869: Hospitals: seismic safety compliance.
- Session Year: 2023-2024
- House: Assembly
- Latest Version Date: 2024-09-28
Current Status:
Passed
(2024-09-28: Chaptered by Secretary of State - Chapter 801, Statutes of 2024.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
(1)Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
This bill would authorize a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, as defined, and except as specified, to seek approval from the Department of Health Care Access and Information for a delay to the January 1, 2030, compliance deadline described above by up to 3 years. The bill would require hospitals seeking a delay to submit a seismic compliance plan, as specified, and, if necessary, a Nonstructural Performance Category-5 evaluation report. The bill would also require the hospital and department to identify least 2 major milestones relating to the seismic compliance plan that will be used as the basis for determining whether a hospital is making adequate progress toward meeting the subject hospitals seismic compliance deadline. The bill would subject the submitted seismic compliance plans to departmental review for reasonableness and require the hospital seeking the delay to submit any documentation requested by the department to assist its review. The bill would require the department to approve or deny a seismic compliance plan and any delay to the seismic compliance deadline within 120 days. The bill would also authorize the department to additionally delay the deadline for compliance by 2 years, up to a maximum of January 1, 2035, as necessary, for hospitals that continue to experience financial distress or that need to deal with contractor, labor, or material delays, acts of God, governmental entitlements, or other circumstances beyond the hospitals control. The bill would require hospitals eligible to delay compliance under these provisions to comply with the seismic safety standards described above by no later than January 1, 2035.
The bill would impose a fine of $5,000 per calendar day for a hospitals failure to comply with a revised construction schedule or to meet any major milestone established by the department until the requirements or milestones, respectively, are met. The bill would also prohibit these hospitals from being issued a building permit for any building in the facility except those required for seismic compliance, maintenance, and emergency repairs until the milestone is met and the hospital is adequately progressing toward meeting the subject hospitals seismic compliance, as determined by the department. The bill would require the department to implement the above-described provisions by regulation, as specified.
The bill would require the department to support a hospital requesting a delay under the above-described provisions to explore the opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance and to annually post a list of hospitals that have been granted a delay on its internet website, as specified.
(2)Existing law establishes the Small and Rural Hospital Relief Program for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
This bill would require the department to expand eligibility for grants for single- and 2-story general acute care hospitals located in remote or rural areas with fewer than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with the seismic safety standards described in paragraph (1), the bill would require a hospital that qualifies for assessment grants under the program to submit specified financial information relating to, among other things, the accuracy of the hospitals SPC-4D cost estimates to the department before being awarded state funds.
(1)Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
This bill would authorize a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, as defined, and except as specified, to seek approval from the Department of Health Care Access and Information for a delay to the January 1, 2030, compliance deadline described above by up to 3 years. The bill would require hospitals seeking a delay to submit a seismic compliance plan, as specified, and, if necessary, a Nonstructural Performance Category-5 evaluation report. The bill would also require the hospital and department to identify least 2 major milestones relating to the seismic compliance plan that will be used as the basis for determining whether a hospital is making adequate progress toward meeting the subject hospitals seismic compliance deadline. The bill would subject the submitted seismic compliance plans to departmental review for reasonableness and require the hospital seeking the delay to submit any documentation requested by the department to assist its review. The bill would require the department to approve or deny a seismic compliance plan and any delay to the seismic compliance deadline within 120 days. The bill would also authorize the department to additionally delay the deadline for compliance by 2 years, up to a maximum of January 1, 2035, as necessary, for hospitals that continue to experience financial distress or that need to deal with contractor, labor, or material delays, acts of God, governmental entitlements, or other circumstances beyond the hospitals control. The bill would require hospitals eligible to delay compliance under these provisions to comply with the seismic safety standards described above by no later than January 1, 2035.
The bill would impose a fine of $5,000 per calendar day for a hospitals failure to comply with a revised construction schedule or to meet any major milestone established by the department until the requirements or milestones, respectively, are met. The bill would also prohibit these hospitals from being issued a building permit for any building in the facility except those required for seismic compliance, maintenance, and emergency repairs until the milestone is met and the hospital is adequately progressing toward meeting the subject hospitals seismic compliance, as determined by the department. The bill would require the department to implement the above-described provisions by regulation, as specified.
The bill would require the department to support a hospital requesting a delay under the above-described provisions to explore the opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance and to annually post a list of hospitals that have been granted a delay on its internet website, as specified.
(2)Existing law establishes the Small and Rural Hospital Relief Program for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
This bill would require the department to expand eligibility for grants for single- and 2-story general acute care hospitals located in remote or rural areas with fewer than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with the seismic safety standards described in paragraph (1), the bill would require a hospital that qualifies for assessment grants under the program to submit specified financial information relating to, among other things, the accuracy of the hospitals SPC-4D cost estimates to the department before being awarded state funds.
(1)Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
The bill would require all rural, district, and distressed acute care hospitals to provide the department with a seismic safety compliance plan by no later than July 1, 2026, that describes how the hospital intends to meet the seismic safety requirements described above.(2)Existing law establishes the Distressed Hospital Loan Program to provide interest-free cashflow loans to not-for-profit hospitals and public hospitals in significant financial distress or to governmental entities representing a closed hospital, except as otherwise provided, to prevent the closure of, or facilitate the reopening of, those hospitals.This bill would qualify a general acute care hospital that received a distressed hospital loan for an extension of the seismic safety standards described above until January 1, 2032. If the department determines that the cost of design and construction for compliance with these seismic safety standards will result in a financial hardship for a distressed hospital that may result in hospital closure, and state funds, federal grants, or private funds are not available to assist with the cost of compliance, the bill would authorize the distressed hospital to delay compliance until January 1, 2035. The bill would require the department to confirm a distressed hospitals lack of ability to comply and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the distressed hospital. The bill would authorize the department to implement these provisions through emergency regulations.This bill would authorize a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, as defined, and except as specified, to seek approval from the Department of Health Care Access and Information for a delay to the January 1, 2030, compliance deadline described above by up to 3 years. The bill would require hospitals seeking a delay to submit a seismic compliance plan, as specified, and, if necessary, a Nonstructural Performance Category-5 evaluation report. The bill would also require the hospital and department to identify least 2 major milestones relating to the seismic compliance plan that will be used as the basis for determining whether a hospital is making adequate progress toward meeting the subject hospitals seismic compliance deadline. The bill would subject the submitted seismic compliance plans to departmental review for reasonableness and require the hospital seeking the delay to submit any documentation requested by the department to assist its review. The bill would require the department to approve or deny a seismic compliance plan and any delay to the seismic compliance deadline within 120 days. The bill would also authorize the department to additionally delay the deadline for compliance by 2 years, up to a maximum of January 1, 2035, as necessary, for hospitals that continue to experience financial distress or that need to deal with contractor, labor, or material delays, acts of God, governmental entitlements, or other circumstances beyond the hospitals control. The bill would require hospitals eligible to delay compliance under these provisions to comply with the seismic safety standards described above by no later than January 1, 2035.
The bill would impose a fine of $5,000 per calendar day for a hospitals failure to comply with a revised construction schedule or to meet any major milestone established by the department until the requirements or milestones, respectively, are met. The bill would also prohibit these hospitals from being issued a building permit for any building in the facility except those required for seismic compliance, maintenance, and emergency repairs until the milestone is met and the hospital is adequately progressing toward meeting the subject hospitals seismic compliance, as determined by the department. The bill would require the department to implement the above-described provisions by regulation, as specified.
The bill would require the department to support a hospital requesting a delay under the above-described provisions to explore the opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance and to annually post a list of hospitals that have been granted a delay on its internet website, as specified.
(3)(2)Existing law establishes the Small and Rural Hospital Relief Program for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
This bill would require the department to expand eligibility for grants for single- and 2-story general acute care hospitals located in remote or rural areas with less fewer than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
The bill would delay the requirement to meet those and other building standards for specified general acute care hospitals until January 1, 2035, and would exempt a general acute care hospital with an SPC-4D assessment and with a certain estimated cost from those seismic safety standards if the department determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance. (4)Existing law provides for the formation and administration of health care districts.The bill would also authorize a health care district that meets certain criteria to submit financial information to the department, on a form required by the department, to allow the department to determine if the health care district is financially distressed and if so, would allow the health care district to apply for a grant for the purpose of meeting those seismic safety standards. The bill would delay the requirement to meet the seismic safety standards until January 1, 2032, for a health care district that qualifies for those grants. The bill would exempt a health care district hospital from those requirements until January 1, 2035, if the department determines that the cost of design and construction for compliance with those requirements results in a financial hardship that may result in hospital closure. The bill would authorize the department to implement these provisions through emergency regulations.If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with the seismic safety standards described in paragraph (1), the bill would require a hospital that qualifies for assessment grants under the program to submit specified financial information relating to, among other things, the accuracy of the hospitals SPC-4D cost estimates to the department before being awarded state funds.
(1)Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
The bill would require all rural, district, and distressed acute care hospitals to provide the department with a seismic safety compliance plan by no later than July 1, 2026, that describes how the hospital intends to meet the seismic safety requirements described above.
(2)Existing law establishes the Distressed Hospital Loan Program to provide interest-free cashflow loans to not-for-profit hospitals and public hospitals in significant financial distress or to governmental entities representing a closed hospital, except as otherwise provided, to prevent the closure of, or facilitate the reopening of, those hospitals.
This bill would qualify a general acute care hospital that received a distressed hospital loan for an extension of the seismic safety standards described above until January 1, 2032. If the department determines that the cost of design and construction for compliance with these seismic safety standards will result in a financial hardship for a distressed hospital that may result in hospital closure, and state funds, federal grants, or private funds are not available to assist with the cost of compliance, the bill would authorize the distressed hospital to delay compliance until January 1, 2035. The bill would require the department to confirm a distressed hospitals lack of ability to comply and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the distressed hospital. The bill would authorize the department to implement these provisions through emergency regulations.
Existing(3)Existing law establishes the Small and Rural Hospital Relief Program under the administration of the Department of Health Care Access and Information for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
Existing law provides for the formation and administration of health care districts.This bill would require the department to expand eligibility for grants for single- and 2-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
The bill would delay the requirement to meet those and other building standards for specified general acute care hospitals until January 1, 2035, and would exempt a general acute care hospital with an SPC-4D assessment and with a certain estimated cost from those seismic safety standards if the department determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance.
(4)Existing law provides for the formation and administration of health care districts.
The bill would also authorize a health care district that meets certain criteria to submit financial information to the department, on a form required by the department, to allow the department to determine if the health care district is financially distressed and if so, would allow the health care district to apply for a grant for the purpose of meeting those seismic safety standards. The bill would delay the requirement to meet the seismic safety standards until January 1, 2032, for a health care district that qualifies for those grants. The bill would exempt a health care district hospital from those requirements until January 1, 2035, if the department determines that the cost of design and construction for compliance with those requirements results in a financial hardship that may result in hospital closure. The bill would authorize the department to implement these provisions through emergency regulations.
Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
Existing law establishes the Small and Rural Hospital Relief Program under the administration of the Department of Health Care Access and Information for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
Existing law provides for the formation and administration of health care districts.
This bill would require the department to expand eligibility for grants for single- and 2-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
The bill would delay the requirement to meet those and other building standards for specified general acute care hospitals until January 1, 2033, 2035, and would exempt a general acute care hospital with an SPC-4D assessment and with a certain estimated cost from those seismic safety standards if the department determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance.
The bill would also authorize a health care district that meets certain criteria to submit financial information to the department, on a form required by the department, to allow the department to determine if the health care district is financially distressed and if so, would allow the health care district to apply for a grant for the purpose of meeting those seismic safety standards. The bill would delay the requirement to meet the seismic safety standards until January 1, 2032, for a health care district that qualifies for those grants. The bill would exempt a health care district hospital from those requirements until January 1, 2033, 2035, if the department determines that the cost of design and construction for compliance with those requirements results in a financial hardship that may result in hospital closure. The bill would authorize the department to implement these provisions through emergency regulations.
Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
Existing law establishes the Small and Rural Hospital Relief Program under the administration of the Department of Health Care Access and Information for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
Existing law provides for the formation and administration of health care districts.
This bill would require the department to give first priority to grants expand eligibility for grants for single- and 2-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
The bill would delay the requirement to meet those and other building standards for specified general acute care hospitals until January 1, 2035, 2033, and would exempt a general acute care hospital with an SPC-4D assessment and with a certain estimated cost from those seismic safety standards if the department determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance.
The bill would also authorize a health care district that meets certain criteria to submit financial information to the department, on a form required by the department, to allow the department to determine if the health care district is financially distressed and if so, would allow the health care district to apply for a grant for the purpose of meeting those seismic safety standards. The bill would delay the requirement to meet the seismic safety standards until January 1, 2035, 2032, for a health care district that qualifies for those grants. The bill would exempt a health care district hospital from those requirements until funds are made available to meet those requirements January 1, 2033, if the department determines that the cost of design and construction for compliance with those requirements results in a financial hardship that may result in hospital closure. The bill would authorize the department to implement these provisions through emergency regulations.
The bill would require, by January 1, 2030, and at 2-year intervals thereafter, a hospital or health care district that meets the criteria for the above-described abeyances to provide any information that the department deems necessary to assess whether the hospital or health care district continues to meet those criteria. The bill would require the department to inform a hospital or health care district in writing if it deems the hospital or health care district is no longer qualified for the above-described abeyances. The bill would require the department to post on its internet website a list of hospitals and health care districts that continue to meet the criteria for abeyance.Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
Existing law establishes the Small and Rural Hospital Relief Program under the administration of the Department of Health Care Access and Information for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
Existing law provides for the formation and administration of health care districts.
This bill would require the department to give first priority to grants for single- and 2-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
The bill would delay the requirement to meet those and other building standards for specified general acute care hospitals until January 1, 2035, and would exempt a general acute care hospital with an SPC-4D assessment and with a certain estimated cost from those seismic safety standards if the department determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance.
The bill would also authorize a health care district that meets certain criteria to submit financial information to the department, on a form required by the department, to allow the department to determine if the health care district is financially distressed and if so, would allow the health care district to apply for a grant for the purpose of meeting those seismic safety standards. The bill would delay the requirement to meet the seismic safety standards until January 1, 2035, for a health care district that qualifies for those grants. The bill would exempt a health care district hospital from those requirements until funds are made available to meet those requirements if the department determines that the cost of design and construction for compliance with those requirements results in a financial hardship that may result in hospital closure.
The bill would require, by January 1, 2030, and at 2-year intervals thereafter, a hospital or health care district that meets the criteria for the above-described abeyances to provide any information that the department deems necessary to assess whether the hospital or health care district continues to meet those criteria. The bill would require the department to inform a hospital or health care district in writing if it deems the hospital or health care district is no longer qualified for the above-described abeyances. The bill would require the department to post on its internet website a list of hospitals and health care districts that continue to meet the criteria for abeyance.
Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
Existing law establishes the Small and Rural Hospital Relief Program under the administration of the Department of Health Care Access and Information for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
Existing law provides for the formation and administration of health care districts.
This bill would require the department to give first priority to grants for single- and 2-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
The bill would delay the requirement to meet those and other building standards for specified general acute care hospitals until January 1, 2035, and would exempt a general acute care hospital with an SPC-4D assessment and with a certain estimated cost from those seismic safety standards if the department determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance.
The bill would also authorize a health care district that meets certain criteria to submit financial information to the department department, on a form required by the department, to allow the department to determine if the health care district is financially distressed and if so, would allow the health care district to apply for a grant for the purpose of meeting those seismic safety standards. The bill would require a health care district to provide financial information to the department for the purposes of, among other things, demonstrating whether the health care district has attempted to secure other methods of funding, prior to being awarded state funds. The bill would delay the requirement to meet the seismic safety standards until January 1, 2035, for a health care district that qualifies for those grants. The bill would exempt a health care district hospital from those requirements until funds are made available to meet those requirements if the department determines that the cost of design and construction for compliance with those requirements results in a financial hardship that may result in hospital closure.
The bill would require, by January 1, 2030, and at 2-year intervals thereafter, a hospital or health care district that meets the criteria for the above-described abeyances to provide any information that the department deems necessary to assess whether the hospital or health care district continues to meet those criteria. The bill would require the department to inform a hospital or health care district in writing if it deems the hospital or health care district is no longer qualified for the above-described abeyances. The bill would require the department to post on its internet website a list of hospitals and health care districts that continue to meet the criteria for abeyance.
The bill would condition implementation of its provisions on an appropriation of funds by the Legislature.Existing law requires, no later than January 1, 2030, owners of all acute care inpatient hospitals to either demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with specified seismic safety standards or to seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with those seismic safety standards. Existing law requires the Department of Health Care Access and Information to issue a written notice upon compliance with those requirements.
Existing law establishes the Small and Rural Hospital Relief Program under the administration of the Department of Health Care Access and Information for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals in the state. Existing law requires the department to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. Existing law also creates the Small and Rural Hospital Relief Fund and continuously appropriates the moneys in the fund for purposes of administering and funding the grant program.
Existing law provides for the formation and administration of health care districts.
This bill would require the department to give first priority to grants for single- and 2-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of $75 million or less. The bill would require grants under the program to provide general acute care hospitals with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, compliance with certain seismic safety standards, as specified. The bill would authorize specified general acute care hospitals to apply for a grant for purposes of complying with those seismic safety standards.
The bill would delay the requirement to meet those and other building standards for specified general acute care hospitals until January 1, 2035, and would exempt a general acute care hospital with an SPC-4D assessment and with a certain estimated cost from those seismic safety standards if the department determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance.
The bill would also authorize a health care district to submit financial information to the department to allow the department to determine if the health care district is financially distressed and if so, would allow the health care district to apply for a grant for the purpose of meeting those seismic safety standards. The bill would require a health care district to provide financial information to the department for the purposes of, among other things, demonstrating whether the health care district has attempted to secure other methods of funding, prior to being awarded state funds. The bill would delay the requirement to meet the seismic safety standards until January 1, 2035, for a health care district that qualifies for those grants. The bill would exempt a health care district hospital from those requirements until funds are made available to meet those requirements if the department determines that the cost of design and construction for compliance with those requirements results in a financial hardship that may result in hospital closure.
The bill would require, by January 1, 2030, and at 2-year intervals thereafter, a hospital or health care district that meets the criteria for the above-described abeyances to provide any information that the department deems necessary to assess whether the hospital or health care district continues to meet those criteria. The bill would require the department to post on its internet website a list of hospitals and health care districts that continue to meet the criteria for abeyance.
The bill would condition implementation of its provisions on an appropriation of funds by the Legislature.
(a)In accordance with the compliance schedule approved by the department, but in any case no later than January 1, 2030, owners of all acute care inpatient hospitals shall either:
(1)Demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(2)Seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act and this act.
(b)Notwithstanding subdivision (a), if a hospitals seismic compliance plan, developed pursuant to subdivisions (b) and (d) of Section 130065.1 and approved by the department, substantiates the need for a delay of up to three years or, at most, five years beyond January 1, 2030, the owner of that general acute care hospital shall, by the deadline authorized in the approved extension, either:
(1)Demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(2)Seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(c)Upon compliance with this section, the hospital shall be issued a written notice of compliance by the department. The department shall send a written notice of violation to hospital owners that fail to comply with this section.
SEC. 2.Section 130065.1 is added to the Health and Safety Code, to read:130065.1.(a)For purposes of this article, the following definitions shall apply:
(1)Critical access hospital means a hospital designated by the State Department of Public Health as a critical access hospital, and certified as such by the Secretary of the United States Department of Health and Human Services under the federal Medicare Rural Hospital Flexibility Program.
(2)Distressed Hospital Loan Program recipient is a hospital that received a loan pursuant to Chapter 4 (commencing with Section 129380) of Part 6. This may also include a future program recipient, should the Legislature appropriate additional state funding to the program and extend the date identified in Section 129387.
(3)Health care district hospital is a hospital authorized pursuant to Division 23.
(4)Rural hospital means a rural general acute care hospital as set forth in subdivision (a) of Section 1250 or a hospital located in a rural or frontier medical study service area, as defined by the California Healthcare Workforce Policy Commission.
(5)Small hospital is a hospital with 50 beds or fewer.
(b)Notwithstanding the January 1, 2030, seismic compliance deadline outlined in Section 130065, a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise provided in this section, may seek approval from the department for a delay to the compliance deadline by up to three years with the submission and departmental approval of a seismic compliance plan, as described in subdivision (d), and, if necessary, a Nonstructural Performance Category-5 evaluation report.
(c)(1)Hospitals that belong to integrated health care systems with two or more separately licensed hospital facilities shall be ineligible for a delay under this section, including a health care district hospital that has a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care districts infrastructure costs for compliance with Section 130065, unless the entire integrated health care system is determined by the department to be in financial distress.
(2)Paragraph (1) shall not apply to any of the following:
(A)A rural hospital with fewer than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or fewer, as reported to the department pursuant to Section 128740 in 2020.
(B)A hospital that is part of an integrated health care system that is operated by a health care district or a nonprofit corporation that is affiliated with the health care district hospital owner by means of the districts status as the nonprofit corporations sole corporate member.
(C)A health care district hospital that does not have a contractual, management, lease, or operating agreement with a health system that imposes upon the health system any financial responsibility for the health care districts infrastructure cost for compliance with Section 130065.
(d)A Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise specified, with a building that is not anticipated to be in full compliance with the seismic safety regulations or standards described in Section 130065 when this section becomes operative shall provide all of the following to the department:
(1)A Nonstructural Performance Category-5 evaluation report in compliance with Article 11 of Chapter 6 of Title 24 of the California Administrative Code for each noncompliant building, if necessary, by no later than January 1, 2025.
(2)The hospitals seismic compliance plan in accordance with Section 1.4 of Article 1 of Chapter 6 of Title 24 of the California Administrative Code and related regulations, by no later than January 1, 2026. The seismic compliance plan shall outline steps, including milestones, to achieve compliance with seismic safety standards at the earliest reasonable date, but by no later than January 1, 2033.
(3)The subject hospital and the department shall identify at least two major milestones relating to the seismic compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the subject hospitals seismic compliance deadline. The seismic compliance plan is subject to departmental review for reasonableness.
(A)If the seismic compliance plan includes a compliance schedule that is delayed beyond the 2030 seismic compliance deadline described in Section 130065, the hospital shall submit any documentation requested by the department to assist the department in its review of the reasonableness of the compliance schedule.
(B)The department shall have 120 days to approve or deny the hospitals seismic compliance plan and any delay to the seismic compliance deadline. If the department determines the compliance schedule is unreasonable based on the information submitted, the department shall notify the hospital and provide the departments rationale for its determination. The hospital shall be given the opportunity to address the identified concerns or to provide additional information to substantiate the compliance schedule.
(e)(1)The department shall have the discretion to additionally delay the amount of time by which a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital shall comply with Section 130065 by two years, up to a maximum of January 1, 2035. This delay may be authorized as necessary for hospitals that continue to experience financial distress or that need to deal with contractor, labor, or material delays, acts of God, governmental entitlements, or other circumstances beyond the hospitals control. If up to an additional two-year delay is granted, the hospital shall submit a revised construction schedule and associated milestones to the department.
(2)A Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise specified, that is granted a delay in compliance with the requirements of Section 130065 pursuant to this subdivision shall provide the department with any information that the department deems necessary, including, but not limited to, information to assess whether the hospital is in financial distress or continues to be in financial distress.
(3)For eligible hospitals requesting an additional delay under this subdivision due to financial distress, the department make a determination of financial distress using financial criteria, including, but not limited to, days cash on hand, current ratio, access to working capital, operating margin, cash burn rate, the financial impact of mandatory seismic compliance costs on the hospital or integrated health care system, and other methodologies developed pursuant to Chapter 4 (commencing with Section 129380) of Part 6.
(4)If the department determines that an eligible hospital or integrated health care system is no longer in financial distress and is not likely to return to financial distress due to complying with seismic safety standards, the hospital or integrated health care system shall submit a revised seismic compliance plan to the department for review and approval one month after being informed of the departments determination that the hospital or integrated health care system is no longer in financial distress. Notwithstanding any delay of the January 1, 2030, seismic requirements granted to the hospital or integrated health care system pursuant to subdivision (b), the department may adjust compliance deadlines to reflect the fact that the hospital or integrated system is no longer in financial distress.
(f)Notwithstanding any other provisions in this chapter, a hospital seeking a delay under this section shall comply with requirements for a seismic compliance plan in accordance with Section 1.4 of Article 1 of Chapter 6 of Title 24 of the California Administrative Code and related regulations.
(g)All hospitals determined eligible to delay compliance with Section 130065 pursuant to this section shall comply with Section 130065 no later than January 1, 2035. Failure to comply with the revised construction schedule or meet any major milestones established by the department and the hospital shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.
(h)The department shall provide support to a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital requesting a delay under this section to explore the opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance.
(i)Hospitals that fail to meet any milestone or seismic compliance deadline approved in its compliance plan shall not be issued a building permit for any building in the facility except those required for seismic compliance, maintenance, and emergency repairs until the milestone is met and the hospital is adequately progressing toward meeting the subject hospitals seismic compliance, as determined by the department.
(j)This section shall not extend any deadlines for Structural Performance Category-1 buildings to achieve structural integrity to no longer pose a potential risk of collapse or a significant risk of loss of life.
(k)Notwithstanding any other law, any information used by the department to determine a hospitals financial status for purposes of this section is confidential and shall not be subject to disclosure under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(l)The department shall adopt regulations and standards, or revise existing regulations and standards, or both, to implement the provisions of this section. Regulatory submissions made by the department to the California Building Standards Commission pursuant to this section shall be deemed to be emergency regulations and shall be adopted as such. The adoption of these regulations shall be deemed to be an emergency and necessary for the immediate preservation of the public peace, health and safety, and general welfare.
SEC. 3.Section 130065.15 is added to the Health and Safety Code, to read:130065.15.The department shall annually post a list of hospitals that have been granted a delay of the January 1, 2030, deadline described in Section 130065 pursuant to Section 130065.1 on its internet website. The list shall include the name and location of each hospital and the projected final compliance date approved by the department.
SEC. 4.Section 130078.5 is added to the Health and Safety Code, to read:130078.5.(a)The department shall expand eligibility for grants for single- and two-story general acute care hospitals located in rural areas with fewer than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department.
(c)(1)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(2)Subject to paragraphs (2) and (3), for general acute care hospitals that already have an SPC-4D assessment approved by the department, the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
SEC. 5.Section 130078.6 is added to the Health and Safety Code, to read:130078.6.(a)If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with Section 130065, before being awarded state funds, a hospital that qualifies for assessment grants under this chapter shall submit financial information to the department, on a form as required by the department, related to all of the following:
(1)Whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why.
(2)The accuracy of the hospitals SPC-4D cost estimates and confirmation that the estimated costs are only for purposes of SPC-4D compliance.
(3)The hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(b)In awarding grants, the department shall have the authority to deny any costs from the assessment completed pursuant to this chapter that the department determines are not necessary to comply with SPC-4D requirements.
(a)In accordance with the compliance schedule approved by the department, but in any case no later than January 1, 2030, owners of all acute care inpatient hospitals shall either:
(1)Demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(2)Seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act and this act.
(b)Notwithstanding subdivision (a), if a hospitals seismic compliance plan, developed pursuant to subdivisions (b) and (d) of Section 130065.1 and approved by the department, substantiates the need for a delay of up to three years or, at most, five years beyond January 1, 2030, the owner of that general acute care hospital shall, by the deadline authorized in the approved extension, either:
(1)Demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(2)Seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(c)Upon compliance with this section, the hospital shall be issued a written notice of compliance by the department. The department shall send a written notice of violation to hospital owners that fail to comply with this section.
SEC. 2.Section 130065.1 is added to the Health and Safety Code, to read:130065.1.(a)For purposes of this article, the following definitions shall apply:
(1)Critical access hospital means a hospital designated by the State Department of Public Health as a critical access hospital, and certified as such by the Secretary of the United States Department of Health and Human Services under the federal Medicare Rural Hospital Flexibility Program.
(2)Distressed Hospital Loan Program recipient is a hospital that received a loan pursuant to Chapter 4 (commencing with Section 129380) of Part 6. This may also include a future program recipient, should the Legislature appropriate additional state funding to the program and extend the date identified in Section 129387.
(3)Health care district hospital is a hospital authorized pursuant to Division 23.
(4)Rural hospital means a rural general acute care hospital as set forth in subdivision (a) of Section 1250 or a hospital located in a rural or frontier medical study service area, as defined by the California Healthcare Workforce Policy Commission.
(5)Small hospital is a hospital with 50 beds or fewer.
(b)Notwithstanding the January 1, 2030, seismic compliance deadline outlined in Section 130065, a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise provided in this section, may seek approval from the department for a delay to the compliance deadline by up to three years with the submission and departmental approval of a seismic compliance plan, as described in subdivision (d), and, if necessary, a Nonstructural Performance Category-5 evaluation report.
(c)(1)Hospitals that belong to integrated health care systems with two or more separately licensed hospital facilities shall be ineligible for a delay under this section, including a health care district hospital that has a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care districts infrastructure costs for compliance with Section 130065, unless the entire integrated health care system is determined by the department to be in financial distress.
(2)Paragraph (1) shall not apply to any of the following:
(A)A rural hospital with fewer than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or fewer, as reported to the department pursuant to Section 128740 in 2020.
(B)A hospital that is part of an integrated health care system that is operated by a health care district or a nonprofit corporation that is affiliated with the health care district hospital owner by means of the districts status as the nonprofit corporations sole corporate member.
(C)A health care district hospital that does not have a contractual, management, lease, or operating agreement with a health system that imposes upon the health system any financial responsibility for the health care districts infrastructure cost for compliance with Section 130065.
(d)A Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise specified, with a building that is not anticipated to be in full compliance with the seismic safety regulations or standards described in Section 130065 when this section becomes operative shall provide all of the following to the department:
(1)A Nonstructural Performance Category-5 evaluation report in compliance with Article 11 of Chapter 6 of Title 24 of the California Administrative Code for each noncompliant building, if necessary, by no later than January 1, 2025.
(2)The hospitals seismic compliance plan in accordance with Section 1.4 of Article 1 of Chapter 6 of Title 24 of the California Administrative Code and related regulations, by no later than January 1, 2026. The seismic compliance plan shall outline steps, including milestones, to achieve compliance with seismic safety standards at the earliest reasonable date, but by no later than January 1, 2033.
(3)The subject hospital and the department shall identify at least two major milestones relating to the seismic compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the subject hospitals seismic compliance deadline. The seismic compliance plan is subject to departmental review for reasonableness.
(A)If the seismic compliance plan includes a compliance schedule that is delayed beyond the 2030 seismic compliance deadline described in Section 130065, the hospital shall submit any documentation requested by the department to assist the department in its review of the reasonableness of the compliance schedule.
(B)The department shall have 120 days to approve or deny the hospitals seismic compliance plan and any delay to the seismic compliance deadline. If the department determines the compliance schedule is unreasonable based on the information submitted, the department shall notify the hospital and provide the departments rationale for its determination. The hospital shall be given the opportunity to address the identified concerns or to provide additional information to substantiate the compliance schedule.
(e)(1)The department shall have the discretion to additionally delay the amount of time by which a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital shall comply with Section 130065 by two years, up to a maximum of January 1, 2035. This delay may be authorized as necessary for hospitals that continue to experience financial distress or that need to deal with contractor, labor, or material delays, acts of God, governmental entitlements, or other circumstances beyond the hospitals control. If up to an additional two-year delay is granted, the hospital shall submit a revised construction schedule and associated milestones to the department.
(2)A Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise specified, that is granted a delay in compliance with the requirements of Section 130065 pursuant to this subdivision shall provide the department with any information that the department deems necessary, including, but not limited to, information to assess whether the hospital is in financial distress or continues to be in financial distress.
(3)For eligible hospitals requesting an additional delay under this subdivision due to financial distress, the department make a determination of financial distress using financial criteria, including, but not limited to, days cash on hand, current ratio, access to working capital, operating margin, cash burn rate, the financial impact of mandatory seismic compliance costs on the hospital or integrated health care system, and other methodologies developed pursuant to Chapter 4 (commencing with Section 129380) of Part 6.
(4)If the department determines that an eligible hospital or integrated health care system is no longer in financial distress and is not likely to return to financial distress due to complying with seismic safety standards, the hospital or integrated health care system shall submit a revised seismic compliance plan to the department for review and approval one month after being informed of the departments determination that the hospital or integrated health care system is no longer in financial distress. Notwithstanding any delay of the January 1, 2030, seismic requirements granted to the hospital or integrated health care system pursuant to subdivision (b), the department may adjust compliance deadlines to reflect the fact that the hospital or integrated system is no longer in financial distress.
(f)Notwithstanding any other provisions in this chapter, a hospital seeking a delay under this section shall comply with requirements for a seismic compliance plan in accordance with Section 1.4 of Article 1 of Chapter 6 of Title 24 of the California Administrative Code and related regulations.
(g)All hospitals determined eligible to delay compliance with Section 130065 pursuant to this section shall comply with Section 130065 no later than January 1, 2035. Failure to comply with the revised construction schedule or meet any major milestones established by the department and the hospital shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.
(h)The department shall provide support to a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital requesting a delay under this section to explore the opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance.
(i)Hospitals that fail to meet any milestone or seismic compliance deadline approved in its compliance plan shall not be issued a building permit for any building in the facility except those required for seismic compliance, maintenance, and emergency repairs until the milestone is met and the hospital is adequately progressing toward meeting the subject hospitals seismic compliance, as determined by the department.
(j)This section shall not extend any deadlines for Structural Performance Category-1 buildings to achieve structural integrity to no longer pose a potential risk of collapse or a significant risk of loss of life.
(k)Notwithstanding any other law, any information used by the department to determine a hospitals financial status for purposes of this section is confidential and shall not be subject to disclosure under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(l)The department shall adopt regulations and standards, or revise existing regulations and standards, or both, to implement the provisions of this section. Regulatory submissions made by the department to the California Building Standards Commission pursuant to this section shall be deemed to be emergency regulations and shall be adopted as such. The adoption of these regulations shall be deemed to be an emergency and necessary for the immediate preservation of the public peace, health and safety, and general welfare.
SEC. 3.Section 130065.15 is added to the Health and Safety Code, to read:130065.15.The department shall annually post a list of hospitals that have been granted a delay of the January 1, 2030, deadline described in Section 130065 pursuant to Section 130065.1 on its internet website. The list shall include the name and location of each hospital and the projected final compliance date approved by the department.
SEC. 4.Section 130078.5 is added to the Health and Safety Code, to read:130078.5.(a)The department shall expand eligibility for grants for single- and two-story general acute care hospitals located in rural areas with fewer than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department.
(c)(1)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(2)Subject to paragraphs (2) and (3), for general acute care hospitals that already have an SPC-4D assessment approved by the department, the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
SEC. 5.Section 130078.6 is added to the Health and Safety Code, to read:130078.6.(a)If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with Section 130065, before being awarded state funds, a hospital that qualifies for assessment grants under this chapter shall submit financial information to the department, on a form as required by the department, related to all of the following:
(1)Whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why.
(2)The accuracy of the hospitals SPC-4D cost estimates and confirmation that the estimated costs are only for purposes of SPC-4D compliance.
(3)The hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(b)In awarding grants, the department shall have the authority to deny any costs from the assessment completed pursuant to this chapter that the department determines are not necessary to comply with SPC-4D requirements.
(a)In accordance with the compliance schedule approved by the department, but in any case no later than January 1, 2030, owners of all acute care inpatient hospitals shall either:
(a)(1)Demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(b)(2)Seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act and this act.
(b)Notwithstanding subdivision (a), if a hospitals seismic compliance plan, developed pursuant to subdivisions (b) and (d) of Section 130065.1 and approved by the department, substantiates the need for a delay of up to three years or, at most, five years beyond January 1, 2030, the owner of that general acute care hospital shall, by the deadline authorized in the approved extension, either:
(1)Demolish, replace, or change to nonacute care use all hospital buildings not in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
(2)Seismically retrofit all acute care inpatient hospital buildings so that they are in substantial compliance with the regulations and standards developed by the department pursuant to the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 and this act.
Upon(c)Upon compliance with this section, the hospital shall be issued a written notice of compliance by the department. The department shall send a written notice of violation to hospital owners that fail to comply with this section.
SEC. 2.Section 130065.1 is added to the Health and Safety Code, to read:130065.1.(a)For purposes of this article, the following definitions shall apply:
(1)Critical access hospital means a hospital designated by the State Department of Public Health as a critical access hospital, and certified as such by the Secretary of the United States Department of Health and Human Services under the federal Medicare Rural Hospital Flexibility Program.
(2)Distressed Hospital Loan Program recipient is a hospital that received a loan pursuant to Chapter 4 (commencing with Section 129380) of Part 6. This may also include a future program recipient, should the Legislature appropriate additional state funding to the program and extend the date identified in Section 129387.
(3)Health care district hospital is a hospital authorized pursuant to Division 23.
(4)Rural hospital means a rural general acute care hospital as set forth in subdivision (a) of Section 1250 or a hospital located in a rural or frontier medical study service area, as defined by the California Healthcare Workforce Policy Commission.
(5)Small hospital is a hospital with 50 beds or fewer.
(b)Notwithstanding the January 1, 2030, seismic compliance deadline outlined in Section 130065, a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise provided in this section, may seek approval from the department for a delay to the compliance deadline by up to three years with the submission and departmental approval of a seismic compliance plan, as described in subdivision (d), and, if necessary, a Nonstructural Performance Category-5 evaluation report.
(c)(1)Hospitals that belong to integrated health care systems with two or more separately licensed hospital facilities shall be ineligible for a delay under this section, including a health care district hospital that has a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care districts infrastructure costs for compliance with Section 130065, unless the entire integrated health care system is determined by the department to be in financial distress.
(2)Paragraph (1) shall not apply to any of the following:
(A)A rural hospital with fewer than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or fewer, as reported to the department pursuant to Section 128740 in 2020.
(B)A hospital that is part of an integrated health care system that is operated by a health care district or a nonprofit corporation that is affiliated with the health care district hospital owner by means of the districts status as the nonprofit corporations sole corporate member.
(C)A health care district hospital that does not have a contractual, management, lease, or operating agreement with a health system that imposes upon the health system any financial responsibility for the health care districts infrastructure cost for compliance with Section 130065.
(d)A Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise specified, with a building that is not anticipated to be in full compliance with the seismic safety regulations or standards described in Section 130065 when this section becomes operative shall provide all of the following to the department:
(1)A Nonstructural Performance Category-5 evaluation report in compliance with Article 11 of Chapter 6 of Title 24 of the California Administrative Code for each noncompliant building, if necessary, by no later than January 1, 2025.
(2)The hospitals seismic compliance plan in accordance with Section 1.4 of Article 1 of Chapter 6 of Title 24 of the California Administrative Code and related regulations, by no later than January 1, 2026. The seismic compliance plan shall outline steps, including milestones, to achieve compliance with seismic safety standards at the earliest reasonable date, but by no later than January 1, 2033.
(3)The subject hospital and the department shall identify at least two major milestones relating to the seismic compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the subject hospitals seismic compliance deadline. The seismic compliance plan is subject to departmental review for reasonableness.
(A)If the seismic compliance plan includes a compliance schedule that is delayed beyond the 2030 seismic compliance deadline described in Section 130065, the hospital shall submit any documentation requested by the department to assist the department in its review of the reasonableness of the compliance schedule.
(B)The department shall have 120 days to approve or deny the hospitals seismic compliance plan and any delay to the seismic compliance deadline. If the department determines the compliance schedule is unreasonable based on the information submitted, the department shall notify the hospital and provide the departments rationale for its determination. The hospital shall be given the opportunity to address the identified concerns or to provide additional information to substantiate the compliance schedule.
(e)(1)The department shall have the discretion to additionally delay the amount of time by which a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital shall comply with Section 130065 by two years, up to a maximum of January 1, 2035. This delay may be authorized as necessary for hospitals that continue to experience financial distress or that need to deal with contractor, labor, or material delays, acts of God, governmental entitlements, or other circumstances beyond the hospitals control. If up to an additional two-year delay is granted, the hospital shall submit a revised construction schedule and associated milestones to the department.
(2)A Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, except as otherwise specified, that is granted a delay in compliance with the requirements of Section 130065 pursuant to this subdivision shall provide the department with any information that the department deems necessary, including, but not limited to, information to assess whether the hospital is in financial distress or continues to be in financial distress.
(3)For eligible hospitals requesting an additional delay under this subdivision due to financial distress, the department make a determination of financial distress using financial criteria, including, but not limited to, days cash on hand, current ratio, access to working capital, operating margin, cash burn rate, the financial impact of mandatory seismic compliance costs on the hospital or integrated health care system, and other methodologies developed pursuant to Chapter 4 (commencing with Section 129380) of Part 6.
(4)If the department determines that an eligible hospital or integrated health care system is no longer in financial distress and is not likely to return to financial distress due to complying with seismic safety standards, the hospital or integrated health care system shall submit a revised seismic compliance plan to the department for review and approval one month after being informed of the departments determination that the hospital or integrated health care system is no longer in financial distress. Notwithstanding any delay of the January 1, 2030, seismic requirements granted to the hospital or integrated health care system pursuant to subdivision (b), the department may adjust compliance deadlines to reflect the fact that the hospital or integrated system is no longer in financial distress.
(f)Notwithstanding any other provisions in this chapter, a hospital seeking a delay under this section shall comply with requirements for a seismic compliance plan in accordance with Section 1.4 of Article 1 of Chapter 6 of Title 24 of the California Administrative Code and related regulations.
(g)All hospitals determined eligible to delay compliance with Section 130065 pursuant to this section shall comply with Section 130065 no later than January 1, 2035. Failure to comply with the revised construction schedule or meet any major milestones established by the department and the hospital shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.
(h)The department shall provide support to a Distressed Hospital Loan Program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital requesting a delay under this section to explore the opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance.
(i)Hospitals that fail to meet any milestone or seismic compliance deadline approved in its compliance plan shall not be issued a building permit for any building in the facility except those required for seismic compliance, maintenance, and emergency repairs until the milestone is met and the hospital is adequately progressing toward meeting the subject hospitals seismic compliance, as determined by the department.
(j)This section shall not extend any deadlines for Structural Performance Category-1 buildings to achieve structural integrity to no longer pose a potential risk of collapse or a significant risk of loss of life.
(k)Notwithstanding any other law, any information used by the department to determine a hospitals financial status for purposes of this section is confidential and shall not be subject to disclosure under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code).
(l)The department shall adopt regulations and standards, or revise existing regulations and standards, or both, to implement the provisions of this section. Regulatory submissions made by the department to the California Building Standards Commission pursuant to this section shall be deemed to be emergency regulations and shall be adopted as such. The adoption of these regulations shall be deemed to be an emergency and necessary for the immediate preservation of the public peace, health and safety, and general welfare.
SEC. 3.Section 130065.15 is added to the Health and Safety Code, to read:130065.15.The department shall annually post a list of hospitals that have been granted a delay of the January 1, 2030, deadline described in Section 130065 pursuant to Section 130065.1 on its internet website. The list shall include the name and location of each hospital and the projected final compliance date approved by the department.
SEC. 3.SEC. 4.Section 130078.5 is added to the Health and Safety Code, to read:130078.5.(a)The department shall expand eligibility for grants for single- and two-story general acute care hospitals located in rural areas with less fewer than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department as soon as possible. department.
(c)(1)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(2)Subject to paragraphs (2) and (3), for general acute care hospitals that already have an SPC-4D assessment approved by the department, the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
SEC. 4.Section 130078.6 is added to the Health and Safety Code, to read:130078.6.(a)If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with Section 130065, before being awarded state funds, a hospital that qualified for assessment grants under this chapter shall provide the department with financial information on a form as required by the department for the following purposes:(1)Demonstrating whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why.(2)Confirming the accuracy of the SPC-4D cost estimate and that estimated costs are only for the purpose of SPC-4D compliance.(3)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.(b)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to this chapter that the department determines are not necessary to comply with SPC-4D requirements.(c)General acute care hospitals as described in subdivision (a) of Section 130078.5 that apply and qualify for grants pursuant to subdivision (c) of Section 130078.5 shall be required to comply with Section 130065 by January 1, 2032.(d)A general acute care hospital as described in subdivision (a) of Section 130078.5 with a completed assessment pursuant to subdivision (b) of Section 130078.5, with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 until January 1, 2035, if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.(e)The department shall have the authority to implement the provisions of this section through emergency regulations.SEC. 5.Chapter 1.6 (commencing with Section 130080) is added to Part 7 of Division 107 of the Health and Safety Code, to read:1.6.Health Care district relief program130080.(a)(1)A health care district hospital authorized pursuant to Division 23 (commencing with Section 32000) that meets the criteria described in subdivision (b), may submit financial information to the Department of Health Care Access and Information to allow the department to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospitals percentage of patients on Medi-Cal. The health care district hospital shall provide the department with financial information on a form required by the department for the following purposes:(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with Section 130065, including federal funding, and if not, why.(B)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.(2)If the department determines the hospital is financially distressed according to the information submitted pursuant to this subdivision, the health care district hospital may apply to the department for a grant for the purpose of complying with Section 130065. When applying for a grant, the health care district hospital shall provide the department with an estimate of the cost for the hospital to comply with Section 130065.(b)A health care district hospital may submit information to the department pursuant to subdivision (a) if it meets any of the following requirements:(1)The health care district meets the requirements for rural hospitals pursuant to subdivision (a) of Section 130078.5.(2)The health care district has placed a bond measure on the ballot within the last five years regarding compliance with Section 130065 and the measure did not pass.(3)The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals.(4)The health care district hospital is more than 30 minutes or 30 miles from the nearest hospital.(c)(1)If state funds are made available for the purpose of complying with Section 130065, prior to awarding state funds, the department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.(2)In awarding grants, the department shall have the authority to deny costs that the department determines are not necessary to comply with Section 130065.(d)(1)Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2032. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, the health care district hospital shall not be required to comply with Section 130065 until January 1, 2035.(2)The department shall confirm a health care district hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the health care district hospital.(3)A health care district hospital in a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care district hospitals infrastructure costs shall not be eligible for funds or a delay of compliance with Section 130065 pursuant to this chapter. This paragraph does not apply to a health care district hospital that has a management agreement with a health system that does not impose upon the health system any responsibility for the health care district hospitals infrastructure costs.(e)The department shall have the authority to implement the provisions of this section through emergency regulations.SEC. 5.Section 130078.6 is added to the Health and Safety Code, to read:130078.6.(a)If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with Section 130065, before being awarded state funds, a hospital that qualifies for assessment grants under this chapter shall submit financial information to the department, on a form as required by the department, related to all of the following:
(1)Whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why.
(2)The accuracy of the hospitals SPC-4D cost estimates and confirmation that the estimated costs are only for purposes of SPC-4D compliance.
(3)The hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(b)In awarding grants, the department shall have the authority to deny any costs from the assessment completed pursuant to this chapter that the department determines are not necessary to comply with SPC-4D requirements.
(a)A general acute care hospital that received a distressed hospital loan pursuant to Chapter 4 (commencing with Section 129380) of Part 6 of shall qualify for an extension of the requirements of Section 130065 no later than January 1, 2032.
(b)If the department determines that the cost of design and construction for compliance with Section 130065 will result in a financial hardship for a distressed hospital that may result in hospital closure, and state funds, federal grants, or private funds are not available to assist with the cost of compliance, the distressed hospital shall not be required to comply with Section 130065 until January 1, 2035.
(c)The department shall confirm a distressed hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the distressed hospital.
(d)The department shall have the authority to implement the provisions of this section through emergency regulations.
SEC. 2.Section 130072 is added to the Health and Safety Code, to read:130072.All rural, district, and distressed acute care hospitals shall provide the department with a seismic safety compliance plan by no later than July 1, 2026. The seismic safety compliance plan shall provide information, as requested by the department, describing how the hospital intends to meet the requirements of Section 130065.
SECTION 1.SEC. 3.Section 130078.5 is added to the Health and Safety Code, to read:130078.5.(a)The department shall expand eligibility for grants for single- and two-story general acute care hospitals located in rural areas with less than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department as soon as possible.
(c)(1)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(2)Subject to paragraphs (2) and (3), for general acute care hospitals that already have an SPC-4D assessment approved by the department, the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
SEC. 2.SEC. 4.Section 130078.6 is added to the Health and Safety Code, to read:130078.6.(a)If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with Section 130065, before being awarded state funds, a hospital that qualified for assessment grants under this chapter shall provide the department with financial information on a form as required by the department for the following purposes:
(1)Demonstrating whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why.
(2)Confirming the accuracy of the SPC-4D cost estimate and that estimated costs are only for the purpose of SPC-4D compliance.
(3)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(b)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to this chapter that the department determines are not necessary to comply with SPC-4D requirements.
(c)General acute care hospitals as described in subdivision (a) of Section 130078.5 that apply and qualify for grants pursuant to subdivision (c) of Section 130078.5 shall be required to comply with Section 130065 by January 1, 2032.
(d)(1)A general acute care hospital as described in subdivision (a) of Section 130078.5 with a completed assessment pursuant to subdivision (b) of Section 130078.5, with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 until January 1, 2035, if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
(2)(e)The department shall have the authority to implement the provisions of this act section through emergency regulations.
SEC. 3.SEC. 5.Chapter 1.6 (commencing with Section 130080) is added to Part 7 of Division 107 of the Health and Safety Code, to read:1.6.Health Care district relief program130080.(a)(1)A health care district hospital authorized pursuant to Division 23 (commencing with Section 32000) that meets the criteria described in subdivision (b), may submit financial information to the Department of Health Care Access and Information to allow the department to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospitals percentage of patients on Medi-Cal. The health care district hospital shall provide the department with financial information on a form required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with Section 130065, including federal funding, and if not, why.
(B)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(2)If the department determines the hospital is financially distressed according to the information submitted pursuant to this subdivision, the health care district hospital may apply to the department for a grant for the purpose of complying with Section 130065. When applying for a grant, the health care district hospital shall provide the department with an estimate of the cost for the hospital to comply with Section 130065.
(b)A health care district hospital may submit information to the department pursuant to subdivision (a) if it meets any of the following requirements:
(1)The health care district meets the requirements for rural hospitals pursuant to subdivision (a) of Section 130078.5.
(2)The health care district has placed a bond measure on the ballot within the last five years regarding compliance with Section 130065 and the measure did not pass.
(3)The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals.
(4)The health care district hospital is more than 30 minutes or 30 miles from the nearest hospital.
(c)(1)If state funds are made available for the purpose of complying with Section 130065, prior to awarding state funds, the department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.
(2)In awarding grants, the department shall have the authority to deny costs that the department determines are not necessary to comply with Section 130065.
(d)(1)Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2032. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, the health care district hospital shall not be required to comply with Section 130065 until January 1, 2035.
(2)The department shall confirm a health care district hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the health care district hospital.
(3)A health care district hospital in a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care district hospitals infrastructure costs shall not be eligible for funds or a delay of compliance with Section 130065 pursuant to this chapter. This paragraph does not apply to a health care district hospital that has a management agreement with a health system that does not impose upon the health system any responsibility for the health care district hospitals infrastructure costs.
(4)(e)The department shall have the authority to implement the provisions of this act section through emergency regulations.
(a)The department shall expand eligibility for grants for single- and two-story general acute care hospitals located in rural areas with less than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department as soon as possible.
(c)(1)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(2)Subject to paragraphs (2) and (3), for general acute care hospitals that already have an SPC-4D assessment approved by the department, the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
SEC. 2.Section 130078.6 is added to the Health and Safety Code, to read:130078.6.(a)If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with Section 130065, before being awarded state funds, a hospital that qualified for assessment grants under this chapter shall provide the department with financial information on a form as required by the department for the following purposes:
(1)Demonstrating whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why.
(2)Confirming the accuracy of the SPC-4D cost estimate and that estimated costs are only for the purpose of SPC-4D compliance.
(3)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(b)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to this chapter that the department determines are not necessary to comply with SPC-4D requirements.
(c)General acute care hospitals as described in subdivision (a) of Section 130078.5 that apply and qualify for grants pursuant to subdivision (c) of Section 130078.5 shall be required to comply with Section 130065 by January 1, 2032.
(d)(1)A general acute care hospital as described in subdivision (a) of Section 130078.5 with a completed assessment pursuant to subdivision (b) of Section 130078.5, with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 until January 1, 2033, 2035, if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
(2)The department shall have the authority to implement the provisions of this act through emergency regulations.
SEC. 3.Chapter 1.6 (commencing with Section 130080) is added to Part 7 of Division 107 of the Health and Safety Code, to read:1.6.Health Care district relief program130080.(a)(1)A health care district hospital authorized pursuant to Division 23 (commencing with Section 32000) that meets the criteria described in subdivision (b), may submit financial information to the Department of Health Care Access and Information to allow the department to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospitals percentage of patients on Medi-Cal. The health care district hospital shall provide the department with financial information on a form required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with Section 130065, including federal funding, and if not, why.
(B)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(2)If the department determines the hospital is financially distressed according to the information submitted pursuant to this subdivision, the health care district hospital may apply to the department for a grant for the purpose of complying with Section 130065. When applying for a grant, the health care district hospital shall provide the department with an estimate of the cost for the hospital to comply with Section 130065.
(b)A health care district hospital may submit information to the department pursuant to subdivision (a) if it meets any of the following requirements:
(1)The health care district meets the requirements for rural hospitals pursuant to subdivision (a) of Section 130078.5.
(2)The health care district has placed a bond measure on the ballot within the last five years regarding compliance with Section 130065 and the measure did not pass.
(3)The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals.
(4)The health care district hospital is more than 30 minutes or 30 miles from the nearest hospital.
(c)(1)If state funds are made available for the purpose of complying with Section 130065, prior to awarding state funds, the department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.
(2)In awarding grants, the department shall have the authority to deny costs that the department determines are not necessary to comply with Section 130065.
(d)(1)Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2032. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, the health care district hospital shall not be required to comply with Section 130065 until January 1, 2033. 2035.
(2)The department shall confirm a health care district hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the health care district hospital.
(3)A health care district hospital in a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care district hospitals infrastructure costs shall not be eligible for funds or a delay of compliance with Section 130065 pursuant to this chapter. This paragraph does not apply to a health care district hospital that has a management agreement with a health system that does not impose upon the health system any responsibility for the health care district hospitals infrastructure costs.
(4)The department shall have the authority to implement the provisions of this act through emergency regulations.
(a)The department shall give the first priority to grants expand eligibility for grants for single- and two-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department as soon as possible.
(4)The department shall provide grants to secure assessments to general acute care hospitals that qualify within 18 months of the implementation of this section.(c)(1)(A)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(B)
(2)Subject to paragraphs (2) and (3), for general acute care hospitals that already have a completed an SPC-4D assessment may provide that assessment to the department and approved by the department, the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
(2)If state funds are appropriated in the future for the purpose of complying with Section 130065, prior to being awarded state funds, a hospital that qualified for assessment grants under subdivision (b) shall provide the department with financial information on a form as required by the department for the following purposes:(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, why.(B)Confirming the accuracy of the SPC-4D cost estimate, and that estimated costs are only for the purpose of SPC-4D compliance.(C)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.(3)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to subdivision (b) that the department determines are not necessary to comply with SPC-4D requirements.(d)General acute care hospitals that qualify for grants as described in subdivision (b) shall be required to comply with NPC-3 standards no later than January 1, 2035.(e)General acute care hospitals as described in subdivision (a) that apply, and qualify, for grants pursuant to subdivision (c) shall be required to comply with Section 130065 by January 1, 2035.(f)(1)A general acute care hospital as described in subdivision (a) with a completed assessment pursuant to subdivision (b), with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.(2)The department shall confirm a hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the hospital.(g)(1)By January 1, 2030, and at two-year intervals thereafter, each hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (f) shall provide to the department any information that the department deems necessary to assess whether the hospital continues to meet the criteria of subdivision (f). If a hospitals circumstances have not significantly altered, the department shall not require an updated SPC-4D assessment. If the department deems a hospital is no longer qualified for an abeyance, it shall inform the hospital in writing, and the hospital shall comply with Section 130065 within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. The department shall have the discretion to extend the amount of time by which a hospital shall comply with Section 130065 for an additional two years based on the estimated cost of compliance.(2)The department shall post on its internet website a list of hospitals that continue to meet the criteria for an abeyance from the requirements of Section 130065 pursuant to subdivision (f).SEC. 2.Section 130078.6 is added to the Health and Safety Code, to read:130078.6.(a)If state funds are appropriated to the Small and Rural Hospital Relief Fund in the future for the purpose of complying with Section 130065, before being awarded state funds, a hospital that qualified for assessment grants under this chapter shall provide the department with financial information on a form as required by the department for the following purposes:
(1)Demonstrating whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why.
(2)Confirming the accuracy of the SPC-4D cost estimate and that estimated costs are only for the purpose of SPC-4D compliance.
(3)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(b)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to this chapter that the department determines are not necessary to comply with SPC-4D requirements.
(c)General acute care hospitals as described in subdivision (a) of Section 130078.5 that apply and qualify for grants pursuant to subdivision (c) of Section 130078.5 shall be required to comply with Section 130065 by January 1, 2032.
(d)(1)A general acute care hospital as described in subdivision (a) of Section 130078.5 with a completed assessment pursuant to subdivision (b) of Section 130078.5, with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 until January 1, 2033, if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
(2)The department shall have the authority to implement the provisions of this act through emergency regulations.
SEC. 2.SEC. 3.Chapter 1.6 (commencing with Section 130080) is added to Part 7 of Division 107 of the Health and Safety Code, to read:1.6.Health Care district relief program130080.(a)(1)A health care district hospital authorized pursuant to Division 23 (commencing with Section 32000) that meets the criteria described in subdivision (b), may submit financial information to the Department of Health Care Access and Information to allow the department to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospitals percentage of patients on Medi-Cal. The health care district hospital shall provide the department with financial information on a form required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with Section 130065, including federal funding, and if not, why.
(B)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(2)If the department determines the hospital is financially distressed according to the information submitted pursuant to this subdivision, the health care district hospital may apply to the department for a grant for the purpose of complying with Section 130065. When applying for a grant, the health care district hospital shall provide the department with an estimate of the cost for the hospital to comply with Section 130065.
(b)A health care district hospital may submit information to the department pursuant to subdivision (a) if it meets any of the following requirements:
(1)The health care district meets the requirements for rural hospitals pursuant to subdivision (a) of Section 130078.5.
(2)The health care district has placed a bond measure on the ballot within the last five years regarding compliance with Section 130065 and the measure did not pass.
(3)The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals.
(4)The health care district hospital is more than 30 minutes or 30 miles from the nearest hospital.
(c)(1)If state funds are made available for the purpose of complying with Section 130065, prior to awarding state funds, the department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.
(2)In awarding grants, the department shall have the authority to deny costs that the department determines are not necessary to comply with Section 130065.
(d)(1)Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2035. 2032. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, the health care district hospital shall not be required to comply with Section 130065 until funds are made available for the purpose of complying with Section 130065. January 1, 2033.
(2)The department shall confirm a health care district hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the health care district hospital.
(3)A health care district hospital in a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care district hospitals infrastructure costs shall not be eligible for funds or a delay of compliance with Section 130065 pursuant to this chapter. This paragraph does not apply to a health care district hospital that has a management agreement with a health system that does not impose upon the health system any responsibility for the health care district hospitals infrastructure costs.
(4)The department shall have the authority to implement the provisions of this act through emergency regulations.
(e)(1)By January 1, 2030, and at two-year intervals thereafter, each health care district hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (d) shall provide to the department any information the department deems necessary to assess whether the hospital continues to meet the requirements of subdivision (d). If the department deems a hospital is no longer qualified for an abeyance, it shall inform the hospital in writing, and the hospital shall comply with Section 130065 within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. The department shall have the discretion to extend the amount of time by which a hospital shall comply with Section 130065 for an additional two years based on the estimated cost of compliance.(2)The department shall post on its internet website a list of hospitals that continue to meet the requirements for an abeyance form the requirements of Section 130065 pursuant to subdivision (d).(a)The department shall give the first priority to grants for single- and two-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department as soon as possible.
(4)The department shall provide grants to secure assessments to general acute care hospitals that qualify within 18 months of the implementation of this section.
(c)(1)(A)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(B)Subject to paragraphs (2) and (3), general acute care hospitals that already have a completed SPC-4D assessment may provide that assessment to the department and the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
(2)If state funds are appropriated in the future for the purpose of complying with Section 130065, prior to being awarded state funds, a hospital that qualified for assessment grants under subdivision (b) shall provide the department with financial information on a form as required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, why.
(B)Confirming the accuracy of the SPC-4D cost estimate, and that estimated costs are only for the purpose of SPC-4D compliance.
(C)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(3)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to subdivision (b) that the department determines are not necessary to comply with SPC-4D requirements.
(d)General acute care hospitals that qualify for grants as described in subdivision (b) shall be required to comply with NPC-3 standards no later than January 1, 2035.
(e)General acute care hospitals as described in subdivision (a) that apply, and qualify, for grants pursuant to subdivision (c) shall be required to comply with Section 130065 by January 1, 2035.
(f)(1)A general acute care hospital as described in subdivision (a) with a completed assessment pursuant to subdivision (b), with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
(2)The department shall confirm a hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the hospital.
(g)(1)By January 1, 2030, and at two-year intervals thereafter, each hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (f) shall provide to the department any information that the department deems necessary to assess whether the hospital continues to meet the criteria of subdivision (f). If a hospitals circumstances have not significantly altered, the department shall not require an updated SPC-4D assessment. If the department deems a hospital is no longer qualified for an abeyance, it shall inform the hospital in writing, and the hospital shall comply with Section 130065 within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. The department shall have the discretion to extend the amount of time by which a hospital shall comply with Section 130065 for an additional two years based on the estimated cost of compliance.
(2)The department shall post on its internet website a list of hospitals that continue to meet the criteria for an abeyance from the requirements of Section 130065 pursuant to subdivision (f).
SEC. 2.Chapter 1.6 (commencing with Section 130080) is added to Part 7 of Division 107 of the Health and Safety Code, to read:1.6.Health Care district relief program130080.(a)(1)A health care district hospital authorized pursuant to Division 23 (commencing with Section 32000) that meets the criteria described in subdivision (b), may submit financial information to the Department of Health Care Access and Information to allow the department to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospitals percentage of patients on Medi-Cal. The health care district hospital shall provide the department with financial information on a form required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with Section 130065, including federal funding, and if not, why.
(B)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(2)If the department determines the hospital is financially distressed according to the information submitted pursuant to this subdivision, the health care district hospital may apply to the department for a grant for the purpose of complying with Section 130065. When applying for a grant, the health care district hospital shall provide the department with an estimate of the cost for the hospital to comply with Section 130065.
(b)A health care district hospital may submit information to the department pursuant to subdivision (a) if it meets any of the following requirements:
(1)The health care district meets the requirements for rural hospitals pursuant to subdivision (a) of Section 130078.5.
(2)The health care district has placed a bond measure on the ballot within the last five years regarding compliance with Section 130065 and the measure did not pass.
(3)The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals.
(4)The health care district hospital is more than 30 minutes or 30 miles from the nearest hospital.
(c)(1)If state funds are made available for the purpose of complying with Section 130065, prior to awarding state funds, the department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.
(2)In awarding grants, the department shall have the authority to deny costs that the department determines are not necessary to comply with Section 130065.
(d)(1)Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2035. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, the health care district hospital shall not be required to comply with Section 130065 until funds are made available for the purpose of complying with Section 130065.
(2)The department shall confirm a health care district hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the health care district hospital.
(3)A health care district hospital in a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care district hospitals infrastructure costs shall not be eligible for funds or a delay of compliance with Section 130065 pursuant to this chapter. This paragraph does not apply to a health care district hospital that has a management agreement with a health system that does not impose upon the health system any responsibility for the health care district hospitals infrastructure costs.
(e)(1)By January 1, 2030, and at two-year intervals thereafter, each health care district hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (d) shall provide to the department any information the department deems necessary to assess whether the hospital continues to meet the requirements of subdivision (d). If the department deems a hospital is no longer qualified for an abeyance, it shall inform the hospital in writing, and the hospital shall comply with Section 130065 within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. The department shall have the discretion to extend the amount of time by which a hospital shall comply with Section 130065 for an additional two years based on the estimated cost of compliance.
(2)The department shall post on its internet website a list of hospitals that continue to meet the requirements for an abeyance form the requirements of Section 130065 pursuant to subdivision (d).
(a)The department shall give the first priority to grants for single- and two-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department as soon as possible.
(4)The department shall provide grants to secure assessments to general acute care hospitals that qualify within 18 months of the implementation of this section.
(c)(1)(A)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(B)Subject to paragraphs (2) and (3), general acute care hospitals that already have a completed SPC-4D assessment may provide that assessment to the department and the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
(2)If state funds are appropriated in the future for the purpose of complying with Section 130065, prior to being awarded state funds, a hospital that qualified for assessment grants under subdivision (b) shall provide the department with financial information on a form as required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, why.
(B)Confirming the accuracy of the SPC-4D cost estimate, and that estimated costs are only for the purpose of SPC-4D compliance.
(C)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(3)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to subdivision (b) that the department determines are not necessary to comply with SPC-4D requirements.
(d)General acute care hospitals that qualify for grants as described in subdivision (b) shall be required to comply with NPC-3 standards no later than January 1, 2035.
(e)General acute care hospitals as described in subdivision (a) that apply, and qualify, for grants pursuant to subdivision (c) shall be required to comply with Section 130065 by January 1, 2035.
(f)(1)A general acute care hospital as described in subdivision (a) with a completed assessment pursuant to subdivision (b), with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
(2)The department shall confirm a hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the hospital.
(g)(1)By January 1, 2030, and at two-year intervals thereafter, each hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (f) shall provide to the department any information that the department deems necessary to assess whether the hospital continues to meet the criteria of subdivision (f). If a hospitals circumstances have not significantly altered, the department shall not require an updated SPC-4D assessment. If the department deems a hospital is no longer qualified for an abeyance, it shall inform the hospital in writing, and the hospital shall comply with Section 130065 within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. The department shall have the discretion to extend the amount of time by which a hospital shall comply with Section 130065 for an additional two years based on the estimated cost of compliance.
(2)The department shall post on its internet website a list of hospitals that continue to meet the criteria for an abeyance from the requirements of Section 130065 pursuant to subdivision (f).
(h)This section shall be implemented only upon appropriation of funds by the Legislature.SEC. 2.Chapter 1.6 (commencing with Section 130080) is added to Part 7 of Division 107 of the Health and Safety Code, to read:1.6.Health Care district relief program130080.(a)(1)A health care district hospital authorized pursuant to Division 23 (commencing with Section 32000) that meets the criteria described in subdivision (b), may submit financial information to the Department of Health Care Access and Information to allow the department to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospitals percentage of patients on Medi-Cal and Medicare. Medi-Cal. The health care district hospital shall provide the department with financial information on a form required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with Section 130065, including federal funding, and if not, why.
(B)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(2)If the department determines the hospital is financially distressed according to the information submitted pursuant to paragraph (1), this subdivision, the health care district hospital may apply to the department for a grant for the purpose of complying with Section 130065. When applying for a grant, the health care district hospital shall provide the department with an estimate of the cost for the hospital to comply with Section 130065.
(b)A health care district hospital may submit information to the department pursuant to subdivision (a) if it meets any of the following requirements:
(1)The health care district meets the requirements for rural hospitals pursuant to subdivision (a) of Section 130078.5.
(2)The health care district has placed a bond measure on the ballot within the last five years regarding compliance with Section 130065 and the measure did not pass.
(3)The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals.
(4)The health care district hospital is more than 30 minutes or 30 miles from the nearest hospital.
(b)(c)(1)If state funds are appropriated in the future made available for the purpose of complying with Section 130065, prior to being awarded state funds, a health care district hospital that qualifies for a grant pursuant to subdivision (a) shall provide the department with financial information on a form as required by the department for both of the following purposes: awarding state funds, the department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.
(A)Demonstrating whether or not the health care district has attempted to secure other methods of funding for compliance with Section 130065, including, but not limited to, federal funding, and if not, an explanation for why the hospital has not attempted to secure other funding.(B)Demonstrating the health care districts need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.(2)The department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.(3)(2)In awarding grants, the department shall have the authority to deny costs that the department determines are not necessary to comply with Section 130065.
(c)(d)(1)Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2035. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, and the health care district hospital is more than 30 minutes or 30 miles from the closest hospital, the health care district hospital shall not be required to comply with Section 130065 until funds are made available for the purpose of complying with Section 130065.
(2)The department shall confirm a health care district hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the health care district hospital.
(d)(e)(1)By January 1, 2030, and at two-year intervals thereafter, each health care district hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (c) (d) shall provide to the department any information the department deems necessary to assess whether the hospital continues to meet the requirements of subdivision (c). (d). If the department deems a hospital is no longer qualified for an abeyance, it shall inform the hospital in writing, and the hospital shall comply with Section 130065 within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. The department shall have the discretion to extend the amount of time by which a hospital shall comply with Section 130065 for an additional two years based on the estimated cost of compliance.
(2)The department shall post on its internet website a list of hospitals that continue to meet the requirements for an abeyance form the requirements of Section 130065 pursuant to subdivision (c). (d).
(e)This section shall only be implemented upon appropriation of funds by the Legislature. REVISIONS: HeadingLines 1 and 2.(a)The department shall give the first priority to grants for single- and two-story general acute care hospitals located in remote or rural areas with less than 80 general acute care beds and general acute care hospital revenue of seventy-five million dollars ($75,000,000) or less, as reported to the department pursuant to Section 128740 in 2020.
(b)(1)Grants pursuant to this chapter shall provide general acute care hospitals described in subdivision (a) with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with Section 130065.
(2)The department shall conduct outreach to general acute care hospitals described in subdivision (a) regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
(3)A general acute care hospital receiving a grant for an assessment pursuant to this subdivision shall provide the estimated cost of SPC-4D compliance to the department as soon as possible.
(4)The department shall provide grants to secure assessments to general acute care hospitals that qualify within 18 months of the implementation of this section.
(c)(1)(A)Subject to paragraphs (2) and (3), general acute care hospitals that have received a grant for an assessment pursuant to subdivision (b) may apply for a grant for purposes of complying with Section 130065.
(B)Subject to paragraphs (2) and (3), general acute care hospitals that already have a completed SPC-4D assessment may provide that assessment to the department and the department may award the general acute care hospital grant money for purposes of complying with Section 130065.
(2)If state funds are appropriated in the future for the purpose of complying with Section 130065, prior to being awarded state funds, a hospital that qualified for assessment grants under subdivision (b) shall provide the department with financial information on a form as required by the department for the following purposes:
(A)Demonstrating whether or not the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, why.
(B)Confirming the accuracy of the SPC-4D cost estimate, and that estimated costs are only for the purpose of SPC-4D compliance.
(C)Demonstrating the hospitals need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(3)In awarding grants, the department shall have the authority to deny costs from the assessment completed pursuant to subdivision (b) that the department determines are not necessary to comply with SPC-4D requirements.
(d)General acute care hospitals that qualify for grants as described in subdivision (b) shall be required to comply with NPC-3 standards no later than January 1, 2035.
(e)General acute care hospitals as described in subdivision (a) that apply, and qualify, for grants pursuant to subdivision (c) shall be required to comply with Section 130065 by January 1, 2035.
(f)(1)A general acute care hospital as described in subdivision (a) with a completed assessment pursuant to subdivision (b), with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospitals revenue, whichever is greater, shall not be required to comply with Section 130065 if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
(2)The department shall confirm a hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the hospital.
(g)(1)By January 1, 2030, and at two-year intervals thereafter, each hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (f) shall provide to the department any information that the department deems necessary to assess whether the hospital continues to meet the criteria of subdivision (f). If a hospitals circumstances have not significantly altered, the department shall not require an updated SPC-4D assessment.
(2)The department shall post on its internet website a list of hospitals that continue to meet the criteria for an abeyance from the requirements of Section 130065 pursuant to subdivision (f).
(h)This section shall be implemented only upon appropriation of funds by the Legislature.
SEC. 2.Chapter 1.6 (commencing with Section 130080) is added to Part 7 of Division 107 of the Health and Safety Code, to read:1.6.Health Care district relief program130080.(a)(1)A health care district hospital authorized pursuant to Division 23 (commencing with Section 32000) may submit financial information to the Department of Health Care Access and Information to allow the department to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospitals percentage of patients on Medi-Cal and Medicare.
(2)If the department determines the hospital is financially distressed according to the information submitted pursuant to paragraph (1), the health care district hospital may apply to the department for a grant for the purpose of complying with section 130065. When applying for a grant, the health care district hospital shall provide the department with an estimate of the cost for the hospital to comply with Section 130065.
(b)(1)If state funds are appropriated in the future for the purpose of complying with Section 130065, prior to being awarded state funds, a health care district hospital that qualifies for a grant pursuant to subdivision (a) shall provide the department with financial information on a form as required by the department for both of the following purposes:
(A)Demonstrating whether or not the health care district has attempted to secure other methods of funding for compliance with Section 130065, including, but not limited to, federal funding, and if not, an explanation for why the hospital has not attempted to secure other funding.
(B)Demonstrating the health care districts need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
(2)The department shall confirm the accuracy of the health care districts seismic cost estimate, and that estimated costs are only for the purpose of compliance with Section 130065.
(3)In awarding grants, the department shall have the authority to deny costs that the department determines are not necessary to comply with Section 130065.
(c)(1)Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2035. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, and the health care district hospital is more than 30 minutes or 30 miles from the closest hospital, the health care district hospital shall not be required to comply with Section 130065 until funds are made available for the purpose of complying with Section 130065.
(2)The department shall confirm a health care district hospitals lack of ability to comply with Section 130065 and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the health care district hospital.
(d)(1)By January 1, 2030, and at two-year intervals thereafter, each health care district hospital whose compliance with the requirements of Section 130065 is in abeyance according to subdivision (c) shall provide to the department any information the department deems necessary to assess whether the hospital continues to meet the requirements of subdivision (c).
(2)The department shall post on its internet website a list of hospitals that continue to meet the requirements for an abeyance form the requirements of Section 130065 pursuant to subdivision (c).
(e)This section shall only be implemented upon appropriation of funds by the Legislature.
|
Date
|
Status
|
|---|---|
| Sep 28, 2024 | Chaptered by Secretary of State - Chapter 801, Statutes of 2024. |
| Sep 28, 2024 | Approved by the Governor. |
| Sep 10, 2024 | Enrolled and presented to the Governor at 4:30 p.m. |
| Aug 29, 2024 | Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 76. Noes 0.). |
| Aug 29, 2024 | Assembly Rule 77 suspended. |
| Aug 28, 2024 | In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 30 pursuant to Assembly Rule 77. |
| Aug 28, 2024 | Read third time. Passed. Ordered to the Assembly. (Ayes 37. Noes 0.). |
| Aug 26, 2024 | Read second time. Ordered to third reading. |
| Aug 23, 2024 | Read third time and amended. Ordered to second reading. |
| Aug 19, 2024 | Read second time. Ordered to third reading. |
| Aug 15, 2024 | From committee: Amend, and do pass as amended. (Ayes 6. Noes 0.) (August 15). |
| Aug 15, 2024 | Read second time and amended. Ordered returned to second reading. |
| Aug 5, 2024 | In committee: Referred to APPR suspense file. |
| Jun 27, 2024 | Read second time and amended. Re-referred to Com. on APPR. |
| Jun 26, 2024 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR with recommendation: To Consent Calendar. (Ayes 11. Noes 0.) (June 26). |
| Jun 18, 2024 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on HEALTH. |
| Jul 10, 2023 | In committee: Set, second hearing. Hearing canceled at the request of author. |
| Jun 27, 2023 | In committee: Hearing postponed by committee. |
| Jun 20, 2023 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on HEALTH. |
| Jun 20, 2023 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Jun 7, 2023 | Referred to Com. on HEALTH. |
| May 31, 2023 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 30, 2023 | Read third time. Passed. Ordered to the Senate. (Ayes 80. Noes 0. Page 1879.) |
| May 18, 2023 | Read second time. Ordered to third reading. |
| May 18, 2023 | From committee: Do pass. (Ayes 15. Noes 0.) (May 18). |
| Apr 19, 2023 | In committee: Set, first hearing. Referred to APPR. suspense file. |
| Mar 22, 2023 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (March 21). Re-referred to Com. on APPR. |
| Mar 22, 2023 | Coauthors revised. |
| Mar 8, 2023 | Re-referred to Com. on HEALTH. |
| Mar 7, 2023 | From committee chair, with author's amendments: Amend, and re-refer to Com. on HEALTH. Read second time and amended. |
| Feb 23, 2023 | Referred to Com. on HEALTH. |
| Feb 15, 2023 | From printer. May be heard in committee March 17. |
| Feb 14, 2023 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 29, 2024 | AB 869 Wood Concurrence in Senate Amendments | Assembly Floor |
Passed |
|
| Aug 28, 2024 | Assembly 3rd Reading AB869 Wood et al. By Roth | Senate Floor |
Passed |
|
| Aug 15, 2024 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Aug 5, 2024 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jun 26, 2024 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Health |
Passed |
|
| May 30, 2023 | AB 869 Wood Assembly Third Reading | Assembly Floor |
Passed |
|
| May 18, 2023 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Mar 21, 2023 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Health |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Adventist Health | ** Support | |
| Antelope Valley Healthcare District | ** Support | |
| Association of California Healthcare Districts | ** Support | |
| California Special Districts Association | ** Support | |
| Coast Democratic Club | ** Support | |
| Coast Democratic Club of Mendocino County | ** Support | |
| Community Health Systems | ** Support | |
| County of Santa Clara Office of the County Executive | ** Support | |
| District Hospital Leadership Forum | ** Support | |
| Inland Empire Health Plan | ** Support | |
| Kaweah Delta Health Care District | ** Support | |
| Los Angeles Area Chamber Of Commerce | ** Support | |
| Mad River Community Hospital | ** Support | |
| Mark Twain Healthcare District | ** Support | |
| Mendocino County Democratic Party | ** Support | |
| Plumas District Hospital | ** Support | |
| Rural County Representatives of California | ** Support | |
| Vision y Compromiso | ** Support |
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 869
Author:(Wood and Garcia)
As Amended Ver:August 23, 2024
Majority vote
SUMMARY
Authorizes a Distressed Hospital Loan Program (DHLP) recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, as defined, except as specified, to seek approval from the Department of Health Care Access and Information (HCAI) for a delay of the January 1, 2030 seismic compliance deadline of up to three years. Requires Hospitals seeking a delay to submit a seismic compliance plan and if necessary a Nonstructural Performance Category-5 evaluation report. Requires hospitals and HCAI to identify milestones relating to the compliance plan that will be used to determine whether a hospital is making progress toward meeting seismic compliance. Requires HCAI to approve or deny a compliance plan and any delay within 120 days. Authorizes HCAI to grant an additional two-year delay, up to a maximum of January 1, 2035, for hospitals that continue to experience financial distress or other issues beyond the hospital’s control. Imposes a fine of $5,000 per calendar day for a hospital’s failure to comply with a revised construction schedule or to meet any major milestone. Requires HCAI to support a hospital requesting a delay in exploring opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance.
Senate Amendments
- Delete provisions of this bill that grants a five-year extension of seismic safety requirements for single- and two-story hospitals located in rural areas with less than 80 beds and revenue of $75 million or less, where an assessment of the cost of retrofitting to comply with seismic safety requirements has shown it will result in a financial hardship.
- Delete provisions of this bill that grants a five-year extension of seismic safety requirements for health care district hospitals who meet certain financial hardship criteria, and to hospitals that received a distressed hospital loan.
COMMENTS
Non-structural damage to hospitals by the 1994 Northridge earthquake prompted the Legislature to update seismic safety requirements from 1974 that only applied to new construction. SB 1953 (Alquist), Chapter 740, Statutes of 1994 required the then Office of Statewide Health Planning and Development (OSHPD now HCAI) to create seismic performance categories for hospitals depending on the risk of collapse, and the ability to remain operable following an earthquake. Specifically, SB 1953 required HCAI to create structural performance categories (SPCs), as well as nonstructural performance categories (NPCs) for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. According to HCAI, the SPC requirements can be thought of as protecting the skeleton, while NPC requirements ensure the organs and other tissues necessary for a human body to function will remain safely attached to the skeleton. There are very few remaining buildings at risk of collapse in an earthquake. However, compliance with the 2030 requirement to remain operational is much more expensive.
- Status of 2030 seismic safety compliance. Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 674 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. There may be more, depending on how many of the 47 remaining SPC-1 buildings are only being brought up to SPC-2. There are currently only nine hospital buildings that have opted to use the SPC-4D option to retrofit older buildings, but since it has only been available since 2017, it is unclear whether that will be utilized more frequently for the remaining 674-plus buildings, or whether it will still be a rarely used option and most hospitals will choose to construct new replacement buildings.
For additional background information on seismic safety SPC and NPC compliance requirements, please see the Assembly Health Committee analysis of AB 1882 (Rivas) of the 2021-2022 Legislative Session.
- Impact of rural hospital closures. According to an August 2019 National Bureau of Economic Research paper, “Impact of Rural and Urban Hospital Closures on Inpatient Mortality,” 92 rural hospitals closed in California from 1995 to 2011. The paper found that mortality rates rose nearly 6% when a rural hospital closed. However, the closings of urban hospitals did not have a similar impact. In rural areas, ambulances have to travel further to patients after a hospital closes. The paper also found no measurable impact of hospital closures when all closures are considered alike, i.e. no distinction is made between a rural vs. urban hospital closure. When examining the differential impact of hospital closures, rural closures increase inpatient mortality by 8.7%, whereas urban closures have no measurable impact on inpatient mortality. In the last five years (since 2017), three small urban hospitals have closed: Menlo Park Surgical Hospital in 2021, Promise Hospital of East Los Angeles in 2017, and Fallbrook Hospital of Fallbrook in 2017. Since 2017, an additional four older small hospitals closed (three rural, one urban) and either consolidated services within another facility or were replaced with a new facility. In this timeframe, two small urban hospitals opened: Bakersfield in 2022 and Rancho Mirage in 2018.
- Why these hospitals? According to the American Hospital Association, rural hospitals provide care to nearly 20% of Americans and are often the largest local employer. However, many rural hospitals are struggling financially and since 2010, 121 have closed across the country. According to the University of North Carolina Rural Health Research Program, since 2006, nine of those rural closures were in California.
- Status of hospital seismic safety compliance. According to HCAI, as of February of 2024, there are a total of 3,340 buildings at 410 licensed hospital facilities that are subject to the seismic safety standards. All have achieved at least the SPC-2 standard that allows them to remain in service until 2030 except for 41 buildings spread across 20 hospital facilities. In some cases, there are no plans to retrofit or rebuild, and the hospital has either already taken them out of service but it is not reflected in the data yet, or there are plans to take them out of service prior to the January 1, 2025 deadline. It is unclear how many of the remaining out-of-compliance buildings are expected to remain in service, but are in jeopardy of missing the January 1, 2025 deadline for retrofit or replacement projects.
Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 658 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. Of the 658 SPC-2 buildings, 151 have SPC-4D upgrade projects submitted. It is unclear how many of these 151 SPC 2 building upgrade projects will be in construction. The SPC 4D option has only been available since 2017; it is not known whether that will be utilized for the remaining buildings, or whether hospitals will choose to construct new replacement buildings.
Regarding NPC compliance, the vast majority of buildings have not yet met 2030 standards. More than half of all hospital buildings are still NPC 2. Only about 6% of all hospital buildings have achieved NPC 5 and are fully 2030 compliant. Another 34% have met NPC 4 requirements. The deadline to submit NPC construction projects is January 1, 2026, followed by an NPC construction permit deadline of January 1, 2028.
According to the Author
The targeted hospitals eligible to apply for a seismic delay under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards and directs HCAI to provide them technical assistance on how best to comply. The author states that there has to be a way to move forward to keep these hospitals open as they work to meet these standards, noting that the hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and that any closure would jeopardize the health of the community and its ability to respond to emergency situations.
Arguments in Support
The District Hospital Leadership Forum supports this bill and states that by 2030, all California hospitals are mandated to retrofit or rebuild their hospitals to remain fully operational in the event of an earthquake. Hospitals have met the prior standard (2020) which requires them to remain standing in the wake of a seismic event, which protects all staff and patients. The 2030 requirement to remain fully operational is a far greater and much more costly requirement than the 2020 mandate, and it will be—if not impossible—for many district hospitals. It is critically important for the state to assist these public hospitals before they fail to meet the 2030 deadline.
Arguments in Opposition
There is no known opposition to this bill.
FISCAL COMMENTS
According to the Senate Appropriations Committee (June 27, 2024 version):
- Unknown costs, likely low millions, in 2025-26 through 2029-30 for HCAI for staffing resources that include senior structural engineers, compliance officers, construction analysts, and facility construction financing specialists. (Small and Rural Hospital Relief Fund and the Hospital Building Fund).
- Unknown costs, likely low millions, from 2030-31 to 2035-36 for the HCAI for staffing resources to monitor compliance during the deadline extension period (Hospital Building Fund).
- Unknown one-time General Fund costs, likely low hundreds of thousands, for the California Building Standards Commission for Title 24, California Building Standards Code emergency regulations promulgation and for special information technology programming.
- Cost pressures, likely tens of millions, for a grant program to support district hospitals in complying with seismic safety standards. The bill does not identify a funding source for the grant program
VOTES:
ASM HEALTH: 14-0-1
YES: Wood, Waldron, Aguiar-Curry, Arambula, Boerner Horvath, Flora, Vince Fong, Maienschein, McCarty, Joe Patterson, Rodriguez, Santiago, Villapudua, Weber
ABS, ABST OR NV: Wendy Carrillo
ASM APPROPRIATIONS: 15-0-1
YES: Holden, Megan Dahle, Bryan, Calderon, Wendy Carrillo, Dixon, Mike Fong, Hart, Lowenthal, Mathis, Papan, Pellerin, Sanchez, Weber, Ortega
ABS, ABST OR NV: Robert Rivas
ASSEMBLY FLOOR: 80-0-0
YES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, Mathis, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Rendon
SENATE FLOOR: 38-0-2
YES: Allen, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Stern, Umberg, Wahab, Wiener, Wilk
ABS, ABST OR NV: Alvarado-Gil, Smallwood-Cuevas
UPDATED
VERSION: June 27, 2024
CONSULTANT: Lara Flynn / HEALTH / (916) 319-2097 FN: 0004681
CONCURRENCE IN SENATE AMENDMENTS
CSA1 Bill Id:AB 869
Author:(Wood and Garcia)
As Amended Ver:August 23, 2024
Majority vote
SUMMARY
Authorizes a Distressed Hospital Loan Program (DHLP) recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital, as defined, except as specified, to seek approval from the Department of Health Care Access and Information (HCAI) for a delay of the January 1, 2030 seismic compliance deadline of up to three years. Requires Hospitals seeking a delay to submit a seismic compliance plan and if necessary a Nonstructural Performance Category-5 evaluation report. Requires hospitals and HCAI to identify milestones relating to the compliance plan that will be used to determine whether a hospital is making progress toward meeting seismic compliance. Requires HCAI to approve or deny a compliance plan and any delay within 120 days. Authorizes HCAI to grant an additional two-year delay, up to a maximum of January 1, 2035, for hospitals that continue to experience financial distress or other issues beyond the hospital’s control. Imposes a fine of $5,000 per calendar day for a hospital’s failure to comply with a revised construction schedule or to meet any major milestone. Requires HCAI to support a hospital requesting a delay in exploring opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance.
Senate Amendments
- Delete provisions of this bill that grants a five-year extension of seismic safety requirements for single- and two-story hospitals located in rural areas with less than 80 beds and revenue of $75 million or less, where an assessment of the cost of retrofitting to comply with seismic safety requirements has shown it will result in a financial hardship.
- Delete provisions of this bill that grants a five-year extension of seismic safety requirements for health care district hospitals who meet certain financial hardship criteria, and to hospitals that received a distressed hospital loan.
COMMENTS
Non-structural damage to hospitals by the 1994 Northridge earthquake prompted the Legislature to update seismic safety requirements from 1974 that only applied to new construction. SB 1953 (Alquist), Chapter 740, Statutes of 1994 required the then Office of Statewide Health Planning and Development (OSHPD now HCAI) to create seismic performance categories for hospitals depending on the risk of collapse, and the ability to remain operable following an earthquake. Specifically, SB 1953 required HCAI to create structural performance categories (SPCs), as well as nonstructural performance categories (NPCs) for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. According to HCAI, the SPC requirements can be thought of as protecting the skeleton, while NPC requirements ensure the organs and other tissues necessary for a human body to function will remain safely attached to the skeleton. There are very few remaining buildings at risk of collapse in an earthquake. However, compliance with the 2030 requirement to remain operational is much more expensive.
- Status of 2030 seismic safety compliance. Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 674 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. There may be more, depending on how many of the 47 remaining SPC-1 buildings are only being brought up to SPC-2. There are currently only nine hospital buildings that have opted to use the SPC-4D option to retrofit older buildings, but since it has only been available since 2017, it is unclear whether that will be utilized more frequently for the remaining 674-plus buildings, or whether it will still be a rarely used option and most hospitals will choose to construct new replacement buildings.
For additional background information on seismic safety SPC and NPC compliance requirements, please see the Assembly Health Committee analysis of AB 1882 (Rivas) of the 2021-2022 Legislative Session.
- Impact of rural hospital closures. According to an August 2019 National Bureau of Economic Research paper, “Impact of Rural and Urban Hospital Closures on Inpatient Mortality,” 92 rural hospitals closed in California from 1995 to 2011. The paper found that mortality rates rose nearly 6% when a rural hospital closed. However, the closings of urban hospitals did not have a similar impact. In rural areas, ambulances have to travel further to patients after a hospital closes. The paper also found no measurable impact of hospital closures when all closures are considered alike, i.e. no distinction is made between a rural vs. urban hospital closure. When examining the differential impact of hospital closures, rural closures increase inpatient mortality by 8.7%, whereas urban closures have no measurable impact on inpatient mortality. In the last five years (since 2017), three small urban hospitals have closed: Menlo Park Surgical Hospital in 2021, Promise Hospital of East Los Angeles in 2017, and Fallbrook Hospital of Fallbrook in 2017. Since 2017, an additional four older small hospitals closed (three rural, one urban) and either consolidated services within another facility or were replaced with a new facility. In this timeframe, two small urban hospitals opened: Bakersfield in 2022 and Rancho Mirage in 2018.
- Why these hospitals? According to the American Hospital Association, rural hospitals provide care to nearly 20% of Americans and are often the largest local employer. However, many rural hospitals are struggling financially and since 2010, 121 have closed across the country. According to the University of North Carolina Rural Health Research Program, since 2006, nine of those rural closures were in California.
- Status of hospital seismic safety compliance. According to HCAI, as of February of 2024, there are a total of 3,340 buildings at 410 licensed hospital facilities that are subject to the seismic safety standards. All have achieved at least the SPC-2 standard that allows them to remain in service until 2030 except for 41 buildings spread across 20 hospital facilities. In some cases, there are no plans to retrofit or rebuild, and the hospital has either already taken them out of service but it is not reflected in the data yet, or there are plans to take them out of service prior to the January 1, 2025 deadline. It is unclear how many of the remaining out-of-compliance buildings are expected to remain in service, but are in jeopardy of missing the January 1, 2025 deadline for retrofit or replacement projects.
Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 658 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. Of the 658 SPC-2 buildings, 151 have SPC-4D upgrade projects submitted. It is unclear how many of these 151 SPC 2 building upgrade projects will be in construction. The SPC 4D option has only been available since 2017; it is not known whether that will be utilized for the remaining buildings, or whether hospitals will choose to construct new replacement buildings.
Regarding NPC compliance, the vast majority of buildings have not yet met 2030 standards. More than half of all hospital buildings are still NPC 2. Only about 6% of all hospital buildings have achieved NPC 5 and are fully 2030 compliant. Another 34% have met NPC 4 requirements. The deadline to submit NPC construction projects is January 1, 2026, followed by an NPC construction permit deadline of January 1, 2028.
According to the Author
The targeted hospitals eligible to apply for a seismic delay under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards and directs HCAI to provide them technical assistance on how best to comply. The author states that there has to be a way to move forward to keep these hospitals open as they work to meet these standards, noting that the hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and that any closure would jeopardize the health of the community and its ability to respond to emergency situations.
Arguments in Support
The District Hospital Leadership Forum supports this bill and states that by 2030, all California hospitals are mandated to retrofit or rebuild their hospitals to remain fully operational in the event of an earthquake. Hospitals have met the prior standard (2020) which requires them to remain standing in the wake of a seismic event, which protects all staff and patients. The 2030 requirement to remain fully operational is a far greater and much more costly requirement than the 2020 mandate, and it will be—if not impossible—for many district hospitals. It is critically important for the state to assist these public hospitals before they fail to meet the 2030 deadline.
Arguments in Opposition
There is no known opposition to this bill.
FISCAL COMMENTS
According to the Senate Appropriations Committee (June 27, 2024 version):
- Unknown costs, likely low millions, in 2025-26 through 2029-30 for HCAI for staffing resources that include senior structural engineers, compliance officers, construction analysts, and facility construction financing specialists. (Small and Rural Hospital Relief Fund and the Hospital Building Fund).
- Unknown costs, likely low millions, from 2030-31 to 2035-36 for the HCAI for staffing resources to monitor compliance during the deadline extension period (Hospital Building Fund).
- Unknown one-time General Fund costs, likely low hundreds of thousands, for the California Building Standards Commission for Title 24, California Building Standards Code emergency regulations promulgation and for special information technology programming.
- Cost pressures, likely tens of millions, for a grant program to support district hospitals in complying with seismic safety standards. The bill does not identify a funding source for the grant program
VOTES:
ASM HEALTH: 14-0-1
YES: Wood, Waldron, Aguiar-Curry, Arambula, Boerner Horvath, Flora, Vince Fong, Maienschein, McCarty, Joe Patterson, Rodriguez, Santiago, Villapudua, Weber
ABS, ABST OR NV: Wendy Carrillo
ASM APPROPRIATIONS: 15-0-1
YES: Holden, Megan Dahle, Bryan, Calderon, Wendy Carrillo, Dixon, Mike Fong, Hart, Lowenthal, Mathis, Papan, Pellerin, Sanchez, Weber, Ortega
ABS, ABST OR NV: Robert Rivas
ASSEMBLY FLOOR: 80-0-0
YES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, Mathis, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Rendon
UPDATED
VERSION: June 27, 2024
CONSULTANT: Lara Flynn / HEALTH / (916) 319-2097 FN: 0004681
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 869 |
THIRD READING
Bill No: AB 869
Author: Wood (D) and Garcia (D), et al.
Amended: 8/23/24 in Senate
Vote: 21
SENATE HEALTH COMMITTEE: 11-0, 6/26/24
AYES: Roth, Nguyen, Glazer, Gonzalez, Grove, Hurtado, Limón, Menjivar, Rubio, Smallwood-Cuevas, Wiener
SENATE APPROPRIATIONS COMMITTEE: 6-0, 8/15/24
AYES: Caballero, Jones, Ashby, Becker, Seyarto, Wahab
NO VOTE RECORDED: Bradford
ASSEMBLY FLOOR: 80-0, 5/30/23 - See last page for vote
SUBJECT: Hospitals: seismic safety compliance
SOURCE: Author
DIGEST:
This bill establishes a process for small, rural, and district hospitals, as well as hospitals that are recipients of the Distressed Hospital Loan Program, to seek a delay in the seismic compliance deadline of January 1, 2030 of up to three years, with HCAI having the discretion to extend the delay by an additional two years if the hospital continues to be in financial distress, or due to factors outside of the hospital’s control.
Senate Floor Amendments of 8/23/24 delete provisions that provided an extension of the 2030 seismic compliance requirements of up to five years for certain hospitals, and instead incorporate technical assistance from the Department of Health Care Access and Information (HCAI), as well as stakeholders, to provide a process for small, rural, and district hospitals, as well as hospitals that are recipients of the Distressed Hospital Loan Program, to seek a delay in the seismic compliance deadline of up to three years, with HCAI having the discretion to extend the delay by an additional two years if the hospital continues to be in financial distress, or due to factors outside of the hospital’s control.
ANALYSIS:
Existing law:
- Licenses and regulates health facilities, including general acute care hospitals, by the California Department of Public Health (CDPH). [HSC §1250, et seq.]
- Establishes the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (Seismic Safety Act), to ensure that hospital buildings are designed and constructed to resist the forces generated by earthquakes and requires HCAI to propose building standards for earthquake resistance and to provide independent review of the design and construction of hospital buildings. [HSC §129675, et seq.]
- Establishes timelines for hospital compliance with seismic safety standards, including a requirement that buildings posing a significant risk of collapse and a danger to the public (referred to as SPC-1 buildings) be rebuilt or retrofitted to be capable of withstanding an earthquake, or removed from acute care service, by January 1, 2008 (which has since been extended for various hospitals to various dates), and a requirement that hospitals must also be capable of continued operation by January 1, 2030. [HSC §130060, §130065]
- Permits HCAI to grant an extension of up to five years to the 2008 deadline (January 1, 2013) for hospitals for which compliance will result in a loss of health care capacity, as defined. Allows HCAI to grant various further extensions beyond this, including up to seven years (January 1, 2020), in part based on the loss of essential hospital services to the community if the hospital closed, and financial hardship. [HSC §130060, §130061.5]
- Permits HCAI, under legislation enacted in 2018, to provide for an extension of the January 1, 2020 deadline in 4) above, for up to 30 months (until July 1, 2022) for hospitals that plan to replace or retrofit a building to meet the 2020 standard, and up to five years (January 1, 2025) for hospitals that plan to rebuild to a standard that meets the 2030 requirement. [HSC §130062]
- Requires the owner of a hospital whose building does not substantially comply with the January 1, 2030 seismic safety requirement described in 3) above, to submit to HCAI, by January 1, 2020, an attestation that the board of directors of that hospital is aware that the hospital building is required to meet this requirement. [HSC §130066]
- Establishes the Small and Rural Hospital Relief Program (SRHRP) within HCAI for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals. Requires HCAI to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. [HSC §130075, §130076, §130078]
This bill:
- Permits a distressed hospital loan program recipient, a small hospital, a rural hospital, a critical access hospital, or a health care district hospital (eligible hospitals), as each of these are defined, to seek approval from HCAI for a delay to the January 1, 2030 seismic compliance deadline by up to three years with the submission and departmental approval of a seismic compliance plan, as described, and if necessary, a Nonstructural Performance Category-5 (NPC-5) evaluation report.
- Excludes hospitals that belong to integrated health care systems with two or more separately licensed hospital facilities from being eligible for a delay under this bill, including a health care district hospital that has a contractual agreement with a health system that imposes upon the health system any financial responsibility for seismic compliance costs, unless the entire integrated health care system is determined by HCAI to be in financial distress. However, specifies that the following are still permitted to be eligible for a delay despite being part of an integrated health care system:
- A rural hospital with less than 80 general acute care beds and general acute care revenue of $75 million or less in 2020;
- A hospital that is part of an integrated health care system that is operated by a health care district or a nonprofit corporation that is affiliated with the health care district hospital owner by means of the district’s status as the nonprofit corporation’s sole corporate owners; or
- A health care district hospital that does not have a contractual, management, lease, or operating agreement with a health system that imposes upon the health system any financial responsibility for the health care district’s infrastructure cost for seismic compliance.
- Requires eligible hospitals to provide all of the following to HCAI:
- An NPC-5 evaluation report, as specified, if necessary, by January 1, 2025;
- The hospital’s seismic compliance plan in accordance with specified regulations by January 1, 2026, which is required to outline steps, including milestones, to achieve compliance with seismic safety standards at the earliest reasonable date, but by no later than January 1, 2033.
- Requires the hospital and HCAI to identify at least two major milestones relating to the seismic compliance plan to be used as the basis for determining whether the hospital is making adequate progress towards meeting the seismic compliance deadline. Requires the seismic compliance plan to be subject to HCAI review for reasonableness, and requires HCAI to have 120 days to approve or deny the plan and any delay to the seismic deadline. If HCAI determines the compliance schedule is unreasonable, requires HCAI to notify the hospital and provide its rationale for its determination, and requires the hospital to be given an opportunity to address the identified concerns.
- Provides HCAI to have the discretion to additionally delay the amount of time by which an eligible hospital is required to comply with the seismic requirements by an additional two years, up to a maximum of January 1, 2035. Permits this discretion to be authorized for hospitals that continue to experience financial distress or that need to deal with contractor, labor, or material delays, acts of God, governmental entitlements, or other circumstances beyond the hospital’s control.
- Requires eligible hospitals that are requesting an additional delay due to financial distress, requires HCAI to make a determination of financial distress using days cash on hand, current ratio, access to working capital, operating margin, cash burn rate, the financial impact of mandatory seismic compliance costs on the hospital or health system, and other methodologies developed under the Distressed Hospital Loan Program.
- Requires a hospital, if HCAI determines that it is no longer in financial distress, to submit a revised seismic compliance plan for review and approval, and permits HCAI to adjust compliance deadline to reflect the fact that the hospital is no longer in financial distress.
- Requires failure by a hospital to comply with the revised construction schedule or meet any major milestones established by HCAI and the hospital to result in the assessment of a fine of $5,000 per calendar day until the requirements or milestones are met.
- Requires HCAI to provide support to an eligible hospital to explore opportunities under the Small and Rural Hospital Relief Program to assist with seismic compliance.
- Prohibits hospitals that fail to meet any milestone or compliance deadline approved in its compliance plan from being issued a building permit for any building in the facility except those required for seismic compliance, maintenance, and emergency repairs until the milestone is met and the hospital is adequately progressing toward compliance.
- Requires HCAI to annually post a list of hospitals that have been granted a delay of the January 1, 2030 deadline on its internet website.
- Requires HCAI to expand eligibility for grants under the SRHRP for single- and two-story general acute care hospitals located in rural areas with fewer than 80 general acute care beds and revenue of $75 million or less.
- Requires grants under the SRHRP to provide hospitals described in 1) above with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with the seismic safety requirement that hospitals be capable of remaining in operation following a major earthquake (seismic safety requirements).
- Requires HCAI to conduct outreach to hospitals described in 1) above regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
- Requires a hospital receiving a grant for an assessment pursuant to 2) above to provide the estimated cost of SPC-4D compliance to HCAI.
- Permits hospitals that received a grant for an assessment pursuant to 2) above to apply for a grant for purposes of complying with the seismic safety requirements. Permits HCAI, for hospitals that already have an approved SPC-4D assessment, to award hospitals these grants.
- Requires a hospital that qualifies for assessment grants under the SRHRP, if funds are appropriated to that program in the future for purposes of complying with seismic requirements, before being awarded state funds, to submit financial information to HCAI related to all of the following:
- Whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why;
- The accuracy of the hospital’s SPC-4D cost estimates and confirmation that the estimated costs are only for purposes of SPC-4D compliance; and,
- The hospital’s need for assistance due to financial hardship and lack of ability to finance the requirement improvements, in order to access state funds.
- Requires HCAI, in awarding grants pursuant to 16) above, to have the authority to deny any costs from the assessment completed pursuant to the SRHRP that HCAI determines are not necessary to comply with SPC-4D requirements.
Comments
- Author’s statement. According to the author, “the targeted hospitals eligible to apply for grants under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards until there are resources available to assist them. The author states that there has to be a way to move forward to keep these hospitals open as they work to meet these standards, noting that the hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and that any closure would jeopardize the health of the community and its ability to respond to emergency situations.”
- Background on hospital seismic safety requirements. The original Seismic Safety Act was passed in 1973, following the 1971 San Fernando Valley (also known as Sylmar) earthquake, and required all new hospital construction to meet seismic safety standards. The Seismic Safety Act did not apply to existing buildings with the expectation that older buildings would be replaced with conforming buildings over time. By the time of the Northridge earthquake in 1994, however, 80% of hospital beds were still in pre-1973 non-conforming buildings. The Northridge earthquake caused significant structural damage to a number of hospitals, with at least two hospitals needing to be evacuated. What also became apparent in the Northridge earthquake was that nonstructural damage was also a threat to patient safety, with damage to heating and ventilation systems and sprinklers, forcing evacuations. Following the Northridge earthquake, the Legislature updated the Seismic Safety Act with SB 1953 (Alquist, Chapter 740, Statutes of 1994), which required HCAI (at that time OSHPD) to establish earthquake performance categories for hospitals. SB 1953 also established a January 1, 2008 deadline by which general acute care hospitals must be retrofitted or replaced so that they do not pose a risk of collapse in the event of an earthquake (which has been repeatedly extended by subsequent legislation for most hospitals), and a January 1, 2030, deadline by which they must be capable of remaining operational following an earthquake.
Specifically, SB 1953 required HCAI to create structural performance categories (SPCs), as well as nonstructural performance categories (NPCs) for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. According to HCAI, the SPC requirements can be thought of as protecting the skeleton, while NPC requirements ensure the organs and other tissues that are necessary for a human body to function will remain safely attached to the skeleton. It is important to note that a licensed facility, or hospital, is often made up of several buildings on its campus. Many hospitals may have one or more buildings that are 2030 compliant, while other buildings still need to be retrofitted, replaced, or changed to a use that is not associated with acute care services. - Status of hospital seismic safety compliance. According to HCAI, as of February of 2024, there are a total of 3,340 buildings at 410 licensed hospital facilities that are subject to the seismic safety standards. All have achieved at least the SPC-2 standard that allows them to remain in service until 2030 except for 41 buildings spread across 20 hospital facilities. In some cases, there are no plans to retrofit or rebuild, and the hospital has either already taken them out of service but it is not reflected in the data yet, or there are plans to take them out of service prior to the January 1, 2025 deadline. It is unclear how many of the remaining out-of-compliance buildings are expected to remain in service, but are in jeopardy of missing the January 1, 2025 deadline for retrofit or replacement projects.
Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 658 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. Of the 658 SPC-2 buildings, 151 have SPC-4D upgrade projects submitted. It is unclear how many of these 151 SPC 2 building upgrade projects will be in construction. The SPC 4D option has only been available since 2017; it is not known whether that will be utilized for the remaining buildings, or whether hospitals will choose to construct new replacement buildings.
Regarding NPC compliance, the vast majority of buildings have not yet met 2030 standards. More than half of all hospital buildings are still NPC 2. Only about 6% of all hospital buildings have achieved NPC 5 and are fully 2030 compliant. Another 34% have met NPC 4 requirements. The deadline to submit NPC construction projects is January 1, 2026, followed by an NPC construction
permit deadline of January 1, 2028.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee analysis of the prior version of this bill:
- Unknown costs, likely low millions, in 2025-26 through 2029-30 for the Department of Health Care Access and Information (HCAI) for staffing resources that include senior structural engineers, compliance officers, construction analysts, and facility construction financing specialists. (Small and Rural Hospital Relief Fund and the Hospital Building Fund).
- Unknown costs, likely low millions, from 2030-31 to 2035-36 for the HCAI for staffing resources to monitor compliance during the deadline extension period (Hospital Building Fund).
- Unknown one-time General Fund costs, likely low hundreds of thousands, for the California Building Standards Commission for Title 24, California Building Standards Code emergency regulations promulgation and for special information technology programming.
- Cost pressures, likely tens of millions, for a grant program to support district hospitals in complying with seismic safety standards. The bill does not identify a funding source for the grant program.
SUPPORT: (Verified 8/14/24)
Adventist Health
Antelope Valley Healthcare District
Association of California Healthcare Districts
California Special Districts Association
Coast Democratic Club of Mendocino County
Community Health System
County of Santa Clara, Office of the County Executive
District Hospital Leadership Forum
Inland Empire Health Plan
Kaweah Delta Health Care District
Los Angeles Area Chamber of Commerce
Mad River Community Hospital
Mark Twain Healthcare District
Mayers Memorial Hospital District
Mendocino County Democratic Party
Plumas District Hospital
Rural County Representatives of California
Vision Y Compromiso
OPPOSITION: (Verified 8/14/24)
None received
ARGUMENTS IN SUPPORT: The District Hospital Leadership Forum states in support that the 2030 requirement to remain fully operational is a far greater and much more costly requirement than the prior mandate, and it will be difficult, if not impossible, for many district hospitals. Most face construction costs that are simply unattainable to comply with the 2030 requirement, with decimated reserves and worsening bond ratings as a result of the pandemic and its aftermath. By providing access to grant funding for assessments and additional time to meet the 2030 standard, this bill provides the relief that small, rural, and district hospitals need to achieve compliance. The Association of California Healthcare Districts (ACHD) makes similar arguments in support, and states that while it is hard to quantify with certainty the total cost for all district hospitals to meet the 2030 mandate, in ACHD’s estimates it well exceeds $3 billion, with small hospital projects estimate at $45 million and larger projects in the hundreds of millions. ACHD points out that district hospitals must go to their voters to approve a bond or tax to fund these projects or to leverage government financing, and these initiatives often fail based on the economic composition of their constituents. With 2030 rapidly approaching, district hospitals continue to struggle to secure financing to begin these projects. The County of Santa Clara writes in support that while hospitals inside their county would not directly benefit from this bill, it could benefit hospitals in their neighboring counties of San Benito, Santa Cruz, and Monterey, allowing regional hospital to remain operational and serve their communities. The County of Santa Clara states that their health system would be ready and willing to serve patients from other areas, but they believe the overall safety net is only as strong as its weakest link and efforts to keep it viable are needed.
ASSEMBLY FLOOR: 80-0, 5/30/23
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, Mathis, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Rendon
Prepared by: Vincent D. Marchand / HEALTH / (916) 651-4111
8/26/24 17:00:43
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | AB 869 |
THIRD READING
Bill No: AB 869
Author: Wood (D) and Garcia (D), et al.
Amended: 8/15/24 in Senate
Vote: 21
SENATE HEALTH COMMITTEE: 11-0, 6/26/24
AYES: Roth, Nguyen, Glazer, Gonzalez, Grove, Hurtado, Limón, Menjivar, Rubio, Smallwood-Cuevas, Wiener
SENATE APPROPRIATIONS COMMITTEE: 6-0, 8/15/24
AYES: Caballero, Jones, Ashby, Becker, Seyarto, Wahab
NO VOTE RECORDED: Bradford
ASSEMBLY FLOOR: 80-0, 5/30/23 - See last page for vote
SUBJECT: Hospitals: seismic safety compliance
SOURCE: Author
DIGEST:
This bill grants a five-year extension of seismic safety requirements for single- and two-story hospitals located in rural areas with less than 80 beds and revenue of $75 million or less, where an assessment of the cost of retrofitting to comply with seismic safety requirements has shown it will result in a financial hardship. Expands the Small and Rural Hospital Relief Program to provide grants to hospitals that meet this definition. Grants a five-year extension of seismic safety requirements for health care district hospitals who meet certain financial hardship criteria, and to hospitals that received a distressed hospital loan.
ANALYSIS:
Existing law:
- Licenses and regulates health facilities, including general acute care hospitals, by the California Department of Public Health (CDPH). [HSC §1250, et seq.]
- Establishes the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (Seismic Safety Act), to ensure that hospital buildings are designed and constructed to resist the forces generated by earthquakes and requires HCAI to propose building standards for earthquake resistance and to provide independent review of the design and construction of hospital buildings. [HSC §129675, et seq.]
- Establishes timelines for hospital compliance with seismic safety standards, including a requirement that buildings posing a significant risk of collapse and a danger to the public (referred to as SPC-1 buildings) be rebuilt or retrofitted to be capable of withstanding an earthquake, or removed from acute care service, by January 1, 2008 (which has since been extended for various hospitals to various dates), and a requirement that hospitals must also be capable of continued operation by January 1, 2030. [HSC §130060, §130065]
- Permits HCAI to grant an extension of up to five years to the 2008 deadline (January 1, 2013) for hospitals for which compliance will result in a loss of health care capacity, as defined. Allows HCAI to grant various further extensions beyond this, including up to seven years (January 1, 2020), in part based on the loss of essential hospital services to the community if the hospital closed, and financial hardship. [HSC §130060, §130061.5]
- Permits HCAI, under legislation enacted in 2018, to provide for an extension of the January 1, 2020 deadline in 4) above, for up to 30 months (until July 1, 2022) for hospitals that plan to replace or retrofit a building to meet the 2020 standard, and up to five years (January 1, 2025) for hospitals that plan to rebuild to a standard that meets the 2030 requirement. [HSC §130062]
- Requires the owner of a hospital whose building does not substantially comply with the January 1, 2030 seismic safety requirement described in 3) above, to submit to HCAI, by January 1, 2020, an attestation that the board of directors of that hospital is aware that the hospital building is required to meet this requirement. [HSC §130066]
- Establishes the Small and Rural Hospital Relief Program (SRHRP) within HCAI for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals. Requires HCAI to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. [HSC §130075, §130076, §130078]
This bill:
- Requires HCAI to expand eligibility for grants under the SRHRP for single- and two-story general acute care hospitals located in rural areas with less than 80 general acute care beds and revenue of $75 million or less.
- Requires grants under the SRHRP to provide hospitals described in 1) above with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with the seismic safety requirement that hospitals be capable of remaining in operation following a major earthquake (seismic safety requirements).
- Requires HCAI to conduct outreach to hospitals described in 1) above regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
- Requires a hospital receiving a grant for an assessment pursuant to 2) above to provide the estimated cost of SPC-4D compliance to HCAI as soon as possible.
- Permits hospitals that received a grant for an assessment pursuant to 2) above to apply for a grant for purposes of complying with the seismic safety requirements. Permits HCAI, for hospitals that already have an approved SPC-4D assessment, to award hospitals these grants.
- Requires a hospital that qualified for a SPC-4D assessment, if state funds are appropriated to the SRHRP in the future for the purpose of complying with the seismic safety requirements, before being awarded state funds, to provide HCAI with financial information for the following purposes:
- Demonstrating whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why;
- Confirming the accuracy of the SPC-4D cost estimate and that estimated costs are only for the purpose of SPC-4D compliance; and,
- Demonstrating the hospital’s need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
- Requires HCAI to have the authority, in awarding grants under the SRHRP, to deny costs from the assessment that HCAI determines are not necessary to comply with SPC-4D requirements.
- Requires hospitals described in 1) above that apply and qualify for grants to comply with seismic safety requirements pursuant to 5) above to comply with the seismic safety requirements by January 1, 2032 instead of January 1, 2030.
- Requires a hospital described in 1) above with a completed SPC-4D assessment that has an estimated cost of more than $1 million, or 2% of the hospital’s revenue, whichever is greater, to comply with the seismic safety requirements by January 1, 2035 instead of January 1, 2030, if HCAI determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
- Authorizes HCAI to implement the provisions of this bill related to the SRHRP through emergency regulations.
- Establishes a health care district relief program for health care district hospitals that meet any of the following requirements:
- The health care district meets the requirements for rural hospitals pursuant to 1) above;
- The health care district placed a bond measure on the ballot within the previous five years regarding compliance with seismic safety requirements and the measure did not pass;
- The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals; or,
- The health care district hospital is more than 30 minutes or 30 miles from the nearest other hospital.
- Permits a health care district hospital that meets one of the criteria in 11) above to submit financial information to HCAI to allow HCAI to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospital’s percentage of patients on Medi-Cal. Requires the health care district to provide HCAI with financial information on a form required by HCAI for the following purposes:
- Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with the seismic safety requirements, including federal funding, and if not, why;
- Demonstrating the hospital’s need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
- Permits a health care district hospital, if HCAI determines the hospital is financially distressed, to apply to HCAI for a grant for the purpose of complying with seismic safety requirements. Requires the hospital to provide HCAI, when applying for a grant, with an estimate of the cost of compliance.
- Requires HCAI, if state funds are made available for the purpose of complying with the seismic safety requirements, to confirm the accuracy of the health care district’s seismic cost estimate, and that estimated costs are only for the purpose of seismic compliance.
- In awarding grants, requires HCAI to have authority to deny costs that it determines are not necessary to comply with seismic safety requirements.
- Requires health care districts that qualify for grants to comply with seismic safety requirements by January 1, 2032 instead of January 1, 2030. Extends this deadline to January 1, 2035 if HCAI determines that the cost of design and construction results in a financial hardship that may result in hospital closure and other funds are not available to assist with the cost of compliance.
- Excludes a health care district hospital in a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care district hospital’s infrastructure costs from being eligible for funds or a delay of seismic compliance under this bill. Specifies that this exclusion does not apply to a health care district hospital that has a management agreement with a health system that does not impose upon the health system any responsibility for the hospital’s infrastructure costs.
- Authorizes HCAI to implement the provisions of this bill related to health care district hospitals through emergency regulations.
- Requires a hospital that received a distressed hospital loan, as specified, to qualify for a seismic safety extension to January 1, 2032. Extends this deadline to January 1, 2035 if HCAI determines that the cost of design and construction will result in a financial hardship that may result in closure and other funds are not available.
- Requires all rural, district, and distressed hospitals to provide HCAI with a seismic safety compliance plan no later than July 1, 2026 describing how the hospital intends to meet the seismic safety requirements.
Background
- Background on hospital seismic safety requirements. The original Seismic Safety Act was passed in 1973, following the 1971 San Fernando Valley (also known as Sylmar) earthquake, and required all new hospital construction to meet seismic safety standards. The Seismic Safety Act did not apply to existing buildings with the expectation that older buildings would be replaced with conforming buildings over time. By the time of the Northridge earthquake in 1994, however, 80% of hospital beds were still in pre-1973 non-conforming buildings. The Northridge earthquake caused significant structural damage to a number of hospitals, with at least two hospitals needing to be evacuated. What also became apparent in the Northridge earthquake was that nonstructural damage was also a threat to patient safety, with damage to heating and ventilation systems and sprinklers, forcing evacuations. Following the Northridge earthquake, the Legislature updated the Seismic Safety Act with SB 1953 (Alquist, Chapter 740, Statutes of 1994), which required HCAI (at that time OSHPD) to establish earthquake performance categories for hospitals. SB 1953 also established a January 1, 2008 deadline by which general acute care hospitals must be retrofitted or replaced so that they do not pose a risk of collapse in the event of an earthquake (which has been repeatedly extended by subsequent legislation for most hospitals), and a January 1, 2030, deadline by which they must be capable of remaining operational following an earthquake.
Specifically, SB 1953 required HCAI to create structural performance categories (SPCs), as well as nonstructural performance categories (NPCs) for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. According to HCAI, the SPC requirements can be thought of as protecting the skeleton, while NPC requirements ensure the organs and other tissues that are necessary for a human body to function will remain safely attached to the skeleton. It is important to note that a licensed facility, or hospital, is often made up of several buildings on its campus. Many hospitals may have one or more buildings that are 2030 compliant, while other buildings still need to be retrofitted, replaced, or changed to a use that is not associated with acute care services. - Status of hospital seismic safety compliance. According to HCAI, as of February of 2024, there are a total of 3,340 buildings at 410 licensed hospital facilities that are subject to the seismic safety standards. All have achieved at least the SPC-2 standard that allows them to remain in service until 2030 except for 41 buildings spread across 20 hospital facilities. In some cases, there are no plans to retrofit or rebuild, and the hospital has either already taken them out of service but it is not reflected in the data yet, or there are plans to take them out of service prior to the January 1, 2025 deadline. It is unclear how many of the remaining out-of-compliance buildings are expected to remain in service, but are in jeopardy of missing the January 1, 2025 deadline for retrofit or replacement projects.
Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 658 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. Of the 658 SPC-2 buildings, 151 have SPC-4D upgrade projects submitted. It is unclear how many of these 151 SPC 2 building upgrade projects will be in construction. The SPC 4D option has only been available since 2017; it is not known whether that will be utilized for the remaining buildings, or whether hospitals will choose to construct new replacement buildings.
Regarding NPC compliance, the vast majority of buildings have not yet met 2030 standards. More than half of all hospital buildings are still NPC 2. Only about 6% of all hospital buildings have achieved NPC 5 and are fully 2030 compliant. Another 34% have met NPC 4 requirements. The deadline to submit NPC construction projects is January 1, 2026, followed by an NPC construction permit deadline of January 1, 2028.
Comments
Author’s statement. According to the author, “the targeted hospitals eligible to apply for grants under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards until there are resources available to assist them. The author states that there has to be a way to move forward to keep these hospitals open as they work to meet these standards, noting that the hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and that any closure would jeopardize the health of the community and its ability to respond to emergency situations.”
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee:
- Unknown costs, likely low millions, in 2025-26 through 2029-30 for the Department of Health Care Access and Information (HCAI) for staffing resources that include senior structural engineers, compliance officers, construction analysts, and facility construction financing specialists. (Small and Rural Hospital Relief Fund and the Hospital Building Fund).
- Unknown costs, likely low millions, from 2030-31 to 2035-36 for the HCAI for staffing resources to monitor compliance during the deadline extension period (Hospital Building Fund).
- Unknown one-time General Fund costs, likely low hundreds of thousands, for the California Building Standards Commission for Title 24, California Building Standards Code emergency regulations promulgation and for special information technology programming.
- Cost pressures, likely tens of millions, for a grant program to support district hospitals in complying with seismic safety standards. The bill does not identify a funding source for the grant program.
SUPPORT: (Verified 8/14/24)
Adventist Health
Antelope Valley Healthcare District
Association of California Healthcare Districts
California Special Districts Association
Coast Democratic Club of Mendocino County
Community Health System
County of Santa Clara, Office of the County Executive
District Hospital Leadership Forum
Inland Empire Health Plan
Kaweah Delta Health Care District
Los Angeles Area Chamber of Commerce
Mad River Community Hospital
Mark Twain Healthcare District
Mayers Memorial Hospital District
Mendocino County Democratic Party
Plumas District Hospital
Rural County Representatives of California
Vision Y Compromiso
OPPOSITION: (Verified 8/14/24)
None received
ARGUMENTS IN SUPPORT: The District Hospital Leadership Forum states in support that the 2030 requirement to remain fully operational is a far greater and much more costly requirement than the prior mandate, and it will be difficult, if not impossible, for many district hospitals. Most face construction costs that are simply unattainable to comply with the 2030 requirement, with decimated reserves and worsening bond ratings as a result of the pandemic and its aftermath. By providing access to grant funding for assessments and additional time to meet the 2030 standard, this bill provides the relief that small, rural, and district hospitals need to achieve compliance. The Association of California Healthcare Districts (ACHD) makes similar arguments in support, and states that while it is hard to quantify with certainty the total cost for all district hospitals to meet the 2030 mandate, in ACHD’s estimates it well exceeds $3 billion, with small hospital projects estimate at $45 million and larger projects in the hundreds of millions. ACHD points out that district hospitals must go to their voters to approve a bond or tax to fund these projects or to leverage government financing, and these initiatives often fail based on the economic composition of their constituents. With 2030 rapidly approaching, district hospitals continue to struggle to secure financing to begin these projects. The County of Santa Clara writes in support that while hospitals inside their county would not directly benefit from this bill, it could benefit hospitals in their neighboring counties of San Benito, Santa Cruz, and Monterey, allowing regional hospital to remain operational and serve their communities. The County of Santa Clara states that their health system would be ready and willing to serve patients from other areas, but they believe the overall safety net is only as strong as its weakest link and efforts to keep it viable are needed.
ASSEMBLY FLOOR: 80-0, 5/30/23
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Cervantes, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Vince Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, Mathis, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Ortega, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Luz Rivas, Robert Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Rendon
Prepared by: Vincent D. Marchand / HEALTH / (916) 651-4111
8/19/24 10:47:14
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anna Caballero, Chair
2023 - 2024 Regular Session
AB 869 (Wood) - Hospitals: seismic safety compliance
Version: June 27, 2024 | Policy Vote: HEALTH 11 - 0 |
Urgency: No | Mandate: No |
Hearing Date: August 15, 2024 | Consultant: Agnes Lee |
Bill Summary:
AB 869 would expand the Small and Rural Hospital Relief Program and establish a relief program for health care district hospitals; and provide for extensions of seismic safety requirement deadlines, as specified.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on August 15, 2024
Fiscal Impact:
- Unknown costs, likely low millions, in 2025-26 through 2029-30 for the Department of Health Care Access and Information (HCAI) for staffing resources that include senior structural engineers, compliance officers, construction analysts, and facility construction financing specialists. (Small and Rural Hospital Relief Fund and the Hospital Building Fund).
- Unknown costs, likely low millions, from 2030-31 to 2035-36 for the HCAI for staffing resources to monitor compliance during the deadline extension period (Hospital Building Fund).
- Unknown one-time General Fund costs, likely low hundreds of thousands, for the California Building Standards Commission for Title 24, California Building Standards Code emergency regulations promulgation and for special information technology programming.
- Cost pressures, likely tens of millions, for a grant program to support district hospitals in complying with seismic safety standards. The bill does not identify a funding source for the grant program.
Author Amendments:
- Revise co-authors.
- Require a hospital that received a distressed hospital loan, as specified, to qualify for an extension of the January 1, 2030 seismic safety requirements to no later than January 1, 2032.
- Require that if the HCAI determines that the cost of design and construction for compliance with the January 1, 2030 seismic safety requirements will result in a financial hardship for a distressed hospital that may result in hospital closure, and state funds, federal grants, or private funds are not available to assist with the cost of compliance, the distressed hospital cannot be required to comply with the requirements until January 1, 2035.
- Require the HCAI to confirm a distressed hospital’s lack of ability to comply with the January 1, 2030 seismic safety requirements and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the distressed hospital.
- Require all rural, district, and distressed acute care hospitals to provide the HCAI with a seismic safety compliance plan, as specified, by no later than July 1, 2026.
-- END --
SENATE COMMITTEE ON
Senator Anna Caballero, Chair
2023 - 2024 Regular Session
AB 869 (Wood) - Hospitals: seismic safety compliance
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
AB 869 would expand the Small and Rural Hospital Relief Program and establish a relief program for health care district hospitals; and provide for extensions of seismic safety requirement deadlines, as specified.
Fiscal Impact:
The Department of Health Care Access and Information (HCAI) estimates the following:
- Costs of $1.35 million in 2025-26 and $1.5 to $1.6 million in 2026-27 through 2029-30 for staffing resources that include senior structural engineers; compliance officers, health facility construction; an associate construction analyst; and facility construction financing specialists. Approximately $360,000 for the financing specialists are attributable to the Small and Rural Hospital Relief Fund and the remaining costs are attributable to the Hospital Building Fund.
- Costs over $1.5 million from 2030-31 to 2035-36 for staffing resources to monitor compliance during the deadline extension period (Hospital Building Fund).
- One-time General Fund costs of $145,000 for the California Building Standards Commission for Title 24, California Building Standards Code emergency regulations promulgation and $100,000 for special information technology programming.
- Cost pressures, likely tens of millions, for a grant program to support district hospitals in complying with seismic safety standards. The bill does not identify a funding source for the grant program.
Background:
Current law requires the HCAI to propose building standards for earthquake resistance and to provide independent review of the design and construction of hospital buildings. State law established a January 1, 2008 deadline by which general acute care hospitals must be retrofitted or replaced so that they do not pose a risk of collapse in the event of an earthquake, and a January 1, 2030 deadline by which they must be capable of remaining operational following an earthquake. Subsequent legislation has allowed most hospitals to qualify for various extensions of the January 1, 2008 deadline.
Current law requires HCAI to create Structural Performance Categories (SPCs), as well as Nonstructural Performance Categories (NPCs) for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. For example, buildings with and “SPC-2” rating are permitted to remain in service only until January 1, 2030, at which point they need to be replaced, have the acute care services relocated, or be retrofitted. Many hospitals may have one or more buildings that are compliant with the January 1, 2030 requirements, while other buildings still need to be retrofitted, replaced, or changed to a use that is not associated with acute care services.
Current law establishes the Small and Rural Hospital Relief Program (SRHRP) within HCAI for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals. Under the program, HCAI provides grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure.
Proposed Law:
Specific provisions of the bill would:
- Require HCAI to expand eligibility for grants under the SRHRP for single- and two-story general acute care hospitals located in rural areas with less than 80 general acute care beds and revenue of $75 million or less, as specified; require hospitals that apply and qualify for grants, as specified, to comply with the seismic safety requirements by January 1, 2032 instead of January 1, 2030; and permit certain hospitals, with an estimated cost over $1,000,000 or 2 percent of the hospital’s revenue, whichever is greater, to comply with the seismic safety requirements by January 1, 2035 instead of January 1, 2030, if HCAI determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and other funds are not available to assist with the cost of compliance.
- Establish a health care district relief program for district hospitals that meet specified requirements; permit a health care district hospital, if HCAI determines the hospital is financially distressed, to apply to HCAI for a grant for the purpose of complying with seismic safety requirements; require health care district hospitals that qualify for grants to comply with seismic safety requirements by January 1, 2032 instead of January 1, 2030; and permit health care district hospitals to comply with seismic safety requirements by January 1, 2035 if HCAI determines that the cost of design and construction results in a financial hardship that may result in hospital closure and other funds are not available to assist with the cost of compliance.
Related Legislation:
SB 1119 (Newman) would extend the dates by which four hospitals owned by Providence are required to comply with seismic safety standards. The bill is currently on the suspense file in the Assembly Appropriations Committee.
SB 1432 (Caballero) would provide for extensions of the January 1, 2030 seismic compliance deadline for hospitals, as specified. The bill is currently in the Assembly Appropriations Committee.
SB 1447 (Durazo) would extend the January 1, 2030 seismic compliance deadline for Children’s Hospital Los Angeles. The bill is currently in the Assembly Appropriations Committee.
-- END --
SENATE COMMITTEE ON HEALTH
Senator Richard Roth, Chair
BILL NO: AB 869
AUTHOR: | Wood and Garcia | ||
VERSION: | June 18, 2024 | ||
HEARING DATE: | June 26, 2024 | ||
CONSULTANT: | Vincent D. Marchand | ||
SUBJECT: Hospitals: seismic safety compliance
SUMMARY:
Grants a three-year extension of seismic safety requirements for single- and two-story hospitals located in rural areas with less than 80 beds and revenue of $75 million or less, where an assessment of the cost of retrofitting to comply with seismic safety requirements has shown it will result in a financial hardship. Expands the Small and Rural Hospital Relief Program to provide grants to hospitals that meet this definition. Grants a three-year extension of seismic safety requirements for health care district hospitals who meet certain financial hardship criteria.
Existing law:
- Licenses and regulates health facilities, including general acute care hospitals, by the California Department of Public Health (CDPH). [HSC §1250, et seq.]
- Establishes the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (Seismic Safety Act), to ensure that hospital buildings are designed and constructed to resist the forces generated by earthquakes and requires HCAI to propose building standards for earthquake resistance and to provide independent review of the design and construction of hospital buildings. [HSC §129675, et seq.]
- Establishes timelines for hospital compliance with seismic safety standards, including a requirement that buildings posing a significant risk of collapse and a danger to the public (referred to as SPC-1 buildings) be rebuilt or retrofitted to be capable of withstanding an earthquake, or removed from acute care service, by January 1, 2008 (which has since been extended for various hospitals to various dates), and a requirement that hospitals must also be capable of continued operation by January 1, 2030. [HSC §130060, §130065]
- Permits HCAI to grant an extension of up to five years to the 2008 deadline (January 1, 2013) for hospitals for which compliance will result in a loss of health care capacity, as defined. Allows HCAI to grant various further extensions beyond this, including up to seven years (January 1, 2020), in part based on the loss of essential hospital services to the community if the hospital closed, and financial hardship. [HSC §130060, §130061.5]
- Permits HCAI, under legislation enacted in 2018, to provide for an extension of the January 1, 2020 deadline in 4) above, for up to 30 months (until July 1, 2022) for hospitals that plan to replace or retrofit a building to meet the 2020 standard, and up to five years (January 1, 2025) for hospitals that plan to rebuild to a standard that meets the 2030 requirement. [HSC §130062]
- Requires the owner of a hospital whose building does not substantially comply with the January 1, 2030 seismic safety requirement described in 3) above, to submit to HCAI, by January 1, 2020, an attestation that the board of directors of that hospital is aware that the hospital building is required to meet this requirement. [HSC §130066]
- Establishes the Small and Rural Hospital Relief Program (SRHRP) within HCAI for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals. Requires HCAI to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. [HSC §130075, §130076, §130078]
This bill:
Small and Rural Hospital Relief Program provisions
- Requires HCAI to expand eligibility for grants under the SRHRP for single- and two-story general acute care hospitals located in rural areas with less than 80 general acute care beds and revenue of $75 million or less.
- Requires grants under the SRHRP to provide hospitals described in 1) above with funds to secure an SPC-4D assessment for purposes of planning for, and estimating the costs of, complying with the seismic safety requirement that hospitals be capable of remaining in operation following a major earthquake (seismic safety requirements).
- Requires HCAI to conduct outreach to hospitals described in 1) above regarding the availability of these grants and provide technical assistance to hospitals applying for the grants.
- Requires a hospital receiving a grant for an assessment pursuant to 2) above to provide the estimated cost of SPC-4D compliance to HCAI as soon as possible.
- Permits hospitals that received a grant for an assessment pursuant to 2) above to apply for a grant for purposes of complying with the seismic safety requirements. Permits HCAI, for hospitals that already have an approved SPC-4D assessment, to award hospitals these grants.
- Requires a hospital that qualified for a SPC-4D assessment, if state funds are appropriated to the SRHRP in the future for the purpose of complying with the seismic safety requirements, before being awarded state funds, to provide HCAI with financial information for the following purposes:
- Demonstrating whether the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, the reason why;
- Confirming the accuracy of the SPC-4D cost estimate and that estimated costs are only for the purpose of SPC-4D compliance; and,
- Demonstrating the hospital’s need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
- Requires HCAI to have the authority, in awarding grants under the SRHRP, to deny costs from the assessment that HCAI determines are not necessary to comply with SPC-4D requirements.
- Requires hospitals described in 1) above that apply and qualify for grants to comply with seismic safety requirements pursuant to 5) above to comply with the seismic safety requirements by January 1, 2032 instead of January 1, 2030.
- Requires a hospital described in 1) above with a completed SPC-4D assessment that has an estimated cost of more than $1 million, or 2% of the hospital’s revenue, whichever is greater, to comply with the seismic safety requirements by January 1, 2033 instead of January 1, 2030, if HCAI determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
- Authorizes HCAI to implement the provisions of this bill related to the SRHRP through emergency regulations.
Health care district relief program provisions
- Establishes a health care district relief program for health care district hospitals that meet any of the following requirements:
- The health care district meets the requirements for rural hospitals pursuant to 1) above;
- The health care district placed a bond measure on the ballot within the previous five years regarding compliance with seismic safety requirements and the measure did not pass;
- The Medi-Cal revenue for the health care district exceeds the statewide average percentage of Medi-Cal revenue for hospitals; or,
- The health care district hospital is more than 30 minutes or 30 miles from the nearest other hospital.
- Permits a health care district hospital that meets one of the criteria in 11) above to submit financial information to HCAI to allow HCAI to determine if the health care district hospital is financially distressed, including, but not limited to, the health care district hospital’s percentage of patients on Medi-Cal. Requires the health care district to provide HCAI with financial information on a form required by HCAI for the following purposes:
- Demonstrating whether or not the hospital has attempted to secure other methods of funding for coming into compliance with the seismic safety requirements, including federal funding, and if not, why;
- Demonstrating the hospital’s need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
- Permits a health care district hospital, if HCAI determines the hospital is financially distressed, to apply to HCAI for a grant for the purpose of complying with seismic safety requirements. Requires the hospital to provide HCAI, when applying for a grant, with an estimate of the cost of compliance.
- Requires HCAI, if state funds are made available for the purpose of complying with the seismic safety requirements, to confirm the accuracy of the health care district’s seismic cost estimate, and that estimated costs are only for the purpose of seismic compliance.
- In awarding grants, requires HCAI to have authority to deny costs that it determines are not necessary to comply with seismic safety requirements.
- Requires health care districts that qualify for grants to comply with seismic safety requirements by January 1, 2032 instead of January 1, 2030. Extends this deadline to January 1, 2033 if HCAI determines that the cost of design and construction results in a financial hardship that may result in hospital closure and other funds are not available to assist with the cost of compliance.
- Excludes a health care district hospital in a contractual agreement with a health system that imposes upon the health system any financial responsibility for the health care district hospital’s infrastructure costs from being eligible for funds or a delay of seismic compliance under this bill. Specifies that this exclusion does not apply to a health care district hospital that has a management agreement with a health system that does not impose upon the health system any responsibility for the hospital’s infrastructure costs.
- Authorizes HCAI to implement the provisions of this bill related to health care district hospitals through emergency regulations.
FISCAL EFFECT:
According to the Assembly Appropriations Committee analysis of a prior version of this bill from last year, HCAI estimates the costs of this bill as follows:
- $155,000 in direct costs in fiscal year (FY) 2024-25 and ongoing to expand the SRHR and conduct the financial assessments, develop screening criteria, analyze applications and financial statements, and monitor requests and compliance (Hospital Care District Relief Program Fund).
- $902,000 in FY 2024-25, or the year the funds are appropriated (if additional funds are appropriated to the SRHR), and $763,000 per year for five years, or until all estimates have been reviewed for accuracy, to evaluate the financial information to confirm the accuracy of SPC-4D assessments and deny ineligible costs (General Fund (GF)).
- $42,000 in FY 2024-25, or a future year, for the California Building Standards Commission to promulgate emergency regulations for the California Building Code (GF).
- Over $900,000 from FY 2030-31 to FY 2035-36 for the extension to seismic compliance requirements until 2035, if a five-year extension to existing seismic safety compliance timelines is approved. The seismic compliance unit must monitor compliance for the extension period, requiring a technical team consisting of an associate construction analyst, senior structural engineers, compliance officer, associate health facility construction financing analyst, and associate governmental program analyst (Hospital Building Fund).
- Additional ongoing cost pressures in the tens of millions of dollars for a grant program supporting district hospitals in meeting seismic safety standard requirements (GF).
PRIOR VOTES:
Assembly Floor: | 80 - 0 |
Assembly Appropriations Committee: | 15 - 0 |
Assembly Health Committee: | 14 - 0 |
COMMENTS:
- Author’s statement. According to the author, the targeted hospitals eligible to apply for grants under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards until there are resources available to assist them. The author states that there has to be a way to move forward to keep these hospitals open as they work to meet these standards, noting that the hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and that any closure would jeopardize the health of the community and its ability to respond to emergency situations.
- Background on hospital seismic safety requirements. The original Seismic Safety Act was passed in 1973, following the 1971 San Fernando Valley (also known as Sylmar) earthquake, and required all new hospital construction to meet seismic safety standards. The Seismic Safety Act did not apply to existing buildings with the expectation that older buildings would be replaced with conforming buildings over time. By the time of the Northridge earthquake in 1994, however, 80% of hospital beds were still in pre-1973 non-conforming buildings. The Northridge earthquake caused significant structural damage to a number of hospitals, with at least two hospitals needing to be evacuated. What also became apparent in the Northridge earthquake was that nonstructural damage was also a threat to patient safety, with damage to heating and ventilation systems and sprinklers, forcing evacuations. Following the Northridge earthquake, the Legislature updated the Seismic Safety Act with SB 1953 (Alquist, Chapter 740, Statutes of 1994), which required HCAI (at that time OSHPD) to establish earthquake performance categories for hospitals. SB 1953 also established a January 1, 2008 deadline by which general acute care hospitals must be retrofitted or replaced so that they do not pose a risk of collapse in the event of an earthquake (which has been repeatedly extended by subsequent legislation for most hospitals), and a January 1, 2030, deadline by which they must be capable of remaining operational following an earthquake.
Specifically, SB 1953 required HCAI to create structural performance categories (SPCs), as well as nonstructural performance categories (NPCs) for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. According to HCAI, the SPC requirements can be thought of as protecting the skeleton, while NPC requirements ensure the organs and other tissues that are necessary for a human body to function will remain safely attached to the skeleton. It is important to note that a licensed facility, or hospital, is often made up of several buildings on its campus. Many hospitals may have one or more buildings that are 2030 compliant, while other buildings still need to be retrofitted, replaced, or changed to a use that is not associated with acute care services. - Description of SPC ratings. Following the enactment of SB 1953, HCAI adopted regulations that initially created five SPC ratings, with a sixth category (SPC 4D) added more recently. The SPC ratings are as follows:
- SPC 1 – These are pre-1973 buildings (built prior to the adoption of the Seismic Safety Act standards) that are at significant risk of collapse and that represent a danger to the public. These buildings were originally required to be brought up to SPC 2 level or removed from service by 2008, but there have been a number of extensions. Most recently, AB 2190 (Reyes, Chapter 673, Statutes of 2018), provided for an extension until July 1, 2022 for hospitals that plan to replace or retrofit to SPC 2, and up to January 1, 2025 for hospitals that plan to retrofit to SPC 4D or replace with a new SPC 5 building.
- SPC 2 – These are also pre-1973 buildings, but were in substantial compliance with pre-1973 California Building Standards Codes, and while they may not be repairable or functional following an earthquake, they will not significantly jeopardize life. These buildings are permitted to remain in service only until January 1, 2030, at which point they need to have been replaced by an SPC 5 building, have the acute care services relocated to a conforming building (SPC 3, 4, or 5), or be retrofitted to SPC 4D.
The following categories are 2030 compliant, and can continue operating indefinitely:
- SPC 3 – These buildings are in compliance with the original 1973 Seismic Safety Act, but were constructed under a permit issued prior to October 25, 1994, and utilized steel movement-resisting frames. These buildings may experience structural damage during an earthquake, which does not significantly jeopardize life, but may not be repairable or functional following strong ground motion.
- SPC 4 – These are buildings constructed in compliance with the Seismic Safety Act under building permits issued between 1973 and 1989, but may experience structural damage, which may inhibit the ability to provide services to the public following strong ground motion.
- SPC 4D – This is a relatively new category created to allow SPC 2 buildings to be retrofitted to a standard that is 2030 compliant. Because SPC 2 buildings were constructed prior to 1973, they can never reach SPC 3, 4 or 5, since these categories required construction to have started after the adoption of the 1973 standards. SPC 4D became effective on January 1, 2017.
- SPC 5 – These are buildings constructed after 1989, and are considered reasonably capable of providing services to the public following strong ground motion.
- Description of NPC ratings. The NPC requirements, unlike SPC requirements, are cumulative, and not different options. For example, a hospital is first required to achieve NPC 2, which ensures that the nonstructural components that are necessary for a safe evacuation are braced and anchored. Next, a hospital is required to achieve NPC 3 status, which ensures that at a minimum the critical care areas are able to continue to function following an earthquake, and so on. The NPC standards are as follows:
- NPC 1 – The building does not meet any bracing and anchorage requirements.
- NPC 2 – The following systems in the building are braced or anchored according to the California Building Standards Code: communications systems, emergency power supply, bulk medical gas systems, fire alarm systems, and emergency lighting equipment and signs in the means of egress. Hospitals had to meet at least the NPC 2 standard by January 1, 2002.
- NPC 3 – This standard requires NPC 2 compliance, plus specified additional bracing and anchorage requirements in critical care areas, clinical laboratory services spaces, pharmaceutical service spaces, radiological service spaces, and central and sterile supply areas. Hospitals had to meet this standard by January 1, 2008, unless an extension or exemption was approved. Extensions generally tracked the extensions given to SPC 1 buildings, so some buildings were not required to achieve NPC 3 until January 1, 2024.
- NPC 4 – This standard requires NPC 3 compliance, plus all architectural, mechanical, electrical systems, components and equipment, and hospital equipment to meet bracing and anchorage requirements. Hospitals are required to meet this standard by January 1, 2024 or 2030 depending on the building’s seismic risk category and extension request requirements.
- NPC 4D – This is a new category assigned to existing hospital buildings that are in compliance with NPC 3 requirements, and have additionally achieved one of three levels with regards to emergency preparedness. NPC 4D became effective on January 1, 2017. Hospitals are required to meet this standard by January 1, 2030.
- NPC 5 – This final standard requires the hospital building to meet NPC 4 or NPC 4D, plus have onsite supplies of water and holding tanks for sewage and liquid waste, sufficient to support 72 hours of emergency operations, which are required to be integrated into the plumbing systems. Additionally, an onsite emergency system, as defined in the California Electrical Code, must be incorporated in the building electrical system for critical care areas, and the system is required to provide for radiological service and onsite fuel supply for 72 hours of acute care operation. Hospitals are required to meet this standard by January 1, 2030.
- Building code requirements account for regional variation of seismic risk. According to HCAI, compared to rest of the nation, California, in general, has high seismicity throughout the state. Parts of the state have very high seismicity in areas of close proximity to the major earthquake faults. Other areas of the state still have high seismicity. Additionally, each facility has a seismicity value based on their location. This location-specific seismic value is used to evaluate and design buildings at that site. Therefore, the evaluation for a building located in an area with a very high seismicity value will require a stronger building that can resist stronger earthquakes when compared to the evaluation for a building in a high seismicity value area. The evaluation based on location-specific seismicity values addresses the narrow differences in seismicity levels in California. Therefore, an SPC 2 building near a fault line will need to be stronger to be life-safe than an SPC 2 building located significantly farther away from a fault line.
- Status of hospital seismic safety compliance. According to HCAI, as of February of 2024, there are a total of 3,340 buildings at 410 licensed hospital facilities that are subject to the seismic safety standards. All have achieved at least the SPC-2 standard that allows them to remain in service until 2030 except for 41 buildings spread across 20 hospital facilities. In some cases, there are no plans to retrofit or rebuild, and the hospital has either already taken them out of service but it is not reflected in the data yet, or there are plans to take them out of service prior to the January 1, 2025 deadline. It is unclear how many of the remaining out-of-compliance buildings are expected to remain in service, but are in jeopardy of missing the January 1, 2025 deadline for retrofit or replacement projects.
Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 658 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. Of the 658 SPC-2 buildings, 151 have SPC-4D upgrade projects submitted. It is unclear how many of these 151 SPC 2 building upgrade projects will be in construction. The SPC 4D option has only been available since 2017; it is not known whether that will be utilized for the remaining buildings, or whether hospitals will choose to construct new replacement buildings.
Regarding NPC compliance, the vast majority of buildings have not yet met 2030 standards. More than half of all hospital buildings are still NPC 2. Only about 6% of all hospital buildings have achieved NPC 5 and are fully 2030 compliant. Another 34% have met NPC 4 requirements. The deadline to submit NPC construction projects is January 1, 2026, followed by an NPC construction permit deadline of January 1, 2028. - RAND report on costs of seismic compliance. The California Hospital Association (which supports this bill) commissioned the RAND Corporation to update a prior estimate of the cost of future seismic safety compliance with a particular focus on the 2030 deadline. RAND published its report in 2019, and estimated that collectively, California hospitals faced (at that time) a range of $34 billion to $143 billion in compliance costs, depending on assumptions regarding retrofit versus new construction and future cost escalation. RAND stated that a significant portion of hospitals were already experiencing some degree of financial distress, and the burden of future compliance is likely to exacerbate this stress. RAND suggested that there are a variety of options to provide regulatory relief or flexibility to hospitals, including providing public subsidies, offering additional flexibility in the timing of compliance, rethinking what it means for hospitals to remain operational after an earthquake, and streamlining the administrative processes associated with seismic compliance projects.
- What is a rural hospital? While there is a statutory definition of “rural general acute care hospital,” the statute cross-references a publication that was published in 1982, and the list of these hospitals has not changed since at least 1997. According to HCAI, there are 61 general acute care hospitals on this list that are tied to the statutory definition. However, because the reference source is so old, when implementing the Small and Rural Hospital Relief Program (described in 9) below), HCAI instead used a definition based on rural Medical Service Study Areas (MSSAs), which in turn are based on U.S. Census data. MSSAs are composed of one or more complete census tracts, and do not cross county lines. A rural MSSA is defined as a population density of less than 250 persons per square mile, and no population center exceeds 50,000 people. Using the MSSAs (which were last updated in 2012 based on the 2010 census, and are due another update based on the 2020 census), there are about 81 hospitals located in a rural area.
- SRHRP. SRHRP was established by SB 395 (Caballero, Chapter 489, Statutes of 2021), with funding from 10% of the excise tax revenue from electronic cigarettes. SRHRP provides grants to qualified small and rural hospitals for the purpose of funding seismic safety compliance projects. As stated above, there are approximately 81 hospitals that meet the definition of “rural hospitals” for purposes of this program. HCAI defines “small hospital” as one with 50 licensed beds or fewer. Together, HCAI states there are 102 eligible hospitals for the SRHRP. It is projected that this program will have approximately $2 to $3 million annually available for disbursement from the electronic cigarette excise tax. Additionally, the health trailer bill for the Budget Act of 2023-2024 [AB 118 (Committee on Budget), Chapter 42, Statutes of 2023] provided an additional $50 million in one-time funds for this program utilizing revenue from the Managed Care Organization provider tax. According to HCAI, which administers the program, as of November 2023, 30 of the potentially eligible 102 hospitals have initiated applications for program participation, and 22 have submitted updated seismic compliance plans to fulfill application requirements. Once a participating hospital has submitted updated seismic compliance plans, HCAI meets with executive leadership for each participating facility to review their proposed compliance plan details, describe available technical assistance to their project teams, and prepare them for their subsequent grant applications. Grant awards may partially or fully cover the grant request as allowed by availability of funds. So far, ten hospitals have submitted grant applications, and three of those have grant approvals pending.
- Governor’s Technical Assistance on seismic bills. In addition to this bill, Senator Caballero also has a seismic extension bill this year that this Committee already heard and passed out, and which is pending in Assembly Health Committee. SB 1432 (Caballero), sponsored by the California Hospital Association, would offer a broader seismic extension package that potentially all hospitals would be eligible for, including an automatic 3-year extension for hospitals that submit a seismic compliance plan and an NPC-5 evaluation for the hospital. Hospitals could then seek, on a case-by-case base, an extension up to 2038 based on specified criteria, including financial distress or complexity of the seismic compliance project.
At the end of May, HCAI presented both authors with suggested amendments, authorized by the Administration under “technical assistance” (TA). At the time, AB 869 included provisions that would have granted a hospital that met the definition in this bill (single- and two-story general acute care hospitals located in rural areas with less than 80 general acute care beds and revenue of $75 million or less), and that had completed an assessment of the costs to retrofit to SPC-4D which found it would cost over $1 million or 2% of the hospital’s revenue, whichever was greater, an indefinite “abeyance” from complying with the 2030 seismic compliance requirements if it would result in a financial hardship and funds were not available to assist with compliance. Hospitals with an abeyance would have to demonstrate every two years that they still met the financial requirements to continue the abeyance. There were also similar provisions in this bill to grant an abeyance for health care district hospitals.
The suggested amendments from HCAI’s TA proposed significant changes to both bills. For both bills, no hospital would be granted an automatic seismic extension of any length. All hospitals would have to apply, and would only be granted the length of time deemed necessary, up to a maximum of three years (with a limited exception to add two more years for some hospitals). Under the framework offered by HCAI, SB 1432 would be the vehicle by which ALL hospitals could apply for an extension up to a maximum of three years, but ONLY for factors outside of the hospital’s control, such as difficulties obtaining necessary permits, or construction delays. AB 869, on the other hand, would be the vehicle by which hospitals could seek a seismic extension based on financial distress, but certain types of hospitals would be excluded from seeking relief based on financial distress: the TA for AB 869 excluded any for-profit hospital, and any hospital that was part of a system of three or more hospitals. Additionally, the TA for AB 869, while also initially limiting the extensions to just three years, permitted hospitals to get an additional two years based on specified criteria for a total of five years.
While Senator Caballero recently amended her bill to make some modest changes, the author and sponsor are continuing negotiations with the Administration to seek greater flexibility and relief for all types of hospitals across the state, and have not accepted the bulk of the TA at this time. Assemblymember Wood, while not taking the TA language, did recently remove the indefinite abeyance provisions in place of extensions more in line with the Governor’s request (note: as described in Proposed Amendments below, the most recent amendments inadvertently limited extensions to a maximum of three years, rather than the maximum of five years as intended, and the author is proposing amendments to correct this error). However, Assemblymember Wood kept the focus of his bill on rural and district hospitals, rather than broaden it to all nonprofits that are not part of a system, as proposed in the Governor’s TA. Both authors are continuing discussions with the Administration, with each other, and with the broader stakeholder community. - Related legislation. SB 1432 (Caballero) extends the January 1, 2030 deadline by which hospitals are required to be capable of continued operations following a major earthquake, until January 1, 2033 if hospitals submit a seismic compliance plan by January 1, 2026. Permits HCAI to grant hospitals an additional extension up to January 1, 2038 based on an application and demonstration by the hospital that it meets specified criteria. SB 1432 is set for hearing on June 25, 2024 in the Assembly Health Committee.
SB 1447 (Durazo) provides Children’s Hospital Los Angeles with a three-year extension, to January 1, 2033, of the seismic safety requirement that hospitals be capable of continued operation following a major earthquake. Additionally, permits Children’s Hospital Los Angeles to request a further extension, up to a maximum of January 1, 2038, if it meets certain specified criteria. SB 1447 is pending in the Senate Rules Committee.
SB 1119 (Newman) extends the dates by which four hospitals owned by Providence are required to comply with seismic safety standards, including two hospitals on a consolidated license in Eureka, one hospital in Fullerton, and one hospital in Tarzana. SB 1119 is set for hearing on June 26, 2024 in the Assembly Appropriations Committee.
- Prior legislation. SB 1339 (Pan of 2022) would have required general acute care hospital buildings with specific seismic ratings to submit estimated costs to comply with the 2030 seismic requirements to HCAI. SB 1339 would have required HCAI to provide a report to the Legislature with an assessment of the projected costs to retrofit each hospital building to meet the 2030 seismic requirements. SB 1339 was held on the Assembly Appropriations suspense file.
AB 1882 (Robert Rivas, Chapter 584, Statutes of 2022) requires owners of general acute care hospital buildings that are not compliant with the January 1, 2030 seismic safety requirement to remain operational following a major earthquake, to submit annual status updates to various entities, including the county board of supervisors, any labor union that represents workers in a building that is not January 1, 2030 compliant, the local office of emergency services, and the medical health operational area coordinator; and, requires hospitals to post in any lobby or waiting area of a hospital building that is not compliant with the January 1, 2030 seismic requirement a notice that the hospital is not in compliance.
AB 2904 (Bonta of 2022) would have extended the January 1, 2030 seismic safety requirement for Alameda Hospital until January 1, 2032. AB 2904 was vetoed by the Governor, who stated that any consideration of an extension must be contemplated across all communities and across all types of facilities in a holistic manner.
SB 758 (Portantino of 2020), among other provisions, would have extended the 2030 hospital seismic compliance deadline to January 1, 2032. SB 758 was not taken up on the Assembly Floor.
AB 2190 (Reyes, Chapter 673, Statutes of 2018) provides for an extension of the January 1, 2020 hospital seismic safety deadline of up to 30 months (until July 1, 2022) for hospitals that plan to replace or retrofit a building to at least the 2020 standard of SPC-2, and up to five years (January 1, 2025) for hospitals that plan to rebuild to SPC-4D or SPC-5 standards that meet 2030 standards. AB 2190 required OSHPD to provide the Legislature with an inventory of the SPC category of each hospital building, and required hospitals that do not comply with the January 1, 2030 deadline to submit an attestation to OSHPD that it is aware of the deadline.
SB 90 (Steinberg, Chapter 19, Statutes of 2011) allows a hospital to seek an extension for seismic compliance for its SPC-1 buildings of up to seven years based on the following elements: the structural integrity of the building, the loss of essential hospital services to the community if the hospital closed, and financial hardship.
SB 499 (Ducheny, Chapter 601, Statutes of 2009) required all general acute care hospitals that have SPC-1 buildings to report to OSHPD by November 1, 2010, and annually thereafter, on the status of their compliance with the seismic safety deadlines.
SB 306 (Ducheny, Chapter 642, Statutes of 2007) amends the Alquist Act to permit hospitals to delay compliance with the July 1, 2008 seismic retro deadline, and the 2013 extension, to the year 2020, by filing a declaration with OSHPD that the owner lacks financial capacity to comply with the law. - Support. The District Hospital Leadership Forum states in support that the 2030 requirement to remain fully operational is a far greater and much more costly requirement than the prior mandate, and it will be difficult, if not impossible, for many district hospitals. Most face construction costs that are simply unattainable to comply with the 2030 requirement, with decimated reserves and worsening bond ratings as a result of the pandemic and its aftermath. By providing access to grant funding for assessments and additional time to meet the 2030 standard, this bill provides the relief that small, rural, and district hospitals need to achieve compliance. The Association of California Healthcare Districts (ACHD) makes similar arguments in support, and states that while it is hard to quantify with certainty the total cost for all district hospitals to meet the 2030 mandate, in ACHD’s estimates it well exceeds $3 billion, with small hospital projects estimate at $45 million and larger projects in the hundreds of millions. ACHD points out that district hospitals must go to their voters to approve a bond or tax to fund these projects or to leverage government financing, and these initiatives often fail based on the economic composition of their constituents. With 2030 rapidly approaching, district hospitals continue to struggle to secure financing to begin these projects. The County of Santa Clara writes in support that while hospitals inside their county would not directly benefit from this bill, it could benefit hospitals in their neighboring counties of San Benito, Santa Cruz, and Monterey, allowing regional hospital to remain operational and serve their communities. The County of Santa Clara states that their health system would be ready and willing to serve patients from other areas, but they believe the overall safety net is only as strong as its weakest link and efforts to keep it viable are needed.
- Proposed amendments. In the most recent amendments, the author intended to conform the seismic deadline requirements to be more in line with the Governor’s TA (though not verbatim). The author is requesting that amendments be adopted to provide rural hospitals and health care district hospitals a maximum of five years, as follows:
§130078.5
(d) (1) A general acute care hospital as described in subdivision (a) of Section 130078.5 with a completed assessment pursuant to subdivision (b) of Section 130078.5, with an estimated cost over one million dollars ($1,000,000), or 2 percent of the hospital’s revenue, whichever is greater, shall not be required to comply with Section 130065 until January 1, 2033 2035, if the department determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
§130078.6
(d) (1) Health care district hospitals that qualify for grants as described in subdivision (a) shall be required to comply with Section 130065 no later than January 1, 2032. If the department determines that the cost of design and construction for compliance with Section 130065 results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, the health care district hospital shall not be required to comply with Section 130065 until January 1, 2033 2035.
SUPPORT AND OPPOSITION:
Support: Adventist Health
Antelope Valley Healthcare District
Association of California Healthcare Districts
California Special Districts Association
Coast Democratic Club of Mendocino County
Community Health System
County of Santa Clara, Office of the County Executive
District Hospital Leadership Forum
Inland Empire Health Plan
Kaweah Delta Health Care District
Los Angeles Area Chamber of Commerce
Mad River Community Hospital
Mark Twain Healthcare District
Mayers Memorial Hospital District
Mendocino County Democratic Party
Plumas District Hospital
Rural County Representatives of California
Vision Y Compromiso
Oppose: None received
-- END --
ASSEMBLY THIRD READING
ATR Bill Id:AB 869
Author:(Wood and Garcia)
As Amended Ver:March 7, 2023
Majority vote
SUMMARY
Requires the Small and Rural Hospital Relief Program (SRHR) within the Department of Health Care Access and Information (HCAI) to give first priority for planning grants to single- and two-story general acute care hospitals (GACHs) that meet specified criteria. Creates an additional grant program for rural hospitals with a seismic safety compliance assessment to apply for grants to come into compliance with 2030 seismic safety requirements. Delays the requirement to meet those and other building standards for specified GACHs until January 1, 2035, and exempts a GACH with an assessment and with a certain estimated cost from those seismic safety standards if HCAI determines that the cost of design and construction for compliance results in a financial hardship for the hospital and certain funds are not available to assist with the cost of compliance. Establishes a similar program for financially distressed health care district hospitals (HCDHs).
Major Provisions
COMMENTS
Non-structural damage to hospitals by the 1994 Northridge earthquake prompted the Legislature to update seismic safety requirements from 1974 that only applied to new construction. SB 1953 (Alquist), Chapter 740, Statutes of 1994 required the then Office of Statewide Health Planning and Development (OSHPD now HCAI) to create seismic performance categories for hospitals depending on the risk of collapse, and the ability to remain operable following an earthquake. Specifically, SB 1953 required HCAI to create structural performance categories (SPCs), as well as nonstructural performance categories (NPCs) for "nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster." Each hospital building receives both an SPC and an NPC rating. According to HCAI, the SPC requirements can be thought of as protecting the skeleton, while NPC requirements ensure the organs and other tissues necessary for a human body to function will remain safely attached to the skeleton. There are very few remaining buildings at risk of collapse in an earthquake. However, compliance with the 2030 requirement to remain operational is much more expensive.
- Status of 2030 seismic safety compliance. Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 674 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. There may be more, depending on how many of the 47 remaining SPC-1 buildings are only being brought up to SPC-2. There are currently only nine hospital buildings that have opted to use the SPC-4D option to retrofit older buildings, but since it has only been available since 2017, it is unclear whether that will be utilized more frequently for the remaining 674-plus buildings, or whether it will still be a rarely used option and most hospitals will choose to construct new replacement buildings. The chart below illustrates the current status of NPC compliance:
For additional background information on seismic safety SPC and NPC compliance requirements, please see the Assembly Health Committee analysis of AB 1882 (Rivas) of the 2021-2022 Legislative Session.
- SRHR Fund. The SRHR Fund and accompanying program were established by SB 395 (Caballero), Chapter 489, Statutes of 2021, with funding coming from excise tax revenue from electronic cigarettes. The 2023 Governor's Budget updated revenue projections, and noted $2,903,000 available for the SRHR Fund in 2022-23. The initial revenue transfers are scheduled for the end of March 2023. The Department of Finance will also be updating these revenue projections as part of the May Revision process.
Currently no funding has been allocated to the program, and HCAI has not accepted any grant applications yet. However, HCAI has been preparing to open the program. They have developed a Program Eligibility Tool, where potential grant applicants can assess their eligibility into the program. Fifteen facilities have submitted inquiries through the tool and seven of the fifteen have submitted seismic compliance plans and are eligible to apply for grant funding once the program is open.
- California Hospitals. According to the California Hospital Association, there are currently 461 hospitals in California serving a population of over 39.54 million people.
- Rural, small, and critical access hospitals. There are 81 rural GACHs in California (hospitals located in rural medical study service areas). Small hospitals are those with less than 50 beds. The provisions of this bill include hospitals with less than 80 general acute care beds. In California there are 88 hospitals (49 rural and 39 urban) with 50 General Acute Care beds or less and 41 hospitals (12 rural and 29 urban) with 51-80 General Acute Care beds.
Critical access hospitals (CAHs) are licensed GACHs that are certified to receive cost-based reimbursement from Medicare, which is intended to reduce hospital closures in rural areas. To be certified as a CAH, a hospital can have no more than 25 beds and must be located in a rural area and (1) more than 35 miles from another hospital, or (2) 15 miles from another hospital in mountainous terrain or an area with only secondary roads. Other requirements include operating an emergency department, and having an annual average length of stay of 96 hours or less per patient. According to HCAI, there are 36 CAHs in California
- HCDHs. There are 33 district hospitals in the state of California, 17 of which have critical access designation. Near the end of World War II, California faced a severe shortage of hospital beds. To respond to the inadequacy of acute care services in rural areas, the Legislature enacted the Local Hospital District Law to provide medically underserved areas without access to hospital facilities the ability to form special districts that could be a source of tax dollars for constructing and operating community hospitals.
- Impact of rural hospital closures. According to an August 2019 National Bureau of Economic Research paper, "Impact of Rural and Urban Hospital Closures on Inpatient Mortality," 92 rural hospitals closed in California from 1995 to 2011. The paper found that mortality rates rose nearly 6% when a rural hospital closed. However, the closings of urban hospitals did not have a similar impact. In rural areas, ambulances have to travel further to patients after a hospital closes. The paper also found no measurable impact of hospital closures when all closures are considered alike, i.e. no distinction is made between a rural vs. urban hospital closure. When examining the differential impact of hospital closures, rural closures increase inpatient mortality by 8.7%, whereas urban closures have no measurable impact on inpatient mortality. In the last five years (since 2017), three small urban hospitals have closed: Menlo Park Surgical Hospital in 2021, Promise Hospital of East Los Angeles in 2017, and Fallbrook Hospital of Fallbrook in 2017. Since 2017, an additional four older small hospitals closed (three rural, one urban) and either consolidated services within another facility or were replaced with a new facility. In this timeframe, two small urban hospitals opened: Bakersfield in 2022 and Rancho Mirage in 2018.
- Why these hospitals? According to the American Hospital Association, rural hospitals provide care to nearly 20% of Americans and are often the largest local employer. However, many rural hospitals are struggling financially and since 2010, 121 have closed across the country. According to the University of North Carolina Rural Health Research Program, since 2006, nine of those rural closures were in California.
Mad River Community Hospital (Mad River) is a 78 bed GACH located in Arcata, California. It is a locally owned and independent hospital, and is one of the facilities that would benefit from the provisions of this bill. Mad River, which is in the author's district, is single-story wood frame building. During the December 2022 Humboldt County earthquake, the facility suffered no loss of care or time serving patients. Generators immediately came on line and according to staff; the only damage was to a vase that fell off a shelf in the gift shop during the quake. Mad River hospital is currently operating in the red, and has had to temporarily discontinue home health services and consolidate some clinics services. Without financial help, complying with the 2030 seismic safety requirements is not an option. Mad River is the only provider of gender affirming and reproductive care north of Sonoma in the author’s district, and if it closes, patients would have to travel to Sonoma (four and a half hours) or Redding (three hours) for their care.
Under the provisions of this bill, approximately 32 small and rural hospitals (including some district hospitals) will be eligible to apply for grants from HCAI to assist with their seismic safety compliance. The HCDH specific provisions in the bill, which acknowledge the unique situations these facilities face in needing voter approval to raise funds, capture less than half a dozen district hospitals.
According to the Author
The targeted hospitals eligible to apply for grants under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards until there are resources available to assist them with compliance. The author states that there has to be a way to move forward to keep these hospitals open as they work to meet these standards, noting that the hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and that any closure would jeopardize the health of the community and its ability to respond to emergency situations.
Arguments in Support
The Association of California Healthcare Districts (ACHD) supports this bill and notes that district hospitals are funded nominally by their communities through taxes, but their primary source of revenue is through reimbursement for services. Therefore, they face significant financial challenges generating funding for capital outlay- especially of this magnitude. While it is hard to quantify with certainty the total cost for all districts to meet the 2030 mandate, in ACHD's estimates it well exceeds $3 billion, with small hospital projects estimated at $45 million and larger projects in the hundreds of millions. ACHD points out that district hospitals must go to their voters to approve a bond or tax to fund these projects or to leverage government financing. These initiatives often fail based on the economic composition of their constituents. With 2030 rapidly approaching, district hospitals continue to struggle to secure financing to begin these projects. Healthcare districts are committed to protecting access to care in their communities, but relief is needed to ensure they can meet the seismic mandate.
Arguments is Support if Amended
The California Hospital Association (CHA) has taken a support if amended position on this bill. CHA notes that while California's hospitals have already spent billions to strengthen their buildings so they will be able to withstand powerful earthquakes, they must still meet a 2030 deadline that requires them to spend tens of billions more to be fully operational after an earthquake. CHA contends that this deadline will force many hospitals to close if they are unable to comply. CHA states that this bill would provide much-needed relief for some of the rural and district hospitals most challenged in meeting these seismic requirements. However, CHA concludes that it is also critical that the Legislature protects the same access to care for every community whose hospitals are unable to meet the 2030 deadline.
Arguments in Opposition
There is no known opposition.
FISCAL COMMENTS
According to the Assembly Appropriations Committee, HCAI estimates the costs of this bill as follows:
- $155,000 in direct costs in fiscal year (FY) 2024-25 and ongoing to expand the SRHR and conduct the financial assessments, develop screening criteria, analyze applications and financial statements, and monitor requests and compliance (Hospital Care District Relief Program Fund).
- $902,000 in FY 2024-25, or the year the funds are appropriated (if additional funds are appropriated to the SRHR), and $763,000 per year for five years, or until all estimates have been reviewed for accuracy, to evaluate the financial information to confirm the accuracy of SPC-4D assessments and deny ineligible costs (General Fund (GF)).
- $42,000 in FY 2024-25, or a future year, for the California Building Standards Commission to promulgate emergency regulations for the California Building Code (GF).
- Over $900,000 from FY 2030-31 to FY 2035-36 for the extension to seismic compliance requirements until 2035, if a five-year extension to existing seismic safety compliance timelines is approved. The seismic compliance unit must monitor compliance for the extension period, requiring a technical team consisting of an associate construction analyst, senior structural engineers, compliance officer, associate health facility construction financing analyst, and associate governmental program analyst (Hospital Building Fund).
- Additional ongoing cost pressures in the tens of millions of dollars for a grant program supporting district hospitals in meeting seismic safety standard requirements (GF).
VOTES
ASM HEALTH: 14-0-1
YES: Wood, Waldron, Aguiar-Curry, Arambula, Boerner Horvath, Flora, Vince Fong, Maienschein, McCarty, Joe Patterson, Rodriguez, Santiago, Villapudua, Weber
ABS, ABST OR NV: Wendy Carrillo
ASM APPROPRIATIONS: 15-0-1
YES: Holden, Megan Dahle, Bryan, Calderon, Wendy Carrillo, Dixon, Mike Fong, Hart, Lowenthal, Mathis, Papan, Pellerin, Sanchez, Weber, Ortega
ABS, ABST OR NV: Robert Rivas
UPDATED
VERSION: March 7, 2023
CONSULTANT: Lara Flynn / HEALTH / (916) 319-2097 FN: 0000625
Date of Hearing: April 19, 2023
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Chris Holden, Chair
ABPCA Bill Id:AB 869
Author:(Wood) – As Amended Ver:March 7, 2023
Policy Committee: | Health | Vote: | 14 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill requires the Small and Rural Hospital Relief Program (SRHRP) within the Department of Health Care Access and Information (HCAI) to give first priority to single- or two-story general acute care hospitals (hospitals) that meet specified criteria for grants to conduct structural performance category (SPC)-4D assessments (cost estimates) and planning for the purposes of meeting seismic safety standards, and extends, from 2030 to 2035, the deadline for these hospitals to meet the SPC-4D standards.
This bill also exempts a hospital with an SPC-4D assessment from meeting the seismic safety standard if HCAI determines doing so would cause financial hardship for the hospital and funds are not available to assist with compliance.
Additionally, this bill authorizes a health care district hospital (HCDH) with a seismic safety assessment, if HCAI determines it is financially distressed, to apply for a grant to meet the 2030 seismic safety standard, and delay meeting the seismic requirement to 2035, or until sufficient funds are available to meet the requirement, if HCAI determines the cost of meeting the standard otherwise would result in a financial hardship that may cause the HCDH to close.
FISCAL EFFECT:
HCAI estimates the costs of this bill as follows:
- $155,000 in direct costs in fiscal year (FY) 2024-25 and ongoing to expand the SRHRP and conduct the financial assessments, develop screening criteria, analyze applications and financial statements, and monitor requests and compliance (Hospital Care District Relief Program Fund).
- $902,000 in FY 2024-25, or the year the funds are appropriated (if additional funds are appropriated to the SRHRP), and $763,000 per year for five years, or until all estimates have been reviewed for accuracy, to evaluate the financial information to confirm the accuracy of SPC-4D assessments and deny ineligible costs (General Fund (GF)).
- $42,000 in FY 2024-25, or a future year, for the California Building Standards Commission to promulgate emergency regulations for the California Building Code (GF).
- Over $900,000 from FY 2030-31 to FY 2035-36 for the extension to seismic compliance requirements until 2035, if a five-year extension to existing seismic safety compliance timelines is approved. The seismic compliance unit must monitor compliance for the extension period, requiring a technical team consisting of an associate construction analyst, senior structural engineers, compliance officer, associate health facility construction financing analyst, and associate governmental program analyst (Hospital Building Fund).
- Additional ongoing cost pressures in the tens of millions of dollars for a grant program supporting district hospitals in meeting seismic safety standard requirements (GF).
COMMENTS:
- Purpose. According to the author:
The targeted hospitals eligible to apply for grants under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards until there are resources available to assist them with compliance. There has to be a way to move forward to keep these hospitals open as they work to meet these standards. The hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and any closure would jeopardize the health of the community and its ability to respond to emergency situations.
- Background.
- SB 1953 (Alquist), Chapter 740, Statutes of 1994, required the then-Office of Statewide Health Planning and Development (OSHPD, now HCAI) to create seismic performance categories for hospitals depending on the risk of collapse and the ability to remain operable following an earthquake. Specifically, SB 1953 required HCAI to create structural performance categories (SPCs), as well as nonstructural performance categories (NPCs) for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. There are very few remaining hospital buildings at risk of collapse in an earthquake. However, compliance with the 2030 requirement to remain operational is much more expensive.
- The Small and Rural Hospital Relief Program (SRHRP) and Fund were established by SB 395 (Caballero), Chapter 489, Statutes of 2021, for the purpose of funding seismic safety compliance for small hospitals, rural hospitals, and critical access hospitals, with funding from excise tax revenue from electronic cigarettes. Under the SRHRP, HCAI will provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance imposes a financial burden that may result in hospital closure. According to the 2023-24 Governor’s Budget updated revenue projections, $2.9 million is available for the SRHR Fund in 2022-23.
HCAI has not accepted any applications for SRHR grants, but has developed a program eligibility tool to help potential grant applicants assess their eligibility for the program. Fifteen facilities have submitted inquiries through the tool and seven of the fifteen have submitted seismic compliance plans and are eligible to apply for grant funding once the program is open. - HCDHs. Near the end of World War II, California faced a severe shortage of hospital beds. To respond to the inadequacy of acute care services in rural areas, the Legislature enacted the Local Hospital District Law to provide medically underserved areas without access to hospital facilities the ability to form special districts that could be a source of tax dollars for constructing and operating community hospitals. There are 33 HCDHs in California, 17 of which have a “critical access” designation.
- Related Legislation. AB 412 (Soria) requires the California Health Facilities Financing Authority (CHFFA) to establish the Hospital Emergency Loan Program (HELP) for the purpose of providing loans to prevent the closure of a hospital or facilitating the reopening of a closed hospital, as defined. AB 412 is pending in the Assembly Health Committee.
- Prior Legislation.
- AB 1882 (Rivas), Chapter 584, Statutes of 2022, requires owners of hospitals that are not compliant with the 2030 seismic safety requirement to submit annual status updates to various entities, including the county board of supervisors, any labor union that represents workers in a building that is not 2030-compliant, the local office of emergency services, and the medical health operational area coordinator; and requires hospitals to post in any lobby or waiting area of a hospital building that is not 2030-compliant a notice that the hospital is not in compliance.
- AB 2404 (Luz Rivas), Chapter 592, Statutes of 2022, authorizes HCAI to waive specified seismic safety requirements for Pacifica Hospital of the Valley in the County of Los Angeles, under certain conditions.
- AB 1527 (Ting), Chapter 65, Statutes of 2021, authorizes HCAI to waive requirements for the Seaton Medical Center in Daly City to comply with seismic safety requirements.
- AB 2190 (Reyes), Chapter 73, Statutes of 2018, provides for an extension of the January 1, 2020, hospital seismic safety deadline of up to 30 months (until July 1, 2022) for hospitals that plan to replace or retrofit a building to at least the 2020 standard of SPC-2, and up to five years (January 1, 2025) for hospitals that plan to rebuild to SPC-4D or SPC-5 standards that meet 2030 standards.
- AB 908 (Dababneh), Chapter 350, Statutes of 2017, authorizes Providence Tarzana Medical Center in Los Angeles to request an additional extension, until October 1, 2022, of the seismic safety requirement that hospital buildings must be rebuilt or retrofitted in order to be capable of withstanding an earthquake.
- AB 81 (Wood), Chapter 63, Statutes of 2015, permitted a hospital in the City of Willits to request an eight-month deadline extension of a seismic safety requirement that hospitals be rebuilt or retrofitted to be capable of withstanding an earthquake.
- AB 2557 (Pan), Chapter 821, Statutes of 2014, permitted a hospital located in the counties of Sacramento, San Mateo, or Santa Barbara or the City of San Jose, that had received an additional extension of the January 1, 2008, seismic safety requirements under specified provisions of existing law to January 1, 2015, to request an additional extension until September 1, 2015, in order to obtain either a certificate of occupancy or a construction final HCAI (then the Office of Statewide Health Planning and Development).
- AB 1464 (Arambula), of the 2021-22 Legislative Session, would have required the owner of a hospital whose building does not substantially comply with the 2030 seismic safety standards to report to HCAI what services are provided in each building of the acute care inpatient hospital. AB 1464 was referred to but not heard in the Assembly Health Committee.
- SB 1339 (Pan), of the 2021-22 Legislative Session, would have required hospitals with specific seismic ratings to submit estimated costs to comply with the 2030 seismic requirements to HCAI and required HCAI to provide a report to the Legislature with an assessment of the projected costs to retrofit each hospital building to meet the 2030 seismic requirements. SB 1339 was held in this committee.
- SB 1388 (Umberg), of the 2021-22 Legislative Session, would have authorized HCAI to waive, in whole or in part, any requirement of the Alquist Act, for Southern California Hospital at Culver City, if HCAI accepted a plan for the hospital to comply with applicable seismic safety standards on or before January 1, 2024. SB 1338 was referred to but not heard in Senate Health Committee.
Analysis Prepared by: Allegra Kim / APPR. / (916) 319-2081
Date of Hearing: March 21, 2023
ASSEMBLY COMMITTEE ON HEALTH
Jim Wood, Chair
ABPCA Bill Id:AB 869
Author:(Wood) – As Amended Ver:March 7, 2023
SUBJECT: Hospitals: seismic safety compliance.
SUMMARY: Requires the Small and Rural Hospital Relief Program within the Department of Health Care Access and Information (HCAI) to give first priority for planning grants to single- and two-story general acute care hospitals (GACHs) that meet specified criteria. Creates an additional grant program for rural hospitals with a seismic safety compliance assessment to apply for grants to come into compliance with 2030 seismic safety requirements. Establishes a similar grant program for financially distressed health care district hospitals. Specifically, this bill:
Small, rural and critical access hospitals (CAHs)
- Requires HCAI to give the first priority for Small and Rural Hospital Relief Program grants to single- and two-story GACHs located in remote or rural areas with less than 80 general acute care beds and GACH revenue of seventy-five million dollars ($75,000,000) or less.
- Requires grants made pursuant 1) above to provide eligible GACHs with funds to secure an structural performance category (SPC)-4D assessment for purposes of planning for, and estimating the costs of, complying with 2030 seismic safety requirements. Requires HCAI to conduct outreach to eligible GACHs regarding the availability of these grants and provide technical assistance to GACHs applying for the grants.
- Requires a GACH receiving a grant for an assessment pursuant to 2) above to provide the estimated cost of SPC-4D compliance to HCAI as soon as possible, and requires HCAI to provide grants to secure assessments to GACHs that qualify within 18 months of the implementation of this bill.
- Authorizes GACHs that have received a grant pursuant to 2) above to apply for an additional grant for the purpose of complying with SPC-4D 2030 seismic safety requirements.
- Authorizes GACHs that already have a completed SPC-4D assessment to provide that assessment to HCAI and HCAI to award the GACH grant money for purposes of complying with 2030 seismic safety requirements.
- Requires a GACH that qualified for an assessment grant as described in 2) above, if state funds are appropriated in the future for the purpose of complying with SPC-4D 2030 seismic safety requirements, prior to being awarded state funds, to provide HCAI with financial information on a form as required by HCAI for the following purposes:
- Demonstrating whether or not the hospital has attempted to secure other methods of funding for SPC-4D compliance, including federal funding, and if not, why;
- Confirming the accuracy of the SPC-4D cost estimate, and that estimated costs are only for the purpose of SPC-4D compliance; and,
- Demonstrating the GACHs need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
- Gives HCAI the authority, in awarding grants, to deny costs from the assessment completed pursuant to 2) above that HCAI determines are not necessary to comply with SPC-4D requirements.
- Requires GACHs that qualify for grants as described in 4) above to comply with nonstructural performance category (NPC)-3 standards no later than January 1, 2035, and requires eligible GACHs that apply, and qualify, for grants
pursuant to 4) to comply with 2030 seismic safety requirements by January 1, 2035. - Exempts eligible GACHs with a completed assessment pursuant to 2) above, with an estimated cost over one million dollars ($1,000,000), or 2% of the hospitals revenue, whichever is greater, from being required to comply with 2030 seismic safety requirements if HCAI determines that the cost of design and construction for SPC-4D compliance results in a financial hardship for the hospital and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance.
- Requires HCAI to confirm a hospital’s lack of ability to comply with 2030 seismic requirements and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the hospital.
- Requires eligible GACHs, by January 1, 2030, and at two-year intervals thereafter, whose compliance with the 2030 seismic safety requirements is in abeyance pursuant to 9) above, to provide HCAI any information that HCAI deems necessary to assess whether the GACH continues to meet the criteria in 9) above. Prohibits HCAI, if a GACHs circumstances have not significantly altered, from requiring an updated SPC-4D assessment.
- Requires HCAI, if it deems a GACH is no longer qualified for an abeyance, to inform the GACH in writing, and the GACH to comply with 2030 seismic safety requirements within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. Grants HCAI the discretion to extend the amount of time by which a GACH must comply with 2030 seismic safety requirements for an additional two years based on the estimated cost of compliance.
- Requires HCAI to post a list of GACHs on its internet website that continue to meet the criteria for an abeyance from 2030 seismic safety requirements.
Health care district hospitals (HCDH)
- Authorizes a HCDH that meets the criteria described in 16) below, to, submit financial information to HCAI to allow HCAI to determine if the HCDH is financially distressed, including, but not limited to, the HCDH’s percentage of patients on Medi-Cal. Requires the HCDH to provide the HCAI with financial information on a form as required by HCAI for the following purposes:
- Demonstrating whether or not the HCDH has attempted to secure other methods of funding for coming into 2030 seismic compliance, including federal funding, and if not, why; and,
- Demonstrating the HCDH’s need for assistance due to financial hardship and lack of ability to finance the required improvements, in order to access state funds.
- Authorizes an HCDH that HCAI has determined is financially distressed according to the information submitted pursuant to 14) above to apply to HCAI for a grant for the purpose of complying with 2030 seismic safety requirements. Requires an HCDH, when applying for a grant, to provide HCAI with an estimate of the cost for the hospital to comply with 2030 seismic safety requirements.
- Authorizes an HCDH to submit information to HCAI pursuant to 14) above if it meets any of the following requirements:
- It meets the requirements for rural hospitals described in 1) above;
- Its Medi-Cal revenue exceeds the statewide average percentage of Medi-Cal revenue for hospitals;
- It has tried and failed to pass a local bond measure within the last five years to provide funds for its 2030 seismic safety compliance costs; or,
- The HCDH is more than 30 minutes or 30 miles from the nearest hospital.
- Requires HCAI, if state funds are made available for the purpose of complying with 2030 seismic safety requirements, prior to awarding state funds, to confirm the accuracy of the HCDH’s seismic cost estimate, and that estimated costs are only for the purpose of compliance with 2030 seismic safety requirements.
- Provides HCAI, in awarding grants, with the authority to deny costs that HCAI determines are not necessary to comply with 2030 seismic safety requirements.
- Requires HCDHs that qualify for grants as described in 15) to comply with 2030 seismic safety requirements no later than January 1, 2035. Exempts a HCDH, if HCAI determines that the cost of design and construction for compliance with 2030 seismic safety requirements results in a financial hardship that may result in hospital closure and state funds, federal grants, or private foundation funds are not available to assist with the cost of compliance, from being required to comply with 2030 seismic safety requirements until funds are made available for that purpose.
- Requires HCAI to confirm a HCDH’s lack of ability to comply with 2030 seismic safety requirements, and that the cost of compliance may result in hospital closure, or would substantially impact the accessibility to health care in communities surrounding the HCDH.
- Requires HCDHs, by January 1, 2030, and at two-year intervals thereafter, whose compliance with 2030 seismic safety requirements is in abeyance pursuant to 19) above to provide HCAI any information HCAI deems necessary to assess whether the HCDH continues to meet the requirements of 19) above. Requires HCAI, if it deems a HCDH is no longer qualified for an abeyance, to inform the HCDH in writing, and the HCDH to comply with 2030 seismic safety requirements within five years of the date of notification, or the length of time spent in abeyance, whichever is greater. Provides HCAI with the discretion to extend the amount of time by which a hospital must comply with 2030 seismic safety requirements for an additional two years based on the estimated cost of compliance.
- Requires HCAI to post a list of hospitals on its internet website that continue to meet the requirements for an abeyance.
EXISTING LAW:
- Licenses and regulates health facilities, including GACHs, by the California Department of Public Health. [Health and Safety Code (HSC) §1250, et seq.]
- Establishes the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (Alquist Act), to ensure that hospital buildings are designed and constructed to resist the forces generated by earthquakes and requires HCAI to propose building standards for earthquake resistance and to provide independent review of the design and construction of hospital buildings. [HSC §129675, et seq.]
- Establishes timelines for hospital compliance with seismic safety standards, including a requirement that buildings posing a significant risk of collapse and a danger to the public (referred to as SPC-1 buildings) be rebuilt or retrofitted to be capable of withstanding an earthquake, or removed from acute care service, by January 1, 2008 (which has since been extended for various hospitals to various dates), and a requirement that hospitals must also be capable of continued operation by January 1, 2030. [HSC §130060, §130065]
- Establishes the Small and Rural Hospital Relief (SRHR) Program within HCAI for the purpose of funding seismic safety compliance with respect to small hospitals, rural hospitals, and critical access hospitals. Requires HCAI to provide grants to small, rural, and critical access hospital applicants that meet certain criteria, including that seismic safety compliance, as defined, imposes a financial burden on the applicant that may result in hospital closure. [HSC §130075, §130076, §130078]
- Provides for the formation and administration of health care districts to provide medically underserved areas without access to hospital facilities the ability to form special districts that could be a source of tax dollars for constructing and operating community hospitals. [HSC §32000 et seq.]
FISCAL EFFECT: Unknown. This bill has not yet been analyzed by a fiscal committee.
COMMENTS:
- PURPOSE OF THIS BILL. According to the author, the targeted hospitals eligible to apply for grants under this bill are financially distressed and do not have the financial resources nor the ability to acquire funding from other sources to meet seismic requirements. This bill provides them a delay in meeting compliance standards until there are resources available to assist them with compliance. The author states that there has to be a way to move forward to keep these hospitals open as they work to meet these standards, noting that the hospitals covered by this legislation are often in remote locations, are the only hospital in the area with the next hospital many miles away, and that any closure would jeopardize the health of the community and its ability to respond to emergency situations.
- BACKGROUND. Non-structural damage to hospitals by the 1994 Northridge earthquake prompted the Legislature to update seismic safety requirements from 1974 that only applied to new construction. SB 1953 (Alquist), Chapter 740, Statutes of 1994 required the then Office of Statewide Health Planning and Development (OSHPD now HCAI) to create seismic performance categories for hospitals depending on the risk of collapse, and the ability to remain operable following an earthquake. Specifically, SB 1953 required HCAI to create SPCs, as well as NPCs for “nonstructural systems that are critical to providing basic services to hospital inpatients and the public after a disaster.” Each hospital building receives both an SPC and an NPC rating. According to HCAI, the SPC requirements can be thought of as protecting the skeleton, while NPC requirements ensure the organs and other tissues necessary for a human body to function will remain safely attached to the skeleton. There are very few remaining buildings at risk of collapse in an earthquake. However, compliance with the 2030 requirement to remain operational is much more expensive.
- Status of 2030 seismic safety compliance. Regarding the 2030 deadline for buildings to achieve SPC-3, 4, 4D or 5, there are still 674 buildings, spread across 251 licensed hospitals, that have an SPC-2 rating and will need to either be retrofitted to SPC-4D, replaced with an SPC-5 building, or removed from acute care service. There may be more, depending on how many of the 47 remaining SPC-1 buildings are only being brought up to SPC-2. There are currently only nine hospital buildings that have opted to use the SPC-4D option to retrofit older buildings, but since it has only been available since 2017, it is unclear whether that will be utilized more frequently for the remaining 674-plus buildings, or whether it will still be a rarely used option and most hospitals will choose to construct new replacement buildings. The chart below illustrates the current status of NPC compliance:
For additional background information on seismic safety SPC and NPC compliance requirements, please see the Assembly Health Committee analysis of AB 1882 (Rivas) of the 2021-2022 Legislative Session.
- SRHR Fund. The SRHR Fund and accompanying program were established by SB 395 (Caballero), Chapter 489, Statutes of 2021, with funding coming from excise tax revenue from electronic cigarettes. The 2023 Governor’s Budget updated revenue projections, and noted $2,903,000 available for the SRHR Fund in 2022-23. The initial revenue transfers are scheduled for the end of March 2023. The Department of Finance will also be updating these revenue projections as part of the May Revision process.
Currently no funding has been allocated to the program, and HCAI has not accepted any grant applications yet. However, HCAI has been preparing to open the program. They have developed a Program Eligibility Tool, where potential grant applicants can assess their eligibility into the program. Fifteen facilities have submitted inquiries through the tool and seven of the fifteen have submitted seismic compliance plans and are eligible to apply for grant funding once the program is open. - California Hospitals. According to the California Hospital Association, there are currently 461 hospitals in California serving a population of over 39.54 million people.
- Rural, small, and critical access hospitals. There are 81 rural GACHs in California (hospitals located in rural medical study service areas). Small hospitals are those with less than 50 beds. The provisions of this bill include hospitals with less than 80 general acute care beds. In California there are 88 hospitals (49 rural and 39 urban) with 50 General Acute Care beds or less and 41 hospitals (12 rural and 29 urban) with 51-80 General Acute Care beds.
- Rural, small, and critical access hospitals. There are 81 rural GACHs in California (hospitals located in rural medical study service areas). Small hospitals are those with less than 50 beds. The provisions of this bill include hospitals with less than 80 general acute care beds. In California there are 88 hospitals (49 rural and 39 urban) with 50 General Acute Care beds or less and 41 hospitals (12 rural and 29 urban) with 51-80 General Acute Care beds.
- SRHR Fund. The SRHR Fund and accompanying program were established by SB 395 (Caballero), Chapter 489, Statutes of 2021, with funding coming from excise tax revenue from electronic cigarettes. The 2023 Governor’s Budget updated revenue projections, and noted $2,903,000 available for the SRHR Fund in 2022-23. The initial revenue transfers are scheduled for the end of March 2023. The Department of Finance will also be updating these revenue projections as part of the May Revision process.
CAHs are licensed GACHs that are certified to receive cost-based reimbursement from Medicare, which is intended to reduce hospital closures in rural areas. To be certified as a CAH, a hospital can have no more than 25 beds and must be located in a rural area and (1) more than 35 miles from another hospital, or (2) 15 miles from another hospital in mountainous terrain or an area with only secondary roads. Other requirements include operating an emergency department, and having an annual average length of stay of 96 hours or less per patient. According to HCAI, there are 36 CAHs in California
- HCDHs. There are 33 district hospitals in the state of California, 17 of which have critical access designation. Near the end of World War II, California faced a severe shortage of hospital beds. To respond to the inadequacy of acute care services in rural areas, the Legislature enacted the Local Hospital District Law to provide medically underserved areas without access to hospital facilities the ability to form special districts that could be a source of tax dollars for constructing and operating community hospitals.
- Impact of rural hospital closures. According to an August 2019 National Bureau of Economic Research paper, “Impact of Rural and Urban Hospital Closures on Inpatient Mortality,” 92 rural hospitals closed in California from 1995 to 2011. The paper found that mortality rates rose nearly 6% when a rural hospital closed. However, the closings of urban hospitals did not have a similar impact. In rural areas, ambulances have to travel further to patients after a hospital closes. The paper also found no measurable impact of hospital closures when all closures are considered alike, i.e. no distinction is made between a rural vs. urban hospital closure. When examining the differential impact of hospital closures, rural closures increase inpatient mortality by 8.7%, whereas urban closures have no measurable impact on inpatient mortality.
In the last five years (since 2017), three small urban hospitals have closed: Menlo Park Surgical Hospital in 2021, Promise Hospital of East Los Angeles in 2017, and Fallbrook Hospital of Fallbrook in 2017. Since 2017, an additional four older small hospitals closed (three rural, one urban) and either consolidated services within another facility or were replaced with a new facility. In this timeframe, two small urban hospitals opened: Bakersfield in 2022 and Rancho Mirage in 2018. - Why these hospitals? According to the American Hospital Association, rural hospitals provide care to nearly 20% of Americans and are often the largest local employer. However, many rural hospitals are struggling financially and since 2010, 121 have closed across the country. According to the University of North Carolina Rural Health Research Program, since 2006, nine of those rural closures were in California.
Mad River Community Hospital (Mad River) is a 78 bed GACH located in Arcata, California. It is a locally owned and independent hospital, and is one of the facilities that would benefit from the provisions of this bill. Mad River, which is in the author’s district, is single-story wood frame building. During the December 2022 Humboldt County earthquake, the facility suffered no loss of care or time serving patients. Generators immediately came on line and according to staff; the only damage was to a vase that fell off a shelf in the gift shop during the quake.
Mad River hospital is currently operating in the red, and has had to temporarily discontinue home health services and consolidate some clinics services. Without financial help, complying with the 2030 seismic safety requirements is not an option. Mad River is the only provider of gender affirming and reproductive care north of Sonoma in the author’s district, and if it closes, patients would have to travel to Sonoma (four and a half hours) or Redding (three hours) for their care.
Under the provisions of this bill, approximately 32 small and rural hospitals (including some district hospitals) will be eligible to apply for grants from HCAI to assist with their seismic safety compliance. The HCDH specific provisions in the bill, which acknowledge the unique situations these facilities face in needing voter approval to raise funds, capture less than half a dozen district hospitals.
- SUPPORT. The Association of California Healthcare Districts (ACHD) supports this bill and notes that district hospitals are funded nominally by their communities through taxes, but their primary source of revenue is through reimbursement for services. Therefore, they face significant financial challenges generating funding for capital outlay- especially of this magnitude. While it is hard to quantify with certainty the total cost for all districts to meet the 2030 mandate, in ACHD’s estimates it well exceeds $3 billion, with small hospital projects estimated at $45 million and larger projects in the hundreds of millions. ACHD points out that district hospitals must go to their voters to approve a bond or tax to fund these projects or to leverage government financing. These initiatives often fail based on the economic composition of their constituents. With 2030 rapidly approaching, district hospitals continue to struggle to secure financing to begin these projects. Healthcare districts are committed to protecting access to care in their communities, but relief is needed to ensure they can meet the seismic mandate. Some district hospitals can meet the mandate by shuttering services and decommissioning buildings. While this may satisfy the mandate, it does not address California’s goals of preserving and expanding access to care. ACHD concludes that this bill will provide the assistance that small, rural and district hospitals need to prevent these types of decisions from having to be made and will, with certainty, preserve access to care for millions of Californians.
- SUPPORT IF AMENDED. The California Hospital Association (CHA) has taken a support if amended position on this bill. CHA notes that while California’s hospitals have already spent billions to strengthen their buildings so they will be able to withstand powerful earthquakes, they must still meet a 2030 deadline that requires them to spend tens of billions more to be fully operational after an earthquake. CHA contends that this deadline will force many hospitals to close if they are unable to comply. CHA states that this bill would provide much-needed relief for some of the rural and district hospitals most challenged in meeting these seismic requirements. However, CHA concludes that it is also critical that the Legislature protects the same access to care for every community whose hospitals are unable to meet the 2030 deadline.
- RELATED LEGISLATION.
- AB 412 (Soria) requires the California Health Facilities Financing Authority (CHFFA) to establish the Hospital Emergency Loan Program (HELP) for the purpose of providing loans to prevent the closure of a hospital or facilitating the reopening of a closed hospital, as defined. Grants CHFFA the authority to adopt guidelines, rather than regulations, to implement HELP, and other programs. AB 412 is pending a hearing in the Assembly Health Committee.
- SB 879 (Caballero) states the intent of the Legislature to enact legislation to aid in the prevention of rural hospital closures. AB 879 is pending referral in the Senate Rules Committee.
- PREVIOUS LEGISLATION.
- AB 1882 (Rivas), Chapter 584, Statutes of 2022, requires owners of GACHs that are not compliant with the January 1, 2030, seismic safety requirement to remain operational following a major earthquake, to submit annual status updates to various entities, including the county board of supervisors, any labor union that represents workers in a building that is not January 1, 2030, compliant, the local office of emergency services, and the medical health operational area coordinator; and, requires hospitals to post in any lobby or waiting area of a hospital building that is not compliant with the January 1, 2030, seismic requirement a notice that the hospital is not in compliance.
- AB 2404 (Luz Rivas), Chapter 592, Statutes of 2022, authorizes HCAI to waive specified seismic safety requirements for Pacifica Hospital of the Valley in the County of Los Angeles, under certain conditions.
- SB 1339 (Pan) of 2022 would have required GACHs with specific seismic ratings to submit estimated costs to comply with the 2030 seismic requirements to HCAI and required HCAI to provide a report to the Legislature with an assessment of the projected costs to retrofit each hospital building to meet the 2030 seismic requirements. SB 1339 was held in the Assembly Appropriations Committee.
- SB 1388 (Umberg) of 2022 would have authorized HCAI to waive, in whole or in part, any requirement of the Alquist Act, for Southern California Hospital at Culver City, if HCAI accepts a plan, submitted on or before April 1, 2022, for Southern California Hospital at Culver City to comply with applicable seismic safety standards on or before January 1, 2024. SB 1338 was not heard in the Senate Health Committee.
- AB 1464 (Arambula) of 2021 would have required the owner of an acute care inpatient hospital whose building does not substantially comply with the 2030 seismic safety regulations or standards, to report to HCAI what services are provided in each building of the acute care inpatient hospital. AB 1464 was not heard in Assembly Health Committee.
- AB 1527 (Ting), Chapter 65, Statutes of 2021, authorizes HCAI to waive requirements for the Seaton Medical Center in Daly City to comply with seismic safety requirements.
- AB 2190 (Reyes), Chapter 73, Statutes of 2018, provides for an extension of the January 1, 2020 hospital seismic safety deadline of up to 30 months (until July 1, 2022) for hospitals that plan to replace or retrofit a building to at least the 2020 standard of SPC-2, and up to five years (January 1, 2025) for hospitals that plan to rebuild to SPC-4D or SPC-5 standards that meet 2030 standards.
- AB 908 (Dababneh), Chapter 350, Statutes of 2017, authorizes Providence Tarzana Medical Center in Los Angeles to request an additional extension, until October 1, 2022, of the seismic safety requirement that hospital buildings must be rebuilt or retrofitted in order to be capable of withstanding an earthquake.
- AB 81 (Wood), Chapter 63, Statutes of 2015, permitted a hospital in the City of Willits to request an eight-month deadline extension of a seismic safety requirement that hospitals be rebuilt or retrofitted to be capable of withstanding an earthquake, which it is currently required to meet by January 1, 2015, so that this hospital could have until September 1, 2015, to meet this seismic safety requirement.
- AB 2557 (Pan), Chapter 821, Statutes of 2014, permitted a hospital located in the Counties of Sacramento, San Mateo, or Santa Barbara or the City of San Jose, that had received an additional extension of the January 1, 2008, seismic safety requirements under specified provisions of existing law to January 1, 2015, to request an additional extension until September 1, 2015, in order to obtain either a certificate of occupancy or a construction final HCAI (then the Office of Statewide Health Planning and Development).
- SB 90 (Steinberg), Chapter 19, Statutes of 2011, allowed a hospital to seek an extension for seismic compliance for its SPC-1 buildings of up to seven years based on the following elements: the structural integrity of the building, the loss of essential hospital services to the community if the hospital closed, and financial hardship.
- SB 499 (Ducheny), Chapter 601, Statutes of 2009, required all general acute care hospitals that have SPC-1 buildings to report to HCAI by November 1, 2010, and annually thereafter, on the status of their compliance with the seismic safety deadlines.
- SB 306 (Ducheny), Chapter 642, Statutes of 2007, amended the Alquist Act to permit hospitals to delay compliance with the July 1, 2008 seismic retro deadline, and the 2013 extension, to the year 2020, by filing a declaration with HCAI that the owner lacks financial capacity to comply with the law.
- SB 1661 (Cox), Chapter 679, Statutes of 2006, authorized an extension of up to an additional two years for hospitals that had already received extensions of the January 1, 2008 seismic safety compliance deadline if specified criteria were met, and required specified hospital reports to be posted on the HCAI website.
REGISTERED SUPPORT / OPPOSITION:
Support
Adventist Health
Antelope Valley Healthcare District
Association of California Healthcare Districts
Coast Democratic Club
County of Santa Clara
District Hospital Leadership Forum
Kaweah Delta Health Care District
Mark Twain Healthcare District
Mayers Memorial Hospital District
Mendocino County Democratic Party
Plumas District Hospital
Rural County Representatives of California
Opposition
None on file.
Analysis Prepared by: Lara Flynn / HEALTH / (916) 319-2097
Bill Author
Bill Co-Author(s):