SB 1098: Passenger and freight rail: LOSSAN Rail Corridor.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2024-09-27
Current Status:
Passed
(2024-09-27: Chaptered by Secretary of State. Chapter 777, Statutes of 2024.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law establishes the Department of Transportation in the Transportation Agency. Existing law authorizes the department subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would require the Secretary of Transportation to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor, as specified.
This bill would also require the Secretary of Transportation, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, to submit a report to the Legislature regarding the LOSSAN Rail Corridor that includes specified information no later than 2 years after an appropriation is made by the Legislature for purposes of this report. The bill would also require the Secretary of Transportation, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on the performance of the LOSSAN Rail Corridor no later than 3 years after an appropriation is made by the Legislature for purposes of this performance report and biennially thereafter.
This bill would require the Secretary of Transportation to convene a working group composed of representatives of certain types of entities, including, among others, metropolitan planning organizations from specified counties. The bill would require the working group to submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, on various topics relating to rail service in the LOSSAN Rail Corridor. Before submitting the report to the Legislature, the bill would require the recommendations and feedback to be submitted to the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. By adding to the duties of local agencies, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the LOSSAN Rail Corridor.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency. Existing law authorizes the department subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would require the Secretary of Transportation to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor, as specified.
This bill would also require the Secretary of Transportation, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, to submit a report to the Legislature regarding the LOSSAN Rail Corridor that includes specified information no later than 2 years after an appropriation is made by the Legislature for purposes of this report. The bill would also require the Secretary of Transportation, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on the performance of the LOSSAN Rail Corridor no later than 3 years after an appropriation is made by the Legislature for purposes of this performance report and biennially thereafter.
This bill would require the Secretary of Transportation to convene a working group composed of representatives of certain types of entities, including, among others, metropolitan planning organizations from specified counties. The bill would require the working group to submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, on various topics relating to rail service in the LOSSAN Rail Corridor. Before submitting the report to the Legislature, the bill would require the recommendations and feedback to be submitted to the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. By adding to the duties of local agencies, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the LOSSAN Rail Corridor.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency under the control of an executive officer known as the Director of Transportation. Agency. Existing law authorizes the Department of Transportation, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering the state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would require the Secretary of Transportation to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor, as specified.
This bill would also require the Secretary of Transportation, in consultation with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, to submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that includes specified information. information no later than 2 years after an appropriation is made by the Legislature for purposes of this report. The bill would also require the Secretary of Transportation, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the performance of the LOSSAN Rail Corridor, as provided. Corridor no later than 3 years after an appropriation is made by the Legislature for purposes of this performance report and biennially thereafter.
This bill would require the Secretary of Transportation to convene a working group composed of representatives of certain types of entities, including, among others, metropolitan planning organizations from specified counties. The bill would require the working group to submit recommendations to the secretary for inclusion in the above-described report due consensus recommendations and feedback in a report to the Legislature on or before January February 1, 2026, on various topics relating to rail service in the LOSSAN Rail Corridor. Before the recommendations are submitted to the secretary, submitting the report to the Legislature, the bill would require the recommendations and feedback to be submitted to the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. By adding to the duties of local agencies, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the LOSSAN Rail Corridor.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency under the control of an executive officer known as the Director of Transportation. Existing law authorizes the Department of Transportation, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering the state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would require the Secretary of Transportation to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor, as specified.
This bill would also require the Secretary of Transportation, in consultation with the Director of Transportation, the California Transportation Commission, the Secretary for Environmental Protection, Protection and the Secretary of the Natural Resources Agency, to submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that includes specified information. The bill would also require the Secretary of Transportation, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the performance of the LOSSAN Rail Corridor, as provided.
This bill would require an unspecified entity the Secretary of Transportation to convene a working group composed of representatives of certain types of entities, including, among others, metropolitan planning organizations from specified counties. The bill would require the working group to submit a report to the Legislature on or before January 1, 2026, that provides recommendations to the secretary for inclusion in the above-described report due on or before January 1, 2026, on various topics relating to rail service in the LOSSAN Rail Corridor. Before the report is recommendations are submitted to the Legislature, secretary, the bill would require the report recommendations to be reviewed and approved by submitted to the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District. District for review and consideration. By adding to the duties of local agencies, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the LOSSAN Rail Corridor.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency under the control of an executive officer known as the Director of Transportation. Existing law authorizes the Department of Transportation, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering the state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would require the Secretary of Transportation to provide strategic guidance, recommendations, and facilitate all necessary coordination, collaboration, and intervention when necessary between stakeholders, guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor, as specified.
This bill would also require the Secretary of Transportation, in consultation with the Director of Transportation, the California Transportation Commission, the Secretary for Environmental Protection, and the Secretary of the Natural Resources Agency, to submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that includes specified information, including certain recommendations made by the department and the California Transportation Commission, in consultation with the Secretary for Environmental Protection. information. The bill would also require the Secretary of Transportation Transportation, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the management performance of the LOSSAN Rail Corridor, as provided.
This bill would require the metropolitan planning organizations for the counties located within the LOSSAN Rail Corridor to jointly an unspecified entity to convene a working group composed of representatives of certain types of entities, including, among others, metropolitan planning organizations from specified counties. The bill would require the working group to submit a report to the Legislature a report on or before January 1, 2026, that provides recommendations on various topics relating to rail service in the corridor. LOSSAN Rail Corridor. Before the report is submitted to the Legislature, the bill would require the report to be reviewed and approved by the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District. By adding to the duties of local agencies, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the LOSSAN Rail Corridor.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law establishes the Department of Transportation in the Transportation Agency under the control of an executive officer known as the Director of Transportation. Existing law authorizes the Department of Transportation, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a joint powers board assumes responsibility for administering the state-funded intercity rail service in certain rail corridors, including the LOSSAN Rail Corridor. Existing law defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo. Pursuant to this authority, the department entered into an interagency transfer agreement with the LOSSAN Rail Corridor Agency to administer intercity passenger rail service in the LOSSAN Rail Corridor.
This bill would require the Secretary of Transportation to provide strategic guidance, recommendations, and facilitate all necessary coordination, collaboration, and intervention when necessary between stakeholders, to ensure the performance of the LOSSAN Rail Corridor, as specified.
This bill would also require the Secretary of Transportation, in consultation with the Director of Transportation, to submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that includes specified information, including certain recommendations made by the department and the California Transportation Commission, in consultation with the Secretary for Environmental Protection. The bill would also require the Secretary of Transportation to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the management of the LOSSAN Rail Corridor, as provided.
This bill would require the metropolitan planning organizations for the counties located within the LOSSAN Rail Corridor to jointly submit to the Legislature a report on or before January 1, 2026, that provides recommendations on various topics relating to rail service in the corridor. By adding to the duties of local agencies, the bill would impose a state-mandated local program.
This bill would make legislative findings and declarations as to the necessity of a special statute for the LOSSAN Rail Corridor.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
The act shall be known, and may be cited, as the Southern California Rail Revitalization Act.
SEC. 2.Section 14072.6 is added to the Government Code, to read:14072.6.(a)(1)Upon appropriation by the Legislature for purposes of this subdivision, the secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature no later than two years after an appropriation is made by the Legislature for purposes of this subdivision regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
(B)Prioritized capital improvement projects in the corridor necessary to improve current services and achieve service growth, performance, and network goals consistent with the State Rail Plan prepared pursuant to Section 14036. Each prioritized capital improvement project identified pursuant to this subparagraph shall indicate in the report whether it is aligned with the near-term, mid-term, or long-term planning year horizons identified in the State Rail Plan and shall indicate in the report the specific service outcomes tied to the project.
(C)Prioritized improvement projects in the corridor necessary to ensure the resiliency of both natural resources and transportation infrastructure.
(D)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve operations and performance of the corridor.
(E)Recommendations for the corridor to connect with other passenger rail services.
(F)Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
(G)Recommendations to achieve zero-emission state-supported intercity service, including an analysis of available technologies and necessary corridor infrastructure. The recommendations made pursuant to this subparagraph shall identify efforts by the Southern California Regional Rail Authority and the North County Transit District to achieve zero-emission services, and opportunities to coordinate those efforts and ensure interoperability between those zero-emission services.
(H)Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
(I)A description of coordination activities through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code.
(2)In preparing the report pursuant to this subdivision, the secretary shall consult existing plans, studies, reports, and guidance for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study, the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency, the guidance document Critical Infrastructure at Risk: Sea Level Rise Planning Guidance for Californias Coastal Zone adopted by the California Coastal Commission, and the report submitted to the Legislature pursuant to subdivision (c).
(3)When undertaking the duties pursuant to this subdivision, the secretaries identified in paragraph (1) may consult with any other state agency, as needed for technical and subject matter assistance.
(4)For projects identified pursuant to paragraph (1), the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, recommended strategies and plans to address any funding shortfall, and next steps for site-specific project analysis and environmental review documents. In identifying projects pursuant to paragraph (1), if the secretary does not identify a project that is included in the 2024 LOSSAN Rail Corridor Agency Business Plan and has approved environmental or programmatic documents, or if the secretary includes a modified version of one of those projects, the secretary shall explain in the report why the project was excluded or why the project was included in a modified version, as applicable.
(b)The secretary shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(6)The California Coastal Commission.
(7)The Division of Rail and Mass Transportation in the department.
(c)(1)The working group convened pursuant to subdivision (b) shall submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
(A)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(B)Alternative management and operations models or structures that improve intercity and regional rail services.
(C)Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures. In making recommendations and providing feedback pursuant to this subparagraph, the working group shall review how local and regional planning agencies responsible for recommending transportation strategies include information about train service, operations, capital projects, resiliency, and performance in their respective planning documents, including, but not limited to, sustainable communities strategies, regional transportation plans, transportation demand management plans, and long-range transportation plans.
(D)Coordination of planning and project development through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code to streamline processes and expand opportunities for federal capital funding.
(2)The working group shall consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
(3)The working group shall recognize the ownership and rights held in the LOSSAN Rail Corridor, and past and ongoing service, operations, and capital investments made by the member agencies of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District.
(4)The recommendations required pursuant to this subdivision shall be developed with meaningful public engagement led by the working group convened pursuant to subdivision (b).
(5)Before submitting the report to the Legislature pursuant to this subdivision, the working group shall submit the recommendations and feedback to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. A governing board described in this paragraph shall notify the secretary of any action taken in response to these recommendations or feedback and the secretary shall include all of the information provided by the governing board pursuant to that notification in the report required pursuant to this subdivision.
(6)The secretary and working group may also include information in the report required pursuant to this subdivision regarding where additional follow-up discussion or action is needed.
(7)The requirement for submitting a report imposed under this subdivision is inoperative on February 1, 2030, pursuant to Section 10231.5.
(d)(1)The reports to be submitted pursuant to subdivisions (a) and (c) shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is inoperative four years after the date that the report described in subdivision (a) is required to be submitted to the Legislature and, as of January 1 following the date that this section is inoperative, is repealed.
SEC. 3.Section 14072.8 is added to the Government Code, to read:14072.8.(a)Notwithstanding Section 10231.5, upon appropriation by the Legislature for purposes of this section, the secretary, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, shall submit a report to the Legislature no later than three years after an appropriation is made by the Legislature for purposes of this section, and every two years thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
(1)Performance, ridership, usage, and quality of rail services.
(2)Updates to capital improvement planning.
(3)Progress in delivering fleet and infrastructure improvement projects.
(4)Improvements to service and fare coordination.
(5)Opportunities to increase the quality and frequency of services.
(6)Updates to technical information, studies, reports, or research relating to the planning, operations, or maintenance of rail services.
(7)Updates on corridor resiliency, prepared in coordination with the California Coastal Commission, including updates on any projects identified by the LOSSAN Rail Corridor Agency pursuant to Section 14072.4 to increase climate resiliency on the corridor. These updates shall include the status of current and planned development projects in the coastal zone and an analysis of environmental conditions.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795.
SEC. 4.Section 14072.10 is added to the Government Code, to read:14072.10.(a)The secretary shall provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor.
(b)The responsibilities set forth in subdivision (a) shall include planning, as needed, for any of the following:
(1)Service frequencies.
(2)Equipment and fleet management.
(3)Infrastructure improvement and state-of-good repair projects.
(4)Resiliency of the corridor, including coordination with the California Coastal Commission as it relates to the California coastal zone.
SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
SEC. 6.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The act shall be known, and may be cited, as the Southern California Rail Revitalization Act.
SEC. 2.Section 14072.6 is added to the Government Code, to read:14072.6.(a)(1)Upon appropriation by the Legislature for purposes of this subdivision, the secretary, with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature no later than two years after an appropriation is made by the Legislature for purposes of this subdivision regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
(B)Prioritized capital improvement projects in the corridor necessary to improve current services and achieve service growth, performance, and network goals consistent with the State Rail Plan prepared pursuant to Section 14036. Each prioritized capital improvement project identified pursuant to this subparagraph shall indicate in the report whether it is aligned with the near-term, mid-term, or long-term planning year horizons identified in the State Rail Plan and shall indicate in the report the specific service outcomes tied to the project.
(C)Prioritized improvement projects in the corridor necessary to ensure the resiliency of both natural resources and transportation infrastructure.
(D)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve operations and performance of the corridor.
(E)Recommendations for the corridor to connect with other passenger rail services.
(F)Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
(G)Recommendations to achieve zero-emission state-supported intercity service, including an analysis of available technologies and necessary corridor infrastructure. The recommendations made pursuant to this subparagraph shall identify efforts by the Southern California Regional Rail Authority and the North County Transit District to achieve zero-emission services, and opportunities to coordinate those efforts and ensure interoperability between those zero-emission services.
(H)Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
(I)A description of coordination activities through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code.
(2)In preparing the report pursuant to this subdivision, the secretary shall consult existing plans, studies, reports, and guidance for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study, the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency, the guidance document Critical Infrastructure at Risk: Sea Level Rise Planning Guidance for Californias Coastal Zone adopted by the California Coastal Commission, and the report submitted to the Legislature pursuant to subdivision (c).
(3)When undertaking the duties pursuant to this subdivision, the secretaries identified in paragraph (1) may consult with any other state agency, as needed for technical and subject matter assistance.
(4)For projects identified pursuant to paragraph (1), the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, recommended strategies and plans to address any funding shortfall, and next steps for site-specific project analysis and environmental review documents. In identifying projects pursuant to paragraph (1), if the secretary does not identify a project that is included in the 2024 LOSSAN Rail Corridor Agency Business Plan and has approved environmental or programmatic documents, or if the secretary includes a modified version of one of those projects, the secretary shall explain in the report why the project was excluded or why the project was included in a modified version, as applicable.
(b)The secretary shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(6)The California Coastal Commission.
(7)The Division of Rail and Mass Transportation in the department.
(c)(1)The working group convened pursuant to subdivision (b) shall submit consensus recommendations and feedback in a report to the Legislature on or before February 1, 2026, on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
(A)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(B)Alternative management and operations models or structures that improve intercity and regional rail services.
(C)Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures. In making recommendations and providing feedback pursuant to this subparagraph, the working group shall review how local and regional planning agencies responsible for recommending transportation strategies include information about train service, operations, capital projects, resiliency, and performance in their respective planning documents, including, but not limited to, sustainable communities strategies, regional transportation plans, transportation demand management plans, and long-range transportation plans.
(D)Coordination of planning and project development through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code to streamline processes and expand opportunities for federal capital funding.
(2)The working group shall consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
(3)The working group shall recognize the ownership and rights held in the LOSSAN Rail Corridor, and past and ongoing service, operations, and capital investments made by the member agencies of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District.
(4)The recommendations required pursuant to this subdivision shall be developed with meaningful public engagement led by the working group convened pursuant to subdivision (b).
(5)Before submitting the report to the Legislature pursuant to this subdivision, the working group shall submit the recommendations and feedback to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. A governing board described in this paragraph shall notify the secretary of any action taken in response to these recommendations or feedback and the secretary shall include all of the information provided by the governing board pursuant to that notification in the report required pursuant to this subdivision.
(6)The secretary and working group may also include information in the report required pursuant to this subdivision regarding where additional follow-up discussion or action is needed.
(7)The requirement for submitting a report imposed under this subdivision is inoperative on February 1, 2030, pursuant to Section 10231.5.
(d)(1)The reports to be submitted pursuant to subdivisions (a) and (c) shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is inoperative four years after the date that the report described in subdivision (a) is required to be submitted to the Legislature and, as of January 1 following the date that this section is inoperative, is repealed.
SEC. 3.Section 14072.8 is added to the Government Code, to read:14072.8.(a)Notwithstanding Section 10231.5, upon appropriation by the Legislature for purposes of this section, the secretary, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, shall submit a report to the Legislature no later than three years after an appropriation is made by the Legislature for purposes of this section, and every two years thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
(1)Performance, ridership, usage, and quality of rail services.
(2)Updates to capital improvement planning.
(3)Progress in delivering fleet and infrastructure improvement projects.
(4)Improvements to service and fare coordination.
(5)Opportunities to increase the quality and frequency of services.
(6)Updates to technical information, studies, reports, or research relating to the planning, operations, or maintenance of rail services.
(7)Updates on corridor resiliency, prepared in coordination with the California Coastal Commission, including updates on any projects identified by the LOSSAN Rail Corridor Agency pursuant to Section 14072.4 to increase climate resiliency on the corridor. These updates shall include the status of current and planned development projects in the coastal zone and an analysis of environmental conditions.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795.
SEC. 4.Section 14072.10 is added to the Government Code, to read:14072.10.(a)The secretary shall provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor.
(b)The responsibilities set forth in subdivision (a) shall include planning, as needed, for any of the following:
(1)Service frequencies.
(2)Equipment and fleet management.
(3)Infrastructure improvement and state-of-good repair projects.
(4)Resiliency of the corridor, including coordination with the California Coastal Commission as it relates to the California coastal zone.
SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
SEC. 6.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The act shall be known, and may be cited, as the Southern California Rail Revitalization Act.
SEC. 2.Section 14072.6 is added to the Government Code, to read:14072.6.(a)(1)The Upon appropriation by the Legislature for purposes of this subdivision, the secretary, in consultation with technical and subject matter assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature on or before January 1, 2026, no later than two years after an appropriation is made by the Legislature for purposes of this subdivision regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
(B)Prioritized capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth achieve service growth, performance, and network goals consistent with the State Rail Plan prepared pursuant to Section 14036. Each prioritized capital improvement project identified pursuant to this subparagraph shall indicate in the report whether it is aligned with the near-term, mid-term, or long-term planning year horizons identified in the State Rail Plan and shall indicate in the report the specific service outcomes tied to the project.
(C)Prioritized improvement projects in the corridor necessary to ensure the resiliency of both natural resources and transportation infrastructure.
(D)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve operations and performance of the corridor.
(E)Recommendations for the corridor to connect with other passenger rail services.
(F)Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
(G)Recommendations to achieve zero-emission state-supported equipment, intercity service, including an analysis of recommended available technologies and necessary corridor infrastructure. The recommendations made pursuant to this subparagraph shall identify efforts by the Southern California Regional Rail Authority and the North County Transit District to achieve zero-emission services, and opportunities to coordinate those efforts and ensure interoperability between those zero-emission services.
(H)Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
(I)Recommendations and information regarding any actions taken in response to those recommendations received from the working group pursuant to subdivision (c).(I)A description of coordination activities through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code.
(2)In preparing the report pursuant to this subdivision, the secretary shall consult existing plans, studies, reports, and guidance for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study, the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency, and the guidance document Critical Infrastructure at Risk: Sea Level Rise Planning Guidance for Californias Coastal Zone adopted by the California Coastal Commission. Commission, and the report submitted to the Legislature pursuant to subdivision (c).
(3)When undertaking the duties pursuant to this subdivision, the secretaries identified in paragraph (1) may consult with any other state agency. agency, as needed for technical and subject matter assistance.
(4)For projects identified pursuant to paragraph (1), the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, and recommended strategies and plans to address any funding shortfall. shortfall, and next steps for site-specific project analysis and environmental review documents. In identifying projects pursuant to paragraph (1), if the secretary does not identify a project that is included in the 2024 LOSSAN Rail Corridor Agency Business Plan and has approved environmental or programmatic documents, or if the secretary includes a modified version of one of those projects, the secretary shall explain in the report why the project was excluded or why the project was included in a modified version, as applicable.
(b)The secretary shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(6)The California Coastal Commission.
(7)The Division of Rail and Mass Transportation in the department.
(c)(1)The working group convened pursuant to subdivision (b) shall submit consensus recommendations and feedback in a report to the secretary for inclusion in the report required pursuant to subdivision (a) Legislature on or before February 1, 2026, on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
(A)Dedicated and formula funding distributions available for passenger rail operations, including intercity and regional rail services along the corridor.(B)(A)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(C)(B)Alternative management and operations models or structures that improve intercity and regional rail services.
(D)(C)Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures. In making recommendations and providing feedback pursuant to this subparagraph, the working group shall review how local and regional planning agencies responsible for recommending transportation strategies include information about train service, operations, capital projects, resiliency, and performance in their respective planning documents, including, but not limited to, sustainable communities strategies, regional transportation plans, transportation demand management plans, and long-range transportation plans.
(E)Opportunities for rail to accelerate and support equity, safety, sustainability, and economic development goals.(F)Opportunities for metropolitan planning organizations to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.(G)Opportunities for metropolitan planning organizations to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.(H)Improving connections to existing and planned public transit services.(I)Strategies that increase ridership and use of rail services.(J)Strategies to coordinate fleet equipment planning and management.(D)Coordination of planning and project development through the federal Corridor Identification and Development Program established pursuant to Section 25101 of Title 49 of the United States Code to streamline processes and expand opportunities for federal capital funding.
(2)The working group shall consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
(3)The working group shall recognize the ownership and rights held in the LOSSAN Rail Corridor, and past and ongoing service, operations, and capital investments made by the member agencies of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District.
(3)(4)The recommendations required pursuant to this subdivision shall be developed with meaningful public engagement led by the working group convened pursuant to subdivision (b).
(4)(5)Before submitting the recommendations required pursuant to this subdivision to the secretary, report to the Legislature pursuant to this subdivision, the working group shall submit the recommendations and feedback to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. A governing board described in this paragraph shall notify the secretary of any action taken in response to these recommendations for inclusion or feedback and the secretary shall include all of the information provided by the governing board pursuant to that notification in the report required pursuant to subdivision (a). this subdivision.
(6)The secretary and working group may also include information in the report required pursuant to this subdivision regarding where additional follow-up discussion or action is needed.
(7)The requirement for submitting a report imposed under this subdivision is inoperative on February 1, 2030, pursuant to Section 10231.5.
(d)(1)The report reports to be submitted pursuant to subdivision subdivisions (a) and (c) shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is repealed on January 1, 2030. inoperative four years after the date that the report described in subdivision (a) is required to be submitted to the Legislature and, as of January 1 following the date that this section is inoperative, is repealed.
SEC. 3.Section 14072.8 is added to the Government Code, to read:14072.8.(a)Notwithstanding Section 10231.5, upon appropriation by the Legislature for purposes of this section, the secretary, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, shall submit a report to the Legislature on or before January 1, 2027, no later than three years after an appropriation is made by the Legislature for purposes of this section, and every two years thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
(1)Performance, ridership, usage, and quality of rail services.
(2)Updates to capital improvement planning.
(3)Progress in delivering fleet and infrastructure improvement projects.
(4)Improvements to service and fare coordination.
(5)Opportunities to increase the quality and frequency of services.
(6)Updates to technical information, studies, reports, or research relating to the planning, operations, or maintenance of rail services.
(6)(7)Updates on corridor resiliency, prepared in coordination with the California Coastal Commission, including updates on any projects identified by the LOSSAN Rail Corridor Agency pursuant to Section 14072.4 to increase climate resiliency on the corridor. These updates shall include the status of current and planned development projects in the coastal zone and an analysis of environmental conditions.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795.
SEC. 4.Section 14072.10 is added to the Government Code, to read:14072.10.(a)The secretary shall provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor.
(b)The responsibilities set forth in subdivision (a) shall include planning, as needed, for any of the following:
(1)Service frequencies.
(2)Equipment and fleet management.
(3)Infrastructure improvement and state-of-good repair projects.
(4)Resiliency of the corridor, including coordination with the California Coastal Commission as it relates to the California coastal zone.
SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
SEC. 6.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The act shall be known, and may be cited, as the Southern California Rail Revitalization Act.
SEC. 2.Section 14072.6 is added to the Government Code, to read:14072.6.(a)(1)The secretary, in consultation with the director, the commission, the Secretary for Environmental Protection, Protection and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
(A)(B)Prioritized capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth consistent with the State Rail Plan prepared pursuant to Section 14036.
(B)(C)Prioritized resiliency improvement projects in the corridor necessary to ensure the safe and continued movement of trains. resiliency of natural resources and transportation infrastructure.
(C)(D)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve operations and performance of the corridor.
(D)(E)Recommendations for the corridor to connect with other passenger rail services.
(E)(F)Strategies to support and improve existing rail service and resiliency planning in the corridor. increase ridership, including a description of necessary operations funding for increased service frequencies.
(G)Recommendations to achieve zero-emission state-supported equipment, including an analysis of recommended technologies and necessary infrastructure.
(H)Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
(I)Recommendations and information regarding any actions taken in response to those recommendations received from the working group pursuant to subdivision (c).
(2)In preparing the report pursuant to this subdivision, the secretary shall consult existing plans and studies plans, studies, and guidance for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study and Study, the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency. Agency, and the guidance document Critical Infrastructure at Risk: Sea Level Rise Planning Guidance for Californias Coastal Zone adopted by the California Coastal Commission.
(3)When undertaking the duties pursuant to this subdivision, the secretaries identified in paragraph (1) may consult with any other state agency.
(4)For projects identified pursuant to paragraph (1), the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, and recommended strategies and plans to address any funding shortfall.
(b)The _____ secretary shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators. operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(6)The California Coastal Commission.
(c)(1)The working group convened pursuant to subdivision (b) shall submit a report to the Legislature on or before January 1, 2026, that provides recommendations to the secretary for inclusion in the report required pursuant to subdivision (a) on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in in, or that connect to, the LOSSAN Rail Corridor: Corridor as of January 1, 2025:
(A)Dedicated and formula funding distributions available for passenger rail operations, including intercity and regional rail services along the corridor.
(B)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by climate resiliency, resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(C)Alternative management and operations models or structures that improve intercity and regional rail services.
(D)Changes to state statutes, rules, or funding relating to intercity and regional rail services. necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures.
(E)Opportunities for rail to accelerate and support equity, safety, sustainability, zero-emissions, equipment, and economic development goals.
(F)Opportunities for metropolitan planning organizations to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.
(G)Opportunities for metropolitan planning organizations to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.
(H)Improving connections to existing and planned public transit services.
(I)Strategies that increase ridership and use of rail services.
(J)Strategies to coordinate fleet equipment planning and management.
(2)The working group shall consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
(2)(3)The report recommendations required pursuant to this subdivision shall include be developed with meaningful public engagement led by the working group convened pursuant to subdivision (b).
(3)(4)Before submitting the report recommendations required pursuant to this subdivision to the Legislature, secretary, the working group shall submit the report recommendations to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and approval. consideration. A governing board described in this paragraph shall notify the secretary of any action taken in response to these recommendations for inclusion in the report pursuant to subdivision (a).
(d)(1)The reports report to be submitted pursuant to this section subdivision (a) shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is repealed on January 1, 2030.
SEC. 3.Section 14072.8 is added to the Government Code, to read:14072.8.(a)Notwithstanding Section 10231.5, the secretary, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, shall submit a report to the Legislature on or before January 1, 2027, and every two years thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
(1)Performance, ridership, usage, and quality of rail services.
(2)Updates to capital improvement planning.
(3)Progress in delivering fleet and infrastructure improvement projects.
(4)Improvements to service and fare coordination.
(5)Opportunities to increase the quality and frequency of services.
(6)Updates on corridor resiliency, prepared in coordination with the California Coastal Commission, including updates on any projects identified by the LOSSAN Rail Corridor Agency pursuant to Section 14072.4 to increase climate resiliency on the corridor. These updates shall include the status of current and planned development projects in the coastal zone and an analysis of environmental conditions.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795.
SEC. 4.Section 14072.10 is added to the Government Code, to read:14072.10.(a)The secretary shall provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor.
(b)The responsibilities set forth in subdivision (a) shall include planning, as needed, for any of the following:
(1)Service frequencies.
(2)Equipment and fleet management.
(3)Infrastructure improvement and state-of-good repair projects.
(4)Resiliency of the corridor. corridor, including coordination with the California Coastal Commission as it relates to the California coastal zone.
SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
SEC. 6.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
The act shall be known, and may be cited, as the Southern California Rail Revitalization Act.
SECTION 1.SEC. 2.Section 14072.6 is added to the Government Code, to read:14072.6.(a)(1)The secretary, in consultation with the director, the commission, the Secretary for Environmental Protection, and the Secretary of the Natural Resources Agency, shall submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)Prioritized capacity capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth. growth consistent with the State Rail Plan prepared pursuant to Section 14036.
(B)Prioritized resiliency improvement projects in the corridor necessary to ensure the safe and continued movement of trains.
(C)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve the management operations and performance of the corridor.
(D)Recommendations received pursuant to paragraph (2). for the corridor to connect with other passenger rail services.
(E)Strategies to support and improve existing rail service and resiliency planning in the corridor.
(2)The department and commission, in consultation with the Secretary for Environmental Protection, shall submit recommendations to the secretary for inclusion in the report required pursuant to this subdivision regarding updates or changes to state agencies, policies, planning documents, programs, including the state transportation improvement program and the interregional transportation improvement program, and guidelines, needed to support the LOSSAN Rail Corridor. These recommendations shall include a review of how state rail planning documents are implemented, managed, and enforced.(3)(2)In preparing the report pursuant to this subdivision, the secretary and director shall consult existing plans and studies for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study and the LOSSAN Rail Corridor Agency Business Plan adopted by the LOSSAN Rail Corridor Agency.
(b)The _____ shall convene a working group that includes, but is not limited to, representatives of all of the following entities:
(1)LOSSAN Rail Corridor track owners.
(2)LOSSAN Rail Corridor passenger and freight rail operators.
(3)The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura established pursuant to Division 12 (commencing with Section 130000) of the Public Utilities Code.
(4)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
(5)Business, community, transportation, environmental, labor, and civic organizations.
(b)(c)(1)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, and Santa Barbara shall jointly working group convened pursuant to subdivision (b) shall submit a report to the Legislature on or before January 1, 2026, that provides recommendations on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Rail Corridor:
(A)Dedicated and formula funding distributions available for passenger rail operations, including intercity and regional rail services along the corridor.
(B)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by climate resiliency, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and conditions of assets, reduced track closures, and greater on-time performance.
(C)Changes to local or regional governance, Alternative management structures, and consolidation for and operations models or structures that improve intercity and regional rail services.
(D)Changes to state statutes or policies statutes, rules, or funding relating to intercity and regional rail services.
(E)Changes to enabling state legislation, policies, rules, or funding.(F)(E)Opportunities for rail to accelerate and support equity, safety, sustainability, zero-emissions, equipment, and economic development goals.
(G)(F)Opportunities for these metropolitan planning organizations to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.
(H)(G)Opportunities for these metropolitan planning organizations to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.
(H)Improving connections to existing and planned public transit services.
(I)Strategies that increase ridership and use of rail services.
(2)The report required pursuant to this subdivision shall include meaningful public engagement led by the metropolitan planning organizations and be developed with the support of a steering committee composed of representatives of business, community, transportation, environmental, labor, and civic organizations. The report shall be adopted by the governing boards of each metropolitan planning organization before submission to the Legislature. working group convened pursuant to subdivision (b).
(3)Before submitting the report required pursuant to this subdivision to the Legislature, the working group shall submit the report to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and approval.
(c)(d)(1)The reports to be submitted pursuant to this section shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is repealed on January 1, 2030.
SEC. 2.SEC. 3.Section 14072.8 is added to the Government Code, to read:14072.8.(a)Notwithstanding Section 10231.5, the secretary secretary, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, shall submit a report to the Legislature on or before January 1, 2027, and every two years thereafter, on the management performance of the LOSSAN Rail Corridor that includes all of the following information:
(1)Performance, ridership, usage, and quality of intercity, regional rail, and freight rail services.
(2)Updates to capital improvement planning.
(3)Progress in delivering fleet and infrastructure improvement projects.
(4)Improvements to service and fare coordination.
(5)Opportunities to increase the quality and frequency of services.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795.
SEC. 3.SEC. 4.Section 14072.10 is added to the Government Code, to read:14072.10.(a)The secretary shall provide strategic guidance, recommendations, and facilitate all necessary coordination, collaboration, and intervention when necessary between stakeholders, guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor.
(b)The responsibilities set forth in subdivision (a) shall include oversight and development of plans, planning, as needed, for any of the following:
(1)Service frequencies.
(2)Equipment and fleet management.
(3)Infrastructure improvement and state-of-good repair projects.
(4)Resiliency of the corridor.
SEC. 4.SEC. 5.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
SEC. 5.SEC. 6.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
(a)(1)The secretary, in consultation with the director, shall submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that includes all of the following information:
(A)Prioritized capacity improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth.
(B)Prioritized resiliency improvement projects in the corridor necessary to ensure the safe and continued movement of trains.
(C)A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve the management of the corridor.
(D)Recommendations received pursuant to paragraph (2).
(2)The department and commission, in consultation with the Secretary for Environmental Protection, shall submit recommendations to the secretary for inclusion in the report required pursuant to this subdivision regarding updates or changes to state agencies, policies, planning documents, programs, including the state transportation improvement program and the interregional transportation improvement program, and guidelines, needed to support the LOSSAN Rail Corridor. These recommendations shall include a review of how state rail planning documents are implemented, managed, and enforced.
(3)In preparing the report pursuant to this subdivision, the secretary and director shall consult existing plans and studies for the LOSSAN Rail Corridor, including, but not limited to, the LOSSAN Rail Corridor Optimization Study adopted by the LOSSAN Rail Corridor Agency.
(b)(1)The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, and Santa Barbara shall jointly submit a report to the Legislature on or before January 1, 2026, that provides recommendations on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Rail Corridor:
(A)Dedicated and formula funding distributions for passenger rail operations, including intercity and regional rail services along the corridor.
(B)Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by climate resiliency, track closures, state of good repair, equipment, and staffing.
(C)Changes to local or regional governance, management structures, and consolidation for intercity and regional rail services.
(D)Changes to state statutes or policies relating to intercity and regional rail services.
(E)Changes to enabling state legislation, policies, rules, or funding.
(F)Opportunities for rail to accelerate and support equity, safety, sustainability, zero-emissions, equipment, and economic development goals.
(G)Opportunities for these metropolitan planning organizations to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.
(H)Opportunities for these metropolitan planning organizations to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to Section 65080.
(2)The report required pursuant to this subdivision shall include meaningful public engagement led by the metropolitan planning organizations and be developed with the support of a steering committee composed of representatives of business, community, transportation, environmental, labor, and civic organizations. The report shall be adopted by the governing boards of each metropolitan planning organization before submission to the Legislature.
(c)(1)The reports to be submitted pursuant to this section shall be submitted in compliance with Section 9795.
(2)Pursuant to Section 10231.5, this section is repealed on January 1, 2030.
SEC. 2.Section 14072.8 is added to the Government Code, to read:14072.8.(a)Notwithstanding Section 10231.5, the secretary shall submit a report to the Legislature on or before January 1, 2027, and every two years thereafter, on the management of the LOSSAN Rail Corridor that includes all of the following information:
(1)Performance, ridership, usage, and quality of intercity, regional rail, and freight services.
(2)Updates to capital improvement planning.
(3)Progress in delivering fleet and infrastructure improvement projects.
(4)Improvements to service and fare coordination.
(5)Opportunities to increase the quality and frequency of services.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795.
SEC. 3.Section 14072.10 is added to the Government Code, to read:14072.10.(a)The secretary shall provide strategic guidance, recommendations, and facilitate all necessary coordination, collaboration, and intervention when necessary between stakeholders, to ensure the performance of the LOSSAN Rail Corridor.
(b)The responsibilities set forth in subdivision (a) shall include oversight and development of plans, as needed, for any of the following:
(1)Service frequencies.
(2)Equipment and fleet management.
(3)Infrastructure improvement and state-of-good repair projects.
(4)Resiliency of the corridor.
SEC. 4.The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
SEC. 5.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
|
Date
|
Status
|
|---|---|
| Sep 27, 2024 | Chaptered by Secretary of State. Chapter 777, Statutes of 2024. |
| Sep 27, 2024 | Approved by the Governor. |
| Sep 4, 2024 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 28, 2024 | Assembly amendments concurred in. (Ayes 39. Noes 0. Page 5613.) Ordered to engrossing and enrolling. |
| Aug 27, 2024 | Ordered to special consent calendar. |
| Aug 26, 2024 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 26, 2024 | Read third time. Passed. (Ayes 73. Noes 1. Page 6576.) Ordered to the Senate. |
| Aug 20, 2024 | Read second time. Ordered to third reading. |
| Aug 19, 2024 | Read second time and amended. Ordered to second reading. |
| Aug 15, 2024 | From committee: Do pass as amended. (Ayes 11. Noes 0.) (August 15). |
| Aug 7, 2024 | August 7 set for first hearing. Placed on suspense file. |
| Jun 18, 2024 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 15. Noes 0.) (June 17). Re-referred to Com. on APPR. |
| Jun 3, 2024 | Referred to Com. on TRANS. |
| May 24, 2024 | In Assembly. Read first time. Held at Desk. |
| May 24, 2024 | Read third time. Passed. (Ayes 38. Noes 0. Page 4209.) Ordered to the Assembly. |
| May 22, 2024 | Ordered to special consent calendar. |
| May 20, 2024 | Read second time. Ordered to third reading. |
| May 16, 2024 | Read second time and amended. Ordered to second reading. |
| May 16, 2024 | From committee: Do pass as amended. (Ayes 7. Noes 0. Page 3971.) (May 16). |
| May 10, 2024 | Set for hearing May 16. |
| Apr 22, 2024 | April 22 hearing: Placed on APPR suspense file. |
| Apr 12, 2024 | Set for hearing April 22. |
| Apr 10, 2024 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 14. Noes 0. Page 3535.) (April 9). Re-referred to Com. on APPR. |
| Mar 20, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on TRANS. |
| Mar 6, 2024 | Set for hearing April 9. |
| Feb 21, 2024 | Referred to Com. on TRANS. |
| Feb 14, 2024 | From printer. May be acted upon on or after March 15. |
| Feb 13, 2024 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 28, 2024 | Special Consent SB1098 Blakespear et al. | Senate Floor |
Passed |
|
| Aug 26, 2024 | SB 1098 Blakespear Senate Third Reading By Hart | Assembly Floor |
Passed |
|
| Aug 15, 2024 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jun 17, 2024 | Do pass and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Transportation |
Passed |
|
| May 24, 2024 | Special Consent SB1098 Blakespear et al. | Senate Floor |
Passed |
|
| May 16, 2024 | Do pass as amended | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 22, 2024 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 9, 2024 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Capo Cares | ** Support | |
| City Of Del Mar | ** Support | |
| RideSD | ** Support | |
| SanDiego350 | ** Support | |
| San Juan Capistrano Chamber of Commerce | ** Support | |
| Streets for All | ** Support | |
| The Surf Line Trail | ** Against |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1098 |
UNFINISHED BUSINESS
Bill No: SB 1098
Author: Blakespear (D), et al.
Amended: 8/19/24
Vote: 21
SENATE TRANSPORTATION COMMITTEE: 14-0, 4/9/24
AYES: Cortese, Niello, Allen, Archuleta, Becker, Blakespear, Dodd, Gonzalez, Limón, Newman, Nguyen, Portantino, Seyarto, Umberg
NO VOTE RECORDED: Dahle
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/16/24
AYES: Caballero, Jones, Ashby, Becker, Bradford, Seyarto, Wahab
SENATE FLOOR: 38-0, 5/24/24
AYES: Alvarado-Gil, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Stern, Umberg, Wahab, Wiener, Wilk
NO VOTE RECORDED: Allen, Archuleta
ASSEMBLY FLOOR: 73-1, 8/26/24 - See last page for vote
SUBJECT: Passenger and freight rail: LOSSAN Rail Corridor
SOURCE: Author
DIGEST:
This bill requires the Secretary of the California State Transportation Agency (CalSTA) submit a report, within two years of appropriation, regarding the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor. Requires the Secretary, in coordination with LOSSAN Rail Corridor operating stakeholders, to submit a report, no later than three years after appropriation, and biennially thereafter, on the management of the LOSSAN Rail Corridor. Requires the CalSTA secretary to convene a working group of stakeholders involved in the LOSSAN corridor, as specified, to develop and submit a report with recommendations, regarding long-term viability and coordination of corridor rail service. Requires that the Secretary provide guidance, recommendations, and facilitate coordination between stakeholders, on the LOSSAN Rail Corridor.
Assembly Amendments
- make the reports pursuant to this bill contingent on the appropriation of the Legislature. Alters some of the information needed to be included in the CalSTA led report and specifies materials and agencies that shall be consulted for the report. Requires an additional representative be on the Working Group and that the working group report include feedback to the Legislature along with information regarding where additional follow-up discussions or actions are needed. Adds one additional piece of required information to the biannual report.
ANALYSIS:
Existing law:
- Authorizes the California Department of Transportation (Caltrans) to contract with the National Railroad Passenger Corporation (Amtrak) for intercity rail passenger services.
- Provides funding for intercity passenger rail service from a portion of the sales tax on diesel fuel through the Public Transportation Account.
- Authorizes the Capitol Corridor Joint Powers Agreement (JPA), San Joaquin JPA, and the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service.
- Authorizes Caltrans, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a JPA assumes responsibility for administering the state-supported intercity passenger rail service, and associated feeder bus service, in a particular corridor.
- Defines the boundaries of the three intercity rail corridors. Defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo.
- Requires the preparation of an annual Business Plan, due to the Secretary of Transportation by April 1 every year, for the corridor by each participating JPA board of directors.
This bill:
- Requires, subject to appropriation by the Legislature, the Secretary of Transportation, with technical and subject matter assistance from the Secretary for Environmental Protection (CalEPA) and the Secretary of Natural Resources Agency to submit a report to the Legislature on no later than two years after an appropriation is made by the Legislature for purposes of this bill, regarding the LOSSAN Rail Corridor that includes all of the following information:
- A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
- Prioritized capital improvement projects in the corridor necessary to improve current services and achieve service growth, performance, and network goals consistent with the State Rail Plan. Identified capital projects shall indicate alignment with planning horizons identified in the State Rail Plan, and the specific service outcomes tied to each project.
- Prioritized improvement projects in the corridor necessary to ensure the resiliency of both natural resources and transportation infrastructure.
- A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve the operations and performance of the corridor.
- Recommendations for the corridor to connect with other passenger rail services.
- Strategies to support and improve existing rail service and increase ridership, as specified.
- Recommendations to achieve zero-emission state-supported intercity service, as specified.
- Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
- A description of coordination activities through the federal Corridor Identification and Development Program.
- In preparing this report, the secretary shall consult existing plans, studies, and guidance for the LOSSAN Rail Corridor, as specified
- When undertaking this report, the secretaries identified may consult with any other state agency as needed for technical and subject matter assistance.
- For projects identified pursuant to the report, the secretary shall include in the report all available funding sources, projected completion schedules for priority projects, current funding shortfalls, recommended strategies and plans to address any funding shortfall, and next steps for site specific project analysis and environmental review documents, as specified.
- Requires that the Secretary of Transportation convene a working group including, but not limited to a representative from the following entities:
- LOSSAN Rail Corridor track owners.
- LOSSAN Rail Corridor passenger and freight rail operators, as specified.
- The county transportation commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura.
- The metropolitan planning organizations for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
- Business, community, transportation, environmental, labor, and civic organizations.
- The California Coastal Commission.
- The Division of Rail and Mass Transportation in the department.
- Requires the Working Group to submit consensus recommendations and feedback in a report to the Legislature no later than February 1, 2026, on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
- Strategies to increase rail service coordination and reduce disruptions or delays, as specified.
- Alternative management and operations models or structures that improve intercity and regional rail services.
- Changes to state statues, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes, or procedures as specified.
- Coordination of planning and project development through the Federal Corridor Identification and Development Program to streamline processes and expand opportunities for federal capital funding.
- Requires the working group to consider the known and expected impacts of recommendations on the coastal environment and local communities, and consider opportunities to support the coastal zone and local communities when making recommendations.
- Requires the working group to recognize the ownership and rights held in the LOSSAN corridor, as well as past and ongoing service, operations, and capital investments, as specified.
- Requires that the recommendations be developed with meaningful public engagement led by the working group.
- Requires that the working group before submitting the report to the Legislature, to submit recommendations and feedback to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and consideration. A governing board, as described, shall notify the secretary of any action taken in response to these recommendations or feedback and the secretary shall include all of the information provided by the governing board pursuant to that notification in the required working group report.
- The secretary and working group may also include information in the required working group report regarding where additional follow-up discussion or action is needed.
- The requirement for submitting the working group report is inoperative on February 1, 2030.
- The requirement for submitting the Transportation secretary led report is inoperative four years after the date that the report is required to be submitted to the Legislature and, as of January 1 following the date that this section is inoperative, is repealed.
- Requires the Secretary of Transportation, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature no later than three years after an appropriation is made by the Legislature for purposes of this section, and biennially thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information: Performance, ridership, usage, and quality of rail services.
- Updates to capital improvement planning.
- Progress in delivering fleet and infrastructure improvement projects.
- Improvements to service and fare coordination.
- Opportunities to increase the quality and frequency of services.
- Updates to technical information, studies, reports, or research relating to the planning, operations, or maintenance of rail services.
- Updates on corridor resiliency, as specified.
- Requires the Secretary of Transportation provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor. These responsibilities shall include planning, as needed, for any of the following:
- Service frequencies.
- Equipment and fleet management.
- Infrastructure improvement and state-of-good repair projects.
- Resiliency of the corridor, including coordination with California Coastal Commission as it relates to the California coastal zone.
Comments
- Purpose of the bill. According to the author, “The LOSSAN coastal rail corridor that operates between San Luis Obispo and San Diego is at critical risk of resiliency and performance challenges. The rail line is used for Amtrak intercity services managed by the LOSSAN Rail Corridor Agency and regional Metrolink and COASTER services managed by local JPAs. Additionally, the corridor is strategically important for freight and military purposes. However, since 2021, passenger and freight service has been suspended five times due to emergency track closures. The state of California cannot achieve its mobility, environmental, and quality of life goals while service disruptions and delays continue to impact ridership. SB 1098 aligns state and local action by requiring action plans and recommendations that result in improved services for passengers.”
- Intercity rail in California. California is home to three of the six busiest Amtrak intercity passenger rail routes in the nation. In Southern California, the Pacific Surfliner service is a 351-mile coastal corridor that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties.
Prior to 2012, Caltrans Division of Rail and Mass Transit managed and funded two of the three intercity rail services within the state - the Pacific Surfliner and the San Joaquins. The Capitol Corridor was, and still is, managed by a JPA that administers day-to-day operations within specified service boundaries. During the 2011-12 Legislative Session, SB 1225 (Padilla, Chapter 802, Statutes of 2012), and AB 1779 (Galgiani, Chapter 801, Statutes of 2012), authorized the transfer of responsibility of Pacific Surfliner and San Joaquins, respectively, to JPA managing agencies and, among other provisions, defined the service boundaries within each region. Currently, all three intercity rail service lines are managed by local JPAs while Caltrans remains responsible for providing state funding for each intercity rail line.
Historically, the intercity rail lines were partially funded by the federal government through Amtrak operations. However, with the passage of the Passenger Rail Investment and Improvement Act of 2008 (PRIIA), states were required to assume full funding of these lines. In California, the three intercity rail lines are funded from a portion of the sales tax on diesel fuel, which was roughly $130 million for the 2021-22 fiscal year. With the passage of SB 1 (Beall, Chapter 5, Statutes of 2017), the three intercity rail providers also receive an additional roughly $20 million per year for capital and operations support from the State Rail Assistance (SRA) program. Additionally, there are other funding sources for capital improvements for intercity rail including the Transit Intercity Rail Capital Program (TIRCP) and the Interregional Transportation Improvement Program (ITIP).
- LOSSAN Rail Corridor Agency. As mentioned, in Southern California, the LOSSAN Rail Corridor Agency runs the Pacific Surfliner service. The LOSSAN corridor is used by four different passenger and freight rail services, including the NCTD Coaster commuter rail, Metrolink, the BNSF railway, and the Union Pacific railroad. As LOSSAN agency notes, while each member agency or host railroad is responsible for the implementation of its respective capital improvement projects, the LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Based on numbers from FY 2023, ridership across these services totaled 3.74 million. The LOSSAN corridor also transports over $1 billion in goods via freight rail operators, and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
As required by SB 1225, and the terms of the interagency transfer agreement, the LOSSAN Agency must submit an annual business plan by April 1 of each year to CalSTA.
- Corridor of Concern. The LOSSAN corridor, which runs directly on the coast in many areas, is suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time.
On January 24, 2024, heavy rain caused a landslide in Mariposa which damaged a pedestrian and bike bridge causing debris to fall onto a parallel section of rail track owned by OCTA. Caltrans issued an emergency declaration on February 1, 2024 making $10 million in state funding available for the two phased project. Construction of the barrier wall began in late February was completed in time for full service resumption on March 25, 2024.
In San Diego County, SANDAG and NCTD have been leading efforts to stabilize portions of the coastal bluffs in the City of Del Mar to protect the railroad from erosion, landslides, and seismic events; and plan for a possible longer term realignment of the tracks. Phase 5 of the Del Mar stabilization project will begin construction in early 2024 and cost $78 million.
- Long term fixes being looked at. SANDAG is leading a San Diego Regional Rail Alterative Alignment and Improvements study to analyze ways to reduce travel times, enhance safety, and increase capacity along the San Diego segment of the corridor. As part of the 2022-2023 state budget, SANDAG was allocated $300 million to begin environmental analysis, study potential impacts, address stakeholder concerns, and identify future costs of the project. This work is still ongoing as of spring 2024, SANDAG expects final design and securing of right-of-way to be completed by 2026.
Meanwhile, OCTA is leading the Orange County Coastal Rail Resiliency Study to assess existing and future environmental risks and issues with operations and maintenance along the LOSSAN Rail Corridor while evaluating strategies to address these challenges. A final report on the full scope of the study and its recommendations is expected in the fall of 2025.
Recently, CalSTA has been reinvigorated on LOSSAN Rail Corridor issues and stood up the LOSSAN Regional Rail Working group which meets quarterly.
- Legislature and LOSSAN. Since 2016 the state has provided about $3.2 billion through various grant programs for the corridor. Additionally, in 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the Corridor. The subcommittee conducted three hearings in 2023, and two so far in 2024. The activities of the subcommittee led to the drafting and submission of a letter to CalSTA on January 9, 2024.
CalSTA responded to this letter in mid-March describing their activities to help with current emergency projects and identify the role they can play in long-term planning on the corridor.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
“The main work created by this bill will fall to CalSTA and the Department of Transportation (Caltrans), which estimate costs will be $2 million in the first year for two positions (approximately $400,000) and a related contract with an outside consultant, followed by annual ongoing costs thereafter of approximately $1 million, again for two positions and a contract with an outside consultant (special funds).
Similarly, this bill will create ongoing work for the California Environmental Protection Agency (Cal EPA) and the Natural Resources Agency to consult with CalSTA on the report, likely in the tens of thousands of dollars in staff costs to each agency annually (special funds).
The bill also directs the Coastal Commission, specifically, to participate in the working group convened by CalSTA, which the Coastal Commission estimates will require the full-time attention of one staff member, at an ongoing annual cost of $215,000 (General Fund).
According to the Legislative Analyst’s Office, the General Fund faces a structural deficit in the tens of billions of dollars over the next several fiscal years.”
SUPPORT: (Verified 8/27/24)
City of Del Mar
RideSD
San Juan Capistrano Chamber of Commerce
SanDiego350
OPPOSITION: (Verified 8/27/24)
The Surf Line Trail
ARGUMENTS IN SUPPORT:
City of Del Mar writes, "SB 1098 addresses these long-term challenges by creating both state and locally driven paths forward. The state will lead by identifying and prioritizing capital improvement projects and recommended changes to state policies that result in improved outcomes for the corridor. Local agencies will identify consensus-driven recommendations for how the region can best build a strong foundation for making the corridor successful."
ARGUMENTS IN OPPOSITION:
The Surf Line Trail writes, "We oppose the establishment of the contemplated working group unless an independent comparative cost-benefit analysis that includes a rail-to-trail option. The coastal railroad "emperor" has been wearing no clothes for some time. Reasoned citizens can see this clearly. We ask our legislators to objectively consider the facts. Taxpayer dollars should be used instead to fund electric buses and study alternate routes instead of shoveling boulders onto a fragile coast in a futile war with Mother Nature."
ASSEMBLY FLOOR: 73-1, 8/26/24
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Connolly, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, Mathis, Muratsuchi, Stephanie Nguyen, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Robert Rivas
NOES: McKinnor
NO VOTE RECORDED: Cervantes, Chen, McCarty, Ortega, Soria
Prepared by: Benjamin O'Brien-Hokanson / TRANS. / (916) 651-4121
8/27/24 12:09:16
**** END ****
SENATE THIRD READING
STR Bill Id:SB 1098
Author:(Blakespear)
As Amended Ver:August 19, 2024
Majority vote
SUMMARY
Requires the Secretary of the California State Transportation Agency (CalSTA) to convene a working group regarding the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor, develop recommendations, and regularly report to the Legislature on this topic.
Major Provisions
- Requires CalSTA, with assistance from the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency to submit a report regarding the LOSSAN Rail Corridor to the Legislature no later than two years after the Legislature appropriates funds for this purpose. In preparation of the report, the Secretary of CalSTA shall consult existing plans and studies, may consult with other state agencies, and shall report on funding status, shortfalls, and completion schedules for projects identified in the report. The report shall include all of the following information:
- A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the LOSSAN Rail Corridor;
- Prioritized capital improvement projects in the corridor necessary to improve current services and achieve service growth, performance, and network goals;
- Prioritized improvement projects for both natural resources and transportation infrastructure resiliency;
- A description of administrative actions taken by CalSTA to improve the operations and performance of the corridor;
- Recommendations for the LOSSAN Rail Corridor to connect with other passenger rail services;
- Strategies to support and improve existing rail service and increase ridership;
- Recommendations to achieve zero-emission state-supported intercity service;
- Strategies and recommendations to support coastal hazard resiliency planning in the LOSSAN Rail Corridor; and,
- A description of coordination activities through the federal Corridor Identification and Development Program.
- Requires CalSTA convene a working group regarding the LOSSAN Rail Corridor including, but not limited to, the following representatives:
- LOSSAN Rail Corridor track owners;
- LOSSAN Rail Corridor operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services;
- County Transportation Commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura;
- Metropolitan Planning Organizations (MPOs) for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura;
- Business, community, transportation, environmental, labor, and civic organizations;
- The California Coastal Commission; and,
- The California Department of Transportation (Caltrans) Division of Rail and Mass Transportation.
- Requires the working group to submit consensus recommendations and feedback in a report to the Legislature, on or before February 1, 2026, including all of the following:
- Strategies to increase rail service coordination and reduce disruptions or delays;
- Alternative management and operations models or structures that improve intercity and regional rail services;
- Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services; and,
- Coordination of planning and project development through the Federal Corridor Identification and Development Program to streamline processes and expand opportunities for federal capital funding.
- Requires CalSTA, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on the performance of the LOSSAN Rail Corridor, no later than three years after an appropriation is made by the Legislature for purposes of the performance report, and biennially thereafter, that includes all of the following information:
- Performance, ridership, usage, and quality of rail services;
- Updates to capital improvement planning;
- Progress in delivering fleet and infrastructure improvement projects;
- Improvements to service and fare coordination;
- Opportunities to increase the quality and frequency of services;
- Updates to technical information, studies, reports, or research relating to planning, operations, or maintenance of rail service; and,
- Updates on corridor resiliency, prepared in coordination with the California Coastal Commission, including the status of current and planned development projects in the coastal zone and an analysis of environmental conditions.
- Requires CalSTA to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor. These responsibilities shall include planning, as needed, for any of the following:
- Service frequencies;
- Equipment and fleet management;
- Infrastructure improvement and state-of-good repair projects; and,
- Resiliency of the corridor.
- Finds and declares that a special statute is necessary because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
COMMENTS
The LOSSAN Rail Corridor Agency operates the Pacific Surfliner—a 351-mile coastal corridor train that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Pre-pandemic, the Pacific Surfliner had 26 daily trains and an annual ridership of nearly three million.
In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the North County Transit District (NCTD) Coaster commuter rail, Metrolink, the (Burlington Northern Sante Fe (BNSF) railway, and the Union Pacific railroad. The LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators, and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
Unstable tracks. The LOSSAN corridors suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time. Several corridor stakeholders including the Orange County Transportation Authority (OCTA) North County Transit District (NCTD), and San Diego Association of Governments (SANDAG) have conducted emergency projects to stabilize the corridor as well as producing their own studies and reports on segments of the corridor they own.
Since 2016, the state has provided about $3.2 billion through various grant programs for the corridor. Additionally, in 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the Corridor and chaired by the author of this bill, Senator Catherine Blakespear (D-Encinitas).
This bill requires stakeholders of the LOSSAN corridor to come together to make recommendations on various topics to help ensure the future success and resiliency of the corridors. This bill also serves to empower CalSTA as a convener within the corridor to build and maintain stakeholder relationships that will be critical for the corridor moving forward.
It is also important to consider the role these reports will play in the context of other ongoing or recently completed studies and reports initiated by the LOSSAN Agency and other corridor stakeholders. These ongoing reports and studies include: the LOSSAN Rail Optimization Study, published in 2021; the Southern California Association of Governments (SCAG) Integrated Passenger and Freight Rail Forecast Study published in 2022; the LOSSAN Agency Business Plan published annually; the SANDAG Rail Realignment and Infrastructure Development Plan; and the Orange County Coastal Rail Resiliency Study. While these reports and studies consider the LOSSAN Rail Corridor, none of them convene input from all state or local stakeholder groups to develop a shared vision and understanding of roles.
According to the Author
"In Southern California, the 351-mile rail corridor referred to as the Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor connects six counties and includes 14.3 million residents in station catchment areas. The corridor supports Pacific Surfliner, Metrolink, and COASTER passenger rail service and freight service operated by BNSF and Union Pacific. Extreme weather events, sea level rise, and coastal erosion are threatening the line and provoking track closures and suspended service. Management of the rail line, which has multiple different owners and several separate agencies operating on it, lacks clear coordination and a unified vision. In order to help meet the state’s mobility, air quality, environmental, and resource management goals, the rail line must significantly improve service and boost ridership. SB 1098 lays the foundation for this by requiring coordinated planning, management, and action that benefits all stakeholders."
Arguments in Support
City of Del Mar writes, "SB 1098 addresses these long-term challenges by creating both state and locally driven paths forward. The state will lead by identifying and prioritizing capital improvement projects and recommended changes to state policies that result in improved outcomes for the corridor. Local agencies will identify consensus-driven recommendations for how the region can best build a strong foundation for making the corridor successful."
Arguments in Opposition
The Surf Line Trail writes, "We oppose the establishment of the contemplated working group unless an independent comparative cost-benefit analysis that includes a rail-to-trail option. The coastal railroad "emperor" has been wearing no clothes for some time. Reasoned citizens can see this clearly. We ask our legislators to objectively consider the facts. Taxpayer dollars should be used instead to fund electric buses and study alternate routes instead of shoveling boulders onto a fragile coast in a futile war with Mother Nature."
FISCAL COMMENTS
According to the Assembly Appropriations Committee:
"The main work created by this bill will fall to CalSTA and the Department of Transportation (Caltrans), which estimate costs will be $2 million in the first year for two positions (approximately $400,000) and a related contract with an outside consultant, followed by annual ongoing costs thereafter of approximately $1 million, again for two positions and a contract with an outside consultant (special funds).
Similarly, this bill will create ongoing work for the California Environmental Protection Agency (Cal EPA) and the Natural Resources Agency to consult with CalSTA on the report, likely in the tens of thousands of dollars in staff costs to each agency annually (special funds).
The bill also directs the Coastal Commission, specifically, to participate in the working group convened by CalSTA, which the Coastal Commission estimates will require the full-time attention of one staff member, at an ongoing annual cost of $215,000 (General Fund).
According to the Legislative Analyst's Office, the General Fund faces a structural deficit in the tens of billions of dollars over the next several fiscal years."
VOTES
SENATE FLOOR: 38-0-2
YES: Alvarado-Gil, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Stern, Umberg, Wahab, Wiener, Wilk
ABS, ABST OR NV: Allen, Archuleta
ASM TRANSPORTATION: 15-0-0
YES: Wilson, Davies, Aguiar-Curry, Berman, Juan Carrillo, Hart, Hoover, Jackson, Lowenthal, Papan, Sanchez, Ting, Wallis, Ward, Wicks
ASM APPROPRIATIONS: 11-0-4
YES: Wicks, Arambula, Bryan, Calderon, Wendy Carrillo, Mike Fong, Grayson, Haney, Hart, Pellerin, Villapudua
ABS, ABST OR NV: Sanchez, Dixon, Jim Patterson, Ta
UPDATED
VERSION: August 19, 2024
CONSULTANT: Julia Kingsley / TRANS. / (916) 319-2093 FN: 0004128
Date of Hearing: August 7, 2024
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1098
Author:(Blakespear) – As Amended Ver:May 16, 2024
Policy Committee: | Transportation | Vote: | 15 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: Yes
SUMMARY:
This bill requires the Secretary of Transportation, by January 1, 2026 and in consultation with Secretary for Environmental Protection and the Secretary of the Natural Resources Agency, to submit a report to the Legislature regarding the Los Angeles–San Luis Obispo–San Diego (LOSSAN) Rail Corridor, and to submit a report every two years on performance of the rail corridor.
The bill requires the report, generally, to include a summary of baseline conditions of the rail corridor, a description of actions taken by the California Transportation Agency (CalSTA) to improve operations and performance of the corridor, improvement projects and recommendations to improve current and anticipated service, ensure resiliency, connect with other passenger rail services, and achieve certain environmental goals.
The bill also requires the CalSTA to convene a working group of specified stakeholders—LOSSAN Rail Corridor track owners; LOSSAN Rail Corridor passenger and freight rail operators; the county transportation commissions for the counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura; the metropolitan planning organizations for those same counties; business, community, transportation, environmental, labor, and civic organizations, and the California Coastal Commission—that is to submit recommendations to the Secretary of Transportation for inclusion in the report, developed after meaningful public engagement led by the working group.
In addition, the bill requires the Secretary of Transportation, by January 1, 2027, and every two years thereafter, and in coordination with stakeholders responsible for operating rail service along the LOSSAN Rail Corridor, to submit a report to the Legislature on the performance of the rail corridor.
FISCAL EFFECT:
The main work created by this bill will fall to CalSTA and the Department of Transportation (Caltrans), which estimate costs will be $2 million in the first year for two positions (approximately $400,000) and a related contract with an outside consultant, followed by annual ongoing costs thereafter of approximately $1 million, again for two positions and a contract with an outside consultant (special funds).
Similarly, this bill will create ongoing work for the California Environmental Protection Agency (Cal EPA) and the Natural Resources Agency to consult with CalSTA on the report, likely in the tens of thousands of dollars in staff costs to each agency annually (special funds).
The bill also directs the Coastal Commission, specifically, to participate in the working group convened by CalSTA, which the Coastal Commission estimates will require the full-time attention of one staff member, at an ongoing annual cost of $215,000 (General Fund).
According to the Legislative Analyst’s Office, the General Fund faces a structural deficit in the tens of billions of dollars over the next several fiscal years.
COMMENTS:
- Purpose. The author intends this bill to lead to better management of the LOSSAN rail line, which the author describes as lacking “coordination and a clear vision.” According to the author:
Extreme weather events, sea level rise, and coastal erosion are threatening the line and provoking track closures and suspended service. Management of the rail line, which has multiple different owners and several separate agencies operating on it, lacks clear coordination and a unified vision. In order to help meet the state’s mobility, air quality, environmental, and resource management goals, the rail line must significantly improve service and boost ridership. SB 1098 lays the foundation for this by requiring coordinated planning, management, and action that benefits all stakeholders.
- Background. State law defines several intercity rail corridors, among them the San Diego-Los Angeles-San Luis Obispo intercity passenger rail corridor, defined in statute as the LOSSAN Rail Corridor. The state-supported Pacific Surfliner intercity passenger rail service operates on the LOSSAN Rail Corridor and is the busiest intercity passenger rail service in the country.
Statute authorizes the LOSSAN Rail Corridor Agency to oversee operation of the Pacific Surfliner and to increase ridership, revenue, capacity, reliability, coordination and safety on the LOSSAN Rail Corridor. The agency is a joint powers authority composed of 11 voting members representing rail owners, operators, and planning agencies along the corridor. The Orange County Transportation Authority (OCTA) serves as the managing agency for the LOSSAN Rail Corridor Agency and provides management and administrative support to the agency.
State law requires the LOSSAN Rail Corridor Agency produce an annual business plan and submit it to the California State Transportation Agency (CalSTA) by April 1 of each year. The plan must include:
- A report on the recent as well as historical performance of the corridor service.
- An overall operating plan including proposed service enhancements to increase ridership and provide for increased traveler demands in the corridor for the upcoming year.
- Short-term and long-term capital improvement programs.
- Funding requirements for the upcoming fiscal year.
- An action plan with specific performance goals and objectives.
The tracks of the LOSSAN Rail Corridor, in many places, run directly adjacent to the coast. For much of 2021 and 2022, rail service on the corridor was suspended in the face of repeated landslides and rockslides that pushed the rails dangerously seaward.
Corridor managers undertook emergency actions to stabilize the land under the rails, at least temporarily, and the Pacific Surfliner has resumed services.
As noted in the description of the bill’s fiscal effect, CalSTA and Caltrans will require resources to complete the requirements of this bill. Nonetheless, CalSTA warns it would be unlikely to complete the tasks assigned by this bill within the timelines prescribed by the bill.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: June 17, 2024
ASSEMBLY COMMITTEE ON TRANSPORTATION
Lori D. Wilson, Chair
SBPCA Bill Id:SB 1098
Author:(Blakespear) – As Amended Ver:May 16, 2024
SENATE VOTE: 38-0
SUBJECT: Passenger and freight rail: LOSSAN Rail Corridor
SUMMARY: Requires the Secretary of the California State Transportation Agency (CalSTA) to convene a working group regarding the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor and develop recommendations and regularly report to the Legislature on this topic. Specifically, this bill:
- Requires the CalSTA, in consultation with the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency to submit a report to the Legislature by January 1, 2026, regarding the LOSSAN Rail Corridor, which utilizes existing plans and studies, involves consultation with other state agencies, reports on funding status, shortfalls, and completion schedules for projects identified in the report, and include all of the following information:
- A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the LOSSAN Rail Corridor;
- Prioritized capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth;
- Prioritized improvement projects;
- A description of administrative actions taken by CalSTA to improve the operations and performance of the corridor;
- Recommendations for the LOSSAN Rail Corridor to connect with other passenger rail services;
- Strategies to support and improve existing rail service and increase ridership;
- Recommendations to achieve zero-emission state-supported equipment;
- Strategies and recommendations to support coastal hazard resiliency planning in the LOSSAN Rail Corridor; and,
- Recommendations and information regarding any actions taken in response to those recommendations received from the working group.
- Requires CalSTA convene a working group regarding the LOSSAN Rail Corridor including, but not limited to, the following representatives:
- LOSSAN Rail Corridor track owners;
- LOSSAN Rail Corridor operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services;
- County Transportation Commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura;
- Metropolitan Planning Organizations (MPOs) for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura;
- Business, community, transportation, environmental, labor, and civic organizations; and,
- The California Coastal Commission.
- Requires the working group to submit recommendations to CalSTA to be included in the report the Legislature. The recommendations shall include all of the following:
- Dedicated and formula funding distributions available for passenger rail operations;
- Strategies to increase rail service coordination and reduce disruptions or delays;
- Alternative management and operations models or structures that improve intercity and regional rail services;
- Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services;
- Opportunities for rail to accelerate and support equity, safety, sustainability, and economic development goals;
- Opportunities for MPOs to analyze, describe, and report progress in operating, maintaining, and improving the corridor;
- Opportunities for MPOs to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor;
- Improving connections to existing and planned public transit services;
- Strategies that increase ridership and utilization of rail services; and,
- Strategies to coordinate fleet equipment planning and management.
- Requires the CalSTA, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
- Performance, ridership, usage, and quality of rail services;
- Updates to capital improvement planning;
- Progress in delivering fleet and infrastructure improvement projects;
- Improvements to service and fare coordination;
- Opportunities to increase the quality and frequency of services; and,
- Opportunities on corridor resiliency, prepared in coordination with the California Coastal Commission.
- Requires the CalSTA to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor. These responsibilities shall include planning, as needed, for any of the following:
- Service frequencies;
- Equipment and fleet management;
- Infrastructure improvement and state-of-good repair projects; and,
- Resiliency of the corridor, including coordination with the California Coastal Commission as it relates to the California coastal zone.
- Finds and declares that a special statute is necessary because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
EXISTING LAW:
- Establishes the LOSSAN Rail Corridor Agency, also known as the LOSSAN Agency, as an existing joint powers authority (JPA) established to provide an organization capable of implementing the recommendations contained in the State Rail Corridor Study Group’s June 1987 report entitled “Los Angeles-San Diego State Rail Corridor Study” and undertaking related efforts to improve intercity services and facilities in the corridor and to coordinate subcorridor commuter rail services with intercity services. (Government Code (GOV) 14072)
- Authorizes the California Department of Transportation (Caltrans) to contract with the National Railroad Passenger Corporation (Amtrak) for intercity rail passenger services. (GOV 14070.6)
- Authorizes the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service (GOV 14070.7).
- Authorizes Caltrans, subject to approval of the CalSTA, to enter into an interagency transfer agreement under which a JPA assumes responsibility for administering the state-supported intercity passenger rail service, and associated feeder bus service, in a particular corridor. (GOV 14070.4)
- Requires the preparation of an annual Business Plan, due to the CalSTA by April 1 every year, for the corridor by each participating JPA board of directors. (GOV 14070.4)
FISCAL EFFECT:
According to the Senate Committee on Appropriations:
“According to the Senate Appropriations Committee, CalSTA estimates costs of approximately $2 million in the first year and approximately $1 million annually thereafter for 2.0 PY of staff and consulting services to complete the one-time report, and for ongoing resources to complete the biennial reporting, provide ongoing guidance and recommendations to ensure LOSSAN Corridor performance. (State Highway Account)
Unknown CalSTA costs, potentially in the low- to mid-hundreds of thousands of dollars to convene the specified working group and act as the lead agency in the preparation of recommendations to ensure long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor. (State Highway Account)
Staff estimates costs would be in the minor to moderate range for the Secretary for Environmental Protection (CalEPA) and the Secretary of the Natural Resources Agency (CNRA) to coordinate with CalSTA in the preparation of the one-time report on the LOSSAN Corridor. (Various funds)
Ongoing significant cost pressures and potential redirection of funds for new capital improvement projects and/or resiliency improvement projects in the LOSSAN Corridor, depending on the recommendations specified in this bill’s required reports. To the extent this bill results in increased funding for projects in the LOSSAN Corridor, there could be decreased funding available for future capital projects or increased service levels elsewhere in the state rail system. (Various transportation funds and/or climate resiliency funding sources)”
COMMENTS: The LOSSAN Rail Corridor Agency operates the Pacific Surfliner—a 351-mile coastal corridor train that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Pre-pandemic, the Pacific Surfliner had 26 daily trains and an annual ridership of nearly 3 million.
In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the North County Transit District (NCTD) Coaster commuter rail, Metrolink, the (Burlington Northern Sante Fe (BNSF) railway, and the Union Pacific railroad. The LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators, and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
Unstable tracks. The LOSSAN corridors suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time. Several corridor stakeholders including the Orange County Transportation Authority (OCTA) North County Transit District (NCTD), and San Diego Association of Governments (SANDAG) have conducted emergency projects to stabilize the corridor as well as producing their own studies and reports on segments of the corridor they own.
Since 2016, the state has provided about $3.2 billion through various grant programs for the corridor. Additionally, in 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the Corridor and chaired by the author of this bill, Senator Catherine Blakespear (D-Encinitas).
This bill requires stakeholders of the LOSSAN corridor to come together to make recommendations on various topics to help ensure the future success and resilience of the corridor. This bill also serves to empower CalSTA as a convener within the corridor to build and maintain stakeholder relationships that will be critical for the corridor moving forward.
It is also important to consider the role these reports will play in the context of other ongoing or recently completed studies and reports initiated by the LOSSAN Agency and other corridor stakeholders. These ongoing reports and studies include: the LOSSAN Rail Optimization Study, published in 2021; the Southern California Association of Governments (SCAG) Integrated Passenger and Freight Rail Forecast Study published in 2022; the LOSSAN Agency Business Plan published annually; the SANDAG Rail Realignment and Infrastructure Development Plan; and the Orange County Coastal Rail Resiliency Study. While these reports and studies consider the LOSSAN Rail Corridor, none of them convene input from all state or local stakeholder groups to develop a shared vision and understanding of roles.
According to the author, “In Southern California, the 351-mile rail corridor referred to as the Los Angeles – San Diego – San Luis Obispo (LOSSAN) Rail Corridor connects six counties and includes 14.3 million residents in station catchment areas. The corridor supports Pacific Surfliner, Metrolink, and COASTER passenger rail service and freight service operated by BNSF and Union Pacific. Extreme weather events, sea level rise, and coastal erosion are threatening the line and provoking track closures and suspended service. Management of the rail line, which has multiple different owners and several separate agencies operating on it, lacks clear coordination and a unified vision. In order to help meet the state’s mobility, air quality, environmental, and resource management goals, the rail line must significantly improve service and boost ridership. SB 1098 lays the foundation for this by requiring coordinated planning, management, and action that benefits all stakeholders.”
In support, the City of Del Mar writes, “SB 1098 addresses these long-term challenges by creating both state and locally driven paths forward. The state will lead by identifying and prioritizing capital improvement projects and recommended changes to state policies that result in improved outcomes for the corridor. Local agencies will identify consensus-driven recommendations for how the region can best build a strong foundation for making the corridor successful.”
In opposition, The Surf Line Trail writes, “We oppose the establishment of the contemplated working group unless an independent comparative cost-benefit analysis that includes a rail-to-trail option. The coastal railroad “emperor” has been wearing no clothes for some time. Reasoned citizens can see this clearly. We ask our legislators to objectively consider the facts. Taxpayer dollars should be used instead to fund electric buses and study alternate routes instead of shoveling boulders onto a fragile coast in a futile war with Mother Nature.”
Previous legislation. SB 677 (Blakespear), Chapter 407, Statutes of 2023 requires the LOSSAN Rail Corridor Agency to include in its annual business plan a description of the effects of climate change, including sea level rise and weather-related events, on the corridor.
SB 1225 (Padilla), Chapter 802, Statutes of 2012 authorizes Caltrans to enter into a transfer of services agreement with the Los Angeles-San Diego Corridor Agency for the provision of intercity passenger rail service in the corridor.
AB 1779 (Galgiani), Chapter 801, Statutes of 2012 authorizes Caltrans with approval of the Secretary of the Business, Transportation and Housing Agency, to enter into interagency transfer agreements for additional intercity rail corridors, to be entered into between June 30, 2014, and June 30, 2015, and authorizes Caltrans to enter into a transfer of services agreement with a Joint Powers Authority (JPA) to administer the state-contracted Amtrak service operating between the San Joaquin Valley, the San Francisco Bay Area, and Sacramento.
REGISTERED SUPPORT / OPPOSITION:
Support
City of Del Mar
RideSD
San Juan Capistrano Chamber of Commerce
Sandiego350
Support If Amended
Capo Cares
Streets for All
Oppose Unless Amended
The Surf Line Trail
Analysis Prepared by: Julia Kingsley / TRANS. / (916) 319-2093
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1098 |
THIRD READING
Bill No: SB 1098
Author: Blakespear (D), et al.
Amended: 5/16/24
Vote: 21
SENATE TRANSPORTATION COMMITTEE: 14-0, 4/9/24
AYES: Cortese, Niello, Allen, Archuleta, Becker, Blakespear, Dodd, Gonzalez, Limón, Newman, Nguyen, Portantino, Seyarto, Umberg
NO VOTE RECORDED: Dahle
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/16/24
AYES: Caballero, Jones, Ashby, Becker, Bradford, Seyarto, Wahab
SUBJECT: Passenger and freight rail: LOSSAN Rail Corridor
SOURCE: Author
DIGEST:
This bill requires: (1) the Secretary of the California State Transportation Agency (CalSTA), to submit a report, as specified, on or before January 1, 2026, regarding the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor; (2) CalSTA to convene a Working Group of LOSSAN corridor stakeholders, as specified, to develop and submit specified recommendations for inclusion in the report to the Legislature regarding long-term viability and coordination of rail service on the corridor; (3) CalSTA, in coordination with LOSSAN Rail Corridor operating stakeholders, to submit a report, as specified, on or before January 1, 2027, and biennially thereafter, on the management of the LOSSAN Rail Corridor; and (4) CalSTA provide strategic guidance, recommendations, and facilitation of all necessary coordination, collaboration, and intervention between stakeholders, to ensure the performance of the LOSSAN Rail Corridor.
ANALYSIS:
Existing law:
- Authorizes the California Department of Transportation (Caltrans) to contract with the National Railroad Passenger Corporation (Amtrak) for intercity rail passenger services.
- Provides funding for intercity passenger rail service from a portion of the sales tax on diesel fuel through the Public Transportation Account.
- Authorizes the Captiol Corridor Joint Powers Agreement (JPA), San Joaquin JPA, and the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service.
- Authorizes Caltrans, subject to approval of the CalSTA, to enter into an interagency transfer agreement under which a JPA assumes responsibility for administering the state-supported intercity passenger rail service, and associated feeder bus service, in a particular corridor.
- Defines the boundaries of the three intercity rail corridors. Defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo.
- Requires the preparation of an annual Business Plan, due to the CalSTA by April 1 every year, for the corridor by each participating JPA board of directors.
This bill:
- Requires the CalSTA, in consultation with the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency to submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor. This report shall utilize existing plans and studies, as specified, involve consultation with other state agencies as needed led by the secretaries listed above, report on funding status, shortfalls, and completion schedules for projects identified in the report, and include all of the following information:
- A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
- Prioritized capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth consistent with the State Rail Plan.
- Prioritized improvement projects in the corridor necessary to ensure the resiliency of natural resources and transportation infrastructure.
- A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve the operations and performance of the corridor.
- Recommendations for the corridor to connect with other passenger rail services.
- Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
- Recommendations to achieve zero-emission state-supported equipment, including an analysis of recommended technologies and necessary infrastructure.
- Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
- Recommendations and information regarding any actions taken in response to those recommendations received from the working group.
- Requires that the CalSTA convene a Working Group including, but not limited to:
- LOSSAN corridor track owners.
- LOSSAN corridor rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
- County Transportation Commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura.
- Metropolitan Planning Organizations (MPOs) for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
- Business, community, transportation, environmental, labor, and civic organizations.
- The California Coastal Commission.
- Requires the Working Group to submit recommendations to the secretary of Transportation for inclusion in the report required above. The recommendations shall be developed with meaningful public engagement led by the Working Group. The Working Group must also consider the known and expected impacts of recommendations on the coastal environment and local communities when making recommendations. Before submitting the recommendations to the secretary, the Working Group shall submit them to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority (Metrolink), and the North County Transit District (NCTD), for review and consideration. The recommendations shall include all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
- Dedicated and formula funding distributions available for passenger rail operations, including intercity and regional rail services along the corridor.
- Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and condition of assets, reduced track closures, and greater on-time performance.
- Alternative management and operations models or structures that improve intercity and regional rail services.
- Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures.
- Opportunities for rail to accelerate and support equity, safety, sustainability, and economic development goals.
- Opportunities for MPOs to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to the each MPOs regional transportation plan.
- Opportunities for MPOs to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to each MPOs regional transportation plan.
- Improving connections to existing and planned public transit services.
- Strategies that increase ridership and utilization of rail services.
- Strategies to coordinate fleet equipment planning and management.
- Requires the CalSTA, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
- Performance, ridership, usage, and quality of rail services.
- Updates to capital improvement planning.
- Progress in delivering fleet and infrastructure improvement projects.
- Improvements to service and fare coordination.
- Opportunities to increase the quality and frequency of services.
- Opportunities on corridor resiliency, prepared in coordination with the California Coastal Commission.
- Requires the CalSTA to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor. These responsibilities shall include planning, as needed, for any of the following:
- Service frequencies.
- Equipment and fleet management.
- Infrastructure improvement and state-of-good repair projects.
- Resiliency of the corridor, including coordination with the California Coastal Commission as it relates to the California coastal zone.
- Finds and declares that a special statute is necessary because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
- Declares this bill may constitute a reimbursable mandate.
Comments
- Purpose of the bill. According to the author, “The LOSSAN coastal rail corridor that operates between San Luis Obispo and San Diego is at critical risk of resiliency and performance challenges. The rail line is used for Amtrak intercity services managed by the LOSSAN Rail Corridor Agency and regional Metrolink and COASTER services managed by local JPAs. Additionally, the corridor is strategically important for freight and military purposes. However, since 2021, passenger and freight service has been suspended five times due to emergency track closures. The state of California cannot achieve its mobility, environmental, and quality of life goals while service disruptions and delays continue to impact ridership. SB 1098 aligns state and local action by requiring action plans and recommendations that result in improved services for passengers.”
- Intercity Rail - Pacific Surfliner. The Pacific Surfliner service is a 351-mile coastal corridor that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Pre-pandemic, the Pacific Surfliner had 26 daily trains and an annual ridership of nearly 3 million.
Prior to 2012, Caltrans Division of Rail and Mass Transit managed and funded two of the three intercity rail services within the state - the Pacific Surfliner and the San Joaquins. During the 2011-12 Legislative Session, SB 1225 (Padilla, Chapter 802, Statutes of 2012), and AB 1779 (Galgiani, Chapter 801, Statutes of 2012), authorized the transfer of responsibility of Pacific Surfliner and San Joaquins, respectively, to JPA managing agencies and, among other provisions, defined the service boundaries within each region. Caltrans remains responsible for providing state funding for each intercity rail line.
In California, the three intercity rail lines are funded from a portion of the sales tax on diesel fuel, which was roughly $130 million for the 2021-22 fiscal year. With the passage of SB 1 (Beall, Chapter 5, Statutes of 2017), the three intercity rail providers also receive an additional roughly $20 million per year for capital and operations support from the State Rail Assistance (SRA) program. Additionally, there are other funding sources for capital improvements for intercity rail including the Transit Intercity Rail Capital Program (TIRCP) and the Interregional Transportation Improvement Program (ITIP).
- LOSSAN Rail Corridor Agency. The LOSSAN Rail Corridor Agency runs the Pacific Surfliner service a 351-mile coastal corridor that runs from San Diego to San Luis Obispo. In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the NCTD Coaster commuter rail, Metrolink, the BNSF railway, and the Union Pacific railroad. The LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Based on numbers from FY 2023, ridership across these services totaled 3.74 million. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators, and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego. As required by SB 1225, and the terms of the interagency transfer agreement, the LOSSAN Agency must submit an annual business plan by April 1 of each year to CalSTA.
- Corridor of Concern. As noted by the author, the LOSSAN corridor, which runs directly on the coast in many areas, is suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time. Several corridor stakeholders including the Orange County Transportation Authority (OCTA) NCTD, and San Diego Association of Governments (SANDAG) have conducted emergency projects to stabilize the corridor as well as producing their own studies and reports on segments of the corridor they own.
Since 2016 the state has provided about $3.2 billion through various grant programs for the corridor. Additionally, in 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the Corridor and chaired by the author, California State Senator Catherine Blakespear (D-Encinitas).
The LOSSAN Rail Corridor is a complex system facing many challenges and containing many competing stakeholders. This requires these different groups to come together and produce reports and recommendations that will help understand the current state of the corridor, define roles, and generate state and local plans for the future success and resilience of the corridor. This bill also serves to empower CalSTA as a convener within the corridor to build and maintain stakeholder relationships that will be critical for the corridor moving forward.
It is also important to consider the role these reports will play in the context of other ongoing or recently completed studies and reports initiated by the LOSSAN Agency and other corridor stakeholders. These ongoing reports and studies include: (a) the LOSSAN Rail Optimization Study, published in 2021; (b) the Southern California Association of Governments (SCAG) Integrated Passenger and Freight Rail Forecast Study published in 2022; (c) the LOSSAN Agency Business Plan published annually; (d) the SANDAG Rail Realignment and Infrastructure Development Plan; and (e) the Orange County Coastal Rail Resiliency Study. While these reports and studies consider the LOSSAN Rail Corridor, none of them convene input from all state or local stakeholder groups to develop a shared vision and understanding of roles.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, CalSTA estimates costs of approximately $2 million in the first year and approximately $1 million annually thereafter for 2.0 PY of staff and consulting services to complete the one-time report, and for ongoing resources to complete the biennial reporting, provide ongoing guidance and recommendations to ensure LOSSAN Corridor performance. (State Highway Account)
Unknown CalSTA costs, potentially in the low- to mid-hundreds of thousands of dollars to convene the specified working group and act as the lead agency in the preparation of recommendations to ensure long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor. (State Highway Account)
Staff estimates costs would be in the minor to moderate range for the Secretary for Environmental Protection (CalEPA) and the Secretary of the Natural Resources Agency (CNRA) to coordinate with CalSTA in the preparation of the one-time report on the LOSSAN Corridor. (various funds)
Ongoing significant cost pressures and potential redirection of funds for new capital improvement projects and/or resiliency improvement projects in the LOSSAN Corridor, depending on the recommendations specified in this bill’s required reports. To the extent this bill results in increased funding for projects in the LOSSAN Corridor, there could be decreased funding available for future capital projects or increased service levels elsewhere in the state rail system. (Various transportation funds and/or climate resiliency funding sources)
SUPPORT: (Verified 5/16/24)
RideSD
San Diego 350
San Juan Capistrano Chamber of Commerce
OPPOSITION: (Verified 5/16/24)
Prepared by: Benjamin O'Brien-Hokanson / TRANS. / (916) 651-4121
5/20/24 10:42:32
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anna Caballero, Chair
2023 - 2024 Regular Session
SB 1098 (Blakespear) - Passenger and freight rail: LOSSAN Rail Corridor
Version: March 20, 2024 | Policy Vote: TRANS. 14 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: May 16, 2024 | Consultant: Mark McKenzie |
Bill Summary:
SB 1098 would require the Secretary of the California Transportation Agency (CalSTA) to provide coordination, guidance, and recommendations to stakeholders to ensure the performance of the San Diego-Los Angeles-San Luis Obispo intercity rail corridor (LOSSAN Corridor). The bill would also require CalSTA to be the lead agency in preparing and submitting a one-time report, as well as a separate biennial report to the Legislature, as specified, regarding the LOSSAN Corridor. Lastly, the bill would require an unspecified entity to convene a specified working group and submit a one-time report with recommendations necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor.
*********** ANALYSIS ADDENDUM – SUSPENSE FILE ***********
The following information is revised to reflect amendments
adopted by the committee on May 16, 2024
Fiscal Impact:
- CalSTA estimates costs of approximately $2 million in the first year and approximately $1 million annually thereafter for 2.0 PY of staff and consulting services to complete the one-time report, and for ongoing resources to complete the biennial reporting, provide ongoing guidance and recommendations to ensure LOSSAN Corridor performance. (State Highway Account)
- Unknown CalSTA costs, potentially in the low- to mid-hundreds of thousands of dollars to convene the specified working group and act as the lead agency in the preparation of recommendations to ensure long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor. (State Highway Account)
- Staff estimates costs would be in the minor to moderate range for the Secretary for Environmental Protection (CalEPA) and the Secretary of the Natural Resources Agency (CNRA) to coordinate with CalSTA in the preparation of the one-time report on the LOSSAN Corridor. (various funds)
- Ongoing significant cost pressures and potential redirection of funds for new capital improvement projects and/or resiliency improvement projects in the LOSSAN Corridor, depending on the recommendations specified in this bill’s required reports. To the extent this bill results in increased funding for projects in the LOSSAN Corridor, there could be decreased funding available for future capital projects or increased service levels elsewhere in the state rail system. (Various transportation funds and/or climate resiliency funding sources)
Author Amendments:
- Specify that the Secretary of CalSTA is the entity responsible for convening the working group, add the California Coastal Commission to the working group, and delete the requirement for the working group to submit a report to the Legislature by January 1, 2026. Instead the working group would submit recommendations for inclusion in the one-time report to the Legislature that is due on January 1, 2026.
- Require the working group recommendations to include strategies to coordinate fleet equipment planning and management, and changes to statutes, rules, or funding necessary to improve the quality performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures.
- Require the working group to consider the known and expected impacts of recommendations on the coastal environment and local communities and consider opportunities to support the coastal zone and local communities.
- Delete Caltrans and the CTC from the groups that CalSTA must coordinate with in preparing the one-time report to the Legislature and instead authorize CalSTA, CNRA, and CalEPA to coordinate with any other state agency.
- Require the one-time report to include the following additional elements:
- A baseline summary of transportation and environmental conditions in existence along the rail corridor as of January 1, 2025.
- Strategies to increase ridership including a description of necessary operations funding for increased service frequencies.
- Recommendations to achieve zero-emission state-supported equipment including an analysis of recommended technologies and necessary infrastructure.
- Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
- Recommendations and information regarding any actions taken in response to the recommendations received from the working group.
- Require CalSTA to consider a specified report by the Coastal Conservancy regarding sea level rise planning in preparing the one-time report.
- Require CalSTA to include in the one-time report, relative to any projects identified in that report, all available funding sources, projected completion schedules for priority projects, current funding shortfalls, and recommended strategies and plans to address any funding shortfall.
- Require CalSTA’s biennial report to include updates on corridor resiliency prepared in coordination with the Coastal Commission, including updates on any projects identified in the LOSSAN Rail Corridor Agency’s annual business plan to increase climate resiliency in the corridor. These updates must include the status of current and planned development projects in the coastal zone and an analysis of environmental conditions.
- Make other clarifying changes.
-- END --
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1098 |
THIRD READING
Bill No: SB 1098
Author: Blakespear (D), et al.
Amended: 5/16/24
Vote: 21
SENATE TRANSPORTATION COMMITTEE: 14-0, 4/9/24
AYES: Cortese, Niello, Allen, Archuleta, Becker, Blakespear, Dodd, Gonzalez, Limón, Newman, Nguyen, Portantino, Seyarto, Umberg
NO VOTE RECORDED: Dahle
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/16/24
AYES: Caballero, Jones, Ashby, Becker, Bradford, Seyarto, Wahab
SUBJECT: Passenger and freight rail: LOSSAN Rail Corridor
SOURCE: Author
DIGEST: This bill (1) requires the Secretary of the California State Transportation Agency (CalSTA), to submit a report, as specified, on or before January 1, 2026, regarding the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor; (2) requires the CalSTA to convene a Working Group of LOSSAN corridor stakeholders, as specified, to develop and submit specified recommendations for inclusion in the report to the Legislature regarding long-term viability and coordination of rail service on the corridor; (3) requires the CalSTA, in coordination with LOSSAN Rail Corridor operating stakeholders, to submit a report, as specified, on or before January 1, 2027, and biennially thereafter, on the management of the LOSSAN Rail Corridor; and (4) requires that the CalSTA provide strategic guidance, recommendations, and facilitation of all necessary coordination, collaboration, and intervention between stakeholders, to ensure the performance of the LOSSAN Rail Corridor.
ANALYSIS:
Existing law:
- Authorizes the California Department of Transportation (Caltrans) to contract with the National Railroad Passenger Corporation (Amtrak) for intercity rail passenger services.
- Provides funding for intercity passenger rail service from a portion of the sales tax on diesel fuel through the Public Transportation Account.
- Authorizes the Captiol Corridor Joint Powers Agreement (JPA), San Joaquin JPA, and the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service.
- Authorizes Caltrans, subject to approval of the CalSTA, to enter into an interagency transfer agreement under which a JPA assumes responsibility for administering the state-supported intercity passenger rail service, and associated feeder bus service, in a particular corridor.
- Defines the boundaries of the three intercity rail corridors. Defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo.
- Requires the preparation of an annual Business Plan, due to the Secretary of Transportation by April 1 every year, for the corridor by each participating JPA board of directors.
This bill:
- Requires the CalSTA, in consultation with the Secretary for Environmental Protection and the Secretary of the Natural Resources Agency to submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor. This report shall utilize existing plans and studies, as specified, involve consultation with other state agencies as needed led by the secretaries listed above, report on funding status, shortfalls, and completion schedules for projects identified in the report, and include all of the following information:
- A baseline summary of transportation and environmental conditions in existence as of January 1, 2025, along the rail corridor.
- Prioritized capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth consistent with the State Rail Plan.
- Prioritized improvement projects in the corridor necessary to ensure the resiliency of natural resources and transportation infrastructure.
- A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve the operations and performance of the corridor.
- Recommendations for the corridor to connect with other passenger rail services.
- Strategies to support and improve existing rail service and increase ridership, including a description of necessary operations funding for increased service frequencies.
- Recommendations to achieve zero-emission state-supported equipment, including an analysis of recommended technologies and necessary infrastructure.
- Strategies and recommendations to support coastal hazard resiliency planning in the corridor.
- Recommendations and information regarding any actions taken in response to those recommendations received from the working group.
- Requires that the CalSTA convene a Working Group including, but not limited to:
- LOSSAN corridor track owners.
- LOSSAN corridor rail operators, including managing agencies, joint powers authorities, and transit districts responsible for rail services.
- County Transportation Commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura.
- Metropolitan Planning Organizations (MPOs) for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
- Business, community, transportation, environmental, labor, and civic organizations.
- The California Coastal Commission.
- Requires the Working Group to submit recommendations to the secretary of Transportation for inclusion in the report required above. The recommendations shall be developed with meaningful public engagement led by the Working Group. The Working Group must also consider the known and expected impacts of recommendations on the coastal environment and local communities when making recommendations. Before submitting the recommendations to the secretary, the Working Group shall submit them to the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority (Metrolink), and the North County Transit District (NCTD), for review and consideration. The recommendations shall include all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in, or that connect to, the LOSSAN Rail Corridor as of January 1, 2025:
- Dedicated and formula funding distributions available for passenger rail operations, including intercity and regional rail services along the corridor.
- Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by resiliency vulnerabilities, track closures, state of good repair, equipment, and staffing. The recommendations made pursuant to this subparagraph should result in improved maintenance and condition of assets, reduced track closures, and greater on-time performance.
- Alternative management and operations models or structures that improve intercity and regional rail services.
- Changes to state statutes, rules, or funding necessary to improve the quality, performance, usage, management, or frequency of passenger rail services with a focus on streamlining, clarifying, and improving existing processes or procedures.
- Opportunities for rail to accelerate and support equity, safety, sustainability, and economic development goals.
- Opportunities for MPOs to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to the each MPOs regional transportation plan.
- Opportunities for MPOs to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to each MPOs regional transportation plan.
- Improving connections to existing and planned public transit services.
- Strategies that increase ridership and utilization of rail services.
- Strategies to coordinate fleet equipment planning and management.
- Requires the CalSTA in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
- Performance, ridership, usage, and quality of rail services.
- Updates to capital improvement planning.
- Progress in delivering fleet and infrastructure improvement projects.
- Improvements to service and fare coordination.
- Opportunities to increase the quality and frequency of services.
- Opportunities on corridor resiliency, prepared in coordination with the California Coastal Commission.
- Requires the CalSTA to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor. These responsibilities shall include planning, as needed, for any of the following:
- Service frequencies.
- Equipment and fleet management.
- Infrastructure improvement and state-of-good repair projects.
- Resiliency of the corridor, including coordination with the California Coastal Commission as it relates to the California coastal zone.
- Finds and declares that a special statute is necessary because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
- Declares the bill may constitute a reimbursable mandate.
COMMENTS:
- Purpose of the bill. According to the author, “The LOSSAN coastal rail corridor that operates between San Luis Obispo and San Diego is at critical risk of resiliency and performance challenges. The rail line is used for Amtrak intercity services managed by the LOSSAN Rail Corridor Agency and regional Metrolink and COASTER services managed by local JPAs. Additionally, the corridor is strategically important for freight and military purposes. However, since 2021, passenger and freight service has been suspended five times due to emergency track closures. The state of California cannot achieve its mobility, environmental, and quality of life goals while service disruptions and delays continue to impact ridership. SB 1098 aligns state and local action by requiring action plans and recommendations that result in improved services for passengers.”
- Intercity Rail - Pacific Surfliner. The Pacific Surfliner service is a 351-mile coastal corridor that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Pre-pandemic, the Pacific Surfliner had 26 daily trains and an annual ridership of nearly 3 million.
Prior to 2012, Caltrans Division of Rail and Mass Transit managed and funded two of the three intercity rail services within the state - the Pacific Surfliner and the San Joaquins. During the 2011-12 Legislative Session, SB 1225 (Padilla, Chapter 802, Statutes of 2012), and AB 1779 (Galgiani, Chapter 801, Statutes of 2012), authorized the transfer of responsibility of Pacific Surfliner and San Joaquins, respectively, to JPA managing agencies and, among other provisions, defined the service boundaries within each region. Caltrans remains responsible for providing state funding for each intercity rail line.
In California, the three intercity rail lines are funded from a portion of the sales tax on diesel fuel, which was roughly $130 million for the 2021-22 fiscal year. With the passage of SB 1 (Beall, Chapter 5, Statutes of 2017), the three intercity rail providers also receive an additional roughly $20 million per year for capital and operations support from the State Rail Assistance (SRA) program. Additionally, there are other funding sources for capital improvements for intercity rail including the Transit Intercity Rail Capital Program (TIRCP) and the Interregional Transportation Improvement Program (ITIP).
- LOSSAN Rail Corridor Agency. The LOSSAN Rail Corridor Agency runs the Pacific Surfliner service a 351-mile coastal corridor that runs from San Diego to San Luis Obispo. In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the NCTD Coaster commuter rail, Metrolink, the BNSF railway, and the Union Pacific railroad. The LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Based on numbers from FY 2023, ridership across these services totaled 3.74 million. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators, and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego. As required by SB 1225, and the terms of the interagency transfer agreement, the LOSSAN Agency must submit an annual business plan by April 1 of each year to CalSTA.
- Corridor of Concern. As noted by the author, the LOSSAN corridor, which runs directly on the coast in many areas, is suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time. Several corridor stakeholders including the Orange County Transportation Authority (OCTA) NCTD, and San Diego Association of Governments (SANDAG) have conducted emergency projects to stabilize the corridor as well as producing their own studies and reports on segments of the corridor they own.
Since 2016 the state has provided about $3.2 billion through various grant programs for the corridor. Additionally, in 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the Corridor and chaired by the author, Senator Blakespear (D-Encinitas).
The LOSSAN Rail Corridor is a complex system facing many challenges and containing many competing stakeholders. SB 1098 requires these different groups to come together and produce reports and recommendations that will help understand the current state of the corridor, define roles, and generate state and local plans for the future success and resilience of the corridor. This bill would also serve to empower CalSTA as a convener within the corridor to build and maintain stakeholder relationships that will be critical for the corridor moving forward.
It is also important to consider the role these reports will play in the context of other ongoing or recently completed studies and reports initiated by the LOSSAN Agency and other corridor stakeholders. These ongoing reports and studies include: (1) the LOSSAN Rail Optimization Study, published in 2021; (2) the Southern California Association of Governments (SCAG) Integrated Passenger and Freight Rail Forecast Study published in 2022; (3) the LOSSAN Agency Business Plan published annually; (4) the SANDAG Rail Realignment and Infrastructure Development Plan; and (5) the Orange County Coastal Rail Resiliency Study. While these reports and studies consider the LOSSAN Rail Corridor, none of them convene input from all state or local stakeholder groups to develop a shared vision and understanding of roles.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, “CalSTA estimates costs of approximately $2 million in the first year and approximately $1 million annually thereafter for 2.0 PY of staff and consulting services to complete the one-time report, and for ongoing resources to complete the biennial reporting, provide ongoing guidance and recommendations to ensure LOSSAN Corridor performance. (State Highway Account)
Staff estimates costs would be in the minor to moderate range for the Secretary for Environmental Protection (CalEPA), the Secretary of the Natural Resources Agency (CNRA), and California Transportation Commission (CTC) to coordinate with CalSTA in the preparation of the one-time report on the LOSSAN Corridor. (various funds)
Unknown, significant costs, potentially in the low millions, for an unspecified entity to convene a specified working group and act as the lead agency in the preparation of the one-time working group report that provides recommendations to ensure long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor. (General Fund or special funds, depending on the unspecified entity’s operating funds)
Ongoing significant cost pressures and potential redirection of funds for new capital improvement projects and/or resiliency improvement projects in the LOSSAN Corridor, depending on the recommendations specified in this bill’s required reports. To the extent this bill results in increased funding for projects in the LOSSAN Corridor, there could be decreased funding available for future capital projects or increased service levels elsewhere in the state rail system. (Various transportation funds and/or climate resiliency funding sources)
SUPPORT: (Verified 5/16/24)
RideSD
San Juan Capistrano Chamber of Commerce
San Diego 350
OPPOSITION: (Verified 5/16/24)
The Surf Line Trail
Prepared by: Benjamin O'Brien-Hokanson / TRANS. / (916) 651-4121
5/18/24 14:48:51
**** END ****
SENATE COMMITTEE ON APPROPRIATIONS
Senator Anna Caballero, Chair
2023 - 2024 Regular Session
SB 1098 (Blakespear) - Passenger and freight rail: LOSSAN Rail Corridor
Version: March 20, 2024 | Policy Vote: TRANS. 14 - 0 |
Urgency: No | Mandate: Yes |
Hearing Date: April 22, 2024 | Consultant: Mark McKenzie |
Bill Summary:
SB 1098 would require the Secretary of the California Transportation Agency (CalSTA) to provide coordination, guidance, and recommendations to stakeholders to ensure the performance of the San Diego-Los Angeles-San Luis Obispo intercity rail corridor (LOSSAN Corridor). The bill would also require CalSTA to be the lead agency in preparing and submitting a one-time report, as well as a separate biennial report to the Legislature, as specified, regarding the LOSSAN Corridor. Lastly, the bill would require an unspecified entity to convene a specified working group and submit a one-time report with recommendations necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor.
Fiscal Impact:
- CalSTA estimates costs of approximately $2 million in the first year and approximately $1 million annually thereafter for 2.0 PY of staff and consulting services to complete the one-time report, and for ongoing resources to complete the biennial reporting, provide ongoing guidance and recommendations to ensure LOSSAN Corridor performance. (State Highway Account)
- Staff estimates costs would be in the minor to moderate range for the Secretary for Environmental Protection (CalEPA), the Secretary of the Natural Resources Agency (CNRA), and California Transportation Commission (CTC) to coordinate with CalSTA in the preparation of the one-time report on the LOSSAN Corridor. (various funds)
- Unknown, significant costs, potentially in the low millions, for an unspecified entity to convene a specified working group and act as the lead agency in the preparation of the one-time working group report that provides recommendations to ensure long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor. (General Fund or special funds, depending on the unspecified entity’s operating funds)
- Ongoing significant cost pressures and potential redirection of funds for new capital improvement projects and/or resiliency improvement projects in the LOSSAN Corridor, depending on the recommendations specified in this bill’s required reports. To the extent this bill results in increased funding for projects in the LOSSAN Corridor, there could be decreased funding available for future capital projects or increased service levels elsewhere in the state rail system. (Various transportation funds and/or climate resiliency funding sources)
Background:
In Southern California, the LOSSAN Rail Corridor Agency is a local joint powers authority (JPA) that runs the Pacific Surfliner service pursuant to an interagency transfer agreement with Caltrans. The Pacific Surfliner is a 351-mile coastal rail corridor that runs from San Diego to San Luis Obispo, travelling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Pre-COVID, the Pacific Surfliner had 26 daily trains (13 roundtrips) and an annual ridership of nearly 3 million. LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Additionally, the LOSSAN corridor is used for commuter rail service, transports $1 billion in goods via freight rail operators, and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
Existing law, and the interagency transfer agreement with Caltrans, requires the LOSSAN Agency to submit an annual business plan by April 1 of each year to the California State Transportation Agency. The primary purpose of the business plan is to identify the major goals and objectives for the LOSSAN agency’s management of the Pacific Surfliner, as well as the budget necessary to administer, market, and operate the service during the upcoming two-year period. The business plan also summarizes operations, service levels, budget, and capital improvements that have contributed to the success of the Pacific Surfliner service and identifies improvements to sustain and grow its success moving forward, including a Capital Improvement Program that includes details of planned corridor-wide capital projects and possible funding options, including federal and state funding. Existing law, as enacted by SB 677 (Blakespear), Chap. 407/2023, requires the LOSSAN Agency to include in its business plan a description of the effects of climate change, including sea level rise and weather-related events, on the corridor and how to adapt to its impacts. That bill also requires the Capital Improvement Program to identify specific projects that increase climate resiliency on the corridor, and discuss possible federal and state funding options for the projects.
The LOSSAN corridor, which runs directly on the coast in many areas, is suffering the climate impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for months at a time. Since 2021, passenger and freight service in the corridor has been suspended five times due to various emergency track closures.
Proposed Law:
SB 1098 requires the preparation and submittal of two one-time reports and one biennial report, as well as coordination among numerous state, regional, and local entities regarding the LOSSAN Corridor. Specifically, this bill would:
- Require CalSTA to provide guidance and recommendations to, and coordination among, stakeholders as necessary to ensure the performance of the LOSSAN Corridor, including planning for service frequencies, equipment and fleet management, infrastructure improvement and state-of-good repair projects, and resiliency of the corridor.
- Require CalSTA, in consultation with the Department of Transportation, CTC, CalEPA, and CNRA, to consult existing specified plans and studies and submit a report to the Legislature by January 1, 2026 regarding the LOSSAN Corridor that includes the following:
- Prioritized capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth consistent with the State Rail Plan.
- Prioritized resiliency improvement projects in the corridor necessary to ensure the safe and continued movement of trains.
- A description of administrative actions taken by CalSTA using existing authority before January 1, 2025, to improve the operations and performance of the corridor.
- Recommendations for the corridor to connect with other passenger rail services.
- Strategies to support and improve existing rail service and resiliency planning in the corridor.
- Require an unspecified entity to convene a working group that includes representatives from all of the following entities:
- LOSSAN Rail Corridor track owners.
- LOSSAN Rail Corridor passenger and freight rail operators.
- County transportation commissions for Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura Counties.
- The metropolitan planning organizations (MPOs) for those counties.
- Business, community, transportation, environmental, labor, and civic organizations.
- Require the working group to submit a report to the Legislature by January 1, 2026 that provides recommendations on the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Corridor:
- Dedicated and formula funding distributions available for passenger rail operations, including intercity and regional rail services along the corridor.
- Strategies to increase rail service coordination and reduce disruptions or delays, including those caused by climate resiliency, track closures, state of good repair, equipment, and staffing. These must improve maintenance and condition of assets, improve on-time performance, and reduce track closures.
- Alternative management and operations models or structures that improve intercity and regional rail services.
- Changes to state statutes, rules, or funding relating to intercity and regional rail services.
- Opportunities for rail to accelerate and support equity, safety, sustainability, zero-emissions, equipment, and economic development goals.
- Opportunities for MPOs to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or alternative planning strategies, as specified.
- Opportunities for MPOs to adopt multiregional goals relating to passenger and freight rail service, relevant capital improvement projects, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or alternative planning strategies, as specified.
- Improving connections to existing and planned public transit services.
- Strategies that increase ridership and utilization of rail services.
- This report must include meaningful public engagement led by the working group, and it must be reviewed by the governing boards of the LOSSAN Corridor Agency, the Southern California Regional Rail Authority, and the North County Transit District for review and approval before the working group submits the report to the Legislature.
- Require CalSTA, in coordination with stakeholders responsible for operating rail services along the LOSSAN Corridor, to submit a report to the Legislature by January 1, 2027, and every two years thereafter, on the performance of the LOSSAN Corridor that includes the following:
- Performance, ridership, usage, and quality of rail services.
- Updates to capital improvement planning.
- Progress in delivering fleet and infrastructure improvement projects.
- Improvements to service and fare coordination.
- Opportunities to increase the quality and frequency of services.
Related Legislation:
SB 677 (Blakespear), Chap. 407/2023, required the LOSSAN Agency to include in its business plan a description of the effects of climate change, including sea level rise and weather-related events, on the corridor and how to adapt to its impacts, and to identify specific projects that increase climate resiliency on the corridor, and discuss funding options for the projects.
SB 1225 (Padilla), Chap. 802/2012, authorized Caltrans to transfer all responsibility for administering state-funded intercity passenger rail service in the LOSSAN corridor through an interagency transfer agreement to the LOSSAN Rail Corridor Agency.
Staff Comments:
CalSTA indicates that the bill does not provide sufficient time to acquire resources, conduct the required analysis, and coordinate and consult stakeholders. To the extent resources and staffing are provided as part of the 2025-26 budget for the purposes of this bill, CalSTA would only have 6 months to hire staff, conduct necessary coordination and research, and prepare and submit the one-time report to the Legislature by January 1, 2026.
Recommended Amendments:
The bill should be amended to delete the blank on page 4, line 8 of the bill and to specify the entity responsible for convening a working group to report to the Legislature by January 1, 2026 with specified recommendations to ensure long term viability of passenger and freight rail services in the LOSSAN Rail Corridor.
-- END --
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2023 - 2024 Regular
Bill No: Hearing Date: 4/9/2024
Author: | Blakespear | ||
Version: | 3/20/2024 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Benjamin O'Brien-Hokanson | ||
SUBJECT:
DIGEST: This bill requires the Secretary of the California State Transportation Agency (CalSTA), to submit a report, as specified, on or before January 1, 2026, regarding the Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor. Requires the Secretary, in coordination with LOSSAN Rail Corridor operating stakeholders, to submit a report, as specified, on or before January 1, 2027, and biennially thereafter, on the management of the LOSSAN Rail Corridor. Requires the convening of a working group of stakeholders involved in the LOSSAN corridor, as specified, to develop and submit a report, as specified, on or before January 1, 2026, regarding long-term viability and coordination of rail service on the corridor. Requires that the Secretary provide strategic guidance, recommendations, and facilitation of all necessary coordination, collaboration, and intervention between stakeholders, to ensure the performance of the LOSSAN Rail Corridor.
Existing law:
- Authorizes the California Department of Transportation (Caltrans) to contract with the National Railroad Passenger Corporation (Amtrak) for intercity rail passenger services.
- Provides funding for intercity passenger rail service from a portion of the sales tax on diesel fuel through the Public Transportation Account.
- Authorizes the Captiol Corridor Joint Powers Agreement (JPA), San Joaquin JPA, and the LOSSAN Rail Corridor Agency to oversee state-supported intercity passenger rail service.
- Authorizes Caltrans, subject to approval of the Secretary of Transportation, to enter into an interagency transfer agreement under which a JPA assumes responsibility for administering the state-supported intercity passenger rail service, and associated feeder bus service, in a particular corridor.
- Defines the boundaries of the three intercity rail corridors. Defines the LOSSAN Rail Corridor as the intercity passenger rail corridor between San Diego, Los Angeles, and San Luis Obispo.
- Requires the preparation of an annual Business Plan, due to the Secretary of Transportation by April 1 every year, for the corridor by each participating JPA board of directors.
This bill:
- Requires the Secretary of Transportation, in consultation with the Caltrans Director, the California Transportation Commission (CTC), Secretary for Environmental Protection (CalEPA), and Secretary of Natural Resources Agency to submit a report to the Legislature on or before January 1, 2026, regarding the LOSSAN Rail Corridor that utilizes existing plans and studies, as specified, and includes all of the following information:
- Prioritized capital improvement projects in the corridor necessary to improve current services and accommodate future passenger and freight service growth consistent with the State Rail Plan.
- Prioritized resiliency improvement projects in the corridor necessary to ensure the safe and continued movement of trains.
- A description of administrative actions taken by the Transportation Agency using authority in existence before January 1, 2025, to improve the operations and performance of the corridor.
- Recommendations for the corridor to connect with other passenger rail services.
- Strategies to support and improve existing rail service and resiliency planning in the corridor.
- Requires that an unnamed entity convene a working group including, but not limited to:
- LOSSAN corridor track owners.
- LOSSAN corridor rail operators.
- County Transportation Commissions for the Counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura.
- Metropolitan Planning Organizations (MPOs) for the Counties of Los Angeles, Orange, San Diego, San Luis Obispo, Santa Barbara, and Ventura.
- Business, community, transportation, environmental, labor, and civic organizations.
- Requires the Working Group to submit a report to the Legislature on or before January 1, 2026. Requires the report to include meaningful public engagement led by the Working Group. Requires the report to be reviewed and approved by the governing boards of the LOSSAN Rail Corridor Agency, the Southern California Regional Rail Authority (Metrolink), and the North County Transit District (NCTD), prior to submission.
- Requires the report to provide recommendations on all of the following as necessary to ensure the long-term viability of comprehensive and coordinated passenger and freight rail services in the LOSSAN Rail Corridor:
- Dedicated and formula funding distributions available for passenger rail operations, including intercity and regional rail services along the corridor.
- Strategies to increase rail service coordination and reduce disruptions or delays, including, but not limited to, those caused by climate resiliency, track closures, state of good repair, equipment, and staffing. Requires these recommendations to result in improved maintenance and condition of assets, reduced track closures, and greater on-time performance.
- Alternative management and operations models or structures that improve intercity and regional rail services.
- Changes to state statutes, rules, or funding relating to intercity and regional rail services.
- Opportunities for rail to accelerate and support equity, safety, sustainability, zero-emissions, equipment, and economic development goals.
- Opportunities for MPOs to analyze, describe, and report progress in operating, maintaining, and improving the corridor consistent with state and local planning documents in their sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to the each MPOs regional transportation plan.
- Opportunities for MPOs to adopt multiregional goals relating to passenger and freight rail service, capital improvement projects related to those services, and resiliency of those services along the corridor to include in their respective sustainable communities strategies or, if applicable, alternative planning strategies, adopted pursuant to each MPOs regional transportation plan.
- Improving connections to existing and planned public transit services.
- Strategies that increase ridership and utilization of rail services.
- Requires the Secretary of Transportation, in coordination with stakeholders responsible for operating rail services along the LOSSAN Rail Corridor, to submit a report to the Legislature on or before January 1, 2027, and biennially thereafter, on the performance of the LOSSAN Rail Corridor that includes all of the following information:
- Performance, ridership, usage, and quality of rail services.
- Updates to capital improvement planning.
- Progress in delivering fleet and infrastructure improvement projects.
- Improvements to service and fare coordination.
- Opportunities to increase the quality and frequency of services.
- Requires the Secretary of Transportation to provide guidance and recommendations to, and coordination between, stakeholders as necessary to ensure the performance of the LOSSAN Rail Corridor. These responsibilities shall include planning, as needed, for any of the following:
- Service frequencies.
- Equipment and fleet management.
- Infrastructure improvement and state-of-good repair projects.
- Resiliency of the corridor.
- Finds and declares that a special statute is necessary because of the unique need to address the resiliency and performance of the LOSSAN Rail Corridor.
- Declares the bill may constitute a reimbursable mandate.
COMMENTS:
- Purpose of the bill. According to the author, “The LOSSAN coastal rail corridor that operates between San Luis Obispo and San Diego is at critical risk of resiliency and performance challenges. The rail line is used for Amtrak intercity services managed by the LOSSAN Rail Corridor Agency and regional Metrolink and COASTER services managed by local JPAs. Additionally, the corridor is strategically important for freight and military purposes. However, since 2021, passenger and freight service has been suspended five times due to emergency track closures. The state of California cannot achieve its mobility, environmental, and quality of life goals while service disruptions and delays continue to impact ridership. SB 1098 aligns state and local action by requiring action plans and recommendations that result in improved services for passengers.”
- Intercity rail in California. California is home to three of the six busiest Amtrak intercity passenger rail routes in the nation. The Capitol Corridor service in Northern California covers 170 miles, with 18 stations, connecting Auburn to San Jose. In 2019, the Capitol Corridor had record ridership of roughly 1.7 million. The San Joaquins serves the Central Valley and pre-COVID were operating two daily round trips between Sacramento and Bakersfield and five daily round trips between Oakland and Bakersfield, carrying over 1.1 million passengers a year. In Southern California, the Pacific Surfliner service is a 351-mile coastal corridor that runs from San Diego to San Luis Obispo, traveling through Orange, Los Angeles, Ventura, and Santa Barbara counties. Pre-pandemic, the Pacific Surfliner had 26 daily trains and an annual ridership of nearly 3 million.
Prior to 2012, Caltrans Division of Rail and Mass Transit managed and funded two of the three intercity rail services within the state - the Pacific Surfliner and the San Joaquins. The Capitol Corridor was, and still is, managed by a JPA that administers day-to-day operations within specified service boundaries. During the 2011-12 Legislative Session, SB 1225 (Padilla, Chapter 802, Statutes of 2012), and AB 1779 (Galgiani, Chapter 801, Statutes of 2012), authorized the transfer of responsibility of Pacific Surfliner and San Joaquins, respectively, to
JPA managing agencies and, among other provisions, defined the service boundaries within each region. Currently, all three intercity rail service lines are managed by local JPAs while Caltrans remains responsible for providing state funding for each intercity rail line.
Historically, the intercity rail lines were partially funded by the federal government through Amtrak operations. However, with the passage of the Passenger Rail Investment and Improvement Act of 2008 (PRIIA), states were required to assume full funding of these lines. In California, the three intercity rail lines are funded from a portion of the sales tax on diesel fuel, which was roughly $130 million for the 2021-22 fiscal year. With the passage of SB 1 (Beall, Chapter 5, Statutes of 2017), the three intercity rail providers also receive an additional roughly $20 million per year for capital and operations support from the State Rail Assistance (SRA) program. Additionally, there are other funding sources for capital improvements for intercity rail including the Transit Intercity Rail Capital Program (TIRCP) and the Interregional Transportation Improvement Program (ITIP).
The statutes governing the JPAs define the specific corridors in which they are authorized to operate and provide service. Specifically, the Capitol Corridor is defined to extend from Colfax to San Jose. The San Joaquins corridor is defined as Los Angeles through Bakersfield to Oakland and Sacramento. The LOSSAN corridor is San Diego through Los Angeles to San Luis Obispo.
- LOSSAN Rail Corridor Agency. As mentioned, in Southern California, the LOSSAN Rail Corridor Agency runs the Pacific Surfliner service a 351-mile coastal corridor that runs from San Diego to San Luis Obispo. Also cited above, Pre-COVID the service had 3 million annual riders with 26 daily trains. To accommodate the drastic decline in ridership during the pandemic, service was reduced to 12 daily trains (6 roundtrips). Despite track closures and the lack of ridership return Post-COVID the Pacific Surfliner service, as of March 2024, is back to running 20 daily trains (10 roundtrips). While total ridership is still lower than Pre-COVID, recent quarters have been trending up and with track repairs now complete, there is hope that numbers will continue to rise.
In addition to the Pacific Surfliner service, the LOSSAN corridor is used by four different passenger and freight rail services, including the NCTD Coaster commuter rail, Metrolink, the BNSF railway, and the Union Pacific railroad. As LOSSAN agency notes, while each member agency or host railroad is responsible for the implementation of its respective capital improvement projects, the LOSSAN agency takes a lead role in funding and legislative pursuits, with a focus on leveraging existing funds to advance capital projects that have a corridor-wide benefit.
LOSSAN is currently the second busiest intercity passenger rail corridor in the United States, and the busiest state-supported Amtrak route. Pre-COVID between Coaster, Metrolink, and Surfliner services the LOSSAN corridor carried 8 million passengers a year. Based on numbers from FY 2023, ridership across these services totaled 3.74 million. In addition to passengers, the LOSSAN corridor transports over $1 billion in goods via freight rail operators, and is part of the Defense Department’s Strategic Rail Corridor Network, providing access to military bases throughout San Diego.
The LOSSAN Agency is governed by a Board of Directors composed of 11 voting members representing rail owners, operators, and planning agencies along the LOSSAN rail corridor, as well as four non-voting, ex-officio members. Specifically, the voting member agencies include San Diego Metropolitan Transit System (MTS), San Diego Association of Governments (SANDAG), NCTD, the Orange County Transportation Authority (OCTA), Riverside County Transportation Commission (RCTC), Los Angeles County Metropolitan Transportation Authority (Metro), Ventura County Transportation Commission (VCTC), Santa Barbara County Association of Governments (SBCAG), and San Luis Obispo Council of Governments (SLOCOG).
As required by SB 1225, and the terms of the interagency transfer agreement, the LOSSAN Agency must submit an annual business plan by April 1 of each year to CalSTA. The primary purpose of the business plan is to identify the major goals and objectives for the LOSSAN agency’s management of the Pacific Surfliner, as well as the budget necessary to administer, market, and operate the service during the upcoming two-year period. The business plan also summarizes operations, service levels, budget, and capital improvements that have contributed to the success of the Pacific Surfliner service and identifies improvements to sustain and grow its success moving forward. As a result of SB 677 (Blakespear, Chapter 407, Statutes of 2023) future business plans are required to include a discussion of climate change issues for the corridor and highlight projects that are directly related to climate resiliency.
- Corridor of Concern. As noted by the author, the LOSSAN corridor, which runs directly on the coast in many areas, is suffering the impacts of sea-level rise, erosion, and weather-related events that have jeopardized the long-term resiliency of the corridor and, in some instances, ceased operations for up to months at a time.
In September 2021, significant beach erosion activated a landslide on a hillside adjacent to the portion of the corridor owned by OCTA, in the city of San Clemente. It pushed the railroad tracks 28 inches toward the Pacific Ocean. Train service was suspended at that time to stabilize the tracks and service resumed. In September 2022, heavy rain, winds, and storm surge caused the hillside adjacent to the railroad right-of-way to fail and shift the tracks. Train service was again suspended and bus connector service was initiated for both Amtrak and Metrolink service. OCTA immediately embarked on emergency repairs in October 2022, to stabilize the rail line and incrementally restart rail service. The project placed ground anchors into bedrock through the slide planes, designed to hold back a larger slide and stabilize movement on the corridor. That same month, the CTC met in special session to approve $6 million in funding for the emergency repairs. The total cost of the emergency work was approximately $13.7 million.
On April 10, 2023, OCTA announced that the construction work had been successful in stabilizing the tracks and that all regular Metrolink and Pacific Surfliner passenger services through San Clemente would resume. However, on April 20, 2023 a slope failure above the tracks, owned by OCTA, near the Casa Romantica Cultural Center and Gardens again halted rail service through San Clemente for a short time. Another more significant slide at the same site in early May 2023 shut down rail service for 6 weeks. To deal with this, on June 20, 2023 there was an emergency allocation of $3 million from CTC and an additional $3 million from OCTA in order to fund the emergency repairs. This money went to installing a temporary barrier wall and removing landslide soil on the rail side of the wall, ultimately restoring service in July 2023.
On January 24, 2024, heavy rain caused a landslide in Mariposa which damaged a pedestrian and bike bridge causing debris to fall onto a parallel section of rail track owned by OCTA. This resulted in another suspension of rail services through San Clemente. Caltrans issued an emergency declaration on February 1, 2024 making $10 million in state funding available for the two phased project. Phase 1 consisted of debris cleanup and removal of the damaged spans of the bridge and phase 2 focused on grading of the slope and building a barrier wall to prevent future debris from falling on the track. Construction of the barrier wall began in late February was completed in time for full service resumption on March 25, 2024. Currently, $9.2 million of the $10 million allocated has been spent.
In San Diego County, SANDAG and NCTD have been leading efforts to stabilize portions of the coastal bluffs in the City of Del Mar to protect the railroad from erosion, landslides, and seismic events; and plan for a possible longer term realignment of the tracks. This section of the corridor has also had to shut down repeatedly to address safety concerns. Specifically, Phase 5 of the Del Mar stabilization project will install additional columns to support the railroad, reinforce the bluffs, and install retaining walls, drainage improvements, and other stabilization and erosion control measures on the upper bluffs, bluff face, and new sea walls to protect the bluff toe. The project is expected to begin construction early in 2024 and is estimated to cost $78 million.
- Long term fixes being looked at. For the longer term, SANDAG is leading a San Diego Regional Rail Alterative Alignment and Improvements study to analyze ways to reduce travel times, enhance safety, and increase capacity along the San Diego segment of the corridor. One aspect of the study is to evaluate potential double track alignments between San Dieguito and Sorrento Valley that would move the tracks completely off the eroding bluffs. As part of the 2022-2023 state budget, SANDAG was allocated $300 million to begin environmental analysis, study potential impacts, address stakeholder concerns, and identify future costs of the project. This work is still ongoing as of spring 2024, SANDAG expects final design and securing of right-of-way to be completed by 2026.
Meanwhile, OCTA is leading the Orange County Coastal Rail Resiliency Study to assess existing and future environmental risks and issues with operations and maintenance along the LOSSAN Rail Corridor while evaluating strategies to address these challenges. The initial assessment is now published and focuses on providing an existing conditions assessment of the rail corridor by identifying areas that are susceptible to risk from bluff failures and coastal erosion in the next two years. This initial assessment also calls for a better defining of roles and responsibilities of key stakeholders along the corridor and the development of an implementation plan for resiliency along the entire corridor. A final report on the full scope of the study and its recommendations is expected in the fall of 2025.
Recently, CalSTA has been reinvigorated on LOSSAN Rail Corridor issues and stood up the LOSSAN Regional Rail Working group which meets quarterly. In the most recent meeting on January 23, 2024 the working group got updates on the Senate Subcommittee hearings, coordination with regulatory and permitting agencies, and various state-led streamlining efforts relevant to the LOSSAN corridor. The next meeting is planned for late April in Santa Barbara and will focus on issues facing the south and north ends of the corridor.
- Legislature and LOSSAN. Since 2016 the state has provided about $3.2 billion through various grant programs for the corridor. Additionally, in 2023, the Senate created the Senate Transportation Subcommittee on LOSSAN Rail Corridor Resiliency comprised of members of the committee who represent the Corridor. Specifically, the subcommittee is chaired by the author, Senator Blakespear (D-Encinitas), and members include Senator Monique Limón (D- Santa Barbara), Senator Josh Newman (D- Fullerton), Senator Janet Nguyen (R-Huntington Beach), and Senator Thomas J. Umberg (D-Santa Ana). The subcommittee conducted three hearings in 2023, kicking off on May 16, 2023, with a hearing entitled “Setting the Stage for a Resilient Rail Future.” The subcommittee next met on August 15, 2023 with the title, “Tracks to Tomorrow: Maximizing the Potential and Safeguarding the Future of the LOSSAN Corridor.” Finally the subcommittee convened on December 11, 2023, for a hearing entitled, “Setting Southern California Rail on Track for Success.”
The activities of the subcommittee led to the drafting and submission of a letter to CalSTA on January 9, 2024, requesting the agency prioritize the following actions: work with the subcommittee to formalize a partnership to convene, coordinate, and arbitrate among stakeholders’ priorities to result in ridership increases and prioritized capital investments, restore cut service and begin service expansions as soon as possible, identify resources needed to achieve the goals outlined in the State Rail Plan specific to the LOSSAN rail line, and identify a new non-rail funding source for emergency bus services during track closures.
CalSTA responded to this letter in mid-March describing their activities to help with current emergency projects and identify the role they can play in long-term planning on the corridor. Specifically, the letter notes coordination CalSTA can provide with the Federal Railroad Administration (FRA) and the opportunity for CalSTA to lead efforts on executing memoranda of understanding among partner agencies on the corridor. The subcommittee plans to meet again at the end of April 2024.
- Bringing everyone together. As is clear from this analysis, the LOSSAN Rail Corridor is a complex system facing many challenges and containing many competing stakeholders. SB 1098 requires these different groups to come together and produce reports that will help understand the current state of the corridor, define roles, and generate state and local plans for the future success and resilience of the corridor. These crucial discussions come at a critical time when the corridor is dealing with challenges in ridership recovery post-COVID and track closures as a result of climate impacts. This bill would also serve to empower CalSTA as a convener within the corridor to build and maintain stakeholder relationships that will be critical for the corridor moving forward.
- Too many reports or just right? SB 1098 requires multiple reports that will likely cost significant time and money, with the potential of causing confusion on a path forward rather than the development of a shared vision. To avoid this potential confusion and additional cost, the author may wish to consider combining the CalSTA led report and the locally led report into one. This combined report could still be led by CalSTA or another central convener that involves engagement with the Secretary for Natural Resources, Secretary for Environmental Protection, MPOs, and corridor track owners and rail operators as well as business, community, environmental, transportation and labor stakeholders. This type of report could have two major sections one containing recommendations to improve passenger service, identification of priority capital improvement projects, strategies to improve resiliency planning corridor wide, and an accounting of previous actions on the corridor. With the second section containing recommendations on available funding, alternative management and operations strategies, opportunities to adopt multiregional goals for the corridor, and opportunities to increase ridership while improving connections to other transit services. Combining of these reports would still allow for the biannual report called for in SB 1098 to occur separately, as specified, to provide timely updates and facilitate continued partnerships on the corridor.
However, due to the complexity of the problem some stakeholders believe it is critical to have separate reports to reflect state and local perspectives on the challenges facing the corridor. Writing in support of the bill, San Diego 350 states, “SB 1098 addresses these long-term challenges [faced by the corridor] by creating both state and locally driven paths forward. The state will lead by identifying and prioritizing capital improvement projects and recommended changes to state policies that result in improved outcomes for the corridor. Local agencies will identify consensus-driven recommendations for how the region can best build a strong foundation for making the corridor successful.”
It is also important to consider the role these reports will play in the context of other ongoing or recently completed studies and reports initiated by the LOSSAN Agency and other corridor stakeholders. These ongoing reports and studies, some mentioned above, include: (1) the LOSSAN Rail Optimization Study, published in 2021 covering optimization and integration of service operation and infrastructure planning; (2) the Southern California Association of Governments (SCAG) Integrated Passenger and Freight Rail Forecast Study published in 2022 that evaluated future rail volumes, identified infrastructure needs, and presented a corridor-based strategic vision for all rail in the SCAG region; (3) the LOSSAN Agency Business Plan published annually and described in detail above; (4) the SANDAG Rail Realignment and Infrastructure Development Plan, an ongoing effort to evaluate and pursue new alignments between Del Mar and Sorrento Valley discussed above; and (5) the Orange County Coastal Rail Resiliency Study, also discussed in more detail above.
While these reports and studies consider the LOSSAN Rail Corridor, none of them convene input from all state or local stakeholder groups to develop a shared vision and understanding of roles. SB 1098 requires CalSTA to consult existing plans and studies, specifically the LOSSAN Rail Optimization Study and the LOSSAN Business Plan.
- Working Group Leader? The current version of the bill does not designate an entity responsible for convening the working group required to complete the locally driven report. SB 1098 contains a blank space for this task, recognizing that a lead will be necessary in order to organize, convene, and recruit the proposed working group and complete the required report. It is important to highlight that this will be a critical decision as it will take significant effort and potentially costs to organize a group representing all of the identified stakeholders and generate the report required. The author will need to work to with stakeholders to identify a lead.
Related Legislation:
SB 677 (Blakespear, Chapter 407, Statutes of 2023) – Required the LOSSAN Rail Corridor Agency as a part of the annual business plan to describe the effects of climate change on the corridor, identify projects to increase climate resiliency, and discuss funding options for these projects.
SB 742 (Allen, Chapter 652, Statutes of 2019) – Made various changes to provisions relating to the state's intercity thruway bus services.
SB 477 (Cannella, 2017) – Would have authorized a local JPA operating intercity rail service to expand service beyond its statutorily defined corridor if specific conditions are met. This bill was held on the Assembly Appropriations Committee suspense file.
SB 1 (Beall, Chapter 5, Statutes of 2017) – Provides approximately $5.2 billion per year in new funding for highways, transit and active transportation programs.
SB 1225 (Padilla, Chapter 802, Statutes of 2012) – Authorized an interagency transfer agreement to be entered into with a local JPA to provide intercity rail service in the LOSSAN Corridor if specific conditions are met.
AB 1779 (Galgiani, Chapter 801, Statutes of 2012) – Authorized an interagency transfer agreement to be entered into with a local JPA to provide intercity rail service in the San Joaquin Corridor if specific conditions are met.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
POSITIONS: (Communicated to the committee before noon on Wednesday, April 3, 2024.)
SUPPORT:
Capo Cares (if amended)
San Diego 350
Streets for All (if amended)
OPPOSITION:
The Surf Line Trail (unless amended)
-- END --
Discussed in Hearing
Assembly Floor
Assembly Standing Committee on Transportation
Senate Standing Committee on Appropriations
Senate Standing Committee on Transportation
Bill Author
Bill Co-Author(s):