SB 1305: Electricity: virtual power plant procurement.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2024-03-18
Current Status:
Failed
(2024-04-18: April 22 set for first hearing canceled at the request of author.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law requires the Public Utilities Commission (PUC), in consultation with the Independent System Operator, to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. Existing law requires electrical corporations, electric service providers, and community choice aggregators to maintain physical generating capacity and electrical demand response adequate to meet their load requirements, as specified.
This bill would require the PUC, in coordination with the State Energy Resources Conservation and Development Commission and the Independent System Operator, to take specified actions in relation to virtual power plants, as defined. The bill would require the PUC, on or before March 1, 2026, to begin a proceeding to determine targets for each electrical corporation to procure generation from cost-effective virtual power plants, and would require the PUC, on or before October 1, 2026, to finalize its proceeding and issue a decision adopting virtual power plant procurement targets to be achieved by each electrical corporation on or before December 31, 2028, and on or before December 31, 2033. The bill would, upon the PUC adopting virtual power plant procurement targets, require each electrical corporation, beginning January 30, 2028, and each year thereafter, to file a report with the PUC on its progress toward complying with the virtual power plant procurement targets.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission PUC is a crime.
Because the above above-described provisions would be part of the act and a violation of a commission PUC action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Public Utilities Act, directs the Public Utilities Commission to require each load-serving entity, defined to include electrical corporations, electric service providers, and community choice aggregators, to maintain physical generating capacity and electrical demand response adequate to meet their load requirements as part of their resource adequacy requirements.
This bill would require each load-serving entity to procure from virtual power plants, defined as actively coordinated aggregations of behind-the-meter distributed energy resources that can perform certain functions, sufficient capacity to meet specified minimum capacity requirements by certain dates, as provided. The bill would require capacity procured from a virtual power plant by a load-serving entity pursuant to these provisions to be used to meet the resource adequacy requirements established for the load-serving entity. The bill would authorize the commission to postpone, in one-year increments, the deadlines for compliance with these requirements for a particular load-serving entity if the commission makes certain findings. The bill would require, on or before January 30, 2026, and each year thereafter, each load-serving entity to submit a report to the commission showing the load-serving entitys progress toward complying with the virtual power plant capacity requirements.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the above provisions would be part of the act and a violation of a commission action implementing this bills requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The Legislature finds and declares all of the following:
(a)Expanding the use of virtual power plants, which are comprised of behind-the-meter aggregations of distributed energy resources, can assist load-serving entities in integrating increased amounts of renewable energy resources into the electrical transmission and distribution grid in a manner that minimizes emissions of greenhouse gases.
(b)Virtual power plants, which can reduce peak electricity use, shift peak electricity use to off-peak times, and supply energy to the grid, are an important means of supporting the states energy loading order, which directs that Californias energy demand first be met by demand response and energy efficiency before new generation is considered.
(c)Additional use of virtual power plants can facilitate and optimize integration of the additional amounts of variable, intermittent, and off-peak electrical generation from wind and solar energy that comprise compose a significant and increasing portion of the California power mix.
(d)Expanded use of virtual power plants can reduce costs to ratepayers by avoiding or deferring the need for new fossil-fuel powered peaking power plants, avoiding or deferring distribution and transmission system upgrades and expansion of the grid, and avoiding or deferring the high cost of expansion of grid-scale energy storage systems.
(e)Expanded use of virtual power plants will reduce the use of electricity generated from fossil fuels to meet peak-load requirements on days with high electricity demand, and can avoid or reduce the use of electricity generated by high carbon-emitting electrical generating facilities during those high electricity demand periods. This will have substantial cobenefits from reduced emissions of criteria pollutants.
(f)In response to Senate Bill 846 (Chapter 239 of the Statues of 2022), the California Energy Commission State Energy Resources Conservation and Development Commission established a 7,000 megawatt load shift goal by 2030. Many of the policy recommendations in the commissions Senate Bill 846 load-shift goal report can be achieved through the expansion of virtual power plants.
(g)Use of virtual power plants to provide the ancillary services otherwise provided by fossil-fueled generating facilities will reduce emissions of carbon dioxide and criteria pollutants.
(h)The United States Department of Energy estimates that the United States could deploy 80-160 gigawatts of virtual power plants, tripling the current scale, by 2030 to support the rapid electrification of vehicles and homes.
(i)There are significant barriers to obtaining the benefits of virtual power plants, including virtual power plant operators severely limited access to customer meter data, the failure to incorporate the use of virtual power plants into long-term electricity resource planning, the lack of recognition of technological and marketplace advancements, and inadequate statutory and regulatory support.
SEC. 2.Section 380.6 is added to the Public Utilities Code, to read:380.6.(a)For purposes of this section, the following definitions apply:
(1)Load-serving entity has the same meaning as defined in Section 380.(2)(1)Procure, in reference to procurement from a virtual power plant, means to acquire by ownership or by contract the right to use the energy from, the energy savings or shifting from, or the capacity of, a virtual power plant owned by a virtual power plant operator.
(3)(2)(A)Virtual power plant means an actively coordinated aggregation of behind-the-meter distributed energy resources, including battery storage systems like those installed with rooftop solar systems, electric vehicles and chargers, electric water heaters, smart thermostats, smart plugs, smart buildings and their controls, and flexible commercial and industrial loads, that can balance electricity demand and supply, reduce or shift demand, or provide utility-scale and utility-grade grid services similar to a traditional power plant. plant, and meet the requirements of this paragraph.
(B)For purposes of this paragraph, smart means a device or appliance that adjusts or reduces its energy use, is internet connected, is able to be controlled, with explicit customer consent, remotely by the consumer, the manufacturer, the utility, or the aggregator, provides information about the energy usage and operating status of the device or appliance, and enables the customer to refuse to participate in the smart features at any time.
(B)(C)For purposes of this section, a virtual power plant shall accomplish one or more of the following purposes: reduce emissions of greenhouse gases, reduce demand for peak electrical generation, or improve the reliable operation of the electrical transmission or distribution grid.
(C)(D)For purposes of this section, a virtual power plant shall do one or more of the following:
(i)Use controls to reduce electricity use when called upon.
(ii)Shift electricity use from peak to off-peak times through the use of automated controls managed by the virtual power plant operator.
(iii)Provide dispatchable energy, capacity, and other grid services from distributed renewable generation resources and energy storage systems.
(iv)Reduce consumer cost for electricity by reducing peak time electricity use or shifting electricity use from peak to off-peak times.
(b)Each load-serving entity shall procure from virtual power plants sufficient capacity to meet the following capacity and timeline requirements: (1)On or before January 1, 2028, a capacity of not less than 2.5 percent of the load-serving entitys monthly system resource adequacy obligation.(2)On or before January 1, 2030, a capacity of not less than 5 percent of the load-serving entitys monthly system resource adequacy obligation.(3)On or before January 1, 2031, a capacity of not less than 7.5 percent of the load-serving entitys monthly system resource adequacy obligation.(4)On or before January 1, 2032, a capacity of not less than 10 percent of the load-serving entitys monthly system resource adequacy obligation.(5)On or before January 1, 2033, a capacity of not less than 12.5 percent of the load-serving entitys monthly system resource adequacy obligation.(6)On or before January 1, 2035, a capacity of not less than 15 percent of the load-serving entitys monthly system resource adequacy obligation.(c)Capacity procured from a virtual power plant by a load-serving entity pursuant to this section shall be used to meet the resource adequacy requirements established for the load-serving entity pursuant to Section 380.(d)The commission may postpone, in one-year increments, the deadlines specified for compliance with the capacity requirements in subdivision (b) for a particular load-serving entity. The commission shall only approve delayed compliance if the commission finds both of the following:(1)The load-serving entity has fully explored all reasonable methods to comply with its procurement requirements.(2)A one-year delay is warranted because compliance would not be cost effective, after considering all lifetime avoided costs of virtual power plants, including environmental costs, and all of the purposes served by virtual power plants.(e)On or before January 30, 2026, and each year thereafter, each load-serving entity shall submit a report to the commission showing the load-serving entitys progress toward complying with the virtual power plant capacity targets established pursuant to subdivision (b).(b)The commission, in coordination with the Energy Commission and the Independent System Operator, shall do all of the following:
(1)Estimate the size of the resource potential of resource adequacy-qualifying virtual power plant resources.
(2)Identify existing and potential regulatory barriers and opportunities for virtual power plant resources to qualify for resource adequacy capacity, such as streamlining or eliminating the load impact protocol process.
(3)Accelerate, where feasible, the resolution of regulatory barriers in order to facilitate the growth of virtual power plant resources.
(c)On or before March 1, 2026, the commission shall begin a proceeding to determine targets for each electrical corporation to procure generation from cost-effective virtual power plants.
(d)On or before October 1, 2026, the commission shall finalize its proceeding and issue a decision adopting virtual power plant procurement targets to be achieved by each electrical corporation on or before December 31, 2028, and on or before December 31, 2033.
(e)Upon the commission adopting virtual power plant procurement targets pursuant to subdivision (d), each electrical corporation shall, beginning January 30, 2028, and each year thereafter, file a report with the commission on its progress toward complying with the virtual power plant procurement targets.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
The Legislature finds and declares all of the following:
(a)Expanding the use of virtual power plants, which are comprised of behind-the-meter aggregations of distributed energy resources, can assist load-serving entities in integrating increased amounts of renewable energy resources into the electrical transmission and distribution grid in a manner that minimizes emissions of greenhouse gases.
(b)Virtual power plants, which can reduce peak electricity use, shift peak electricity use to off-peak times, and supply energy to the grid, are an important means of supporting the states energy loading order, which directs that Californias energy demand first be met by demand response and energy efficiency before new generation is considered.
(c)Additional use of virtual power plants can facilitate and optimize integration of the additional amounts of variable, intermittent, and off-peak electrical generation from wind and solar energy that comprise a significant and increasing portion of the California power mix.
(d)Expanded use of virtual power plants can reduce costs to ratepayers by avoiding or deferring the need for new fossil-fuel powered peaking power plants, avoiding or deferring distribution and transmission system upgrades and expansion of the grid, and avoiding or deferring the high cost of expansion of grid-scale energy storage systems.
(e)Expanded use of virtual power plants will reduce the use of electricity generated from fossil fuels to meet peak-load requirements on days with high electricity demand, and can avoid or reduce the use of electricity generated by high carbon-emitting electrical generating facilities during those high electricity demand periods. This will have substantial cobenefits from reduced emissions of criteria pollutants.
(f)In response to Senate Bill 846 (Chapter 239 of the Statues of 2022), the California Energy Commission established a 7,000 megawatt load shift goal by 2030. Many of the policy recommendations in the commissions Senate Bill 846 load-shift goal report can be achieved through the expansion of virtual power plants.
(g)Use of virtual power plants to provide the ancillary services otherwise provided by fossil-fueled generating facilities will reduce emissions of carbon dioxide and criteria pollutants.
(h)The United States Department of Energy estimates that the United States could deploy 80-160 gigawatts of virtual power plants, tripling the current scale, by 2030 to support the rapid electrification of vehicles and homes.
(i)There are significant barriers to obtaining the benefits of virtual power plants, including virtual power plant operators severely limited access to customer meter data, the failure to incorporate the use of virtual power plants into long-term electricity resource planning, the lack of recognition of technological and marketplace advancements, and inadequate statutory and regulatory support.
SEC. 2.Section 380.6 is added to the Public Utilities Code, to read:380.6.(a)For purposes of this section, the following definitions apply:
(1)Load-serving entity has the same meaning as defined in Section 380.
(2)Procure, in reference to procurement from a virtual power plant, means to acquire by ownership or by contract the right to use the energy from, the energy savings or shifting from, or the capacity of, a virtual power plant owned by a virtual power plant operator.
(3)(A)Virtual power plant means an actively coordinated aggregation of behind-the-meter distributed energy resources, including battery storage systems like those installed with rooftop solar systems, electric vehicles and chargers, electric water heaters, smart thermostats, smart plugs, smart buildings and their controls, and flexible commercial and industrial loads, that can balance electricity demand and supply, reduce or shift demand, or provide utility-scale and utility-grade grid services similar to a traditional power plant.
(B)For purposes of this section, a virtual power plant shall accomplish one or more of the following purposes: reduce emissions of greenhouse gases, reduce demand for peak electrical generation, or improve the reliable operation of the electrical transmission or distribution grid.
(C)For purposes of this section, a virtual power plant shall do one or more of the following:
(i)Use controls to reduce electricity use when called upon.
(ii)Shift electricity use from peak to off-peak times through the use of automated controls managed by the virtual power plant operator.
(iii)Provide dispatchable energy, capacity, and other grid services from distributed renewable generation resources and energy storage systems.
(iv)Reduce consumer cost for electricity by reducing peak time electricity use or shifting electricity use from peak to off-peak times.
(b)Each load-serving entity shall procure from virtual power plants sufficient capacity to meet the following capacity and timeline requirements:
(1)On or before January 1, 2028, a capacity of not less than 2.5 percent of the load-serving entitys monthly system resource adequacy obligation.
(2)On or before January 1, 2030, a capacity of not less than 5 percent of the load-serving entitys monthly system resource adequacy obligation.
(3)On or before January 1, 2031, a capacity of not less than 7.5 percent of the load-serving entitys monthly system resource adequacy obligation.
(4)On or before January 1, 2032, a capacity of not less than 10 percent of the load-serving entitys monthly system resource adequacy obligation.
(5)On or before January 1, 2033, a capacity of not less than 12.5 percent of the load-serving entitys monthly system resource adequacy obligation.
(6)On or before January 1, 2035, a capacity of not less than 15 percent of the load-serving entitys monthly system resource adequacy obligation.
(c)Capacity procured from a virtual power plant by a load-serving entity pursuant to this section shall be used to meet the resource adequacy requirements established for the load-serving entity pursuant to Section 380.
(d)The commission may postpone, in one-year increments, the deadlines specified for compliance with the capacity requirements in subdivision (b) for a particular load-serving entity. The commission shall only approve delayed compliance if the commission finds both of the following:
(1)The load-serving entity has fully explored all reasonable methods to comply with its procurement requirements.
(2)A one-year delay is warranted because compliance would not be cost effective, after considering all lifetime avoided costs of virtual power plants, including environmental costs, and all of the purposes served by virtual power plants.
(e)On or before January 30, 2026, and each year thereafter, each load-serving entity shall submit a report to the commission showing the load-serving entitys progress toward complying with the virtual power plant capacity targets established pursuant to subdivision (b).
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
|
Date
|
Status
|
|---|---|
| Apr 18, 2024 | April 22 set for first hearing canceled at the request of author. |
| Apr 4, 2024 | Set for hearing April 22. |
| Mar 18, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on E., U. & C. |
| Feb 29, 2024 | Referred to Com. on E., U. & C. |
| Feb 16, 2024 | From printer. May be acted upon on or after March 17. |
| Feb 15, 2024 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| 350s: Conejo, Humboldt, SoCal, South Bay LA, Southland Legislative Alliance, | ** Support | |
| Acterra: Action for A Healthy Planet | ** Support | |
| An individual | ** Support | |
| Ballona Institute | ** Support | |
| Ban SUP | ** Support | |
| Barbara, Santa Cruz, Sausalito, Sebastopol, SF, SF Peninsula and CA-14, SFV, | ** Support | |
| Bay, East Valley, El Dorado Hills, Elmwood, Euclid, Hillcrest, Indian Valley, | ** Support | |
| Begins With Me, Claremont/Inland Valley, Cloverdale, Colusa County, East | ** Support | |
| California Alliance for Community Energy | ** Support | |
| California Climate Voters | ** Support | |
| california efficiency + demand management council | ** Support | |
| California Environmental Voters | ** Support | |
| Californians for Energy Choice | ** Support | |
| California State Association Of Electrical Workers | ** Against | |
| Center For Biological Diversity | ** Support | |
| City Of Laguna Beach | ** Support | |
| Clean Coalition | ** Support | |
| cleanearth4kids.org | ** Support | |
| Coalition of California Utility Employees | ** Against | |
| Coastal Lands Action Network | ** Support | |
| Contra Costa Move On | ** Support | |
| Courageous Resistance | ** Support | |
| Creek, Ross Valley, Sacramento, San Diego Central, San Jose, San Pedro, Santa | ** Support | |
| Custom Power Solar | ** Support | |
| Defend Ballona Wetlands | ** Support | |
| Environmental Defense Fund | ** Support | |
| Environment California | ** Support | |
| Extinction Rebellion | ** Support | |
| Feminists In Action | ** Support | |
| FissionTransition | ** Against | |
| Glendale Environmental Coalition | ** Support | |
| Habitable Designs | ** Support | |
| Hammond Climate Solutions | ** Support | |
| Hang Out Do Good | ** Support | |
| Indivisibles: 36, 41, Alta Pasadena, Auburn CA, Beach Cities, CA-25 Simi Valley- | ** Support | |
| LEAP | ** Support | |
| Livermore, Los Angeles, Manteca, Marin, Media City Burbank, Mendocino, | ** Support | |
| Local Clean Energy Alliance | ** Support | |
| Long Beach Alliance for Clean Energy | ** Support | |
| Long Beach Environmental Alliance | ** Support | |
| mill valley community action network | ** Support | |
| Normal Heights, OC 46, OC 48, Orchard City, Petaluma, Resisters Walnut | ** Support | |
| our revolution, long beach | ** Support | |
| Pacific Gas And Electric Company | ** Against | |
| Porter Ranch, CA-43, CA-45, CA: StateStrong, California Green Team, Change | ** Support | |
| Progressive Democrats of America, California | ** Support | |
| Progressive Democrats Of Santa Monica Mountains | ** Support | |
| Récolte Energy | ** Support | |
| Renew Home | ** Support | |
| Rooted in Resistance | ** Support | |
| San Diego Gas and Electric Company | ** Against | |
| San Joaquin Valley Democratic Club | ** Support | |
| San Jose Community Energy Advocates | ** Support | |
| San Lorenzo Valley Women’s Club Environmental Committee | ** Support | |
| San Luis Obispo Mothers for Peace | ** Support | |
| Santa Cruz Climate Action Network | ** Support | |
| Silicon Valley Youth Climate Action | ** Support | |
| Sonoma Clean Power | ** Against | |
| Sonoma County Democratic Party | ** Support | |
| Southern California Edison | ** Against | |
| Sustainable Systems Research Foundation | ** Support | |
| SWTCH Energy | ** Support | |
| The Climate Alliance of Santa Cruz County | ** Support | |
| Together We Will Contra Costa | ** Support | |
| Venice Resistance | ** Support | |
| ventura county climate hub | ** Support | |
| Voltus | ** Support | |
| Women's Alliance Los Angeles | ** Support | |
| Women'S Energy Matters | ** Support |
SENATE COMMITTEE ON ENERGY, UTILITIES AND COMMUNICATIONS
Senator Steven Bradford, Chair
2023 - 2024 Regular
Bill No: SB 1305 Hearing Date: 4/22/2024
Author: | Stern | ||
Version: | 3/18/2024 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Nidia Bautista | ||
SUBJECT: Electricity: virtual power plant procurement
DIGEST: This bill >
ANALYSIS:
Existing law:
- Requires the California Public Utilities Commission (CPUC), in consultation with the California Independent System Operator (CAISO), to establish resource adequacy requirements for all electrical corporations, electric service providers, and community choice aggregators. (Public Utilities Code §380)
- Requires electrical corporations, electric service providers, and community choice aggregators to maintain physical generating capacity and electrical demand response adequate to meet their load requirements, as specified. (Public Utilities Code §380)
This bill:
- Requires the CPUC, in coordination with the State Energy Resources Conservation and Development Commission (CEC) and the CAISO, to take specified actions in relation to virtual power plants, as defined.
- Requires the CPUC, on or before March 1, 2026, to begin a proceeding to determine targets for each electrical corporation to procure generation from cost-effective virtual power plants, and would require the CPUC, on or before October 1, 2026, to finalize its proceeding and issue a decision adopting virtual power plant procurement targets to be achieved by each electrical corporation on or before December 31, 2028, and on or before December 31, 2033. The bill would, upon the PUC adopting virtual power plant procurement targets, require each electrical corporation, beginning January 30, 2028, and each year thereafter, to file a report with the PUC on its progress toward complying with the virtual power plant procurement targets.
Background
Virtual Power Plant.
Resource adequacy.
IRP procurement
In response to SB 846 the CEC established a 7,000 megawatt load shift goal by 2030. Many of the policy recommendations in the commission’s Senate Bill 846 load-shift goal report can be achieved through the expansion of virtual power plants.
Comments
Need for this bill.
The CPUC currently has a proceeding on demand flexibility (R.22-07-005) with two tracks, and two procedural timelines.
Brattle Group report
Costs to ratepayers. Supporters contend the bill would provide savings
Prior/Related Legislation
SB 846 (Dodd, Chapter 239, Statues of 2022)
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT:
350s: Conejo, Humboldt, SoCal, South Bay LA, Southland Legislative Alliance,
Ventura County Climate Hub
Acterra: Action for A Healthy Planet
Ballona Institute
Ban SUP
California Alliance for Community Energy
California Climate Voters
California Efficiency + Demand Management Council
California Environmental Voters
Californians for Energy Choice
Center for Biological Diversity
City of Laguna Beach
Clean Coalition
CleanEarth4Kids.org
Coastal Lands Action Network
Contra Costa MoveOn
Courageous Resistance
Custom Power Solar
Defend Ballona Wetlands
Environment California
Environmental Defense Fund
Extinction Rebellion
Feminists in Action
Glendale Environmental Coalition
Habitable Designs
Hammond Climate Solutions
Hang Out Do Good
Indivisibles: 36, 41, Alta Pasadena, Auburn CA, Beach Cities, CA-25 Simi Valley-
Porter Ranch, CA-43, CA-45, CA: StateStrong, California Green Team, Change
Begins With Me, Claremont/Inland Valley, Cloverdale, Colusa County, East
Bay, East Valley, El Dorado Hills, Elmwood, Euclid, Hillcrest, Indian Valley,
Livermore, Los Angeles, Manteca, Marin, Media City Burbank, Mendocino,
Normal Heights, OC 46, OC 48, Orchard City, Petaluma, Resisters Walnut
Creek, Ross Valley, Sacramento, San Diego Central, San Jose, San Pedro, Santa
Barbara, Santa Cruz, Sausalito, Sebastopol, SF, SF Peninsula and CA-14, SFV,
Sonoma County, South Bay LA, Stanislaus, The Resistance Northridge,
Ventura, Westside LA, Yalla, and Yolo
Leap
Local Clean Energy Alliance
Long Beach Alliance for Clean Energy
Long Beach Environmental Alliance
Mill Valley Community Action Network
Our Revolution Long Beach
Progressive Democrats of America, California
Progressive Democrats of Santa Monica Mountains
Récolte Energy
Renew Home
Rooted in Resistance
San Joaquin Valley Democratic Club
San Jose Community Energy Advocates
San Lorenzo Valley Women’s Club Environmental Committee
San Luis Obispo Mothers for Peace
Santa Cruz Climate Action Network
Silicon Valley Youth Climate Action
Sonoma County Democratic Party
Sustainable Systems Research Foundation
SWTCH Energy
The Climate Alliance of Santa Cruz County
Together We Will Contra Costa
Venice Resistance
Voltus
Women's Energy Matters
Women's Alliance Los Angeles
An Individual
OPPOSITION:
California State Association of Electrical Workers
Coalition of California Utility Employees
Fission Transition
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Sonoma Clean Power
Southern California Edison
ARGUMENTS IN SUPPORT: >
ARGUMENTS IN OPPOSITION: >
-- END --
Bill Author
Bill Co-Author(s):