SB 1418: Hydrogen-fueling stations: expedited review.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2024-09-25
Current Status:
Passed
(2024-09-25: Chaptered by Secretary of State. Chapter 607, Statutes of 2024.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law, the Planning and Zoning Law, requires every city, county, and city and county to administratively approve an application to install electric vehicle charging stations and hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit.
Existing law, the Planning and Zoning Law, requires each city, county, and city and county to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations. Existing law authorizes a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist, as specified. Existing law requires a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which electric vehicle charging stations must comply to be eligible for expedited review.
For these purposes, existing law defines hydrogen-fueling station to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public. Existing law requires a hydrogen-fueling station to meet certain requirements, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would modify the definition of hydrogen-fueling station to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public. This bill would modify the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would require every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for certain hydrogen-fueling stations, as specified. This bill would authorize a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook, as specified. The bill would require a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The bill would require a city, county, or city and county with a population of 250,000 or more residents to comply with these provisions on or before September 30, 2025, and would require a city, county, or city and county with a population of fewer than 250,000 residents to comply with these provisions by September 30, 2028. By imposing additional duties on cities, counties, and cities and counties, the bill would impose a state-mandated local program.
The bill would repeal these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook, on January 1, 2030.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Planning and Zoning Law, requires every city, county, and city and county to administratively approve an application to install electric vehicle charging stations and hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit.
Existing law, the Planning and Zoning Law, requires each city, county, and city and county to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations. Existing law authorizes a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist, as specified. Existing law requires a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which electric vehicle charging stations must comply to be eligible for expedited review.
For these purposes, existing law defines hydrogen-fueling station to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public. Existing law requires a hydrogen-fueling station to meet certain requirements, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would modify the definition of hydrogen-fueling station to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public. This bill would modify the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would require every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for certain hydrogen-fueling stations, as specified. This bill would authorize a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook, as specified. The bill would require a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The bill would require a city, county, or city and county with a population of 250,000 or more residents to comply with these provisions on or before September 30, 2025, and would require a city, county, or city and county with a population of fewer than 250,000 residents to comply with these provisions by September 30, 2028. By imposing additional duties on cities, counties, and cities and counties, the bill would impose a state-mandated local program.
The bill would repeal these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook, on January 1, 2030.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Planning and Zoning Law, requires every city, county, and city and county to administratively approve an application to install electric vehicle charging stations and hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit.
Existing law, the Planning and Zoning Law, requires each city, county, and city and county to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations. Existing law authorizes a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist, as specified. Existing law requires a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which electric vehicle charging stations must comply to be eligible for expedited review.
For these purposes, existing law defines hydrogen-fueling station to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public. Existing law requires a hydrogen-fueling station to meet certain requirements, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would modify the definition of hydrogen-fueling station to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public. This bill would modify the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would require every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for certain hydrogen-fueling stations, as specified. This bill would authorize a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook, as specified. The bill would require a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The bill would require a city, county, or city and county with a population of 250,000 or more residents to comply with these provisions on or before September 30, 2025, and would require a city, county, or city and county with a population of fewer than 250,000 residents to comply with these provisions by September 30, 2028. The bill would repeal these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook, on January 1, 2030.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Planning and Zoning Law, requires every city, county, and city and county to administratively approve an application to install electric vehicle charging stations and hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit.
Existing law, the Planning and Zoning Law, requires each city, county, and city and county to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations. Existing law authorizes a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist, as specified. Existing law requires a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which electric vehicle charging stations must comply to be eligible for expedited review.
For these purposes, existing law defines hydrogen-fueling station to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public. Existing law requires a hydrogen-fueling station to meet certain requirements, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would modify the definition of hydrogen-fueling station to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public. This bill would modify the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would require every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, as specified. This bill would authorize a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook, as specified. The bill would require a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The bill would require a city, county, or city and county with a population of 200,000 250,000 or more residents to comply with these provisions on or before September 30, 2025, and would require a city, county, or city and county with a population of less fewer than 200,000 250,000 residents to comply with these provisions by September 30, 2026. 2028. The bill would repeal these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook, on January 1, 2030.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Planning and Zoning Law, requires every city, county, and city and county to administratively approve an application to install electric vehicle charging stations and hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit.
Existing law, the Planning and Zoning Law, requires each city, county, and city and county to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations. Existing law authorizes a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist, as specified. Existing law requires a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which electric vehicle charging stations must comply to be eligible for expedited review.
For these purposes, existing law defines hydrogen-fueling station to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public. Existing law requires a hydrogen-fueling station to meet certain requirements, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would modify the definition of hydrogen-fueling station to mean the equipment and supporting components, structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public. This bill would modify the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would require every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, as specified. This bill would authorize a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook, as specified. The bill would require a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The bill would require a city, county, or city and county with a population of 200,000 or more residents to comply with these provisions on or before September 30, 2025, and would require a city, county, or city and county with a population of less than 200,000 residents to comply with these provisions by September 30, 2026. The bill would repeal these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook, on January 1, 2030.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law law, the Planning and Zoning Law, requires every city, county, and city and county to administratively approve an application to install electric vehicle charging stations and hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit and requires the review of an application to install an electric vehicle charging station or a hydrogen-fueling station to be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. Existing law prohibits a city, county, or city and county from denying an application for a use permit to install an electric vehicle charging station or a hydrogen-fueling station unless it makes written findings that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. permit.
Existing law repeals these provisions as they pertain to hydrogen-fueling stations on January 1, 2030.This bill would extend the operation of these provisions as they pertain to hydrogen-fueling stations to January 1, 2035.Existing law law, the Planning and Zoning Law, requires each city, county, and city and county to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations. Existing law authorizes a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist, as specified. Existing law requires a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which electric vehicle charging stations must comply to be eligible for expedited review.
For these purposes, existing law defines hydrogen-fueling station to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public. Existing law requires a hydrogen-fueling station to meet certain requirements, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would modify the definition of hydrogen-fueling station to mean the equipment and supporting components, including hydrogen-refueling canopies, used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public. This bill would modify the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
This bill would require every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, as specified. This bill would authorize a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook, as specified. The bill would require a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The bill would require a city, county, or city and county with a population of 200,000 or more residents to comply with these provisions on or before September 30, 2025, and would require a city, county, or city and county with a population of less than 200,000 residents to comply with these provisions by September 30, 2026. The bill would repeal these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook, on January 1, 2035. 2030.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires every city, county, and city and county to administratively approve an application to install electric vehicle charging stations and hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit and requires the review of an application to install an electric vehicle charging station or a hydrogen-fueling station to be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. Existing law prohibits a city, county, or city and county from denying an application for a use permit to install an electric vehicle charging station or a hydrogen-fueling station unless it makes written findings that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact.
Existing law repeals these provisions as they pertain to hydrogen-fueling stations on January 1, 2030.
This bill would extend the operation of these provisions as they pertain to hydrogen-fueling stations to January 1, 2035.
Existing law requires each city, county, and city and county to adopt an ordinance that creates an expedited, streamlined permitting process for electric vehicle charging stations. Existing law authorizes a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist, as specified. Existing law requires a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which electric vehicle charging stations must comply to be eligible for expedited review.
This bill would require every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, as specified. This bill would authorize a city, county, or city and county developing an ordinance to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook, as specified. The bill would require a city, county, and city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The bill would require a city, county, or city and county with a population of 200,000 or more residents to comply with these provisions on or before September 30, 2025, and would require a city, county, or city and county with a population of less than 200,000 residents to comply with these provisions by September 30, 2026. The bill would repeal these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook, on January 1, 2035.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)(1)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.
(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, service station means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as applicable:
(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governors Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1)(A)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
(B)On or before September 30, 2025, every city, county, or city and county with a population of 250,000 or more residents, and, on or before September 30, 2028, every city, county, or city and county with a population of fewer than 250,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations that meet the requirements of paragraph (2) of subdivision (b). In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
(2)An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(3)Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebooks due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Hydrogen-fueling station means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public.
(5)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.Section 65850.7 of the Government Code, as added by Section 2 of Chapter 373 of the Statutes of 2022, is amended to read:65850.7.(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall become operative on January 1, 2030.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)(1)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.
(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, service station means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as applicable:
(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governors Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1)(A)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
(B)On or before September 30, 2025, every city, county, or city and county with a population of 250,000 or more residents, and, on or before September 30, 2028, every city, county, or city and county with a population of fewer than 250,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations that meet the requirements of paragraph (2) of subdivision (b). In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
(2)An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(3)Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebooks due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Hydrogen-fueling station means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public.
(5)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.Section 65850.7 of the Government Code, as added by Section 2 of Chapter 373 of the Statutes of 2022, is amended to read:65850.7.(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall become operative on January 1, 2030.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)(1)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.
(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, service station means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as applicable:
(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governors Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1)(A)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
(B)On or before September 30, 2025, every city, county, or city and county with a population of 250,000 or more residents, and, on or before September 30, 2028, every city, county, or city and county with a population of fewer than 250,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations. stations that meet the requirements of paragraph (2) of subdivision (b). In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
(2)An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(3)Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebooks due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Hydrogen-fueling station means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public.
(5)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.Section 65850.7 of the Government Code, as added by Section 2 of Chapter 373 of the Statutes of 2022, is amended to read:65850.7.(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall become operative on January 1, 2030.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)(1)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.
(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, service station means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as applicable:
(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governors Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1)(A)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
(B)On or before September 30, 2025, every city, county, or city and county with a population of 200,000 250,000 or more residents, and, on or before September 30, 2026, 2028, every city, county, or city and county with a population of less fewer than 200,000 250,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
(2)An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(3)Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebooks due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Hydrogen-fueling station means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public.
(5)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.Section 65850.7 of the Government Code, as added by Section 2 of Chapter 373 of the Statutes of 2022, is amended to read:65850.7.(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall become operative on January 1, 2030.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)(1)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.
(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, service station means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as applicable:
(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governors Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1)(A)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
(B)On or before September 30, 2025, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2026, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
(2)An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(3)Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook guidebooks due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Hydrogen-fueling station means the equipment and supporting components, structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public.
(5)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.Section 65850.7 of the Government Code, as added by Section 2 of Chapter 373 of the Statutes of 2022, is amended to read:65850.7.(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook published by the Governors Office of Business and Economic Development A Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall become operative on January 1, 2030.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)(1)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.
(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, service station means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as applicable:
(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)Any All applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governors Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1)(A)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
(B)On or before September 30, 2025, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2026, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
(2)An application that satisfies the information requirements in either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(3)Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook published by the Governors Office of Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Hydrogen-fueling station means the equipment equipment and supporting components, including hydrogen-refueling canopies, used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is are open to the public.
(5)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2035, 2030, and as of that date is repealed.
SEC. 2.Section 65850.7 of the Government Code, as added by Section 2 of Chapter 373 of the Statutes of 2022, is amended to read:65850.7.(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Electric Vehicle Charging Station Permitting Guidebook published by the Governors Office of Business and Economic Development A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall become operative on January 1, 2035. 2030.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations and hydrogen-fueling stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of zero-emission vehicle infrastructure and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging and hydrogen-fueling stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and hydrogen-fueling stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations and hydrogen-fueling stations by removing obstacles to, and minimizing costs of, permitting for charging and hydrogen-fueling stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)(1)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit.
(2)A city, county, or city and county shall administratively approve an application to install hydrogen-fueling stations through the issuance of a building permit or similar nondiscretionary permit. This paragraph shall only apply to an application to install hydrogen-fueling stations on a parcel that satisfies either of the following:
(A)It is zoned for industrial or commercial development and does not contain any residential units.
(B)It was previously developed with service station. For purposes of this subparagraph, service station means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
(3)Review of an application to install an electric vehicle charging station or hydrogen-fueling station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station or hydrogen-fueling station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station or hydrogen-fueling station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station or hydrogen-fueling station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station or hydrogen-fueling station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(3)A hydrogen-fueling station shall meet all of the following, as applicable:
(A)Safety and performance standards established by the Society of Automotive Engineers and accredited nationally recognized testing laboratories.
(B)Any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(C)Guidance established by the Governors Office of Business and Economic Development, as outlined in the Hydrogen Station Permitting Guidebook.
(g)(1)(A)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review.
(B)On or before September 30, 2025, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2026, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
(2)An application that satisfies the information requirements in the checklist, either checklist adopted pursuant to paragraph (1), as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(3)The checklist Each checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist of the Zero-Emission Vehicles in California: Community Readiness Guidebook Electric Vehicle Charging Station Permitting Guidebook or the Hydrogen Station Permitting Guidebook published by the Governors Office of Planning and Research. Business and Economic Development. A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station or hydrogen-fueling station permit on the approval of the station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Hydrogen-fueling station means the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is open to the public.
(5)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall remain in effect only until January 1, 2030, 2035, and as of that date is repealed.
SEC. 2.Section 65850.7 of the Government Code, as added by Section 2 of Chapter 373 of the Statutes of 2022, is amended to read:65850.7.(a)The Legislature finds and declares all of the following:
(1)The implementation of consistent statewide standards to achieve the timely and cost-effective installation of electric vehicle charging stations is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern. Therefore, this section applies to all cities, including charter cities.
(2)It is the intent of the Legislature that local agencies not adopt ordinances that create unreasonable barriers to the installation of electric vehicle charging stations and not unreasonably restrict the ability of homeowners and agricultural and business concerns to install electric vehicle charging stations.
(3)It is the policy of the state to promote and encourage the use of electric vehicle charging stations and to limit obstacles to their use.
(4)It is the intent of the Legislature that local agencies comply not only with the language of this section, but also the legislative intent to encourage the installation of electric vehicle charging stations by removing obstacles to, and minimizing costs of, permitting for charging stations so long as the action does not supersede the building officials authority to identify and address higher priority life-safety situations.
(b)A city, county, or city and county shall administratively approve an application to install electric vehicle charging stations through the issuance of a building permit or similar nondiscretionary permit. Review of the application to install an electric vehicle charging station shall be limited to the building officials review of whether it meets all health and safety requirements of local, state, and federal law. The requirements of local law shall be limited to those standards and regulations necessary to ensure that the electric vehicle charging station will not have a specific, adverse impact upon the public health or safety. However, if the building official of the city, county, or city and county makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the city, county, or city and county may require the applicant to apply for a use permit.
(c)A city, county, or city and county may not deny an application for a use permit to install an electric vehicle charging station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. The findings shall include the basis for the rejection of potential feasible alternatives of preventing the adverse impact.
(d)The decision of the building official pursuant to subdivisions (b) and (c) may be appealed to the planning commission of the city, county, or city and county.
(e)Any conditions imposed on an application to install an electric vehicle charging station shall be designed to mitigate the specific, adverse impact upon the public health or safety at the lowest cost possible.
(f)(1)An electric vehicle charging station shall meet applicable health and safety standards and requirements imposed by state and local permitting authorities.
(2)An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories and, where applicable, rules of the Public Utilities Commission regarding safety and reliability, or rules of the Department of Food and Agriculture regarding safety, reliability, weights, and measures.
(g)(1)On or before September 30, 2016, every city, county, or city and county with a population of 200,000 or more residents, and, on or before September 30, 2017, every city, county, or city and county with a population of less than 200,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for electric vehicle charging stations. In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which electric vehicle charging stations shall comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist, as determined by the city, county, or city and county, shall be deemed complete. Upon confirmation by the city, county, or city and county of the application and supporting documents being complete and meeting the requirements of the checklist, and consistent with the ordinance, a city, county, or city and county shall, consistent with subdivision (b), approve the application and issue all required permits or authorizations. However, the city, county, or city and county may establish a process to prioritize competing applications for expedited permits. Upon receipt of an incomplete application, a city, county, or city and county shall issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. An application submitted to a city, county, or city and county that owns and operates an electric utility shall demonstrate compliance with the utilitys interconnection policies prior to approval.
(2)The checklist and required permitting documentation shall be published on a publicly accessible internet website, if the city, county, or city and county has an internet website, and the city, county, or city and county shall allow for electronic submittal of a permit application and associated documentation, and shall authorize the electronic signature on all forms, applications, and other documentation in lieu of a wet signature by an applicant. In developing the ordinance, the city, county, or city and county may refer to the recommendations contained in the most current version of the Plug-In Electric Vehicle Infrastructure Permitting Checklist of the Zero-Emission Vehicles in California: Community Readiness Electric Vehicle Charging Station Permitting Guidebook published by the Governors Office of Planning and Research. Business and Economic Development A city, county, or city and county may adopt an ordinance that modifies the checklists and standards found in the guidebook due to unique climactic, geological, seismological, or topographical conditions. If a city, county, or city and county determines that it is unable to authorize the acceptance of an electronic signature on all forms, applications, and other documents in lieu of a wet signature by an applicant, the city, county, or city and county shall state, in the ordinance required under this subdivision, the reasons for its inability to accept electronic signatures and acceptance of an electronic signature shall not be required.
(h)A city, county, or city and county shall not condition approval for any electric vehicle charging station permit on the approval of an electric vehicle charging station by an association, as that term is defined in Section 4080 of the Civil Code.
(i)The following definitions shall apply to this section:
(1)A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by a city, county, or city and county on another similarly situated application in a prior successful application for a permit.
(2)Electronic submittal means the utilization of one or more of the following:
(A)Email.
(B)The internet.
(C)Facsimile.
(3)Electric vehicle charging station or charging station means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, as it reads on the effective date of this section, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle.
(4)Specific, adverse impact means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(j)This section shall become operative on January 1, 2030. 2035.
SEC. 3.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
|
Date
|
Status
|
|---|---|
| Sep 25, 2024 | Chaptered by Secretary of State. Chapter 607, Statutes of 2024. |
| Sep 25, 2024 | Approved by the Governor. |
| Sep 9, 2024 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 29, 2024 | Assembly amendments concurred in. (Ayes 31. Noes 1. Page 5645.) Ordered to engrossing and enrolling. |
| Aug 28, 2024 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 28, 2024 | Read third time. Passed. (Ayes 59. Noes 3. Page 6691.) Ordered to the Senate. |
| Aug 8, 2024 | Read second time. Ordered to third reading. |
| Aug 7, 2024 | From committee: Do pass. (Ayes 13. Noes 0.) (August 7). |
| Jul 3, 2024 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 2, 2024 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 14. Noes 1.) (July 1). |
| Jun 26, 2024 | From committee: Do pass and re-refer to Com. on TRANS. (Ayes 7. Noes 0.) (June 26). Re-referred to Com. on TRANS. |
| Jun 3, 2024 | Referred to Coms. on L. GOV. and TRANS. |
| May 22, 2024 | In Assembly. Read first time. Held at Desk. |
| May 21, 2024 | Read third time. Passed. (Ayes 33. Noes 0. Page 4058.) Ordered to the Assembly. |
| May 16, 2024 | Read second time. Ordered to third reading. |
| May 15, 2024 | Ordered to second reading. |
| May 15, 2024 | Read third time and amended. |
| May 7, 2024 | Read second time. Ordered to third reading. |
| May 6, 2024 | From committee: Be ordered to second reading pursuant to Senate Rule 28.8. |
| Apr 26, 2024 | Set for hearing May 6. |
| Apr 24, 2024 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 9. Noes 0. Page 3733.) (April 23). Re-referred to Com. on APPR. |
| Apr 16, 2024 | Set for hearing April 23. |
| Apr 8, 2024 | Read second time and amended. Re-referred to Com. on TRANS. |
| Apr 4, 2024 | From committee: Do pass as amended and re-refer to Com. on TRANS. (Ayes 4. Noes 0. Page 3469.) (April 3). |
| Mar 18, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on L. GOV. |
| Mar 15, 2024 | Set for hearing April 3. |
| Mar 13, 2024 | March 20 set for first hearing canceled at the request of author. |
| Mar 6, 2024 | Set for hearing March 20. |
| Feb 29, 2024 | Referred to Coms. on L. GOV. and TRANS. |
| Feb 20, 2024 | From printer. May be acted upon on or after March 18. |
| Feb 16, 2024 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 29, 2024 | Unfinished Business SB1418 Archuleta et al. Concurrence | Senate Floor |
Passed |
|
| Aug 28, 2024 | SB 1418 Archuleta Senate Third Reading By Petrie-Norris | Assembly Floor |
Passed |
|
| Aug 7, 2024 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 1, 2024 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Transportation |
Passed |
|
| Jun 26, 2024 | Do pass and be re-referred to the Committee on [Transportation] | Assembly Standing Committee on Local Government |
Passed |
|
| May 21, 2024 | Senate 3rd Reading SB1418 Archuleta et al. | Senate Floor |
Passed |
|
| Apr 23, 2024 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Transportation |
Passed |
|
| Apr 3, 2024 | Do pass as amended, but first amend, and re-refer to the Committee on [Transportation] | Senate Standing Committee on Local Government |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Air Products and Chemicals, Inc. | ** Support | |
| AltaSea | ** Support | |
| Asian Pacific Environmental Network | ** Against | |
| Ballona Institute | ** Against | |
| CalChamber | ** Support | |
| California Fuels And Convenience Alliance | ** Support | |
| California Hydrogen Business Council | ** Support | |
| California Hydrogen Car Owners Association | ** Support | |
| California Hydrogen Coalition | ** Support | |
| California Trucking Association | ** Support | |
| Calstart INC. | ** Support | |
| Ceja Action | ** Against | |
| Center For Biological Diversity | ** Against | |
| Center on Race, Poverty and the Environment | ** Against | |
| City of Concord | ** Against | |
| City of Oceanside | ** Against | |
| City Of Seaside | ** Against | |
| Coastal Lands Action Network | ** Against | |
| Communities for a Better Environment | ** Against | |
| Defend Ballona Wetlands | ** Against | |
| East Bay Leadership Council | ** Support | |
| Jea & Associates | ** Against | |
| League Of California Cities | ** Against | |
| Los Angeles Area Chamber Of Commerce | ** Support | |
| Los Angeles County Business Federation | ** Support | |
| Natural Resources Defense Council | ** Against | |
| Oberon Fuels | ** Support | |
| Sierra Club California | ** Against | |
| SoCal 350 Climate Action | ** Against | |
| Social Eco Education | ** Against | |
| Southern California Watershed Alliance | ** Against | |
| The Climate Center | ** Against | |
| The Greenlining Institute | ** Against | |
| Vote Solar | ** Against |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1418 |
UNFINISHED BUSINESS
Bill No: SB 1418
Author: Archuleta (D), et al.
Amended: 7/3/24
Vote: 21
SENATE LOCAL GOVERNMENT COMMITTEE: 4-0, 4/3/24
AYES: Durazo, Dahle, Wahab, Wiener
NO VOTE RECORDED: Seyarto, Glazer, Skinner
SENATE TRANSPORTATION COMMITTEE: 9-0, 4/23/24
AYES: Cortese, Archuleta, Blakespear, Dahle, Dodd, Laird, Newman, Portantino, Umberg
NO VOTE RECORDED: Niello, Allen, Gonzalez, Limón, Nguyen, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 33-0, 5/21/24
AYES: Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Grove, Hurtado, Jones, Laird, McGuire, Menjivar, Min, Newman, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Skinner, Smallwood-Cuevas, Umberg, Wahab, Wiener, Wilk
NO VOTE RECORDED: Allen, Gonzalez, Limón, Nguyen, Niello, Seyarto, Stern
ASSEMBLY FLOOR: 59-3, 8/28/24 - See last page for vote
SUBJECT: Hydrogen-fueling stations: expedited review
SOURCE: Author
DIGEST:
This bill requires cities and counties to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations.
Assembly Amendments
clarify that the bill’s provisions only apply to the hydrogen-fueling stations that are eligible for nondiscretionary permitting under existing law.
ANALYSIS:
Existing law:
- Allows a city or county to make and enforce within its limits, all local, police, sanitary, and other ordinances and regulations not in conflict with general laws. This includes land use authority and the power to enact zoning ordinances and specify permitting requirements for development projects within their jurisdiction.
- Requires cities and counties to administratively permit hydrogen fueling stations located on parcels that are either zoned for industrial and commercial development or were previously developed as gas stations.
- Defines “hydrogen-fueling stations” to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards and that is open to the public.
- Requires that hydrogen fueling station development projects meet state and local laws including the state building code, electrical code, energy code, fire code, and any locally adopted building codes that are more restrictive than state standards.
- Requires hydrogen-fueling stations to meet certain requirements, including any rules established by the California Air Resources Board (CARB), California Energy Commission (CEC), or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires that the electrical utility, whether public or private, approve the hydrogen fueling station project prior to providing power to the site.
- Requires the CEC to allocate funds from the Clean Transportation Program to fund 100 publicly available hydrogen fueling stations, subject to specific conditions including need, and requires annual reporting on its progress.
- Establishes under Executive Order B-48-18, a goal of 200 hydrogen fueling stations, 250,000 electric vehicle (EV) charges, and 10,000 EV fast chargers by 2025.
- Establishes under Executive Order N-79-20, a goal that 100% of in-state sales of new passenger cars and trucks be zero-emission by 2035 and that 100% of medium- and heavy-duty vehicles in the State be zero-emission by 2045.
This bill:
- Modifies the definition of “hydrogen-fueling station” to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry standards and that are open to the public.
- Modifies the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by CARB, CEC, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, in consultation with the local fire department or district and the utility director, if the city or county operates a utility. This requirement applies only to the hydrogen-fueling stations that are eligible for nondiscretionary permitting under existing law. In developing this ordinance a city, county, or city and county must refer to the recommendations contained in the permitting guidebooks produced by the Governor’s Office of Business and Economic Development (GO-Biz), and may modify them based on unique climate, geological, seismological, or topographical conditions.
- Requires a city, county, or city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. Once the city, county, or city and county verifies that the application meets the requirements of the checklist, it must approve the permit. If the application is incomplete, the city, county, or city and county must notify the applicant of all deficiencies in the application and any additional information required to be eligible for the expedited permit. The checklist must be published on the city, county, or city and county’s website and must allow for electronic submittal of an application and associated documentation with an electronic signature.
- Requires a city, county, or city and county with a population of 250,000 or more residents to comply with these provisions on or before September 30, 2025, and a city, county, or city and county with a population of less than 250,000 residents to comply with these provisions by September 30, 2028.
- Repeals these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook,” on January 1, 2030.
Background
As an alternative to gasoline-based vehicles, California has more fuel cell electric vehicles (FCEVs)—and the hydrogen-fueling stations necessary to fuel them—than any other state in the nation. FCEVs contain a fuel cell, which converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling a conventional internal combustion engine, a FCEV can be refueled in less than four minutes and has a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks. FCEVs can also complement battery electric vehicles (battery EVs) because the faster refueling and longer range of FCEVs provide advantages for longer trips.
Currently, battery EVs, which are recharged at EV charging stations, dominate the zero-emission vehicle (ZEV) market. Responding to the patchwork of California’s EV permitting structure and the uncertainty it posed to installers, AB 1236 (Chiu, Chapter 598, Statutes of 2015) placed significant new requirements into law regarding applications to install EV charging stations. AB 1236 requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations by issuing a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law. AB 1236 also requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. The ordinance must include a checklist for determining an application is complete and allow for electronic submittal of applications. Other measures have sought to further accelerate EV charging deployment. In particular, AB 970 (McCarty, Chapter 710, Statutes 2021) specified timelines for local government review and approval of EV charger applications.
Hydrogen fueling station permit streamlining under SB 1291 (Archuleta, 2022). Seeking to extend some of the streamlining benefits applicable to EV chargers to hydrogen fueling stations, the Legislature enacted SB 1291 (Archuleta, Chapter 373, Statutes of 2022). SB 1291 requires cities and counties to administratively permit hydrogen fueling stations located on a parcel that is either zoned for industrial and commercial development or was previously developed as a gas station. This provision limits both the public hearings as well as any CEQA analysis for a project. Similar to the law governing EV charging station permitting, local governments can only consider health and safety requirements for hydrogen fueling stations, and they can only deny a permit if they document a specific, adverse impact to the public health or safety. SB 1291 sunsets on January 1, 2030.
Unlike AB 1236 for EV chargers, SB 1291 does not require every jurisdiction to adopt an ordinance providing for the streamlined permitting. According to the GO-Biz Hydrogen Fueling Permit Streamlining Map, only one city or county in the state has even partially streamlined permitting for hydrogen fueling stations—the City of Baldwin Park. The author wants to ensure that hydrogen fueling station permitting is fully streamlined across the state.
Comments
- Purpose of the bill. According to the author, “The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations. With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
- Everywhere? In 2022, the Legislature started to close the gap between permitting procedures for battery EVs and FCEVs by requiring local governments to permit hydrogen fueling stations administratively (SB 1291, Archuleta). However, SB 1291 stopped short of full parity with battery EVs by not requiring local governments to proactively adopt an ordinance with a checklist, as is required for battery EVs. At the time, a requirement to adopt an ordinance was viewed as unnecessary because the small number of stations expected to be developed in the coming years meant that most jurisdictions were unlikely to see an application for a hydrogen fueling station. Today, the situation is generally unchanged. Fewer fueling stations are expected to be developed than previously projected and it is unclear when the state will even remotely approach its goals for fueling stations. As a result, this bill may require local governments to expend time and resources on developing an ordinance that may never get used. On the other hand, hydrogen remains important for the state’s efforts to reduce greenhouse gas emissions, particularly in the freight sector, and the federal government recently awarded $1.2 billion to ARCHES, a public-private partnership comprising various California state bodies and actors in the hydrogen industry, to support the deployment of clean hydrogen technologies in California, including a network of heavy-duty FCEVs and refueling stations for goods movement across southern California. This bill may help stretch those dollars further by reducing the cost of hydrogen station development. Are the costs of requiring cities and counties across the state to develop an ordinance worth the potential benefit of more rapid hydrogen fueling station deployment?
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
- Negligible state costs. Local costs to cities and counties of an unknown, but potentially significant amount to adopt an ordinance per the bill. These costs are not reimbursable by the state because local governments have general authority to charge and adjust planning and permitting fees to cover their administrative expenses associated with new planning mandates.
SUPPORT: (Verified 8/28/24)
Air Products and Chemicals, INC.
Altasea
Calchamber
California Fuels and Convenience Alliance
California Hydrogen Business Council
California Hydrogen Car Owners Association
California Hydrogen Coalition
California Trucking Association
Calstart INC.
East Bay Leadership Council
Los Angeles Area Chamber of Commerce
Los Angeles County Business Federation
OPPOSITION: (Verified 8/28/24)
Asian Pacific Environmental Network
Ballona Institute
Ceja Action
Center for Biological Diversity
Center on Race, Poverty and The Environment
City of Concord
City of Oceanside
City of Seaside
Coastal Lands Action Network (CLAN)
Communities for A Better Environment
Defend Ballona Wetlands
Jea & Associates
League of California Cities
Natural Resources Defense Council (NRDC)
Sierra Club California
So Cal 350 Climate Action
Social Eco Education
Southern California Watershed Alliance
The Climate Center
The Greenlining Institute
Vote Solar
ASSEMBLY FLOOR: 59-3, 8/28/24
AYES: Aguiar-Curry, Alanis, Alvarez, Bains, Bauer-Kahan, Bennett, Berman, Calderon, Juan Carrillo, Wendy Carrillo, Chen, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Lackey, Low, Lowenthal, Maienschein, Mathis, McCarty, McKinnor, Stephanie Nguyen, Pacheco, Papan, Jim Patterson, Joe Patterson, Petrie-Norris, Quirk-Silva, Ramos, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Valencia, Villapudua, Waldron, Wallis, Weber, Wicks, Wilson, Wood, Robert Rivas
NOES: Muratsuchi, Rendon, Ting
NO VOTE RECORDED: Addis, Arambula, Boerner, Bonta, Bryan, Cervantes, Connolly, Friedman, Gabriel, Kalra, Lee, Ortega, Pellerin, Reyes, Luz Rivas, Ward, Zbur
Prepared by: Anton Favorini-Csorba / L. GOV. / (916) 651-4119
8/29/24 20:03:42
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1418 |
UNFINISHED BUSINESS
Bill No: SB 1418
Author: Archuleta (D), et al.
Amended: 7/3/24
Vote: 21
SENATE LOCAL GOVERNMENT COMMITTEE: 4-0, 4/3/24
AYES: Durazo, Dahle, Wahab, Wiener
NO VOTE RECORDED: Seyarto, Glazer, Skinner
SENATE TRANSPORTATION COMMITTEE: 9-0, 4/23/24
AYES: Cortese, Archuleta, Blakespear, Dahle, Dodd, Laird, Newman, Portantino, Umberg
NO VOTE RECORDED: Niello, Allen, Gonzalez, Limón, Nguyen, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SENATE FLOOR: 33-0, 5/21/24
AYES: Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Grove, Hurtado, Jones, Laird, McGuire, Menjivar, Min, Newman, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Skinner, Smallwood-Cuevas, Umberg, Wahab, Wiener, Wilk
NO VOTE RECORDED: Allen, Gonzalez, Limón, Nguyen, Niello, Seyarto, Stern
ASSEMBLY FLOOR: 59-3, 8/28/24 - See last page for vote
SUBJECT: Hydrogen-fueling stations: expedited review
SOURCE: Author
DIGEST:
This bill requires cities and counties to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations.
Assembly Amendments
clarify that the bill’s provisions only apply to the hydrogen-fueling stations that are eligible for nondiscretionary permitting under existing law.
ANALYSIS:
Existing law:
- Allows a city or county to make and enforce within its limits, all local, police, sanitary, and other ordinances and regulations not in conflict with general laws. This includes land use authority and the power to enact zoning ordinances and specify permitting requirements for development projects within their jurisdiction.
- Requires cities and counties to administratively permit hydrogen fueling stations located on parcels that are either zoned for industrial and commercial development or were previously developed as gas stations.
- Defines “hydrogen-fueling stations” to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards and that is open to the public.
- Requires that hydrogen fueling station development projects meet state and local laws including the state building code, electrical code, energy code, fire code, and any locally adopted building codes that are more restrictive than state standards.
- Requires hydrogen-fueling stations to meet certain requirements, including any rules established by the California Air Resources Board (CARB), California Energy Commission (CEC), or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires that the electrical utility, whether public or private, approve the hydrogen fueling station project prior to providing power to the site.
- Requires the CEC to allocate funds from the Clean Transportation Program to fund 100 publicly available hydrogen fueling stations, subject to specific conditions including need, and requires annual reporting on its progress.
- Establishes under Executive Order B-48-18, a goal of 200 hydrogen fueling stations, 250,000 electric vehicle (EV) charges, and 10,000 EV fast chargers by 2025.
- Establishes under Executive Order N-79-20, a goal that 100% of in-state sales of new passenger cars and trucks be zero-emission by 2035 and that 100% of medium- and heavy-duty vehicles in the State be zero-emission by 2045.
This bill:
- Modifies the definition of “hydrogen-fueling station” to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry standards and that are open to the public.
- Modifies the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by CARB, CEC, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, in consultation with the local fire department or district and the utility director, if the city or county operates a utility. This requirement applies only to the hydrogen-fueling stations that are eligible for nondiscretionary permitting under existing law. In developing this ordinance a city, county, or city and county must refer to the recommendations contained in the permitting guidebooks produced by the Governor’s Office of Business and Economic Development (GO-Biz), and may modify them based on unique climate, geological, seismological, or topographical conditions.
- Requires a city, county, or city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. Once the city, county, or city and county verifies that the application meets the requirements of the checklist, it must approve the permit. If the application is incomplete, the city, county, or city and county must notify the applicant of all deficiencies in the application and any additional information required to be eligible for the expedited permit. The checklist must be published on the city, county, or city and county’s website and must allow for electronic submittal of an application and associated documentation with an electronic signature.
- Requires a city, county, or city and county with a population of 250,000 or more residents to comply with these provisions on or before September 30, 2025, and a city, county, or city and county with a population of less than 250,000 residents to comply with these provisions by September 30, 2028.
- Repeals these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook,” on January 1, 2030.
Background
As an alternative to gasoline-based vehicles, California has more fuel cell electric vehicles (FCEVs)—and the hydrogen-fueling stations necessary to fuel them—than any other state in the nation. FCEVs contain a fuel cell, which converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling a conventional internal combustion engine, a FCEV can be refueled in less than four minutes and has a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks. FCEVs can also complement battery electric vehicles (battery EVs) because the faster refueling and longer range of FCEVs provide advantages for longer trips.
Currently, battery EVs, which are recharged at EV charging stations, dominate the zero-emission vehicle (ZEV) market. Responding to the patchwork of California’s EV permitting structure and the uncertainty it posed to installers, AB 1236 (Chiu, Chapter 598, Statutes of 2015) placed significant new requirements into law regarding applications to install EV charging stations. AB 1236 requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations by issuing a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law. AB 1236 also requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. The ordinance must include a checklist for determining an application is complete and allow for electronic submittal of applications. Other measures have sought to further accelerate EV charging deployment. In particular, AB 970 (McCarty, Chapter 710, Statutes 2021) specified timelines for local government review and approval of EV charger applications.
Hydrogen fueling station permit streamlining under SB 1291 (Archuleta, 2022). Seeking to extend some of the streamlining benefits applicable to EV chargers to hydrogen fueling stations, the Legislature enacted SB 1291 (Archuleta, Chapter 373, Statutes of 2022). SB 1291 requires cities and counties to administratively permit hydrogen fueling stations located on a parcel that is either zoned for industrial and commercial development or was previously developed as a gas station. This provision limits both the public hearings as well as any CEQA analysis for a project. Similar to the law governing EV charging station permitting, local governments can only consider health and safety requirements for hydrogen fueling stations, and they can only deny a permit if they document a specific, adverse impact to the public health or safety. SB 1291 sunsets on January 1, 2030.
Unlike AB 1236 for EV chargers, SB 1291 does not require every jurisdiction to adopt an ordinance providing for the streamlined permitting. According to the GO-Biz Hydrogen Fueling Permit Streamlining Map, only one city or county in the state has even partially streamlined permitting for hydrogen fueling stations—the City of Baldwin Park. The author wants to ensure that hydrogen fueling station permitting is fully streamlined across the state.
Comments
- Purpose of the bill. According to the author, “The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations. With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
- Everywhere? In 2022, the Legislature started to close the gap between permitting procedures for battery EVs and FCEVs by requiring local governments to permit hydrogen fueling stations administratively (SB 1291, Archuleta). However, SB 1291 stopped short of full parity with battery EVs by not requiring local governments to proactively adopt an ordinance with a checklist, as is required for battery EVs. At the time, a requirement to adopt an ordinance was viewed as unnecessary because the small number of stations expected to be developed in the coming years meant that most jurisdictions were unlikely to see an application for a hydrogen fueling station. Today, the situation is generally unchanged. Fewer fueling stations are expected to be developed than previously projected and it is unclear when the state will even remotely approach its goals for fueling stations. As a result, this bill may require local governments to expend time and resources on developing an ordinance that may never get used. On the other hand, hydrogen remains important for the state’s efforts to reduce greenhouse gas emissions, particularly in the freight sector, and the federal government recently awarded $1.2 billion to ARCHES, a public-private partnership comprising various California state bodies and actors in the hydrogen industry, to support the deployment of clean hydrogen technologies in California, including a network of heavy-duty FCEVs and refueling stations for goods movement across southern California. This bill may help stretch those dollars further by reducing the cost of hydrogen station development. Are the costs of requiring cities and counties across the state to develop an ordinance worth the potential benefit of more rapid hydrogen fueling station deployment?
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Appropriations Committee:
- Negligible state costs. Local costs to cities and counties of an unknown, but potentially significant amount to adopt an ordinance per the bill. These costs are not reimbursable by the state because local governments have general authority to charge and adjust planning and permitting fees to cover their administrative expenses associated with new planning mandates.
SUPPORT: (Verified 8/28/24)
Air Products and Chemicals, INC.
Altasea
Calchamber
California Fuels and Convenience Alliance
California Hydrogen Business Council
California Hydrogen Car Owners Association
California Hydrogen Coalition
California Trucking Association
Calstart INC.
East Bay Leadership Council
Los Angeles Area Chamber of Commerce
Los Angeles County Business Federation
OPPOSITION: (Verified 8/28/24)
Asian Pacific Environmental Network
Ballona Institute
Ceja Action
Center for Biological Diversity
Center on Race, Poverty and The Environment
City of Concord
City of Oceanside
City of Seaside
Coastal Lands Action Network (CLAN)
Communities for A Better Environment
Defend Ballona Wetlands
Jea & Associates
League of California Cities
Natural Resources Defense Council (NRDC)
Sierra Club California
So Cal 350 Climate Action
Social Eco Education
Southern California Watershed Alliance
The Climate Center
The Greenlining Institute
Vote Solar
ASSEMBLY FLOOR: 59-3, 8/28/24
AYES: Aguiar-Curry, Alanis, Alvarez, Bains, Bauer-Kahan, Bennett, Berman, Calderon, Juan Carrillo, Wendy Carrillo, Chen, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Lackey, Low, Lowenthal, Maienschein, Mathis, McCarty, McKinnor, Stephanie Nguyen, Pacheco, Papan, Jim Patterson, Joe Patterson, Petrie-Norris, Quirk-Silva, Ramos, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Valencia, Villapudua, Waldron, Wallis, Weber, Wicks, Wilson, Wood, Robert Rivas
NOES: Muratsuchi, Rendon, Ting
NO VOTE RECORDED: Addis, Arambula, Boerner, Bonta, Bryan, Cervantes, Connolly, Friedman, Gabriel, Kalra, Lee, Ortega, Pellerin, Reyes, Luz Rivas, Ward, Zbur
Click here to enter text.
Prepared by: Anton Favorini-Csorba / L. GOV. / (916) 651-4119
8/28/24 22:39:46
**** END ****
SENATE THIRD READING
STR Bill Id:SB 1418
Author:(Archuleta)
As Amended Ver:July 3, 2024
Majority vote
SUMMARY
Requires cities and counties to create an expedited, streamlined permitting process for specified hydrogen-fueling stations.
Major Provisions
- Requires cities and counties, in consultation with the local fire department or district and the utility director, if the city or county operates a utility, to adopt an ordinance, consistent with the goals and intent of existing law governing the permitting of electric vehicle (EV) charging stations and hydrogen-fueling stations, that creates an expedited, streamlined permitting process for hydrogen-fueling stations, provided that the proposed station is on a parcel that satisfies either of the following:
- It is zoned for industrial or commercial development and does not contain any residential units.
- It was previously developed with service station. "Service station" means any establishment which offers for sale or sells gasoline or other motor vehicle fuel to the public.
- Requires cities and counties, in developing an expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
- Clarifies that hydrogen-fueling stations shall meet all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Clarifies that "hydrogen-fueling station" means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that are open to the public.
- Provides the following compliance timelines:
- Cities and counties with a population of 250,000 or more residents must comply on or before September 30, 2025.
- Cities and counties with a population of fewer than 250,000 residents must comply on or before September 30, 2028,
- Contains a sunset date of January 1, 2030.
COMMENTS
- Permitting EV Charging and Hydrogen-Fueling Charging Stations. California has been steadily expanding its policies supporting the adoption of EV technology and infrastructure, beginning with incentives for purchasing EVs and requirements on automakers to manufacture specified percentages of EVs in relation to their production of conventional cars. This was followed by statutes governing the degree of authority Common Interest Developments (CIDs) can exercise over the installation of EV charging infrastructure, and prohibitions against specified membership and fee requirements for the privilege of using an EV charging station.
In 2012, the Governor issued an Executive Order directing the California Air Resources Board (CARB), the California Energy Commission, the PUC, and other relevant agencies working with the California Plug-In Electric Vehicle Collaborative and the Fuel Cell Partnership to develop benchmarks to help support and facilitate the rapid commercialization of zero emission vehicles (ZEVs). The order directed these agencies to establish benchmarks to help the state's ZEV infrastructure support 1.5 million EVs by 2025. Furthering this goal, the Governor's Office of Planning and Research and the State Architect published guidelines to address physical accessibility standards and design guidelines for the installation of EV charging stations throughout California.
To further these efforts, at the end of 2020, Governor Newsom issued Executive Order (EO) N-79-20, which requires 100% of in-state sales of new passenger cars and trucks to be zero-emission by 2035. This EO tasks CARB with developing and proposing passenger vehicle and truck regulations requiring increasing volumes of new zero-emission vehicles sold in the State towards that goal. The EO also directs CEC to update the biennial statewide assessment of zero-emission vehicle infrastructure required by AB 2127 (Ting) Chapter 365, Statutes of 2018, to support the level of EV adoption required by the EO.
- AB 1236 of 2015. Responding to the patchwork of California's EV permitting structure and the uncertainty it posed to installers, AB 1236 (Chiu), Chapter 598, Statutes of 2015, placed significant new requirements into law regarding applications to install EV charging stations. AB 1236 required counties and cities to administratively approve an application to install EV charging stations through the issuance of a building permit or similar nondiscretionary permit, and limited review of an application to whether it meets all health and safety requirements of local, state, and federal law. Requirements of local law were limited to those standards and regulations necessary to ensure that the EV charging station will not have a specific, adverse impact upon the public health or safety. AB 1236 allowed a county or city to require an applicant to apply for a use permit under certain circumstances.
AB 1236 also required local agencies to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. Local agencies must adopt a checklist of all requirements with which EV charging stations must comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist is deemed complete. A local agency must approve the application and issue all required permits once the local agency confirms the application and supporting documents are complete and meet the requirements of the checklist. If a local agency receives an incomplete application, it must issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.
- SB 1291 of 2022. SB 1291 (Archuleta), Chapter 373, Statutes of 2022, added hydrogen-fueling stations to the provisions of AB 1236, requiring administrative approval of applications to install hydrogen-fueling stations. This was limited to parcels that are zoned for industrial or commercial development and do not contain any residential units, or to parcels that were previously developed with a service station. Notably, SB 1291 did not extend the expedited, streamlined permitting process to hydrogen-fueling stations. SB 1291 contained a sunset date of January 1, 2030.
According to the Author
The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar, but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations.
With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.
Arguments in Support
The California Hydrogen Coalition writes, "The California Hydrogen Coalition (CHC) writes in strong support of SB 1418 (Archuleta), which will bring parity to the electric vehicle permitting process by streamlining the administrative approval process for hydrogen fueling stations in the same way we do for battery electric charging stations. Specifically, SB 1418 mandates that cities and counties must adopt an ordinance and checklist that creates an expedited, streamlined permitting process for hydrogen-fueling stations. This expedited procedure will ensure that citizens have access to clean energy options without unnecessary administrative hurdles.
"The mission of CHC is to enable California's transition to zero emission vehicles by expanding the availability of reliable, convenient and affordable hydrogen fueling to support the state's emission reduction goals. SB 1418 is a critical tool in the rapid deployment of fueling infrastructure needed to support the state's clean transportation goals. For California to take full advantage of the federal funding provided through the ARCHES hydrogen hub application, policies must be in place to expedite the development and deployment of hydrogen infrastructure. The program will deploy 8,000 zero emission fuel cell trucks and 5,000 zero emission fuel cell buses – all depending on available fueling infrastructure that needs to begin planning and construction now. SB 1418 is one such policy that will help California transition to a cleaner, more sustainable transportation future."
Arguments in Opposition
The League of California Cities, in an "opposed, unless amended" position, writes, "While Cal Cities respects the policy objectives of SB 1418, we disagree with the approach taken by the measure. Cal Cities supports hydrogen as clean fuel alternative and, in many ways, would prefer it to fuel medium-to-heavy duty public fleets. However, the local permitting process is not the barrier to this industry growing in the state. The largest factors have been the state prioritizing electrification over hydrogen, the cost of hydrogen, the energy required to produce hydrogen, complexities to the production, storage and dispensing of the hydrogen, and the upfront cost of the vehicles…
"Hydrogen is highly flammable and explosive, so systems that use it must comply with strict safety and explosion prevention codes. Land use permits for hydrogen fuel stations may include technical requirements for piping, tankage, fire safety, and more. Expediting and streamlining a process that introduces a highly volatile and difficult-to-contain gas into local communities is dangerous. Decisions about flammable and in certain cases explosive gasses such as hydrogen require careful scrutiny and ample time to ensure that public health and safety is safeguarded…
"SB 1418 requires cities to provide a level of service to hydrogen fuel station applicants unavailable to most all other individuals seeking a permit. According to the California Energy Commission's website, there are 68 hydrogen fueling stations (27 in Los Angeles County) in operation in California. Data from the Hydrogen Fuel Cell Partnership now shows there are 18 permits for hydrogen-fueling stations. Given the relatively small numbers of pending permits and operational hydrogen fuel stations, the effect of SB 1418 would be to compel local agencies with scarce resources to favor the exceedingly low number of hydrogen fuel station permits over all other permit seekers, including solar permit applications. Both that law and this bill depart from longstanding efforts by cities to treat all applicants equally.
"Cal Cities stands opposed unless amended because the measure imposes costly requirements on struggling cities. Under the bill, every city -- no matter its financial resources -- must create a new, costly ordinance to establish an expedited, streamlined permitting and inspection process for hydrogen fuel stations regardless of the demand in the community. SB 1418 would force short-staffed cities to sideline more pressing issues to develop an ordinance and special permit checklist for hydrogen fuel stations that do not exist."
FISCAL COMMENTS
Negligible state costs. Local costs to cities and counties of an unknown, but potentially significant amount to adopt an ordinance per the bill. These costs are not reimbursable by the state because local governments have general authority to charge and adjust planning and permitting fees to cover their administrative expenses associated with new planning mandates.
VOTES
SENATE FLOOR: 33-0-7
YES: Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Grove, Hurtado, Jones, Laird, McGuire, Menjivar, Min, Newman, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Skinner, Smallwood‑Cuevas, Umberg, Wahab, Wiener, Wilk
ABS, ABST OR NV: Allen, Gonzalez, Limón, Nguyen, Niello, Seyarto, Stern
ASM LOCAL GOVERNMENT: 7-0-2
YES: Juan Carrillo, Waldron, Haney, Pacheco, Ramos, Ward, Wilson
ABS, ABST OR NV: Essayli, Kalra
ASM TRANSPORTATION: 14-1-0
YES: Wilson, Davies, Aguiar-Curry, Berman, Juan Carrillo, Hart, Hoover, Jackson, Lowenthal, Papan, Sanchez, Wallis, Ward, Wicks
NO: Ting
ASM APPROPRIATIONS: 13-0-2
YES: Wicks, Sanchez, Arambula, Calderon, Wendy Carrillo, Dixon, Mike Fong, Grayson, Haney, Hart, Jim Patterson, Pellerin, Ta
ABS, ABST OR NV: Bryan, Villapudua
UPDATED
VERSION: July 3, 2024
CONSULTANT: Angela Mapp / L. GOV. / (916) 319-3958 FN: 0003784
Date of Hearing: August 7, 2024
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 1418
Author:(Archuleta) – As Amended Ver:July 3, 2024
Policy Committee: | Local Government | Vote: | 7 - 0 |
Transportation | 14 - 1 | ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill requires each city and county to adopt an ordinance that creates an expedited, streamlined permitting process for certain hydrogen-fueling stations, as specified.
Specifically, this bill:
- Requires each city, county, or city and county to adopt an ordinance creating an expedited, streamlined permitting process for hydrogen-fueling stations, in consultation with the local fire department or district and the utility director, if applicable, consistent with the goals and intent of existing law governing the permitting of EV charging stations and hydrogen-fueling stations, by the following deadlines:
- September 30, 2025, for a city, county, or city and county with a population of 250,000 or more residents.
- September 30, 2028, for a city, county, or city and county with a population of fewer than 250,000 residents.
- Requires the city, county, or city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which a hydrogen-fueling station must comply to be eligible for expedited review.
- Authorizes the city, county, or city and county, in developing the ordinance, to refer to the recommendations contained in the Hydrogen Station Permitting Guidebook produced by the Governor’s Office of Business and Economic Development (GO-Biz), and to modify the standards in the guidebook based on unique climate, geological, seismological, or topographical conditions.
- Requires a hydrogen-fueling station to meet all applicable state laws and regulations pertaining to hydrogen-fueling, in addition to any rules established by the California Air Resources Board (CARB), the California Energy Commission (CEC), or the Department of Food and Agriculture (CDFA) regarding safety, reliability, weights, and measures.
- Modifies the definition of “hydrogen-fueling station” to include structural design components necessary for the safety of the fueling station, such as hydrogen-refueling canopies.
- Repeals the bill’s provisions on January 1, 2030.
FISCAL EFFECT:
Negligible state costs. Local costs to cities and counties of an unknown, but potentially significant amount to adopt an ordinance per the bill. These costs are not reimbursable by the state because local governments have general authority to charge and adjust planning and permitting fees to cover their administrative expenses associated with new planning mandates.
COMMENTS:
- Purpose. According to the author:
With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of [this bill] is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.
- Background. To reduce transportation-related greenhouse gas (GHG) emissions, the state has focused significant effort toward promoting the use of zero-emission vehicles (ZEVs), including battery electric vehicles (EVs) and hydrogen-powered fuel cell electric vehicles (FCEVs). While battery EVs use electricity as a fuel to recharge the vehicle battery, which then discharges to power an electric motor, FCEVs contain a fuel cell that converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling a gasoline- or diesel-fueled vehicle, a FCEV can be refueled in less than four minutes and have a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks and complement battery EVs by providing vehicles with faster refueling and long-range travel advantages.
Hydrogen-Fueling Stations. In January 2018, Governor Brown signed Executive Order B-48-18, setting targets of 200 hydrogen-fueling stations and 250,000 EV chargers to support 1.5 million ZEVs on California roads by 2025. The 2025 target is an interim goal on the state’s path to five million ZEVs by 2030 and 100% of in-state sales of new passenger cars and trucks as ZEVs by 2035.
AB 8 (Perea) Chapter 401, Statutes of 2013, set a target for the CEC to award funding for at least 100 publicly available hydrogen-fueling stations by January 1, 2024. According to the CEC, the state has 54 open light-duty hydrogen-fueling stations, seven listed as temporarily non-operational, and an additional 33 planned (28 light-duty, five mixed-duty) and currently in permitting, construction or commissioning phases.
CEC and CARB’s latest 2023 Annual Hydrogen Evaluation Report projects that 100 stations will be fully operational by the end of 2025, two years later than projected in prior reports. Several planned fueling stations have been canceled by station developers, and some existing stations for light-duty passenger vehicles have been closed by station operators. The 2023 report notes that “securing site access, permitting timelines, utility connection timelines, and other site-specific issues appear to remain barriers to rapidly deploying hydrogen-fueling stations.”
Streamlined Permit Approval. Existing law, enacted AB 1236 (Chiu), Chapter 598, Statutes of 2015, required cities and counties to administratively approve an application to install an EV charging station by issuing a building permit or similar nondiscretionary permit, limiting review to whether a station meets all health and safety requirements of local, state, and federal law. Administrative or ministerial approval is in lieu of discretionary approval, which requires public hearings and potential additional approvals. AB 1236 also required each city and county to adopt an ordinance to create an expedited, streamlined permitting process for EV charging stations and to adopt a checklist for determining an application is complete.
SB 1291 (Archuleta), Chapter 373, Statutes of 2022, added hydrogen-fueling stations to the provisions of AB 1236 by requiring administrative approval of applications to install hydrogen-fueling stations. SB 1291 was limited to parcels zoned for industrial or commercial development that do not contain residential units, or to parcels previously developed with a service station. Unlike SB 1236, SB 1291 did not require a local government to adopt an ordinance creating a streamlined process and contained a sunset date of January 1, 2030.
This bill requires each city and county to adopt an ordinance to create a streamlined permitting process for hydrogen-fueling stations, similar to the approach for EV charging stations in AB 1236.
- Arguments in Support. This bill is supported by business groups and hydrogen industry groups. The California Hydrogen Coalition (CHC) writes:
[This bill] is a critical tool in the rapid deployment of fueling infrastructure needed to support the state’s clean transportation goals. For California to take full advantage of the federal funding provided through the ARCHES hydrogen hub application, policies must be in place to expedite the development and deployment of hydrogen infrastructure.
- Arguments in Opposition. This bill is opposed by a variety of environmental groups concerned that hydrogen production and use pose risks to environmental health and community safety. The League of California Cities is opposed unless amended and writes:
The local permitting process is not the barrier to this industry growing in the state. The largest factors have been the state prioritizing electrification over hydrogen, the cost of hydrogen, the energy required to produce hydrogen, complexities to the production, storage and dispensing of the hydrogen, and the upfront cost of the vehicles. Cal Cities stands opposed unless amended because the measure imposes costly requirements on struggling cities. Under the bill, every city -- no matter its financial resources -- must create a new, costly ordinance to establish an expedited, streamlined permitting and inspection process for hydrogen fuel stations regardless of the demand in the community.
Analysis Prepared by: Jennifer Swenson / APPR. / (916) 319-2081
Date of Hearing: July 1, 2024
ASSEMBLY COMMITTEE ON TRANSPORTATION
Lori D. Wilson, Chair
SBPCA Bill Id:SB 1418
Author:(Archuleta) – As Amended Ver:May 15, 2024
SENATE VOTE: 33-0
SUBJECT: Hydrogen-fueling stations: expedited review
SUMMARY: Requires cities and counties to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations. Specifically, this bill:
- Requires hydrogen-fueling stations to meet all applicable state laws and regulations pertaining to hydrogen-fueling, in addition to any rules established by the California Air Resources Board (CARB), the California Energy Commission (CEC), or the Department of Food and Agriculture (CDFA) regarding safety, reliability, weights, and measures.
- Requires every city, county, or city and county to adopt an ordinance creating an expedited, streamlined permitting process for hydrogen-fueling stations and, in developing the expedited permitting process, to adopt a checklist of all requirements for hydrogen-fueling stations to comply with in order to be eligible for expedited review:
- On or before September 30, 2025, for a city, county, or city and county with a population of 250,000 or more residents; and,
- On or before September 30, 2028, for a city, county, or city and county with a population of fewer than 250,000 residents.
- Authorizes the city, county, or city and county, in developing the ordinance, to refer to the recommendations contained in the Hydrogen Station Permitting Guidebook produced by the Governor’s Office of Business and Economic Development (GO-Biz), and to modify the standards in the guidebook based on unique climate, geological, seismological, or topographical conditions.
- Modifies the definition of “hydrogen-fueling station” to include structural design components for safety of the fueling station, such as hydrogen-refueling canopies.
- Repeals these provisions on January 1, 2030.
EXISTING LAW:
- Allows a city or county to make and enforce within its limits, all local, police, sanitary, and other ordinances and regulations not in conflict with general laws. This includes land use authority and the power to enact zoning ordinances and specify permitting requirements for development projects within their jurisdiction. (California Constitution, Art. XI, Section 7)
- Requires cities and counties to administratively permit electric vehicle charging stations and hydrogen-fueling stations, provided that the hydrogen stations are located on parcels that are either zoned for industrial and commercial development or were previously developed as gas stations. (Government Code (GOV) 65850.7(b)(2)(A)-(B))
- Prohibits a city, county, or city and county from denying an application for a use permit to install an electric vehicle charging station or hydrogen-fueling station unless it makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. (GOV 65850.7(b)(3))
- Requires hydrogen-fueling stations to meet certain requirements, including any rules established by CARB, the CEC, or CDFA regarding safety, reliability, weights, and measures. (GOV 65850.7(f)(3))
- Requires every city, county, or city and county to adopt an ordinance creating an expedited, streamlined permitting process for electric vehicle charging stations and, in developing the expedited permitting process, to adopt a checklist of all requirements for electric vehicle charging stations to comply with in order to be eligible for expedited review:
- On or before September 30, 2016, for every city, county, or city and county with a population of 200,000 or more residents; and,
- On or before September 30, 2017, for every city, county, or city and county with a population of less than 200,000 residents. (GOV 65850.7 (g)(1))
- Defines “hydrogen-fueling stations” as the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards and that is open to the public. (GOV65850.7(i)(4))
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS: Nearly 40% of California's greenhouse gas (GHG) emissions are generated by the transportation sector, which includes light-duty passenger as well as medium- and heavy duty (MHD) vehicles. In order to reduce transportation-related GHG emissions, the state has focused a significant amount of effort toward promoting the use of ZEVs. ZEVs encompass two vehicle technology categories—battery electric vehicles (BEVs, also referred to simply as “EVs”) and hydrogen-powered fuel cell electric vehicles (FCEVs).
BEVs utilize electricity as a fuel to recharge the vehicle battery, which then discharges to power an electric motor, whereas FCEVs fuel up with hydrogen, which is subsequently converted to electricity by the vehicle to power its electric motor. Similar to refueling a gasoline- or diesel-fueled vehicle, an FCEV can be refueled in less than four minutes and has a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks and buses. FCEVs can also complement BEVs because of their faster refueling and longer range capabilities over variable terrain.
Even with FCEVs’ potential complementarity to BEVs, BEVs dominate the ZEV market across light- and medium-and heavy-duty (MHD) sales. According to CARB and the DMV, as of 2024 Q1, over 1.3 million light-duty BEVs and over 490,000 light-duty plug-in hybrid BEVs were registered in California, compared to only about 17,800 light-duty FCEVs. For MHD ZEVs, at the end of 2023, BEVs made up almost 95% of all MHD ZEVs (3,581 BEVs and 203 FCEVs out of 3,784 total MHD ZEVs).
GO-Biz’s ABCs of ZEV permitting. To support ZEV deployment and infrastructure development, GO-Biz has produced a variety of tools as well as two guidebooks for permitting both electric vehicle charging and hydrogen-fueling stations.
GO-Biz has also published a parallel “Hydrogen Station Permitting Guidebook,” which was last updated September 2020. GO-Biz expects to update and release a new “Hydrogen Station Permitting Guidebook” in 2025. The Go-Biz Guidebook is intended to help local jurisdictions streamline the station development process and hydrogen station developers navigate the process by serving as a centralized resource “to minimize the research required to permit a station from both the authorities having jurisdiction or reviewing entities (usually city or county) and station developer perspective, offering insight and tools from past experiences and general recommendations for streamlining the permitting process.” GO-Biz is in the process of developing a model streamlining ordinance and sample checklist for hydrogen-fueling station permitting that local governments may adopt, tentatively to be released in 2025.
For BEVs, GO-Biz has published an “Electric Vehicle Charging Station Permitting Guidebook” alongside model checklists for EV chargers from jurisdictions around the state.
Easy as 1, 2 … How Many Hydrogen Stations? AB 8 (Perea), Chapter 401, Statutes of 2013, set a target for the CEC to award funding for at least 100 publicly available hydrogen-fueling stations by January 1, 2024, whereas Executive Order (EO) B-48-18 issued by Gov. Jerry Brown, set an elevated objective of building 200 total hydrogen-fueling stations by 2025. The majority of hydrogen-fueling stations to date have been built for light-duty FCEVs, though the proposed milestones do not specify or emphasize any particular vehicle size class.
California has more FCEVs and hydrogen-fueling stations than any other state in the nation. However, the construction of hydrogen-fueling stations has been slower than anticipated. In the CEC and CARB’s latest 2023 Annual Hydrogen Evaluation Report, previous projections that 100 stations would be fully operational by the end of 2023 have now been pushed back to 2025, based on input from station developers. According to the CEC’s Zero Emission Vehicle and Infrastructure Statistics Dashboard, the state has 54 open light-duty hydrogen-fueling stations, with seven listed as temporarily non-operational and an additional 33 planned (28 light-duty, five mixed-duty) and currently in permitting, construction or commissioning phases. Per the CEC’s MDHD ZEV Station Dashboard (in beta version), California has 27 MHD ZEV stations listed as having hydrogen-fueling capacity, though this number includes stations both under development and operating.
Several planned fueling stations have been canceled by station developers, and there have been closures of some existing stations for light-duty passenger vehicles by station operators. The 2023 Report notes that “securing site access, permitting timelines, utility connection timelines, and other site-specific issues appear to remain barriers to rapidly deploying hydrogen-fueling stations.” There also appear to be hiring difficulties related to the tight labor market, e.g., the limited availability of skilled contractors with specialized experience in hydrogen permitting and construction as well as personnel trained to work with high-pressure hydrogen.
Permits, permits, everywhere. To keep up with the state’s goals and demand for battery EV charging stations, the Legislature enacted AB 1236 (Chiu), Chapter 598, Statutes of 2015, which with certain exceptions, requires cities and counties to administratively approve an application to install EV charging stations by issuing a building permit or similar nondiscretionary permit, limiting review to whether a station meets all health and safety requirements of local, state, and federal law. Administrative or ministerial approval is in lieu of discretionary approval, which is a more arduous review process requiring hearings by the local planning commission, public notice, and potential additional approvals.
AB 1236 also requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. The ordinance must include a checklist for determining an application is complete and allow for electronic submittal of applications. Other subsequent measures have sought to further accelerate EV charging deployment. In particular, AB 970 (McCarty), Chapter 710, Statutes of 2021 requires local governments to review and approve EV charger applications within a certain number of days of receipt of a complete application.
Seeking to extend some of the streamlining benefits applicable to EV chargers to hydrogen-fueling stations, the Legislature enacted SB 1291 (Archuleta), Chapter 373, Statutes of 2022. SB 1291 requires cities and counties to administratively permit hydrogen-fueling stations located on a parcel that is either zoned for industrial and commercial development or was previously developed as a gas station. This provision limits both the public hearings as well as any California Environmental Quality Act (CEQA) analysis for a project. Similar to the law governing EV charging station permitting, local governments can only consider health and safety requirements for hydrogen-fueling stations, and they can only deny a permit if they document a specific, adverse impact to the public health or safety. SB 1291 sunsets on January 1, 2030.
Unlike AB 1236 for EV chargers, SB 1291 did not require every jurisdiction to adopt an ordinance providing for the streamlined permitting of hydrogen-fueling stations. At the time, an ordinance for expedited permitting was viewed as unnecessary, as very few hydrogen-fueling stations were expected to be built over the next several years, which meant that most jurisdictions were unlikely to see an application for a hydrogen-fueling station. Today, the situation is generally unchanged. According to the GO-Biz Hydrogen-fueling Permit Streamlining Map, only one city or county in the state has even partially streamlined permitting for hydrogen-fueling stations—the City of Baldwin Park. This bill, SB 1418, applies approach adopted in AB 1236 for expedited permitting to hydrogen-fueling stations, requiring cities and counties to adopt an ordinance streamlining the permitting process for hydrogen-fueling stations regardless of local demand.
Meanwhile, hydrogen remains important for the state’s efforts to reduce GHG emissions, particularly in the freight sector. Under existing statute, at least 15% of the CEC’s annual funds under the Clean Transportation Program must go towards hydrogen-fueling stations. In the its recent Clean Freight Corridor Efficiency Assessment (December 2023), required by SB 671 (Gonzalez), Chapter 769, Statutes of 2021, the California Transportation Commission highlighted 34 priority freight corridors, including a list of the “Top 6” priority freight corridors (I-5, I-15, SR 99, I-10/I-710, I-40, I-80/I-580/I-880) for the development of MHD ZEV infrastructure. Timely permitting of hydrogen-fueling stations along these highways, which traverse both major urban centers and sparsely populated rural communities, will be critical to establishing an initial ZEV fueling network to support goods movement.
In addition to state funds, the U.S. Department of Energy recently awarded $1.2 billion to California’s Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES), a public-private partnership led by GO-Biz, to support the deployment of clean hydrogen technologies in California. The ARCHES program is expected to focus on hydrogen infrastructure projects in support of three hard-to-decarbonize sectors: heavy-duty vehicles, power plants, and ports. SB 1418 may help stretch federal dollars further by reducing the cost of hydrogen station development, especially along highly trafficked freight corridors.
Health and safety. While EV charging stations face difficulties related to grid interconnection and capacity, hydrogen-fueling stations face some unique health and safety obstacles that EV charging stations do not. For example, hydrogen is highly flammable and burns invisibly. Despite these properties, hydrogen will need to be compressed and kept under high pressure at various stages of storage, delivery, and dispensing. In addition, hydrogen is not a commonly used gas and, due to its small molecular size, is more prone to leakage than methane, which can be readily transmitted through gas pipelines. Though most all of the state’s hydrogen supply is produced off-site from large-scale generation facilities and delivered to hydrogen-fueling stations via truck, there is increasing interest in generating hydrogen on-site which may result in additional permitting challenges in the future. The author may also wish to amend the bill to modify the definition of hydrogen-fueling station to include stations having on-site generation of hydrogen to reflect guidance in GO-Biz’s permitting guidebook.
This bill does allow for an expedited permit to be denied if the city or county can document a specific, adverse impact to the public health or safety. While this does create a health and safety carve out, it sets the bar high for cities and counties to deny an expedited permit.
According to the author, “The permitting process for electric vehicle charging stations and hydrogen-fueling stations is similar, but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen-fueling stations, achieving parity in the permitting process for both types of stations. With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
Writing in support, the Los Angeles County Business Federation states: “Los Angeles and the State of California have enacted numerous policies to help drive the decarbonization of vehicles, but few policies are as meaningful as permit streamlining for zero-emission vehicle (ZEV) infrastructure. This infrastructure is essential to creating trust with consumers and must be deployed at speed and scale. The patchwork nature of local ordinances related to permitting often slows the pace of deployment. EV chargers already enjoy permit streamlining. This bill extends the same streamlining provisions to hydrogen stations, bringing parity between the two technologies. …. SB 1418 sets clear timelines for compliance based on population size, which will ensure municipalities have the necessary guidance to implement these processes effectively. This approach allows for a coordinated and efficient rollout of hydrogen-fueling infrastructure across the state.”
Writing in opposition, the League of California Cities (Cal Cities) states: “While Cal Cities respects the policy objectives of SB 1418, we disagree with the approach taken by the measure. Cal Cities supports hydrogen as clean fuel alternative and, in many ways, would prefer it to fuel medium-to-heavy duty public fleets. However, the local permitting process is not the barrier to this industry growing in the state. The largest factors have been the state prioritizing electrification over hydrogen, the cost of hydrogen, the energy required to produce hydrogen, complexities to the production, storage and dispensing of the hydrogen, and the upfront cost of the vehicles….Given the relatively small numbers of pending permits and operational hydrogen fuel stations, the effect of SB 1418 would be to compel local agencies with scarce resources to favor the exceedingly low number of hydrogen fuel station permits over all other permit seekers, including solar permit applications. Both that law and this bill depart from longstanding efforts by cities to treat all applicants equally.”
Committee comments: This bill requires every city, county, and city and county to adopt a local ordinance to create an expedited, streamlined permitting process for hydrogen-fueling stations, and also to adopt a checklist indicating eligibility requirements for expedited permitting.
The low adoption of light-duty passenger FCEVs and slow deployment of hydrogen-fueling stations currently present a chicken-and-egg problem for California’s hydrogen-fueling station network. Consumers are reluctant to commit to FCEVs in view of limited hydrogen-fueling infrastructure, and station developers hesitant to build out capacity based on BEV dominance. Demand for hydrogen is expected to increase as MHD fleets transition to ZEVs and with the anticipated influx of federal dollars to support the growth of a renewable hydrogen market.
Hydrogen-fueling stations will be an important part of the state’s ZEV future and expedited permitting processes will support California’s most immediate needs in building out MHD ZEV freight infrastructure and developing projects under ARCHES. Outside of these instances, it is not apparent where else in the state or when in the future expedited permitting processes will be useful. The uniform requirement for all jurisdictions to create an expedited permitting process for hydrogen-fueling stations helps prevent a patchwork of requirements across the state but also imposes a time-, cost- and personnel-burden on many cities and counties without an obvious need or near-term benefit.
As acknowledged in its analysis of the bill, Senate Transportation Committee notes that: “For many reasons fewer fueling stations are being developed than previously projected and it is unclear when the state will even remotely approach its goals for fueling stations. As a result, SB 1418 may require local governments to expend time and resources on developing an ordinance that may never get used. On the other hand, SB 1418 phases in its requirements so that most cities and counties in the state will not have to develop an ordinance until September 30, 2028—well after GO-Biz releases its model ordinance and checklist for hydrogen-fueling station permitting, which should reduce the burden on local governments.”
This author models this bill after the expedited permitting process provisions for EV chargers in AB 1236. However, FCEV adoption has followed a different path than BEV adoption, given the ZEV drivers’ familiarity and comfort with electricity, as well as the ubiquity of electricity in our counties, cities and homes. The model for EV charging stations may not translate so well to hydrogen-fueling stations, without recognizing that the light-duty market is unlikely to shore up the hydrogen marketplace and without more nuance to this bill’s requirements reflecting the absence of strong light-duty demand. In consideration of the above, the author may wish to amend the bill to require the adoption of a local ordinance for expedited permitting for jurisdictions that encompass or fall within some distance of a Top 6 priority freight corridor as identified by the CTC.
Double referral and Proposed Committee Amendments. This bill was heard in the Assembly Committee on Local Government on June 26, 2024, and approved by a vote of 7-0. Conceptual amendments were discussed, but not taken, in that committee to restrict expedited permit approvals of hydrogen-fueling stations to parcels of land that are either zoned for industrial and commercial development and do not have residences or were previously developed as gas stations. This would harmonize the expedited permitting process to include a restriction currently applies to administrative approvals of hydrogen-fueling stations under GOV 65850.7(b)(2). The author has agreed to adopt the amendments proposed by Assembly Local Government Committee in this committee.
Proposed amendment: At GOV 65850.7(g)(1)(B), relating to the expedited, streamlined permitting process for hydrogen-fueling stations, strike out “stations.” and insert “stations that meet the requirements of paragraph (2) of subdivision (b)”.
Related legislation: SB 1291 (Archuleta), Chapter 373, Statutes of 2022 requires administrative review of applications for hydrogen-fueling stations and allows for denials based only on health or safety impacts.
AB 970 (McCarty), Chapter 710, Statutes of 2021 establishes specific time frames in which local agencies must approve permits for EV charging stations.
AB 1236 (Chiu), Chapter 598, Statutes of 2015 requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations through the issuance of a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law.
AB 8 (Perea), Chapter 401, Statutes of 2013 requires the CEC and CARB to annually review and report on progress toward establishing a hydrogen-fueling network that provides coverage and capacity necessary to fuel current and anticipated FCEVs in the state. AB 8 also established a target for the CEC to award co-funding for at least 100 stations by 2023.
REGISTERED SUPPORT / OPPOSITION:
Support
California Fuels and Convenience Alliance
California Hydrogen Car Owners Association
California Hydrogen Coalition
Calstart
Los Angeles Area Chamber of Commerce
Los Angeles County Business Federation (BIZFED)
Support If Amended
Oberon Fuels
Oppose
Asian Pacific Environmental Network
Ballona Institute
Ceja Action
Center for Biological Diversity
Center on Race, Poverty and the Environment
City of Oceanside
Coastal Lands Action Network
Communities for A Better Environment
Defend Ballona Wetlands
Natural Resources Defense Council
Sierra Club California
So-Cal 350 Climate Action
Social Eco Education
Southern California Watershed Alliance
The Climate Center
The Greenlining Institute
Vote Solar
Oppose Unless Amended
League of California Cities
Analysis Prepared by: Stephanie Choing / TRANS. / (916) 319-2093
Date of Hearing: June 26, 2024
ASSEMBLY COMMITTEE ON LOCAL GOVERNMENT
Juan Carrillo, Chair
SBPCA Bill Id:SB 1418
Author:(Archuleta) – As Amended Ver:May 15, 2024
SENATE VOTE: 33-0
SUBJECT: Hydrogen-fueling stations: expedited review.
SUMMARY: Requires cities and counties to create an expedited, streamlined permitting process for hydrogen-fueling stations. Specifically, this bill:
- Provides that, on or before September 30, 2025, every city, county, or city and county with a population of 250,000 or more residents, and, on or before September 30, 2028, every city, county, or city and county with a population of fewer than 250,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of existing law governing the permitting of EV charging stations and hydrogen-fueling stations, that creates an expedited, streamlined permitting process for hydrogen-fueling stations.
- Provides that, in developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
- Clarifies that hydrogen-fueling stations shall meet all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Clarifies that “hydrogen-fueling station” means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is are open to the public.
- Is subject to a sunset date of January 1, 2030.
- Makes technical and clarifying changes to existing law governing the permitting of electric vehicle (EV) charging stations and hydrogen-fueling stations.
- Provides that no reimbursement is required by this bill pursuant to Section 6 of Article XIII B of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
FISCAL EFFECT: According to the Senate Appropriations Committee, pursuant to Senate Rule 28.8, negligible state costs.
COMMENTS:
- Author’s Statement. “The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar, but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations.
“With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
- Hydrogen Fueling. As an alternative to gasoline-based vehicles, California has more fuel cell EVs (FCEVs) – and the hydrogen-fueling stations necessary to fuel them – than any other state in the nation. In January 2018, Governor Brown signed Executive Order B-48-18, setting targets of 200 hydrogen-fueling stations and 250,000 EV chargers to support 1.5 million zero-emission vehicles (ZEVs) on California roads by 2025. The 2025 target is an interim goal on the state’s path to 5 million ZEVs by 2030 and 100 percent of in-state sales of new passenger cars and trucks as ZEVs by 2035. Although the vast majority of those vehicles are projected to be battery EVs supported by EV chargers, the state currently has approximately 8,000 FCEVs on the roads and 61 hydrogen-fueling stations, according to the CEC’s Zero Emission Vehicle and Infrastructure Statistics dashboard.
FCEVs contain a fuel cell, which converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling a conventional internal combustion engine, a FCEV can be refueled in less than four minutes and have a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks and complement battery EVs by providing vehicles that have advantages pertaining to long-range travel.
The numbers of FCEVs and hydrogen stations have grown in recent years due to various state policies that support the adoption of FCEV technology and infrastructure, beginning with rebates for purchasing FCEVs. Additionally, AB 8 (Perea) Chapter 401, Statutes of 2013, requires the CEC to allocate $20 million annually, as specified, until there are at least 100 publicly available hydrogen-fueling stations in California. The bill also requires the CEC and the California Air Resources Board (CARB) to annually review and report on progress toward establishing a hydrogen-fueling network that provides the coverage and capacity to fuel vehicles requiring hydrogen fuel that are being placed into operation in the state.
In its analysis of AB 2147 (Mathis) of this year, the Assembly Transportation Committee notes:
“The construction of hydrogen-fueling stations has been slower than anticipated. At the end of 2023, there were 68 active hydrogen-fueling stations statewide. In the latest 2023 Annual Hydrogen Evaluation Report, previous projections that 100 stations would be fully operational by the end of 2023 have now been pushed back to 2025, based on input from station developers. Several planned fueling stations have been canceled by station developers, and there have been closures of some existing stations for light-duty passenger vehicles by station operators.
“Station developers cite many factors for the reduced roll-out and closures of hydrogen-fueling stations, including political and economic uncertainty as well as practical challenges with construction, operation, and hydrogen fuel sourcing. On the construction side, the 2023 Report notes that ‘securing site access, permitting timelines, utility connection timelines, and other site-specific issues appear to remain barriers to rapidly deploying hydrogen-fueling stations.’ There also appear to be hiring difficulties related to the tight labor market, e.g., the limited availability of skilled contractors with specialized experience in hydrogen permitting and construction as well as personnel trained to work with high-pressure hydrogen. Station equipment reliability also remains a challenge. Across operational fueling stations, consumers frequently experience long wait times and occasional equipment failures. Station owners are evaluating strategies ranging from equipment improvements to changes in operational strategies and even workforce development to improve consumer experiences with hydrogen-fueling.
“Looking ahead, California’s efforts to deploy hydrogen-fueling infrastructure will be further bolstered by federal funds. In October 2023, the U.S. Department of Energy awarded $1.2 billion to California’s Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) through the Regional Clean Hydrogen Hub Program created under the Bipartisan Infrastructure Law. ARCHES is a statewide public-private partnership led by the Governor’s Office of Business and Economic Development (GO-Biz), the University of California, the California State Building Trades Council and the Renewables 100 Policy Institute Energy to produce and create a market for renewable hydrogen. The program is expected to focus on hydrogen infrastructure projects in support of three hard-to-decarbonize sectors: heavy-duty vehicles, power plants, and ports.”
- Permitting EV Charging and Hydrogen-Fueling Charging Stations. California has been steadily expanding its policies supporting the adoption of EV technology and infrastructure, beginning with incentives for purchasing EVs and requirements on automakers to manufacture specified percentages of EVs in relation to their production of conventional cars. This was followed by statutes governing the degree of authority Common Interest Developments (CIDs) can exercise over the installation of EV charging infrastructure, and prohibitions against specified membership and fee requirements for the privilege of using an EV charging station.
In 2012, the Governor issued an Executive Order directing the California Air Resources Board (CARB), the California Energy Commission, the PUC, and other relevant agencies working with the California Plug-In Electric Vehicle Collaborative and the Fuel Cell Partnership to develop benchmarks to help support and facilitate the rapid commercialization of zero emission vehicles (ZEVs). The order directed these agencies to establish benchmarks to help the state's ZEV infrastructure support 1.5 million EVs by 2025. Furthering this goal, the Governor’s Office of Planning and Research and the State Architect published guidelines to address physical accessibility standards and design guidelines for the installation of EV charging stations throughout California.
To further these efforts, at the end of 2020, Governor Newsom issued Executive Order (EO) N-79-20, which requires 100% of in-state sales of new passenger cars and trucks to be zero-emission by 2035. This EO tasks CARB with developing and proposing passenger vehicle and truck regulations requiring increasing volumes of new zero-emission vehicles sold in the State towards that goal. The EO also directs CEC to update the biennial statewide assessment of zero-emission vehicle infrastructure required by AB 2127 (Ting) Chapter 365, Statutes of 2018, to support the level of EV adoption required by the EO.
- AB 1236 of 2015. Responding to the patchwork of California’s EV permitting structure and the uncertainty it posed to installers, AB 1236 (Chiu), Chapter 598, Statutes of 2015, placed significant new requirements into law regarding applications to install EV charging stations. AB 1236 required counties and cities to administratively approve an application to install EV charging stations through the issuance of a building permit or similar nondiscretionary permit, and limited review of an application to whether it meets all health and safety requirements of local, state, and federal law. Requirements of local law were limited to those standards and regulations necessary to ensure that the EV charging station will not have a specific, adverse impact upon the public health or safety. AB 1236 allowed a county or city to require an applicant to apply for a use permit under certain circumstances.
AB 1236 also required local agencies to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. Local agencies must adopt a checklist of all requirements with which EV charging stations must comply to be eligible for expedited review. An application that satisfies the information requirements in the checklist is deemed complete. A local agency must approve the application and issue all required permits once the local agency confirms the application and supporting documents are complete and meet the requirements of the checklist. If a local agency receives an incomplete application, it must issue a written correction notice detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance.
- SB 1291 of 2022. SB 1291 (Archuleta), Chapter 373, Statutes of 2022, added hydrogen-fueling stations to the provisions of AB 1236, requiring administrative approval of applications to install hydrogen-fueling stations. This was limited to parcels that are zoned for industrial or commercial development and do not contain any residential units, or to parcels that were previously developed with a service station. Notably, SB 1291 did not extend the expedited, streamlined permitting process to hydrogen-fueling stations. SB 1291 contained a sunset date of January 1, 2030.
- Bill Summary. This bill extends the expedited, streamlined permitting process that current law requires for EV charging stations to hydrogen-fueling stations. Cities and counties with a population of 250,000 or more residents must comply by September 30, 2025. Cities and counties with a population under 250,000 residents must comply by September 30, 2028.
This bill also clarifies that hydrogen-fueling stations shall meet all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by the State Air Resources Board, Energy Commission, or Department of Food and Agriculture regarding safety, reliability, weights, and measures. It also clarifies that “hydrogen-fueling station” means the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry codes and standards that is are open to the public.
This bill is subject to a sunset date of January 1, 2030. This bill is sponsored by the author.
- Policy Considerations. The Committee may wish to consider the following: while this bill extends expedited, streamlined permitting to hydrogen-fueling stations, it does not limit the location of these proposed stations as SB 1291 did for ministerial review of these stations. The Committee may wish to consider if these limitations should be added to the bill to ensure expedited, streamlined permitting for hydrogen-fueling stations applies only to parcels that are zoned for industrial or commercial development and do not contain any residential units, or to parcels that were previously developed with a service station.
- Committee Amendments. To address the policy considerations noted above, the Committee may wish to amend the bill as follows:
GOV 65850.7(g)(1)(B) On or before September 30, 2025, every city, county, or city and county with a population of 250,000 or more residents, and, on or before September 30, 2028, every city, county, or city and county with a population of fewer than 250,000 residents, shall, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, adopt an ordinance, consistent with the goals and intent of this section, that creates an expedited, streamlined permitting process for hydrogen-fueling stations that meet the requirements of paragraph (2) of subdivision (b). In developing an expedited permitting process, the city, county, or city and county shall adopt a checklist of all requirements with which hydrogen-fueling stations shall comply to be eligible for expedited review.
Due to legislative deadlines, this amendments should be adopted in the Transportation Committee.
- Related Legislation. AB 2427 (McCarty) requires local agencies to undertake specified actions regarding the permitting of EV charging stations in the public right-of-way. AB 2427 is pending in the Senate Appropriations Committee.
AB 2559 (Petrie-Norris) requires the Governor’s Office of Business and Economic Development (GO-Biz) to create and maintain a publicly accessible internet website to collect information and report delays and denials in the permitting of EV service equipment (EVSE). AB 2559 is pending in the Senate Business, Professions and Economic Development Committee.
SB 347 adds an exemption to the Subdivision Map Act for a hydrogen fueling station or electrical charging station on a parcel that is zoned for industrial or commercial development and does not contain any residential units, or on a parcel that was previously developed with a service station, as specified. SB 347 is pending in this committee.
- Previous Legislation. AB 1504 (McCarty) of 2023 would have required cities and counties to complete a plan for the installation of EV charging stations in the public right-of-way, and made changes to the statewide assessment of EV charging infrastructure the CEC must prepare pursuant to existing law. AB 1504 was held in the Assembly Appropriations Committee.
SB 1291 (Archuleta), Chapter 373, Statutes of 2022, added hydrogen-fueling stations to the provisions of AB 1236.
AB 970 (McCarty), Chapter 710, Statutes of 2021, established specific time frames in which local agencies must approve permits for EV charging stations.
AB 2168 (McCarty) of 2020 was nearly identical to AB 970. AB 2168 was held in this Committee.
AB 1236 (Chiu), Chapter 598, Statutes of 2015, required counties and cities to administratively approve applications to install EV charging stations, and create an expedited, streamlined permitting process for EV charging stations.
- Arguments in Support. The California Hydrogen Coalition writes, “The California Hydrogen Coalition (CHC) writes in strong support of SB 1418 (Archuleta), which will bring parity to the electric vehicle permitting process by streamlining the administrative approval process for hydrogen fueling stations in the same way we do for battery electric charging stations. Specifically, SB 1418 mandates that cities and counties must adopt an ordinance and checklist that creates an expedited, streamlined permitting process for hydrogen-fueling stations. This expedited procedure will ensure that citizens have access to clean energy options without unnecessary administrative hurdles.
“The mission of CHC is to enable California’s transition to zero emission vehicles by expanding the availability of reliable, convenient and affordable hydrogen fueling to support the state’s emission reduction goals. SB 1418 is a critical tool in the rapid deployment of fueling infrastructure needed to support the state’s clean transportation goals. For California to take full advantage of the federal funding provided through the ARCHES hydrogen hub application, policies must be in place to expedite the development and deployment of hydrogen infrastructure. The program will deploy 8,000 zero emission fuel cell trucks and 5,000 zero emission fuel cell buses – all depending on available fueling infrastructure that needs to begin planning and construction now. SB 1418 is one such policy that will help California transition to a cleaner, more sustainable transportation future.”
- Arguments in Opposition. The League of California Cities, in an “oppose, unless amended” position, writes, “While Cal Cities respects the policy objectives of SB 1418, we disagree with the approach taken by the measure. Cal Cities supports hydrogen as clean fuel alternative and, in many ways, would prefer it to fuel medium-to-heavy duty public fleets. However, the local permitting process is not the barrier to this industry growing in the state. The largest factors have been the state prioritizing electrification over hydrogen, the cost of hydrogen, the energy required to produce hydrogen, complexities to the production, storage and dispensing of the hydrogen, and the upfront cost of the vehicles…
“Hydrogen is highly flammable and explosive, so systems that use it must comply with strict safety and explosion prevention codes. Land use permits for hydrogen fuel stations may include technical requirements for piping, tankage, fire safety, and more. Expediting and streamlining a process that introduces a highly volatile and difficult-to-contain gas into local communities is dangerous. Decisions about flammable and in certain cases explosive gasses such as hydrogen require careful scrutiny and ample time to ensure that public health and safety is safeguarded…
“SB 1418 requires cities to provide a level of service to hydrogen fuel station applicants unavailable to most all other individuals seeking a permit. According to the California Energy Commission’s website, there are 68 hydrogen fueling stations (27 in Los Angeles County) in operation in California. Data from the Hydrogen Fuel Cell Partnership now shows there are 18 permits for hydrogen-fueling stations. Given the relatively small numbers of pending permits and operational hydrogen fuel stations, the effect of SB 1418 would be to compel local agencies with scarce resources to favor the exceedingly low number of hydrogen fuel station permits over all other permit seekers, including solar permit applications. Both that law and this bill depart from longstanding efforts by cities to treat all applicants equally.
“Cal Cities stands opposed unless amended because the measure imposes costly requirements on struggling cities. Under the bill, every city -- no matter its financial resources -- must create a new, costly ordinance to establish an expedited, streamlined permitting and inspection process for hydrogen fuel stations regardless of the demand in the community. SB 1418 would force short-staffed cities to sideline more pressing issues to develop an ordinance and special permit checklist for hydrogen fuel stations that do not exist.”
- Double-Referral. This bill is double-referred to the Transportation Committee.
REGISTERED SUPPORT / OPPOSITION:
Support
Air Products and Chemicals, INC.
Altasea
Calchamber
California Fuels and Convenience Alliance
California Hydrogen Business Council
California Hydrogen Car Owners Association
California Hydrogen Coalition
California Trucking Association
Calstart INC.
Los Angeles Area Chamber of Commerce
Los Angeles County Business Federation (BIZFED)
Support If Amended
Modern Hydrogen
Oberon Fuels
Opposition
Asian Pacific Environmental Network
Ballona Institute
CEJA Action
Center for Biological Diversity
Center on Race, Poverty and the Environment
City of Oceanside
City of Seaside
Coastal Lands Action Network
Communities for a Better Environment
Defend Ballona Wetlands
League of California Cities
Sierra Club California
So Cal 350 Climate Action
Social Eco Education
Southern California Watershed Alliance
The Climate Center
The Greenlining Institute
Vote Solar
Analysis Prepared by: Angela Mapp / L. GOV. / (916) 319-3958
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1418 |
THIRD READING
Bill No: SB 1418
Author: Archuleta (D), et al.
Amended: 5/15/24
Vote: 21
SENATE LOCAL GOVERNMENT COMMITTEE: 4-0, 4/3/24
AYES: Durazo, Dahle, Wahab, Wiener
NO VOTE RECORDED: Seyarto, Glazer, Skinner
SENATE TRANSPORTATION COMMITTEE: 9-0, 4/23/24
AYES: Cortese, Archuleta, Blakespear, Dahle, Dodd, Laird, Newman, Portantino, Umberg
NO VOTE RECORDED: Niello, Allen, Gonzalez, Limón, Nguyen, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: Hydrogen-fueling stations: expedited review
SOURCE: Author
DIGEST:
This bill requires cities and counties to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations.
Senate Floor Amendments of 5/15/24 delay implementation of the bill’s requirements.
ANALYSIS:
Existing law:
- Allows a city or county to make and enforce within its limits, all local, police, sanitary, and other ordinances and regulations not in conflict with general laws. This includes land use authority and the power to enact zoning ordinances and specify permitting requirements for development projects within their jurisdiction.
- Requires cities and counties to administratively permit hydrogen fueling stations located on parcels that are either zoned for industrial and commercial development or were previously developed as gas stations.
- Defines “hydrogen-fueling stations” to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards and that is open to the public.
- Requires that hydrogen fueling station development projects meet state and local laws including the state building code, electrical code, energy code, fire code, and any locally adopted building codes that are more restrictive than state standards.
- Requires hydrogen-fueling stations to meet certain requirements, including any rules established by the California Air Resources Board (CARB), California Energy Commission (CEC), or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires that the electrical utility, whether public or private, approve the hydrogen fueling station project prior to providing power to the site.
- Requires the CEC to allocate funds from the Clean Transportation Program to fund 100 publicly available hydrogen fueling stations, subject to specific conditions including need, and requires annual reporting on its progress.
- Establishes under Executive Order B-48-18, a goal of 200 hydrogen fueling stations, 250,000 electric vehicle (EV) charges, and 10,000 EV fast chargers by 2025.
- Establishes under Executive Order N-79-20, a goal that 100% of in-state sales of new passenger cars and trucks be zero-emission by 2035 and that 100% of medium- and heavy-duty vehicles in the State be zero-emission by 2045.
This bill:
- Modifies the definition of “hydrogen-fueling station” to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry standards and that are open to the public.
- Modifies the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by CARB, CEC, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, in consultation with the local fire department or district and the utility director, if the city or county operates a utility. In developing this ordinance a city, county, or city and county shall refer to the recommendations contained in the permitting guidebooks produced by the Governor’s Office of Business and Economic Development (GO-Biz), and may modify them based on unique climate, geological, seismological, or topographical conditions.
- Requires a city, county, or city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. Once the city, county, or city and county verifies that the application meets the requirements of the checklist, it must approve the permit. If the application is incomplete, the city, county, or city and county must notify the applicant of all deficiencies in the application and any additional information required to be eligible for the expedited permit. The checklist must be published on the city, county, or city and county’s website and must allow for electronic submittal of an application and associated documentation with an electronic signature.
- Requires a city, county, or city and county with a population of 250,000 or more residents to comply with these provisions on or before September 30, 2025, and a city, county, or city and county with a population of less than 250,000 residents to comply with these provisions by September 30, 2028.
- Repeals these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook,” on January 1, 2030.
Background
As an alternative to gasoline-based vehicles, California has more fuel cell electric vehicles (FCEVs)—and the hydrogen-fueling stations necessary to fuel them—than any other state in the nation. FCEVs contain a fuel cell, which converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling a conventional internal combustion engine, a FCEV can be refueled in less than four minutes and has a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks. FCEVs can also complement battery electric vehicles (battery EVs) because the faster refueling and longer range of FCEVs provide advantages for longer trips.
Currently, battery EVs, which are recharged at EV charging stations, dominate the zero-emission vehicle (ZEV) market. Responding to the patchwork of California’s EV permitting structure and the uncertainty it posed to installers, AB 1236 (Chiu, Chapter 598, Statutes of 2015) placed significant new requirements into law regarding applications to install EV charging stations. AB 1236 requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations by issuing a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law. AB 1236 also requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. The ordinance must include a checklist for determining an application is complete and allow for electronic submittal of applications. Other measures have sought to further accelerate EV charging deployment. In particular, AB 970 (McCarty, Chapter 710, Statutes 2021) specified timelines for local government review and approval of EV charger applications.
Hydrogen fueling station permit streamlining under SB 1291 (Archuleta, 2022). Seeking to extend some of the streamlining benefits applicable to EV chargers to hydrogen fueling stations, the Legislature enacted SB 1291 (Archuleta, Chapter 373, Statutes of 2022). SB 1291 requires cities and counties to administratively permit hydrogen fueling stations located on a parcel that is either zoned for industrial and commercial development or was previously developed as a gas station. This provision limits both the public hearings as well as any CEQA analysis for a project. Similar to the law governing EV charging station permitting, local governments can only consider health and safety requirements for hydrogen fueling stations, and they can only deny a permit if they document a specific, adverse impact to the public health or safety. SB 1291 sunsets on January 1, 2030.
Unlike AB 1236 for EV chargers, SB 1291 does not require every jurisdiction to adopt an ordinance providing for the streamlined permitting. According to the GO-Biz Hydrogen Fueling Permit Streamlining Map, only one city or county in the state has even partially streamlined permitting for hydrogen fueling stations—the City of Baldwin Park. The author wants to ensure that hydrogen fueling station permitting is fully streamlined across the state.
Comments
- Purpose of the bill. According to the author, “The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations. With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
- Everywhere? In 2022, the Legislature started to close the gap between permitting procedures for battery EVs and FCEVs by requiring local governments to permit hydrogen fueling stations administratively (SB 1291, Archuleta). However, SB 1291 stopped short of full parity with battery EVs by not requiring local governments to proactively adopt an ordinance with a checklist, as is required for battery EVs. At the time, a requirement to adopt an ordinance was viewed as unnecessary because the small number of stations expected to be developed in the coming years meant that most jurisdictions were unlikely to see an application for a hydrogen fueling station. Today, the situation is generally unchanged. Fewer fueling stations are expected to be developed than previously projected and it is unclear when the state will even remotely approach its goals for fueling stations. As a result, this bill may require local governments to expend time and resources on developing an ordinance that may never get used. On the other hand, hydrogen remains important for the state’s efforts to reduce greenhouse gas emissions, particularly in the freight sector, and the federal government recently awarded $1.2 billion to ARCHES, a public-private partnership comprising various California state bodies and actors in the hydrogen industry, to support the deployment of clean hydrogen technologies in California, including a network of heavy-duty FCEVs and refueling stations for goods movement across southern California. This bill may help stretch those dollars further by reducing the cost of hydrogen station development. Are the costs of requiring cities and counties across the state to develop an ordinance worth the potential benefit of more rapid hydrogen fueling station deployment?
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 5/16/24)
Air Products and Chemicals, INC.
Altasea
Calchamber
California Fuels and Convenience Alliance
California Hydrogen Coalition
California Trucking Association
Calstart INC.
OPPOSITION: (Verified 5/16/24)
City of Seaside
League of California Cities
The Climate Center
Prepared by: Anton Favorini-Csorba / L. GOV. / (916) 651-4119
5/17/24 15:29:00
**** END ****
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 1418 |
THIRD READING
Bill No: SB 1418
Author: Archuleta (D), et al.
Amended: 4/8/24
Vote: 21
SENATE LOCAL GOVERNMENT COMMITTEE: 4-0, 4/3/24
AYES: Durazo, Dahle, Wahab, Wiener
NO VOTE RECORDED: Seyarto, Glazer, Skinner
SENATE TRANSPORTATION COMMITTEE: 9-0, 4/23/24
AYES: Cortese, Archuleta, Blakespear, Dahle, Dodd, Laird, Newman, Portantino, Umberg
NO VOTE RECORDED: Niello, Allen, Gonzalez, Limón, Nguyen, Seyarto
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
SUBJECT: Hydrogen-fueling stations: expedited review
SOURCE: Author
DIGEST:
This bill requires cities and counties to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations.
ANALYSIS:
Existing law:
- Allows a city or county to make and enforce within its limits, all local, police, sanitary, and other ordinances and regulations not in conflict with general laws. This includes land use authority and the power to enact zoning ordinances and specify permitting requirements for development projects within their jurisdiction.
- Requires cities and counties to administratively permit hydrogen fueling stations located on parcels that are either zoned for industrial and commercial development or were previously developed as gas stations.
- Defines “hydrogen-fueling stations” to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards and that is open to the public.
- Requires that hydrogen fueling station development projects meet state and local laws including the state building code, electrical code, energy code, fire code, and any locally adopted building codes that are more restrictive than state standards.
- Requires hydrogen-fueling stations to meet certain requirements, including any rules established by the California Air Resources Board (CARB), California Energy Commission (CEC), or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires that the electrical utility, whether public or private, approve the hydrogen fueling station project prior to providing power to the site.
- Requires the CEC to allocate funds from the Clean Transportation Program to fund 100 publicly available hydrogen fueling stations, subject to specific conditions including need, and requires annual reporting on its progress.
- Establishes under Executive Order B-48-18, a goal of 200 hydrogen fueling stations, 250,000 electric vehicle (EV) charges, and 10,000 EV fast chargers by 2025.
- Establishes under Executive Order N-79-20, a goal that 100% of in-state sales of new passenger cars and trucks be zero-emission by 2035 and that 100% of medium- and heavy-duty vehicles in the State be zero-emission by 2045.
This bill:
- Modifies the definition of “hydrogen-fueling station” to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry standards and that are open to the public.
- Modifies the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by CARB, CEC, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, in consultation with the local fire department or district and the utility director, if the city or county operates a utility. In developing this ordinance a city, county, or city and county shall refer to the recommendations contained in the permitting guidebooks produced by the Governor’s Office of Business and Economic Development (GO-Biz), and may modify them based on unique climate, geological, seismological, or topographical conditions.
- Requires a city, county, or city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. Once the city, county, or city and county verifies that the application meets the requirements of the checklist, it must approve the permit. If the application is incomplete, the city, county, or city and county must notify the applicant of all deficiencies in the application and any additional information required to be eligible for the expedited permit. The checklist must be published on the city, county, or city and county’s website and must allow for electronic submittal of an application and associated documentation with an electronic signature.
- Requires a city, county, or city and county with a population of 200,000 or more residents to comply with these provisions on or before September 30, 2025, and a city, county, or city and county with a population of less than 200,000 residents to comply with these provisions by September 30, 2026.
- Repeals these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook,” on January 1, 2030.
Background
As an alternative to gasoline-based vehicles, California has more fuel cell electric vehicles (FCEVs)—and the hydrogen-fueling stations necessary to fuel them—than any other state in the nation. FCEVs contain a fuel cell, which converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling a conventional internal combustion engine, a FCEV can be refueled in less than four minutes and has a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks. FCEVs can also complement battery electric vehicles (battery EVs) because the faster refueling and longer range of FCEVs provide advantages for longer trips.
Currently, battery EVs, which are recharged at EV charging stations, dominate the zero-emission vehicle (ZEV) market. Responding to the patchwork of California’s EV permitting structure and the uncertainty it posed to installers, AB 1236 (Chiu, Chapter 598, Statutes of 2015) placed significant new requirements into law regarding applications to install EV charging stations. AB 1236 requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations by issuing a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law. AB 1236 also requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. The ordinance must include a checklist for determining an application is complete and allow for electronic submittal of applications. Other measures have sought to further accelerate EV charging deployment. In particular, AB 970 (McCarty, Chapter 710, Statutes 2021) specified timelines for local government review and approval of EV charger applications.
Hydrogen fueling station permit streamlining under SB 1291 (Archuleta, 2022). Seeking to extend some of the streamlining benefits applicable to EV chargers to hydrogen fueling stations, the Legislature enacted SB 1291 (Archuleta, Chapter 373, Statutes of 2022). SB 1291 requires cities and counties to administratively permit hydrogen fueling stations located on a parcel that is either zoned for industrial and commercial development or was previously developed as a gas station. This provision limits both the public hearings as well as any CEQA analysis for a project. Similar to the law governing EV charging station permitting, local governments can only consider health and safety requirements for hydrogen fueling stations, and they can only deny a permit if they document a specific, adverse impact to the public health or safety. SB 1291 sunsets on January 1, 2030.
Unlike AB 1236 for EV chargers, SB 1291 does not require every jurisdiction to adopt an ordinance providing for the streamlined permitting. According to the GO-Biz Hydrogen Fueling Permit Streamlining Map, only one city or county in the state has even partially streamlined permitting for hydrogen fueling stations—the City of Baldwin Park. The author wants to ensure that hydrogen fueling station permitting is fully streamlined across the state.
Comments
- Purpose of the bill. According to the author, “The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations. With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
- Everywhere? In 2022, the Legislature started to close the gap between permitting procedures for battery EVs and FCEVs by requiring local governments to permit hydrogen fueling stations administratively (SB 1291, Archuleta). However, SB 1291 stopped short of full parity with battery EVs by not requiring local governments to proactively adopt an ordinance with a checklist, as is required for battery EVs. At the time, a requirement to adopt an ordinance was viewed as unnecessary because the small number of stations expected to be developed in the coming years meant that most jurisdictions were unlikely to see an application for a hydrogen fueling station. Today, the situation is generally unchanged. Fewer fueling stations are expected to be developed than previously projected and it is unclear when the state will even remotely approach its goals for fueling stations. As a result, this bill may require local governments to expend time and resources on developing an ordinance that may never get used. On the other hand, hydrogen remains important for the state’s efforts to reduce greenhouse gas emissions, particularly in the freight sector, and the federal government recently awarded $1.2 billion to ARCHES, a public-private partnership comprising various California state bodies and actors in the hydrogen industry, to support the deployment of clean hydrogen technologies in California, including a network of heavy-duty FCEVs and refueling stations for goods movement across southern California. This bill may help stretch those dollars further by reducing the cost of hydrogen station development. Are the costs of requiring cities and counties across the state to develop an ordinance worth the potential benefit of more rapid hydrogen fueling station deployment?
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
SUPPORT: (Verified 5/8/24)
Air Products and Chemicals, INC.
Altasea
Calchamber
California Fuels and Convenience Alliance
California Hydrogen Coalition
California Trucking Association
Calstart INC.
OPPOSITION: (Verified 5/8/24)
City of Seaside
League of California Cities
Prepared by: Anton Favorini-Csorba / L. GOV. / (916) 651-4119
5/8/24 12:29:15
**** END ****
SENATE COMMITTEE ON TRANSPORTATION
Senator Dave Cortese, Chair
2023 - 2024 Regular
Bill No: Hearing Date: 4/23/2024
Author: | Archuleta | ||
Version: | 4/8/2024 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Benjamin O'Brien-Hokanson | ||
SUBJECT:
DIGEST: This bill would require cities and counties to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen fueling stations.
ANALYSIS:
Existing law:
- Allows a city or county to make and enforce within its limits, all local, police, sanitary, and other ordinances and regulations not in conflict with general laws. This includes land use authority and the power to enact zoning ordinances and specify permitting requirements for development projects within their jurisdiction.
- Requires cities and counties to administratively permit hydrogen fueling stations located on parcels that are either zoned for industrial and commercial development or were previously developed as gas stations.
- Defines “hydrogen-fueling stations” to mean the equipment used to store and dispense hydrogen fuel to vehicles according to industry codes and standards and that is open to the public.
- Requires that hydrogen fueling station development projects meet state and local laws including the state building code, electrical code, energy code, fire code, and any locally adopted building codes that are more restrictive than state standards.
- Requires hydrogen-fueling stations to meet certain requirements, including any rules established by the California Air Resources Board (CARB), California Energy Commission (CEC), or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires that the electrical utility, whether public or private, approve the hydrogen fueling station project prior to providing power to the site.
- Requires the CEC to allocate funds from the Clean Transportation Program to fund 100 publicly available hydrogen fueling stations, subject to specific conditions including need, and requires annual reporting on its progress.
- Establishes under Executive Order B-48-18, a goal of 200 hydrogen fueling stations, 250,000 electric vehicle (EV) charges, and 10,000 EV fast chargers by 2025.
- Establishes under Executive Order N-79-20, a goal that 100% of in-state sales of new passenger cars and trucks be zero-emission by 2035 and that 100% of medium- and heavy-duty vehicles in the State be zero-emission by 2045.
This bill:
- Modifies the definition of “hydrogen-fueling station” to mean the equipment and structural design components necessary to ensure the safety of the fueling station, including hydrogen-refueling canopies, that are used to store and dispense hydrogen fuel to vehicles according to industry standards and that are open to the public.
- Modifies the requirements a hydrogen-fueling station must meet to include all applicable state laws and regulations pertaining to hydrogen fueling, including any rules established by CARB, CEC, or Department of Food and Agriculture regarding safety, reliability, weights, and measures.
- Requires every city, county, or city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, in consultation with the local fire department or district and the utility director, if the city or county operates a utility. In developing this ordinance a city, county, or city and county shall refer to the recommendations contained in the permitting guidebooks produced by the Governor’s Office of Business and Economic Development (GO-Biz), and may modify them based on unique climate, geological, seismological, or topographical conditions.
- Requires a city, county, or city and county, in developing the expedited permitting process, to adopt a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. Once the city, county, or city and county verifies that the application meets the requirements of the checklist, it must approve the permit. If the application is incomplete, the city, county, or city and county must notify the applicant of all deficiencies in the application and any additional information required to be eligible for the expedited permit. The checklist must be published on the city, county, or city and county’s website and must allow for electronic submittal of an application and associated documentation with an electronic signature.
- Requires a city, county, or city and county with a population of 200,000 or more residents to comply with these provisions on or before September 30, 2025, and a city, county, or city and county with a population of less than 200,000 residents to comply with these provisions by September 30, 2026.
- Repeals these provisions, except with regard to a city, county, or city and county being authorized to refer to the recommendations contained in the most current version of the “Electric Vehicle Charging Station Permitting Guidebook,” on January 1, 2030.
COMMENTS:
- Purpose of the bill. According to the author, “The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations. With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
- FCEVs in California. As a result of California’s goals relating to greenhouse gas (GHG) and air pollution reductions, zero emission vehicle (ZEV) deployment and infrastructure development are priorities as transportation still accounts for nearly 40% of the states total GHG emissions. Currently, California has more FCEVs and hydrogen-fueling stations needed to fuel them than any other state in the nation. FCEVs contain a fuel cell, which converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling an internal combustion engine, an FCEV can be refueled in less than four minutes and has a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks. FCEVs can also complement battery based EVs because of their faster refueling and longer range capabilities.
To support ZEV deployment and infrastructure development, GO-Biz has produced a variety of tools and guidebooks. In October 2015, GO-Biz published the first edition of its “Hydrogen Station Permitting Guidebook,” and updated it in September 2020. The Go-Biz Guidebook is intended to help local jurisdictions and hydrogen station developers navigate and streamline the station development process by serving as a centralized resource “to minimize the research required to permit a station from both the authorities having jurisdiction or reviewing entities (usually city or county) and station developer perspective, offering insight and tools from past experiences and general recommendations for streamlining the permitting process.” GO-Biz has similar resources for battery EVs, including an Electric Vehicle Charging Station Permitting Guidebook and model checklists for EV chargers from jurisdictions around the state. GO-Biz is in the process of developing a model streamlining ordinance and sample checklist for hydrogen fueling station permitting that local governments may adopt. Those documents may be available as soon as April 2024.
- Following the battery EV charging station paradigm. Currently, battery EVs which are recharged at EV charging stations, dominate the ZEV market. In January of 2018, Governor Brown signed Executive Order B-48-18, setting targets of 200 hydrogen fueling stations, 250,000 EV chargers, and 10,000 EV fast chargers to support 1.5 million ZEVs on California roads by 2025, on the path to 5 million ZEVs by 2030 and 100% of in-state sales of new passenger cars and trucks as ZEVs by 2035. Although the vast majority of those ZEVs are projected to be battery EVs supported by EV chargers, the state currently has approximately 12,000 fuel cell electric vehicles (FCEVs), which run on hydrogen, and 71 hydrogen-fueling stations, according to the CEC’s Zero Emission Vehicle and Infrastructure Statistics dashboard.
To keep up with the states goals and demand for battery EV charging stations, AB 1236 (Chiu, 2015) was passed. This legislation requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations by issuing a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law. Administrative or ministerial approval is in lieu of discretionary approval, which is a more arduous review process that requires hearings by the local planning commission, public notice, and potential additional approvals.
AB 1236 also requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. The ordinance must include a checklist for determining an application is complete and allow for electronic submittal of applications. Other subsequent measures have sought to further accelerate EV charging deployment. In particular, AB 970 (McCarty, 2021) specified timelines for local government review and approval of EV charger applications.
Seeking to extend some of the streamlining benefits applicable to EV chargers to hydrogen fueling stations, the Legislature enacted SB 1291 (Archuleta, 2022). SB 1291 requires cities and counties to administratively permit hydrogen fueling stations located on a parcel that is either zoned for industrial and commercial development or was previously developed as a gas station. This provision limits both the public hearings as well as any California Environmental Quality Act (CEQA) analysis for a project. Similar to the law governing EV charging station permitting, local governments can only consider health and safety requirements for hydrogen fueling stations, and they can only deny a permit if they document a specific, adverse impact to the public health or safety. SB 1291 sunsets on January 1, 2030.
- Does the paradigm fit? Unlike AB 1236 for EV chargers, SB 1291 did not require every jurisdiction to adopt an ordinance providing for the streamlined permitting of hydrogen fueling stations. At the time, a requirement to adopt an ordinance was viewed as unnecessary because the small number of stations expected to be developed in the subsequent years meant that most jurisdictions were unlikely to see an application for a hydrogen fueling station. Today, the situation is generally unchanged. According to the GO-Biz Hydrogen Fueling Permit Streamlining Map, only one city or county in the state has even partially streamlined permitting for hydrogen fueling stations—the City of Baldwin Park. SB 1418 would require cities and counties to adopt an ordinance streamlining the permitting process for hydrogen fueling stations regardless of local demand.
The CEC is required to annually report on its progress in deploying hydrogen fueling stations. It’s 2021 report notes, “in order to further accelerate the future growth of the fuel cell electric vehicle (FCEV) population, multiple barriers to adoption will need to be overcome, including limited vehicle model availability, high FCEV prices, high hydrogen fuel prices, and limited consumer awareness.” Absent from that list of challenges is the local government permitting process, although the report cites unspecified “delays in station permitting, construction, and opening caused by the COVID-19 pandemic.”
For many reasons fewer fueling stations are being developed than previously projected and it is unclear when the state will even remotely approach its goals for fueling stations. As a result, SB 1418 may require local governments to expend time and resources on developing an ordinance that may never get used. On the other hand, SB 1418 phases in its requirements so that most cities and counties in the state will not have to develop an ordinance until September 30, 2026—well after GO-Biz releases its model ordinance and checklist for hydrogen fueling station permitting, which should reduce the burden on local governments. Meanwhile, hydrogen remains important for the state’s efforts to reduce GHG emissions, particularly in the freight sector. Additionally, the federal government recently awarded $1.2 billion to ARCHES, a public-private partnership comprising various California state bodies and actors in the hydrogen industry, to support the deployment of clean hydrogen technologies in California. This includes a network of heavy-duty FCEVs and refueling stations for goods movement across southern California. SB 1418 may help stretch those dollars further by reducing the cost of hydrogen station development. This sentiment is echoed in a letter of support written by the California Trucking Association and referenced in the arguments in support section below.
- Health and safety. It should also be considered that while hydrogen fueling stations serve the same ultimate goal as EV charging stations, decreasing emissions and spurring the state transition to ZEVs, hydrogen fuel stations face some unique health and safety obstacles that EV charging stations do not. In terms of delivery and dispensation, hydrogen will need to be compressed and stored at high pressure despite it being highly flammable and burning invisibly. Further, it is not a commonly used gas and is more prone to leakage because of the small size of the hydrogen molecule. This is further summarized in the Climate Center’s letter of opposition referenced below in the arguments in opposition section. This bill does allow for an expedited permit to be denied if the city or county can document a specific, adverse impact to the public health or safety. While this does create a health and safety carve out, it sets the bar high for cities and counties to deny an expedited permit.
Related Legislation:
SB 1291 (Archuleta, Chapter 373, Statutes of 2022) – Requires administrative review of applications for hydrogen-fueling stations and allows for denials based only on health or safety impacts.
AB 970 (McCarty, Chapter 710, Statutes of 2021) – Establishes specific time frames in which local agencies must approve permits for EV charging stations.
AB 1236 (Chiu, Chapter 598, Statutes of 2015) – Requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations through the issuance of a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law.
AB 8 (Perea, Chaptered 401, Statutes of 2013) – Requires the CEC and CARB to annually review and report on progress toward establishing a hydrogen-fueling network that provides coverage and capacity necessary to fuel current and anticipated FCEVs in the state.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
POSITIONS: (Communicated to the committee before noon on Wednesday,
April 17th.)
SUPPORT:
Air Products and Chemicals Inc.
Altasea
Calchamber
California Fuels and Convenience Alliance
California Hydrogen Coalition
California Trucking Association
Calstart INC.
OPPOSITION:
The Climate Center
Jea & Associates (unless amended)
League of California Cities (unless amended)
ARGUMENTS IN SUPPORT:
According to the California Truckers Association, “SB 1418 would provide much-needed support for the development of hydrogen infrastructure by requiring cities, counties, and city and county governments to adopt expedited permitting processes for hydrogen-fueling stations. By streamlining the permitting process, this bill would make it easier for businesses to invest in hydrogen infrastructure and deploy hydrogen fuel cell trucks, ultimately helping to reduce emissions and improve air quality in our communities.”
ARGUMENTS IN OPPOSITION:
According to the Climate Center, “Expediting and streamlining a process that introduces a highly volatile and difficult-to-contain gas into local communities is dangerous. Decisions about flammable and in certain cases explosive gasses such as hydrogen require careful scrutiny and ample time to ensure that public health and safety is safeguarded.”
-- END --
SENATE COMMITTEE ON LOCAL GOVERNMENT
Senator María Elena Durazo, Chair
2023 - 2024 Regular
Bill No: | SB 1418 | Hearing Date: | 4/3/24 |
Author: | Archuleta | Fiscal: | Yes |
Version: | 3/18/24 | Consultant: | Favorini-Csorba |
Hydrogen-fueling stations: expedited review
Requires cities and counties to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations.
Background
As an alternative to gasoline-based vehicles, California has more fuel cell electric vehicles (FCEVs)—and the hydrogen-fueling stations necessary to fuel them—than any other state in the nation. FCEVs contain a fuel cell, which converts energy stored as hydrogen to electricity to power the vehicle. Similar to refueling a conventional internal combustion engine, a FCEV can be refueled in less than four minutes and has a range of around 300 miles. These characteristics create the potential for FCEVs to replace conventional medium- and heavy-duty trucks. FCEVs can also complement battery electric vehicles (battery EVs) because the faster refueling and longer range of FCEVs provide advantages for longer trips.
Hydrogen-fueling station permitting. The California Constitution allows a city or county to “make and enforce within its limits, all local, police, sanitary and other ordinances and regulations not in conflict with general laws.” It is from this fundamental power (commonly called the police power) that cities and counties derive their authority to regulate behavior to preserve the health, safety, and welfare of the public—including land use authority.
Local governments use their police power to enact zoning ordinances and specify permitting requirements for development projects within their jurisdiction. Some projects can be permitted by city or county planning staff “ministerially” or administratively—without further approval from elected officials. But many projects require “discretionary” approvals from local governments, such as a conditional use permit or a change in zoning laws. This process requires hearings by the local planning commission, public notice and may require additional approvals.
Similar to other development projects, hydrogen-fueling stations must meet the requirements of state and local laws. These include the state building code, electrical code, energy code, and fire code standards (local governments can adopt local building code requirements to address specific climatic, geological, or topographical conditions that are more restrictive than state standards). Local laws applicable to hydrogen-fueling stations can include local zoning requirements and processes. These requirements can include planning commission hearings or analysis under the California Environmental Quality Act (CEQA) to identify environmental impacts. The electrical utility, whether private or public, must also approve the project to provide power to the site. Finally, other construction-related permits may be required, such as demolition permits, encroachment permits for operating in the city or county right-of-way, or excavation permits.
GO-Biz Hydrogen Station Permitting Guidebook and other resources. The California Governor’s Office of Business and Economic Development (GO-Biz) has developed a variety of tools and guidebooks to support zero emission vehicle (ZEV) deployment. In October 2015, GO-Biz published the first edition of its “Hydrogen Station Permitting Guidebook,” and updated it in September 2020. The GO-Biz Guidebook is intended to help local jurisdictions and hydrogen station developers navigate and streamline the station development process by serving as a centralized resource “to minimize the research required to permit a station from both the authorities having jurisdiction (AHJs) or reviewing entities (often a city or county) and station developer perspective, offering insight and tools from past experiences and general recommendations for streamlining the permitting process.” GO-Biz has similar resources for battery EVs, including an Electric Vehicle Charging Station Permitting Guidebook and model checklists for EV chargers from jurisdictions around the state. GO-Biz is in the process of developing a model streamlining ordinance and sample checklist for hydrogen fueling station permitting that local governments may adopt, and those documents may be available as soon as April 2024.
Battery EV charger permit streamlining. Currently, battery EVs, which are recharged at EV charging stations, dominate the ZEV market. Responding to the patchwork of California’s EV permitting structure and the uncertainty it posed to installers, AB 1236 (Chiu, 2015) placed significant new requirements into law regarding applications to install EV charging stations. AB 1236 requires, with certain exceptions, counties and cities to administratively approve an application to install EV charging stations by issuing a building permit or similar nondiscretionary permit and limits review to whether the station meets all health and safety requirements of local, state, and federal law. AB 1236 also requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for EV charging stations. The ordinance must include a checklist for determining an application is complete and allow for electronic submittal of applications. Other measures have sought to further accelerate EV charging deployment. In particular, AB 970 (McCarty, 2021) specified timelines for local government review and approval of EV charger applications.
Hydrogen fueling station permit streamlining under SB 1291 (Archuleta, 2022). Seeking to extend some of the streamlining benefits applicable to EV chargers to hydrogen fueling stations, the Legislature enacted SB 1291 (Archuleta, 2022). SB 1291 requires cities and counties to administratively permit hydrogen fueling stations located on a parcel that is either zoned for industrial and commercial development or was previously developed as a gas station. This provision limits both the public hearings as well as any CEQA analysis for a project. Similar to the law governing EV charging station permitting, local governments can only consider health and safety requirements for hydrogen fueling stations, and they can only deny a permit if they document a specific, adverse impact to the public health or safety. SB 1291 sunsets on January 1, 2030.
Unlike AB 1236 for EV chargers, SB 1291 does not require every jurisdiction to adopt an ordinance providing for the streamlined permitting. According to the GO-Biz Hydrogen Fueling Permit Streamlining Map, only one city or county in the state has even partially streamlined permitting for hydrogen fueling stations—the City of Baldwin Park. The author wants to ensure that hydrogen fueling station permitting is fully streamlined across the state.
Proposed Law
Senate Bill 1418 requires every city and county to adopt an ordinance that creates an expedited, streamlined permitting process for hydrogen-fueling stations, in consultation with the local fire department or district and the utility director, if the city or county operates a utility. Cities and counties with a population of 200,000 or more must adopt the ordinance by September 30, 2025, and all others must do so by September 30, 2026.
SB 1418 spells out the requirements for an ordinance, which are identical to the requirements for an ordinance to streamline permitting for EV chargers. Specifically, the ordinance must include a checklist of all requirements with which hydrogen-fueling stations must comply to be eligible for expedited review. The city or county can refer to the recommendations in the permitting guidebooks produced by GO-Biz, and may modify them based on unique climactic, geological, seismological, or topographical conditions.
Any application for a hydrogen fueling station that includes all of the items on the checklist is deemed complete, and once the city or county verifies that the application meets the requirements of the checklist, it must approve the permit. If the application is incomplete, the city or county must notify the applicant of all deficiencies in the application and any additional information required to be eligible for the expedited permit. The checklist must be published on the city or county’s website and must allow for electronic submittal of an application and associated documentation with an electronic signature.
Additionally, SB 1418 incorporates “supporting components, including hydrogen refueling canopies” to the definition of “hydrogen fueling station” and makes other technical changes.
The provisions of the bill sunset on January 1, 2030, in accordance with the existing sunset for streamlined permitting of hydrogen fueling stations.
Comments
1. Purpose of the bill. According to the author, “The permitting process for electric vehicle charging stations and hydrogen fueling stations is similar but has a few key differences. Both applications undergo review by the building official to ensure compliance with health and safety requirements. However, while electric vehicle charging stations require locals to streamline the permitting process, my bill, SB 1418, aims to extend this streamlining process to hydrogen fueling stations, achieving parity in the permitting process for both types of stations. With California's recent success in securing substantial federal funding for clean renewable hydrogen initiatives, such as through the Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) application, the timely passage of SB 1418 is essential to expedite the development and deployment of hydrogen infrastructure, facilitating the transition to a cleaner transportation future.”
2. How it started… In January 2018, Governor Brown signed Executive Order B-48-18, setting targets of 200 hydrogen fueling stations and 250,000 electric vehicle chargers to support 1.5 million ZEVs on California roads by 2025, on the path to 5 million ZEVs by 2030 and 100 percent of in-state sales of new passenger cars and trucks as ZEVs by 2035. Although the vast majority of those ZEVs are projected to be battery EVs supported by EV chargers, the state currently has approximately 12,000 FCEVs on the roads and 71 hydrogen-fueling stations, according to the California Energy Commission’s (CEC’s) Zero Emission Vehicle and Infrastructure Statistics dashboard.
3. How it’s going. AB 8 (Perea, 2013) requires the CEC and California Air Resources Board (CARB) to annually review and report on progress toward establishing a hydrogen-fueling network that provides the coverage and capacity necessary to fuel current and anticipated FCEVs in the state. The most recent AB 8 report, for 2023, notes that progress on building out a FCEV fueling network is proceeding more slowly than expected. The report states:
“As in prior reporting, securing site access, permitting timelines, utility connection timelines, and other site-specific issues appear to remain barriers to rapidly deploying hydrogen fueling stations. In addition, station developers increasingly report difficulty with securing skilled and affordable contractors, longer commissioning processes to ensure properly functioning station equipment, and other financial and logistical concerns affecting station build times. Some of these issues may be due to the currently small scale of the hydrogen refueling industry, while others appear due to broader economic concerns, such as high inflation. With respect to permitting, Senate Bill 1291 … sets limits on the time to complete permitting review for hydrogen fueling stations. CARB staff are aware of individual cases where this statute has helped station permitting progress, but it does not appear to be universally implemented in all jurisdictions yet.
“The recent cancellation of Shell’s planned hydrogen station development also contributes to a long-term two-year delay in planned network development and a significant decrease in the total number of planned hydrogen fueling stations. One year ago, station developer projections indicated as many as 130 stations could be open by the end of 2024; current projections now point to 129 stations no sooner than 2026. The total number of station projects tracked by CARB and CEC has also decreased from 176 to 129.”
Implementing SB 1291 and, should it be enacted, this bill, may assist in building out the network of hydrogen fueling stations to a sufficient level to support wider adoption of FCEVs. However, many other obstacles to developing stations exist, including those listed above, as well as limited demand for FCEVs and increased hydrogen prices at the pump that prove necessary to recoup the cost of station development. Even with the adoption of SB 1418, stations may remain scarce.
4. Everywhere? In 2022, the Legislature started to close the gap between permitting procedures for battery EVs and FCEVs by requiring local governments to permit hydrogen fueling stations administratively (SB 1291, Archuleta). However, SB 1291 stopped short of full parity with battery EVs by not requiring local governments to proactively adopt an ordinance with a checklist, as is required for battery EVs. At the time, a requirement to adopt an ordinance was viewed as unnecessary because the small number of stations expected to be developed in the coming years meant that most jurisdictions were unlikely to see an application for a hydrogen fueling station. Today, the situation is generally unchanged. As discussed above, fewer fueling stations are expected to be developed than previously projected and it is unclear when the state will even remotely approach its goals for fueling stations. As a result, SB 1418 may require local governments to expend time and resources on developing an ordinance that may never get used. On the other hand, SB 1418 phases in its requirements so that most cities and counties in the state will not have to develop an ordinance until September 30, 2026—well after GO-Biz releases its model ordinance and checklist for hydrogen fueling station permitting, which should reduce the burden on local governments. Meanwhile, hydrogen remains important for the state’s efforts to reduce greenhouse gas emissions, particularly in the freight sector, and the federal government recently awarded $1.2 billion to ARCHES, a public-private partnership comprising various California state bodies and actors in the hydrogen industry, to support the deployment of clean hydrogen technologies in California, including a network of heavy-duty FCEVs and refueling stations for goods movement across southern California. SB 1418 may help stretch those dollars further by reducing the cost of hydrogen station development. Are the costs of requiring cities and counties across the state to develop an ordinance worth the potential benefit of more rapid hydrogen fueling station deployment?
5. Let’s be clear. SB 1418 adds “supporting components” to the definition of hydrogen fueling station, thereby including any supporting components in the what must be streamlined. Although the bill provides that supporting components “includes hydrogen refueling canopies,” it otherwise doesn’t define or limit the term. To clarify the additional components that must be streamlined, the Committee may wish to consider amending SB 1418 to instead add “structural design components necessary to ensure the safety of the fueling station, including hydrogen refueling canopies,” to the definition of hydrogen fueling stations.
6. Let’s get technical. Committee staff recommend the following technical amendment: On p. 7, in line 9, strike “guidebook” and insert “guidebooks.”
7. Mandate. The California Constitution generally requires the state to reimburse local agencies for their costs when the state imposes new programs or additional duties on them. According to the Legislative Counsel’s Office, SB 1418 creates a new state-mandated local program because it increases the duties of local officials. SB 1418 disclaims this liability by stating that no reimbursement is required under the Constitution because local agencies have the authority to levy fees sufficient to cover the cost of the increased services.
8. Double-referred. The Senate Rules Committee has ordered a double referral of SB 1418: first to the Senate Local Government Committee to hear issues of local permitting authority, and then to the Senate Transportation Committee.
Support and Opposition
(3/28/24)
Support: Altasea
CalChamber
California Fuels and Convenience Alliance
California Hydrogen Coalition
California Trucking Association
Opposition: League of California Cities
The Climate Center
-- END --
Discussed in Hearing
Senate Floor
Assembly Floor
Assembly Standing Committee on Appropriations
Assembly Standing Committee on Transportation
Assembly Standing Committee on Local Government
Senate Floor
Senate Standing Committee on Transportation
Senate Standing Committee on Transportation
Bill Author
Bill Co-Author(s):