AB 81: Hospitals: seismic safety.
- Session Year: 2015-2016
- House: Assembly
- Latest Version Date: 2015-07-13
Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973.
Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant a 5-year extension under prescribed circumstances. Existing law also allows the office to grant an additional 2-year extension in specified circumstances.
This bill would authorize a hospital located in the City of Willits that has received the additional 2-year extension to the January 2008 deadline pursuant to specified provisions to request an additional extension until September 1, 2015, to obtain either a certificate of occupancy for a replacement building or a construction final for a building on which a retrofit has been performed.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Willits.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973.
Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant a 5-year extension under prescribed circumstances. Existing law also allows the office to grant an additional 2-year extension in specified circumstances.
This bill would authorize a hospital located in the City of Willits that has received the additional 2-year extension to the January 2008 deadline pursuant to specified provisions to request an additional extension until September 1, 2015, to obtain either a certificate of occupancy for a replacement building or a construction final for a building on which a retrofit has been performed.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Willits.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law, the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, establishes, under the jurisdiction of the Office of Statewide Health Planning and Development, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973.
Existing law provides that, after January 1, 2008, a general acute care hospital building that is determined to be a potential risk of collapse or to pose significant loss of life in the event of seismic activity be used only for nonacute care hospital purposes, except that the office may grant a 5-year extension under prescribed circumstances. Existing law also allows the office to grant an additional 2-year extension in specified circumstances.
This bill would authorize a hospital located in the City of Willits that has received the additional 2-year extension to the January 2008 deadline pursuant to specified provisions to request an additional extension until September 1, 2015, to obtain either a certificate of occupancy for a replacement building or a construction final for a building on which a retrofit has been performed.
This bill would make legislative findings and declarations as to the necessity of a special statute for the City of Willits.
This bill would declare that it is to take effect immediately as an urgency statute.
(a)(1)After January 1, 2008, any general acute care hospital building that is determined to be a potential risk of collapse or pose significant loss of life shall only be used for nonacute care hospital purposes, unless an extension of this deadline has been granted and either of the following occurs before the end of the extension:
(A)A replacement building has been constructed and a certificate of occupancy has been granted by the office for the replacement building.
(B)A retrofit has been performed on the building and a construction final has been obtained by the office.
(2)An extension of the deadline may be granted by the office upon a demonstration by the owner that compliance will result in a loss of health care capacity that may not be provided by other general acute care hospitals within a reasonable proximity. In its request for an extension of the deadline, a hospital shall state why the hospital is unable to comply with the January 1, 2008, deadline requirement.
(3)Prior to granting an extension of the January 1, 2008, deadline pursuant to this section, the office shall do all of the following:
(A)Provide public notice of a hospitals request for an extension of the deadline. The notice, at a minimum, shall be posted on the offices Internet Web site, and shall include the facilitys name and identification number, the status of the request, and the beginning and ending dates of the comment period, and shall advise the public of the opportunity to submit public comments pursuant to subparagraph (C). The office shall also provide notice of all requests for the deadline extension directly to interested parties upon request of the interested parties.
(B)Provide copies of extension requests to interested parties within 10 working days to allow interested parties to review and provide comment within the 45-day comment period. The copies shall include those records that are available to the public pursuant to the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code).
(C)Allow the public to submit written comments on the extension proposal for a period of not less than 45 days from the date of the public notice.
(b)(1)It is the intent of the Legislature, in enacting this subdivision, to facilitate the process of having more hospital buildings in substantial compliance with this chapter and to take nonconforming general acute care hospital inpatient buildings out of service more quickly.
(2)The functional contiguous grouping of hospital buildings of a general acute care hospital, each of which provides, as the primary source, one or more of the hospitals eight basic services as specified in subdivision (a) of Section 1250, may receive a five-year extension of the January 1, 2008, deadline specified in subdivision (a) of this section pursuant to this subdivision for both structural and nonstructural requirements. A functional contiguous grouping refers to buildings containing one or more basic hospital services that are either attached or connected in a way that is acceptable to the State Department of Health Care Services. These buildings may be either on the existing site or a new site.
(3)To receive the five-year extension, a single building containing all of the basic services or at least one building within the contiguous grouping of hospital buildings shall have obtained a building permit prior to 1973 and this building shall be evaluated and classified as a nonconforming, Structural Performance Category-1 (SPC-1) building. The classification shall be submitted to and accepted by the Office of Statewide Health Planning and Development. The identified hospital building shall be exempt from the requirement in subdivision (a) until January 1, 2013, if the hospital agrees that the basic service or services that were provided in that building shall be provided, on or before January 1, 2013, as follows:
(A)Moved into an existing conforming Structural Performance Category-3 (SPC-3), Structural Performance Category-4 (SPC-4), or Structural Performance Category-5 (SPC-5) and Non-Structural Performance Category-4 (NPC-4) or Non-Structural Performance Category-5 (NPC-5) building.
(B)Relocated to a newly built compliant SPC-5 and NPC-4 or NPC-5 building.
(C)Continued in the building if the building is retrofitted to a SPC-5 and NPC-4 or NPC-5 building.
(4)A five-year extension is also provided to a post-1973 building if the hospital owner informs the Office of Statewide Health Planning and Development that the building is classified as SPC-1, SPC-3, or SPC-4 and will be closed to general acute care inpatient service use by January 1, 2013. The basic services in the building shall be relocated into a SPC-5 and NPC-4 or NPC-5 building by January 1, 2013.
(5)SPC-1 buildings, other than the building identified in paragraph (3) or (4), in the contiguous grouping of hospital buildings shall also be exempt from the requirement in subdivision (a) until January 1, 2013. However, on or before January 1, 2013, at a minimum, each of these buildings shall be retrofitted to a SPC-2 and NPC-3 building, or no longer be used for general acute care hospital inpatient services.
(c)On or before March 1, 2001, the office shall establish a schedule of interim work progress deadlines that hospitals shall be required to meet to be eligible for the extension specified in subdivision (b). To receive this extension, the hospital building or buildings shall meet the year 2002 nonstructural requirements.
(d)A hospital building that is eligible for an extension pursuant to this section shall meet the January 1, 2030, nonstructural and structural deadline requirements if the building is to be used for general acute care inpatient services after January 1, 2030.
(e)Upon compliance with subdivision (b), the hospital shall be issued a written notice of compliance by the office. The office shall send a written notice of violation to hospital owners that fail to comply with this section. The office shall make copies of these notices available on its Internet Web site.
(f)(1)A hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) may request an additional extension of up to two years for a hospital building that it owns or operates and that meets the criteria specified in paragraph (2), (3), or (5).
(2)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital building is under construction at the time of the request for extension under this subdivision and the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b).
(B)The hospital building plans were submitted to the office and were deemed ready for review by the office at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital received a building permit for the construction described in subparagraph (A) at least two years prior to the applicable deadline for the building.
(D)The hospital submitted a construction timeline at least two years prior to the applicable deadline for the building demonstrating the hospitals intent to meet the applicable deadline. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D), but factors beyond the hospitals control make it impossible for the hospital to meet the deadline.
(3)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital building is owned by a health care district that has, as owner, received the extension of the January 1, 2008, deadline, but where the hospital is operated by an unaffiliated third-party lessee pursuant to a facility lease that extends at least through December 31, 2009. The district shall file a declaration with the office with a request for an extension stating that, as of the date of the filing, the district has lacked, and continues to lack, unrestricted access to the subject hospital building for seismic planning purposes during the term of the lease, and that the district is under contract with the county to maintain hospital services when the hospital comes under district control. The office shall not grant the extension if an unaffiliated third-party lessee will operate the hospital beyond December 31, 2010.
(B)The hospital building plans were submitted to the office and were deemed ready for review by the office at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital received a building permit for the construction described in subparagraph (B) by December 31, 2011.
(D)The hospital submitted, by December 31, 2011, a construction timeline for the building demonstrating the hospitals intent and ability to meet the deadline of December 31, 2014. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F)The hospital granted an extension pursuant to this paragraph shall submit an additional status report to the office, equivalent to that required by subdivision (c) of Section 130061, no later than June 30, 2013.
(4)An extension granted pursuant to paragraph (3) shall be applicable only to the health care district applicant and its affiliated hospital while the hospital is operated by the district or an entity under the control of the district.
(5)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital owner submitted to the office, prior to June 30, 2009, a request for review using current computer modeling utilized by the office and based upon software developed by the Federal Emergency Management Agency (FEMA), referred to as Hazards US, and the building was deemed SPC-1 after that review.
(B)The hospital building plans for the building are submitted to the office and deemed ready for review by the office prior to July 1, 2010. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that shall be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital receives a building permit from the office for the construction described in subparagraph (B) prior to January 1, 2012.
(D)The hospital submits, prior to January 1, 2012, a construction timeline for the building demonstrating the hospitals intent and ability to meet the applicable deadline. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F)The hospital owner completes construction such that the hospital meets all criteria to enable the office to issue a certificate of occupancy by the applicable deadline for the building.
(6)A hospital located in the County of Sacramento, San Mateo, or Santa Barbara or the City of San Jose or the City of Willits that has received an additional extension pursuant to paragraph (2) or (5) may request an additional extension until September 1, 2015, to obtain either a certificate of occupancy from the office for a replacement building, or a construction final from the office for a building on which a retrofit has been performed.
(7)A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(8)The office may revoke an extension granted pursuant to this subdivision for any hospital building where the work of construction is abandoned or suspended for a period of at least one year, unless the hospital demonstrates in a public document that the abandonment or suspension was caused by factors beyond its control.
(g)(1)Notwithstanding subdivisions (a), (b), (c), and (f), and Sections 130061.5 and 130064, a hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) also may request an additional extension of up to seven years for a hospital building that it owns or operates. The office may grant the extension subject to the hospital meeting the milestones set forth in paragraph (2).
(2)The hospital building subject to the extension shall meet all of the following milestones, unless the hospital building is reclassified as SPC-2 or higher as a result of its Hazards US score:
(A)The hospital owner submits to the office, no later than September 30, 2012, a letter of intent stating whether it intends to rebuild, replace, or retrofit the building, or remove all general acute care beds and services from the building, and the amount of time necessary to complete the construction.
(B)The hospital owner submits to the office, no later than September 30, 2012, a schedule detailing why the requested extension is necessary, and specifically how the hospital intends to meet the requested deadline.
(C)The hospital owner submits to the office, no later than September 30, 2012, an application ready for review seeking structural reassessment of each of its SPC-1 buildings using current computer modeling based upon software developed by FEMA, referred to as Hazards US.
(D)The hospital owner submits to the office, no later than January 1, 2015, plans ready for review consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B).
(E)The hospital owner submits a financial report to the office at the time the plans are submitted pursuant to subparagraph (D). The report shall demonstrate the hospital owners financial capacity to implement the construction plans submitted pursuant to subparagraph (D).
(F)The hospital owner receives a building permit consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B), no later than July 1, 2018.
(3)To evaluate public safety and determine whether to grant an extension of the deadline, the office shall consider the structural integrity of the hospitals SPC-1 buildings based on its Hazards US scores, community access to essential hospital services, and the hospital owners financial capacity to meet the deadline as determined by either a bond rating of BBB or below or the financial report on the hospital owners financial capacity submitted pursuant to subparagraph (E) of paragraph (2). The criteria contained in this paragraph shall be considered by the office in its determination of the length of an extension or whether an extension should be granted.
(4)The extension or subsequent adjustments granted pursuant to this subdivision may not exceed the amount of time that is reasonably necessary to complete the construction specified in paragraph (2).
(5)If the circumstances underlying the request for extension submitted to the office pursuant to paragraph (2) change, the hospital owner shall notify the office as soon as practicable, but in no event later than six months after the hospital owner discovered the change of circumstances. The office may adjust the length of the extension granted pursuant to paragraphs (2) and (3) as necessary, but in no event longer than the period specified in paragraph (1).
(6)A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(7)The office may revoke an extension granted pursuant to this subdivision for any hospital building when it is determined that any information submitted pursuant to this section was falsified, or if the hospital failed to meet a milestone set forth in paragraph (2), or where the work of construction is abandoned or suspended for a period of at least six months, unless the hospital demonstrates in a publicly available document that the abandonment or suspension was caused by factors beyond its control.
(8)Regulatory submissions made by the office to the California Building Standards Commission to implement this section shall be deemed to be emergency regulations and shall be adopted as emergency regulations.
(9)The hospital owner that applies for an extension pursuant to this subdivision shall pay the office an additional fee, to be determined by the office, sufficient to cover the additional reasonable costs incurred by the office for maintaining the additional reporting requirements established under this section, including, but not limited to, the costs of reviewing and verifying the extension documentation submitted pursuant to this subdivision. This additional fee shall not include any cost for review of the plans or other duties related to receiving a building or occupancy permit.
(10)This subdivision shall become operative on the date that the State Department of Health Care Services receives all necessary federal approvals for a 201112 fiscal year hospital quality assurance fee program that includes three hundred twenty million dollars ($320,000,000) in fee revenue to pay for health care coverage for children, which is made available as a result of the legislative enactment of a 201112 fiscal year hospital quality assurance fee program.
SEC. 2.The Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances facing hospitals in the City of Willits that are working on meeting seismic safety and building standards.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
To prevent the loss of hospital licensure, Medicaid and Medicare funding, and eligibility for Federal Emergency Management Agency assistance following a disaster that would lead to hospital closures and loss of access to health care in the City of Willits, it is necessary for this act to take effect immediately.
(a)(1)After January 1, 2008, any general acute care hospital building that is determined to be a potential risk of collapse or pose significant loss of life shall only be used for nonacute care hospital purposes, unless an extension of this deadline has been granted and either of the following occurs before the end of the extension:
(A)A replacement building has been constructed and a certificate of occupancy has been granted by the office for the replacement building.
(B)A retrofit has been performed on the building and a construction final has been obtained by the office.
(2)An extension of the deadline may be granted by the office upon a demonstration by the owner that compliance will result in a loss of health care capacity that may not be provided by other general acute care hospitals within a reasonable proximity. In its request for an extension of the deadline, a hospital shall state why the hospital is unable to comply with the January 1, 2008, deadline requirement.
(3)Prior to granting an extension of the January 1, 2008, deadline pursuant to this section, the office shall do all of the following:
(A)Provide public notice of a hospitals request for an extension of the deadline. The notice, at a minimum, shall be posted on the offices Internet Web site, and shall include the facilitys name and identification number, the status of the request, and the beginning and ending dates of the comment period, and shall advise the public of the opportunity to submit public comments pursuant to subparagraph (C). The office shall also provide notice of all requests for the deadline extension directly to interested parties upon request of the interested parties.
(B)Provide copies of extension requests to interested parties within 10 working days to allow interested parties to review and provide comment within the 45-day comment period. The copies shall include those records that are available to the public pursuant to the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code).
(C)Allow the public to submit written comments on the extension proposal for a period of not less than 45 days from the date of the public notice.
(b)(1)It is the intent of the Legislature, in enacting this subdivision, to facilitate the process of having more hospital buildings in substantial compliance with this chapter and to take nonconforming general acute care hospital inpatient buildings out of service more quickly.
(2)The functional contiguous grouping of hospital buildings of a general acute care hospital, each of which provides, as the primary source, one or more of the hospitals eight basic services as specified in subdivision (a) of Section 1250, may receive a five-year extension of the January 1, 2008, deadline specified in subdivision (a) of this section pursuant to this subdivision for both structural and nonstructural requirements. A functional contiguous grouping refers to buildings containing one or more basic hospital services that are either attached or connected in a way that is acceptable to the State Department of Health Care Services. These buildings may be either on the existing site or a new site.
(3)To receive the five-year extension, a single building containing all of the basic services or at least one building within the contiguous grouping of hospital buildings shall have obtained a building permit prior to 1973 and this building shall be evaluated and classified as a nonconforming, Structural Performance Category-1 (SPC-1) building. The classification shall be submitted to and accepted by the Office of Statewide Health Planning and Development. The identified hospital building shall be exempt from the requirement in subdivision (a) until January 1, 2013, if the hospital agrees that the basic service or services that were provided in that building shall be provided, on or before January 1, 2013, as follows:
(A)Moved into an existing conforming Structural Performance Category-3 (SPC-3), Structural Performance Category-4 (SPC-4), or Structural Performance Category-5 (SPC-5) and Non-Structural Performance Category-4 (NPC-4) or Non-Structural Performance Category-5 (NPC-5) building.
(B)Relocated to a newly built compliant SPC-5 and NPC-4 or NPC-5 building.
(C)Continued in the building if the building is retrofitted to a SPC-5 and NPC-4 or NPC-5 building.
(4)A five-year extension is also provided to a post-1973 building if the hospital owner informs the Office of Statewide Health Planning and Development that the building is classified as SPC-1, SPC-3, or SPC-4 and will be closed to general acute care inpatient service use by January 1, 2013. The basic services in the building shall be relocated into a SPC-5 and NPC-4 or NPC-5 building by January 1, 2013.
(5)SPC-1 buildings, other than the building identified in paragraph (3) or (4), in the contiguous grouping of hospital buildings shall also be exempt from the requirement in subdivision (a) until January 1, 2013. However, on or before January 1, 2013, at a minimum, each of these buildings shall be retrofitted to a SPC-2 and NPC-3 building, or no longer be used for general acute care hospital inpatient services.
(c)On or before March 1, 2001, the office shall establish a schedule of interim work progress deadlines that hospitals shall be required to meet to be eligible for the extension specified in subdivision (b). To receive this extension, the hospital building or buildings shall meet the year 2002 nonstructural requirements.
(d)A hospital building that is eligible for an extension pursuant to this section shall meet the January 1, 2030, nonstructural and structural deadline requirements if the building is to be used for general acute care inpatient services after January 1, 2030.
(e)Upon compliance with subdivision (b), the hospital shall be issued a written notice of compliance by the office. The office shall send a written notice of violation to hospital owners that fail to comply with this section. The office shall make copies of these notices available on its Internet Web site.
(f)(1)A hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) may request an additional extension of up to two years for a hospital building that it owns or operates and that meets the criteria specified in paragraph (2), (3), or (5).
(2)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital building is under construction at the time of the request for extension under this subdivision and the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b).
(B)The hospital building plans were submitted to the office and were deemed ready for review by the office at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital received a building permit for the construction described in subparagraph (A) at least two years prior to the applicable deadline for the building.
(D)The hospital submitted a construction timeline at least two years prior to the applicable deadline for the building demonstrating the hospitals intent to meet the applicable deadline. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D), but factors beyond the hospitals control make it impossible for the hospital to meet the deadline.
(3)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital building is owned by a health care district that has, as owner, received the extension of the January 1, 2008, deadline, but where the hospital is operated by an unaffiliated third-party lessee pursuant to a facility lease that extends at least through December 31, 2009. The district shall file a declaration with the office with a request for an extension stating that, as of the date of the filing, the district has lacked, and continues to lack, unrestricted access to the subject hospital building for seismic planning purposes during the term of the lease, and that the district is under contract with the county to maintain hospital services when the hospital comes under district control. The office shall not grant the extension if an unaffiliated third-party lessee will operate the hospital beyond December 31, 2010.
(B)The hospital building plans were submitted to the office and were deemed ready for review by the office at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital received a building permit for the construction described in subparagraph (B) by December 31, 2011.
(D)The hospital submitted, by December 31, 2011, a construction timeline for the building demonstrating the hospitals intent and ability to meet the deadline of December 31, 2014. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F)The hospital granted an extension pursuant to this paragraph shall submit an additional status report to the office, equivalent to that required by subdivision (c) of Section 130061, no later than June 30, 2013.
(4)An extension granted pursuant to paragraph (3) shall be applicable only to the health care district applicant and its affiliated hospital while the hospital is operated by the district or an entity under the control of the district.
(5)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital owner submitted to the office, prior to June 30, 2009, a request for review using current computer modeling utilized by the office and based upon software developed by the Federal Emergency Management Agency (FEMA), referred to as Hazards US, and the building was deemed SPC-1 after that review.
(B)The hospital building plans for the building are submitted to the office and deemed ready for review by the office prior to July 1, 2010. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that shall be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital receives a building permit from the office for the construction described in subparagraph (B) prior to January 1, 2012.
(D)The hospital submits, prior to January 1, 2012, a construction timeline for the building demonstrating the hospitals intent and ability to meet the applicable deadline. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F)The hospital owner completes construction such that the hospital meets all criteria to enable the office to issue a certificate of occupancy by the applicable deadline for the building.
(6)A hospital located in the County of Sacramento, San Mateo, or Santa Barbara or the City of San Jose or the City of Willits that has received an additional extension pursuant to paragraph (2) or (5) may request an additional extension until September 1, 2015, to obtain either a certificate of occupancy from the office for a replacement building, or a construction final from the office for a building on which a retrofit has been performed.
(7)A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(8)The office may revoke an extension granted pursuant to this subdivision for any hospital building where the work of construction is abandoned or suspended for a period of at least one year, unless the hospital demonstrates in a public document that the abandonment or suspension was caused by factors beyond its control.
(g)(1)Notwithstanding subdivisions (a), (b), (c), and (f), and Sections 130061.5 and 130064, a hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) also may request an additional extension of up to seven years for a hospital building that it owns or operates. The office may grant the extension subject to the hospital meeting the milestones set forth in paragraph (2).
(2)The hospital building subject to the extension shall meet all of the following milestones, unless the hospital building is reclassified as SPC-2 or higher as a result of its Hazards US score:
(A)The hospital owner submits to the office, no later than September 30, 2012, a letter of intent stating whether it intends to rebuild, replace, or retrofit the building, or remove all general acute care beds and services from the building, and the amount of time necessary to complete the construction.
(B)The hospital owner submits to the office, no later than September 30, 2012, a schedule detailing why the requested extension is necessary, and specifically how the hospital intends to meet the requested deadline.
(C)The hospital owner submits to the office, no later than September 30, 2012, an application ready for review seeking structural reassessment of each of its SPC-1 buildings using current computer modeling based upon software developed by FEMA, referred to as Hazards US.
(D)The hospital owner submits to the office, no later than January 1, 2015, plans ready for review consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B).
(E)The hospital owner submits a financial report to the office at the time the plans are submitted pursuant to subparagraph (D). The report shall demonstrate the hospital owners financial capacity to implement the construction plans submitted pursuant to subparagraph (D).
(F)The hospital owner receives a building permit consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B), no later than July 1, 2018.
(3)To evaluate public safety and determine whether to grant an extension of the deadline, the office shall consider the structural integrity of the hospitals SPC-1 buildings based on its Hazards US scores, community access to essential hospital services, and the hospital owners financial capacity to meet the deadline as determined by either a bond rating of BBB or below or the financial report on the hospital owners financial capacity submitted pursuant to subparagraph (E) of paragraph (2). The criteria contained in this paragraph shall be considered by the office in its determination of the length of an extension or whether an extension should be granted.
(4)The extension or subsequent adjustments granted pursuant to this subdivision may not exceed the amount of time that is reasonably necessary to complete the construction specified in paragraph (2).
(5)If the circumstances underlying the request for extension submitted to the office pursuant to paragraph (2) change, the hospital owner shall notify the office as soon as practicable, but in no event later than six months after the hospital owner discovered the change of circumstances. The office may adjust the length of the extension granted pursuant to paragraphs (2) and (3) as necessary, but in no event longer than the period specified in paragraph (1).
(6)A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(7)The office may revoke an extension granted pursuant to this subdivision for any hospital building when it is determined that any information submitted pursuant to this section was falsified, or if the hospital failed to meet a milestone set forth in paragraph (2), or where the work of construction is abandoned or suspended for a period of at least six months, unless the hospital demonstrates in a publicly available document that the abandonment or suspension was caused by factors beyond its control.
(8)Regulatory submissions made by the office to the California Building Standards Commission to implement this section shall be deemed to be emergency regulations and shall be adopted as emergency regulations.
(9)The hospital owner that applies for an extension pursuant to this subdivision shall pay the office an additional fee, to be determined by the office, sufficient to cover the additional reasonable costs incurred by the office for maintaining the additional reporting requirements established under this section, including, but not limited to, the costs of reviewing and verifying the extension documentation submitted pursuant to this subdivision. This additional fee shall not include any cost for review of the plans or other duties related to receiving a building or occupancy permit.
(10)This subdivision shall become operative on the date that the State Department of Health Care Services receives all necessary federal approvals for a 201112 fiscal year hospital quality assurance fee program that includes three hundred twenty million dollars ($320,000,000) in fee revenue to pay for health care coverage for children, which is made available as a result of the legislative enactment of a 201112 fiscal year hospital quality assurance fee program.
SEC. 2.The Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances facing hospitals in the City of Willits that are working on meeting seismic safety and building standards.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
To prevent the loss of hospital licensure, Medicaid and Medicare funding, and eligibility for Federal Emergency Management Agency assistance following a disaster that would lead to hospital closures and loss of access to health care in the City of Willits, it is necessary for this act to take effect immediately.
(a)(1)After January 1, 2008, any general acute care hospital building that is determined to be a potential risk of collapse or pose significant loss of life shall only be used for nonacute care hospital purposes, unless an extension of this deadline has been granted and either of the following occurs before the end of the extension:
(A)A replacement building has been constructed and a certificate of occupancy has been granted by the office for the replacement building.
(B)A retrofit has been performed on the building and a construction final has been obtained by the office.
(2)An extension of the deadline may be granted by the office upon a demonstration by the owner that compliance will result in a loss of health care capacity that may not be provided by other general acute care hospitals within a reasonable proximity. In its request for an extension of the deadline, a hospital shall state why the hospital is unable to comply with the January 1, 2008, deadline requirement.
(3)Prior to granting an extension of the January 1, 2008, deadline pursuant to this section, the office shall do all of the following:
(A)Provide public notice of a hospitals request for an extension of the deadline. The notice, at a minimum, shall be posted on the offices Internet Web site, and shall include the facilitys name and identification number, the status of the request, and the beginning and ending dates of the comment period, and shall advise the public of the opportunity to submit public comments pursuant to subparagraph (C). The office shall also provide notice of all requests for the deadline extension directly to interested parties upon request of the interested parties.
(B)Provide copies of extension requests to interested parties within 10 working days to allow interested parties to review and provide comment within the 45-day comment period. The copies shall include those records that are available to the public pursuant to the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code).
(C)Allow the public to submit written comments on the extension proposal for a period of not less than 45 days from the date of the public notice.
(b)(1)It is the intent of the Legislature, in enacting this subdivision, to facilitate the process of having more hospital buildings in substantial compliance with this chapter and to take nonconforming general acute care hospital inpatient buildings out of service more quickly.
(2)The functional contiguous grouping of hospital buildings of a general acute care hospital, each of which provides, as the primary source, one or more of the hospitals eight basic services as specified in subdivision (a) of Section 1250, may receive a five-year extension of the January 1, 2008, deadline specified in subdivision (a) of this section pursuant to this subdivision for both structural and nonstructural requirements. A functional contiguous grouping refers to buildings containing one or more basic hospital services that are either attached or connected in a way that is acceptable to the State Department of Health Care Services. These buildings may be either on the existing site or a new site.
(3)To receive the five-year extension, a single building containing all of the basic services or at least one building within the contiguous grouping of hospital buildings shall have obtained a building permit prior to 1973 and this building shall be evaluated and classified as a nonconforming, Structural Performance Category-1 (SPC-1) building. The classification shall be submitted to and accepted by the Office of Statewide Health Planning and Development. The identified hospital building shall be exempt from the requirement in subdivision (a) until January 1, 2013, if the hospital agrees that the basic service or services that were provided in that building shall be provided, on or before January 1, 2013, as follows:
(A)Moved into an existing conforming Structural Performance Category-3 (SPC-3), Structural Performance Category-4 (SPC-4), or Structural Performance Category-5 (SPC-5) and Non-Structural Performance Category-4 (NPC-4) or Non-Structural Performance Category-5 (NPC-5) building.
(B)Relocated to a newly built compliant SPC-5 and NPC-4 or NPC-5 building.
(C)Continued in the building if the building is retrofitted to a SPC-5 and NPC-4 or NPC-5 building.
(4)A five-year extension is also provided to a post-1973 building if the hospital owner informs the Office of Statewide Health Planning and Development that the building is classified as SPC-1, SPC-3, or SPC-4 and will be closed to general acute care inpatient service use by January 1, 2013. The basic services in the building shall be relocated into a SPC-5 and NPC-4 or NPC-5 building by January 1, 2013.
(5)SPC-1 buildings, other than the building identified in paragraph (3) or (4), in the contiguous grouping of hospital buildings shall also be exempt from the requirement in subdivision (a) until January 1, 2013. However, on or before January 1, 2013, at a minimum, each of these buildings shall be retrofitted to a SPC-2 and NPC-3 building, or no longer be used for general acute care hospital inpatient services.
(c)On or before March 1, 2001, the office shall establish a schedule of interim work progress deadlines that hospitals shall be required to meet to be eligible for the extension specified in subdivision (b). To receive this extension, the hospital building or buildings shall meet the year 2002 nonstructural requirements.
(d)A hospital building that is eligible for an extension pursuant to this section shall meet the January 1, 2030, nonstructural and structural deadline requirements if the building is to be used for general acute care inpatient services after January 1, 2030.
(e)Upon compliance with subdivision (b), the hospital shall be issued a written notice of compliance by the office. The office shall send a written notice of violation to hospital owners that fail to comply with this section. The office shall make copies of these notices available on its Internet Web site.
(f)(1)A hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) may request an additional extension of up to two years for a hospital building that it owns or operates and that meets the criteria specified in paragraph (2), (3), or (5).
(2)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital building is under construction at the time of the request for extension under this subdivision and the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b).
(B)The hospital building plans were submitted to the office and were deemed ready for review by the office at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital received a building permit for the construction described in subparagraph (A) at least two years prior to the applicable deadline for the building.
(D)The hospital submitted a construction timeline at least two years prior to the applicable deadline for the building demonstrating the hospitals intent to meet the applicable deadline. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D), but factors beyond the hospitals control make it impossible for the hospital to meet the deadline.
(3)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital building is owned by a health care district that has, as owner, received the extension of the January 1, 2008, deadline, but where the hospital is operated by an unaffiliated third-party lessee pursuant to a facility lease that extends at least through December 31, 2009. The district shall file a declaration with the office with a request for an extension stating that, as of the date of the filing, the district has lacked, and continues to lack, unrestricted access to the subject hospital building for seismic planning purposes during the term of the lease, and that the district is under contract with the county to maintain hospital services when the hospital comes under district control. The office shall not grant the extension if an unaffiliated third-party lessee will operate the hospital beyond December 31, 2010.
(B)The hospital building plans were submitted to the office and were deemed ready for review by the office at least four years prior to the applicable deadline for the building. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that will be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital received a building permit for the construction described in subparagraph (B) by December 31, 2011.
(D)The hospital submitted, by December 31, 2011, a construction timeline for the building demonstrating the hospitals intent and ability to meet the deadline of December 31, 2014. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F)The hospital granted an extension pursuant to this paragraph shall submit an additional status report to the office, equivalent to that required by subdivision (c) of Section 130061, no later than June 30, 2013.
(4)An extension granted pursuant to paragraph (3) shall be applicable only to the health care district applicant and its affiliated hospital while the hospital is operated by the district or an entity under the control of the district.
(5)The office may grant the additional extension if the hospital building subject to the extension meets all of the following criteria:
(A)The hospital owner submitted to the office, prior to June 30, 2009, a request for review using current computer modeling utilized by the office and based upon software developed by the Federal Emergency Management Agency (FEMA), referred to as Hazards US, and the building was deemed SPC-1 after that review.
(B)The hospital building plans for the building are submitted to the office and deemed ready for review by the office prior to July 1, 2010. The hospital shall indicate, upon submission of its plans, the SPC-1 building or buildings that shall be retrofitted or replaced to meet the requirements of this section as a result of the project.
(C)The hospital receives a building permit from the office for the construction described in subparagraph (B) prior to January 1, 2012.
(D)The hospital submits, prior to January 1, 2012, a construction timeline for the building demonstrating the hospitals intent and ability to meet the applicable deadline. The timeline shall include all of the following:
(i)The projected construction start date.
(ii)The projected construction completion date.
(iii)Identification of the contractor.
(E)The hospital building is under construction at the time of the request for the extension, the purpose of the construction is to meet the requirements of subdivision (a) to allow the use of the building as a general acute care hospital building after the extension deadline granted by the office pursuant to subdivision (a) or (b), and the hospital is making reasonable progress toward meeting the timeline set forth in subparagraph (D).
(F)The hospital owner completes construction such that the hospital meets all criteria to enable the office to issue a certificate of occupancy by the applicable deadline for the building.
(6)A hospital located in the County of Sacramento, San Mateo, or Santa Barbara or the City of San Jose or the City of Willits that has received an additional extension pursuant to paragraph (2) or (5) may request an additional extension until September 1, 2015, to obtain either a certificate of occupancy from the office for a replacement building, or a construction final from the office for a building on which a retrofit has been performed.
(7)A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(8)The office may revoke an extension granted pursuant to this subdivision for any hospital building where the work of construction is abandoned or suspended for a period of at least one year, unless the hospital demonstrates in a public document that the abandonment or suspension was caused by factors beyond its control.
(g)(1)Notwithstanding subdivisions (a), (b), (c), and (f), and Sections 130061.5 and 130064, a hospital that has received an extension of the January 1, 2008, deadline pursuant to subdivision (a) or (b) also may request an additional extension of up to seven years for a hospital building that it owns or operates. The office may grant the extension subject to the hospital meeting the milestones set forth in paragraph (2).
(2)The hospital building subject to the extension shall meet all of the following milestones, unless the hospital building is reclassified as SPC-2 or higher as a result of its Hazards US score:
(A)The hospital owner submits to the office, no later than September 30, 2012, a letter of intent stating whether it intends to rebuild, replace, or retrofit the building, or remove all general acute care beds and services from the building, and the amount of time necessary to complete the construction.
(B)The hospital owner submits to the office, no later than September 30, 2012, a schedule detailing why the requested extension is necessary, and specifically how the hospital intends to meet the requested deadline.
(C)The hospital owner submits to the office, no later than September 30, 2012, an application ready for review seeking structural reassessment of each of its SPC-1 buildings using current computer modeling based upon software developed by FEMA, referred to as Hazards US.
(D)The hospital owner submits to the office, no later than January 1, 2015, plans ready for review consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B).
(E)The hospital owner submits a financial report to the office at the time the plans are submitted pursuant to subparagraph (D). The report shall demonstrate the hospital owners financial capacity to implement the construction plans submitted pursuant to subparagraph (D).
(F)The hospital owner receives a building permit consistent with the letter of intent submitted pursuant to subparagraph (A) and the schedule submitted pursuant to subparagraph (B), no later than July 1, 2018.
(3)To evaluate public safety and determine whether to grant an extension of the deadline, the office shall consider the structural integrity of the hospitals SPC-1 buildings based on its Hazards US scores, community access to essential hospital services, and the hospital owners financial capacity to meet the deadline as determined by either a bond rating of BBB or below or the financial report on the hospital owners financial capacity submitted pursuant to subparagraph (E) of paragraph (2). The criteria contained in this paragraph shall be considered by the office in its determination of the length of an extension or whether an extension should be granted.
(4)The extension or subsequent adjustments granted pursuant to this subdivision may not exceed the amount of time that is reasonably necessary to complete the construction specified in paragraph (2).
(5)If the circumstances underlying the request for extension submitted to the office pursuant to paragraph (2) change, the hospital owner shall notify the office as soon as practicable, but in no event later than six months after the hospital owner discovered the change of circumstances. The office may adjust the length of the extension granted pursuant to paragraphs (2) and (3) as necessary, but in no event longer than the period specified in paragraph (1).
(6)A hospital denied an extension pursuant to this subdivision may appeal the denial to the Hospital Building Safety Board.
(7)The office may revoke an extension granted pursuant to this subdivision for any hospital building when it is determined that any information submitted pursuant to this section was falsified, or if the hospital failed to meet a milestone set forth in paragraph (2), or where the work of construction is abandoned or suspended for a period of at least six months, unless the hospital demonstrates in a publicly available document that the abandonment or suspension was caused by factors beyond its control.
(8)Regulatory submissions made by the office to the California Building Standards Commission to implement this section shall be deemed to be emergency regulations and shall be adopted as emergency regulations.
(9)The hospital owner that applies for an extension pursuant to this subdivision shall pay the office an additional fee, to be determined by the office, sufficient to cover the additional reasonable costs incurred by the office for maintaining the additional reporting requirements established under this section, including, but not limited to, the costs of reviewing and verifying the extension documentation submitted pursuant to this subdivision. This additional fee shall not include any cost for review of the plans or other duties related to receiving a building or occupancy permit.
(10)This subdivision shall become operative on the date that the State Department of Health Care Services receives all necessary federal approvals for a 201112 fiscal year hospital quality assurance fee program that includes three hundred twenty million dollars ($320,000,000) in fee revenue to pay for health care coverage for children, which is made available as a result of the legislative enactment of a 201112 fiscal year hospital quality assurance fee program.
SEC. 2.The Legislature finds and declares that a special law is necessary and that a general law cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances facing hospitals in the City of Willits that are working on meeting seismic safety and building standards.
SEC. 3.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
To prevent the loss of hospital licensure, Medicaid and Medicare funding, and eligibility for Federal Emergency Management Agency assistance following a disaster that would lead to hospital closures and loss of access to health care in the City of Willits, it is necessary for this act to take effect immediately.
|
Date
|
Status
|
|---|---|
| Jul 13, 2015 | Approved by the Governor. |
| Jul 13, 2015 | Chaptered by Secretary of State - Chapter 63, Statutes of 2015. |
| Jul 1, 2015 | Enrolled and presented to the Governor at 2:30 p.m. |
| Jun 25, 2015 | In Assembly. Ordered to Engrossing and Enrolling. |
| Jun 25, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. (Ayes 37. Noes 0. Page 1619.). |
| Jun 25, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Assembly. |
| Jun 23, 2015 | Read second time. Ordered to Consent Calendar. |
| Jun 22, 2015 | From committee: Be placed on second reading file pursuant to Senate Rule 28.8 and ordered to consent calendar. |
| Jun 11, 2015 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 9. Noes 0.) (June 10). Re-referred to Com. on APPR. |
| May 7, 2015 | Referred to Com. on HEALTH. |
| Apr 23, 2015 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Apr 23, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 78. Noes 0. Page 1107.). |
| Apr 23, 2015 | Read third time. Urgency clause adopted. Passed. Ordered to the Senate. (Ayes 78. Noes 0.). |
| Apr 16, 2015 | Read second time. Ordered to consent calendar. |
| Apr 15, 2015 | From committee: Do pass. To Consent Calendar. (Ayes 16. Noes 0.) (April 15). |
| Apr 15, 2015 | From committee: Do pass. Ordered to Consent Calendar. (Ayes 16. Noes 0.) (April 15). |
| Apr 8, 2015 | From committee: Do pass and re-refer to Com. on APPR. with recommendation: To Consent Calendar. (Ayes 18. Noes 0.) (April 7). Re-referred to Com. on APPR. |
| Jan 22, 2015 | Referred to Com. on HEALTH. |
| Jan 6, 2015 | From printer. May be heard in committee February 5. |
| Jan 5, 2015 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Jun 25, 2015 | Consent Calendar 2nd AB81 Wood Urgency Clause | Senate Floor |
Passed |
|
| Jun 10, 2015 | Do pass, but first be re-referred to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Health |
Passed |
|
| Apr 23, 2015 | AB 81 WOOD Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Apr 15, 2015 | Do pass. To Consent Calendar. | Assembly Standing Committee on Appropriations |
Passed |
|
| Apr 7, 2015 | Do pass and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Health |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
AB 81
Page 6
|
Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 |
CONSENT
Bill No: AB 81
Introduced: 1/5/15
SENATE HEALTH COMMITTEE: 9-0, 6/10/15
AYES: Hernandez, Nguyen, Hall, Mitchell, Monning, Nielsen, Pan, Roth, Wolk
SENATE APPROPRIATIONS COMMITTEE: Senate Rule 28.8
ASSEMBLY FLOOR: 78-0, 4/23/15 (Consent) - See last page for vote
SUBJECT: Hospitals: seismic safety
SOURCE: Frank R. Howard Memorial Hospital
DIGEST: This bill permits a hospital in the City of Willits to request an eight-month deadline extension of a seismic safety requirement that hospitals be rebuilt or retrofitted to be capable of withstanding an earthquake, which it is currently required to meet by January 1, 2015, so that this hospital could have until September 1, 2015, to meet this seismic safety requirement.
Existing law:
Establishes timelines for hospital compliance with seismic safety standards, including a requirement that buildings posing a significant risk of collapse and a danger to the public (referred to as SPC -1 buildings) be rebuilt or retrofitted to be capable of withstanding an earthquake, or removed from acute care service, by January 1, 2008, and a requirement that hospital buildings be capable of remaining intact after an earthquake, and must also be capable of continued operation by January 1, 2030.
Permits the Office of Statewide Health Planning and Development (OSHPD) to grant an extension of up to five years to the 2008 deadline, which would be January 1, 2013, for hospitals for which compliance will result in a loss of health care capacity, as defined. Existing law also allows OSHPD to grant various further extensions beyond this, including up to two years, which would be January 1, 2015, for certain hospitals that face construction delays, hospitals that encounter delays due to an attempt to reclassify their buildings to higher seismic status, and hospitals that experience local planning delays.
Permits a hospital to continue operating under a deadline extension if either of the following occurs before the end of the extension:
A replacement building has been constructed and a certificate of occupancy has been granted by OSHPD for the replacement building; or,
A retrofit has been performed on the building and a construction final has been obtained by OSHPD.
Permits a hospital located in the Counties of Sacramento, San Mateo, or Santa Barbara, or the City of San Jose, that has received the additional two-year extension to January 1, 2015, described in 2) above, to request an additional extension until September 1, 2015, to obtain either a certificate of occupancy from OSHPD for a replacement building, or a construction final from OSHPD on a retrofitted building.
This bill:
Adds a hospital located in the City of Willits to existing provisions of law that permit hospitals located in the Counties of Sacramento, San Mateo, or Santa Barbara, or the City of San Jose, that have received an additional extension of the January 1, 2008, seismic safety requirement under specified provisions of existing law to January 1, 2015, to request an additional extension until September 1, 2015, in order to obtain either a certificate of occupancy or a construction final from OSHPD.
Contains an urgency clause, stating that to prevent the loss of hospital licensure, Medicaid and Medicare funding, and eligibility for Federal Emergency Management Agency assistance following a disaster that would lead to hospital closures and loss of access to health care in the City of Willits, it is necessary for this act to take effect immediately.
Makes legislative findings and declarations that a special law is necessary and that a general law cannot be made applicable because of the unique circumstances facing hospitals in the City of Willits that are working on meeting seismic safety building standards.
Comments
Author’s statement. According to the author, the Frank R. Howard Memorial Hospital (HMH) has been in construction and working to meet the seismic safety requirements. However, given the rural nature of the area, the construction project has encountered unforeseen circumstances that delayed completion of the hospital from meeting the deadline. This bill seeks to provide an extension to HMH until September 1, 2015, to complete construction on a project that is nearly completed. This is the same extension given to five other hospitals last year, provided by the passage of AB 2557 (Pan, Chapter 821, Statutes of 2014). If the deadline is not extended, HMH could lose its license and even jeopardize its ability to participate in Medicare and Medicaid program, which is about 80 percent of their patients this hospital serves.
Hospital seismic requirements. Following the 1971 San Fernando Valley earthquake, California enacted the Alfred E. Alquist Hospital Facility Seismic Safety Act of 1973 (Alquist Act), which mandated that all new hospital construction meet stringent seismic safety standards. In 1994, after the Northridge earthquake, the Legislature passed and the Governor signed SB 1953 (Alquist, Chapter 740, Statutes of 1994), which required OSHPD to establish earthquake performance categories for hospitals, and established a January 1, 2008, deadline by which general acute care hospitals must be retrofitted or replaced so that they do not pose a risk of collapse in the event of an earthquake, and a January 1, 2030, deadline by which they must be capable of remaining operational following an earthquake. SB 1953 also allowed most hospitals to qualify for an extension of the January 1, 2008 deadline to January 1, 2013.
Current law allows an extension of the 2008 deadline if compliance will result in an interruption of health care services provided by hospitals within the area. Hospital owners can request extensions in one-year increments up to a maximum of five years after January 1, 2008. Hospitals may also request extensions of up to five years if acute care services will be moved to an existing conforming building, relocated to a new building, or if the existing building will be retrofitted to designated seismic performance categories.
In addition to the five-year extension, the Legislature has passed additional bills allowing hospitals to extend the deadlines for retrofitting beyond the 2013 deadline. SB 1661 (Cox, Chapter 679, Statutes of 2006) authorized an extension of up to an additional two years for hospitals that have already received five-year extensions of the January 1, 2008, seismic safety compliance deadline if specified criteria are met, including that the hospital building is under construction at the time of the request for extension and the hospital is making reasonable progress toward meeting its deadline, but factors beyond the hospital's control make it impossible for the hospital to meet the deadline.
SB 306 (Ducheny, Chapter 642, Statutes of 2007) permitted a
hospital owner to comply with seismic safety deadlines and
requirements in current law by replacing all of its buildings subject
to seismic retrofit by January 1, 2020, rather than retrofitting by
2013 and replacing them by 2030, if the hospital meets several
conditions and OSHPD certifies that the hospital owner lacks the
financial capacity to meet seismic standards, as defined. Among the
conditions a hospital must meet to be eligible for this extension are
that it maintains a contract to provide Medi-Cal services, maintains
a basic emergency room, and is either in an underserved area, serves
an underserved community, is an essential provider of Medi-Cal
services, or is a heavy provider of services to Medi-Cal and indigent
patients. Eighteen hospitals have qualified for extensions to 2020
under this authority.
Prior Legislation
AB 2557 (Pan, Chapter 821, Statutes of 2014) permitted a hospital located in the Counties of Sacramento, San Mateo, or Santa Barbara or the City of San Jose, that had received an additional extension of the January 1, 2008, seismic safety requirements under specified provisions of existing law to January 1, 2015, to request an additional extension until September 1, 2015, in order to obtain either a certificate of occupancy or a construction final from OSHPD.
SB
90 (Steinberg, Chapter 19, Statutes of 2011) allowed a hospital to
seek an extension for seismic compliance for its SPC-1 buildings of
up to seven years based on the following elements: the structural
integrity of the building, the loss of essential hospital services to
the community if the hospital closed, and financial hardship.
SB 499 (Ducheny, Chapter 601, Statutes of 2009) required all general acute care hospitals that have Structural Performance Category-1 buildings to report to OSHPD by November 1, 2010, and annually thereafter, on the status of their compliance with the seismic safety deadlines.
SB 306 (Ducheny, Chapter 642, Statutes of 2007) amended the Alquist Act to permit hospitals to delay compliance with the July 1, 2008 seismic retro deadline, and the 2013 extension, to the year 2020, by filing a declaration with OSHPD that the owner lacks financial capacity to comply with the law.
SB 1661 (Cox, Chapter 679, Statutes of 2006) authorized an extension of up to an additional two years for hospitals that had already received extensions of the January 1, 2008 seismic safety compliance deadline if specified criteria were met, and required specified hospital reports to be posted on the OSHPD Web site.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
Frank R. Howard
Memorial Hospital (source)
Adventist Health
California
Hospital Association
Loma Linda University Medical Center
OPPOSITION: (Verified 6/23/15)
None received
ARGUMENTS IN SUPPORT: This bill is sponsored by the Frank R. Howard Memorial Hospital (HMH), which states that it is a 25-bed Critical Access Hospital located in northern Mendocino County. HMH states that it has been engaged for since 2009 in the design and construction of a new facility which was planned to open for occupancy in advance of January 1, 2015. The contractor’s written construction schedule, in place through the summer of 2014, called for substantial completion of HMH’s new facility in early October 2014, which would have given the hospital time to open in advance of January 1, 2015. In mid-September 2014, HMH states that the contractor, citing unanticipated construction delays, provided HMH with a new schedule reflecting completion of construction in mid-January 2015, which was later pushed back into the spring. HMH notes that last year, five hospital construction projects were identified as working toward the January 1, 2015 deadline, but due to extenuating circumstances, were not likely to be completed in time. Legislation was passed to allow these five hospitals to request an additional eight-month extension, and that this bill is seeking to provide HMH with this same ability. Adventist Health, and Loma Linda University Medical Center state in support that HMH is an important health care provider in northern Mendocino County, with more than 80 percent of the hospital’s inpatient payor mix is a combination of Medicare and Medi-Cal, and that non-compliance with seismic deadlines could cause a hospital to lose its license. The California Hospital Association states in support that many designers and structural engineers consider California hospitals to be the most complex and costly buildings to construct due to the intricate structural, mechanical, plumbing and electrical systems needed to remain operational following an earthquake.
ASSEMBLY FLOOR: 78-0, 4/23/15
AYES: Achadjian, Alejo, Travis Allen, Baker, Bigelow, Bloom, Bonilla, Bonta, Brough, Brown, Burke, Calderon, Chang, Chau, Chávez, Chiu, Chu, Cooley, Cooper, Dababneh, Dahle, Daly, Dodd, Eggman, Frazier, Beth Gaines, Gallagher, Cristina Garcia, Eduardo Garcia, Gatto, Gipson, Gomez, Gonzalez, Gordon, Gray, Grove, Hadley, Harper, Roger Hernández, Holden, Irwin, Jones, Jones-Sawyer, Kim, Lackey, Levine, Linder, Lopez, Low, Maienschein, Mathis, Mayes, McCarty, Medina, Melendez, Mullin, Nazarian, Obernolte, O'Donnell, Olsen, Patterson, Perea, Quirk, Rendon, Ridley-Thomas, Rodriguez, Santiago, Steinorth, Mark Stone, Thurmond, Ting, Wagner, Waldron, Weber, Wilk, Williams, Wood, Atkins
NO VOTE RECORDED: Campos, Salas
Prepared by: Vince Marchand / HEALTH /
6/24/15 17:31:38
**** END ****
AB 81 (Wood) Page 4 of 4
SENATE COMMITTEE ON HEALTH
Senator Ed Hernandez, O.D., Chair
BILL NO: AB 81
AUTHOR: |
Wood |
||
VERSION: |
January 5, 2015 |
||
HEARING DATE: |
June 10, 2015 |
|
|
CONSULTANT: |
Vince Marchand |
||
SUBJECT: Hospitals: seismic safety.
SUMMARY:
Permits a hospital in the City of Willits to request an eight-month deadline extension of a seismic safety requirement that hospitals be rebuilt or retrofitted to be capable of withstanding an earthquake, which it is currently required to meet by January 1, 2015, so that this hospital could have until September 1, 2015, to meet this seismic safety requirement.
Existing law:
Establishes timelines for hospital compliance with seismic safety standards, including a requirement that buildings posing a significant risk of collapse and a danger to the public (referred to as SPC -1 buildings) be rebuilt or retrofitted to be capable of withstanding an earthquake, or removed from acute care service, by January 1, 2008, and a requirement that hospital buildings be capable of remaining intact after an earthquake, and must also be capable of continued operation by January 1, 2030.
Permits the Office of Statewide Health Planning and Development (OSHPD) to grant an extension of up to five years to the 2008 deadline, which would be January 1, 2013, for hospitals for which compliance will result in a loss of health care capacity, as defined. Existing law also allows OSHPD to grant various further extensions beyond this, including up to two years, which would be January 1, 2015, for certain hospitals that face construction delays, hospitals that encounter delays due to an attempt to reclassify their buildings to higher seismic status, and hospitals that experience local planning delays.
Permits a hospital to continue operating under a deadline extension if either of the following occurs before the end of the extension:
A replacement building has been constructed and a certificate of occupancy has been granted by OSHPD for the replacement building; or,
A retrofit has been performed on the building and a construction final has been obtained by OSHPD.
Permits a hospital located in the Counties of Sacramento, San Mateo, or Santa Barbara, or the City of San Jose, that has received the additional two year extension to January 1, 2015 described in 2) above, to request an additional extension until September 1, 2015, to obtain either a certificate of occupancy from OSHPD for a replacement building, or a construction final from OSHPD on a retrofitted building.
This bill:
Adds a hospital located in the City of Willits to existing provisions of law that permit hospitals located in the Counties of Sacramento, San Mateo, or Santa Barbara or the City of San Jose, that have received an additional extension of the January 1, 2008, seismic safety requirement under specified provisions of existing law to January 1, 2015, to request an additional extension until September 1, 2015, in order to obtain either a certificate of occupancy or a construction final from OSHPD.
Contains an urgency clause, stating that to prevent the loss of hospital licensure, Medicaid and Medicare funding, and eligibility for Federal Emergency Management Agency assistance following a disaster that would lead to hospital closures and loss of access to health care in the City of Willits, it is necessary for this act to take effect immediately.
Makes legislative findings and declarations that a special law is necessary and that a general law cannot be made applicable because of the unique circumstances facing hospitals in the City of Willits that are working on meeting seismic safety building standards.
FISCAL EFFECT:
According to the Assembly Appropriations Committee, costs to OSHPD to oversee this delay are minor and absorbable.
PRIOR VOTES:
Assembly Floor: |
78 - 0 |
Assembly Appropriations Committee: |
16 - 0 |
Assembly Health Committee: |
18 - 0 |
COMMENTS:
Author’s statement. According to the author, the Frank R. Howard Memorial Hospital (HMH) has been in construction and working to meet the seismic safety requirements. However, given the rural nature of the area, the construction project has encountered unforeseen circumstances that delayed completion of the hospital from meeting the deadline. This bill seeks to provide an extension to HMH until September 1, 2015, to complete construction on a project that is nearly completed. This is the same extension given to 5 other hospitals last year, provided by the passage of AB 2557 (Pan, Chapter 821, Statutes of 2014). If the deadline is not extended, HMH could lose its license and even jeopardize its ability to participate in Medicare and Medicaid program, which is about 80 percent of their patients this hospital serves.
Hospital seismic requirements. Following the 1971 San Fernando Valley earthquake, California enacted the Alfred E. Alquist Hospital Facility Seismic Safety Act of 1973 (Alquist Act), which mandated that all new hospital construction meet stringent seismic safety standards. In 1994, after the Northridge earthquake, the Legislature passed and the Governor signed SB 1953 (Alquist, Chapter 740, Statutes of 1994), which required OSHPD to establish earthquake performance categories for hospitals, and established a January 1, 2008, deadline by which general acute care hospitals must be retrofitted or replaced so that they do not pose a risk of collapse in the event of an earthquake, and a January 1, 2030, deadline by which they must be capable of remaining operational following an earthquake. SB 1953 also allowed most hospitals to qualify for an extension of the January 1, 2008 deadline to January 1, 2013.
Current law allows an extension of the 2008 deadline if compliance will result in an interruption of health care services provided by hospitals within the area. Hospital owners can request extensions in one-year increments up to a maximum of five years after January 1, 2008. Hospitals may also request extensions of up to five years if acute care services will be moved to an existing conforming building, relocated to a new building, or if the existing building will be retrofitted to designated seismic performance categories.
In addition to the five-year extension, the Legislature has passed additional bills allowing hospitals to extend the deadlines for retrofitting beyond the 2013 deadline. SB 1661 (Cox, Chapter 679, Statutes of 2006), authorizes an extension of up to an additional two years for hospitals that have already received five-year extensions of the January 1, 2008, seismic safety compliance deadline if specified criteria are met, including that the hospital building is under construction at the time of the request for extension and the hospital is making reasonable progress toward meeting its deadline, but factors beyond the hospital's control make it impossible for the hospital to meet the deadline.
SB
306 (Ducheny, Chapter 642, Statutes of 2007), permits a hospital
owner to comply with seismic safety deadlines and requirements in
current law by replacing all of its buildings subject to seismic
retrofit by January 1, 2020, rather than retrofitting by 2013 and
replacing them by 2030, if the hospital meets several conditions and
OSHPD certifies that the hospital owner lacks the financial capacity
to meet seismic standards, as defined. Among the conditions a
hospital must meet to be eligible for this extension are that it
maintains a contract to provide Medi-Cal services, maintains a basic
emergency room, and is either in an underserved area, serves an
underserved community, is an essential provider of Medi-Cal services,
or is a heavy provider of services to Medi-Cal and indigent patients.
Eighteen hospitals have qualified for extensions to 2020 under this
authority.
Prior legislation. AB 2557 permitted a hospital located in the Counties of Sacramento, San Mateo, or Santa Barbara or the City of San Jose, that had received an additional extension of the January 1, 2008, seismic safety requirements under specified provisions of existing law to January 1, 2015, to request an additional extension until September 1, 2015, in order to obtain either a certificate of occupancy or a construction final from the Office of Statewide Health Planning and Development
SB 90 (Steinberg, Chapter 19, Statutes of 2011), allowed a hospital to seek an extension for seismic compliance for its SPC-1 buildings of up to seven years based on the following elements: the structural integrity of the building, the loss of essential hospital services to the community if the hospital closed, and financial hardship.
SB 499 (Ducheny, Chapter
601, Statutes of 2009), required all general acute care hospitals
that have SPC-1 buildings to report to OSHPD by November 1, 2010, and
annually thereafter, on the status of their compliance with the
seismic safety deadlines.
SB 306 (Ducheny, Chapter 642, Statues of 2007), amended the Alfred E. Alquist Hospital Facilities Seismic Safety Act to permit hospitals to delay compliance with the July 1, 2008 seismic retro deadline, and the 2013 extension, to the year 2020, by filing a declaration with OSHPD that the owner lacks financial capacity to comply with the law.
SB 1661 (Cox, Chapter 679, Statutes of 2006), authorized an extension of up to an additional two years for hospitals that had already received extensions of the January 1, 2008 seismic safety compliance deadline if specified criteria were met, and required specified hospital reports to be posted on the OSHPD Web site.
Support. This bill is sponsored by the Frank R. Howard Memorial Hospital (HMH), which states that it is a 25-bed Critical Access Hospital located in northern Mendocino County. HMH states that it has been engaged for since 2009 in the design and construction of a new facility which was planned to open for occupancy in advance of January 1, 2015. The contractor’s written construction schedule, in place through the summer of 2014, called for substantial completion of HMH’s new facility in early October 2014, which would have given the hospital time to open in advance of January 1, 2015. In mid-September 2014, HMH states that the contractor, citing unanticipated construction delays, provided HMH with a new schedule reflecting completion of construction in mid-January 2015, which was later pushed back into the spring. HMH notes that last year, five hospital construction projects were identified as working toward the January 1, 2015 deadline, but due to extenuating circumstances, were not likely to be completed in time. Legislation was passed to allow these five hospitals to request an additional eight-month extension, and that this bill is seeking to provide HMH with this same ability. Adventist Health, and Loma Linda University Medical Center state in support that HMH is an important health care provider in northern Mendocino County, with more than 80 percent of the hospital’s inpatient payor mix is a combination of Medicare and Medi-Cal, and that non-compliance with seismic deadlines could cause a hospital to lose its license. The California Hospital Association states in support that many designers and structural engineers consider California hospitals to be the most complex and costly buildings to construct due to the intricate structural, mechanical, plumbing and electrical systems needed to remain operational following an earthquake.
SUPPORT AND OPPOSITION:
Support: Frank
R. Howard Memorial Hospital (sponsor)
Adventist
Health
California Hospital Association
Loma Linda
University Medical Center
Oppose: None received
-- END --
AB 81
Page 2
Date of Hearing: April 15, 2015
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Jimmy Gomez, Chair
AB 81
(Wood) – As Introduced January 5, 2015
Policy Committee: |
Health |
Vote: |
18 - 0 |
|
|
|
|
|
|
|
|
Urgency: Yes State Mandated Local Program: No Reimbursable: No
SUMMARY:
SUMMARY:
This bill adds hospitals in the City of Willits to a list of hospitals eligible for an additional extension, until September 1, 2015, of the deadline for compliance with seismic safety regulations.
FISCAL EFFECT:
Costs to the Office of Statewide Health Planning and Development (OSHPD) to oversee this delay are minor and absorbable.
COMMENTS:
Purpose. This bill is intended to allow Frank R. Howard Memorial Hospital (HMH) in the city of Willits to request an additional extension of the hospital's deadline for compliance with seismic safety regulations. HMH was already granted an extension to January 1, 2015, pursuant to SB 1661 (Cox), Chapter 679, Statutes of 2006, which allowed extensions of compliance deadlines if specified criteria were met. HMH contends that since 2009, they have been working closely with their contractor to ensure the new facility under construction was seismically compliant and would be ready for occupancy on or before the January 1, 2015 deadline. However, HMH indicates in mid-September 2014, citing unanticipated construction delays, the contractor provided HMH with a new schedule reflecting completion of construction in the spring of 2015. HMH indicates without this extension, they could lose their license and jeopardize their ability to participate in Medicare and Medicaid, which is about 80% of their inpatient payer mix.
Background. Following the 1994 Northridge earthquake, seismic requirements for hospitals were strengthened. SB 1953 (Chapter 740, Statutes of 1994) established a schedule for California hospitals to meet seismic safety goals. It established Structural Performance Categories (SPC) to measure a hospital building's risk of collapse, and instituting deadlines for retrofitting and/or reconstruction. OSHPD works closely with hospitals to monitor plans for seismic compliance.
Subsequent legislation has provided for additional seismic compliance extensions. The final date by which all hospitals must comply is January 1, 2020. In order to grant an extension to the hospital, OSHPD must consider the structural integrity of the building, the loss of essential healthcare services to the community should the hospital be closed, and the financial hardship that the hospital may have experienced.
SPC-1 buildings are at the highest risk of collapse and are considered a threat to public safety, while those categorized as SPC-5 are expected to maintain services even in the case of a severe earthquake. Most HMH buildings are categorized as SPC-1.
Prior Legislation. AB 2557 (Pan), Chapter 821, Statutes of 2014, authorized compliance delays similar to the one in this bill. AB 2557 allowed OSHPD to grant five hospitals who had already received an extension of the January 1, 2008, seismic safety deadline, an additional extension until September 1, 2015.
Analysis Prepared by: Lisa Murawski / APPR. / (916) 319-2081
AB 81
Page 5
Date of Hearing: April 7, 2015
ASSEMBLY COMMITTEE ON HEALTH
Bonta, Chair
AB 81
(Wood) – As Introduced January 5, 2015
SUBJECT:
Hospitals: seismic safety.
SUMMARY:
Authorizes a hospital in the City of Willits, that has already received an extension of the January 1, 2008, seismic safety deadline from the Office of Statewide Health Planning and Development (OSHPD), to request an additional extension of the deadline until September 1, 2015. Makes findings and declarations as to the necessity of a special statute for the City of Willits and contains an urgency clause to ensure that the provisions of this bill go into immediate effect upon enactment.
EXISTING LAW:
1) Establishes the Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983, to ensure that hospital buildings be designed and constructed to resist the forces generated by earthquakes and requires OSHPD to propose building standards for earthquake resistance and to provide independent review of the design and construction of hospital buildings.
2) Creates a 16-member Hospital Building Safety Board appointed by the Director of OSHPD to act as a board of appeals in all matters relating to the administration and enforcement of seismic safety requirements.
3) Provides the ability for hospitals to request and receive a delay in their January 1, 2008 seismic compliance deadline if the hospital can demonstrate that compliance will result in a loss of health care capacity that may not be provided by another hospital within a reasonable distance. Requires the requesting hospital to state why it cannot comply with the deadline.
4) Requires OSHPD, prior to granting an extension of the 2008 deadline, to:
a) Provide public notice of a hospital's request for an extension which includes the facility's name, identification number, the status of the request, and the beginning and ending dates of the public comment period, as well as provide copies of extension requests to interested parties within 10 working days; and,
b) Allow the public to submit written comments on the extension proposal for at least 45 days from the date of the public notice.
5) Requires OSHPD to notify the Department of Public Health (DPH), of the hospital owners that have received a written notice of violation for failure to comply with the 2008 requirements. Requires DPH to suspend or refuse to renew the license of a hospital that has received a notice of violation from OSHPD because of its failure to comply, unless the hospital places its license in voluntary suspense.
FISCAL EFFECT:
This bill has not been analyzed by a fiscal committee.
COMMENTS:
PURPOSE OF THIS BILL.
According to the author, this bill seeks to extend the seismic safety deadline to provide time to complete construction on a new hospital building that is already 90% complete, and if the deadline for Frank R. Howard Memorial Hospital (HMH) in the city of Willits is not extended, they could lose their license and jeopardize their ability to participate in Medicare and Medicaid, which is about 80% of their inpatient payer mix. The author notes that key services that make HMH unique compared to other hospitals in the surrounding area (around 100 miles or an hour drive away) include a 24-hour emergency department, intensive care, laboratory, imaging, orthopedics, physical rehabilitation, and surgery.
BACKGROUND. Existing law establishes a seismic safety building standards program under OSHPD's jurisdiction for hospitals built on or after March 7, 1973. These provisions were initiated because of the loss of life incurred due to the collapse of hospitals during the Sylmar earthquake of 1971. Approximately 470 general acute care hospital facilities comprised of 2,673 hospital buildings are impacted by existing seismic safety law. Hospitals built in accordance with the standards resisted the January 1994 Northridge earthquake with minimal structural damage, while several facilities built prior to the enforcement of the new standards experienced major structural damage and had to be evacuated.
One of the main provisions in existing law was the development, via regulation, of earthquake or seismic performance categories, specifically the Structural Performance Categories (SPC) and Nonstructural Performance Categories. These include seismic performance categories, or life safety levels, for new and existing general acute care hospital facilities at various levels, i.e., from those capable of providing services to the public after a seismic event to those at significant risk of collapse and that represent a danger to the public. The goal of these regulations is to develop retrofit and repair designs for existing hospital buildings to yield predictable seismic performance, whether at the essential life safety level or post-earthquake continued operations level.
Each general acute care hospital facility must be at certain SPC levels by specified timeframes. At one time all general acute care hospital facility buildings were required to be at the SPC-2 life safety level by January 1, 2008, to be in compliance with the regulations, however, provisions were made to allow this deadline to be extended to January 1, 2013, if compliance with the 2008 deadline would result in a diminished capacity of healthcare services to the community. In addition, timeframes for submittal of seismic evaluations, compliance plans, and other SPC levels are cited in the seismic evaluation procedure regulations.
STATUS OF WAIVERS AND COMPLIANCE. Subsequent legislation has provided for additional seismic compliance extensions. Statewide, many hospitals are on different timelines based on the specific extension. HMH has what is commonly known as an SB 1661 waiver.
SB 1661 (Cox), Chapter 679, Statutes of 2006, requires all general acute care hospitals that have non-seismically safe buildings to report to OSHPD by June 30, 2009, on the status of their compliance with the seismic safety deadlines. SPC-1 buildings are buildings posing significant risk of collapse and danger to the public. Buildings with an approved extension are permitted to provide acute care service only up to the length of extension granted, the maximum extension that may be granted per statute is January 1, 2020, beyond which the building can no longer provide general acute care services. In order to grant an extension to the hospital, OSHPD must consider the structural integrity of the building, the loss of essential healthcare services to the community should the hospital be closed, and the financial hardship that the hospital may have experienced. The extension granted to HMH was until January 1, 2015, and the hospital complied with the SB 1661 reporting requirements, which state:
The hospital building was under construction at the time of the request for extension;
The hospital building plans were submitted to OSHPD and were deemed ready for review by OSHPD at least four years prior to the applicable deadline for the building;
The hospital received a building permit at least two years prior to the applicable deadline for the building;
The hospital submitted a construction timeline at least two years prior to the applicable deadline for the building demonstrating the hospital's intent to meet the applicable deadline. Requires the timeline to include all of the following:
The projected construction start date;
The projected construction completion date;
Identification of the contractor; and,
The hospital is making reasonable progress toward meeting the timeline set forth in d) above, but factors beyond the hospital's control make it impossible for the hospital to meet the deadline.
SUPPORT.
HMH (located in northern Mendocino County) is the sponsor of this bill and states that they are central to the maintenance of access to care in the communities they serve. HMH contends that since 2009 they have been working closely with their contractor to make sure that the new facility under construction was seismically compliant and would be ready for occupancy on or before the January 1, 2015 deadline. However, in mid-September 2014, citing unanticipated construction delays, the contractor provided HMH with a new schedule reflecting completion of construction in the spring of 2015. HMH notes that the circumstances they encountered appear to be much like those experienced by the five hospital projects that were the subject of AB 2557 (Pan), Chapter 821, Statutes of 2014 that extended the deadline to September 1, 2015.
Adventist Health, the operator of the hospital, writes that as part of their hospital system in California, HMH has been designated by the federal government as a Critical Access hospital, which means it is a vitally important link in maintaining access to care in rural areas where hospital services are scarce.
PREVIOUS LEGISLATION.
AB 2557authorized OSHPD to grant five hospitals, who had already received an extension of the January 1, 2008, seismic safety deadline, an additional extension until September 1, 2015.
SB 90 (Steinberg), Chapter 19, Statutes of 2011, allowed a hospital to seek an extension for seismic compliance for its SPC-1 buildings of up to seven years based on the following elements: the structural integrity of the building; the loss of essential hospital services to the community if the hospital closed; and, financial hardship.
SB 499 (Ducheny), Chapter 601, Statutes of 2009, required all general acute care hospitals that have SPC-1 buildings to report to OSHPD by November 1, 2010, and annually thereafter, on the status of their compliance with the seismic safety deadlines.
SB 306 (Ducheny), Chapter 642, Statues of 2007, amended the Alfred E. Alquist Hospital Facilities Seismic Safety Act to permit hospitals to delay compliance with the July 1, 2008 seismic retro deadline, and the 2013 extension, to the year 2020, by filing a declaration with OSHPD that the owner lacks financial capacity to comply with the law.
SB 1661 (Cox), Chapter 679, Statutes of 2006, authorized an extension of up to an additional two years for hospitals that had already received extensions of the January 1, 2008 seismic safety compliance deadline if specified criteria were met, and required specified hospital reports to be posted on the OSHPD Website.
REGISTERED SUPPORT / OPPOSITION:
Support
Frank R. Howard Memorial Hospital (sponsor)
Adventist
Health
California Hospital Association
Loma Linda
University Medical Center
Opposition
None on file.
Analysis Prepared by:
Lara Flynn / HEALTH /
Bill Author
Bill Co-Author(s):