SB 312: California Environmental Quality Act: university housing development projects: exemption.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2024-09-19
Current Status:
Passed
(2024-09-19: Chaptered by Secretary of State. Chapter 284, Statutes of 2024.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located. Existing law requires a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, to be consistent with the most recent long-range development plan EIR certified on or after January 1, 2018, as provided.
This bill would extend the application of the university housing development project exemption until January 1, 2032. The bill would instead require a university housing development project carried out by the University of California, in order to be exempt from CEQA under the above-described exemption to be located on a campus site identified for housing in the most recent long-range development plan EIR or an EIR prepared for any subsequent amendment to that plan relating to housing, as specified. The bill would repeal the requirement to file the LEED certificate with the county clerk of the county in which the project is located.
Existing law requires a public university or a relevant public agency with authority to issue a certificate of occupancy for a building within an exempt university housing development project to not issue the certificate of occupancy for the building unless the lead agency receives certification of LEED Platinum or better from the United States Green Building Council for the building and the lead agency determines that the construction impacts of the project have been fully mitigated.
This bill would instead require a public university to obtain LEED Platinum certification for each building within a university housing development project no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage, and would authorize a public university to obtain 2 extensions for this LEED certification compliance requirement in 6-month increments, as provided. The bill would prohibit a public university that has exempted an approved university housing development project pursuant to the above-described exemption from applying that exemption to a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project, except as specified. The bill would also make other related changes.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located. Existing law requires a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, to be consistent with the most recent long-range development plan EIR certified on or after January 1, 2018, as provided.
This bill would extend the application of the university housing development project exemption until January 1, 2032. The bill would instead require a university housing development project carried out by the University of California, in order to be exempt from CEQA under the above-described exemption to be located on a campus site identified for housing in the most recent long-range development plan EIR or an EIR prepared for any subsequent amendment to that plan relating to housing, as specified. The bill would repeal the requirement to file the LEED certificate with the county clerk of the county in which the project is located.
Existing law requires a public university or a relevant public agency with authority to issue a certificate of occupancy for a building within an exempt university housing development project to not issue the certificate of occupancy for the building unless the lead agency receives certification of LEED Platinum or better from the United States Green Building Council for the building and the lead agency determines that the construction impacts of the project have been fully mitigated.
This bill would instead require a public university to obtain LEED Platinum certification for each building within a university housing development project no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage, and would authorize a public university to obtain 2 extensions for this LEED certification compliance requirement in 6-month increments, as provided. The bill would prohibit a public university that has exempted an approved university housing development project pursuant to the above-described exemption from applying that exemption to a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project, except as specified. The bill would also make other related changes.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located. Existing law requires a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, to be consistent with the most recent long-range development plan EIR certified on or after January 1, 2018, as provided.
This bill would extend the application of the university housing development project exemption until January 1, 2032. The bill would instead require a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, the above-described exemption to be consistent with the land use designation located on a campus site identified for housing in the most recent long-range development plan that has an EIR prepared for that plan, EIR or an EIR prepared for any subsequent amendment to that plan relating to housing, that was certified not more than 25 years before the approval of the project. housing, as specified. The bill would remove the requirement to file the LEED certificate with the county clerk of the county in which the project is located.
Existing law requires a public university or a relevant public agency with authority to issue a certificate of occupancy for a building within the an exempt university housing development project to not issue the certificate of occupancy for the building unless the lead agency receives certification of LEED Platinum or better from the United States Green Building Council for the building and the lead agency determines that the construction impacts of the project have been fully mitigated.
This bill would instead require a public university to obtain LEED Platinum certification for each building within a university housing development project no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage, and would authorize a public university to obtain 2 extensions for this LEED certification compliance requirement in 6-month increments, as provided. The bill would prohibit a public university that has exempted a an approved university housing development project pursuant to the above-described exemption from being eligible to exempt applying that exemption to a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project, except as specified. The bill would also make other related changes.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located. Existing law requires a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, to be consistent with the most recent long-range development plan EIR certified on or after January 1, 2018, as provided.
This bill would extend the application of the university housing development project exemption until January 1, 2032. The bill would instead require a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, to be consistent with the land use designation in the most recent long-range development plan that has an EIR prepared for that plan, or an EIR prepared for any subsequent amendment to that plan relating to housing, that was certified not more than 25 years before the approval of the project. The bill would remove the requirement to file the LEED certificate with the county clerk of the county in which the project is located.
Existing law requires a public university or a relevant public agency with authority to issue a certificate of occupancy for a building within the project to not issue the certificate of occupancy for the building unless the lead agency receives certification of LEED Platinum or better from the United States Green Building Council for the building and the lead agency determines that the construction impacts of the project have been fully mitigated.
This bill would instead require a public university to obtain LEED Platinum certification for each building within a university housing development project no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage, and would authorize a public university to obtain extensions for this LEED certification compliance requirement in 6-month increments, as provided. The bill would prohibit a public university that has exempted a university housing development project from being eligible to exempt a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project, except as specified. The bill would also make other related changes.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located. Existing law requires a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, to be consistent with the most recent long-range development plan EIR certified on or after January 1, 2018, as provided.
This bill would extend the application of the university housing development project exemption until January 1, 2032. The bill would instead require a university housing development project carried out by the University of California, in order to be exempt from CEQA under this law, to be consistent with the land use designation in the most recent long-range development plan that has an EIR prepared for that plan, or an EIR prepared for any subsequent amendment to that plan relating to housing, that was certified not more than 25 years before the approval of the project.
Existing law requires a public university or a relevant public agency with authority to issue a certificate of occupancy for a building within the project to not issue the certificate of occupancy for the building unless the lead agency receives certification of LEED Platinum or better from the United States Green Building Council for the building and the lead agency determines that the construction impacts of the project have been fully mitigated.
This bill would instead require a public university to obtain LEED Platinum certification for each building within a university housing development project no later than 12 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its usage. initial usage, and would authorize a public university to obtain extensions for this LEED certification compliance requirement in 6-month increments, as provided. The bill would prohibit a public university that has exempted a university housing development project from being eligible to exempt a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project. project, except as specified. The bill would also make other related changes.
The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) platinum Platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located.
Existing law requires a public university or a relevant public agency with authority to issue a certificate of occupancy for a building within the project to not issue the certificate of occupancy for the building unless the lead agency receives certification of LEED Platinum or better from the United States Green Building Council for the building and the lead agency determines that the construction impacts of the project have been fully mitigated.
This bill would revise the exemption for a university housing development project to require each building within the project to qualify for certification as LEED gold with a point total of 79 or better. Because the bill would result in additional university housing development projects being exempt from CEQA, thereby increasing the duties of the county clerk, this bill would impose a state-mandated local program. instead require a public university to obtain LEED Platinum certification for each building within a university housing development project no later than 12 months from the issuance of the buildings certificate of occupancy or its usage. The bill would prohibit a public university that has exempted a university housing development project from being eligible to exempt a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.
Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as Leadership in Energy and Environmental Design (LEED) platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA under the above provision, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the Office of Planning and Research and the county clerk of the county in which the project is located.
This bill would revise the exemption for a university housing development project to require each building within the project to qualify for certification as LEED gold with a point total of 79 or better. Because the bill would result in additional university housing development projects being exempt from CEQA, thereby increasing the duties of the county clerk, this bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law, the Planning and Zoning Law, requires the legislative body of each county and city to adopt a comprehensive, long-term general plan for the physical development of the county or city and of any land outside its boundaries that bears relation to its planning. Existing law also authorizes the legislative body to adopt ordinances that, among other things, regulate the use of buildings, structures, and land as between industry, business, residences, and open space, as specified.This bill would state the intent of the Legislature to enact legislation to support the revitalization of the City and County of San Franciscos downtown.Existing law, the Planning and Zoning Law, requires the legislative body of each county and city to adopt a comprehensive, long-term general plan for the physical development of the county or city and of any land outside its boundaries that bears relation to its planning. Existing law also authorizes the legislative body to adopt ordinances that, among other things, regulate the use of buildings, structures, and land as between industry, business, residences, and open space, as specified.
This bill would state the intent of the Legislature to enact legislation to support the revitalization of the City and County of San Franciscos downtown.
Existing law authorizes the Department of Transportation to construct, improve, and maintain state highways. Existing law authorizes the department to provide for the payment of extra compensation to a contractor on a road project, as a bonus for completion prior to the specified time.Until January 1, 2029, this bill would require the department to also provide for the payment of extra compensation, as specified, to a contractor on a road project, as a bonus for using true warm mix asphalt, as defined by this bill. The bill would require the department to submit specified reports to the Legislature on certain findings related to true warm mix asphalt.Existing law authorizes the Department of Transportation to construct, improve, and maintain state highways. Existing law authorizes the department to provide for the payment of extra compensation to a contractor on a road project, as a bonus for completion prior to the specified time.
Until January 1, 2029, this bill would require the department to also provide for the payment of extra compensation, as specified, to a contractor on a road project, as a bonus for using true warm mix asphalt, as defined by this bill. The bill would require the department to submit specified reports to the Legislature on certain findings related to true warm mix asphalt.
Existing law authorizes the Department of Transportation to construct, improve, and maintain state highways. Existing law authorizes the department to provide for the payment of extra compensation to a contractor on a road project, as a bonus for completion prior to the specified time.
Until January 1, 2029, this bill would require the department to also provide for the payment of extra compensation, as specified, to a contractor on a road project, as a bonus for using true warm mix asphalt, as defined by this bill. The bill would require the department to submit specified reports to the Legislature on certain findings related to true warm mix asphalt.
(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Article 5 (commencing with Section 78760) of Chapter 4 of Part 2 of Division 45 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)(i)If the university housing development project is carried out by the University of California, the university housing development project is located on a campus site identified for housing in the most recent long-range development plan environmental impact report or the environmental impact report prepared for any subsequent amendment to the most recent long-range development plan relating to housing.
(ii)If the most recent environmental impact report identifies a range of housing units or beds for the project site, the number of housing units or beds is within the range of housing units or beds analyzed for that site.
(iii)If the most recent environmental impact report does not identify a range of housing units or beds for specific sites, the project does not result in the total additional campus housing units or beds exceeding the number of additional units or beds analyzed in that environmental impact report.
(B)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(2)Each building within the university housing development project meets the minimum requirements to qualify for certification as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council.
(3)(A)No more than one-third of the project square footage shall be used for dining, academic, parking, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(B)For faculty and staff housing projects, and student housing projects occupied by more than two-thirds graduate students, no more than 12 percent of total project square footage shall be used for parking facilities.
(C)For student housing projects occupied by more than two-thirds undergraduate students, no more than 5 percent of total project square footage shall be used for parking.
(4)The project is within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long-range development plan or master plan, as appropriate, or would not exceed the vehicle miles traveled screening threshold of 110 trips per day as stated in the Office of Planning and Research April 2018 publication entitled Technical Advisory on Evaluating Transportation Impacts in CEQA, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with any applicable local, state, or federal law, except that for purposes of this paragraph, applicable law shall not include this division.
(7)(A)The project would not result in any net additional emission of greenhouse gases, as supported by substantial evidence.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, not including 50 percent of emissions reductions attributable to design features necessary to qualify for LEED Platinum certification.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to receive all public comment before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)(A)A public university shall obtain LEED Platinum certification for each building within an approved university housing development project that is exempt from this division pursuant to subdivision (b) no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage.
(B)Notwithstanding subparagraph (A), a public university that has completed all actions the public university believes are necessary to obtain LEED Platinum certification for each building within the university housing development project within the 18-month timeframe described in subparagraph (A), but that has not obtained LEED Platinum certification for each building within that university housing development project within that 18-month timeframe due to circumstances outside of the control of the public university, may, after making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, obtain LEED Platinum certification as required by subparagraph (A) within an additional six months. A public university may obtain one additional six-month extension by making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, as long as the circumstances outside of the control of the public university persist.
(C)For purposes of subparagraph (B), circumstances outside of the control of the public university include, but are not limited to, an unreasonable delay in obtaining LEED certification that is the fault of the certifying organization and any force majeure event that includes, but is not limited to, any strike, factory closure, explosion, maritime peril, natural disaster, pandemic, act of a public enemy, fire, flood, accident, war, riot, insurgence, or other similar event.
(2)(A)A public university that has approved a university housing development project that is exempt from this division pursuant to subdivision (b) shall not exempt a subsequent university housing development project pursuant to subdivision (b) until the public university has obtained LEED Platinum certification for each building within the prior university housing development project exempted pursuant to subdivision (b).
(B)Notwithstanding subparagraph (A), a public university that has authorized funding for preliminary plans or a schematic design, or both, for a subsequent public university housing project before the date that a prior public university housing project is noncompliant with paragraph (1) may exempt the subsequent public university housing project pursuant to subdivision (b), if the campus where the subsequent project is located does not have more than two approved projects that were exempt from this division pursuant to subdivision (b) with one or more buildings that have not received LEED Platinum certification within the timeframe permitted by paragraph (1).
(3)The lead agency shall file the LEED certification described in paragraph (1) along with a determination that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) with the Office of Planning and Research.
(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years, except an existing university student housing project.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university files a notice of exemption or submits an application under this section, whichever occurs sooner.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Article 5 (commencing with Section 78760) of Chapter 4 of Part 2 of Division 45 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)(i)If the university housing development project is carried out by the University of California, the university housing development project is located on a campus site identified for housing in the most recent long-range development plan environmental impact report or the environmental impact report prepared for any subsequent amendment to the most recent long-range development plan relating to housing.
(ii)If the most recent environmental impact report identifies a range of housing units or beds for the project site, the number of housing units or beds is within the range of housing units or beds analyzed for that site.
(iii)If the most recent environmental impact report does not identify a range of housing units or beds for specific sites, the project does not result in the total additional campus housing units or beds exceeding the number of additional units or beds analyzed in that environmental impact report.
(B)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(2)Each building within the university housing development project meets the minimum requirements to qualify for certification as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council.
(3)(A)No more than one-third of the project square footage shall be used for dining, academic, parking, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(B)For faculty and staff housing projects, and student housing projects occupied by more than two-thirds graduate students, no more than 12 percent of total project square footage shall be used for parking facilities.
(C)For student housing projects occupied by more than two-thirds undergraduate students, no more than 5 percent of total project square footage shall be used for parking.
(4)The project is within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long-range development plan or master plan, as appropriate, or would not exceed the vehicle miles traveled screening threshold of 110 trips per day as stated in the Office of Planning and Research April 2018 publication entitled Technical Advisory on Evaluating Transportation Impacts in CEQA, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with any applicable local, state, or federal law, except that for purposes of this paragraph, applicable law shall not include this division.
(7)(A)The project would not result in any net additional emission of greenhouse gases, as supported by substantial evidence.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, not including 50 percent of emissions reductions attributable to design features necessary to qualify for LEED Platinum certification.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to receive all public comment before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)(A)A public university shall obtain LEED Platinum certification for each building within an approved university housing development project that is exempt from this division pursuant to subdivision (b) no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage.
(B)Notwithstanding subparagraph (A), a public university that has completed all actions the public university believes are necessary to obtain LEED Platinum certification for each building within the university housing development project within the 18-month timeframe described in subparagraph (A), but that has not obtained LEED Platinum certification for each building within that university housing development project within that 18-month timeframe due to circumstances outside of the control of the public university, may, after making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, obtain LEED Platinum certification as required by subparagraph (A) within an additional six months. A public university may obtain one additional six-month extension by making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, as long as the circumstances outside of the control of the public university persist.
(C)For purposes of subparagraph (B), circumstances outside of the control of the public university include, but are not limited to, an unreasonable delay in obtaining LEED certification that is the fault of the certifying organization and any force majeure event that includes, but is not limited to, any strike, factory closure, explosion, maritime peril, natural disaster, pandemic, act of a public enemy, fire, flood, accident, war, riot, insurgence, or other similar event.
(2)(A)A public university that has approved a university housing development project that is exempt from this division pursuant to subdivision (b) shall not exempt a subsequent university housing development project pursuant to subdivision (b) until the public university has obtained LEED Platinum certification for each building within the prior university housing development project exempted pursuant to subdivision (b).
(B)Notwithstanding subparagraph (A), a public university that has authorized funding for preliminary plans or a schematic design, or both, for a subsequent public university housing project before the date that a prior public university housing project is noncompliant with paragraph (1) may exempt the subsequent public university housing project pursuant to subdivision (b), if the campus where the subsequent project is located does not have more than two approved projects that were exempt from this division pursuant to subdivision (b) with one or more buildings that have not received LEED Platinum certification within the timeframe permitted by paragraph (1).
(3)The lead agency shall file the LEED certification described in paragraph (1) along with a determination that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) with the Office of Planning and Research.
(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years, except an existing university student housing project.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university files a notice of exemption or submits an application under this section, whichever occurs sooner.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites excluded from the specified fire hazard severity zones by a local agency, pursuant to subdivision (b) of Section 51179 of the Government Code, or sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Article 5 (commencing with Section 78760) of Chapter 4 of Part 2 of Division 45 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)(i)If the university housing development project is carried out by the University of California, the university housing development project is consistent with the land use designation located on a campus site identified for housing in the most recent long-range development plan, so long as the plan environmental impact report prepared for the most recent long-range development plan, or the environmental impact report prepared for any subsequent amendment to the most recent long-range development plan relating to housing, was certified not more than 25 years before the approval of the university housing development project. housing.
(ii)If the most recent environmental impact report identifies a range of housing units or beds for the project site, the number of housing units or beds is within the range of housing units or beds analyzed for that site.
(iii)If the most recent environmental impact report does not identify a range of housing units or beds for specific sites, the project does not result in the total additional campus housing units or beds exceeding the number of additional units or beds analyzed in that environmental impact report.
(B)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(2)Each building within the university housing development project meets the minimum requirements to qualify for certification as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council.
(3)(A)No more than one-third of the project square footage shall be used for dining, academic, parking, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(B)For faculty and staff housing projects, and student housing projects occupied by more than two-thirds graduate students, no more than 12 percent of total project square footage shall be used for parking facilities.
(C)For student housing projects occupied by more than two-thirds undergraduate students, no more than 5 percent of total project square footage shall be used for parking.
(4)The project is within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long-range development plan or master plan, as appropriate, or would not exceed the vehicle miles traveled screening threshold of 110 trips per day as stated in the Office of Planning and Research April 2018 publication entitled Technical Advisory on Evaluating Transportation Impacts in CEQA, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with any applicable local, state, or federal law, except that for purposes of this paragraph, applicable law shall not include this division.
(7)(A)The project, when completed, project would not result in any net additional emission of greenhouse gases, as supported by substantial evidence.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, not including 50 percent of emissions reductions attributable to design features necessary to qualify for LEED Platinum certification.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to receive all public comment before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)(A)A public university shall obtain LEED Platinum certification for each building within a an approved university housing development project built that is exempt from this division pursuant to subdivision (b) no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage.
(B)Notwithstanding subparagraph (A), a public university that has completed all actions the public university believes are necessary to obtain LEED Platinum certification for each building within a the university housing development project within the 18-month timeframe described in subparagraph (A), but that has not obtained LEED Platinum certification for each building within that university housing development project within that 18-month timeframe due to circumstances outside of the control of the public university, may, after making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, obtain LEED Platinum certification as required by subparagraph (A) within an additional six months. A public university may obtain one additional extensions for compliance in six-month increments six-month extension by making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, as long as the circumstances outside of the control of the public university persist.
(C)For purposes of subparagraph (B), circumstances outside of the control of the public university include, but are not limited to, an unreasonable delay in obtaining LEED certification that is the fault of the certifying organization and any force majeure event that includes, but is not limited to, any strike, factory closure, explosion, maritime peril, natural disaster, pandemic, act of a public enemy, fire, flood, accident, war, riot, insurgence, or other similar event.
(2)(A)A public university that has exempted approved a university housing development project that is exempt from this division pursuant to subdivision (b) shall not be eligible to exempt a subsequent university housing development project pursuant to subdivision (b) until the public university has obtained LEED Platinum certification for each building within the prior university housing development project exempted pursuant to subdivision (b).
(B)Notwithstanding subparagraph (A), a public university that has authorized funding for preliminary plans or a schematic design, or both, for a subsequent public university housing project prior to before the date that a prior public university housing project is noncompliant with paragraph (1) of subdivision (c) may exempt the subsequent public university housing project pursuant to subdivision (b). (b), if the campus where the subsequent project is located does not have more than two approved projects that were exempt from this division pursuant to subdivision (b) with one or more buildings that have not received LEED Platinum certification within the timeframe permitted by paragraph (1).
(3)The lead agency shall file the LEED certification described in paragraph (1) along with a determination that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) with the Office of Planning and Research.
(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years, except an existing university student housing project.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university files a notice of exemption or submits an application under this section, whichever occurs sooner.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites excluded from the specified fire hazard severity zones by a local agency, pursuant to subdivision (b) of Section 51179 of the Government Code, or sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Article 5 (commencing with Section 78760) of Chapter 4 of Part 2 of Division 45 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)If the university housing development project is carried out by the University of California, the university housing development project is consistent with the land use designation in the most recent long-range development plan, so long as the environmental impact report prepared for the most recent long-range development plan, or the environmental impact report prepared for any subsequent amendment to the most recent long-range development plan relating to housing, was certified not more than 25 years before the approval of the university housing development project.
(B)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(2)Each building within the university housing development project meets the minimum requirements to qualify for certification as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council.
(3)(A)No more than one-third of the project square footage shall be used for dining, academic, parking, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(B)For faculty and staff housing projects, and student housing projects occupied by more than two-thirds graduate students, no more than 12 percent of total project square footage shall be used for parking facilities.
(C)For student housing projects occupied by more than two-thirds undergraduate students, no more than 5 percent of total project square footage shall be used for parking.
(4)The project is within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long-range development plan or master plan, as appropriate, or would not exceed the vehicle miles traveled screening threshold of 110 trips per day as stated in the Office of Planning and Research April 2018 publication entitled Technical Advisory on Evaluating Transportation Impacts in CEQA, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with applicable local, state, or federal law, except that for purposes of this paragraph, applicable law shall not include this division.
(7)(A)The project, when completed, would not result in any net additional emission of greenhouse gases, as supported by substantial evidence.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, not including 50 percent of emissions reductions attributable to design features necessary to qualify for LEED Platinum certification.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to receive all public comment before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)(A)A public university shall obtain LEED Platinum certification for each building within a university housing development project built pursuant to subdivision (b) no later than 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage.
(B)Notwithstanding subparagraph (A), a public university that has completed all actions the public university believes are necessary to obtain LEED Platinum certification for each building within a university housing development project within the 18-month timeframe described in subparagraph (A), but that has not obtained LEED Platinum certification for each building within that university housing development project within that 18-month timeframe due to circumstances outside of the control of the public university, may, after making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, obtain LEED Platinum certification as required by subparagraph (A) within an additional six months. A public university may obtain additional extensions for compliance in six-month increments by making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, as long as the circumstances outside of the control of the public university persist, as certified by ____. persist.
(C)For purposes of subparagraph (B), circumstances outside of the control of the public university include, but are not limited to, an unreasonable delay in obtaining LEED certification that is the fault of the certifying organization and any force majeure event that includes, but is not limited to, any strike, factory closure, explosion, maritime peril, natural disaster, pandemic, act of a public enemy, fire, flood, accident, war, riot, insurgence, or other similar event.
(2)(A)A public university that has exempted a university housing development project pursuant to subdivision (b) shall not be eligible to exempt a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior university housing development project exempted pursuant to subdivision (b).
(B)Notwithstanding subparagraph (A), a public university that has authorized funding for preliminary plans or a schematic design, or both, for a subsequent public university housing project prior to the date that a prior public university housing project is noncompliant with paragraph (1) of subdivision (c) may exempt the subsequent public university housing project pursuant to subdivision (b).
(3)The lead agency shall file the LEED certification described in paragraph (1) along with a determination that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) with the Office of Planning and Research and the county clerk of the county in which the project is located. Research.
(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years, except an existing university student housing project.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university files a notice of exemption or submits an application under this section, whichever occurs sooner.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2032, and as of that date is repealed.
(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites excluded from the specified fire hazard severity zones by a local agency, pursuant to subdivision (b) of Section 51179 of the Government Code, or sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Article 5 (commencing with Section 78760) of Chapter 4 of Part 2 of Division 45 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)(i)If the university housing development project is carried out by the University of California, the university housing development project is consistent with the most recent long range development plan environmental impact report prepared pursuant to Section 21080.09 and certified on or after January 1, 2018, and any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred. land use designation in the most recent long-range development plan, so long as the environmental impact report prepared for the most recent long-range development plan, or the environmental impact report prepared for any subsequent amendment to the most recent long-range development plan relating to housing, was certified not more than 25 years before the approval of the university housing development project.
(ii)(B)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(B)For purposes of subparagraph (A), the project is consistent with the relevant environmental impact report or applicable tiered environmental analysis, if there is substantial evidence in the record that would allow a reasonable person to find it consistent.(2)Each building within the university housing development project qualifies meets the minimum requirements to qualify for certification as Leadership in Energy and Environmental Design (LEED) Platinum or better by the United States Green Building Council.
(3)(A)No more than one-third of the project square footage shall be used for dining, academic, parking, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(B)For faculty and staff housing projects, and student housing projects occupied by more than two-thirds graduate students, no more than 12 percent of total project square footage shall be used for parking facilities.
(C)For student housing projects occupied by more than two-thirds undergraduate students, no more than 5 percent of total project square footage shall be used for parking.
(4)The project is either within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long range long-range development plan or master plan, as appropriate, or would not exceed the vehicle miles traveled screening threshold of 110 trips per day as stated in the Office of Planning and Research April 2018 publication entitled Technical Advisory on Evaluating Transportation Impacts in CEQA, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with applicable law. local, state, or federal law, except that for purposes of this paragraph, applicable law shall not include this division.
(7)(A)The project does project, when completed, would not result in any net additional emission of greenhouse gases, as determined by an independent third-party evaluation approved by the lead agency. supported by substantial evidence.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, except for not including 50 percent of emissions reductions attributable to design features necessary to qualify for LEED Platinum certification.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to hear and respond to receive all public comments comment before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)(A)A public university shall obtain LEED Platinum certification for each building within a university housing development project built pursuant to subdivision (b) no later than 12 18 months from the issuance of the buildings certificate of occupancy or an equivalent certification, or its initial usage.
(B)Notwithstanding subparagraph (A), a public university that has completed all actions the public university believes are necessary to obtain LEED Platinum certification for each building within a university housing development project within the 18-month timeframe described in subparagraph (A), but that has not obtained LEED Platinum certification for each building within that university housing development project within that 18-month timeframe due to circumstances outside of the control of the public university, may, after making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, obtain LEED Platinum certification as required by subparagraph (A) within an additional six months. A public university may obtain additional extensions for compliance in six-month increments by making a public notice and a disclosure to the Office of Planning and Research of the reasons that LEED Platinum certification has not been obtained, as long as the circumstances outside of the control of the public university persist, as certified by ____.
(2)(A)A public university that has exempted a university housing development project pursuant to subdivision (b) shall not be eligible to exempt a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior university housing development project exempted pursuant to subdivision (b).
(B)Notwithstanding subparagraph (A), a public university that has authorized funding for preliminary plans or a schematic design, or both, for a subsequent public university housing project prior to the date that a prior public university housing project is noncompliant with paragraph (1) of subdivision (c) may exempt the subsequent public university housing project pursuant to subdivision (b).
(3)The lead agency shall file the certificate of occupancy and a notice that the lead agency has determined LEED certification described in paragraph (1) with a determination that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) with the Office of Planning and Research and the county clerk of the county in which the project is located. Subdivision (c) of Section 21108 and subdivision (c) of Section 21152 shall apply to the certificate and notice filed pursuant to this paragraph.
(4)An action or proceeding alleging that the certificate of occupancy has been issued in violation of this subdivision shall be commenced within 35 days of the filing by the lead agency of the certificate and notice under this subdivision.(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years. years, except an existing university student housing project.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university files a notice of exemption or submits an application under this section. section, whichever occurs sooner.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2030, 2032, and as of that date is repealed.
(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites excluded from the specified fire hazard severity zones by a local agency, pursuant to subdivision (b) of Section 51179 of the Government Code, or sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Article 5 (commencing with Section 78760) of Chapter 4 of Part 2 of Division 45 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)(i)If the university housing development project is carried out by the University of California, the university housing development project is consistent with the most recent long range development plan environmental impact report prepared pursuant to Section 21080.09 and certified on or after January 1, 2018, and any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(ii)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(B)For purposes of subparagraph (A), the project is consistent with the relevant environmental impact report or applicable tiered environmental analysis, if theres there is substantial evidence in the record that would allow a reasonable person to find it consistent.
(2)Each building within the university housing development project qualifies for certification as Leadership in Energy and Environmental Design (LEED) gold with a point total of 79 Platinum or better by the United States Green Building Council.
(3)No more than one-third of the project square footage shall be used for dining, academic, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(4)The project is either within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long range development plan or master plan, as appropriate, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with applicable law.
(7)(A)The project does not result in any net additional emission of greenhouse gases, as determined by an independent third-party evaluation approved by the lead agency.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, except for 50 percent of emissions reductions attributable to design features necessary to meet the certification requirements for LEED gold with a point total of 79 or better. qualify for LEED Platinum certification.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to hear and respond to public comments before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)The public university or a relevant public agency with authority to issue a certificate of occupancy for a building within the project shall not issue the certificate of occupancy for the building unless both of the following occurs:(A)The lead agency receives certification of LEED gold with a point total of 79 or better from the United States Green Building Council for the building.(B)The lead agency determines that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) and issues a notice making that determination.(c)(1)A public university shall obtain LEED Platinum certification for each building within a university housing development project built pursuant to subdivision (b) no later than 12 months from the issuance of the buildings certificate of occupancy or its usage.
(2)A public university that has exempted a university housing development project pursuant to subdivision (b) shall not be eligible to exempt a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior university housing development project exempted pursuant to subdivision (b).
(2)(3)The lead agency shall file the certificate and the notice described in paragraph (1) of occupancy and a notice that the lead agency has determined the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) with the Office of Planning and Research and the county clerk of the county in which the project is located. Subdivision (c) of Section 21108 and subdivision (c) of Section 21152 shall apply to the certificate and notice filed pursuant to this paragraph.
(3)(4)An action or proceeding alleging that the certificate of occupancy has been issued in violation of this subdivision shall be commenced within 35 days of the filing by the lead agency of the certificate and notice under this subdivision.
(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university submits an application under this section.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.(a)For purposes of this section, the following definitions apply:
(1)Faculty and staff housing project means one or more housing facilities to be occupied by faculty or staff of one or more campuses, and owned by a public university, including dining, academic, and faculty and staff support service spaces and other necessary and usual attendant and related facilities and equipment.
(2)Public university means the University of California, the California State University, or the California Community Colleges.
(3)Skilled and trained workforce has the same meaning as in Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(4)Student housing project means one or more housing facilities to be occupied by students of one or more campuses and owned by a public university, including dining, academic and student support service spaces, and other necessary and usual attendant and related facilities and equipment.
(5)University housing development project or project means a student housing project or a faculty and staff housing project that is not located, in whole or in part, on a site that is any of the following:
(A)Either prime farmland or farmland of statewide importance, as defined pursuant to United States Department of Agriculture land inventory and monitoring criteria, as modified for California, and designated on the maps prepared by the Farmland Mapping and Monitoring Program of the Department of Conservation, or land zoned or designated for agricultural protection or preservation by a local ballot measure that was approved by the voters of that jurisdiction.
(B)Wetlands, as defined in the United States Fish and Wildlife Service Manual, Part 660 FW 2 (June 21, 1993).
(C)Within a very high fire hazard severity zone, as determined by the State Fire Marshal pursuant to Section 51178 of the Government Code, or within a high or very high fire hazard severity zone as indicated on maps adopted by the State Fire Marshal pursuant to Section 4202. This subparagraph does not apply to sites excluded from the specified fire hazard severity zones by a local agency, pursuant to subdivision (b) of Section 51179 of the Government Code, or sites that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the project.
(D)Either a hazardous waste site listed pursuant to Section 65962.5 of the Government Code or a hazardous substances release site designated by the Department of Toxic Substances Control pursuant to Article 5 (commencing with Section 78760) of Chapter 4 of Part 2 of Division 45 of the Health and Safety Code, unless the State Department of Public Health, State Water Resources Control Board, or Department of Toxic Substances Control has cleared the site for residential use or residential mixed uses.
(E)Within a delineated earthquake fault zone as determined by the State Geologist in any official maps published by the State Geologist, unless the project complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by any local building department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code.
(F)Within a special flood hazard area subject to inundation by a 1 percent annual chance flood (100-year flood) as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site. A project may be located on a site described in this subparagraph if either of the following are met:
(i)The site has been subject to a Letter of Map Revision prepared by the Federal Emergency Management Agency and issued to the local government.
(ii)The site meets Federal Emergency Management Agency requirements necessary to meet minimum flood plain management criteria of the National Flood Insurance Program pursuant to Part 59 (commencing with Section 59.1) and Part 60 (commencing with Section 60.1) of Subchapter B of Chapter I of Title 44 of the Code of Federal Regulations.
(G)Within a regulatory floodway as determined by the Federal Emergency Management Agency in any official maps published by the Federal Emergency Management Agency, unless the project has received a no-rise certification in accordance with Section 60.3(d)(3) of Title 44 of the Code of Federal Regulations. If a public university is able to satisfy all applicable federal qualifying criteria in order to demonstrate that the site satisfies this subparagraph and is otherwise eligible to be exempt from this division pursuant to this section, a local government shall not deny an application on the basis that the public university did not comply with any additional permit requirement, standard, or action adopted by that local government that is applicable to that site.
(H)Lands identified for conservation in an adopted natural community conservation plan pursuant to the Natural Community Conservation Planning Act (Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code), habitat conservation plan pursuant to the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), or other adopted natural resource protection plan.
(I)Habitat for protected species identified as candidate, sensitive, or species of special status by a state or federal agency, fully protected species, or species protected by the federal Endangered Species Act of 1973 (16 U.S.C. Sec. 1531 et seq.), the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code), or the Native Plant Protection Act (Chapter 10 (commencing with Section 1900) of Division 2 of the Fish and Game Code).
(J)Lands under conservation easement.
(b)Except as provided in subdivision (c), (d), this division does not apply to a university housing development project carried out by a public university on real property owned by the public university that meets all of the following requirements:
(1)(A)(i)If the university housing development project is carried out by the University of California, the university housing development project is consistent with the most recent long range development plan environmental impact report prepared pursuant to Section 21080.09 and certified on or after January 1, 2018, and any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(ii)If the university housing development project is carried out by the California State University or the California Community Colleges, the university housing development project is consistent with the most recent master plan environmental impact report prepared pursuant to Section 21080.09 and certified no more than 10 years before the determination that the exemption under this section applies and with any applicable tiered environmental analysis, so long as none of the events specified in Section 21166 have occurred.
(B)For purposes of subparagraph (A), the project is consistent with the relevant environmental impact report or applicable tiered environmental analysis, if theres substantial evidence in the record that would allow a reasonable person to find it consistent.
(2)Each building within the university housing development project is certified qualifies for certification as Leadership in Energy and Environmental Design (LEED) platinum gold with a point total of 79 or better by the United States Green Building Council.
(3)No more than one-third of the project square footage shall be used for dining, academic, or student support service spaces, or other necessary and usual attendant and related facilities and equipment.
(4)The project is either within one-half mile of a major transit stop or one-half mile of the campus boundary, as defined by the public universitys long range development plan or master plan, as appropriate, or has 15 percent lower per capita vehicle miles traveled as compared to that for the jurisdiction in which the university housing development project is located.
(5)The project has a transportation demand management program.
(6)The projects construction impacts are fully mitigated consistent with applicable law.
(7)(A)The project does not result in any net additional emission of greenhouse gases, as determined by an independent third-party evaluation approved by the lead agency.
(B)To maximize public health and environmental benefits, the public university shall ensure that the measures will reduce the emissions of greenhouse gases in the project area and in the neighboring communities.
(C)Not less than 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this paragraph shall be from local, direct greenhouse gas emissions reduction measures, including, but not limited to, any of the following:
(i)Project design features or onsite reduction measures, or both design features and onsite reduction measures, that include, but are not limited to, any of the following:
(I)Implementing project design features that enable the project to exceed the building energy efficiency standards set forth in Part 6 (commencing with Section 100) of Title 24 of the California Code of Regulations, except for 50 percent of emissions reductions attributable to design features necessary to meet the LEED platinum certification requirement. certification requirements for LEED gold with a point total of 79 or better.
(II)Requiring a transportation demand management program to reduce single-occupancy vehicular travel and vehicle miles traveled.
(III)Providing onsite renewable energy generation, including a solar roof on the project with a minimum peak generation capacity of 500 kilowatts.
(IV)Providing solar-ready roofs.
(V)Providing cool roofs and cool parking promoting cool surface treatment for new parking facilities.
(ii)Offsite reduction measures in neighboring communities, including, but not limited to, any of the following:
(I)Providing funding to an offsite mitigation project consisting of replacing buses, trolleys, or other transit vehicles with zero-emission vehicles.
(II)Providing offsite safety or other improvements for bicycles, pedestrians, and transit connections.
(III)Undertaking or funding building retrofits to improve the energy efficiency of existing buildings.
(D)(i)The public university may obtain offset credits for up to 50 percent of the greenhouse gas emissions reductions necessary to achieve the requirement of this subdivision that produce emissions reductions within the jurisdiction that the university housing development project is located. Any offset credits shall be verified by a third party accredited by the State Air Resources Board, and shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offset be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the same community in which the project is located or adjacent communities.
(ii)If 50 percent of greenhouse gas emissions reductions necessary to achieve no additional emissions of greenhouse gases cannot be feasibly and fully mitigated by offset credits as described in clause (i), the mitigation of the remaining emissions of greenhouse gases shall be achieved pursuant to the following priority:
(I)Offset credits that would also reduce the emissions of criteria air pollutants or toxic air contaminants. The offsets shall be undertaken in a manner consistent with Division 25.5 (commencing with Section 38500) of the Health and Safety Code, including, but not limited to, the requirement that the offsets be real, permanent, quantifiable, verifiable, and enforceable, and shall be undertaken from sources in the community within which the project is located or in adjacent communities.
(II)If the remaining emissions of greenhouse gases cannot be feasibly or fully mitigated by the offsets credits described in subclause (I), the remaining unmitigated greenhouse gas emissions shall be mitigated through the use of offsets that would also reduce emissions of criteria air pollutants or toxic air contaminants and shall be undertaken in a manner consistent with subclause (I) and shall be undertaken from sources that provide a specific, quantifiable, and direct environmental and public health benefit to the community in which the project is located.
(E)It is the intent of the Legislature, in enacting this paragraph, to maximize the environmental and public health benefits from measures to mitigate the emissions of greenhouse gases of a university housing development project to those people that are impacted most by the project.
(8)All contractors and subcontractors at every tier on the project will be required to pay prevailing wages in accordance with Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(9)(A)An entity shall not be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors at every tier will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, in accordance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code.
(B)This paragraph does not apply if any of the following requirements are met:
(i)The public university has entered into a project labor agreement that will bind all contractors and subcontractors at every tier performing work on the project to use a skilled and trained workforce, and the entity agrees to be bound by that project labor agreement.
(ii)The project is being performed under the extension or renewal of a project labor agreement that was entered into by the public university before January 1, 2023.
(iii)The entity has entered into a project labor agreement that will bind the entity and all of its contractors and subcontractors at every tier performing the project to use a skilled and trained workforce.
(10)(A)Except as provided in subparagraph (B), for a project carried out by the University of California, all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California Service Unit (SX) job classifications shall be performed only by employees of the University of California at any facility, building, property, or space that is part of the project.
(B)Subparagraph (A) does not apply to, and shall not restrict the performance of, work done under contract and paid for in whole or in part out of public funds when the work is either of the following:
(i)Construction, alteration, demolition, installation, cleanup work at the construction jobsite, or repair work, including work performed during the design and all phases of construction, including preconstruction and postconstruction phases.
(ii)Carpentry, electrical, plumbing, glazing, painting, and other craftwork designed to preserve, protect, or keep a publicly owned facility in a safe and continuously usable condition, including repairs, cleaning, and other operations on machinery and other equipment permanently attached to the building or real property as fixtures.
(11)(A)The public university holds at least one noticed public hearing in the project area to hear and respond to public comments before determining that a university housing development project is exempt pursuant to this section.
(B)The public university shall give public notice of the meeting to the last known name and address of all the organizations and individuals that have previously requested notice and shall also give the general public notice using at least one of the following procedures:
(i)Publication of the notice in a newspaper of general circulation in the area affected by the project. If more than one area will be affected, the notice shall be published in the newspaper of largest circulation from among the newspapers of general circulation in those areas.
(ii)Posting of the notice onsite and offsite in the area where the project is located.
(iii)Posting of the notice on the public universitys internet website and social media accounts.
(12)The public university files a notice of exemption with the Office of Planning and Research pursuant to subdivisions (b) to (d), inclusive, of Section 21108.
(c)(1)The public university or a relevant public agency with authority to issue a certificate of occupancy for a building within the project shall not issue the certificate of occupancy for the building unless both of the following occurs:
(A)The lead agency receives certification of LEED platinum gold with a point total of 79 or better from the United States Green Building Council for the building.
(B)The lead agency determines that the construction impacts of the project have been fully mitigated as required pursuant to paragraph (6) of subdivision (b) and issues a notice making that determination.
(2)The lead agency shall file the certificate and the notice described in paragraph (1) with the Office of Planning and Research and the county clerk of the county in which the project is located. Subdivision (c) of Section 21108 and subdivision (c) of Section 21152 shall apply to the certificate and notice filed pursuant to this paragraph.
(3)An action or proceeding alleging that the certificate of occupancy has been issued in violation of this subdivision shall be commenced within 35 days of the filing by the lead agency of the certificate and notice under this subdivision.
(d)The exemption from this division provided by subdivision (b) does not apply to a university housing development project that meets any of the following criteria:
(1)The project would require the demolition of any of the following:
(A)Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income.
(B)Housing that is subject to any form of rent or price control through a public entitys valid exercise of its police power.
(C)Housing that has been occupied by tenants within the past 10 years.
(D)A historic structure that is listed on a national, state, or local historic register.
(2)The project is located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university submits an application under this section.
(3)The project is located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, or were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
(4)The project consists of more than 2,000 units or 4,000 beds.
(e)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 2.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because a local agency or school district has the authority to levy service charges, fees, or assessments sufficient to pay for the program or level of service mandated by this act, within the meaning of Section 17556 of the Government Code.
SECTION 1.It is the intent of the Legislature to enact legislation to support the revitalization of the City and County of San Franciscos downtown by streamlining the regulatory process for, and supporting, adaptive reuse projects, nightlife, and entertainment establishments; incentivizing investments in and leasing of downtown properties, including on upper floors and ground floor storefronts, through targeted tax relief or other financial incentive programs; creating new or enhanced financing mechanisms for public-private development and redevelopment projects; and promoting enhanced cleanliness and safety throughout downtown.It is the intent of the Legislature to enact legislation to support the revitalization of the City and County of San Franciscos downtown by streamlining the regulatory process for, and supporting, adaptive reuse projects, nightlife, and entertainment establishments; incentivizing investments in and leasing of downtown properties, including on upper floors and ground floor storefronts, through targeted tax relief or other financial incentive programs; creating new or enhanced financing mechanisms for public-private development and redevelopment projects; and promoting enhanced cleanliness and safety throughout downtown.
SECTION 1.The Legislature finds and declares all of the following:(a)Climate change poses a serious threat to the environment, our economy, and the well-being of communities in California and around the world.(b)The United States manufacturing sector produces the materials that are critical to rebuilding and strengthening the nations infrastructure, but is responsible for nearly one-third of United States greenhouse gas emissions from industrial processes.(c)Despite Californias push for an all-electric vehicle fleet starting in 2035, cars will still have tires, and will still need to travel on roads. Transportation infrastructure materials will continue to be a significant source of emissions productions, unless we embrace technologies in the marketplace to manufacture them in a more sustainable manner.(d)Approximately 26,000,000 tons of hot mix asphalt (HMA) pavement material are produced in the state annually. Typical asphalt mix production temperatures range from 300 to 350 degrees Fahrenheit, which is accomplished by heating the liquid asphalt cement and aggregate using a fossil fuel, such as natural gas, to allow for appropriate mixing of the materials.(e)Warm mix asphalt (WMA) is the generic term for a variety of technologies that allow producers of HMA to lower the production temperature at which the material is mixed and placed on the road. True WMA is that product which is manufactured at temperatures of 275 degrees and lower.(f)The use of true WMA provides multiple benefits, including significant reductions in fossil fuel use and the emissions of greenhouse gases during the asphalt mixing and production process; reductions or elimination of smoke, odors, and other byproduct pollutant gases and particulates; and optimized compaction at reduced temperatures and the extension of road life, leading to further greenhouse gas emission reductions and significant cost savings for the state related to increased long-term performance and the potential to increase recycling uptake. Benefits improve as production temperatures decrease.(g)The University of California Pavement Research Center has studied true WMA pavement extensively. The center found that the use of true WMA has clear benefits when compared to HMA, including the benefits identified above, and improved workability, better conditions for workers, and better performance on projects with long hauls or where mixes are placed under cool conditions.(h)Executive Order No. N-19-19 directs the Transportation Agency to leverage more than five billion dollars ($5,000,000,000) in annual state transportation spending for construction, operations, and maintenance to help reduce greenhouse gas emissions.SEC. 2.Part 9 (commencing with Section 71470) is added to Division 34 of the Public Resources Code, to read:9.True Warm Mix Asphalt71470.For the purpose of this part, the following definitions apply:(a)Department means the Department of Transportation.(b)True warm mix asphalt means a hot mix asphalt that is heated to no more than 275 degrees Fahrenheit during mixing and production.71471.The department shall provide for the payment of extra compensation to a contractor on a contract for a road project, as a bonus for using true warm mix asphalt, in accordance with the following:(a)The department shall pay a bonus of three dollars ($3) per ton for true warm mix asphalt that is heated to a temperature of 251 to 275, inclusive, degrees Fahrenheit during mixing and production.(b)The department shall pay a bonus of five dollars per ($5) per ton for true warm mix asphalt that is heated to no more than 250 degrees Fahrenheit during mixing and production.71472.(a)The department shall submit a report to the Legislature on or before January 1, 2026, and every two years thereafter, containing all the following information:(1)The reduction in carbon dioxide resulting from the use of true warm mix asphalt.(2)The increase in use of true warm mix asphalt as a result of the extra compensation required by this article.(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.71473.This part shall remain in effect only until January 1, 2029, and as of that date is repealed.The Legislature finds and declares all of the following:
(a)Climate change poses a serious threat to the environment, our economy, and the well-being of communities in California and around the world.
(b)The United States manufacturing sector produces the materials that are critical to rebuilding and strengthening the nations infrastructure, but is responsible for nearly one-third of United States greenhouse gas emissions from industrial processes.
(c)Despite Californias push for an all-electric vehicle fleet starting in 2035, cars will still have tires, and will still need to travel on roads. Transportation infrastructure materials will continue to be a significant source of emissions productions, unless we embrace technologies in the marketplace to manufacture them in a more sustainable manner.
(d)Approximately 26,000,000 tons of hot mix asphalt (HMA) pavement material are produced in the state annually. Typical asphalt mix production temperatures range from 300 to 350 degrees Fahrenheit, which is accomplished by heating the liquid asphalt cement and aggregate using a fossil fuel, such as natural gas, to allow for appropriate mixing of the materials.
(e)Warm mix asphalt (WMA) is the generic term for a variety of technologies that allow producers of HMA to lower the production temperature at which the material is mixed and placed on the road. True WMA is that product which is manufactured at temperatures of 275 degrees and lower.
(f)The use of true WMA provides multiple benefits, including significant reductions in fossil fuel use and the emissions of greenhouse gases during the asphalt mixing and production process; reductions or elimination of smoke, odors, and other byproduct pollutant gases and particulates; and optimized compaction at reduced temperatures and the extension of road life, leading to further greenhouse gas emission reductions and significant cost savings for the state related to increased long-term performance and the potential to increase recycling uptake. Benefits improve as production temperatures decrease.
(g)The University of California Pavement Research Center has studied true WMA pavement extensively. The center found that the use of true WMA has clear benefits when compared to HMA, including the benefits identified above, and improved workability, better conditions for workers, and better performance on projects with long hauls or where mixes are placed under cool conditions.
(h)Executive Order No. N-19-19 directs the Transportation Agency to leverage more than five billion dollars ($5,000,000,000) in annual state transportation spending for construction, operations, and maintenance to help reduce greenhouse gas emissions.
SEC. 2.Part 9 (commencing with Section 71470) is added to Division 34 of the Public Resources Code, to read:9.True Warm Mix Asphalt71470.For the purpose of this part, the following definitions apply:
(a)Department means the Department of Transportation.
(b)True warm mix asphalt means a hot mix asphalt that is heated to no more than 275 degrees Fahrenheit during mixing and production.
71471.The department shall provide for the payment of extra compensation to a contractor on a contract for a road project, as a bonus for using true warm mix asphalt, in accordance with the following:
(a)The department shall pay a bonus of three dollars ($3) per ton for true warm mix asphalt that is heated to a temperature of 251 to 275, inclusive, degrees Fahrenheit during mixing and production.
(b)The department shall pay a bonus of five dollars per ($5) per ton for true warm mix asphalt that is heated to no more than 250 degrees Fahrenheit during mixing and production.
71472.(a)The department shall submit a report to the Legislature on or before January 1, 2026, and every two years thereafter, containing all the following information:
(1)The reduction in carbon dioxide resulting from the use of true warm mix asphalt.
(2)The increase in use of true warm mix asphalt as a result of the extra compensation required by this article.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
71473.This part shall remain in effect only until January 1, 2029, and as of that date is repealed.
The Legislature finds and declares all of the following:
(a)Climate change poses a serious threat to the environment, our economy, and the well-being of communities in California and around the world.
(b)The United States manufacturing sector produces the materials that are critical to rebuilding and strengthening the nations infrastructure, but is responsible for nearly one-third of United States greenhouse gas emissions from industrial processes.
(c)Despite Californias push for an all-electric vehicle fleet starting in 2035, cars will still have tires, and will still need to travel on roads. Transportation infrastructure materials will continue to be a significant source of emissions productions, unless we embrace technologies in the marketplace to manufacture them in a more sustainable manner.
(d)Approximately 26,000,000 tons of hot mix asphalt (HMA) pavement material are produced in the state annually. Typical asphalt mix production temperatures range from 300 to 350 degrees Fahrenheit, which is accomplished by heating the liquid asphalt cement and aggregate using a fossil fuel, such as natural gas, to allow for appropriate mixing of the materials.
(e)Warm mix asphalt (WMA) is the generic term for a variety of technologies that allow producers of HMA to lower the production temperature at which the material is mixed and placed on the road. True WMA is that product which is manufactured at temperatures of 275 degrees and lower.
(f)The use of true WMA provides multiple benefits, including significant reductions in fossil fuel use and the emissions of greenhouse gases during the asphalt mixing and production process; reductions or elimination of smoke, odors, and other byproduct pollutant gases and particulates; and optimized compaction at reduced temperatures and the extension of road life, leading to further greenhouse gas emission reductions and significant cost savings for the state related to increased long-term performance and the potential to increase recycling uptake. Benefits improve as production temperatures decrease.
(g)The University of California Pavement Research Center has studied true WMA pavement extensively. The center found that the use of true WMA has clear benefits when compared to HMA, including the benefits identified above, and improved workability, better conditions for workers, and better performance on projects with long hauls or where mixes are placed under cool conditions.
SEC. 2.Part 9 (commencing with Section 71470) is added to Division 34 of the Public Resources Code, to read:9.True Warm Mix Asphalt71470.For the purpose of this part, the following definitions apply:
(a)Department means the Department of Transportation.
(b)True warm mix asphalt means a hot mix asphalt that is heated to no more than 275 degrees Fahrenheit during mixing and production.
71471.The department shall provide for the payment of extra compensation to a contractor on a contract for a road project, as a bonus for using true warm mix asphalt, in accordance with the following:
(a)The department shall pay a bonus of three dollars ($3) per ton for true warm mix asphalt that is heated to a temperature of 251 to 275, inclusive, degrees Fahrenheit during mixing and production.
(b)The department shall pay a bonus of five dollars per ($5) per ton for true warm mix asphalt that is heated to no more than 250 degrees Fahrenheit during mixing and production.
71472.(a)The department shall submit a report to the Legislature on or before January 1, 2026, and every two years thereafter, containing all the following information:
(1)The reduction in carbon dioxide resulting from the use of true warm mix asphalt.
(2)The increase in use of true warm mix asphalt as a result of the extra compensation required by this article.
(b)A report to be submitted pursuant to subdivision (a) shall be submitted in compliance with Section 9795 of the Government Code.
71473.This part shall remain in effect only until January 1, 2029, and as of that date is repealed.
|
Date
|
Status
|
|---|---|
| Sep 19, 2024 | Chaptered by Secretary of State. Chapter 284, Statutes of 2024. |
| Sep 19, 2024 | Approved by the Governor. |
| Sep 9, 2024 | Enrolled and presented to the Governor at 3 p.m. |
| Aug 29, 2024 | Assembly amendments concurred in. (Ayes 39. Noes 0. Page 5683.) Ordered to engrossing and enrolling. |
| Aug 26, 2024 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 26, 2024 | Read third time. Passed. (Ayes 66. Noes 0. Page 6528.) Ordered to the Senate. |
| Aug 19, 2024 | Read second time. Ordered to third reading. |
| Aug 15, 2024 | From committee: Do pass. (Ayes 12. Noes 1.) (August 15). |
| Aug 7, 2024 | August 7 set for first hearing. Placed on suspense file. |
| Jul 3, 2024 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 2, 2024 | From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 10. Noes 0.) (July 1). |
| Jun 10, 2024 | June 10 set for first hearing canceled at the request of author. |
| Jun 3, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on NAT. RES. |
| May 24, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on NAT. RES. |
| May 13, 2024 | Referred to Com. on NAT. RES. |
| Jan 25, 2024 | In Assembly. Read first time. Held at Desk. |
| Jan 25, 2024 | Read third time. Passed. (Ayes 34. Noes 1. Page 3035.) Ordered to the Assembly. |
| Jan 22, 2024 | Read second time. Ordered to third reading. |
| Jan 18, 2024 | From committee: Do pass. (Ayes 6. Noes 0. Page 3011.) (January 18). |
| Jan 17, 2024 | Set for hearing January 18. |
| Jan 16, 2024 | January 16 hearing: Placed on APPR suspense file. |
| Jan 11, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on APPR. |
| Jan 11, 2024 | Set for hearing January 16. |
| Jan 10, 2024 | From committee: Do pass and re-refer to Com. on APPR. (Ayes 7. Noes 0. Page 2970.) (January 10). Re-referred to Com. on APPR. |
| Jan 5, 2024 | Set for hearing January 10. |
| Jan 3, 2024 | Re-referred to Com. on E.Q. |
| Jan 3, 2024 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on RLS. |
| Sep 14, 2023 | Re-referred to Com. on RLS. |
| Sep 14, 2023 | Withdrawn from committee. |
| Sep 13, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on TRANS. |
| Sep 13, 2023 | Senate rules suspended. |
| Apr 11, 2023 | April 11 set for first hearing canceled at the request of author. |
| Mar 22, 2023 | Set for hearing April 11. |
| Mar 21, 2023 | March 28 hearing postponed by committee. |
| Mar 14, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on TRANS. |
| Mar 7, 2023 | Set for hearing March 28. |
| Feb 15, 2023 | Referred to Coms. on TRANS. and E.Q. |
| Feb 7, 2023 | From printer. May be acted upon on or after March 9. |
| Feb 6, 2023 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 29, 2024 | Unfinished Business SB312 Wiener et al. Concurrence | Senate Floor |
Passed |
|
| Aug 26, 2024 | SB 312 Wiener Senate Third Reading By Bryan | Assembly Floor |
Passed |
|
| Aug 15, 2024 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 1, 2024 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Jan 25, 2024 | Senate 3rd Reading SB312 Wiener et al. | Senate Floor |
Passed |
|
| Jan 18, 2024 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| Jan 16, 2024 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Jan 10, 2024 | Do pass, but first be re-referred to the Committee on [Appropriations] | Senate Standing Committee on Environmental Quality |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| Alameda County Democratic Central Committee | ** Support | |
| California Competes: Higher Education for a Strong Economy | ** Support | |
| California State University Employees Union | ** Support | |
| California YIMBY | ** Support | |
| Center on Race, Poverty, and the Environment | ** Against | |
| Communities for a Better Environment | ** Against | |
| Endangered Habitats League | ** Against | |
| GENup | ** Support | |
| Granite Construction Company | ** Against | |
| Housing Action Coalition | ** Support | |
| Ingevity | ** Support | |
| Physicians for Social Responsibility - Los Angeles | ** Against | |
| Planning And Conservation League | ** Against | |
| Student Homes Coalition | ** Support | |
| University Of California Student Association | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 312 |
UNFINISHED BUSINESS
Bill No: SB 312
Author: Wiener (D), et al.
Amended: 7/3/24
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 1/10/24
AYES: Allen, Dahle, Gonzalez, Hurtado, Menjivar, Nguyen, Skinner
SENATE APPROPRIATIONS COMMITTEE: 6-0, 1/18/24
AYES: Portantino, Jones, Bradford, Seyarto, Wahab, Wiener
NO VOTE RECORDED: Ashby
SENATE FLOOR: 34-1, 1/25/24
AYES: Allen, Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Bradford, Caballero, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Umberg, Wahab, Wiener, Wilk
NOES: Laird
NO VOTE RECORDED: Blakespear, Cortese, Jones, Portantino, Stern
ASSEMBLY FLOOR: 66-0, 8/26/24 - See last page for vote
SUBJECT: California Environmental Quality Act: university housing development projects: exemption
SOURCE: Author
DIGEST:
This bill relaxes several conditions attached to the California Environmental Quality Act (CEQA) exemption for public university housing projects established by SB 886 (Wiener) in 2022.
Assembly Amendments
. relax several additional conditions attached to the CEQA exemption for public university housing projects established by SB 886 (Wiener) in 2022, including giving additional time extensions for universities to achieve LEED platinum certification, removing the requirement that the university respond to public comments on exempted projects, and replacing the requirement that projects be consistent with the most recent campus LRDP with a less stringent requirement that projects be located on a campus site identified for housing in the most recent long-range development plan (LRDP) Environmental Impact Report (EIR) under certain conditions. Assembly amendments also extend the sunset on the SB 866 CEQA exemption by two additional years (until 2032).
ANALYSIS:
Existing law:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for the project, unless the project is exempt from CEQA. (Public Resources Code (PRC) §21000 et seq.). If a project may have a significant effect on the environment, the lead agency must prepare a draft EIR. (CEQA Guidelines §15064(a)(1), (f)(1))
- Exempts from CEQA, until January 1, 2030, a public university housing project, as defined, carried out by a public university on real property owned by the public university if all of the following are met:
- The project is consistent with the university’s most recent LRDP EIR or master plan EIR.
- Each building of the project is certified as Leadership in Energy and Environmental Design (LEED) platinum or better.
- No more than one-third of the project square footage is used for nonresidential purposes.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled.
- The project has a transportation demand management program.
- The project’s construction impacts are fully mitigated.
- The project does not result in any net additional greenhouse gas (GHG) emissions, as determined by an independent third-party evaluation approved by the lead agency.
- All contractors and subcontractors at every tier on the project will be required to pay prevailing wages. An entity cannot be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors, at every tier, will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, except as specified.
- Requires all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California (UC) Service Unit job classifications to be performed only by UC employees at any facility, building, property, or space that is part of the project.
- The public university holds at least one noticed public hearing in the project area to hear and respond to public comments before determining that the project is exempt.
- The public university files a notice of exemption (NOE) with the Office of Planning and Research (OPR).
- The project is not located on an environmentally sensitive site, as specified.
- The project does not require the demolition of certain types of housing or historic structures.
- The project is not located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university submits an application pursuant to this exemption.
- The project is not located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
- The project does not consist of more than 2,000 units or 4,000 beds. (PRC 21080.58)
- Provides that the approval of a long-range development plan (LRDP) (i.e., a physical development and land use plan to meet the academic and institutional objectives for a particular campus or medical center of public higher education) is subject to CEQA and requires the preparation of an EIR. (PRC 21080.09) 9) Provides that the approval of a project on a particular campus or medical center of public higher education is subject to CEQA and may be addressed in a tiered environmental analysis based upon a LRDP EIR. (PRC 21080.09)
This bill:
- For University of California (UC) housing projects, revises the requirement that projects must be consistent with the university's most recent long range development plan (LRDP) environmental impact report (EIR), instead requiring the project to be located on a site identified for housing in the EIR and either within the range of housing units or beds analyzed for that site, if the EIR identifies such a range, or within the total housing units or beds analyzed in the EIR.
- Eliminates the requirement for Leadership in Energy and Environmental Design (LEED) certification prior to issuance of the certificate of occupancy, instead requiring the project to meet the minimum requirements to qualify for LEED certification, and requiring the university to obtain LEED certification for each project building within 18 months of completion, with up to two six-month extensions if certification is not obtained for reasons beyond the university's control.
- Prohibits further use of the exemption by a campus that has failed to obtain the required LEED certification for a prior exempt project, subject to an exception for previously planned projects, provided the campus does not have more than two exempted projects with one or more buildings that have not obtained the required LEED certification.
- Provides that mitigation of project construction impacts does not include mitigation required by CEQA.
- Eliminates the requirement for the university to respond to public comments offered at the public hearing required prior to the university's determination that a project is exempt.
- Extends the sunset from 2030 to 2032.
Background
- The A, B, C’s of CEQA. CEQA was enacted by the Legislature and signed into law by Governor Ronald Reagan in 1970. While it has evolved into a very complex Act over the past 53 years, at its core the basic principles of CEQA are relatively simple.
It is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment.
CEQA is a self-executing statute that is enforced by civil lawsuits that can challenge any project’s environmental review. Public agencies, as well as private individuals and organizations, can file lawsuits under CEQA.
- Follow The LEEDer. LEED is a voluntary green building standard established by the U.S. Green Building Council (USGBC). It is the most widely used green building rating system in the world.
The LEED system encourages green and sustainable building practices. The LEED system awards points to a building based on dozens of different factors such as the type of building materials used, whether the building is located near public transportation, the energy efficiency of the building, and much more. Buildings can be LEED Certified (40-49 points), LEED Silver (50-59 points), LEED Gold (60-79 points) or LEED Platinum (80+ points).
LEED certification is a “point in time” assessment of how “green” a building is based on the score it receives from the USGBC. There is nothing inherent in the LEED scoring system that precludes a LEED Silver building from eventually becoming LEED Gold certified or a LEED Gold building from becoming LEED Platinum.
- LEED certification and CEQA exemptions in UC, CSU, and CCC campuses. In 2022, SB 886 (Wiener, Chapter 663, Statutes of 2022) was signed into law, creating a CEQA exemption for faculty, staff, and student housing built on UC, CSU, and CCC campuses if those projects met certain criteria. The eligibility criteria for this exemption included a number of environmental protections, alternative standards, benchmarks, and locational exclusions including:
- The project is consistent with the school’s most recent long-range development plan (LRDP) EIR or master plan EIR and any applicable tiered environmental analysis.
- Each building of the project is certified as LEED Platinum or better before the certificate of occupancy is issued.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled (VMT).
- The project does not result in any net additional greenhouse gas (GHG) emissions.
Comments
- Purpose of the bill. According to the author “Currently, California is in the depths of a housing crisis. The impacts of this go beyond typical residential developments and into other areas such as student housing. As of 2019, 5% of UC, 10% of California State University, and 19% of California Community College students are homeless. In an attempt to address the growing student housing crisis, the Legislature passed SB 886 in 2022, which provided a streamlined path for student and faculty housing in specified circumstances. However, some of the requirements for projects to utilize the law simply do not work. For example, SB 886 requires projects to accomplish LEED Platinum certification prior to a CEQA exemption being granted or the certificate of occupancy being issued; however, LEED Platinum cannot be certified until a building is occupied. SB 312 addresses this timing issue by reducing the requirement of these buildings from LEED Platinum to qualifying for LEED Platinum, which can be achieved prior to occupancy. As amended the bill will also further clean up SB 886 by proposing a number of clarifying changes to ensure that this pathway is functional for public universities.”
- LEED conundrum. Under SB 886, projects that wish to be eligible for the SB 886 CEQA exemption must be LEED Platinum certified: since projects undergo environmental review through CEQA before they are built, the project would need to be certified LEED platinum before a certificate of occupancy can be issued. However, according to the USGBC, a building generally cannot achieve LEED Platinum status until after it is occupied. According to USGBC, in most cases, a project only receives LEED Platinum status following a post-occupancy study that examines whether the building is performing as it was designed to perform. For example, are the forecasted energy savings being realized? Are the GHG emissions as low as anticipated when the building was designed? Once a study looking at those and many other factors is completed, additional LEED points can be awarded and a building may move from LEED Gold to LEED Platinum status. This sets up a “chicken and egg” problem for projects that are seeking to use the CEQA exemption under SB 886: in order to get the CEQA exemption, projects must be certified LEED Platinum, but projects are only likely to get LEED Platinum certification after the project is completed, the building occupied, a study completed. At this post-occupancy phase, the CEQA exemption is no longer relevant.
This bill addresses this issue by giving universities an additional 18 months after a project is finished to receive their LEED certification for the project. To ensure universities do in fact get LEED platinum certifications for projects that received the CEQA exemption, SB 312 further specifies that universities cannot get another CEQA exemption under this bill until the previous project has attained its LEED platinum certification. The bill provides further padding for universities to reach their LEED certification, giving two additional six-month extensions on the 18-month timeline if the university could not get LEED certification for “circumstances outside of the control of the public university”.
LEED certification typically follows the submittal of a completed application, which can be done shortly after construction is completed. According to the USGBC website, the typical timeline for certification of a completed application is within 30 days.
- Beyond the LEED problem: backtracking SB 886 conditions. This bill passed the Senate in January as a “clean up” measure, addressing only the LEED certification issue, with no opposition. On May 24, it was amended to relax additional conditions included in SB 886 unrelated to LEED certification. Some of these changes remain in the bill, including removing the requirement that the university respond to public comments on exempted projects, and replacing the requirement that projects be consistent with the most recent campus LRDP with a less stringent requirement that projects be located on a campus site identified for housing in the most recent LRDP EIR under certain conditions.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the assembly appropriations committee: The Governor's Office of Planning and Research (OPR), which has duties to accept and review CEQA certifications, reports no or minor costs from this bill. OPR states that this bill requires OPR to receive certain disclosures around the LEED certification of projects, and some determinations around construction impacts and mitigation measures, but anticipates that receiving these new document types will not have any fiscal impact. OPR notes, however, that it is possible it will need to provide technical assistance related to this bill's provisions. The CSU anticipates any costs associated with SB 312 to be minor and absorbable. The UC's costs are unknown. Nonetheless, for at least two reasons, this bill may create General Fund cost pressure, in an unknown but likely significant amount, potentially in the hundreds of thousands of dollars. First, this bill defines "public university" to include the UC, the CSUs, and the CCCs, which collectively have dozens of campuses where a housing development covered by this bill could be constructed and for which technical assistance from OPR may be requested. Second, this bill extends the CEQA exemption for two years, adding to the time period when any of these costs may be incurred.
SUPPORT: (Verified 8/27/24)
Alameda County Democratic Central Committee
California Competes: Higher Education for A Strong Economy
California State University Employees Union (CSUEU)
California Yimby
Genup
Housing Action Coalition
Ingevity
Student Homes Coalition
University of California Student Association
OPPOSITION: (Verified 8/27/24)
Center on Race, Poverty, and The Environment
Communities for A Better Environment
Endangered Habitats League
Physicians for Social Responsibility - Los Angeles
Planning and Conservation League
ARGUMENTS IN SUPPORT: According to the University of California Student Association, SB 312 eliminates duplicative bureaucratic processes and shields student housing from lawsuits shortening construction by 1-3 years and saving millions in construction costs.
ARGUMENTS IN OPPOSITION: According to a coalition of environmental and environmental justice advocates, SB 312 grants UC an undue "free pass" to shirk its planning responsibilities for housing its student population and the many other uses the exemption allows for, significantly undermining the integrity of CEQA's environmental and community protections
ASSEMBLY FLOOR: 66-0, 8/26/24
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bennett, Berman, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Connolly, Megan Dahle, Davies, Flora, Mike Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lee, Low, Lowenthal, Maienschein, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Reyes, Rodriguez, Blanca Rubio, Santiago, Schiavo, Soria, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Robert Rivas
NO VOTE RECORDED: Bauer-Kahan, Boerner, Cervantes, Chen, Dixon, Essayli, Lackey, Mathis, Ortega, Rendon, Luz Rivas, Sanchez, Ta
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
8/27/24 12:38:10
**** END ****
SENATE THIRD READING
STR Bill Id:SB 312
Author:(Wiener)
As Amended Ver:July 3, 2024
Majority vote
SUMMARY
Relaxes several conditions attached to the California Environmental Quality Act (CEQA) exemption for public university housing projects established by SB 886 (Wiener) in 2022.
Major Provisions
- For University of California (UC) housing projects, revises the requirement that projects must be consistent with the university's most recent long range development plan (LRDP) environmental impact report (EIR), instead requiring the project to be located on a site identified for housing in the EIR and either within the range of housing units or beds analyzed for that site, if the EIR identifies such a range, or within the total housing units or beds analyzed in the EIR.
- Eliminates the requirement for Leadership in Energy and Environmental Design (LEED) certification prior to issuance of the certificate of occupancy, instead requiring the project to meet the minimum requirements to qualify for LEED certification, and requiring the university to obtain LEED certification for each project building within 18 months of completion, with up to two six-month extensions if certification is not obtained for reasons beyond the university's control.
- Prohibits further use of the exemption by a campus that has failed to obtain the required LEED certification for a prior exempt project, subject to an exception for previously planned projects, provided the campus does not have more than two exempted projects with one or more buildings that have not obtained the required LEED certification.
- Provides that mitigation of project construction impacts does not include mitigation required by CEQA.
- Eliminates the requirement for the university to respond to public comments offered at the public hearing required prior to the university's determination that a project is exempt.
- Extends the sunset from 2030 to 2032.
COMMENTS
CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines, for housing projects. For example, any residential development project, including any subdivision, or any zoning change that is consistent with an adopted specific plan is exempt from CEQA pursuant to a statute enacted in 1984.
Since 1978, CEQA has included statutory exemptions for housing projects. There are now at least 14 distinct CEQA exemptions for housing projects. Three are specific to projects with an affordable housing fraction, the rest are available to affordable and market-rate projects alike. Each exemption includes a range of conditions, including requirements for prior planning-level review, as well as limitations on the location and characteristics of the site. These conditions are intended to guard against the approval of projects with significant environmental impacts that go undisclosed and unmitigated – endangering workers, residents and the greater environment.
There are several avenues under current law to claim a CEQA exemption for residential projects, which can include university-sponsored projects, as well as private projects to house university students, faculty and staff. Public universities also periodically adopt planning-level EIRs, which can serve as the basis for streamlined review of subsequent housing projects.
According to the Author
Currently, California is in the depths of a housing crisis. The impacts of this go beyond typical residential developments and into other areas such as student housing. As of 2019, 5% of UC, 10% of California State University, and 19% of California Community College students are homeless. In an attempt to address the growing student housing crisis, the Legislature passed SB 886 in 2022, which provided a streamlined path for student and faculty housing in specified circumstances. However, some of the requirements for projects to utilize the law simply do not work. For example, SB 886 requires projects to accomplish LEED Platinum certification prior to a CEQA exemption being granted or the certificate of occupancy being issued; however LEED Platinum cannot be certified until a building is occupied. SB 312 addresses this timing issue by reducing the requirement of these buildings from LEED Platinum to qualifying for LEED Platinum, which can be achieved prior to occupancy. As amended the bill will also further clean up SB 886 by proposing a number of clarifying changes to ensure that this pathway is functional for public universities.
Arguments in Support
According to the University of California Student Association, SB 312 eliminates duplicative bureaucratic processes and shields student housing from lawsuits shortening construction by 1-3 years and saving millions in construction costs.
Arguments in Opposition
According to a coalition of environmental and environmental justice advocates, SB 312 grants UC an undue "free pass" to shirk its planning responsibilities for housing its student population and the many other uses the exemption allows for, significantly undermining the integrity of CEQA's environmental and community protections.
FISCAL COMMENTS
The Governor's Office of Planning and Research (OPR), which has duties to accept and review CEQA certifications, reports no or minor costs from this bill. OPR states that this bill requires OPR to receive certain disclosures around the LEED certification of projects, and some determinations around construction impacts and mitigation measures, but anticipates that receiving these new document types will not have any fiscal impact. OPR notes, however, that it is possible it will need to provide technical assistance related to this bill's provisions.
The CSU anticipates any costs associated with SB 312 to be minor and absorbable. The UC's costs are unknown.
Nonetheless, for at least two reasons, this bill may create General Fund cost pressure, in an unknown but likely significant amount, potentially in the hundreds of thousands of dollars. First, this bill defines "public university" to include the UC, the CSUs, and the CCCs, which collectively have dozens of campuses where a housing development covered by this bill could be constructed and for which technical assistance from OPR may be requested. Second, this bill extends the CEQA exemption for two years, adding to the time period when any of these costs may be incurred.
According to the Legislative Analyst's Office, the General Fund faces a structural deficit in the tens of billions of dollars over the next several fiscal years.
VOTES
SENATE FLOOR: 34-1-5
YES: Allen, Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Bradford, Caballero, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Umberg, Wahab, Wiener, Wilk
NO: Laird
ABS, ABST OR NV: Blakespear, Cortese, Jones, Portantino, Stern
ASM NATURAL RESOURCES: 10-0-2
YES: Bryan, Flora, Connolly, Friedman, Hoover, Kalra, Muratsuchi, Pellerin, Wicks, Wood
ABS, ABST OR NV: Bauer-Kahan, Lackey
ASM APPROPRIATIONS: 12-1-2
YES: Wicks, Arambula, Bryan, Calderon, Wendy Carrillo, Mike Fong, Grayson, Haney, Hart, Pellerin, Ta, Villapudua
NO: Dixon
ABS, ABST OR NV: Sanchez, Jim Patterson
UPDATED
VERSION: July 3, 2024
CONSULTANT: Lawrence Lingbloom / NAT. RES. / (916) 319-2092 FN: 0003949
Date of Hearing: August 7, 2024
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 312
Author:(Wiener) – As Amended Ver:July 3, 2024
Policy Committee: | Natural Resources | Vote: | 10-0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill relaxes several conditions for the California Environmental Quality Act (CEQA) exemption in existing law for public university housing projects, defined to include the University of California (UC), California State University (CSU), and California Community Colleges (CCC), and extends the sunset for the program.
Specifically, this bill:
1) For UC housing projects, revises the requirement that projects must be consistent with the university’s most recent long range development plan (LRDP) environmental impact report (EIR), instead requiring the project to be located on a site identified for housing in the EIR and either within the range of housing units or beds analyzed for that site, if the EIR identifies such a range, or within the total housing units or beds analyzed in the EIR.
2) Eliminates the requirement for Leadership in Energy and Environmental Design (LEED) certification prior to issuance of the certificate of occupancy, instead requiring the project to meet the minimum requirements to qualify for LEED certification, and requiring the university to obtain LEED certification for each project building within 18 months of completion, with up to two six-month extensions if certification is not obtained for reasons beyond the university’s control.
3) Prohibits further use of the exemption by a campus that has failed to obtain the required LEED certification for a prior exempt project, subject to an exception for previously planned projects, provided the campus does not have more than two exempted projects with one or more buildings that have not obtained the required LEED certification.
4) Provides that mitigation of project construction impacts does not include mitigation required by CEQA.
5) Eliminates the requirement for the university to respond to public comments offered at the public hearing required prior to the university’s determination that a project is exempt.
6) Extends the sunset from 2030 to 2032.
FISCAL EFFECT:
The Governor’s Office of Planning and Research (OPR), which has duties to accept and review CEQA certifications, reports no or minor costs from this bill. OPR states that this bill requires OPR to receive certain disclosures around the LEED certification of projects, and some determinations around construction impacts and mitigation measures, but anticipates that receiving these new document types will not have any fiscal impact. OPR notes, however, that it is possible it will need to provide technical assistance related to this bill’s provisions.
The CSU anticipates any costs associated with SB 312 to be minor and absorbable. The UC’s costs are unknown.
Nonetheless, for at least two reasons, this bill may create General Fund cost pressure, in an unknown but likely significant amount, potentially in the hundreds of thousands of dollars. First, this bill defines “public university” to include the UC, the CSUs, and the CCCs, which collectively have dozens of campuses where a housing development covered by this bill could be constructed and for which technical assistance from OPR may be requested. Second, this bill extends the CEQA exemption for two years, adding to the time period when any of these costs may be incurred.
According to the Legislative Analyst’s Office, the General Fund faces a structural deficit in the tens of billions of dollars over the next several fiscal years.
COMMENTS:
- Purpose. According to the author:
Currently, California is in the depths of a housing crisis. The impacts of this go beyond typical residential developments and into other areas such as student housing. As of 2019, 5% of UC, 10% of CSU, and 19% of CCC students are homeless. In an attempt to address the growing student housing crisis, the Legislature passed SB 886 (Wiener) in 2022, which provided a streamlined path for student and faculty housing in specified circumstances. However, some of the requirements for projects to utilize the law simply do not work. For example, SB 886 requires projects to accomplish LEED Platinum certification prior to a CEQA exemption being granted or the certificate of occupancy being issued; however LEED Platinum cannot be certified until a building is occupied. SB 312 addresses this timing issue by reducing the requirement of these buildings from LEED Platinum to qualifying for LEED Platinum, which can be achieved prior to occupancy. As amended the bill will also further clean up SB 886 by proposing a number of clarifying changes to ensure that this pathway is functional for public universities.
- Background. CEQA includes various statutory exemptions, as well as categorical exemptions in CEQA Guidelines issued by OPR, for housing projects. Existing law, until January 1, 2030, exempts from CEQA a university housing development project carried out by a public university on real property owned by the public university if the project meets certain requirements, including that each building within the project is certified as LEED Platinum or better by the United States Green Building Council. Existing law requires the lead agency, if the university housing development project is exempt from CEQA, to file the LEED certificate for buildings within the project and a notice determining that the construction impacts of the project have been fully mitigated with the OPR and the county clerk of the county in which the project is located. Existing law requires a university housing development project carried out by the UC, in order to be exempt from CEQA under this law, to be consistent with the most recent LRDP EIR certified on or after January 1, 2018.
This bill extends the application of the university housing development project exemption until January 1, 2032. It instead requires a university housing development project carried out by the UC, in order to be exempt from CEQA, to be located on a campus site identified for housing in the most recent long-range development plan EIR or an EIR prepared for any subsequent amendment to that plan relating to housing. This bill removes the requirement to file the LEED certificate with the county clerk of the county in which the project is located.
Existing law requires a public university or a relevant public agency with authority to issue a certificate of occupancy for a building within an exempt university housing development project to not issue the certificate of occupancy for the building unless the lead agency receives certification of LEED Platinum or better for the building and the lead agency determines that the construction impacts of the project have been fully mitigated.
This bill instead requires a public university to obtain LEED Platinum certification for each building within a university housing development project no later than 18 months from the issuance of the building’s certificate of occupancy or an equivalent certification, or its initial usage, and would authorize a public university to obtain two extensions for this LEED certification compliance requirement in six-month increments. The bill prohibits a public university that has exempted an approved university housing development project from applying that exemption to a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project.
- Prior Legislation. SB 886 (Wiener), Chapter 663, Statutes of 2022, established a CEQA exemption for faculty, staff, and student housing built on UC, CSU, and CCC campuses if projects meet certain criteria.
Analysis Prepared by: Jacqueline Kinney / APPR. / (916) 319-2081
Date of Hearing: July 1, 2024
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
SBPCA Bill Id:SB 312
Author:(Wiener) – As Amended Ver:June 3, 2024
SENATE VOTE: 34-1
SUBJECT: California Environmental Quality Act: university housing development projects: exemption
SUMMARY: Relaxes several conditions attached to the California Environmental Quality Act (CEQA) exemption for public university housing projects established by SB 886 (Wiener) in 2022.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (Public Resources Code (PRC) 21000, et seq.)
- Exempts from CEQA any residential development project, including any subdivision, or any zoning change that is undertaken to implement and is consistent with a specific plan for which an EIR has been certified after January 1, 1980, unless substantial changes or new information require the preparation of a supplemental EIR for the specific plan, in which case the exemption applies once the supplemental EIR is certified. (Government Code 65457)
- Exempts from CEQA specified residential projects which meet detailed criteria established to ensure the project does not have a significant effect on the environment, including:
- Affordable agricultural housing projects not more than 45 units within a city, or 20 units within an agricultural zone, on a site not more than five acres in size;
- Urban affordable housing projects not more than 100 units on a site not more than five acres in size; and,
- Urban infill housing projects not more than 100 units on a site not more than four acres in size which is within one-half mile of a major transit stop.
- Affordable agricultural housing projects not more than 45 units within a city, or 20 units within an agricultural zone, on a site not more than five acres in size;
(PRC 21159.20-21159.24)
- Requires metropolitan planning organizations (MPOs) to include a sustainable communities strategy (SCS), as defined, in their regional transportation plans, or an alternative planning strategy (APS), for the purpose of reducing greenhouse gas (GHG) emissions, aligns planning for transportation and housing, and creates specified incentives for the implementation of the strategies, including CEQA exemption or abbreviated review for residential or mixed-use residential "transit priority projects" if the project is consistent with the use designation, density, building intensity, and applicable policies specified for the project area in either an approved SCS or APS. (PRC 21155.1)
- Exempts from CEQA residential, mixed-use, and "employment center" projects, as defined, located within "transit priority areas," as defined, if the project is consistent with an adopted specific plan and specified elements of an SCS or APS. (PRC 21155.4)
- Exempts from CEQA multi-family residential and mixed-use housing projects on infill sites within cities and unincorporated areas that are within the boundaries of an urbanized area or urban cluster. (PRC 21159.25)
- The CEQA Guidelines include a categorical exemption for infill development projects, as follows:
- The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations;
- The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses;
- The project site has no value as habitat for endangered, rare, or threatened species;
- Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and,
- The site can be adequately served by all required utilities and public services.
(CEQA Guidelines 15332)
- Provides that the approval of a long-range development plan (LRDP) (i.e., a physical development and land use plan to meet the academic and institutional objectives for a particular campus or medical center of public higher education) is subject to CEQA and requires the preparation of an EIR. (PRC 21080.09)
- Provides that the approval of a project on a particular campus or medical center of public higher education is subject to CEQA and may be addressed in a tiered environmental analysis based upon a LRDP EIR. (PRC 21080.09)
- Exempts from CEQA, until January 1, 2030, a public university housing project, as defined, carried out by a public university on real property owned by the public university if all of the following are met:
- The project is consistent with the university’s most recent LRDP EIR or master plan EIR.
- Each building of the project is certified as Leadership in Energy and Environmental Design (LEED) platinum or better.
- No more than one-third of the project square footage is used for nonresidential purposes.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled.
- The project has a transportation demand management program.
- The project’s construction impacts are fully mitigated.
- The project does not result in any net additional greenhouse gas (GHG) emissions, as determined by an independent third-party evaluation approved by the lead agency.
- All contractors and subcontractors at every tier on the project will be required to pay prevailing wages. An entity cannot be prequalified or shortlisted or awarded a contract to perform work on the project unless the entity provides an enforceable commitment to the public university that the entity and its contractors and subcontractors, at every tier, will use a skilled and trained workforce to perform all work on the project that falls within an apprenticeable occupation in the building and construction trades, except as specified.
- Requires all cleaning, maintenance, groundskeeping, food service, or other work traditionally performed by persons with University of California (UC) Service Unit job classifications to be performed only by UC employees at any facility, building, property, or space that is part of the project.
- The public university holds at least one noticed public hearing in the project area to hear and respond to public comments before determining that the project is exempt.
- The public university files a notice of exemption (NOE) with the Office of Planning and Research (OPR).
- The project is not located on an environmentally sensitive site, as specified.
- The project does not require the demolition of certain types of housing or historic structures.
- The project is not located on a site that was previously used for housing that was occupied by tenants and was demolished within 10 years before the public university submits an application pursuant to this exemption.
- The project is not located on a site that contains housing units that are occupied by tenants and the housing units are offered for sale, were subsequently offered for sale, to the general public by a subdivider or subsequent owner of the site.
- The project does not consist of more than 2,000 units or 4,000 beds.
(PRC 21080.58)
THIS BILL:
- Eliminates the requirement for UC projects to be consistent with the university’s most recent LRDP EIR, instead requiring consistency with the LRDP’s land-use designation.
- Eliminates the requirement for LEED certification prior to issuance of the certificate of occupancy, instead requiring the project to meet the minimum requirements to qualify for LEED certification, and requiring the university to obtain LEED certification for each project building within 18 months of completion, subject to unlimited six-month extensions if certification is not obtained for reasons beyond the university’s control.
- Provides that mitigation of project construction impacts does not include mitigation required by CEQA.
- Limits mitigation of greenhouse gas (GHG) impacts to the project “when completed,” implying that GHG impacts from construction are not included, and eliminates the requirement for an independent evaluation of GHG mitigation.
- Eliminates the requirement for the university to respond to public comments offered at the public hearing required prior to the university’s determination that a project is exempt.
- Extends the sunset from 2030 to 2032.
FISCAL EFFECT: Unknown
COMMENTS:
- Background. CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA Guidelines, for housing projects. For example, any residential development project, including any subdivision, or any zoning change that is consistent with an adopted specific plan is exempt from CEQA pursuant to a statute enacted in 1984.
Since 1978, CEQA has included statutory exemptions for housing projects. There are now at least 14 distinct CEQA exemptions for housing projects. Three are specific to projects with an affordable housing fraction, the rest are available to affordable and market-rate projects alike. Each exemption includes a range of conditions, including requirements for prior planning-level review, as well as limitations on the location and characteristics of the site. These conditions are intended to guard against the approval of projects with significant environmental impacts that go undisclosed and unmitigated – endangering workers, residents and the greater environment.
There are several avenues under current law to claim a CEQA exemption for residential projects, which can include university-sponsored projects, as well as private projects to house university students, faculty and staff. Public universities also periodically adopt planning-level EIRs, which can serve as the basis for streamlined review of subsequent housing projects.
- Author’s statement:
Currently, California is in the depths of a housing crisis. The impacts of this go beyond typical residential developments and into other areas such as student housing. As of 2019, 5% of UC, 10% of CSU, and 19% of CCC students are homeless. In an attempt to address the growing student housing crisis, the Legislature passed SB 886 (Wiener) in 2022, which provided a streamlined path for student and faculty housing in specified circumstances. However, some of the requirements for projects to utilize the law simply do not work. For example, SB 886 requires projects to accomplish LEED Platinum certification prior to a CEQA exemption being granted or the certificate of occupancy being issued; however LEED Platinum cannot be certified until a building is occupied. SB 312 addresses this timing issue by reducing the requirement of these buildings from LEED Platinum to qualifying for LEED Platinum, which can be achieved prior to occupancy. As amended the bill will also further clean up SB 886 by proposing a number of clarifying changes to ensure that this pathway is functional for public universities.
- Does the LEED certification timing issue justify such a significant departure from the conditions in SB 886? This bill passed the Senate in January as a “clean up” measure, addressing only the LEED certification issue, with no opposition. On May 24, it was amended to relax several additional conditions included in SB 886, at the request of UC. The LEED certification requirement in SB 886 has been converted into an open-ended requirement to qualify for LEED certification, without a firm deadline or enforcement.
The bill also eliminates the requirement for UC projects to be consistent with the LRDP EIR, eliminates mitigation of construction GHG emissions, and eliminates the requirement for the university to respond to public comments on exempted projects. The justification for these changes is unclear, beyond expedience.
LEED certification follows the submittal of a completed application, which can be done shortly after construction is completed. The typical timeline for certification of a completed application is within 30 days. In this bill, UC is seeking an initial certification timeline of 18 months, with unlimited six-month extensions. The committee asked UC for examples to explain why LEED certification would take so long for UC projects. None have been offered.
- Bill exempts very large projects without regard for the established planning and environmental review process required at each UC campus. Every UC campus has a LRDP, which plans for housing among other things. The LRDP is accompanied by an EIR, which analyzes the environmental impacts of planned development.
According to UC, these are the LRDP adoption dates for UC campuses with substantial housing units:
UC Berkeley: 2021
UC Davis: 2018
UC Irvine: 2007
UCLA: 2002 (amended in 2018 for student housing projects)
UC Merced: 2020
UC Riverside: 2021
UC San Diego La Jolla Campus: 2018
UCSF: 2014
UCSB: 2014
UC Santa Cruz: 2021
In the past five years, 13 large student housing projects consisting of over 1,000 beds have been constructed on UC campuses. Some of these projects have exceeded 1,000,000 square feet and included significant parking and other non-residential uses.
Like SB 886, this bill caps each exempt project at 2,000 units or 4,000 beds (more than the largest recent UC projects), and allows one third of the project square footage to be non-residential uses. The bill imposes no limits on parcel size, square footage, or building height.
A 2,000 unit project might range from 400,000 to over 1,000,000 square feet of residential use, with an additional 200,000 to 500,000 square feet allowed for non-residential uses. These are enormous mixed-use projects to be approved without any project-specific CEQA review or connection to the prior, planning-level review that every UC campus is required to perform.
- Suggested amendments. The author and the committee may wish to consider the following amendments:
- Require exempt projects at UC campuses to be located on sites identified for housing in the most recent LRDP EIR, and within the range of housing units or beds identified for the site.
- Limit the number of six-month LEED certification extensions to two.
- Suspend use of the exemption on any campus that has more than one prior project that has not received LEED certification within the bill’s timeline.
- Restore the requirement to fully mitigate project GHG emissions by striking “, when completed,” on page 7, line 20.
REGISTERED SUPPORT / OPPOSITION:
Support
California State University Employees Union
California YIMBY
GENup
Housing Action Coalition
Student Homes Coalition
University of California Student Association
Opposition
Center on Race, Poverty, and the Environment
Communities for a Better Environment
Endangered Habitats League
Physicians for Social Responsibility - Los Angeles
Planning and Conservation League
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 312 |
THIRD READING
Bill No: SB 312
Author: Wiener (D), et al.
Amended: 1/11/24
Vote: 21
SENATE ENVIRONMENTAL QUALITY COMMITTEE: 7-0, 1/10/24
AYES: Allen, Dahle, Gonzalez, Hurtado, Menjivar, Nguyen, Skinner
SENATE APPROPRIATIONS COMMITTEE: 6-0, 1/18/24
AYES: Portantino, Jones, Bradford, Seyarto, Wahab, Wiener
NO VOTE RECORDED: Ashby
SUBJECT: California Environmental Quality Act: university housing development projects: exemption
SOURCE: Author
DIGEST:
This bill changes the eligibility criteria for a certain California Environmental Quality Act (CEQA) exemption for public higher education housing projects.
ANALYSIS:
Existing law:
- Requires, pursuant to CEQA, lead agencies with the principal responsibility for carrying out or approving a project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for the project, unless the project is exempt from CEQA. (Public Resources Code (PRC) §21000 et seq.). If a project may have a significant effect on the environment, the lead agency must prepare a draft EIR. (CEQA Guidelines §15064(a)(1), (f)(1))
- Provides a university housing development project with an exemption from CEQA if it meets certain requirements, one of which is that the housing development project be certified as LEED Platinum before a certificate of occupancy is issued for the project. (PRC §21080.58)
- Defines “public higher education” as (1) the California Community Colleges (CCC); (2) the California State University (CSU); and each campus, branch, and function thereof; and (3) each campus, branch, and function of the University of California (UC). (Education Code §66010)
- Enacts Executive Order (EO) B-18-12, issued in April 2012, which includes many green building related requirements, including one that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher.
This bill:
- Allows public higher education entities applying for a CEQA exemption for housing projects established by SB 886 (Wiener, Chapter 663, Statutes of 2022) if the project qualifies for LEED Platinum, replacing a previous requirement that the project be certified as LEED Platinum.
- Establishes that if an entity qualifies for LEED Platinum to be eligible for the SB 886 exemption, the entity must achieve LEED Platinum status within 12 months.
- Precludes a higher education system that utilized the SB 886 CEQA exemption from using that same exemption again until a SB 886 exempted building becomes LEED Platinum certified.
Background
- The A, B, C’s of CEQA. CEQA was enacted by the Legislature and signed into law by Governor Ronald Reagan in 1970. While it has evolved into a very complex Act over the past 53 years, at its core the basic principles of CEQA are relatively simple.
It is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment.
CEQA is self-executing statute that is enforced by civil lawsuits that can challenge any project’s environmental review. Public agencies, as well as private individuals and organizations, can file lawsuits under CEQA.
- Follow The LEEDer. LEED is a voluntary green building standard established by the U.S. Green Building Council (USGBC). It is the most widely used green building rating system in the world.
The LEED system encourages green and sustainable building practices. The LEED system awards points to a building based on dozens of different factors such as the type of building materials used, whether the building is located near public transportation, the energy efficiency of the building, and much more. Buildings can be LEED Certified (40-49 points), LEED Silver (50-59 points), LEED Gold (60-79 points) or LEED Platinum (80+ points).
LEED certification is a “point in time” assessment of how “green” a building is based on the score it receives from the USGBC. There is nothing inherent in the LEED scoring system that precludes a LEED Silver building from eventually becoming LEED Gold certified or a LEED Gold building from becoming LEED Platinum.
- California State Government & LEED. In 2012, Governor Jerry Brown issued EO B-18-12 which included a requirement that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher. This formalized a policy that the Department of General Services states on its website has been in place since 2004.
According to documents on the UC Office of the President’s website as of December 20, 2023, of 408 UC-related projects built since 2005, 18 are LEED Certified, 83 are LEED Silver, 224 are LEED Gold, and 90 achieved LEED Platinum status.
- LEED certification and CEQA exemptions in UC, CSU, and CCC campuses. In 2022, SB 886 (Wiener, Chapter 663, Statutes of 2022) was signed into law, creating a CEQA exemption for faculty, staff, and student housing built on UC, CSU, and CCC campuses if those projects met certain criteria. The eligibility criteria for this exemption included a number of environmental protections, alternative standards, benchmarks, and locational exclusions including:
- The project is consistent with the school’s most recent long-range development plan EIR or master plan EIR and any applicable tiered environmental analysis.
- Each building of the project is certified as LEED Platinum or better before the certificate of occupancy is issued.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled.
- The project does not result in any net additional greenhouse gas (GHG) emissions.
Comments
- Purpose of Bill. According to the author, “Currently, California is in the depths of a housing crisis. The impacts of this go beyond typical residential developments and into other areas such as student housing. As of 2019, 5% of UC, 10% of CSU, and 19% of CCC students are homeless. In an attempt to address the growing student housing crisis, the Legislature passed SB 886 (Wiener) in 2022, which provided a streamlined path for student and faculty housing in specified circumstances. However, some of the requirements for projects to utilize the law simply do not work: SB 886 requires projects to accomplish LEED Platinum certification prior to a CEQA exemption being granted or the certificate of occupancy being issued, however LEED Platinum cannot be certified until a building is occupied. SB 270 addresses this timing issue, reducing the requirement of these buildings from LEED Platinum to LEED Gold, which can be achieved prior to occupancy. To assure these projects are still held to a high standard, SB 270 requires the LEED Gold certification to include the highest type of LEED Gold – achieving 79 or more points as determined by LEED.”
- A Hitch in SB 886. Under SB 886, projects that wish to be eligible for the SB 886 CEQA exemption must be LEED Platinum certified: since projects undergo environmental review through CEQA before they are built, the project would need to be certified LEED platinum before a certificate of occupancy can be issued. However, according to the USGBC, a building generally cannot achieve LEED Platinum status until after it is occupied. According to USGBC, in most cases, a project only receives LEED Platinum status following a post-occupancy study that examines whether the building is performing as it was designed to perform. For example, are the forecasted energy savings being realized? Are the GHG emissions as low as anticipated when the building was designed? Once a study looking at those and many other factors is completed, additional LEED points can be awarded and a building may move from LEED Gold to LEED Platinum status.
This led to a “chicken-and-egg” problem for projects that are seeking to use the CEQA exemption under SB 886: in order to get the CEQA exemption, projects must be certified LEED Platinum, but projects are only likely to get LEED Platinum certification after the project is completed, the building occupied, a study completed. At this post-occupancy phase, the CEQA exemption is no longer relevant.
This bill resolves this issue by making two changes to the measure. First, this bill seeks to resolve the chicken-and-egg dilemma in SB 886 by requiring that projects must qualify for LEED Platinum, rather than be certified as LEED Platinum. This bill further adds an enforcing mechanism to ensure projects reach that LEED Platinum certification within a year; higher education system that use the SB 886 CEQA exemption are precluded from using it again until the SB 886 exempted building becomes LEED Platinum certified.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
According to the Senate Appropriations Committee:
- To the extent that this bill results in additional spending on faculty, staff, and student housing projects from what otherwise would occur, unknown, potentially significant costs (General Fund) to public postsecondary institutions.
- Unknown costs, likely in the low hundreds of thousands of dollars per project, for public postsecondary institutions to meet the specified requirements for projects under this bill. These costs would be offset by savings due to being exempt from other environmental reporting requirements under CEQA.
SUPPORT: (Verified 1/19/24)
California Yimby
Ingevity
OPPOSITION: (Verified 1/19/24)
Prepared by: Brynn Cook / E.Q. / (916) 651-4108
1/23/24 10:33:08
**** END ****
SENATE COMMITTEE ON
Senator Anthony Portantino, Chair
2023 - 2024 Regular Session
SB 312 (Wiener) - California Environmental Quality Act: university housing development projects: exemption
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
This bill would replace the requirement that, for a higher education institution to utilize a particular CEQA exemption, a building be certified as Leadership in Energy and Environmental Design (LEED) Platinum with a requirement that it obtain LEED Platinum certification for each building within a university housing development project no later than 12 months from the issuance of the building’s certificate of occupancy or its usage, among other things.
Fiscal Impact:
- To the extent that this bill results in additional spending on faculty, staff, and student housing projects from what otherwise would occur, unknown, potentially significant costs (General Fund) to public postsecondary institutions.
- Unknown costs, likely in the low hundreds of thousands of dollars per project, for public postsecondary institutions to meet the specified requirements for projects under this bill. These costs would be offset by savings due to being exempt from other environmental reporting requirements under CEQA.
Background:
Overview of CEQA Process. CEQA provides a process for evaluating the environmental effects of a project, and includes statutory exemptions, as well as categorical exemptions in the CEQA guidelines. If a project is not exempt from CEQA, an initial study is prepared to determine whether a project may have a significant effect on the environment. If the initial study shows that there would not be a significant effect on the environment, the lead agency must prepare a ND. If the initial study shows that the project may have a significant effect on the environment, the lead agency must prepare an EIR.
Generally, an EIR must accurately describe the proposed project, identify and analyze each significant environmental impact expected to result from the proposed project, identify mitigation measures to reduce those impacts to the extent feasible, and evaluate a range of reasonable alternatives to the proposed project.
What is analyzed in an environmental review? An environmental review analyzes the significant direct and indirect environmental impacts of a proposed project and may include water quality, surface and subsurface hydrology, land use and agricultural resources, transportation and circulation, air quality and greenhouse gas emissions, terrestrial and aquatic biological resources, aesthetics, geology and soils, recreation, public services and utilities such as water supply and wastewater disposal, and cultural resources. The analysis must also evaluate the cumulative impacts of any past, present, and reasonably foreseeable projects/activities within study areas that are applicable to the resources being evaluated.
CEQA provides hub for multi-disciplinary regulatory process. An environmental review provides a forum for all the described issue areas to be considered together rather than siloed from one another. It provides a comprehensive review of the project, considering all applicable environmental laws and how those laws interact with one another. For example, it would be prudent for a lead agency to know that a proposal to mitigate a significant impact (i.e. alleviate temporary traffic congestion, due to construction of a development project, by detouring traffic to an alternative route) may trigger a new significant impact (i.e. the detour may redirect the impact onto a sensitive resource, such as a habitat of an endangered species or near a hospital). CEQA provides the opportunity to analyze a broad spectrum of a project’s potential environmental impacts and how each impact may intertwine with one another.
CEQA streamlining provisions. CEQA has been amended over the years to provide several tools to expedite the review of, or altogether exempt from CEQA, various types of projects.
Projects Eligible for Exemptions
Numerous types of projects may be eligible for an exemption from CEQA review pursuant to either a statutory exemption or a “categorical” exemption in the CEQA Guidelines. Categorical exemptions are projects determined by the Secretary of the Natural Resources Agency to not have a significant effect on the environment. In general, if a project meets certain specified criteria, it is not subject to CEQA. See Comment 4 of this analysis for an overview of existing exemptions for which a university housing development project may already be eligible.
Streamlined Administrative Review
CEQA provides for streamlined processes for preparing EIRs and other CEQA documents that enable public agencies to use various special types of EIR’s to simplify preparation and avoid duplication. These various documents include “program” EIRs for a series of related actions that can be collectively characterized as a single project, “staged” EIRs for sequential projects, and “master” EIRs for community-level projects. This streamlines the review of such projects and reduces the need to prepare repetitive studies.
CEQA also provides for “tiering”—the process of analyzing general projects in a broad EIR, followed by focused review of subsequent environmental projects that are narrower in scope, thereby allowing an agency to defer analysis of certain details of later phases of long-term linked or complex projects until those phases are up for approval.
Planning for long-term development by institutions of higher education. In California, public universities prepare planning documents that help guide the university in its physical development as well as the growth of student enrollment.
University of California (UC). Each campus and medical center of the UC periodically develops an LRDP that guides its physical development – based on academic goals and projected student enrollment levels – for an established time horizon. Each plan identifies how a campus will accommodate the anticipated enrollment along with the faculty and staff needed to support that enrollment. Thus, an LRDP outlines a campus’s priorities and guides future development. CEQA requires an EIR be prepared for the LRDP and requires the UC Board of Regents, as the lead agency, to certify the EIR before approving the LRDP. Since the LRDP includes multiple projects, the accompanying EIR is typically referred to as the “master” EIR or a “program-level” EIR. As each project covered by the LRDP is implemented, a project-level EIR is prepared. However, given the certification of a program-level EIR on the LRDP, these project-level EIRs are not required to be as detailed.
UC is constitutionally exempt from local land use control. In other words, the local government’s planning commission does not have the jurisdiction to deny or oppose an LRDP or a specific project within the LRDP.
California State University (CSU). The CSU is the largest university system in the United States. Governed by the Board of Trustees, CSU's 23 campuses across the state collectively enroll 405,000 students and employ 44,000 faculty and staff. Each of the 23 CSU campuses develop a master plan that guides the future development of campus facilities based on its academic priorities and student enrollment projections. The physical plan is not subject to local land use regulations and usually covers a period of 10 years. As with UC, CEQA requires CSU campuses to complete an EIR for each master plan. The CSU Board of Trustees serves as the lead agency in the EIR process and has the responsibility of approving both the master plan and the EIR.
California Community College. Each community college district maintains a district-wide master plan, as well as a separate master plan for each college located in the district. The master plan serves as a comprehensive planning document encompassing all functions of the college or district for a period of 10 years. The master plan also includes a facilities component that evaluates existing land, infrastructure, and facility needs, and specifies the projects necessary to meet those needs. The various districts are exempt from local land use regulations. The district prepares an EIR that is subsequently reviewed and approved with the master plan by the district’s board of trustees.
Legislative Analyst Report finds LRDPs lack accountability, standardization, and clarity. In 2007, the Legislative Analyst’s Office (LAO) published the report, A Review of UC’s Long Range Development Planning Process. That report reviewed the process used by UC to prepare LRDPs and analyzed whether the process adequately addressed impacts that campus growth has on surrounding communities. In general, the report found a lack of accountability, standardization, and clarity in the current process, and noted that this creates tension between the university and local communities regarding campus growth and the mitigation of the environmental impacts related to the growth. The LAO findings can be summarized as:
- Lack of state accountability and oversight. Generally, the state neither approves the LRDP nor the implementation of the mitigation measures identified in the EIR.
- Lack of standardization in public participation leading to varying degrees of local community involvement.
- Minimal systemwide coordination in projecting enrollment for recent LRDPs.
- Campuses want to primarily expand graduate enrollment due to expected decline in number of California public high school graduates.
- Lack of clarity in CEQA requirements making its application uncertain and inconsistent.
- No campus has reached a “fair share” agreement with neighboring jurisdictions to contribute towards mitigating off-campus impacts.
While it is unclear if any systemwide changes have been made to LRDPs to address these concerns since the report was published, it does appear that some LRDPs have incorporated community advisory boards.
California State Government & LEED. As noted above, EO B-18-12 issued by former Governor Jerry Brown in April 2012 included a requirement that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher. This formalized a policy that the Department of General Services states on its website has been in place since 2004.
According to documents on the UC Office of the President’s website, as of January 6, 2023, of 408 UC-related projects built since 2005, 18 are LEED Certified, 83 are LEED Silver, 224 are LEED Gold, and 90 achieved LEED Platinum status.
Proposed Law:
This bill would replace the requirement that, for a higher education institution to utilize a particular CEQA exemption, a building be certified as Leadership in Energy and Environmental Design (LEED) Platinum with a requirement that it obtain LEED Platinum certification for each building within a university housing development project no later than 12 months from the issuance of the building’s certificate of occupancy or its usage. The bill would prohibit a public university that has exempted a university housing development project from being eligible to exempt a subsequent university housing development project until the public university has obtained LEED Platinum certification for each building within the prior exempted university housing development project.
Related Legislation:
SB 886 (Wiener, Chapter 663, Statutes of 2022) provided a CEQA exemption until January 1, 2030, for certain UC, CSU, and CCC faculty, staff, and student housing projects if they meet certain environmental standards.
The bill exempted these projects from CEQA as long as they met a number of alternative standards and benchmarks, including:
- The project is consistent with the school’s most recent long-range development plan (LRDP) EIR or master plan EIR and any applicable tiered environmental analysis.
- Each building of the project is certified as LEED Platinum or better before the certificate of occupancy is issued.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled (VMT).
- The project does not result in any net additional greenhouse gas (GHG) emissions.
SB 270 (Wiener, 2023) was almost identical to the language in SB 312 prior to amendments agreed to in the Senate Environmental Quality Committee, except that SB 270 required projects be LEED Gold certified instead of qualifying as LEED Gold. SB 270 was held in this committee.
-- END --
SENATE COMMITTEE ON ENVIRONMENTAL QUALITY
Senator Allen, Chair
2023 - 2024 Regular
Bill No: SB 312
Author: | Wiener | ||
Version: | 1/3/2024 | Hearing Date: | 1/10/2024 |
Urgency: | No | Fiscal: | No |
Consultant: | Brynn Cook | ||
SUBJECT:
- DIGEST: This bill lowers the Leadership in Energy and Environmental Design (LEED) certification eligibility requirement by one point for public housing projects seeking an exemption from the California Environmental Quality Act (CEQA) established SB 886 (Wiener, Chapter 663, Statutes of 2022).
ANALYSIS:
Existing law:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a project to prepare a negative declaration (ND), mitigated negative declaration (MND), or environmental impact report (EIR) for the project, unless the project is exempt from CEQA. (Public Resources Code (PRC) §21000 et seq.). If a project may have a significant effect on the environment, the lead agency must prepare a draft EIR. (CEQA Guidelines §15064(a)(1), (f)(1))
- Provides a university housing development project with an exemption from CEQA if it meets certain requirements, one of which is that the housing development project be certified as LEED Platinum before a certificate of occupancy is issued for the project. (PRC §21080.58)
- Defines “public higher education” as (1) the California Community Colleges (CCC), (2) the California State University (CSU), and each campus, branch, and function thereof, and (3) each campus, branch, and function of the University of California (UC). (Education Code §66010)
- Executive Order (EO) B-18-12, issued in April 2012, includes many green building related requirements, including one that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher.
This bill:
- Replaces the requirement that a housing development project be certified as LEED Platinum to qualify for the CEQA exemption created in SB 886 (Wiener, Chapter 663, Statutes of 2022) with a requirement that the project qualify as LEED Gold with a score of 79 before a certificate of occupancy can be issued.
Background
- The A, B, C’s of CEQA. CEQA was enacted by the Legislature and signed into law by Governor Ronald Reagan in 1970. While it has evolved into a very complex Act over the past 53 years, at its core the basic principles of CEQA are relatively simple.
It is designed to (a) make government agencies and the public aware of the environmental impacts of a proposed project, (b) ensure the public can take part in the review process, and (c) identify and implement measures to mitigate or eliminate any negative impact the project may have on the environment.
CEQA is self-executing statute that is enforced by civil lawsuits that can challenge any project’s environmental review. Public agencies, as well as private individuals and organizations, can file lawsuits under CEQA.
- Follow The LEEDer. LEED is a voluntary green building standard established by the U.S. Green Building Council (USGBC). It is the most widely used green building rating system in the world.
The LEED system encourages green and sustainable building practices. The LEED system awards points to a building based on dozens of different factors such as the type of building materials used, whether the building is located near public transportation, the energy efficiency of the building, and much more. Buildings can be LEED Certified (40-49 points), LEED Silver (50-59 points), LEED Gold (60-79 points) or LEED Platinum (80+ points).
LEED certification is a “point in time” assessment of how “green” a building is based on the score it receives from the USGBC. There is nothing inherent in the LEED scoring system that precludes a LEED Silver building from eventually becoming LEED Gold certified or a LEED Gold building from becoming LEED Platinum.
- California State Government & LEED. In 2012, then-Governor Jerry Brown issued EO B-18-12 which included a requirement that all new or major renovated state buildings and build-to-suit leases larger than 10,000 square feet obtain LEED Silver certification or higher. This formalized a policy that the Department of General Services states on its website has been in place since 2004.
According to documents on the UC Office of the President’s website as of December 20, 2023, of 408 UC-related projects built since 2005, 18 are LEED Certified, 83 are LEED Silver, 224 are LEED Gold, and 90 achieved LEED Platinum status.
- LEED certification and CEQA exemptions in UC, CSU, and CCC campuses. In 2022, SB 886 (Wiener, Chapter 663, Statutes of 2022) was signed into law, creating a CEQA exemption for faculty, staff, and student housing built on UC, CSU, and CCC campuses if those projects met certain criteria. The eligibility criteria for this exemption included a number of environmental protections, alternative standards, benchmarks, and locational exclusions including:
- The project is consistent with the school’s most recent long-range development plan (LRDP) EIR or master plan EIR and any applicable tiered environmental analysis.
- Each building of the project is certified as LEED Platinum or better before the certificate of occupancy is issued.
- The project is either within one-half mile of a major transit stop, one-half mile of the campus boundary, or has 15% lower per capita vehicle miles traveled (VMT).
- The project does not result in any net additional greenhouse gas (GHG) emissions.
Comments
- Purpose of Bill. According to the author, “Currently, California is in the depths of a housing crisis. The impacts of this go beyond typical residential developments and into other areas such as student housing. As of 2019, 5% of UC, 10% of CSU, and 19% of CCC students are homeless. In an attempt to address the growing student housing crisis, the Legislature passed SB 886 (Wiener) in 2022, which provided a streamlined path for student and faculty housing in specified circumstances. However, some of the requirements for projects to utilize the law simply do not work: SB 886 requires projects to accomplish LEED Platinum certification prior to a CEQA exemption being granted or the certificate of occupancy being issued, however LEED Platinum cannot be certified until a building is occupied. SB 270 addresses this timing issue, reducing the requirement of these buildings from LEED Platinum to LEED Gold, which can be achieved prior to occupancy. To assure these projects are still held to a high standard, SB 270 requires the LEED Gold certification to include the highest type of LEED Gold – achieving 79 or more points as determined by LEED.”
- A Hitch in SB 886. Under SB 886, projects that wish to be eligible for the SB 886 CEQA exemption must be LEED Platinum certified: since projects undergo environmental review through CEQA before they are built, the project would need to be certified LEED platinum before a certificate of occupancy can be issued. However, according to the USGBC, a building generally cannot achieve LEED Platinum status until after it is occupied. According to USGBC, in most cases, a project only receives LEED Platinum status following a post-occupancy study that examines whether the building is performing as it was designed to perform. For example, are the forecasted energy savings being realized? Are the GHG emissions as low as anticipated when the building was designed? Once a study looking at those and many other factors is completed, additional LEED points can be awarded and a building may move from LEED Gold to LEED Platinum status.
This sets up a “chicken and egg” problem for projects that are seeking to use the CEQA exemption under SB 886: in order to get the CEQA exemption, projects must be certified LEED Platinum, but projects are only likely to get LEED Platinum certification after the project is completed, the building occupied, a study completed. At this post-occupancy phase, the CEQA exemption is no longer relevant.
- Go for Platinum. SB 312 seeks to address the “chicken and egg” problem in SB 886 by making two changes to the measure. First, the bill replaces the LEED Platinum requirement for CEQA exemption with a requirement that projects achieve one point below LEED Platinum (LEED Gold score with 79 points). In lowering the LEED standard by one point, this bill would avoid requiring the LEED platinum standard which typically requires a post-occupancy study and would make it more feasible for projects to use the SB 886 CEQA exemption.
Secondly, the bill also seeks to resolve the chicken-and-egg dilemma in SB 886 by requiring that projects must qualify for LEED Gold with 79 points certification, rather than be certified as LEED Platinum.
Since both solutions effectively address the “chicken-and-egg” dilemma in SB 886, the committee and author may wish to amend the bill to remove this redundancy in solutions and opt for the single highest-standard criteria by requiring that projects seeking the SB 886 CEQA exemption should qualify for LEED Platinum.
- Staying on Track. Requiring that projects qualify for LEED Platinum rather than be certified LEED Platinum effectively resolves the chicken-and-egg dilemma of SB 886. However, to ensure that higher education institutions are actually achieving LEED Platinum after receiving the SB 886 CEQA exemption, a further enforcement mechanism is needed. The author and committee may wish to amend the bill to add requirements that:
- Any entity that complies with this bill’s new requirement to qualify for LEED Platinum must actually achieve LEED Platinum status within 12 months.
- Preclude the higher education system that utilized the SB 886 CEQA exemption from using it again until the SB 886 exempted building becomes LEED Platinum certified.
- Committee amendments. Staff recommends the committee adopt the bolded amendments contained in comments 2 &3 above. Due to timing constraints, if the committee chooses to support the staff recommendations, amendments shall be adopted in Senate Appropriations Committee.
Related/Prior Legislation
SB 886 (Wiener, Chapter 663, Statutes of 2022) provided a CEQA exemption until January 1, 2030, for certain UC, CSU, and CCC faculty, staff, and student housing projects if they meet certain environmental standards.
SB 270 (Wiener, 2023) the language for SB 270 was almost identical to the language in SB 312, except that SB 270 requires projects be LEED Gold certified instead of qualifying as LEED Gold. SB 270 was held in the Senate Appropriations Committee.
SOURCE:
Author
SUPPORT:
Ingevity
OPPOSITION:
None received
-- END --
SENATE COMMITTEE ON TRANSPORTATION
Senator Lena Gonzalez, Chair
2023 - 2024 Regular
Bill No: Hearing Date: 4/11/2023
Author: | Wiener | ||
Version: | 3/14/2023 Amended | ||
Urgency: | No | Fiscal: | Yes |
Consultant: | Randy Chinn | ||
SUBJECT:
DIGEST: This bill defines a new category of asphalt called “true warm mix asphalt” and award a bonus of from $3 - $5 per ton for its use by Caltrans.
ANALYSIS:
Existing law:
- Provides that Caltrans has full possession and control of all state highways and all property acquitted for state highway purposes. (Streets and Highways Code Section 90)
- Requires Caltrans, cities, and counties to use advanced technologies and material recycling techniques that reduce the cost of maintaining streets and highways and that exhibit reduced levels of greenhouse gas (GHG) emissions, where cost effective and feasible. (Streets and Highways Code Section 2030(c))
- Requires Caltrans to use recycled materials unless it determines that the use of these materials is not cost effective. (Public Resources Code Section 42701)
- Requires Caltrans to phase in the use of crumb rubber at specified levels on projects using asphalt where feasible. (Public Resources Code Section 42703)
- Authorizes Caltrans to establish specifications for the use of reclaimed asphalt pavement of up to 40% for hot mix asphalt mixes. (Public Resources Code Section 42704)
This bill:
- Defines “true warm mix asphalt” as hot mix asphalt heated to no more than 275 degrees during mixing and production.
- Requires Caltrans to pay a bonus for using true warm mix asphalt of $3 per ton when the asphalt is heated to between 251 and 275 degrees and $5 per ton when the asphalt is heated to no more than 250 degrees.
- Requires Caltrans to report to the Legislature on or before January 1, 2026, and every two years thereafter, on how much carbon dioxide was reduced by using true warm mix asphalt and the increase in use of true warm mix asphalt as a result of the bonus provided by this bill.
COMMENTS:
- Author’s Statement. “SB 312 incentivizes the use of warm mix asphalt — asphalt manufactured and laid at lower temperature, thus reducing energy use and carbon emissions — by requiring Caltrans to make bonus payments on road repair contracts of $3-$5 per ton of warm asphalt used. Asphalt is a major source of emissions, both during the mixing process and while it is being laid. In the traditional process, asphalt is mixed between 300 and 350 degrees Fahrenheit, requiring massive amounts of fuel and release of harmful pollutants that contribute to a variety of respiratory and other health conditions. As the transportation agency for the world’s fifth largest economy, Caltrans is a significant consumer of asphalt. In 2020 alone, Caltrans utilized 3,405,088 metric tons of asphalt across 443 construction paving projects. With an average carbon intensity of 50.2 to 52.1 kg CO2e/ton of mix produced, Caltrans’s use of asphalt emitted roughly 174 million tons of greenhouse gas (CO2 equivalent) in 2020 alone. The State must do everything in its power to reduce GHG emissions, and SB 312 equips us with another tool to ensure we are doing so.”
- Asphalt 101. Asphalt is a common construction material. According to the author, Caltrans used 3.4 million tons of asphalt in 2020. Asphalt is not a single product; it has many variations and can be made in different ways. Traditional asphalt is known as hot mix asphalt (HMA). Some asphalt is made with crumb rubber, which comes from recycled tires, and is known as rubberized HMA. Other asphalt is made by reusing old asphalt, known as recycled asphalt pavement (RAP). Finally, warm mix asphalt (WMA) is defined by Caltrans as asphalt that can be produced at plants that produce HMA but at temperatures 45 - 85 degrees lower.
WMA can be produced two ways, either using a chemical additive or by injecting water. All of these pavement technologies are recognized and used by Caltrans. This bill creates a new category of WMA that is based on the maximum temperature of the material.
While cost and sustainability are important issues, the durability of the material is a critical question. Assessing durability is complicated in California because the environment is so varied: scorching heat to freezing snow; desert to rainforest; saltwater and fog; soils which are rocky, sandy or clay. Knowing where and under what conditions a given type of asphalt can be used is essential to building a durable highway system.
- Is this type of WMA Better? This bill establishes a new category of asphalt called “true WMA” and provides a specified bonus payment when that type of asphalt is used. The purpose of the bonus is to incentivize the use of true WMA because, it is argued, it results in significantly lower GHG emission reductions than other asphalt. While that seems to be a reasonable conclusion — lower temperatures should mean lower energy use — it isn’t supported by sufficient published objective data. Missing are data that show the reduced amount of natural gas used during mixing, and how the reduced gas use compares with the GHG emissions of the chemical additives used to create “true WMA”, according to John Harvey at the University of California Davis Pavement Research Center.
- Compared to Competitors. California requires the use of rubberized HMA because it reduces tire waste. In 2020, rubberized HMA diverted 3.8 million tires from landfills. California also strongly encourages the use of RAP to support the use of recycled materials and reduce waste. Is true WMA, the material which is the subject of this bill, better than either of those types of asphalt? We don’t know. Answering that question is complicated because it depends on how much we value reducing the amount of waste tires, how much we value reducing the amount of waste asphalt, and how much either of those materials reduces GHG compared to true WMA.
Pavement technology will continue to advance, offering Caltrans new choices. Recently, Caltrans installed asphalt made with recycled plastic bottles. That might turn out to be a very desirable and environmentally friendly product. Net zero asphalt, made with plant material, is also under development. But were this bill to be enacted, both of these technologies would be disadvantaged by $3 - $5 per ton. Caltrans should be using the most sustainable material available that is suitable to the job and cost effective. This bill will thwart that.
- Implementation Issues. This bill assumes that a batch of asphalt is made at a uniform temperature, but that isn’t true. The aggregate, or rocks and sand, is often heated to a higher temperature than the binder that holds everything together. This complicates the analysis of GHG emission savings from true WMA and also raises the question of whether the temperature limit in the bill applies to the aggregate, the binder or both. The second question is how the temperature is monitored. How will Caltrans know that the asphalt temperature was continuously between 250 and 275 degrees, and therefore entitled to a $5 per ton bonus?
- How Much? The bill provides for a bonus of from $3- $5 per ton for using true WMA. Supporters have said that the $3 per ton is based on $1.50 per ton to cover the cost of the chemical additive to make true WMA and $1.50 per ton to provide an extra incentive to the asphalt company. Are the GHG emission reductions from “true” WMA worth an extra $3-$5 per ton? No one knows because the GHG benefits aren’t known. And those benefits would need to be compared to the other unsubsidized competing materials (e.g. steam injected WMA, RAP, and rubberized HMA). Note that those bonus payments would come from the existing Caltrans programs that pay to repair and maintain highways, resulting in fewer miles of highway being repaired or maintained.
- Alternative Solution. Reducing GHG emissions is a critical state policy. But so too is reducing tire waste and encouraging the use of recycled pavement, both of which may also help reduce GHG emissions. In lieu of the current language, the author may wish to instead urge Caltrans to evaluate its major building materials for GHG emissions and other sustainability features and require the use of those materials whenever cost effective and suitable.
Related Legislation:
AB 2954 (Salas, Chapter 872 of 2022) – Requires local governments above a specified size to adopt specified Caltrans recycled material standards unless certain criteria are met.
SB 1227 (Skinner) of 2020 – Would have required cities and counties to allow the use of recycled materials in road maintenance and rehabilitation in order to be eligible for SB 1 funds. This bill was held by the author in Senate Transportation Committee in light of the COVID-19 pandemic.
SB 1238 (Hueso) of 2020 – Would have required Caltrans to conduct a study to assess the feasibility, cost effectiveness, and life-cycle environmental benefits of including recycled plastics in asphalt used as paving materials, and, depending on the findings, authorizes Caltrans to develop specifications for the use of recycled plastics in asphalt. This bill died in Assembly Transportation Committee.
AB 2355 (Levine), Chapter 609, Statutes of 2014 – Required by January 1, 2017, local agencies to adopt Caltrans standards on the use of recycled materials or to discuss why the standards are not being adopted at a public hearing.
AB 812 (Ma), Chapter 230, Statutes of 2012 – Authorized Caltrans to establish specifications for the use of up to 40% reclaimed asphalt pavement for hot asphalt mixes on or before January 1, 2014.
SB 420 (Simitian), Chapter 392, Statutes of 2006 – Expanded the application of recycled-content requirements for road paving projects to all paving construction and repair projects.
AB 338 (Levine), Chapter 709, Statutes of 2005 – Required Caltrans to make use of a specific weight of crumb rubber per metric ton of the total amount of asphalt paving materials it uses each year.
AB 574 (Wolk), Chapter 693, Statutes of 2005 – Encouraged the use of recycled concrete. Defined “recycled concrete,” authorized recycled concrete to be used if a user has been informed the concrete may contain recycled materials, and prohibited recycled concrete from being sold to Caltrans or the Department of General Services only when specifically requested by the department.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: No
Unknown
POSITIONS: (Communicated to the committee before noon on Wednesday, April 5, 2023.)
SUPPORT:
Ingevity
OPPOSITION:
Granite Construction Company
-- END --
Bill Author
Bill Co-Author(s):