SB 778: Excavations: subsurface installations.
- Session Year: 2023-2024
- House: Senate
- Latest Version Date: 2024-09-22
Current Status:
Passed
(2024-09-22: Chaptered by Secretary of State. Chapter 447, Statutes of 2024.)
Introduced
In Committee
First Chamber
In Committee
Second Chamber
Enacted
Existing law, commonly referred to as the Dig Safe Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair.
Existing law requires an excavator planning to conduct an excavation to notify the regional notification center of their intent before beginning excavation. Existing law requires the regional notification center, in response to this notification, to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Should a ticket obtained by an excavator expire, existing law requires an excavator to contact the regional notification center, cease all excavation, and wait a minimum of 2 working days before restarting excavation. Existing law authorizes an excavator to use a vacuum excavation device to expose subsurface installations within the tolerance zone if specified conditions are met, including that the excavator has contacted any operator whose subsurface installations may be in conflict with the excavation. Existing law requires an operator to take one of several specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, marking the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives a response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would revise the procedure an excavator must follow should a ticket expire. The bill would also revise requirements for an excavator to use vacuum equipment. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation.
Existing law authorizes a local agency that is required to provide specified services related to field marking to charge a fee to cover the cost of providing the service.
This bill would revise those provisions by, among other things, requiring a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled in an annual report by regional notification centers and made available to the board upon request, as specified.
This bill would revoke the requirement that regional notification centers compile and make available the above-described annual reports. The bill would specify the types of events that the board may investigate.
Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, composed of 9 members, for the enforcement and administration of the Dig Safe Act of 2016. Existing law requires the Governor to appoint 7 of the board members and the Senate Committee on Rules to appoint one board member. Existing law imposes certain eligibility requirements upon board members, as specified.
This bill would revise the knowledge and experience requirements for 3 of the members appointed by the Governor. The bill would also allow that the board member appointed by the Senate Committee on Rules be employed by an operator.
The bill would also make other conforming changes and nonsubstantive changes.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, commonly referred to as the Dig Safe Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair.
Existing law requires an excavator planning to conduct an excavation to notify the regional notification center of their intent before beginning excavation. Existing law requires the regional notification center, in response to this notification, to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Should a ticket obtained by an excavator expire, existing law requires an excavator to contact the regional notification center, cease all excavation, and wait a minimum of 2 working days before restarting excavation. Existing law authorizes an excavator to use a vacuum excavation device to expose subsurface installations within the tolerance zone if specified conditions are met, including that the excavator has contacted any operator whose subsurface installations may be in conflict with the excavation. Existing law requires an operator to take one of several specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, marking the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives a response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would revise the procedure an excavator must follow should a ticket expire. The bill would also revise requirements for an excavator to use vacuum equipment. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation.
Existing law authorizes a local agency that is required to provide specified services related to field marking to charge a fee to cover the cost of providing the service.
This bill would revise those provisions by, among other things, requiring a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled in an annual report by regional notification centers and made available to the board upon request, as specified.
This bill would revoke the requirement that regional notification centers compile and make available the above-described annual reports. The bill would specify the types of events that the board may investigate.
Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, composed of 9 members, for the enforcement and administration of the Dig Safe Act of 2016. Existing law requires the Governor to appoint 7 of the board members and the Senate Committee on Rules to appoint one board member. Existing law imposes certain eligibility requirements upon board members, as specified.
This bill would revise the knowledge and experience requirements for 3 of the members appointed by the Governor. The bill would also allow that the board member appointed by the Senate Committee on Rules be employed by an operator.
The bill would also make other conforming changes and nonsubstantive changes.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, commonly referred to as the Dig Safe Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair. Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, composed of 9 members, for the enforcement and administration of the Dig Safe Act. Existing law requires the Governor to appoint 7 of the board members.
This bill would revise the knowledge and experience requirements for 3 of the members appointed by the Governor.Existing law requires excavators planning to conduct an excavation, before notifying the appropriate regional notification center, to delineate the area to be excavated. Existing law authorizes an operator at their discretion, if the area is not delineated, to choose not to locate and field mark until the area to excavate has been delineated.This bill would require the operator to contact the excavator to gain clarification if the operator has a question about the location of the area proposed for excavation.Existing law requires an excavator planning to conduct an excavation to notify the regional notification center of their intent before beginning excavation. Existing law requires the regional notification center, in response to the above-described contact this notification, to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Should a ticket obtained by an excavator expire, existing law requires an excavator to contact the regional notification center, cease all excavation, and wait a minimum of 2 working days before restarting excavation. Existing law authorizes an excavator to use a vacuum excavation device to expose subsurface installations within the tolerance zone if specified conditions are met, including that the excavator has contacted any operator whose subsurface installations may be in conflict with the excavation. Existing law requires an operator to take one of specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives a response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would authorize an excavator to request a return trip ticket to better determine the location of subsurface installations in conflict with the excavation, and revise the procedure an excavator must follow should a ticket expire. The bill would also revise requirements for an excavator to use vacuum equipment. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation.
Existing law authorizes a local agency that is required to provide specified services related to field marketing marking to charge a fee to cover the cost of providing the service.
This bill would revise those provisions by, among other things, requiring a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled and made available in an annual report by regional notification centers and made available, available to the board upon request as specified.
This bill would instead require the board to compile and make that information available in an annual report, as specified. The bill would require the California Regional Common Ground Alliance to provide statewide information to the board by April 15 each year. The bill would make other technical and conforming changes, including deleting obsolete provisions relating to the adoption of regulations by the board.This bill would revoke the requirement that regional notification centers compile and make available the above-described annual reports. The bill would specify the types of events that the board may investigate.
Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, composed of 9 members, for the enforcement and administration of the Dig Safe Act of 2016. Existing law requires the Governor to appoint 7 of the board members and the Senate Committee on Rules to appoint one board member. Existing law imposes certain eligibility requirements upon board members, as specified.
This bill would revise the knowledge and experience requirements for 3 of the members appointed by the Governor. The bill would also allow that the board member appointed by the Senate Committee on Rules be employed by an operator.
The bill would also make other conforming changes and nonsubstantive changes.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, commonly referred to as the Safe Dig Safe Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair. Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, composed of 9 members, for the enforcement and administration of the Safe Dig Safe Act. Existing law requires the Governor to appoint 7 of the board members.
This bill would revise the knowledge and experience requirements for 3 of the members appointed by the Governor.
Existing law requires certain entities, before beginning excavation, to delineate the area to be excavated and to notify the appropriate regional notification center, which, in excavators planning to conduct an excavation, before notifying the appropriate regional notification center, to delineate the area to be excavated. Existing law authorizes an operator at their discretion, if the area is not delineated, to choose not to locate and field mark until the area to excavate has been delineated.
This bill would require the operator to contact the excavator to gain clarification if the operator has a question about the location of the area proposed for excavation.
Existing law requires the regional notification center, in response to that the above-described contact, is required to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Existing law authorizes an excavator to use a vacuum excavation device to expose subsurface installations within the tolerance zone if specified conditions are met, including that the excavator has contacted any operator whose subsurface installations may be in conflict with the excavation. Existing law requires an operator to take one of specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives an electronic positive a response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would revise requirements for notifying operators of subsurface installations within a proposed area of excavation, would specify conditions under which an excavator is required to contact the regional notification authorize an excavator to request a return trip ticket, ticket to better determine the location of subsurface installations in conflict with the excavation, and would revise requirements for an excavator to use vacuum equipment. The bill would require an operator to contact the excavator by electronic positive response if the area delineated by the excavator does not match the ticket description. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation. The bill would revise the meaning of inaccurate field mark for purposes of exempting from liability an excavator who damages a subsurface installation due to an inaccurate field mark.
Existing law authorizes a local agency that is required to provide specified services related to field marketing to charge a fee to cover the cost of providing the service.
This bill would revise services for which a local agency may charge a fee. The bill would require those provisions by, among other things, requiring a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled and made available in an annual report by regional notification centers and made available, as specified.
This bill would instead require the board to compile and make that information available in an annual report, as specified. The bill would require the California Regional Common Ground Alliance to provide statewide information to the board by April 15 each year. The bill would make other technical and conforming changes, including deleting obsolete provisions relating to the adoption of regulations by the board.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, commonly referred to as the Safe Dig Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair. Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, composed of 9 members, for the enforcement and administration of the Safe Dig Act. Existing law requires the Governor to appoint 7 of the board members.
This bill would revise the knowledge and experience requirements for 3 of the members appointed by the Governor.
Existing law requires certain entities, before beginning excavation, to delineate the area to be excavated and to notify the appropriate regional notification center, which, in response to that contact, is required to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Existing law requires an operator to take one of specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives an electronic positive response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would revise requirements for notifying operators of subsurface installations within a proposed area of excavation, would specify conditions under which an excavator is required to contact the regional notification to request a return trip, trip ticket, and would revise requirements for an excavator to use vacuum equipment. The bill would authorize an operator, under certain circumstances, to choose not to locate and field mark an area to be excavated. require an operator to contact the excavator by electronic positive response if the area delineated by the excavator does not match the ticket description. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation. The bill would revise the meaning of inaccurate field mark for purposes of exempting from liability an excavator who damages a subsurface installation due to an inaccurate field mark.
Existing law authorizes a local agency that is required to provide specified services to charge a fee to cover the cost of providing the service.
This bill would revise services for which a local agency may charge a fee. The bill would require a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled and made available in an annual report by regional notification centers and made available, as specified.
This bill would instead require the board to compile and make that information available in an annual report, as specified. The bill would require the California Regional Common Ground Alliance to provide statewide information to the board by April 15 each year. The bill would make other technical and conforming changes, including deleting obsolete provisions relating to the adoption of regulations by the board.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, commonly referred to as the Safe Dig Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair. Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, for the enforcement and administration of the Safe Dig Act.
Existing law requires certain entities, before beginning excavation, to delineate the area to be excavated and to notify the appropriate regional notification center, which, in response to that contact, is required to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Existing law requires an operator to take one of specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives an electronic positive response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would revise requirements for notifying operators of subsurface installations within a proposed area of excavation, would specify conditions under which an excavator is required to contact the regional notification to request a return trip, and would revise requirements for an excavator to use vacuum equipment. The bill would authorize an operator, under certain circumstances, to choose not to locate and field mark an area to be excavated. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation. The bill would revise the meaning of inaccurate field mark for purposes of exempting from liability an excavator who damages a subsurface installation due to an inaccurate field mark.
Existing law authorizes a local agency that is required to provide specified services to charge a fee to cover the cost of providing the service.
This bill would revise services for which a local agency may charge a fee. The bill would require a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled and made available in an annual report by regional notification centers and made available, as specified.
This bill would instead require the board to compile and make that information available in an annual report, as specified. The bill would require the California Regional Common Ground Alliance to provide statewide information to the board by April 15 each year. The bill would make other technical and conforming changes, including deleting obsolete provisions relating to the adoption of regulations by the board.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, commonly referred to as the Safe Dig Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair. Existing law defines a subsurface installation for purposes of the act as any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, and other nonpressurized drain lines. Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, for the enforcement and administration of the Safe Dig Act.
Existing law requires certain entities, before beginning excavation, to delineate the area to be excavated and to notify the appropriate regional notification center, which, in response to that contact, is required to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Existing law requires an operator to take one of specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives an electronic positive response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would revise the definition of subsurface installation to include nonpressurized sewerlines, nonpressurized storm drains, and other nonpressurized drain lines. The bill would revise requirements for notifying operators of subsurface installations within a proposed area of excavation, would specify conditions under which an excavator is required to contact the regional notification to request a return trip, and would revise requirements for an excavator to use vacuum equipment. The bill would authorize an operator, under certain circumstances, to choose not to locate and field mark an area to be excavated. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation. The bill would revise the meaning of inaccurate field mark for purposes of exempting from liability an excavator who damages a subsurface installation due to an inaccurate field mark.
Existing law authorizes a local agency that is required to provide specified services to charge a fee to cover the cost of providing the service.
This bill would revise services for which a local agency may charge a fee. The bill would require a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled and made available in an annual report by regional notification centers and made available, as specified.
This bill would instead require the board to compile and make that information available in an annual report, as specified. The bill would require the California Regional Common Ground Alliance to provide statewide information to the board by April 15 each year. The bill would make other technical and conforming changes, including deleting obsolete provisions relating to the adoption of regulations by the board.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
Existing law, commonly referred to as the Safe Dig Act, establishes a regional notification system to provide certain entities, defined as operators, that own, operate, and maintain subsurface installations with advance warning of nearby excavations or other work for the purpose of protecting those installations from damage, removal, relocation, or repair. Existing law defines a subsurface installation for purposes of the act as any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, and other nonpressurized drain lines. Existing law establishes the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board, for the enforcement and administration of the Safe Dig Act.
Existing law requires certain entities, before beginning excavation, to delineate the area to be excavated and to notify the appropriate regional notification center, which, in response to that contact, is required to provide the excavator with a ticket and to notify certain operators who have a subsurface installation in the proposed excavation area. Existing law requires an operator to take one of specified actions before the legal excavation start date and time, including locating and field marking within the delineated area and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations. Existing law prohibits an excavator from beginning excavation until the excavator receives an electronic positive response from all known operators of subsurface installations, as specified. Existing law also establishes emergency and notification procedures for an excavator who discovers or causes damage to a subsurface installation.
This bill, among other changes, would revise the definition of subsurface installation to include nonpressurized sewerlines, nonpressurized storm drains, and other nonpressurized drain lines. The bill would revise requirements for notifying operators of subsurface installations within a proposed area of excavation, would specify conditions under which an excavator is required to contact the regional notification to request a return trip, and would revise requirements for an excavator to use vacuum equipment. The bill would authorize an operator, under certain circumstances, to choose not to locate and field mark an area to be excavated. The bill would revise the requirements related to subsurface installation operator responses that an excavator must receive before beginning excavation, and the emergency and notification procedures when an excavator discovers or causes damage to a subsurface installation. The bill would revise the meaning of inaccurate field mark for purposes of exempting from liability an excavator who damages a subsurface installation due to an inaccurate field mark.
Existing law authorizes a local agency that is required to provide specified services to charge a fee to cover the cost of providing the service.
This would revise services for which a local agency may charge a fee. The bill would require a local agency to consider specified factors with respect to charging fees, including whether the fee could deter an excavator from contacting the regional notification center. By imposing new duties on local agencies, this bill would impose a state-mandated local program.
Existing law requires statewide information provided by operators and excavators regarding incident events to be compiled and made available in an annual report by regional notification centers and made available, as specified.
This bill would instead require the board to compile and make that information available in an annual report, as specified. The bill would require the California Regional Common Ground Alliance to provide statewide information to the board by April 15 each year. The bill would make other technical and conforming changes, including deleting obsolete provisions relating to the adoption of regulations by the board.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to the statutory provisions noted above.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, from 7:00 a.m. to 5:00 p.m., except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area to be excavated has been delineated.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to fulfill their obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)(1)Unless an emergency exists, an excavator shall not begin excavation until all operators of subsurface installations that are listed on the ticket have fulfilled their obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c).
(2)The excavator may begin excavation before the legal excavation start date and time if all of the conditions in paragraph (1) have been satisfied.
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall immediately cease excavation, contact the regional notification center, and get a new ticket pursuant to subdivision (b), and may not resume excavation until the conditions in subdivision (g) have been satisfied.
SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time.
(B)The regional notification center shall make the electronic positive responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)An excavator may use a vacuum excavation device to expose subsurface installations within the tolerance zone if the excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response.
(B)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.
(C)An excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph.
(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. The operator shall provide relevant existing additional information to the excavator within one working day. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)An excavator shall immediately call 911 emergency services upon discovering or causing damage to one of the following:
(A)A gas or hazardous liquid pipeline subsurface installation in which the damage results in the escape of any flammable, toxic, or corrosive gas or liquid.
(B)A high priority subsurface installation of any kind, except that the excavator does not need to call 911 if all of the following conditions are satisfied:
(i)The excavator is the operator of the high priority subsurface installation.
(ii)The damage was discovered by the operator during operations and maintenance activities.
(iii)The damage does not meet the circumstances in subparagraph (A).
(2)An excavator shall immediately notify the operator upon discovering or causing damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection. In the event of damage to a subsurface excavation described in paragraph (1), the excavator must contact the operator immediately after calling 911 emergency services. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(3)Except as provided in subparagraph (A), an excavator shall notify the regional notification center within 48 hours of discovering or causing damage to any subsurface installation pursuant to paragraph (2).
(A)An excavator does not need to notify the regional notification center of damage discovered by the excavator if all of the following conditions are satisfied:
(i)The excavator is the operator of the subsurface installation.
(ii)The damage was discovered by the operator during operations and maintenance activities.
(iii)The damage does not meet the circumstances in subparagraph (A) of paragraph (1).
(B)Nothing in this section preempts or impedes the boards authority to impose more restrictive notification windows.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.Section 4216.10 of the Government Code is amended to read:4216.10.(a)In lieu of the notification and locate and field mark requirements of Sections 4216.2 and 4216.3, an excavator may contact a regional notification center to request a continual excavation ticket for an area of continual excavation. The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of continual excavation. The ticket provided to the excavator shall include the contact information for notified operators.
(b)An operator shall fulfill its obligations pursuant to subdivision (a) of Section 4216.3.
(c)(1)When the area of continual excavation includes, or is within 10 feet of, a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and to prevent damage to the high priority subsurface installation during the continual excavation time period. The onsite meeting shall be used to develop a mutually agreed upon plan for excavation activities that may be conducted within 25 feet of each side of the subsurface installation. Additional onsite meetings should also be held following unexpected occurrences or prior to excavation activities that may create conflicts with subsurface installations. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting and information has been provided describing the activities that can be safely conducted to prevent damage to the high priority subsurface installation.
(2)When the area of continual excavation includes a subsurface installation but does not include, or is not within 10 feet of, a high priority subsurface installation, the excavator or the operator may request an onsite meeting at a mutually agreed upon time to determine actions or activities required to verify the location and to prevent damage to the subsurface installation during the continual excavation time period. The onsite meeting may be used to develop a plan for excavation activities that may be conducted within five feet of each side of the subsurface installation. The operator and excavator may mutually agree to conduct additional onsite meetings following unexpected occurrences or prior to excavation activities that may create conflicts with subsurface installations. As part of the meeting, the excavator may discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. If an onsite meeting is requested prior to the legal excavation start date and time, the excavator shall not begin excavating until after the completion of the onsite meeting and information has been provided describing the activities that can be safely conducted to prevent damage to the subsurface installation.
(3)The excavator and operator shall maintain records regarding the plan of excavation, any locate and field mark and standby activities, and any other information deemed necessary by the excavator and operator. Excavation activities outside the scope of the plan shall be undertaken subsequent to notification pursuant to Section 4216.2.
(d)A ticket for an area of continual excavation shall be valid for one year from the date of issuance. The excavator may renew the ticket within two working days either by accessing the regional notification centers internet website or by calling 811.
(e)The board shall, in consultation with the regional notification centers, develop through regulation a process by which the renewal requirement for a continual excavation ticket may be modified or eliminated for areas of continual excavation in which no subsurface installations are present.
(f)This section shall become operative on July 1, 2020.
SEC. 9.Section 4216.13 of the Government Code is amended to read:4216.13.(a)The board shall be composed of nine members, of which seven shall be appointed by the Governor, one shall be appointed by the Speaker of the Assembly, and one shall be appointed by the Senate Committee on Rules.
(b)The seven members appointed by the Governor shall be appointed, as follows:
(1)Three members shall have knowledge and expertise in the operation of subsurface installations. Of those three members, one shall have knowledge and expertise in the operation of the subsurface installations of a municipal utility. At least one of the three members shall have knowledge and experience in the operation of high priority subsurface installations.
(2)Three members shall have knowledge and experience in contract excavation for employers who are not operators of subsurface installations. Of the three members, one member shall have knowledge and experience in general engineering contracting work and one member shall have knowledge and experience in specialty contracting work. For the purposes of this section, the terms general engineering contracting and specialty contracting shall have the meanings given in Article 4 (commencing with Section 7055) of Chapter 9 of Division 3 of the Business and Professions Code.
(3)One member shall have knowledge and expertise in performing or managing agricultural operations in the vicinity of subsurface installations.
(c)The member appointed by the Speaker of the Assembly shall have knowledge and expertise in representing in safety matters the workers employed by contract excavators.
(d)The member appointed by the Senate Committee on Rules shall have knowledge and expertise in subsurface installation location and marking.
(e)The board may invite two directors of operations or other appropriate representatives of regional notification centers to be nonvoting ex officio members of the board.
SEC. 10.Section 4216.18 of the Government Code is amended to read:4216.18.The board shall develop a standard or set of standards relevant to safety practices in excavating around subsurface installations and procedures and guidance in encouraging those practices. When possible, standards should be informed by publicly available data, including, but not limited to, that collected by state and federal agencies and by the regional notification centers. The standard or set of standards are not intended to replace other relevant standards, including the Best Practices of the Common Ground Alliance, but are to inform areas currently without established standards. The standard or set of standards shall address all of the following:
(a)Evidence necessary for excavators and operators to demonstrate compliance with Sections 4216.2, 4216.3, 4216.4, and 4216.10.
(b)What constitutes reasonable care, as required by paragraph (1) of subdivision (a) of Section 4216.4, in using hand tools around subsurface installations within the tolerance zone, considering the need to balance worker safety in trenches with the protection of subsurface installations. As part of determining reasonable care, the board shall consider the appropriate additional excavating depth an excavator should make if either of the following occur:
(1)The subsurface installation is delineated within the tolerance zone but it is not in conflict with the excavation.
(2)The location of a subsurface installation is determined, but additional subsurface installations may exist immediately below the located subsurface installation.
(c)What constitutes reasonable care, as required by paragraph (1) of subdivision (a) of Section 4216.4, in grading activities on road shoulders and dirt roads which may include standards for potholing.
SEC. 11.Section 4216.19 of the Government Code is amended to read:4216.19.(a)The board shall investigate possible violations of this article.
(b)The board may investigate reports of occurrences of excavator downtime, damages, near misses, and complaints of violations from affected parties and members of the public.
(c)In determining whether to pursue an investigation, the board shall consider whether the parties have settled the matter and whether further enforcement is necessary as a deterrent to maintain the integrity of subsurface installations and to protect the safety of excavators and the public.
(d)If the board, upon the completion of an investigation, finds a probable violation of the article, the board shall transmit the investigation results and any recommended penalty to the state or local agency pursuant to subdivision (c) or (d) of Section 4216.6.
(e)Sanctions shall be graduated and may include notification and information letters, direction to attend relevant education, and financial penalties. When considering the issuance of citations and assessment of penalties, the board shall consider all of the following:
(1)The type of violation and its gravity.
(2)The degree of culpability.
(3)The operators or excavators history of violations.
(4)The operators or excavators history of work conducted without violations.
(5)The efforts taken by the violator to prevent violation and, once the violation occurred, the efforts taken to mitigate the safety consequences of the violation.
SEC. 12.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, from 7:00 a.m. to 5:00 p.m., except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area to be excavated has been delineated.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to fulfill their obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)(1)Unless an emergency exists, an excavator shall not begin excavation until all operators of subsurface installations that are listed on the ticket have fulfilled their obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c).
(2)The excavator may begin excavation before the legal excavation start date and time if all of the conditions in paragraph (1) have been satisfied.
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall immediately cease excavation, contact the regional notification center, and get a new ticket pursuant to subdivision (b), and may not resume excavation until the conditions in subdivision (g) have been satisfied.
SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time.
(B)The regional notification center shall make the electronic positive responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)An excavator may use a vacuum excavation device to expose subsurface installations within the tolerance zone if the excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response.
(B)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.
(C)An excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph.
(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. The operator shall provide relevant existing additional information to the excavator within one working day. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)An excavator shall immediately call 911 emergency services upon discovering or causing damage to one of the following:
(A)A gas or hazardous liquid pipeline subsurface installation in which the damage results in the escape of any flammable, toxic, or corrosive gas or liquid.
(B)A high priority subsurface installation of any kind, except that the excavator does not need to call 911 if all of the following conditions are satisfied:
(i)The excavator is the operator of the high priority subsurface installation.
(ii)The damage was discovered by the operator during operations and maintenance activities.
(iii)The damage does not meet the circumstances in subparagraph (A).
(2)An excavator shall immediately notify the operator upon discovering or causing damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection. In the event of damage to a subsurface excavation described in paragraph (1), the excavator must contact the operator immediately after calling 911 emergency services. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(3)Except as provided in subparagraph (A), an excavator shall notify the regional notification center within 48 hours of discovering or causing damage to any subsurface installation pursuant to paragraph (2).
(A)An excavator does not need to notify the regional notification center of damage discovered by the excavator if all of the following conditions are satisfied:
(i)The excavator is the operator of the subsurface installation.
(ii)The damage was discovered by the operator during operations and maintenance activities.
(iii)The damage does not meet the circumstances in subparagraph (A) of paragraph (1).
(B)Nothing in this section preempts or impedes the boards authority to impose more restrictive notification windows.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.Section 4216.10 of the Government Code is amended to read:4216.10.(a)In lieu of the notification and locate and field mark requirements of Sections 4216.2 and 4216.3, an excavator may contact a regional notification center to request a continual excavation ticket for an area of continual excavation. The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of continual excavation. The ticket provided to the excavator shall include the contact information for notified operators.
(b)An operator shall fulfill its obligations pursuant to subdivision (a) of Section 4216.3.
(c)(1)When the area of continual excavation includes, or is within 10 feet of, a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and to prevent damage to the high priority subsurface installation during the continual excavation time period. The onsite meeting shall be used to develop a mutually agreed upon plan for excavation activities that may be conducted within 25 feet of each side of the subsurface installation. Additional onsite meetings should also be held following unexpected occurrences or prior to excavation activities that may create conflicts with subsurface installations. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting and information has been provided describing the activities that can be safely conducted to prevent damage to the high priority subsurface installation.
(2)When the area of continual excavation includes a subsurface installation but does not include, or is not within 10 feet of, a high priority subsurface installation, the excavator or the operator may request an onsite meeting at a mutually agreed upon time to determine actions or activities required to verify the location and to prevent damage to the subsurface installation during the continual excavation time period. The onsite meeting may be used to develop a plan for excavation activities that may be conducted within five feet of each side of the subsurface installation. The operator and excavator may mutually agree to conduct additional onsite meetings following unexpected occurrences or prior to excavation activities that may create conflicts with subsurface installations. As part of the meeting, the excavator may discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. If an onsite meeting is requested prior to the legal excavation start date and time, the excavator shall not begin excavating until after the completion of the onsite meeting and information has been provided describing the activities that can be safely conducted to prevent damage to the subsurface installation.
(3)The excavator and operator shall maintain records regarding the plan of excavation, any locate and field mark and standby activities, and any other information deemed necessary by the excavator and operator. Excavation activities outside the scope of the plan shall be undertaken subsequent to notification pursuant to Section 4216.2.
(d)A ticket for an area of continual excavation shall be valid for one year from the date of issuance. The excavator may renew the ticket within two working days either by accessing the regional notification centers internet website or by calling 811.
(e)The board shall, in consultation with the regional notification centers, develop through regulation a process by which the renewal requirement for a continual excavation ticket may be modified or eliminated for areas of continual excavation in which no subsurface installations are present.
(f)This section shall become operative on July 1, 2020.
SEC. 9.Section 4216.13 of the Government Code is amended to read:4216.13.(a)The board shall be composed of nine members, of which seven shall be appointed by the Governor, one shall be appointed by the Speaker of the Assembly, and one shall be appointed by the Senate Committee on Rules.
(b)The seven members appointed by the Governor shall be appointed, as follows:
(1)Three members shall have knowledge and expertise in the operation of subsurface installations. Of those three members, one shall have knowledge and expertise in the operation of the subsurface installations of a municipal utility. At least one of the three members shall have knowledge and experience in the operation of high priority subsurface installations.
(2)Three members shall have knowledge and experience in contract excavation for employers who are not operators of subsurface installations. Of the three members, one member shall have knowledge and experience in general engineering contracting work and one member shall have knowledge and experience in specialty contracting work. For the purposes of this section, the terms general engineering contracting and specialty contracting shall have the meanings given in Article 4 (commencing with Section 7055) of Chapter 9 of Division 3 of the Business and Professions Code.
(3)One member shall have knowledge and expertise in performing or managing agricultural operations in the vicinity of subsurface installations.
(c)The member appointed by the Speaker of the Assembly shall have knowledge and expertise in representing in safety matters the workers employed by contract excavators.
(d)The member appointed by the Senate Committee on Rules shall have knowledge and expertise in subsurface installation location and marking.
(e)The board may invite two directors of operations or other appropriate representatives of regional notification centers to be nonvoting ex officio members of the board.
SEC. 10.Section 4216.18 of the Government Code is amended to read:4216.18.The board shall develop a standard or set of standards relevant to safety practices in excavating around subsurface installations and procedures and guidance in encouraging those practices. When possible, standards should be informed by publicly available data, including, but not limited to, that collected by state and federal agencies and by the regional notification centers. The standard or set of standards are not intended to replace other relevant standards, including the Best Practices of the Common Ground Alliance, but are to inform areas currently without established standards. The standard or set of standards shall address all of the following:
(a)Evidence necessary for excavators and operators to demonstrate compliance with Sections 4216.2, 4216.3, 4216.4, and 4216.10.
(b)What constitutes reasonable care, as required by paragraph (1) of subdivision (a) of Section 4216.4, in using hand tools around subsurface installations within the tolerance zone, considering the need to balance worker safety in trenches with the protection of subsurface installations. As part of determining reasonable care, the board shall consider the appropriate additional excavating depth an excavator should make if either of the following occur:
(1)The subsurface installation is delineated within the tolerance zone but it is not in conflict with the excavation.
(2)The location of a subsurface installation is determined, but additional subsurface installations may exist immediately below the located subsurface installation.
(c)What constitutes reasonable care, as required by paragraph (1) of subdivision (a) of Section 4216.4, in grading activities on road shoulders and dirt roads which may include standards for potholing.
SEC. 11.Section 4216.19 of the Government Code is amended to read:4216.19.(a)The board shall investigate possible violations of this article.
(b)The board may investigate reports of occurrences of excavator downtime, damages, near misses, and complaints of violations from affected parties and members of the public.
(c)In determining whether to pursue an investigation, the board shall consider whether the parties have settled the matter and whether further enforcement is necessary as a deterrent to maintain the integrity of subsurface installations and to protect the safety of excavators and the public.
(d)If the board, upon the completion of an investigation, finds a probable violation of the article, the board shall transmit the investigation results and any recommended penalty to the state or local agency pursuant to subdivision (c) or (d) of Section 4216.6.
(e)Sanctions shall be graduated and may include notification and information letters, direction to attend relevant education, and financial penalties. When considering the issuance of citations and assessment of penalties, the board shall consider all of the following:
(1)The type of violation and its gravity.
(2)The degree of culpability.
(3)The operators or excavators history of violations.
(4)The operators or excavators history of work conducted without violations.
(5)The efforts taken by the violator to prevent violation and, once the violation occurred, the efforts taken to mitigate the safety consequences of the violation.
SEC. 12.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators statutorily required response to a ticket. obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, from 7:00 a.m. to 5:00 p.m., except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area to be excavated has been delineated. If the operator has a question about the location of the area proposed for excavation, the operator shall contact the excavator to gain clarification.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to respond. fulfill their obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area has been delineated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)(1)Unless an emergency exists, an excavator shall not begin excavation until the excavator receives a response pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 from all operators of subsurface installations that are listed on the ticket have fulfilled their obligations under subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c). An excavator may begin excavation before the legal excavation start date and time if all operators have provided their responses pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(2)The excavator may begin excavation before the legal excavation start date and time if all of the conditions in paragraph (1) have been satisfied.
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall immediately cease excavation, contact the regional notification center center, and get a new ticket and wait a minimum of two working days, not including the date of the contact, before restarting excavation. All excavation shall cease during the waiting period. pursuant to subdivision (b), and may not resume excavation until the conditions in subdivision (g) have been satisfied.
(j)Notwithstanding subdivision (b) of Section 4216.4, an excavator may request a return trip ticket to better determine the location of subsurface installations in conflict with the excavation. The operator shall respond within one working day, not including the date of notification, or on a mutually agreed upon and documented time. SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time.
(B)The regional notification center shall make the electronic positive responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)An excavator may use a vacuum excavation device to expose subsurface installations within the tolerance zone if the excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response.
(B)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.
(C)Beginning July 1, 2020, an An excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph on or before July 1, 2020. paragraph.
(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. The operator shall respond to provide relevant existing additional information to the excavator within one working day. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)An excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid, shall do the following: An excavator shall immediately call 911 emergency services upon discovering or causing damage to one of the following:
(A)The excavator shall immediately call 911 emergency services. A gas or hazardous liquid pipeline subsurface installation in which the damage results in the escape of any flammable, toxic, or corrosive gas or liquid.
(B)A high priority subsurface installation of any kind, except that the excavator does not need to call 911 if all of the following conditions are satisfied:
(i)The excavator is the operator of the high priority subsurface installation.
(ii)The damage was discovered by the operator during operations and maintenance activities.
(iii)The damage does not meet the circumstances in subparagraph (A).
(B)After calling 911 emergency services, the excavator shall immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene.(2)An excavator shall immediately notify the operator upon discovering or causing damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection. In the event of damage to a subsurface excavation described in paragraph (1), the excavator must contact the operator immediately after calling 911 emergency services. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(C)Within two hours of discovering or causing damage to any subsurface installation, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website. (2)If an excavator discovers or causes damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, that does not immediately endanger life or cause serious bodily harm or damage to property, both of the following apply:(A)The excavator shall immediately notify the subsurface installation operator. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.(B)Within 48 hours of discovering or causing damage, the excavator shall notify the regional notification center.(3)Except as provided in subparagraph (A), an excavator shall notify the regional notification center within 48 hours of discovering or causing damage to any subsurface installation pursuant to paragraph (2).
(A)An excavator does not need to notify the regional notification center of damage discovered by the excavator if all of the following conditions are satisfied:
(i)The excavator is the operator of the subsurface installation.
(ii)The damage was discovered by the operator during operations and maintenance activities.
(iii)The damage does not meet the circumstances in subparagraph (A) of paragraph (1).
(B)Nothing in this section preempts or impedes the boards authority to impose more restrictive notification windows.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
(g)Statewide information provided by operators and excavators regarding incident events shall be compiled and made available in an annual report by the board and posted on the internet website of the board. The California Regional Common Ground Alliance shall provide the statewide information to the board by April 15 of each year.(h)For purposes of subdivision (g), the following terms have the following meanings:(1)Incident event means the occurrence of excavator downtime, damages, near misses, and violations.(2)Statewide information means information submitted by operators and excavators using the California Regional Common Ground Alliances Virtual Private Damage Information Reporting Tool. Supplied data shall comply with the Damage Information Reporting Tools minimum essential information as listed in the most recent version of the Best Practices guide of the Common Ground Alliance.SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.Section 4216.10 of the Government Code is amended to read:4216.10.(a)In lieu of the notification and locate and field mark requirements of Sections 4216.2 and 4216.3, an excavator may contact a regional notification center to request a continual excavation ticket for an area of continual excavation. The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of continual excavation. The ticket provided to the excavator shall include the contact information for notified operators.
(b)An operator shall provide a response to the excavator fulfill its obligations pursuant to subdivision (a) of Section 4216.3.
(c)(1)When the area of continual excavation includes, or is within 10 feet of, a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and to prevent damage to the high priority subsurface installation during the continual excavation time period. The onsite meeting shall be used to develop a mutually agreed upon plan for excavation activities that may be conducted within 25 feet of each side of the subsurface installation. Additional onsite meetings should also be held following unexpected occurrences or prior to excavation activities that may create conflicts with subsurface installations. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting and information has been provided describing the activities that can be safely conducted to prevent damage to the high priority subsurface installation.
(2)When the area of continual excavation includes a subsurface installation but does not include, or is not within 10 feet of, a high priority subsurface installation, the excavator or the operator may request an onsite meeting at a mutually agreed upon time to determine actions or activities required to verify the location and to prevent damage to the subsurface installation during the continual excavation time period. The onsite meeting may be used to develop a plan for excavation activities that may be conducted within five feet of each side of the subsurface installation. The operator and excavator may mutually agree to conduct additional onsite meetings following unexpected occurrences or prior to excavation activities that may create conflicts with subsurface installations. As part of the meeting, the excavator may discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. If an onsite meeting is requested prior to the legal excavation start date and time, the excavator shall not begin excavating until after the completion of the onsite meeting and information has been provided describing the activities that can be safely conducted to prevent damage to the subsurface installation.
(3)The excavator and operator shall maintain records regarding the plan of excavation, any locate and field mark and standby activities, and any other information deemed necessary by the excavator and operator. Excavation activities outside the scope of the plan shall be undertaken subsequent to notification pursuant to Section 4216.2.
(d)A ticket for an area of continual excavation shall be valid for one year from the date of issuance. The excavator may renew the ticket within two working days either by accessing the regional notification centers Internet Web site internet website or by calling 811.
(e)The board shall, in consultation with the regional notification centers, develop through regulation a process by which the renewal requirement for a continual excavation ticket may be modified or eliminated for areas of continual excavation in which no subsurface installations are present.
(f)This section shall become operative on July 1, 2020.
SEC. 8.SEC. 9.Section 4216.13 of the Government Code is amended to read:4216.13.(a)The board shall be composed of nine members, of which seven shall be appointed by the Governor, one shall be appointed by the Speaker of the Assembly, and one shall be appointed by the Senate Committee on Rules.
(b)The seven members appointed by the Governor shall be appointed, as follows:
(1)Three members shall have knowledge and expertise in the operation of subsurface installations. Of those three members, one shall have knowledge and expertise in the operation of the subsurface installations of a municipal utility. At least one of the three members shall have knowledge and experience in the operation of high priority subsurface installations.
(2)Three members shall have knowledge and experience in contract excavation for employers who are not operators of subsurface installations. Of the three members, one member shall be from the have knowledge and experience in general engineering contractor industry, contracting work and one member shall be from the have knowledge and experience in specialty contractor industry, and one member shall be from either the general engineering contractor industry or the specialty contractor industry. contracting work. For the purposes of this section, the terms general engineering contractor contracting and specialty contractor contracting shall have the meanings given in Article 4 (commencing with Section 7055) of Chapter 9 of Division 3 of the Business and Professions Code.
(3)One member shall have knowledge and expertise in performing or managing agricultural operations in the vicinity of subsurface installations.
(c)The member appointed by the Speaker of the Assembly shall have knowledge and expertise in representing in safety matters the workers employed by contract excavators.
(d)The member appointed by the Senate Committee on Rules shall have knowledge and expertise in subsurface installation location and marking and shall not be under the direct employment of an operator. marking.
(e)The board may invite two directors of operations or other appropriate representatives of regional notification centers to be nonvoting ex officio members of the board.
SEC. 10.Section 4216.18 of the Government Code is amended to read:4216.18.The board shall develop a standard or set of standards relevant to safety practices in excavating around subsurface installations and procedures and guidance in encouraging those practices. When possible, standards should be informed by publicly available data, including, but not limited to, that collected by state and federal agencies and by the regional notification centers pursuant to subdivision (g) of Section 4216.6, and the board should refrain from using data about facility events not provided either to a state or federal agency or as statewide information, as defined in paragraph (2) of subdivision (h) of Section 4216.6. centers. The standard or set of standards are not intended to replace other relevant standards, including the Best Practices of the Common Ground Alliance, but are to inform areas currently without established standards. The standard or set of standards shall address all of the following:
(a)Evidence necessary for excavators and operators to demonstrate compliance with Sections 4216.2, 4216.3, 4216.4, and 4216.10.
(b)What constitutes reasonable care, as required by paragraph (1) of subdivision (a) of Section 4216.4, in using hand tools around subsurface installations within the tolerance zone, considering the need to balance worker safety in trenches with the protection of subsurface installations. As part of determining reasonable care, the board shall consider the appropriate additional excavating depth an excavator should make if either of the following occur:
(1)The subsurface installation is delineated within the tolerance zone but it is not in conflict with the excavation.
(2)The location of a subsurface installation is determined, but additional subsurface installations may exist immediately below the located subsurface installation.
(c)What constitutes reasonable care, as required by paragraph (1) of subdivision (a) of Section 4216.4, in grading activities on road shoulders and dirt roads which may include standards for potholing.
SEC. 11.Section 4216.19 of the Government Code is amended to read:4216.19.(a)The board shall investigate possible violations of this article.
(b)The board may investigate reports of incident events, as defined in paragraph (1) of subdivision (h) of Section 4216.6, occurrences of excavator downtime, damages, near misses, and complaints of violations from affected parties and members of the public.
(c)In determining whether to pursue an investigation, the board shall consider whether the parties have settled the matter and whether further enforcement is necessary as a deterrent to maintain the integrity of subsurface installations and to protect the safety of excavators and the public.
(d)If the board, upon the completion of an investigation, finds a probable violation of the article, the board shall transmit the investigation results and any recommended penalty to the state or local agency pursuant to subdivision (c) or (d) of Section 4216.6.
(e)Sanctions shall be graduated and may include notification and information letters, direction to attend relevant education, and financial penalties. When considering the issuance of citations and assessment of penalties, the board shall consider all of the following:
(1)The type of violation and its gravity.
(2)The degree of culpability.
(3)The operators or excavators history of violations.
(4)The operators or excavators history of work conducted without violations.
(5)The efforts taken by the violator to prevent violation and, once the violation occurred, the efforts taken to mitigate the safety consequences of the violation.
SEC. 9.SEC. 12.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators statutorily required response to a ticket.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. notification. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. notification.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area delineated does not match the ticket description, the operator shall contact the excavator by electronic positive response to advise of the discrepancy and may is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area delineated and ticket description match. to be excavated has been delineated. If the operator has a question about the location of the area proposed for excavation, the operator shall contact the excavator to gain clarification.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to respond. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area has been delineated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)Unless an emergency exists, an excavator shall not begin excavation until the excavator receives an electronic positive response a response pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 from all known operators of subsurface installations that are listed on the ticket pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c). An excavator may begin excavation before the legal excavation start date and time if all operators have provided their responses pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall contact the regional notification center and get a new ticket and wait a minimum of two working days, not including the date of the contact, before restarting excavation. All excavation shall cease during the waiting period.
(j)An excavator shall contact the regional notification center to request a return trip ticket if the electronic positive response to the original ticket indicates resend ticket requested. An operator shall have two working days, not including the date of notification, to respond to the excavators return trip ticket request.(k)(j)Notwithstanding subdivision (b) of Section 4216.4, an excavator may request a return trip ticket to better determine the location of subsurface installations in conflict with the excavation. The operator shall respond within one working day, not including the date of notification, or on a mutually agreed upon and documented time.
(l)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting as identified in subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by the operator and excavator.SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(D)Notwithstanding any other provision of this paragraph and subdivision (e), if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, an operator may choose to either locate and field mark or provide information on the location of subsurface installations known to be below the pavement.(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time.
(B)The regional notification center shall make the responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)An excavator may use a vacuum excavation device that is designed, engineered, and purpose-built for vacuum excavation purposes to expose subsurface installations within the tolerance zone if the excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response. An operator that fails to respond to a request to use a vacuum excavation device shall be deemed in agreement with its use.
(B)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.
(C)Beginning July 1, 2020, an excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph on or before July 1, 2020.
(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. The operator shall respond to the excavator within one working day. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)An excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid, shall do the following:
(A)The excavator shall immediately call 911 emergency services.
(B)After calling 911 emergency services, the excavator shall immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(C)Within two hours of discovering or causing damage to any subsurface installation, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(2)If an excavator discovers or causes damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, that does not immediately endanger life or cause serious bodily harm or damage to property, both of the following apply:
(A)The excavator shall immediately notify the subsurface installation operator. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(B)Within 48 hours of discovering or causing damage, the excavator shall notify the regional notification center.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
(g)Statewide information provided by operators and excavators regarding incident events shall be compiled and made available in an annual report by the board and posted on the internet website of the board. The California Regional Common Ground Alliance shall provide the statewide information to the board by April 15 of each year.
(h)For purposes of subdivision (g), the following terms have the following meanings:
(1)Incident event means the occurrence of excavator downtime, damages, near misses, and violations.
(2)Statewide information means information submitted by operators and excavators using the California Regional Common Ground Alliances Virtual Private Damage Information Reporting Tool. Supplied data shall comply with the Damage Information Reporting Tools minimum essential information as listed in the most recent version of the Best Practices guide of the Common Ground Alliance.
SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.Section 4216.13 of the Government Code is amended to read:4216.13.(a)The board shall be composed of nine members, of which seven shall be appointed by the Governor, one shall be appointed by the Speaker of the Assembly, and one shall be appointed by the Senate Committee on Rules.
(b)The seven members appointed by the Governor shall be appointed, as follows:
(1)Three members shall have knowledge and expertise in the operation of subsurface installations. Of those three members, one shall have knowledge and expertise in the operation of the subsurface installations of a municipal utility. At least one of the three members shall have knowledge and experience in the operation of high priority subsurface installations.
(2)Three members shall have knowledge and experience in contract excavation for employers who are not operators of subsurface installations. Of the three members, one member shall be from the general engineering contractor industry, one member shall be from the specialty contractor industry, and one member shall be from either the general engineering contractor industry or the specialty contractor industry. For the purposes of this section, the terms general engineering contractor and specialty contractor shall have the meanings given in Article 4 (commencing with Section 7055) of Chapter 9 of Division 3 of the Business and Professions Code.
(3)One member shall have knowledge and expertise in performing or managing agricultural operations in the vicinity of subsurface installations.
(c)The member appointed by the Speaker of the Assembly shall have knowledge and expertise in representing in safety matters the workers employed by contract excavators.
(d)The member appointed by the Senate Committee on Rules shall have knowledge and expertise in subsurface installation location and marking and shall not be under the direct employment of an operator.
(e)The board may invite two directors of operations or other appropriate representatives of regional notification centers to be nonvoting ex officio members of the board.
SEC. 9.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators statutorily required response to a ticket.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification or weekends or holidays, notification, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification or weekends or holidays, notification, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area delineated does not match the ticket description, the operator shall contact the excavator by electronic positive response to advise of the discrepancy and may choose not to locate and field mark until the area delineated and ticket description match. The operator shall contact the excavator to advise of the discrepancy and shall provide an electronic positive response.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to respond. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area has been delineated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)Unless an emergency exists, an excavator shall not begin excavation until the excavator receives an electronic positive response from, or has otherwise confirmed response directly from, from all known operators of subsurface installations that are listed on the ticket pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c).
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall contact the regional notification center and get a new ticket and wait a minimum of two working days, not including the date of the contact, before restarting excavation. All excavation shall cease during the waiting period.
(j)(1)An excavator shall contact the regional notification center to request a return trip for any of the following reasons:(A)The excavator was unable to find the utility based on the markings an operator has placed pursuant to subdivision (b) of Section 4216.4.(B)Standby observation of the excavation activities, including, but not limited to, high-priority installations and postevent restorations.(C)The electronic positive response indicates a resend ticket is requested by the excavator for reasons including, but not limited to, incorrect location information, no access to the locate and field mark area, the excavation area is not delineated, or the delineated area does not match the location request.(2)A return trip requested pursuant to subparagraph (A) or (B) of paragraph (1) shall occur within one business day, or on a mutually agreed-upon and documented date. A return trip requested pursuant to subparagraph (C) of paragraph (1) shall occur within two working days, not counting the date of notification.(3)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting required pursuant to subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by both the operator and excavator.(j)An excavator shall contact the regional notification center to request a return trip ticket if the electronic positive response to the original ticket indicates resend ticket requested. An operator shall have two working days, not including the date of notification, to respond to the excavators return trip ticket request.
(k)Notwithstanding subdivision (b) of Section 4216.4, an excavator may request a return trip ticket to better determine the location of subsurface installations in conflict with the excavation. The operator shall respond within one working day, not including the date of notification, or on a mutually agreed upon and documented time.
(k)(l)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting as identified in subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by the operator and excavator.
SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(D)Notwithstanding any other provision of this paragraph and subdivision (e), if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, an operator may choose to either locate and field mark or provide information on the location of subsurface installations known to be below the pavement.
(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time.
(B)The regional notification center shall make the responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)Subject to subparagraph (B), an An excavator may use a vacuum excavation device that is designed, engineered, and purpose-built for vacuum excavation purposes to expose subsurface installations within the tolerance zone if the excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response. An operator that fails to respond to a request to use a vacuum excavation device shall be deemed in agreement with its use.
(B)For an excavator to use vacuum equipment to expose subsurface installations within the tolerance zone, the following requirements shall apply:(i)Vacuum equipment used shall be designed, engineered, and purpose built for vacuum excavation work.(ii)Trained and competent persons shall operate the vacuum equipment.(iii)Vacuum equipment personnel shall know and adhere to all operator requirements for any marked subsurface installations being exposed to determine the exact location of subsurface installations in conflict with the excavation. If the operator has any requirements for the use of vacuum equipment at the site of the planned excavation, those requirements shall be provided by the operator before excavation or the operator shall furnish an observer during excavation. (C)(B)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.
(D)(C)Beginning July 1, 2020, an excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph on or before July 1, 2020.
(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. The operator shall respond to the excavator within one working day. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)Except as provided in paragraph (2), an An excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid, shall do the following:
(A)The excavator shall immediately call 911 emergency services.
(B)After calling 911 emergency services, the excavator shall immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(C)Within two hours of discovering or causing damage to any subsurface installation, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(2)(A)Except as provided in subparagraph (B), if If an excavator discovers or causes damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, corrosion, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, that does not immediately endanger life or cause serious bodily harm or damage to property, all both of the following apply:
(i)(A)The excavator shall, within one hour, shall immediately notify the subsurface installation operator. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(ii)Except as provided in subparagraphs (C) and (D), within two hours of discovering or causing damage, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.(iii)An excavator discovering any damage to a subsurface installation is not required to notify the board of the damage.(B)This paragraph does not apply to an excavator who is the owner or operator of the damaged facility.(B)Within 48 hours of discovering or causing damage, the excavator shall notify the regional notification center.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
(g)Statewide information provided by operators and excavators regarding incident events shall be compiled and made available in an annual report by the board and posted on the internet website of the board. The California Regional Common Ground Alliance shall provide the statewide information to the board by April 15 of each year.
(h)For purposes of subdivision (g), the following terms have the following meanings:
(1)Incident event means the occurrence of excavator downtime, damages, near misses, and violations.
(2)Statewide information means information submitted by operators and excavators using the California Regional Common Ground Alliances Virtual Private Damage Information Reporting Tool. Supplied data shall comply with the Damage Information Reporting Tools minimum essential information as listed in the most recent version of the Best Practices guide of the Common Ground Alliance.
SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.Section 4216.13 of the Government Code is amended to read:4216.13.(a)The board shall be composed of nine members, of which seven shall be appointed by the Governor, one shall be appointed by the Speaker of the Assembly, and one shall be appointed by the Senate Committee on Rules.
(b)The seven members appointed by the Governor shall be appointed, as follows:
(1)Three members shall have knowledge and expertise in the operation of subsurface installations. Of those three members, one shall have knowledge and expertise in the operation of the subsurface installations of a municipal utility. At least one of the three members shall have knowledge and experience in the operation of high priority subsurface installations.
(2)Three members shall have knowledge and experience in contract excavation for employers who are not operators of subsurface installations. Of the three members, one member shall be a general engineering contractor, one member shall be a general building contractor, and one member shall be a specialty contractor. from the general engineering contractor industry, one member shall be from the specialty contractor industry, and one member shall be from either the general engineering contractor industry or the specialty contractor industry. For the purposes of this section, the terms general engineering contractor, general building contractor, contractor and specialty contractor shall have the meanings given in Article 4 (commencing with Section 7055) of Chapter 9 of Division 3 of the Business and Professions Code.
(3)One member shall have knowledge and expertise in performing or managing agricultural operations in the vicinity of subsurface installations.
(c)The member appointed by the Speaker of the Assembly shall have knowledge and expertise in representing in safety matters the workers employed by contract excavators.
(d)The member appointed by the Senate Committee on Rules shall have knowledge and expertise in subsurface installation location and marking and shall not be under the direct employment of an operator.
(e)The board may invite two directors of operations or other appropriate representatives of regional notification centers to be nonvoting ex officio members of the board.
SEC. 8.SEC. 9.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators statutorily required response to a ticket.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification or weekends or holidays, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification or weekends or holidays, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area delineated does not match the ticket description, the operator may choose not to locate and field mark until the area delineated and ticket description match. The operator shall contact the excavator to advise of the discrepancy and shall provide an electronic positive response.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to respond. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area has been delineated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)Unless an emergency exists, an excavator shall not begin excavation until the excavator receives an electronic positive response from, or has otherwise confirmed response directly from, all known operators of subsurface installations that are listed on the ticket pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c).
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall contact the regional notification center and get a new ticket and wait a minimum of two working days, not including the date of the contact, before restarting excavation. All excavation shall cease during the waiting period.
(j)(1)An excavator shall contact the regional notification center to request a return trip for any of the following reasons:
(A)The excavator was unable to find the utility based on the markings an operator has placed pursuant to subdivision (b) of Section 4216.4.
(B)Standby observation of the excavation activities, including, but not limited to, high-priority installations and postevent restorations.
(C)The electronic positive response indicates a resend ticket is requested by the excavator for reasons including, but not limited to, incorrect location information, no access to the locate and field mark area, the excavation area is not delineated, or the delineated area does not match the location request.
(2)A return trip requested pursuant to subparagraph (A) or (B) of paragraph (1) shall occur within one business day, or on a mutually agreed-upon and documented date. A return trip requested pursuant to subparagraph (C) of paragraph (1) shall occur within two working days, not counting the date of notification.
(3)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting required pursuant to subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by both the operator and excavator.
(k)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting as identified in subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by the operator and excavator.
SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(D)Notwithstanding any other provision of this paragraph and subdivision (e), if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, an operator may choose to either locate and field mark or provide information on the location of subsurface installations known to be below the pavement.
(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time.
(B)The regional notification center shall make the responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)Subject to subparagraph (B), an excavator may use a vacuum excavation device to expose subsurface installations within the tolerance zone if the excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response.
(B)For an excavator to use vacuum equipment to expose subsurface installations within the tolerance zone, the following requirements shall apply:
(i)Vacuum equipment used shall be designed, engineered, and purpose built for vacuum excavation work.
(ii)Trained and competent persons shall operate the vacuum equipment.
(iii)Vacuum equipment personnel shall know and adhere to all operator requirements for any marked subsurface installations being exposed to determine the exact location of subsurface installations in conflict with the excavation. If the operator has any requirements for the use of vacuum equipment at the site of the planned excavation, those requirements shall be provided by the operator before excavation or the operator shall furnish an observer during excavation.
(C)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.
(C)(D)Beginning July 1, 2020, an excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph on or before July 1, 2020.
(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)Except as provided in paragraph (2), an excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid, shall do the following:
(A)The excavator shall immediately call 911 emergency services.
(B)After calling 911 emergency services, the excavator shall immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(C)Within two hours of discovering or causing damage to any subsurface installation, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(2)(A)Except as provided in subparagraph (B), if an excavator discovering or causing discovers or causes damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, corrosion, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, that does not immediately endanger life or cause serious bodily harm or damage to property, all of the following apply:
(i)The excavator shall, within one hour, notify the subsurface installation operator. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(ii)Except as provided in subparagraphs (C) and (D), within two hours of discovering or causing damage, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(iii)An excavator discovering any damage to a subsurface installation is not required to notify the board of the damage.
(B)This paragraph does not apply to an excavator who is the owner or operator of the damaged facility.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
(g)Statewide information provided by operators and excavators regarding incident events shall be compiled and made available in an annual report by the board and posted on the internet website of the board. The California Regional Common Ground Alliance shall provide the statewide information to the board by April 15 of each year.
(h)For purposes of subdivision (g), the following terms have the following meanings:
(1)Incident event means the occurrence of excavator downtime, damages, near misses, and violations.
(2)Statewide information means information submitted by operators and excavators using the California Regional Common Ground Alliances Virtual Private Damage Information Reporting Tool. Supplied data shall comply with the Damage Information Reporting Tools minimum essential information as listed in the most recent version of the Best Practices guide of the Common Ground Alliance.
SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators statutorily required response to a ticket.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification or weekends or holidays, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification or weekends or holidays, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure. structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area delineated does not match the ticket description, the operator may choose not to locate and field mark until the area delineated and ticket description match. The operator shall contact the excavator to advise of the discrepancy and shall provide an electronic positive response.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to respond. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area has been delineated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)Unless an emergency exists, an excavator shall not begin excavation until the excavator receives an electronic positive response from, or has otherwise confirmed response directly from, all known operators of subsurface installations that are listed on the ticket pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c).
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall contact the regional notification center and get a new ticket and wait a minimum of two working days, not including the date of the contact, before restarting excavation. All excavation shall cease during the waiting period.
(j)(1)An excavator shall contact the regional notification center to request a return trip for any of the following reasons:
(A)The excavator was unable to find the utility based on the markings an operator has placed pursuant to subdivision (b) of Section 4216.4.
(B)Standby observation of the excavation activities, including, but not limited to, high-priority installations and postevent restorations.
(C)The electronic positive response indicates a resend ticket is requested by the excavator for reasons including, but not limited to, incorrect location information, no access to the locate and field mark area, the excavation area is not delineated, or the delineated area does not match the location request.
(2)A return trip requested pursuant to subparagraph (A) or (B) of paragraph (1) shall occur within one business day, or on a mutually agreed-upon and documented date. A return trip requested pursuant to subparagraph (C) of paragraph (1) shall occur within two working days, not counting the date of notification.
(3)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting required pursuant to subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by both the operator and excavator.
(k)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting as identified in subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by the operator and excavator.
SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(D)Notwithstanding any other provision of this paragraph and subdivision (e), if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, an operator may choose to either locate and field mark or provide information on the location of subsurface installations known to be below the pavement.
(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time.
(B)The regional notification center shall make the responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)Subject to subparagraph (B), an excavator may use a vacuum excavation device to expose subsurface installations within the tolerance zone if the excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response.
(B)For an excavator to use vacuum equipment to expose subsurface installations within the tolerance zone, the following requirements shall apply:
(i)Vacuum equipment used shall be designed, engineered, and purpose built for vacuum excavation work.
(ii)Trained and competent persons shall operate the vacuum equipment.
(iii)Vacuum equipment personnel shall know and adhere to all operator requirements for any marked subsurface installations being exposed to determine the exact location of subsurface installations in conflict with the excavation. If the operator has any requirements for the use of vacuum equipment at the site of the planned excavation, those requirements shall be provided by the operator before excavation or the operator shall furnish an observer during excavation.
(C)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.(C)Beginning July 1, 2020, an excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph on or before July 1, 2020.
(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)Except as provided in paragraph (2), an excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid, shall do the following:
(A)The excavator shall immediately call 911 emergency services.
(B)After calling 911 emergency services, the excavator shall immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(C)Within two hours of discovering or causing damage to any subsurface installation, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(2)(A)Except as provided in subparagraph (B), if an excavator discovering or causing damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, corrosion, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, that does not immediately endanger life or cause serious bodily harm or damage to property, all of the following apply:
(i)The excavator shall, within one hour, notify the subsurface installation operator. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(ii)Except as provided in subparagraphs (C) and (D), within two hours of discovering or causing damage, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(iii)An excavator discovering any damage to a subsurface installation is not required to notify the board of the damage.
(B)This paragraph does not apply to an excavator who is the owner or operator of the damaged facility.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
(g)Statewide information provided by operators and excavators regarding incident events shall be compiled and made available in an annual report by the board and posted on the internet website of the board. The California Regional Common Ground Alliance shall provide the statewide information to the board by April 15 of each year.
(h)For purposes of subdivision (g), the following terms have the following meanings:
(1)Incident event means the occurrence of excavator downtime, damages, near misses, and violations.
(2)Statewide information means information submitted by operators and excavators using the California Regional Common Ground Alliances Virtual Private Damage Information Reporting Tool. Supplied data shall comply with the Damage Information Reporting Tools minimum essential information as listed in the most recent version of the Best Practices guide of the Common Ground Alliance.
SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
As used in this article, the following definitions apply:
(a)Active subsurface installation means a subsurface installation currently in use or currently carrying service.
(b)Board means the California Underground Facilities Safe Excavation Board, also known as the Dig Safe Board.
(c)Area of continual excavation means a location where excavation is part of the normal business activities of agricultural operations and flood control facilities.
(d)Delineate means to mark in white the location or path of the proposed excavation using the guidelines in Appendix B of the Guidelines for Excavation Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance. If there is a conflict between the marking practices in those guidelines and other provisions of this article, this article shall control. Delineation also includes physical identification of the area to be excavated using alternative marking methods, including, but not limited to, flags, stakes, whiskers, or a combination of these methods, if an excavator makes a determination that standard delineation may be misleading to those persons using affected streets and highways, or be misinterpreted as a traffic or pedestrian control, and the excavator has contacted the regional notification center to advise the operators that the excavator will physically identify the area to be excavated using alternative marking methods.
(e)Electronic positive response means an electronic response from an operator to the regional notification center providing the status of an operators statutorily required response to a ticket.
(f)(1)Emergency means a sudden, unexpected occurrence, involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services.
(2)Unexpected occurrence includes, but is not limited to, a fire, flood, earthquake or other soil or geologic movement, riot, accident, damage to a subsurface installation requiring immediate repair, or sabotage.
(g)Excavation means any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, cable or pipe plowing and driving, or any other way.
(h)Except as provided in Section 4216.8, excavator means any person, firm, contractor or subcontractor, owner, operator, utility, association, corporation, partnership, business trust, public agency, or other entity that, with their own employees or equipment, performs any excavation.
(i)Hand tool means a piece of equipment used for excavating that uses human power and is not powered by any motor, engine, hydraulic, or pneumatic device.
(j)High priority subsurface installation means high-pressure natural gas pipelines with normal operating pressures greater than 415kPA gauge (60psig), petroleum pipelines, pressurized sewage pipelines, high-voltage electric supply lines, conductors, or cables that have a potential to ground of greater than or equal to 60kv, or hazardous materials pipelines that are potentially hazardous to workers or the public if damaged.
(k)Inactive subsurface installation means either of the following:
(1)The portion of an underground subsurface installation that is not active but is still connected to the subsurface installation, or to any other subsurface installation, that is active or still carries service.
(2)A new underground subsurface installation that has not been connected to any portion of an existing subsurface installation.
(l)Legal excavation start date and time means two working days, not including the date of notification, notification or weekends or holidays, unless the excavator specifies a later date and time, which shall not be more than 14 calendar days from the date of notification. notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3. For excavation in an area of continual excavation, legal excavation start date and time means two working days, not including the date of notification, notification or weekends or holidays, unless the excavator specifies a later date and time, which shall not be more than six months from the date of notification. notification or once the excavator has received a response from all known operators, as specified in subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3.
(m)Local agency means a city, county, city and county, school district, or special district.
(n)(1)Locate and field mark means to indicate the existence of any owned or maintained subsurface installations by using the guidelines in Appendix B of the Guidelines for Operator Facility Field Delineation published in the most recent version of the Best Practices guide of the Common Ground Alliance and in conformance with the uniform color code of the American Public Works Association. If there is a conflict between the marking practices in the guidelines and this article, this article shall control.
(2)Locate and field mark does not require an indication of the depth.
(o)Operator means any person, corporation, partnership, business trust, public agency, or other entity that owns, operates, or maintains a subsurface installation. For purposes of Section 4216.1, an operator does not include an owner of real property where subsurface installations are exclusively located if they are used exclusively to furnish services on that property and the subsurface facilities are under the operation and control of that owner.
(p)Qualified person means a person who completes a training program in accordance with the requirements of Section 1509 of Title 8 of the California Code of Regulations Injury and Illness Prevention Program, that meets the minimum locators training guidelines and practices published in the most recent version of the Best Practices guide of the Common Ground Alliance.
(q)Regional notification center means a nonprofit association or other organization of operators of subsurface installations that provides advance warning of excavations or other work close to existing subsurface installations, for the purpose of protecting those installations from damage, removal, relocation, or repair.
(r)State agency means every state agency, department, division, bureau, board, or commission.
(s)Subsurface installation means any underground pipeline, conduit, duct, wire, or other structure, except nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines. structure.
(t)Ticket means an excavation location request issued a number by the regional notification center.
(u)Tolerance zone means 24 inches on each side of the field marking placed by the operator in one of the following ways:
(1)Twenty-four inches from each side of a single marking, assumed to be the centerline of the subsurface installation.
(2)Twenty-four inches plus one-half the specified size on each side of a single marking with the size of installation specified.
(3)Twenty-four inches from each outside marking that graphically shows the width of the outside surface of the subsurface installation on a horizontal plane.
(v)Working day for the purposes of determining legal excavation start date and time means a weekday Monday through Friday, from 7:00 a.m. to 5:00 p.m., except for federal holidays and state holidays, as defined in Section 19853, or as otherwise posted on the internet website of the regional notification center.
SEC. 2.Section 4216.2 of the Government Code is amended to read:4216.2.(a)Before notifying the appropriate regional notification center, an excavator planning to conduct an excavation shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area to be excavated has been delineated. delineated does not match the ticket description, the operator may choose not to locate and field mark until the area delineated and ticket description match. The operator shall contact the excavator to advise of the discrepancy and shall provide an electronic positive response.
(b)Except in an emergency, an excavator planning to conduct an excavation shall notify the appropriate regional notification center of the excavators intent to excavate at least two working days, and not more than 14 calendar days, before beginning that excavation. The date of the notification shall not count as part of the two-working-day notice. If an excavator gives less notice than the legal excavation start date and time and the excavation is not an emergency, the regional notification center will take the information and provide a ticket, but an operator has until the legal excavation start date and time to respond. However, an excavator and an operator may mutually agree to a different notice and start date. The contact information for operators notified shall be available to the excavator.
(c)When the excavation is proposed within 10 feet of a high priority subsurface installation, the operator of the high priority subsurface installation shall notify the excavator of the existence of the high priority subsurface installation to set up an onsite meeting prior to the legal excavation start date and time or at a mutually agreed upon time to determine actions or activities required to verify the location and prevent damage to the high priority subsurface installation. As part of the meeting, the excavator shall discuss with the operator the method and tools that will be used during the excavation and the information the operator will provide to assist in verifying the location of the subsurface installation. The excavator shall not begin excavating until after the completion of the onsite meeting.
(d)Except in an emergency, every excavator covered by Section 4216.8 planning to conduct an excavation on private property that does not require an excavation permit may contact the appropriate regional notification center if the private property is known, or reasonably should be known, to contain a subsurface installation other than the underground facility owned or operated by the excavator. Before notifying the appropriate regional notification center, an excavator shall delineate the area to be excavated. If the area is not delineated, an operator may, at the operators discretion, choose not to locate and field mark until the area has been delineated. Any temporary marking placed at the planned excavation location shall be clearly seen, functional, and considerate to surface aesthetics and the local community. An excavator shall check if any local ordinances apply to the placement of temporary markings.
(e)The regional notification center shall provide a ticket to the person who contacts the center pursuant to this section and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation. A ticket shall be valid for 28 days from the date of issuance. If work continues beyond 28 days, the excavator shall renew the ticket either by accessing the centers internet website or by calling 811 by the end of the 28th day.
(f)A record of all notifications by an excavator or operator to the regional notification center shall be maintained for a period of not less than three years. The record shall be available for inspection by the excavator and any member, or their representative, during normal working hours and according to guidelines for inspection as may be established by the regional notification centers. A regional notification center shall provide notification records to the board quarterly and shall provide notifications of damage to the board within five business days of receipt at the regional notification center.
(g)Unless an emergency exists, an excavator shall not begin excavation until the excavator receives a response from an electronic positive response from, or has otherwise confirmed response directly from, all known operators of subsurface installations within the delineated boundaries of the proposed area of excavation pursuant to that are listed on the ticket pursuant to subparagraph (A) of paragraph (1) of subdivision (a) of Section 4216.3 and until the completion of any onsite meeting, if required by subdivision (c).
(h)If a site requires special access, an excavator shall request an operator to contact the excavator regarding that special access or give special instructions on the location request.
(i)If a ticket obtained by an excavator expires but work is ongoing, the excavator shall contact the regional notification center and get a new ticket and wait a minimum of two working days, not including the date of the contact, before restarting excavation. All excavation shall cease during the waiting period.
(j)(1)An excavator shall contact the regional notification center to request a return trip for any of the following reasons:
(A)The excavator was unable to find the utility based on the markings an operator has placed pursuant to subdivision (b) of Section 4216.4.
(B)Standby observation of the excavation activities, including, but not limited to, high-priority installations and postevent restorations.
(C)The electronic positive response indicates a resend ticket is requested by the excavator for reasons including, but not limited to, incorrect location information, no access to the locate and field mark area, the excavation area is not delineated, or the delineated area does not match the location request.
(2)A return trip requested pursuant to subparagraph (A) or (B) of paragraph (1) shall occur within one business day, or on a mutually agreed-upon and documented date. A return trip requested pursuant to subparagraph (C) of paragraph (1) shall occur within two working days, not counting the date of notification.
(3)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting required pursuant to subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by both the operator and excavator.
(k)If an operator requires a representative to be onsite to monitor the excavation activity, the operator shall notify the excavator of the requirement during or before the onsite field meeting as identified in subdivision (c). The excavator shall allow the operator an opportunity to provide the scheduling of personnel to be onsite. That time for which the onsite personnel is provided shall not exceed two working days from the date the requirement is identified by the operator, unless otherwise mutually agreed to by the operator and excavator.
SEC. 3.Section 4216.3 of the Government Code is amended to read:4216.3.(a)(1)(A)Unless the excavator and operator mutually agree to a later start date and time, or otherwise agree to the sequence and timeframe in which the operator will locate and field mark, an operator shall do one of the following before the legal excavation start date and time:
(i)Locate and field mark within the area delineated for excavation and, where multiple subsurface installations of the same type are known to exist together, mark the number of subsurface installations.
(ii)To the extent and degree of accuracy that the information is available, provide information to an excavator where the operators active or inactive subsurface installations are located.
(iii)Advise the excavator it operates no subsurface installations in the area delineated for excavation.
(B)An operator shall mark newly installed subsurface installations in areas with continuing excavation activity.
(C)An operator shall indicate with an A inside a circle the presence of any abandoned subsurface installations, if known, within the delineated area. The markings are to make an excavator aware that there are abandoned subsurface installations within that delineated work area.
(D)Notwithstanding any other provision of this paragraph and subdivision (e), if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, an operator may choose to either locate and field mark or provide information on the location of subsurface installations known to be below the pavement.
(2)Only a qualified person shall perform subsurface installation locating activities.
(3)A qualified person performing subsurface installation locating activities on behalf of an operator shall use a minimum of a single-frequency utility locating device and shall have access to alternative sources for verification, if necessary.
(4)An operator shall amend, update, maintain, and preserve all plans and records for its subsurface installations as that information becomes known. If there is a change in ownership of a subsurface installation, the records shall be turned over to the new operator. Commencing January 1, 2017, records on abandoned subsurface installations, to the extent that those records exist, shall be retained.
(5)Commencing January 1, 2023, all new subsurface installations shall be mapped using a geographic information system and maintained as permanent records of the operator. This paragraph shall not apply to oil and gas flowlines three inches or less in diameter that are located within the administrative boundaries of an oil field as designated by the Geologic Energy Management Division. For purposes of this paragraph, the following terms have the following meanings:
(A)Flowline means any pipeline that connects an oil, gas, or natural gas liquids well with a gathering line or header.
(B)Gathering line means a pipeline that transports liquid hydrocarbons between any of the following: multiple wells, a testing facility, a treating and production facility, a storage facility, or a custody transfer facility.
(C)Header means a chamber from which liquid or gas is distributed to or from smaller pipelines.
(6)Nothing in this section shall be interpreted to preempt the Professional Land Surveyors Act, as described in Chapter 15 (commencing with Section 8700) of Division 3 of the Business and Professions Code.
(b)If the field marks are no longer reasonably visible, an excavator shall renotify the regional notification center with a request for remarks that can be for all or a portion of the excavation. Excavation shall cease in the area to be remarked. If the delineation markings are no longer reasonably visible, the excavator shall redelineate the area to be remarked. If remarks are requested, the operator shall have two working days, not including the date of request, to remark the subsurface installation. If the area to be remarked is not the full extent of the original excavation, the excavator shall delineate the portion to be remarked and provide a description of the area requested to be remarked on the ticket. The excavator shall provide a description for the area to be remarked that falls within the area of the original location request.
(c)(1)(A)On and after January 1, 2021, every Every operator shall supply an electronic positive response through the regional notification center before the legal excavation start date and time. Upon a showing of good cause by an operator, the board may extend the time by which the operator is required to comply with this requirement. The board shall not grant an extension beyond December 31, 2021. The board shall determine which facts or circumstances constitute good cause.
(B)The regional notification center shall make the responses required by subparagraph (A) available to the excavator.
(2)The regional notification centers shall annually report to the board regarding their continual technological development in their roles of facilitating communication between excavators and operators in a manner that enhances safety, accountability, and efficiency.
(d)(1)On or before January 1, 2021, the board shall adopt regulations to implement subparagraph (A) of paragraph (1) of subdivision (c). The initial adoption, amendment, or repeal of a regulation authorized by this section is deemed to address an emergency, for purposes of Sections 11346.1 and 11349.6, and the board is hereby exempted for that purpose from the requirements of subdivision (b) of Section 11346.1. After the initial adoption, amendment, or repeal of an emergency regulation pursuant to this section, the board shall not request approval from the Office of Administrative Law to readopt the regulation as an emergency regulation pursuant to Section 11346.1.(2)It is the intent of the Legislature, in authorizing the deviations in this section from the requirements and procedures of Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2, to authorize the board to expedite the exercise of its power to implement regulations as its unique operational circumstances require. (e)(d)The excavator shall notify the appropriate regional notification center of the failure of an operator to identify subsurface installations pursuant to subparagraph (A) or (B) of paragraph (1) of subdivision (a), or subdivision (b). The notification shall include the ticket issued by the regional notification center. The regional notification center shall maintain a record of all notifications received pursuant to this subdivision for a period of not less than three years. The record shall be available for inspection pursuant to subdivision (f) of Section 4216.2.
(f)(e)If an operator or local agency knows that it has a subsurface installation embedded or partially embedded in the pavement that is not visible from the surface, the operator or local agency shall contact the excavator before pavement removal to communicate and determine a plan of action to protect that subsurface installation and excavator.
SEC. 4.Section 4216.4 of the Government Code is amended to read:4216.4.(a)(1)Except as provided in paragraph (2), if an excavation is within the tolerance zone of a subsurface installation, the excavator shall determine the exact location of the subsurface installations in conflict with the excavation using hand tools before using any power-driven excavation or boring equipment within the tolerance zone of the subsurface installations. In all cases the excavator shall use reasonable care to prevent damaging subsurface installations.
(2)(A)An Subject to subparagraph (B), an excavator may use a vacuum excavation device to expose subsurface installations within the tolerance zone if the operator has marked the subsurface installation, the excavator has contacted any operator whose subsurface installations may be in conflict with the excavation, excavator has informed the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket and the operator has agreed to the use of a vacuum excavation device. An excavator shall inform the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket. operator not agreeing to the use of a vacuum excavation device shall include that information on their electronic positive response.
(B)For an excavator to use vacuum equipment to expose subsurface installations within the tolerance zone, the following requirements shall apply:
(i)Vacuum equipment used shall be designed, engineered, and purpose built for vacuum excavation work.
(ii)Trained and competent persons shall operate the vacuum equipment.
(iii)Vacuum equipment personnel shall know and adhere to all operator requirements for any marked subsurface installations being exposed to determine the exact location of subsurface installations in conflict with the excavation. If the operator has any requirements for the use of vacuum equipment at the site of the planned excavation, those requirements shall be provided by the operator before excavation or the operator shall furnish an observer during excavation.
(B)(C)An excavator may use power-operated or boring equipment for the removal of any existing pavement only if there is no known subsurface installation contained in the pavement.
(C)Beginning July 1, 2020, an excavator may use power-operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. The board shall adopt regulations to implement this paragraph on or before July 1, 2020.(3)An excavator shall presume all subsurface installations to be active, and shall use the same care around subsurface installations that may be inactive as the excavator would use around active subsurface installations.
(b)If the exact location of the subsurface installation cannot be determined by hand excavating in accordance with subdivision (a), the excavator shall request the operator to provide additional information to the excavator, to the extent that information is available to the operator, to enable the excavator to determine the exact location of the installation. If the excavator has questions about the markings that an operator has placed, the excavator may contact the notification center to send a request to have the operator contact the excavator directly. The regional notification center shall provide the excavator with the contact telephone number of the subsurface installation operator.
(c)(1)Except as provided in paragraph (2), an excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid, shall do the following:
(A)The excavator shall immediately call 911 emergency services.
(B)After calling 911 emergency services, the excavator shall immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(C)Within two hours of discovering or causing damage to any subsurface installation, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(c)(1)An(2)(A)Except as provided in subparagraph (B), if an excavator discovering or causing damage to a subsurface installation, including all breaks, leaks, nicks, dents, gouges, grooves, corrosion, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, shall immediately that does not immediately endanger life or cause serious bodily harm or damage to property, all of the following apply:
(i)The excavator shall, within one hour, notify the subsurface installation operator. The excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator. If the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
(2)An excavator shall call 911 emergency services upon discovering or causing damage to either of the following:(A)A gas or hazardous liquid pipeline subsurface installation in which the damage results in the escape of any flammable, toxic, or corrosive gas or liquid.(B)A high priority subsurface installation of any kind.(3)An excavator discovering or causing damage shall notify the regional notification center within 48 hours of discovering or causing the damage.(4)Nothing in this section preempts or impedes the boards authority to impose more restrictive notification windows.(ii)Except as provided in subparagraphs (C) and (D), within two hours of discovering or causing damage, the excavator shall notify the board of the damage through the web portal on the regional notification centers internet website or the boards internet website.
(iii)An excavator discovering any damage to a subsurface installation is not required to notify the board of the damage.
(B)This paragraph does not apply to an excavator who is the owner or operator of the damaged facility.
(d)Each excavator, operator, or locator shall communicate with each other and respect the appropriate safety requirements and ongoing activities of the other parties, if known, at an excavation site.
SEC. 5.Section 4216.5 of the Government Code is amended to read:4216.5.(a)The requirements of this article apply to state agencies and to local agencies which that own or operate subsurface installations, except as otherwise provided in Section 4216.1. A local agency which that is required to provide the services described in paragraph (1) of subdivision (a) of Section 4216.3 may charge a fee in an amount sufficient to cover the cost of providing that service.
(b)A local agency that chooses to recover its costs via a fee shall consider whether the fee could deter an excavator from contacting the regional notification center.
(c)A local agency shall consider recouping its costs via existing permit fees instead of a separate fee related to responding to a ticket.
(d)A local agency shall consider not charging a fee to an excavator covered by Section 4216.8 to encourage the excavator to create a ticket as specified in subdivision (d) of Section 4216.2.
SEC. 6.Section 4216.6 of the Government Code is amended to read:4216.6.(a)(1)Any operator or excavator who negligently violates this article is subject to a civil penalty in an amount not to exceed ten thousand dollars ($10,000).
(2)Any operator or excavator who knowingly and willfully violates any of the provisions of this article is subject to a civil penalty in an amount not to exceed fifty thousand dollars ($50,000).
(3)Any operator or excavator who knowingly and willfully violates any of the provisions of this article in a way that results in damage to a gas or hazardous liquid pipeline subsurface installation and that results in the escape of any flammable, toxic, or corrosive gas or liquid is subject to a civil penalty in an amount not to exceed one hundred thousand dollars ($100,000).
(4)Except as otherwise specifically provided in this article, this section is not intended to affect any civil remedies otherwise provided by law for personal injury or for property damage, including any damage to subsurface installations, nor is this section intended to create any new civil remedies for those injuries or that damage.
(5)This article shall not be construed to limit any other provision of law granting governmental immunity to state or local agencies or to impose any liability or duty of care not otherwise imposed by law upon any state or local agency.
(b)An action may be brought by the Attorney General, the district attorney, or the local or state agency that issued the permit to excavate, for the enforcement of the civil penalty pursuant to this section in a civil action brought in the name of the people of the State of California. If penalties are collected as a result of a civil suit brought by a state or local agency for collection of those civil penalties, the penalties imposed shall be paid to the general fund of the agency. If more than one agency is involved in enforcement, the penalties imposed shall be apportioned among them by the court in a manner that will fairly offset the relative costs incurred by the state or local agencies, or both, in collecting these fees.
(c)This article may also be enforced by the following agencies, either following a recommendation of the Dig Safe Board that the agency shall act to accept, amend, or reject, or through the agencys own investigations, as follows:
(1)The Registrar of Contractors of the Contractors State License Board shall enforce this article on contractors, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code, and telephone corporations, as defined in Section 234 of the Public Utilities Code, when acting as a contractor, as defined in Article 2 (commencing with Section 7025) of Chapter 9 of Division 3 of the Business and Professions Code. Nothing in this section affects the Public Utilities Commissions existing authority over a public utility.
(2)The Public Utilities Commission shall enforce this article on gas corporations, as defined in Section 222 of the Public Utilities Code, and electrical corporations, as defined in Section 218 of the Public Utilities Code, and water corporations, as defined in Section 241 of the Public Utilities Code.
(3)The Office of the State Fire Marshal shall enforce this article on operators of hazardous liquid pipeline facilities, as defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49 of the United States Code.
(d)A local governing board may enforce this article on local agencies under the governing boards jurisdiction.
(e)Commencing July 1, 2020, the Dig Safe Board shall enforce this article on persons other than those listed in subdivisions (c) and (d). The board shall not initiate an enforcement action pursuant to this subdivision for a violation that occurred prior to July 1, 2020. As the enforcing body for persons other than those listed in subdivisions (c) and (d), the board may collect any monetary penalties imposed upon those persons.
(f)Moneys collected as a result of penalties imposed pursuant to subdivisions (c) and (e) shall be deposited into the Safe Energy Infrastructure and Excavation Fund.
(g)Statewide information provided by operators and excavators regarding incident events shall be compiled and made available in an annual report by regional notification centers the board and posted on the internet websites website of the regional notification centers and shall be made available board. The California Regional Common Ground Alliance shall provide the statewide information to the board upon request. by April 15 of each year.
(h)For purposes of subdivision (g), the following terms have the following meanings:
(1)Incident event means the occurrence of excavator downtime, damages, near misses, and violations.
(2)Statewide information means information submitted by operators and excavators using the California Regional Common Ground Alliances Virtual Private Damage Information Reporting Tool. Supplied data shall comply with the Damage Information Reporting Tools minimum essential information as listed in the most recent version of the Best Practices guide of the Common Ground Alliance.
SEC. 7.Section 4216.7 of the Government Code is amended to read:4216.7.(a)If a subsurface installation is damaged by an excavator as a result of failing to comply with Section 4216.2, 4216.4, or 4216.10 or subdivision (b) of Section 4216.3, or as a result of failing to comply with the operators requests to protect the subsurface installation as specified by the operator before the start of excavation, the excavator shall be liable to the operator of the subsurface installation for resulting damages, costs, and expenses to the extent the damages, costs, and expenses were proximately caused by the excavators failure to comply.
(b)If an operator has failed to become a member of, participate in, or share in the costs of, a regional notification center, that operator shall forfeit the operators claim for damages to the operators subsurface installation arising from an excavation against an excavator who has complied with this article to the extent damages were proximately caused by the operators failure to comply with this article.
(c)If an operator of a subsurface installation without a reasonable basis, as determined by a court of competent jurisdiction, has failed to comply with the provisions of Section 4216.3, including, but not limited to, the requirement to field mark the appropriate location of subsurface installations within two working days of notification, as defined by subdivision (v) of Section 4216 and subdivision (b) of Section 4216.2, has failed to comply with subdivision (c) of Section 4216.2, or has failed to comply with subdivision (b) of Section 4216.4, the operator shall be liable for damages to the excavator who has complied with Section 4216.2, subdivisions (b) and (e) of Section 4216.3, and Section 4216.4, including liquidated damages, liability, losses, costs, and expenses, actually incurred by the excavator, resulting from the operators failure to comply with these specified requirements to the extent the damages, costs, and expenses were proximately caused by the operators failure to comply.
(d)(1)An excavator who damages a subsurface installation due to an inaccurate field mark by an operator, or by a third party under contract to perform field marking for the operator, shall not be liable for damages, replacement costs, or other expenses arising from damages to the subsurface installation if the excavator complied with Section 4216.10 or Sections 4216.2 and 4216.4.
(2)This section is not intended to create any presumption or to affect the burden of proof in any action for personal injuries or property damage, other than damage to the subsurface installation, nor is this section intended to affect, create, or eliminate any remedy for personal injury or property damage, other than damage to the subsurface installation.
(e)For the purposes of this section:
(1)Approximate location means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth.
(e)For the purposes of this section, inaccurate(2)Inaccurate field mark means a mark, or set of markings, made pursuant to Section 4216.3 or 4216.10, that did not correctly indicate the approximate location of a subsurface installation affected by an excavation and includes the actual physical location of a subsurface installation affected by an excavation that should have been marked pursuant to Section 4216.3 but was not.
(f)Nothing in this section shall be construed to do any of the following:
(1)Affect claims, including, but not limited to, third-party claims brought against the excavator or operator by other parties for damages arising from the excavation.
(2)Exempt the excavator or operator from the excavators or the operators duty to mitigate any damages as required by common or other applicable law.
(3)Exempt the excavator or operator from liability to each other or third parties based on equitable indemnity or comparative or contributory negligence.
(g)A court or arbitrator shall award reasonable attorneys costs and fees, including expert witness fees, to an excavator if either of the following apply:
(1)The court or arbitrator determines that an excavator is not liable for damages to a subsurface installation for a reason described in subdivision (d).
(2)The excavator makes an offer to settle the matter that is not accepted and the plaintiff fails to obtain a more favorable judgment or award.
SEC. 8.If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.
|
Date
|
Status
|
|---|---|
| Sep 22, 2024 | Chaptered by Secretary of State. Chapter 447, Statutes of 2024. |
| Sep 22, 2024 | Approved by the Governor. |
| Sep 4, 2024 | Enrolled and presented to the Governor at 4 p.m. |
| Aug 28, 2024 | Assembly amendments concurred in. (Ayes 39. Noes 0. Page 5611.) Ordered to engrossing and enrolling. |
| Aug 27, 2024 | Ordered to special consent calendar. |
| Aug 26, 2024 | In Senate. Concurrence in Assembly amendments pending. |
| Aug 26, 2024 | Read third time. Passed. (Ayes 77. Noes 0. Page 6544.) Ordered to the Senate. |
| Aug 20, 2024 | Read second time. Ordered to third reading. |
| Aug 19, 2024 | Read second time and amended. Ordered to second reading. |
| Aug 15, 2024 | From committee: Do pass as amended. (Ayes 11. Noes 0.) (August 15). |
| Aug 7, 2024 | August 7 set for first hearing. Placed on suspense file. |
| Jul 3, 2024 | Read second time and amended. Re-referred to Com. on APPR. |
| Jul 2, 2024 | From committee: Do pass as amended and re-refer to Com. on APPR. with recommendation: To consent calendar. (Ayes 15. Noes 0.) (July 1). |
| Jul 12, 2023 | July 12 set for second hearing canceled at the request of author. |
| Jun 28, 2023 | June 28 set for first hearing canceled at the request of author. |
| Jun 15, 2023 | From committee with author's amendments. Read second time and amended. Re-referred to Com. on U. & E. |
| Jun 8, 2023 | Referred to Com. on U. & E. |
| May 25, 2023 | In Assembly. Read first time. Held at Desk. |
| May 25, 2023 | Read third time. Passed. (Ayes 40. Noes 0. Page 1305.) Ordered to the Assembly. |
| May 23, 2023 | Ordered to special consent calendar. |
| May 18, 2023 | From committee: Do pass. (Ayes 7. Noes 0. Page 1183.) (May 18). |
| May 18, 2023 | Read second time. Ordered to third reading. |
| May 12, 2023 | Set for hearing May 18. |
| May 8, 2023 | May 8 hearing: Placed on APPR suspense file. |
| May 2, 2023 | Set for hearing May 8. |
| May 1, 2023 | Read second time and amended. Re-referred to Com. on APPR. |
| Apr 27, 2023 | From committee: Do pass as amended and re-refer to Com. on APPR with recommendation: To consent calendar. (Ayes 8. Noes 0. Page 939.) (April 26). |
| Apr 18, 2023 | Set for hearing April 26. |
| Apr 12, 2023 | Read second time and amended. Re-referred to Com. on GOV. & F. |
| Apr 11, 2023 | From committee: Do pass as amended and re-refer to Com. on GOV. & F. (Ayes 12. Noes 0. Page 636.) (April 10). |
| Mar 30, 2023 | Set for hearing April 10. |
| Mar 1, 2023 | Referred to Coms. on B., P. & E. D. and GOV. & F. |
| Feb 21, 2023 | From printer. May be acted upon on or after March 20. |
| Feb 17, 2023 | Introduced. Read first time. To Com. on RLS. for assignment. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Aug 28, 2024 | Special Consent SB778 Ochoa Bogh | Senate Floor |
Passed |
|
| Aug 26, 2024 | SB 778 Ochoa Bogh Senate Third Reading By Chen | Assembly Floor |
Passed |
|
| Aug 15, 2024 | Do pass as amended. | Assembly Standing Committee on Appropriations |
Passed |
|
| Jul 1, 2024 | Do pass as amended, and be re-referred to the Committee on [Appropriations] with recommendation: To Consent Calendar | Assembly Standing Committee on Utilities and Energy |
Passed |
|
| May 25, 2023 | Special Consent SB778 Ochoa Bogh | Senate Floor |
Passed |
|
| May 18, 2023 | Do pass | Senate Standing Committee on Appropriations |
Passed |
|
| May 8, 2023 | Placed on suspense file | Senate Standing Committee on Appropriations |
Passed |
|
| Apr 26, 2023 | Do pass as amended, but first amend, and re-refer to the Committee on [Appropriations] with the recommendation: To Consent Calendar | Senate Standing Committee on Governance and Finance |
Passed |
|
| Apr 10, 2023 | Do pass as amended, but first amend, and re-refer to the Committee on [Governance and Finance] | Senate Standing Committee on Business, Professions and Economic Development |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| California Association Of Sanitation Agencies | ** Against | |
| Los Angeles County Sanitation Districts | ** Against | |
| Underground Service Alert Of Northern California And Nevada | ** Support | |
| Underground Service Alert Of Southern California | ** Support | |
| Underground Service Alert of Southern California Southern California Contractors Association | ** Support |
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 778 |
UNFINISHED BUSINESS
Bill No: SB 778
Author: Ochoa Bogh (R)
Amended: 8/19/24
Vote: 21
SENATE BUS., PROF. & ECON. DEV. COMMITTEE: 12-0, 4/10/23
AYES: Roth, Nguyen, Archuleta, Ashby, Becker, Dodd, Eggman, Glazer, Niello, Smallwood-Cuevas, Wahab, Wilk
NO VOTE RECORDED: Alvarado-Gil
SENATE GOVERNANCE & FIN. COMMITTEE: 8-0, 4/26/23
AYES: Caballero, Seyarto, Blakespear, Dahle, Durazo, Glazer, Skinner, Wiener
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/18/23
AYES: Portantino, Jones, Ashby, Bradford, Seyarto, Wahab, Wiener
SENATE FLOOR: 40-0, 5/25/23
AYES: Allen, Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Stern, Umberg, Wahab, Wiener, Wilk
ASSEMBLY FLOOR: 77-0, 8/26/24 - See last page for vote
SUBJECT: Excavations: subsurface installations
SOURCE: Underground Service Alert of Southern California
DIGEST:
This bill revises provisions in the Dig Safe Act related to operator and excavator responsibilities when preparing for, and conducting excavations.
Assembly Amendments
delete the requirement for an operator to contact the excavator if there is an issue the with work area; delete the authorization for an operator to not locate and mark an area, as specified; clarify how an excavator begins an excavation prior to the legal excavation start time if specified conditions are met; remove the requirements for a return trip, clarify reporting requirements when damage occurs; revise criteria for board appointments; and, make other technical and conforming changes.
ANALYSIS: Existing law establishes the Dig Safe Board/Underground Safety Board (Board) within the Office of Energy Infrastructure Safety to coordinate education and outreach activities that encourage safe excavation practices, along with developing standards and investigating violations, as specified. (Government Code (GC) § 4216.12)
This bill:
- Prohibits, unless an emergency exists, an excavator from beginning an excavation until all operators of subsurface installations listed on the ticket have fulfilled their obligations, as specified. And, allows an excavator to begin excavation before the legal start date and time if all operators have fulfilled their obligations, as specified.
- Requires an excavator to immediately cease excavation, if the ticket expires but the work is ongoing, and obtain a new ticket and may not resume excavation unless all operators fulfill requirements, as specified.
- Requires the excavator to inform the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket, as specified, and requires an operator not agreeing to use vacuum excavation to include that information on the EPR.
- Requires an excavator to call 911 emergency services immediately upon discovering or causing damage to one of the following:
- A gas or hazardous liquid pipeline subsurface installation in which damage results in the escape of any flammable, toxic, or corrosive gas or liquid; or,
- A high priority subsurface installation of any kind,
- An excavator does not need to call 911 if all of the following condition are satisficed; 1) the excavator is the operator of the high priority subsurface installation, 2) the damage was discovered by the operator during operations and maintenance activities; 3) the damage does not meet the specifications in a) or b) above.
- Revises requirements when an excavator is to notify the operator of a subsurface installation when damage occurs, as specified, and when an excavator does, and does not need to notify the regional notification center.
- Requires a local agency that chooses to recover costs for providing locate and mark services of a subsurface installation via a fee to consider whether the fee could deter an excavator from contracting the regional notification center. Requires a local agency to consider recouping its costs via existing permit fees instead of a separate fee; requires a local agency to consider not charging a fee to an excavator on private property, as specified.
- Deletes the requirement for regional notification centers, to compile an annual report of incident events, as specified.
- Adds a definition of “approximate location” to mean a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation and does not mean depth.
- Revises the contracting work experience qualifications for appointees to the Board, as specified, and deletes the current prohibition on the Senate Rules Appointee from being under the direct supervision of an operator.
- Authorizes the Board to investigate occurrences of excavator downtime, damages, near misses and complaints of violations.
- Makes other technical and clarifying changes.
Background
The Board, under the office of Energy Infrastructure Safety, (formally under the Office of the State Fire Marshall) is responsible for investigating accidents, developing excavation safety standards, and coordinating education and outreach programs.
Current law requires an individual or entity wishing to perform an excavation where they will dig, drill, or bore below the ground to inform the regional notification center of the planned excavation so owners of underground facilities such as gas lines, sewer lines, water mains or communication cables in the area can mark their facilities and prevent excavators from damaging their property. Damage to underground structures may result in the disruption of essential services and poses potential safety hazards to workers, the public, and the environment.
Once an excavator contacts a regional notification center, then one or more utility operators are notified to mark the location of their subsurface installations (underground facilities) with paint, flags, or by other means. According to information on the USA North 811 regional notification center website, the regional center receives over 110,000 ticket requests per month. This bill will update and revise a number of actions and requirements for operators and excavators prior to, and in the process of carrying out an excavation, and in those instances if an emergency occurs.
There are two regional notification centers that serve California, the Underground Service Alert of Northern California and Nevada, also known as USA North 811; and, Underground Service Alert of Southern California, also known as DigAlert. Collectively, the two centers are commonly referred to as 811 centers. GC §§ 4216-4216.9 requires anyone planning to excavate to contact the appropriate regional notification center at least two working days (but not more than 14 calendar days) before beginning to excavate. Under current practices, and due to the current definition of “legal excavation start date and time,” there is a requirement for a two-day period after notification to a regional center for an excavation to begin. This bill clarifies that an operator has until the legal excavation start date to fulfill its obligations related to locating and marking of subsurface installations.
An operator of a subsurface installation has the responsibility to do one of three things in response to receiving a ticket from the regional notification center that an excavation is planned in area where they may have a subsurface installation: 1) locate and mark the operator’s subsurface installations with paint, flags, or other markings; 2) provide the excavator information, such as maps, to assist the excavator with finding the subsurface installation; or, 3) notify the excavator that the operator has no subsurface installations in the proposed area of excavation.
This operator response is known as “positive response.” AB 1166 (Levine, Chapter, Statutes of 2019), changed existing law to require every operator of subsurface installations to supply an electronic positive response (EPR) through a regional notification center before the legal excavation start date. This bill adds clarifying language to require the EPR prior to beginning an excavation for all areas listed on the ticket.
A vacuum excavation is an excavation technique that utilizes high-pressure water to dig into the ground, break up the material, and then suction up the debris to be removed from the excavation hole. For any excavation within the tolerance zone of a subsurface installation (meaning 24 inches on either side), the excavator is authorized to use only a hand tool to determine the exact location of the subsurface installation. The aim is to avoid accidental underground line damage from a power tool. The tolerance zone is a defined as an area, which is 24 inches on each side of the field marking placed by the operator. This bill proposes to require the excavator notify the regional center of their intent to use a vacuum device during the excavation at the time of requesting a ticket. If an operator does not agree to the use of vacuum equipment, this bill would require the information be provided in the EPR.
Emergency response in the event an excavator damages a subsurface installation is critical to mitigate the potential for a catastrophic disaster or other minor disrupting events, such as water leaks or power outages. Existing law provides the steps that an excavator must take when an excavator causes or discovers damage to a subsurface installation (GC § 4216.4(c)(1)). An excavator is only required to call 911 is when a gas or hazardous subsurface installation is damaged and results in the escape of any flammable, toxic, or corrosive gas or liquid or if they damage a high priority subsurface installation which include specified high pressure natural gas pipelines. The Board has the oversight authority to take enforcement actions against those excavators who fail to provide the appropriate incident information. This bill codifies a number of the Board’s current regulations.
Local governments must comply with the requirements to locate and mark their subsurface installations when notified of a pending excavation in an area, which may affect their underground facilities. Per GC § 4216.5, a local agency which provides those services is authorized to charge a fee to recover the costs for the agency associated with locating and marking a site. This bill would add requirements for local governments to consider their costs and when determining whether to charge a fee for providing those services. There are some concerns that local governments charging fees to excavators could deter individuals, including private property homeowners, from reporting potential excavations and following the law due to concerns with costs. This bill requires local governments to consider whether or not there are other appropriate means to recover costs and to consider the potential scenario where the fee deters compliance.
Current law requires statewide information on reports from operators and excavators regarding incidents whereby underground installations are damaged or hit, to be compiled in an annual report. Currently, the regional notification centers are responsible for compiling and posting this data. An incident event includes damages, near misses and other violations of the Dig Safe Act. Stakeholders voluntarily provide this statewide information.
Per GC § 4216.3, the Board is composed of nine members, seven are appointed by the Governor, one appointed by the Speaker of the Assembly, and one by the Senate Committee on Rules. This bill revises the criteria for specified appointees to help ensure there are a sufficient number of candidates.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Assembly Committee on Appropriations, this bill will result in new work at the Office of Energy Infrastructure Safety (OEIS) to compile an annual report on dig-in incident events. OEIS anticipates needing one research data specialist, as a cost of $169,000 annually ongoing, to analyze data, develop data models and coordinate with the California Regional Common Ground Alliance (CARCGA) on data acceptance and transfer, development of data policies and procedures, and standardization of data (Safe Energy Infrastructure and Excavation Fund).
SUPPORT: (Verified 8/6/24)
Underground Service Alert of Southern California (source) Southern California Contractors Association
Underground Service Alert of Northern California and Nevada
OPPOSITION: (Verified 8/6/24)
None received
ARGUMENTS IN SUPPORT: Supporters note that this bill makes a number of technical changes that provide clarifying changes to the Call Before You Dig Law.
ASSEMBLY FLOOR: 77-0, 8/26/24
AYES: Addis, Aguiar-Curry, Alanis, Alvarez, Arambula, Bains, Bauer-Kahan, Bennett, Berman, Boerner, Bonta, Bryan, Calderon, Juan Carrillo, Wendy Carrillo, Chen, Connolly, Megan Dahle, Davies, Dixon, Essayli, Flora, Mike Fong, Friedman, Gabriel, Gallagher, Garcia, Gipson, Grayson, Haney, Hart, Holden, Hoover, Irwin, Jackson, Jones-Sawyer, Kalra, Lackey, Lee, Low, Lowenthal, Maienschein, Mathis, McCarty, McKinnor, Muratsuchi, Stephanie Nguyen, Pacheco, Papan, Jim Patterson, Joe Patterson, Pellerin, Petrie-Norris, Quirk-Silva, Ramos, Rendon, Reyes, Luz Rivas, Rodriguez, Blanca Rubio, Sanchez, Santiago, Schiavo, Soria, Ta, Ting, Valencia, Villapudua, Waldron, Wallis, Ward, Weber, Wicks, Wilson, Wood, Zbur, Robert Rivas
NO VOTE RECORDED: Cervantes, Ortega
Prepared by: Elissa Silva / B., P. & E.D. / 916-651-4104
8/27/24 12:20:39
**** END ****
SENATE THIRD READING
STR Bill Id:SB 778
Author:(Ochoa Bogh)
As Amended Ver:August 19, 2024
Majority vote
SUMMARY
Revises provisions in the Dig Safe Act related to operator (i.e., the utility or other entity that owns and maintains underground infrastructure) and excavator (i.e., the company doing the digging) responsibilities when preparing for, and conducting excavations, as well as broadens the criteria for Governor appointments to the California Underground Safety Board (Board).
Major Provisions
COMMENTS
The Legislature passed the Dig Safe Act of 2016 (Act) to enhance the safety of excavations. (See SB 661 (Hill), Chapter 809, Statutes of 2016.) The Act created the Safe Excavation Board, now located within the Office of Energy Infrastructure Safety (OEIS) at the Natural Resources Agency, of appointed excavation stakeholders, funded through fees on "operators," that is, the entities, such as utilities and telecommunications companies that own underground infrastructure. The purpose of SB 661 was to update California's excavation safety laws and practices and establish a centralized authority to enforce those laws. The Board is charged with investigating accidents, developing excavation safety standards, and coordinating education and outreach programs.
The law requires excavators to contact the local Regional Notification Center prior to beginning work. Once the excavator notifies the appropriate Regional Notification Center – there are two such centers, one in northern and one in southern California – the operator is then tasked with going to the construction site to locate and field mark the location of all subsurface installations.
Existing law requires excavators to continuously request new markings if a project goes on for a prolonged period. Similarly, if the markings are not properly visible, an excavator must cease work, notify the Regional Notification Center and request new markings. The state may impose civil penalties not to exceed $100,000 if an excavator or operator willfully violates existing law related to subsurface installation resulting in the escape of flammable, toxic, or corrosive gas or liquid. This bill proposes various clarifying and technical changes to the Dig Safe Act, largely driven by recent Board regulations or stakeholder discussions.
According to the Author
According to the author, "The state's Call Before You Dig Law serves a dual purpose: to protect the people working around potentially dangerous underground lines and protect the utility lines themselves. In its simplest explanation, the law requires excavators to contact a notification center and disclose their intent to dig. The notification center in turn notifies the utility operators who might have infrastructure in the area. Operators with underground infrastructure near the excavation site are required to locate and mark them using paint or flags within two days of receiving notification. The provisions contained in SB 778 originated from the California Common Ground Alliance (CCGA), which identified several shortcomings in California's 811 law. These are the functional and clarifying issues addressed in SB 778. In short, all of the changes contained in SB 778 are clarifications and codifications of either existing law, existing regulations, or existing practice."
Arguments in Support
This bill is supported by both Regional Notification Centers – USA North 811 and DigAlert – as well as by the Southern California Contractors Association. USA North 811 notes this measure is "a consensus-driven bill that proposes several technical changes" to the Dig Safe Act, and is a "well-thought-out proposal."
Arguments in Opposition
None on file.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill will result in minor costs to OEIS, if any.
VOTES
SENATE FLOOR: 40-0-0
YES: Allen, Alvarado-Gil, Archuleta, Ashby, Atkins, Becker, Blakespear, Bradford, Caballero, Cortese, Dahle, Dodd, Durazo, Eggman, Glazer, Gonzalez, Grove, Hurtado, Jones, Laird, Limón, McGuire, Menjivar, Min, Newman, Nguyen, Niello, Ochoa Bogh, Padilla, Portantino, Roth, Rubio, Seyarto, Skinner, Smallwood-Cuevas, Stern, Umberg, Wahab, Wiener, Wilk
ASM UTILITIES AND ENERGY: 15-0-1
YES: Petrie-Norris, Bauer-Kahan, Calderon, Chen, Friedman, Hart, Holden, Joe Patterson, Reyes, Santiago, Schiavo, Ting, Wallis, Wood, Zbur
ABS, ABST OR NV: Jim Patterson
ASM APPROPRIATIONS: 11-0-4
YES: Wicks, Arambula, Bryan, Calderon, Wendy Carrillo, Mike Fong, Grayson, Haney, Hart, Pellerin, Villapudua
ABS, ABST OR NV: Sanchez, Dixon, Jim Patterson, Ta
UPDATED
VERSION: August 19, 2024
CONSULTANT: Laura Shybut / U. & E. / (916) 319-2083 FN: 0004074
Date of Hearing: August 7, 2024
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
SBPCA Bill Id:SB 778
Author:(Ochoa Bogh) – As Amended Ver:July 3, 2024
Policy Committee: | Utilities and Energy | Vote: | 15 - 0 |
|
| ||
|
|
Urgency: No State Mandated Local Program: Yes Reimbursable: No
SUMMARY:
This bill makes numerous revisions to the provisions of the Dig Safe Act related to the operator (meaning the utility or other entity that owns and maintains underground infrastructure) and the excavator (meaning the company doing the digging) when preparing for and conducting excavations. The bill also broadens the criteria for the Governor’s appointments to the California Underground Safety Board (Board).
Relative to the fiscal effect, this bill requires the Board, instead of regional notification centers, to compile an annual report of incident events.
FISCAL EFFECT:
This bill will result in new work at the Office of Energy Infrastructure Safety (OEIS) to compile an annual report on dig-in incident events. OEIS anticipates needing one research data specialist, as a cost of $169,000 annually ongoing, to analyze data, develop data models and coordinate with the California Regional Common Ground Alliance (CARCGA) on data acceptance and transfer, development of data policies and procedures, and standardization of data (Safe Energy Infrastructure and Excavation Fund).
COMMENTS:
- Purpose. The author intends this bill to codify recommendations from CARCGA, a membership organization made up of professionals who, in a wide variety of ways, interact with underground utility infrastructure. According to the author, CARCGA “identified several shortcomings in California’s 811 law” and all the changes to existing law in SB 778 “are clarifications and codifications of either existing law, existing regulations or existing practice.”
- Background. The Legislature passed the Dig Safe Act of 2016 (Act) to enhance the safety of excavations. (See SB 661 (Hill), Chapter 809, Statutes of 2016.) The Act created the Safe Excavation Board, now located within OEIS at the Natural Resources Agency, of appointed excavation stakeholders, funded through fees on “operators,” that is, the entities, such as utilities and telecommunications companies, that own underground infrastructure. The Act also established California’s Regional Notification Center System to ensure excavators are properly apprised of the location of critical infrastructure.
The law requires excavators to contact the local Regional Notification Center prior to beginning work. Once the excavator notifies the appropriate Regional Notification Center—there are two such centers, the Underground Service Alert of Northern California and Nevada, also known as USA North 811, and Underground Service Alert of Southern California, also known as DigAlert—the operator is then tasked with going to the construction site to locate and field mark the location of all subsurface installations.
Existing law requires excavators to continuously request new markings if a project goes on for a prolonged period. Similarly, if the markings are not properly visible, an excavator must cease work, notify the Regional Notification Center and request new markings. The state may impose civil penalties not to exceed $100,000 if an excavator or operator willfully violates existing law related to subsurface installation resulting in the escape of flammable, toxic or corrosive gas or liquid.
This bill is supported by both Regional Notification Centers—USA North 811 and DigAlert—as well as by the Southern California Contractors Association. There is no opposition to this bill.
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: July 1, 2024
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
SBPCA Bill Id:SB 778
Author:(Ochoa Bogh) – As Amended Ver:June 15, 2023
SENATE VOTE: 40-0
SUBJECT: Excavations: subsurface installations
SUMMARY: Revises provisions in the Dig Safe Act related to operator (i.e., the utilities that own and maintain underground infrastructure) and excavator (i.e., the companies doing the digging) responsibilities when preparing for, and conducting excavations, as well as broadens the criteria for Governor appointments to the California Underground Safety Board (Board). Specifically, this bill:
- Revises the definition of “legal excavation start date and time” to specify that an excavation may begin before the required two days if the excavator has received a response from all known operators, as specified. Revises the definition of “working day” by striking the reference to 7:00 a.m.-5:00 p.m.
- Revises the operator’s discretion to choose to not locate and field mark an area to be excavated if the area delineated does not match the ticket description and further requires the operator to contact the excavator to advise of the discrepancy and provide an “electronic positive response” (EPR). Prohibits an excavator from beginning an excavation without an EPR, or has otherwise confirmed response directly from all operators listed on the ticket, as specified, and changes the EPR to all installations that are listed on the ticket, instead of the delineated boundaries of the proposed area of the excavation.
- Requires an excavator to contact the regional notification center to request a return trip for a number of specified reasons. Requires a return trip to occur within one business day, or on a mutually agreed-upon and documented date when the excavator cannot find the utility or standby observation required and within two working days when the EPR indicates a resend, as specified.
- Provides requirements regarding operator representatives being onsite to monitor excavation activity, as specified.
- Restates existing excavator and operator protocols around excavation specific to pavement grinding.
- Establishes new requirements for excavator use of vacuum excavation devices, including requiring that the vacuum device is “purpose-built” for excavation, and requires the excavator to inform the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket, as specified. Establishes that an operator not agreeing to use vacuum excavation must include that information on the EPR, and failure of the operator to do so will automatically grant permission to the excavator to use the vacuum device.
- Recasts various provisions of existing law regarding notification of 9-1-1 emergency services when an excavator discovers or causes excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property. Requires an excavator discovering or causing any damage to a subsurface installation that causes immediate threat to notify the subsurface installation operator immediately, and to notify the Board of the damage within two hours.
- Specifies immediate notification to the operator and a two-day notification window to the regional notification center if the excavator discovers or causes damage to a subsurface installation that does not immediately endanger life or cause serious bodily harm or damage property.
- Deletes the Board’s authority to impose more restrictive notification windows for damages to subsurface installations.
- Requires a local agency that chooses to recover costs for providing locate and mark services of a subsurface installation via a fee to consider whether the fee could deter an excavator from contracting the regional notification center. Requires a local agency to consider recouping its costs via existing permit fees instead of a separate fee; requires a local agency to consider not charging a fee to an excavator on private property, as specified.
- Requires the Board, instead of regional notification centers, to compile an annual report of incident events, and requires the California Regional Common Ground Alliance to provide statewide information to the Board by April 15 of each year.
- Adds a definition of “approximate location” to mean a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation and does not mean depth.
- Broadens the requirements involving three of the Governor’s appointments to the Board.
- Makes other technical and clarifying changes.
EXISTING LAW:
- Establishes the Board within the Office of Energy Infrastructure Safety (OEIS) to coordinate education and outreach activities that encourage safe excavation practices, along with developing standards and investigating violations, as specified. (Government Code § 4216.12)
- Defines the following:
- “Active subsurface installation” to mean a subsurface installation currently in use or currently carrying service;
- “Delineate” to mean to mark in white the location or path of the proposed excavation using specified guidelines, and also includes the physical identification of the area to be excavated using alternative marking methods, as specified;
- “Electronic positive response” to mean an electronic response from an operator to the regional notification center providing the status of an operator’s statutorily required response to a ticket.
- “Excavation” to mean any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, auguring, tunneling, scraping, cable or pipe plowing and driving, or any other way.
- “Legal excavation start date and time” to mean two working days, not including the date of notification, unless the excavator specifies a later date and time, which cannot be more than six months from the date of notification.
- “Subsurface installation” to mean any underground pipeline, conduit, duct, wire, or other structure, except non-pressurized sewer lines, non-pressurized storm drains, or other non-pressurized drain lines (Government Code § 4216(a)(d)(e)(g)(k)(l))
- Requires every operator of a subsurface installation, except the Department of Transportation (Caltrans), to become a member of, participate in, and share in the costs of a regional notification center, as specified. (Government Code § 4216.1(a))
- Requires an excavator planning to conduct an excavation to delineate the area to be excavated before notifying the appropriate regional notification center, and if the area is not delineated, an operator may, at its own discretion, choose not to locate and field mark until the area to be excavated has been delineated. (Government Code § 4216.2(a))
- Prohibits, unless an emergency exists, an excavator from beginning an excavation until the excavator receives a response from all known operators of subsurface installations, as specified, and until the completion of any required onsite meeting. (Government Code § 4216.2(g))
- Allows an excavator to use a vacuum excavation device to expose subsurface installations within the tolerance zone if the operator has marked the subsurface installation, the excavator has contacted any operator whose subsurface installations may be in conflict with the excavation, and the operator has agreed to the use of a vacuum excavation device. (Government Code § 4216.4(a)(2)(A))
- Requires an excavator discovering or causing damage to a subsurface installation, including, all breaks, leaks, nicks, dents, gouges, grooves, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, to immediately notify the subsurface installation operator, as specified. (Government Code § 4216.4(3)(c))
- Requires each excavator, operator, or locator to communicate with each other and respect the appropriate safety requirements and ongoing activities of the parties, if known, at an excavation site. (Government Code § 4216.4(4)(d))
- Requires the provisions of the Dig Safe Act to apply to state agencies and local agencies, except Caltrans, and authorizes a local agency to charge a fee in an amount sufficient to recover the cost of providing the services. (Government Code § 4216.5(a))
- Requires statewide information provided by operators and excavators regarding incident events reported by excavators and operators be compiled and made available in an annual report by regional notification centers and posted on the internet website of the board. (Government Code § 4216.6(g))
FISCAL EFFECT: According to the Senate Committee on Appropriations, this bill will result in ongoing, annual costs of $154,000 for additional staff at OEIS.
BACKGROUND:
8-1-1 and Underground Safety – Much of California’s essential services travel through underground infrastructure, such as water mains, conduit carrying telecommunications cabling or electric lines, or natural gas or oil pipelines. Many California industries work beside this underground infrastructure, from the utilities themselves doing maintenance or installation work, to landscapers, construction companies, homeowners, or farmers. As a result, the potential for these various workers to strike underground infrastructure poses a unique and ever-present safety risk.
To minimize the chance of striking underground infrastructure, a calling system was established around the 8-1-1 “Call Before You Dig” phone number.[1] Excavators – the landscapers, farmers, homeowners – call 8-1-1 before beginning work. The 8-1-1 call is routed to the nearest “one-call center,”[2] a nonprofit association providing operators – i.e., the utilities that own and maintain the underground infrastructure – information about the excavator’s planned dig site. The one-call center assigns a “ticket” to the excavator’s information. The one-call center then communicates the ticket information to the appropriate operators, sometimes multiple operators, with known infrastructure in the planned dig area. Statute prohibits one-call centers from charging excavators a fee for obtaining a ticket.[3]
Once operators receive a ticket, they have two working days,[4] not including the date of notification, to visit the excavation site and mark the areas above underground infrastructure, in a process known as “locate and mark.” After the operator locate and mark occurs, the excavator is able to commence digging but must maintain a tolerance zone[5] around the marked underground infrastructure.
A “dig-in” occurs when an excavator strikes underground utility infrastructure. Dig-ins can result in fatalities and injuries – such as the explosions in November 2015 in Bakersfield, California[6] and in July 2019 in Murrieta, California[7] – as well as property damage, environmental damage, significant cost, and fire. Any error in the 8-1-1 chain could result in a dig-in, from the excavator never calling 8-1-1, to the operator never marking or incorrectly marking the area.
Excavation near underground facilities is a persistent threat to utilities, contractors, farmers, and homeowners. Despite the presence and availability of the one-call centers and 8-1-1 resources, dig-ins continue to damage underground infrastructure, leave residents without vital utility service, and put workers and civilians at risk. The causes for excavation damage are varied and may arise from any break in the 8-1-1 chain. Many excavators still fail to call 8-1-1 ahead of their project, meaning they embark on an excavation project without any markings to indicate the location of underground facilities. This failure to call may be due to lack of information about the 8-1-1 service, or due to the excavator thinking their project does not necessitate a call. Even if 8-1-1 is called, operators may still fail to respond promptly to the excavator’s ticket. Operators who do respond may incorrectly mark underground facilities, either due to their own error or because they were relying on records that are obsolete or inaccurate.
Although the causes are varied, the common thread in excavation incidents is a lack of communication between parties along the 8-1-1 chain. Legislative efforts to limit the risk in the 8-1-1 system established statutory liability provisions centered on enforcement.[8] In response to the disparity between liability and safety in the dig space, as well as the lack of a single authority coordinating education and outreach surrounding safe excavation practices, the Legislature adopted SB 661 (Hill, Chapter 809, Statutes of 2016) in 2016. SB 661 established the “Dig Safe Act” and the Board to regulate the Act. The purpose of SB 661 was to update California’s excavation safety laws and practices and establish the centralized authority to enforce those laws. The Board, under OEIS, is charged with investigating accidents, developing excavation safety standards, and coordinating education and outreach programs.
COMMENTS:
- Author’s Statement. According to the author, “The state’s Call Before You Dig Law serves a dual purpose: to protect the people working around potentially dangerous underground lines and protect the utility lines themselves. In its simplest explanation, the law requires excavators to contact a notification center and disclose their intent to dig. The notification center in turn notifies the utility operators who might have infrastructure in the area. Operators with underground infrastructure near the excavation site are required to locate and mark them using paint or flags within two days of receiving notification. The provisions contained in SB 778 originated from the California Common Ground Alliance (CCGA), which identified several shortcomings in California’s 811 law. These are the functional and clarifying issues addressed in SB 778. In short, all of the changes contained in SB 778 are clarifications and codifications of either existing law, existing regulations, or existing practice.”
- Technical Solutions. This bill proposes various clarifying and technical changes to the Dig Safe Act, largely driven by recent Board regulations or stakeholder discussions. Most changes are modest and helpful. However a few proposed changes establish circular statutory references, restate existing law for specific use cases that seem to duplicate rather than clarify, or inadvertently remove existing safety protections. As discussed with this committee, these technical issues are counter to the author’s intent. As such, the author and committee may wish to provide technical amendments that address these provisions, including: reverting the definition of “legal excavation start date and time” in § 4216(l) to existing law; subsequently specifying that an excavator may begin excavation prior to the legal excavation start date and time if certain conditions are met; maintaining existing law regarding an operator’s discretion to not locate and field mark in § 4216.2(a) but clarifying that the operator is obligated to contact the excavator if the operator has any confusion regarding the excavation area; rephrasing amendments in § 4216.2(g) to tie excavation to the operator’s response and not solely the receipt of an EPR; and striking § 4216.2(j), § 4216.2(l) and § 4216.3(a)(1)(D).
- Vacuuming Allowances. Vacuum excavation is a technique that utilizes high-pressure water to dig into the ground, break up the material, and then suction up the debris to be removed from the excavation hole. For any excavation within the tolerance zone (meaning 24 inches on either side of the operator’s marking) of a subsurface installation, the excavator is directed to use hand tools to determine the exact location of the subsurface installation. The aim is to avoid accidental underground line damage from a power tool.
Current law also allows the use of a vacuum excavation device in the tolerance zone under limited circumstances: 1) the operator has marked the subsurface installation and the excavator has contacted all subsurface installation operators in the area; 2) the operators agree to the use of a vacuum excavation device; and, 3) the excavator notifies the regional notification center of the desire to use a vacuum excavation device at the time of requesting a ticket for marking an excavation site.
This bill aims to enhance the safety measures when a vacuum device is being utilized during an excavation, by ensuring that the equipment used is appropriate. However, this bill creates a new requirement on the operators to determine what devices would be appropriate, or “purpose-built.” It is not clear how operators would determine the intent behind a product’s design, or whether operators across the various utility sectors would consistently agree to certain products’ usage. This could create a scenario where some operators agree to some vacuum device usage, while other operators do not, creating a hodge-podge approval landscape and sowing confusion amongst excavators. The author notes the intent behind these statutory changes is to create a baseline standard for what is considered appropriate vacuum devices, given anecdotal instances where improper use of vacuum equipment and untrained personnel have led to unsafe excavations and potential damage. Yet, if a baseline standard for safe vacuum devices is the goal, it may be more appropriate to have the Board adopt regulations to that effect.
Additionally, this bill would require that if an operator does not agree to the use of vacuum equipment that they shall include that information on the EPR back to the excavator. Yet the bill goes a step further and grants permission to excavators to use vacuum devices if the operator fails to respond on the EPR to the request for these devices’ usage. There are various reasons an operator may not respond to a request for usage of a vacuum device, simplest amongst them is that the operator did not see the request listed on the 8-1-1 ticket; a ticket which is often busy with other information the operator may be more focused on, such as the excavation area. Moreover, it seems discordant to limit vacuum device types due to safety concerns around their inappropriate usage in one part of this bill, while granting universal permission to their usage due to a lack of operator response in another part of this bill. As such, the author and committee may wish to consider amendments that strike the requirement that vacuum excavation equipment be “designed, engineered, and purpose-built.” Further, the author and committee may wish to strike the presumption of permission granted to excavators for vacuum device use.
- Prior Legislation.
SB 1345 (Ochoa Bogh, 2022) sought to revise provisions in the Dig Safe Act related to operator and excavator responsibilities when preparing for and conducting excavations, add non-pressurized sewer lines and storm drains to the definition of a “subsurface installation,” and require the California Department of Transportation (CalTrans) to comply with the requirements of the Dig Safe Act beginning January 1, 2025. Status: Held in the Senate Committee on Appropriations.
SB 297 (Durazo) increased penalties for operators or excavators who cause damage to a gas or hazardous liquid pipeline subsurface installation that results in the escape of any flammable, toxic or corrosive gas or liquid, as specified. Status: Chapter 726, Statutes of 2021.
SB 895 (Hill) made a number of changes to the Dig Safe Act of 2016 including: requiring new subsurface installations be mapped using geographic information systems, as specified; renaming the California Underground Facilities Safe Excavation Board as the “Dig Safe Board”; moving the Board from the Office of the State Fire Marshall to OEIS; and requiring an excavator to notify the Regional Notification Center within 48 hours of discovering or causing damage, among other things. Status: Chapter 307, Statues of 2020.
SB 1198 (Durazo, 2020) would have increased penalties for contractors who cause damage to subsurface installations for failing to provide notice for a gas corporation to locate its subsurface installations, as specified; placed new requirements on gas corporations by the California Public Utilities Commission (CPUC); required the CPUC to review and publish specified safety plans of gas corporations no later than June 30, 2021; and, required gas corporations to establish formal training for workers. Status: This bill was never heard in a policy committee of the Legislature.
AB 1166 (Levine) required every operator of subsurface installations to supply an electronic positive response through a regional notification center before the legal excavation start date, as specified. Status: Chapter 453, Statutes of 2019.
AB 1914 (Flora) authorized an excavator to use power-operated or boring equipment prior to determining the exact location of a subsurface facility, as specified. Status: Chapter 708, Statutes of 2018.
SB 92 (Committee on Budget and Fiscal Review) among other changes to the Budget Act of 2017, clarified the intent and requirements for an “area of continual excavation,” extends the dates by which the Board is required to complete their regulations and begin enforcement, from November 2017 to July 2020, and makes other technical changes. Status: Chapter 26, Statutes of 2017.
SB 661 (Hill) enacted the Dig Safe Act of 2016 to modify laws governing excavations near subsurface installations. Status: Chapter 809, Statutes of 2016.
SB 119 (Hill, 2015) would have modified “call before you dig” laws governing excavations near underground pipelines, conduit, duct, wire, or other structures (collectively known as subsurface installations). Among other things, this bill would have enhanced the existing enforcement powers of specified state entities, revised liability provisions that apply to the pre-excavation notification and subsurface installation marking requirements for operators and excavators, and would have established the California Underground Facilities Safe Excavation Advisory Committee to coordinate education and outreach, develop standards, and investigate violations of laws pertaining to excavation. Status: Vetoed by Governor Brown.
REGISTERED SUPPORT / OPPOSITION:
Support
Southern California Contractors Association
Underground Service Alert of Northern California and Nevada (USA North)
Underground Service Alert of Southern California
Opposition
None on file.
Analysis Prepared by: Laura Shybut / U. & E. / (916) 319-2083
Created in March 2005 by the FCC; https://docs.fcc.gov/public/attachments/DOC-257293A1.pdf ↑
Also known as a “regional notification center”. In California there are two : the Underground Service Alert-North (USA North) and Underground Service Alert South (DigAlert) ↑
Government Code §4216.1 ↑
Government Code §4216(l) ↑
Statute maintains 24 inches as the tolerance zone; Government Code §4216(u) ↑
https://www.bakersfield.com/news/one-dead-and-three-injured-in-pg-e-natural-gas-line-explosion-southwest-of-bakersfield/article_98f3c442-fef3-541a-a2d6-fc77f6e22b00.html ↑
https://www.nbclosangeles.com/news/local/SoCal-Gas-Technician-Killed-in-Explosion--512805811.html ↑
Government Code §4216.7 ↑
SENATE RULES COMMITTEE Office of Senate Floor Analyses (916) 651-1520 Fax: (916) 327-4478 | SB 778 |
THIRD READING
Bill No: SB 778
Author: Ochoa Bogh (R)
Amended: 5/1/23
Vote: 21
SENATE BUS., PROF. & ECON. DEV. COMMITTEE: 12-0, 4/10/23
AYES: Roth, Nguyen, Archuleta, Ashby, Becker, Dodd, Eggman, Glazer, Niello, Smallwood-Cuevas, Wahab, Wilk
NO VOTE RECORDED: Alvarado-Gil
SENATE GOVERNANCE & FIN. COMMITTEE: 8-0, 4/26/23
AYES: Caballero, Seyarto, Blakespear, Dahle, Durazo, Glazer, Skinner, Wiener
SENATE APPROPRIATIONS COMMITTEE: 7-0, 5/18/23
AYES: Portantino, Jones, Ashby, Bradford, Seyarto, Wahab, Wiener
SUBJECT: Excavations: subsurface installations
SOURCE: Underground Service Alert of Southern California
DIGEST:
This bill revises provisions in the Dig Safe Act related to operator and excavator responsibilities when preparing for, and conducting excavations.
ANALYSIS: Existing law establishes the Dig Safe Board/Underground Safety Board (Board) within the Office of Energy Infrastructure Safety to coordinate education and outreach activities that encourage safe excavation practices, along with developing standards and investigating violations, as specified. (Government Code (GC) § 4216.12)
This bill:
- Revises the definition of “legal excavation start date and time” to specify that it does not include weekends of holidays, and clarifies in the definition that an excavation may begin before two days if the excavator has received a response from all known operators, as specified. Revises the definition of “working day” by striking the reference to 7:00 a.m.-5:00 p.m.
- Revises the operator’s discretion to choose to not locate and field mark an area to be excavated if the area delineated does not match the ticket description and further requires the operator to contact the excavator to advise of the discrepancy and provide an “electronic positive response” (EPR). Prohibits an excavator from beginning an excavation without an EPR, or has otherwise confirmed response directly from all operators listed on the ticket, as specified, and changes the EPR to all installations that are listed on the ticket, instead of the delineated boundaries of the proposed area of the excavation.
- Requires an excavator to contact the regional notification center to request a return trip for a number of specified reasons. Requires a return trip to occur within one business day, or on a mutually agreed-upon and documented date when the excavator cannot find the utility or standby observation required and within two working days when the EPR indicates a resend, as specified.
- Specifies that if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, the operator may choose to locate and field mark, or provide information on the location of subsurface installations known to be embedded in the pavement, or provide information on the location of subsurface installations known to be below the pavement, unless specified exemptions apply.
- Revises the requirements for an excavator to use an excavation device, requires the excavator to inform the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket, as specified, and requires an operator not agreeing to use vacuum excavation to include that information on the EPR. Establishes specified requirements for an excavator to use vacuum equipment to expose subsurface installations within the tolerance zone.
- Requires an excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid to make specified notifications. Requires an excavator discovering or causing any damage to a subsurface installation, as specified, to notify the subsurface installation operator within one hour, and states that an excavator who discovers any damage to a subsurface installation is not required to notify the Board of the damage.
- Deletes the Board’s authority to impose more restrictive notification windows for damages to subsurface installations.
- Requires a local agency that chooses to recover costs for providing locate and mark services of a subsurface installation via a fee to consider whether the fee could deter an excavator from contracting the regional notification center. Requires a local agency to consider recouping its costs via existing permit fees instead of a separate fee; requires a local agency to consider not charging a fee to an excavator on private property, as specified.
- Requires the Board, instead of regional notification centers, to compile an annual report of incident events, and requires the California Regional Common Ground Alliance to provide statewide information to the Board by April 15 of each year.
- Adds a definition of “approximate location” to mean a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation and does not mean depth.
- Makes other technical and clarifying changes.
Background
The Board, under the office of Energy Infrastructure Safety, (formally under the Office of the State Fire Marshall) is charged with investigating accidents, developing excavation safety standards, and coordinating education and outreach programs.
Current law requires an individual or entity wishing to perform an excavation where they will dig, drill, or bore below the ground to inform the regional notification center of the planned excavation so owners of underground facilities such as gas lines, sewer lines, water mains or communication cables in the area can mark their facilities and prevent excavators from damaging their property. Damage to underground structures may result in the disruption of essential services and poses potential safety hazards to workers, the public, and the environment.
Once an excavator contacts a regional notification center, then one or more utility operators are notified to mark the location of their subsurface installations (underground facilities) with paint, flags, or by other means. According to information on the USA North 811 regional notification center website, the regional center receives over 110,000 ticket requests per month. This bill will update and revise a number of actions and requirements for operators and excavators prior to, and in the process of carrying out an excavation, and in those instances if an emergency occurs.
There are two regional notification centers that serve California, the Underground Service Alert of Northern California and Nevada, also known as USA North 811; and, Underground Service Alert of Southern California, also known as DigAlert. Collectively, the two centers are commonly referred to as 811 centers. GC §§ 4216-4216.9 requires anyone planning to excavate to contact the appropriate regional notification center at least two working days (but not more than 14 calendar days) before beginning to excavate. Under current practices, and due to the current definition of “legal excavation start date and time,” there is a requirement for a two-day period after notification to a regional center for an excavation to begin. This bill will would revise that definition to specify that two working days does not include holidays and weekends. Further, the definition attempts to reflect that if an excavator receives notice before the two days that the area for excavation has been marked by all known operators, the excavation may commence prior to the two-day period ending.
Current law (GC § 4216.2(a)) requires an excavator who is planning to conduct an excavation, to delineate the area that will be excavated, prior to notifying the regional notification center. The reason to delineate the excavation site first is to determine whom the appropriate operators are who will need to be contacted to locate and mark potential subsurface installations. However, current law also allows operators to withhold marking or locating an area if the excavator has not identified the boundaries of the excavation site. This bill seeks to ensure that all areas of a potential excavation are properly marked and delineated prior to notifying the regional center. This bill would allow an operator to choose not to locate and field mark if the delineated area does not match the ticket description, until the delineated area and ticket description match. Further, this bill would require the operator to notify the excavator of the discrepancy and provide the EPR.
Currently, individuals operating on private property are exempt from certain provisions of the Dig Safe Act. However, they are not prohibited from notifying regional centers of any intent to excavate on their private property. Instead, it is encouraged for private property owners to notify regional centers and have the appropriate operators mark their subsurface installations in order to ensure public safety. While this bill would delete an operator’s ability to not mark and locate the subsurface installations in an area that has not been outlined by the excavator, this bill would add that provision to private property owner exemptions to encourage participation.
An operator of a subsurface installation has the responsibility to do one of three things in response to receiving a ticket from the regional notification center that an excavation is planned in area where they may have a subsurface installation: 1) locate and mark the operator’s subsurface installations with paint, flags, or other markings; 2) provide the excavator information, such as maps, to assist the excavator with finding the subsurface installation; or, 3) notify the excavator that the operator has no subsurface installations in the proposed area of excavation. This operator response is known as “positive response.” AB 1166 (Levine, Chapter, Statutes of 2019), changed existing law to require every operator of subsurface installations to supply an electronic positive response through a regional notification center before the legal excavation start date. This bill adds clarifying language to require the electronic positive response prior to beginning an excavation for all areas listed on the ticket.
This bill aims to codify that practice and establishes the parameters for when an excavator is required to contact a regional notification center to request a return trip and establishes the timeframes in which the operator must complete the return trip (within one to two business days) depending on the reason requested for the return trip. In addition, this bill specifies the requirements for both an operator and excavator to comply with if an operator requires a representative to be on site for an excavation to monitor the activity.
A vacuum excavation is an excavation technique that utilizes high-pressure water to dig into the ground, break up the material, and then suction up the debris to be removed from the excavation hole. For any excavation within the tolerance zone of a subsurface installation (meaning 24 inches on either side), the excavator is authorized to use only a hand tool to determine the exact location of the subsurface installation. The aim is to avoid accidental underground line damage from a power tool. The tolerance zone is a defined as an area, which is 24 inches on each side of the field marking placed by the operator. This bill aims to enhance the safety measures when a vacuum device is being utilized during an excavation, by ensuring that only trained personnel use vacuum equipment and that the equipment used is appropriate for a vacuum excavation. Further, this bill would require that if an operator has any requirements for the use of vacuum equipment, those requirements are provided by the operator prior to the excavation or the operator must furnish an observer. In addition, the excavator must notify the regional center of their intent to use a vacuum device during the excavation at the time of requesting a ticket. If an operator does not agree to the use of vacuum equipment, this bill would require the information be provided in the EPR.
Emergency response in the event an excavator damages a subsurface installation is critical to mitigate the potential for a catastrophic disaster or other minor disrupting events, such as water leaks or power outages. Existing law provides the steps that an excavator must take when an excavator causes or discovers damage to a subsurface installation (GC § 4216.4(c)(1)). An excavator is only required to call 911 is when a gas or hazardous subsurface installation is damaged and results in the escape of any flammable, toxic, or corrosive gas or liquid or if they damage a high priority subsurface installation which include specified high pressure natural gas pipelines. The Board has the oversight authority to take enforcement actions against those excavators who fail to provide the appropriate incident information. This bill codifies a number of the Board’s current regulations, and includes very prescriptive requirements in statute for an excavator to follow if a situation arises in which damage to a subsurface installation occurs-depending on the damage and the type of subsurface installation affected. This bill delineates the steps an excavator must take in reporting incidents when the incident may cause serious or deadly injuries or damage to property and in those instances when there is no immediate danger.
Local governments must comply with the requirements to locate and mark their subsurface installations when notified of a pending excavation in an area, which may affect their underground facilities. Per GC § 4216.5, a local agency which provides those services is authorized to charge a fee to recover the costs for the agency associated with locating and marking a site. This bill would add requirements for local governments to consider their costs and when determining whether to charge a fee for providing those services. There are some concerns that local governments charging fees to excavators could deter individuals, including private property homeowners, from reporting potential excavations and following the law due to concerns with costs. This bill requires local governments to consider whether or not there are other appropriate means to recover costs and to consider the potential scenario where the fee deters compliance.
Current law requires statewide information on reports from operators and excavators regarding incidents whereby underground installations are damaged or hit, to be compiled in an annual report. Currently, the regional notification centers are responsible for compiling and posting this data. An incident event includes damages, near misses and other violations of the Dig Safe Act. Stakeholders voluntarily provide this statewide information.
Instead of regional notification centers compiling the annual report of incident events, this bill would require the Board to compile and post the annual report related to incident data, and further require the California Regional Common Ground Alliance to provide the statewide data to the Board for use in the annual report by April 15 of each year.
FISCAL EFFECT: Appropriation: No Fiscal Com.: Yes Local: Yes
According to the Senate Appropriations Committee, “the Office of Energy Infrastructure Safety (OEIS) reports ongoing annual costs of $154,000 beginning Fiscal Year 2024-25 for an additional staff to coordinate with the California Regional Common Ground Alliance to accept and transfer data, perform data analysis, and compile the annual report on incident events (Safe Energy Infrastructure and Excavation Fund).”
SUPPORT: (Verified 5/18/23)
Underground Service Alert of Southern California (source)Southern California Contractors Association
Underground Service Alert of Northern California and Nevada
OPPOSITION: (Verified 5/18/23)
None received
ARGUMENTS IN SUPPORT: Supporters note that this bill makes a number of technical changes that providing clarifying changes to the Call Before You Dig Law.
Prepared by: Elissa Silva / B., P. & E.D. / 916-651-4104
5/20/23 13:09:31
SENATE COMMITTEE ON
Senator Anthony Portantino, Chair
2023 - 2024 Regular Session
SB 778 (Ochoa Bogh) - Excavations: subsurface installations
Version: | Policy Vote: |
Urgency: | Mandate: |
Hearing Date: | Consultant: |
Bill Summary:
SB 778 revises provisions in the Dig Safe Act related to operator and excavator responsibilities when preparing for, and conducting excavations.
Fiscal Impact:
The Office of Energy Infrastructure Safety (OEIS) reports ongoing annual costs of $154,000 beginning Fiscal Year 2024-25 for an additional staff to coordinate with the California Regional Common Ground Alliance to accept and transfer data, perform data analysis, and compile the annual report on incident events (Safe Energy Infrastructure and Excavation Fund).
Background:
SB 661 (Hill, Chapter 809, Statutes of 2016) established the “Dig Safe Act” and the Underground Safety Board (Board). The purpose of SB 661 was to update California’s excavation safety laws and practices and establish the centralized authority to enforce those laws. The Board under the OEIS, (formally under the Office of the State Fire Marshall) is charged with investigating accidents, developing excavation safety standards, and coordinating education and outreach programs.
Current law requires an individual or entity wishing to perform an excavation where they will dig, drill, or bore below the ground to inform a regional notification center of the planned excavation so owners of underground facilities such as gas lines, sewer lines, water mains or communication cables in the area can mark their facilities and prevent excavators from damaging their property. Once an excavator contacts a regional notification center, then one or more utility operators are notified to mark the location of their subsurface installations (underground facilities) with paint, flags, or by other means.
There are two regional notification centers that serve California, the Underground Service Alert of Northern California and Nevada, also known as USA North 811; and, Underground Service Alert of Southern California, also known as DigAlert. Collectively, the two centers are commonly referred to as 811 centers. A regional notification center is an association of owners and operators of subsurface installations (water, gas, electric, telephone, sewer, oil lines, etc.).
Proposed Law:
- Revises the definition of “legal excavation start date and time” to specify that it does not include weekends of holidays, and clarifies in the definition that an excavation may begin before two days if the excavator has received a response from all known operators, as specified.
- Revises the definition of “working day” for purposes of determining a legal excavation start date and time by striking the reference to 7:00 a.m. to 5:00 p.m.
- Revises the operator’s discretion to choose to not locate and field mark an area to be excavated by specifying that if the area delineated does not match the ticket description, the operator can choose to wait until the area delineated and ticket description match. Requires the operator to contact the excavator to advise of the discrepancy provide an “electronic positive response” (EPR).
- Authorizes an operator, at the operator’s discretion, to choose not to locate and field mark until the area has been delineated in circumstances which are not emergencies where owners of real property, as defined, or licensed contractors or subcontractors working on that property, are planning to conduct an excavation on the private property that does not require an excavation permit, as specified.
- Prohibits an excavator from beginning an excavation without an EPR, or has otherwise confirmed response directly from all operators listed on the ticket, as specified, and changes the EPR to all installations that are listed on the ticket, instead of the delineated boundaries of the proposed area of the excavation.
- Requires an excavator to contact the regional notification center to request a return trip for any of the following reasons:
- The excavator was unable to find the utility based on the markings an operator has placed.
- Standby observation of the excavation activities, including but not limited to, high priority installations and postevent restorations.
- The EPR indicates a resend ticket is requested by the excavator for reasons including but not limited to, incorrect location information, no access to the locate and filed mark area, the excavation area is not delineated, or the delineated area does not match the location request
- Requires a return trip to occur within one business day or on a mutually agreed-upon and documented date when the excavator cannot find the utility or standby observation required, and within two working days when the EPR indicates a resend.
- Requires an operator to notify the excavator during or before the onsite field meeting if the operator requires a representative to be onsite to monitor the excavation activity. Requires the excavator to allow the operator an opportunity to provide the scheduling of personnel to be onsite, as specified.
- Specifies that if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, the operator may choose to locate and field mark, or provide information on the location of subsurface installations known to be embedded in the pavement, or provide information on the location of subsurface installations known to be below the pavement, unless specified exemptions apply.
- Revises the requirements for an excavator to use an excavation device, requires the excavator to inform the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket, as specified, and requires an operator not agreeing to use vacuum excavation to include that information on the EPR.
- Specifies requirements for an excavator to use vacuum equipment to expose subsurface installations within the tolerance zone.
- Requires an excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid to do the following:
- Immediately call 911 emergency services.
- After calling 911 emergency services, the excavator must immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene. Authorizes the excavator to contact the regional notification center to obtain the contact information of the subsurface installation operator. Provides that if the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message.
- Within two hours of discovering or causing any damage to a subsurface installation, requires the excavator to notify the Dig Safe Board of the damage through the web portal on the regional notification center through its internet website or the Dig Safe Board’s internet website.
- Requires an excavator discovering or causing any damage to a subsurface installation, as specified, to notify the subsurface installation operator within one hour.
- States that an excavator who discovers any damage to a subsurface installation is not required to notify the Dig Safe Board of the damage.
- Deletes the Dig Safe Board’s authority to impose more restrictive notification windows for damages to subsurface installations.
- Provides that certain notification requirements do not apply to an excavator who is the owner or operator of the damaged facility.
- Requires a local agency that chooses to recover costs for providing locate and mark services of a subsurface installation via a fee to consider whether the fee could deter an excavator from contracting the regional notification center.
- Requires a local agency to consider recouping its costs via existing permit fees instead of a separate fee.
- Requires a local agency to consider not charging a fee to an excavator on private property, as specified, to encourage the excavator to create a ticket, as specified.
- Requires the Dig Safe Board, instead of regional notification centers, to compile an annual report of incident events, and requires the California Regional Common Ground Alliance to provide statewide information to the Board by April 15 of each year.
- Defines “approximate location” as a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation. It does not mean depth
Related Legislation:
SB 1345 (Ochoa Bogh, 2022) would have removed the exemption in the definition of “subsurface installation” for nonpressurized sewerlines, nonpressurized storm drains, or other nonpressurized drain lines; would have required the Department of Transportation to comply with the requirements of the Dig Safe Act beginning January 1, 2025; and would have made other changes to excavator notification requirements under the Act. SB 1345 was held on the Suspense File in this committee.
-- END --
SENATE COMMITTEE ON GOVERNANCE AND FINANCE
Senator Anna M. Caballero, Chair
2023 - 2024 Regular
Bill No: | SB 778 | Hearing Date: | 4/26/23 |
Author: | Ochoa Bogh | Tax Levy: | No |
Version: | 4/12/23 Amended | Fiscal: | Yes |
Consultant: | Royce, Favorini-Csorba | ||
Excavations: subsurface installations
Revises various provisions in existing law relating to operator and excavator responsibilities when preparing for and performing excavations.
Background
Call Before You Dig and the Dig Safe Act of 2016. In 1986, an excavating crew in southern California incorrectly assumed there was no subsurface infrastructure at their construction site and, as a result, struck a gas main line that exploded, killing a 23-year old crew member. This incident, along with others, prompted adoption of California’s “Call Before You Dig” law in 1989 (AB 73, Elder), which was later modernized by the “Dig Safe Act of 2016” (SB 661, Hill).
Generally, the Dig Safe Act (Act) requires an individual who is planning to dig (an “excavator”) to notify a “regional notification center” (RNC) prior to planned excavations. An RNC is a nonprofit association of operators of subsurface installations, such as utilities and local governments. The two RNCs in California are Underground Service Alert of Northern California and Nevada; and, Underground Service Alert of Southern California. These two RNCs are commonly referred to as 811 centers because of the phone number used for notification.
The Act also requires any utility or other operator of subsurface installations located in the vicinity of a planned excavation to go to the excavation site and clearly identify and mark all underground infrastructure. These subsurface installations include underground facilities such as gas lines, electrical lines, water mains, or communication cables. Every operator, except for the Department of Transportation and owners of real property that maintain subsurface installations only for use on that same property, must be a member of, participate in, and share in the costs of, a RNC.
Once an excavator contacts an RNC about a planned excavation, the RNC issues a ticket to the excavator and notifies any operators that may have a subsurface installation in the area of planned excavation. An operator of a subsurface installation must take one of three actions in response to receiving the notification ticket:
- Locate and mark the operator’s subsurface installation(s) with paint, flags, or other markings;
- Provide the excavator with information, such as maps, to assist in finding the subsurface installation; or
- Notify the excavator that the operator has no subsurface installations in the proposed area of excavation. This operator response is known as “positive response.”
An “electronic positive response” (EPR) from an operator to the RNC provides the status of an operator’s statutorily required response to a notification ticket. AB 1166 (Levine, 2019) requires, as of January 1, 2021, every operator of subsurface installations to supply an EPR through an RNC before the legal excavation start date of a planned excavation. The RNC then posts these responses online, allowing excavators to view them.
Both operators and excavators are subject to fines for failing to comply with the Act to the tune of $10,000 or more for negligent or willful violations. An excavator that damages a subsurface installation as a result of failure to heed markings or comply with the Act is also liable for resulting damages, costs and expenses.
The Act also establishes the Dig Safe Board within the Office of Energy Infrastructure Safety, as a centralized authority to help enforce its provisions. Specifically, the Board is charged with coordinating education and outreach activities that encourage safe excavation practices, developing safety standards for excavating around subsurface installations, establishing procedures and guidance in encouraging relevant practices, investigating violations of the Act, and recommending cases for investigation to law enforcement agencies. The Board must also meet annually to identify education and outreach issues related to safe excavation practices.
Based on their experience with implementing the Act, Underground Service Alert of Southern California wants to update some of the Act’s provisions to enhance the safety benefits and address issues that have arisen in recent years for both excavators and operators alike.
Proposed Law
Senate Bill 778 revises various provisions in the Act regarding operator and excavator responsibilities when preparing for and conducting excavations.
The Act defines “legal excavation start date and time” to mean two working days from the date of notification. SB 778 clarifies that this excludes weekends or holidays, but also allows excavation to start once the excavator has received a response from all known operators. The bill also deletes a redundant time period specified within the definition of “working day.”
The Act requires an excavator to delineate the area to be excavated, but allows an operator to choose not to locate and field mark subsurface installations until the area to be excavated has been delineated. SB 778 specifies that an operator may choose not to locate and field mark in cases where the area delineated does not match the notification ticket, and may choose not to locate and field mark an area that is not appropriately delineated in certain circumstances involving private property owners who are exempt from the Act and not required to get any state or local permit for an excavation project on their own property.
The bill further provides that an operator must contact the excavator for clarification if the operator has questions about the excavator’s delineation of the proposed excavation area, as specified.
Under SB 778, an excavator must contact the relevant RNC to request a return trip by a utility operator for any of the following reasons:
- The excavator was unable to find the subsurface utility installation based on the markings placed by the operator;
- The excavator requests that the utility operator provide standby observation for excavation activities that include high priority installations and postevent restorations; or
- The EPR indicates an excavator requests a resend ticket for reasons including that the location information is incorrect, there is no access to the area to be located and marked, the excavation area is not delineated, or the area that is delineated does not match the location request.
The return trip must occur within one business day, or on a mutually agreed-upon and documented date that ensures the operator returns to provide the standby observation within a certain amount of time, as specified, and within two working days specifically when the EPR indicates a resend request.
SB 778 also includes provisions to address the marking of subsurface installations when work is limited to pavement grinding (e.g. not disturbing ground below the pavement) and clarifies that operators may choose to either locate and mark subsurface installations directly or provide information on the location of installations known to be below the pavement.
The Act allows an excavator to use a vacuum excavation device to expose subsurface installations within 24 inches on each side of the markings placed by the operator, as specified, if the operator agrees. SB 778 requires an excavator to inform the RNC of their intent to use a vacuum excavation device when obtaining a ticket, as specified, and requires an operator not agreeing to use vacuum excavation to include that information on the EPR.
SB 778 specifies that excavators must use vacuum equipment designed, engineered, and built for vacuum excavation and employ trained and competent persons to operate the equipment who have knowledge of specific operator requirements for marked subsurface installations being exposed by vacuum excavation.
Under the Act, any excavator that discovers or causes damage to a subsurface installation must notify the operator immediately and notify the RNC within 48 hours. The operator must also call 911 upon discovering or causing damage to either a high priority subsurface installation, as specified, or a gas or hazardous liquid pipeline subsurface installation in which the damage results in the escape of any flammable, toxic, or corrosive gas or liquid. The Act permits the Board to adopt more restrictive notification windows with regard to damage notifications. SB 778 revises, reorganizes, and recasts these provisions to codify regulations approved by the Board that govern the emergency response notification process when an excavator damages a subsurface installation.
Specifically, SB 778 removes the Board’s authority to impose stricter notification windows and instead gives the Board the broad authority to prescribe rules and regulations as necessary or proper to carry out the Act.
In codifying the Board’s regulations, the bill requires the excavator to take the following actions after discovering or causing excavation-related damage to a subsurface installation:
- If the damage may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid, immediately call 911 and then the operator. The excavator must also notify the Board within two hours.
- If the damage does not immediately endanger life or cause serious bodily harm or damage to property, notify the operator within one hour. If the excavator caused the damage, the excavator must notify the Board.
Under the Act, an excavator who damages a subsurface installation due to an “inaccurate field mark” is not liable for damages, replacement costs, or other expenses. The Act defines “inaccurate field mark” to mean a mark that did not correctly indicate the approximate location of a subsurface installation affected by an excavation, but does not define “approximate location.” SB 778 specifies that “approximate location” means a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation and does not mean depth.
The Act authorizes a local agency that is required to provide services under the Act to charge a fee to cover the cost of providing the service. SB 778 requires a local agency that chooses to recover its costs via a fee to consider:
- Whether the fee could deter an excavator from contacting the RNC;
- Recouping its costs via existing permit fees instead of a separate fee related to responding to a notification ticket; and
- Not charging a fee to excavators that are not required to comply with the Act to encourage them to notify the RNC of planned excavations.
SB 778 also makes technical and conforming changes to update the law after the requirement to furnish an EPR became effective on January 1, 2021, including clarifying that an excavator may not begin excavation unless the excavator receives an EPR from all known operators listed on the notification ticket.
The bill also requires the Board, rather than the RNCs, to report annually on incidents statewide, and requires the California Regional Common Ground Alliance, a national excavation safety organization consisting of utilities, utility-locating companies and excavators, to provide the statewide information to the Board.
SB 778 makes other technical and clarifying changes.
State Revenue Impact
No estimate.
Comments
1. Purpose of the bill. According to the author, “The state’s Call Before You Dig Law is dual purposed: protect the people working around potentially dangerous underground lines and protect the operators themselves. In its simplest explanation, the law requires excavators to contact a notification center and disclose their intent to dig. The notification center in turn notifies companies that might have infrastructure in the area. Companies with underground infrastructure near the excavation site are required to locate and mark them using paint or flags within two days of their notification.
The provisions contained in SB 778 originated from the California Common Ground Alliance (CCGA). The CCGA has identified several shortcomings with California’s 811 law. These are the functional and clarifying issues addressed in SB 778. In short, all of the changes contained in SB 778 are clarifications and codifications of either existing law or existing practice.”
2. Local Agency Fee Recovery. Local governments have relatively broad authority to charge fees to offset the reasonable costs of providing a permit or other benefit to an individual. In accordance with this authority, the Act states that local agencies may charge fees for the activities required under the Act. It is unclear that charging fees for marking or other activities under the Act is widespread practice. However, there is some concern that local governments charging fees to excavators could deter individuals, including private property homeowners, from reporting potential excavations and following the law due to objections over the cost. This bill requires local governments to consider how the fees might deter excavators from notifying an RNC and whether there are other appropriate means to recover costs, such as rolling them into other permits instead of charging them separately. While SB 778’s provisions do not actually compel any change in behavior, its minor nudge towards lower fees may be commensurate with the potential benefit of encouraging greater marking if any agencies that currently charge fees are moved to reconsider as a result of the bill.
3. Prior legislation. SB 778 is substantially similar to SB 1345 (Ochoa Bogh, 2022), which was approved by the Governance and Finance Committee, but held in the Senate Appropriations Committee.
4. Mandate. The California Constitution requires the state to reimburse local governments for the costs of new or expanded state-mandated local programs. SB 778 provides that if the Commission on State Mandates determine that the bill imposes a reimbursable mandate, reimbursement must be made pursuant to existing statutory procedures.
5. Incoming! The Senate Business, Professions, and Economic Development Committee approved SB 778 with a vote of 12-0 on April 10, 2023. The Senate Governance and Finance Committee is hearing it as the committee of second reference.
6. Technical. Committee staff recommends amending SB 778 to reinstate the provision on page 13, lines 4-6, dealing with the use of power operated tools for removing pavement if there are no underground installations as it was inadvertently deleted due to a drafting error.
Support and Opposition
(4/21/23)
Support:
Underground Service Alert of Southern California (Sponsor)
Southern California Contractors Association
Opposition:
None listed
-- END --
SENATE COMMITTEE ON
BUSINESS, PROFESSIONS AND ECONOMIC DEVELOPMENT
Senator Richard Roth, Chair
2023 - 2024 Regular
Bill No: SB 778 Hearing Date: April 10, 2023
Author: | Ochoa Bogh | ||
Version: |
| ||
Urgency: | Fiscal: | ||
Consultant: | |||
Subject: Excavations: subsurface installations
SUMMARY:
Revises provisions in the Dig Safe Act related to operator and excavator responsibilities when preparing for, and conducting excavations.
NOTE:
This measure is double-referred to the Senate Governance and Finance Committee, second.
Existing law:
- Establishes the Dig Safe Board/Underground Safety Board (Board) within the Office of Energy Infrastructure Safety to coordinate education and outreach activities that encourage safe excavation practices, along with developing standards and investigating violations, as specified. (Government Code (GC) § 4216.12)
- Defines the following:
- “Active subsurface installation” to mean a subsurface installation currently is use or currently carrying service;
- “Delineate” to mean to mark in white the location or path of the proposed excavation using specified guidelines, and also includes the physical identification of the area to be excavated using alternative marking methods, as specified;
- “Electronic positive response” to mean an electronic response from an operator to the regional notification center providing the status of an operator’s statutorily required response to a ticket.
- “Excavation” to mean any operation in which earth, rock, or other material in the ground is moved, removed, or otherwise displaced by means of tools, equipment, or explosives in any of the following ways: grading, trenching, digging, ditching, drilling, auguring, tunneling, scraping, cable or pipe plowing and driving, or any other way.
- “Legal excavation start date and time” to mean two working days, not including the date of notification, unless the excavator specifies a later date and time, which cannot be more than six months from the date of notification.
- “Subsurface installation” to mean any underground pipeline, conduit, duct, wire, or other structure, except non-pressurized sewer lines, non-pressurized storm drains, or other non-pressurized drain lines (GC § 4216(a)(d)(e)(g)(k)(l))
- Requires every operator of a subsurface installation, except the Department of Transportation (Caltrans), to become a member of, participate in, and share in the costs of a regional notification center, as specified. (GC § 4216.1(a))
- Requires an excavator planning to conduct an excavation to delineate the area to be excavated before notifying the appropriate regional notification center, and if the area is not delineated, an operator may, at its own discretion, choose not to locate and field mark until the area to be excavated has been delineated. (GC § 4216.2(a))
- Prohibits, unless an emergency exists, an excavator from beginning an excavation until the excavator receives a response from all known operators of subsurface installations, as specified, and until the completion of any required onsite meeting. (GC § 4216.2(g))
- Allows an excavator to use a vacuum excavation device to expose subsurface installations within the tolerance zone if the operator has marked the subsurface installation, the excavator has contacted any operator whose subsurface installations may be in conflict with the excavation, and the operator has agreed to the use of a vacuum excavation device. (GC § 4216.4(a)(2)(A))
- Requires an excavator discovering or causing damage to a subsurface installation, including, all breaks, leaks, nicks, dents, gouges, grooves, or other damage to subsurface installation lines, conduits, coatings, or cathodic protection, to immediately notify the subsurface installation operator, as specified. (GC § 4216.4(3)(c))
- Requires each excavator, operator, or locator to communicate with each other and respect the appropriate safety requirements and ongoing activities of the parties, if known, at an excavation site. (GC § 4216.4(4)(d))
- Requires provisions for operators and excavators to apply to state agencies and local agencies, except Caltrans, and authorizes a local agency to charge a fee in an amount sufficient to recover the cost of providing the services. (GC § 4216.5(a))
- Requires statewide information provided by operators and excavators regarding incident event reported by excavators and operators be compiled and made available in an annual report by regional notification centers and posted on the internet website of the board. (GC § 4216.6(g))
This bill:
- Revises the definition of “legal excavation start date and time” to specify that it does not include weekends of holidays, and clarifies in the definition that an excavation may begin before two days if the excavator has received a response from all known operators, as specified.
- Adds non-pressurized sewer lines, non-pressurized storm drains or other non-pressurized drain lines to the definition of “subsurface installation.”
- Revises the definition of “working day” by striking the reference to 7:00 a.m.-5:00 p.m.
- Revises the operator’s discretion to choose to not locate and field mark an area to be excavated if the area delineated does not match the ticket description, the operator may choose not to locate and field mark until the delineated area and ticket description match, and further requires the operator to contact the excavator to advise of the discrepancy and provide an “electronic positive response” (EPR). Authorizes an operator, at the operator’s discretion, to choose not to locate and field mark until the area has been delineated in circumstances which are not emergencies where owners of real property, as defined, or licensed contractors or subcontractors working on that property, are planning to conduct an excavation on the private property that does not require an excavation permit, as specified.
- Prohibits an excavator from beginning an excavation without an EPR, or has otherwise confirmed response directly from all operators listed on the ticket, as specified, and changes the EPR to all installations that are listed on the ticket, instead of the delineated boundaries of the proposed area of the excavation.
- Requires an excavator to contact the regional notification center to request a return trip for any of the following reasons:
- The excavator was unable to find the utility based on the markings an operator has placed;
- Standby observation of the excavation activities, including but not limited to, high priority installations and postevent restorations; or,
- The EPR indicates a resend ticket is requested by the excavator for reasons including but not limited to, incorrect location information, no access to the locate and filed mark area, the excavation area is not delineated, or the delineated area does not match the location request.
- Requires a return trip to occur within one business day, or on a mutually agreed-upon and documented date when the excavator cannot find the utility or standby observation required and within two working days when the EPR indicates a resend, as specified.
- Specifies that if excavation or work type is pavement grinding that is limited to removal of a portion of the solid pavement of a road or sidewalk surface, the operator may choose to locate and field mark, or provide information on the location of subsurface installations known to be embedded in the pavement, or provide information on the location of subsurface installations known to be below the pavement, unless specified exemptions apply.
- Revises the requirements for an excavator to use an excavation device, requires the excavator to inform the regional notification center of their intent to use a vacuum excavation device when obtaining a ticket, as specified, and requires an operator not agreeing to use vacuum excavation to include that information on the EPR.
- Requires the following for an excavator to use vacuum equipment to expose subsurface installations within the tolerance zone:
- Vacuum equipment be designed, engineered, and purpose built for vacuum excavation work;
- Trained and competent persons are required to operate the vacuum equipment; and,
- Vacuum equipment personnel know and adhere to all operator requirements for marked subsurface installations being exposed to determine if the exact location of subsurface installations in conflict with the excavation, and if the operator has any requirements for vacuum equipment to be used at the site of the planned excavation, those requirements must be provided by an operator before excavation or the operator must furnish an observer during excavation.
- Requires an excavator discovering or causing excavation-related damage to a subsurface installation that may endanger life or cause serious bodily harm or damage to property, including escape of any flammable, toxic, or corrosive gas or liquid to do the following:
- Immediately call 911 emergency services;
- After calling 911 emergency services, the excavator must immediately notify the subsurface installation operator and comply with any guidance provided to secure the scene; the excavator may contact the regional notification center to obtain the contact information of the subsurface installation operator, if the operator is unknown and the damage or discovery of damage occurs outside the working hours of the regional notification center, the excavator may follow the instructions provided by the regional notification center through its internet website or the telephone line recorded message; and,
- Within two hours of discovering or causing any damage to a subsurface installation, the excavator must notify the Dig Safe Board of the damage through the web portal on the regional notification center through its internet website or the Dig Safe Board’s internet website.
- Requires an excavator discovering or causing any damage to a subsurface installation, as specified, to notify the subsurface installation operator within one hour.
- States that an excavator who discovers any damage to a subsurface installation is not required to notify the Dig Safe Board of the damage.
- Deletes the Dig Safe Board’s authority to impose more restrictive notification windows for damages to subsurface installations.
- Requires a local agency that chooses to recover costs for providing locate and mark services of a subsurface installation via a fee to consider whether the fee could deter an excavator from contracting the regional notification center.
- Requires a local agency to consider recouping its costs via existing permit fees instead of a separate fee.
- Requires a local agency to consider not charging a fee to an excavator on private property, as specified, to encourage the excavator to create a ticket, as specified.
- Requires the Dig Safe Board, instead of regional notification centers, to compile an annual report of incident events, and requires the California Regional Common Ground Alliance to provide statewide information to the Board by April 15 of each year.
- Adds a definition of “approximate location” to mean a strip of land not more than 24 inches on either side of the exterior surface of the subsurface installation and does not mean depth.
- Deletes the current authority for n excavator to use power operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installation, as specified.
- Makes other technical and clarifying changes.
FISCAL EFFECT:
Unknown. This bill is keyed fiscal by the Legislative Counsel.
COMMENTS:
- Purpose. The Underground Service Alert of Southern California is the sponsor of this bill. According to the author, “Current law requires an individual or entity planning to perform an excavation to inform one of two regional notification centers so operators of any underground utilities in that area can mark their facilities. The law is intended to prevent excavators from damaging underground utilities. Once an excavator contacts a regional notification center (colloquially referred to as “811”), one or more utility operators mark the location of their underground facilities with paint, flags, or by other means. It is then the excavator’s responsibility to determine the exact location of the underground facilities and avoid damaging them.
A 2014 federal report produced by the Pipeline and Hazardous Material Safety Administration (PHMSA) gave California a lower grade because the two notification centers do not currently include non-pressurized sewer lines or storm drains in the definition of subsurface installation. Because the two notification centers are not required to include non-pressurized sewer lines or storm drains in their notifications to excavators, these structures often go unmarked and are unknown to the individuals excavating— until the excavator strikes one.”
- Background.
California Underground Facilities Safe Excavation Board (Dig Safe Board). SB 661 (Hill, Chapter 809, Statutes of 2016) established the “Dig Safe Act” and the Underground Safety Board (Board). The purpose of that bill was to update California’s excavation safety laws and practices and establish the centralized authority to enforce those laws. The enactment of SB 661 followed other legislation and trends aimed at reducing incidents at construction sites, whereby injuries or death were the result of workers not realizing they were digging into underground lines.
The Board under the office of Energy Infrastructure Safety, (formally under the Office of the State Fire Marshall) is charged with investigating accidents, developing excavation safety standards, and coordinating education and outreach programs. According to information from the Board’s website, “the Board improves public and worker safety by facilitating communication and learning among excavators and the operators of subsurface installations and by investigating accidents to determine their causes by developing solutions to improve safety outcomes.” The Board is currently comprised of nine members and GC § 4216.13 specifies the membership of the Board, which includes a mix of contractors and individuals with specialized knowledge in subsurface installations and excavations. The Board is required to meet annually to address education and outreach issues related to safe excavation practices (GC § 4216.17). In addition, the Board is required to develop standards relevant to safety practices in excavating around subsurface installations and procedures and guidance in encouraging those practices.
“Call Before you Dig.” Current law requires an individual or entity wishing to perform an excavation where they will dig, drill, or bore below the ground to inform the regional notification center of the planned excavation so owners of underground facilities such as gas lines, sewer lines, water mains or communication cables in the area can mark their facilities and prevent excavators from damaging their property. Damage to underground structures may result in the disruption of essential services and poses potential safety hazards to workers, the public, and the environment.
Once an excavator contacts a regional notification center, then one or more utility operators are notified to mark the location of their subsurface installations (underground facilities) with paint, flags, or by other means. According to information on the USA North 811 regional notification center website, the regional center receives over 110,000 ticket requests per month. This bill will update and revise a number of actions and requirements for operators and excavators prior to, and in the process of carrying out an excavation, and in those instances if an emergency occurs.
Regional Notification Centers. There are two regional notification centers that serve California, the Underground Service Alert of Northern California and Nevada, also known as USA North 811; and, Underground Service Alert of Southern California, also known as DigAlert. Collectively, the two centers are commonly referred to as 811 centers. A regional notification center is an association of owners and operators of subsurface installations (water, gas, electric, telephone, sewer, oil lines, etc.). GC §§ 4216-4216.9 requires anyone planning to excavate to contact the appropriate regional notification center at least two working days (but not more than 14 calendar days) before beginning to excavate. The center will issue an inquiry identification number to the excavator as confirmation, and will notify any member, if known, who has a subsurface installation in the area of the proposed excavation.
Under current practices, and due to the current definition of “legal excavation start date and time,” there is a requirement for a two-day period after notification to a regional center for an excavation to begin. This bill will would revise that definition to specify that two working days does not include holidays and weekends. Further, the definition attempts to reflect that if an excavator receives notice before the two days that the area for excavation has been marked by all known operators, the excavation may commence prior to the two-day period ending.
Under current law, owners or operators of subsurface installations that are non-pressurized sewer lines, non-pressurized storm drains or other non-pressurized drains are not required to mark those prior to an excavation. These underground facilities are exempt from the current provisions of the dig safe act. These exemptions have been in statute for more than 30 years and tend to include systems such as storm drains and sewer drains. Current law requires every operator of a subsurface installation to become a member of a regional notification center which includes participating in marking of subsurface installations and sharing the costs associated with those facilities.
Current law (GC § 4216.2(a)) requires an excavator who is planning to conduct an excavation, to delineate the area that will be excavated, prior to notifying the regional notification center. The reason to delineate the excavation site first is to determine whom the appropriate operators are who will need to be contacted to locate and mark potential subsurface installations. However, current law also allows operators to withhold marking or locating an area if the excavator has not identified the boundaries of the excavation site. This bill seeks to ensure that all areas of a potential excavation are properly marked and delineated prior to notifying the regional center. This bill would allow an operator to choose not to locate and field mark if the delineated area does not match the ticket description, until the delineated area and ticket description match. Further, this bill would require the operator to notify the excavator of the discrepancy and provide the EPR.
Currently, individuals operating on private property are exempt from certain provisions of the Dig Safe Act. However, they are not prohibited from notifying regional centers of any intent to excavate on their private property. Instead, it is encouraged for private property owners to notify regional centers and have the appropriate operators mark their subsurface installations in order to ensure public safety. While this bill would delete an operator’s ability to not mark and locate the subsurface installations in an area that has not been outlined by the excavator, this bill would add that provision to private property owner exemptions to encourage participation.
Notification from Regional Center. An operator of a subsurface installation has the responsibility to do one of three things in response to receiving a ticket from the regional notification center that an excavation is planned in area where they may have a subsurface installation: 1) locate and mark the operator’s subsurface installations with paint, flags, or other markings; 2) provide the excavator information, such as maps, to assist the excavator with finding the subsurface installation; or, 3) notify the excavator that the operator has no subsurface installations in the proposed area of excavation. This operator response is known as “positive response.” AB 1166 (Levine, Chapter, Statutes of 2019), changed existing law to require every operator of subsurface installations to supply an electronic positive response through a regional notification center before the legal excavation start date. This bill adds clarifying language to require the electronic positive response prior to beginning an excavation for all areas listed on the ticket.
In addition, this bill attempts to codify current practice when an excavator must contact the regional notification center to request a return trip. According to information from the Sponsor, the additional requirements laid out in this bill are a result of changes implemented by the changes in AB 1166. Because of that bill, regional notification centers implemented new electronic codes to comply with the process required for notification by that bill, part of those codes include a return trip ticket. This bill aims to codify that practice and establishes the parameters for when an excavator is required to contact a regional notification center to request a return trip and establishes the timeframes in which the operator must complete the return trip (within one to two business days) depending on the reason requested for the return trip. In addition, this bill specifies the requirements for both an operator and excavator to comply with if an operator requires a representative to be on site for an excavation to monitor the activity.
Vacuum Excavations. A vacuum excavation is an excavation technique that utilizes high-pressure water to dig into the ground, break up the material, and then suction up the debris to be removed from the excavation hole. For any excavation within the tolerance zone of a subsurface installation (meaning 24 inches on either side), the excavator is authorized to use only a hand tool to determine the exact location of the subsurface installation. The aim is to avoid accidental underground line damage from a power tool. The tolerance zone is a defined as an area, which is 24 inches on each side of the field marking placed by the operator.
Current law also allows the use of a vacuum excavation device in the tolerance zone under limited circumstances, 1) the operator has marked the subsurface installation and the excavator has had contact with all subsurface installation operators in the area; 2) the operator of the subsurface installation agrees to the use of a vacuum excavation device; and, 3) the excavator notifies the regional notification center of the desire to use a vacuum excavation device at the time of requesting a ticket for marking an excavation site. Although the data is limited, the Sponsor notes that there are instances where improper use of vacuum equipment and untrained personnel have led to unsafe excavations and potentially cause damage.
This bill aims to enhance the safety measures when a vacuum device is being utilized during an excavation, by ensuring that only trained personnel use vacuum equipment and that the equipment used is appropriate for a vacuum excavation. Further, this bill would require that if an operator has any requirements for the use of vacuum equipment, those requirements are provided by the operator prior to the excavation or the operator must furnish an observer. In addition, the excavator must notify the regional center of their intent to use a vacuum device during the excavation at the time of requesting a ticket. If an operator does not agree to the use of vacuum equipment, this bill would require the information be provided in the EPR.
Emergency Notifications. Emergency response in the event an excavator damages a subsurface installation is critical to mitigate the potential for a catastrophic disaster or other minor disrupting events, such as water leaks or power outages. Existing law provides the steps that an excavator must take when an excavator causes or discovers damage to a subsurface installation (GC § 4216.4(c)(1)). An excavator is only required to call 911 is when a gas or hazardous subsurface installation is damaged and results in the escape of any flammable, toxic, or corrosive gas or liquid or if they damage a high priority subsurface installation which include specified high pressure natural gas pipelines.
Recently, the Board promulgated regulations which build on existing statute requirements (BPC § 4216.4) for emergency response. California Code of Regulations (CCR) Title 19, § 4100) which specify detailed instructions for excavators who cause damage. On February 10, 2020, the Board approved regulations to require excavators to notify the appropriate regional center upon damaging or discovering damage to natural gas facilities or high priority facilities of any kind, as well as damages that require medical care or result in a fatality. Excavators must make these notifications within 2 hours of damage, and the one-call centers provide this information to the Board upon receipt.
When an excavator calls 911 to report an incident, the regulations, (19 CCR, § 4100(a)) require the excavator to also notify the appropriate regional center no later than two hours after contacting 911 emergency services if the damage is natural gas or hazardous liquid, if there is damage to any high priority subsurface installation, or if there is damage that causes injury requiring treatment or results in a fatality. The regulations specify that the excavators be required to notify regional centers of the damage through the appropriate regional centers’ website or mobile application. Regional notifications centers are then required to notify the Board within the hour of receiving these notifications.
The Board has the oversight authority to take enforcement actions against those excavators who fail to provide the appropriate incident information. This bill codifies a number of the Board’s current regulations, and includes very prescriptive requirements in statute for an excavator to follow if a situation arises in which damage to a subsurface installation occurs-depending on the damage and the type of subsurface installation affected. This bill delineates the steps an excavator must take in reporting incidents when the incident may cause serious or deadly injuries or damage to property and in those instances when there is no immediate danger.
Local Governments. Local governments must comply with the requirements to locate and mark their subsurface installations when notified of a pending excavation in an area, which may affect their underground facilities. Per GC § 4216.5, a local agency which provides those services is authorized to charge a fee to recover the costs for the agency associated with locating and marking a site. This bill would add requirements for local governments to consider their costs and when determining whether to charge a fee for providing those services. There are some concerns that local governments charging fees to excavators could deter individuals, including private property homeowners, from reporting potential excavations and following the law due to concerns with costs. This bill requires local governments to consider whether or not there are other appropriate means to recover costs and to consider the potential scenario where the fee deters compliance.
Reports of incident events. Current law requires statewide information on reports from operators and excavators regarding incidents whereby underground installations are damaged or hit, to be compiled in an annual report. Currently, the regional notification centers are responsible for compiling and posting this data. An incident event includes damages, near misses and other violations of the Dig Safe Act. Stakeholders voluntarily provide this statewide information.
Instead of regional notification centers compiling the annual report of incident events, this bill would require the Board to compile and post the annual report related to incident data, and further require the California Regional Common Ground Alliance to provide the statewide data to the Board for use in the annual report by April 15 of each year.
- Related Legislation. SB 1345 (Ochoa Bogh of 2022) sought to revise provisions in the Dig Safe Act related to operator and excavator responsibilities when preparing for and conducting excavations, add non-pressurized sewer lines and storm drains to the definition of a “subsurface installation,” and require the California Department of Transportation (CalTrans) to comply with the requirements of the Dig Safe Act beginning January 1, 2025. (Status: This bill was held in the Senate Committee on Appropriations)
SB 297 (Durazo, Chapter 726, Statutes of 2021) increased penalties for operators or excavators who cause damage to a gas or hazardous liquid pipeline subsurface installation that results in the escape of any flammable, toxic or corrosive gas or liquid, as specified.
SB 895 (Hill, Chapter 307, Statues of 2020) made a number of changes to the Dig Safe Act of 2016 including: requiring new subsurface installations be mapped using a geographic information systems, as specified; renaming the California Underground Facilities Safe Excavation Board as the “Dig Safe Board”; and requiring an excavator to notify the Regional Notification Center within 48 hours of discovering or causing damage, among other things.
SB 1198 (Durazo of 2020) would have increased penalties for contractors who cause damage to subsurface installations for failing to provide notice for a gas corporation to locate its subsurface installations, as specified; placed new requirements on gas corporations by the Public Utilities Commission (PUC); required the PUC to review and publish specified safety plans of gas corporations no later than June 30, 2021; and, required gas corporations to establish formal training for workers. (Status: This bill was never heard in a policy committee of the Legislature.)
AB 1166 (Levine, Chapter 453, Statutes of 2019) required every operator of subsurface installations to supply an electronic positive response through a regional notification center before the legal excavation start date, as specified.
AB 1914 (Flora, Chapter, Statutes of 2017), authorized an excavator to use power-operated or boring equipment prior to determining the exact location of a subsurface facility, as specified.
SB 92 (Committee on Budget and Fiscal Review, Chapter 26, Statutes of 2017) among other changes to the Budget act of 2017, clarified the intent and requirements for an “area of continual excavation,” extends the dates by which the Board is required to complete their regulations and begin enforcement, from November 2017 to July 2020, and makes other technical changes.
SB 661 (Hill, Chapter 809, Statutes of 2016) enacted the Dig Safe Act of 2016 to modify laws governing excavations near subsurface installations.
SB 119 (Hill of 2015) would have modified “call before you dig” laws governing excavations near underground pipelines, conduit, duct, wire, or other structures (collectively known as subsurface installations). Among other things, this bill would have enhanced the existing enforcement powers of specified state entities, revised liability provisions that apply to the pre-excavation notification and subsurface installation marking requirements for operators and excavators, and would have established the California Underground Facilities Safe Excavation Advisory Committee to coordinate education and outreach, develop standards, and investigate violations of laws pertaining to excavation. (Status: This bill was vetoed by Governor Brown.)
- Arguments in Support. The Southern California Contractors Association writes in support, “SB 778 proposes several minor yet important changes to the Call Before You Dig Law contained in Government Code Section 4216. Those changes include increasing the requirements for the use of vacuum excavation, clarifying when an excavator must call 911 when damage occurs or is discovered on underground utility lines and clarifies the “approximate location” for liability purposes. It contains other similar provisions.”
Underground Service Alert of Southern California writes in support, “The changes proposed in SB 778 are technical in nature. They shore up some of the requirements authorizing vacuum excavation, clarify when and when not an excavator must call 911 when damaging or finding damaged underground infrastructure and clarifies and cleans up several inoperable deadlines regarding recently enacted electronic positive response system. There are other similarly technical changes in the bill.”
- Arguments in Opposition. The California Association of Sanitation Agencies writes in opposition, “We have significant concerns with the bill which proposes to eliminate the exemption afforded nearly 50 years ago for non-pressurized sewer and storm drains. This exemption is appropriate and has not resulted in any significant incidents impacting health and safety in our communities. Non-pressurized sewer lines are unique in their depth and design, making “hits” due to excavation work uncommon. Occasional cross-boring incidents have occurred in private sewer laterals, but removing the exemption for marking non-pressurized lines would not avoid those incidents, as most utilities do not retain ownership or liability for shallower private sewer laterals until they extend into the public right of way.”
Los Angeles County Sanitation Districts writes in opposition and notes, “The Sanitation Districts’ primary concern is that Section 1 in SB 778 would eliminate the current exemption under which non-pressurized sewer lines, non-pressurized storm drains, or other non-pressurized drain lines are explicitly exempted from the definition of “subsurface installation” for the purposes of the requirements for marking utilities when excavation work is planned (Gov’t Code Sec. 4216(s)). Removing this exemption would provide little benefit to the environment while significantly increasing costs to local governments. Sewers are typically deeper than other utilities and are easy to locate due to the presence of sewer maintenance holes at the surface, so incidents of damage are fairly rare and, because the pipelines are not under pressure, any sewage that does exit the sewer line remains within the excavation area. In fact, we are not aware of any instance where a sewer that was damaged by an excavator resulted in an overflow of sewage to the environment. On the other hand, complying with the requirements to mark non-pressurized sewers would likely cost the Sanitation Districts alone approximately $1 million per year for new staff, vehicles, and other associated expenses. Removing the exemption would simply result in shifting liability and costs away from excavators and onto local public agencies and by extension ratepayers and taxpayers. This bill is an expensive solution in search of a problem that is already easily avoidable.”
- Policy Issues for Consideration and Proposed Author’s Amendments.
Potential unintended consequences. This bill seeks to revise the current requirements for excavators and operators to ensure the most up-to-date standards of practice exist and that all excavations meet important safety guidelines so routine excavations do not result in potentially tragic or disruptive outcomes. However, some of the changes proposed by this bill may unintentionally create confusion for operators and excavators, and potentially the Board in its work to ensure safe excavation practices. For example, this bill seeks enhance the operational requirements in the use of vacuum excavations and would require that trained and competent persons operate the vacuum equipment, yet the bill is silent on what might qualify as a trained and competent person. Additionally, this bill incorporates changes based on current EPR response codes, which may need further review to ensure all parties are able to comply. The Author should continue to work with stakeholders and the Board to ensure any changes result in the desired outcome.
Pressurized lines. As currently drafted, this bill adds non-pressurized lines, including storm drains and sewer lines to the definition of subsurface installations subject to the provisions of the Dig Safe Act. These types of underground facilities have been exempt from the requirements of the Dig Safe Act for many years. While damage to communities can occur if an excavation erroneously results in damage to a storm drain or sewer line, there seems to be limited data to highlight the frequency of occurrences and resulting impacts on consumer and worker safety.
In order to address concerns from stakeholders pertaining to the requirement that non-pressurized lines be included in the definition of a subsurface installation; the author has proposed the following amendment to maintain the current exemption for non-pressurized lines as follows:
On page 6, lines 11-13, strike the changes and revert to existing law.
Deletion of Existing Statue. In an effort to provide technical clean-up language, this bill strikes the current authorization for an excavator to use power operated or boring equipment, as determined by the board, prior to determining the exact location of subsurface installations. That authorization was provided in AB 1914 (Flora, Chapter, Statutes of 2018). That bill authorized the use of specific equipment beginning in 2020 and required the board to promulgate regulations for the usage of specific tools. Those regulations have been completed. It appears the intention was to provide code clean-up, as the board has promulgated the regulations, but as currently drafted, this bill deletes GC § (a)(2)(C) entirely which authorizes the excavator to use power operated or boring equipment. The Author should amend the bill to maintain that current provision as follows.
On page, 14, lines 4-8, strike the changes and revert to existing law.
SUPPORT AND OPPOSITION:
Support:
Southern California Contractors Association
Underground Service Alert of Southern California
Opposition:
California Association of Sanitation Agencies
Los Angeles County Sanitation Districts
-- END --