AB 1022: Solar Water Heating and Efficiency Act of 2007.
- Session Year: 2015-2016
- House: Assembly
- Latest Version Date: 2015-03-26
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including gas corporations. The Solar Water Heating and Efficiency Act of 2007 requires the commission, if it determines that a solar water heating program is cost effective for ratepayers and in the public interest, to design and implement a program applicable to the service territories of a gas corporation to achieve the goal of the Legislature to promote the installation of 200,000 solar water heating systems, as defined, in homes, businesses, and buildings or facilities of eligible customer classes, as specified, receiving natural gas service throughout the state by 2017. The act prohibits funding from exceeding $250,000,000 for the collective service territories of all gas corporations over the 10-year life of the program and requires that the cost of the program be paid through a usage-based surcharge annually established for each class of gas customers, with specified exceptions. The act requires the governing body of each publicly owned utility providing gas service to retail end-use customers to adopt, implement, and finance a solar water heating system incentive program that meets certain requirements. Existing law repeals these requirements on August 1, 2018.
This bill would repeal the substantive requirements of the act and would prohibit any additional moneys from being collected from ratepayers to fund the act after December 31, 2015. The bill would require that any loans that are outstanding as of January 1, 2016, that were made pursuant to the act, continue to be repaid in a manner that is consistent with the terms and conditions of the loan agreements, until repaid in full. The bill would authorize moneys to be dispersed after January 1, 2016, that were encumbered on or before December 31, 2015, pursuant to the act and would require that all moneys not encumbered on or before December 31, 2015, that were collected from ratepayers pursuant to the act and all loan repayments be refunded to the ratepayers in proportion to the ratepayer classes from which they were collected.
Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
Because the bill requires action by the commission to implement certain of its requirements, a violation of these commission orders would impose a state-mandated local program by creating a new crime.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
Existing law requires every electric utility to make available to an eligible customer-generator a standard contract or tariff for net energy metering on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer-generators exceeds 5% of the electric utilitys aggregate customer peak demand.
This bill would make technical, nonsubstantive revisions to the net energy metering requirements.
Existing law requires every electric utility to make available to an eligible customer-generator a standard contract or tariff for net energy metering on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer-generators exceeds 5% of the electric utilitys aggregate customer peak demand.
This bill would make technical, nonsubstantive revisions to the net energy metering requirements.
As used in this article, the following terms have the following meanings:
(a)Gas customer includes both core and noncore customers, as those terms are used in Chapter 2.2 (commencing with Section 328) of Part 1, that receive retail end-use gas service within the service territory of a gas corporation.
(b)kWth means the kilowatt thermal capacity of a solar water heating system, measured consistent with the standard established by the SRCC.
(c)kWhth means kilowatthours thermal as measured by the number of kilowatts thermal generated, or displaced, in an hour.
(d)Low-income residential housing means either of the following:
(1)Residential housing financed with low-income housing tax credits, tax-exempt mortgage revenue bonds, general obligation bonds, or local, state, or federal loans or grants, and for which the rents of the occupants who are lower income households, as defined in Section 50079.5 of the Health and Safety Code, do not exceed those prescribed by deed restrictions or regulatory agreements pursuant to the terms of the financing or financial assistance.
(2)A residential complex in which at least 20 percent of the total units are sold or rented to lower income households, as defined in Section 50079.5 of the Health and Safety Code, and the housing units targeted for lower income households are subject to a deed restriction or affordability covenant with a public entity that ensures that the units will be available at an affordable housing cost meeting the requirements of Section 50052.5 of the Health and Safety Code, or at an affordable rent meeting the requirements of Section 50053 of the Health and Safety Code, for a period of not less than 30 years.
(e)New Solar Homes Partnership means the 10-year program, administered by the Energy Commission, encouraging solar energy systems in new home construction.
(f)Solar heating collector means a device that is used to collect or capture heat from the sun and that is generally, but need not be, located on a roof.
(g)Solar water heating system means a solar energy device that has the primary purpose of reducing demand for natural gas through water heating, space heating, or other methods of capturing energy from the sun to reduce natural gas consumption in a home, business, or any building or facility receiving natural gas that is subject to the surcharge established pursuant to subdivision (b) of Section 2863, or exempt from the surcharge pursuant to subdivision (c) of Section 2863, and that meets or exceeds the eligibility criteria established pursuant to Section 2864. Solar water heating systems include multifamily residential, governmental, educational, and nonprofit solar pool heating systems, but do not include single-family residential solar pool heating systems.
(h)SRCC means the Solar Rating and Certification Corporation.
SEC. 2.Section 2861 is added to the Public Utilities Code, to read:2861.(a)No additional moneys may be collected from ratepayers to fund the Solar Water Heating and Efficiency Act of 2007 after December 31, 2015, and no moneys collected from ratepayers on or before that date shall be dispersed other than as directed by subdivisions (c) and (d).
(b)All loans made pursuant to the Solar Water Heating and Efficiency Act of 2007 that are outstanding as of January 1, 2016, shall continue to be repaid in a manner that is consistent with the terms and conditions of the loan agreements, until repaid in full.
(c)Moneys may be dispersed after January 1, 2016, that were encumbered on or before December 31, 2015, pursuant to the Solar Water Heating and Efficiency Act of 2007.
(d)All moneys not encumbered on or before December 31, 2015, that were collected from ratepayers and all loan repayments made pursuant to the Solar Water Heating and Efficiency Act of 2007 shall be refunded to the ratepayers in proportion to the ratepayer classes from which they were collected.
SEC. 3.Section 2862 of the Public Utilities Code is repealed.2862.The Legislature finds and declares all of the following:
(a)California is heavily dependent on natural gas, importing more than 80 percent of the natural gas it consumes.
(b)Rising worldwide demand for natural gas and a shrinking supply create rising and unstable prices that can harm California consumers and the economy.
(c)Natural gas is a fossil fuel and a major source of global warming pollution and the pollutants that cause air pollution, including smog.
(d)Californias growing population and economy will put a strain on energy supplies and threaten the ability of the state to meet its global warming goals unless specific steps are taken to reduce demand and generate energy cleanly and efficiently.
(e)Water heating for domestic and industrial use relies almost entirely on natural gas and accounts for a significant percentage of the states natural gas consumption.
(f)Solar water heating systems represent the largest untapped natural gas saving potential remaining in California.
(g)In addition to financial and energy savings, solar water heating systems can help protect against future gas and electricity shortages and reduce our dependence on foreign sources of energy.
(h)Solar water heating systems can also help preserve the environment and protect public health by reducing air pollution, including carbon dioxide, a leading global warming gas, and nitrogen oxide, a precursor to smog.
(i)Growing demand for these technologies will create jobs in California as well as promote greater energy independence, protect consumers from rising energy costs, and result in cleaner air.
(j)It is in the interest of the State of California to promote solar water heating systems and other technologies that directly reduce demand for natural gas in homes and businesses.
(k)It is the intent of the Legislature to build a mainstream market for solar water heating systems that directly reduces demand for natural gas in homes, businesses, schools, nonprofit, and government buildings. Toward that end, it is the goal of this article to install at least 200,000 solar water heating systems on homes, businesses, and other buildings or facilities of eligible customer classes throughout the state by 2017, thereby lowering prices and creating a self-sufficient market that will sustain itself beyond the life of this program.
(l)It is the intent of the Legislature that the solar water heating system incentives created by this article should be a cost-effective investment by gas customers. Gas customers will recoup the cost of their investment through lower prices as a result of avoiding purchases of natural gas.
(m)It is the intent of the Legislature that this article will encourage the cost-effective deployment of solar heating systems in both residential and commercial markets and in each end-use application sector in a balanced manner. It is the intent of the Legislature that the commission monitor and adjust incentives created by this article so that they are cost-effective investments sufficient to significantly increase markets and promote market transformation. It is the intent of the Legislature that the commission ensure that increased, uniform growth in each market sector is achieved through program incentives or structure adjustments that prevent overutilization of program resources by any single sector.
SEC. 4.Section 2863 of the Public Utilities Code is repealed.2863.(a)If, after a public hearing, the commission determines that a solar water heating program is cost effective for ratepayers and in the public interest, the commission shall do all of the following:
(1)Design and implement a program applicable to the service territories of a gas corporation, to achieve the goal of the Legislature to promote the installation of 200,000 solar water heating systems in homes, businesses, and buildings or facilities of eligible customer classes receiving natural gas service throughout the state by 2017. Eligible customer classes shall include single-family and multifamily residential, commercial, industrial, governmental, nonprofit, and primary, secondary, and postsecondary educational customers.
(2)The program shall be administered by gas corporations or third-party administrators, as determined by the commission, and subject to the supervision of the commission.
(3)The commission shall coordinate the program with the Energy Commissions New Solar Homes Partnership to achieve the goal of building zero-energy homes.
(4)The commission shall determine an appropriate division of funds between solar water heating systems that are and are not solar pool heating systems.
(b)(1)The commission shall fund the program through the use of a surcharge applied to gas customers based upon the amount of natural gas consumed. The surcharge shall be in addition to any other charges for natural gas sold or transported for consumption in this state.
(2)The commission shall impose the surcharge at a level that is necessary to meet the goal of installing 200,000 solar water heating systems, or the equivalent output of 200,000 solar water heating systems, on homes, businesses, and buildings or facilities of eligible customer classes receiving natural gas service in California by 2017. Funding for the program established by this article shall not, for the collective service territories of all gas corporations, exceed two hundred fifty million dollars ($250,000,000) over the course of the 10-year program.
(3)The commission shall annually establish a surcharge rate for each class of gas customers. Any gas customer participating in the California Alternate Rates for Energy (CARE) or Family Electric Rate Assistance (FERA) programs shall be exempt from paying any surcharge imposed to fund the program designed and implemented pursuant to this article.
(4)Any surcharge imposed to fund the program designed and implemented pursuant to this article shall not be imposed upon the portion of any gas customers procurement of natural gas that is used or employed for a purpose that Section 896 excludes from being categorized as the consumption of natural gas.
(5)The gas corporation or other person or entity providing revenue cycle services, as defined in Section 328.1, shall be responsible for collecting the surcharge.
(c)Funds shall be allocated for the benefit of gas customers to promote utilization of solar water heating systems.
(d)In designing and implementing the program required by this article, no moneys shall be diverted from any existing programs for low-income ratepayers or cost-effective energy efficiency programs.
SEC. 5.Section 2864 of the Public Utilities Code is repealed.2864.(a)The commission, in consultation with the Energy Commission and interested members of the public, shall establish eligibility criteria for solar water heating systems receiving gas customer funded incentives pursuant to this article. The criteria should specify and include all of the following:
(1)Design, installation, and energy output or displacement standards. To be eligible for rebate funding, a residential solar water heating system shall be certified by an accredited listing agency in accordance with standards adopted by the commission. Solar collectors used in systems for multifamily residential, commercial, government, nonprofit, educational, or industrial water heating shall be certified by an accredited listing agency in accordance with standards adopted by the commission. Energy output of collectors and systems shall be determined in accordance with procedures set forth by the listing agency, and shall be based on testing results from accredited testing laboratories.
(2)Require that solar water heating system components are new and unused, and have not previously been placed in service in any other location or for any other application.
(3)Require that solar water heating collectors have a warranty of not less than 10 years to protect against defects and undue degradation.
(4)Require that solar water heating systems are in buildings or facilities connected to a natural gas utilitys distribution system within the state.
(5)Require that solar water heating systems have meters or other kWhth measuring devices in place to monitor and measure the systems performance and the quantity of energy generated or displaced by the system. The criteria shall require meters for systems with a capacity for displacing over 30 kWth. The criteria may require meters for systems with a capacity of 30 kWth or smaller.
(6)Require that solar water heating systems are installed in conformity with the manufacturers specifications and all applicable codes and standards.
(b)Gas customer funded incentives shall not be made for a solar water heating system that does not meet the eligibility criteria.
(c)The commission may adopt consensus solar standards applicable to products or systems as developed by accredited standards developers.
SEC. 6.Section 2865 of the Public Utilities Code is repealed.2865.(a)The commission shall establish conditions on gas customer funded incentives pursuant to this article. The conditions shall require both of the following:
(1)Appropriate siting and high-quality installation of the solar water heating system based on installation guidelines that maximize the performance of the system and prevent qualified systems from being inefficiently or inappropriately installed. The conditions shall not impact housing designs or densities presently authorized by a city, county, or city and county. The goal of this paragraph is to achieve efficient installation of solar water heating systems and promote the greatest energy production or displacement per gas customer dollar.
(2)Appropriate energy efficiency improvements in the new or existing home or facility where the solar water heating system is installed.
(b)The commission shall set rating standards for equipment, components, and systems to ensure reasonable performance and shall develop standards that provide for compliance with the minimum ratings.
SEC. 7.Section 2866 of the Public Utilities Code is repealed.2866.(a)The commission shall provide not less than 10 percent of the overall funds for installation of solar water heating systems on low-income residential housing.
(b)The commission may establish a grant program or a revolving loan or loan guarantee program for low-income residential housing consistent with the requirements of Chapter 5.3 (commencing with Section 25425) of Division 15 of the Public Resources Code. All loans outstanding as of August 1, 2018, shall continue to be repaid in a manner that is consistent with the terms and conditions of the program adopted and implemented by the commission pursuant to this subdivision, until repaid in full.
(c)The commission may extend eligibility for funding pursuant to this section to include residential housing occupied by ratepayers participating in a commission approved and supervised gas corporation Low-Income Energy Efficiency (LIEE) program and who either:
(1)Occupy a single-family home.
(2)Occupy at least 50 percent of all units in a multifamily dwelling structure.
(d)The commission shall ensure that lower income households, as defined in Section 50079.5 of the Health and Safety Code, and, if the commission expands the program pursuant to subdivision (c), ratepayers participating in a LIEE program, that receive gas service at residential housing with a solar water heating system receiving incentives pursuant to subdivision (a), benefit from the installation of the solar water heating systems through reduced or lowered energy costs.
(e)No later than January 1, 2010, the commission shall do all of the following to implement the requirements of this section:
(1)Maximize incentives to properties that are committed to continuously serving the needs of lower income households, as defined in Section 50079.5 of the Health and Safety Code, and, if the commission expands the program pursuant to subdivision (c), ratepayers participating in a LIEE program.
(2)Establish conditions on the installation of solar water heating systems that ensure properties on which solar water heating systems are installed under subdivision (a) remain low-income residential properties for at least 10 years from the time of installation, including property ownership restrictions and income rental protections, and appropriate enforcement of these conditions.
(f)All moneys set aside for the purpose of funding the installation of solar water heating systems on low-income residential housing that are unexpended and unencumbered on August 1, 2018, and all moneys thereafter repaid pursuant to subdivision (b), except to the extent that those moneys are encumbered pursuant to this section, shall be utilized to augment cost-effective energy efficiency measures in low-income residential housing that benefit ratepayers.
SEC. 8.Section 2867 of the Public Utilities Code is repealed.2867.(a)The rebates provided through this program shall decline over time. They shall be structured so as to drive down the cost of the solar water heating technologies, and be paid out on a performance-based incentive basis so that incentives are earned based on the actual energy savings, or on predicted energy savings as established by the commission.
(b)The commission shall consider federal tax credits and other incentives available for this technology when determining the appropriate rebate amount.
(c)The commission shall consider the impact of rebates for solar water heating systems pursuant to this article on existing incentive programs for energy efficiency technology.
(d)In coordination with the commission, the Energy Commission shall consider, when appropriate, coupling rebates for solar water heating systems with complementary energy efficiency technologies, including, but not limited to, efficient hot water heating tanks and tankless or on demand hot water systems that can be installed in addition to the solar water heating system.
SEC. 9.Section 2867.1 of the Public Utilities Code is repealed.2867.1.(a)Not later than July 1, 2010, the commission shall report to the Legislature as to the effectiveness of the program and make recommendations as to any changes that should be made to the program. This report shall include justification for the size of the rebate program in terms of total available incentive moneys as well as the anticipated benefits of the program in its entirety. To facilitate the understanding of how solar water heating systems compare with other clean energy and energy efficiency technologies, all documents related to and rebates provided by this program shall be measured in both kWhth and therms of natural gas saved.
(b)Not later than February 1, 2014, the commission shall complete a review of whether the rebate levels established by the commission will be sufficient to spur investment to reach the program goal of installing 200,000 solar water heating systems in homes, businesses, and other buildings or facilities receiving natural gas service throughout the state by 2017, and shall report to the Legislature on the results of its review. The report submitted pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.
SEC. 10.Section 2867.2 of the Public Utilities Code is repealed.2867.2.Except for the Solar Water Heating Pilot Program in San Diego, solar water heating technologies shall not be eligible for California Solar Initiative (CSI) funds, pursuant to Section 2851, unless they also displace electricity, in which case only the electricity displacing portion of the technology may be eligible under the CSI program, as determined by the commission.
SEC. 11.Section 2867.3 of the Public Utilities Code is repealed.2867.3.In order to further the state goal of encouraging the installation of 200,000 solar water heaters by 2017, the governing body of each publicly owned utility providing gas service to retail end-use gas customers shall, after a public proceeding, adopt, implement, and finance a solar water heating system incentive program that does all the following:
(a)Ensures that any solar water heating system receiving monetary incentives complies with eligibility criteria adopted by the governing body. The eligibility criteria shall include those elements contained in paragraphs (1) to (6), inclusive, of subdivision (a) of Section 2864.
(b)Includes minimum ratings and standards for equipment, components, and systems to ensure reasonable performance and compliance with the minimum ratings and standards.
(c)Includes an element that addresses the installation of solar water heating systems on low-income residential housing. If deemed appropriate in consultation with the California Tax Credit Allocation Committee, the governing board may establish a grant program or a revolving loan or loan guarantee program for low-income residential housing consistent with the requirements of Chapter 5.3 (commencing with Section 25425) of Division 15 of the Public Resources Code.
SEC. 12.Section 2867.4 of the Public Utilities Code is repealed.2867.4.This article shall remain in effect only until August 1, 2018, and as of that date is repealed, unless a later enacted statute, that is enacted before August 1, 2018, deletes or extends that date.
SEC. 13.No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
All matter omitted in this version of the bill appears in the bill as introduced in the Assembly, February 26, 2015. (JR11)(a)The Legislature finds and declares that a program to provide net energy metering combined with net surplus compensation, co-energy metering, and wind energy co-metering for eligible customer-generators is one way to encourage substantial private investment in renewable energy resources, stimulate in-state economic growth, reduce demand for electricity during peak consumption periods, help stabilize Californias energy supply infrastructure, enhance the continued diversification of Californias energy resource mix, reduce interconnection and administrative costs for electricity suppliers, and encourage conservation and efficiency.
(b)As used in this section, the following terms have the following meanings:
(1)Co-energy metering means a program that is the same in all other respects as a net energy metering program, except that the local publicly owned electric utility has elected to apply a generation-to-generation energy and time-of-use credit formula as provided in subdivision (i).
(2)Electrical cooperative means an electrical cooperative as defined in Section 2776.
(3)Electric utility means an electrical corporation, a local publicly owned electric utility, or an electrical cooperative, or any other entity, except an electric service provider, that offers electrical service. This section shall not apply to a local publicly owned electric utility that serves more than 750,000 customers and that also conveys water to its customers.
(4)(A)Eligible customer-generator means a residential customer, small commercial customer as defined in subdivision (h) of Section 331, or commercial, industrial, or agricultural customer of an electric utility, who uses a renewable electrical generation facility, or a combination of those facilities, with a total capacity of not more than one megawatt, that is located on the customers owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the customers own electrical requirements.
(B)(i)Notwithstanding subparagraph (A), eligible customer-generator includes the Department of Corrections and Rehabilitation using a renewable electrical generation technology, or a combination of renewable electrical generation technologies, with a total capacity of not more than eight megawatts, that is located on the departments owned, leased, or rented premises, and is interconnected and operates in parallel with the electrical grid, and is intended primarily to offset part or all of the facilitys own electrical requirements. The amount of any wind generation exported to the electrical grid shall not exceed 1.35 megawatt at any time.
(ii)Notwithstanding any other law, an electrical corporation shall be afforded a prudent but necessary time, as determined by the executive director of the commission, to study the impacts of a request for interconnection of a renewable generator with a capacity of greater than one megawatt under this subparagraph. If the study reveals the need for upgrades to the transmission or distribution system arising solely from the interconnection, the electrical corporation shall be afforded the time necessary to complete those upgrades before the interconnection and those costs shall be borne by the customer-generator. Upgrade projects shall comply with applicable state and federal requirements, including requirements of the Federal Energy Regulatory Commission.
(5)Large electrical corporation means an electrical corporation with more than 100,000 service connections in California.
(6)Net energy metering means measuring the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period as described in subdivisions (c) and (h).
(7)Net surplus customer-generator means an eligible customer-generator that generates more electricity during a 12-month period than is supplied by the electric utility to the eligible customer-generator during the same 12-month period.
(8)Net surplus electricity means all electricity generated by an eligible customer-generator measured in kilowatthours over a 12-month period that exceeds the amount of electricity consumed by that eligible customer-generator.
(9)Net surplus electricity compensation means a per kilowatthour rate offered by the electric utility to the net surplus customer-generator for net surplus electricity that is set by the ratemaking authority pursuant to subdivision (h).
(10)Ratemaking authority means, for an electrical corporation, the commission, for an electrical cooperative, its ratesetting body selected by its shareholders or members, and for a local publicly owned electric utility, the local elected body responsible for setting the rates of the local publicly owned utility.
(11)Renewable electrical generation facility means a facility that generates electricity from a renewable source listed in paragraph (1) of subdivision (a) of Section 25741 of the Public Resources Code. A small hydroelectric generation facility is not an eligible renewable electrical generation facility if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(12)Wind energy co-metering means any wind energy project greater than 50 kilowatts, but not exceeding one megawatt, where the difference between the electricity supplied through the electrical grid and the electricity generated by an eligible customer-generator and fed back to the electrical grid over a 12-month period is as described in subdivision (h). Wind energy co-metering shall be accomplished pursuant to Section 2827.8.
(c)(1)Except as provided in paragraph (4) and in Section 2827.1, every electric utility shall develop a standard contract or tariff providing for net energy metering, and shall make this standard contract or tariff available to eligible customer-generators, upon request, on a first-come-first-served basis until the time that the total rated generating capacity used by eligible customer-generators exceeds 5 percent of the electric utilitys aggregate customer peak demand. Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions. An additional meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the eligible customer-generator, at the expense of the electric utility, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the eligible customer-generator pursuant to subdivision (h), or to collect generating system performance information for research purposes relative to a renewable electrical generation facility. If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions. If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a single meter. An eligible customer-generator that is receiving service other than through the standard contract or tariff may elect to receive service through the standard contract or tariff until the electric utility reaches the generation limit set forth in this paragraph. Once the generation limit is reached, only eligible customer-generators that had previously elected to receive service pursuant to the standard contract or tariff have a right to continue to receive service pursuant to the standard contract or tariff. Eligibility for net energy metering does not limit an eligible customer-generators eligibility for any other rebate, incentive, or credit provided by the electric utility, or pursuant to any a governmental program, including rebates and incentives provided pursuant to the California Solar Initiative.
(2)An electrical corporation shall include a provision in the net energy metering contract or tariff requiring that any a customer with an existing electrical generating facility and meter who enters into a new net energy metering contract shall provide an inspection report to the electrical corporation, unless the electrical generating facility and meter have been installed or inspected within the previous three years. The inspection report shall be prepared by a California licensed contractor who is not the owner or operator of the facility and meter. A California licensed electrician shall perform the inspection of the electrical portion of the facility and meter.
(3)(A)On an annual basis, every electric utility shall make available to the ratemaking authority information on the total rated generating capacity used by eligible customer-generators that are customers of that provider in the providers service area and the net surplus electricity purchased by the electric utility pursuant to this section.
(B)An electric service provider operating pursuant to Section 394 shall make available to the ratemaking authority the information required by this paragraph for each eligible customer-generator that is their customer for each service area of an electrical corporation, local publicly owned electrical electric utility, or electrical cooperative, in which the eligible customer-generator has net energy metering.
(C)The ratemaking authority shall develop a process for making the information required by this paragraph available to electric utilities, and for using that information to determine when, pursuant to paragraphs (1) and (4), an electric utility is not obligated to provide net energy metering to additional eligible customer-generators in its service area.
(4)(A)An electric utility that is not a large electrical corporation is not obligated to provide net energy metering to additional eligible customer-generators in its service area when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in that service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities.
(B)The commission shall require every large electrical corporation to make the standard contract or tariff available to eligible customer-generators, continuously and without interruption, until such times as the large electrical corporation reaches its net energy metering program limit or July 1, 2017, whichever is earlier. A large electrical corporation reaches its program limit when the combined total peak demand of all electricity used by eligible customer-generators served by all the electric utilities in the large electrical corporations service area furnishing net energy metering to eligible customer-generators exceeds 5 percent of the aggregate customer peak demand of those electric utilities. For purposes of calculating a large electrical corporations program limit, aggregate customer peak demand means the highest sum of the noncoincident peak demands of all of the large electrical corporations customers that occurs in any calendar year. To determine the aggregate customer peak demand, every large electrical corporation shall use a uniform method approved by the commission. The program limit calculated pursuant to this paragraph shall not be less than the following:
(i)For San Diego Gas and Electric Company, when it has made 607 megawatts of nameplate generating capacity available to eligible customer-generators.
(ii)For Southern California Edison Company, when it has made 2,240 megawatts of nameplate generating capacity available to eligible customer-generators.
(iii)For Pacific Gas and Electric Company, when it has made 2,409 megawatts of nameplate generating capacity available to eligible customer-generators.
(C)Every large electrical corporation shall file a monthly report with the commission detailing the progress toward the net energy metering program limit established in subparagraph (B). The report shall include separate calculations on progress toward the limits based on operating solar energy systems, cumulative numbers of interconnection requests for net energy metering eligible systems, and any other criteria required by the commission.
(D)Beginning July 1, 2017, or upon reaching the net metering program limit of subparagraph (B), whichever is earlier, the obligation of a large electrical corporation to provide service pursuant to a standard contract or tariff shall be pursuant to Section 2827.1 and applicable state and federal requirements.
(d)Every electric utility shall make all necessary forms and contracts for net energy metering and net surplus electricity compensation service available for download from the Internet.
(e)(1)Every electric utility shall ensure that requests for establishment of net energy metering and net surplus electricity compensation are processed in a time period not exceeding that for similarly situated customers requesting new electric service, but not to exceed 30 working days from the date it receives a completed application form for net energy metering service or net surplus electricity compensation, including a signed interconnection agreement from an eligible customer-generator and the electric inspection clearance from the governmental authority having jurisdiction.
(2)Every electric utility shall ensure that requests for an interconnection agreement from an eligible customer-generator are processed in a time period not to exceed 30 working days from the date it receives a completed application form from the eligible customer-generator for an interconnection agreement.
(3)If an electric utility is unable to process a request within the allowable timeframe pursuant to paragraph (1) or (2), it shall notify the eligible customer-generator and the ratemaking authority of the reason for its inability to process the request and the expected completion date.
(f)(1)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365, or Section 365.1, with an electric service provider that does not provide distribution service for the direct transactions, the electric utility that provides distribution service for the eligible customer-generator is not obligated to provide net energy metering or net surplus electricity compensation to the customer.
(2)If a customer participates in direct transactions pursuant to paragraph (1) of subdivision (b) of Section 365 or 365.1 with an electric service provider, and the customer is an eligible customer-generator, the electric utility that provides distribution service for the direct transactions may recover from the customers electric service provider the incremental costs of metering and billing service related to net energy metering and net surplus electricity compensation in an amount set by the ratemaking authority.
(g)Except for the time-variant kilowatthour pricing portion of any tariff adopted by the commission pursuant to paragraph (4) of subdivision (a) of Section 2851, each net energy metering contract or tariff shall be identical, with respect to rate structure, all retail rate components, and any monthly charges, to the contract or tariff to which the same customer would be assigned if the customer did not use a renewable electrical generation facility, except that eligible customer-generators shall not be assessed standby charges on the electrical generating capacity or the kilowatthour production of a renewable electrical generation facility. The charges for all retail rate components for eligible customer-generators shall be based exclusively on the customer-generators net kilowatthour consumption over a 12-month period, without regard to the eligible customer-generators choice as to from whom it purchases electricity that is not self-generated. Any new or additional demand charge, standby charge, customer charge, minimum monthly charge, interconnection charge, or any other charge that would increase an eligible customer-generators costs beyond those of other customers who are not eligible customer-generators in the rate class to which the eligible customer-generator would otherwise be assigned if the customer did not own, lease, rent, or otherwise operate a renewable electrical generation facility is contrary to the intent of this section, and shall not form a part of net energy metering contracts or tariffs.
(h)For eligible customer-generators, the net energy metering calculation shall be made by measuring the difference between the electricity supplied to the eligible customer-generator and the electricity generated by the eligible customer-generator and fed back to the electrical grid over a 12-month period. The following rules shall apply to the annualized net metering calculation:
(1)The eligible residential or small commercial customer-generator, at the end of each 12-month period following the date of final interconnection of the eligible customer-generators system with an electric utility, and at each anniversary date thereafter, shall be billed for electricity used during that 12-month period. The electric utility shall determine if the eligible residential or small commercial customer-generator was a net consumer or a net surplus customer-generator during that period.
(2)At the end of each 12-month period, where the electricity supplied during the period by the electric utility exceeds the electricity generated by the eligible residential or small commercial customer-generator during that same period, the eligible residential or small commercial customer-generator is a net electricity consumer and the electric utility shall be owed compensation for the eligible customer-generators net kilowatthour consumption over that 12-month period. The compensation owed for the eligible residential or small commercial customer-generators consumption shall be calculated as follows:
(A)For all eligible customer-generators taking service under contracts or tariffs employing baseline and over baseline rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned to, or be eligible for, if the customer was not an eligible customer-generator. If those same customer-generators are net generators over a billing period, the net kilowatthours generated shall be valued at the same price per kilowatthour as the electric utility would charge for the baseline quantity of electricity during that billing period, and if the number of kilowatthours generated exceeds the baseline quantity, the excess shall be valued at the same price per kilowatthour as the electric utility would charge for electricity over the baseline quantity during that billing period.
(B)For all eligible customer-generators taking service under contracts or tariffs employing time-of-use rates, any net monthly consumption of electricity shall be calculated according to the terms of the contract or tariff to which the same customer would be assigned, or be eligible for, if the customer was not an eligible customer-generator. When those same customer-generators are net generators during any discrete time-of-use period, the net kilowatthours produced shall be valued at the same price per kilowatthour as the electric utility would charge for retail kilowatthour sales during that same time-of-use period. If the eligible customer-generators time-of-use electrical meter is unable to measure the flow of electricity in two directions, paragraph (1) of subdivision (c) shall apply.
(C)For all eligible residential and small commercial customer-generators and for each billing period, the net balance of moneys owed to the electric utility for net consumption of electricity or credits owed to the eligible customer-generator for net generation of electricity shall be carried forward as a monetary value until the end of each 12-month period. For all eligible commercial, industrial, and agricultural customer-generators, the net balance of moneys owed shall be paid in accordance with the electric utilitys normal billing cycle, except that if the eligible commercial, industrial, or agricultural customer-generator is a net electricity producer over a normal billing cycle, any excess kilowatthours generated during the billing cycle shall be carried over to the following billing period as a monetary value, calculated according to the procedures set forth in this section, and appear as a credit on the eligible commercial, industrial, or agricultural customer-generators account, until the end of the annual period when paragraph (3) shall apply.
(3)At the end of each 12-month period, where the electricity generated by the eligible customer-generator during the 12-month period exceeds the electricity supplied by the electric utility during that same period, the eligible customer-generator is a net surplus customer-generator and the electric utility, upon an affirmative election by the net surplus customer-generator, shall either (A) provide net surplus electricity compensation for any net surplus electricity generated during the prior 12-month period, or (B) allow the net surplus customer-generator to apply the net surplus electricity as a credit for kilowatthours subsequently supplied by the electric utility to the net surplus customer-generator. For an eligible customer-generator that does not affirmatively elect to receive service pursuant to net surplus electricity compensation, the electric utility shall retain any excess kilowatthours generated during the prior 12-month period. The eligible customer-generator not affirmatively electing to receive service pursuant to net surplus electricity compensation shall not be owed any compensation for the net surplus electricity unless the electric utility enters into a purchase agreement with the eligible customer-generator for those excess kilowatthours. Every electric utility shall provide notice to eligible customer-generators that they are eligible to receive net surplus electricity compensation for net surplus electricity, that they must elect to receive net surplus electricity compensation, and that the 12-month period commences when the electric utility receives the eligible customer-generators election. For an electric utility that is an electrical corporation or electrical cooperative, the commission may adopt requirements for providing notice and the manner by which eligible customer-generators may elect to receive net surplus electricity compensation.
(4)(A)An eligible customer-generator with multiple meters may elect to aggregate the electrical load of the meters located on the property where the renewable electrical generation facility is located and on all property adjacent or contiguous to the property on which the renewable electrical generation facility is located, if those properties are solely owned, leased, or rented by the eligible customer-generator. If the eligible customer-generator elects to aggregate the electric load pursuant to this paragraph, the electric utility shall use the aggregated load for the purpose of determining whether an eligible customer-generator is a net consumer or a net surplus customer-generator during a 12-month period.
(B)If an eligible customer-generator chooses to aggregate pursuant to subparagraph (A), the eligible customer-generator shall be permanently ineligible to receive net surplus electricity compensation, and the electric utility shall retain any kilowatthours in excess of the eligible customer-generators aggregated electrical load generated during the 12-month period.
(C)If an eligible customer-generator with multiple meters elects to aggregate the electrical load of those meters pursuant to subparagraph (A), and different rate schedules are applicable to service at any of those meters, the electricity generated by the renewable electrical generation facility shall be allocated to each of the meters in proportion to the electrical load served by those meters. For example, if the eligible customer-generator receives electric service through three meters, two meters being at an agricultural rate that each provide service to 25 percent of the customers total load, and a third meter, at a commercial rate, that provides service to 50 percent of the customers total load, then 50 percent of the electrical generation of the eligible renewable generation facility shall be allocated to the third meter that provides service at the commercial rate and 25 percent of the generation shall be allocated to each of the two meters providing service at the agricultural rate. This proportionate allocation shall be computed each billing period.
(D)This paragraph shall not become operative for an electrical corporation unless the commission determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers who are not eligible customer-generators. The commission shall make this determination by September 30, 2013. In making this determination, the commission shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generators would pay pursuant to the net energy metering program as it exists prior to aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph.
(E)A local publicly owned electric utility or electrical cooperative shall only allow eligible customer-generators to aggregate their load if the utilitys ratemaking authority determines that allowing eligible customer-generators to aggregate their load from multiple meters will not result in an increase in the expected revenue obligations of customers that are not eligible customer-generators. The ratemaking authority of a local publicly owned electric utility or electrical cooperative shall make this determination within 180 days of the first request made by an eligible customer-generator to aggregate their load. In making the determination, the ratemaking authority shall determine if there are any public purpose or other noncommodity charges that the eligible customer-generator would pay pursuant to the net energy metering or co-energy metering program of the utility as it exists prior to aggregation, that the eligible customer-generator would not pay if permitted to aggregate the electrical load of multiple meters pursuant to this paragraph. If the ratemaking authority determines that load aggregation will not cause an incremental rate impact on the utilitys customers that are not eligible customer-generators, the local publicly owned electric utility or electrical cooperative shall permit an eligible customer-generator to elect to aggregate the electrical load of multiple meters pursuant to this paragraph. The ratemaking authority may reconsider any determination made pursuant to this subparagraph in a subsequent public proceeding.
(F)For purposes of this paragraph, parcels that are divided by a street, highway, or public thoroughfare are considered contiguous, provided they are otherwise contiguous and under the same ownership.
(G)An eligible customer-generator may only elect to aggregate the electrical load of multiple meters if the renewable electrical generation facility, or a combination of those facilities, has a total generating capacity of not more than one megawatt.
(H)Notwithstanding subdivision (g), an eligible customer-generator electing to aggregate the electrical load of multiple meters pursuant to this subdivision shall remit service charges for the cost of providing billing services to the electric utility that provides service to the meters.
(5)(A)The ratemaking authority shall establish a net surplus electricity compensation valuation to compensate the net surplus customer-generator for the value of net surplus electricity generated by the net surplus customer-generator. The commission shall establish the valuation in a ratemaking proceeding. The ratemaking authority for a local publicly owned electric utility shall establish the valuation in a public proceeding. The net surplus electricity compensation valuation shall be established so as to provide the net surplus customer-generator just and reasonable compensation for the value of net surplus electricity, while leaving other ratepayers unaffected. The ratemaking authority shall determine whether the compensation will include, where appropriate justification exists, either or both of the following components:
(i)The value of the electricity itself.
(ii)The value of the renewable attributes of the electricity.
(B)In establishing the rate pursuant to subparagraph (A), the ratemaking authority shall ensure that the rate does not result in a shifting of costs between eligible customer-generators and other bundled service customers.
(6)(A)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, any renewable energy credit, as defined in Section 399.12, for net surplus electricity purchased by the electric utility shall belong to the electric utility. Any renewable energy credit associated with electricity generated by the eligible customer-generator that is utilized by the eligible customer-generator shall remain the property of the eligible customer-generator.
(B)Upon adoption of the net surplus electricity compensation rate by the ratemaking authority, the net surplus electricity purchased by the electric utility shall count toward the electric utilitys renewables portfolio standard annual procurement targets for the purposes of paragraph (1) of subdivision (b) of Section 399.15, or for a local publicly owned electric utility, the renewables portfolio standard annual procurement targets established pursuant to Section 399.30.
(7)The electric utility shall provide every eligible residential or small commercial customer-generator with net electricity consumption and net surplus electricity generation information with each regular bill. That information shall include the current monetary balance owed the electric utility for net electricity consumed, or the net surplus electricity generated, since the last 12-month period ended. Notwithstanding this subdivision, an electric utility shall permit that customer to pay monthly for net energy consumed.
(8)If an eligible residential or small commercial customer-generator terminates the customer relationship with the electric utility, the electric utility shall reconcile the eligible customer-generators consumption and production of electricity during any part of a 12-month period following the last reconciliation, according to the requirements set forth in this subdivision, except that those requirements shall apply only to the months since the most recent 12-month bill.
(9)If an electric service provider or electric utility providing net energy metering to a residential or small commercial customer-generator ceases providing that electric service to that customer during any 12-month period, and the customer-generator enters into a new net energy metering contract or tariff with a new electric service provider or electric utility, the 12-month period, with respect to that new electric service provider or electric utility, shall commence on the date on which the new electric service provider or electric utility first supplies electric service to the customer-generator.
(i)Notwithstanding any other provisions of this section, paragraphs (1), (2), and (3) shall apply to an eligible customer-generator with a capacity of more than 10 kilowatts, but not exceeding one megawatt, that receives electric service from a local publicly owned electric utility that has elected to utilize a co-energy metering program unless the local publicly owned electric utility chooses to provide service for eligible customer-generators with a capacity of more than 10 kilowatts in accordance with subdivisions (g) and (h):
(1)The eligible customer-generator shall be required to utilize a meter, or multiple meters, capable of separately measuring electricity flow in both directions. All meters shall provide time-of-use measurements of electricity flow, and the customer shall take service on a time-of-use rate schedule. If the existing meter of the eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of electricity in both directions, the eligible customer-generator shall be responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to utilize any economic incentives provided by a governmental agency or an electric utility to reduce its costs for purchasing and installing a time-of-use meter.
(2)The consumption of electricity from the local publicly owned electric utility shall result in a cost to the eligible customer-generator to be priced in accordance with the standard rate charged to the eligible customer-generator in accordance with the rate structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility. The generation of electricity provided to the local publicly owned electric utility shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, established under the applicable structure to which the customer would be assigned if the customer did not use a renewable electrical generation facility.
(3)All costs and credits shall be shown on the eligible customer-generators bill for each billing period. In any months in which the eligible customer-generator has been a net consumer of electricity calculated on the basis of value determined pursuant to paragraph (2), the customer-generator shall owe to the local publicly owned electric utility the balance of electricity costs and credits during that billing period. In any billing period in which the eligible customer-generator has been a net producer of electricity calculated on the basis of value determined pursuant to paragraph (2), the local publicly owned electric utility shall owe to the eligible customer-generator the balance of electricity costs and credits during that billing period. Any net credit to the eligible customer-generator of electricity costs may be carried forward to subsequent billing periods, provided that a local publicly owned electric utility may choose to carry the credit over as a kilowatthour credit consistent with the provisions of any applicable contract or tariff, including any differences attributable to the time of generation of the electricity. At the end of each 12-month period, the local publicly owned electric utility may reduce any net credit due to the eligible customer-generator to zero.
(j)A renewable electrical generation facility used by an eligible customer-generator shall meet all applicable safety and performance standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories, including Underwriters Laboratories Incorporated and, where applicable, rules of the commission regarding safety and reliability. A customer-generator whose renewable electrical generation facility meets those standards and rules shall not be required to install additional controls, perform or pay for additional tests, or purchase additional liability insurance.
(k)If the commission determines that there are cost or revenue obligations for an electrical corporation that may not be recovered from customer-generators acting pursuant to this section, those obligations shall remain within the customer class from which any shortfall occurred and shall not be shifted to any other customer class. Net energy metering and co-energy metering customers shall not be exempt from the public goods charges imposed pursuant to Article 7 (commencing with Section 381), Article 8 (commencing with Section 385), or Article 15 (commencing with Section 399) of Chapter 2.3 of Part 1.
(l)A net energy metering, co-energy metering, or wind energy co-metering customer shall reimburse the Department of Water Resources for all charges that would otherwise be imposed on the customer by the commission to recover bond-related costs pursuant to an agreement between the commission and the Department of Water Resources pursuant to Section 80110 of the Water Code, as well as the costs of the department equal to the share of the departments estimated net unavoidable power purchase contract costs attributable to the customer. The commission shall incorporate the determination into an existing proceeding before the commission, and shall ensure that the charges are nonbypassable. Until the commission has made a determination regarding the nonbypassable charges, net energy metering, co-energy metering, and wind energy co-metering shall continue under the same rules, procedures, terms, and conditions as were applicable on December 31, 2002.
(m)In implementing the requirements of subdivisions (k) and (l), an eligible customer-generator shall not be required to replace its existing meter except as set forth in paragraph (1) of subdivision (c), nor shall the electric utility require additional measurement of usage beyond that which is necessary for customers in the same rate class as the eligible customer-generator.
(n)It is the intent of the Legislature that the Treasurer incorporate net energy metering, including net surplus electricity compensation, co-energy metering, and wind energy co-metering projects undertaken pursuant to this section as sustainable building methods or distributive energy technologies for purposes of evaluating low-income housing projects.
|
Date
|
Status
|
|---|---|
| Feb 1, 2016 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan 31, 2016 | Died pursuant to Article IV, Sec. 10(c) of the Constitution. |
| Apr 16, 2015 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Apr 6, 2015 | Re-referred to Com. on U. & C. |
| Mar 26, 2015 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & C. Read second time and amended. |
| Mar 26, 2015 | Referred to Com. on U. & C. |
| Feb 27, 2015 | From printer. May be heard in committee March 29. |
| Feb 26, 2015 | Read first time. To print. |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
Bill Author
Bill Co-Author(s):