AB 938: Sustainable Groundwater Management Act: adjudicated basins.
- Session Year: 2015-2016
- House: Assembly
- Latest Version Date: 2016-03-09
Existing law specifies the jurisdiction of the courts. Under existing law, courts may adjudicate rights to produce groundwater and exercise other powers relating to the supervision of a groundwater basin.
Existing law, the Sustainable Groundwater Management Act, requires all groundwater basins designated as high- or medium-priority basins by the Department of Water Resources that are designated as basins subject to critical overdraft to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2020, and requires all other basins designated as high- or medium-priority basins to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2022, except as specified. Under existing law, the provisions of the act do not apply to an adjudicated groundwater basin, as specified, or to a local agency that conforms to the requirements of an adjudication of water rights for an adjudicated groundwater basin.
This bill would authorize the watermaster or local agency administering an adjudicated basin to elect that the adjudicated basin be subject to the provisions of the act. The bill would authorize the court with jurisdiction over the adjudicated basin to issue an order setting a hearing to determine whether the adjudicated basin shall be subject to the act, as prescribed. The bill would require the watermaster or local agency to provide written notice to the department that the adjudicated basin is subject to the act, and would require the department to post that notice to its Internet Web site within 15 days.
This bill would declare that it is to take effect immediately as an urgency statute.
Existing law requires the Department of Water Resources to identify the extent of monitoring of groundwater elevations that is being undertaken within each groundwater basin or subbasin and to prioritize basins or subbasins as high, medium, low, or very low priority and requires the initial priority for each basin to be established no later than January 31, 2015. Existing law, the Sustainable Groundwater Management Act, requires all groundwater basins designated as high- or medium-priority basins by the department that are designated as basins subject to critical conditions of overdraft to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2020, and requires all other groundwater basins designated as high- or medium-priority basins to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2022, except as specified. The act requires, any time the department changes these basin priorities and elevates a basin to a medium- or high-priority basin after January 31, 2015, a local agency or combination of local agencies overlying a groundwater basin to either establish a groundwater sustainability agency within 2 years of reprioritization and adopt a groundwater sustainability plan within 5 years of reprioritization, or to submit an alternative to the department that the local agency believes satisfies the objectives of these provisions within 2 years of reprioritization.
This bill would make nonsubstantive changes to these groundwater basin provisions.
Existing law requires the Department of Water Resources to identify the extent of monitoring of groundwater elevations that is being undertaken within each groundwater basin or subbasin and to prioritize basins or subbasins as high, medium, low, or very low priority and requires the initial priority for each basin to be established no later than January 31, 2015. Existing law, the Sustainable Groundwater Management Act, requires all groundwater basins designated as high- or medium-priority basins by the department that are designated as basins subject to critical conditions of overdraft to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2020, and requires all other groundwater basins designated as high- or medium-priority basins to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2022, except as specified. The act requires requires, any time the department changes these basin priorities and elevates a basin to a medium- or high-priority basin after January 31, 2015, a local agency, any time the department changes these basin priorities and elevates a basin to a medium- or high-priority basin after January 31, 2015, agency or combination of local agencies overlying a groundwater basin to either establish a groundwater sustainability agency within 2 years of reprioritization and adopt a groundwater sustainability plan within 5 years of reprioritization, or to submit an alternative to the department that the local agency believes satisfies the objectives of these provisions within 2 years of reprioritization.
This bill would impose the requirement to establish a groundwater sustainability agency or submit an alternative after reprioritization on a local agency or combination of local agencies overlying a groundwater basin. make nonsubstantive changes to these groundwater basin provisions.
Existing law requires the Department of Water Resources to identify the extent of monitoring of groundwater elevations that is being undertaken within each groundwater basin or subbasin and to prioritize basins or subbasins as high, medium, low, or very low priority and requires the initial priority for each basin to be established no later than January 31, 2015. Existing law, the Sustainable Groundwater Management Act, requires all groundwater basins designated as high- or medium-priority basins by the department that are designated as basins subject to critical conditions of overdraft to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2020, and requires all other groundwater basins designated as high- or medium-priority basins to be managed under a groundwater sustainability plan or coordinated groundwater sustainability plans by January 31, 2022, except as specified. The act requires a local agency, any time the department changes these basin priorities and elevates a basin to a medium- or high-priority basin after January 31, 2015, to either establish a groundwater sustainability agency within 2 years of reprioritization and adopt a groundwater sustainability plan within 5 years of reprioritization, or to submit an alternative to the department that the local agency believes satisfies the objectives of these provisions within 2 years of reprioritization.
This bill would impose the requirement to establish a groundwater sustainability agency or submit an alternative after reprioritization on a local agency or combination of local agencies overlying a groundwater basin.
(a)Except as provided in subdivision (e), this part does not apply to the following adjudicated areas or a local agency that conforms to the requirements of an adjudication of water rights for one of the following adjudicated areas:
(1)Beaumont Basin.
(2)Brite Basin.
(3)Central Basin.
(4)Chino Basin.
(5)Cucamonga Basin.
(6)Cummings Basin.
(7)Goleta Basin.
(8)Lytle Basin.
(9)Main San Gabriel Basin.
(10)Mojave Basin Area.
(11)Puente Basin.
(12)Raymond Basin.
(13)Rialto-Colton Basin.
(14)Riverside Basin.
(15)San Bernardino Basin Area.
(16)San Jacinto Basin.
(17)Santa Margarita River Watershed.
(18)Santa Maria Valley Basin.
(19)Santa Paula Basin.
(20)Scott River Stream System.
(21)Seaside Basin.
(22)Six Basins.
(23)Tehachapi Basin.
(24)Upper Los Angeles River Area.
(25)Warren Valley Basin.
(26)West Coast Basin.
(b)The Antelope Valley basin at issue in the Antelope Valley Groundwater Cases (Judicial Council Coordination Proceeding Number 4408) shall be treated as an adjudicated basin pursuant to this section if the superior court issues a final judgment, order, or decree.
(c)Any groundwater basin or portion of a groundwater basin in Inyo County managed pursuant to the terms of the stipulated judgment in City of Los Angeles v. Board of Supervisors of the County of Inyo, et al. (Inyo County Case No. 12908) shall be treated as an adjudicated area pursuant to this section.
(d)The Los Osos Groundwater Basin at issue in Los Osos Community Service District v. Southern California Water Company [Golden State Water Company] et al. (San Luis Obispo County Superior Court Case No. CV 040126) shall be treated as an adjudicated basin pursuant to this section if the superior court issues a final judgment, order, or decree.
(e)If an adjudication action has determined the rights to extract groundwater for only a portion of a basin, subdivisions (a), (b), (c), and (d) apply only within the area for which the adjudication action has determined those rights.
(f)A watermaster or local agency administering an adjudicated basin may elect that the adjudicated basin be subject to the provisions of this part as follows:
(1)The watermaster or local agency shall provide written notice of the proposed election to the court with jurisdiction over the adjudicated basin and to all parties over which the court has continuing jurisdiction in connection with the adjudication decree adopted by the court for that adjudicated basin.
(2)The court with jurisdiction over the adjudicated basin may order a hearing to determine whether the adjudicated basin shall be subject to this part. If, on its own motion, the court determines that a hearing on the request is appropriate, the court shall issue an order setting a hearing within 60 days of the date on which the court receives notice pursuant to paragraph (1). If a party that receives notice pursuant to paragraph (1) wishes the court to hold a hearing on the request, the party shall file a motion with the court requesting a hearing within 30 days of the date of the notice and the court may issue an order either setting a hearing or denying the request for a hearing within 60 days of the date of the notice.
(3)After a hearing held pursuant to paragraph (2), the court shall issue an order that states whether the adjudicated basin shall be subject to this part.
(4)If the court does not issue an order setting a hearing within the time limits described in paragraph (2), the adjudicated basin shall be subject to this part.
(5)The court shall maintain continuing jurisdiction over the watermasters or local agencys administration of the adjudicated basin.
(6)If the adjudicated basin is determined to be subject to the requirements of this part pursuant to paragraph (3) or (4), the watermaster or local agency administering the adjudicated basin shall provide written notice to the department that the adjudicated basin is subject to this part. The department shall post all notices it receives pursuant to this paragraph on its Internet Web site within 15 days.
(7)Nothing in this part shall be construed in a manner that would do either of the following:
(A)Require the watermaster or local agency that administers an adjudicated basin to violate the adjudication decree.
(B)Deprive a court with jurisdiction over an adjudicated basin of its authority to enforce compliance with the adjudication decree.
(f)
(g)The watermaster or a local agency within a basin identified in subdivision (a) shall do all of the following:
(1)By April 1, 2016, submit to the department a copy of a governing final judgment, or other judicial order or decree, and any amendments entered before April 1, 2016.
(2)Within 90 days of entry by a court, submit to the department a copy of any amendment made and entered by the court to the governing final judgment or other judicial order or decree on or after April 1, 2016.
(3)By April 1, 2016, and annually thereafter, submit to the department a report containing the following information to the extent available for the portion of the basin subject to the adjudication:
(A)Groundwater elevation data unless otherwise submitted pursuant to Section 10932.
(B)Annual aggregated data identifying groundwater extraction for the preceding water year.
(C)Surface water supply used for or available for use for groundwater recharge or in-lieu use.
(D)Total water use.
(E)Change in groundwater storage.
(F)The annual report submitted to the court.
SEC. 2.This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to permit groundwater sustainability agencies to include entities representing adjudicated basins to meet organizational deadlines of the act and to respond to emergency conditions caused by declining groundwater tables caused by the prolonged drought, it is necessary that the act take effect immediately.
SECTION 1.Section 10722.4 of the Water Code is amended to read:10722.4.(a)Pursuant to Section 10933, for purposes of this part, the department shall categorize each basin as one of the following priorities:
(1)High priority.
(2)Medium priority.
(3)Low priority.
(4)Very low priority.
(b)The initial priority for each basin shall be established by the department pursuant to Section 10933 no later than January 31, 2015.
(c)Any time the department updates Bulletin 118 boundaries pursuant to subdivision (b) of Section 12924, the department shall reassess the prioritization pursuant to Section 10933.
(d)If the department changes priorities pursuant to Section 10933 to elevate a basin from a low- or very low priority basin to a medium- or high-priority basin after January 31, 2015, the agency formation and planning deadlines of this part shall be extended as follows:
(1)A local agency, or combination of local agencies overlying a groundwater basin, shall have two years from the date of reprioritization to either establish a groundwater sustainability agency pursuant to Chapter 4 (commencing with Section 10723) or two years to satisfy the requirements of Section 10733.6.
(2)A groundwater sustainability agency shall have five years from the date of reprioritization to meet the requirements of subdivision (a) of Section 10720.7, except that if the reprioritization occurs before January 31, 2017, a groundwater sustainability agency subject to paragraph (2) of subdivision (a) of Section 10720.7 shall have until January 31, 2022.
(a)Pursuant to Section 10933, for the purposes of this part the department shall categorize each basin as one of the following priorities:
(1)High priority.
(2)Medium priority.
(3)Low priority.
(4)Very low priority.
(b)The initial priority for each basin shall be established by the department pursuant to Section 10933 no later than January 31, 2015.
(c)Any time the department updates Bulletin 118 boundaries pursuant to subdivision (b) of Section 12924, the department shall reassess the prioritization pursuant to Section 10933.
(d)Any time the department changes the basin priorities pursuant to Section 10933, if a basin is elevated to a medium- or high-priority basin after January 31, 2015, a local agency or combination of local agencies overlying a groundwater basin shall have two years from the date of reprioritization to either establish a groundwater sustainability agency pursuant to Chapter 4 (commencing with Section 10723) and five years from the date of reprioritization to adopt a groundwater sustainability plan pursuant to Chapter 6 (commencing with Section 10727) or two years to satisfy the requirements of Section 10733.6.
SECTION 1.Section 10722.4 of the Water Code is amended to read:10722.4.(a)Pursuant to Section 10933, for the purposes of this part part, the department shall categorize each basin as one of the following priorities:
(1)High priority.
(2)Medium priority.
(3)Low priority.
(4)Very low priority.
(b)The initial priority for each basin shall be established by the department pursuant to Section 10933 no later than January 31, 2015.
(c)Any time the department updates Bulletin 118 boundaries pursuant to subdivision (b) of Section 12924, the department shall reassess the prioritization pursuant to Section 10933.
(d)If the department changes priorities pursuant to Section 10933 to elevate a basin from a low- or very low priority basin to a medium- or high-priority basin after January 31, 2015, the agency formation and planning deadlines of this part shall be extended as follows:
(1)A local agency, or combination of local agencies overlying a groundwater basin, shall have two years from the date of reprioritization to either establish a groundwater sustainability agency pursuant to Chapter 4 (commencing with Section 10723) or two years to satisfy the requirements of Section 10733.6.
(2)A groundwater sustainability agency shall have five years from the date of reprioritization to meet the requirements of subdivision (a) of Section 10720.7, except that if the reprioritization occurs before January 31, 2017, a groundwater sustainability agency subject to paragraph (2) of subdivision (a) of Section 10720.7 shall have until January 31, 2022.
(a)Pursuant to Section 10933, for the purposes of this part the department shall categorize each basin as one of the following priorities:
(1)High priority.
(2)Medium priority.
(3)Low priority.
(4)Very low priority.
(b)The initial priority for each basin shall be established by the department pursuant to Section 10933 no later than January 31, 2015.
(c)Any time the department updates Bulletin 118 boundaries pursuant to subdivision (b) of Section 12924, the department shall reassess the prioritization pursuant to Section 10933.
(d)Any time the department changes the basin priorities pursuant to Section 10933, if a basin is elevated to a medium- or high-priority basin after January 31, 2015, a local agency or combination of local agencies overlying a groundwater basin shall have two years from the date of reprioritization to either establish a groundwater sustainability agency pursuant to Chapter 4 (commencing with Section 10723) and five years from the date of reprioritization to adopt a groundwater sustainability plan pursuant to Chapter 6 (commencing with Section 10727) or two years to satisfy the requirements of Section 10733.6.
|
Date
|
Status
|
|---|---|
| Mar 9, 2016 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on N.R. & W. |
| Feb 11, 2016 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on N.R. & W. |
| Jul 13, 2015 | In committee: Set, second hearing. Hearing canceled at the request of author. |
| Jun 15, 2015 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| May 7, 2015 | Referred to Com. on N.R. & W. |
| Apr 20, 2015 | In Senate. Read first time. To Com. on RLS. for assignment. |
| Apr 20, 2015 | Read third time. Passed. Ordered to the Senate. (Ayes 80. Noes 0. Page 1016.) |
| Apr 15, 2015 | Read second time. Ordered to consent calendar. |
| Apr 14, 2015 | From committee: Do pass. To Consent Calendar. (Ayes 15. Noes 0.) (April 14). |
| Apr 14, 2015 | From committee: Do pass. Ordered to Consent Calendar. (Ayes 15. Noes 0.) (April 14). |
| Mar 16, 2015 | Referred to Com. on W., P., & W. |
| Feb 27, 2015 | From printer. May be heard in committee March 29. |
| Feb 26, 2015 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| Apr 20, 2015 | AB 938 SALAS Consent Calendar Second Day Regular Session | Assembly Floor |
Passed |
|
| Apr 14, 2015 | Do pass. To Consent Calendar. | Assembly Standing Committee on Water, Parks, and Wildlife |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
AB 938
Page 2
Date of Hearing: April 14, 2015
ASSEMBLY COMMITTEE ON WATER, PARKS, AND WILDLIFE
Marc Levine, Chair
AB 938
(Salas) – As Introduced February 26, 2015
SUBJECT: Sustainable Groundwater Management Act
SUMMARY: Clarifies that a statutory section that refers to an agency in the singular also means agencies in the plural.
Specifically, this bill amends the Sustainable Groundwater Management Act (SGMA) to specify if the Department of Water Resources reclassifies a basin such that it becomes subject to SGMA then not just a local agency overlying a groundwater basin subject to SGMA would be entitled to additional time to comply with SGMA but also if there is a combination of local agencies overlying a groundwater basin they would be entitled to additional time.
EXISTING LAW:
States that the singular number includes the plural and the plural the singular in the Water Code.
Requires the Department of Water Resources (DWR) to evaluate groundwater basins and designate them as high, medium, low or very low, according to various factors including, but not limited to, level of dependence upon the basin by municipal and agricultural users;
Requires that local agencies in high- and medium-priority groundwater basins subject to SGMA form one or more local Groundwater Sustainability Agencies (GSAs) by June 30, 2017 in order to develop and implement Groundwater Sustainability Plans (GSPs) that provide for the sustainable management of the groundwater basin or subbasin, as defined.
Requires that GSAs in basins with chronic overdraft develop and adopt GSPs for their basin or subbasin by January 31, 2020.
Requires that GSAs in all other high- and medium-priority basins subject to SGMA develop and adopt GSPs by January 31, 2022.
Delays enforcement for failure to a adopt a GSP in a high- or medium-priority basins that is in a condition where groundwater extractions result in significant depletions of interconnected surface waters until January 31, 2025.
Requires that adopted GSPs utilize a 50 year planning horizon that will achieve sustainability in a basin or subbasin within 20 years and include identified milestones at five year intervals.
Allows that if a low or very low priority basin is reprioritzed by DWR such that it becomes subject to SGMA, then local agencies shall have two years from the date of reprioritization to form a GSA and five years from the date of reprioritization to adopt a GSP.
FISCAL EFFECT: None. This bill keyed non-fiscal by the Legislative Counsel.
COMMENTS: This bill would make a minor technical change to SGMA. The author states this bill is needed because it is ambiguous as to whether the language stating that local agencies shall have two years from the date of reprioritization to form a GSA and five years from the date of reprioritization to adopt a GSP would also apply to "a combination of agencies."
Supporting arguments. Supporters state that this bill clarifies that "a combination of local agencies" can also establish a Groundwater Sustainability Agency.
SGMA-related legislation
This is one of 14 bills in the Legislature proposing changes to SGMA and its related statutes. The other bills are: AB 452 (Bigelow) prohibiting the State Water Board from using Water Rights Fund monies for SGMA enforcement, except funds collected from SGMA enforcement; AB 453 (Bigelow) allowing groundwater management plans adopted prior to SGMA to be amended and extended; AB 454 (Bigelow) adding one year to the deadline to form a GSA or adopt a GSP; AB 455 (Bigelow) requiring the Judicial Council to come up with a 270-day process for completing all California Environmental Quality Act (CEQA) legal challenges to SGMA projects; AB 617 (Perea) adding mutual water companies to GSAs; AB 939 (Salas) changing the time period for providing technical data upon which a fee is based from 10 days to 20 days before the meeting to adopt the fee; AB 1242 (Gray) prohibiting the State Water Board from setting in-stream flows standards unless the Board mitigates for the potential local response of increased groundwater use; AB 1243 (Gray) rebating 50% of all SGMA enforcement penalties back to local governments and water districts for groundwater recharge projects; AB 1390 (Alejo) creating a streamlined process for groundwater adjudications and exempting them from SGMA, except minimal reporting requirements; AB 1531 (Environmental Safety and Toxic Materials Committee) making minor technical changes to SGMA; SB 13 (Pavley) making noncontroversial technical cleanup changes to SGMA; SB 226 (Pavley) adding a streamlined groundwater adjudication section to SGMA; and SB 487 (Nielsen) exempting SGMA projects from CEQA.
REGISTERED SUPPORT / OPPOSITION:
Support
Association of California Water Agencies
Rural County Representatives of California
Opposition
None on file
Analysis Prepared by: Tina Cannon Leahy / W., P., & W. / (916) 319-2096
Bill Author
Bill Co-Author(s):