AB 1016: Power facility and site certifications: thermal powerplants: geothermal resources.
- Session Year: 2025-2026
- House: Assembly
- Latest Version Date: 2025-06-19
Current Status:
In Progress
(2025-06-26: In committee: Set, first hearing. Hearing canceled at the request of author.)
Introduced
In Committee
Awaiting First Chamber Vote
Passed First Chamber
In Committee
Awaiting Second Chamber Vote
Passed Second Chamber
Enacted
Existing law vests the State Energy Resources Conservation and Development Commission with the exclusive jurisdiction to certify the construction of a thermal powerplant, as defined. Existing law prohibits a person from constructing a thermal powerplant unless that person obtains certification from the commission. Existing law authorizes the commission to exempt from the certification requirement a thermal powerplant with a generating capacity of up to 100 megawatts and modifications to existing generating facilities that do not add capacity in excess of 100 megawatts, if the commission finds that no substantial adverse impact on the environment or energy resources will result from the project. Existing law makes the commission the lead agency for purposes of environmental review pursuant to the California Environmental Quality Act (CEQA) for all projects that require certification and for projects that are exempted by the commission.
This bill would additionally authorize the commission to exempt from the certification requirement, only until January 1, 2030, a thermal powerplant that generates electricity using exclusively geothermal resources and is found by the commission to meet specified criteria, including that the person proposing the powerplant files an application on or before June 30, 2029, with the local governmental agency that has land use and related jurisdiction over the area in which the powerplant is located, that the local governmental agency will be the lead agency for the project and will require a discretionary permit that is subject to environmental review pursuant to CEQA, that the person proposing the powerplant certifies that specified skilled and trained workforce requirements will be followed if the exemption is granted, and that the powerplant has a net generating capacity of 50 to 150 megawatts or that modifications are being made to the powerplant to add capacity resulting in total net generating capacity of 50 to 150 megawatts. megawatts, and for any plan for multiple geothermal powerplants that use at least one common infrastructure component and those powerplants, in total, have a net generating capacity of 50 or more megawatts. Upon the commission granting an exemption, the bill would require the local governmental agency to be the lead agency for purposes of CEQA to certify the site and related facility, as provided. The bill would would, until January 1, 2030, make the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility the lead agency pursuant to CEQA for any project that the commission exempts from the certification requirement and that generates electricity using geothermal resources as provided.
Existing law vests the State Energy Resources Conservation and Development Commission with the exclusive jurisdiction to certify the construction of a thermal powerplant, as defined. Existing law prohibits a person from constructing a thermal powerplant unless that person obtains certification from the commission. Existing law authorizes the commission to exempt from the certification requirement a thermal powerplant with a generating capacity of up to 100 megawatts and modifications to existing generating facilities that do not add capacity in excess of 100 megawatts, if the commission finds that no substantial adverse impact on the environment or energy resources will result from the project. Existing law makes the commission the lead agency for purposes of environmental review pursuant to the California Environmental Quality Act (CEQA) for all projects that require certification and for projects that are exempted by the commission.
This bill would additionally authorize the commission to exempt from the certification requirement, only until January 1, 2030, a thermal powerplant that generates electricity using exclusively geothermal resources and meets is found by the commission to meet specified criteria, including that a the person proposing an eligible thermal the powerplant files an application on or before June 30, 2029, for certification with the local governmental agency that has land use and related jurisdiction over the area in which the powerplant is located to certify the site and related facility, located, that the local governmental agency will be the lead agency for the project and will require a discretionary permit that is subject to environmental review pursuant to CEQA, that the person proposing the powerplant certifies that specified skilled and trained workforce requirements will be followed if the exemption is granted, and that the powerplant has a net generating capacity of up 50 to 150 megawatts, megawatts or that modifications are being made to a thermal the powerplant that generates electricity using geothermal resources that do not add capacity in excess of to add capacity resulting in total net generating capacity of 50 to 150 megawatts. Upon the commission granting an exemption, the bill would require the local governmental agency to be the lead agency for purposes of CEQA to certify the site and related facility, as provided. The bill would make the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility the lead agency pursuant to CEQA for any project that the commission exempts from the certification requirement and that generates electricity using geothermal resources as provided.
Existing law vests the State Energy Resources Conservation and Development Commission with the exclusive jurisdiction to certify the construction of a thermal powerplant, as defined. Existing law prohibits a person from constructing a thermal powerplant unless that person obtains certification from the commission. Existing law authorizes the commission to exempt from the certification requirement a thermal powerplant with a generating capacity of up to 100 megawatts and modifications to existing generating facilities that do not add capacity in excess of 100 megawatts, if the commission finds that no substantial adverse impact on the environment or energy resources will result from the project. Existing law makes the commission the lead agency for purposes of environmental review pursuant to the California Environmental Quality Act (CEQA) for all projects that require certification and for projects that are exempted by the commission.
This bill would additionally require authorize the commission to exempt from the certification requirement, only until January 1, 2030, a thermal powerplant that generates electricity using geothermal resources and meets specified criteria, including having that a person proposing an eligible thermal powerplant files an application on or before June 30, 2029, for certification with the local governmental agency that has land use and related jurisdiction over the area in which the powerplant is located to certify the site and related facility, and that the powerplant has a generating capacity of up to 150 megawatts, or making that modifications are being made to a thermal powerplant that generates electricity using geothermal resources that do not add capacity in excess of 150 megawatts. Upon the commission granting an exemption, the bill would require the local governmental agency to be the lead agency to certify the site and related facility, as provided. The bill would make the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility the lead agency pursuant to CEQA for any project that the commission exempts from the certification requirement and that generates electricity using geothermal resources as provided.
Existing law vests the State Energy Resources Conservation and Development Commission with the exclusive jurisdiction to certify the construction of a thermal powerplant, as defined. Existing law prohibits a person from constructing a thermal powerplant unless that person obtains certification from the commission. Existing law authorizes the commission to exempt from the certification requirement a thermal powerplant with a generating capacity of up to 100 megawatts and modifications to existing generating facilities that do not add capacity in excess of 100 megawatts, if the commission finds that no substantial adverse impact on the environment or energy resources will result from the project. Existing law makes the commission the lead agency for purposes of environmental review pursuant to the California Environmental Quality Act (CEQA) for all projects that require certification and for projects that are exempted by the commission.
This bill would additionally require the commission to exempt from the certification requirement, only until January 1, 2030, a thermal powerplant that generates electricity using geothermal resources and meets specified criteria, including having a generating capacity of up to 150 megawatts, or making modifications to a thermal powerplant that generates electricity using geothermal resources that do not add capacity in excess of 150 megawatts. The bill would make the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility the lead agency pursuant to CEQA for any project that the commission exempts from the certification requirement and that generates electricity using geothermal resources as provided.
Existing law establishes the California Renewables Portfolio Standard Program, which requires the Public Utilities Commission to implement annual procurement targets for the procurement of eligible renewable energy resources, as defined, for all retail sellers, as defined, and requires local publicly owned electric utilities to adopt and implement a renewable energy resources procurement plan to achieve the targets and goals of the program.This bill would make nonsubstantive changes to definitions applicable to that program.Existing law establishes the California Renewables Portfolio Standard Program, which requires the Public Utilities Commission to implement annual procurement targets for the procurement of eligible renewable energy resources, as defined, for all retail sellers, as defined, and requires local publicly owned electric utilities to adopt and implement a renewable energy resources procurement plan to achieve the targets and goals of the program.
This bill would make nonsubstantive changes to definitions applicable to that program.
(a)To obtain certification for a site and related facility, an application for certification of the site and related facility shall be filed with the commission. The application shall be in a form prescribed by the commission and shall be for a site and related facility that has been found to be acceptable by the commission pursuant to Section 25516, or for an additional facility at a site that has been designated a potential multiple-facility site pursuant to Section 25514.5 and found to be acceptable pursuant to Sections 25516 and 25516.5. An application for an additional facility at a potential multiple-facility site shall be subject to the conditions and review specified in Section 25520.5. An application may not be filed for a site and related facility, if there is no suitable alternative for the site and related facility that was previously found to be acceptable by the commission, unless the commission has approved the notice based on the one site as specified in Section 25516.
(b)Notwithstanding any other provision of this section, the commission, upon its own motion or in response to the request of any party, may require the applicant to submit any information, document, or data that it determines is reasonably necessary to make any decision on the application.
(c)(1)Except as provided in paragraph (2), the commission shall be the lead agency as provided in Section 21165 for all projects that require certification pursuant to this chapter and for projects that are exempted from such certification pursuant to Section 25541. Unless the commissions regulatory program governing site and facility certification and related proceedings are certified by the Natural Resources Agency pursuant to Section 21080.5, an environmental impact report shall be completed within one year after receipt of the application. If the commission prepares a document or documents in the place of an environmental impact report or negative declaration under a regulatory program certified pursuant to Section 21080.5, any other public agency that must make a decision that is subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000)), on a site or related facility, shall use the document or documents prepared by the commission in the same manner as they would use an environmental impact report or negative declaration prepared by a lead agency.
(2)For a project that the commission exempts, pursuant to Section 25541.2, from the requirement to obtain certification pursuant to this chapter and that generates electricity using geothermal resources, as defined in Section 6903, the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility shall, notwithstanding any other law, require a discretionary permit that is subject to environmental review pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000)) for each project and shall be the lead agency for purposes of Section 21165. This paragraph shall become inoperative on January 1, 2030.
(d)If the site and related facility specified in the application is proposed to be located in the coastal zone, the commission shall transmit a copy of the application to the California Coastal Commission for its review and comments.
(e)If the site and related facility specified in the application is proposed to be located in the Suisun Marsh or the jurisdiction of the San Francisco Bay Conservation and Development Commission, the commission shall transmit a copy of the application to the San Francisco Bay Conservation and Development Commission for its review and comments.
(f)Upon receipt of an application, the commission shall forward the application to local governmental agencies having land use and related jurisdiction in the area of the proposed site and related facility. Those local agencies shall review the application and submit comments on, among other things, the design of the facility, architectural and aesthetic features of the facility, access to highways, landscaping and grading, public use of lands in the area of the facility, and other appropriate aspects of the design, construction, or operation of the proposed site and related facility.
(g)Upon receipt of an application, the commission shall cause a summary of the application to be published in a newspaper of general circulation in the county in which the site and related facilities, or any part thereof, designated in the application, is proposed to be located. The commission shall transmit a copy of the application to each federal and state agency having jurisdiction or special interest in matters pertinent to the proposed site and related facilities and to the Attorney General.
(h)Local and state agencies having jurisdiction or special interest in matters pertinent to the proposed site and related facilities shall provide their comments and recommendations on the project within 180 days of the date of filing of an application.
(i)The public advisor shall require that adequate notice is given to the public and that the procedures specified by this division are complied with.
(j)For any proposed site and related facility requiring a certificate of public convenience and necessity, the commission shall transmit a copy of the application to the Public Utilities Commission and request the comments and recommendations of the Public Utilities Commission on the economic, financial, rate, system reliability, and service implications of the proposed site and related facility. If the commission requires modification of the proposed facility, the commission shall consult with the Public Utilities Commission regarding the economic, financial, rate, system reliability, and service implications of those modifications.
(k)The commission shall transmit a copy of the application to any governmental agency not specifically mentioned in this act, but which it finds has any information or interest in the proposed site and related facilities, and shall invite the comments and recommendations of each agency. The commission shall request any relevant laws, ordinances, or regulations that an agency has promulgated or administered.
(l)An application for certification of any site and related facilities shall contain a listing of every federal agency from which any approval or authorization concerning the proposed site is required, specifying the approvals or authorizations obtained at the time of the application and the schedule for obtaining any approvals or authorizations pending.
SEC. 2.Section 25541.2 is added to the Public Resources Code, to read:25541.2.(a)The commission may exempt from this chapter a thermal powerplant that generates electricity using exclusively geothermal resources, as defined in Section 6903, if the commission finds that all of the following criteria are met:
(1)A person proposing the thermal powerplant files an application, on or before June 30, 2029, with the local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located.
(2)Notwithstanding any other law, the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility will be the lead agency for the project for purposes of, and require a discretionary permit that is subject to environmental review pursuant to, the California Environmental Quality Act (Division 13 (commencing with Section 21000)).
(3)The thermal powerplant is located in a county that has an approved geothermal element, as defined in Section 25133, or a geothermal and renewable element, in the countys general plan plan, and the element requires compliance with Section 25541.3 for a geothermal powerplant that has a net generating capacity of 50 to 150 megawatts, inclusive, and for modifications to a geothermal powerplant that add capacity resulting in a total net generating capacity of 50 to 150 megawatts, inclusive. inclusive, and for any plan for multiple geothermal powerplants that use at least one common infrastructure component and those powerplants, in total, have a net generating capacity of 50 or more megawatts.
(4)The thermal powerplant has a net generating capacity of 50 to 150 megawatts, inclusive, or modifications to the thermal powerplant that add capacity resulting in a total net generating capacity of 50 to 150 megawatts, inclusive.
(5) No prior project exempted pursuant to this section and approved by the local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located has resulted, after environmental review pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000)), in any significant adverse impact on public health, the environment, or energy resources.
(6)The person proposing the thermal powerplant certifies to the commission that the requirements of Section 25541.3 will be followed if the exemption is granted.
(b)Upon the commission granting an exemption pursuant to subdivision (a), the local governmental agency shall be the lead agency for purposes of the California Environmental Quality Act (Division 13 (commencing with Section 21000)) to certify the site and related facility, whether the application proposes a new site and related facility or a change or addition to an existing facility.
(c)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 3.Section 25541.3 is added to the Public Resources Code, to read:25541.3.(a)(1)All contractors and subcontractors performing initial and subsequent construction, alteration, demolition, installation, repair, or maintenance work for a facility exempted pursuant to Section 25541.2 shall use a skilled and trained workforce to perform all onsite work within an apprenticeable occupation in the building and construction trades. The owner or operator of the facility shall include this requirement in all contracts for performance of the work.
(2)The requirement specified in paragraph (1) to use a skilled and trained workforce applies to each individual contractors and subcontractors onsite workforce.
(b)For purposes of paragraph (2) of subdivision (b) of Section 3075 of the Labor Code, a facility covered by this section shall be considered in determining whether existing apprenticeship programs do not have the capacity, or have neglected or refused, to dispatch sufficient apprentices to qualified employers who are willing to abide by the applicable apprenticeship standards.
(c)This section does not apply to the employees of the owner or operator of the facility or prevent the owner or operator from using its own employees to perform any work that has not been assigned to contractors while the employees of the contractor are present and working.
(d)An apprenticeship program approved by the chief may enroll, with advanced standing, applicants with relevant prior work experience at a facility that is subject to this section, in accordance with the approved apprenticeship standards of the program.
(e)The criteria of paragraph (9) of subdivision (h) and of subparagraph (A) of paragraph (10) of subdivision (h) do not apply to either of the following:
(1)To the extent that the contractor has requested qualified workers from the local hiring halls that dispatch workers in the apprenticeable occupation and, due to workforce shortages, the contractor is unable to obtain sufficient qualified workers within 48 hours of the request, Saturdays, Sundays, and holidays excepted. This section does not prevent contractors from obtaining workers from any source.
(2)To the extent that compliance is impracticable because an emergency requires immediate action to prevent harm to public health or safety or to the environment, but the criteria applies as soon as the emergency is over or it becomes practicable for contractors to obtain a qualified workforce.
(f)This section does not make the construction, alteration, demolition, installation, repair, or maintenance work at a facility that is subject to this section a public work, within the meaning of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code. This section does not preclude the use of an alternative workweek schedule adopted pursuant to Section 511 or 514 of the Labor Code.
(g)(1)The owner or operator of the facility shall provide to the commission, on a monthly basis, a report demonstrating compliance with this section. The required monthly report demonstrating compliance with this section shall include the full name of, and identify the apprenticeship program name, location, and graduation date of, each worker relied on to satisfy the apprenticeship graduation percentage requirements of this section. A monthly report provided to the commission pursuant to this section shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection.
(2)(A)If the Labor Commissioner, or the Labor Commissioners designee, determines after an investigation that a contractor or subcontractor failed to use a skilled and trained workforce in accordance with this section, the contractor or subcontractor responsible for the violation shall forfeit, as a civil penalty to the state, not more than five thousand dollars ($5,000) per month of work performed in violation of this section. A contractor or subcontractor that commits a second or subsequent violation of this section within a three-year period shall forfeit, as a civil penalty to the state, not more than ten thousand dollars ($10,000) per month of work performed in violation of this section.
(B)The amount of the civil penalty may be reduced or waived by the Labor Commissioner if the amount of the civil penalty would be disproportionate to the severity of the violation. The Labor Commissioner shall consider, in setting the amount of the civil penalty, all of the following circumstances:
(i)Whether the violation was intentional.
(ii)Whether the contractor or subcontractor has committed other violations of this section or of the Labor Code.
(iii)Whether, upon notice of the violation, the contractor or subcontractor took steps to voluntarily remedy the violation.
(iv)The extent or severity of the violation.
(C)The Labor Commissioner, or the Labor Commissioners designee, shall issue a civil wage and penalty assessment, in accordance with Section 1741 of the Labor Code, upon assessing a civil penalty pursuant to subparagraph (A). Review of a civil wage and penalty assessment issued under this paragraph may be requested in accordance with Section 1742 of the Labor Code. The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code, apply to a civil wage and penalty assessment issued pursuant to this subparagraph.
(D)The determination of the Labor Commissioner as to the amount of the civil penalty imposed under this paragraph shall be reviewable by the Director of Industrial Relations only for an abuse of discretion.
(3)This subdivision does not apply if all construction and maintenance work on the project is covered by a project labor agreement that requires the use of a skilled and trained workforce and provides for the enforcement of that obligation through an arbitration procedure.
(4)For purposes of this subdivision, a project labor agreement means a prehire collective bargaining agreement that establishes terms and conditions of employment for a specific construction project or projects and is an agreement described in Section 158(f) of Title 29 of the United States Code.
(h)For purposes of this section, all of the following definitions apply:
(1)Apprenticeable occupation means an occupation for which the chief has approved an apprenticeship program pursuant to Section 3075 of the Labor Code.
(2)Building and construction trades has the same meaning as in Section 3075.5 of the Labor Code.
(3)Chief means the Chief of the Division of Apprenticeship Standards of the Department of Industrial Relations.
(4)Construction, alteration, demolition, installation, repair, and maintenance have the same meanings as defined in Sections 1720 and 1771 of the Labor Code. Construction includes initial construction work and subsequent construction and construction maintenance work following initial completion that is contracted out to a contractor in the construction industry.
(5)Graduate of an apprenticeship program means either of the following:
(A)An individual who has been issued a certificate of completion under the authority of the California Apprenticeship Council or the chief for completing an apprenticeship program approved by the chief pursuant to Section 3075 of the Labor Code.
(B)An individual who has completed an apprenticeship program located outside California and approved for federal purposes pursuant to the apprenticeship regulations adopted by the United States Secretary of Labor.
(6)Onsite work does not include catalyst handling and loading, chemical cleaning, or inspection and testing that was not within the scope of a prevailing wage determination issued by the Director of Industrial Relations as of January 1, 2013.
(7)Prevailing hourly wage rate means the general prevailing rate of per diem wages, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, but does not include shift differentials, travel and subsistence, or holiday pay. Notwithstanding subdivision (c) of Section 1773.1 of the Labor Code, the requirement that employer payments not reduce the obligation to pay the hourly straight time or overtime wages found to be prevailing does not apply if otherwise provided in a bona fide collective bargaining agreement covering the worker.
(8)Registered apprentice means an apprentice registered in an apprenticeship program approved by the chief pursuant to Section 3075 of the Labor Code, who is performing work covered by the standards of that apprenticeship program and receiving the supervision required by the standards of that apprenticeship program.
(9)Skilled and trained workforce means a workforce that meets both of the following criteria:
(A)All of the workers are either registered apprentices or skilled journeypersons.
(B)At least 60 percent of the skilled journeypersons are graduates of an apprenticeship program for the applicable occupation.
(10)Skilled journeyperson means a worker who meets both of the following criteria:
(A)The worker either graduated from an apprenticeship program for the applicable occupation that was approved by the chief, or has at least as many hours of on-the-job experience in the applicable occupation that would be required to graduate from an apprenticeship program for the applicable occupation that is approved by the chief.
(B)The worker is being paid a rate at least equivalent to the prevailing hourly wage rate for a journeyperson in the applicable occupation and geographic area.
(a)To obtain certification for a site and related facility, an application for certification of the site and related facility shall be filed with the commission. The application shall be in a form prescribed by the commission and shall be for a site and related facility that has been found to be acceptable by the commission pursuant to Section 25516, or for an additional facility at a site that has been designated a potential multiple-facility site pursuant to Section 25514.5 and found to be acceptable pursuant to Sections 25516 and 25516.5. An application for an additional facility at a potential multiple-facility site shall be subject to the conditions and review specified in Section 25520.5. An application may not be filed for a site and related facility, if there is no suitable alternative for the site and related facility that was previously found to be acceptable by the commission, unless the commission has approved the notice based on the one site as specified in Section 25516.
(b)Notwithstanding any other provision of this section, the commission, upon its own motion or in response to the request of any party, may require the applicant to submit any information, document, or data that it determines is reasonably necessary to make any decision on the application.
(c)(1)Except as provided in paragraph (2), the commission shall be the lead agency as provided in Section 21165 for all projects that require certification pursuant to this chapter and for projects that are exempted from such certification pursuant to Section 25541. Unless the commissions regulatory program governing site and facility certification and related proceedings are certified by the Natural Resources Agency pursuant to Section 21080.5, an environmental impact report shall be completed within one year after receipt of the application. If the commission prepares a document or documents in the place of an environmental impact report or negative declaration under a regulatory program certified pursuant to Section 21080.5, any other public agency that must make a decision that is subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000)), on a site or related facility, shall use the document or documents prepared by the commission in the same manner as they would use an environmental impact report or negative declaration prepared by a lead agency.
(2)For projects a project that the commission exempts, pursuant to Section 25541.2, from the requirement to obtain certification pursuant to this chapter and that generate generates electricity using geothermal resources, as defined in Section 6903, the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility shall shall, notwithstanding any other law, require a discretionary permit that is subject to environmental review pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000)) for each project and shall be the lead agency for purposes of Section 21165.
(d)If the site and related facility specified in the application is proposed to be located in the coastal zone, the commission shall transmit a copy of the application to the California Coastal Commission for its review and comments.
(e)If the site and related facility specified in the application is proposed to be located in the Suisun Marsh or the jurisdiction of the San Francisco Bay Conservation and Development Commission, the commission shall transmit a copy of the application to the San Francisco Bay Conservation and Development Commission for its review and comments.
(f)Upon receipt of an application, the commission shall forward the application to local governmental agencies having land use and related jurisdiction in the area of the proposed site and related facility. Those local agencies shall review the application and submit comments on, among other things, the design of the facility, architectural and aesthetic features of the facility, access to highways, landscaping and grading, public use of lands in the area of the facility, and other appropriate aspects of the design, construction, or operation of the proposed site and related facility.
(g)Upon receipt of an application, the commission shall cause a summary of the application to be published in a newspaper of general circulation in the county in which the site and related facilities, or any part thereof, designated in the application, is proposed to be located. The commission shall transmit a copy of the application to each federal and state agency having jurisdiction or special interest in matters pertinent to the proposed site and related facilities and to the Attorney General.
(h)Local and state agencies having jurisdiction or special interest in matters pertinent to the proposed site and related facilities shall provide their comments and recommendations on the project within 180 days of the date of filing of an application.
(i)The public advisor shall require that adequate notice is given to the public and that the procedures specified by this division are complied with.
(j)For any proposed site and related facility requiring a certificate of public convenience and necessity, the commission shall transmit a copy of the application to the Public Utilities Commission and request the comments and recommendations of the Public Utilities Commission on the economic, financial, rate, system reliability, and service implications of the proposed site and related facility. If the commission requires modification of the proposed facility, the commission shall consult with the Public Utilities Commission regarding the economic, financial, rate, system reliability, and service implications of those modifications.
(k)The commission shall transmit a copy of the application to any governmental agency not specifically mentioned in this act, but which it finds has any information or interest in the proposed site and related facilities, and shall invite the comments and recommendations of each agency. The commission shall request any relevant laws, ordinances, or regulations that an agency has promulgated or administered.
(l)An application for certification of any site and related facilities shall contain a listing of every federal agency from which any approval or authorization concerning the proposed site is required, specifying the approvals or authorizations obtained at the time of the application and the schedule for obtaining any approvals or authorizations pending.
SEC. 2.Section 25541.2 is added to the Public Resources Code, to read:25541.2.(a)The commission may exempt from this chapter a thermal powerplant that generates electricity using exclusively geothermal resources, as defined in Section 6903, if the commission finds that all of the following criteria are met:
(1)A person proposing a the thermal powerplant that generates electricity using geothermal resources, as defined in Section 6903, files an application, on or before June 30, 2029, for certification with the local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located to certify a site and related facility. located.
(2)Notwithstanding any other law, the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility will be the lead agency for the project for purposes of, and require a discretionary permit that is subject to environmental review pursuant to, the California Environmental Quality Act (Division 13 (commencing with Section 21000)).
(2)(3)The thermal powerplant is located in a county that has an approved geothermal element, as defined in Section 25133, or a geothermal and renewable element, in the countys general plan. plan and the element requires compliance with Section 25541.3 for a geothermal powerplant that has a net generating capacity of 50 to 150 megawatts, inclusive, and for modifications to a geothermal powerplant that add capacity resulting in a total net generating capacity of 50 to 150 megawatts, inclusive.
(3)(4)The thermal powerplant has a net generating capacity of up 50 to 150 megawatts, inclusive, or modifications to a the thermal powerplant that generates electricity using geothermal resources do not add capacity in excess of 150 megawatts. add capacity resulting in a total net generating capacity of 50 to 150 megawatts, inclusive.
(4)The(5) No prior project exempted pursuant to this section and approved by the local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located finds, has resulted, after environmental review pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000)), that no substantial in any significant adverse impact on public health, the environment or environment, or energy resources will result from the construction or operation of the proposed facility or from the modifications to the thermal powerplant. resources.
(6)The person proposing the thermal powerplant certifies to the commission that the requirements of Section 25541.3 will be followed if the exemption is granted.
(b)Upon the commission granting an exemption pursuant to subdivision (a), the local governmental agency shall be the lead agency for purposes of the California Environmental Quality Act (Division 13 (commencing with Section 21000)) to certify the site and related facility, whether the application proposes a new site and related facility or a change or addition to an existing facility. This section does not modify the Public Utilities Commissions jurisdiction, including the issuance of a certificate of public convenience and necessity under Chapter 5 (commencing with Section 1001) of Part 1 of Division 1 of the Public Utilities Code, for a facility that is proposed by a utility regulated by the Public Utilities Commission.
(c)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SEC. 3.Section 25541.3 is added to the Public Resources Code, to read:25541.3.(a)(1)All contractors and subcontractors performing initial and subsequent construction, alteration, demolition, installation, repair, or maintenance work for a facility exempted pursuant to Section 25541.2 shall use a skilled and trained workforce to perform all onsite work within an apprenticeable occupation in the building and construction trades. The owner or operator of the facility shall include this requirement in all contracts for performance of the work.
(2)The requirement specified in paragraph (1) to use a skilled and trained workforce applies to each individual contractors and subcontractors onsite workforce.
(b)For purposes of paragraph (2) of subdivision (b) of Section 3075 of the Labor Code, a facility covered by this section shall be considered in determining whether existing apprenticeship programs do not have the capacity, or have neglected or refused, to dispatch sufficient apprentices to qualified employers who are willing to abide by the applicable apprenticeship standards.
(c)This section does not apply to the employees of the owner or operator of the facility or prevent the owner or operator from using its own employees to perform any work that has not been assigned to contractors while the employees of the contractor are present and working.
(d)An apprenticeship program approved by the chief may enroll, with advanced standing, applicants with relevant prior work experience at a facility that is subject to this section, in accordance with the approved apprenticeship standards of the program.
(e)The criteria of paragraph (9) of subdivision (h) and of subparagraph (A) of paragraph (10) of subdivision (h) do not apply to either of the following:
(1)To the extent that the contractor has requested qualified workers from the local hiring halls that dispatch workers in the apprenticeable occupation and, due to workforce shortages, the contractor is unable to obtain sufficient qualified workers within 48 hours of the request, Saturdays, Sundays, and holidays excepted. This section does not prevent contractors from obtaining workers from any source.
(2)To the extent that compliance is impracticable because an emergency requires immediate action to prevent harm to public health or safety or to the environment, but the criteria applies as soon as the emergency is over or it becomes practicable for contractors to obtain a qualified workforce.
(f)This section does not make the construction, alteration, demolition, installation, repair, or maintenance work at a facility that is subject to this section a public work, within the meaning of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code. This section does not preclude the use of an alternative workweek schedule adopted pursuant to Section 511 or 514 of the Labor Code.
(g)(1)The owner or operator of the facility shall provide to the commission, on a monthly basis, a report demonstrating compliance with this section. The required monthly report demonstrating compliance with this section shall include the full name of, and identify the apprenticeship program name, location, and graduation date of, each worker relied on to satisfy the apprenticeship graduation percentage requirements of this section. A monthly report provided to the commission pursuant to this section shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection.
(2)(A)If the Labor Commissioner, or the Labor Commissioners designee, determines after an investigation that a contractor or subcontractor failed to use a skilled and trained workforce in accordance with this section, the contractor or subcontractor responsible for the violation shall forfeit, as a civil penalty to the state, not more than five thousand dollars ($5,000) per month of work performed in violation of this section. A contractor or subcontractor that commits a second or subsequent violation of this section within a three-year period shall forfeit, as a civil penalty to the state, not more than ten thousand dollars ($10,000) per month of work performed in violation of this section.
(B)The amount of the civil penalty may be reduced or waived by the Labor Commissioner if the amount of the civil penalty would be disproportionate to the severity of the violation. The Labor Commissioner shall consider, in setting the amount of the civil penalty, all of the following circumstances:
(i)Whether the violation was intentional.
(ii)Whether the contractor or subcontractor has committed other violations of this section or of the Labor Code.
(iii)Whether, upon notice of the violation, the contractor or subcontractor took steps to voluntarily remedy the violation.
(iv)The extent or severity of the violation.
(C)The Labor Commissioner, or the Labor Commissioners designee, shall issue a civil wage and penalty assessment, in accordance with Section 1741 of the Labor Code, upon assessing a civil penalty pursuant to subparagraph (A). Review of a civil wage and penalty assessment issued under this paragraph may be requested in accordance with Section 1742 of the Labor Code. The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770) of Chapter 1 of Part 7 of Division 2 of the Labor Code, apply to a civil wage and penalty assessment issued pursuant to this subparagraph.
(D)The determination of the Labor Commissioner as to the amount of the civil penalty imposed under this paragraph shall be reviewable by the Director of Industrial Relations only for an abuse of discretion.
(3)This subdivision does not apply if all construction and maintenance work on the project is covered by a project labor agreement that requires the use of a skilled and trained workforce and provides for the enforcement of that obligation through an arbitration procedure.
(4)For purposes of this subdivision, a project labor agreement means a prehire collective bargaining agreement that establishes terms and conditions of employment for a specific construction project or projects and is an agreement described in Section 158(f) of Title 29 of the United States Code.
(h)For purposes of this section, all of the following definitions apply:
(1)Apprenticeable occupation means an occupation for which the chief has approved an apprenticeship program pursuant to Section 3075 of the Labor Code.
(2)Building and construction trades has the same meaning as in Section 3075.5 of the Labor Code.
(3)Chief means the Chief of the Division of Apprenticeship Standards of the Department of Industrial Relations.
(4)Construction, alteration, demolition, installation, repair, and maintenance have the same meanings as defined in Sections 1720 and 1771 of the Labor Code. Construction includes initial construction work and subsequent construction and construction maintenance work following initial completion that is contracted out to a contractor in the construction industry.
(5)Graduate of an apprenticeship program means either of the following:
(A)An individual who has been issued a certificate of completion under the authority of the California Apprenticeship Council or the chief for completing an apprenticeship program approved by the chief pursuant to Section 3075 of the Labor Code.
(B)An individual who has completed an apprenticeship program located outside California and approved for federal purposes pursuant to the apprenticeship regulations adopted by the United States Secretary of Labor.
(6)Onsite work does not include catalyst handling and loading, chemical cleaning, or inspection and testing that was not within the scope of a prevailing wage determination issued by the Director of Industrial Relations as of January 1, 2013.
(7)Prevailing hourly wage rate means the general prevailing rate of per diem wages, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, but does not include shift differentials, travel and subsistence, or holiday pay. Notwithstanding subdivision (c) of Section 1773.1 of the Labor Code, the requirement that employer payments not reduce the obligation to pay the hourly straight time or overtime wages found to be prevailing does not apply if otherwise provided in a bona fide collective bargaining agreement covering the worker.
(8)Registered apprentice means an apprentice registered in an apprenticeship program approved by the chief pursuant to Section 3075 of the Labor Code, who is performing work covered by the standards of that apprenticeship program and receiving the supervision required by the standards of that apprenticeship program.
(9)Skilled and trained workforce means a workforce that meets both of the following criteria:
(A)All of the workers are either registered apprentices or skilled journeypersons.
(B)At least 60 percent of the skilled journeypersons are graduates of an apprenticeship program for the applicable occupation.
(10)Skilled journeyperson means a worker who meets both of the following criteria:
(A)The worker either graduated from an apprenticeship program for the applicable occupation that was approved by the chief, or has at least as many hours of on-the-job experience in the applicable occupation that would be required to graduate from an apprenticeship program for the applicable occupation that is approved by the chief.
(B)The worker is being paid a rate at least equivalent to the prevailing hourly wage rate for a journeyperson in the applicable occupation and geographic area.
(a)To obtain certification for a site and related facility, an application for certification of the site and related facility shall be filed with the commission. The application shall be in a form prescribed by the commission and shall be for a site and related facility that has been found to be acceptable by the commission pursuant to Section 25516, or for an additional facility at a site that has been designated a potential multiple-facility site pursuant to Section 25514.5 and found to be acceptable pursuant to Sections 25516 and 25516.5. An application for an additional facility at a potential multiple-facility site shall be subject to the conditions and review specified in Section 25520.5. An application shall may not be filed for a site and related facility, if there is no suitable alternative for the site and related facility that was previously found to be acceptable by the commission, unless the commission has approved the notice based on the one site as specified in Section 25516.
(b)Notwithstanding any other provision of this section, the commission, upon its own motion or in response to the request of any party, may require the applicant to submit any information, document, or data that it determines is reasonably necessary to make any decision on the application.
(c)(1)Except as provided in paragraph (2), the commission shall be the lead agency as provided in Section 21165 for all projects that require certification pursuant to this chapter and for projects that are exempted from such certification pursuant to Section 25541. Unless the commissions regulatory program governing site and facility certification and related proceedings are certified by the Natural Resources Agency pursuant to Section 21080.5, an environmental impact report shall be completed within one year after receipt of the application. If the commission prepares a document or documents in the place of an environmental impact report or negative declaration under a regulatory program certified pursuant to Section 21080.5, any other public agency that must make a decision that is subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000)), on a site or related facility, shall use the document or documents prepared by the commission in the same manner as they would use an environmental impact report or negative declaration prepared by a lead agency.
(2)For projects that are exempt, the commission exempts, pursuant to Section 25541.2, from the requirement to obtain certification pursuant to this chapter and that generate electricity using geothermal resources, as defined in Section 6903, the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility shall be the lead agency for purposes of Section 21165.
(d)If the site and related facility specified in the application is proposed to be located in the coastal zone, the commission shall transmit a copy of the application to the California Coastal Commission for its review and comments.
(e)If the site and related facility specified in the application is proposed to be located in the Suisun Marsh or the jurisdiction of the San Francisco Bay Conservation and Development Commission, the commission shall transmit a copy of the application to the San Francisco Bay Conservation and Development Commission for its review and comments.
(f)Upon receipt of an application, the commission shall forward the application to local governmental agencies having land use and related jurisdiction in the area of the proposed site and related facility. Those local agencies shall review the application and submit comments on, among other things, the design of the facility, architectural and aesthetic features of the facility, access to highways, landscaping and grading, public use of lands in the area of the facility, and other appropriate aspects of the design, construction, or operation of the proposed site and related facility.
(g)Upon receipt of an application, the commission shall cause a summary of the application to be published in a newspaper of general circulation in the county in which the site and related facilities, or any part thereof, designated in the application, is proposed to be located. The commission shall transmit a copy of the application to each federal and state agency having jurisdiction or special interest in matters pertinent to the proposed site and related facilities and to the Attorney General.
(h)Local and state agencies having jurisdiction or special interest in matters pertinent to the proposed site and related facilities shall provide their comments and recommendations on the project within 180 days of the date of filing of an application.
(i)The public advisor shall require that adequate notice is given to the public and that the procedures specified by this division are complied with.
(j)For any proposed site and related facility requiring a certificate of public convenience and necessity, the commission shall transmit a copy of the application to the Public Utilities Commission and request the comments and recommendations of the Public Utilities Commission on the economic, financial, rate, system reliability, and service implications of the proposed site and related facility. If the commission requires modification of the proposed facility, the commission shall consult with the Public Utilities Commission regarding the economic, financial, rate, system reliability, and service implications of those modifications.
(k)The commission shall transmit a copy of the application to any governmental agency not specifically mentioned in this act, but which it finds has any information or interest in the proposed site and related facilities, and shall invite the comments and recommendations of each agency. The commission shall request any relevant laws, ordinances, or regulations that an agency has promulgated or administered.
(l)An application for certification of any site and related facilities shall contain a listing of every federal agency from which any approval or authorization concerning the proposed site is required, specifying the approvals or authorizations obtained at the time of the application and the schedule for obtaining any approvals or authorizations pending.
SEC. 2.Section 25541.2 is added to the Public Resources Code, to read:25541.2.(a)The commission shall may exempt from this chapter a thermal powerplant that generates electricity using geothermal resources, as defined in Section 6903, if all of the following criteria are met:
(1)A person proposing a thermal powerplant that generates electricity using geothermal resources, as defined in Section 6903, files an application, on or before June 30, 2029, for certification with the local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located to certify a site and related facility.
(1)(2)The thermal powerplant is located in a county that has an approved geothermal element, as defined in Section 25133, or a geothermal and renewable element, in the countys general plan.
(2)(3)The thermal powerplant has a generating capacity of up to 150 megawatts, or modifications to a thermal powerplant that generates electricity using geothermal resources do not add capacity in excess of 150 megawatts.
(3)(4)The local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located finds, after environmental review pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000)), that no substantial adverse impact on the environment or energy resources will result from the construction or operation of the proposed facility or from the modifications to the thermal powerplant.
(b)Upon the commission granting an exemption pursuant to subdivision (a), the local governmental agency shall be the lead agency to certify the site and related facility, whether the application proposes a new site and related facility or a change or addition to an existing facility. This section does not modify the Public Utilities Commissions jurisdiction, including the issuance of a certificate of public convenience and necessity under Chapter 5 (commencing with Section 1001) of Part 1 of Division 1 of the Public Utilities Code, for a facility that is proposed by a utility regulated by the Public Utilities Commission.
(b)(c)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
(a)To obtain certification for a site and related facility, an application for certification of the site and related facility shall be filed with the commission. The application shall be in a form prescribed by the commission and shall be for a site and related facility that has been found to be acceptable by the commission pursuant to Section 25516, or for an additional facility at a site that has been designated a potential multiple-facility site pursuant to Section 25514.5 and found to be acceptable pursuant to Sections 25516 and 25516.5. An application for an additional facility at a potential multiple-facility site shall be subject to the conditions and review specified in Section 25520.5. An application may shall not be filed for a site and related facility, if there is no suitable alternative for the site and related facility that was previously found to be acceptable by the commission, unless the commission has approved the notice based on the one site as specified in Section 25516.
(b)Notwithstanding any other provision of this section, the commission, upon its own motion or in response to the request of any party, may require the applicant to submit any information, document, or data that it determines is reasonably necessary to make any decision on the application.
(c)The (1)Except as provided in paragraph (2), the commission shall be the lead agency as provided in Section 21165 for all projects that require certification pursuant to this chapter and for projects that are exempted from such certification pursuant to Section 25541. Unless the commissions regulatory program governing site and facility certification and related proceedings are certified by the Natural Resources Agency pursuant to Section 21080.5, an environmental impact report shall be completed within one year after receipt of the application. If the commission prepares a document or documents in the place of an environmental impact report or negative declaration under a regulatory program certified pursuant to Section 21080.5, any other public agency that must make a decision that is subject to the California Environmental Quality Act, Division Act (Division 13 (commencing with Section 21000), 21000)), on a site or related facility, shall use the document or documents prepared by the commission in the same manner as they would use an environmental impact report or negative declaration prepared by a lead agency.
(2)For projects that are exempt, pursuant to Section 25541.2, from the requirement to obtain certification pursuant to this chapter and that generate electricity using geothermal resources, as defined in Section 6903, the local governmental agency that has land use and related jurisdiction over the area of the proposed site and related facility shall be the lead agency for purposes of Section 21165.
(d)If the site and related facility specified in the application is proposed to be located in the coastal zone, the commission shall transmit a copy of the application to the California Coastal Commission for its review and comments.
(e)If the site and related facility specified in the application is proposed to be located in the Suisun Marsh or the jurisdiction of the San Francisco Bay Conservation and Development Commission, the commission shall transmit a copy of the application to the San Francisco Bay Conservation and Development Commission for its review and comments.
(f)Upon receipt of an application, the commission shall forward the application to local governmental agencies having land use and related jurisdiction in the area of the proposed site and related facility. Those local agencies shall review the application and submit comments on, among other things, the design of the facility, architectural and aesthetic features of the facility, access to highways, landscaping and grading, public use of lands in the area of the facility, and other appropriate aspects of the design, construction, or operation of the proposed site and related facility.
(g)Upon receipt of an application, the commission shall cause a summary of the application to be published in a newspaper of general circulation in the county in which the site and related facilities, or any part thereof, designated in the application, is proposed to be located. The commission shall transmit a copy of the application to each federal and state agency having jurisdiction or special interest in matters pertinent to the proposed site and related facilities and to the Attorney General.
(h)Local and state agencies having jurisdiction or special interest in matters pertinent to the proposed site and related facilities shall provide their comments and recommendations on the project within 180 days of the date of filing of an application.
(i)The public advisor shall require that adequate notice is given to the public and that the procedures specified by this division are complied with.
(j)For any proposed site and related facility requiring a certificate of public convenience and necessity, the commission shall transmit a copy of the application to the Public Utilities Commission and request the comments and recommendations of the Public Utilities Commission on the economic, financial, rate, system reliability, and service implications of the proposed site and related facility. If the commission requires modification of the proposed facility, the commission shall consult with the Public Utilities Commission regarding the economic, financial, rate, system reliability, and service implications of those modifications.
(k)The commission shall transmit a copy of the application to any governmental agency not specifically mentioned in this act, but which it finds has any information or interest in the proposed site and related facilities, and shall invite the comments and recommendations of each agency. The commission shall request any relevant laws, ordinances, or regulations that an agency has promulgated or administered.
(l)An application for certification of any site and related facilities shall contain a listing of every federal agency from which any approval or authorization concerning the proposed site is required, specifying the approvals or authorizations obtained at the time of the application and the schedule for obtaining any approvals or authorizations pending.
SEC. 2.Section 25541.2 is added to the Public Resources Code, to read:25541.2.(a)The commission shall exempt from this chapter a thermal powerplant that generates electricity using geothermal resources, as defined in Section 6903, if all of the following criteria are met:
(1)The thermal powerplant is located in a county that has an approved geothermal element, as defined in Section 25133, or a geothermal and renewable element, in the countys general plan.
(2)The thermal powerplant has a generating capacity of up to 150 megawatts, or modifications to a thermal powerplant that generates electricity using geothermal resources do not add capacity in excess of 150 megawatts.
(3)The local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located finds, after environmental review pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000)), that no substantial adverse impact on the environment or energy resources will result from the construction or operation of the proposed facility or from the modifications to the thermal powerplant.
(b)This section shall remain in effect only until January 1, 2030, and as of that date is repealed.
SECTION 1.Section 399.12 of the Public Utilities Code is amended to read:399.12.For purposes of this article, the following definitions shall apply:(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.(d)California balancing authority means a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the Independent System Operator. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries, which is not limited by the political boundaries of the State of California.(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource if it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.(C)A facility approved by the governing board of a local publicly owned electric utility before June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. A unit shall not be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in the County of Stanislaus that was operational before September 26, 1996.(f)Procure means to acquire through ownership or contract.(g)Procurement entity means a person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.(h)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization of biomass or biogas fuels.(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in the County of Stanislaus that was operational before September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.(i)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.(j)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:(1)An electrical corporation.(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.(3)An electric service provider. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer before the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.(4)Retail seller does not include any of the following:(A)A corporation or person employing cogeneration technology or producing electricity consistent with subdivision (b) of Section 218.(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.(C)A local publicly owned electric utility.(k)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.For purposes of this article, the following terms have the following meanings definitions shall apply:
(a)Conduit hydroelectric facility means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.
(b)Balancing authority means the responsible entity that integrates resource plans ahead of time, maintains load-interchange generation balance within a balancing authority area, and supports interconnection frequency in real time.
(c)Balancing authority area means the collection of generation, transmission, and loads within the metered boundaries of the area within which the balancing authority maintains the electrical load-resource balance.
(d)California balancing authority is means a balancing authority with control over a balancing authority area primarily located in this state and operating for retail sellers and local publicly owned electric utilities subject to the requirements of this article and includes the Independent System Operator (ISO) and a local publicly owned electric utility operating a transmission grid that is not under the operational control of the ISO. Independent System Operator. A California balancing authority is responsible for the operation of the transmission grid within its metered boundaries boundaries, which is not limited by the political boundaries of the State of California.
(e)Eligible renewable energy resource means an electrical generating facility that meets the definition of a renewable electrical generation facility in Section 25741 of the Public Resources Code, subject to the following:
(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource so long as if it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(C)A facility approved by the governing board of a local publicly owned electric utility prior to before June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a renewable electrical generation facility as defined in Section 25741 of the Public Resources Code.
(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. No A unit shall not be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.
(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.
(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.
(2)(A)A facility engaged in the combustion of municipal solid waste shall not be considered an eligible renewable energy resource.
(B)Subparagraph (A) does not apply to generation before January 1, 2017, from a facility located in the County of Stanislaus County that was operational prior to before September 26, 1996.
(f)Procure means to acquire through ownership or contract.
(g)Procurement entity means any a person or corporation authorized by the commission to enter into contracts to procure eligible renewable energy resources on behalf of customers of a retail seller pursuant to subdivision (f) of Section 399.13.
(h)(1)Renewable energy credit means a certificate of proof associated with the generation of electricity from an eligible renewable energy resource, issued through the accounting system established by the Energy Commission pursuant to Section 399.25, that one unit of electricity was generated and delivered by an eligible renewable energy resource.
(2)Renewable energy credit includes all renewable and environmental attributes associated with the production of electricity from the eligible renewable energy resource, except for an emissions reduction credit issued pursuant to Section 40709 of the Health and Safety Code and any credits or payments associated with the reduction of solid waste and treatment benefits created by the utilization of biomass or biogas fuels.
(3)(A)Electricity generated by an eligible renewable energy resource attributable to the use of nonrenewable fuels, beyond a de minimis quantity used to generate electricity in the same process through which the facility converts renewable fuel to electricity, shall not result in the creation of a renewable energy credit. The Energy Commission shall set the de minimis quantity of nonrenewable fuels for each renewable energy technology at a level of no more than 2 percent of the total quantity of fuel used by the technology to generate electricity. The Energy Commission may adjust the de minimis quantity for an individual facility, up to a maximum of 5 percent, if it finds that all of the following conditions are met:
(i)The facility demonstrates that the higher quantity of nonrenewable fuel will lead to an increase in generation from the eligible renewable energy facility that is significantly greater than generation from the nonrenewable fuel alone.
(ii)The facility demonstrates that the higher quantity of nonrenewable fuels will reduce the variability of its electrical output in a manner that results in net environmental benefits to the state.
(iii)The higher quantity of nonrenewable fuel is limited to either natural gas or hydrogen derived by reformation of a fossil fuel.
(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).
(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).
(D)Electricity generated by a facility engaged in the combustion of municipal solid waste shall not result in the creation of a renewable energy credit. This subparagraph does not apply to renewable energy credits that were generated before January 1, 2017, by a facility engaged in the combustion of municipal solid waste located in the County of Stanislaus County that was operational prior to before September 26, 1996, and sold pursuant to contacts entered into before January 1, 2017.
(i)Renewables portfolio standard means the specified percentage of electricity generated by eligible renewable energy resources that a retail seller or a local publicly owned electric utility is required to procure pursuant to this article.
(j)Retail seller means an entity engaged in the retail sale of electricity to end-use customers located within the state, including any of the following:
(1)An electrical corporation, as defined in Section 218. corporation.
(2)A community choice aggregator. A community choice aggregator shall participate in the renewables portfolio standard program subject to the same terms and conditions applicable to an electrical corporation.
(3)An electric service provider, as defined in Section 218.3. provider. The electric service provider shall be subject to the same terms and conditions applicable to an electrical corporation pursuant to this article. This paragraph does not impair a contract entered into between an electric service provider and a retail customer prior to before the suspension of direct access by the commission pursuant to Section 80110 of the Water Code.
(4)Retail seller does not include any of the following:
(A)A corporation or person employing cogeneration technology or producing electricity consistent with subdivision (b) of Section 218.
(B)The Department of Water Resources acting in its capacity pursuant to Division 27 (commencing with Section 80000) of the Water Code.
(C)A local publicly owned electric utility.
(k)WECC means the Western Electricity Coordinating Council of the North American Electric Reliability Corporation, or a successor to the corporation.
|
Date
|
Status
|
|---|---|
| Jun 26, 2025 | In committee: Set, first hearing. Hearing canceled at the request of author. |
| Jun 19, 2025 | From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U & C. |
| Jun 4, 2025 | Referred to Coms. on E., U & C. and E.Q. |
| May 23, 2025 | In Senate. Read first time. To Com. on RLS. for assignment. |
| May 23, 2025 | Read third time. Passed. Ordered to the Senate. (Ayes 69. Noes 1. Page 1656.) |
| May 15, 2025 | Read second time. Ordered to third reading. |
| May 14, 2025 | From committee: Do pass. (Ayes 15. Noes 0.) (May 14). |
| May 7, 2025 | Re-referred to Com. on APPR. |
| May 6, 2025 | Read second time and amended. |
| May 5, 2025 | From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 14. Noes 0.) (May 1). |
| Apr 28, 2025 | Re-referred to Com. on NAT. RES. |
| Apr 24, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on NAT. RES. Read second time and amended. |
| Apr 24, 2025 | From committee: Do pass and re-refer to Com. on NAT. RES. (Ayes 15. Noes 0.) (April 23). Re-referred to Com. on NAT. RES. |
| Mar 26, 2025 | Re-referred to Com. on U. & E. |
| Mar 25, 2025 | From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended. |
| Mar 24, 2025 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb 21, 2025 | From printer. May be heard in committee March 23. |
| Feb 20, 2025 | Read first time. To print. |
|
Date
|
Description
|
Location
|
Votes
|
|
|---|---|---|---|---|
| May 23, 2025 | AB 1016 Jeff Gonzalez Assembly Third Reading | Assembly Floor |
Passed |
|
| May 14, 2025 | Do pass. | Assembly Standing Committee on Appropriations |
Passed |
|
| May 1, 2025 | Do pass as amended and be re-referred to the Committee on [Appropriations] | Assembly Standing Committee on Natural Resources |
Passed |
|
| Apr 23, 2025 | Do pass and be re-referred to the Committee on [Natural Resources] | Assembly Standing Committee on Utilities and Energy |
Passed |
This list shows positions taken on this bill by organizations on the date displayed, which is linked to the original source.
Positions by individuals are not included.
|
Organization
|
Position
|
Date
|
|---|---|---|
| California-Nevada Conference Of Operating Engineers | ** Against | |
| California State Association Of Electrical Workers | ** Against | |
| California State Council Of Laborers | ** Against | |
| Coalition of California Utility Employees | ** Against | |
| County of Imperial | ** Support | |
| District Council Of Iron Workers Of The State Of California And Vicinity | ** Against | |
| Geothermal Rising | ** Support | |
| Hudson Ranch Power 1 | ** Support | |
| Hudson Ranch Power 1 LLC | ** Support | |
| Imperial Irrigation District | ** Support | |
| Imperial Valley Economic Development Corporation | ** Support | |
| Imperial Valley Regional Chamber of Commerce | ** Support | |
| Independent Energy Producers Association | ** Support | |
| International Brotherhood of Boilermakers | ** Against | |
| IVEDC | ** Support | |
| ormat technologies | ** Support | |
| Rural County Representatives of California | ** Support | |
| State Building and Construction Trades Council | ** Against | |
| Xgs Energy | ** Support |
ASSEMBLY THIRD READING
ATR Bill Id:AB 1016
Author:(Jeff Gonzalez)
As Amended Ver:May 6, 2025
Majority vote
SUMMARY
Authorizes the California Energy Commission (CEC) to exempt a proposed geothermal powerplant with a generating capacity of up to 150 megawatts (MW) from the powerplant certification chapter of the Warren-Alquist Act. The bill provides that, upon the CEC's exemption, the local governmental agency that has land use jurisdiction over the site of the proposed powerplant shall be the lead agency for purposes of the California Environmental Quality Act (CEQA) if the site is located in a county that has an approved geothermal element, or a geothermal and renewable element, in the county's general plan.
Major Provisions
COMMENTS
Geothermal is a form of renewable energy defined as heat energy from the earth. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth's surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes. The United States is the world's largest producer of geothermal electricity and California has the highest geothermal capacity of all states. "The Geysers" geothermal steam field, located within Lake, Mendocino, and Sonoma Counties, contains 349 out of California's 563 high-temperature geothermal wells within the state. Imperial County (including the Salton Sea) houses 194 of these wells, and the remaining 20 are located in Lassen, Modoc, and Mono Counties. California has installed 2,627 MW of geothermal nameplate capacity—accounting for 72% of the total geothermal plant capacity in the United States.
Existing law—the Warren-Alquist Act—grants the CEC exclusive authority to license thermal powerplants 50 MW and larger, including geothermal powerplants. This exclusive authority notwithstanding, the Warren-Alquist Act allows the CEC to delegate permitting authority for a geothermal powerplant to a local government, upon petition by that government, regardless of the powerplant's generating capacity. Specifically, section 25540.5 of the Public Resources Code reads, in part, "The commission may, at the petition of a county which has adopted a geothermal element for its general plan, approve an equivalent certification program which delegates to that county full authority for the certification of all geothermal powerplants within such county."
Geothermal elements are optional components that counties may include in their general plans to guide the development of geothermal resources within their jurisdictions. For example, Imperial County has adopted a Renewable Energy & Transmission Element as part of its general plan, which establishes comprehensive policies and frameworks for the development of geothermal and other renewable energy resources. This element serves as a foundational guide for reviewing and approving renewable energy projects in the county.
There are three proposed geothermal projects in CEC review now, all proposed by Berkshire Hathaway Energy (BHE) in the Salton Sea area. All three projects recently requested the CEC to suspend consideration of their applications amid reports that the projects have been unable to secure the long-term power purchase agreements necessary to finance, construct, and operate a powerplant. On February 7, 2025, BHE filed a motion requesting orders suspending the CEC proceeding in each of the three proposed projects. BHE cited challenges related to procurement and offtake agreements, transmission interconnection studies, and permitting timelines as the primary bases for requesting suspension. On March 20, 2025, the CEC partially granted the joint motion to suspend the projects.
According to the Author
"Imperial County and other regions with rich geothermal resources have proven for decades that they are capable of responsibly permitting and managing clean energy development. AB 1016 empowers these local governments—who have invested in planning, community engagement and environmental stewardship—to lead the way in building the clean energy infrastructure California urgently needs. By streamlining the permitting process for geothermal projects up to 150 megawatts, this bill reduces bureaucratic delays, speeds up project delivery, and ensures that local voices are central in decisions that directly impact their communities. AB 1016 is not only about efficiency—it's about equity. It gives local jurisdictions the tools they need to create jobs, attract investment and advance the state's clean energy goals from the ground up. This is how we accelerate our climate progress and bring tangible benefits to regions like Imperial County that are ready to lead."
Arguments in Support
This bill is sponsored by Imperial County who write that, "1016 increases the threshold for local permitting from up to 50 MW to up to 150 MW for counties that have adopted a geothermal element in their General Plan. This update reflects the increasing size and complexity
of modern geothermal projects and empowers counties that have proactively prepared for geothermal development through planning, environmental documentation, and community engagement."
Arguments in Opposition
This bill is opposed by various labor groups. While the amendments adopted by the author in the Assembly Natural Resources Committee have addressed concerns raised by the State Building and Construction Trades Council and the California State Association of Electrical Workers, who are now in support, it remains unclear whether other labor organizations continue to oppose the measure.
FISCAL COMMENTS
According to the Assembly Committee on Appropriations, this bill is unlikely to result in significant new costs to the CEC, as it does not appear to grant the CEC any authority beyond what is already provided under existing law, as noted above.
VOTES
ASM UTILITIES AND ENERGY: 15-0-3
YES: Petrie-Norris, Patterson, Calderon, Chen, Davies, Mark González, Harabedian, Hart, Irwin, Papan, Schiavo, Schultz, Ta, Wallis, Zbur
ABS, ABST OR NV: Boerner, Kalra, Rogers
ASM NATURAL RESOURCES: 14-0-0
YES: Bryan, Alanis, Connolly, Ellis, Flora, Garcia, Haney, Hoover, Kalra, Muratsuchi, Pellerin, Schultz, Wicks, Zbur
ASM APPROPRIATIONS: 15-0-0
YES: Wicks, Sanchez, Arambula, Calderon, Caloza, Dixon, Elhawary, Fong, Mark González, Hart, Pacheco, Pellerin, Solache, Ta, Tangipa
UPDATED
VERSION: May 6, 2025
CONSULTANT: Lina V. Malova / U. & E. / (916) 319-2083 FN: 0000455
Date of Hearing: May 14, 2025
ASSEMBLY COMMITTEE ON APPROPRIATIONS
Buffy Wicks, Chair
ABPCA Bill Id:AB 1016
Author:(Jeff Gonzalez) – As Amended Ver:May 6, 2025
Policy Committee: | Utilities and Energy | Vote: | 15 - 0 |
Natural Resources | 14 - 0 | ||
|
|
Urgency: No State Mandated Local Program: No Reimbursable: No
SUMMARY:
This bill allows the California Energy Commission (CEC) to delegate to a local government licensing authority for a geothermal power plant.
Specifically, this bill authorizes the CEC to exempt a proposed geothermal powerplant with a generating capacity of up to 150 megawatts (MW) from the powerplant certification chapter of the Warren-Alquist Act. The bill provides that, upon the CEC’s exemption, the local governmental agency that has land use jurisdiction over the site of the proposed powerplant shall be the lead agency for purposes of the California Environmental Quality Act (CEQA) if the site is located in a county that has an approved geothermal element, or a geothermal and renewable element, in the county’s general plan.
The bill also requires all contractors and subcontractors on a proposed powerplant that is eligible for the exemption described above use a skilled and trained workforce and makes related provisions.
FISCAL EFFECT:
This bill is unlikely to result in significant new costs to the CEC because, as described below, the bill does not seem to provide the CEC with authority beyond that which existing law already provides.
COMMENTS:
Existing law—the Warren-Alquist Act—grants the CEC exclusive authority to license thermal powerplants 50 MW and larger, including geothermal powerplants. This exclusive authority notwithstanding, the Warren-Alquist Act allows the CEC to delegate permitting authority for a geothermal powerplant to a local government, upon petition by that government, regardless of the powerplant’s generating capacity. Specifically, section 25540.5 of the Public Resources Code reads, in part:
The commission may, at the petition of a county which has adopted a geothermal element for its general plan, approve an equivalent certification program which delegates to that county full authority for the certification of all geothermal powerplants within such county.
With this section of the Public Resources Code in mind, it is not clear what substantial new authority this bill gives to the CEC. Nonetheless, the author asserts, “By allowing communities to leverage their knowledge of local conditions, AB 1016 significantly reduces project delays, ensuring that clean energy projects can move forward in a timely manner.”
Analysis Prepared by: Jay Dickenson / APPR. / (916) 319-2081
Date of Hearing: May 1, 2025
ASSEMBLY COMMITTEE ON NATURAL RESOURCES
Isaac G. Bryan, Chair
ABPCA Bill Id:AB 1016 (
Author:Jeff Gonzalez) – As Amended Ver:April 24, 2025
SUBJECT: Power facility and site certifications: thermal powerplants: geothermal resources
SUMMARY: Authorizes the California Energy Commission (CEC) to exempt geothermal powerplants up to 150 megawatts (MW) from the powerplant certification chapter of the Warren-Alquist Act, and delegate land use and California Environmental Quality Act (CEQA) review to the county in which the project is located, as specified.
EXISTING LAW:
- CEQA requires lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA. (Public Resources Code (PRC) 21000 et seq.)
- The Warren-Alquist Act grants the CEC exclusive authority to license thermal powerplants 50 MW and larger (including related facilities such as fuel supply lines, water pipelines and electric transmission lines that tie the plant to the grid). The CEC must consult with specified agencies, but the CEC may override any contrary state or local decision. The CEC process is a certified regulatory program (determined by the Resources Secretary to be the functional equivalent of CEQA), so the CEC is exempt from having to prepare an EIR. The certified program, however, does require environmental analysis of the project, including an analysis of alternatives and mitigation measures to minimize any significant adverse effect the project may have on the environment. (PRC 25500 et seq.)
- Authorizes the CEC to exempt thermal powerplants with a generating capacity of up to 100 MW if the CEC finds that no substantial adverse impact on the environment or energy resources will result from the construction or operation of the proposed facility. (PRC 25541)
- AB 205 (Budget Committee), Chapter 61, Statutes of 2022, authorizes additional facilities not subject to the CEC’s thermal powerplant licensing process to “opt-in” to a CEC process for CEQA review until June 30, 2029, in lieu of review by the appropriate local lead agency. These opt-in permitting procedures apply to six categories of energy projects, including a stationary electrical generating powerplant using any source of thermal energy, with a generating capacity of 50 MW or more, excluding any powerplant that burns, uses, or relies on fossil or nuclear fuels;
AB 205 provides the CEC exclusive power to certify the site and related facilities, and provides that the CEC’s approval preempts state, local, or regional authorities, except for the authority of the State Lands Commission to require leases and receive lease revenues, if applicable, or the authority of the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the State Water Resources Control Board, or the applicable regional water quality control boards. (PRC 25545 et seq.)
- SB 149 (Caballero), Chapter 60, Statutes of 2023, establishes procedures for expedited administrative review (i.e., concurrent preparation) and judicial review (i.e., requiring the courts to resolve lawsuits within 270 days, to the extent feasible) for four categories of public and private “infrastructure” projects, including renewable energy generation (excluding resources that combust biomass fuels). (PRC 21189.80 et seq.)
- AB 205 and SB 149 require eligible energy projects to be either “public work” or pay construction workers prevailing wages, as specified, and further require the use of a “skilled and trained” workforce, as defined, for all construction work. (PRC 25545.3.3 and 25545.3.5)
- Defines “geothermal resources” as the natural heat of the earth, the energy, in whatever form, below the surface of the earth present in, resulting from, or created by, or which may be extracted from, such natural heat, and all minerals in solution or other products obtained from naturally heated fluids, brines, associated gases, and steam, in whatever form, found below the surface of the earth, but excluding oil, hydrocarbon gas or other hydrocarbon substances. (Government Code 6903)
THIS BILL:
- Authorizes the CEC to exempt a geothermal powerplant, if all of the following criteria are met:
- A person proposing a geothermal powerplant files an application, on or before June 30, 2029, for certification with the local governmental agency that has land use and related jurisdiction over the area in which the thermal powerplant is located.
- The geothermal powerplant is located in a county that has an approved geothermal element, or a geothermal and renewable element, in the county’s general plan (e.g., Imperial and Siskiyou Counties).
- The geothermal powerplant has a generating capacity of up to 150 MW, or modifications to a thermal powerplant that generates electricity using geothermal resources do not add capacity in excess of 150 MW.
- The local governmental agency finds, after CEQA review, that no substantial adverse impact on the environment or energy resources will result from the construction or operation of the proposed facility or from the modifications to the thermal powerplant.
- Requires, upon the CEC granting an exemption, the local governmental agency to be the lead agency to certify the site and related facility.
- Declares that the bill does not modify the Public Utilities Commission’s jurisdiction for a facility that is proposed by a utility regulated by the Public Utilities Commission.
- Sunsets January 1, 2030.
FISCAL EFFECT: Unknown
COMMENTS:
- Background. Geothermal is a form of renewable energy defined as heat energy from the earth. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth’s surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes. The United States is the world’s largest producer of geothermal electricity and California has the highest geothermal capacity of all states. “The Geysers” geothermal steam field, located within Lake, Mendocino, and Sonoma Counties, contains 349 out of California’s 563 high-temperature geothermal wells within the state. Imperial County (including the Salton Sea) houses 194 of these wells, and the remaining 20 are located in Lassen, Modoc, and Mono Counties. California has installed 2,627 MW of geothermal nameplate capacity—accounting for 72% of the total geothermal plant capacity in the United States.
The CEC has exclusive jurisdiction to review, and ultimately approve or deny, applications to construct and operate thermal powerplants that generate 50 MW or more. For projects that will generate more than 50 MW but less than 100 MW, the CEC may grant the proposed project an exemption from the CEC’s exclusive jurisdiction whereby local permitting entities would obtain jurisdiction over the approval of the site and related facility. The CEC acts as the CEQA lead agency for these projects, and must find that a proposed project would not create a substantial adverse impact on the environment or on energy resources in order to approve the project or grant it a small powerplant exemption (SPPE).
Since the establishment of the SPPE process in the 1980s, the CEC has provided a total of 32 SPPEs, initially mostly for cogeneration projects associated with oil refineries, and more recently for data centers’ backup power generation.
- Author’s statement:
AB 1016 represents a critical step forward in addressing California's clean energy goals while maintaining the integrity of environmental protections. This bill recognizes the importance of local expertise in the decision-making process, empowering local agencies to take an active role in permitting processes. By allowing communities to leverage their knowledge of local conditions, AB 1016 significantly reduces project delays, ensuring that clean energy projects can move forward in a timely manner.
In alignment with the state’s ambitious clean energy goals, AB 1016 ensures that the transition to a clean energy future is both efficient and effective. The bill also upholds stringent environmental protections, ensuring that if development proceeds, it does so with a continued commitment to preserving California's environment. AB 1016 is designed to support economic development by creating opportunities for local jobs and workforce development. By reducing red tape and engaging local expertise, the bill helps to accelerate the deployment of clean energy technologies in ways that benefit all Californians, particularly those in disadvantaged communities.
Overall, AB 1016 is a forward-thinking piece of legislation that balances the need for swift action on clean energy with a commitment to environmental stewardship, and economic growth.
- Recent Imperial County geothermal projects at the CEC. There are three proposed geothermal projects in CEC review now, all proposed by Berkshire Hathaway Energy (BHE) in the Salton Sea area. All three projects recently requested the CEC to suspend consideration of their applications amid reports that the projects have been unable to secure the long-term power purchase agreements necessary to finance, construct, and operate a powerplant.
According to the CEC:
- Black Rock Geothermal Project: The project is on 55 acres of a 160-acre parcel in unincorporated Imperial County and would have a net output of roughly 77 MW. Their application was filed on April 18, 2023. The CEC accepted the application as complete for purposes of starting the certification process on July 26, 2023. CEC staff published their Preliminary Staff Assessment (PSA) on July 11, 2024.
- Elmore North Geothermal Project: The project is on 51 acres of a 140-acre parcel in unincorporated Imperial County and would have a net output of roughly 140 MW. Their application was filed on April 18, 2023. The CEC accepted the application as complete for purposes of starting the certification process on July 26, 2023. CEC staff published their Preliminary Staff Assessment (PSA) on June 13, 2024.
- Morton Bay Geothermal Project: The project is on 63 acres of a 160-acre parcel in unincorporated Imperial County and would have a net output of roughly 140 MW. Their application was filed on April 18, 2023. The CEC accepted the application as complete for purposes of starting the certification process on July 26, 2023. CEC staff published their Preliminary Staff Assessment (PSA) on June 27, 2024.
On January 24, 2025, CEC staff filed a motion to extend the due dates for posting the Final Staff Assessments (FSA), as there was still outstanding critical data and information staff was waiting on to prepare and update its analysis for each of the proposed projects. On January 31, 2025, BHE filed a response that they didn't object to the request to extend the dates for the FSA.
On February 7, 2025, BHE filed a motion requesting orders suspending the CEC proceeding in each of the three proposed projects. BHE cited challenges related to procurement and offtake agreements, transmission interconnection studies, and permitting timelines as the primary bases for requesting suspension. On March 20, 2025, the CEC partially granted the joint motion to suspend the projects.
- Related legislation. AB 531 (Rogers) permits a geothermal powerplant or a geothermal field development project under 50 MW to opt in to the AB 205 process for expedited CEQA review at the CEC. AB 531 passed this committee on April 21 by a vote of 14-0 and is pending in the Appropriations Committee.
- Double referral. This bill was heard in the Utilities and Energy Committee on April 23 and passed by a vote of 15-0.
REGISTERED SUPPORT / OPPOSITION:
Support
County of Imperial (sponsor)
Geothermal Rising
Hudson Ranch Power 1
Imperial Irrigation District
Imperial Valley Economic Development Corporation
Imperial Valley Regional Chamber of Commerce
Independent Energy Producers Association
Ormat Technologies
Rural County Representatives of California
XGS Energy
Opposition
Calfornia-Nevada Conference of Operating Engineers
California State Association of Electrical Workers
California State Council of Laborers
Coalition of California Utility Employees
District Council of Iron Workers of the State of California and Vicinity
International Brotherhood of Boilermakers
State Building and Construction Trades Council
Analysis Prepared by: Lawrence Lingbloom / NAT. RES. /
Date of Hearing: April 23, 2025
ASSEMBLY COMMITTEE ON UTILITIES AND ENERGY
Cottie Petrie-Norris, Chair
ABPCA Bill Id:AB 1016 (
Author:Jeff Gonzalez) – As Amended Ver:March 25, 2025
SUBJECT: Power facility and site certifications: thermal powerplants: geothermal resources
SUMMARY: Requires the California Energy Commission (CEC) to exempt certain geothermal thermal power plants from state certification requirements, as specified, and for the power plants granted this exemption, this bill designates the local land use agency as the lead agency for environmental review under California Environmental Quality Act (CEQA).
Specifically, this bill:
- Requires the CEC to exempt, until January 1, 2030, thermal powerplants that generate electricity using geothermal resources from the certification requirement, if they meet specified criteria, including having a generating capacity of up to 150 megawatts, or undergoing modifications that do not add capacity in excess of 150 megawatts.
- Designates the local governmental agency with land use and related jurisdiction over the area of the proposed site and related facility as the lead agency pursuant to CEQA for any geothermal electricity generation project that the commission exempts from the certification requirement.
EXISTING LAW:
- Establishes and vests the CEC's various responsibilities with respect to developing and implementing the state’s energy policies. (Public Resources Code §§ 25200- 25231)
- Defines a “thermal power plant” as any stationary or floating electrical generating facility with a generating capacity of 50 MW or more using any source of thermal energy, including any facilities related to the power plant. Exempts from the definition facilities related to a geothermal development or production facility, as well as wind, hydroelectric, or solar photovoltaic facilities. (Public Resources Code § 25120)
- Authorizes the CEC with exclusive jurisdiction to certify all thermal power plants and facilities in the state, regardless of whether a facility is a new site or a change or addition to an existing facility. Provides that the certificate issued by the CEC for a power facility serves in lieu of any permit, certificate, or similar authorization required by any local, regional, state, or federal agency to the extent permitted by federal law. (Public Resources Code § 25500)
- Designates the CEC as the lead review agency under the California Environmental Quality Act (CEQA) for projects subject to the CEC’s power plant siting review authority. Requires any other public agency making a decision related to the CEQA review of a power plant that is subject to the CEC’s authority to use the CEC’s certification review as the environmental impact report (EIR) for that decision. (Public Resources Code § 25519)
- Permits the CEC to exempt from certification thermal power plants with a generating capacity of up to 100 megawatts, as well as modifications to existing facilities that do not increase capacity by more than 100 megawatts, provided the commission determines that the project will not have a substantial adverse impact on the environment or energy resources. (Public Resources Code § 25541)
- Establishes an “opt-in” framework for specified clean energy projects to seek consolidated permitting at the CEC by June 30, 2029, if they adhere to specified labor standards, including the use of skilled and trained workforce, and provide community benefits, as specified. Existing law specifies that this consolidated permitting process shall not supersede the authorities of the Lands Commission to require leases and receive lease revenues, if applicable, or the authority of the California Coastal Commission, the San Francisco Bay Conservation and Development Commission, the State Water Resources Control Board, or the applicable regional water quality control boards. Existing law specifies that the following types of facilities are eligible for this consolidated permitting:
- A solar or terrestrial wind facility with a generating capacity of 50 MW or more and associated facilities.
- An energy storage system capable of storing 200 MW or more of energy, as specified.
- A stationary thermal electrical generating power plant, with a generating capacity of 50 MW or more that does not use or rely on fossil or nuclear fuels.
- Certain renewable energy component manufacturing facilities and transmission lines to certain renewable energy facilities. (Public Resources Code § 25545)
- Requires, pursuant to CEQA, lead agencies with the principal responsibility for carrying out or approving a proposed project to prepare a negative declaration, mitigated negative declaration, or environmental impact report (EIR) for this action, unless the project is exempt from CEQA (CEQA includes various statutory exemptions, as well as categorical exemptions in the CEQA guidelines). (Public Resources Code § 21000 et seq.)
- Establishes a framework for providing certain infrastructure projects with expedited judicial review of appeals and litigation related to the CEQA, subject to specified conditions. Existing law limits eligibility for these streamlining provisions to certain energy, transportation, water, and semiconductor projects. Existing law explicitly excludes projects that use hydrogen as a fuel from the list of eligible projects. (Public Resources Code § 21189.80)
- Authorizes the Geologic Energy Management Division (CalGEM) in the Department of Conservation (DOC) to delegate lead agency authority under CEQA for geothermal exploratory projects. (Public Resources Code § 3715.5)
- Provides an expedited judicial review by the California Supreme Court of decisions by the CEC on applications for certification of a power plant or transmission facility. (Public Resources Code § 25531)
FISCAL EFFECT: Unknown. This bill is keyed fiscal and will be referred to the Committee on Appropriations for its review.
CUSTOMER COST IMPACTS: Uncertain. This measure seeks to modify the regulatory requirements for specific geothermal projects in California. While the legislation does not directly address customer costs, its implementation could ultimately impact ratepayer costs.
BACKGROUND:
Geothermal Energy – Geothermal is a form of renewable energy defined as heat energy from the earth. Geothermal resources are reservoirs of hot water that are naturally occurring or are manufactured to operate at varying temperatures and depths below the earth’s surface. Wells, ranging from a few feet to several miles deep, can be drilled into underground reservoirs to tap steam and hot water that can be brought to the surface for use in electricity generation, direct heating, and industrial processes.[1] The United States is the world’s largest producer of geothermal electricity and California has the highest geothermal capacity of all states.[2] “The Geysers” geothermal steam field, located within Lake, Mendocino, and Sonoma Counties, contains 349 out of California’s 563 high-temperature geothermal wells within the state. Imperial County (including the Salton Sea) houses 194 of these wells, and the remaining 20 are located in Lassen, Modoc, and Mono Counties.[3] California has installed 2,627 MW of geothermal nameplate capacity—accounting for 72% of the total geothermal plant capacity in the United States.[4]
Geothermal Procurement Orders. Geothermal energy can supply power even when intermittent resources – such as solar and wind – are offline (such as at night or on cloudy days), and therefore support California in its transition to a 100% clean electricity by 2045 and maintain system reliability. Recognizing the need, California has authorized procurement orders for geothermal energy through various channels:
- Integrated Resource Plan (IRP): The IRP is California’s procurement strategy used by California’s electric providers and the CPUC to ensure the state’s electricity system remains reliable, cost-effective, and aligned with clean energy goals.[5] In February 2024, the CPUC adopted the 2023 Preferred System Plan which estimated that at least 2 GW of geothermal energy is needed to meet the GHG reduction target of 25 million metric tons (MMT) by 2035.[6]
- In June 2021, the CPUC issued a major procurement order – Decision 21-06-035, also known as the Mid-Term Reliability (MTR) requiring utilities to procure 11,597 MW of RPS- eligible resources between 2023 and 2026.[7] Of this quantity, about 1,000 MW of zero-carbon resources such as geothermal energy was ordered[8] with an additional 4,000 MW of net qualifying capacity (NQC) ordered in early 2023[9] following an updated load forecast by the CEC.
- In 2023, the legislature adopted AB 1373 (Chapter 367, Statutes of 2023) which authorized the CPUC through a central procurement mechanism to work with the Department of Water Resources (DWR) to procure long lead-time clean energy resources —such as offshore wind, geothermal, and long-duration storage. This procurement was intended to support the development of long lead time resources necessary to ensure grid reliability while advancing the state’s 100% clean energy goals.[10] The total solicitation cap includes up to 10.6 GW of long lead-time clean energy resources, with 1 GW specifically allocated for geothermal energy.[11]
These procurement orders reflect California’s progress and growing intention to expand geothermal energy generation. However, geothermal energy struggles to scale in-state primarily due to its high capital costs and extended permitting timelines. Many geothermal developers opt to construct projects outside of California and contract with California’s LSEs to meet the above procurement obligations. Fervo Energy, a company focused on harnessing heat energy through enhanced geothermal systems, is currently developing a 400 MW geothermal plant in Cape Station, Utah, and has already secured two power purchase agreements (PPAs) totaling 320 MW with Southern California Edison (SCE). As discussed above, the procurement orders require LSEs to procure a specified amount of geothermal energy as part of their long-term resource planning obligations. These existing procurement orders suggest that the limitation to in-state geothermal development is not for want of procurement direction.
Application for Certification (AFC) – Enacted in 1974, the Warren-Alquist Act, established the CEC as the state's primary energy policy and planning agency.[12] One of its key provisions is to grant the CEC the exclusive authority to license and certify thermal power plants with a generating capacity of 50 megawatts or more.[13] This approval process, known as the Application for Certification (AFC), a certified regulatory program under the California Environmental Quality Act (CEQA), ensures that proposed power plants meet environmental, public health, and safety standards while aligning with California’s broader energy and environmental policies. The AFC process involves rigorous evaluation, including environmental impact assessments, public participation, and coordination with local, state, and federal agencies to ensure responsible energy development. The thermal plants covered by the act include:
- Natural gas-fired power plants (including combined-cycle and peaking plants)
- Geothermal plants
- Solar thermal power plants (e.g., concentrated solar power or CSP plants)
- Biomass or biogas facilities (waste-to-energy plants)
For thermal power plants generating less than 50 MW, the CEC's certification is not required, and local permitting agencies typically the county or city government with jurisdiction over the project site—retain permitting authority these power plants.
Small Power Plant Exemptions (SPPE) – The CEC has exclusive jurisdiction to review, and ultimately approve or deny, applications to construct and operate thermal power plants[14] that generate 50 MW or more, as provided under the Warren-Alquist Act.[15] However, for projects that can generate more than 50 MW but less than 100 MW, developers may apply for a Small power plant exemptions (SPPE). As the lead agency under CEQA, the CEC determines that the proposed project would not create a substantial adverse impact on the environment or energy resources, it may grant this exemption. Upon granting an SPPE, the local land use agency—typically the county or city government with jurisdiction over the project site—assumes permitting authority for the project.[16] If the application for the SPPE is denied, the project applicant would be required to file an application for power plant certification with the CEC.
Opt-in Certification Program – AB 205 (Assembly Committee on Budget, Chapter 61, Statutes of 2022) expanded the CEC authority to oversee the streamlined permitting of certain clean and renewable energy facilities through an opt-in certification program until June 30, 2029.[17] This program allows the following eligible projects to undergo a consolidated state-level review, similar to, but distinct from, the AFC.[18]
- Solar photovoltaic or terrestrial wind power plants with a generating capacity of 50 megawatts or more
- Energy storage systems capable of storing 200 megawatt hours or more of electrical energy
- Any stationary power plant using any source of thermal energy, excluding fossil or nuclear fuels, 50 MW or greater
- Specified facilities that cost at least $250 million and are for the manufacturing, production, or assembly of an energy storage system
- Electric transmission lines carrying electric power from a facility described the above generating and storage facilities
- Hydrogen production facilities (not derived from fossil fuel feedstock) and associated onsite storage and processing facilities
Under the AB 205 process, the CEC serves as the lead agency for the California Environmental Quality Act (CEQA) review, conducting a comprehensive environmental assessment equivalent to an Environmental Impact Report (EIR). This consolidated permitting process aims to complete the environmental review and reach a certification decision within 270 of determining that an application is complete, subject to specified exceptions. [19] Additionally, the program mandates the CEC to carry out ongoing public participation and tribal consultation through engagement with local communities and California Native American tribes.[20] Within five days of deeming an application complete, the CEC must invite California Native American tribes to engage in consultation. A public scoping meeting is required within 30 days, and a draft EIR is released by day 150, followed by a public meeting and a 60-day public comment period. To obtain certification, applicants must demonstrate that the project will provide a net positive economic benefit to the local community. This includes requirements to: enter into a community benefits agreement, ensure payment of prevailing wages, and use of a skilled and trained workforce for construction.[21] As such, if a developer submits an application, a certification issued by the CEC under AB 205 serves in lieu of most other state, local, or regional permits, thereby streamlining the overall approval process. Consistent with the existing requirements in the Warren-Alquist Act, local governments may participate in the process but they do not retain primary land use authority over the application once it is under CEC jurisdiction.
Permitting Challenges – Geothermal projects in California must comply with both federal and state-level environmental regulations, specifically the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).
- NEPA- If a geothermal project involves federal land, or requires federal permits, it is subject to NEPA. Under NEPA, federal agencies must assess the environmental impacts of a project. Depending on the project’s potential effects, developers must complete either an Environmental Assessment (EA) or a more comprehensive Environmental Impact Statement (EIS), which can significantly extend approval timelines.
- CEQA- Geothermal projects in California are also subject to CEQA which mandates state and local agencies to identify and mitigate significant environmental impacts of proposed projects. If a project is found to have substantial environmental effects, developers must prepare an Environmental Impact Report (EIR), outlining potential risks and mitigation strategies. The California Department of Conservation’s Geologic Energy Management Division (CalGEM) oversees compliance with CEQA for geothermal projects, ensuring responsible resource development. However, AB 1359 (Papan, Chapter 678, Statutes of 2024) permits project applicants to request that the county where the project is located assume the lead agency role, regardless of whether the county has adopted a geothermal element in its general plan. While regulatory requirements, are essential for environmental protection, they have been reported to prolong permitting timelines and hence increasing projects costs, making geothermal project development in California particularly challenging.[22]
Geothermal Element – These are optional components that counties can incorporate into their general plans to guide the development of geothermal resources within their jurisdictions.[23] For instance, Imperial County has adopted a Renewable Energy & Transmission Element in its general plan, which includes comprehensive policies and frameworks for the development of geothermal energy, among other renewable resources.[24] This element serves as a foundational guide for the review and approval of renewable projects in the county. Similarly, Siskiyou County has adopted a Geothermal Element in its general plan, emphasizing the county's approach to managing geothermal resources responsibly.[25] The element outlines policies and objectives related to geothermal development, ensuring that such activities align with the county's land use goals and environmental considerations.
COMMENTS:
- Author’s Statement. According to the author, "Imperial County and other regions with rich geothermal resources have proven for decades that they are capable of responsibly permitting and managing clean energy development. AB 1016 empowers these local governments—who have invested in planning, community engagement and environmental stewardship—to lead the way in building the clean energy infrastructure California urgently needs. By streamlining the permitting process for geothermal projects up to 150 megawatts, this bill reduces bureaucratic delays, speeds up project delivery, and ensures that local voices are central in decisions that directly impact their communities. AB 1016 is not only about efficiency—it’s about equity. It gives local jurisdictions the tools they need to create jobs, attract investment and advance the state’s clean energy goals from the ground up. This is how we accelerate our climate progress and bring tangible benefits to regions like Imperial County that are ready to lead.”
- California’s “Lithium Valley.” Lithium is critical[26] to the clean energy transition and national security of the United States, serving as a key component in batteries that power electric vehicles, renewable energy storage systems, and military equipment (radios, sensors, GPS units). Globally, majority of lithium production occurs in Australia, South America, and Asia with China dominating in the downstream supply chain, including processing, refining, and battery manufacturing. As of 2023, the United States accounted for less than 2% of global lithium supply, with production concentrated in Nevada.[27] However, California’s, “Lithium Valley”— the Salton Sea Geothermal Resource Area, in Imperial County— has an existing geothermal capacity of 400MW (as of 2023) and is home to one of the world’s largest and most environmentally sustainable lithium reserves.[28]According to an analysis by the Department of Energy’s (DOE’s) Lawrence Berkeley National Laboratory (Berkeley Lab), the Salton Sea region could contain more than 3,400 kilotons of lithium—enough to support the production of over 375 million electric vehicle batteries.[29] In recent years, some companies have developed technologies to sustainably extract lithium directly from geothermal brines, avoiding the environmental impacts associated with traditional mining methods.
- Conflicting Directives. Under this measure, the local agency assumes the role of lead agency under CEQA for qualifying geothermal projects; current law grants this authority exclusively to the CEC. AB 531 (Rogers, 2025) has the opposite approach, but for geothermal projects below 50 MW. That measure allows geothermal projects below 50 MW to be permitted by the CEC, and makes the CEC lead agency under CEQA, should a developer choose to file their application with the CEC (the AB 205 Opt-in process, mentioned above). Currently law exempts CEC review of these projects, and local permitting agencies typically the county or city government with jurisdiction over the project site—retain permitting authority of these power plants.
Additionally, AB 205 seeks to centralize permitting under the CEC for faster approvals, ensuring a consistent state-led process. This measure requires the CEC to exempt larger geothermal power plants from its certification process if they meet specific criteria. This action would decentralize permitting for these specified geothermal plants by mandating local oversight, which contradicts the intent of AB 205 to consolidate clean energy project approvals at the state level.
Specifically, this bill requires the CEC to exempt certain geothermal power plants from its certification process, provided they meet the following criteria:
- Location: The facility must be situated in a county with an approved geothermal or geothermal and renewable element in its general plan.
- Capacity: The plant's generating capacity should not exceed 150 MW, or any modifications should not increase capacity beyond this limit.
- Permitting Authority: The local governmental agency with jurisdiction must determine, after conducting an environmental review under the CEQA, that the project will not have a substantial adverse impact on the environment or energy resources.
The author contends that counties are prohibited from permitting geothermal projects with a generating capacity above 50 MW—a threshold that does not reflect the scale of development needed to meet California’s clean energy goals. The proposed change could help address the lengthy permitting timelines that often occur under the current-state level review process. Therefore, this measure expands local authority by allowing counties that have adopted a geothermal element in their general plans to permit geothermal power plants up to 150 MW—tripling the current threshold. As such, the local agency assumes the role of the lead agency for CEQA purposes, instead of the CEC.
This shift may or may not speed up the permitting process, depending on the resources and expertise that a local agency has on permitting geothermal power plants. The CEC has expertise on navigating the permitting process for thermal powerplants, including potentially coordinating with CalGEM or dovetailing CEQA with NEPA as required. The CEC also has specialized expertise in assessing the impacts of proposed energy facilities on grid reliability, and their alignment with California’s climate and energy goals. In contrast, local agencies may lack the necessary capacity and resources to conduct robust project reviews. Moreover, other bills this committee has considered seek to grant the CEC more – not less – authority to permit geothermal projects. Given these conflicting directives, the committee recommends amendments that delete language limiting CEC authority and instead include provisions that permit the CEC to retain certification authority for these specified geothermal facilities, but only in circumstances where the applicant chooses to file with the CEC. This approach provides geothermal developers with the discretion to pursue permitting either at the local level or state-level certification through the CEC; a similar process adopted under AB 205.
- Related legislation.
AB 526 (Papan) would require the California Energy Commission (CEC) in coordination with other relevant state, federal and local agencies to develop a strategic plan for the development of new in-state geothermal energy in California. Status: Assembly Natural Resources Committee
AB 527 (Papan) would allow geothermal exploratory projects that meet the same environmental standards, as determined by the lead agency overseeing the project, to be considered compliant with California Environmental Quality Act (CEQA). Status: Assembly Natural Resources Committee
AB 531 (Rogers) would expand the types of facilities eligible for certification as environmental leadership development projects by the California Energy Commission (CEC) to include geothermal power plants and geothermal field development projects, as defined. Status: Assembly Natural Resources Committee
- Prior Legislation.
AB 1359 (Papan), authorizes the Geologic Energy Management Division (CalGEM) in the Department of Conservation (DOC) to delegate lead agency authority under the California Environmental Quality Act (CEQA) for geothermal exploratory projects, as provided. Status: Chaptered by Secretary of State - Chapter 678, Statutes of 2024.
AB 1373 (Garcia), authorizes the Department of Water Resources (DWR) to serve as a central procurement entity to procure energy resources to include offshore wind, long-duration storage, and geothermal in order to help the state meet its renewable and zero-carbon energy resources and reliability goals. Status: Chaptered by Secretary of State - Chapter 367, Statutes of 2023.
AB 205 (Committee on Budget), among its many provisions, established the SRR at DWR to fund procurement of backstop resources to provide reliability to CAISO’s grid. Status: Chapter 61, Statutes of 2022.
AB 1161 (E. Garcia, 2021) would have required DWR to procure newly developed eligible renewable energy resources or zero-carbon resources, and energy storage associated with those resources, in an amount that satisfies 100% of the electricity procured to serve all state agencies by December 31, 2030. Status: Died – Assembly Committee on Utilities and Energy.
SB 423 (Stern) requires the CEC to submit to the Legislature an assessment by December 31, 2023, of firm zero-carbon resources that support a clean, reliable, and resilient electrical grid and will help achieve the existing statutory goal of ensuring renewable energy and zero-carbon resources supply 100 percent of all retail sales of electricity to California customers by December 31, 2045. Status: Chapter 243, Statutes of 2021.
AB 56 (E. Garcia, 2019) would have required the CPUC to empower the CAEATFA to undertake backstop procurement of electricity that would otherwise be performed by an electrical corporation to meet state resource adequacy, integrated resource planning, and renewable portfolio standard goals not satisfied by retail sellers or load-serving entities. Status: Died – Senate Committee on Energy, Utilities, and Communications.
SB 350 (De León), among its many provisions, requires the CPUC to adopt a process for each LSE to file an IRP starting in 2017 and updating periodically. Additionally requires POUs to file an IRP by January 1, 2019. Status: Chapter 547, Statutes of 2015.
SB 100 (De León) established the 100 Percent Clean Energy Act of 2018 which increases the RPS requirement from 50% by 2030 to 60%, and creates the policy of planning to meet all of the state's retail electricity supply with a mix of RPS-eligible and zero-carbon resources by December 31, 2045, for a total of 100% clean energy. Status: Chapter 312, Statutes of 2018.
Double Referral. This bill is double-referred; upon passage in this Committee, this bill will be referred
REGISTERED SUPPORT / OPPOSITION:
Support
County of Imperial
Geothermal Rising
Hudson Ranch Power 1 LLC
Imperial Irrigation District
Imperial Valley Regional Chamber of Commerce
Independent Energy Producers Association
Ivedc
Ormat Technologies, INC.
Rural County Representatives of California (RCRC)
Xgs Energy
Oppose
Calfornia-nevada Conference of Operating Engineers
California State Council of Laborers
District Council of Iron Workers of the State of California and Vicinity
International Brotherhood of Boilermakers
State Building and Construction Trades Council
Analysis Prepared by: Lina V. Malova / U. & E. / (916) 319-2083
Pg. 16; SB 423 Report “Emerging Renewable and Firm Zero-Carbon Resources”; December 2024 ↑
Pg. ii; “California Energy Commission, California Department of Conservation, California Geologic Energy Management Division (CalGEM), “Assessing California’s Population of Low-Temperature Geothermal Wells for Plugging and Abandonment” September 2023 ↑
Pg. E-2; “SB 423 Emerging Renewable and Firm Zero-Carbon Resources”; December 2024 ↑
Robins, Jody C., Amanda Kolker, Francisco Flores-Espino, Will Pettitt, Brian Schmidt, Koenraad Beckers,
Hannah Pauling et al. 2021. U.S. Geothermal Power Production and District Heating Market Report.
https://www.nrel.gov/docs/fy21osti/78291.pdf ↑
Integrated Resource Plan, https://www.cpuc.ca.gov/irp/ ↑
Pg. 68; CPUC ; Decision 24-02-047; February 15, 2024 ↑
Page 25, CPUC; Decision 21-06-035; June 24, 2021 ↑
https://fervoenergy.com/fervo-energy-announces-320-mw-power-purchase-agreements-with-southern-california-edison/, June 25, 2024 ↑
COUC, CPUC Augments Historic Clean Energy Procurement Goals To Ensure Electric Reliability”; https://www.cpuc.ca.gov/news-and-updates/all-news/cpuc-augments-historic-clean-energy-procurement-goals-to-ensure-electric-reliability-2023, February 23, 2023; Accessed April 12, 2025 ↑
https://legiscan.com/CA/text/AB1373/id/2815509, Bill text CA AB1373, 2023-2024, LegiScan ↑
Bernier P. et al, CPUC Authorizes Procurement of 10.6 GW of Clean Energy Resources under AB 1373, https://www.mayerbrown.com/en/insights/publications/2024/08/cpuc-authorizes-procurement-of-106-gw-of-clean-energy-resources-under-ab-1373
CEC; “About”; https://www.energy.ca.gov/about; Accessed April 12, 2025 ↑
CEC; “Power Plant Licensing”; https://www.energy.ca.gov/programs-and-topics/topics/power-plants/power-plant licensing#:~:text=The%20California%20Energy%20Commission%20(CEC,of%20Water%20Resources%20energy%20facilities. Accessed April 12, 2025 ↑
And related facilities, such as transmission to and from the power plant ↑
Public Resources Code § 25500 ↑
Public Resources Code § 25541 ↑
Opt-In Certification Program, California Energy Commission, https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program ↑
Ibid ↑
Ibid ↑
Opt-In Certification Program Fact Sheet, California Energy Commission, https://www.energy.ca.gov/sites/default/files/2024-06/Opt-In_Certification_Fact_Sheet_ada.pdf ↑
Ibid ↑
E-6; California Energy Commission; “Report: SB 423 Emerging Renewable Firm and Firm Zero-Carbon Resources Report”, December 2024 ↑
Government Code § 65303 ↑
Imperial County; “Renewable Energy & Transmission Element”; https://www.icpds.com/planning/land-use-documents/general-plan/renewable-energy-and-transmission-element?utm_source=chatgpt.com; Accessed April 12, 2025. ↑
Geothermal Element; “To the Siskiyou County General Plan”; May 1984 ↑
Critical minerals provide the building blocks for many modern technologies and are essential to our national security and economic prosperity. These minerals—such as rare earth elements, lithium, and cobalt—can be found in products from computers to household appliances. They are also key inputs in clean energy technologies like batteries, electric vehicles, wind turbines, and solar panels. As the world transitions to a clean energy economy, global demand for these critical minerals is set to skyrocket by 400-600 percent over the next several decades, and, for minerals such as lithium and graphite used in electric vehicle (EV) batteries, demand will increase by even more—as much as 4,000 percent. ↑
Center on Global Energy Policy at Columbia; “ Lithium Supply in the Energy Transition”; December 2023 ↑
Department of Energy Fact Sheet; “Improved Quantification of Lithium Resources in the Salton Sea Region”; November 2023; Accessed April 12, 2025. ↑
Discussed in Hearing
Assembly Floor
Assembly Standing Committee on Natural Resources
Assembly Standing Committee on Utilities and Energy
Bill Author
Bill Co-Author(s):